@critical-path/core 0.35.0 → 0.36.1

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (187) hide show
  1. package/README.md +11 -0
  2. package/dist/engine/index.d.ts +2 -0
  3. package/dist/engine/index.d.ts.map +1 -1
  4. package/dist/engine/index.js +25 -2
  5. package/dist/engine/index.js.map +1 -1
  6. package/dist/types/index.d.ts +11 -0
  7. package/dist/types/index.d.ts.map +1 -1
  8. package/package.json +5 -1
  9. package/CHANGELOG.md +0 -584
  10. package/dist/deliverables.test.d.ts +0 -2
  11. package/dist/deliverables.test.d.ts.map +0 -1
  12. package/dist/deliverables.test.js +0 -232
  13. package/dist/deliverables.test.js.map +0 -1
  14. package/dist/domain/calendar.test.d.ts +0 -2
  15. package/dist/domain/calendar.test.d.ts.map +0 -1
  16. package/dist/domain/calendar.test.js +0 -181
  17. package/dist/domain/calendar.test.js.map +0 -1
  18. package/dist/domain/cpm.test.d.ts +0 -2
  19. package/dist/domain/cpm.test.d.ts.map +0 -1
  20. package/dist/domain/cpm.test.js +0 -166
  21. package/dist/domain/cpm.test.js.map +0 -1
  22. package/dist/domain/ddd.test.d.ts +0 -2
  23. package/dist/domain/ddd.test.d.ts.map +0 -1
  24. package/dist/domain/ddd.test.js +0 -349
  25. package/dist/domain/ddd.test.js.map +0 -1
  26. package/dist/domain/ladder.test.d.ts +0 -2
  27. package/dist/domain/ladder.test.d.ts.map +0 -1
  28. package/dist/domain/ladder.test.js +0 -213
  29. package/dist/domain/ladder.test.js.map +0 -1
  30. package/dist/domain/metrics.test.d.ts +0 -2
  31. package/dist/domain/metrics.test.d.ts.map +0 -1
  32. package/dist/domain/metrics.test.js +0 -252
  33. package/dist/domain/metrics.test.js.map +0 -1
  34. package/dist/domain/task-duration.test.d.ts +0 -2
  35. package/dist/domain/task-duration.test.d.ts.map +0 -1
  36. package/dist/domain/task-duration.test.js +0 -307
  37. package/dist/domain/task-duration.test.js.map +0 -1
  38. package/dist/domain/workload.test.d.ts +0 -2
  39. package/dist/domain/workload.test.d.ts.map +0 -1
  40. package/dist/domain/workload.test.js +0 -261
  41. package/dist/domain/workload.test.js.map +0 -1
  42. package/dist/engine/actor.test.d.ts +0 -2
  43. package/dist/engine/actor.test.d.ts.map +0 -1
  44. package/dist/engine/actor.test.js +0 -54
  45. package/dist/engine/actor.test.js.map +0 -1
  46. package/dist/engine/authorization.test.d.ts +0 -2
  47. package/dist/engine/authorization.test.d.ts.map +0 -1
  48. package/dist/engine/authorization.test.js +0 -154
  49. package/dist/engine/authorization.test.js.map +0 -1
  50. package/dist/engine/cascade.test.d.ts +0 -2
  51. package/dist/engine/cascade.test.d.ts.map +0 -1
  52. package/dist/engine/cascade.test.js +0 -99
  53. package/dist/engine/cascade.test.js.map +0 -1
  54. package/dist/engine/config.test.d.ts +0 -2
  55. package/dist/engine/config.test.d.ts.map +0 -1
  56. package/dist/engine/config.test.js +0 -46
  57. package/dist/engine/config.test.js.map +0 -1
  58. package/dist/engine/entity-events.test.d.ts +0 -2
  59. package/dist/engine/entity-events.test.d.ts.map +0 -1
  60. package/dist/engine/entity-events.test.js +0 -61
  61. package/dist/engine/entity-events.test.js.map +0 -1
  62. package/dist/index.test.d.ts +0 -2
  63. package/dist/index.test.d.ts.map +0 -1
  64. package/dist/index.test.js +0 -429
  65. package/dist/index.test.js.map +0 -1
  66. package/dist/plugins/plugins.test.d.ts +0 -2
  67. package/dist/plugins/plugins.test.d.ts.map +0 -1
  68. package/dist/plugins/plugins.test.js +0 -137
  69. package/dist/plugins/plugins.test.js.map +0 -1
  70. package/dist/schemas/schemas.test.d.ts +0 -2
  71. package/dist/schemas/schemas.test.d.ts.map +0 -1
  72. package/dist/schemas/schemas.test.js +0 -58
  73. package/dist/schemas/schemas.test.js.map +0 -1
  74. package/dist/status.test.d.ts +0 -2
  75. package/dist/status.test.d.ts.map +0 -1
  76. package/dist/status.test.js +0 -295
  77. package/dist/status.test.js.map +0 -1
  78. package/dist/storage/storage.test.d.ts +0 -2
  79. package/dist/storage/storage.test.d.ts.map +0 -1
  80. package/dist/storage/storage.test.js +0 -236
  81. package/dist/storage/storage.test.js.map +0 -1
  82. package/dist/store/conformance.test.d.ts +0 -2
  83. package/dist/store/conformance.test.d.ts.map +0 -1
  84. package/dist/store/conformance.test.js +0 -15
  85. package/dist/store/conformance.test.js.map +0 -1
  86. package/dist/store/firebase.test.d.ts +0 -2
  87. package/dist/store/firebase.test.d.ts.map +0 -1
  88. package/dist/store/firebase.test.js +0 -103
  89. package/dist/store/firebase.test.js.map +0 -1
  90. package/dist/store/query.test.d.ts +0 -2
  91. package/dist/store/query.test.d.ts.map +0 -1
  92. package/dist/store/query.test.js +0 -89
  93. package/dist/store/query.test.js.map +0 -1
  94. package/dist/store/sqlite.test.d.ts +0 -2
  95. package/dist/store/sqlite.test.d.ts.map +0 -1
  96. package/dist/store/sqlite.test.js +0 -177
  97. package/dist/store/sqlite.test.js.map +0 -1
  98. package/dist/task-state.test.d.ts +0 -2
  99. package/dist/task-state.test.d.ts.map +0 -1
  100. package/dist/task-state.test.js +0 -423
  101. package/dist/task-state.test.js.map +0 -1
  102. package/dist/use-case-validation.test.d.ts +0 -2
  103. package/dist/use-case-validation.test.d.ts.map +0 -1
  104. package/dist/use-case-validation.test.js +0 -281
  105. package/dist/use-case-validation.test.js.map +0 -1
  106. package/dist/utils/fractional-index.test.d.ts +0 -2
  107. package/dist/utils/fractional-index.test.d.ts.map +0 -1
  108. package/dist/utils/fractional-index.test.js +0 -182
  109. package/dist/utils/fractional-index.test.js.map +0 -1
  110. package/dist/utils/key.test.d.ts +0 -2
  111. package/dist/utils/key.test.d.ts.map +0 -1
  112. package/dist/utils/key.test.js +0 -65
  113. package/dist/utils/key.test.js.map +0 -1
  114. package/dist/utils/mentions.test.d.ts +0 -2
  115. package/dist/utils/mentions.test.d.ts.map +0 -1
  116. package/dist/utils/mentions.test.js +0 -114
  117. package/dist/utils/mentions.test.js.map +0 -1
  118. package/dist/webhooks/webhooks.test.d.ts +0 -2
  119. package/dist/webhooks/webhooks.test.d.ts.map +0 -1
  120. package/dist/webhooks/webhooks.test.js +0 -154
  121. package/dist/webhooks/webhooks.test.js.map +0 -1
  122. package/src/deliverables.test.ts +0 -284
  123. package/src/domain/authorization.ts +0 -82
  124. package/src/domain/calendar.test.ts +0 -216
  125. package/src/domain/calendar.ts +0 -502
  126. package/src/domain/cpm.test.ts +0 -189
  127. package/src/domain/cpm.ts +0 -258
  128. package/src/domain/custom-fields.ts +0 -172
  129. package/src/domain/ddd.test.ts +0 -442
  130. package/src/domain/entities.ts +0 -798
  131. package/src/domain/errors.ts +0 -38
  132. package/src/domain/events.ts +0 -369
  133. package/src/domain/graph.ts +0 -70
  134. package/src/domain/index.ts +0 -12
  135. package/src/domain/ladder.test.ts +0 -251
  136. package/src/domain/ladder.ts +0 -474
  137. package/src/domain/metrics.test.ts +0 -288
  138. package/src/domain/metrics.ts +0 -497
  139. package/src/domain/task-duration.test.ts +0 -354
  140. package/src/domain/workload.test.ts +0 -311
  141. package/src/domain/workload.ts +0 -457
  142. package/src/engine/actor.test.ts +0 -63
  143. package/src/engine/authorization.test.ts +0 -199
  144. package/src/engine/cascade.test.ts +0 -121
  145. package/src/engine/config.test.ts +0 -51
  146. package/src/engine/entity-events.test.ts +0 -67
  147. package/src/engine/index.ts +0 -2472
  148. package/src/index.test.ts +0 -514
  149. package/src/index.ts +0 -9
  150. package/src/plugins/index.ts +0 -103
  151. package/src/plugins/plugins.test.ts +0 -161
  152. package/src/schemas/index.ts +0 -402
  153. package/src/schemas/schemas.test.ts +0 -116
  154. package/src/status.test.ts +0 -354
  155. package/src/storage/file-storage.ts +0 -200
  156. package/src/storage/firebase-storage.ts +0 -209
  157. package/src/storage/index.ts +0 -3
  158. package/src/storage/s3.ts +0 -151
  159. package/src/storage/storage.test.ts +0 -274
  160. package/src/store/conformance.test.ts +0 -15
  161. package/src/store/firebase.test.ts +0 -131
  162. package/src/store/firebase.ts +0 -658
  163. package/src/store/index.ts +0 -623
  164. package/src/store/query.test.ts +0 -110
  165. package/src/store/query.ts +0 -113
  166. package/src/store/sqlite.test.ts +0 -218
  167. package/src/store/sqlite.ts +0 -1480
  168. package/src/task-state.test.ts +0 -506
  169. package/src/testing/conformance.ts +0 -319
  170. package/src/testing/index.ts +0 -1
  171. package/src/types/index.ts +0 -859
  172. package/src/use-case-validation.test.ts +0 -324
  173. package/src/utils/fractional-index.test.ts +0 -228
  174. package/src/utils/fractional-index.ts +0 -254
  175. package/src/utils/index.ts +0 -7
  176. package/src/utils/key.test.ts +0 -76
  177. package/src/utils/key.ts +0 -62
  178. package/src/utils/mentions.test.ts +0 -132
  179. package/src/utils/mentions.ts +0 -131
  180. package/src/utils/status.ts +0 -419
  181. package/src/utils/workflow.ts +0 -306
  182. package/src/webhooks/dispatcher.ts +0 -190
  183. package/src/webhooks/index.ts +0 -2
  184. package/src/webhooks/signature.ts +0 -57
  185. package/src/webhooks/webhooks.test.ts +0 -201
  186. package/tsconfig.json +0 -8
  187. package/tsconfig.tsbuildinfo +0 -1
package/src/domain/cpm.ts DELETED
@@ -1,258 +0,0 @@
1
- import type {
2
- Task,
3
- TaskDependency,
4
- TaskCriticalPathSchedule,
5
- CriticalPathAnalysis,
6
- WorkSchedule
7
- } from '../types/index.js';
8
- import { DEFAULT_WORK_SCHEDULE, addWorkingHours, parseDate } from './calendar.js';
9
-
10
- export function getTaskDurationHours(task: Task): number {
11
- if (typeof task.estimatedHours === 'number' && task.estimatedHours >= 0) {
12
- return task.estimatedHours;
13
- }
14
- if (typeof task.estimatedDurationMinutes === 'number' && task.estimatedDurationMinutes >= 0) {
15
- return task.estimatedDurationMinutes / 60;
16
- }
17
- if (typeof task.actualHours === 'number' && task.actualHours > 0) {
18
- return task.actualHours;
19
- }
20
- // Default to 1 hour for non-empty tasks without explicit estimate
21
- return 1;
22
- }
23
-
24
- export interface CPMOptions {
25
- projectStartDate?: string | Date;
26
- schedule?: WorkSchedule;
27
- }
28
-
29
- /**
30
- * Calculates the Critical Path Method (CPM) schedule for a set of tasks and their dependencies.
31
- * - Forward Pass: computes earlyStart and earlyFinish (in working hours and calendar dates)
32
- * - Backward Pass: computes lateStart, lateFinish, and totalSlack
33
- * - Respects working days, working hours, and holidays via WorkSchedule
34
- * - Identifies critical tasks (totalSlack === 0) that dictate the minimum project duration.
35
- */
36
- export function calculateCPM(
37
- projectId: string,
38
- tasks: Task[],
39
- dependencies: TaskDependency[],
40
- options: CPMOptions = {}
41
- ): CriticalPathAnalysis {
42
- const calculatedAt = new Date().toISOString();
43
- const schedule = options.schedule || DEFAULT_WORK_SCHEDULE;
44
- const projectStartDate = options.projectStartDate ? parseDate(options.projectStartDate) : undefined;
45
-
46
- if (tasks.length === 0) {
47
- return {
48
- projectId,
49
- calculatedAt,
50
- totalDurationHours: 0,
51
- totalWorkingHours: 0,
52
- projectStartDate: projectStartDate ? projectStartDate.toISOString() : undefined,
53
- projectEndDate: projectStartDate ? projectStartDate.toISOString() : undefined,
54
- criticalTaskIds: [],
55
- tasks: []
56
- };
57
- }
58
-
59
- const taskMap = new Map<string, Task>(tasks.map((t) => [t.id, t]));
60
- const taskIds = Array.from(taskMap.keys());
61
-
62
- // Build adjacency graph:
63
- // prerequisites[v] = tasks that v depends on (must finish before v starts)
64
- // successors[u] = tasks that depend on u (can only start after u finishes)
65
- const prerequisites = new Map<string, Set<string>>();
66
- const successors = new Map<string, Set<string>>();
67
-
68
- for (const id of taskIds) {
69
- prerequisites.set(id, new Set<string>());
70
- successors.set(id, new Set<string>());
71
- }
72
-
73
- for (const dep of dependencies) {
74
- let sourceId: string | null = null;
75
- let targetId: string | null = null;
76
-
77
- if (dep.type === 'blocking') {
78
- // taskId depends on dependsOnTaskId (dependsOnTaskId -> taskId)
79
- sourceId = dep.dependsOnTaskId;
80
- targetId = dep.taskId;
81
- } else if (dep.type === 'blocked_by') {
82
- // dependsOnTaskId is blocked by taskId (taskId -> dependsOnTaskId)
83
- sourceId = dep.taskId;
84
- targetId = dep.dependsOnTaskId;
85
- }
86
-
87
- if (sourceId && targetId && taskMap.has(sourceId) && taskMap.has(targetId) && sourceId !== targetId) {
88
- prerequisites.get(targetId)!.add(sourceId);
89
- successors.get(sourceId)!.add(targetId);
90
- }
91
- }
92
-
93
- // Topological sorting via Kahn's algorithm
94
- const inDegree = new Map<string, number>();
95
- for (const id of taskIds) {
96
- inDegree.set(id, prerequisites.get(id)!.size);
97
- }
98
-
99
- const queue: string[] = [];
100
- for (const [id, deg] of inDegree.entries()) {
101
- if (deg === 0) {
102
- queue.push(id);
103
- }
104
- }
105
-
106
- const topoOrder: string[] = [];
107
- while (queue.length > 0) {
108
- const current = queue.shift()!;
109
- topoOrder.push(current);
110
-
111
- for (const next of successors.get(current)!) {
112
- const updatedDeg = inDegree.get(next)! - 1;
113
- inDegree.set(next, updatedDeg);
114
- if (updatedDeg === 0) {
115
- queue.push(next);
116
- }
117
- }
118
- }
119
-
120
- // If there's a cycle or disconnected nodes not processed in topoOrder, append them
121
- if (topoOrder.length < taskIds.length) {
122
- for (const id of taskIds) {
123
- if (!topoOrder.includes(id)) {
124
- topoOrder.push(id);
125
- }
126
- }
127
- }
128
-
129
- // --- FORWARD PASS ---
130
- const earlyStart = new Map<string, number>();
131
- const earlyFinish = new Map<string, number>();
132
-
133
- for (const id of topoOrder) {
134
- const task = taskMap.get(id)!;
135
- const duration = getTaskDurationHours(task);
136
- const prereqs = prerequisites.get(id) || new Set();
137
-
138
- let maxPrereqFinish = 0;
139
- for (const p of prereqs) {
140
- const pFinish = earlyFinish.get(p) ?? 0;
141
- if (pFinish > maxPrereqFinish) {
142
- maxPrereqFinish = pFinish;
143
- }
144
- }
145
-
146
- const es = maxPrereqFinish;
147
- const ef = es + duration;
148
-
149
- earlyStart.set(id, es);
150
- earlyFinish.set(id, ef);
151
- }
152
-
153
- // Total project duration
154
- let totalDurationHours = 0;
155
- for (const ef of earlyFinish.values()) {
156
- if (ef > totalDurationHours) {
157
- totalDurationHours = ef;
158
- }
159
- }
160
-
161
- // --- BACKWARD PASS ---
162
- const lateStart = new Map<string, number>();
163
- const lateFinish = new Map<string, number>();
164
-
165
- // Process in reverse topological order
166
- for (let i = topoOrder.length - 1; i >= 0; i--) {
167
- const id = topoOrder[i];
168
- const task = taskMap.get(id)!;
169
- const duration = getTaskDurationHours(task);
170
- const succs = successors.get(id) || new Set();
171
-
172
- let minSuccLateStart = totalDurationHours;
173
- if (succs.size > 0) {
174
- minSuccLateStart = Infinity;
175
- for (const s of succs) {
176
- const sLateStart = lateStart.get(s);
177
- if (sLateStart !== undefined && sLateStart < minSuccLateStart) {
178
- minSuccLateStart = sLateStart;
179
- }
180
- }
181
- if (!Number.isFinite(minSuccLateStart)) {
182
- minSuccLateStart = totalDurationHours;
183
- }
184
- }
185
-
186
- const lf = minSuccLateStart;
187
- const ls = lf - duration;
188
-
189
- lateFinish.set(id, lf);
190
- lateStart.set(id, ls);
191
- }
192
-
193
- // --- SLACK & CRITICAL PATH ---
194
- const schedules: TaskCriticalPathSchedule[] = [];
195
- const criticalTaskIds: string[] = [];
196
-
197
- for (const id of taskIds) {
198
- const es = earlyStart.get(id) ?? 0;
199
- const ef = earlyFinish.get(id) ?? 0;
200
- const ls = lateStart.get(id) ?? 0;
201
- const lf = lateFinish.get(id) ?? 0;
202
-
203
- const rawSlack = lf - ef;
204
- const totalSlack = Math.round(rawSlack * 100) / 100;
205
- const isCritical = totalSlack <= 0.001;
206
-
207
- if (isCritical) {
208
- criticalTaskIds.push(id);
209
- }
210
-
211
- const task = taskMap.get(id)!;
212
- const duration = getTaskDurationHours(task);
213
-
214
- const earlyStartDate = projectStartDate
215
- ? addWorkingHours(projectStartDate, es, schedule).toISOString()
216
- : undefined;
217
- const earlyFinishDate = projectStartDate
218
- ? addWorkingHours(projectStartDate, ef, schedule).toISOString()
219
- : undefined;
220
- const lateStartDate = projectStartDate
221
- ? addWorkingHours(projectStartDate, ls, schedule).toISOString()
222
- : undefined;
223
- const lateFinishDate = projectStartDate
224
- ? addWorkingHours(projectStartDate, lf, schedule).toISOString()
225
- : undefined;
226
-
227
- schedules.push({
228
- taskId: id,
229
- earlyStart: Math.round(es * 100) / 100,
230
- earlyFinish: Math.round(ef * 100) / 100,
231
- lateStart: Math.round(ls * 100) / 100,
232
- lateFinish: Math.round(lf * 100) / 100,
233
- totalSlack,
234
- isCritical,
235
- durationHours: duration,
236
- slackWorkingHours: totalSlack,
237
- earlyStartDate,
238
- earlyFinishDate,
239
- lateStartDate,
240
- lateFinishDate
241
- });
242
- }
243
-
244
- const projectEndDate = projectStartDate
245
- ? addWorkingHours(projectStartDate, totalDurationHours, schedule).toISOString()
246
- : undefined;
247
-
248
- return {
249
- projectId,
250
- calculatedAt,
251
- totalDurationHours: Math.round(totalDurationHours * 100) / 100,
252
- totalWorkingHours: Math.round(totalDurationHours * 100) / 100,
253
- projectStartDate: projectStartDate ? projectStartDate.toISOString() : undefined,
254
- projectEndDate,
255
- criticalTaskIds,
256
- tasks: schedules
257
- };
258
- }
@@ -1,172 +0,0 @@
1
- import type { CustomFieldDefinition, CustomFieldType } from '../types/index.js';
2
- import { BUILT_IN_CUSTOM_FIELD_TYPES } from '../plugins/index.js';
3
-
4
- export class CustomFieldValidationError extends Error {
5
- public readonly fieldKey: string;
6
- public readonly expectedType?: string;
7
- public readonly receivedValue?: unknown;
8
-
9
- constructor(message: string, fieldKey: string, expectedType?: string, receivedValue?: unknown) {
10
- super(message);
11
- this.name = 'CustomFieldValidationError';
12
- this.fieldKey = fieldKey;
13
- this.expectedType = expectedType;
14
- this.receivedValue = receivedValue;
15
- }
16
- }
17
-
18
- export function validateCustomFieldValues(
19
- definitions: CustomFieldDefinition[] | undefined,
20
- values: Record<string, unknown> | undefined,
21
- customTypes?: ReadonlyMap<string, CustomFieldType>
22
- ): void {
23
- if (!definitions || definitions.length === 0) return;
24
- const customValues = values || {};
25
-
26
- for (const def of definitions) {
27
- const value = customValues[def.key];
28
-
29
- // Check required invariant
30
- if (def.required && (value === undefined || value === null || value === '')) {
31
- throw new CustomFieldValidationError(
32
- `Custom field "${def.label || def.key}" (${def.key}) is required.`,
33
- def.key,
34
- def.type,
35
- value
36
- );
37
- }
38
-
39
- if (value === undefined || value === null) {
40
- continue;
41
- }
42
-
43
- // Type and schema validation
44
- switch (def.type) {
45
- case 'number':
46
- if (typeof value !== 'number' || isNaN(value)) {
47
- throw new CustomFieldValidationError(
48
- `Custom field "${def.label || def.key}" must be a valid number. Received: ${typeof value}`,
49
- def.key,
50
- 'number',
51
- value
52
- );
53
- }
54
- break;
55
-
56
- case 'text':
57
- case 'user':
58
- if (typeof value !== 'string') {
59
- throw new CustomFieldValidationError(
60
- `Custom field "${def.label || def.key}" must be a string. Received: ${typeof value}`,
61
- def.key,
62
- def.type,
63
- value
64
- );
65
- }
66
- break;
67
-
68
- case 'boolean':
69
- if (typeof value !== 'boolean') {
70
- throw new CustomFieldValidationError(
71
- `Custom field "${def.label || def.key}" must be a boolean. Received: ${typeof value}`,
72
- def.key,
73
- 'boolean',
74
- value
75
- );
76
- }
77
- break;
78
-
79
- case 'date':
80
- if (typeof value !== 'string' || isNaN(new Date(value).getTime())) {
81
- throw new CustomFieldValidationError(
82
- `Custom field "${def.label || def.key}" must be a valid ISO date string. Received: ${JSON.stringify(value)}`,
83
- def.key,
84
- 'date',
85
- value
86
- );
87
- }
88
- break;
89
-
90
- case 'single_select':
91
- if (typeof value !== 'string') {
92
- throw new CustomFieldValidationError(
93
- `Custom field "${def.label || def.key}" must be a string option. Received: ${typeof value}`,
94
- def.key,
95
- 'single_select',
96
- value
97
- );
98
- }
99
- if (def.options && def.options.length > 0 && !def.options.includes(value)) {
100
- throw new CustomFieldValidationError(
101
- `Custom field "${def.label || def.key}" value "${value}" is not an allowed option [${def.options.join(', ')}].`,
102
- def.key,
103
- 'single_select',
104
- value
105
- );
106
- }
107
- break;
108
-
109
- case 'multi_select':
110
- if (!Array.isArray(value)) {
111
- throw new CustomFieldValidationError(
112
- `Custom field "${def.label || def.key}" must be an array of string options. Received: ${typeof value}`,
113
- def.key,
114
- 'multi_select',
115
- value
116
- );
117
- }
118
- if (def.options && def.options.length > 0) {
119
- for (const item of value) {
120
- if (typeof item !== 'string' || !def.options.includes(item)) {
121
- throw new CustomFieldValidationError(
122
- `Custom field "${def.label || def.key}" option "${item}" is not allowed in [${def.options.join(', ')}].`,
123
- def.key,
124
- 'multi_select',
125
- item
126
- );
127
- }
128
- }
129
- }
130
- break;
131
- default: {
132
- const custom = customTypes?.get(def.type);
133
- if (!custom) {
134
- throw new CustomFieldValidationError(
135
- `Custom field "${def.label || def.key}" has unknown type "${def.type}". Register it with a plugin's customFieldTypes.`,
136
- def.key,
137
- def.type,
138
- value
139
- );
140
- }
141
- const problem = custom.validate(value, def);
142
- if (problem) {
143
- throw new CustomFieldValidationError(
144
- `Custom field "${def.label || def.key}" ${problem}`,
145
- def.key,
146
- def.type,
147
- value
148
- );
149
- }
150
- }
151
- }
152
- }
153
- }
154
-
155
- /**
156
- * Checks that every definition uses a built-in type or one registered by a plugin, so projects
157
- * cannot be configured with fields that would reject every value.
158
- */
159
- export function validateCustomFieldDefinitions(
160
- definitions: CustomFieldDefinition[] | undefined,
161
- customTypes?: ReadonlyMap<string, CustomFieldType>
162
- ): void {
163
- for (const def of definitions ?? []) {
164
- if (!(BUILT_IN_CUSTOM_FIELD_TYPES as readonly string[]).includes(def.type) && !customTypes?.has(def.type)) {
165
- throw new CustomFieldValidationError(