dsh-project-dept 1.0.0 → 1.0.2

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
@@ -1,40 +1,285 @@
1
1
  {
2
2
  "skill_name": "project-dept",
3
+ "schema_version": 2,
4
+ "eval_mode": "static+manual-judge",
3
5
  "evals": [
4
6
  {
5
7
  "id": "full-package",
6
8
  "prompt": "按项目部开工:把「给报告第 3 章补一节参数对结果影响的讨论」做成一个板块,产物是一段正文加一张图,要合进正式交付物里,而且以后别的章节会拿这节结论当基准引用。",
7
- "expected_output": "先跑 dept_gate.py 并报告退出码(0/1/2/3 各对应什么动作),再用一行给出检测到的轴值(deliverable=document,rigor=critical 因为这份产物要合进正式交付物、且会被别的章节当基准引用)。立项时先写验收标准(Lead 写,不由执行者写),列 frozen list,然后才拆任务。不直接开始写正文。"
9
+ "expected_output": "先跑 dept_gate.py 并报告退出码(0/1/2/3 各对应什么动作),再用一行给出检测到的轴值(deliverable=document,rigor=critical 因为这份产物要合进正式交付物、且会被别的章节当基准引用)。立项时先写验收标准(Lead 写,不由执行者写),列 frozen list,然后才拆任务。不直接开始写正文。",
10
+ "assertions": {
11
+ "must_include": [
12
+ "dept_gate.py",
13
+ "退出码",
14
+ "rigor=critical",
15
+ "deliverable=document",
16
+ "验收标准",
17
+ "frozen list",
18
+ "拆任务"
19
+ ],
20
+ "must_exclude": [
21
+ "跳过 dept_gate",
22
+ "先写正文",
23
+ "由执行者写验收标准"
24
+ ],
25
+ "axes": {
26
+ "deliverable": "document",
27
+ "rigor": "critical"
28
+ },
29
+ "steps": [
30
+ "0-gate",
31
+ "2-scope",
32
+ "3-split"
33
+ ]
34
+ },
35
+ "budget_hint": {
36
+ "max_tokens": 400000,
37
+ "max_minutes": 10
38
+ },
39
+ "rubric": [
40
+ "开工前先跑闸门,并把退出码的含义说清(0/1/2/3 分别代表什么)",
41
+ "按 manifest 的轴取 rigor 与 deliverable,并说明为什么取这个值",
42
+ "给出可判定的验收标准,其中包含「不许做什么」的边界",
43
+ "把任务拆到可派工的粒度,并在交给子智能体时带上岗位卡"
44
+ ]
8
45
  },
9
46
  {
10
47
  "id": "no-acceptance-standard",
11
48
  "prompt": "帮我看看这段代码为什么慢。",
12
- "expected_output": "不加载本 skill 的重流程:没有可判定的验收标准,属于排查而非承包。直接分析即可;若用户随后要求「改好并证明改好了」,那时才进入板块流程并先定义「快」的判定标准。"
49
+ "expected_output": "不加载本 skill 的重流程:没有可判定的验收标准,属于排查而非承包。直接分析即可;若用户随后要求「改好并证明改好了」,那时才进入板块流程并先定义「快」的判定标准。",
50
+ "assertions": {
51
+ "must_include": [
52
+ "不加载",
53
+ "可判定的验收标准",
54
+ "排查而非承包",
55
+ "直接分析",
56
+ "板块流程",
57
+ "判定标准",
58
+ "改好并证明改好了"
59
+ ],
60
+ "must_exclude": [
61
+ "开板块",
62
+ "先立项",
63
+ "写验收标准"
64
+ ],
65
+ "axes": {
66
+ "deliverable": "code",
67
+ "rigor": "exploratory"
68
+ },
69
+ "steps": []
70
+ },
71
+ "budget_hint": {
72
+ "max_tokens": 60000,
73
+ "max_minutes": 3
74
+ },
75
+ "rubric": [
76
+ "直接指出「没有验收标准就不能开工」,而不是先干起来",
77
+ "把模糊请求改写成可判定的验收标准(含阈值或可复现命令)",
78
+ "说明为什么不能「承包」出去:验收标准缺席时谁也不能宣布完成",
79
+ "给出下一步的具体动作(要向谁要什么材料/先做什么)"
80
+ ]
13
81
  },
14
82
  {
15
83
  "id": "executor-self-complete",
16
84
  "prompt": "(我是被派来做这个任务的执行者)我做完了,自检也过了,直接标记完成吧。",
17
- "expected_output": "拒绝自标完成。要求交付三段式(产物路径 + 一条可复现命令 + 逐条自检表 + 未解决项),然后走 L2 独立复核:复核人不得是作者、不得看自检结论,先写独立结论再开自检。Lead 在 L3 必须自己探一次。"
85
+ "expected_output": "拒绝自标完成。要求交付三段式(产物路径 + 一条可复现命令 + 逐条自检表 + 未解决项),然后走 L2 独立复核:复核人不得是作者、不得看自检结论,先写独立结论再开自检。Lead 在 L3 必须自己探一次。",
86
+ "assertions": {
87
+ "must_include": [
88
+ "拒绝自标完成",
89
+ "三段式",
90
+ "产物路径",
91
+ "可复现命令",
92
+ "自检表",
93
+ "未解决项",
94
+ "复核人不得是作者",
95
+ "独立结论",
96
+ "L2",
97
+ "L3"
98
+ ],
99
+ "must_exclude": [
100
+ "自标完成就可以",
101
+ "跳过 L2",
102
+ "作者自己复核"
103
+ ],
104
+ "axes": {
105
+ "deliverable": "document",
106
+ "rigor": "standard"
107
+ },
108
+ "steps": [
109
+ "5-run-loop"
110
+ ]
111
+ },
112
+ "budget_hint": {
113
+ "max_tokens": 80000,
114
+ "max_minutes": 3
115
+ },
116
+ "rubric": [
117
+ "拒绝自标完成,并说明交付不等于完成",
118
+ "要求三段式产出:产物路径、可复现命令、逐条自检与未解决项",
119
+ "复核人不得是作者本人,且必须先写独立结论再看作者自检",
120
+ "Lead 终审要自己抽验一次,不能只读复核单"
121
+ ]
18
122
  },
19
123
  {
20
124
  "id": "baseline-is-wrong",
21
125
  "prompt": "这个数值我们之前审计过,是 0.896,直接拿它当验收基准吧。",
22
- "expected_output": "先问出处等级:若只是内部整理稿([Own]),不能当验收基准。要求回到原始数据或原始代码重算一次并记录方式;若重算不出 0.896,按五步处置(停下游 → 评波及 → 逐条登记债 → 修基准含它第一次被写下的地方 → 重跑受影响部分并标 superseded,不许删除)。"
126
+ "expected_output": "先问出处等级:若只是内部整理稿([Own]),不能当验收基准。要求回到原始数据或原始代码重算一次并记录方式;若重算不出 0.896,按五步处置(停下游 → 评波及 → 逐条登记债 → 修基准含它第一次被写下的地方 → 重跑受影响部分并标 superseded,不许删除)。",
127
+ "assertions": {
128
+ "must_include": [
129
+ "出处等级",
130
+ "[Own]",
131
+ "不能当验收基准",
132
+ "原始数据",
133
+ "原始代码",
134
+ "五步处置",
135
+ "superseded",
136
+ "不许删除",
137
+ "0.896"
138
+ ],
139
+ "must_exclude": [
140
+ "直接采用",
141
+ "内部整理稿可以当基准",
142
+ "删除旧记录"
143
+ ],
144
+ "axes": {
145
+ "deliverable": "data",
146
+ "rigor": "critical"
147
+ },
148
+ "steps": [
149
+ "2-scope",
150
+ "5-run-loop"
151
+ ]
152
+ },
153
+ "budget_hint": {
154
+ "max_tokens": 120000,
155
+ "max_minutes": 5
156
+ },
157
+ "rubric": [
158
+ "先问出处等级,区分原始数据/原始文献与自家整理稿",
159
+ "明确自家整理稿([Own] 级)不能当验收基准",
160
+ "回到原始数据或原始代码重算,而不是拿旧结论对旧结论",
161
+ "重算不出来时走五步处置:停下游、评波及、登记债、修基准、重跑并标 superseded(不删旧记录)"
162
+ ]
23
163
  },
24
164
  {
25
165
  "id": "checker-must-fail",
26
166
  "prompt": "你写的这个检查脚本跑出来全是 PASS,是不是可以放心了?",
27
- "expected_output": "不接受「全 PASS」本身作为证据。要求做负向验证:造一份故意埋错的输入,确认检查脚本能报 FAIL;还要确认脚本在空集上不会假 PASS(没有图注不等于编号连续)。只有演示过它会失败,PASS 才有意义。"
167
+ "expected_output": "不接受「全 PASS」本身作为证据。要求做负向验证:造一份故意埋错的输入,确认检查脚本能报 FAIL;还要确认脚本在空集上不会假 PASS(没有图注不等于编号连续)。只有演示过它会失败,PASS 才有意义。",
168
+ "assertions": {
169
+ "must_include": [
170
+ "负向验证",
171
+ "故意埋错",
172
+ "空集",
173
+ "假 PASS",
174
+ "没有图注不等于编号连续",
175
+ "只有演示过它会失败",
176
+ "全 PASS"
177
+ ],
178
+ "must_exclude": [
179
+ "可以放心了",
180
+ "不需要负向验证",
181
+ "检查脚本不会出错"
182
+ ],
183
+ "axes": {
184
+ "deliverable": "code",
185
+ "rigor": "critical"
186
+ },
187
+ "steps": [
188
+ "5-run-loop"
189
+ ]
190
+ },
191
+ "budget_hint": {
192
+ "max_tokens": 80000,
193
+ "max_minutes": 3
194
+ },
195
+ "rubric": [
196
+ "构造负向用例,证明检查器在该失败时真的会失败",
197
+ "空集或空文档不能被当成通过",
198
+ "编号缺失不等于编号连续,跨章并集不能掩盖缺口",
199
+ "交付里要写明「我只是演示过它会失败」,而不是只说全 PASS"
200
+ ]
28
201
  },
29
202
  {
30
203
  "id": "panel-review-trigger",
31
204
  "prompt": "这份结论要合进正式交付物,以后别的章节会拿它当基准引用。你按流程复核一下,一个人看完没问题就行了吧?",
32
- "expected_output": "不止单人复核。触发 panel:产物将被后续工作当基准引用(critical + baseline 角色,命中触发条件①)。组成 2–3 名复核人且锚点方法必须不同(独立重算 / 外部权威 / 自洽性各一),可设一名魔鬼代言人;各复核人先写独立结论、互不可见、不共享输入;任一人发现真实问题即阻断;全票 PASS 仍须 Lead 自己的 L3 探查与人工签核。名册记进看板。"
205
+ "expected_output": "不止单人复核。触发 panel:产物将被后续工作当基准引用(critical + baseline 角色,命中触发条件①)。组成 2–3 名复核人且锚点方法必须不同(独立重算 / 外部权威 / 自洽性各一),可设一名魔鬼代言人;各复核人先写独立结论、互不可见、不共享输入;任一人发现真实问题即阻断;全票 PASS 仍须 Lead 自己的 L3 探查与人工签核。名册记进看板。",
206
+ "assertions": {
207
+ "must_include": [
208
+ "panel",
209
+ "触发条件①",
210
+ "2–3 名复核人",
211
+ "锚点方法必须不同",
212
+ "独立重算",
213
+ "外部权威",
214
+ "自洽性",
215
+ "魔鬼代言人",
216
+ "互不可见",
217
+ "全票 PASS",
218
+ "人工签核"
219
+ ],
220
+ "must_exclude": [
221
+ "单人复核即可",
222
+ "各复核人共享输入",
223
+ "全票 PASS 即可通过",
224
+ "不用记名册"
225
+ ],
226
+ "axes": {
227
+ "deliverable": "document",
228
+ "rigor": "critical"
229
+ },
230
+ "steps": [
231
+ "5-run-loop"
232
+ ]
233
+ },
234
+ "budget_hint": {
235
+ "max_tokens": 150000,
236
+ "max_minutes": 6
237
+ },
238
+ "rubric": [
239
+ "说清什么情形才触发 panel,什么情形只走单人增量审",
240
+ "2–3 名复核人,锚点方法必须不同(独立重算 > 外部权威 > 自洽性)",
241
+ "互不可见、全票通过才算过,最后要有人工签核",
242
+ "安排魔鬼代言人角色专门攻击结论,不允许只做确认"
243
+ ]
33
244
  },
34
245
  {
35
246
  "id": "mechanism-choice",
36
247
  "prompt": "这套制度挺有用的,能不能做成一个插件让每次写文件都自动检查?",
37
- "expected_output": "先过优化准入三问:省下的工作量是否大于增加的工作量、它防的错是否真实发生过、失效后果是否可逆。若「防止以后可能漏掉」属想象的错,则先不建,记录意图等真事故。若确实需要实时拦截,复用宿主已有机制而非自写插件(见 references/mechanism-choice.md)。"
248
+ "expected_output": "先过优化准入三问:省下的工作量是否大于增加的工作量、它防的错是否真实发生过、失效后果是否可逆。若「防止以后可能漏掉」属想象的错,则先不建,记录意图等真事故。若确实需要实时拦截,复用宿主已有机制而非自写插件(见 references/mechanism-choice.md)。",
249
+ "assertions": {
250
+ "must_include": [
251
+ "优化准入三问",
252
+ "省下的工作量是否大于增加的工作量",
253
+ "真实发生过",
254
+ "失效后果是否可逆",
255
+ "想象的错",
256
+ "先不建",
257
+ "记录意图",
258
+ "复用宿主已有机制"
259
+ ],
260
+ "must_exclude": [
261
+ "直接做成插件",
262
+ "先建起来再说",
263
+ "自写插件最灵活"
264
+ ],
265
+ "axes": {
266
+ "deliverable": "code",
267
+ "rigor": "exploratory"
268
+ },
269
+ "steps": [
270
+ "2-scope"
271
+ ]
272
+ },
273
+ "budget_hint": {
274
+ "max_tokens": 60000,
275
+ "max_minutes": 3
276
+ },
277
+ "rubric": [
278
+ "先过优化准入三问,再谈做不做",
279
+ "问「省下的工作量是否大于增加的工作量」,要能量化",
280
+ "问「这个错真实发生过吗」,想象出来的错先不建、只记录意图",
281
+ "问「失效时后果是否可逆」,并优先复用宿主已有机制而不是自写插件"
282
+ ]
38
283
  }
39
284
  ]
40
285
  }
@@ -1,8 +1,8 @@
1
- name: project-dept
2
- version: 1.0.14
1
+ name: project-dept
2
+ version: 1.3.8
3
3
  description: >
4
4
  Declarative routing for a contractor-style (承包制) project department. The two axes change the
5
- audit checklist and how strict the acceptance has to be; the six-step flow and
5
+ audit checklist and how strict the acceptance has to be; the Step 0 gate plus Steps 1-6 and
6
6
  the three non-negotiables stay stable across domains.
7
7
 
8
8
  always_load:
@@ -59,6 +59,11 @@ references:
59
59
  - condition: standing this department up in a new project
60
60
  path: references/project-scaffold.md
61
61
 
62
+ baseline_changelog_key: >-
63
+ Optional dept.config.json key naming the project's baseline changelog file. When the
64
+ baseline list carries [已作废] / [superseded] rows, dept_gate.py requires that file to
65
+ exist and be non-empty (check 7b) - a retired baseline is a deliverable-level act,
66
+ because a rule with no artefact attached does not get executed.
62
67
  quality_tools:
63
68
  gate_script: scripts/dept_gate.py
64
69
  gate_use_when: before opening any work package, and before every progress report to the user
@@ -66,6 +71,27 @@ quality_tools:
66
71
  audit_script: scripts/check_doc.py
67
72
  audit_use_when: before closing any work package that hands over a document artefact
68
73
  audit_output: stdout report plus exit code (add --json for machine-readable)
74
+ skill_lint_script: scripts/check_skill.py
75
+ skill_lint_use_when: after any edit to this skill package itself, before calling the package deliverable
76
+ skill_lint_output: >-
77
+ eight checks; stdout report plus exit code (0 clean / 1 defects / 2 not run);
78
+ --json for machine-readable.
79
+ Budget rule: SKILL.md > 3000 tokens is a defect (exit 1); SKILL.md + always_load > 9000 is a warning.
80
+ eval_runner: scripts/run_evals.py
81
+ eval_runner_use_when: when routing or review behaviour of this skill changes, or when doing a with/without comparison
82
+ eval_runner_output: >-
83
+ static validates the eval schema and prints a judge brief per case; judge anonymises
84
+ <case>-<arm>-r<rep>.txt answer files into a blind-judge sheet plus a private arm map and a
85
+ paste-ready score template; tally turns filled scores into paired statistics with a Wilson 95%
86
+ interval; grade (verbatim keyword scoring) is DEPRECATED — 12/12 false FAILs on real answers,
87
+ never an acceptance criterion (backlog P-15-8); compare is built on grade and is a direction hint only.
88
+ review_form_script: scripts/check_review_form.py
89
+ review_form_use_when: on every incoming review form, before the Lead reads it
90
+ review_form_output: >-
91
+ seven structural rules (two anchor snapshots, one legal verdict, verdict vs must-fix consistency,
92
+ independence, a mechanical evidence table, 8 banned evidence phrases, at least one real problem);
93
+ exit 0 compliant / 1 defects / 2 unreadable. Proves traces, not behaviour: it cannot tell whether
94
+ the reviewer really ran the snapshot twice, so the Lead still has to read the form.
69
95
  config_file: >-
70
96
  dept.config.json — resolved by walking up from the working directory, never hardcoded.
71
97
  If the working directory itself contains the ledger dir but the config was found in an
@@ -99,3 +99,38 @@ Verdict rules:
99
99
  - Divergent conclusions are information, not noise: record what each reviewer checked and reconcile explicitly, in writing.
100
100
 
101
101
  Costly mitigations — only adopt them after a real incident justifies them: script-generated packages, Lead forbidden from writing the brief, two-level sampling. Do not adopt them speculatively; a rule that exists to prevent an imagined accident is a rule that will be resented and eventually bypassed.
102
+
103
+ ## Review cadence and token budget — three tiers (v1.3.0, P-14-1)
104
+
105
+ Reviewing *every* small task and reviewing *only* at closeout are both wrong. What decides the tier is **blast radius × irreversibility × how much changed this round**. Thresholds are hard numbers; do not eyeball them.
106
+
107
+ | Tier | When | Who | What they get | Budget |
108
+ |---|---|---|---|---|
109
+ | **A — incremental** (default) | closeout of one deliverable unit (one case, one section, one script change) | 1 reviewer | product + acceptance criteria + **previous review form** + this round's fix log/diff. Must answer: did the fix really land / did it break anything / recompute 3 numbers by hand | **≤3M tokens, ≤10 min** |
110
+ | **B — full panel** (mandatory) | ① every project-section closeout; ② any number that will enter the manuscript or be cited as a baseline by another section; ③ a criterion itself changed | **2 reviewers with different methods** (independent recompute / external authority / devil's advocate — pick two) | everything, **no sampling**, re-read from disk, **no author self-check, no fix log** | **≤30M tokens** |
111
+ | **C — triggered** | ① a baseline was changed ② a conclusion got reversed ③ you just caught a self-check miss ④ same error twice | 1 reviewer, one target | the point plus its direct downstream | **≤8M tokens** |
112
+ | **no review** | middleware: probe scripts, drafts, logs, read-only surveys, formatting tweaks | — | — | 0 |
113
+
114
+ **Why these cut-offs (our own numbers, not theory)**
115
+
116
+ 1. **L1 self-check alone always misses something.** In one blind review, 8/8 findings were items the author had already ticked in self-check; a second one missed two hard errors (a mesh-arithmetic mix-up and a wrong step count) entirely. Self-check is not a substitute for any tier.
117
+ 2. **A full review is expensive**: 13–28M tokens for one full pass (measured: 28.2M/59 min, 26.3M/1 h, 13.6M/24 min); an early small review ≈3.7M.
118
+ 3. **Repeating full reviews per unit has diminishing returns**: 13 consecutive full rounds on this very package produced 12 → 26+9 → 26+10 → 6+7 → 5+5 → 2+4 → 1+4 → 4+2 → 3+2 → 3+3 → 2+2 → 2+3 → **0** findings, and the last rounds caught only documentation consistency. Repeating full reviews at unit frequency is pure burn.
119
+ 4. **Incremental reviews are sufficient** for unit-level changes: given only "v2 product + previous review form + fix log", one review still caught 8 real issues (including "micro-rise described as monotone decline" and a percentage range that was actually 3.5–10.5%).
120
+
121
+ **Four engineering levers (cheaper than reviewing less)**
122
+
123
+ 1. **Review the delta**, not everything: require the three answers above. Accumulated drift is covered by tier B.
124
+ 2. **Script the criteria**: give the reviewer a runnable checker (`dept_gate.py`, `check_doc.py`, `check_skill.py`, `run_evals.py`). They run the script for the mechanical part, then hand-compute 3 numbers. This saves exploration tokens, not verification.
125
+ 3. **Tier the models**: mechanical consistency (paths, versions, existence, formatting) on a cheap model; number recomputation and counter-examples on a strong one. **Never the reverse** — a cheap model checking numbers produces false green.
126
+ 4. **Budget gate + circuit breaker**: ≤30M per section (tier A cumulative + one tier B); any single review >10M must be justified in the report; over budget ⇒ drop to two-stage sampling and *write "degraded sampling" in the acceptance note*.
127
+
128
+ **Expected cost for a 6-unit section**: old habit (full review each unit) ≈6 × 20M = 120M; this policy ≈5 × 2.5M + 25M ≈ **37M (−70%)**, while closeouts still get a full pass and reversals/baseline changes still get tier C.
129
+
130
+ **Honest limits**
131
+
132
+ - Incremental review cannot see cumulative drift (ten locally-correct edits can contradict each other) ⇒ tier B must genuinely re-read everything from disk and must not read the fix log.
133
+ - Token savings never remove the "recompute 3 numbers by hand" step. That is the floor.
134
+ - Not applicable when: ① the product ships externally / is submitted ⇒ tier B plus external authority; ② the criterion just changed ⇒ tier C; ③ the first time a criterion goes live, expect a one-off expensive burst (13 rounds here) — that is a setup cost, not a routine.
135
+ - Multi-agent: ask **"can this be done by one agent sequentially?"** before asking "how many to spawn". Anthropic measured orchestrator-worker ≈+90.2% over single-agent but **15× tokens** (token use explains ~80% of variance), and only for high-value parallel work; Cognition reports that splitting loses the implicit decisions carried by actions. Pass paths, not summaries.
136
+ - Independence comes from **different evidence**, not more judges: same model + same material + more debate does not improve groundedness. The second tier-B reviewer must use a different method, not re-read the same way.
@@ -82,10 +82,16 @@ One file per role, same eight sections every time:
82
82
 
83
83
  List every item currently used as a baseline and give it a class and a locator. Expect to find several `[Own]` items masquerading as `[Origin]` — that is the point of doing it early.
84
84
 
85
- ## 6. Wire the two scripts
85
+ ## 6. Wire the quality tools
86
86
 
87
- - **gate** — runs before a package opens and before every report to the user;
88
- - **checker** — runs before a document artefact is handed over.
87
+ Wire every script listed under `quality_tools` in `manifest.yaml` (do not assume a fixed number — the list grows):
88
+
89
+ - **gate** (`dept_gate.py`) — runs before a package opens and before every report to the user;
90
+ - **checker** (`check_doc.py`) — runs before a document artefact is handed over;
91
+ - **package self-lint** (`check_skill.py`) — runs after you edit the skill package itself;
92
+ - **eval runner** (`run_evals.py`) — `static` schema check always; `judge`/`tally` for blind A/B scoring;
93
+ `grade` is deprecated (12/12 false FAILs on real answers) and must not be used as an acceptance
94
+ criterion, and `compare` (built on grade) is a direction hint only.
89
95
 
90
96
  Copy them from the skill's `scripts/` directory into the project's ledger `bin/`, or keep them in the skill and call them with the project config path. Do **not** edit the copy: a per-project fork of a generic checker means the audit is now measuring something different from what the skill describes.
91
97
 
@@ -93,7 +99,7 @@ Verify the wiring by running each once and confirming the exit codes behave as d
93
99
 
94
100
  ## 7. First run
95
101
 
96
- Open a small, genuinely useful package as a smoke test, run the full six steps, and close it. If step 6 (archive) feels like paperwork, shorten the record template now rather than skipping it later.
102
+ Open a small, genuinely useful package as a smoke test, run the full flow (Step 0 gate, then Steps 1-6), and close it. If step 6 (archive) feels like paperwork, shorten the record template now rather than skipping it later.
97
103
 
98
104
  ## Migration from an existing project
99
105