@seedtactics/insight-client 17.0.4 → 17.0.6
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/dist/assets/{index-B0B_a7c8.js → index-BqTNkPt2.js} +1 -1
- package/dist/components/station-monitor/StationToolbar.js +2 -1
- package/dist/index.html +1 -1
- package/docs/client-efficiency.md +158 -291
- package/docs/client-engineering.md +29 -36
- package/docs/client-launch.md +35 -34
- package/docs/client-operations.md +40 -61
- package/docs/client-quality.md +32 -47
- package/docs/client-sales.md +22 -39
- package/docs/client-scanners.md +21 -27
- package/docs/client-station-monitor.md +75 -100
- package/docs/client-tools-programs.md +30 -59
- package/docs/improve-fms.md +55 -121
- package/docs/makino.md +10 -11
- package/docs/material-quarantine.md +40 -54
- package/docs/material-tracking.md +65 -183
- package/docs/mazak.md +31 -49
- package/docs/niigata.md +61 -89
- package/docs/operator-procedures.md +83 -96
- package/docs/part-instructions.md +43 -57
- package/docs/screenshots/insight-analysis-pallets.png +0 -0
- package/docs/screenshots/insight-analysis-part-completed.png +0 -0
- package/docs/screenshots/insight-analysis-sankey.png +0 -0
- package/docs/screenshots/insight-analysis-station-oee.png +0 -0
- package/docs/screenshots/insight-basket-work.png +0 -0
- package/docs/screenshots/insight-buffer-occupancy.png +0 -0
- package/docs/screenshots/insight-closeout.png +0 -0
- package/docs/screenshots/insight-cost-percentages.png +0 -0
- package/docs/screenshots/insight-dashboard.png +0 -0
- package/docs/screenshots/insight-inspection.png +0 -0
- package/docs/screenshots/insight-load-station-details.png +0 -0
- package/docs/screenshots/insight-load-station.png +0 -0
- package/docs/screenshots/insight-loadcycle-graph.png +0 -0
- package/docs/screenshots/insight-machinecycle-graph.png +0 -0
- package/docs/screenshots/insight-machinecycle-table.png +0 -0
- package/docs/screenshots/insight-machinecycles.png +0 -0
- package/docs/screenshots/insight-machinehours.png +0 -0
- package/docs/screenshots/insight-machineoutliers.png +0 -0
- package/docs/screenshots/insight-monthly-schedules.png +0 -0
- package/docs/screenshots/insight-operations-material.png +0 -0
- package/docs/screenshots/insight-operations-overview.png +0 -0
- package/docs/screenshots/insight-operations-reports.png +0 -0
- package/docs/screenshots/insight-part-cost.png +0 -0
- package/docs/screenshots/insight-program-report.png +0 -0
- package/docs/screenshots/insight-quality-material-details.png +0 -0
- package/docs/screenshots/insight-quality-material.png +0 -0
- package/docs/screenshots/insight-quality-sankey.png +0 -0
- package/docs/screenshots/insight-quality-similar-paths.png +0 -0
- package/docs/screenshots/insight-quarantine.png +0 -0
- package/docs/screenshots/insight-queue-details.png +0 -0
- package/docs/screenshots/insight-queues-jobs-table.png +0 -0
- package/docs/screenshots/insight-queues.png +0 -0
- package/docs/screenshots/insight-sim-day-usage.png +0 -0
- package/docs/screenshots/insight-system-overview.png +0 -0
- package/docs/screenshots/insight-tool-replacements.png +0 -0
- package/docs/screenshots/insight-tool-report.png +0 -0
- package/docs/screenshots/insight-workorder-gantt.png +0 -0
- package/docs/screenshots/insight-workorders.png +0 -0
- package/docs/security.md +98 -131
- package/docs/server-config.md +39 -22
- package/docs/server-errors.md +26 -18
- package/package.json +1 -1
- package/docs/screenshots/insight-all-material.png +0 -0
- package/docs/screenshots/insight-choose-analysis-month.png +0 -0
- package/docs/screenshots/insight-loadstation-small.jpg +0 -0
- package/docs/screenshots/insight-quality-quarantine.png +0 -0
- package/docs/screenshots/insight-station-system-overview-buttons.png +0 -0
- package/docs/screenshots/insight-station-system-overview.png +0 -0
- package/docs/screenshots/insight-toolbar-btns.png +0 -0
|
@@ -2,68 +2,54 @@
|
|
|
2
2
|
title: Material Quarantine
|
|
3
3
|
nav: Procedures > Material Quarantine
|
|
4
4
|
description: >-
|
|
5
|
-
|
|
6
|
-
|
|
5
|
+
Track material set aside for inspection, rework, or a disposition decision, and return it to
|
|
6
|
+
production when it is ready.
|
|
7
7
|
---
|
|
8
8
|
|
|
9
|
-
|
|
9
|
+
Quarantine is an optional part of [material tracking](/fms-insight/material-tracking). It keeps
|
|
10
|
+
material that cannot follow the normal production flow visible while someone decides what should
|
|
11
|
+
happen next. Typical reasons include further inspection, rework, or waiting for an engineering
|
|
12
|
+
decision.
|
|
10
13
|
|
|
11
|
-
|
|
12
|
-
removed from the cell for re-machining, more detailed inspection, or some other rework. FMS Insight
|
|
13
|
-
displays all the material currently on hold, allows a supervisor/manager to update the status of
|
|
14
|
-
quarantined material, and finally allows the material to be re-introduced to the cell or scrapped.
|
|
14
|
+
## Queues for Material on Hold
|
|
15
15
|
|
|
16
|
-
The
|
|
17
|
-
|
|
18
|
-
|
|
19
|
-
These are the "active" whiteboard regions and contain material which is flowing through the normal
|
|
20
|
-
workflow. FMS Insight keeps these whiteboard regions updated automatically by recording the log of
|
|
21
|
-
automated cell activity. In the [server configuration](server-config), FMS Insight allows you to
|
|
22
|
-
define a list of Queues and this list of queues must contain a queue for each "active" in-process
|
|
23
|
-
queue defined in the flexibility plan and used to hold material in the normal workflow. Any queue
|
|
24
|
-
which is listed inside the flexibility plan is treated by FMS Insight as an "active" queue.
|
|
16
|
+
The installation defines queues for production and for material on hold. These are regions on the
|
|
17
|
+
virtual whiteboard: each queue should have a clear physical meaning and someone responsible for
|
|
18
|
+
keeping it accurate. Queue roles supplied by the integration determine how the pages use them.
|
|
25
19
|
|
|
26
|
-
|
|
27
|
-
|
|
28
|
-
|
|
29
|
-
|
|
30
|
-
quarantined material queue and FMS Insight will not update the queue automatically. Instead a
|
|
31
|
-
supervisor, manager, or engineer can manually move material between the various quarantined material
|
|
32
|
-
queues to assist with tracking the material. The material can also be moved back into an "active"
|
|
33
|
-
queue to reintroduce it into the cell or removed completely if scrapped.
|
|
20
|
+
The configured initial quarantine queue receives material when it is quarantined. Additional queues
|
|
21
|
+
can describe the next action, such as waiting for inspection or undergoing rework. There is no need
|
|
22
|
+
for a separate queue for every possible problem; choose enough to show who needs to act and where
|
|
23
|
+
the material is.
|
|
34
24
|
|
|
35
|
-
|
|
36
|
-
webpages allow supervisors, quality engineers and others to manually move material between the
|
|
37
|
-
various quarantined queues, view all the material, add notes, re-introduce material to "active"
|
|
38
|
-
queues, or scrap material. In addition, the [server configuration](server-config) contains a setting
|
|
39
|
-
_QuarantineQueue_ for the initial quarantine queue. Direct quarantine moves material that is waiting
|
|
40
|
-
in a queue into this configured queue. A quarantine signal instead records a request for the backend
|
|
41
|
-
to handle material when it leaves automation control; it does not immediately move material or
|
|
42
|
-
cancel a load. The [operator procedures](operator-procedures#quarantine-material) explain this
|
|
43
|
-
distinction. The available actions depend on the installation and the material's current state.
|
|
25
|
+

|
|
44
26
|
|
|
45
|
-
|
|
46
|
-
|
|
27
|
+
The [Operations Material page](/fms-insight/client-operations#material) and the
|
|
28
|
+
[Quality Quarantine page](/fms-insight/client-quality#quarantine-material) show material on hold.
|
|
29
|
+
Open a card to review its history or add a note. Where permitted, drag the handle on the card to
|
|
30
|
+
move it between quarantine queues. Use the
|
|
31
|
+
[Queues station page](/fms-insight/client-station-monitor#queues) for changes to production queues.
|
|
47
32
|
|
|
48
|
-
|
|
49
|
-
removes material from a pallet/load station/inspection stand/etc. the material is initially moved
|
|
50
|
-
into this queue to get it out of the "active" queues and allows the operator to continue with
|
|
51
|
-
normal operations. A supervisor/manager should then decide what is to be done with this material
|
|
52
|
-
and move it into a more specific quarantined material queue. The _Initial Quarantine_ queue acts
|
|
53
|
-
similarly to the TODO column on the task board. Most of the time the _Initial Quarantine_ queue
|
|
54
|
-
should be empty; if there is anything in the _Initial Quarantine_ queue, it signals to the
|
|
55
|
-
supervisor that a decision on the material is required and once that decision is made, the
|
|
56
|
-
material is moved to a more specific quarantine queue, emptying the _Initial Quarantine_ queue.
|
|
33
|
+
## Putting Material on Hold
|
|
57
34
|
|
|
58
|
-
|
|
59
|
-
|
|
60
|
-
_Waiting for Customer Inspection_, etc. FMS Insight allows notes to be attached to each piece of
|
|
61
|
-
material, so you can keep a log or status on each piece of material. Material can move between one
|
|
62
|
-
or more of these queues while it is quarantined.
|
|
35
|
+
Direct quarantine moves material that is waiting in a queue into the initial quarantine queue.
|
|
36
|
+
Material already involved in station work or under automation control cannot be moved this way.
|
|
63
37
|
|
|
64
|
-
|
|
65
|
-
|
|
66
|
-
|
|
67
|
-
|
|
38
|
+
A quarantine signal is a request for the integration to handle material when it leaves automation
|
|
39
|
+
control. It does not immediately move a card, physically remove a part, or cancel a load. The
|
|
40
|
+
available actions and when a signal takes effect depend on the installation. Follow its procedure
|
|
41
|
+
and check the resulting queue and material status. See the
|
|
42
|
+
[operator procedures](/fms-insight/operator-procedures#quarantine-material) for the distinction
|
|
43
|
+
between signaling, moving, and cancelling work.
|
|
68
44
|
|
|
69
|
-
|
|
45
|
+
## Returning or Disposing of Material
|
|
46
|
+
|
|
47
|
+
Before returning material to production, bring it to the intended location and review the recorded
|
|
48
|
+
part, job, completed processes, and next operation. Then scan or enter its serial on the Queues page
|
|
49
|
+
and add it to the appropriate production queue. If a recorded process must first be corrected,
|
|
50
|
+
follow the [misload recovery procedure](/fms-insight/operator-procedures#recovering-from-misload).
|
|
51
|
+
|
|
52
|
+
If material will not return, record the disposition using the installation's procedure and remove it
|
|
53
|
+
from the queue. Queue removal means that Insight no longer lists it at that location; it does not
|
|
54
|
+
erase the history or by itself record a scrap decision. Notes can preserve the reason and reference
|
|
55
|
+
any associated quality records.
|
|
@@ -2,202 +2,84 @@
|
|
|
2
2
|
title: Material Tracking
|
|
3
3
|
nav: Procedures > Material Tracking
|
|
4
4
|
description: >-
|
|
5
|
-
|
|
6
|
-
|
|
7
|
-
material.
|
|
5
|
+
Keep a shared view of material on the shop floor and connect each piece to its production history,
|
|
6
|
+
inspections, and workorder.
|
|
8
7
|
---
|
|
9
8
|
|
|
10
|
-
|
|
9
|
+
Material tracking connects the physical parts on the shop floor with their production records. It
|
|
10
|
+
helps operators identify what to load, gives inspectors the history of the piece in front of them,
|
|
11
|
+
and keeps material visible through manual work between automated operations. Where serials and
|
|
12
|
+
workorders are used, that record also supports traceability after material leaves the cell.
|
|
11
13
|
|
|
12
|
-
|
|
13
|
-
|
|
14
|
-
|
|
14
|
+
The central requirement is that the computer's view agrees with reality. Normal handling should be
|
|
15
|
+
straightforward, and there must be a clear way to reconcile the record when a part is removed,
|
|
16
|
+
reworked, or loaded differently than expected.
|
|
15
17
|
|
|
16
|
-
|
|
17
|
-
what material is available, the status of all the in-process material, and load/unload
|
|
18
|
-
instructions.
|
|
19
|
-
|
|
20
|
-
2. Increase quality by allow the inspection operator to learn the history of the exact piece of
|
|
21
|
-
material under test (the pallet, machine, program, date and time, etc.).
|
|
22
|
-
|
|
23
|
-
3. Track unloaded material through manual processes such as final wash or any in-process work
|
|
24
|
-
between automated machine cycles.
|
|
25
|
-
|
|
26
|
-
4. Properly fill workorders, ensuring that all produced material is assigned to a workorder and that
|
|
27
|
-
enough material is produced to fill workorders on time.
|
|
28
|
-
|
|
29
|
-
5. Make it as easy as possible for the operators to keep the data in the computers matching the
|
|
30
|
-
reality of the material on the shop floor.
|
|
31
|
-
|
|
32
|
-
6. When the data in the computers no longer matches the reality on the shop floor, provide an easy
|
|
33
|
-
way of rectifying this situation by updating the data in the computers.
|
|
34
|
-
|
|
35
|
-
7. Provide long-term tracking and part identification for downstream customers.
|
|
18
|
+
## Sticky Notes
|
|
36
19
|
|
|
37
|
-
|
|
38
|
-
|
|
20
|
+
Imagine a whiteboard divided into regions for the places where material can be: pallets, transfer
|
|
21
|
+
stands, raw material queues, inspection areas, and material on hold. Give each piece of material a
|
|
22
|
+
sticky note with its part name and serial. Write its history on the back. As the piece moves around
|
|
23
|
+
the factory, move its note to the corresponding region.
|
|
39
24
|
|
|
40
|
-
|
|
25
|
+
For example, when a part is unloaded after its first process, move its note from the pallet to the
|
|
26
|
+
transfer stand. When the part is loaded for its next process, move the note onto that pallet. Anyone
|
|
27
|
+
can compare the whiteboard with the shop floor to see what is available and what needs attention.
|
|
41
28
|
|
|
42
|
-
|
|
43
|
-
|
|
44
|
-
pallet, a region for each in-process transfer stand, a region for material waiting to be inspected,
|
|
45
|
-
a region for material waiting to be washed, a region for in-process queues and conveyors, a region
|
|
46
|
-
for castings, a region for material sent out of the factory for external work, and so on. Any place
|
|
47
|
-
that material could be has a corresponding region on the whiteboard.
|
|
48
|
-
|
|
49
|
-
Now for each piece of material, a new sticky note is used. The part name and serial is written on
|
|
50
|
-
the sticky note and on the back is written a log of activity. At the start of the process, a new
|
|
51
|
-
sticky note is created and placed on the whiteboard. As the process unfolds, the sticky note moves
|
|
52
|
-
around on the whiteboard corresponding to the material moving around the factory floor.
|
|
53
|
-
|
|
54
|
-
For example, a part just completed process 1 and is waiting on pallet 6 at the load station to be
|
|
55
|
-
unloaded into the transfer stand. The sticky note for the material is currently on the whiteboard in
|
|
56
|
-
the region for pallet 6. As part of the unload operation, the sticky note is moved on the whiteboard
|
|
57
|
-
from the pallet 6 region to the transfer-stand region. (Also, if any material is loaded, its
|
|
58
|
-
corresponding sticky note is moved into the pallet 6 region.) The fact that there is a sticky note
|
|
59
|
-
existing in the transfer stand position on the whiteboard signals to the operators that the pallet
|
|
60
|
-
for the second operation should be brought to the load station. When the pallet for the second
|
|
61
|
-
operation arrives and the material is loaded, the sticky note will then move from the whiteboard
|
|
62
|
-
region for the transfer-stand to the region of the whiteboard for the pallet.
|
|
63
|
-
|
|
64
|
-
This whiteboard of sticky notes has several great features:
|
|
65
|
-
|
|
66
|
-
- By centralizing all material on a single whiteboard, it is easy to visualize the entire process
|
|
67
|
-
and make decisions about what actions to take (what material is available for loading, what
|
|
68
|
-
material needs to be inspected, what material to wash and assign to a workorder, etc.).
|
|
69
|
-
|
|
70
|
-
- Operators can at a glance determine if the whiteboard matches the reality on the factory floor. If
|
|
71
|
-
there is a mismatch, the sticky notes can be moved so that the whiteboard matches reality.
|
|
72
|
-
|
|
73
|
-
- Operators at a single station can focus only on a section of the whiteboard to carry out their
|
|
74
|
-
tasks. For example, at the wash station, only the section of the whiteboard corresponding to the
|
|
75
|
-
wash stand is relevant.
|
|
76
|
-
|
|
77
|
-
- It is straightforward to accommodate all sorts of material tasks both inside and outside of
|
|
78
|
-
automation. For example, if a part must be quarantined as potential scrap, its sticky note can be
|
|
79
|
-
set on the side of the whiteboard. Once examined, if the part is determined to be scrap the sticky
|
|
80
|
-
note can be thrown in the trash can. If the part needs some re-machining, the sticky note can be
|
|
81
|
-
added back onto the whiteboard once the re-machining has completed and the part is ready for the
|
|
82
|
-
remainder of the process.
|
|
83
|
-
|
|
84
|
-
- By using a metaphor of physical sticky notes, the design provides an intuitive understanding for
|
|
85
|
-
users. The design is motivated by Google's Material Design, whose founding idea is: "A material
|
|
86
|
-
metaphor is the unifying theory of a rationalized space and a system of motion. The material is
|
|
87
|
-
grounded in tactile reality, inspired by the study of paper and ink, yet technologically advanced
|
|
88
|
-
and open to imagination and magic." In fact, we suggest that operator training start with actual
|
|
89
|
-
physical sticky notes on a whiteboard before transitioning the training to the computers.
|
|
90
|
-
|
|
91
|
-
Of course, there is one main downside to using a physical whiteboard; it is tedious for the
|
|
92
|
-
operators. This is solved by keeping the whiteboard and sticky notes in software and using software
|
|
93
|
-
monitoring to automatically move around the sticky notes. We believe that when using automation and
|
|
94
|
-
software as part of process control, you must always start with a design that could be done without
|
|
95
|
-
software. This produces a design which does not force the process to conform to the software but
|
|
96
|
-
allows the software to support the process. It also eases user understanding because it provides a
|
|
97
|
-
straightforward metaphor for the user to understand how the software functions. The software should
|
|
98
|
-
exist just to support the process by removing the tedious and error-prone tasks.
|
|
29
|
+
This is the model used by FMS Insight. Automation and operator input keep the virtual whiteboard
|
|
30
|
+
updated, while each material card provides access to the recorded history.
|
|
99
31
|
|
|
100
32
|
## Software-Based Sticky Notes
|
|
101
33
|
|
|
102
|
-

|
|
103
35
|
|
|
104
|
-
The
|
|
105
|
-
|
|
106
|
-
|
|
107
|
-
|
|
108
|
-
the current station, in this case the load station 1.
|
|
36
|
+
The [station pages](/fms-insight/client-station-monitor) show the section of the whiteboard relevant
|
|
37
|
+
to an operator. The load station shows material to load, unload, or transfer. Queue pages show
|
|
38
|
+
material waiting at a particular location. Inspection and closeout pages group recent material by
|
|
39
|
+
the work still to be recorded.
|
|
109
40
|
|
|
110
|
-
Insight
|
|
111
|
-
|
|
112
|
-
|
|
113
|
-
|
|
41
|
+
Insight updates cards as it receives events from the cell controller. An operator records manual
|
|
42
|
+
changes where needed, such as adding material to a queue, recording an inspection, or moving waiting
|
|
43
|
+
material to quarantine. A [barcode scanner](/fms-insight/client-scanners) or serial search opens the
|
|
44
|
+
record for a specific piece.
|
|
114
45
|
|
|
115
|
-
|
|
116
|
-
|
|
117
|
-
|
|
118
|
-
place where material is under manual control has a corresponding whiteboard region. By placing a
|
|
119
|
-
computer or tablet at that place in the factory, the operator can at a glance see if the virtual
|
|
120
|
-
whiteboard matches the reality on the factory floor, and if not simply edit the virtual whiteboard
|
|
121
|
-
to match.
|
|
46
|
+
A material record and its serial label are related but distinct. Material can be tracked before a
|
|
47
|
+
serial is assigned, and correcting a label does not transfer another piece's manufacturing history.
|
|
48
|
+
Removing a card from a queue also preserves its history; the serial can be looked up again later.
|
|
122
49
|
|
|
123
50
|
## An Example Design
|
|
124
51
|
|
|
125
|
-
|
|
126
|
-
|
|
127
|
-
|
|
128
|
-
|
|
129
|
-
|
|
130
|
-
|
|
131
|
-
|
|
132
|
-
|
|
133
|
-
|
|
134
|
-
|
|
135
|
-
|
|
136
|
-
|
|
137
|
-
|
|
138
|
-
|
|
139
|
-
|
|
140
|
-
|
|
141
|
-
|
|
142
|
-
|
|
143
|
-
|
|
144
|
-
|
|
145
|
-
|
|
146
|
-
|
|
147
|
-
|
|
148
|
-
|
|
149
|
-
|
|
150
|
-
|
|
151
|
-
|
|
152
|
-
|
|
153
|
-
|
|
154
|
-
|
|
155
|
-
|
|
156
|
-
|
|
157
|
-
|
|
158
|
-
|
|
159
|
-
material flow which you might consider changing the process.
|
|
160
|
-
|
|
161
|
-
At the load station, use a computer or mounted tablet running Insight. Insight will display the
|
|
162
|
-
section of the virtual whiteboard for the pallet, plus the region for material being loaded and the
|
|
163
|
-
region to which material is unloaded. Insight will determine based on the whiteboard which specific
|
|
164
|
-
material to load and display it with its serial. The operator should then load the material with the
|
|
165
|
-
specific serial requested by Insight. But, if the serial that Insight wants to load is unavailable,
|
|
166
|
-
the operator can just edit the virtual whiteboard. Insight will automatically adjust with a new
|
|
167
|
-
instruction for the operator. (Hopefully this doesn't happen and the virtual whiteboard is kept in
|
|
168
|
-
sync, but if it does happen it is easy to correct.)
|
|
169
|
-
|
|
170
|
-
At any place where in-process material is queued outside of control of the automation, create a
|
|
171
|
-
whiteboard region. This could be conveyors between cells or stands for holding parts between
|
|
172
|
-
processes (e.g. large parts which have process 1 and process 2 on different pallets). At each
|
|
173
|
-
location, dedicate a computer or mounted tablet with an attached barcode scanner to view and edit
|
|
174
|
-
the whiteboard region. Insight can be configured to automatically move the virtual sticky notes
|
|
175
|
-
during normal operations as parts are loaded and unloaded into these queues, but the operator can
|
|
176
|
-
use the computer and scanner to adjust the whiteboard region as needed.
|
|
177
|
-
|
|
178
|
-
For in-process manual operations such as manual CMM stations or custom processes outside the
|
|
179
|
-
automated cell, create two whiteboard regions. One region for the input to the process and one
|
|
180
|
-
region for the output from the process. For example, at an in-process CMM stand, create a whiteboard
|
|
181
|
-
region for the unloaded parts not yet measured. FMS Insight can then be configured to automatically
|
|
182
|
-
move the material sticky note from the pallet to the inbound CMM region. The CMM stand then has a
|
|
183
|
-
computer or mounted tablet showing Insight; the operator can then see the material not yet measured,
|
|
184
|
-
perform the CMM measurement, and if successful, use FMS Insight to transfer the virtual sticky note
|
|
185
|
-
from the inbound region to the outbound region. FMS Insight monitors the outbound region and will
|
|
186
|
-
bring a pallet to the load station once the CMM has completed. Insight will also transfer the sticky
|
|
187
|
-
note from the outbound region to the pallet as part of the load operation.
|
|
188
|
-
|
|
189
|
-
For raw material, Insight supports two options. Insight can just assume raw material is always
|
|
190
|
-
available in which case Insight will create a new virtual sticky note during the initial loading. In
|
|
191
|
-
this design, the first time a sticky note appears is on the pallet. Alternatively, Insight can be
|
|
192
|
-
configured to draw initial material from a virtual whiteboard region. In this case, when material
|
|
193
|
-
arrives, an operator must scan or add the material into the initial whiteboard region. Once added,
|
|
194
|
-
FMS Insight will then activate the pallet to load this material.
|
|
195
|
-
|
|
196
|
-
For completed material, Insight automatically adds the sticky notes to regions for signaled
|
|
197
|
-
inspections and final wash. Technically, these could just be configured virtual whiteboard regions
|
|
198
|
-
similar to in-process queues or operations, but inspections and final wash are so common that
|
|
199
|
-
Insight automatically has special regions for them. Each configured inspection type has two regions:
|
|
200
|
-
one for completed parts signaled for inspection but not yet inspected and one region for completed
|
|
201
|
-
inspection. For final wash, Insight also has two regions: one for not yet washed parts and one for
|
|
202
|
-
washed parts. A computer mounted at the inspection and wash stations can show Insight and allow the
|
|
203
|
-
operator to move the virtual sticky note as the inspection or final wash is completed.
|
|
52
|
+
Consider a part with two machining processes and a manual inspection between them. The first process
|
|
53
|
+
unloads to an inspection input queue. The operator checks the part and, once it is released, records
|
|
54
|
+
its move to an output queue. The second process draws material from that output queue.
|
|
55
|
+
|
|
56
|
+
The queue contents tell the cell which material is available for the next operation. If a part is
|
|
57
|
+
set aside for further investigation, it stays out of the production input queue until it is ready.
|
|
58
|
+
[Quarantine queues](/fms-insight/material-quarantine) can keep that material and its disposition
|
|
59
|
+
visible.
|
|
60
|
+
|
|
61
|
+
The precise queue moves and inspection actions depend on the installation. Recording an inspection
|
|
62
|
+
result is distinct from moving material between queues. Design the physical handling and software
|
|
63
|
+
steps together so operators know which actions happen automatically and which they must record.
|
|
64
|
+
|
|
65
|
+
## Whiteboard Tracking Design
|
|
66
|
+
|
|
67
|
+
Start by mapping the physical flow and walking through it with sample parts or sticky notes. Decide
|
|
68
|
+
where material can wait, who is responsible for it, and what makes it ready for the next operation.
|
|
69
|
+
Then configure the corresponding queues and station views.
|
|
70
|
+
|
|
71
|
+
- **Raw material:** a job can assume material is available and create records at the first load, or
|
|
72
|
+
use an input queue where operators record material before it is loaded.
|
|
73
|
+
- **In-process material:** use queues for transfer stands, conveyors, or manual work between
|
|
74
|
+
automated processes. Keep the display near the physical location so mismatches are visible.
|
|
75
|
+
- **Pallets and baskets:** the integration supplies their locations, contents, and station work.
|
|
76
|
+
Where baskets are used, individual slots identify the units of handling.
|
|
77
|
+
- **Inspections and closeout:** these pages help record checks and final manual work. They show
|
|
78
|
+
recent activity, while serial lookup provides access to older material histories.
|
|
79
|
+
- **Exceptions:** agree how to hold, rework, release, and dispose of material. Use the
|
|
80
|
+
[operator procedures](/fms-insight/operator-procedures) and the cell's own recovery instructions
|
|
81
|
+
when a record needs correction.
|
|
82
|
+
|
|
83
|
+
A piece's location alone does not determine which actions are available. Material already involved
|
|
84
|
+
in a load, unload, or automated transfer is protected from conflicting queue changes. Always follow
|
|
85
|
+
the displayed instruction and available actions when reconciling the whiteboard.
|
package/docs/mazak.md
CHANGED
|
@@ -2,14 +2,22 @@
|
|
|
2
2
|
title: Mazak Palletech Integration
|
|
3
3
|
nav: FMS Insight Server > Mazak
|
|
4
4
|
description: >-
|
|
5
|
-
FMS Insight supports Mazak Palletech Web Version and Smooth/Neo PMC. FMS Insight
|
|
6
|
-
|
|
5
|
+
FMS Insight supports Mazak Palletech Web Version and Smooth/Neo PMC. FMS Insight reads controller
|
|
6
|
+
activity and translates downloaded jobs into schedules.
|
|
7
7
|
---
|
|
8
8
|
|
|
9
|
-
|
|
9
|
+
FMS Insight supports Mazak Palletech Web Version and Smooth/Neo PMC. FMS Insight reads controller
|
|
10
|
+
events and status and translates downloaded jobs into controller schedules. The available operations
|
|
11
|
+
depend on the controller version and configured integration.
|
|
10
12
|
|
|
11
|
-
|
|
12
|
-
|
|
13
|
+
## Server Placement
|
|
14
|
+
|
|
15
|
+
FMS Insight usually runs on the Mazak cell-controller computer alongside Open Database Kit. It can
|
|
16
|
+
also run on a separate computer with access to the controller, including the
|
|
17
|
+
[isolated cell-network arrangement](/fms-insight/security#network-layout). Open Database Kit remains
|
|
18
|
+
on the controller. The controller connection and access to controller-generated files must be
|
|
19
|
+
configured for the chosen arrangement; the local paths below describe an installation on the
|
|
20
|
+
controller.
|
|
13
21
|
|
|
14
22
|
## Load station numbering
|
|
15
23
|
|
|
@@ -19,10 +27,10 @@ positions identify controller equipment, while values identify equipment in jobs
|
|
|
19
27
|
Both job downloads and status/event reads translate through the same map. Station display names are
|
|
20
28
|
maintained separately.
|
|
21
29
|
|
|
22
|
-
|
|
23
|
-
cover every controller L/U station used. Job routes outside the map are
|
|
24
|
-
Load Station Number setting has been removed and is no longer read;
|
|
25
|
-
when updating configuration.
|
|
30
|
+
If no list is configured, Insight uses the controller's station numbers. Explicit lists must contain
|
|
31
|
+
unique positive IDs and cover every controller L/U station used. Job routes outside the map are
|
|
32
|
+
rejected. The old Starting Load Station Number setting has been removed and is no longer read;
|
|
33
|
+
replace it with an explicit list when updating configuration.
|
|
26
34
|
|
|
27
35
|
## Open Database Kit
|
|
28
36
|
|
|
@@ -55,17 +63,15 @@ the parts being loaded and unloaded from each pallet at the load station.
|
|
|
55
63
|
|
|
56
64
|
## Simulation Lab
|
|
57
65
|
|
|
58
|
-
The Mazak
|
|
59
|
-
|
|
60
|
-
features active but instead of sending commands to the actual machines and carts, just simulates
|
|
61
|
-
their operation.
|
|
66
|
+
The Mazak controller software can run in simulation mode without connected machines or carts. In
|
|
67
|
+
this mode, its features remain active while it simulates equipment operation.
|
|
62
68
|
|
|
63
69
|
We recommend that you set up what we call a simulation lab, which consists of two computers in an
|
|
64
70
|
office. One computer will run the Mazak cell controller software in simulation mode, Open Database
|
|
65
71
|
Kit, and the FMS Insight server. The second computer will run a browser and access the FMS Insight
|
|
66
|
-
client. This
|
|
67
|
-
|
|
68
|
-
|
|
72
|
+
client. This mirrors the usual installation with Insight on the controller. If production will use a
|
|
73
|
+
separate Insight server, include that arrangement in the lab so its connections can be tested as
|
|
74
|
+
well.
|
|
69
75
|
|
|
70
76
|
A simulation lab allows testing, training, and experimentation. You can set up some dummy orders,
|
|
71
77
|
create a schedule, copy the schedule into the Mazak cell controller, run the schedule inside the
|
|
@@ -77,36 +83,12 @@ new scheduling or inspection signaling techniques, or training new operators and
|
|
|
77
83
|
|
|
78
84
|
## Starting Offset and Decrement Priority
|
|
79
85
|
|
|
80
|
-
The Mazak [config.ini](server-config)
|
|
81
|
-
schedules
|
|
82
|
-
|
|
83
|
-
|
|
84
|
-
|
|
85
|
-
|
|
86
|
-
|
|
87
|
-
|
|
88
|
-
|
|
89
|
-
The main downside to using due dates and priorities is that Mazak will empty out a pallet before
|
|
90
|
-
switching schedules. For example, consider a situation where you have a part PPP with two processes
|
|
91
|
-
and a fixture which can hold one process 1 material and one process 2 material. Also, consider there
|
|
92
|
-
are two schedules for part PPP; a schedule AAA for today's production and a schedule BBB for
|
|
93
|
-
tomorrow's production. Say that the AAA and BBB schedules have different due dates (say AAA has the
|
|
94
|
-
earlier due date). Then Mazak will first run the entire AAA schedule. In particular, the very last
|
|
95
|
-
cycle of AAA will run with a process 2 part and an empty process 1 location. Instead, if the due
|
|
96
|
-
dates of AAA and BBB are the same, Mazak will not empty out the pallet and instead on the very last
|
|
97
|
-
cycle of AAA in the process 2 location will add the very first cycle of BBB in the process 1
|
|
98
|
-
location.
|
|
99
|
-
|
|
100
|
-
In our opinion, due dates and priorities should be enabled; the pallet running empty is not
|
|
101
|
-
typically that big of a deal. The primary goal of the system is to keep the machines busy and a
|
|
102
|
-
pallet with an empty location will return to the load station after cutting just the material on the
|
|
103
|
-
pallet (as long as each process has a separate program). This increases slightly the burden on the
|
|
104
|
-
cart and load station, but these are not the bottleneck and there should be enough work in the
|
|
105
|
-
system to keep the machines busy. In addition, occasionally a pallet will empty out in any case
|
|
106
|
-
because today's schedule had a limited quantity to allow a different part some time on the machines.
|
|
107
|
-
Finally, occasionally emptying out a pallet seems to help tremendously with preventing traffic jams.
|
|
108
|
-
|
|
109
|
-
Finally, when FMS Insight adds a new day's schedule into the cell controller, then FMS Insight will
|
|
110
|
-
first decrement the priority on all existing uncompleted schedules. Since each day a new schedule is
|
|
111
|
-
downloaded, if priorities of existing schedules are first decrement then any unfinished work from
|
|
112
|
-
the previous day gains higher priority and will finish before today's schedule starts.
|
|
86
|
+
The Mazak [config.ini](/fms-insight/server-config) setting `Use Starting Offset For Due Date`
|
|
87
|
+
controls how downloaded schedules receive due dates and priorities. When enabled, Insight uses the
|
|
88
|
+
simulation's projected start times to help order the work. When disabled, downloaded schedules
|
|
89
|
+
receive the same default due date and priority.
|
|
90
|
+
|
|
91
|
+
Due dates and priorities affect which work Mazak selects and when a pallet is emptied between
|
|
92
|
+
schedules. When enabled, Insight also adjusts the priority of existing unfinished schedules as new
|
|
93
|
+
work is downloaded. Agree on these settings during commissioning and evaluate their effect on flow
|
|
94
|
+
with the actual part mix; they are not an operator adjustment for an individual delayed part.
|