@critical-path/client 0.18.0 → 0.20.0
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/CHANGELOG.md +38 -0
- package/README.md +50 -0
- package/dist/index.d.ts +53 -4
- package/dist/index.d.ts.map +1 -1
- package/dist/index.js +113 -43
- package/dist/index.js.map +1 -1
- package/dist/routes.test.d.ts +2 -0
- package/dist/routes.test.d.ts.map +1 -0
- package/dist/routes.test.js +95 -0
- package/dist/routes.test.js.map +1 -0
- package/dist/transport.test.d.ts +2 -0
- package/dist/transport.test.d.ts.map +1 -0
- package/dist/transport.test.js +89 -0
- package/dist/transport.test.js.map +1 -0
- package/package.json +3 -3
- package/src/index.ts +151 -48
- package/src/routes.test.ts +96 -0
- package/src/transport.test.ts +111 -0
- package/tsconfig.tsbuildinfo +1 -1
package/CHANGELOG.md
CHANGED
|
@@ -1,5 +1,43 @@
|
|
|
1
1
|
# @critical-path/client
|
|
2
2
|
|
|
3
|
+
## 0.20.0
|
|
4
|
+
|
|
5
|
+
### Minor Changes
|
|
6
|
+
|
|
7
|
+
- 40e5958: Real S3 uploads and signed URLs, and server-chosen storage keys.
|
|
8
|
+
|
|
9
|
+
**@critical-path/core**
|
|
10
|
+
- **BREAKING:** `S3StorageAdapter` now takes your AWS SDK v3 `client`, `commands` (`PutObjectCommand`, `DeleteObjectCommand`, optional `GetObjectCommand`) and a `presign` function (`getSignedUrl` from `@aws-sdk/s3-request-presigner`). Uploads send real commands and propagate S3 errors; previously failures were swallowed and reported as success. Presigned uploads are actually signed and cover `Content-Type`. New `signedDownloads` for private buckets. The unused `accessKeyId`/`secretAccessKey`/`sessionToken`/`s3Client` options are removed.
|
|
11
|
+
- **BREAKING:** `FirebaseStorageAdapter` requires a `bucket`; it no longer silently uses an in-memory mock. It throws instead of returning a public URL when the bucket cannot sign uploads.
|
|
12
|
+
- **BREAKING:** `engine.getPresignedAttachmentUploadUrl({ projectId, filename, contentType?, expiresInSeconds? })` generates the storage key under `projects/<projectId>/`, instead of accepting a caller-chosen `storageKey`.
|
|
13
|
+
- Attachments created through an actor view must use a `storageKey` under their project's prefix, so callers cannot register (and then delete) other projects' files. Uploads through views are always stored under the project prefix.
|
|
14
|
+
- New `buildStorageKey` (validates path prefixes, crypto-random component) and `contentDispositionFor`. HTML, SVG and script uploads are stored as downloads.
|
|
15
|
+
|
|
16
|
+
**@critical-path/server**
|
|
17
|
+
- **BREAKING:** `POST /attachments/presign` takes `{ projectId, filename, contentType?, expiresInSeconds? }`. `POST /attachments/upload` no longer accepts `pathPrefix`.
|
|
18
|
+
|
|
19
|
+
**@critical-path/client**
|
|
20
|
+
- `getPresignedAttachmentUploadUrl` and `uploadAttachmentFile` use the updated request bodies.
|
|
21
|
+
|
|
22
|
+
### Patch Changes
|
|
23
|
+
|
|
24
|
+
- Updated dependencies [40e5958]
|
|
25
|
+
- @critical-path/core@0.31.0
|
|
26
|
+
|
|
27
|
+
## 0.19.0
|
|
28
|
+
|
|
29
|
+
### Minor Changes
|
|
30
|
+
|
|
31
|
+
- b453472: Client SDK hardening.
|
|
32
|
+
|
|
33
|
+
- **BREAKING:** non-2xx responses throw `CriticalPathError` (`status`, `issues`, `body`, `isNotFound`) instead of a plain `Error`. The message is unchanged.
|
|
34
|
+
- `headers` can be an (async) function, resolved before every request, so you can refresh tokens.
|
|
35
|
+
- New `timeoutMs` and opt-in `retry: { retries, baseDelayMs }`. Retries apply to GET only, on network errors and 429/502/503/504, and honour `Retry-After`.
|
|
36
|
+
- New `client.with({ signal, headers, timeoutMs })` returns a scoped client for cancellation and per-call headers.
|
|
37
|
+
- `Content-Type: application/json` is only sent with a body.
|
|
38
|
+
- All ids in URL paths are now encoded.
|
|
39
|
+
- New `getWebhook`, `getContainer` and `getIteration`.
|
|
40
|
+
|
|
3
41
|
## 0.18.0
|
|
4
42
|
|
|
5
43
|
### Minor Changes
|
package/README.md
CHANGED
|
@@ -86,6 +86,56 @@ const taskLadder = await client.getTaskLadder(newTask.id);
|
|
|
86
86
|
|
|
87
87
|
---
|
|
88
88
|
|
|
89
|
+
## ⚙️ Configuration
|
|
90
|
+
|
|
91
|
+
```ts
|
|
92
|
+
const client = new CriticalPathClient({
|
|
93
|
+
baseUrl: '/api/critical-path',
|
|
94
|
+
// Static headers, or a function called before every request (e.g. to refresh tokens)
|
|
95
|
+
headers: async () => ({ Authorization: `Bearer ${await auth.getAccessToken()}` }),
|
|
96
|
+
timeoutMs: 15_000, // abort slow requests (default: none)
|
|
97
|
+
retry: { retries: 2, baseDelayMs: 250 }, // GET only: network errors, 429, 502-504 (default: off)
|
|
98
|
+
fetch: customFetch // optional fetch implementation
|
|
99
|
+
});
|
|
100
|
+
```
|
|
101
|
+
|
|
102
|
+
### Cancellation and per-call headers
|
|
103
|
+
|
|
104
|
+
`with()` returns a scoped client that applies options to every call it makes:
|
|
105
|
+
|
|
106
|
+
```ts
|
|
107
|
+
const controller = new AbortController();
|
|
108
|
+
const tasks = await client.with({ signal: controller.signal }).getTasks(projectId);
|
|
109
|
+
// later, e.g. when a component unmounts:
|
|
110
|
+
controller.abort();
|
|
111
|
+
|
|
112
|
+
await client.with({ headers: { 'X-Request-Id': id }, timeoutMs: 5_000 }).getProject(projectId);
|
|
113
|
+
```
|
|
114
|
+
|
|
115
|
+
### Errors
|
|
116
|
+
|
|
117
|
+
Non-2xx responses throw `CriticalPathError`:
|
|
118
|
+
|
|
119
|
+
```ts
|
|
120
|
+
import { CriticalPathError } from '@critical-path/client';
|
|
121
|
+
|
|
122
|
+
try {
|
|
123
|
+
await client.addDependency(taskId, { dependsOnTaskId });
|
|
124
|
+
} catch (err) {
|
|
125
|
+
if (err instanceof CriticalPathError) {
|
|
126
|
+
err.status; // e.g. 409
|
|
127
|
+
err.issues; // field-level problems for 400 validation errors
|
|
128
|
+
err.body?.cyclePath; // the rest of the server's error body
|
|
129
|
+
}
|
|
130
|
+
}
|
|
131
|
+
```
|
|
132
|
+
|
|
133
|
+
Delete methods resolve to `false` instead of throwing when the resource does not exist. Network failures, timeouts (`TimeoutError`) and cancellations (`AbortError`) are thrown as-is.
|
|
134
|
+
|
|
135
|
+
Every server route has a client method; `routes.test.ts` fails if a route is added without one.
|
|
136
|
+
|
|
137
|
+
---
|
|
138
|
+
|
|
89
139
|
## 📄 License
|
|
90
140
|
|
|
91
141
|
MIT © [Critical Path](https://github.com/Pixerate/Critical-Path)
|
package/dist/index.d.ts
CHANGED
|
@@ -12,16 +12,62 @@ export interface UpdateStatusResult {
|
|
|
12
12
|
status: string;
|
|
13
13
|
timestamp: number;
|
|
14
14
|
}
|
|
15
|
+
type HeaderMap = Record<string, string>;
|
|
15
16
|
export interface ClientOptions {
|
|
17
|
+
/** API base URL, e.g. `http://localhost:3000/api/critical-path`. */
|
|
16
18
|
baseUrl: string;
|
|
17
|
-
|
|
19
|
+
/**
|
|
20
|
+
* Headers sent with every request. Pass a function to compute them per request, e.g. to attach
|
|
21
|
+
* a freshly refreshed access token: `headers: async () => ({ Authorization: `Bearer ${await getToken()}` })`.
|
|
22
|
+
*/
|
|
23
|
+
headers?: HeaderMap | (() => HeaderMap | Promise<HeaderMap>);
|
|
18
24
|
fetch?: typeof fetch;
|
|
25
|
+
/** Abort requests that take longer than this. Default: no timeout. */
|
|
26
|
+
timeoutMs?: number;
|
|
27
|
+
/**
|
|
28
|
+
* Retry GET requests that fail with a network error, 429, 502, 503 or 504. Default: no retries.
|
|
29
|
+
* Delays double from `baseDelayMs` (default 250 ms) and honour `Retry-After` on 429/503.
|
|
30
|
+
*/
|
|
31
|
+
retry?: {
|
|
32
|
+
retries: number;
|
|
33
|
+
baseDelayMs?: number;
|
|
34
|
+
};
|
|
35
|
+
}
|
|
36
|
+
/** Per-call options for a scoped client (see `CriticalPathClient.with`). */
|
|
37
|
+
export interface RequestOptions {
|
|
38
|
+
signal?: AbortSignal;
|
|
39
|
+
headers?: HeaderMap;
|
|
40
|
+
timeoutMs?: number;
|
|
41
|
+
}
|
|
42
|
+
/**
|
|
43
|
+
* Error thrown for non-2xx responses. Carries the HTTP status and the server's error details
|
|
44
|
+
* (`issues` for validation errors, `cyclePath` for dependency cycles, and so on).
|
|
45
|
+
*/
|
|
46
|
+
export declare class CriticalPathError extends Error {
|
|
47
|
+
/** HTTP status code. */
|
|
48
|
+
readonly status: number;
|
|
49
|
+
/** Field-level validation problems for 400 responses. */
|
|
50
|
+
readonly issues?: Array<{
|
|
51
|
+
path: string;
|
|
52
|
+
message: string;
|
|
53
|
+
}>;
|
|
54
|
+
/** The parsed JSON error body, if any (e.g. `fromStatus`, `toStatus`, `cyclePath`, `fieldKey`). */
|
|
55
|
+
readonly body?: Record<string, unknown>;
|
|
56
|
+
constructor(message: string, status: number, body?: Record<string, unknown>);
|
|
57
|
+
get isNotFound(): boolean;
|
|
19
58
|
}
|
|
20
59
|
export declare class CriticalPathClient {
|
|
21
|
-
private baseUrl;
|
|
22
|
-
private
|
|
23
|
-
private customFetch;
|
|
60
|
+
private readonly baseUrl;
|
|
61
|
+
private readonly options;
|
|
62
|
+
private readonly customFetch;
|
|
63
|
+
/** Set on scoped clients created by `with()`. */
|
|
64
|
+
private readonly requestOptions?;
|
|
24
65
|
constructor(options: ClientOptions);
|
|
66
|
+
/**
|
|
67
|
+
* Returns a client that applies `options` to every call, e.g. to cancel requests when a
|
|
68
|
+
* component unmounts: `client.with({ signal: controller.signal }).getTasks(projectId)`.
|
|
69
|
+
*/
|
|
70
|
+
with(options: RequestOptions): CriticalPathClient;
|
|
25
71
|
/**
|
|
26
72
|
* Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
|
|
27
73
|
* so delete methods keep their boolean contract instead of throwing.
|
|
@@ -68,6 +114,7 @@ export declare class CriticalPathClient {
|
|
|
68
114
|
addTodo(taskId: string, title: string): Promise<TaskTodoItem>;
|
|
69
115
|
toggleTodo(taskId: string, todoIdOrTitle: string, completed?: boolean): Promise<Task>;
|
|
70
116
|
getWebhooks(): Promise<PublicWebhook[]>;
|
|
117
|
+
getWebhook(id: string): Promise<PublicWebhook>;
|
|
71
118
|
/** Registers a webhook. The returned `secret` is shown only once; store it to verify deliveries. */
|
|
72
119
|
createWebhook(data: CreateWebhookBody): Promise<{
|
|
73
120
|
webhook: PublicWebhook;
|
|
@@ -95,6 +142,7 @@ export declare class CriticalPathClient {
|
|
|
95
142
|
updateTeam(id: string, updates: UpdateTeamBody): Promise<Team>;
|
|
96
143
|
deleteTeam(id: string): Promise<boolean>;
|
|
97
144
|
getContainers(projectId: string): Promise<TaskContainer[]>;
|
|
145
|
+
getContainer(id: string): Promise<TaskContainer>;
|
|
98
146
|
createContainer(data: CreateContainerBody): Promise<TaskContainer>;
|
|
99
147
|
updateContainer(id: string, updates: UpdateContainerBody): Promise<TaskContainer>;
|
|
100
148
|
deleteContainer(id: string): Promise<boolean>;
|
|
@@ -105,6 +153,7 @@ export declare class CriticalPathClient {
|
|
|
105
153
|
updateDeliverable(id: string, updates: UpdateDeliverableBody): Promise<Deliverable>;
|
|
106
154
|
deleteDeliverable(id: string): Promise<boolean>;
|
|
107
155
|
getIterations(projectId: string): Promise<Iteration[]>;
|
|
156
|
+
getIteration(id: string): Promise<Iteration>;
|
|
108
157
|
createIteration(data: CreateIterationBody): Promise<Iteration>;
|
|
109
158
|
updateIteration(id: string, updates: UpdateIterationBody): Promise<Iteration>;
|
|
110
159
|
deleteIteration(id: string): Promise<boolean>;
|
package/dist/index.d.ts.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,kBAAkB,EAClB,iBAAiB,EACjB,iBAAiB,EACjB,cAAc,EACd,cAAc,EACd,oBAAoB,EACpB,cAAc,EACd,cAAc,EACd,mBAAmB,EACnB,mBAAmB,EACnB,qBAAqB,EACrB,qBAAqB,EACrB,mBAAmB,EACnB,mBAAmB,EACnB,iBAAiB,EACjB,iBAAiB,EACjB,mBAAmB,EACnB,oBAAoB,EACpB,oBAAoB,EACpB,qBAAqB,EACrB,WAAW,EACX,iBAAiB,EACjB,iBAAiB,EAClB,MAAM,6BAA6B,CAAC;AACrC,OAAO,KAAK,EACV,aAAa,EACb,IAAI,EACJ,SAAS,EACT,aAAa,EACb,cAAc,EACd,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EAEV,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAElB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,MAAM,CAAC;IAChB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;
|
|
1
|
+
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,kBAAkB,EAClB,iBAAiB,EACjB,iBAAiB,EACjB,cAAc,EACd,cAAc,EACd,oBAAoB,EACpB,cAAc,EACd,cAAc,EACd,mBAAmB,EACnB,mBAAmB,EACnB,qBAAqB,EACrB,qBAAqB,EACrB,mBAAmB,EACnB,mBAAmB,EACnB,iBAAiB,EACjB,iBAAiB,EACjB,mBAAmB,EACnB,oBAAoB,EACpB,oBAAoB,EACpB,qBAAqB,EACrB,WAAW,EACX,iBAAiB,EACjB,iBAAiB,EAClB,MAAM,6BAA6B,CAAC;AACrC,OAAO,KAAK,EACV,aAAa,EACb,IAAI,EACJ,SAAS,EACT,aAAa,EACb,cAAc,EACd,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EAEV,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAElB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,KAAK,SAAS,GAAG,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;AAExC,MAAM,WAAW,aAAa;IAC5B,oEAAoE;IACpE,OAAO,EAAE,MAAM,CAAC;IAChB;;;OAGG;IACH,OAAO,CAAC,EAAE,SAAS,GAAG,CAAC,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC;IAC7D,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;IACrB,sEAAsE;IACtE,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB;;;OAGG;IACH,KAAK,CAAC,EAAE;QAAE,OAAO,EAAE,MAAM,CAAC;QAAC,WAAW,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnD;AAED,4EAA4E;AAC5E,MAAM,WAAW,cAAc;IAC7B,MAAM,CAAC,EAAE,WAAW,CAAC;IACrB,OAAO,CAAC,EAAE,SAAS,CAAC;IACpB,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED;;;GAGG;AACH,qBAAa,iBAAkB,SAAQ,KAAK;IAC1C,wBAAwB;IACxB,QAAQ,CAAC,MAAM,EAAE,MAAM,CAAC;IACxB,yDAAyD;IACzD,QAAQ,CAAC,MAAM,CAAC,EAAE,KAAK,CAAC;QAAE,IAAI,EAAE,MAAM,CAAC;QAAC,OAAO,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAC3D,mGAAmG;IACnG,QAAQ,CAAC,IAAI,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;gBAE5B,OAAO,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;IAQ3E,IAAI,UAAU,IAAI,OAAO,CAExB;CACF;AAqBD,qBAAa,kBAAkB;IAC7B,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAS;IACjC,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAgB;IACxC,OAAO,CAAC,QAAQ,CAAC,WAAW,CAAe;IAC3C,iDAAiD;IACjD,OAAO,CAAC,QAAQ,CAAC,cAAc,CAAC,CAAiB;gBAErC,OAAO,EAAE,aAAa;IAMlC;;;OAGG;IACH,IAAI,CAAC,OAAO,EAAE,cAAc,GAAG,kBAAkB;IAWjD;;;OAGG;YACW,aAAa;YAUb,OAAO;IAmDf,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,CAAC;IAK1C,cAAc,CAAC,IAAI,EAAE,kBAAkB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQ3D,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,kBAAkB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQ1E,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK5C,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQxD,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ7E,iFAAiF;IAC3E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,qBAAqB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,oBAAoB,CAAC;IAOvE,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAapB,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IAsBhC,wGAAwG;IAClG,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAInD;;;OAGG;IACG,UAAU,CAAC,KAAK,GAAE,SAAc,GAAG,OAAO,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAY9C,YAAY;IAWpB,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,CAAC;IAOtD,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAOpD,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAOpE,UAAU,CAAC,IAAI,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ/C,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ9D,aAAa,CACjB,YAAY,EAAE,MAAM,EACpB,IAAI,EAAE;QACJ,KAAK,EAAE,MAAM,CAAC;QACd,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,MAAM,CAAC,EAAE,UAAU,CAAC;QACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;QACpB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACxC,GACA,OAAO,CAAC,IAAI,CAAC;IAkBV,OAAO,CACX,MAAM,EAAE,MAAM,EACd,KAAK,EAAE,MAAM,GACZ,OAAO,CAAC,YAAY,CAAC;IAalB,UAAU,CACd,MAAM,EAAE,MAAM,EACd,aAAa,EAAE,MAAM,EACrB,SAAS,CAAC,EAAE,OAAO,GAClB,OAAO,CAAC,IAAI,CAAC;IAiBV,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAIvC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,CAAC;IAIpD,oGAAoG;IAC9F,aAAa,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAO3F,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQ7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIjD,0FAA0F;IACpF,aAAa,CAAC,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,oBAAoB,GAAG,OAAO,CAAC,cAAc,CAAC;IAQxF;;;OAGG;IACG,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,GAAE;QAAE,QAAQ,CAAC,EAAE,QAAQ,GAAG,QAAQ,CAAA;KAAO,GAAG,OAAO,CAAC,OAAO,CAAC;IAK1F,gBAAgB,CAAC,MAAM,EAAE,MAAM,EAAE,YAAY,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIxE,mBAAmB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAKjE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,iBAAiB,CAAC;IAKjE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAK5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAMpE,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,UAAU,CAAC,IAAI,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ/C,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ9D,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,CAAC;IAIhD,eAAe,CAAC,IAAI,EAAE,mBAAmB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQlE,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQjF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAKhD,qBAAqB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,CAAC;IAK9D,iBAAiB,CAAC,IAAI,EAAE,qBAAqB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQpE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,qBAAqB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQnF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK/C,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,CAAC;IAI5C,eAAe,CAAC,IAAI,EAAE,mBAAmB,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ9D,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ7E,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKnD,wGAAwG;IAClG,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAI1F,mDAAmD;IAC7C,eAAe,CAAC,KAAK,GAAE,aAAkB,GAAG,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAWnE,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,UAAU,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQrD,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQvE,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE,mBAAmB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtF,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE,mBAAmB,GAAG,OAAO,CAAC,OAAO,CAAC;IAUzF,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAU3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,CAAC;IAK9C,gBAAgB,CAAC,IAAI,EAAE,oBAAoB,GAAG,OAAO,CAAC,UAAU,CAAC;IAQvE;;OAEG;IACG,oBAAoB,CACxB,IAAI,EAAE,IAAI,CAAC,oBAAoB,EAAE,MAAM,CAAC,GAAG;QAAE,IAAI,EAAE,MAAM,GAAG,UAAU,GAAG,WAAW,CAAA;KAAE,GACrF,OAAO,CAAC,UAAU,CAAC;IAYhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI9C,+BAA+B,CAAC,OAAO,EAAE,qBAAqB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAS/F,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,OAAO,CAAC,IAAI,EAAE,WAAW,GAAG,OAAO,CAAC,SAAS,CAAC;IAS9C,YAAY,CAChB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE,mBAAmB,GAC5B,OAAO,CAAC,kBAAkB,CAAC;CAa/B;AAED,YAAY,EAAE,eAAe,EAAE,CAAC"}
|
package/dist/index.js
CHANGED
|
@@ -1,3 +1,33 @@
|
|
|
1
|
+
/**
|
|
2
|
+
* Error thrown for non-2xx responses. Carries the HTTP status and the server's error details
|
|
3
|
+
* (`issues` for validation errors, `cyclePath` for dependency cycles, and so on).
|
|
4
|
+
*/
|
|
5
|
+
export class CriticalPathError extends Error {
|
|
6
|
+
/** HTTP status code. */
|
|
7
|
+
status;
|
|
8
|
+
/** Field-level validation problems for 400 responses. */
|
|
9
|
+
issues;
|
|
10
|
+
/** The parsed JSON error body, if any (e.g. `fromStatus`, `toStatus`, `cyclePath`, `fieldKey`). */
|
|
11
|
+
body;
|
|
12
|
+
constructor(message, status, body) {
|
|
13
|
+
super(message);
|
|
14
|
+
this.name = 'CriticalPathError';
|
|
15
|
+
this.status = status;
|
|
16
|
+
this.body = body;
|
|
17
|
+
this.issues = Array.isArray(body?.issues) ? body.issues : undefined;
|
|
18
|
+
}
|
|
19
|
+
get isNotFound() {
|
|
20
|
+
return this.status === 404;
|
|
21
|
+
}
|
|
22
|
+
}
|
|
23
|
+
const RETRYABLE_STATUSES = new Set([429, 502, 503, 504]);
|
|
24
|
+
const sleep = (ms, signal) => new Promise((resolve, reject) => {
|
|
25
|
+
const timer = setTimeout(resolve, ms);
|
|
26
|
+
signal?.addEventListener('abort', () => {
|
|
27
|
+
clearTimeout(timer);
|
|
28
|
+
reject(signal.reason);
|
|
29
|
+
}, { once: true });
|
|
30
|
+
});
|
|
1
31
|
function toBase64(data) {
|
|
2
32
|
const bytes = data instanceof Uint8Array ? data : new Uint8Array(data);
|
|
3
33
|
let binary = '';
|
|
@@ -6,20 +36,30 @@ function toBase64(data) {
|
|
|
6
36
|
}
|
|
7
37
|
return btoa(binary);
|
|
8
38
|
}
|
|
9
|
-
class NotFoundResponseError extends Error {
|
|
10
|
-
constructor(message) {
|
|
11
|
-
super(message);
|
|
12
|
-
this.name = 'NotFoundResponseError';
|
|
13
|
-
}
|
|
14
|
-
}
|
|
15
39
|
export class CriticalPathClient {
|
|
16
40
|
baseUrl;
|
|
17
|
-
|
|
41
|
+
options;
|
|
18
42
|
customFetch;
|
|
43
|
+
/** Set on scoped clients created by `with()`. */
|
|
44
|
+
requestOptions;
|
|
19
45
|
constructor(options) {
|
|
46
|
+
this.options = options;
|
|
20
47
|
this.baseUrl = options.baseUrl.replace(/\/+$/, '');
|
|
21
|
-
this.
|
|
22
|
-
|
|
48
|
+
this.customFetch = options.fetch || ((...args) => globalThis.fetch(...args));
|
|
49
|
+
}
|
|
50
|
+
/**
|
|
51
|
+
* Returns a client that applies `options` to every call, e.g. to cancel requests when a
|
|
52
|
+
* component unmounts: `client.with({ signal: controller.signal }).getTasks(projectId)`.
|
|
53
|
+
*/
|
|
54
|
+
with(options) {
|
|
55
|
+
const scoped = Object.create(this);
|
|
56
|
+
const merged = {
|
|
57
|
+
...this.requestOptions,
|
|
58
|
+
...options,
|
|
59
|
+
headers: { ...this.requestOptions?.headers, ...options.headers }
|
|
60
|
+
};
|
|
61
|
+
Object.defineProperty(scoped, 'requestOptions', { value: merged });
|
|
62
|
+
return scoped;
|
|
23
63
|
}
|
|
24
64
|
/**
|
|
25
65
|
* Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
|
|
@@ -31,34 +71,55 @@ export class CriticalPathClient {
|
|
|
31
71
|
return res.success;
|
|
32
72
|
}
|
|
33
73
|
catch (err) {
|
|
34
|
-
if (err instanceof
|
|
74
|
+
if (err instanceof CriticalPathError && err.isNotFound)
|
|
35
75
|
return false;
|
|
36
76
|
throw err;
|
|
37
77
|
}
|
|
38
78
|
}
|
|
39
|
-
async request(endpoint,
|
|
79
|
+
async request(endpoint, init = {}) {
|
|
40
80
|
const url = `${this.baseUrl}${endpoint.startsWith('/') ? endpoint : `/${endpoint}`}`;
|
|
41
|
-
const
|
|
42
|
-
|
|
43
|
-
|
|
44
|
-
|
|
45
|
-
|
|
46
|
-
|
|
81
|
+
const method = (init.method ?? 'GET').toUpperCase();
|
|
82
|
+
const configured = typeof this.options.headers === 'function' ? await this.options.headers() : this.options.headers;
|
|
83
|
+
const headers = {
|
|
84
|
+
...(init.body !== undefined ? { 'Content-Type': 'application/json' } : {}),
|
|
85
|
+
...configured,
|
|
86
|
+
...this.requestOptions?.headers
|
|
87
|
+
};
|
|
88
|
+
const timeoutMs = this.requestOptions?.timeoutMs ?? this.options.timeoutMs;
|
|
89
|
+
const signals = [this.requestOptions?.signal, timeoutMs ? AbortSignal.timeout(timeoutMs) : undefined].filter((s) => !!s);
|
|
90
|
+
const signal = signals.length > 1 ? AbortSignal.any(signals) : signals[0];
|
|
91
|
+
const retries = method === 'GET' ? this.options.retry?.retries ?? 0 : 0;
|
|
92
|
+
const baseDelay = this.options.retry?.baseDelayMs ?? 250;
|
|
93
|
+
for (let attempt = 0;; attempt++) {
|
|
94
|
+
let response;
|
|
95
|
+
try {
|
|
96
|
+
response = await this.customFetch(url, { ...init, method, headers, signal });
|
|
47
97
|
}
|
|
48
|
-
|
|
49
|
-
|
|
50
|
-
|
|
98
|
+
catch (err) {
|
|
99
|
+
// Network failure; never retry after an abort or timeout.
|
|
100
|
+
if (attempt < retries && !signal?.aborted) {
|
|
101
|
+
await sleep(baseDelay * 2 ** attempt, signal);
|
|
102
|
+
continue;
|
|
103
|
+
}
|
|
104
|
+
throw err;
|
|
105
|
+
}
|
|
106
|
+
if (response.ok)
|
|
107
|
+
return response.json();
|
|
108
|
+
if (attempt < retries && RETRYABLE_STATUSES.has(response.status)) {
|
|
109
|
+
const retryAfter = Number(response.headers.get('Retry-After'));
|
|
110
|
+
await sleep(Number.isFinite(retryAfter) && retryAfter > 0 ? retryAfter * 1000 : baseDelay * 2 ** attempt, signal);
|
|
111
|
+
continue;
|
|
112
|
+
}
|
|
113
|
+
let body;
|
|
51
114
|
try {
|
|
52
|
-
|
|
53
|
-
if (errJson.error)
|
|
54
|
-
errorMsg = errJson.error;
|
|
115
|
+
body = await response.json();
|
|
55
116
|
}
|
|
56
117
|
catch {
|
|
57
|
-
//
|
|
118
|
+
// Non-JSON error body
|
|
58
119
|
}
|
|
59
|
-
|
|
120
|
+
const message = typeof body?.error === 'string' ? body.error : `HTTP Error ${response.status}: ${response.statusText}`;
|
|
121
|
+
throw new CriticalPathError(message, response.status, body);
|
|
60
122
|
}
|
|
61
|
-
return response.json();
|
|
62
123
|
}
|
|
63
124
|
// Workflows
|
|
64
125
|
async getWorkflows() {
|
|
@@ -66,7 +127,7 @@ export class CriticalPathClient {
|
|
|
66
127
|
return res.workflows;
|
|
67
128
|
}
|
|
68
129
|
async getWorkflow(id) {
|
|
69
|
-
const res = await this.request(`/workflows/${id}`);
|
|
130
|
+
const res = await this.request(`/workflows/${encodeURIComponent(id)}`);
|
|
70
131
|
return res.workflow;
|
|
71
132
|
}
|
|
72
133
|
async createWorkflow(data) {
|
|
@@ -77,14 +138,14 @@ export class CriticalPathClient {
|
|
|
77
138
|
return res.workflow;
|
|
78
139
|
}
|
|
79
140
|
async updateWorkflow(id, updates) {
|
|
80
|
-
const res = await this.request(`/workflows/${id}`, {
|
|
141
|
+
const res = await this.request(`/workflows/${encodeURIComponent(id)}`, {
|
|
81
142
|
method: 'PATCH',
|
|
82
143
|
body: JSON.stringify(updates)
|
|
83
144
|
});
|
|
84
145
|
return res.workflow;
|
|
85
146
|
}
|
|
86
147
|
async deleteWorkflow(id) {
|
|
87
|
-
return this.deleteRequest(`/workflows/${id}`);
|
|
148
|
+
return this.deleteRequest(`/workflows/${encodeURIComponent(id)}`);
|
|
88
149
|
}
|
|
89
150
|
// Projects
|
|
90
151
|
async getProjects() {
|
|
@@ -92,7 +153,7 @@ export class CriticalPathClient {
|
|
|
92
153
|
return res.projects;
|
|
93
154
|
}
|
|
94
155
|
async getProject(id) {
|
|
95
|
-
const res = await this.request(`/projects/${id}`);
|
|
156
|
+
const res = await this.request(`/projects/${encodeURIComponent(id)}`);
|
|
96
157
|
return res.project;
|
|
97
158
|
}
|
|
98
159
|
async createProject(data) {
|
|
@@ -187,7 +248,7 @@ export class CriticalPathClient {
|
|
|
187
248
|
return items;
|
|
188
249
|
}
|
|
189
250
|
async getTask(id) {
|
|
190
|
-
const res = await this.request(`/tasks/${id}`);
|
|
251
|
+
const res = await this.request(`/tasks/${encodeURIComponent(id)}`);
|
|
191
252
|
return res.task;
|
|
192
253
|
}
|
|
193
254
|
async getTaskLadder(taskId) {
|
|
@@ -210,7 +271,7 @@ export class CriticalPathClient {
|
|
|
210
271
|
return res.task;
|
|
211
272
|
}
|
|
212
273
|
async updateTask(id, updates) {
|
|
213
|
-
const res = await this.request(`/tasks/${id}`, {
|
|
274
|
+
const res = await this.request(`/tasks/${encodeURIComponent(id)}`, {
|
|
214
275
|
method: 'PATCH',
|
|
215
276
|
body: JSON.stringify(updates)
|
|
216
277
|
});
|
|
@@ -262,6 +323,9 @@ export class CriticalPathClient {
|
|
|
262
323
|
async getWebhooks() {
|
|
263
324
|
return (await this.request('/webhooks')).webhooks;
|
|
264
325
|
}
|
|
326
|
+
async getWebhook(id) {
|
|
327
|
+
return (await this.request(`/webhooks/${encodeURIComponent(id)}`)).webhook;
|
|
328
|
+
}
|
|
265
329
|
/** Registers a webhook. The returned `secret` is shown only once; store it to verify deliveries. */
|
|
266
330
|
async createWebhook(data) {
|
|
267
331
|
return this.request('/webhooks', {
|
|
@@ -320,7 +384,7 @@ export class CriticalPathClient {
|
|
|
320
384
|
return res.teams;
|
|
321
385
|
}
|
|
322
386
|
async getTeam(id) {
|
|
323
|
-
const res = await this.request(`/teams/${id}`);
|
|
387
|
+
const res = await this.request(`/teams/${encodeURIComponent(id)}`);
|
|
324
388
|
return res.team;
|
|
325
389
|
}
|
|
326
390
|
async createTeam(data) {
|
|
@@ -331,20 +395,23 @@ export class CriticalPathClient {
|
|
|
331
395
|
return res.team;
|
|
332
396
|
}
|
|
333
397
|
async updateTeam(id, updates) {
|
|
334
|
-
const res = await this.request(`/teams/${id}`, {
|
|
398
|
+
const res = await this.request(`/teams/${encodeURIComponent(id)}`, {
|
|
335
399
|
method: 'PATCH',
|
|
336
400
|
body: JSON.stringify(updates)
|
|
337
401
|
});
|
|
338
402
|
return res.team;
|
|
339
403
|
}
|
|
340
404
|
async deleteTeam(id) {
|
|
341
|
-
return this.deleteRequest(`/teams/${id}`);
|
|
405
|
+
return this.deleteRequest(`/teams/${encodeURIComponent(id)}`);
|
|
342
406
|
}
|
|
343
407
|
// Containers
|
|
344
408
|
async getContainers(projectId) {
|
|
345
409
|
const res = await this.request(`/containers?projectId=${encodeURIComponent(projectId)}`);
|
|
346
410
|
return res.containers;
|
|
347
411
|
}
|
|
412
|
+
async getContainer(id) {
|
|
413
|
+
return (await this.request(`/containers/${encodeURIComponent(id)}`)).container;
|
|
414
|
+
}
|
|
348
415
|
async createContainer(data) {
|
|
349
416
|
const res = await this.request('/containers', {
|
|
350
417
|
method: 'POST',
|
|
@@ -353,14 +420,14 @@ export class CriticalPathClient {
|
|
|
353
420
|
return res.container;
|
|
354
421
|
}
|
|
355
422
|
async updateContainer(id, updates) {
|
|
356
|
-
const res = await this.request(`/containers/${id}`, {
|
|
423
|
+
const res = await this.request(`/containers/${encodeURIComponent(id)}`, {
|
|
357
424
|
method: 'PATCH',
|
|
358
425
|
body: JSON.stringify(updates)
|
|
359
426
|
});
|
|
360
427
|
return res.container;
|
|
361
428
|
}
|
|
362
429
|
async deleteContainer(id) {
|
|
363
|
-
return this.deleteRequest(`/containers/${id}`);
|
|
430
|
+
return this.deleteRequest(`/containers/${encodeURIComponent(id)}`);
|
|
364
431
|
}
|
|
365
432
|
// Deliverables
|
|
366
433
|
async getDeliverables(projectId) {
|
|
@@ -368,11 +435,11 @@ export class CriticalPathClient {
|
|
|
368
435
|
return res.deliverables;
|
|
369
436
|
}
|
|
370
437
|
async getDeliverable(id) {
|
|
371
|
-
const res = await this.request(`/deliverables/${id}`);
|
|
438
|
+
const res = await this.request(`/deliverables/${encodeURIComponent(id)}`);
|
|
372
439
|
return res.deliverable;
|
|
373
440
|
}
|
|
374
441
|
async getDeliverableSummary(id) {
|
|
375
|
-
const res = await this.request(`/deliverables/${id}/summary`);
|
|
442
|
+
const res = await this.request(`/deliverables/${encodeURIComponent(id)}/summary`);
|
|
376
443
|
return res.summary;
|
|
377
444
|
}
|
|
378
445
|
async createDeliverable(data) {
|
|
@@ -383,20 +450,23 @@ export class CriticalPathClient {
|
|
|
383
450
|
return res.deliverable;
|
|
384
451
|
}
|
|
385
452
|
async updateDeliverable(id, updates) {
|
|
386
|
-
const res = await this.request(`/deliverables/${id}`, {
|
|
453
|
+
const res = await this.request(`/deliverables/${encodeURIComponent(id)}`, {
|
|
387
454
|
method: 'PATCH',
|
|
388
455
|
body: JSON.stringify(updates)
|
|
389
456
|
});
|
|
390
457
|
return res.deliverable;
|
|
391
458
|
}
|
|
392
459
|
async deleteDeliverable(id) {
|
|
393
|
-
return this.deleteRequest(`/deliverables/${id}`);
|
|
460
|
+
return this.deleteRequest(`/deliverables/${encodeURIComponent(id)}`);
|
|
394
461
|
}
|
|
395
462
|
// Iterations
|
|
396
463
|
async getIterations(projectId) {
|
|
397
464
|
const res = await this.request(`/iterations?projectId=${encodeURIComponent(projectId)}`);
|
|
398
465
|
return res.iterations;
|
|
399
466
|
}
|
|
467
|
+
async getIteration(id) {
|
|
468
|
+
return (await this.request(`/iterations/${encodeURIComponent(id)}`)).iteration;
|
|
469
|
+
}
|
|
400
470
|
async createIteration(data) {
|
|
401
471
|
const res = await this.request('/iterations', {
|
|
402
472
|
method: 'POST',
|
|
@@ -405,14 +475,14 @@ export class CriticalPathClient {
|
|
|
405
475
|
return res.iteration;
|
|
406
476
|
}
|
|
407
477
|
async updateIteration(id, updates) {
|
|
408
|
-
const res = await this.request(`/iterations/${id}`, {
|
|
478
|
+
const res = await this.request(`/iterations/${encodeURIComponent(id)}`, {
|
|
409
479
|
method: 'PATCH',
|
|
410
480
|
body: JSON.stringify(updates)
|
|
411
481
|
});
|
|
412
482
|
return res.iteration;
|
|
413
483
|
}
|
|
414
484
|
async deleteIteration(id) {
|
|
415
|
-
return this.deleteRequest(`/iterations/${id}`);
|
|
485
|
+
return this.deleteRequest(`/iterations/${encodeURIComponent(id)}`);
|
|
416
486
|
}
|
|
417
487
|
// Activity Stream
|
|
418
488
|
/** The whole activity feed (newest first), following pagination. Prefer `queryActivities` for feeds. */
|
package/dist/index.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAmIA,SAAS,QAAQ,CAAC,IAA8B;IAC9C,MAAM,KAAK,GAAG,IAAI,YAAY,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,UAAU,CAAC,IAAI,CAAC,CAAC;IACvE,IAAI,MAAM,GAAG,EAAE,CAAC;IAChB,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,KAAK,CAAC,MAAM,EAAE,CAAC,IAAI,MAAM,EAAE,CAAC;QAC9C,MAAM,IAAI,MAAM,CAAC,YAAY,CAAC,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC,EAAE,CAAC,GAAG,MAAM,CAAC,CAAC,CAAC;IAClE,CAAC;IACD,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC;AACtB,CAAC;AAED,MAAM,qBAAsB,SAAQ,KAAK;IACvC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,uBAAuB,CAAC;IACtC,CAAC;CACF;AAED,MAAM,OAAO,kBAAkB;IACrB,OAAO,CAAS;IAChB,OAAO,CAAyB;IAChC,WAAW,CAAe;IAElC,YAAY,OAAsB;QAChC,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,IAAI,EAAE,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,KAAK,IAAI,UAAU,CAAC,KAAK,CAAC;IACvD,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,aAAa,CAAC,QAAgB;QAC1C,IAAI,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,QAAQ,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC;YACrF,OAAO,GAAG,CAAC,OAAO,CAAC;QACrB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,GAAG,YAAY,qBAAqB;gBAAE,OAAO,KAAK,CAAC;YACvD,MAAM,GAAG,CAAC;QACZ,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,OAAO,CAAI,QAAgB,EAAE,UAAuB,EAAE;QAClE,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,OAAO,GAAG,QAAQ,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,QAAQ,EAAE,EAAE,CAAC;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,GAAG,EAAE;YAC3C,GAAG,OAAO;YACV,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;gBAClC,GAAG,IAAI,CAAC,OAAO;gBACf,GAAG,OAAO,CAAC,OAAO;aACnB;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,QAAQ,CAAC,EAAE,EAAE,CAAC;YACjB,IAAI,QAAQ,GAAG,cAAc,QAAQ,CAAC,MAAM,KAAK,QAAQ,CAAC,UAAU,EAAE,CAAC;YACvE,IAAI,CAAC;gBACH,MAAM,OAAO,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;gBACtC,IAAI,OAAO,CAAC,KAAK;oBAAE,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC;YAC9C,CAAC;YAAC,MAAM,CAAC;gBACP,yBAAyB;YAC3B,CAAC;YACD,MAAM,QAAQ,CAAC,MAAM,KAAK,GAAG,CAAC,CAAC,CAAC,IAAI,qBAAqB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC5F,CAAC;QAED,OAAO,QAAQ,CAAC,IAAI,EAAE,CAAC;IACzB,CAAC;IAED,YAAY;IACZ,KAAK,CAAC,YAAY;QAChB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA4B,YAAY,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,CAAC,CAAC;QAC3E,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,IAAwB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,YAAY,EAAE;YACnE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA2B;QAC1D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,EAAE;YACzE,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,aAAa,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC;IAChD,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,WAAW,CAAC,CAAC;QACrE,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,EAAE,EAAE,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,IAAuB;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,iFAAiF;IACjF,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,gBAAgB,CAC3D,CAAC;QACF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,KAAK;YAAE,MAAM,CAAC,GAAG,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,CAAC,CAAC;QACtD,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,UAAU,KAAK,EAAE,CAC5D,CAAC;QACF,OAAO,GAAG,CAAC,MAAM,CAAC;IACpB,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAClE,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,QAAQ;YAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC/D,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QACzD,IAAI,OAAO,OAAO,CAAC,0BAA0B,KAAK,QAAQ,EAAE,CAAC;YAC3D,MAAM,CAAC,GAAG,CAAC,4BAA4B,EAAE,OAAO,CAAC,0BAA0B,CAAC,QAAQ,EAAE,CAAC,CAAC;QAC1F,CAAC;QAED,MAAM,IAAI,GAAG,SAAS;YACpB,CAAC,CAAC,aAAa,kBAAkB,CAAC,SAAS,CAAC,WAAW;YACvD,CAAC,CAAC,WAAW,CAAC;QAChB,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqC,GAAG,IAAI,GAAG,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,QAAQ;IACR,wGAAwG;IACxG,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC;IAC3F,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,QAAmB,EAAE;QACpC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC;YACjD,IAAI,KAAK,KAAK,SAAS,IAAI,GAAG,KAAK,YAAY;gBAAE,SAAS;YAC1D,IAAI,GAAG,KAAK,UAAU,IAAI,KAAK,KAAK,IAAI;gBAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,MAAM,CAAC,CAAC;;gBACpE,MAAM,CAAC,GAAG,CAAC,GAAG,EAAE,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAC/E,CAAC;QACD,MAAM,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyC,SAAS,EAAE,EAAE,CAAC,CAAC;QACtF,OAAO,EAAE,KAAK,EAAE,GAAG,CAAC,KAAK,EAAE,UAAU,EAAE,GAAG,CAAC,UAAU,EAAE,CAAC;IAC1D,CAAC;IAEO,KAAK,CAAC,YAAY,CAAI,SAAgD;QAC5E,MAAM,KAAK,GAAQ,EAAE,CAAC;QACtB,IAAI,MAA0B,CAAC;QAC/B,GAAG,CAAC;YACF,MAAM,IAAI,GAAG,MAAM,SAAS,CAAC,MAAM,CAAC,CAAC;YACrC,KAAK,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC;YAC1B,MAAM,GAAG,IAAI,CAAC,UAAU,CAAC;QAC3B,CAAC,QAAQ,MAAM,EAAE;QACjB,OAAO,KAAK,CAAC;IACf,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,SAAS,CAC9C,CAAC;QACF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,UAAU,CAC/C,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,mBAAmB,CACxD,CAAC;QACF,OAAO,GAAG,CAAC,eAAe,CAAC;IAC7B,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAoB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAuB;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,YAAoB,EACpB,IAQC;QAED,IAAI,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAC/B,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACpD,SAAS,GAAG,UAAU,CAAC,SAAS,CAAC;QACnC,CAAC;QACD,OAAO,IAAI,CAAC,UAAU,CAAC;YACrB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,QAAQ,EAAE,YAAY;YACtB,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,QAAQ;YACnC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,YAAY,EAAE,IAAI,CAAC,YAAY;SAChC,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,OAAO,CACX,MAAc,EACd,KAAa;QAEb,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACtE,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,IAAI,EAAE,CAAC,EAAE,IAAI,CAAC,CAAC;QAC5C,MAAM,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,OAAO,IAAI,CAAC;IACd,CAAC;IAED,KAAK,CAAC,UAAU,CACd,MAAc,EACd,aAAqB,EACrB,SAAmB;QAEnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;YAC3C,MAAM,IAAI,KAAK,CAAC,QAAQ,MAAM,0BAA0B,CAAC,CAAC;QAC5D,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAC1B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,aAAa,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,KAAK,aAAa,CAAC,WAAW,EAAE,CACvF,CAAC;QACF,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,mBAAmB,aAAa,uBAAuB,MAAM,GAAG,CAAC,CAAC;QACpF,CAAC;QACD,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;QACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACzE,OAAO,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;IACxD,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAAgC,WAAW,CAAC,CAAC,CAAC,QAAQ,CAAC;IACnF,CAAC;IAED,oGAAoG;IACpG,KAAK,CAAC,aAAa,CAAC,IAAuB;QACzC,OAAO,IAAI,CAAC,OAAO,CAA6C,WAAW,EAAE;YAC3E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAChG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,0FAA0F;IAC1F,KAAK,CAAC,aAAa,CAAC,MAAc,EAAE,IAA0B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,EAAE;YAClH,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,UAA8C,EAAE;QAC3E,MAAM,KAAK,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,aAAa,OAAO,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACtE,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,EAAE,CAAC,GAAG,KAAK,EAAE,CAAC,CAAC;IACxE,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,MAAc,EAAE,YAAoB;QACzD,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,MAAM,CAAC,iBAAiB,kBAAkB,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrH,CAAC;IAED,KAAK,CAAC,mBAAmB,CAAC,MAAc;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC;QACpH,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,UAAU,kBAAkB,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC;QAC/G,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,mBAAmB,CAAC;IACjC,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,uBAAuB,IAAI,EAAE,CAAC;IAC3C,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ;QACZ,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,QAAQ,CAAC,CAAC;QAC5D,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAoB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAuB;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,EAAE,EAAE,CAAC,CAAC;IAC5C,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC1H,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyB;QAC7C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,aAAa,EAAE;YAC1E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA4B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE,EAAE,EAAE;YAChF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,EAAE,EAAE,CAAC,CAAC;IACjD,CAAC;IAED,eAAe;IACf,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,2BAA2B,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5H,OAAO,GAAG,CAAC,YAAY,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,CAAC,CAAC;QACpF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,EAAU;QACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,iBAAiB,EAAE,UAAU,CAAC,CAAC;QAC/F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,IAA2B;QACjD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE;YAC5E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA8B;QAChE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,EAAE;YAClF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,OAAO,IAAI,CAAC,aAAa,CAAC,iBAAiB,EAAE,EAAE,CAAC,CAAC;IACnD,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA8B,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QACtH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyB;QAC7C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,aAAa,EAAE;YACtE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA4B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE,EAAE,EAAE;YAC5E,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,EAAE,EAAE,CAAC,CAAC;IACjD,CAAC;IAED,kBAAkB;IAClB,wGAAwG;IACxG,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,IAAI,CAAC,eAAe,CAAC,EAAE,GAAG,MAAM,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC;IAChG,CAAC;IAED,mDAAmD;IACnD,KAAK,CAAC,eAAe,CAAC,QAAuB,EAAE;QAC7C,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC;YACjD,IAAI,KAAK,KAAK,SAAS,IAAI,GAAG,KAAK,YAAY;gBAAE,MAAM,CAAC,GAAG,CAAC,GAAG,EAAE,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAClF,CAAC;QACD,MAAM,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkD,cAAc,EAAE,EAAE,CAAC,CAAC;QACpG,OAAO,EAAE,KAAK,EAAE,GAAG,CAAC,UAAU,EAAE,UAAU,EAAE,GAAG,CAAC,UAAU,EAAE,CAAC;IAC/D,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,oBAAoB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC1G,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAuB;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA6B;QACvE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA6B;QAC1E,MAAM,KAAK,GAAG,IAAI,eAAe,CAAC,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC7D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,cAAc,KAAK,EAAE,EAC/D,EAAE,MAAM,EAAE,QAAQ,EAAE,CACrB,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,cAAc;IACd,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAgC,eAAe,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrG,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,IAA0B;QAC/C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,EAAE;YACzE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED;;OAEG;IACH,KAAK,CAAC,oBAAoB,CACxB,IAAsF;QAEtF,MAAM,IAAI,GACR,OAAO,IAAI,CAAC,IAAI,KAAK,QAAQ;YAC3B,CAAC,CAAC,EAAE,GAAG,IAAI,EAAE,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE;YAC9B,CAAC,CAAC,EAAE,GAAG,IAAI,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,qBAAqB,EAAE;YAChF,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,OAAO,IAAI,CAAC,aAAa,CAAC,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACtE,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA8B;QAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuC,sBAAsB,EAAE;YAC3F,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,wBAAwB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,IAAiB;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,2BAA2B;IAC3B,KAAK,CAAC,YAAY,CAChB,MAAc,EACd,OAA6B;QAE7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqB,SAAS,EAAE;YAC5D,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM;gBACN,MAAM,EAAE,OAAO,EAAE,MAAM;gBACvB,SAAS,EAAE,OAAO,EAAE,SAAS;gBAC7B,OAAO,EAAE,OAAO,EAAE,OAAO;gBACzB,SAAS,EAAE,OAAO,EAAE,SAAS,IAAI,IAAI;aACtC,CAAC;SACH,CAAC,CAAC;QACH,OAAO,GAAG,CAAC;IACb,CAAC;CACF"}
|
|
1
|
+
{"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAwJA;;;GAGG;AACH,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,wBAAwB;IACf,MAAM,CAAS;IACxB,yDAAyD;IAChD,MAAM,CAA4C;IAC3D,mGAAmG;IAC1F,IAAI,CAA2B;IAExC,YAAY,OAAe,EAAE,MAAc,EAAE,IAA8B;QACzE,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;QAChC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,CAAC,IAAI,GAAG,IAAI,CAAC;QACjB,IAAI,CAAC,MAAM,GAAG,KAAK,CAAC,OAAO,CAAC,IAAI,EAAE,MAAM,CAAC,CAAC,CAAC,CAAE,IAAK,CAAC,MAAsC,CAAC,CAAC,CAAC,SAAS,CAAC;IACxG,CAAC;IAED,IAAI,UAAU;QACZ,OAAO,IAAI,CAAC,MAAM,KAAK,GAAG,CAAC;IAC7B,CAAC;CACF;AAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,CAAC,CAAC,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC,CAAC;AACzD,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,MAA2B,EAAE,EAAE,CACxD,IAAI,OAAO,CAAO,CAAC,OAAO,EAAE,MAAM,EAAE,EAAE;IACpC,MAAM,KAAK,GAAG,UAAU,CAAC,OAAO,EAAE,EAAE,CAAC,CAAC;IACtC,MAAM,EAAE,gBAAgB,CAAC,OAAO,EAAE,GAAG,EAAE;QACrC,YAAY,CAAC,KAAK,CAAC,CAAC;QACpB,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC;IACxB,CAAC,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,CAAC,CAAC;AACrB,CAAC,CAAC,CAAC;AAEL,SAAS,QAAQ,CAAC,IAA8B;IAC9C,MAAM,KAAK,GAAG,IAAI,YAAY,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,UAAU,CAAC,IAAI,CAAC,CAAC;IACvE,IAAI,MAAM,GAAG,EAAE,CAAC;IAChB,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,KAAK,CAAC,MAAM,EAAE,CAAC,IAAI,MAAM,EAAE,CAAC;QAC9C,MAAM,IAAI,MAAM,CAAC,YAAY,CAAC,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC,EAAE,CAAC,GAAG,MAAM,CAAC,CAAC,CAAC;IAClE,CAAC;IACD,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC;AACtB,CAAC;AAED,MAAM,OAAO,kBAAkB;IACZ,OAAO,CAAS;IAChB,OAAO,CAAgB;IACvB,WAAW,CAAe;IAC3C,iDAAiD;IAChC,cAAc,CAAkB;IAEjD,YAAY,OAAsB;QAChC,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC;QACvB,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,KAAK,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,EAAE,CAAC,UAAU,CAAC,KAAK,CAAC,GAAG,IAAI,CAAC,CAAC,CAAC;IAC/E,CAAC;IAED;;;OAGG;IACH,IAAI,CAAC,OAAuB;QAC1B,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACzD,MAAM,MAAM,GAAmB;YAC7B,GAAG,IAAI,CAAC,cAAc;YACtB,GAAG,OAAO;YACV,OAAO,EAAE,EAAE,GAAG,IAAI,CAAC,cAAc,EAAE,OAAO,EAAE,GAAG,OAAO,CAAC,OAAO,EAAE;SACjE,CAAC;QACF,MAAM,CAAC,cAAc,CAAC,MAAM,EAAE,gBAAgB,EAAE,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;QACnE,OAAO,MAAM,CAAC;IAChB,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,aAAa,CAAC,QAAgB;QAC1C,IAAI,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,QAAQ,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC;YACrF,OAAO,GAAG,CAAC,OAAO,CAAC;QACrB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,GAAG,YAAY,iBAAiB,IAAI,GAAG,CAAC,UAAU;gBAAE,OAAO,KAAK,CAAC;YACrE,MAAM,GAAG,CAAC;QACZ,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,OAAO,CAAI,QAAgB,EAAE,OAAoB,EAAE;QAC/D,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,OAAO,GAAG,QAAQ,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,QAAQ,EAAE,EAAE,CAAC;QACrF,MAAM,MAAM,GAAG,CAAC,IAAI,CAAC,MAAM,IAAI,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;QACpD,MAAM,UAAU,GAAG,OAAO,IAAI,CAAC,OAAO,CAAC,OAAO,KAAK,UAAU,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC;QACpH,MAAM,OAAO,GAAc;YACzB,GAAG,CAAC,IAAI,CAAC,IAAI,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,kBAAkB,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC1E,GAAG,UAAU;YACb,GAAG,IAAI,CAAC,cAAc,EAAE,OAAO;SAChC,CAAC;QACF,MAAM,SAAS,GAAG,IAAI,CAAC,cAAc,EAAE,SAAS,IAAI,IAAI,CAAC,OAAO,CAAC,SAAS,CAAC;QAC3E,MAAM,OAAO,GAAG,CAAC,IAAI,CAAC,cAAc,EAAE,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,MAAM,CAC1G,CAAC,CAAC,EAAoB,EAAE,CAAC,CAAC,CAAC,CAAC,CAC7B,CAAC;QACF,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC;QAC1E,MAAM,OAAO,GAAG,MAAM,KAAK,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,KAAK,EAAE,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACxE,MAAM,SAAS,GAAG,IAAI,CAAC,OAAO,CAAC,KAAK,EAAE,WAAW,IAAI,GAAG,CAAC;QAEzD,KAAK,IAAI,OAAO,GAAG,CAAC,GAAI,OAAO,EAAE,EAAE,CAAC;YAClC,IAAI,QAAkB,CAAC;YACvB,IAAI,CAAC;gBACH,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,GAAG,EAAE,EAAE,GAAG,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,CAAC,CAAC;YAC/E,CAAC;YAAC,OAAO,GAAG,EAAE,CAAC;gBACb,0DAA0D;gBAC1D,IAAI,OAAO,GAAG,OAAO,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,CAAC;oBAC1C,MAAM,KAAK,CAAC,SAAS,GAAG,CAAC,IAAI,OAAO,EAAE,MAAM,CAAC,CAAC;oBAC9C,SAAS;gBACX,CAAC;gBACD,MAAM,GAAG,CAAC;YACZ,CAAC;YAED,IAAI,QAAQ,CAAC,EAAE;gBAAE,OAAO,QAAQ,CAAC,IAAI,EAAgB,CAAC;YAEtD,IAAI,OAAO,GAAG,OAAO,IAAI,kBAAkB,CAAC,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC;gBACjE,MAAM,UAAU,GAAG,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,aAAa,CAAC,CAAC,CAAC;gBAC/D,MAAM,KAAK,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,IAAI,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,UAAU,GAAG,IAAI,CAAC,CAAC,CAAC,SAAS,GAAG,CAAC,IAAI,OAAO,EAAE,MAAM,CAAC,CAAC;gBAClH,SAAS;YACX,CAAC;YAED,IAAI,IAAyC,CAAC;YAC9C,IAAI,CAAC;gBACH,IAAI,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;YAC/B,CAAC;YAAC,MAAM,CAAC;gBACP,sBAAsB;YACxB,CAAC;YACD,MAAM,OAAO,GAAG,OAAO,IAAI,EAAE,KAAK,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,cAAc,QAAQ,CAAC,MAAM,KAAK,QAAQ,CAAC,UAAU,EAAE,CAAC;YACvH,MAAM,IAAI,iBAAiB,CAAC,OAAO,EAAE,QAAQ,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;QAC9D,CAAC;IACH,CAAC;IAGD,YAAY;IACZ,KAAK,CAAC,YAAY;QAChB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA4B,YAAY,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC/F,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,IAAwB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,YAAY,EAAE;YACnE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA2B;QAC1D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC7F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,aAAa,CAAC,cAAc,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACpE,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,WAAW,CAAC,CAAC;QACrE,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,IAAuB;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,iFAAiF;IACjF,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,gBAAgB,CAC3D,CAAC;QACF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,KAAK;YAAE,MAAM,CAAC,GAAG,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,CAAC,CAAC;QACtD,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,UAAU,KAAK,EAAE,CAC5D,CAAC;QACF,OAAO,GAAG,CAAC,MAAM,CAAC;IACpB,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAClE,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,QAAQ;YAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC/D,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QACzD,IAAI,OAAO,OAAO,CAAC,0BAA0B,KAAK,QAAQ,EAAE,CAAC;YAC3D,MAAM,CAAC,GAAG,CAAC,4BAA4B,EAAE,OAAO,CAAC,0BAA0B,CAAC,QAAQ,EAAE,CAAC,CAAC;QAC1F,CAAC;QAED,MAAM,IAAI,GAAG,SAAS;YACpB,CAAC,CAAC,aAAa,kBAAkB,CAAC,SAAS,CAAC,WAAW;YACvD,CAAC,CAAC,WAAW,CAAC;QAChB,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqC,GAAG,IAAI,GAAG,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,QAAQ;IACR,wGAAwG;IACxG,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC;IAC3F,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,QAAmB,EAAE;QACpC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC;YACjD,IAAI,KAAK,KAAK,SAAS,IAAI,GAAG,KAAK,YAAY;gBAAE,SAAS;YAC1D,IAAI,GAAG,KAAK,UAAU,IAAI,KAAK,KAAK,IAAI;gBAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,MAAM,CAAC,CAAC;;gBACpE,MAAM,CAAC,GAAG,CAAC,GAAG,EAAE,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAC/E,CAAC;QACD,MAAM,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyC,SAAS,EAAE,EAAE,CAAC,CAAC;QACtF,OAAO,EAAE,KAAK,EAAE,GAAG,CAAC,KAAK,EAAE,UAAU,EAAE,GAAG,CAAC,UAAU,EAAE,CAAC;IAC1D,CAAC;IAEO,KAAK,CAAC,YAAY,CAAI,SAAgD;QAC5E,MAAM,KAAK,GAAQ,EAAE,CAAC;QACtB,IAAI,MAA0B,CAAC;QAC/B,GAAG,CAAC;YACF,MAAM,IAAI,GAAG,MAAM,SAAS,CAAC,MAAM,CAAC,CAAC;YACrC,KAAK,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC;YAC1B,MAAM,GAAG,IAAI,CAAC,UAAU,CAAC;QAC3B,CAAC,QAAQ,MAAM,EAAE;QACjB,OAAO,KAAK,CAAC;IACf,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACnF,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,SAAS,CAC9C,CAAC;QACF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,UAAU,CAC/C,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,mBAAmB,CACxD,CAAC;QACF,OAAO,GAAG,CAAC,eAAe,CAAC;IAC7B,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAoB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAuB;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YACjF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,YAAoB,EACpB,IAQC;QAED,IAAI,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAC/B,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACpD,SAAS,GAAG,UAAU,CAAC,SAAS,CAAC;QACnC,CAAC;QACD,OAAO,IAAI,CAAC,UAAU,CAAC;YACrB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,QAAQ,EAAE,YAAY;YACtB,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,QAAQ;YACnC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,YAAY,EAAE,IAAI,CAAC,YAAY;SAChC,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,OAAO,CACX,MAAc,EACd,KAAa;QAEb,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACtE,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,IAAI,EAAE,CAAC,EAAE,IAAI,CAAC,CAAC;QAC5C,MAAM,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,OAAO,IAAI,CAAC;IACd,CAAC;IAED,KAAK,CAAC,UAAU,CACd,MAAc,EACd,aAAqB,EACrB,SAAmB;QAEnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;YAC3C,MAAM,IAAI,KAAK,CAAC,QAAQ,MAAM,0BAA0B,CAAC,CAAC;QAC5D,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAC1B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,aAAa,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,KAAK,aAAa,CAAC,WAAW,EAAE,CACvF,CAAC;QACF,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,mBAAmB,aAAa,uBAAuB,MAAM,GAAG,CAAC,CAAC;QACpF,CAAC;QACD,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;QACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACzE,OAAO,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;IACxD,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAAgC,WAAW,CAAC,CAAC,CAAC,QAAQ,CAAC;IACnF,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAA6B,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;IACzG,CAAC;IAED,oGAAoG;IACpG,KAAK,CAAC,aAAa,CAAC,IAAuB;QACzC,OAAO,IAAI,CAAC,OAAO,CAA6C,WAAW,EAAE;YAC3E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAChG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,0FAA0F;IAC1F,KAAK,CAAC,aAAa,CAAC,MAAc,EAAE,IAA0B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,EAAE;YAClH,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,UAA8C,EAAE;QAC3E,MAAM,KAAK,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,aAAa,OAAO,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACtE,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,EAAE,CAAC,GAAG,KAAK,EAAE,CAAC,CAAC;IACxE,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,MAAc,EAAE,YAAoB;QACzD,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,MAAM,CAAC,iBAAiB,kBAAkB,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrH,CAAC;IAED,KAAK,CAAC,mBAAmB,CAAC,MAAc;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC;QACpH,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,UAAU,kBAAkB,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC;QAC/G,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,mBAAmB,CAAC;IACjC,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,uBAAuB,IAAI,EAAE,CAAC;IAC3C,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ;QACZ,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,QAAQ,CAAC,CAAC;QAC5D,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACnF,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAoB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAuB;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YACjF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IAChE,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC1H,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;IAC/G,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyB;QAC7C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,aAAa,EAAE;YAC1E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA4B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YACpG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACrE,CAAC;IAED,eAAe;IACf,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,2BAA2B,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5H,OAAO,GAAG,CAAC,YAAY,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACxG,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,EAAU;QACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,iBAAiB,kBAAkB,CAAC,EAAE,CAAC,UAAU,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,IAA2B;QACjD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE;YAC5E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA8B;QAChE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YACtG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,OAAO,IAAI,CAAC,aAAa,CAAC,iBAAiB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACvE,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA8B,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QACtH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;IAC3G,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyB;QAC7C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,aAAa,EAAE;YACtE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA4B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAChG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACrE,CAAC;IAED,kBAAkB;IAClB,wGAAwG;IACxG,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,IAAI,CAAC,eAAe,CAAC,EAAE,GAAG,MAAM,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC;IAChG,CAAC;IAED,mDAAmD;IACnD,KAAK,CAAC,eAAe,CAAC,QAAuB,EAAE;QAC7C,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC;YACjD,IAAI,KAAK,KAAK,SAAS,IAAI,GAAG,KAAK,YAAY;gBAAE,MAAM,CAAC,GAAG,CAAC,GAAG,EAAE,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAClF,CAAC;QACD,MAAM,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkD,cAAc,EAAE,EAAE,CAAC,CAAC;QACpG,OAAO,EAAE,KAAK,EAAE,GAAG,CAAC,UAAU,EAAE,UAAU,EAAE,GAAG,CAAC,UAAU,EAAE,CAAC;IAC/D,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,oBAAoB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC1G,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAuB;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA6B;QACvE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA6B;QAC1E,MAAM,KAAK,GAAG,IAAI,eAAe,CAAC,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC7D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,cAAc,KAAK,EAAE,EAC/D,EAAE,MAAM,EAAE,QAAQ,EAAE,CACrB,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,cAAc;IACd,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAgC,eAAe,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrG,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,IAA0B;QAC/C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,EAAE;YACzE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED;;OAEG;IACH,KAAK,CAAC,oBAAoB,CACxB,IAAsF;QAEtF,MAAM,IAAI,GACR,OAAO,IAAI,CAAC,IAAI,KAAK,QAAQ;YAC3B,CAAC,CAAC,EAAE,GAAG,IAAI,EAAE,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE;YAC9B,CAAC,CAAC,EAAE,GAAG,IAAI,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,qBAAqB,EAAE;YAChF,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,OAAO,IAAI,CAAC,aAAa,CAAC,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACtE,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA8B;QAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuC,sBAAsB,EAAE;YAC3F,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,wBAAwB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,IAAiB;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,2BAA2B;IAC3B,KAAK,CAAC,YAAY,CAChB,MAAc,EACd,OAA6B;QAE7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqB,SAAS,EAAE;YAC5D,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM;gBACN,MAAM,EAAE,OAAO,EAAE,MAAM;gBACvB,SAAS,EAAE,OAAO,EAAE,SAAS;gBAC7B,OAAO,EAAE,OAAO,EAAE,OAAO;gBACzB,SAAS,EAAE,OAAO,EAAE,SAAS,IAAI,IAAI;aACtC,CAAC;SACH,CAAC,CAAC;QACH,OAAO,GAAG,CAAC;IACb,CAAC;CACF"}
|
|
@@ -0,0 +1 @@
|
|
|
1
|
+
{"version":3,"file":"routes.test.d.ts","sourceRoot":"","sources":["../src/routes.test.ts"],"names":[],"mappings":""}
|