@critical-path/client 0.18.0 → 0.20.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,43 @@
1
1
  # @critical-path/client
2
2
 
3
+ ## 0.20.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 40e5958: Real S3 uploads and signed URLs, and server-chosen storage keys.
8
+
9
+ **@critical-path/core**
10
+ - **BREAKING:** `S3StorageAdapter` now takes your AWS SDK v3 `client`, `commands` (`PutObjectCommand`, `DeleteObjectCommand`, optional `GetObjectCommand`) and a `presign` function (`getSignedUrl` from `@aws-sdk/s3-request-presigner`). Uploads send real commands and propagate S3 errors; previously failures were swallowed and reported as success. Presigned uploads are actually signed and cover `Content-Type`. New `signedDownloads` for private buckets. The unused `accessKeyId`/`secretAccessKey`/`sessionToken`/`s3Client` options are removed.
11
+ - **BREAKING:** `FirebaseStorageAdapter` requires a `bucket`; it no longer silently uses an in-memory mock. It throws instead of returning a public URL when the bucket cannot sign uploads.
12
+ - **BREAKING:** `engine.getPresignedAttachmentUploadUrl({ projectId, filename, contentType?, expiresInSeconds? })` generates the storage key under `projects/<projectId>/`, instead of accepting a caller-chosen `storageKey`.
13
+ - Attachments created through an actor view must use a `storageKey` under their project's prefix, so callers cannot register (and then delete) other projects' files. Uploads through views are always stored under the project prefix.
14
+ - New `buildStorageKey` (validates path prefixes, crypto-random component) and `contentDispositionFor`. HTML, SVG and script uploads are stored as downloads.
15
+
16
+ **@critical-path/server**
17
+ - **BREAKING:** `POST /attachments/presign` takes `{ projectId, filename, contentType?, expiresInSeconds? }`. `POST /attachments/upload` no longer accepts `pathPrefix`.
18
+
19
+ **@critical-path/client**
20
+ - `getPresignedAttachmentUploadUrl` and `uploadAttachmentFile` use the updated request bodies.
21
+
22
+ ### Patch Changes
23
+
24
+ - Updated dependencies [40e5958]
25
+ - @critical-path/core@0.31.0
26
+
27
+ ## 0.19.0
28
+
29
+ ### Minor Changes
30
+
31
+ - b453472: Client SDK hardening.
32
+
33
+ - **BREAKING:** non-2xx responses throw `CriticalPathError` (`status`, `issues`, `body`, `isNotFound`) instead of a plain `Error`. The message is unchanged.
34
+ - `headers` can be an (async) function, resolved before every request, so you can refresh tokens.
35
+ - New `timeoutMs` and opt-in `retry: { retries, baseDelayMs }`. Retries apply to GET only, on network errors and 429/502/503/504, and honour `Retry-After`.
36
+ - New `client.with({ signal, headers, timeoutMs })` returns a scoped client for cancellation and per-call headers.
37
+ - `Content-Type: application/json` is only sent with a body.
38
+ - All ids in URL paths are now encoded.
39
+ - New `getWebhook`, `getContainer` and `getIteration`.
40
+
3
41
  ## 0.18.0
4
42
 
5
43
  ### Minor Changes
package/README.md CHANGED
@@ -86,6 +86,56 @@ const taskLadder = await client.getTaskLadder(newTask.id);
86
86
 
87
87
  ---
88
88
 
89
+ ## ⚙️ Configuration
90
+
91
+ ```ts
92
+ const client = new CriticalPathClient({
93
+ baseUrl: '/api/critical-path',
94
+ // Static headers, or a function called before every request (e.g. to refresh tokens)
95
+ headers: async () => ({ Authorization: `Bearer ${await auth.getAccessToken()}` }),
96
+ timeoutMs: 15_000, // abort slow requests (default: none)
97
+ retry: { retries: 2, baseDelayMs: 250 }, // GET only: network errors, 429, 502-504 (default: off)
98
+ fetch: customFetch // optional fetch implementation
99
+ });
100
+ ```
101
+
102
+ ### Cancellation and per-call headers
103
+
104
+ `with()` returns a scoped client that applies options to every call it makes:
105
+
106
+ ```ts
107
+ const controller = new AbortController();
108
+ const tasks = await client.with({ signal: controller.signal }).getTasks(projectId);
109
+ // later, e.g. when a component unmounts:
110
+ controller.abort();
111
+
112
+ await client.with({ headers: { 'X-Request-Id': id }, timeoutMs: 5_000 }).getProject(projectId);
113
+ ```
114
+
115
+ ### Errors
116
+
117
+ Non-2xx responses throw `CriticalPathError`:
118
+
119
+ ```ts
120
+ import { CriticalPathError } from '@critical-path/client';
121
+
122
+ try {
123
+ await client.addDependency(taskId, { dependsOnTaskId });
124
+ } catch (err) {
125
+ if (err instanceof CriticalPathError) {
126
+ err.status; // e.g. 409
127
+ err.issues; // field-level problems for 400 validation errors
128
+ err.body?.cyclePath; // the rest of the server's error body
129
+ }
130
+ }
131
+ ```
132
+
133
+ Delete methods resolve to `false` instead of throwing when the resource does not exist. Network failures, timeouts (`TimeoutError`) and cancellations (`AbortError`) are thrown as-is.
134
+
135
+ Every server route has a client method; `routes.test.ts` fails if a route is added without one.
136
+
137
+ ---
138
+
89
139
  ## 📄 License
90
140
 
91
141
  MIT © [Critical Path](https://github.com/Pixerate/Critical-Path)
package/dist/index.d.ts CHANGED
@@ -12,16 +12,62 @@ export interface UpdateStatusResult {
12
12
  status: string;
13
13
  timestamp: number;
14
14
  }
15
+ type HeaderMap = Record<string, string>;
15
16
  export interface ClientOptions {
17
+ /** API base URL, e.g. `http://localhost:3000/api/critical-path`. */
16
18
  baseUrl: string;
17
- headers?: Record<string, string>;
19
+ /**
20
+ * Headers sent with every request. Pass a function to compute them per request, e.g. to attach
21
+ * a freshly refreshed access token: `headers: async () => ({ Authorization: `Bearer ${await getToken()}` })`.
22
+ */
23
+ headers?: HeaderMap | (() => HeaderMap | Promise<HeaderMap>);
18
24
  fetch?: typeof fetch;
25
+ /** Abort requests that take longer than this. Default: no timeout. */
26
+ timeoutMs?: number;
27
+ /**
28
+ * Retry GET requests that fail with a network error, 429, 502, 503 or 504. Default: no retries.
29
+ * Delays double from `baseDelayMs` (default 250 ms) and honour `Retry-After` on 429/503.
30
+ */
31
+ retry?: {
32
+ retries: number;
33
+ baseDelayMs?: number;
34
+ };
35
+ }
36
+ /** Per-call options for a scoped client (see `CriticalPathClient.with`). */
37
+ export interface RequestOptions {
38
+ signal?: AbortSignal;
39
+ headers?: HeaderMap;
40
+ timeoutMs?: number;
41
+ }
42
+ /**
43
+ * Error thrown for non-2xx responses. Carries the HTTP status and the server's error details
44
+ * (`issues` for validation errors, `cyclePath` for dependency cycles, and so on).
45
+ */
46
+ export declare class CriticalPathError extends Error {
47
+ /** HTTP status code. */
48
+ readonly status: number;
49
+ /** Field-level validation problems for 400 responses. */
50
+ readonly issues?: Array<{
51
+ path: string;
52
+ message: string;
53
+ }>;
54
+ /** The parsed JSON error body, if any (e.g. `fromStatus`, `toStatus`, `cyclePath`, `fieldKey`). */
55
+ readonly body?: Record<string, unknown>;
56
+ constructor(message: string, status: number, body?: Record<string, unknown>);
57
+ get isNotFound(): boolean;
19
58
  }
20
59
  export declare class CriticalPathClient {
21
- private baseUrl;
22
- private headers;
23
- private customFetch;
60
+ private readonly baseUrl;
61
+ private readonly options;
62
+ private readonly customFetch;
63
+ /** Set on scoped clients created by `with()`. */
64
+ private readonly requestOptions?;
24
65
  constructor(options: ClientOptions);
66
+ /**
67
+ * Returns a client that applies `options` to every call, e.g. to cancel requests when a
68
+ * component unmounts: `client.with({ signal: controller.signal }).getTasks(projectId)`.
69
+ */
70
+ with(options: RequestOptions): CriticalPathClient;
25
71
  /**
26
72
  * Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
27
73
  * so delete methods keep their boolean contract instead of throwing.
@@ -68,6 +114,7 @@ export declare class CriticalPathClient {
68
114
  addTodo(taskId: string, title: string): Promise<TaskTodoItem>;
69
115
  toggleTodo(taskId: string, todoIdOrTitle: string, completed?: boolean): Promise<Task>;
70
116
  getWebhooks(): Promise<PublicWebhook[]>;
117
+ getWebhook(id: string): Promise<PublicWebhook>;
71
118
  /** Registers a webhook. The returned `secret` is shown only once; store it to verify deliveries. */
72
119
  createWebhook(data: CreateWebhookBody): Promise<{
73
120
  webhook: PublicWebhook;
@@ -95,6 +142,7 @@ export declare class CriticalPathClient {
95
142
  updateTeam(id: string, updates: UpdateTeamBody): Promise<Team>;
96
143
  deleteTeam(id: string): Promise<boolean>;
97
144
  getContainers(projectId: string): Promise<TaskContainer[]>;
145
+ getContainer(id: string): Promise<TaskContainer>;
98
146
  createContainer(data: CreateContainerBody): Promise<TaskContainer>;
99
147
  updateContainer(id: string, updates: UpdateContainerBody): Promise<TaskContainer>;
100
148
  deleteContainer(id: string): Promise<boolean>;
@@ -105,6 +153,7 @@ export declare class CriticalPathClient {
105
153
  updateDeliverable(id: string, updates: UpdateDeliverableBody): Promise<Deliverable>;
106
154
  deleteDeliverable(id: string): Promise<boolean>;
107
155
  getIterations(projectId: string): Promise<Iteration[]>;
156
+ getIteration(id: string): Promise<Iteration>;
108
157
  createIteration(data: CreateIterationBody): Promise<Iteration>;
109
158
  updateIteration(id: string, updates: UpdateIterationBody): Promise<Iteration>;
110
159
  deleteIteration(id: string): Promise<boolean>;
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,kBAAkB,EAClB,iBAAiB,EACjB,iBAAiB,EACjB,cAAc,EACd,cAAc,EACd,oBAAoB,EACpB,cAAc,EACd,cAAc,EACd,mBAAmB,EACnB,mBAAmB,EACnB,qBAAqB,EACrB,qBAAqB,EACrB,mBAAmB,EACnB,mBAAmB,EACnB,iBAAiB,EACjB,iBAAiB,EACjB,mBAAmB,EACnB,oBAAoB,EACpB,oBAAoB,EACpB,qBAAqB,EACrB,WAAW,EACX,iBAAiB,EACjB,iBAAiB,EAClB,MAAM,6BAA6B,CAAC;AACrC,OAAO,KAAK,EACV,aAAa,EACb,IAAI,EACJ,SAAS,EACT,aAAa,EACb,cAAc,EACd,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EAEV,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAElB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,MAAM,CAAC;IAChB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACjC,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;CACtB;AAkBD,qBAAa,kBAAkB;IAC7B,OAAO,CAAC,OAAO,CAAS;IACxB,OAAO,CAAC,OAAO,CAAyB;IACxC,OAAO,CAAC,WAAW,CAAe;gBAEtB,OAAO,EAAE,aAAa;IAMlC;;;OAGG;YACW,aAAa;YAUb,OAAO;IA0Bf,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,CAAC;IAK1C,cAAc,CAAC,IAAI,EAAE,kBAAkB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQ3D,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,kBAAkB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQ1E,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK5C,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQxD,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ7E,iFAAiF;IAC3E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,qBAAqB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,oBAAoB,CAAC;IAOvE,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAapB,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IAsBhC,wGAAwG;IAClG,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAInD;;;OAGG;IACG,UAAU,CAAC,KAAK,GAAE,SAAc,GAAG,OAAO,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAY9C,YAAY;IAWpB,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,CAAC;IAOtD,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAOpD,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAOpE,UAAU,CAAC,IAAI,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ/C,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ9D,aAAa,CACjB,YAAY,EAAE,MAAM,EACpB,IAAI,EAAE;QACJ,KAAK,EAAE,MAAM,CAAC;QACd,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,MAAM,CAAC,EAAE,UAAU,CAAC;QACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;QACpB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACxC,GACA,OAAO,CAAC,IAAI,CAAC;IAkBV,OAAO,CACX,MAAM,EAAE,MAAM,EACd,KAAK,EAAE,MAAM,GACZ,OAAO,CAAC,YAAY,CAAC;IAalB,UAAU,CACd,MAAM,EAAE,MAAM,EACd,aAAa,EAAE,MAAM,EACrB,SAAS,CAAC,EAAE,OAAO,GAClB,OAAO,CAAC,IAAI,CAAC;IAiBV,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAI7C,oGAAoG;IAC9F,aAAa,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAO3F,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQ7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIjD,0FAA0F;IACpF,aAAa,CAAC,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,oBAAoB,GAAG,OAAO,CAAC,cAAc,CAAC;IAQxF;;;OAGG;IACG,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,GAAE;QAAE,QAAQ,CAAC,EAAE,QAAQ,GAAG,QAAQ,CAAA;KAAO,GAAG,OAAO,CAAC,OAAO,CAAC;IAK1F,gBAAgB,CAAC,MAAM,EAAE,MAAM,EAAE,YAAY,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIxE,mBAAmB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAKjE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,iBAAiB,CAAC;IAKjE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAK5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAMpE,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,UAAU,CAAC,IAAI,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ/C,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ9D,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,eAAe,CAAC,IAAI,EAAE,mBAAmB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQlE,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQjF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAKhD,qBAAqB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,CAAC;IAK9D,iBAAiB,CAAC,IAAI,EAAE,qBAAqB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQpE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,qBAAqB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQnF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK/C,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,eAAe,CAAC,IAAI,EAAE,mBAAmB,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ9D,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ7E,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKnD,wGAAwG;IAClG,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAI1F,mDAAmD;IAC7C,eAAe,CAAC,KAAK,GAAE,aAAkB,GAAG,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAWnE,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,UAAU,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQrD,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQvE,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE,mBAAmB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtF,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE,mBAAmB,GAAG,OAAO,CAAC,OAAO,CAAC;IAUzF,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAU3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,CAAC;IAK9C,gBAAgB,CAAC,IAAI,EAAE,oBAAoB,GAAG,OAAO,CAAC,UAAU,CAAC;IAQvE;;OAEG;IACG,oBAAoB,CACxB,IAAI,EAAE,IAAI,CAAC,oBAAoB,EAAE,MAAM,CAAC,GAAG;QAAE,IAAI,EAAE,MAAM,GAAG,UAAU,GAAG,WAAW,CAAA;KAAE,GACrF,OAAO,CAAC,UAAU,CAAC;IAYhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI9C,+BAA+B,CAAC,OAAO,EAAE,qBAAqB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAS/F,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,OAAO,CAAC,IAAI,EAAE,WAAW,GAAG,OAAO,CAAC,SAAS,CAAC;IAS9C,YAAY,CAChB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE,mBAAmB,GAC5B,OAAO,CAAC,kBAAkB,CAAC;CAa/B;AAED,YAAY,EAAE,eAAe,EAAE,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,kBAAkB,EAClB,iBAAiB,EACjB,iBAAiB,EACjB,cAAc,EACd,cAAc,EACd,oBAAoB,EACpB,cAAc,EACd,cAAc,EACd,mBAAmB,EACnB,mBAAmB,EACnB,qBAAqB,EACrB,qBAAqB,EACrB,mBAAmB,EACnB,mBAAmB,EACnB,iBAAiB,EACjB,iBAAiB,EACjB,mBAAmB,EACnB,oBAAoB,EACpB,oBAAoB,EACpB,qBAAqB,EACrB,WAAW,EACX,iBAAiB,EACjB,iBAAiB,EAClB,MAAM,6BAA6B,CAAC;AACrC,OAAO,KAAK,EACV,aAAa,EACb,IAAI,EACJ,SAAS,EACT,aAAa,EACb,cAAc,EACd,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EAEV,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAElB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,KAAK,SAAS,GAAG,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;AAExC,MAAM,WAAW,aAAa;IAC5B,oEAAoE;IACpE,OAAO,EAAE,MAAM,CAAC;IAChB;;;OAGG;IACH,OAAO,CAAC,EAAE,SAAS,GAAG,CAAC,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC;IAC7D,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;IACrB,sEAAsE;IACtE,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB;;;OAGG;IACH,KAAK,CAAC,EAAE;QAAE,OAAO,EAAE,MAAM,CAAC;QAAC,WAAW,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CACnD;AAED,4EAA4E;AAC5E,MAAM,WAAW,cAAc;IAC7B,MAAM,CAAC,EAAE,WAAW,CAAC;IACrB,OAAO,CAAC,EAAE,SAAS,CAAC;IACpB,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED;;;GAGG;AACH,qBAAa,iBAAkB,SAAQ,KAAK;IAC1C,wBAAwB;IACxB,QAAQ,CAAC,MAAM,EAAE,MAAM,CAAC;IACxB,yDAAyD;IACzD,QAAQ,CAAC,MAAM,CAAC,EAAE,KAAK,CAAC;QAAE,IAAI,EAAE,MAAM,CAAC;QAAC,OAAO,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAC3D,mGAAmG;IACnG,QAAQ,CAAC,IAAI,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;gBAE5B,OAAO,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;IAQ3E,IAAI,UAAU,IAAI,OAAO,CAExB;CACF;AAqBD,qBAAa,kBAAkB;IAC7B,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAS;IACjC,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAgB;IACxC,OAAO,CAAC,QAAQ,CAAC,WAAW,CAAe;IAC3C,iDAAiD;IACjD,OAAO,CAAC,QAAQ,CAAC,cAAc,CAAC,CAAiB;gBAErC,OAAO,EAAE,aAAa;IAMlC;;;OAGG;IACH,IAAI,CAAC,OAAO,EAAE,cAAc,GAAG,kBAAkB;IAWjD;;;OAGG;YACW,aAAa;YAUb,OAAO;IAmDf,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,CAAC;IAK1C,cAAc,CAAC,IAAI,EAAE,kBAAkB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQ3D,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,kBAAkB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQ1E,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK5C,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQxD,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ7E,iFAAiF;IAC3E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,qBAAqB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,oBAAoB,CAAC;IAOvE,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAapB,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IAsBhC,wGAAwG;IAClG,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAInD;;;OAGG;IACG,UAAU,CAAC,KAAK,GAAE,SAAc,GAAG,OAAO,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAY9C,YAAY;IAWpB,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,CAAC;IAOtD,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAOpD,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAOpE,UAAU,CAAC,IAAI,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ/C,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ9D,aAAa,CACjB,YAAY,EAAE,MAAM,EACpB,IAAI,EAAE;QACJ,KAAK,EAAE,MAAM,CAAC;QACd,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,MAAM,CAAC,EAAE,UAAU,CAAC;QACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;QACpB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACxC,GACA,OAAO,CAAC,IAAI,CAAC;IAkBV,OAAO,CACX,MAAM,EAAE,MAAM,EACd,KAAK,EAAE,MAAM,GACZ,OAAO,CAAC,YAAY,CAAC;IAalB,UAAU,CACd,MAAM,EAAE,MAAM,EACd,aAAa,EAAE,MAAM,EACrB,SAAS,CAAC,EAAE,OAAO,GAClB,OAAO,CAAC,IAAI,CAAC;IAiBV,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAIvC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,CAAC;IAIpD,oGAAoG;IAC9F,aAAa,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAO3F,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQ7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIjD,0FAA0F;IACpF,aAAa,CAAC,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,oBAAoB,GAAG,OAAO,CAAC,cAAc,CAAC;IAQxF;;;OAGG;IACG,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,GAAE;QAAE,QAAQ,CAAC,EAAE,QAAQ,GAAG,QAAQ,CAAA;KAAO,GAAG,OAAO,CAAC,OAAO,CAAC;IAK1F,gBAAgB,CAAC,MAAM,EAAE,MAAM,EAAE,YAAY,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIxE,mBAAmB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAKjE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,iBAAiB,CAAC;IAKjE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAK5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAMpE,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,UAAU,CAAC,IAAI,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ/C,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ9D,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,CAAC;IAIhD,eAAe,CAAC,IAAI,EAAE,mBAAmB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQlE,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQjF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAKhD,qBAAqB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,CAAC;IAK9D,iBAAiB,CAAC,IAAI,EAAE,qBAAqB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQpE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,qBAAqB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQnF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK/C,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,CAAC;IAI5C,eAAe,CAAC,IAAI,EAAE,mBAAmB,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ9D,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ7E,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKnD,wGAAwG;IAClG,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAI1F,mDAAmD;IAC7C,eAAe,CAAC,KAAK,GAAE,aAAkB,GAAG,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAWnE,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,UAAU,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQrD,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQvE,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE,mBAAmB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtF,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE,mBAAmB,GAAG,OAAO,CAAC,OAAO,CAAC;IAUzF,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAU3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,CAAC;IAK9C,gBAAgB,CAAC,IAAI,EAAE,oBAAoB,GAAG,OAAO,CAAC,UAAU,CAAC;IAQvE;;OAEG;IACG,oBAAoB,CACxB,IAAI,EAAE,IAAI,CAAC,oBAAoB,EAAE,MAAM,CAAC,GAAG;QAAE,IAAI,EAAE,MAAM,GAAG,UAAU,GAAG,WAAW,CAAA;KAAE,GACrF,OAAO,CAAC,UAAU,CAAC;IAYhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI9C,+BAA+B,CAAC,OAAO,EAAE,qBAAqB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAS/F,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,OAAO,CAAC,IAAI,EAAE,WAAW,GAAG,OAAO,CAAC,SAAS,CAAC;IAS9C,YAAY,CAChB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE,mBAAmB,GAC5B,OAAO,CAAC,kBAAkB,CAAC;CAa/B;AAED,YAAY,EAAE,eAAe,EAAE,CAAC"}
package/dist/index.js CHANGED
@@ -1,3 +1,33 @@
1
+ /**
2
+ * Error thrown for non-2xx responses. Carries the HTTP status and the server's error details
3
+ * (`issues` for validation errors, `cyclePath` for dependency cycles, and so on).
4
+ */
5
+ export class CriticalPathError extends Error {
6
+ /** HTTP status code. */
7
+ status;
8
+ /** Field-level validation problems for 400 responses. */
9
+ issues;
10
+ /** The parsed JSON error body, if any (e.g. `fromStatus`, `toStatus`, `cyclePath`, `fieldKey`). */
11
+ body;
12
+ constructor(message, status, body) {
13
+ super(message);
14
+ this.name = 'CriticalPathError';
15
+ this.status = status;
16
+ this.body = body;
17
+ this.issues = Array.isArray(body?.issues) ? body.issues : undefined;
18
+ }
19
+ get isNotFound() {
20
+ return this.status === 404;
21
+ }
22
+ }
23
+ const RETRYABLE_STATUSES = new Set([429, 502, 503, 504]);
24
+ const sleep = (ms, signal) => new Promise((resolve, reject) => {
25
+ const timer = setTimeout(resolve, ms);
26
+ signal?.addEventListener('abort', () => {
27
+ clearTimeout(timer);
28
+ reject(signal.reason);
29
+ }, { once: true });
30
+ });
1
31
  function toBase64(data) {
2
32
  const bytes = data instanceof Uint8Array ? data : new Uint8Array(data);
3
33
  let binary = '';
@@ -6,20 +36,30 @@ function toBase64(data) {
6
36
  }
7
37
  return btoa(binary);
8
38
  }
9
- class NotFoundResponseError extends Error {
10
- constructor(message) {
11
- super(message);
12
- this.name = 'NotFoundResponseError';
13
- }
14
- }
15
39
  export class CriticalPathClient {
16
40
  baseUrl;
17
- headers;
41
+ options;
18
42
  customFetch;
43
+ /** Set on scoped clients created by `with()`. */
44
+ requestOptions;
19
45
  constructor(options) {
46
+ this.options = options;
20
47
  this.baseUrl = options.baseUrl.replace(/\/+$/, '');
21
- this.headers = options.headers || {};
22
- this.customFetch = options.fetch || globalThis.fetch;
48
+ this.customFetch = options.fetch || ((...args) => globalThis.fetch(...args));
49
+ }
50
+ /**
51
+ * Returns a client that applies `options` to every call, e.g. to cancel requests when a
52
+ * component unmounts: `client.with({ signal: controller.signal }).getTasks(projectId)`.
53
+ */
54
+ with(options) {
55
+ const scoped = Object.create(this);
56
+ const merged = {
57
+ ...this.requestOptions,
58
+ ...options,
59
+ headers: { ...this.requestOptions?.headers, ...options.headers }
60
+ };
61
+ Object.defineProperty(scoped, 'requestOptions', { value: merged });
62
+ return scoped;
23
63
  }
24
64
  /**
25
65
  * Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
@@ -31,34 +71,55 @@ export class CriticalPathClient {
31
71
  return res.success;
32
72
  }
33
73
  catch (err) {
34
- if (err instanceof NotFoundResponseError)
74
+ if (err instanceof CriticalPathError && err.isNotFound)
35
75
  return false;
36
76
  throw err;
37
77
  }
38
78
  }
39
- async request(endpoint, options = {}) {
79
+ async request(endpoint, init = {}) {
40
80
  const url = `${this.baseUrl}${endpoint.startsWith('/') ? endpoint : `/${endpoint}`}`;
41
- const response = await this.customFetch(url, {
42
- ...options,
43
- headers: {
44
- 'Content-Type': 'application/json',
45
- ...this.headers,
46
- ...options.headers
81
+ const method = (init.method ?? 'GET').toUpperCase();
82
+ const configured = typeof this.options.headers === 'function' ? await this.options.headers() : this.options.headers;
83
+ const headers = {
84
+ ...(init.body !== undefined ? { 'Content-Type': 'application/json' } : {}),
85
+ ...configured,
86
+ ...this.requestOptions?.headers
87
+ };
88
+ const timeoutMs = this.requestOptions?.timeoutMs ?? this.options.timeoutMs;
89
+ const signals = [this.requestOptions?.signal, timeoutMs ? AbortSignal.timeout(timeoutMs) : undefined].filter((s) => !!s);
90
+ const signal = signals.length > 1 ? AbortSignal.any(signals) : signals[0];
91
+ const retries = method === 'GET' ? this.options.retry?.retries ?? 0 : 0;
92
+ const baseDelay = this.options.retry?.baseDelayMs ?? 250;
93
+ for (let attempt = 0;; attempt++) {
94
+ let response;
95
+ try {
96
+ response = await this.customFetch(url, { ...init, method, headers, signal });
47
97
  }
48
- });
49
- if (!response.ok) {
50
- let errorMsg = `HTTP Error ${response.status}: ${response.statusText}`;
98
+ catch (err) {
99
+ // Network failure; never retry after an abort or timeout.
100
+ if (attempt < retries && !signal?.aborted) {
101
+ await sleep(baseDelay * 2 ** attempt, signal);
102
+ continue;
103
+ }
104
+ throw err;
105
+ }
106
+ if (response.ok)
107
+ return response.json();
108
+ if (attempt < retries && RETRYABLE_STATUSES.has(response.status)) {
109
+ const retryAfter = Number(response.headers.get('Retry-After'));
110
+ await sleep(Number.isFinite(retryAfter) && retryAfter > 0 ? retryAfter * 1000 : baseDelay * 2 ** attempt, signal);
111
+ continue;
112
+ }
113
+ let body;
51
114
  try {
52
- const errJson = await response.json();
53
- if (errJson.error)
54
- errorMsg = errJson.error;
115
+ body = await response.json();
55
116
  }
56
117
  catch {
57
- // Fallback to HTTP error
118
+ // Non-JSON error body
58
119
  }
59
- throw response.status === 404 ? new NotFoundResponseError(errorMsg) : new Error(errorMsg);
120
+ const message = typeof body?.error === 'string' ? body.error : `HTTP Error ${response.status}: ${response.statusText}`;
121
+ throw new CriticalPathError(message, response.status, body);
60
122
  }
61
- return response.json();
62
123
  }
63
124
  // Workflows
64
125
  async getWorkflows() {
@@ -66,7 +127,7 @@ export class CriticalPathClient {
66
127
  return res.workflows;
67
128
  }
68
129
  async getWorkflow(id) {
69
- const res = await this.request(`/workflows/${id}`);
130
+ const res = await this.request(`/workflows/${encodeURIComponent(id)}`);
70
131
  return res.workflow;
71
132
  }
72
133
  async createWorkflow(data) {
@@ -77,14 +138,14 @@ export class CriticalPathClient {
77
138
  return res.workflow;
78
139
  }
79
140
  async updateWorkflow(id, updates) {
80
- const res = await this.request(`/workflows/${id}`, {
141
+ const res = await this.request(`/workflows/${encodeURIComponent(id)}`, {
81
142
  method: 'PATCH',
82
143
  body: JSON.stringify(updates)
83
144
  });
84
145
  return res.workflow;
85
146
  }
86
147
  async deleteWorkflow(id) {
87
- return this.deleteRequest(`/workflows/${id}`);
148
+ return this.deleteRequest(`/workflows/${encodeURIComponent(id)}`);
88
149
  }
89
150
  // Projects
90
151
  async getProjects() {
@@ -92,7 +153,7 @@ export class CriticalPathClient {
92
153
  return res.projects;
93
154
  }
94
155
  async getProject(id) {
95
- const res = await this.request(`/projects/${id}`);
156
+ const res = await this.request(`/projects/${encodeURIComponent(id)}`);
96
157
  return res.project;
97
158
  }
98
159
  async createProject(data) {
@@ -187,7 +248,7 @@ export class CriticalPathClient {
187
248
  return items;
188
249
  }
189
250
  async getTask(id) {
190
- const res = await this.request(`/tasks/${id}`);
251
+ const res = await this.request(`/tasks/${encodeURIComponent(id)}`);
191
252
  return res.task;
192
253
  }
193
254
  async getTaskLadder(taskId) {
@@ -210,7 +271,7 @@ export class CriticalPathClient {
210
271
  return res.task;
211
272
  }
212
273
  async updateTask(id, updates) {
213
- const res = await this.request(`/tasks/${id}`, {
274
+ const res = await this.request(`/tasks/${encodeURIComponent(id)}`, {
214
275
  method: 'PATCH',
215
276
  body: JSON.stringify(updates)
216
277
  });
@@ -262,6 +323,9 @@ export class CriticalPathClient {
262
323
  async getWebhooks() {
263
324
  return (await this.request('/webhooks')).webhooks;
264
325
  }
326
+ async getWebhook(id) {
327
+ return (await this.request(`/webhooks/${encodeURIComponent(id)}`)).webhook;
328
+ }
265
329
  /** Registers a webhook. The returned `secret` is shown only once; store it to verify deliveries. */
266
330
  async createWebhook(data) {
267
331
  return this.request('/webhooks', {
@@ -320,7 +384,7 @@ export class CriticalPathClient {
320
384
  return res.teams;
321
385
  }
322
386
  async getTeam(id) {
323
- const res = await this.request(`/teams/${id}`);
387
+ const res = await this.request(`/teams/${encodeURIComponent(id)}`);
324
388
  return res.team;
325
389
  }
326
390
  async createTeam(data) {
@@ -331,20 +395,23 @@ export class CriticalPathClient {
331
395
  return res.team;
332
396
  }
333
397
  async updateTeam(id, updates) {
334
- const res = await this.request(`/teams/${id}`, {
398
+ const res = await this.request(`/teams/${encodeURIComponent(id)}`, {
335
399
  method: 'PATCH',
336
400
  body: JSON.stringify(updates)
337
401
  });
338
402
  return res.team;
339
403
  }
340
404
  async deleteTeam(id) {
341
- return this.deleteRequest(`/teams/${id}`);
405
+ return this.deleteRequest(`/teams/${encodeURIComponent(id)}`);
342
406
  }
343
407
  // Containers
344
408
  async getContainers(projectId) {
345
409
  const res = await this.request(`/containers?projectId=${encodeURIComponent(projectId)}`);
346
410
  return res.containers;
347
411
  }
412
+ async getContainer(id) {
413
+ return (await this.request(`/containers/${encodeURIComponent(id)}`)).container;
414
+ }
348
415
  async createContainer(data) {
349
416
  const res = await this.request('/containers', {
350
417
  method: 'POST',
@@ -353,14 +420,14 @@ export class CriticalPathClient {
353
420
  return res.container;
354
421
  }
355
422
  async updateContainer(id, updates) {
356
- const res = await this.request(`/containers/${id}`, {
423
+ const res = await this.request(`/containers/${encodeURIComponent(id)}`, {
357
424
  method: 'PATCH',
358
425
  body: JSON.stringify(updates)
359
426
  });
360
427
  return res.container;
361
428
  }
362
429
  async deleteContainer(id) {
363
- return this.deleteRequest(`/containers/${id}`);
430
+ return this.deleteRequest(`/containers/${encodeURIComponent(id)}`);
364
431
  }
365
432
  // Deliverables
366
433
  async getDeliverables(projectId) {
@@ -368,11 +435,11 @@ export class CriticalPathClient {
368
435
  return res.deliverables;
369
436
  }
370
437
  async getDeliverable(id) {
371
- const res = await this.request(`/deliverables/${id}`);
438
+ const res = await this.request(`/deliverables/${encodeURIComponent(id)}`);
372
439
  return res.deliverable;
373
440
  }
374
441
  async getDeliverableSummary(id) {
375
- const res = await this.request(`/deliverables/${id}/summary`);
442
+ const res = await this.request(`/deliverables/${encodeURIComponent(id)}/summary`);
376
443
  return res.summary;
377
444
  }
378
445
  async createDeliverable(data) {
@@ -383,20 +450,23 @@ export class CriticalPathClient {
383
450
  return res.deliverable;
384
451
  }
385
452
  async updateDeliverable(id, updates) {
386
- const res = await this.request(`/deliverables/${id}`, {
453
+ const res = await this.request(`/deliverables/${encodeURIComponent(id)}`, {
387
454
  method: 'PATCH',
388
455
  body: JSON.stringify(updates)
389
456
  });
390
457
  return res.deliverable;
391
458
  }
392
459
  async deleteDeliverable(id) {
393
- return this.deleteRequest(`/deliverables/${id}`);
460
+ return this.deleteRequest(`/deliverables/${encodeURIComponent(id)}`);
394
461
  }
395
462
  // Iterations
396
463
  async getIterations(projectId) {
397
464
  const res = await this.request(`/iterations?projectId=${encodeURIComponent(projectId)}`);
398
465
  return res.iterations;
399
466
  }
467
+ async getIteration(id) {
468
+ return (await this.request(`/iterations/${encodeURIComponent(id)}`)).iteration;
469
+ }
400
470
  async createIteration(data) {
401
471
  const res = await this.request('/iterations', {
402
472
  method: 'POST',
@@ -405,14 +475,14 @@ export class CriticalPathClient {
405
475
  return res.iteration;
406
476
  }
407
477
  async updateIteration(id, updates) {
408
- const res = await this.request(`/iterations/${id}`, {
478
+ const res = await this.request(`/iterations/${encodeURIComponent(id)}`, {
409
479
  method: 'PATCH',
410
480
  body: JSON.stringify(updates)
411
481
  });
412
482
  return res.iteration;
413
483
  }
414
484
  async deleteIteration(id) {
415
- return this.deleteRequest(`/iterations/${id}`);
485
+ return this.deleteRequest(`/iterations/${encodeURIComponent(id)}`);
416
486
  }
417
487
  // Activity Stream
418
488
  /** The whole activity feed (newest first), following pagination. Prefer `queryActivities` for feeds. */
package/dist/index.js.map CHANGED
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAmIA,SAAS,QAAQ,CAAC,IAA8B;IAC9C,MAAM,KAAK,GAAG,IAAI,YAAY,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,UAAU,CAAC,IAAI,CAAC,CAAC;IACvE,IAAI,MAAM,GAAG,EAAE,CAAC;IAChB,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,KAAK,CAAC,MAAM,EAAE,CAAC,IAAI,MAAM,EAAE,CAAC;QAC9C,MAAM,IAAI,MAAM,CAAC,YAAY,CAAC,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC,EAAE,CAAC,GAAG,MAAM,CAAC,CAAC,CAAC;IAClE,CAAC;IACD,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC;AACtB,CAAC;AAED,MAAM,qBAAsB,SAAQ,KAAK;IACvC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,uBAAuB,CAAC;IACtC,CAAC;CACF;AAED,MAAM,OAAO,kBAAkB;IACrB,OAAO,CAAS;IAChB,OAAO,CAAyB;IAChC,WAAW,CAAe;IAElC,YAAY,OAAsB;QAChC,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,IAAI,EAAE,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,KAAK,IAAI,UAAU,CAAC,KAAK,CAAC;IACvD,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,aAAa,CAAC,QAAgB;QAC1C,IAAI,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,QAAQ,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC;YACrF,OAAO,GAAG,CAAC,OAAO,CAAC;QACrB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,GAAG,YAAY,qBAAqB;gBAAE,OAAO,KAAK,CAAC;YACvD,MAAM,GAAG,CAAC;QACZ,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,OAAO,CAAI,QAAgB,EAAE,UAAuB,EAAE;QAClE,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,OAAO,GAAG,QAAQ,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,QAAQ,EAAE,EAAE,CAAC;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,GAAG,EAAE;YAC3C,GAAG,OAAO;YACV,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;gBAClC,GAAG,IAAI,CAAC,OAAO;gBACf,GAAG,OAAO,CAAC,OAAO;aACnB;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,QAAQ,CAAC,EAAE,EAAE,CAAC;YACjB,IAAI,QAAQ,GAAG,cAAc,QAAQ,CAAC,MAAM,KAAK,QAAQ,CAAC,UAAU,EAAE,CAAC;YACvE,IAAI,CAAC;gBACH,MAAM,OAAO,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;gBACtC,IAAI,OAAO,CAAC,KAAK;oBAAE,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC;YAC9C,CAAC;YAAC,MAAM,CAAC;gBACP,yBAAyB;YAC3B,CAAC;YACD,MAAM,QAAQ,CAAC,MAAM,KAAK,GAAG,CAAC,CAAC,CAAC,IAAI,qBAAqB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC5F,CAAC;QAED,OAAO,QAAQ,CAAC,IAAI,EAAE,CAAC;IACzB,CAAC;IAED,YAAY;IACZ,KAAK,CAAC,YAAY;QAChB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA4B,YAAY,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,CAAC,CAAC;QAC3E,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,IAAwB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,YAAY,EAAE;YACnE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA2B;QAC1D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,EAAE;YACzE,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,aAAa,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC;IAChD,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,WAAW,CAAC,CAAC;QACrE,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,EAAE,EAAE,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,IAAuB;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,iFAAiF;IACjF,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,gBAAgB,CAC3D,CAAC;QACF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,KAAK;YAAE,MAAM,CAAC,GAAG,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,CAAC,CAAC;QACtD,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,UAAU,KAAK,EAAE,CAC5D,CAAC;QACF,OAAO,GAAG,CAAC,MAAM,CAAC;IACpB,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAClE,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,QAAQ;YAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC/D,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QACzD,IAAI,OAAO,OAAO,CAAC,0BAA0B,KAAK,QAAQ,EAAE,CAAC;YAC3D,MAAM,CAAC,GAAG,CAAC,4BAA4B,EAAE,OAAO,CAAC,0BAA0B,CAAC,QAAQ,EAAE,CAAC,CAAC;QAC1F,CAAC;QAED,MAAM,IAAI,GAAG,SAAS;YACpB,CAAC,CAAC,aAAa,kBAAkB,CAAC,SAAS,CAAC,WAAW;YACvD,CAAC,CAAC,WAAW,CAAC;QAChB,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqC,GAAG,IAAI,GAAG,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,QAAQ;IACR,wGAAwG;IACxG,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC;IAC3F,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,QAAmB,EAAE;QACpC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC;YACjD,IAAI,KAAK,KAAK,SAAS,IAAI,GAAG,KAAK,YAAY;gBAAE,SAAS;YAC1D,IAAI,GAAG,KAAK,UAAU,IAAI,KAAK,KAAK,IAAI;gBAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,MAAM,CAAC,CAAC;;gBACpE,MAAM,CAAC,GAAG,CAAC,GAAG,EAAE,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAC/E,CAAC;QACD,MAAM,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyC,SAAS,EAAE,EAAE,CAAC,CAAC;QACtF,OAAO,EAAE,KAAK,EAAE,GAAG,CAAC,KAAK,EAAE,UAAU,EAAE,GAAG,CAAC,UAAU,EAAE,CAAC;IAC1D,CAAC;IAEO,KAAK,CAAC,YAAY,CAAI,SAAgD;QAC5E,MAAM,KAAK,GAAQ,EAAE,CAAC;QACtB,IAAI,MAA0B,CAAC;QAC/B,GAAG,CAAC;YACF,MAAM,IAAI,GAAG,MAAM,SAAS,CAAC,MAAM,CAAC,CAAC;YACrC,KAAK,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC;YAC1B,MAAM,GAAG,IAAI,CAAC,UAAU,CAAC;QAC3B,CAAC,QAAQ,MAAM,EAAE;QACjB,OAAO,KAAK,CAAC;IACf,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,SAAS,CAC9C,CAAC;QACF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,UAAU,CAC/C,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,mBAAmB,CACxD,CAAC;QACF,OAAO,GAAG,CAAC,eAAe,CAAC;IAC7B,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAoB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAuB;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,YAAoB,EACpB,IAQC;QAED,IAAI,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAC/B,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACpD,SAAS,GAAG,UAAU,CAAC,SAAS,CAAC;QACnC,CAAC;QACD,OAAO,IAAI,CAAC,UAAU,CAAC;YACrB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,QAAQ,EAAE,YAAY;YACtB,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,QAAQ;YACnC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,YAAY,EAAE,IAAI,CAAC,YAAY;SAChC,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,OAAO,CACX,MAAc,EACd,KAAa;QAEb,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACtE,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,IAAI,EAAE,CAAC,EAAE,IAAI,CAAC,CAAC;QAC5C,MAAM,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,OAAO,IAAI,CAAC;IACd,CAAC;IAED,KAAK,CAAC,UAAU,CACd,MAAc,EACd,aAAqB,EACrB,SAAmB;QAEnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;YAC3C,MAAM,IAAI,KAAK,CAAC,QAAQ,MAAM,0BAA0B,CAAC,CAAC;QAC5D,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAC1B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,aAAa,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,KAAK,aAAa,CAAC,WAAW,EAAE,CACvF,CAAC;QACF,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,mBAAmB,aAAa,uBAAuB,MAAM,GAAG,CAAC,CAAC;QACpF,CAAC;QACD,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;QACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACzE,OAAO,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;IACxD,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAAgC,WAAW,CAAC,CAAC,CAAC,QAAQ,CAAC;IACnF,CAAC;IAED,oGAAoG;IACpG,KAAK,CAAC,aAAa,CAAC,IAAuB;QACzC,OAAO,IAAI,CAAC,OAAO,CAA6C,WAAW,EAAE;YAC3E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAChG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,0FAA0F;IAC1F,KAAK,CAAC,aAAa,CAAC,MAAc,EAAE,IAA0B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,EAAE;YAClH,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,UAA8C,EAAE;QAC3E,MAAM,KAAK,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,aAAa,OAAO,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACtE,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,EAAE,CAAC,GAAG,KAAK,EAAE,CAAC,CAAC;IACxE,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,MAAc,EAAE,YAAoB;QACzD,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,MAAM,CAAC,iBAAiB,kBAAkB,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrH,CAAC;IAED,KAAK,CAAC,mBAAmB,CAAC,MAAc;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC;QACpH,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,UAAU,kBAAkB,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC;QAC/G,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,mBAAmB,CAAC;IACjC,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,uBAAuB,IAAI,EAAE,CAAC;IAC3C,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ;QACZ,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,QAAQ,CAAC,CAAC;QAC5D,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAoB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAuB;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,EAAE,EAAE,CAAC,CAAC;IAC5C,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC1H,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyB;QAC7C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,aAAa,EAAE;YAC1E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA4B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE,EAAE,EAAE;YAChF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,EAAE,EAAE,CAAC,CAAC;IACjD,CAAC;IAED,eAAe;IACf,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,2BAA2B,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5H,OAAO,GAAG,CAAC,YAAY,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,CAAC,CAAC;QACpF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,EAAU;QACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,iBAAiB,EAAE,UAAU,CAAC,CAAC;QAC/F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,IAA2B;QACjD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE;YAC5E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA8B;QAChE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,EAAE;YAClF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,OAAO,IAAI,CAAC,aAAa,CAAC,iBAAiB,EAAE,EAAE,CAAC,CAAC;IACnD,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA8B,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QACtH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyB;QAC7C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,aAAa,EAAE;YACtE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA4B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE,EAAE,EAAE;YAC5E,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,EAAE,EAAE,CAAC,CAAC;IACjD,CAAC;IAED,kBAAkB;IAClB,wGAAwG;IACxG,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,IAAI,CAAC,eAAe,CAAC,EAAE,GAAG,MAAM,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC;IAChG,CAAC;IAED,mDAAmD;IACnD,KAAK,CAAC,eAAe,CAAC,QAAuB,EAAE;QAC7C,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC;YACjD,IAAI,KAAK,KAAK,SAAS,IAAI,GAAG,KAAK,YAAY;gBAAE,MAAM,CAAC,GAAG,CAAC,GAAG,EAAE,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAClF,CAAC;QACD,MAAM,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkD,cAAc,EAAE,EAAE,CAAC,CAAC;QACpG,OAAO,EAAE,KAAK,EAAE,GAAG,CAAC,UAAU,EAAE,UAAU,EAAE,GAAG,CAAC,UAAU,EAAE,CAAC;IAC/D,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,oBAAoB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC1G,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAuB;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA6B;QACvE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA6B;QAC1E,MAAM,KAAK,GAAG,IAAI,eAAe,CAAC,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC7D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,cAAc,KAAK,EAAE,EAC/D,EAAE,MAAM,EAAE,QAAQ,EAAE,CACrB,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,cAAc;IACd,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAgC,eAAe,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrG,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,IAA0B;QAC/C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,EAAE;YACzE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED;;OAEG;IACH,KAAK,CAAC,oBAAoB,CACxB,IAAsF;QAEtF,MAAM,IAAI,GACR,OAAO,IAAI,CAAC,IAAI,KAAK,QAAQ;YAC3B,CAAC,CAAC,EAAE,GAAG,IAAI,EAAE,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE;YAC9B,CAAC,CAAC,EAAE,GAAG,IAAI,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,qBAAqB,EAAE;YAChF,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,OAAO,IAAI,CAAC,aAAa,CAAC,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACtE,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA8B;QAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuC,sBAAsB,EAAE;YAC3F,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,wBAAwB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,IAAiB;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,2BAA2B;IAC3B,KAAK,CAAC,YAAY,CAChB,MAAc,EACd,OAA6B;QAE7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqB,SAAS,EAAE;YAC5D,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM;gBACN,MAAM,EAAE,OAAO,EAAE,MAAM;gBACvB,SAAS,EAAE,OAAO,EAAE,SAAS;gBAC7B,OAAO,EAAE,OAAO,EAAE,OAAO;gBACzB,SAAS,EAAE,OAAO,EAAE,SAAS,IAAI,IAAI;aACtC,CAAC;SACH,CAAC,CAAC;QACH,OAAO,GAAG,CAAC;IACb,CAAC;CACF"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAwJA;;;GAGG;AACH,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,wBAAwB;IACf,MAAM,CAAS;IACxB,yDAAyD;IAChD,MAAM,CAA4C;IAC3D,mGAAmG;IAC1F,IAAI,CAA2B;IAExC,YAAY,OAAe,EAAE,MAAc,EAAE,IAA8B;QACzE,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;QAChC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,CAAC,IAAI,GAAG,IAAI,CAAC;QACjB,IAAI,CAAC,MAAM,GAAG,KAAK,CAAC,OAAO,CAAC,IAAI,EAAE,MAAM,CAAC,CAAC,CAAC,CAAE,IAAK,CAAC,MAAsC,CAAC,CAAC,CAAC,SAAS,CAAC;IACxG,CAAC;IAED,IAAI,UAAU;QACZ,OAAO,IAAI,CAAC,MAAM,KAAK,GAAG,CAAC;IAC7B,CAAC;CACF;AAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,CAAC,CAAC,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC,CAAC;AACzD,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,MAA2B,EAAE,EAAE,CACxD,IAAI,OAAO,CAAO,CAAC,OAAO,EAAE,MAAM,EAAE,EAAE;IACpC,MAAM,KAAK,GAAG,UAAU,CAAC,OAAO,EAAE,EAAE,CAAC,CAAC;IACtC,MAAM,EAAE,gBAAgB,CAAC,OAAO,EAAE,GAAG,EAAE;QACrC,YAAY,CAAC,KAAK,CAAC,CAAC;QACpB,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC;IACxB,CAAC,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,CAAC,CAAC;AACrB,CAAC,CAAC,CAAC;AAEL,SAAS,QAAQ,CAAC,IAA8B;IAC9C,MAAM,KAAK,GAAG,IAAI,YAAY,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,UAAU,CAAC,IAAI,CAAC,CAAC;IACvE,IAAI,MAAM,GAAG,EAAE,CAAC;IAChB,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,KAAK,CAAC,MAAM,EAAE,CAAC,IAAI,MAAM,EAAE,CAAC;QAC9C,MAAM,IAAI,MAAM,CAAC,YAAY,CAAC,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC,EAAE,CAAC,GAAG,MAAM,CAAC,CAAC,CAAC;IAClE,CAAC;IACD,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC;AACtB,CAAC;AAED,MAAM,OAAO,kBAAkB;IACZ,OAAO,CAAS;IAChB,OAAO,CAAgB;IACvB,WAAW,CAAe;IAC3C,iDAAiD;IAChC,cAAc,CAAkB;IAEjD,YAAY,OAAsB;QAChC,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC;QACvB,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,KAAK,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,EAAE,CAAC,UAAU,CAAC,KAAK,CAAC,GAAG,IAAI,CAAC,CAAC,CAAC;IAC/E,CAAC;IAED;;;OAGG;IACH,IAAI,CAAC,OAAuB;QAC1B,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACzD,MAAM,MAAM,GAAmB;YAC7B,GAAG,IAAI,CAAC,cAAc;YACtB,GAAG,OAAO;YACV,OAAO,EAAE,EAAE,GAAG,IAAI,CAAC,cAAc,EAAE,OAAO,EAAE,GAAG,OAAO,CAAC,OAAO,EAAE;SACjE,CAAC;QACF,MAAM,CAAC,cAAc,CAAC,MAAM,EAAE,gBAAgB,EAAE,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;QACnE,OAAO,MAAM,CAAC;IAChB,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,aAAa,CAAC,QAAgB;QAC1C,IAAI,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,QAAQ,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC;YACrF,OAAO,GAAG,CAAC,OAAO,CAAC;QACrB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,GAAG,YAAY,iBAAiB,IAAI,GAAG,CAAC,UAAU;gBAAE,OAAO,KAAK,CAAC;YACrE,MAAM,GAAG,CAAC;QACZ,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,OAAO,CAAI,QAAgB,EAAE,OAAoB,EAAE;QAC/D,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,OAAO,GAAG,QAAQ,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,QAAQ,EAAE,EAAE,CAAC;QACrF,MAAM,MAAM,GAAG,CAAC,IAAI,CAAC,MAAM,IAAI,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;QACpD,MAAM,UAAU,GAAG,OAAO,IAAI,CAAC,OAAO,CAAC,OAAO,KAAK,UAAU,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC;QACpH,MAAM,OAAO,GAAc;YACzB,GAAG,CAAC,IAAI,CAAC,IAAI,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,kBAAkB,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC1E,GAAG,UAAU;YACb,GAAG,IAAI,CAAC,cAAc,EAAE,OAAO;SAChC,CAAC;QACF,MAAM,SAAS,GAAG,IAAI,CAAC,cAAc,EAAE,SAAS,IAAI,IAAI,CAAC,OAAO,CAAC,SAAS,CAAC;QAC3E,MAAM,OAAO,GAAG,CAAC,IAAI,CAAC,cAAc,EAAE,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,MAAM,CAC1G,CAAC,CAAC,EAAoB,EAAE,CAAC,CAAC,CAAC,CAAC,CAC7B,CAAC;QACF,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC;QAC1E,MAAM,OAAO,GAAG,MAAM,KAAK,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,KAAK,EAAE,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACxE,MAAM,SAAS,GAAG,IAAI,CAAC,OAAO,CAAC,KAAK,EAAE,WAAW,IAAI,GAAG,CAAC;QAEzD,KAAK,IAAI,OAAO,GAAG,CAAC,GAAI,OAAO,EAAE,EAAE,CAAC;YAClC,IAAI,QAAkB,CAAC;YACvB,IAAI,CAAC;gBACH,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,GAAG,EAAE,EAAE,GAAG,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,CAAC,CAAC;YAC/E,CAAC;YAAC,OAAO,GAAG,EAAE,CAAC;gBACb,0DAA0D;gBAC1D,IAAI,OAAO,GAAG,OAAO,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,CAAC;oBAC1C,MAAM,KAAK,CAAC,SAAS,GAAG,CAAC,IAAI,OAAO,EAAE,MAAM,CAAC,CAAC;oBAC9C,SAAS;gBACX,CAAC;gBACD,MAAM,GAAG,CAAC;YACZ,CAAC;YAED,IAAI,QAAQ,CAAC,EAAE;gBAAE,OAAO,QAAQ,CAAC,IAAI,EAAgB,CAAC;YAEtD,IAAI,OAAO,GAAG,OAAO,IAAI,kBAAkB,CAAC,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC;gBACjE,MAAM,UAAU,GAAG,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,aAAa,CAAC,CAAC,CAAC;gBAC/D,MAAM,KAAK,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,IAAI,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,UAAU,GAAG,IAAI,CAAC,CAAC,CAAC,SAAS,GAAG,CAAC,IAAI,OAAO,EAAE,MAAM,CAAC,CAAC;gBAClH,SAAS;YACX,CAAC;YAED,IAAI,IAAyC,CAAC;YAC9C,IAAI,CAAC;gBACH,IAAI,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;YAC/B,CAAC;YAAC,MAAM,CAAC;gBACP,sBAAsB;YACxB,CAAC;YACD,MAAM,OAAO,GAAG,OAAO,IAAI,EAAE,KAAK,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,cAAc,QAAQ,CAAC,MAAM,KAAK,QAAQ,CAAC,UAAU,EAAE,CAAC;YACvH,MAAM,IAAI,iBAAiB,CAAC,OAAO,EAAE,QAAQ,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;QAC9D,CAAC;IACH,CAAC;IAGD,YAAY;IACZ,KAAK,CAAC,YAAY;QAChB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA4B,YAAY,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC/F,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,IAAwB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,YAAY,EAAE;YACnE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA2B;QAC1D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC7F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,aAAa,CAAC,cAAc,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACpE,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,WAAW,CAAC,CAAC;QACrE,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,IAAuB;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,iFAAiF;IACjF,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,gBAAgB,CAC3D,CAAC;QACF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,KAAK;YAAE,MAAM,CAAC,GAAG,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,CAAC,CAAC;QACtD,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,UAAU,KAAK,EAAE,CAC5D,CAAC;QACF,OAAO,GAAG,CAAC,MAAM,CAAC;IACpB,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAClE,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,QAAQ;YAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC/D,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QACzD,IAAI,OAAO,OAAO,CAAC,0BAA0B,KAAK,QAAQ,EAAE,CAAC;YAC3D,MAAM,CAAC,GAAG,CAAC,4BAA4B,EAAE,OAAO,CAAC,0BAA0B,CAAC,QAAQ,EAAE,CAAC,CAAC;QAC1F,CAAC;QAED,MAAM,IAAI,GAAG,SAAS;YACpB,CAAC,CAAC,aAAa,kBAAkB,CAAC,SAAS,CAAC,WAAW;YACvD,CAAC,CAAC,WAAW,CAAC;QAChB,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqC,GAAG,IAAI,GAAG,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,QAAQ;IACR,wGAAwG;IACxG,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC;IAC3F,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,QAAmB,EAAE;QACpC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC;YACjD,IAAI,KAAK,KAAK,SAAS,IAAI,GAAG,KAAK,YAAY;gBAAE,SAAS;YAC1D,IAAI,GAAG,KAAK,UAAU,IAAI,KAAK,KAAK,IAAI;gBAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,MAAM,CAAC,CAAC;;gBACpE,MAAM,CAAC,GAAG,CAAC,GAAG,EAAE,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAC/E,CAAC;QACD,MAAM,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyC,SAAS,EAAE,EAAE,CAAC,CAAC;QACtF,OAAO,EAAE,KAAK,EAAE,GAAG,CAAC,KAAK,EAAE,UAAU,EAAE,GAAG,CAAC,UAAU,EAAE,CAAC;IAC1D,CAAC;IAEO,KAAK,CAAC,YAAY,CAAI,SAAgD;QAC5E,MAAM,KAAK,GAAQ,EAAE,CAAC;QACtB,IAAI,MAA0B,CAAC;QAC/B,GAAG,CAAC;YACF,MAAM,IAAI,GAAG,MAAM,SAAS,CAAC,MAAM,CAAC,CAAC;YACrC,KAAK,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC;YAC1B,MAAM,GAAG,IAAI,CAAC,UAAU,CAAC;QAC3B,CAAC,QAAQ,MAAM,EAAE;QACjB,OAAO,KAAK,CAAC;IACf,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACnF,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,SAAS,CAC9C,CAAC;QACF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,UAAU,CAC/C,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,mBAAmB,CACxD,CAAC;QACF,OAAO,GAAG,CAAC,eAAe,CAAC;IAC7B,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAoB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAuB;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YACjF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,YAAoB,EACpB,IAQC;QAED,IAAI,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAC/B,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACpD,SAAS,GAAG,UAAU,CAAC,SAAS,CAAC;QACnC,CAAC;QACD,OAAO,IAAI,CAAC,UAAU,CAAC;YACrB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,QAAQ,EAAE,YAAY;YACtB,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,QAAQ;YACnC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,YAAY,EAAE,IAAI,CAAC,YAAY;SAChC,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,OAAO,CACX,MAAc,EACd,KAAa;QAEb,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACtE,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,IAAI,EAAE,CAAC,EAAE,IAAI,CAAC,CAAC;QAC5C,MAAM,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,OAAO,IAAI,CAAC;IACd,CAAC;IAED,KAAK,CAAC,UAAU,CACd,MAAc,EACd,aAAqB,EACrB,SAAmB;QAEnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;YAC3C,MAAM,IAAI,KAAK,CAAC,QAAQ,MAAM,0BAA0B,CAAC,CAAC;QAC5D,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAC1B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,aAAa,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,KAAK,aAAa,CAAC,WAAW,EAAE,CACvF,CAAC;QACF,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,mBAAmB,aAAa,uBAAuB,MAAM,GAAG,CAAC,CAAC;QACpF,CAAC;QACD,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;QACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACzE,OAAO,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;IACxD,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAAgC,WAAW,CAAC,CAAC,CAAC,QAAQ,CAAC;IACnF,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAA6B,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;IACzG,CAAC;IAED,oGAAoG;IACpG,KAAK,CAAC,aAAa,CAAC,IAAuB;QACzC,OAAO,IAAI,CAAC,OAAO,CAA6C,WAAW,EAAE;YAC3E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAChG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,0FAA0F;IAC1F,KAAK,CAAC,aAAa,CAAC,MAAc,EAAE,IAA0B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,EAAE;YAClH,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,UAA8C,EAAE;QAC3E,MAAM,KAAK,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,aAAa,OAAO,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACtE,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,EAAE,CAAC,GAAG,KAAK,EAAE,CAAC,CAAC;IACxE,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,MAAc,EAAE,YAAoB;QACzD,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,MAAM,CAAC,iBAAiB,kBAAkB,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrH,CAAC;IAED,KAAK,CAAC,mBAAmB,CAAC,MAAc;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC;QACpH,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,UAAU,kBAAkB,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC;QAC/G,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,mBAAmB,CAAC;IACjC,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,uBAAuB,IAAI,EAAE,CAAC;IAC3C,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ;QACZ,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,QAAQ,CAAC,CAAC;QAC5D,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACnF,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAoB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAuB;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YACjF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IAChE,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC1H,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;IAC/G,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyB;QAC7C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,aAAa,EAAE;YAC1E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA4B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YACpG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACrE,CAAC;IAED,eAAe;IACf,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,2BAA2B,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5H,OAAO,GAAG,CAAC,YAAY,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACxG,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,EAAU;QACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,iBAAiB,kBAAkB,CAAC,EAAE,CAAC,UAAU,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,IAA2B;QACjD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE;YAC5E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA8B;QAChE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YACtG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,OAAO,IAAI,CAAC,aAAa,CAAC,iBAAiB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACvE,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA8B,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QACtH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;IAC3G,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyB;QAC7C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,aAAa,EAAE;YACtE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA4B;QAC5D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAChG,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACrE,CAAC;IAED,kBAAkB;IAClB,wGAAwG;IACxG,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,IAAI,CAAC,eAAe,CAAC,EAAE,GAAG,MAAM,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC;IAChG,CAAC;IAED,mDAAmD;IACnD,KAAK,CAAC,eAAe,CAAC,QAAuB,EAAE;QAC7C,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,EAAE,CAAC;YACjD,IAAI,KAAK,KAAK,SAAS,IAAI,GAAG,KAAK,YAAY;gBAAE,MAAM,CAAC,GAAG,CAAC,GAAG,EAAE,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAClF,CAAC;QACD,MAAM,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkD,cAAc,EAAE,EAAE,CAAC,CAAC;QACpG,OAAO,EAAE,KAAK,EAAE,GAAG,CAAC,UAAU,EAAE,UAAU,EAAE,GAAG,CAAC,UAAU,EAAE,CAAC;IAC/D,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,oBAAoB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC1G,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAuB;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAA0B;QACxD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA6B;QACvE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA6B;QAC1E,MAAM,KAAK,GAAG,IAAI,eAAe,CAAC,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC7D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,cAAc,KAAK,EAAE,EAC/D,EAAE,MAAM,EAAE,QAAQ,EAAE,CACrB,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,cAAc;IACd,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAgC,eAAe,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrG,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,IAA0B;QAC/C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,EAAE;YACzE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED;;OAEG;IACH,KAAK,CAAC,oBAAoB,CACxB,IAAsF;QAEtF,MAAM,IAAI,GACR,OAAO,IAAI,CAAC,IAAI,KAAK,QAAQ;YAC3B,CAAC,CAAC,EAAE,GAAG,IAAI,EAAE,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE;YAC9B,CAAC,CAAC,EAAE,GAAG,IAAI,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,qBAAqB,EAAE;YAChF,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,OAAO,IAAI,CAAC,aAAa,CAAC,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACtE,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA8B;QAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuC,sBAAsB,EAAE;YAC3F,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,wBAAwB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,IAAiB;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,2BAA2B;IAC3B,KAAK,CAAC,YAAY,CAChB,MAAc,EACd,OAA6B;QAE7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqB,SAAS,EAAE;YAC5D,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM;gBACN,MAAM,EAAE,OAAO,EAAE,MAAM;gBACvB,SAAS,EAAE,OAAO,EAAE,SAAS;gBAC7B,OAAO,EAAE,OAAO,EAAE,OAAO;gBACzB,SAAS,EAAE,OAAO,EAAE,SAAS,IAAI,IAAI;aACtC,CAAC;SACH,CAAC,CAAC;QACH,OAAO,GAAG,CAAC;IACb,CAAC;CACF"}
@@ -0,0 +1,2 @@
1
+ export {};
2
+ //# sourceMappingURL=routes.test.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"routes.test.d.ts","sourceRoot":"","sources":["../src/routes.test.ts"],"names":[],"mappings":""}