@critical-path/core 0.35.0 → 0.36.1

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (187) hide show
  1. package/README.md +11 -0
  2. package/dist/engine/index.d.ts +2 -0
  3. package/dist/engine/index.d.ts.map +1 -1
  4. package/dist/engine/index.js +25 -2
  5. package/dist/engine/index.js.map +1 -1
  6. package/dist/types/index.d.ts +11 -0
  7. package/dist/types/index.d.ts.map +1 -1
  8. package/package.json +5 -1
  9. package/CHANGELOG.md +0 -584
  10. package/dist/deliverables.test.d.ts +0 -2
  11. package/dist/deliverables.test.d.ts.map +0 -1
  12. package/dist/deliverables.test.js +0 -232
  13. package/dist/deliverables.test.js.map +0 -1
  14. package/dist/domain/calendar.test.d.ts +0 -2
  15. package/dist/domain/calendar.test.d.ts.map +0 -1
  16. package/dist/domain/calendar.test.js +0 -181
  17. package/dist/domain/calendar.test.js.map +0 -1
  18. package/dist/domain/cpm.test.d.ts +0 -2
  19. package/dist/domain/cpm.test.d.ts.map +0 -1
  20. package/dist/domain/cpm.test.js +0 -166
  21. package/dist/domain/cpm.test.js.map +0 -1
  22. package/dist/domain/ddd.test.d.ts +0 -2
  23. package/dist/domain/ddd.test.d.ts.map +0 -1
  24. package/dist/domain/ddd.test.js +0 -349
  25. package/dist/domain/ddd.test.js.map +0 -1
  26. package/dist/domain/ladder.test.d.ts +0 -2
  27. package/dist/domain/ladder.test.d.ts.map +0 -1
  28. package/dist/domain/ladder.test.js +0 -213
  29. package/dist/domain/ladder.test.js.map +0 -1
  30. package/dist/domain/metrics.test.d.ts +0 -2
  31. package/dist/domain/metrics.test.d.ts.map +0 -1
  32. package/dist/domain/metrics.test.js +0 -252
  33. package/dist/domain/metrics.test.js.map +0 -1
  34. package/dist/domain/task-duration.test.d.ts +0 -2
  35. package/dist/domain/task-duration.test.d.ts.map +0 -1
  36. package/dist/domain/task-duration.test.js +0 -307
  37. package/dist/domain/task-duration.test.js.map +0 -1
  38. package/dist/domain/workload.test.d.ts +0 -2
  39. package/dist/domain/workload.test.d.ts.map +0 -1
  40. package/dist/domain/workload.test.js +0 -261
  41. package/dist/domain/workload.test.js.map +0 -1
  42. package/dist/engine/actor.test.d.ts +0 -2
  43. package/dist/engine/actor.test.d.ts.map +0 -1
  44. package/dist/engine/actor.test.js +0 -54
  45. package/dist/engine/actor.test.js.map +0 -1
  46. package/dist/engine/authorization.test.d.ts +0 -2
  47. package/dist/engine/authorization.test.d.ts.map +0 -1
  48. package/dist/engine/authorization.test.js +0 -154
  49. package/dist/engine/authorization.test.js.map +0 -1
  50. package/dist/engine/cascade.test.d.ts +0 -2
  51. package/dist/engine/cascade.test.d.ts.map +0 -1
  52. package/dist/engine/cascade.test.js +0 -99
  53. package/dist/engine/cascade.test.js.map +0 -1
  54. package/dist/engine/config.test.d.ts +0 -2
  55. package/dist/engine/config.test.d.ts.map +0 -1
  56. package/dist/engine/config.test.js +0 -46
  57. package/dist/engine/config.test.js.map +0 -1
  58. package/dist/engine/entity-events.test.d.ts +0 -2
  59. package/dist/engine/entity-events.test.d.ts.map +0 -1
  60. package/dist/engine/entity-events.test.js +0 -61
  61. package/dist/engine/entity-events.test.js.map +0 -1
  62. package/dist/index.test.d.ts +0 -2
  63. package/dist/index.test.d.ts.map +0 -1
  64. package/dist/index.test.js +0 -429
  65. package/dist/index.test.js.map +0 -1
  66. package/dist/plugins/plugins.test.d.ts +0 -2
  67. package/dist/plugins/plugins.test.d.ts.map +0 -1
  68. package/dist/plugins/plugins.test.js +0 -137
  69. package/dist/plugins/plugins.test.js.map +0 -1
  70. package/dist/schemas/schemas.test.d.ts +0 -2
  71. package/dist/schemas/schemas.test.d.ts.map +0 -1
  72. package/dist/schemas/schemas.test.js +0 -58
  73. package/dist/schemas/schemas.test.js.map +0 -1
  74. package/dist/status.test.d.ts +0 -2
  75. package/dist/status.test.d.ts.map +0 -1
  76. package/dist/status.test.js +0 -295
  77. package/dist/status.test.js.map +0 -1
  78. package/dist/storage/storage.test.d.ts +0 -2
  79. package/dist/storage/storage.test.d.ts.map +0 -1
  80. package/dist/storage/storage.test.js +0 -236
  81. package/dist/storage/storage.test.js.map +0 -1
  82. package/dist/store/conformance.test.d.ts +0 -2
  83. package/dist/store/conformance.test.d.ts.map +0 -1
  84. package/dist/store/conformance.test.js +0 -15
  85. package/dist/store/conformance.test.js.map +0 -1
  86. package/dist/store/firebase.test.d.ts +0 -2
  87. package/dist/store/firebase.test.d.ts.map +0 -1
  88. package/dist/store/firebase.test.js +0 -103
  89. package/dist/store/firebase.test.js.map +0 -1
  90. package/dist/store/query.test.d.ts +0 -2
  91. package/dist/store/query.test.d.ts.map +0 -1
  92. package/dist/store/query.test.js +0 -89
  93. package/dist/store/query.test.js.map +0 -1
  94. package/dist/store/sqlite.test.d.ts +0 -2
  95. package/dist/store/sqlite.test.d.ts.map +0 -1
  96. package/dist/store/sqlite.test.js +0 -177
  97. package/dist/store/sqlite.test.js.map +0 -1
  98. package/dist/task-state.test.d.ts +0 -2
  99. package/dist/task-state.test.d.ts.map +0 -1
  100. package/dist/task-state.test.js +0 -423
  101. package/dist/task-state.test.js.map +0 -1
  102. package/dist/use-case-validation.test.d.ts +0 -2
  103. package/dist/use-case-validation.test.d.ts.map +0 -1
  104. package/dist/use-case-validation.test.js +0 -281
  105. package/dist/use-case-validation.test.js.map +0 -1
  106. package/dist/utils/fractional-index.test.d.ts +0 -2
  107. package/dist/utils/fractional-index.test.d.ts.map +0 -1
  108. package/dist/utils/fractional-index.test.js +0 -182
  109. package/dist/utils/fractional-index.test.js.map +0 -1
  110. package/dist/utils/key.test.d.ts +0 -2
  111. package/dist/utils/key.test.d.ts.map +0 -1
  112. package/dist/utils/key.test.js +0 -65
  113. package/dist/utils/key.test.js.map +0 -1
  114. package/dist/utils/mentions.test.d.ts +0 -2
  115. package/dist/utils/mentions.test.d.ts.map +0 -1
  116. package/dist/utils/mentions.test.js +0 -114
  117. package/dist/utils/mentions.test.js.map +0 -1
  118. package/dist/webhooks/webhooks.test.d.ts +0 -2
  119. package/dist/webhooks/webhooks.test.d.ts.map +0 -1
  120. package/dist/webhooks/webhooks.test.js +0 -154
  121. package/dist/webhooks/webhooks.test.js.map +0 -1
  122. package/src/deliverables.test.ts +0 -284
  123. package/src/domain/authorization.ts +0 -82
  124. package/src/domain/calendar.test.ts +0 -216
  125. package/src/domain/calendar.ts +0 -502
  126. package/src/domain/cpm.test.ts +0 -189
  127. package/src/domain/cpm.ts +0 -258
  128. package/src/domain/custom-fields.ts +0 -172
  129. package/src/domain/ddd.test.ts +0 -442
  130. package/src/domain/entities.ts +0 -798
  131. package/src/domain/errors.ts +0 -38
  132. package/src/domain/events.ts +0 -369
  133. package/src/domain/graph.ts +0 -70
  134. package/src/domain/index.ts +0 -12
  135. package/src/domain/ladder.test.ts +0 -251
  136. package/src/domain/ladder.ts +0 -474
  137. package/src/domain/metrics.test.ts +0 -288
  138. package/src/domain/metrics.ts +0 -497
  139. package/src/domain/task-duration.test.ts +0 -354
  140. package/src/domain/workload.test.ts +0 -311
  141. package/src/domain/workload.ts +0 -457
  142. package/src/engine/actor.test.ts +0 -63
  143. package/src/engine/authorization.test.ts +0 -199
  144. package/src/engine/cascade.test.ts +0 -121
  145. package/src/engine/config.test.ts +0 -51
  146. package/src/engine/entity-events.test.ts +0 -67
  147. package/src/engine/index.ts +0 -2472
  148. package/src/index.test.ts +0 -514
  149. package/src/index.ts +0 -9
  150. package/src/plugins/index.ts +0 -103
  151. package/src/plugins/plugins.test.ts +0 -161
  152. package/src/schemas/index.ts +0 -402
  153. package/src/schemas/schemas.test.ts +0 -116
  154. package/src/status.test.ts +0 -354
  155. package/src/storage/file-storage.ts +0 -200
  156. package/src/storage/firebase-storage.ts +0 -209
  157. package/src/storage/index.ts +0 -3
  158. package/src/storage/s3.ts +0 -151
  159. package/src/storage/storage.test.ts +0 -274
  160. package/src/store/conformance.test.ts +0 -15
  161. package/src/store/firebase.test.ts +0 -131
  162. package/src/store/firebase.ts +0 -658
  163. package/src/store/index.ts +0 -623
  164. package/src/store/query.test.ts +0 -110
  165. package/src/store/query.ts +0 -113
  166. package/src/store/sqlite.test.ts +0 -218
  167. package/src/store/sqlite.ts +0 -1480
  168. package/src/task-state.test.ts +0 -506
  169. package/src/testing/conformance.ts +0 -319
  170. package/src/testing/index.ts +0 -1
  171. package/src/types/index.ts +0 -859
  172. package/src/use-case-validation.test.ts +0 -324
  173. package/src/utils/fractional-index.test.ts +0 -228
  174. package/src/utils/fractional-index.ts +0 -254
  175. package/src/utils/index.ts +0 -7
  176. package/src/utils/key.test.ts +0 -76
  177. package/src/utils/key.ts +0 -62
  178. package/src/utils/mentions.test.ts +0 -132
  179. package/src/utils/mentions.ts +0 -131
  180. package/src/utils/status.ts +0 -419
  181. package/src/utils/workflow.ts +0 -306
  182. package/src/webhooks/dispatcher.ts +0 -190
  183. package/src/webhooks/index.ts +0 -2
  184. package/src/webhooks/signature.ts +0 -57
  185. package/src/webhooks/webhooks.test.ts +0 -201
  186. package/tsconfig.json +0 -8
  187. package/tsconfig.tsbuildinfo +0 -1
@@ -1,497 +0,0 @@
1
- import type {
2
- Task,
3
- Activity,
4
- TimeEntry,
5
- TaskProgressInference,
6
- ProgressInferenceSource,
7
- ProgressCurveProfile,
8
- TaskProgressHistoryPoint,
9
- TaskProgressHistory,
10
- TaskEVM,
11
- TaskInferredActuals,
12
- TaskMetrics,
13
- RealityDelta
14
- } from '../types/index.js';
15
- import { resolveStatusDefinition } from '../utils/status.js';
16
-
17
- export interface MetricOptions {
18
- referenceDate?: Date;
19
- customStatusDefinitions?: Array<{ key: string; category: any; label: string }>;
20
- }
21
-
22
- /**
23
- * Infer task progress percentage from explicit user input, todos/checklists,
24
- * logged effort vs estimate, and elapsed schedule duration.
25
- */
26
- export function inferTaskProgress(
27
- task: Task,
28
- options?: MetricOptions
29
- ): TaskProgressInference {
30
- const referenceDate = options?.referenceDate ?? new Date();
31
- const statusDef = resolveStatusDefinition(task.status, options?.customStatusDefinitions);
32
- const semanticStatus = task.semanticStatus || statusDef.category;
33
-
34
- // Completed tasks are 100% complete
35
- if (semanticStatus === 'completed') {
36
- return {
37
- progressPercentage: 100,
38
- source: task.progress === 100 ? 'explicit' : 'blended',
39
- isExplicit: task.progress !== undefined && task.progress !== null,
40
- breakdown: {
41
- explicitProgress: task.progress,
42
- todoProgress: task.todos && task.todos.length > 0 ? 100 : undefined,
43
- effortProgress: 100,
44
- scheduleProgress: 100
45
- }
46
- };
47
- }
48
-
49
- // 1. Explicit Progress
50
- let explicitProgress: number | undefined;
51
- if (task.progress !== undefined && task.progress !== null) {
52
- explicitProgress = Math.min(100, Math.max(0, Math.round(task.progress * 10) / 10));
53
- }
54
-
55
- // 2. Checklist / Todo Progress
56
- let todoProgress: number | undefined;
57
- if (task.todos && task.todos.length > 0) {
58
- const completed = task.todos.filter((t) => t.completed).length;
59
- todoProgress = Math.round((completed / task.todos.length) * 1000) / 10;
60
- }
61
-
62
- // 3. Effort / Hours Progress (Logged vs Estimated)
63
- let effortProgress: number | undefined;
64
- const estimatedH = task.estimatedHours || (task.estimatedDurationMinutes ? task.estimatedDurationMinutes / 60 : 0);
65
- const loggedH = task.loggedHours || task.actualHours || 0;
66
- if (estimatedH > 0) {
67
- effortProgress = Math.min(100, Math.round((loggedH / estimatedH) * 1000) / 10);
68
- }
69
-
70
- // 4. Schedule Elapsed Progress
71
- let scheduleProgress: number | undefined;
72
- const startDateStr = task.actualStartDate || task.plannedStartDate;
73
- if (startDateStr && task.dueDate && semanticStatus === 'in_progress') {
74
- const startTime = new Date(startDateStr).getTime();
75
- const dueTime = new Date(task.dueDate).getTime();
76
- const nowTime = referenceDate.getTime();
77
-
78
- if (!isNaN(startTime) && !isNaN(dueTime) && dueTime > startTime) {
79
- const elapsed = nowTime - startTime;
80
- const total = dueTime - startTime;
81
- const ratio = Math.min(1, Math.max(0, elapsed / total));
82
- scheduleProgress = Math.round(ratio * 1000) / 10;
83
- }
84
- }
85
-
86
- // Select canonical progress percentage and primary inference source
87
- let progressPercentage = 0;
88
- let source: ProgressInferenceSource = 'explicit';
89
-
90
- if (explicitProgress !== undefined && explicitProgress > 0) {
91
- progressPercentage = explicitProgress;
92
- source = 'explicit';
93
- } else if (todoProgress !== undefined && todoProgress > 0) {
94
- progressPercentage = todoProgress;
95
- source = 'todos';
96
- } else if (effortProgress !== undefined && effortProgress > 0 && semanticStatus === 'in_progress') {
97
- progressPercentage = effortProgress;
98
- source = 'time_effort';
99
- } else if (scheduleProgress !== undefined && scheduleProgress > 0 && semanticStatus === 'in_progress') {
100
- progressPercentage = scheduleProgress;
101
- source = 'schedule_elapsed';
102
- } else if (explicitProgress !== undefined) {
103
- progressPercentage = explicitProgress;
104
- source = 'explicit';
105
- } else {
106
- progressPercentage = 0;
107
- source = 'explicit';
108
- }
109
-
110
- return {
111
- progressPercentage,
112
- source,
113
- isExplicit: explicitProgress !== undefined,
114
- breakdown: {
115
- explicitProgress,
116
- todoProgress,
117
- effortProgress,
118
- scheduleProgress
119
- }
120
- };
121
- }
122
-
123
- /**
124
- * Calculate Earned Value Management (EVM) metrics for a task.
125
- */
126
- export function calculateTaskEVM(
127
- task: Task,
128
- options?: MetricOptions & { progressInference?: TaskProgressInference }
129
- ): TaskEVM {
130
- const referenceDate = options?.referenceDate ?? new Date();
131
- const statusDef = resolveStatusDefinition(task.status, options?.customStatusDefinitions);
132
- const semanticStatus = task.semanticStatus || statusDef.category;
133
-
134
- const estimatedHours = task.estimatedHours || (task.estimatedDurationMinutes ? task.estimatedDurationMinutes / 60 : 0);
135
- const actualCost = Math.round(((task.loggedHours ?? task.actualHours) || 0) * 100) / 100;
136
-
137
- if (estimatedHours <= 0) {
138
- return {
139
- plannedValue: actualCost,
140
- earnedValue: actualCost,
141
- actualCost,
142
- costVariance: 0,
143
- scheduleVariance: 0,
144
- costPerformanceIndex: 1.0,
145
- schedulePerformanceIndex: 1.0
146
- };
147
- }
148
-
149
- const progress = options?.progressInference ?? inferTaskProgress(task, options);
150
- const actualProgressRatio = Math.min(1, Math.max(0, progress.progressPercentage / 100));
151
- const earnedValue = Math.round(actualProgressRatio * estimatedHours * 100) / 100;
152
-
153
- // Compute Planned Value (PV) based on expected progress at reference date
154
- let plannedRatio = 0;
155
- if (semanticStatus === 'completed') {
156
- plannedRatio = 1.0;
157
- } else {
158
- const startStr = task.plannedStartDate || task.actualStartDate;
159
- if (startStr && task.dueDate) {
160
- const startTime = new Date(startStr).getTime();
161
- const dueTime = new Date(task.dueDate).getTime();
162
- const nowTime = referenceDate.getTime();
163
-
164
- if (!isNaN(startTime) && !isNaN(dueTime)) {
165
- if (nowTime <= startTime) {
166
- plannedRatio = 0;
167
- } else if (nowTime >= dueTime) {
168
- plannedRatio = 1.0;
169
- } else {
170
- plannedRatio = (nowTime - startTime) / (dueTime - startTime);
171
- }
172
- }
173
- } else if (task.dueDate) {
174
- const dueTime = new Date(task.dueDate).getTime();
175
- if (!isNaN(dueTime) && referenceDate.getTime() >= dueTime) {
176
- plannedRatio = 1.0;
177
- } else if (semanticStatus === 'in_progress') {
178
- plannedRatio = 0.5;
179
- }
180
- } else if (semanticStatus === 'in_progress') {
181
- plannedRatio = 0.5;
182
- }
183
- }
184
-
185
- const plannedValue = Math.round(plannedRatio * estimatedHours * 100) / 100;
186
- const costVariance = Math.round((earnedValue - actualCost) * 100) / 100;
187
- const scheduleVariance = Math.round((earnedValue - plannedValue) * 100) / 100;
188
-
189
- const costPerformanceIndex = actualCost > 0
190
- ? Math.round((earnedValue / actualCost) * 100) / 100
191
- : earnedValue > 0 ? 1.0 : 1.0;
192
-
193
- const schedulePerformanceIndex = plannedValue > 0
194
- ? Math.round((earnedValue / plannedValue) * 100) / 100
195
- : earnedValue > 0 ? 1.0 : 1.0;
196
-
197
- return {
198
- plannedValue,
199
- earnedValue,
200
- actualCost,
201
- costVariance,
202
- scheduleVariance,
203
- costPerformanceIndex,
204
- schedulePerformanceIndex
205
- };
206
- }
207
-
208
- /**
209
- * Reconstruct task progress history and curve shape from activity logs.
210
- */
211
- export function reconstructTaskProgressHistory(
212
- task: Task,
213
- activities: Activity[] = [],
214
- options?: MetricOptions
215
- ): TaskProgressHistory {
216
- const referenceDate = options?.referenceDate ?? new Date();
217
- const taskActivities = activities
218
- .filter((a) => a.taskId === task.id)
219
- .sort((a, b) => new Date(a.createdAt).getTime() - new Date(b.createdAt).getTime());
220
-
221
- const points: TaskProgressHistoryPoint[] = [];
222
-
223
- // Point 0: Task creation
224
- points.push({
225
- timestamp: task.createdAt,
226
- progress: 0,
227
- inferredProgress: 0,
228
- status: 'todo',
229
- semanticStatus: 'not_started',
230
- action: 'task.created'
231
- });
232
-
233
- let runningProgress = 0;
234
- let runningStatus = task.status;
235
-
236
- for (const act of taskActivities) {
237
- let pointProgress = runningProgress;
238
- let pointInferred: number | undefined;
239
-
240
- const details = (act.details || {}) as Record<string, unknown>;
241
-
242
- if (act.action === 'task.status_changed') {
243
- const newStatus = (details.toStatus as string) || (details.newStatus as string) || runningStatus;
244
- runningStatus = newStatus;
245
- const def = resolveStatusDefinition(newStatus, options?.customStatusDefinitions);
246
- if (def.category === 'completed') {
247
- pointProgress = 100;
248
- pointInferred = 100;
249
- }
250
- } else if (act.action === 'task.updated') {
251
- if (typeof details.progress === 'number') {
252
- pointProgress = Math.min(100, Math.max(0, details.progress));
253
- } else if (details.updates && typeof (details.updates as Record<string, unknown>).progress === 'number') {
254
- pointProgress = Math.min(100, Math.max(0, (details.updates as Record<string, unknown>).progress as number));
255
- }
256
- }
257
-
258
- runningProgress = pointProgress;
259
- const def = resolveStatusDefinition(runningStatus, options?.customStatusDefinitions);
260
-
261
- points.push({
262
- timestamp: act.createdAt,
263
- progress: pointProgress,
264
- inferredProgress: pointInferred,
265
- status: runningStatus,
266
- semanticStatus: def.category,
267
- action: act.action
268
- });
269
- }
270
-
271
- // Ensure latest current state is reflected at the end if different from last point
272
- const currentInferred = inferTaskProgress(task, options);
273
- const currentProgress = task.progress ?? currentInferred.progressPercentage;
274
- const lastPoint = points[points.length - 1];
275
-
276
- if (!lastPoint || lastPoint.progress !== currentProgress || lastPoint.status !== task.status) {
277
- points.push({
278
- timestamp: task.updatedAt || referenceDate.toISOString(),
279
- progress: currentProgress,
280
- inferredProgress: currentInferred.progressPercentage,
281
- status: task.status,
282
- semanticStatus: task.semanticStatus || resolveStatusDefinition(task.status, options?.customStatusDefinitions).category,
283
- action: 'snapshot.current'
284
- });
285
- }
286
-
287
- // Deduplicate any points with exact same timestamp
288
- const uniquePoints: TaskProgressHistoryPoint[] = [];
289
- const seenTimestamps = new Set<string>();
290
- for (const pt of points) {
291
- if (!seenTimestamps.has(pt.timestamp + pt.action)) {
292
- seenTimestamps.add(pt.timestamp + pt.action);
293
- uniquePoints.push(pt);
294
- }
295
- }
296
-
297
- // Classify curve profile
298
- const curveProfile = classifyCurveProfile(uniquePoints, task, referenceDate);
299
-
300
- return {
301
- taskId: task.id,
302
- points: uniquePoints,
303
- curveProfile
304
- };
305
- }
306
-
307
- function classifyCurveProfile(
308
- points: TaskProgressHistoryPoint[],
309
- task: Task,
310
- referenceDate: Date
311
- ): ProgressCurveProfile {
312
- if (points.length < 3) {
313
- return 'insufficient_data';
314
- }
315
-
316
- const startPt = points[0];
317
- const endPt = points[points.length - 1];
318
- const startTime = new Date(startPt.timestamp).getTime();
319
- const endTime = new Date(endPt.timestamp).getTime();
320
- const totalDuration = endTime - startTime;
321
-
322
- if (totalDuration <= 0) {
323
- return 'insufficient_data';
324
- }
325
-
326
- // Check if stalled: last 2 or more points have same progress for an extended span while in progress
327
- const statusDef = resolveStatusDefinition(task.status);
328
- if (statusDef.category === 'in_progress') {
329
- const lastActivity = new Date(endPt.timestamp).getTime();
330
- const stallThresholdMs = 5 * 24 * 60 * 60 * 1000;
331
- if (referenceDate.getTime() - lastActivity > stallThresholdMs) {
332
- return 'stalled';
333
- }
334
- }
335
-
336
- // Sample progress at 25%, 50%, and 75% marks of timeline
337
- const p25Time = startTime + totalDuration * 0.25;
338
- const p50Time = startTime + totalDuration * 0.50;
339
- const p75Time = startTime + totalDuration * 0.75;
340
-
341
- const getInterpolatedProgress = (t: number): number => {
342
- if (t <= startTime) return points[0].progress;
343
- if (t >= endTime) return endPt.progress;
344
-
345
- for (let i = 0; i < points.length - 1; i++) {
346
- const pA = points[i];
347
- const pB = points[i + 1];
348
- const tA = new Date(pA.timestamp).getTime();
349
- const tB = new Date(pB.timestamp).getTime();
350
- if (t >= tA && t <= tB) {
351
- if (tB === tA) return pA.progress;
352
- const fraction = (t - tA) / (tB - tA);
353
- return pA.progress + fraction * (pB.progress - pA.progress);
354
- }
355
- }
356
- return endPt.progress;
357
- };
358
-
359
- const p25 = getInterpolatedProgress(p25Time);
360
- const p50 = getInterpolatedProgress(p50Time);
361
- const p75 = getInterpolatedProgress(p75Time);
362
- const finalP = endPt.progress;
363
-
364
- const totalGain = finalP - startPt.progress;
365
- if (totalGain <= 5) {
366
- return 'stalled';
367
- }
368
-
369
- // Early Surge: Reached > 60% early on (by 25% or 50% time) and flattened
370
- if (p25 >= 60 || (p50 >= 65 && finalP - p50 <= 15)) {
371
- return 'early_surge';
372
- }
373
-
374
- // Late Rush: Little progress (< 25%) until late in the timeline (75%), then steep jump
375
- if (p50 <= 20 && p75 <= 35 && finalP >= 70) {
376
- return 'late_rush';
377
- }
378
-
379
- // S-Curve: Slow start (p25 <= 25), steep middle acceleration (p75 - p25 >= 55), slow finish (finalP - p75 <= 20)
380
- if (p25 <= 25 && (p75 - p25) >= 55 && (finalP - p75) <= 20) {
381
- return 's_curve';
382
- }
383
-
384
- // Default steady progression
385
- return 'linear';
386
- }
387
-
388
- /**
389
- * Calculate comprehensive multi-dimensional metrics for a task.
390
- */
391
- export function calculateTaskMetrics(
392
- task: Task,
393
- activities: Activity[] = [],
394
- timeEntries: TimeEntry[] = [],
395
- options?: MetricOptions
396
- ): TaskMetrics {
397
- const referenceDate = options?.referenceDate ?? new Date();
398
- const taskTimeEntries = timeEntries.filter((te) => te.taskId === task.id);
399
- const taskActivities = activities.filter((a) => a.taskId === task.id);
400
-
401
- const loggedHoursFromEntries = taskTimeEntries.reduce((sum, e) => sum + e.hours, 0);
402
- const effectiveLoggedHours = Math.max(loggedHoursFromEntries, task.loggedHours || 0, task.actualHours || 0);
403
- const estimatedHours = task.estimatedHours || (task.estimatedDurationMinutes ? task.estimatedDurationMinutes / 60 : 0);
404
- const varianceHours = Math.round((effectiveLoggedHours - estimatedHours) * 100) / 100;
405
-
406
- // Multi-dimensional variance
407
- let scheduleVarianceDays: number | undefined;
408
- if (task.dueDate && task.actualEndDate) {
409
- const dueTime = new Date(task.dueDate).getTime();
410
- const actualTime = new Date(task.actualEndDate).getTime();
411
- if (!isNaN(dueTime) && !isNaN(actualTime)) {
412
- scheduleVarianceDays = Math.round((actualTime - dueTime) / (1000 * 60 * 60 * 24));
413
- }
414
- }
415
-
416
- let durationVarianceHours: number | undefined;
417
- if (task.actualStartDate && task.actualEndDate && task.plannedStartDate && task.dueDate) {
418
- const actualDuration = (new Date(task.actualEndDate).getTime() - new Date(task.actualStartDate).getTime()) / (1000 * 60 * 60);
419
- const plannedDuration = (new Date(task.dueDate).getTime() - new Date(task.plannedStartDate).getTime()) / (1000 * 60 * 60);
420
- if (!isNaN(actualDuration) && !isNaN(plannedDuration)) {
421
- durationVarianceHours = Math.round((actualDuration - plannedDuration) * 100) / 100;
422
- }
423
- }
424
-
425
- const accuracyRatio = estimatedHours > 0
426
- ? Math.round((effectiveLoggedHours / estimatedHours) * 100) / 100
427
- : undefined;
428
-
429
- const nowIso = referenceDate.toISOString();
430
- const isOverdue = Boolean(
431
- task.dueDate &&
432
- task.dueDate < nowIso &&
433
- task.semanticStatus !== 'completed' &&
434
- task.semanticStatus !== 'canceled'
435
- );
436
- const isOverEstimate = Boolean(estimatedHours > 0 && effectiveLoggedHours > estimatedHours);
437
-
438
- const realityDelta: RealityDelta = {
439
- plannedStartDate: task.plannedStartDate,
440
- actualStartDate: task.actualStartDate,
441
- dueDate: task.dueDate,
442
- actualEndDate: task.actualEndDate,
443
- estimatedHours: Math.round(estimatedHours * 100) / 100,
444
- loggedHours: Math.round(effectiveLoggedHours * 100) / 100,
445
- varianceHours,
446
- effortVarianceHours: varianceHours,
447
- durationVarianceHours,
448
- scheduleVarianceDays,
449
- accuracyRatio,
450
- isOverdue,
451
- isOverEstimate
452
- };
453
-
454
- // Compute Inferred Actuals
455
- let activeWorkingHours: number | undefined;
456
- let calendarDurationHours: number | undefined;
457
-
458
- if (task.actualStartDate && task.actualEndDate) {
459
- const startMs = new Date(task.actualStartDate).getTime();
460
- const endMs = new Date(task.actualEndDate).getTime();
461
- if (!isNaN(startMs) && !isNaN(endMs) && endMs >= startMs) {
462
- calendarDurationHours = Math.round(((endMs - startMs) / (1000 * 60 * 60)) * 100) / 100;
463
- }
464
- }
465
-
466
- if (task.actualDurationSeconds !== undefined) {
467
- activeWorkingHours = Math.round((task.actualDurationSeconds / 3600) * 100) / 100;
468
- } else if (task.actualHours !== undefined) {
469
- activeWorkingHours = task.actualHours;
470
- } else {
471
- activeWorkingHours = calendarDurationHours;
472
- }
473
-
474
- const inferredActuals: TaskInferredActuals = {
475
- actualStartDate: task.actualStartDate,
476
- actualEndDate: task.actualEndDate,
477
- isStartDateInferred: Boolean(task.actualStartDate && !task.plannedStartDate),
478
- isEndDateInferred: Boolean(task.actualEndDate && task.semanticStatus === 'completed'),
479
- activeWorkingHours,
480
- calendarDurationHours,
481
- actualDurationSeconds: task.actualDurationSeconds,
482
- blockedDurationSeconds: task.blockedDurationSeconds
483
- };
484
-
485
- const progress = inferTaskProgress(task, options);
486
- const evm = calculateTaskEVM(task, { ...options, progressInference: progress });
487
- const progressHistory = reconstructTaskProgressHistory(task, taskActivities, options);
488
-
489
- return {
490
- taskId: task.id,
491
- inferredActuals,
492
- realityDelta,
493
- progress,
494
- evm,
495
- progressHistory
496
- };
497
- }