@mu-crew/mu 3.13.2 → 3.13.3
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/dist/extension/mu-pi.js
CHANGED
|
@@ -1362,7 +1362,7 @@ function registerRefuteNudge(pi, run = defaultRunner(), nested = notNested, hold
|
|
|
1362
1362
|
}
|
|
1363
1363
|
|
|
1364
1364
|
// extension/mu-pi.ts
|
|
1365
|
-
var EXT_VERSION = true ? "3.13.
|
|
1365
|
+
var EXT_VERSION = true ? "3.13.3" : void 0;
|
|
1366
1366
|
var FRESH_COMMAND = "mu-fresh";
|
|
1367
1367
|
var FRESH_TIMEOUT_MS = 3e4;
|
|
1368
1368
|
function commandName(name) {
|
package/package.json
CHANGED
|
@@ -1,6 +1,6 @@
|
|
|
1
1
|
{
|
|
2
2
|
"name": "@mu-crew/mu",
|
|
3
|
-
"version": "3.13.
|
|
3
|
+
"version": "3.13.3",
|
|
4
4
|
"description": "A persistent, observable crew of pi agents running in one tmux or herdr session per workstream, coordinated through a built-in task DAG.",
|
|
5
5
|
"publishConfig": {
|
|
6
6
|
"access": "public"
|
|
@@ -79,6 +79,14 @@ work. A budget is a scheduling trigger, not an indefinite crew-wide stop.
|
|
|
79
79
|
conditions, including coverage/count changes. If neither faster nor
|
|
80
80
|
smaller, say so and why; smaller alone does not prove preserved coverage.
|
|
81
81
|
|
|
82
|
-
|
|
83
|
-
|
|
84
|
-
|
|
82
|
+
6. **Report.** Before teardown, commit a dated report to the repo
|
|
83
|
+
(`docs/test-health/<YYYY-MM-DD>.md`): conditions, BEFORE/AFTER, each
|
|
84
|
+
finding with its evidence, every refuted or rejected verdict with the
|
|
85
|
+
reason, and the remaining bottleneck. Task notes die with the
|
|
86
|
+
workstream; the next pass reads the latest report first and still
|
|
87
|
+
re-measures. Add a file per pass; never edit an old one.
|
|
88
|
+
|
|
89
|
+
Done when AFTER records the outcome, the report is committed, and the slow
|
|
90
|
+
gate is within budget or the report names the remaining bottleneck and
|
|
91
|
+
prioritised follow-up. Keep unmet required checks distinct from a
|
|
92
|
+
time-budget overrun.
|