@seedtactics/insight-client 17.0.4 → 17.0.6
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/dist/assets/{index-B0B_a7c8.js → index-BqTNkPt2.js} +1 -1
- package/dist/components/station-monitor/StationToolbar.js +2 -1
- package/dist/index.html +1 -1
- package/docs/client-efficiency.md +158 -291
- package/docs/client-engineering.md +29 -36
- package/docs/client-launch.md +35 -34
- package/docs/client-operations.md +40 -61
- package/docs/client-quality.md +32 -47
- package/docs/client-sales.md +22 -39
- package/docs/client-scanners.md +21 -27
- package/docs/client-station-monitor.md +75 -100
- package/docs/client-tools-programs.md +30 -59
- package/docs/improve-fms.md +55 -121
- package/docs/makino.md +10 -11
- package/docs/material-quarantine.md +40 -54
- package/docs/material-tracking.md +65 -183
- package/docs/mazak.md +31 -49
- package/docs/niigata.md +61 -89
- package/docs/operator-procedures.md +83 -96
- package/docs/part-instructions.md +43 -57
- package/docs/screenshots/insight-analysis-pallets.png +0 -0
- package/docs/screenshots/insight-analysis-part-completed.png +0 -0
- package/docs/screenshots/insight-analysis-sankey.png +0 -0
- package/docs/screenshots/insight-analysis-station-oee.png +0 -0
- package/docs/screenshots/insight-basket-work.png +0 -0
- package/docs/screenshots/insight-buffer-occupancy.png +0 -0
- package/docs/screenshots/insight-closeout.png +0 -0
- package/docs/screenshots/insight-cost-percentages.png +0 -0
- package/docs/screenshots/insight-dashboard.png +0 -0
- package/docs/screenshots/insight-inspection.png +0 -0
- package/docs/screenshots/insight-load-station-details.png +0 -0
- package/docs/screenshots/insight-load-station.png +0 -0
- package/docs/screenshots/insight-loadcycle-graph.png +0 -0
- package/docs/screenshots/insight-machinecycle-graph.png +0 -0
- package/docs/screenshots/insight-machinecycle-table.png +0 -0
- package/docs/screenshots/insight-machinecycles.png +0 -0
- package/docs/screenshots/insight-machinehours.png +0 -0
- package/docs/screenshots/insight-machineoutliers.png +0 -0
- package/docs/screenshots/insight-monthly-schedules.png +0 -0
- package/docs/screenshots/insight-operations-material.png +0 -0
- package/docs/screenshots/insight-operations-overview.png +0 -0
- package/docs/screenshots/insight-operations-reports.png +0 -0
- package/docs/screenshots/insight-part-cost.png +0 -0
- package/docs/screenshots/insight-program-report.png +0 -0
- package/docs/screenshots/insight-quality-material-details.png +0 -0
- package/docs/screenshots/insight-quality-material.png +0 -0
- package/docs/screenshots/insight-quality-sankey.png +0 -0
- package/docs/screenshots/insight-quality-similar-paths.png +0 -0
- package/docs/screenshots/insight-quarantine.png +0 -0
- package/docs/screenshots/insight-queue-details.png +0 -0
- package/docs/screenshots/insight-queues-jobs-table.png +0 -0
- package/docs/screenshots/insight-queues.png +0 -0
- package/docs/screenshots/insight-sim-day-usage.png +0 -0
- package/docs/screenshots/insight-system-overview.png +0 -0
- package/docs/screenshots/insight-tool-replacements.png +0 -0
- package/docs/screenshots/insight-tool-report.png +0 -0
- package/docs/screenshots/insight-workorder-gantt.png +0 -0
- package/docs/screenshots/insight-workorders.png +0 -0
- package/docs/security.md +98 -131
- package/docs/server-config.md +39 -22
- package/docs/server-errors.md +26 -18
- package/package.json +1 -1
- package/docs/screenshots/insight-all-material.png +0 -0
- package/docs/screenshots/insight-choose-analysis-month.png +0 -0
- package/docs/screenshots/insight-loadstation-small.jpg +0 -0
- package/docs/screenshots/insight-quality-quarantine.png +0 -0
- package/docs/screenshots/insight-station-system-overview-buttons.png +0 -0
- package/docs/screenshots/insight-station-system-overview.png +0 -0
- package/docs/screenshots/insight-toolbar-btns.png +0 -0
|
@@ -2,138 +2,113 @@
|
|
|
2
2
|
title: FMS Station Monitor
|
|
3
3
|
nav: FMS Insight Client > Stations
|
|
4
4
|
description: >-
|
|
5
|
-
|
|
6
|
-
|
|
5
|
+
Station pages help operators load, unload, inspect, close out, and manage material on the shop
|
|
6
|
+
floor.
|
|
7
7
|
---
|
|
8
8
|
|
|
9
|
-
|
|
9
|
+
Station pages display the [virtual whiteboard of material cards](/fms-insight/material-tracking). A
|
|
10
|
+
card identifies a piece of material by part, serial, workorder, and signaled inspections when those
|
|
11
|
+
details are available. Tap a card to see its history and the actions available at the station. The
|
|
12
|
+
colored symbol identifies the part, and the large final character of the serial helps distinguish
|
|
13
|
+
nearby cards.
|
|
10
14
|
|
|
11
|
-
|
|
12
|
-
|
|
13
|
-
|
|
14
|
-
|
|
15
|
-
or tapped to open a dialog with more details about the material including the log of events. The
|
|
16
|
-
dialog also allows the operator to notify Insight of changes in the material, such as completing
|
|
17
|
-
wash or assigning a workorder. Finally, the sticky note contains an identicon based on the part name
|
|
18
|
-
and the final number/letter of the serial.
|
|
19
|
-
|
|
20
|
-
We suggest that computers or mounted tablets be placed next to various stations in the factory,
|
|
21
|
-
perhaps with an attached barcode scanner. The computer or mounted tablet can then be configured to
|
|
22
|
-
open the specific screen for the station by either bookmarking the page or just setting the specific
|
|
23
|
-
page as the homepage for the browser.
|
|
15
|
+
Bookmark the page for each station, including the selected station number and queues. A mounted
|
|
16
|
+
tablet or computer with a [barcode scanner](/fms-insight/client-scanners) lets operators compare the
|
|
17
|
+
display with the material in front of them. Station names, available actions, and terminology can
|
|
18
|
+
differ by installation.
|
|
24
19
|
|
|
25
20
|
## System Overview
|
|
26
21
|
|
|
27
|
-
|
|
28
|
-
|
|
29
|
-
|
|
30
|
-
provides a quick overview of the current state of the system. There is one square for each machine
|
|
31
|
-
and one triangle for each load station. The colors within the squares indicate if a pallet is at the
|
|
32
|
-
inbound, worktable, or outbound position of each machine. The color within the triangle indicates if
|
|
33
|
-
the load station is occupied or not. The icons can be clicked to open up a dialog containing more
|
|
34
|
-
details about the system overview.
|
|
22
|
+
The small machine and load-station symbols in the toolbar give a quick view of which stations are
|
|
23
|
+
occupied. Select them to open the system overview. It is also available as a dedicated station page
|
|
24
|
+
or from [Operations](/fms-insight/client-operations#cell).
|
|
35
25
|
|
|
36
|
-

|
|
37
27
|
|
|
38
|
-
The overview shows
|
|
39
|
-
|
|
28
|
+
The overview shows equipment, its current location or activity, and the material on it.
|
|
29
|
+
Installations with baskets also show basket positions and contents when supplied by the integration.
|
|
30
|
+
Select a material card for details.
|
|
40
31
|
|
|
41
32
|
## Load Station
|
|
42
33
|
|
|
43
|
-

|
|
44
35
|
|
|
45
|
-
|
|
46
|
-
|
|
47
|
-
currently at the load station, and a region for completed material. Optionally, the queues dropdown
|
|
48
|
-
on the top toolbar can be used to add additional whiteboard regions to display in addition to the
|
|
49
|
-
pallet regions. Typically we suggest that in-process queues have their own computer with a dedicated
|
|
50
|
-
display, but for queues closely associated with the load station such as a transfer stand, the
|
|
51
|
-
virtual whiteboard region for the queue can be displayed along with the pallet regions.
|
|
36
|
+
Select the load station in the toolbar. Insight shows the relevant material, pallet faces, and
|
|
37
|
+
expected transfers. The toolbar also lets you display nearby queues and recently completed material.
|
|
52
38
|
|
|
53
|
-
|
|
39
|
+
Open a card to review its event history or instructions. The folder button opens the instructions
|
|
40
|
+
for the current load/unload work. Follow the [operator procedures](/fms-insight/operator-procedures)
|
|
41
|
+
if the displayed work cannot be completed as shown.
|
|
54
42
|
|
|
55
|
-
|
|
56
|
-
piece of material. The dialog can also be opened by [using a scanner](client-scanners) or manually
|
|
57
|
-
entering a serial via the magnifying glass button on the toolbar. In the dialog, a variety of
|
|
58
|
-
actions can be taken for the specific material.
|
|
43
|
+

|
|
59
44
|
|
|
60
|
-
|
|
61
|
-
clicked will open all load instructions for all material currently being loaded or unloaded.
|
|
62
|
-
Alternatively, in the material dialog, the Instructions button can be clicked to open the
|
|
63
|
-
instructions for only a single piece of material.
|
|
45
|
+
### Basket Work
|
|
64
46
|
|
|
65
|
-
|
|
47
|
+
Where the installation uses baskets, the station can show individual slots and instructions to load,
|
|
48
|
+
unload, or exchange their contents. A slot is a unit of handling and may contain more than one piece
|
|
49
|
+
of material. Arrows and destination labels show the intended movement. An **Unknown** slot is not a
|
|
50
|
+
confirmed empty slot.
|
|
66
51
|
|
|
67
|
-

|
|
68
53
|
|
|
69
|
-
|
|
70
|
-
|
|
71
|
-
|
|
72
|
-
|
|
73
|
-
selected, material can be added to a queue by clicking the plus icon in the top-right corner.
|
|
54
|
+
Some basket work is confirmed directly in Insight. Review the displayed slots and complete the
|
|
55
|
+
physical work, then select **Confirm** when it becomes available. The page explains when work is
|
|
56
|
+
waiting or cannot yet be confirmed. If the work changes before confirmation, review the refreshed
|
|
57
|
+
instructions. A request to confirm an empty basket requires checking the physical basket is empty.
|
|
74
58
|
|
|
75
|
-
|
|
76
|
-
a table. This table can be used by the operators to decide which material to run next.
|
|
59
|
+
### Alarms and Unavailable Actions
|
|
77
60
|
|
|
78
|
-
|
|
61
|
+
The bell in the toolbar opens the alarm list. Some alarms are informational; others suspend changes
|
|
62
|
+
for the affected equipment or material. When changes are suspended, the page displays a warning and
|
|
63
|
+
disables the affected controls. Previously displayed instructions may remain visible as a reference;
|
|
64
|
+
follow the warning and your cell's recovery procedure before resuming work.
|
|
79
65
|
|
|
80
|
-
|
|
81
|
-
|
|
82
|
-
|
|
66
|
+
Material actions also depend on its current state. For example, a piece involved in an active load
|
|
67
|
+
cannot be removed from a queue as though it were idle. Where **Cancel Load** is offered, review all
|
|
68
|
+
work listed in the confirmation dialog. See [operator procedures](/fms-insight/operator-procedures)
|
|
69
|
+
for quarantine, cancellation, and recovery.
|
|
83
70
|
|
|
84
|
-
##
|
|
71
|
+
## Queues
|
|
85
72
|
|
|
86
|
-

|
|
87
74
|
|
|
88
|
-
|
|
89
|
-
|
|
90
|
-
|
|
91
|
-
right is material which has completed inspections.
|
|
75
|
+
Select one or more queues in the toolbar. Drag a card's handle to change its position within a
|
|
76
|
+
queue. Movement between queues and removal are available only when the material's state permits
|
|
77
|
+
them. The order can influence material selection, but job and route requirements also apply.
|
|
92
78
|
|
|
93
|
-
|
|
94
|
-
|
|
95
|
-
|
|
96
|
-
event in the log and move the virtual sticky note from the left to the right. The top toolbar on the
|
|
97
|
-
right allows an operator name to be entered and this operator name will be attached to the created
|
|
98
|
-
inspection completed log entry. Finally, the operator can open
|
|
99
|
-
[inspection instructions](part-instructions).
|
|
79
|
+
Depending on the configuration, use the add button or scan a serial to introduce material. Raw
|
|
80
|
+
material queues may also show jobs awaiting material and unfilled workorders. Review the proposed
|
|
81
|
+
job, process, and destination before adding material.
|
|
100
82
|
|
|
101
|
-
|
|
102
|
-
allows viewing details and marking as inspected or uninspected any part by scanned serial (even if
|
|
103
|
-
the part is not on the screen).
|
|
83
|
+

|
|
104
84
|
|
|
105
|
-
|
|
85
|
+
Open a card, scan a barcode, or use the toolbar's serial search to see the material history.
|
|
86
|
+
Removing a card from a queue removes its current queue placement, while preserving the recorded
|
|
87
|
+
history.
|
|
106
88
|
|
|
107
|
-
|
|
89
|
+
## Inspection
|
|
108
90
|
|
|
109
|
-
|
|
110
|
-
whiteboard region for completed but not yet closed out material and on the right is material which
|
|
111
|
-
has completed closeout. Closeout is optional but intended for any final manual process needed before
|
|
112
|
-
the part can be shipped; typically this includes a final wash or workorder assignment or other
|
|
113
|
-
tasks.
|
|
91
|
+

|
|
114
92
|
|
|
115
|
-
|
|
116
|
-
|
|
117
|
-
|
|
118
|
-
|
|
119
|
-
will be attached to the created log entry. Finally, the operator can open
|
|
120
|
-
[instructions](part-instructions).
|
|
93
|
+
The Inspection page separates material awaiting a requested inspection from material with recorded
|
|
94
|
+
results. Select an inspection type in the toolbar, or view all types. Open a material card to review
|
|
95
|
+
its path through the cell, open instructions, and record success or failure for the relevant
|
|
96
|
+
inspection.
|
|
121
97
|
|
|
122
|
-
|
|
123
|
-
|
|
124
|
-
|
|
98
|
+
The selected operator name is attached to the result. Recording a result does not by itself move
|
|
99
|
+
physical material or decide its disposition; follow the installation's procedure for failed parts.
|
|
100
|
+
Serial lookup also works for material outside the recent display window.
|
|
125
101
|
|
|
126
|
-
##
|
|
102
|
+
## Close Out
|
|
127
103
|
|
|
128
|
-

|
|
129
105
|
|
|
130
|
-
|
|
131
|
-
|
|
132
|
-
|
|
133
|
-
of FMS Insight is that each tablet or computer be dedicated to a specific task or station, and thus
|
|
134
|
-
you may consider a dedicated display for the system overview page. (Note, the system overview is
|
|
135
|
-
also available to the operations manager as part of the [Operations Screens](client-operations).)
|
|
106
|
+
Closeout is optional and records completion of final manual tasks, such as washing, final checks, or
|
|
107
|
+
workorder assignment. The page shows material unloaded from its final process in the last 48 hours,
|
|
108
|
+
with pending closeouts on one side and closeouts recorded in the last two hours on the other.
|
|
136
109
|
|
|
137
|
-
|
|
138
|
-
|
|
139
|
-
|
|
110
|
+
Open a material card or scan its serial to review the history, assign a workorder where supported,
|
|
111
|
+
open instructions, and record the closeout. Depending on the installation, scanning the serial or
|
|
112
|
+
assigning a workorder is required before completion is allowed. The selected operator is recorded
|
|
113
|
+
with the result. Older material can still be found by serial even after its card leaves the recent
|
|
114
|
+
display.
|
|
@@ -1,77 +1,48 @@
|
|
|
1
1
|
---
|
|
2
|
-
title: FMS
|
|
2
|
+
title: FMS Insight Tools and Programs
|
|
3
3
|
nav: FMS Insight Client > Tools & Programs
|
|
4
4
|
description: >-
|
|
5
|
-
|
|
6
|
-
|
|
7
|
-
an estimate of the upcoming usage for the scheduled parts.
|
|
5
|
+
Review current tool life, estimated scheduled tool use, and the programs and revisions used by the
|
|
6
|
+
cell.
|
|
8
7
|
---
|
|
9
8
|
|
|
10
|
-
|
|
11
|
-
|
|
12
|
-
|
|
13
|
-
|
|
14
|
-
view information about the tools and programs along with the other metrics and data for day-to-day
|
|
15
|
-
management. Second, just the tools and programs reports tables are available on a dedicated page
|
|
16
|
-
accessible from the initial [launch page](client-launch). This page is intended for display in the
|
|
17
|
-
tool-room or elsewhere on the shop floor where tools are managed. We suggest that this page is
|
|
18
|
-
bookmarked and directly opened.
|
|
9
|
+
The Tools and Programs pages are intended for the tool room and engineers maintaining the cell's
|
|
10
|
+
programs. The same reports are available from [Operations](/fms-insight/client-operations#reports).
|
|
11
|
+
Tool data, program contents, and revision history depend on what the controller and integration
|
|
12
|
+
provide.
|
|
19
13
|
|
|
20
14
|
## Tool Report
|
|
21
15
|
|
|
22
|
-

|
|
29
17
|
|
|
30
|
-
|
|
31
|
-
|
|
32
|
-
be seen on the program report.) Note that if a program is currently-executing, we don't know where
|
|
33
|
-
in the program it is so the _Scheduled Use_ column contains the entire calculated tool-use for the
|
|
34
|
-
program.
|
|
18
|
+
Select **Load Tools** to request current tool data from the machines. Use the refresh button to load
|
|
19
|
+
it again; the table is a snapshot of the returned data.
|
|
35
20
|
|
|
36
|
-
|
|
21
|
+
For each tool, the summary compares estimated scheduled use with the remaining tool life on machines
|
|
22
|
+
relevant to the scheduled work. It shows both the combined remaining life and the smallest total on
|
|
23
|
+
an individual machine. Usage may be measured in time, counts, or both, depending on the controller.
|
|
37
24
|
|
|
38
|
-
|
|
39
|
-
|
|
25
|
+
Scheduled use is estimated from recent program executions. For a program already running, the
|
|
26
|
+
estimate includes the whole cycle because Insight does not know how far through the program it is. A
|
|
27
|
+
part may also be qualified on several machines, so the report cannot predict exactly which machine
|
|
28
|
+
will consume the tool life.
|
|
40
29
|
|
|
41
|
-
|
|
42
|
-
|
|
43
|
-
remaining life to get a sense of if additional tools will be needed soon.
|
|
44
|
-
|
|
45
|
-
For each tool, details about the individual pockets and scheduled parts are available by clicking
|
|
46
|
-
the arrow at the beginning of the row. The parts table shows all scheduled parts, the program, the
|
|
47
|
-
remaining quantity to run, and the estimated use per program. The machines table shows the pocket
|
|
48
|
-
number or numbers containing the tool and the current use and remaining life.
|
|
30
|
+
Expand a tool to see the machine pockets and scheduled parts behind the totals. Use those details
|
|
31
|
+
together with the cell's tool-management procedure to decide where replacement tools are needed.
|
|
49
32
|
|
|
50
33
|
## Program Report
|
|
51
34
|
|
|
52
|
-

|
|
58
36
|
|
|
59
|
-
|
|
60
|
-
|
|
61
|
-
|
|
62
|
-
- _Part_: the part and process number that uses this program.
|
|
63
|
-
- _Revision_: this shows the program revision, but will only appear if program revisions are used as
|
|
64
|
-
part of a downloaded job. If revisions are not used, this column will not appear.
|
|
65
|
-
- _Median Time and Deviation_: For the [flexibility analysis](client-efficiency), FMS Insight uses
|
|
66
|
-
the data from the last 30 days to calculate a statistical median and deviation running time for
|
|
67
|
-
each program. Because times above the median (likely due to program interruptions) is a different
|
|
68
|
-
probability distribution to times below the median (likely due to normal Gaussian noise), we
|
|
69
|
-
calculate deviations of the two separately.
|
|
37
|
+
Select **Load Programs** to request the current program list. The table includes the program name,
|
|
38
|
+
related part and process, and recent cycle-time statistics. Where supported, it also shows the
|
|
39
|
+
controller's program name or number and the revision used by downloaded jobs.
|
|
70
40
|
|
|
71
|
-
|
|
72
|
-
|
|
41
|
+
Median time and deviations describe the recent cycle-time distribution. Insight treats deviations
|
|
42
|
+
above and below the median separately because long interruptions differ from ordinary cycle
|
|
43
|
+
variation. Compare these with the expected times used for planning and investigate recurring
|
|
44
|
+
differences using the [cycle reports](/fms-insight/client-engineering).
|
|
73
45
|
|
|
74
|
-
|
|
75
|
-
|
|
76
|
-
|
|
77
|
-
cycles, we can't calculate the actual usage so that cycle is not included in the average.
|
|
46
|
+
Expand a row to see estimated tool use per execution. The estimate uses up to five recent cycles
|
|
47
|
+
within the typical time range; tool changes during a cycle can prevent a reliable usage estimate for
|
|
48
|
+
that tool. Buttons at the end of a row open program contents and revision history when available.
|
package/docs/improve-fms.md
CHANGED
|
@@ -1,136 +1,70 @@
|
|
|
1
1
|
---
|
|
2
|
-
title: Use analytics to improve
|
|
2
|
+
title: Use analytics to improve an FMS
|
|
3
3
|
nav: Procedures > Monthly Review
|
|
4
4
|
description: >-
|
|
5
|
-
|
|
6
|
-
|
|
5
|
+
Review production, resource use, quality, and cost together to choose and evaluate improvements to
|
|
6
|
+
a flexible machining system.
|
|
7
7
|
---
|
|
8
8
|
|
|
9
|
-
|
|
9
|
+
A flexible machining system depends on scheduling, programming, operators, tooling, quality, and
|
|
10
|
+
material handling working together. Improving one operation in isolation can shift the problem
|
|
11
|
+
elsewhere. A regular review of the whole cell helps choose changes that improve accepted output and
|
|
12
|
+
cost per piece.
|
|
10
13
|
|
|
11
|
-
|
|
12
|
-
|
|
13
|
-
|
|
14
|
-
(such as part programming) in isolation. Recent advances in big data technology make it easier than
|
|
15
|
-
ever to understand the entire manufacturing process, investigate trade-offs, and calculate metrics
|
|
16
|
-
on monthly cost-per-piece, resource utilization, and system bottlenecks. Data analytics leads to
|
|
17
|
-
understanding the entire system as a whole and actionable insights for improvements and future
|
|
18
|
-
investments in automation and process improvement.
|
|
14
|
+
FMS Insight's [Analysis pages](/fms-insight/client-efficiency) provide production, cycle, flow,
|
|
15
|
+
inspection, and cost-allocation reports over a month or the last 30 days. They complement the recent
|
|
16
|
+
reports used for [daily operations](/fms-insight/client-operations).
|
|
19
17
|
|
|
20
18
|
## Actionable Insights
|
|
21
19
|
|
|
22
|
-
|
|
23
|
-
|
|
24
|
-
|
|
25
|
-
|
|
26
|
-
|
|
27
|
-
|
|
28
|
-
|
|
29
|
-
|
|
30
|
-
|
|
31
|
-
|
|
32
|
-
|
|
33
|
-
|
|
34
|
-
|
|
35
|
-
the process change should be kept or adjusted. The entire business benefits from visible and
|
|
36
|
-
accurate cost-per-piece metrics, because various departments and employees can see that even if a
|
|
37
|
-
change requires them to perform extra work, it improves the overall business value of the system.
|
|
38
|
-
The only data required from daily operations is the monthly quantity of parts produced, and it is
|
|
39
|
-
implemented on the [flexibility analysis page](client-efficiency).
|
|
40
|
-
|
|
41
|
-
While it is the ultimate goal, overall cost-per-piece is not a useful metric to improve the system.
|
|
42
|
-
Sure, a cost-per-piece breakdown will show the costs of labor, machining, and tooling but how do you
|
|
43
|
-
turn that into a plan to change something? Also, focusing on improving cost-per-piece directly risks
|
|
44
|
-
optimizing cost by sacrificing quality. Instead, the best metric for continuous improvement is the
|
|
45
|
-
bottlenecks and utilization of system resources, since the goal is to produce more stuff with the
|
|
46
|
-
same machines and quality.
|
|
47
|
-
|
|
48
|
-
Utilization and bottleneck metrics are more difficult to turn into actionable insights. Many
|
|
49
|
-
companies generate OEE (operational equipment effectiveness) data or collect machine utilization and
|
|
50
|
-
bottleneck information, but seemingly inconsequential details in one area can have large impacts in
|
|
51
|
-
other areas. For example, the chosen part programming technique might require complex operational
|
|
52
|
-
part tracking on the shop floor or scheduling techniques might increase quality control overhead.
|
|
53
|
-
When each department focuses only on their own slice of the system, they can't turn these insights
|
|
54
|
-
into actions.
|
|
55
|
-
|
|
56
|
-
To turn the system utilization and performance metrics into actionable insights, we suggest the
|
|
57
|
-
creation of a tactics council. The tactics council is made up of a representative from each
|
|
58
|
-
department and component of the system, and the council's job is to decide on the overall tactics
|
|
59
|
-
for system operation. By combining representatives from all areas of the system, the tactics council
|
|
60
|
-
can produce actions (changes in how the system operates) based on the information and metrics on OEE
|
|
61
|
-
and system performance. Helpful efficiency metrics and graphs are displayed in the
|
|
62
|
-
[flexibility analysis page](client-efficiency).
|
|
20
|
+
Start with a question that can lead to a decision. For example: why are machines waiting while
|
|
21
|
+
material accumulates at the load station? Is a recurring interruption tied to a program? Did a
|
|
22
|
+
change in route flexibility make production more consistent?
|
|
23
|
+
|
|
24
|
+
Use the overview reports to locate the pattern, then inspect the relevant cycles and material
|
|
25
|
+
histories. Distinguish elapsed time from expected active time, recorded production from simulated
|
|
26
|
+
production, and completed processes from accepted finished parts. Missing data or a limited time
|
|
27
|
+
window can change the interpretation.
|
|
28
|
+
|
|
29
|
+
Cost per piece helps assess the overall result, but it rarely identifies the cause of a problem.
|
|
30
|
+
Resource use, buffer occupancy, and cycle histories are more useful for deciding where to
|
|
31
|
+
investigate. Review quality alongside throughput so a faster process is not mistaken for an
|
|
32
|
+
improvement when it produces more rejected material.
|
|
63
33
|
|
|
64
34
|
## Tactics Council
|
|
65
35
|
|
|
66
|
-
|
|
67
|
-
|
|
68
|
-
|
|
69
|
-
|
|
70
|
-
|
|
71
|
-
|
|
72
|
-
|
|
73
|
-
|
|
74
|
-
Plan. Do. Check. Adjust. The [PDCA technique](https://en.wikipedia.org/wiki/PDCA) is an effective
|
|
75
|
-
strategy to improve the performance of an existing FMS and is ideal for the tactics council. During
|
|
76
|
-
the tactics council meeting, the council will perform the plan and adjust phases of PDCA and in the
|
|
77
|
-
6-weeks to two months between meetings, individual departments will perform the do and check phases
|
|
78
|
-
of PDCA. The tactics council should focus on only a single or at most two improvements at once.
|
|
79
|
-
|
|
80
|
-
For example, say that an improvement idea is to implement [material tracking](material-tracking) by
|
|
81
|
-
adding a serial and barcode to each part during machining and then scanning the barcode at the
|
|
82
|
-
inspection station, allowing the inspection operator to view the pallet, machine, and time for this
|
|
83
|
-
specific part. The first step is to develop the plan, which would include the cost of purchasing a
|
|
84
|
-
barcode printer, an analysis of the extra time at the load station applying the barcode to the part,
|
|
85
|
-
a target for reducing the percentage of parts that require inspection, the cost savings from the
|
|
86
|
-
reduced inspections, and other facets such as training. This plan is presented to the tactics
|
|
87
|
-
council, the council discusses it, and say the tactics council agrees to implement this change. In
|
|
88
|
-
the 6-weeks to two months between council meetings, operations will purchase the barcode printer,
|
|
89
|
-
start barcoding parts, and start collecting data (the do and check steps of PDCA). The inspection
|
|
90
|
-
stand will start using the barcodes and importantly record data on quality improvements. The next
|
|
91
|
-
tactics council meeting can then review the data to understand the impact on overall cost-per-piece
|
|
92
|
-
and system performance. By reviewing these metrics, the council can decide on any adjustments if
|
|
93
|
-
necessary.
|
|
94
|
-
|
|
95
|
-
The tactics council is an important management technique because it encourages buy-in from everyone
|
|
96
|
-
to improve overall cost-per-piece and system performance instead of focusing on individual isolated
|
|
97
|
-
metrics such as cycle times or inspection rates. Typical improvements are similar to the previous
|
|
98
|
-
example, where one department (such as operations) has extra work and a different department (such
|
|
99
|
-
as quality control) sees an improvement. The tactics council and the repetitive nature of the PDCA
|
|
100
|
-
technique keeps everyone happy, because the next improvement implemented by the council might
|
|
101
|
-
improve operations while the inspection stand might have some extra work. Since everyone has a
|
|
102
|
-
representative on the tactics council and the tactics council focuses on part cost-per-piece and
|
|
103
|
-
total system performance, one department refusing to implement a change is greatly reduced.
|
|
36
|
+
Bring together representatives from operations, scheduling, programming, tooling, quality, and the
|
|
37
|
+
other teams involved in the cell. This group, or tactics council, should have authority to agree on
|
|
38
|
+
changes that affect more than one department.
|
|
39
|
+
|
|
40
|
+
Meet at a regular interval, such as monthly or every six weeks. Focus on one or two improvements at
|
|
41
|
+
a time. Keep a record of the question, the proposed change, the expected effect, and what evidence
|
|
42
|
+
will show whether it worked.
|
|
104
43
|
|
|
105
44
|
## Continuous Improvement
|
|
106
45
|
|
|
107
|
-
|
|
108
|
-
|
|
109
|
-
|
|
110
|
-
|
|
111
|
-
|
|
112
|
-
|
|
113
|
-
|
|
114
|
-
|
|
115
|
-
|
|
116
|
-
|
|
117
|
-
|
|
118
|
-
|
|
119
|
-
|
|
120
|
-
|
|
121
|
-
|
|
122
|
-
|
|
123
|
-
|
|
124
|
-
|
|
125
|
-
|
|
126
|
-
|
|
127
|
-
|
|
128
|
-
|
|
129
|
-
|
|
130
|
-
|
|
131
|
-
|
|
132
|
-
investment, and general accounting. Cost-per-piece should be produced by the tactics council itself
|
|
133
|
-
and not management because the council is in the best position to decide on cost trade-offs. For
|
|
134
|
-
example, there is a trade-off between quality and inspections and cost, and the council is in the
|
|
135
|
-
best position to decide on the required quality and inspections and then work to reduce costs only
|
|
136
|
-
under these constraints without sacrificing quality.
|
|
46
|
+
Use a plan, do, check, adjust cycle:
|
|
47
|
+
|
|
48
|
+
1. **Plan:** review the evidence, identify a likely cause, and agree on a change. Consider the
|
|
49
|
+
effects on material flow, operators, tooling, inspections, and scheduling. Use simulation where
|
|
50
|
+
it can test those interactions.
|
|
51
|
+
2. **Do:** introduce the reviewed change and ensure the people affected understand it.
|
|
52
|
+
3. **Check:** compare a suitable period before and after the change. Account for changes in part
|
|
53
|
+
mix, available hours, and data coverage. Include quality outcomes.
|
|
54
|
+
4. **Adjust:** keep, revise, or reverse the change based on the evidence, then select the next
|
|
55
|
+
improvement.
|
|
56
|
+
|
|
57
|
+
For example, unusually long pallet cycles may justify investigating one pallet's station history.
|
|
58
|
+
The cause might be machine interruptions, a transfer bottleneck, or competition with other pallets.
|
|
59
|
+
The cycle chart narrows the investigation; it does not decide which intervention is appropriate.
|
|
60
|
+
|
|
61
|
+
## Cost Report
|
|
62
|
+
|
|
63
|
+
The [cost reports](/fms-insight/client-efficiency#costpiece) allocate resource costs using the
|
|
64
|
+
cell's recorded production and resource-use weights. This spreads the cost of both productive and
|
|
65
|
+
idle capacity across the part mix.
|
|
66
|
+
|
|
67
|
+
Use a consistent method and comparable periods when judging an improvement. Export the allocation
|
|
68
|
+
percentages to a spreadsheet or ERP if you need to combine them with material, overhead, or other
|
|
69
|
+
costs outside Insight's view. Share the results with the teams involved so the effects of changes
|
|
70
|
+
are visible across the business.
|
package/docs/makino.md
CHANGED
|
@@ -2,16 +2,14 @@
|
|
|
2
2
|
title: Makino Cell Integration
|
|
3
3
|
nav: FMS Insight Server > Makino
|
|
4
4
|
description: >-
|
|
5
|
-
FMS Insight
|
|
6
|
-
the cell controller and can also insert parts, jobs, and orders;
|
|
7
|
-
|
|
5
|
+
FMS Insight integrates with supported Makino cell controllers. FMS Insight can read events from
|
|
6
|
+
the cell controller and can also insert parts, jobs, and orders; the integration cannot create
|
|
7
|
+
pallets or fixtures.
|
|
8
8
|
---
|
|
9
9
|
|
|
10
|
-
|
|
11
|
-
|
|
12
|
-
|
|
13
|
-
cell controller and can also insert parts, jobs, and orders; at the current time FMS Insight cannot
|
|
14
|
-
create pallets or fixtures.
|
|
10
|
+
FMS Insight integrates with supported Makino cell controllers. FMS Insight can read events from the
|
|
11
|
+
cell controller and can also insert parts, jobs, and orders; the integration cannot create pallets
|
|
12
|
+
or fixtures.
|
|
15
13
|
|
|
16
14
|
## ADE Folder and SQL Server Connection
|
|
17
15
|
|
|
@@ -24,7 +22,8 @@ never modifies the cell data directly but instead just creates the appropriate f
|
|
|
24
22
|
folder.
|
|
25
23
|
|
|
26
24
|
By default, FMS Insight uses `c:\Makino\ADE` as the ADE folder and connects to the database on the
|
|
27
|
-
local computer. Both of these settings can be changed in the
|
|
25
|
+
local computer. Both of these settings can be changed in the
|
|
26
|
+
[configuration file](/fms-insight/server-config).
|
|
28
27
|
|
|
29
28
|
## Download Only Orders
|
|
30
29
|
|
|
@@ -32,5 +31,5 @@ When creating data in the cell controller (by writing a file to the ADE folder),
|
|
|
32
31
|
modes. First, it can include a description of the part, job, and order, causing the Makino cell
|
|
33
32
|
controller to create a new part, a new job, and a new order. This is the default, since it minimizes
|
|
34
33
|
the amount of data which must be manually entered into the cell controller. Alternatively, via a
|
|
35
|
-
setting in the [config file](server-config), FMS Insight will only create orders. FMS
|
|
36
|
-
assume that a matching part already exists inside the Makino cell controller.
|
|
34
|
+
setting in the [config file](/fms-insight/server-config), FMS Insight will only create orders. FMS
|
|
35
|
+
Insight will assume that a matching part already exists inside the Makino cell controller.
|