d3-scheduler 0.1.3 → 0.1.4
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/README.md +0 -12
- package/package.json +2 -2
package/README.md
CHANGED
|
@@ -288,18 +288,6 @@ Performance was verified using the automated benchmark suite (`tests/performance
|
|
|
288
288
|
|
|
289
289
|
---
|
|
290
290
|
|
|
291
|
-
## Resume Summary
|
|
292
|
-
|
|
293
|
-
```markdown
|
|
294
|
-
D3 Resource Scheduler | Creator & Maintainer | https://github.com/DiviteDinesh/d3-scheduler
|
|
295
|
-
- Engineered an open-source resource scheduling and timeline library in TypeScript and D3.js with dual Vanilla JS and React 18/19 support.
|
|
296
|
-
- Built a graph scheduling engine with 3-color DFS cycle detection and Critical Path Method (CPM) algorithms to compute Early/Late schedules and Total Float, highlighting project-critical chains.
|
|
297
|
-
- Formulated an O(N log N) greedy interval partitioning algorithm with dynamic row height auto-expansion, enabling multi-lane stacking without timeline grid misalignment.
|
|
298
|
-
- Developed an interactive backlog drawer allowing drag-and-drop scheduling between unassigned queues and timeline resources synced via continuous time scale projections.
|
|
299
|
-
- Achieved sub-140ms full pipeline throughput for stress datasets of 10,000 events across 100 resources; maintained 100% test coverage across 36 unit and integration test suites.
|
|
300
|
-
```
|
|
301
|
-
|
|
302
|
-
---
|
|
303
291
|
|
|
304
292
|
## Author
|
|
305
293
|
|
package/package.json
CHANGED
|
@@ -1,6 +1,6 @@
|
|
|
1
1
|
{
|
|
2
2
|
"name": "d3-scheduler",
|
|
3
|
-
"version": "0.1.
|
|
3
|
+
"version": "0.1.4",
|
|
4
4
|
"description": "Open-source D3.js resource scheduler and timeline with interactive calendar views, drag-and-drop events, resizing, resource allocation, and Gantt-style planning.",
|
|
5
5
|
"author": "Dinesh Divite <dineshdcoc@gmail.com>",
|
|
6
6
|
"license": "MIT",
|
|
@@ -106,4 +106,4 @@
|
|
|
106
106
|
"react-scheduler",
|
|
107
107
|
"d3-timeline"
|
|
108
108
|
]
|
|
109
|
-
}
|
|
109
|
+
}
|