@mu-crew/mu 3.13.2 → 3.13.3

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
@@ -1362,7 +1362,7 @@ function registerRefuteNudge(pi, run = defaultRunner(), nested = notNested, hold
1362
1362
  }
1363
1363
 
1364
1364
  // extension/mu-pi.ts
1365
- var EXT_VERSION = true ? "3.13.2" : void 0;
1365
+ var EXT_VERSION = true ? "3.13.3" : void 0;
1366
1366
  var FRESH_COMMAND = "mu-fresh";
1367
1367
  var FRESH_TIMEOUT_MS = 3e4;
1368
1368
  function commandName(name) {
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@mu-crew/mu",
3
- "version": "3.13.2",
3
+ "version": "3.13.3",
4
4
  "description": "A persistent, observable crew of pi agents running in one tmux or herdr session per workstream, coordinated through a built-in task DAG.",
5
5
  "publishConfig": {
6
6
  "access": "public"
@@ -79,6 +79,14 @@ work. A budget is a scheduling trigger, not an indefinite crew-wide stop.
79
79
  conditions, including coverage/count changes. If neither faster nor
80
80
  smaller, say so and why; smaller alone does not prove preserved coverage.
81
81
 
82
- Done when AFTER records the outcome and the slow gate is within budget, or
83
- names the remaining bottleneck and prioritised follow-up. Keep unmet required
84
- checks distinct from a time-budget overrun.
82
+ 6. **Report.** Before teardown, commit a dated report to the repo
83
+ (`docs/test-health/<YYYY-MM-DD>.md`): conditions, BEFORE/AFTER, each
84
+ finding with its evidence, every refuted or rejected verdict with the
85
+ reason, and the remaining bottleneck. Task notes die with the
86
+ workstream; the next pass reads the latest report first and still
87
+ re-measures. Add a file per pass; never edit an old one.
88
+
89
+ Done when AFTER records the outcome, the report is committed, and the slow
90
+ gate is within budget or the report names the remaining bottleneck and
91
+ prioritised follow-up. Keep unmet required checks distinct from a
92
+ time-budget overrun.