gantt-lib 0.136.1 → 0.137.0
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/README.md +80 -0
- package/dist/core/scheduling/index.d.mts +1 -1
- package/dist/core/scheduling/index.d.ts +1 -1
- package/dist/{index-D99kbU4p.d.mts → index-DheG4h0O.d.mts} +60 -1
- package/dist/{index-D99kbU4p.d.ts → index-DheG4h0O.d.ts} +60 -1
- package/dist/index.css.map +1 -1
- package/dist/index.d.mts +239 -3
- package/dist/index.d.ts +239 -3
- package/dist/index.js +2043 -1059
- package/dist/index.js.map +1 -1
- package/dist/index.mjs +2031 -1059
- package/dist/index.mjs.map +1 -1
- package/dist/styles.css +164 -1
- package/package.json +1 -1
package/README.md
CHANGED
|
@@ -115,6 +115,83 @@ const tasks: Task[] = [
|
|
|
115
115
|
When using controlled `collapsedParentIds`, provide `onToggleCollapse` to update
|
|
116
116
|
the collapsed parent IDs in application state.
|
|
117
117
|
|
|
118
|
+
## Row Activities (Flow Line)
|
|
119
|
+
|
|
120
|
+
Give a row `activities` to turn it into a multi-bar lane — several works inside
|
|
121
|
+
one row, packed into sub-lanes (e.g. finishing works on one floor). Sequential
|
|
122
|
+
works share a lane; concurrent ones stack below and the row grows to fit the
|
|
123
|
+
busiest day. Activities are plain bars: drag to move, drag an edge to resize,
|
|
124
|
+
both snap to days. The hover tooltip is a narrow one-liner pinned above the bar:
|
|
125
|
+
the row (floor) name, a middle dot, then the work name — e.g. `Floor 12 ·
|
|
126
|
+
Wallpaper`; there is no native `title`. No hierarchy, dependencies, or
|
|
127
|
+
per-activity progress — works in the default gantt mode only.
|
|
128
|
+
|
|
129
|
+
Set `activityChain: true` to enable the ОН-conveyor (finish-to-start chain):
|
|
130
|
+
inside the row every work follows the previous one, and identical works (same
|
|
131
|
+
`id` or `name`) of consecutive chained rows are linked as well, so dragging one
|
|
132
|
+
work pulls the whole conveyor below — live, while the pointer moves, like every
|
|
133
|
+
other bar in the chart — the classic line-of-balance flow.
|
|
134
|
+
|
|
135
|
+
Consecutive works of a lane are linked: a plain gap is drawn as a horizontal
|
|
136
|
+
arrow with the lag («+N») at its head, while overlapping works (or works in
|
|
137
|
+
different lanes) get the standard orthogonal Gantt connector, routed down when
|
|
138
|
+
the successor drops to a lower lane. Turn links and lag labels off with
|
|
139
|
+
`showActivityLinks` and `showActivityLag`.
|
|
140
|
+
|
|
141
|
+
Click-activation is opt-in via `activityClickToDrag`: the first click arms a
|
|
142
|
+
work (a plain drag pans the canvas) and only the armed work is dragged.
|
|
143
|
+
`activityActivationMode` picks the activation visual — `'none'` (default),
|
|
144
|
+
`'dim'` (other work types fade) or `'highlight'` (the chain of the same work,
|
|
145
|
+
matched by `id` or `name` across rows, is outlined). Appearance is tuned with
|
|
146
|
+
`--gantt-activity-dim-opacity`, `--gantt-activity-active-outline`,
|
|
147
|
+
`--gantt-activity-chain-outline`, `--gantt-activity-tip-bg` and
|
|
148
|
+
`--gantt-activity-tip-color`.
|
|
149
|
+
|
|
150
|
+
The tooltip header (`row · work`) is fixed; extend it with declarative
|
|
151
|
+
`tooltipFields` on the activity (label–value rows, any React node as the value)
|
|
152
|
+
and/or the `activityTooltip(context)` render prop, whose context carries
|
|
153
|
+
`{ task, activity, startDate, endDate, durationDays }` — use it to show dates,
|
|
154
|
+
duration, crew, anything.
|
|
155
|
+
|
|
156
|
+
Two conveyor modes are available via `activityChain`. `true` — rigid: dragging a
|
|
157
|
+
work translates the whole downstream chain by the same delta. `'push'` —
|
|
158
|
+
выталкивание (ASAP): when a work moves earlier the downstream gaps fill in
|
|
159
|
+
immediately; when it moves later, successors stay put (the gap stretches) until
|
|
160
|
+
the predecessor's end crosses their start — then they get pushed. An activity's
|
|
161
|
+
`lag` (days) sets a constant gap before its start (e.g. technological curing):
|
|
162
|
+
both fill and push keep «predecessor end + lag» exactly. The lag belongs to the
|
|
163
|
+
same-floor sequence only — the vertical «same work on the floor above» link
|
|
164
|
+
carries no lag. Starts are clamped so
|
|
165
|
+
a dragged work cannot violate its own incoming links. Gaps wider than zero are
|
|
166
|
+
drawn as horizontal arrows between consecutive works of one lane.
|
|
167
|
+
|
|
168
|
+
In `'push'` mode the clamp is live and visible: the bar physically stops at the
|
|
169
|
+
binding predecessor instead of snapping back on drop, the blocking work gets a
|
|
170
|
+
red outline, and the dragged bar shows a stop edge with a «Блок: … · зазор N д»
|
|
171
|
+
line in the tooltip. The binding gap is labelled «+N» at the arrow head in the
|
|
172
|
+
dependency-line colour, matching the dependency lag labels.
|
|
173
|
+
|
|
174
|
+
```tsx
|
|
175
|
+
const tasks: Task[] = [
|
|
176
|
+
{
|
|
177
|
+
id: "floor-12",
|
|
178
|
+
name: "Floor 12",
|
|
179
|
+
startDate: "2026-03-24",
|
|
180
|
+
endDate: "2026-04-02",
|
|
181
|
+
activityChain: true,
|
|
182
|
+
activities: [
|
|
183
|
+
{ id: "screed", name: "Screed", startDate: "2026-03-24", endDate: "2026-03-26", color: "#8b5cf6" },
|
|
184
|
+
{ id: "wallpaper", name: "Wallpaper", startDate: "2026-03-27", endDate: "2026-03-30", color: "#f59e0b" },
|
|
185
|
+
{
|
|
186
|
+
id: "doors", name: "Doors", startDate: "2026-03-31", endDate: "2026-04-01", color: "#10b981",
|
|
187
|
+
lag: 1, // constant gap (days) before this work starts — same-row chain only
|
|
188
|
+
tooltipFields: [{ label: "Contractor", value: "SK Stroy" }],
|
|
189
|
+
},
|
|
190
|
+
],
|
|
191
|
+
},
|
|
192
|
+
];
|
|
193
|
+
```
|
|
194
|
+
|
|
118
195
|
## Resource Planner Mode
|
|
119
196
|
|
|
120
197
|
Use `mode="resource-planner"` when the primary rows are people, equipment, rooms, or other resources instead of tasks. Omitted `mode` still renders the default task Gantt chart.
|
|
@@ -218,6 +295,9 @@ interface Task {
|
|
|
218
295
|
locked?: boolean;
|
|
219
296
|
divider?: 'top' | 'bottom';
|
|
220
297
|
parentId?: string;
|
|
298
|
+
activities?: TaskActivity[]; // multi-bar lane mode for the row
|
|
299
|
+
activityChain?: boolean | 'push'; // ОН-conveyor: chained dragging; 'push' = ASAP с выталкиванием
|
|
300
|
+
// Gantt props: activityClickToDrag, activityActivationMode, showActivityLinks, showActivityLag, activityTooltip
|
|
221
301
|
}
|
|
222
302
|
```
|
|
223
303
|
|
|
@@ -1,2 +1,2 @@
|
|
|
1
|
-
export {
|
|
1
|
+
export { al as CascadeContext, C as CriticalPathOptions, D as DAY_MS, g as DependencyError, L as LinkType, o as ScaleTaskSubtreeAnchor, p as ScaleTaskSubtreeErrorCode, q as ScaleTaskSubtreeExternalPolicy, r as ScaleTaskSubtreeOptions, S as ScaleTaskSubtreeResult, s as ScaleTaskSubtreeWarning, am as ScheduleCommandOptions, an as ScheduleCommandResult, ao as ScheduleDependency, ap as ScheduleTask, aq as ScheduleTaskUpdate, T as Task, ar as TaskDependency, V as ValidationResult, as as addBusinessDays, v as alignToWorkingDay, w as areTasksHierarchicallyRelated, x as buildAdjacencyList, y as buildTaskRangeFromEnd, z as buildTaskRangeFromStart, E as calculateSuccessorDate, F as cascadeByLinks, at as cascadeTaskProgress, H as clampTaskRangeForIncomingFS, I as computeCriticalPath, J as computeLagFromDates, K as computeParentDates, N as computeParentProgress, au as createCascadeContext, O as detectCycles, P as extendCriticalIdsToParents, Q as findParentId, U as getAllDependencyEdges, X as getAllDescendants, Y as getBusinessDayOffset, av as getBusinessDaysCount, Z as getChildren, _ as getDependencyLag, $ as getSuccessorChain, a0 as getTaskDuration, a1 as getTransitiveCascadeChain, a2 as isAncestorTask, a3 as isTaskParent, a4 as moveTaskRange, a5 as moveTaskWithCascade, a6 as normalizeDependencyLag, a7 as normalizePredecessorDates, a8 as normalizeTaskDependencyLags, a9 as normalizeUTCDate, aa as parseDateOnly, ab as recalculateIncomingLags, ac as recalculateProjectSchedule, ad as recalculateTaskFromDependencies, ae as reflowTasksOnModeSwitch, af as removeDependenciesBetweenTasks, ag as resizeTaskWithCascade, ah as scaleTaskSubtreeDuration, ai as shiftBusinessDayOffset, aw as subtractBusinessDays, aj as universalCascade, ak as validateDependencies } from '../../index-DheG4h0O.mjs';
|
|
2
2
|
import 'react';
|
|
@@ -1,2 +1,2 @@
|
|
|
1
|
-
export {
|
|
1
|
+
export { al as CascadeContext, C as CriticalPathOptions, D as DAY_MS, g as DependencyError, L as LinkType, o as ScaleTaskSubtreeAnchor, p as ScaleTaskSubtreeErrorCode, q as ScaleTaskSubtreeExternalPolicy, r as ScaleTaskSubtreeOptions, S as ScaleTaskSubtreeResult, s as ScaleTaskSubtreeWarning, am as ScheduleCommandOptions, an as ScheduleCommandResult, ao as ScheduleDependency, ap as ScheduleTask, aq as ScheduleTaskUpdate, T as Task, ar as TaskDependency, V as ValidationResult, as as addBusinessDays, v as alignToWorkingDay, w as areTasksHierarchicallyRelated, x as buildAdjacencyList, y as buildTaskRangeFromEnd, z as buildTaskRangeFromStart, E as calculateSuccessorDate, F as cascadeByLinks, at as cascadeTaskProgress, H as clampTaskRangeForIncomingFS, I as computeCriticalPath, J as computeLagFromDates, K as computeParentDates, N as computeParentProgress, au as createCascadeContext, O as detectCycles, P as extendCriticalIdsToParents, Q as findParentId, U as getAllDependencyEdges, X as getAllDescendants, Y as getBusinessDayOffset, av as getBusinessDaysCount, Z as getChildren, _ as getDependencyLag, $ as getSuccessorChain, a0 as getTaskDuration, a1 as getTransitiveCascadeChain, a2 as isAncestorTask, a3 as isTaskParent, a4 as moveTaskRange, a5 as moveTaskWithCascade, a6 as normalizeDependencyLag, a7 as normalizePredecessorDates, a8 as normalizeTaskDependencyLags, a9 as normalizeUTCDate, aa as parseDateOnly, ab as recalculateIncomingLags, ac as recalculateProjectSchedule, ad as recalculateTaskFromDependencies, ae as reflowTasksOnModeSwitch, af as removeDependenciesBetweenTasks, ag as resizeTaskWithCascade, ah as scaleTaskSubtreeDuration, ai as shiftBusinessDayOffset, aw as subtractBusinessDays, aj as universalCascade, ak as validateDependencies } from '../../index-DheG4h0O.js';
|
|
2
2
|
import 'react';
|
|
@@ -159,6 +159,50 @@ interface ValidationResult {
|
|
|
159
159
|
/** Array of errors/warnings (empty if valid) */
|
|
160
160
|
errors: DependencyError[];
|
|
161
161
|
}
|
|
162
|
+
/**
|
|
163
|
+
* A single work bar rendered inside a multi-activity task row.
|
|
164
|
+
* Activities are visual bars packed into sub-lanes of one row — no hierarchy,
|
|
165
|
+
* no dependencies, no progress of their own.
|
|
166
|
+
*/
|
|
167
|
+
interface TaskActivityTooltipField {
|
|
168
|
+
/** Field caption, e.g. "Подрядчик" */
|
|
169
|
+
label: string;
|
|
170
|
+
/** Field value — any renderable content (string, badge, icon, JSX) */
|
|
171
|
+
value: ReactNode;
|
|
172
|
+
}
|
|
173
|
+
interface TaskActivity {
|
|
174
|
+
/** Unique identifier within the host task */
|
|
175
|
+
id: string;
|
|
176
|
+
/** Display name rendered inside the activity bar */
|
|
177
|
+
name: string;
|
|
178
|
+
/** Activity start date (ISO string or Date object) */
|
|
179
|
+
startDate: string | Date;
|
|
180
|
+
/** Activity end date (ISO string or Date object) */
|
|
181
|
+
endDate: string | Date;
|
|
182
|
+
/** Optional color; falls back to the default task bar color */
|
|
183
|
+
color?: string;
|
|
184
|
+
/**
|
|
185
|
+
* Обязательный зазор в днях между концом предыдущей работы этой же строки
|
|
186
|
+
* (этажа) и началом этой (например технологическая выдержка). Задан — зазор
|
|
187
|
+
* постоянный; не задан — последователь подтягивается вплотную («как можно
|
|
188
|
+
* раньше»), а зазор тянется, пока его держит другая связь. На вертикальную
|
|
189
|
+
* связь «та же работа этажом выше» лаг не переносится.
|
|
190
|
+
*/
|
|
191
|
+
lag?: number;
|
|
192
|
+
/** Extra rows rendered in the hover tooltip under the header (e.g. contractor). */
|
|
193
|
+
tooltipFields?: TaskActivityTooltipField[];
|
|
194
|
+
}
|
|
195
|
+
/**
|
|
196
|
+
* Context handed to the `activityTooltip` render prop: everything needed to
|
|
197
|
+
* compose a custom activity tooltip (dates, duration, host task, work).
|
|
198
|
+
*/
|
|
199
|
+
interface ActivityTooltipContext {
|
|
200
|
+
task: Task;
|
|
201
|
+
activity: TaskActivity;
|
|
202
|
+
startDate: Date;
|
|
203
|
+
endDate: Date;
|
|
204
|
+
durationDays: number;
|
|
205
|
+
}
|
|
162
206
|
/**
|
|
163
207
|
* Task data structure for Gantt chart
|
|
164
208
|
*/
|
|
@@ -221,6 +265,21 @@ interface Task {
|
|
|
221
265
|
planByDate?: Record<string, number>;
|
|
222
266
|
/** Optional actual quantities keyed by ISO date (YYYY-MM-DD), used by plan-fact mode. */
|
|
223
267
|
factByDate?: Record<string, number>;
|
|
268
|
+
/**
|
|
269
|
+
* Optional list of works rendered as bars packed into sub-lanes of this row
|
|
270
|
+
* (e.g. finishing works on one floor). Replaces the main bar for the row and
|
|
271
|
+
* grows the row height to fit concurrent activities. Works in gantt mode only.
|
|
272
|
+
*/
|
|
273
|
+
activities?: TaskActivity[];
|
|
274
|
+
/**
|
|
275
|
+
* ОН-конвейер (finish-to-start chain) for row activities. Inside the row every
|
|
276
|
+
* work follows the previous one; identical works of consecutive chained rows
|
|
277
|
+
* (floors) are linked too. `true` — жёсткий конвейер: перетаскивание сдвигает
|
|
278
|
+
* всю цепочку ниже на ту же дельту. `'push'` — режим «выталкивания» (ASAP):
|
|
279
|
+
* промежутки заполняются при движении вверх по потоку, вниз последователь
|
|
280
|
+
* сдвигается только после коллизии; лаг работы держит зазор постоянным.
|
|
281
|
+
*/
|
|
282
|
+
activityChain?: boolean | 'push';
|
|
224
283
|
}
|
|
225
284
|
/**
|
|
226
285
|
* Date range for Gantt chart display
|
|
@@ -772,4 +831,4 @@ type ScaleTaskSubtreeResult = {
|
|
|
772
831
|
*/
|
|
773
832
|
declare function scaleTaskSubtreeDuration(parentId: string, targetDuration: number, snapshot: Task[], options?: ScaleTaskSubtreeOptions): ScaleTaskSubtreeResult;
|
|
774
833
|
|
|
775
|
-
export {
|
|
834
|
+
export { getSuccessorChain as $, type ActivityTooltipContext as A, type BuiltInResourceTableColumnId as B, type CriticalPathOptions as C, DAY_MS as D, calculateSuccessorDate as E, cascadeByLinks as F, type GanttScheduleIntent as G, clampTaskRangeForIncomingFS as H, computeCriticalPath as I, computeLagFromDates as J, computeParentDates as K, type LinkType as L, type MonthSpan as M, computeParentProgress as N, detectCycles as O, extendCriticalIdsToParents as P, findParentId as Q, type ResourceTimelineItem as R, type ScaleTaskSubtreeResult as S, type Task as T, getAllDependencyEdges as U, type ValidationResult as V, type WeekendBlock as W, getAllDescendants as X, getBusinessDayOffset as Y, getChildren as Z, getDependencyLag as _, type GanttDateRange as a, getTaskDuration as a0, getTransitiveCascadeChain as a1, isAncestorTask as a2, isTaskParent as a3, moveTaskRange as a4, moveTaskWithCascade as a5, normalizeDependencyLag as a6, normalizePredecessorDates as a7, normalizeTaskDependencyLags as a8, normalizeUTCDate as a9, parseDateOnly as aa, recalculateIncomingLags as ab, recalculateProjectSchedule as ac, recalculateTaskFromDependencies as ad, reflowTasksOnModeSwitch as ae, removeDependenciesBetweenTasks as af, resizeTaskWithCascade as ag, scaleTaskSubtreeDuration as ah, shiftBusinessDayOffset as ai, universalCascade as aj, validateDependencies as ak, type CascadeContext as al, type ScheduleCommandOptions as am, type ScheduleCommandResult as an, type ScheduleDependency as ao, type ScheduleTask as ap, type ScheduleTaskUpdate as aq, type TaskDependency as ar, addBusinessDays as as, cascadeTaskProgress as at, createCascadeContext as au, getBusinessDaysCount as av, subtractBusinessDays as aw, type TimelineMarker as b, type TaskDateChangeMode as c, type ResourcePlannerChartProps as d, type TaskActivity as e, type ResourceTimelineResource as f, type DependencyError as g, type GanttChartMode as h, type GridConfig as i, type GridLine as j, type ResourceTableColumnId as k, type ResourceTableColumnWidthMap as l, type ResourceTimelineMove as m, type ResourceTimelineResourceMenuCommand as n, type ScaleTaskSubtreeAnchor as o, type ScaleTaskSubtreeErrorCode as p, type ScaleTaskSubtreeExternalPolicy as q, type ScaleTaskSubtreeOptions as r, type ScaleTaskSubtreeWarning as s, type TaskActivityTooltipField as t, type TaskBarGeometry as u, alignToWorkingDay as v, areTasksHierarchicallyRelated as w, buildAdjacencyList as x, buildTaskRangeFromEnd as y, buildTaskRangeFromStart as z };
|
|
@@ -159,6 +159,50 @@ interface ValidationResult {
|
|
|
159
159
|
/** Array of errors/warnings (empty if valid) */
|
|
160
160
|
errors: DependencyError[];
|
|
161
161
|
}
|
|
162
|
+
/**
|
|
163
|
+
* A single work bar rendered inside a multi-activity task row.
|
|
164
|
+
* Activities are visual bars packed into sub-lanes of one row — no hierarchy,
|
|
165
|
+
* no dependencies, no progress of their own.
|
|
166
|
+
*/
|
|
167
|
+
interface TaskActivityTooltipField {
|
|
168
|
+
/** Field caption, e.g. "Подрядчик" */
|
|
169
|
+
label: string;
|
|
170
|
+
/** Field value — any renderable content (string, badge, icon, JSX) */
|
|
171
|
+
value: ReactNode;
|
|
172
|
+
}
|
|
173
|
+
interface TaskActivity {
|
|
174
|
+
/** Unique identifier within the host task */
|
|
175
|
+
id: string;
|
|
176
|
+
/** Display name rendered inside the activity bar */
|
|
177
|
+
name: string;
|
|
178
|
+
/** Activity start date (ISO string or Date object) */
|
|
179
|
+
startDate: string | Date;
|
|
180
|
+
/** Activity end date (ISO string or Date object) */
|
|
181
|
+
endDate: string | Date;
|
|
182
|
+
/** Optional color; falls back to the default task bar color */
|
|
183
|
+
color?: string;
|
|
184
|
+
/**
|
|
185
|
+
* Обязательный зазор в днях между концом предыдущей работы этой же строки
|
|
186
|
+
* (этажа) и началом этой (например технологическая выдержка). Задан — зазор
|
|
187
|
+
* постоянный; не задан — последователь подтягивается вплотную («как можно
|
|
188
|
+
* раньше»), а зазор тянется, пока его держит другая связь. На вертикальную
|
|
189
|
+
* связь «та же работа этажом выше» лаг не переносится.
|
|
190
|
+
*/
|
|
191
|
+
lag?: number;
|
|
192
|
+
/** Extra rows rendered in the hover tooltip under the header (e.g. contractor). */
|
|
193
|
+
tooltipFields?: TaskActivityTooltipField[];
|
|
194
|
+
}
|
|
195
|
+
/**
|
|
196
|
+
* Context handed to the `activityTooltip` render prop: everything needed to
|
|
197
|
+
* compose a custom activity tooltip (dates, duration, host task, work).
|
|
198
|
+
*/
|
|
199
|
+
interface ActivityTooltipContext {
|
|
200
|
+
task: Task;
|
|
201
|
+
activity: TaskActivity;
|
|
202
|
+
startDate: Date;
|
|
203
|
+
endDate: Date;
|
|
204
|
+
durationDays: number;
|
|
205
|
+
}
|
|
162
206
|
/**
|
|
163
207
|
* Task data structure for Gantt chart
|
|
164
208
|
*/
|
|
@@ -221,6 +265,21 @@ interface Task {
|
|
|
221
265
|
planByDate?: Record<string, number>;
|
|
222
266
|
/** Optional actual quantities keyed by ISO date (YYYY-MM-DD), used by plan-fact mode. */
|
|
223
267
|
factByDate?: Record<string, number>;
|
|
268
|
+
/**
|
|
269
|
+
* Optional list of works rendered as bars packed into sub-lanes of this row
|
|
270
|
+
* (e.g. finishing works on one floor). Replaces the main bar for the row and
|
|
271
|
+
* grows the row height to fit concurrent activities. Works in gantt mode only.
|
|
272
|
+
*/
|
|
273
|
+
activities?: TaskActivity[];
|
|
274
|
+
/**
|
|
275
|
+
* ОН-конвейер (finish-to-start chain) for row activities. Inside the row every
|
|
276
|
+
* work follows the previous one; identical works of consecutive chained rows
|
|
277
|
+
* (floors) are linked too. `true` — жёсткий конвейер: перетаскивание сдвигает
|
|
278
|
+
* всю цепочку ниже на ту же дельту. `'push'` — режим «выталкивания» (ASAP):
|
|
279
|
+
* промежутки заполняются при движении вверх по потоку, вниз последователь
|
|
280
|
+
* сдвигается только после коллизии; лаг работы держит зазор постоянным.
|
|
281
|
+
*/
|
|
282
|
+
activityChain?: boolean | 'push';
|
|
224
283
|
}
|
|
225
284
|
/**
|
|
226
285
|
* Date range for Gantt chart display
|
|
@@ -772,4 +831,4 @@ type ScaleTaskSubtreeResult = {
|
|
|
772
831
|
*/
|
|
773
832
|
declare function scaleTaskSubtreeDuration(parentId: string, targetDuration: number, snapshot: Task[], options?: ScaleTaskSubtreeOptions): ScaleTaskSubtreeResult;
|
|
774
833
|
|
|
775
|
-
export {
|
|
834
|
+
export { getSuccessorChain as $, type ActivityTooltipContext as A, type BuiltInResourceTableColumnId as B, type CriticalPathOptions as C, DAY_MS as D, calculateSuccessorDate as E, cascadeByLinks as F, type GanttScheduleIntent as G, clampTaskRangeForIncomingFS as H, computeCriticalPath as I, computeLagFromDates as J, computeParentDates as K, type LinkType as L, type MonthSpan as M, computeParentProgress as N, detectCycles as O, extendCriticalIdsToParents as P, findParentId as Q, type ResourceTimelineItem as R, type ScaleTaskSubtreeResult as S, type Task as T, getAllDependencyEdges as U, type ValidationResult as V, type WeekendBlock as W, getAllDescendants as X, getBusinessDayOffset as Y, getChildren as Z, getDependencyLag as _, type GanttDateRange as a, getTaskDuration as a0, getTransitiveCascadeChain as a1, isAncestorTask as a2, isTaskParent as a3, moveTaskRange as a4, moveTaskWithCascade as a5, normalizeDependencyLag as a6, normalizePredecessorDates as a7, normalizeTaskDependencyLags as a8, normalizeUTCDate as a9, parseDateOnly as aa, recalculateIncomingLags as ab, recalculateProjectSchedule as ac, recalculateTaskFromDependencies as ad, reflowTasksOnModeSwitch as ae, removeDependenciesBetweenTasks as af, resizeTaskWithCascade as ag, scaleTaskSubtreeDuration as ah, shiftBusinessDayOffset as ai, universalCascade as aj, validateDependencies as ak, type CascadeContext as al, type ScheduleCommandOptions as am, type ScheduleCommandResult as an, type ScheduleDependency as ao, type ScheduleTask as ap, type ScheduleTaskUpdate as aq, type TaskDependency as ar, addBusinessDays as as, cascadeTaskProgress as at, createCascadeContext as au, getBusinessDaysCount as av, subtractBusinessDays as aw, type TimelineMarker as b, type TaskDateChangeMode as c, type ResourcePlannerChartProps as d, type TaskActivity as e, type ResourceTimelineResource as f, type DependencyError as g, type GanttChartMode as h, type GridConfig as i, type GridLine as j, type ResourceTableColumnId as k, type ResourceTableColumnWidthMap as l, type ResourceTimelineMove as m, type ResourceTimelineResourceMenuCommand as n, type ScaleTaskSubtreeAnchor as o, type ScaleTaskSubtreeErrorCode as p, type ScaleTaskSubtreeExternalPolicy as q, type ScaleTaskSubtreeOptions as r, type ScaleTaskSubtreeWarning as s, type TaskActivityTooltipField as t, type TaskBarGeometry as u, alignToWorkingDay as v, areTasksHierarchicallyRelated as w, buildAdjacencyList as x, buildTaskRangeFromEnd as y, buildTaskRangeFromStart as z };
|