@critical-path/core 0.28.0 → 0.29.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,26 @@
1
1
  # @critical-path/core
2
2
 
3
+ ## 0.29.0
4
+
5
+ ### Minor Changes
6
+
7
+ - a019d37: Cascading deletes and dependency removal.
8
+
9
+ **@critical-path/core**
10
+ - **BREAKING:** `deleteTask` now also deletes subtasks (recursively), dependencies, comments, attachments (including stored files and comment attachments) and time entries. Pass `{ subtasks: 'detach' }` to keep subtasks.
11
+ - **BREAKING:** `deleteProject` also deletes containers, iterations, deliverables and project attachments. `project.deleted`'s `deletedTaskIds` includes subtasks.
12
+ - Deleting a container, iteration or deliverable clears the reference on its tasks; nested containers are detached.
13
+ - New `engine.removeDependency(id)` and `dependency.removed` event.
14
+ - **BREAKING (storage adapters):** `DependencyRepository` gains `getDependency` and `removeDependency`, and `TimeEntryRepository` gains `deleteTimeEntry`.
15
+ - `SQLiteStore` no longer returns `null` for unset optional fields.
16
+ - `FirebaseStore` updates now remove fields cleared with `undefined` (for example, reopening a completed task now clears `completedAt`).
17
+
18
+ **@critical-path/server**
19
+ - New `DELETE /tasks/:id/dependencies/:dependencyId`. `DELETE /tasks/:id` accepts `?subtasks=detach`.
20
+
21
+ **@critical-path/client**
22
+ - New `removeDependency(taskId, dependencyId)`. `deleteTask(id, { subtasks })`.
23
+
3
24
  ## 0.28.0
4
25
 
5
26
  ### Minor Changes
package/README.md CHANGED
@@ -120,6 +120,10 @@ try {
120
120
  }
121
121
  ```
122
122
 
123
+ Remove a dependency with `engine.removeDependency(dependencyId)` (publishes `dependency.removed`).
124
+
125
+ Deletes cascade: `deleteTask` removes subtasks (or detaches them with `{ subtasks: 'detach' }`), dependencies, comments, attachments with their stored files, and time entries; `deleteProject` also removes containers, iterations and deliverables; deleting a container, iteration or deliverable clears the reference on its tasks. The activity log is kept as an audit trail.
126
+
123
127
  Cycle detection follows the full upstream chain, so indirect cycles (A → B → C → D → A) are rejected as well as direct ones.
124
128
 
125
129
  #### Request Payload Schemas (`@critical-path/core/schemas`)
@@ -147,6 +147,12 @@ export interface TaskDependencyAddedEvent extends DomainEvent<{
147
147
  readonly name: 'dependency.added';
148
148
  readonly aggregateType: 'Dependency';
149
149
  }
150
+ export interface TaskDependencyRemovedEvent extends DomainEvent<{
151
+ dependency: TaskDependency;
152
+ }> {
153
+ readonly name: 'dependency.removed';
154
+ readonly aggregateType: 'Dependency';
155
+ }
150
156
  export interface ProjectCreatedEvent extends DomainEvent<{
151
157
  project: Project;
152
158
  }> {
@@ -242,7 +248,7 @@ export interface DeliverableDeletedEvent extends DomainEvent<{
242
248
  readonly name: 'deliverable.deleted';
243
249
  readonly aggregateType: 'Deliverable';
244
250
  }
245
- export type CriticalPathDomainEvent = TaskCreatedEvent | TaskUpdatedEvent | TaskStatusChangedEvent | TaskBlockedEvent | TaskUnblockedEvent | TaskDeletedEvent | TimeLoggedEvent | CommentAddedEvent | CommentUpdatedEvent | CommentDeletedEvent | CommentReactionAddedEvent | CommentReactionRemovedEvent | AttachmentCreatedEvent | AttachmentDeletedEvent | TaskDependencyAddedEvent | ProjectCreatedEvent | ProjectUpdatedEvent | ProjectDeletedEvent | WorkflowCreatedEvent | WorkflowUpdatedEvent | WorkflowDeletedEvent | IterationStartedEvent | IterationCompletedEvent | TeamCreatedEvent | ContainerCreatedEvent | DeliverableCreatedEvent | DeliverableUpdatedEvent | DeliverableStatusChangedEvent | DeliverableDeletedEvent;
251
+ export type CriticalPathDomainEvent = TaskCreatedEvent | TaskUpdatedEvent | TaskStatusChangedEvent | TaskBlockedEvent | TaskUnblockedEvent | TaskDeletedEvent | TimeLoggedEvent | CommentAddedEvent | CommentUpdatedEvent | CommentDeletedEvent | CommentReactionAddedEvent | CommentReactionRemovedEvent | AttachmentCreatedEvent | AttachmentDeletedEvent | TaskDependencyAddedEvent | TaskDependencyRemovedEvent | ProjectCreatedEvent | ProjectUpdatedEvent | ProjectDeletedEvent | WorkflowCreatedEvent | WorkflowUpdatedEvent | WorkflowDeletedEvent | IterationStartedEvent | IterationCompletedEvent | TeamCreatedEvent | ContainerCreatedEvent | DeliverableCreatedEvent | DeliverableUpdatedEvent | DeliverableStatusChangedEvent | DeliverableDeletedEvent;
246
252
  export type DomainEventHandler<T extends DomainEvent = DomainEvent> = (event: T) => Promise<void> | void;
247
253
  export declare class DomainEventBus {
248
254
  private handlers;
@@ -252,5 +258,5 @@ export declare class DomainEventBus {
252
258
  clear(): void;
253
259
  }
254
260
  /** Every domain event name, e.g. for validating webhook subscriptions at runtime. */
255
- export declare const DOMAIN_EVENT_NAMES: readonly ["attachment.created", "attachment.deleted", "comment.created", "comment.deleted", "comment.reaction.added", "comment.reaction.removed", "comment.updated", "container.created", "deliverable.created", "deliverable.deleted", "deliverable.status_changed", "deliverable.updated", "dependency.added", "iteration.completed", "iteration.started", "project.created", "project.deleted", "project.updated", "task.blocked", "task.created", "task.deleted", "task.status_changed", "task.unblocked", "task.updated", "team.created", "time.logged", "workflow.created", "workflow.deleted", "workflow.updated"];
261
+ export declare const DOMAIN_EVENT_NAMES: readonly ["attachment.created", "attachment.deleted", "comment.created", "comment.deleted", "comment.reaction.added", "comment.reaction.removed", "comment.updated", "container.created", "deliverable.created", "deliverable.deleted", "deliverable.status_changed", "deliverable.updated", "dependency.added", "dependency.removed", "iteration.completed", "iteration.started", "project.created", "project.deleted", "project.updated", "task.blocked", "task.created", "task.deleted", "task.status_changed", "task.unblocked", "task.updated", "team.created", "time.logged", "workflow.created", "workflow.deleted", "workflow.updated"];
256
262
  //# sourceMappingURL=events.d.ts.map
@@ -1 +1 @@
1
- {"version":3,"file":"events.d.ts","sourceRoot":"","sources":["../../src/domain/events.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,OAAO,EACP,QAAQ,EACR,SAAS,EACT,IAAI,EACJ,aAAa,EACb,cAAc,EACd,SAAS,EACT,OAAO,EACP,eAAe,EACf,UAAU,EACV,WAAW,EACZ,MAAM,mBAAmB,CAAC;AAE3B,MAAM,WAAW,WAAW,CAAC,QAAQ,GAAG,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;IAC7D,QAAQ,CAAC,EAAE,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,IAAI,EAAE,MAAM,CAAC;IACtB,QAAQ,CAAC,WAAW,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,aAAa,EAAE,MAAM,GAAG,SAAS,GAAG,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,WAAW,GAAG,YAAY,GAAG,SAAS,GAAG,YAAY,GAAG,aAAa,CAAC;IACvJ,QAAQ,CAAC,UAAU,EAAE,MAAM,CAAC;IAC5B,QAAQ,CAAC,OAAO,EAAE,QAAQ,CAAC;CAC5B;AAGD,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IAAE,IAAI,EAAE,IAAI,CAAA;CAAE,CAAC;IACnE,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IACpD,IAAI,EAAE,IAAI,CAAC;IACX,QAAQ,EAAE,IAAI,CAAC;IACf,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE;QAAE,MAAM,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnE,CAAC;IACA,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,sBAAuB,SAAQ,WAAW,CAAC;IAC1D,IAAI,EAAE,IAAI,CAAC;IACX,cAAc,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,MAAM,CAAC;IAClB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE;QAAE,MAAM,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnE,CAAC;IACA,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IACpD,IAAI,EAAE,IAAI,CAAC;IACX,MAAM,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACvB,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE;QAAE,MAAM,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnE,CAAC;IACA,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,kBAAmB,SAAQ,WAAW,CAAC;IACtD,IAAI,EAAE,IAAI,CAAC;IACX,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE;QAAE,MAAM,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnE,CAAC;IACA,QAAQ,CAAC,IAAI,EAAE,gBAAgB,CAAC;IAChC,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IAAE,MAAM,EAAE,MAAM,CAAC;IAAC,SAAS,EAAE,MAAM,CAAC;IAAC,KAAK,EAAE,MAAM,CAAA;CAAE,CAAC;IACzG,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,eAAgB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,SAAS,CAAC;IAAC,MAAM,EAAE,MAAM,CAAA;CAAE,CAAC;IAC5F,QAAQ,CAAC,IAAI,EAAE,aAAa,CAAC;IAC7B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,iBAAkB,SAAQ,WAAW,CAAC;IAAE,OAAO,EAAE,OAAO,CAAC;IAAC,MAAM,EAAE,MAAM,CAAA;CAAE,CAAC;IAC1F,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,OAAO,EAAE,OAAO,CAAC;IAAC,QAAQ,EAAE,OAAO,CAAA;CAAE,CAAC;IAC/F,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,MAAM,CAAC;IAAC,MAAM,EAAE,MAAM,CAAA;CAAE,CAAC;IAC7F,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,yBAA0B,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,MAAM,CAAC;IAAC,QAAQ,EAAE,eAAe,CAAC;IAAC,OAAO,EAAE,OAAO,CAAA;CAAE,CAAC;IAChI,QAAQ,CAAC,IAAI,EAAE,wBAAwB,CAAC;IACxC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,2BAA4B,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,MAAM,CAAC;IAAC,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAAC,OAAO,EAAE,OAAO,CAAA;CAAE,CAAC;IACpJ,QAAQ,CAAC,IAAI,EAAE,0BAA0B,CAAC;IAC1C,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,sBAAuB,SAAQ,WAAW,CAAC;IAAE,UAAU,EAAE,UAAU,CAAA;CAAE,CAAC;IACrF,QAAQ,CAAC,IAAI,EAAE,oBAAoB,CAAC;IACpC,QAAQ,CAAC,aAAa,EAAE,YAAY,CAAC;CACtC;AAED,MAAM,WAAW,sBAAuB,SAAQ,WAAW,CAAC;IAAE,YAAY,EAAE,MAAM,CAAC;IAAC,UAAU,CAAC,EAAE,MAAM,CAAC;IAAC,GAAG,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,CAAC;IACzI,QAAQ,CAAC,IAAI,EAAE,oBAAoB,CAAC;IACpC,QAAQ,CAAC,aAAa,EAAE,YAAY,CAAC;CACtC;AAED,MAAM,WAAW,wBAAyB,SAAQ,WAAW,CAAC;IAAE,UAAU,EAAE,cAAc,CAAA;CAAE,CAAC;IAC3F,QAAQ,CAAC,IAAI,EAAE,kBAAkB,CAAC;IAClC,QAAQ,CAAC,aAAa,EAAE,YAAY,CAAC;CACtC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,OAAO,EAAE,OAAO,CAAA;CAAE,CAAC;IAC5E,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,OAAO,EAAE,OAAO,CAAC;IAAC,QAAQ,EAAE,OAAO,CAAA;CAAE,CAAC;IAC/F,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,MAAM,CAAC;IAAC,IAAI,EAAE,MAAM,CAAC;IAAC,cAAc,EAAE,MAAM,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;CAAE,CAAC;IACxI,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,oBAAqB,SAAQ,WAAW,CAAC;IAAE,QAAQ,EAAE,QAAQ,CAAA;CAAE,CAAC;IAC/E,QAAQ,CAAC,IAAI,EAAE,kBAAkB,CAAC;IAClC,QAAQ,CAAC,aAAa,EAAE,UAAU,CAAC;CACpC;AAED,MAAM,WAAW,oBAAqB,SAAQ,WAAW,CAAC;IAAE,QAAQ,EAAE,QAAQ,CAAC;IAAC,QAAQ,EAAE,QAAQ,CAAA;CAAE,CAAC;IACnG,QAAQ,CAAC,IAAI,EAAE,kBAAkB,CAAC;IAClC,QAAQ,CAAC,aAAa,EAAE,UAAU,CAAC;CACpC;AAED,MAAM,WAAW,oBAAqB,SAAQ,WAAW,CAAC;IAAE,UAAU,EAAE,MAAM,CAAC;IAAC,IAAI,EAAE,MAAM,CAAC;IAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;CAAE,CAAC;IAChH,QAAQ,CAAC,IAAI,EAAE,kBAAkB,CAAC;IAClC,QAAQ,CAAC,aAAa,EAAE,UAAU,CAAC;CACpC;AAED,MAAM,WAAW,qBAAsB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,SAAS,CAAA;CAAE,CAAC;IAClF,QAAQ,CAAC,IAAI,EAAE,mBAAmB,CAAC;IACnC,QAAQ,CAAC,aAAa,EAAE,WAAW,CAAC;CACrC;AAED,MAAM,WAAW,uBAAwB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,SAAS,CAAA;CAAE,CAAC;IACpF,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,WAAW,CAAC;CACrC;AAED,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IAAE,IAAI,EAAE,IAAI,CAAA;CAAE,CAAC;IACnE,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,qBAAsB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,aAAa,CAAA;CAAE,CAAC;IACtF,QAAQ,CAAC,IAAI,EAAE,mBAAmB,CAAC;IACnC,QAAQ,CAAC,aAAa,EAAE,WAAW,CAAC;CACrC;AAED,MAAM,WAAW,uBAAwB,SAAQ,WAAW,CAAC;IAAE,WAAW,EAAE,WAAW,CAAA;CAAE,CAAC;IACxF,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,aAAa,CAAC;CACvC;AAED,MAAM,WAAW,uBAAwB,SAAQ,WAAW,CAAC;IAAE,WAAW,EAAE,WAAW,CAAC;IAAC,QAAQ,EAAE,WAAW,CAAA;CAAE,CAAC;IAC/G,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,aAAa,CAAC;CACvC;AAED,MAAM,WAAW,6BAA8B,SAAQ,WAAW,CAAC;IAAE,WAAW,EAAE,WAAW,CAAC;IAAC,cAAc,EAAE,MAAM,CAAC;IAAC,SAAS,EAAE,MAAM,CAAA;CAAE,CAAC;IACzI,QAAQ,CAAC,IAAI,EAAE,4BAA4B,CAAC;IAC5C,QAAQ,CAAC,aAAa,EAAE,aAAa,CAAC;CACvC;AAED,MAAM,WAAW,uBAAwB,SAAQ,WAAW,CAAC;IAAE,aAAa,EAAE,MAAM,CAAC;IAAC,SAAS,EAAE,MAAM,CAAA;CAAE,CAAC;IACxG,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,aAAa,CAAC;CACvC;AAED,MAAM,MAAM,uBAAuB,GAC/B,gBAAgB,GAChB,gBAAgB,GAChB,sBAAsB,GACtB,gBAAgB,GAChB,kBAAkB,GAClB,gBAAgB,GAChB,eAAe,GACf,iBAAiB,GACjB,mBAAmB,GACnB,mBAAmB,GACnB,yBAAyB,GACzB,2BAA2B,GAC3B,sBAAsB,GACtB,sBAAsB,GACtB,wBAAwB,GACxB,mBAAmB,GACnB,mBAAmB,GACnB,mBAAmB,GACnB,oBAAoB,GACpB,oBAAoB,GACpB,oBAAoB,GACpB,qBAAqB,GACrB,uBAAuB,GACvB,gBAAgB,GAChB,qBAAqB,GACrB,uBAAuB,GACvB,uBAAuB,GACvB,6BAA6B,GAC7B,uBAAuB,CAAC;AAE5B,MAAM,MAAM,kBAAkB,CAAC,CAAC,SAAS,WAAW,GAAG,WAAW,IAAI,CAAC,KAAK,EAAE,CAAC,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;AAEzG,qBAAa,cAAc;IACzB,OAAO,CAAC,QAAQ,CAAqD;IAErE,SAAS,CAAC,CAAC,SAAS,WAAW,GAAG,WAAW,EAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,GAAG,GAAG,EAC1B,OAAO,EAAE,kBAAkB,CAAC,CAAC,CAAC,GAC7B,MAAM,IAAI;IAcP,OAAO,CAAC,KAAK,EAAE,WAAW,GAAG,OAAO,CAAC,IAAI,CAAC;IAe1C,UAAU,CAAC,MAAM,EAAE,WAAW,EAAE,GAAG,OAAO,CAAC,IAAI,CAAC;IAMtD,KAAK,IAAI,IAAI;CAGd;AAED,qFAAqF;AACrF,eAAO,MAAM,kBAAkB,2lBA8BgC,CAAC"}
1
+ {"version":3,"file":"events.d.ts","sourceRoot":"","sources":["../../src/domain/events.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,OAAO,EACP,QAAQ,EACR,SAAS,EACT,IAAI,EACJ,aAAa,EACb,cAAc,EACd,SAAS,EACT,OAAO,EACP,eAAe,EACf,UAAU,EACV,WAAW,EACZ,MAAM,mBAAmB,CAAC;AAE3B,MAAM,WAAW,WAAW,CAAC,QAAQ,GAAG,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;IAC7D,QAAQ,CAAC,EAAE,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,IAAI,EAAE,MAAM,CAAC;IACtB,QAAQ,CAAC,WAAW,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,aAAa,EAAE,MAAM,GAAG,SAAS,GAAG,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,WAAW,GAAG,YAAY,GAAG,SAAS,GAAG,YAAY,GAAG,aAAa,CAAC;IACvJ,QAAQ,CAAC,UAAU,EAAE,MAAM,CAAC;IAC5B,QAAQ,CAAC,OAAO,EAAE,QAAQ,CAAC;CAC5B;AAGD,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IAAE,IAAI,EAAE,IAAI,CAAA;CAAE,CAAC;IACnE,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IACpD,IAAI,EAAE,IAAI,CAAC;IACX,QAAQ,EAAE,IAAI,CAAC;IACf,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE;QAAE,MAAM,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnE,CAAC;IACA,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,sBAAuB,SAAQ,WAAW,CAAC;IAC1D,IAAI,EAAE,IAAI,CAAC;IACX,cAAc,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,MAAM,CAAC;IAClB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE;QAAE,MAAM,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnE,CAAC;IACA,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IACpD,IAAI,EAAE,IAAI,CAAC;IACX,MAAM,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACvB,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE;QAAE,MAAM,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnE,CAAC;IACA,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,kBAAmB,SAAQ,WAAW,CAAC;IACtD,IAAI,EAAE,IAAI,CAAC;IACX,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE;QAAE,MAAM,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnE,CAAC;IACA,QAAQ,CAAC,IAAI,EAAE,gBAAgB,CAAC;IAChC,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IAAE,MAAM,EAAE,MAAM,CAAC;IAAC,SAAS,EAAE,MAAM,CAAC;IAAC,KAAK,EAAE,MAAM,CAAA;CAAE,CAAC;IACzG,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,eAAgB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,SAAS,CAAC;IAAC,MAAM,EAAE,MAAM,CAAA;CAAE,CAAC;IAC5F,QAAQ,CAAC,IAAI,EAAE,aAAa,CAAC;IAC7B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,iBAAkB,SAAQ,WAAW,CAAC;IAAE,OAAO,EAAE,OAAO,CAAC;IAAC,MAAM,EAAE,MAAM,CAAA;CAAE,CAAC;IAC1F,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,OAAO,EAAE,OAAO,CAAC;IAAC,QAAQ,EAAE,OAAO,CAAA;CAAE,CAAC;IAC/F,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,MAAM,CAAC;IAAC,MAAM,EAAE,MAAM,CAAA;CAAE,CAAC;IAC7F,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,yBAA0B,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,MAAM,CAAC;IAAC,QAAQ,EAAE,eAAe,CAAC;IAAC,OAAO,EAAE,OAAO,CAAA;CAAE,CAAC;IAChI,QAAQ,CAAC,IAAI,EAAE,wBAAwB,CAAC;IACxC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,2BAA4B,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,MAAM,CAAC;IAAC,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAAC,OAAO,EAAE,OAAO,CAAA;CAAE,CAAC;IACpJ,QAAQ,CAAC,IAAI,EAAE,0BAA0B,CAAC;IAC1C,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,sBAAuB,SAAQ,WAAW,CAAC;IAAE,UAAU,EAAE,UAAU,CAAA;CAAE,CAAC;IACrF,QAAQ,CAAC,IAAI,EAAE,oBAAoB,CAAC;IACpC,QAAQ,CAAC,aAAa,EAAE,YAAY,CAAC;CACtC;AAED,MAAM,WAAW,sBAAuB,SAAQ,WAAW,CAAC;IAAE,YAAY,EAAE,MAAM,CAAC;IAAC,UAAU,CAAC,EAAE,MAAM,CAAC;IAAC,GAAG,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,CAAC;IACzI,QAAQ,CAAC,IAAI,EAAE,oBAAoB,CAAC;IACpC,QAAQ,CAAC,aAAa,EAAE,YAAY,CAAC;CACtC;AAED,MAAM,WAAW,wBAAyB,SAAQ,WAAW,CAAC;IAAE,UAAU,EAAE,cAAc,CAAA;CAAE,CAAC;IAC3F,QAAQ,CAAC,IAAI,EAAE,kBAAkB,CAAC;IAClC,QAAQ,CAAC,aAAa,EAAE,YAAY,CAAC;CACtC;AAED,MAAM,WAAW,0BAA2B,SAAQ,WAAW,CAAC;IAAE,UAAU,EAAE,cAAc,CAAA;CAAE,CAAC;IAC7F,QAAQ,CAAC,IAAI,EAAE,oBAAoB,CAAC;IACpC,QAAQ,CAAC,aAAa,EAAE,YAAY,CAAC;CACtC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,OAAO,EAAE,OAAO,CAAA;CAAE,CAAC;IAC5E,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,OAAO,EAAE,OAAO,CAAC;IAAC,QAAQ,EAAE,OAAO,CAAA;CAAE,CAAC;IAC/F,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,MAAM,CAAC;IAAC,IAAI,EAAE,MAAM,CAAC;IAAC,cAAc,EAAE,MAAM,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;CAAE,CAAC;IACxI,QAAQ,CAAC,IAAI,EAAE,iBAAiB,CAAC;IACjC,QAAQ,CAAC,aAAa,EAAE,SAAS,CAAC;CACnC;AAED,MAAM,WAAW,oBAAqB,SAAQ,WAAW,CAAC;IAAE,QAAQ,EAAE,QAAQ,CAAA;CAAE,CAAC;IAC/E,QAAQ,CAAC,IAAI,EAAE,kBAAkB,CAAC;IAClC,QAAQ,CAAC,aAAa,EAAE,UAAU,CAAC;CACpC;AAED,MAAM,WAAW,oBAAqB,SAAQ,WAAW,CAAC;IAAE,QAAQ,EAAE,QAAQ,CAAC;IAAC,QAAQ,EAAE,QAAQ,CAAA;CAAE,CAAC;IACnG,QAAQ,CAAC,IAAI,EAAE,kBAAkB,CAAC;IAClC,QAAQ,CAAC,aAAa,EAAE,UAAU,CAAC;CACpC;AAED,MAAM,WAAW,oBAAqB,SAAQ,WAAW,CAAC;IAAE,UAAU,EAAE,MAAM,CAAC;IAAC,IAAI,EAAE,MAAM,CAAC;IAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;CAAE,CAAC;IAChH,QAAQ,CAAC,IAAI,EAAE,kBAAkB,CAAC;IAClC,QAAQ,CAAC,aAAa,EAAE,UAAU,CAAC;CACpC;AAED,MAAM,WAAW,qBAAsB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,SAAS,CAAA;CAAE,CAAC;IAClF,QAAQ,CAAC,IAAI,EAAE,mBAAmB,CAAC;IACnC,QAAQ,CAAC,aAAa,EAAE,WAAW,CAAC;CACrC;AAED,MAAM,WAAW,uBAAwB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,SAAS,CAAA;CAAE,CAAC;IACpF,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,WAAW,CAAC;CACrC;AAED,MAAM,WAAW,gBAAiB,SAAQ,WAAW,CAAC;IAAE,IAAI,EAAE,IAAI,CAAA;CAAE,CAAC;IACnE,QAAQ,CAAC,IAAI,EAAE,cAAc,CAAC;IAC9B,QAAQ,CAAC,aAAa,EAAE,MAAM,CAAC;CAChC;AAED,MAAM,WAAW,qBAAsB,SAAQ,WAAW,CAAC;IAAE,SAAS,EAAE,aAAa,CAAA;CAAE,CAAC;IACtF,QAAQ,CAAC,IAAI,EAAE,mBAAmB,CAAC;IACnC,QAAQ,CAAC,aAAa,EAAE,WAAW,CAAC;CACrC;AAED,MAAM,WAAW,uBAAwB,SAAQ,WAAW,CAAC;IAAE,WAAW,EAAE,WAAW,CAAA;CAAE,CAAC;IACxF,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,aAAa,CAAC;CACvC;AAED,MAAM,WAAW,uBAAwB,SAAQ,WAAW,CAAC;IAAE,WAAW,EAAE,WAAW,CAAC;IAAC,QAAQ,EAAE,WAAW,CAAA;CAAE,CAAC;IAC/G,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,aAAa,CAAC;CACvC;AAED,MAAM,WAAW,6BAA8B,SAAQ,WAAW,CAAC;IAAE,WAAW,EAAE,WAAW,CAAC;IAAC,cAAc,EAAE,MAAM,CAAC;IAAC,SAAS,EAAE,MAAM,CAAA;CAAE,CAAC;IACzI,QAAQ,CAAC,IAAI,EAAE,4BAA4B,CAAC;IAC5C,QAAQ,CAAC,aAAa,EAAE,aAAa,CAAC;CACvC;AAED,MAAM,WAAW,uBAAwB,SAAQ,WAAW,CAAC;IAAE,aAAa,EAAE,MAAM,CAAC;IAAC,SAAS,EAAE,MAAM,CAAA;CAAE,CAAC;IACxG,QAAQ,CAAC,IAAI,EAAE,qBAAqB,CAAC;IACrC,QAAQ,CAAC,aAAa,EAAE,aAAa,CAAC;CACvC;AAED,MAAM,MAAM,uBAAuB,GAC/B,gBAAgB,GAChB,gBAAgB,GAChB,sBAAsB,GACtB,gBAAgB,GAChB,kBAAkB,GAClB,gBAAgB,GAChB,eAAe,GACf,iBAAiB,GACjB,mBAAmB,GACnB,mBAAmB,GACnB,yBAAyB,GACzB,2BAA2B,GAC3B,sBAAsB,GACtB,sBAAsB,GACtB,wBAAwB,GACxB,0BAA0B,GAC1B,mBAAmB,GACnB,mBAAmB,GACnB,mBAAmB,GACnB,oBAAoB,GACpB,oBAAoB,GACpB,oBAAoB,GACpB,qBAAqB,GACrB,uBAAuB,GACvB,gBAAgB,GAChB,qBAAqB,GACrB,uBAAuB,GACvB,uBAAuB,GACvB,6BAA6B,GAC7B,uBAAuB,CAAC;AAE5B,MAAM,MAAM,kBAAkB,CAAC,CAAC,SAAS,WAAW,GAAG,WAAW,IAAI,CAAC,KAAK,EAAE,CAAC,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;AAEzG,qBAAa,cAAc;IACzB,OAAO,CAAC,QAAQ,CAAqD;IAErE,SAAS,CAAC,CAAC,SAAS,WAAW,GAAG,WAAW,EAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,GAAG,GAAG,EAC1B,OAAO,EAAE,kBAAkB,CAAC,CAAC,CAAC,GAC7B,MAAM,IAAI;IAcP,OAAO,CAAC,KAAK,EAAE,WAAW,GAAG,OAAO,CAAC,IAAI,CAAC;IAe1C,UAAU,CAAC,MAAM,EAAE,WAAW,EAAE,GAAG,OAAO,CAAC,IAAI,CAAC;IAMtD,KAAK,IAAI,IAAI;CAGd;AAED,qFAAqF;AACrF,eAAO,MAAM,kBAAkB,inBA+BgC,CAAC"}
@@ -47,6 +47,7 @@ export const DOMAIN_EVENT_NAMES = [
47
47
  'deliverable.status_changed',
48
48
  'deliverable.updated',
49
49
  'dependency.added',
50
+ 'dependency.removed',
50
51
  'iteration.completed',
51
52
  'iteration.started',
52
53
  'project.created',
@@ -1 +1 @@
1
- {"version":3,"file":"events.js","sourceRoot":"","sources":["../../src/domain/events.ts"],"names":[],"mappings":"AAqOA,MAAM,OAAO,cAAc;IACjB,QAAQ,GAAG,IAAI,GAAG,EAA0C,CAAC;IAErE,SAAS,CACP,SAA0B,EAC1B,OAA8B;QAE9B,MAAM,IAAI,GAAG,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,EAAE,CAAC;QAChD,IAAI,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnB,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;QAEnC,OAAO,GAAG,EAAE;YACV,MAAM,WAAW,GAAG,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,EAAE,CAAC;YACvD,IAAI,CAAC,QAAQ,CAAC,GAAG,CACf,SAAS,EACT,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,OAAO,CAAC,CACzC,CAAC;QACJ,CAAC,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,KAAkB;QAC9B,MAAM,cAAc,GAAG,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC;QAC3D,MAAM,gBAAgB,GAAG,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC;QACtD,MAAM,WAAW,GAAG,CAAC,GAAG,cAAc,EAAE,GAAG,gBAAgB,CAAC,CAAC;QAE7D,KAAK,MAAM,OAAO,IAAI,WAAW,EAAE,CAAC;YAClC,IAAI,CAAC;gBACH,MAAM,OAAO,CAAC,KAAK,CAAC,CAAC;YACvB,CAAC;YAAC,OAAO,GAAG,EAAE,CAAC;gBACb,2DAA2D;gBAC3D,OAAO,CAAC,KAAK,CAAC,4CAA4C,KAAK,CAAC,IAAI,IAAI,EAAE,GAAG,CAAC,CAAC;YACjF,CAAC;QACH,CAAC;IACH,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,MAAqB;QACpC,KAAK,MAAM,KAAK,IAAI,MAAM,EAAE,CAAC;YAC3B,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAC5B,CAAC;IACH,CAAC;IAED,KAAK;QACH,IAAI,CAAC,QAAQ,CAAC,KAAK,EAAE,CAAC;IACxB,CAAC;CACF;AAED,qFAAqF;AACrF,MAAM,CAAC,MAAM,kBAAkB,GAAG;IAChC,oBAAoB;IACpB,oBAAoB;IACpB,iBAAiB;IACjB,iBAAiB;IACjB,wBAAwB;IACxB,0BAA0B;IAC1B,iBAAiB;IACjB,mBAAmB;IACnB,qBAAqB;IACrB,qBAAqB;IACrB,4BAA4B;IAC5B,qBAAqB;IACrB,kBAAkB;IAClB,qBAAqB;IACrB,mBAAmB;IACnB,iBAAiB;IACjB,iBAAiB;IACjB,iBAAiB;IACjB,cAAc;IACd,cAAc;IACd,cAAc;IACd,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,cAAc;IACd,aAAa;IACb,kBAAkB;IAClB,kBAAkB;IAClB,kBAAkB;CAC2C,CAAC;AAIhE,MAAM,sBAAsB,GAAuE,IAAI,CAAC;AACxG,KAAK,sBAAsB,CAAC"}
1
+ {"version":3,"file":"events.js","sourceRoot":"","sources":["../../src/domain/events.ts"],"names":[],"mappings":"AA2OA,MAAM,OAAO,cAAc;IACjB,QAAQ,GAAG,IAAI,GAAG,EAA0C,CAAC;IAErE,SAAS,CACP,SAA0B,EAC1B,OAA8B;QAE9B,MAAM,IAAI,GAAG,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,EAAE,CAAC;QAChD,IAAI,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnB,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;QAEnC,OAAO,GAAG,EAAE;YACV,MAAM,WAAW,GAAG,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,EAAE,CAAC;YACvD,IAAI,CAAC,QAAQ,CAAC,GAAG,CACf,SAAS,EACT,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,OAAO,CAAC,CACzC,CAAC;QACJ,CAAC,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,KAAkB;QAC9B,MAAM,cAAc,GAAG,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC;QAC3D,MAAM,gBAAgB,GAAG,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC;QACtD,MAAM,WAAW,GAAG,CAAC,GAAG,cAAc,EAAE,GAAG,gBAAgB,CAAC,CAAC;QAE7D,KAAK,MAAM,OAAO,IAAI,WAAW,EAAE,CAAC;YAClC,IAAI,CAAC;gBACH,MAAM,OAAO,CAAC,KAAK,CAAC,CAAC;YACvB,CAAC;YAAC,OAAO,GAAG,EAAE,CAAC;gBACb,2DAA2D;gBAC3D,OAAO,CAAC,KAAK,CAAC,4CAA4C,KAAK,CAAC,IAAI,IAAI,EAAE,GAAG,CAAC,CAAC;YACjF,CAAC;QACH,CAAC;IACH,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,MAAqB;QACpC,KAAK,MAAM,KAAK,IAAI,MAAM,EAAE,CAAC;YAC3B,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAC5B,CAAC;IACH,CAAC;IAED,KAAK;QACH,IAAI,CAAC,QAAQ,CAAC,KAAK,EAAE,CAAC;IACxB,CAAC;CACF;AAED,qFAAqF;AACrF,MAAM,CAAC,MAAM,kBAAkB,GAAG;IAChC,oBAAoB;IACpB,oBAAoB;IACpB,iBAAiB;IACjB,iBAAiB;IACjB,wBAAwB;IACxB,0BAA0B;IAC1B,iBAAiB;IACjB,mBAAmB;IACnB,qBAAqB;IACrB,qBAAqB;IACrB,4BAA4B;IAC5B,qBAAqB;IACrB,kBAAkB;IAClB,oBAAoB;IACpB,qBAAqB;IACrB,mBAAmB;IACnB,iBAAiB;IACjB,iBAAiB;IACjB,iBAAiB;IACjB,cAAc;IACd,cAAc;IACd,cAAc;IACd,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,cAAc;IACd,aAAa;IACb,kBAAkB;IAClB,kBAAkB;IAClB,kBAAkB;CAC2C,CAAC;AAIhE,MAAM,sBAAsB,GAAuE,IAAI,CAAC;AACxG,KAAK,sBAAsB,CAAC"}
@@ -0,0 +1,2 @@
1
+ export {};
2
+ //# sourceMappingURL=cascade.test.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"cascade.test.d.ts","sourceRoot":"","sources":["../../src/engine/cascade.test.ts"],"names":[],"mappings":""}
@@ -0,0 +1,99 @@
1
+ import { describe, it, expect } from 'vitest';
2
+ import { CriticalPathEngine, InMemoryStore, SQLiteStore, FirebaseStore, InMemoryFirestoreMock, InMemoryFileStore, createRolePolicy, ForbiddenError } from '../index.js';
3
+ const stores = [
4
+ ['InMemoryStore', () => new InMemoryStore()],
5
+ ['SQLiteStore', () => new SQLiteStore({ filename: ':memory:' })],
6
+ ['FirebaseStore', () => new FirebaseStore({ db: new InMemoryFirestoreMock() })]
7
+ ];
8
+ describe.each(stores)('cascading deletes (%s)', (_name, makeStore) => {
9
+ async function setup() {
10
+ const fileStorage = new InMemoryFileStore();
11
+ const engine = new CriticalPathEngine({ store: makeStore(), fileStorage });
12
+ const project = await engine.createProject({ name: 'Cascade' });
13
+ const parent = await engine.createTask({ projectId: project.id, title: 'Parent' });
14
+ const child = await engine.createTask({ projectId: project.id, title: 'Child', parentId: parent.id });
15
+ const grandchild = await engine.createTask({ projectId: project.id, title: 'Grandchild', parentId: child.id });
16
+ const other = await engine.createTask({ projectId: project.id, title: 'Other' });
17
+ return { engine, fileStorage, project, parent, child, grandchild, other };
18
+ }
19
+ it('removes subtasks, dependencies, comments, attachments with files, and time entries', async () => {
20
+ const { engine, fileStorage, parent, child, grandchild, other } = await setup();
21
+ const dependency = await engine.addDependency({ taskId: other.id, dependsOnTaskId: parent.id, type: 'blocking' });
22
+ const comment = await engine.addComment({ taskId: parent.id, content: 'note', authorId: 'u1' });
23
+ const upload = await engine.uploadAttachmentFile({ taskId: parent.id, filename: 'spec.txt', data: 'hello', uploaderId: 'u1' });
24
+ const onComment = await engine.createAttachment({ commentId: comment.id, filename: 'c.png', url: 'https://example.com/c.png', uploaderId: 'u1', mimeType: 'image/png', sizeBytes: 1 });
25
+ const entry = await engine.logTime({ taskId: parent.id, hours: 2 });
26
+ expect(await engine.deleteTask(parent.id)).toBe(true);
27
+ for (const id of [parent.id, child.id, grandchild.id])
28
+ expect(await engine.getTask(id)).toBeNull();
29
+ expect(await engine.getTask(other.id)).not.toBeNull();
30
+ expect(await engine.store.getDependency(dependency.id)).toBeNull();
31
+ expect(await engine.store.getComment(comment.id)).toBeNull();
32
+ expect(await engine.store.getAttachment(upload.id)).toBeNull();
33
+ expect(await engine.store.getAttachment(onComment.id)).toBeNull();
34
+ expect(await fileStorage.download(upload.storageKey).catch(() => null)).toBeNull();
35
+ expect((await engine.store.getTimeEntries(parent.id)).map((e) => e.id)).not.toContain(entry.id);
36
+ });
37
+ it('can detach subtasks instead of deleting them', async () => {
38
+ const { engine, parent, child } = await setup();
39
+ await engine.deleteTask(parent.id, { subtasks: 'detach' });
40
+ const kept = await engine.getTask(child.id);
41
+ expect(kept).not.toBeNull();
42
+ expect(kept?.parentId).toBeUndefined();
43
+ });
44
+ it('deletes a project with all its planning records and reports every deleted task', async () => {
45
+ const { engine, project, parent, child, grandchild, other } = await setup();
46
+ const container = await engine.createContainer({ projectId: project.id, name: 'Epic' });
47
+ const iteration = await engine.createIteration({ projectId: project.id, name: 'S1', status: 'planning' });
48
+ const deliverable = await engine.createDeliverable({ projectId: project.id, title: 'Cut' });
49
+ const projectFile = await engine.createAttachment({ projectId: project.id, filename: 'brief.pdf', url: 'https://example.com/b.pdf', uploaderId: 'u1', mimeType: 'application/pdf', sizeBytes: 1 });
50
+ let deletedTaskIds = [];
51
+ engine.events.subscribe('project.deleted', (e) => {
52
+ deletedTaskIds = e.payload.deletedTaskIds;
53
+ });
54
+ expect(await engine.deleteProject(project.id)).toBe(true);
55
+ expect(deletedTaskIds.sort()).toEqual([parent.id, child.id, grandchild.id, other.id].sort());
56
+ expect(await engine.store.getContainer(container.id)).toBeNull();
57
+ expect(await engine.store.getIteration(iteration.id)).toBeNull();
58
+ expect(await engine.store.getDeliverable(deliverable.id)).toBeNull();
59
+ expect(await engine.store.getAttachment(projectFile.id)).toBeNull();
60
+ });
61
+ it('clears task references when containers, iterations and deliverables are deleted', async () => {
62
+ const { engine, project, other } = await setup();
63
+ const epic = await engine.createContainer({ projectId: project.id, name: 'Epic' });
64
+ const nested = await engine.createContainer({ projectId: project.id, name: 'Nested', parentId: epic.id });
65
+ const sprint = await engine.createIteration({ projectId: project.id, name: 'S1', status: 'planning' });
66
+ const cut = await engine.createDeliverable({ projectId: project.id, title: 'Cut' });
67
+ await engine.updateTask(other.id, { containerId: epic.id, iterationId: sprint.id, deliverableId: cut.id });
68
+ await engine.deleteContainer(epic.id);
69
+ await engine.deleteIteration(sprint.id);
70
+ await engine.deleteDeliverable(cut.id);
71
+ const task = await engine.getTask(other.id);
72
+ expect(task?.containerId).toBeUndefined();
73
+ expect(task?.iterationId).toBeUndefined();
74
+ expect(task?.deliverableId).toBeUndefined();
75
+ expect((await engine.getContainer(nested.id))?.parentId).toBeUndefined();
76
+ });
77
+ });
78
+ describe('removeDependency', () => {
79
+ it('removes a dependency, publishes dependency.removed, and requires task.update', async () => {
80
+ const engine = new CriticalPathEngine({ authorize: createRolePolicy() });
81
+ const project = await engine.createProject({
82
+ name: 'Deps',
83
+ members: [
84
+ { userId: 'cora', role: 'contributor' },
85
+ { userId: 'vic', role: 'viewer' }
86
+ ]
87
+ });
88
+ const a = await engine.createTask({ projectId: project.id, title: 'A' });
89
+ const b = await engine.createTask({ projectId: project.id, title: 'B' });
90
+ const dependency = await engine.addDependency({ taskId: a.id, dependsOnTaskId: b.id, type: 'blocking' });
91
+ const events = [];
92
+ engine.events.subscribe('dependency.removed', (e) => void events.push(e.name));
93
+ await expect(engine.withActor({ userId: 'vic' }).removeDependency(dependency.id)).rejects.toThrow(ForbiddenError);
94
+ expect(await engine.withActor({ userId: 'cora' }).removeDependency(dependency.id)).toBe(true);
95
+ expect(await engine.removeDependency(dependency.id)).toBe(false);
96
+ expect(events).toEqual(['dependency.removed']);
97
+ });
98
+ });
99
+ //# sourceMappingURL=cascade.test.js.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"cascade.test.js","sourceRoot":"","sources":["../../src/engine/cascade.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EACL,kBAAkB,EAClB,aAAa,EACb,WAAW,EACX,aAAa,EACb,qBAAqB,EACrB,iBAAiB,EACjB,gBAAgB,EAChB,cAAc,EAEf,MAAM,aAAa,CAAC;AAErB,MAAM,MAAM,GAA0C;IACpD,CAAC,eAAe,EAAE,GAAG,EAAE,CAAC,IAAI,aAAa,EAAE,CAAC;IAC5C,CAAC,aAAa,EAAE,GAAG,EAAE,CAAC,IAAI,WAAW,CAAC,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC,CAAC;IAChE,CAAC,eAAe,EAAE,GAAG,EAAE,CAAC,IAAI,aAAa,CAAC,EAAE,EAAE,EAAE,IAAI,qBAAqB,EAAE,EAAE,CAAC,CAAC;CAChF,CAAC;AAEF,QAAQ,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,wBAAwB,EAAE,CAAC,KAAK,EAAE,SAAS,EAAE,EAAE;IACnE,KAAK,UAAU,KAAK;QAClB,MAAM,WAAW,GAAG,IAAI,iBAAiB,EAAE,CAAC;QAC5C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,EAAE,WAAW,EAAE,CAAC,CAAC;QAC3E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;QAChE,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,CAAC,CAAC;QACnF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,CAAC,EAAE,EAAE,CAAC,CAAC;QACtG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,KAAK,CAAC,EAAE,EAAE,CAAC,CAAC;QAC/G,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;QACjF,OAAO,EAAE,MAAM,EAAE,WAAW,EAAE,OAAO,EAAE,MAAM,EAAE,KAAK,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC;IAC5E,CAAC;IAED,EAAE,CAAC,oFAAoF,EAAE,KAAK,IAAI,EAAE;QAClG,MAAM,EAAE,MAAM,EAAE,WAAW,EAAE,MAAM,EAAE,KAAK,EAAE,UAAU,EAAE,KAAK,EAAE,GAAG,MAAM,KAAK,EAAE,CAAC;QAChF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,eAAe,EAAE,MAAM,CAAC,EAAE,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,CAAC;QAClH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,MAAM,CAAC,EAAE,EAAE,OAAO,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,CAAC,CAAC;QAChG,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,EAAE,MAAM,EAAE,MAAM,CAAC,EAAE,EAAE,QAAQ,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QAC/H,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,GAAG,EAAE,2BAA2B,EAAE,UAAU,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE,CAAC,EAAE,CAAC,CAAC;QACvL,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,MAAM,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,CAAC,CAAC;QAEpE,MAAM,CAAC,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEtD,KAAK,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,EAAE,EAAE,KAAK,CAAC,EAAE,EAAE,UAAU,CAAC,EAAE,CAAC;YAAE,MAAM,CAAC,MAAM,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QACnG,MAAM,CAAC,MAAM,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;QACtD,MAAM,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QACnE,MAAM,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAC7D,MAAM,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAC/D,MAAM,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAClE,MAAM,CAAC,MAAM,WAAW,CAAC,QAAS,CAAC,MAAM,CAAC,UAAW,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE,CAAC,IAAI,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QACrF,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,SAAS,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;IAClG,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8CAA8C,EAAE,KAAK,IAAI,EAAE;QAC5D,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,MAAM,KAAK,EAAE,CAAC;QAChD,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC3D,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,CAAC,IAAI,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;QAC5B,MAAM,CAAC,IAAI,EAAE,QAAQ,CAAC,CAAC,aAAa,EAAE,CAAC;IACzC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,gFAAgF,EAAE,KAAK,IAAI,EAAE;QAC9F,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,KAAK,EAAE,UAAU,EAAE,KAAK,EAAE,GAAG,MAAM,KAAK,EAAE,CAAC;QAC5E,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;QACxF,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,MAAM,EAAE,UAAU,EAAE,CAAC,CAAC;QAC1G,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC5F,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,WAAW,EAAE,GAAG,EAAE,2BAA2B,EAAE,UAAU,EAAE,IAAI,EAAE,QAAQ,EAAE,iBAAiB,EAAE,SAAS,EAAE,CAAC,EAAE,CAAC,CAAC;QAEnM,IAAI,cAAc,GAAa,EAAE,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,iBAAiB,EAAE,CAAC,CAAC,EAAE,EAAE;YAC/C,cAAc,GAAI,CAAC,CAAC,OAAwC,CAAC,cAAc,CAAC;QAC9E,CAAC,CAAC,CAAC;QACH,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE1D,MAAM,CAAC,cAAc,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,EAAE,EAAE,KAAK,CAAC,EAAE,EAAE,UAAU,CAAC,EAAE,EAAE,KAAK,CAAC,EAAE,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC;QAC7F,MAAM,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,YAAY,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QACjE,MAAM,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,YAAY,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QACjE,MAAM,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,cAAc,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QACrE,MAAM,CAAC,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;IACtE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iFAAiF,EAAE,KAAK,IAAI,EAAE;QAC/F,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,KAAK,EAAE,GAAG,MAAM,KAAK,EAAE,CAAC;QACjD,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;QACnF,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC1G,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,MAAM,EAAE,UAAU,EAAE,CAAC,CAAC;QACvG,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QACpF,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,WAAW,EAAE,IAAI,CAAC,EAAE,EAAE,WAAW,EAAE,MAAM,CAAC,EAAE,EAAE,aAAa,EAAE,GAAG,CAAC,EAAE,EAAE,CAAC,CAAC;QAE3G,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACtC,MAAM,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACxC,MAAM,MAAM,CAAC,iBAAiB,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QAEvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,CAAC,IAAI,EAAE,WAAW,CAAC,CAAC,aAAa,EAAE,CAAC;QAC1C,MAAM,CAAC,IAAI,EAAE,WAAW,CAAC,CAAC,aAAa,EAAE,CAAC;QAC1C,MAAM,CAAC,IAAI,EAAE,aAAa,CAAC,CAAC,aAAa,EAAE,CAAC;QAC5C,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,YAAY,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,EAAE,QAAQ,CAAC,CAAC,aAAa,EAAE,CAAC;IAC3E,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC;AAEH,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;IAChC,EAAE,CAAC,8EAA8E,EAAE,KAAK,IAAI,EAAE;QAC5F,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,SAAS,EAAE,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACzC,IAAI,EAAE,MAAM;YACZ,OAAO,EAAE;gBACP,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE;gBACvC,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE;aAClC;SACF,CAAC,CAAC;QACH,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;QACzE,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;QACzE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,CAAC;QACzG,MAAM,MAAM,GAAa,EAAE,CAAC;QAC5B,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,oBAAoB,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC;QAE/E,MAAM,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;QAClH,MAAM,CAAC,MAAM,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC9F,MAAM,CAAC,MAAM,MAAM,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACjE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,CAAC,oBAAoB,CAAC,CAAC,CAAC;IACjD,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
@@ -87,7 +87,18 @@ export declare class CriticalPathEngine {
87
87
  };
88
88
  }): Promise<Task | null>;
89
89
  private checkAndUnblockDownstreamTasks;
90
- deleteTask(id: string): Promise<boolean>;
90
+ /**
91
+ * Deletes a task and everything that belongs to it: subtasks (or, with `subtasks: 'detach'`,
92
+ * their parent link), dependencies, comments, attachments (including stored files) and time
93
+ * entries. The activity log is kept as an audit trail.
94
+ */
95
+ deleteTask(id: string, options?: {
96
+ subtasks?: 'delete' | 'detach';
97
+ }): Promise<boolean>;
98
+ /** Removes records owned by a task; the task's deletion was already authorized. */
99
+ private deleteTaskChildren;
100
+ /** Removes a dependency between two tasks. Requires `task.update` on the dependent task's project. */
101
+ removeDependency(id: string): Promise<boolean>;
91
102
  addDependency(dep: Omit<TaskDependency, 'id'>): Promise<TaskDependency>;
92
103
  /**
93
104
  * Collects every dependency edge reachable upstream from `startTaskId`. A new edge
@@ -158,7 +169,10 @@ export declare class CriticalPathEngine {
158
169
  getContainer(id: string): Promise<TaskContainer | null>;
159
170
  createContainer(container: Omit<TaskContainer, 'id' | 'createdAt' | 'updatedAt'>): Promise<TaskContainer>;
160
171
  updateContainer(id: string, updates: Partial<TaskContainer>): Promise<TaskContainer | null>;
172
+ /** Deletes a container. Its tasks and nested containers are kept but no longer reference it. */
161
173
  deleteContainer(id: string): Promise<boolean>;
174
+ /** Unsets a reference (e.g. `iterationId`) on every task in the project that points at `id`. */
175
+ private clearTaskReferences;
162
176
  getDeliverables(projectId: string): Promise<Deliverable[]>;
163
177
  getDeliverable(id: string): Promise<Deliverable | null>;
164
178
  createDeliverable(input: CreateDeliverableInput): Promise<Deliverable>;
@@ -169,6 +183,7 @@ export declare class CriticalPathEngine {
169
183
  getIteration(id: string): Promise<Iteration | null>;
170
184
  createIteration(iteration: Omit<Iteration, 'id' | 'createdAt'>): Promise<Iteration>;
171
185
  updateIteration(id: string, updates: Partial<Iteration>): Promise<Iteration | null>;
186
+ /** Deletes an iteration. Its tasks are kept and moved back to the backlog (no iteration). */
172
187
  deleteIteration(id: string): Promise<boolean>;
173
188
  calculateCriticalPath(projectId: string, options?: CPMOptions): Promise<CriticalPathAnalysis>;
174
189
  getTimelineLadder(projectId: string, options?: TimelineLadderOptions): Promise<TimelineLadder>;
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,QAAQ,EACR,KAAK,EAEL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EACT,OAAO,EACP,aAAa,EACb,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EA8Bf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAE,iBAAiB,EAAoB,MAAM,2BAA2B,CAAC;AAGhF,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,+GAA+G;IAC/G,SAAgB,QAAQ,EAAE,iBAAiB,CAAC;IAC5C,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;IAC9B,wFAAwF;IACxF,OAAO,CAAC,QAAQ,CAAC,qBAAqB,CAAC,CAAU;gBAErC,MAAM,GAAE,kBAAuB;IA6B3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,OAAO,CAAC,SAAS;IAMjB;;;OAGG;IACH,OAAO,KAAK,SAAS,GAEpB;IAED,qGAAqG;IACrG,OAAO,CAAC,QAAQ;IAOhB,OAAO,CAAC,aAAa;YAKP,SAAS;IAWvB,yFAAyF;YAC3E,eAAe;YAOf,cAAc;IAK5B;;;OAGG;YACW,oBAAoB;YAapB,sBAAsB;IAIpC,kGAAkG;YACpF,cAAc;YAgBd,eAAe;YAIf,kBAAkB;YAMlB,qBAAqB;IAInC,wFAAwF;IACxF,OAAO,CAAC,aAAa;YAMP,UAAU;YASV,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAKjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA4BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAiBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAK/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IA+BzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA+BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAuC3C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAM7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAoGrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EACtB,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YA8TT,8BAA8B;IAyEtC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsCxC,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA8B7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAgCpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IA4C1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAM/C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKpF,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,UAAU,CACd,KAAK,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAC1F,OAAO,CAAC,OAAO,CAAC;IA0Bb,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4B7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8CzG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC5G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAUlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;YAM7C,uBAAuB;IAO/B,gBAAgB,CACpB,KAAK,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,YAAY,CAAC,GAAG;QAAE,UAAU,CAAC,EAAE,MAAM,CAAA;KAAE,GACjG,OAAO,CAAC,UAAU,CAAC;IAsBhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsC9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IA8BhB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiC/C,+BAA+B,CACnC,OAAO,EAAE,mBAAmB,GAAG;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACpD,OAAO,CAAC,qBAAqB,CAAC;IAoB3B,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAKzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAMvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAO3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAMvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAiDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA4B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAMnD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAkBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAiCnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ7C,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAoB1B,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAyDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IA0BhC,sFAAsF;YACxE,eAAe;IAS7B,OAAO,CAAC,eAAe;IAIvB,mGAAmG;IAC7F,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAMvC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAM3D;;;OAGG;IACG,aAAa,CAAC,KAAK,EAAE;QACzB,IAAI,EAAE,MAAM,CAAC;QACb,GAAG,EAAE,MAAM,CAAC;QACZ,MAAM,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,MAAM,CAAC,EAAE,OAAO,CAAC;KAClB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAgBjD,aAAa,CACjB,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,OAAO,EAAE,MAAM,GAAG,KAAK,GAAG,QAAQ,GAAG,QAAQ,GAAG,QAAQ,CAAC,CAAC,GAC/E,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAY1B,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOjD,OAAO,CAAC,kBAAkB;IAQ1B,2FAA2F;YAC7E,kBAAkB;CAkBjC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,QAAQ,EACR,KAAK,EAEL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EACT,OAAO,EACP,aAAa,EACb,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EA+Bf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAE,iBAAiB,EAAoB,MAAM,2BAA2B,CAAC;AAGhF,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,+GAA+G;IAC/G,SAAgB,QAAQ,EAAE,iBAAiB,CAAC;IAC5C,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;IAC9B,wFAAwF;IACxF,OAAO,CAAC,QAAQ,CAAC,qBAAqB,CAAC,CAAU;gBAErC,MAAM,GAAE,kBAAuB;IA6B3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,OAAO,CAAC,SAAS;IAMjB;;;OAGG;IACH,OAAO,KAAK,SAAS,GAEpB;IAED,qGAAqG;IACrG,OAAO,CAAC,QAAQ;IAOhB,OAAO,CAAC,aAAa;YAKP,SAAS;IAWvB,yFAAyF;YAC3E,eAAe;YAOf,cAAc;IAK5B;;;OAGG;YACW,oBAAoB;YAapB,sBAAsB;IAIpC,kGAAkG;YACpF,cAAc;YAgBd,eAAe;YAIf,kBAAkB;YAMlB,qBAAqB;IAInC,wFAAwF;IACxF,OAAO,CAAC,aAAa;YAMP,UAAU;YASV,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAKjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA4BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAiBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAK/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IA+BzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA+BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA6C3C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAM7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAoGrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EACtB,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YA8TT,8BAA8B;IAyE5C;;;;OAIG;IACG,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,GAAE;QAAE,QAAQ,CAAC,EAAE,QAAQ,GAAG,QAAQ,CAAA;KAAO,GAAG,OAAO,CAAC,OAAO,CAAC;IAsChG,mFAAmF;YACrE,kBAAkB;IAiChC,sGAAsG;IAChG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB9C,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA8B7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAgCpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IA4C1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAM/C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKpF,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,UAAU,CACd,KAAK,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAC1F,OAAO,CAAC,OAAO,CAAC;IA0Bb,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4B7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8CzG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC5G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAUlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;YAM7C,uBAAuB;IAO/B,gBAAgB,CACpB,KAAK,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,YAAY,CAAC,GAAG;QAAE,UAAU,CAAC,EAAE,MAAM,CAAA;KAAE,GACjG,OAAO,CAAC,UAAU,CAAC;IAsBhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsC9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IA8BhB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiC/C,+BAA+B,CACnC,OAAO,EAAE,mBAAmB,GAAG;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACpD,OAAO,CAAC,qBAAqB,CAAC;IAoB3B,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAKzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAMvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAOjG,gGAAgG;IAC1F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAWnD,gGAAgG;YAClF,mBAAmB;IAW3B,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAMvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAiDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA6B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAMnD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAkBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAiCzF,6FAA6F;IACvF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAS7C,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAoB1B,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAyDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IA0BhC,sFAAsF;YACxE,eAAe;IAS7B,OAAO,CAAC,eAAe;IAIvB,mGAAmG;IAC7F,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAMvC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAM3D;;;OAGG;IACG,aAAa,CAAC,KAAK,EAAE;QACzB,IAAI,EAAE,MAAM,CAAC;QACb,GAAG,EAAE,MAAM,CAAC;QACZ,MAAM,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,MAAM,CAAC,EAAE,OAAO,CAAC;KAClB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAgBjD,aAAa,CACjB,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,OAAO,EAAE,MAAM,GAAG,KAAK,GAAG,QAAQ,GAAG,QAAQ,GAAG,QAAQ,CAAC,CAAC,GAC/E,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAY1B,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOjD,OAAO,CAAC,kBAAkB;IAQ1B,2FAA2F;YAC7E,kBAAkB;CAkBjC"}
@@ -404,12 +404,19 @@ export class CriticalPathEngine {
404
404
  // Deleting the project implies deleting its tasks; skip per-task checks for the cascade.
405
405
  const cascade = this.elevated();
406
406
  const tasks = await this.store.getTasks(id);
407
- const deletedTaskIds = [];
408
407
  for (const task of tasks) {
409
- if (await cascade.deleteTask(task.id)) {
410
- deletedTaskIds.push(task.id);
411
- }
412
- }
408
+ // Subtasks may already be gone with their parent; deleteTask then returns false.
409
+ await cascade.deleteTask(task.id);
410
+ }
411
+ const deletedTaskIds = (await Promise.all(tasks.map(async (t) => ((await this.store.getTask(t.id)) ? null : t.id)))).filter((taskId) => taskId !== null);
412
+ for (const container of await this.store.getContainers(id))
413
+ await this.store.deleteContainer(container.id);
414
+ for (const iteration of await this.store.getIterations(id))
415
+ await this.store.deleteIteration(iteration.id);
416
+ for (const deliverable of await this.store.getDeliverables(id))
417
+ await cascade.deleteDeliverable(deliverable.id);
418
+ for (const attachment of await this.store.getAttachments({ projectId: id }))
419
+ await cascade.deleteAttachment(attachment.id);
413
420
  const deleted = await this.store.deleteProject(id);
414
421
  if (deleted) {
415
422
  const now = new Date().toISOString();
@@ -874,12 +881,18 @@ export class CriticalPathEngine {
874
881
  console.error(`[CriticalPathEngine] Error during auto-unblocking for task ${completedTask.id}:`, err);
875
882
  }
876
883
  }
877
- async deleteTask(id) {
884
+ /**
885
+ * Deletes a task and everything that belongs to it: subtasks (or, with `subtasks: 'detach'`,
886
+ * their parent link), dependencies, comments, attachments (including stored files) and time
887
+ * entries. The activity log is kept as an audit trail.
888
+ */
889
+ async deleteTask(id, options = {}) {
878
890
  const existing = await this.getTask(id);
879
891
  if (!existing)
880
892
  return false;
881
893
  await this.requireProjectAccess('task.delete', existing.projectId);
882
894
  await this.plugins.runBeforeTaskDelete(id, existing);
895
+ await this.deleteTaskChildren(existing, options.subtasks ?? 'delete');
883
896
  const deleted = await this.store.deleteTask(id);
884
897
  if (deleted) {
885
898
  await this.plugins.runAfterTaskDelete(id, existing);
@@ -907,6 +920,61 @@ export class CriticalPathEngine {
907
920
  }
908
921
  return deleted;
909
922
  }
923
+ /** Removes records owned by a task; the task's deletion was already authorized. */
924
+ async deleteTaskChildren(task, subtasks) {
925
+ const cascade = this.elevated();
926
+ const children = (await this.store.getTasks(task.projectId)).filter((t) => t.parentId === task.id);
927
+ for (const child of children) {
928
+ if (subtasks === 'delete') {
929
+ await cascade.deleteTask(child.id, { subtasks });
930
+ }
931
+ else {
932
+ await this.store.updateTask(child.id, { parentId: undefined });
933
+ }
934
+ }
935
+ for (const dependency of await this.store.getDependencies(task.id)) {
936
+ await cascade.removeDependency(dependency.id);
937
+ }
938
+ const comments = await this.store.getComments(task.id);
939
+ const attachments = [
940
+ ...(await this.store.getAttachments({ taskId: task.id })),
941
+ ...(await Promise.all(comments.map((c) => this.store.getAttachments({ commentId: c.id })))).flat()
942
+ ];
943
+ for (const attachmentId of new Set(attachments.map((a) => a.id))) {
944
+ await cascade.deleteAttachment(attachmentId);
945
+ }
946
+ for (const comment of comments) {
947
+ await cascade.deleteComment(comment.id);
948
+ }
949
+ for (const entry of await this.store.getTimeEntries(task.id)) {
950
+ await this.store.deleteTimeEntry(entry.id);
951
+ }
952
+ }
953
+ /** Removes a dependency between two tasks. Requires `task.update` on the dependent task's project. */
954
+ async removeDependency(id) {
955
+ const dependency = await this.store.getDependency(id);
956
+ if (!dependency)
957
+ return false;
958
+ if (this.enforcing) {
959
+ const task = await this.getTask(dependency.taskId);
960
+ if (!task)
961
+ return false;
962
+ await this.requireProjectAccess('task.update', task.projectId);
963
+ }
964
+ const removed = await this.store.removeDependency(id);
965
+ if (removed) {
966
+ const event = {
967
+ id: `evt_${Math.random().toString(36).substring(2, 9)}`,
968
+ name: 'dependency.removed',
969
+ aggregateId: id,
970
+ aggregateType: 'Dependency',
971
+ occurredAt: new Date().toISOString(),
972
+ payload: { dependency }
973
+ };
974
+ await this.events.publish(event);
975
+ }
976
+ return removed;
977
+ }
910
978
  // --- Task Dependencies & Graph ---
911
979
  async addDependency(dep) {
912
980
  if (this.enforcing) {
@@ -1429,13 +1497,25 @@ export class CriticalPathEngine {
1429
1497
  await this.requireProjectAccess('plan.manage', existing.projectId);
1430
1498
  return this.store.updateContainer(id, updates);
1431
1499
  }
1500
+ /** Deletes a container. Its tasks and nested containers are kept but no longer reference it. */
1432
1501
  async deleteContainer(id) {
1433
1502
  const existing = await this.getContainer(id);
1434
1503
  if (!existing)
1435
1504
  return false;
1436
1505
  await this.requireProjectAccess('plan.manage', existing.projectId);
1506
+ await this.clearTaskReferences(existing.projectId, 'containerId', id);
1507
+ for (const child of (await this.store.getContainers(existing.projectId)).filter((c) => c.parentId === id)) {
1508
+ await this.store.updateContainer(child.id, { parentId: undefined });
1509
+ }
1437
1510
  return this.store.deleteContainer(id);
1438
1511
  }
1512
+ /** Unsets a reference (e.g. `iterationId`) on every task in the project that points at `id`. */
1513
+ async clearTaskReferences(projectId, field, id) {
1514
+ for (const task of await this.store.getTasks(projectId)) {
1515
+ if (task[field] === id)
1516
+ await this.store.updateTask(task.id, { [field]: undefined });
1517
+ }
1518
+ }
1439
1519
  // --- Deliverables ---
1440
1520
  async getDeliverables(projectId) {
1441
1521
  if (!(await this.canReadProject(projectId)))
@@ -1527,6 +1607,7 @@ export class CriticalPathEngine {
1527
1607
  if (!existing)
1528
1608
  return false;
1529
1609
  await this.requireProjectAccess('plan.manage', existing.projectId);
1610
+ await this.clearTaskReferences(existing.projectId, 'deliverableId', id);
1530
1611
  const deleted = await this.store.deleteDeliverable(id);
1531
1612
  if (deleted) {
1532
1613
  const now = new Date().toISOString();
@@ -1654,11 +1735,13 @@ export class CriticalPathEngine {
1654
1735
  }
1655
1736
  return updated;
1656
1737
  }
1738
+ /** Deletes an iteration. Its tasks are kept and moved back to the backlog (no iteration). */
1657
1739
  async deleteIteration(id) {
1658
1740
  const existing = await this.getIteration(id);
1659
1741
  if (!existing)
1660
1742
  return false;
1661
1743
  await this.requireProjectAccess('plan.manage', existing.projectId);
1744
+ await this.clearTaskReferences(existing.projectId, 'iterationId', id);
1662
1745
  return this.store.deleteIteration(id);
1663
1746
  }
1664
1747
  // --- Ladder of Abstraction & Critical Path Method ---