@seedtactics/insight-client 17.0.4 → 17.0.6

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (69) hide show
  1. package/dist/assets/{index-B0B_a7c8.js → index-BqTNkPt2.js} +1 -1
  2. package/dist/components/station-monitor/StationToolbar.js +2 -1
  3. package/dist/index.html +1 -1
  4. package/docs/client-efficiency.md +158 -291
  5. package/docs/client-engineering.md +29 -36
  6. package/docs/client-launch.md +35 -34
  7. package/docs/client-operations.md +40 -61
  8. package/docs/client-quality.md +32 -47
  9. package/docs/client-sales.md +22 -39
  10. package/docs/client-scanners.md +21 -27
  11. package/docs/client-station-monitor.md +75 -100
  12. package/docs/client-tools-programs.md +30 -59
  13. package/docs/improve-fms.md +55 -121
  14. package/docs/makino.md +10 -11
  15. package/docs/material-quarantine.md +40 -54
  16. package/docs/material-tracking.md +65 -183
  17. package/docs/mazak.md +31 -49
  18. package/docs/niigata.md +61 -89
  19. package/docs/operator-procedures.md +83 -96
  20. package/docs/part-instructions.md +43 -57
  21. package/docs/screenshots/insight-analysis-pallets.png +0 -0
  22. package/docs/screenshots/insight-analysis-part-completed.png +0 -0
  23. package/docs/screenshots/insight-analysis-sankey.png +0 -0
  24. package/docs/screenshots/insight-analysis-station-oee.png +0 -0
  25. package/docs/screenshots/insight-basket-work.png +0 -0
  26. package/docs/screenshots/insight-buffer-occupancy.png +0 -0
  27. package/docs/screenshots/insight-closeout.png +0 -0
  28. package/docs/screenshots/insight-cost-percentages.png +0 -0
  29. package/docs/screenshots/insight-dashboard.png +0 -0
  30. package/docs/screenshots/insight-inspection.png +0 -0
  31. package/docs/screenshots/insight-load-station-details.png +0 -0
  32. package/docs/screenshots/insight-load-station.png +0 -0
  33. package/docs/screenshots/insight-loadcycle-graph.png +0 -0
  34. package/docs/screenshots/insight-machinecycle-graph.png +0 -0
  35. package/docs/screenshots/insight-machinecycle-table.png +0 -0
  36. package/docs/screenshots/insight-machinecycles.png +0 -0
  37. package/docs/screenshots/insight-machinehours.png +0 -0
  38. package/docs/screenshots/insight-machineoutliers.png +0 -0
  39. package/docs/screenshots/insight-monthly-schedules.png +0 -0
  40. package/docs/screenshots/insight-operations-material.png +0 -0
  41. package/docs/screenshots/insight-operations-overview.png +0 -0
  42. package/docs/screenshots/insight-operations-reports.png +0 -0
  43. package/docs/screenshots/insight-part-cost.png +0 -0
  44. package/docs/screenshots/insight-program-report.png +0 -0
  45. package/docs/screenshots/insight-quality-material-details.png +0 -0
  46. package/docs/screenshots/insight-quality-material.png +0 -0
  47. package/docs/screenshots/insight-quality-sankey.png +0 -0
  48. package/docs/screenshots/insight-quality-similar-paths.png +0 -0
  49. package/docs/screenshots/insight-quarantine.png +0 -0
  50. package/docs/screenshots/insight-queue-details.png +0 -0
  51. package/docs/screenshots/insight-queues-jobs-table.png +0 -0
  52. package/docs/screenshots/insight-queues.png +0 -0
  53. package/docs/screenshots/insight-sim-day-usage.png +0 -0
  54. package/docs/screenshots/insight-system-overview.png +0 -0
  55. package/docs/screenshots/insight-tool-replacements.png +0 -0
  56. package/docs/screenshots/insight-tool-report.png +0 -0
  57. package/docs/screenshots/insight-workorder-gantt.png +0 -0
  58. package/docs/screenshots/insight-workorders.png +0 -0
  59. package/docs/security.md +98 -131
  60. package/docs/server-config.md +39 -22
  61. package/docs/server-errors.md +26 -18
  62. package/package.json +1 -1
  63. package/docs/screenshots/insight-all-material.png +0 -0
  64. package/docs/screenshots/insight-choose-analysis-month.png +0 -0
  65. package/docs/screenshots/insight-loadstation-small.jpg +0 -0
  66. package/docs/screenshots/insight-quality-quarantine.png +0 -0
  67. package/docs/screenshots/insight-station-system-overview-buttons.png +0 -0
  68. package/docs/screenshots/insight-station-system-overview.png +0 -0
  69. package/docs/screenshots/insight-toolbar-btns.png +0 -0
@@ -1,318 +1,185 @@
1
1
  ---
2
- title: FMS Monthly Flexibility Analysis
3
- nav: FMS Insight Client > Flexibility Analysis
2
+ title: FMS Insight Analysis
3
+ nav: FMS Insight Client > Analysis
4
4
  description: >-
5
- The FMS Insight flexibility analysis pages are used by managers to view a monthly report on the
6
- system and to focus on continuous improvement. The pages highlight potential bottlenecks and
7
- places for efficiency improvements in the cell.
5
+ Review production, resource use, material flow, and cost allocation over the last 30 days or a
6
+ calendar month to identify opportunities for improvement.
8
7
  ---
9
8
 
10
- # FMS Insight Monthly Flexibility Analysis
9
+ The Analysis pages support a [regular review](/fms-insight/improve-fms) of cell performance. Select
10
+ the last 30 days or a calendar month, then choose a report from the navigation. Use a wider period
11
+ to find patterns and individual cycles or material histories to investigate their causes.
11
12
 
12
- FMS Insight supports continuous improvement by assisting with a monthly review. We suggest that
13
- approximately once a month, all stakeholders review the operation of the cell and decide on
14
- potential improvements. The [improve an FMS](improve-fms) documentation goes into more details about
15
- how to make the most of these efficiency calculations.
13
+ Available data depends on the integration and the schedules supplied to Insight. In particular,
14
+ simulated station use and projected completions require simulation results in the downloaded jobs. A
15
+ missing measurement or forecast should not be interpreted as zero activity.
16
16
 
17
- ![Screenshot of choosing analysis month](screenshots/insight-choose-analysis-month.png)
17
+ ## Efficiency
18
18
 
19
- At the top of the page are two radio buttons allowing you to analyze either the last 30 days or a
20
- specific calendar month. You can then select from a variety of reports to investigate the cell.
19
+ ### Buffer Occupancy
21
20
 
22
- The best metric for continuous improvement of an FMS is not cost/piece but instead is the
23
- bottlenecks and utilization of system resources (the goal is to produce more stuff with the same
24
- machines and quality). The efficiency tab shows some charts and graphs for a monthly summary of the
25
- operation of the cell, displaying reports that in our experience are very helpful to find and fix
26
- bottlenecks. We suggest you review this data once a month and use these reports to gradually alter
27
- the flexibility or operation of the cell to improve the performance.
21
+ ![Material waiting in buffers over time](screenshots/insight-buffer-occupancy.png)
28
22
 
29
- ## Efficiency
23
+ Material can wait in the stocker, at machine buffers, or in transfer queues between processes. The
24
+ buffer chart shows a moving average of the quantity waiting in these locations. Adjust the averaging
25
+ window to reveal trends without being distracted by individual pallet movements.
26
+
27
+ A growing buffer can point to a downstream constraint. For example, material waiting to unload may
28
+ indicate that loading and unloading are falling behind, while empty machine input buffers may help
29
+ explain idle machines. Compare these patterns with station use and the part mix. The chart
30
+ identifies where to investigate; it cannot by itself distinguish staffing, tooling, downtime, or
31
+ scheduling causes. The locations shown depend on the events available from the controller.
32
+
33
+ ### Station Use
34
+
35
+ ![Daily station usage heatmap](screenshots/insight-analysis-station-oee.png)
36
+
37
+ The Station OEE report shows one row per station and one column per day. Darker cells represent
38
+ higher percentages; hover for the value. Choose one of three views:
39
+
40
+ | View | What it measures |
41
+ | ------------ | ---------------------------------------------------------------------------- |
42
+ | Standard OEE | Active time credited to recorded cycles, relative to available time. |
43
+ | Planned OEE | Simulated station use from downloaded schedules, relative to available time. |
44
+ | Occupied | Recorded elapsed cycle time, relative to available time. |
45
+
46
+ Available time is 24 hours per day minus planned downtime supplied with the simulation. Active time
47
+ normally represents the expected operation time supplied by the integration, rather than measured
48
+ cutting time. Where active time is absent, the client can estimate it from typical cycles. The
49
+ Occupied view uses recorded cycle durations; it is not a separate sensor measurement of every moment
50
+ a pallet is physically present.
51
+
52
+ For example, a cycle with 25 minutes of active time and 40 minutes elapsed contributes 25 minutes to
53
+ Standard OEE and 40 minutes to Occupied. A repeated gap is worth investigating alongside the
54
+ expected times and cycle histories. These reports do not independently apply a good-parts quality
55
+ factor; review inspection and disposition information as well.
56
+
57
+ Compare machines across the same days to look for imbalance, then use the part production report to
58
+ understand the mix that ran. A lightly used machine may reflect downtime or limited route
59
+ flexibility; it does not necessarily mean more work should be assigned to it.
30
60
 
31
- #### Buffer Occupancy
32
-
33
- ![Screenshot of buffer occupancy chart](screenshots/insight-buffer-occupancy.png)
34
-
35
- As material moves through the system, it buffers before various operations. It can buffer on a
36
- pallet waiting on the inbound rotary table, it can buffer on a pallet in the stocker waiting for
37
- either machining or unloading, or it can buffer between processes in a
38
- [transfer queue](material-tracking). In general, material will buffer right in front of the
39
- bottleneck operation. The buffer occupancy chart can thus be used to determine which operation
40
- (machining, loading, unloading) is the current bottleneck and also how the bottleneck changes over
41
- time.
42
-
43
- The buffer occupancy chart calculates a moving average of the quantity of material buffered in all
44
- these various places. The x-axis is the days of the month. For each time on the x-axis, a window
45
- around that point is used to calculate the average quantity of material in the buffer during the
46
- window of time. This average quantity is graphed on the y-axis.
47
-
48
- Using a moving average window smooths out the jitter from individual pallet moves, for example when
49
- a pallet rotates into the machine and another pallet is quickly sent to the inbound rotary. The size
50
- of the window can be controlled by the slider in the top-right. The size of the window should be set
51
- so that the major trends are visible while short oscillations are smoothed out.
52
-
53
- In an efficient, well-running system the bottleneck is always machining. This will be reflected in
54
- the buffer occupancy chart with the "Stocker[Waiting for unload]" line zero or almost zero, the
55
- "Rotary" for each machine always above zero, the "Stocker[Waiting for machining]" only positive if
56
- all rotary tables are full, and any in-process transfer queues small. If instead the load stations
57
- become the bottleneck, the buffer occupancy chart will show a rise either "Stocker[Waiting for
58
- unload]" or a rise in the in-process transfer queue between processes. Also, the rotary buffer
59
- occupancy will drop to zero.
60
-
61
- #### Station Use
62
-
63
- ![Screenshot of Station Use Heatmap](screenshots/insight-analysis-station-oee.png)
64
-
65
- The Station Use heatmap shows the station usage over the month. On the x-axis are the days of the
66
- month and on the y-axis are the machines and load stations. There are three charts which can be
67
- selected in the top-right corner: "Standard OEE", "Planned OEE", and "Occupied".
68
-
69
- - The "Standard OEE" chart computes the actual overall equipment effectiveness (OEE) over the month.
70
- For each station and each day, FMS Insight uses the log of parts produced and adds up the expected
71
- operation time for each part cycle and then divides by 24 hours to obtain a percentage that the
72
- station was busy with productive work. (If station cycles were longer than expected, this extra
73
- time is not counted in the OEE.) For each grid cell in the chart, the OEE percentage is drawn with
74
- a color with darker colors higher OEE and lighter colors lower OEE. A grid cell can be moused over
75
- to obtain extra information in a tooltip.
76
-
77
- - The "Planned OEE" chart displays the simulated station usage for the downloaded jobs and is the
78
- prediction of what the OEE should look like based on all the schedules for the month.
79
-
80
- - The "Occupied" chart computes the total percentage of time that a pallet is occupying the station.
81
- For each station and each day, FMS Insight uses the log of events to determine when a pallet
82
- arrives and departs from each station. The total time a pallet is at the station is then divided
83
- by 24 hours to obtain a percentage that the station was occupied. These percentages are then
84
- charted with darker colors higher occupancy.
85
-
86
- The Station Use heatmaps are useful for several observations. First, the Occupied heatmap can be
87
- used to determine the overall usage of the load station. If the load station occupied percentages
88
- are very high, it can indicate that the load station is a bottleneck and preventing the cell from
89
- performing useful work. In a healthy cell, the load stations should be faster than the machines, so
90
- the load stations should be empty at least part of the time waiting for machining to finish.
91
-
92
- The difference between the Standard OEE and Occupied heatmaps can be useful to determine if there is
93
- a lot of cycle interruptions. For example, if a program is expected to take 25 minutes but spends 40
94
- minutes at the machine, the Standard OEE heatmap will be credited with 25 minutes and the Occupied
95
- heatmap will be credited with 40 minutes, causing the Occupied heatmap to be darker in color for
96
- that day. Now, cycle interruptions do occasionally happen; comparing the Standard OEE and Occupied
97
- heatmaps allows you to determine if these are one-off events or a consistent problem. If most days
98
- are darker on the Occupied heatmap, the cycle interruptions should be investigated in more detail.
99
- (For example, look at individual parts on the machine cycle charts, ensure the expected time entered
100
- into the schedule is actually correct, investigate machine maintenance records, etc.)
101
-
102
- Finally, the Standard OEE heatmap helps visualize how balanced the machines were loaded over the
103
- month. We want to see all the machines consistently roughly the same color. If you see that a
104
- machine has a lighter color for a couple days, that indicates either the machine was down or that
105
- the daily mix for that day did not have enough flexibility. You should then consider picking a part
106
- and extending that part to run on the lightly loaded machine. To find such a part, you can use the
107
- part production chart below to see which part mix was run on this day to help find a part that might
108
- be changed to run on the lightly loaded machine.
109
-
110
- #### Part Production
111
-
112
- ![Screenshot of Part Production Heatmap](screenshots/insight-analysis-part-completed.png)
113
-
114
- The Part Production heatmap shows the distribution of completed parts over the month. On the x-axis
115
- are the days of the month and on the y-axis are the part types. For each part and each day, FMS
116
- Insight counts how many parts were produced that day. For each grid cell in the chart, the entry is
117
- drawn as a color with darker colors higher machine hours and lighter colors lower machine hours. A
118
- grid cell can be moused over to obtain extra information in a tooltip.
119
-
120
- The part production OEE heatmap is mainly useful to visualize the part mix as it varies throughout
121
- the month, by comparing the relative color shades. Also, it can help find a part to change move onto
122
- a lightly loaded machine. For example, consider that a machine is found to be lightly loaded via the
123
- station OEE heatmap. That same day can be viewed on the part production OEE heatmap and the darkest
124
- colored part was the highest run that day and could be considered to be extended to be run on the
125
- lightly loaded machine.
126
-
127
- Note that these heatmaps should only be used to brainstorm ideas. We would still to investigate if
128
- expanding `yyy` to include machine 2 would increase overall system performance. Are there enough
129
- pallets? How many extra inspections are required? Will this cause a traffic jam? These questions can
130
- be answered using simulation, _SeedTactic: Designer_, Little's Law, or a tool such as our
131
- [SeedTactic: Planning](https://www.seedtactics.com/features#seedtactic-planning).
61
+ ### Part Production
62
+
63
+ ![Production by part and process over time](screenshots/insight-analysis-part-completed.png)
64
+
65
+ The Completed Parts heatmap groups production by part and process. Its color represents the
66
+ associated active machine hours, while the tooltip shows both quantity and hours. Switch between
67
+ Completed and Planned to compare recorded unloads with simulated production.
68
+
69
+ A completed process is not necessarily a finished part, and production counts do not establish
70
+ quality acceptance. Use the report to compare the part mix and resource demand across days. Evaluate
71
+ proposed route or capacity changes with engineering review and simulation, such as
72
+ [SeedTactic: Planning](https://www.seedtactics.com/features#seedtactic-planning), before changing
73
+ the cell.
132
74
 
133
75
  ## Cycle Analysis
134
76
 
135
- If the broad analysis above indicates a problem, the cycle analysis can be used to investigate the
136
- problem in more detail.
137
-
138
- #### Machine Cycles
139
-
140
- ![Screenshot of station cycle chart](screenshots/insight-machinecycle-graph.png)
141
-
142
- The machine cycle chart displays a point for each program cycle. The cycles can be filtered by a
143
- specific part, a specific program, a specific machine, a specific pallet or a combination. The
144
- x-axis is the days of the month and the y-axis is cycle time in minutes. The cycle time is the wall
145
- clock time between program start and program end of the machine. The legend at the bottom shows
146
- which colors correspond to which stations, and by clicking on stations in the legend you can enable
147
- or disable the viewing of specific stations. By clicking on a point you can obtain details about
148
- that specific cycle in a tooltip and open the material card for the cycle. Finally, the chart can be
149
- zoomed by clicking and dragging.
150
-
151
- When a specific part and specific program are selected, a gray background and black horizontal line
152
- are shown. The gray background is calculated to be the statistical median and deviation of the
153
- points; the middle of the gray band is the median of the program time and the width of the band is
154
- determined by calculating the median absolute deviation of the median (MAD). In contrast, the
155
- horizontal black line is the expected cycle time entered during scheduling and sent in the scheduled
156
- jobs. Thus if the horizontal black line differs significantly from the middle of the gray band, this
157
- means that likely the expected time used in the simulation and scheduling is incorrect.
158
-
159
- The example screenshot above is an example of a part program which looks good. We see that almost
160
- all of the machine cycles are around 40 minutes, within the gray band and the horizontal black line
161
- and there are only a couple machine cycles significantly longer than 40 minutes which likely come
162
- from program interruptions, tool problems, etc. Since there are only a couple outlier points, we
163
- might instead conclude that it is not worth the effort to spend a large amount of time focusing on
164
- this part. If instead the graph showed many points outside the gray band and longer than 40 minutes,
165
- it would be worth it to investigate and improve the part program and tooling.
166
-
167
- ![Screenshot of station cycle table](screenshots/insight-machinecycle-table.png)
168
-
169
- The cycles can be toggled to display the raw data in a table instead of a chart. The table can be
170
- filtered, sorted, and restricted to a specific date range. The resulting raw data can be copied to
171
- the clipboard to be pasted into a spreadsheet for further analysis.
172
-
173
- #### Load/Unload Cycles
174
-
175
- ![Screenshot of load station cycle chart](screenshots/insight-loadcycle-graph.png)
176
-
177
- The load/unload cycle chart displays a point for each load or unload event. The x-axis is the days
178
- of the month and the y-axis is time in minutes. The cycles can be filtered by a specific part or
179
- pallet. The chart will display one of three possible times for each operation: "L/U Occupancy",
180
- "Load (estimated)", and "Unload (estimated)".
181
-
182
- The "L/U Occupancy" chart displays a point for the wall clock time that the pallet spends at the
183
- load station; the time from the pallet arriving at the load station until the operator presses the
184
- ready button. This is the time that FMS Insight collects and stores so this chart displays the
185
- actual raw data collected.
186
-
187
- Despite being the actual data FMS Insight collects, the "L/U Occupancy" chart is hard to use to
188
- determine if there are problems or slowdowns in loading a specific part. The recorded time is the
189
- wall clock time from pallet arrival to departure so includes all the operations which occur at the
190
- load station which might include a load and an unload or just a load or just an unload. Thus, FMS
191
- Insight attempts to split the wall clock occupied time of the pallet at the load station among the
192
- various operations such as loading or unloading that occurred.
193
-
194
- For each cycle, FMS Insight splits the time the pallet spends at the load station among each piece
195
- of material being loaded, transferred, or unload. To do so, FMS Insight uses the list of material
196
- loaded/unloaded/transferred and calculates the expected time the operation should take based on the
197
- values entered into the scheduled jobs. The expected time is then used to calculate a percentage
198
- consumption for each material, and this percentage is then applied to the actual wall clock time of
199
- the pallet occupancy. For example, consider an operation where part _aaa_ is loaded and part _bbb_
200
- is unloaded. The schedule says that the loading of _aaa_ should take 5 minutes and the unloading of
201
- _bbb_ should take 8 minutes for a total time the pallet should spend at the load station of 13
202
- minutes. Now say that the pallet actually spent 15 minutes at the load station. The load of _aaa_ is
203
- expected to consume `5/13 = 38%` of the cycle and the unload of _bbb_ is expected to consume
204
- `8/13 = 62%` of the cycle. The 38% is multiplied by the actual wall clock time of 15 minutes to give
205
- approximately 5.8 minutes for the load of _aaa_. Similarly for the unload of _bbb_, 15 minutes times
206
- 62% is approximately 9.2 minutes. Note how the "extra" 2 minutes (15 minutes compared to 13 minutes)
207
- for the entire cycle is divided among both the load and the unload operation. This calculation is
208
- repeated separately for each load/unload cycle.
209
-
210
- The result of FMS Insight's estimated splitting is graphed in the "Load Operation (estimated)" and
211
- "Unload Operation (estimated)" charts selected in the top-right corner. The screenshot above shows
212
- the "Load Operation (estimated)" chart. For each load/unload cycle, FMS Insight splits the time as
213
- described above and then plots a point with the y-coordinate the calculated time, filtering the data
214
- to a specific part and/or pallet. (In the example from the previous paragraph, the points would have
215
- y-coordinate 5.8 and 9.2 minutes.) Exactly like the machine cycles, FMS Insight calculates the
216
- median and median absolute deviation of the points and plots them as a gray band in the background.
217
- Finally, the expected time entered into the scheduled jobs is graphed as a horizontal black line.
218
-
219
- #### Pallet Cycles
220
-
221
- ![Screenshot of pallet cycle chart](screenshots/insight-analysis-pallets.png)
222
-
223
- Select a pallet from the combo box in the top-right. Once selected, all pallet cycles are displayed.
224
- The x-axis is the days of the month and the y-axis is the pallet cycle time in minutes. A pallet
225
- cycle time is the wall clock time from when a pallet leaves the load station to the next time it
226
- leaves the load station. This will therefore include cart transfer time, buffer time, machining
227
- time, and load/unload time. By clicking on a point, you can obtain more information about the pallet
228
- cycle in a tooltip. Similarly to the station cycle chart, the pallet cycle chart can be zoomed by
229
- clicking and dragging or the zoom range can be manually set via the button in the bottom-right.
230
-
231
- The pallet cycle chart is best used to determine if the cell is running lean and validate the
232
- [daily allocation and scheduling technique](https://www.seedtactics.com/docs/tactics/preventing-traffic-jams)
233
- to determine if there are traffic jams occurring in the pallets. In a lean, healthy cell, most
234
- pallet cycles should be low and reasonably consistent. If pallet cycle times vary wildly, there is
235
- likely traffic jams or other flow problems.
77
+ ### Machine Cycles
78
+
79
+ ![Machine cycle times for a selected part and program](screenshots/insight-machinecycle-graph.png)
80
+
81
+ Each point is a recorded program cycle. Filter by part, program, machine, or pallet, and zoom to a
82
+ period of interest. Select a point to see the cycle details and associated material. The vertical
83
+ axis is elapsed wall-clock time, including interruptions.
84
+
85
+ For a selected part and program, the gray band shows typical cycle times based on the median and
86
+ median absolute deviation. The horizontal reference line shows the expected active time. A
87
+ persistent difference between the band and reference line suggests reviewing the planning inputs;
88
+ scattered high points suggest investigating individual interruptions.
89
+
90
+ ![Machine cycles in table form](screenshots/insight-machinecycle-table.png)
91
+
92
+ Switch to the table to sort and compare records, or copy the displayed data to a spreadsheet.
93
+
94
+ ### Load/Unload Cycles
95
+
96
+ ![Load and unload cycle analysis](screenshots/insight-loadcycle-graph.png)
97
+
98
+ The load/unload report distinguishes recorded station occupancy from estimated time for each load or
99
+ unload operation. A single station visit can include several parts and operations, so Insight cannot
100
+ infer the time spent on each one from the total duration alone.
101
+
102
+ For ordinary pallet work, it apportions elapsed time using expected operation times. If one load is
103
+ expected to take five minutes and one unload eight minutes, a 15-minute visit is split in the ratio
104
+ 5:8, approximately 5.8 and 9.2 minutes. These are estimates, not separate stopwatch measurements.
105
+ Filter by part, pallet, or basket where available to investigate repeated patterns.
106
+
107
+ Basket load/unload work is included when the integration records it. Transfers between a pallet and
108
+ a basket are represented without counting their companion records as a second timed operation.
109
+
110
+ ### Pallet Cycles
111
+
112
+ ![Pallet cycle durations](screenshots/insight-analysis-pallets.png)
113
+
114
+ Select a pallet to examine its recorded cycle durations. These cover the pallet's circulation
115
+ through the cell, including the transfer, waiting, and processing intervals included by the
116
+ integration. Long or irregular cycles can reveal flow problems that are not obvious from machine
117
+ times alone. Select a point for the associated material and investigate the corresponding station
118
+ activity.
119
+
120
+ Use this alongside the
121
+ [daily allocation approach](https://www.seedtactics.com/tactics/preventing-traffic-jams) to review
122
+ how much work is circulating and whether queues or competing pallets are delaying flow.
123
+
124
+ ### Basket Cycles
125
+
126
+ Where basket cycle history is available, a separate report shows basket cycle durations. Select a
127
+ basket or part and process, then inspect individual points and their material. The installation may
128
+ use another name for baskets. These cycles describe basket circulation and are separate from the
129
+ load/unload operations performed at a station.
236
130
 
237
131
  ## Cell
238
132
 
239
- #### Quality
133
+ ### Quality
240
134
 
241
- The quality shows all paths taken by parts through the system for each inspection. The inspections
242
- can be viewed either as a sankey diagram or as a table.
135
+ ![Manufacturing paths and inspection outcomes](screenshots/insight-analysis-sankey.png)
243
136
 
244
- ![Screenshot of path sankey](screenshots/insight-quality-sankey.png)
137
+ The quality report groups recorded manufacturing paths and inspection outcomes for the selected
138
+ period. Choose a part and inspection type, then use the Sankey diagram or table to compare paths.
139
+ See the [Quality pages](/fms-insight/client-quality#paths) for how to interpret the results.
245
140
 
246
- #### Tool Replacements
141
+ ### Tool Replacements
247
142
 
248
- The tool replacement chart shows data about tool replacements over the month. Each tool is shown
249
- with the number of replacements, average usage at replacement, and average count at replacement.
250
- These numbers are approximate if a tool replacement happens during a cycle, since we do not know the
251
- exact time of the replacement. Each tool also shows a graph of all replacements over the whole
252
- month, with the red line the average and a black dot for each replacement. A replacement can be
253
- hovered for more information.
143
+ ![Tool replacements during the analysis period](screenshots/insight-tool-replacements.png)
254
144
 
255
- ![Screenshot of tool replacements](screenshots/insight-tool-replacements.png)
145
+ Where tool data is supplied, this report shows replacements and the recorded usage or count at
146
+ replacement. Each tool's graph shows individual replacements and their average. Replacements during
147
+ a cycle may have approximate usage values because the exact replacement time is not known.
256
148
 
257
- #### Schedules
149
+ ### Schedules
258
150
 
259
- The schedules report shows all the scheduled jobs for the month, details about the schedule, and a
260
- list of all serials machined on the schedule.
151
+ ![Scheduled jobs and production details](screenshots/insight-monthly-schedules.png)
261
152
 
262
- ![Screenshot of schedules](screenshots/insight-monthly-schedules.png)
153
+ The schedules report lists jobs for the selected period. Expand a job to review its routes,
154
+ quantities, and recorded serials. Use it to connect the production reports with the work that was
155
+ scheduled.
263
156
 
264
157
  ## Cost/Piece
265
158
 
266
- Cost-per-piece is a great [metric](improve-fms) for scheduling, operations management, future
267
- capital purchases, quoting work, accounting, and budgeting. The cost/piece tab is largely intended
268
- to serve as a verification that flexibility and operational changes are reducing part costs; you can
269
- compare part costs from before a change to after a change to understand if the change improved the
270
- system. Indeed, FMS Insight has a narrow view of just the cell itself and does not take into account
271
- any overhead or other costs. Therefore, for budgeting, quoting work, and other management decisions,
272
- we suggest that you export the cost breakdown or workorder data to your ERP and implement a cost
273
- report in your ERP taking into account all factors.
274
-
275
- Cost/piece is not a great metric to use initially when searching for techniques to improve the
276
- cell's operation, since focusing only on cost/piece risks introducing quality problems and OEE
277
- reduction. Instead, cost/piece is a great metric to use after-the-fact to determine if an
278
- implemented change in production operations has had a meaningful impact on cost/piece.
279
-
280
- #### Percentages
281
-
282
- Calculating cost-per-piece requires splitting large fixed costs such as machine depreciation and
283
- labor across the parts that were produced. To do so, we use a monthly analysis window of the actual
284
- operations together with the planned use of resources to determine a percentage breakdown of the
285
- cost for each part.
286
-
287
- ![Screenshot of cost breakdown table](screenshots/insight-cost-percentages.png)
288
-
289
- To do so, consider that the system produces two part types, aaa and bbb, and aaa has a planned cycle
290
- time of 3 hours and bbb has a planned cycle time of 2 hours. For January we collect data on the
291
- total number of parts produced by the system. Consider that in January the system produced 400 aaa
292
- parts and 500 bbb parts. We then calculate the cost breakdown as follows. Since we produced 400 aaa
293
- parts, those aaa parts should have used 400\*3 = 1200 machine-hours. Similarly, the bbb parts should
294
- have used 500\*2 = 1000 hours. Thus, aaa used `1200 / (1000 + 1200) = 54.5%` of the planned hours
295
- and bbb used `1000 / (1000 + 1200) = 45.5%` of the planned hours. Similar calculations happen for
296
- labor and automation.
297
-
298
- From a cost perspective, any bottlenecks or utilization slowdowns should be viewed as system
299
- problems and all parts are responsible for a portion of this cost. Indeed, The cost-per-piece metric
300
- is an actionable insight for quoting orders and justifying future capital investments and for these
301
- purposes any OEE problems are a problem for everything produced by the system. The above method does
302
- this by using planned cycle times to divide the total machine cost (which includes active and idle
303
- time) among the parts produced during the month based on their weights. A quick calculation of
304
- machine utilization gives `(1200 + 1000) / (24*30*4) = 76%` use. The above method divides the 24% of
305
- the time the machine is not in use among aaa and bbb based on their percentages of planned use.
306
- Attempting to identify OEE problems are better addressed using the efficiency reports above.
307
-
308
- The data can be copied to the clipboard via the two-arrow-icon button in the top right.
309
-
310
- #### Part Cost/Piece
311
-
312
- Once the percentage breakdown for each part is calculated, the webpage allows you to enter the total
313
- machining, labor, and automation cost for the period. This value is then multiplied by the above
314
- cost breakdown percentages to get a total cost per piece. As mentioned above, we suggest that you
315
- copy the above cost breakdown percentages into your own spreadsheet or ERP system to be able to
316
- account for overhead, overtime, material costs, and other costs not visible to FMS Insight.
317
-
318
- ![Screenshot of part cost/piece page](screenshots/insight-part-cost.png)
159
+ Cost allocation helps compare periods and assess whether a process change has reduced cost per
160
+ piece. Insight sees the cell's production and resource use; overhead, material cost, and other
161
+ business costs may need to be added in a spreadsheet or ERP report.
162
+
163
+ ### Percentages
164
+
165
+ ![Resource cost allocation percentages](screenshots/insight-cost-percentages.png)
166
+
167
+ The Percentages report allocates resource costs among part types with recorded work during the
168
+ selected period. Machine and labor shares use active time from recorded cycles; automation shares
169
+ use unload-cycle counts. These weights allocate a share of the total resource cost, including its
170
+ idle time, to each part type.
171
+
172
+ For example, if two part types account for 1,200 and 1,000 active machine hours in a group, their
173
+ shares of that group's cost are approximately 54.5% and 45.5%. The percentages describe how cost is
174
+ allocated, not why time was lost. Use the efficiency and cycle reports to investigate losses.
175
+
176
+ Copy the percentages to a spreadsheet or ERP to combine them with your own cost model. Check the
177
+ period, completed quantities, and active-time inputs before interpreting the results.
178
+
179
+ ### Part Cost/Piece
180
+
181
+ ![Part cost calculation from entered resource costs](screenshots/insight-part-cost.png)
182
+
183
+ Enter the resource costs using the units shown on the page. Insight applies the allocation
184
+ percentages and completed quantities to estimate cost per piece. This is a cell-level estimate;
185
+ combine it with other costs and quality information for a complete business comparison.
@@ -2,52 +2,45 @@
2
2
  title: FMS Engineering Daily Monitoring
3
3
  nav: FMS Insight Client > Engineering
4
4
  description: >-
5
- The FMS Insight engineering pages are used by part programming engineers. These pages display
6
- information about the past few days of machine cycles and program execution.
5
+ Review recent machine cycles, compare actual and planned hours, and investigate unusual cycle
6
+ times.
7
7
  ---
8
8
 
9
- # FMS Insight Engineering Pages
10
-
11
- The _Engineering_ page is intended for the part programming engineers. We suggest they bookmark this
12
- page and visit it directly. The page can be used after a new part-program is introduced to closely
13
- watch the timings of the new program. The page can also be used to stay on top of problematic
14
- programs which are frequently interrupted. All data available here is also available in the reports
15
- tab of the [operations page](client-operations). The engineering page just provides a dedicated
16
- place for engineers to bookmark and visit directly.
9
+ The Engineering pages help part-programming and manufacturing engineers review recent machine
10
+ activity. They are useful after introducing a program or when investigating recurring interruptions.
11
+ The same reports are available from [Operations](/fms-insight/client-operations#reports).
17
12
 
18
13
  ## Cycles
19
14
 
20
- ![Screenshot of machine cycles](screenshots/insight-machinecycles.png)
15
+ ![Recent machine cycles](screenshots/insight-machinecycles.png)
16
+
17
+ The cycle chart initially shows the past five days. Filter by part, program, pallet, or station,
18
+ zoom to a time range, and select a point to inspect the cycle and its material. A table view makes
19
+ it easier to compare individual records or copy data to a spreadsheet.
21
20
 
22
- First, the page contains a tab with a chart of all machine cycles from the past 3 days. The chart
23
- can be zoomed by clicking and dragging, filtered to specific parts and/or pallets, and toggled to a
24
- table. Clicking on any point allows more details about the cycle to be loaded. Anything older than 3
25
- days is available as part of the [monthly review](improve-fms) on the
26
- [flexibility analysis page](client-efficiency).
21
+ Cycle time is elapsed wall-clock time, including interruptions. When a part and program are
22
+ selected, the statistical band shows typical recent times and the horizontal reference line shows
23
+ the expected active time. A persistent difference may mean the planned time needs review; isolated
24
+ long cycles may have a different cause.
25
+ [Monthly cycle analysis](/fms-insight/client-efficiency#machine-cycles) provides a wider view.
27
26
 
28
27
  ## Hours
29
28
 
30
- ![Screenshot of machine hours](screenshots/insight-machinehours.png)
29
+ ![Actual and planned machine hours](screenshots/insight-machinehours.png)
31
30
 
32
- In the Hours tab, the planned and actual machine hours for the past 7 days are shown. The data can
33
- be toggled between a bar chart and a table. Anything older than 7 days is available as part of the
34
- [monthly review](improve-fms) on the [flexibility analysis page](client-efficiency).
31
+ The Hours view compares active hours credited to recorded cycles with simulated hours for the past
32
+ seven days. These active hours represent expected productive time rather than the full elapsed time
33
+ of interrupted cycles. Switch between the chart and table to compare machines and days. Use the
34
+ [Analysis pages](/fms-insight/client-efficiency) for older periods and broader comparisons.
35
35
 
36
36
  ## Outliers
37
37
 
38
- ![Screenshot of Machine outliers](screenshots/insight-machineoutliers.png)
39
-
40
- On the Outliers tab, there is a table which shows cycles from the last three days which are
41
- statistical outliers. The outlier detection is based on the
42
- [median absolute deviation of the median](https://en.wikipedia.org/wiki/Median_absolute_deviation),
43
- which is more resilient to outliers than the standard deviation. There are two reasons that a
44
- machine cycle will appear here:
45
-
46
- - If the actual time on the machine is far away from the median actual time, the cycle will be
47
- displayed. Cycles of this type indicate that the program was interrupted and took longer than
48
- expected.
49
- - If the expected machine time from the job is far away from the median actual time, the cycle will
50
- be displayed. Cycles of this type indicate that the expected time is unrealistic (as long as
51
- enough cycles are available to obtain good statistics). In this case, the expected machine time in
52
- the flexibility plan should be adjusted to be equal to the median time. Alternatively, perhaps the
53
- program should be changed to improve the machine time.
38
+ ![Recent machine cycle outliers](screenshots/insight-machineoutliers.png)
39
+
40
+ The Outliers view lists cycles from the past five days whose elapsed time is outside the typical
41
+ range. Insight estimates that range using the median and median absolute deviation, reducing the
42
+ influence of occasional long interruptions.
43
+
44
+ An outlier is a reason to investigate, not a diagnosis. Review the material history, program,
45
+ tooling, and circumstances of the cycle. Separately compare typical cycle times with the expected
46
+ times used for planning; a consistently unrealistic planned time may not appear as an outlier.