bpmax-cli 0.2.1-beta.86 → 0.2.1-beta.88

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "bpmax-cli",
3
- "version": "0.2.1-beta.86",
3
+ "version": "0.2.1-beta.88",
4
4
  "description": "CLI for BPMAX environments with multi-profile config and local login callback flow",
5
5
  "type": "module",
6
6
  "bin": {
@@ -33,16 +33,25 @@ Use these skills as needed; this skill orchestrates them and does not replace th
33
33
  2. **Draft the blueprint**
34
34
  - Use `references/blueprint-structure.md` for the document skeleton.
35
35
  - Use `references/source-traceability-and-flow-modeling.md` to build the source-logic mapping, manual-adjustment register, main-flow stage map, parallel-scenario modeling decisions, approval/matrix assessment, PC/H5 navigation, and permission design before drafting flow chapters.
36
+ - Use `references/business-language.md` for every sentence a business reader will see. Write in business language: no system identifiers, no variable names, no type names, no API paths, no script snippets in explanatory prose.
36
37
  - Treat flows as the primary structure. Data sets, forms, lists, details, dashboards, automations, and permissions must attach to an owning flow unless they are genuinely shared support objects.
37
38
  - Use `references/per-flow-required-structure.md` for every flow section. Each flow must be independently complete.
38
39
  - Put each flow diagram in a Feishu whiteboard block such as `<whiteboard type="mermaid">...</whiteboard>`. Do not use Mermaid code blocks in final docs.
39
40
 
40
- 3. **Create or update Feishu Docx**
41
+ 3. **Review the design, then confirm it with the user**
42
+ - Follow `references/review-and-confirmation-dialogue.md`.
43
+ - Review the drafted blueprint from a professional process-design stance, not just for section completeness. Run several independent sub agents in parallel, one per lens (业务流程合理性 / 业务人员视角 / 流程设计专业性 / 边界与落地性), so that no single pass can rationalize the whole draft.
44
+ - Each sub agent reads the blueprint **and** the source material, and reports only defects tied to a concrete business consequence, separating 设计错误 from 信息缺失.
45
+ - Every 信息缺失 finding becomes a question to the user. Ask in business language, with the realistic options and their implications; batch related questions; raise conflicts rather than silently resolving them. Never close an open business question by assuming an answer.
46
+ - Record every review finding and every answer in the document (`流程评审记录`, `业务确认问答`, `待确认事项`). Re-review the parts changed while answering questions.
47
+ - A flow that still depends on an unanswered question is `incomplete`, never `complete`.
48
+
49
+ 4. **Create or update Feishu Docx**
41
50
  - For new docs, use `lark-cli docs +create --api-version v2`.
42
51
  - For updates, fetch the relevant outline/section first and use precise block operations where possible.
43
52
  - Preserve existing resource blocks unless the user explicitly asks to replace them.
44
53
 
45
- 4. **Lint before claiming completion**
54
+ 5. **Lint before claiming completion**
46
55
  - Fetch the produced/updated doc:
47
56
  ```bash
48
57
  lark-cli docs +fetch --api-version v2 --doc <DOC> --detail with-ids --format json > /tmp/blueprint-fetch.json
@@ -57,17 +66,26 @@ Use these skills as needed; this skill orchestrates them and does not replace th
57
66
  - If project-specific wording matters, add `--require-term` and `--forbid-term`.
58
67
  - Export and visually inspect every whiteboard against the source-logic mapping. A non-empty resource block or successful lint does not prove branch, sequence, parallel launch, or merge correctness.
59
68
  - Fix every lint error and rerun until it passes, unless the user explicitly accepts a known exception.
69
+ - Lint passing is a floor, not the finish line: it cannot judge whether the flow is right for the business, or whether the wording is understandable. Those two are covered by the review and the self-check in `references/business-language.md`.
60
70
 
61
- 5. **Final response**
71
+ 6. **Final response**
62
72
  - Return the Feishu document title and URL.
63
73
  - List every flow with a `complete`, `incomplete`, or `blocked` conclusion; summarize whiteboard count, visual inspection, and lint result.
64
74
  - Summarize preserved manual adjustments and any conflicts with source artifacts.
75
+ - Summarize the design review: which lenses ran, how many findings were raised, and what changed as a result.
76
+ - List the questions already answered by the user and the questions still open.
65
77
  - State any business assumptions or unresolved confirmation items.
66
78
  - Mention Feishu/lark auth or version blockers if they affected delivery.
67
79
 
68
80
  ## Hard Rules
69
81
 
70
82
  - Final blueprint deliverables are Feishu Docx documents, not local Markdown, unless the user explicitly asks for local-only output.
83
+ - A drafted blueprint is not deliverable until it has been reviewed from a professional process-design stance by several independent sub agents, and every open business question has been either answered by the user or recorded as unresolved.
84
+ - Do not resolve an open business question by assuming an answer. Ask the user, in business language, with the realistic options and what each implies.
85
+ - Every review finding and every user answer must be recorded in the document (`流程评审记录`, `业务确认问答`, `待确认事项`). A decision that exists only in the conversation does not count.
86
+ - A flow that depends on an unanswered question is `incomplete`. Do not mark it `complete`.
87
+ - Write for business readers, not for implementers. Explanatory prose, node tables, and diagrams use business names only. No flow identifiers (`flow454372735`), form/template/list ids, data set keys, variable names (`ctx.$PROJECT`, `$CAN_DELETE`), type names (`sn_number`), API paths, script snippets, or `null`/`true`/`false` values.
88
+ - Identifiers belong only in the implementation table of the owning flow, in a dedicated column. The business name stays the same everywhere else, and one business object keeps one name across the whole document.
71
89
  - Every business flow must have its own complete section. Do not make a flow rely on another section for fields, forms, writeback, AI behavior, or implementation boundary.
72
90
  - Every flow must have a process diagram, and the diagram must be a Feishu whiteboard/resource block. Mermaid code blocks are draft-only and fail lint.
73
91
  - A start node must name the creation action/form.
@@ -93,8 +111,10 @@ Use these skills as needed; this skill orchestrates them and does not replace th
93
111
 
94
112
  - Read `references/blueprint-structure.md` before drafting a new blueprint or restructuring a document.
95
113
  - Read `references/source-traceability-and-flow-modeling.md` before interpreting a source flowchart or applying user modeling adjustments.
114
+ - Read `references/review-and-confirmation-dialogue.md` before starting the design review, and again before writing the review/confirmation record.
115
+ - Read `references/business-language.md` before writing reader-facing prose, and run its self-check before delivery.
96
116
  - Read `references/per-flow-required-structure.md` before writing or lint-fixing flow sections.
97
117
 
98
118
  ## Lint Script
99
119
 
100
- `scripts/lint_blueprint_doc.py` checks a fetched Feishu Docx JSON or XML file for source traceability, manual-adjustment records, stage/parallel/matrix semantics, separate PC/H5 navigation, permission and field-access coverage, per-flow detail tables, whiteboard diagrams, forbidden Mermaid code blocks, implementation boundary labels, AI confirmation/fallback language, and project-specific required/forbidden terms.
120
+ `scripts/lint_blueprint_doc.py` checks a fetched Feishu Docx JSON or XML file for source traceability, manual-adjustment records, stage/parallel/matrix semantics, separate PC/H5 navigation, permission and field-access coverage, per-flow detail tables, whiteboard diagrams, forbidden Mermaid code blocks, implementation boundary labels, AI confirmation/fallback language, the review-and-confirmation record, system identifiers leaking into business prose, and project-specific required/forbidden terms.
@@ -24,29 +24,35 @@ Use this structure for BPMAX blueprint方案 documents unless the user provides
24
24
  - Public support objects.
25
25
  - BPMAX configuration object map.
26
26
 
27
- 4. **公共支撑配置**
27
+ 4. **设计评审与业务确认记录**
28
+ - `流程评审记录`: review lens, issue raised, conclusion (已修改 / 保持原设计 / 转为待确认), affected flow.
29
+ - `业务确认问答`: question, options offered, user's final answer, where it landed in the design.
30
+ - `待确认事项`: open question, impact of leaving it open, current handling.
31
+ - Follow `review-and-confirmation-dialogue.md`. These three tables are the only acceptable place for a design decision to live; a decision recorded solely in the conversation is not part of the blueprint.
32
+
33
+ 5. **公共支撑配置**
28
34
  - Only genuinely shared objects belong here.
29
35
  - Examples: organization dictionary, BPMAX user model extensions, shared tool library, automation logs, role/navigation rules.
30
36
  - Do not make public data sets independent business flows when the data belongs to a process.
31
37
 
32
- 5. **业务流程章节**
38
+ 6. **业务流程章节**
33
39
  - Each business flow gets a full independent chapter.
34
40
  - Use `per-flow-required-structure.md`.
35
41
  - The first flow should be the end-to-end main lifecycle when the business has one.
36
42
 
37
- 6. **权限、导航、集成与自动化**
43
+ 7. **权限、导航、集成与自动化**
38
44
  - A `PC/H5 导航设计` table with separate PC and H5 rows for every flow, including target users, entry/menu, route/page, visibility permission, and acceptance.
39
45
  - A `权限设计` table covering flow/project actions, field visibility/editability by step and role, navigation visibility, denied/read-only behavior, and acceptance.
40
46
  - Cross-flow permission rules, menus, Feishu/OpenClaw/API integration, automation logging, retry/fallback.
41
47
  - Flow-specific automation remains in the owning flow section.
42
48
 
43
- 7. **BPMAX 可配置能力与需定制能力边界**
49
+ 8. **BPMAX 可配置能力与需定制能力边界**
44
50
  - Use the exact three labels:
45
51
  - `BPMAX 配置可实现`
46
52
  - `配置 + 脚本/API/现有插件`
47
53
  - `需定制插件/外部服务`
48
54
 
49
- 8. **一期验收路径、风险与待确认事项**
55
+ 9. **一期验收路径、风险与待确认事项**
50
56
  - End-to-end acceptance path.
51
57
  - Acceptance metrics.
52
58
  - Risks and unresolved business decisions.
@@ -62,7 +68,9 @@ Use this structure for BPMAX blueprint方案 documents unless the user provides
62
68
 
63
69
  ## Blueprint Tone
64
70
 
65
- - Write for implementers and reviewers.
66
- - Be specific enough for BPMAX configuration without inventing unconfirmed personal names or private data.
67
- - Use role names, flow names, field types, triggers, writeback behavior, and validation rules.
71
+ - Write for the business reader: the department that owns the process, the approvers, and the front-line users. The implementer is a secondary reader who can translate business language into configuration.
72
+ - Be specific enough that a business person can confirm the rules without knowing the system: who does what, when, under which condition, and what happens afterwards.
73
+ - Use business names (流程名称、表单名称、角色、环节) in prose, node tables, and diagrams. Put exact identifiers only in the implementation table of the owning flow.
74
+ - See `business-language.md` for the wording rules and the self-check before delivery.
75
+ - Do not invent unconfirmed personal names or private data; use role names.
68
76
  - Label uncertain items as “待业务确认” only in a dedicated “待确认事项” section, not inside required flow structure.
@@ -0,0 +1,74 @@
1
+ # Business Language For Blueprint Readers
2
+
3
+ The blueprint is read by business people — the department that owns the process, the approvers, the front-line users who will work in it, and the reviewers who sign off. It is not a configuration manual for the person who builds it.
4
+
5
+ Write so that a reader who has never seen the system can follow the process and sign off on it.
6
+
7
+ ## Who Reads What
8
+
9
+ | Reader | What they need from the document |
10
+ | --- | --- |
11
+ | 业务负责人 | 流程是否符合业务规则,谁在什么条件下做什么,异常怎么处理 |
12
+ | 一线使用者 | 我要在哪里、看到什么、填什么、点哪个按钮 |
13
+ | 审批人 | 什么时候轮到我,我要判断什么,可以退回到哪一步 |
14
+ | 实施人员 | 上述内容怎么落成配置(他们能自己把业务语言翻译成配置对象) |
15
+
16
+ The first three readers outnumber the fourth. Optimize for them.
17
+
18
+ ## Write Business Meaning, Not System Names
19
+
20
+ Describe what a person sees and does. Internal identifiers exist so the implementer can find the object; they do not belong in the sentence that explains the business.
21
+
22
+ | 不要写 | 改成 |
23
+ | --- | --- |
24
+ | `flow454372735` | 「招标立项审批」流程 |
25
+ | 「流程代号 flow_type=flow82407163」 | 投标登记流程 |
26
+ | `form_template_id=954573815` | 项目基本信息表 |
27
+ | 「数据集 `tender_main`」 | 招标项目台账 |
28
+ | 「节点 `step_3`」 | 「资格预审」环节 |
29
+ | `data_set_field.status = 3` | 状态为「已确认」 |
30
+ | 「`ctx.$PROJECT.id` 写入关联字段」 | 系统自动记录所关联的项目编号 |
31
+ | 「`plugin_urgent_reminder.auto_action` 置空」 | 超时后只提醒,不自动处理 |
32
+ | 「`$CAN_DELETE` 为 true 时显示按钮」 | 有删除权限的人才能看到删除按钮 |
33
+ | 「走 `flow_page_template` type=1」 | 用一个项目列表页展示 |
34
+
35
+ Words that may stay when the business genuinely uses them: 环节、审批、驳回、退回、会签、加签、抄送、办结、台账、工作台. These are business words even though they also happen to be system concepts.
36
+
37
+ Words to avoid in explanatory prose: 字段命名、类型名(`string`、`select`、`sn_number`)、接口名(`/api/...`)、脚本片段、配置项路径、`null`/`true`/`false` 这类程序取值。
38
+
39
+ ## Where Identifiers Still Belong
40
+
41
+ Identification is necessary for implementation, so keep it — but keep it out of the way.
42
+
43
+ - Put the exact flow name, form name, list name, and any identifier in the implementation table of the owning flow, in a dedicated column (for example 「对象」 or 「对应配置」).
44
+ - The prose, the node tables, and the diagrams use the business name only.
45
+ - When one business object has several names in the source (旧称、简称、系统名), pick one business name for the whole document and list the aliases once in a glossary.
46
+
47
+ ## Diagrams And Tables
48
+
49
+ - Node labels describe the business action or resulting state: 「资格预审」「发出中标通知」,not 「节点 3」「sys_wait」.
50
+ - Branch labels describe the condition in business terms: 「金额超过 100 万」「初审不通过」.
51
+ - Table headers describe what a business reader wants to know: 谁来做、什么时候做、做完之后发生什么.
52
+ - Keep the 「配置」 columns for the implementer, but do not let them replace the business columns.
53
+
54
+ ## Numbers, Time, And Conditions
55
+
56
+ - Give conditions as a business person would state them: 「合同金额 ≥ 100 万元」「距截止时间不足 3 个工作日」.
57
+ - Do not write the raw expression that implements the condition.
58
+ - When a threshold is still unconfirmed, say 「待业务确认」 in 待确认事项 rather than picking a number.
59
+
60
+ ## Consistency
61
+
62
+ - One business object has one name throughout. Switching between 「投标项目」「招标项目」「标包」 mid-document makes readers think these are different things.
63
+ - If the business itself uses two words for the same thing, state the equivalence once and then stay consistent.
64
+
65
+ ## Quick Self-Check Before Delivery
66
+
67
+ Ask about every section:
68
+
69
+ 1. 一个没接触过系统的人,能只凭这一段说清楚「谁、做什么、什么时候、做完之后怎样」吗?
70
+ 2. 段落里出现的名字,是业务叫法还是系统里的标识符?如果有标识符,它是不是只出现在实现表格里?
71
+ 3. 有没有把「怎么实现」写进了「业务流程」的位置?
72
+ 4. 读起来像不像一份给人看的方案,而不是一份导出给机器读的配置?
73
+
74
+ A section that fails any of these is not finished, even if lint passes.
@@ -0,0 +1,70 @@
1
+ # Blueprint Review And Confirmation Dialogue
2
+
3
+ Use this reference before a blueprint is declared complete. Its job is to catch flow designs that are structurally valid but wrong for the business, and to convert open questions into recorded decisions instead of silent assumptions.
4
+
5
+ The three steps are sequential: review, then ask, then fold the answers back into the document.
6
+
7
+ ## Step 1: Professional Flow Review
8
+
9
+ Draft the blueprint first, then review it as a process designer rather than as a document editor. A review that only checks "does every section exist" adds nothing — the lint already does that.
10
+
11
+ Run the review with several independent sub agents, one per lens, so that a finding from one lens is not diluted by another. Do not let one agent cover all lenses; a single pass tends to rationalize whatever was drafted.
12
+
13
+ Minimum lenses:
14
+
15
+ | Lens | Question it must answer |
16
+ | --- | --- |
17
+ | 业务流程合理性 | 这条流程符合真实业务规则吗?有没有漏掉的业务情形、越权环节、无法执行的审批? |
18
+ | 业务人员视角 | 一线人员能不能看懂、能不能按这个流程干活?谁在什么时候必须做什么? |
19
+ | 流程设计专业性 | 阶段划分、并行/串行、汇合、回退、超时、异常路径是否成立?有没有多余的确认或等待节点? |
20
+ | 边界与落地性 | 权限、数据归属、AI 介入点、跨流程联动、系统外动作是否被清楚交代? |
21
+
22
+ Each sub agent must:
23
+
24
+ - read the drafted blueprint plus the source material, not the blueprint alone;
25
+ - report only issues it can tie to a concrete business consequence, with the affected flow/node and the failure scenario;
26
+ - separate "设计错误" (the flow as written cannot work) from "信息缺失" (a decision is needed before it can work);
27
+ - avoid restating requirements back as praise, and avoid generic advice such as "建议细化".
28
+
29
+ Optionally add a lens for the project's specific domain (for example 招投标、供应链、财务) when the blueprint's correctness depends on domain rules.
30
+
31
+ Consolidate the findings before talking to the user. Deduplicate, drop anything two lenses could not substantiate, and rank by whether it blocks the design.
32
+
33
+ ## Step 2: Ask The User, Do Not Assume
34
+
35
+ Every "信息缺失" finding becomes a question to the user. Do not resolve it by picking the most plausible option and moving on — a silently chosen business rule is the defect this step exists to prevent.
36
+
37
+ Rules for the questions:
38
+
39
+ - Ask in business language, with the concrete consequence. Not "阶段二的出口条件是什么?" but "抽查完成后如果发现不合格,是回到整改环节,还是另起一条返工流程?两种做法对负责人的工作量影响不同。"
40
+ - Give the realistic options and say what each implies. A question without options pushes the work back onto the user.
41
+ - Batch related questions so a person can answer them in one sitting; do not drip-feed one question at a time across many turns.
42
+ - Ask the blocking questions first. Nice-to-have clarifications belong in the 待确认事项 section, not in the dialogue.
43
+ - When the user's answer conflicts with an earlier answer or with source material, surface the conflict and ask which one wins. Do not quietly apply the latest message.
44
+
45
+ Prefer an interactive question surface (selection or form) over a wall of text when the tooling supports it, so the user can answer by choosing rather than by writing prose.
46
+
47
+ If the user is unavailable or explicitly defers, record the question as unresolved in 待确认事项 and mark the affected flow `incomplete`. Never mark it `complete` on an assumption.
48
+
49
+ ## Step 3: Record And Fold Back
50
+
51
+ Each review finding and each answer must end up in the document. A finding that only existed in a chat message is lost as soon as the session ends.
52
+
53
+ The blueprint document must contain a review-and-confirmation record with three tables:
54
+
55
+ | Table | Content |
56
+ | --- | --- |
57
+ | 流程评审记录 | 评审视角、提出的问题、结论(已修改 / 保持原设计 / 转为待确认)、影响的流程 |
58
+ | 业务确认问答 | 提出的问题、给出的选项、用户的最终答复、落实到的流程或节点 |
59
+ | 待确认事项 | 仍需业务决策的问题、不确认的影响、当前处理方式 |
60
+
61
+ After folding answers back in, re-run the flow review on the changed parts. A design change made while answering questions can invalidate an earlier conclusion; do not assume the previous review still holds.
62
+
63
+ ## Anti-Patterns
64
+
65
+ - Reviewing the document against a checklist instead of reviewing the flow against the business.
66
+ - Running all lenses in one agent, so a weak finding survives because no independent pass contradicted it.
67
+ - Asking the user to confirm details the source material already answers.
68
+ - Asking a question without options, or asking several unrelated questions in separate turns.
69
+ - Recording "已确认" when the user did not actually answer.
70
+ - Closing an open question by choosing the most common industry practice without saying so.
@@ -0,0 +1,72 @@
1
+ <title>示例 BPMAX 蓝图方案</title>
2
+ <h1>1. 蓝图定位与目标</h1>
3
+ <p>示例目标。</p>
4
+ <h1>2. BPMAX 实施总规则</h1>
5
+ <p>流程优先,流程图使用飞书画板。</p>
6
+ <h1>3. 总体业务架构</h1>
7
+ <p>主流程与联动流程。</p>
8
+ <h2>3.1 源流程逻辑映射与完整性核对</h2>
9
+ <table><tr><th>源节点</th><th>蓝图位置</th><th>状态</th></tr><tr><td>申请</td><td>主流程阶段一</td><td>已覆盖</td></tr></table>
10
+ <h2>3.2 人工调整记录</h2>
11
+ <table><tr><th>调整</th><th>最终决策</th></tr><tr><td>无人工调整</td><td>按源流程建模</td></tr></table>
12
+ <h2>3.3 主流程阶段划分</h2>
13
+ <table><tr><th>阶段</th><th>入口</th><th>出口</th></tr><tr><td>阶段一:申请处理</td><td>提交申请</td><td>处理完成</td></tr></table>
14
+ <h2>3.4 并行场景建模决策</h2>
15
+ <table><tr><th>场景</th><th>建模选择</th><th>原因</th></tr><tr><td>辅助处理</td><td>拆分为不同子流程</td><td>独立生命周期</td></tr></table>
16
+ <h2>3.5 审批/决策矩阵评估</h2>
17
+ <table><tr><th>决策范围</th><th>条件</th><th>处理人/审批人来源</th><th>结果/下一步</th><th>维护责任人</th><th>蓝图规则矩阵</th><th>正式 BPMAX 矩阵</th><th>运行态验收</th></tr><tr><td>处理人路由</td><td>申请类型</td><td>负责人角色</td><td>进入处理环节</td><td>流程管理员</td><td>需要,落实为流程条件</td><td>本期不采用</td><td>真实用户 owner 解析与页面审批</td></tr></table>
18
+ <h1>4. 公共支撑配置</h1>
19
+ <p>共享组织、用户模型和自动化日志。</p>
20
+ <h1>5. 流程一:主流程</h1>
21
+ <h2>5.1 业务目标与适用场景</h2>
22
+ <p>业务目标与适用场景。</p>
23
+ <h2>5.2 流程模板</h2>
24
+ <whiteboard type="mermaid">flowchart TD
25
+ A[开始节点:创建申请表单] --&gt; B[处理]</whiteboard>
26
+ <h2>5.3 开始节点与创建表单</h2>
27
+ <table><tr><th>开始节点</th><th>创建表单</th><th>角色</th></tr><tr><td>创建申请</td><td>申请表单</td><td>申请人</td></tr></table>
28
+ <h2>5.4 环节配置说明</h2>
29
+ <table><tr><th>环节</th><th>角色</th></tr><tr><td>处理</td><td>负责人</td></tr></table>
30
+ <h2>5.5 表单模板</h2>
31
+ <table><tr><th>字段</th><th>类型</th></tr><tr><td>名称</td><td>文本</td></tr></table>
32
+ <h2>5.6 流程数据集</h2>
33
+ <table><tr><th>字段组</th><th>写回</th></tr><tr><td>状态</td><td>处理完成</td></tr></table>
34
+ <h2>5.7 列表/筛选/详情/看板入口</h2>
35
+ <table><tr><th>入口</th><th>用户</th></tr><tr><td>申请列表</td><td>申请人</td></tr></table>
36
+ <h2>5.8 自动化与 AI/agent</h2>
37
+ <table><tr><th>触发</th><th>输入</th><th>输出</th><th>人工确认</th><th>异常兜底</th></tr><tr><td>提交后</td><td>申请数据</td><td>建议</td><td>负责人</td><td>转人工</td></tr></table>
38
+ <h2>5.9 办结口径与下游联动</h2>
39
+ <table><tr><th>办结</th><th>下游联动</th></tr><tr><td>处理完成</td><td>归档</td></tr></table>
40
+ <h2>5.10 BPMAX 实现边界</h2>
41
+ <table><tr><th>BPMAX 配置可实现</th><th>配置 + 脚本/API/现有插件</th><th>需定制插件/外部服务</th></tr><tr><td>流程</td><td>自动化</td><td>无</td></tr></table>
42
+ <h1>6. 流程二:辅助流程</h1>
43
+ <h2>6.1 业务目标与适用场景</h2>
44
+ <p>业务目标与适用场景。</p>
45
+ <h2>6.2 流程模板</h2>
46
+ <whiteboard type="mermaid">flowchart TD
47
+ A[开始节点:创建辅助表单] --&gt; B[办结]</whiteboard>
48
+ <h2>6.3 开始节点与创建表单</h2>
49
+ <table><tr><th>开始节点</th><th>创建表单</th><th>角色</th></tr><tr><td>创建辅助任务</td><td>辅助表单</td><td>管理员</td></tr></table>
50
+ <h2>6.4 环节配置说明</h2>
51
+ <table><tr><th>环节</th><th>角色</th></tr><tr><td>办结</td><td>管理员</td></tr></table>
52
+ <h2>6.5 表单模板</h2>
53
+ <table><tr><th>字段</th><th>类型</th></tr><tr><td>名称</td><td>文本</td></tr></table>
54
+ <h2>6.6 流程数据集</h2>
55
+ <table><tr><th>字段组</th><th>写回</th></tr><tr><td>状态</td><td>辅助流程完成</td></tr></table>
56
+ <h2>6.7 列表/筛选/详情/看板入口</h2>
57
+ <table><tr><th>入口</th><th>用户</th></tr><tr><td>辅助列表</td><td>管理员</td></tr></table>
58
+ <h2>6.8 自动化与 AI/agent</h2>
59
+ <table><tr><th>触发</th><th>输入</th><th>输出</th><th>人工确认</th><th>异常兜底</th></tr><tr><td>创建后</td><td>辅助数据</td><td>建议</td><td>管理员</td><td>转人工</td></tr></table>
60
+ <h2>6.9 办结口径与下游联动</h2>
61
+ <table><tr><th>办结</th><th>下游联动</th></tr><tr><td>辅助任务完成</td><td>回写主流程</td></tr></table>
62
+ <h2>6.10 BPMAX 实现边界</h2>
63
+ <table><tr><th>BPMAX 配置可实现</th><th>配置 + 脚本/API/现有插件</th><th>需定制插件/外部服务</th></tr><tr><td>子流程</td><td>回写</td><td>无</td></tr></table>
64
+ <h1>7. 权限与导航设计</h1>
65
+ <h2>7.1 PC/H5 导航设计</h2>
66
+ <table><tr><th>流程</th><th>终端</th><th>目标用户</th><th>入口/菜单</th><th>路由/页面</th><th>可见权限</th><th>验收</th></tr><tr><td>主流程</td><td>PC</td><td>申请人、负责人</td><td>工作台/申请列表</td><td>/project?flow_type=main</td><td>具备流程查看权限时显示</td><td>有权限用户可进入,无权限用户隐藏</td></tr><tr><td>主流程</td><td>H5</td><td>申请人、负责人</td><td>移动工作台/申请列表</td><td>/h5/project?flow_type=main</td><td>具备流程查看权限时显示</td><td>移动端可进入并完成查看</td></tr><tr><td>辅助流程</td><td>PC</td><td>管理员</td><td>工作台/辅助列表</td><td>/project?flow_type=aux</td><td>管理员角色可见</td><td>管理员可进入,其他用户隐藏</td></tr><tr><td>辅助流程</td><td>H5</td><td>不适用:仅后台管理员处理</td><td>不提供 H5 入口</td><td>不适用:仅 PC 后台页面</td><td>H5 隐藏</td><td>移动端无入口且不能访问</td></tr></table>
67
+ <h2>7.2 权限设计</h2>
68
+ <table><tr><th>流程</th><th>对象/字段</th><th>环节</th><th>用户/角色</th><th>可见</th><th>可编辑</th><th>操作权限</th><th>验收</th></tr><tr><td>主流程</td><td>流程项目与导航</td><td>全流程</td><td>申请人、负责人、管理员</td><td>按角色和项目关系可见</td><td>按当前环节只读或可编辑</td><td>创建、查看、编辑、删除、提交、审批、导航均按角色授权;无权限禁止</td><td>分别使用有权限与无权限用户验证</td></tr><tr><td>主流程</td><td>申请表字段</td><td>创建、处理</td><td>申请人、负责人</td><td>字段按环节可见</td><td>申请人创建时可编辑,负责人处理时部分字段只读</td><td>字段查看与编辑受控;无权限字段隐藏</td><td>逐环节验证字段可见和可编辑状态</td></tr><tr><td>辅助流程</td><td>流程项目与导航</td><td>全流程</td><td>管理员</td><td>仅管理员可见</td><td>处理环节可编辑</td><td>创建、查看、编辑、删除、提交、审批、导航均仅管理员可用;其他用户禁止</td><td>管理员成功、普通用户无权限</td></tr><tr><td>辅助流程</td><td>辅助表字段</td><td>创建、办结</td><td>管理员</td><td>字段仅管理员可见</td><td>创建时可编辑,办结后只读</td><td>字段查看与编辑受控;其他用户字段隐藏</td><td>验证办结前后字段权限变化</td></tr></table>
69
+ <h1>8. BPMAX 可配置能力与需定制能力边界</h1>
70
+ <p>BPMAX 配置可实现;配置 + 脚本/API/现有插件;需定制插件/外部服务。</p>
71
+ <h1>9. 一期验收路径、风险与待确认事项</h1>
72
+ <p>验收、风险、待确认。</p>
@@ -15,58 +15,65 @@
15
15
  <table><tr><th>场景</th><th>建模选择</th><th>原因</th></tr><tr><td>辅助处理</td><td>拆分为不同子流程</td><td>独立生命周期</td></tr></table>
16
16
  <h2>3.5 审批/决策矩阵评估</h2>
17
17
  <table><tr><th>决策范围</th><th>条件</th><th>处理人/审批人来源</th><th>结果/下一步</th><th>维护责任人</th><th>蓝图规则矩阵</th><th>正式 BPMAX 矩阵</th><th>运行态验收</th></tr><tr><td>处理人路由</td><td>申请类型</td><td>负责人角色</td><td>进入处理环节</td><td>流程管理员</td><td>需要,落实为流程条件</td><td>本期不采用</td><td>真实用户 owner 解析与页面审批</td></tr></table>
18
- <h1>4. 公共支撑配置</h1>
18
+ <h1>4. 设计评审与业务确认记录</h1>
19
+ <h2>4.1 流程评审记录</h2>
20
+ <table><tr><th>评审视角</th><th>提出的问题</th><th>结论</th><th>影响的流程</th></tr><tr><td>业务流程合理性</td><td>辅助处理失败后主流程如何继续</td><td>已修改:补充回退到处理环节</td><td>主流程</td></tr><tr><td>业务人员视角</td><td>一线人员如何知道任务已分派给自己</td><td>保持原设计:工作台待办已覆盖</td><td>主流程</td></tr></table>
21
+ <h2>4.2 业务确认问答</h2>
22
+ <table><tr><th>问题</th><th>给出的选项</th><th>用户答复</th><th>落实到</th></tr><tr><td>辅助处理不合格时如何处理</td><td>A 退回原环节重做;B 另起返工流程</td><td>选择 A,退回原环节重做</td><td>主流程处理环节的回退路径</td></tr></table>
23
+ <h2>4.3 待确认事项</h2>
24
+ <table><tr><th>待确认问题</th><th>不确认的影响</th><th>当前处理</th></tr><tr><td>是否需要短信通知审批人</td><td>可能漏掉紧急审批</td><td>本期先按站内待办,上线后评估</td></tr></table>
25
+ <h1>5. 公共支撑配置</h1>
19
26
  <p>共享组织、用户模型和自动化日志。</p>
20
- <h1>5. 流程一:主流程</h1>
21
- <h2>5.1 业务目标与适用场景</h2>
27
+ <h1>6. 流程一:主流程</h1>
28
+ <h2>6.1 业务目标与适用场景</h2>
22
29
  <p>业务目标与适用场景。</p>
23
- <h2>5.2 流程模板</h2>
30
+ <h2>6.2 流程模板</h2>
24
31
  <whiteboard type="mermaid">flowchart TD
25
32
  A[开始节点:创建申请表单] --&gt; B[处理]</whiteboard>
26
- <h2>5.3 开始节点与创建表单</h2>
33
+ <h2>6.3 开始节点与创建表单</h2>
27
34
  <table><tr><th>开始节点</th><th>创建表单</th><th>角色</th></tr><tr><td>创建申请</td><td>申请表单</td><td>申请人</td></tr></table>
28
- <h2>5.4 环节配置说明</h2>
35
+ <h2>6.4 环节配置说明</h2>
29
36
  <table><tr><th>环节</th><th>角色</th></tr><tr><td>处理</td><td>负责人</td></tr></table>
30
- <h2>5.5 表单模板</h2>
37
+ <h2>6.5 表单模板</h2>
31
38
  <table><tr><th>字段</th><th>类型</th></tr><tr><td>名称</td><td>文本</td></tr></table>
32
- <h2>5.6 流程数据集</h2>
39
+ <h2>6.6 流程数据集</h2>
33
40
  <table><tr><th>字段组</th><th>写回</th></tr><tr><td>状态</td><td>处理完成</td></tr></table>
34
- <h2>5.7 列表/筛选/详情/看板入口</h2>
41
+ <h2>6.7 列表/筛选/详情/看板入口</h2>
35
42
  <table><tr><th>入口</th><th>用户</th></tr><tr><td>申请列表</td><td>申请人</td></tr></table>
36
- <h2>5.8 自动化与 AI/agent</h2>
43
+ <h2>6.8 自动化与 AI/agent</h2>
37
44
  <table><tr><th>触发</th><th>输入</th><th>输出</th><th>人工确认</th><th>异常兜底</th></tr><tr><td>提交后</td><td>申请数据</td><td>建议</td><td>负责人</td><td>转人工</td></tr></table>
38
- <h2>5.9 办结口径与下游联动</h2>
45
+ <h2>6.9 办结口径与下游联动</h2>
39
46
  <table><tr><th>办结</th><th>下游联动</th></tr><tr><td>处理完成</td><td>归档</td></tr></table>
40
- <h2>5.10 BPMAX 实现边界</h2>
47
+ <h2>6.10 BPMAX 实现边界</h2>
41
48
  <table><tr><th>BPMAX 配置可实现</th><th>配置 + 脚本/API/现有插件</th><th>需定制插件/外部服务</th></tr><tr><td>流程</td><td>自动化</td><td>无</td></tr></table>
42
- <h1>6. 流程二:辅助流程</h1>
43
- <h2>6.1 业务目标与适用场景</h2>
49
+ <h1>7. 流程二:辅助流程</h1>
50
+ <h2>7.1 业务目标与适用场景</h2>
44
51
  <p>业务目标与适用场景。</p>
45
- <h2>6.2 流程模板</h2>
52
+ <h2>7.2 流程模板</h2>
46
53
  <whiteboard type="mermaid">flowchart TD
47
54
  A[开始节点:创建辅助表单] --&gt; B[办结]</whiteboard>
48
- <h2>6.3 开始节点与创建表单</h2>
55
+ <h2>7.3 开始节点与创建表单</h2>
49
56
  <table><tr><th>开始节点</th><th>创建表单</th><th>角色</th></tr><tr><td>创建辅助任务</td><td>辅助表单</td><td>管理员</td></tr></table>
50
- <h2>6.4 环节配置说明</h2>
57
+ <h2>7.4 环节配置说明</h2>
51
58
  <table><tr><th>环节</th><th>角色</th></tr><tr><td>办结</td><td>管理员</td></tr></table>
52
- <h2>6.5 表单模板</h2>
59
+ <h2>7.5 表单模板</h2>
53
60
  <table><tr><th>字段</th><th>类型</th></tr><tr><td>名称</td><td>文本</td></tr></table>
54
- <h2>6.6 流程数据集</h2>
61
+ <h2>7.6 流程数据集</h2>
55
62
  <table><tr><th>字段组</th><th>写回</th></tr><tr><td>状态</td><td>辅助流程完成</td></tr></table>
56
- <h2>6.7 列表/筛选/详情/看板入口</h2>
63
+ <h2>7.7 列表/筛选/详情/看板入口</h2>
57
64
  <table><tr><th>入口</th><th>用户</th></tr><tr><td>辅助列表</td><td>管理员</td></tr></table>
58
- <h2>6.8 自动化与 AI/agent</h2>
65
+ <h2>7.8 自动化与 AI/agent</h2>
59
66
  <table><tr><th>触发</th><th>输入</th><th>输出</th><th>人工确认</th><th>异常兜底</th></tr><tr><td>创建后</td><td>辅助数据</td><td>建议</td><td>管理员</td><td>转人工</td></tr></table>
60
- <h2>6.9 办结口径与下游联动</h2>
67
+ <h2>7.9 办结口径与下游联动</h2>
61
68
  <table><tr><th>办结</th><th>下游联动</th></tr><tr><td>辅助任务完成</td><td>回写主流程</td></tr></table>
62
- <h2>6.10 BPMAX 实现边界</h2>
69
+ <h2>7.10 BPMAX 实现边界</h2>
63
70
  <table><tr><th>BPMAX 配置可实现</th><th>配置 + 脚本/API/现有插件</th><th>需定制插件/外部服务</th></tr><tr><td>子流程</td><td>回写</td><td>无</td></tr></table>
64
- <h1>7. 权限与导航设计</h1>
65
- <h2>7.1 PC/H5 导航设计</h2>
71
+ <h1>8. 权限与导航设计</h1>
72
+ <h2>8.1 PC/H5 导航设计</h2>
66
73
  <table><tr><th>流程</th><th>终端</th><th>目标用户</th><th>入口/菜单</th><th>路由/页面</th><th>可见权限</th><th>验收</th></tr><tr><td>主流程</td><td>PC</td><td>申请人、负责人</td><td>工作台/申请列表</td><td>/project?flow_type=main</td><td>具备流程查看权限时显示</td><td>有权限用户可进入,无权限用户隐藏</td></tr><tr><td>主流程</td><td>H5</td><td>申请人、负责人</td><td>移动工作台/申请列表</td><td>/h5/project?flow_type=main</td><td>具备流程查看权限时显示</td><td>移动端可进入并完成查看</td></tr><tr><td>辅助流程</td><td>PC</td><td>管理员</td><td>工作台/辅助列表</td><td>/project?flow_type=aux</td><td>管理员角色可见</td><td>管理员可进入,其他用户隐藏</td></tr><tr><td>辅助流程</td><td>H5</td><td>不适用:仅后台管理员处理</td><td>不提供 H5 入口</td><td>不适用:仅 PC 后台页面</td><td>H5 隐藏</td><td>移动端无入口且不能访问</td></tr></table>
67
- <h2>7.2 权限设计</h2>
74
+ <h2>8.2 权限设计</h2>
68
75
  <table><tr><th>流程</th><th>对象/字段</th><th>环节</th><th>用户/角色</th><th>可见</th><th>可编辑</th><th>操作权限</th><th>验收</th></tr><tr><td>主流程</td><td>流程项目与导航</td><td>全流程</td><td>申请人、负责人、管理员</td><td>按角色和项目关系可见</td><td>按当前环节只读或可编辑</td><td>创建、查看、编辑、删除、提交、审批、导航均按角色授权;无权限禁止</td><td>分别使用有权限与无权限用户验证</td></tr><tr><td>主流程</td><td>申请表字段</td><td>创建、处理</td><td>申请人、负责人</td><td>字段按环节可见</td><td>申请人创建时可编辑,负责人处理时部分字段只读</td><td>字段查看与编辑受控;无权限字段隐藏</td><td>逐环节验证字段可见和可编辑状态</td></tr><tr><td>辅助流程</td><td>流程项目与导航</td><td>全流程</td><td>管理员</td><td>仅管理员可见</td><td>处理环节可编辑</td><td>创建、查看、编辑、删除、提交、审批、导航均仅管理员可用;其他用户禁止</td><td>管理员成功、普通用户无权限</td></tr><tr><td>辅助流程</td><td>辅助表字段</td><td>创建、办结</td><td>管理员</td><td>字段仅管理员可见</td><td>创建时可编辑,办结后只读</td><td>字段查看与编辑受控;其他用户字段隐藏</td><td>验证办结前后字段权限变化</td></tr></table>
69
- <h1>8. BPMAX 可配置能力与需定制能力边界</h1>
76
+ <h1>9. BPMAX 可配置能力与需定制能力边界</h1>
70
77
  <p>BPMAX 配置可实现;配置 + 脚本/API/现有插件;需定制插件/外部服务。</p>
71
- <h1>9. 一期验收路径、风险与待确认事项</h1>
78
+ <h1>10. 一期验收路径、风险与待确认事项</h1>
72
79
  <p>验收、风险、待确认。</p>
@@ -0,0 +1,79 @@
1
+ <title>示例 BPMAX 蓝图方案</title>
2
+ <h1>1. 蓝图定位与目标</h1>
3
+ <p>示例目标。</p>
4
+ <h1>2. BPMAX 实施总规则</h1>
5
+ <p>流程优先,流程图使用飞书画板。</p>
6
+ <h1>3. 总体业务架构</h1>
7
+ <p>主流程与联动流程。</p>
8
+ <h2>3.1 源流程逻辑映射与完整性核对</h2>
9
+ <table><tr><th>源节点</th><th>蓝图位置</th><th>状态</th></tr><tr><td>申请</td><td>主流程阶段一</td><td>已覆盖</td></tr></table>
10
+ <h2>3.2 人工调整记录</h2>
11
+ <table><tr><th>调整</th><th>最终决策</th></tr><tr><td>无人工调整</td><td>按源流程建模</td></tr></table>
12
+ <h2>3.3 主流程阶段划分</h2>
13
+ <table><tr><th>阶段</th><th>入口</th><th>出口</th></tr><tr><td>阶段一:申请处理</td><td>提交申请</td><td>处理完成</td></tr></table>
14
+ <h2>3.4 并行场景建模决策</h2>
15
+ <table><tr><th>场景</th><th>建模选择</th><th>原因</th></tr><tr><td>辅助处理</td><td>拆分为不同子流程</td><td>独立生命周期</td></tr></table>
16
+ <h2>3.5 审批/决策矩阵评估</h2>
17
+ <table><tr><th>决策范围</th><th>条件</th><th>处理人/审批人来源</th><th>结果/下一步</th><th>维护责任人</th><th>蓝图规则矩阵</th><th>正式 BPMAX 矩阵</th><th>运行态验收</th></tr><tr><td>处理人路由</td><td>申请类型</td><td>负责人角色</td><td>进入处理环节</td><td>流程管理员</td><td>需要,落实为流程条件</td><td>本期不采用</td><td>真实用户 owner 解析与页面审批</td></tr></table>
18
+ <h1>4. 设计评审与业务确认记录</h1>
19
+ <h2>4.1 流程评审记录</h2>
20
+ <table><tr><th>评审视角</th><th>提出的问题</th><th>结论</th><th>影响的流程</th></tr><tr><td>业务流程合理性</td><td>辅助处理失败后主流程如何继续</td><td>已修改:补充回退到处理环节</td><td>主流程</td></tr><tr><td>业务人员视角</td><td>一线人员如何知道任务已分派给自己</td><td>保持原设计:工作台待办已覆盖</td><td>主流程</td></tr></table>
21
+ <h2>4.2 业务确认问答</h2>
22
+ <table><tr><th>问题</th><th>给出的选项</th><th>用户答复</th><th>落实到</th></tr><tr><td>辅助处理不合格时如何处理</td><td>A 退回原环节重做;B 另起返工流程</td><td>选择 A,退回原环节重做</td><td>主流程处理环节的回退路径</td></tr></table>
23
+ <h2>4.3 待确认事项</h2>
24
+ <table><tr><th>待确认问题</th><th>不确认的影响</th><th>当前处理</th></tr><tr><td>是否需要短信通知审批人</td><td>可能漏掉紧急审批</td><td>本期先按站内待办,上线后评估</td></tr></table>
25
+ <h1>5. 公共支撑配置</h1>
26
+ <p>共享组织、用户模型和自动化日志。</p>
27
+ <h1>6. 流程一:主流程</h1>
28
+ <h2>6.1 业务目标与适用场景</h2>
29
+ <p>本流程编号flow454372735由系统生成,表单模板form_template_id=954573815,状态用ctx.status判断,接口走/api/project/list,权限$CAN_DELETE为true时显示按钮,超时提醒插件plugin_urgent_reminder置空,状态为null时跳过。</p>
30
+ <h2>6.2 流程模板</h2>
31
+ <whiteboard type="mermaid">flowchart TD
32
+ A[开始节点:创建申请表单] --&gt; B[处理]</whiteboard>
33
+ <h2>6.3 开始节点与创建表单</h2>
34
+ <table><tr><th>开始节点</th><th>创建表单</th><th>角色</th></tr><tr><td>创建申请</td><td>申请表单</td><td>申请人</td></tr></table>
35
+ <h2>6.4 环节配置说明</h2>
36
+ <table><tr><th>环节</th><th>角色</th></tr><tr><td>处理</td><td>负责人</td></tr></table>
37
+ <h2>6.5 表单模板</h2>
38
+ <table><tr><th>字段</th><th>类型</th></tr><tr><td>名称</td><td>文本</td></tr></table>
39
+ <h2>6.6 流程数据集</h2>
40
+ <table><tr><th>字段组</th><th>写回</th></tr><tr><td>状态</td><td>处理完成</td></tr></table>
41
+ <h2>6.7 列表/筛选/详情/看板入口</h2>
42
+ <table><tr><th>入口</th><th>用户</th></tr><tr><td>申请列表</td><td>申请人</td></tr></table>
43
+ <h2>6.8 自动化与 AI/agent</h2>
44
+ <table><tr><th>触发</th><th>输入</th><th>输出</th><th>人工确认</th><th>异常兜底</th></tr><tr><td>提交后</td><td>申请数据</td><td>建议</td><td>负责人</td><td>转人工</td></tr></table>
45
+ <h2>6.9 办结口径与下游联动</h2>
46
+ <table><tr><th>办结</th><th>下游联动</th></tr><tr><td>处理完成</td><td>归档</td></tr></table>
47
+ <h2>6.10 BPMAX 实现边界</h2>
48
+ <table><tr><th>BPMAX 配置可实现</th><th>配置 + 脚本/API/现有插件</th><th>需定制插件/外部服务</th></tr><tr><td>流程</td><td>自动化</td><td>无</td></tr></table>
49
+ <h1>7. 流程二:辅助流程</h1>
50
+ <h2>7.1 业务目标与适用场景</h2>
51
+ <p>业务目标与适用场景。</p>
52
+ <h2>7.2 流程模板</h2>
53
+ <whiteboard type="mermaid">flowchart TD
54
+ A[开始节点:创建辅助表单] --&gt; B[办结]</whiteboard>
55
+ <h2>7.3 开始节点与创建表单</h2>
56
+ <table><tr><th>开始节点</th><th>创建表单</th><th>角色</th></tr><tr><td>创建辅助任务</td><td>辅助表单</td><td>管理员</td></tr></table>
57
+ <h2>7.4 环节配置说明</h2>
58
+ <table><tr><th>环节</th><th>角色</th></tr><tr><td>办结</td><td>管理员</td></tr></table>
59
+ <h2>7.5 表单模板</h2>
60
+ <table><tr><th>字段</th><th>类型</th></tr><tr><td>名称</td><td>文本</td></tr></table>
61
+ <h2>7.6 流程数据集</h2>
62
+ <table><tr><th>字段组</th><th>写回</th></tr><tr><td>状态</td><td>辅助流程完成</td></tr></table>
63
+ <h2>7.7 列表/筛选/详情/看板入口</h2>
64
+ <table><tr><th>入口</th><th>用户</th></tr><tr><td>辅助列表</td><td>管理员</td></tr></table>
65
+ <h2>7.8 自动化与 AI/agent</h2>
66
+ <table><tr><th>触发</th><th>输入</th><th>输出</th><th>人工确认</th><th>异常兜底</th></tr><tr><td>创建后</td><td>辅助数据</td><td>建议</td><td>管理员</td><td>转人工</td></tr></table>
67
+ <h2>7.9 办结口径与下游联动</h2>
68
+ <table><tr><th>办结</th><th>下游联动</th></tr><tr><td>辅助任务完成</td><td>回写主流程</td></tr></table>
69
+ <h2>7.10 BPMAX 实现边界</h2>
70
+ <table><tr><th>BPMAX 配置可实现</th><th>配置 + 脚本/API/现有插件</th><th>需定制插件/外部服务</th></tr><tr><td>子流程</td><td>回写</td><td>无</td></tr></table>
71
+ <h1>8. 权限与导航设计</h1>
72
+ <h2>8.1 PC/H5 导航设计</h2>
73
+ <table><tr><th>流程</th><th>终端</th><th>目标用户</th><th>入口/菜单</th><th>路由/页面</th><th>可见权限</th><th>验收</th></tr><tr><td>主流程</td><td>PC</td><td>申请人、负责人</td><td>工作台/申请列表</td><td>/project?flow_type=main</td><td>具备流程查看权限时显示</td><td>有权限用户可进入,无权限用户隐藏</td></tr><tr><td>主流程</td><td>H5</td><td>申请人、负责人</td><td>移动工作台/申请列表</td><td>/h5/project?flow_type=main</td><td>具备流程查看权限时显示</td><td>移动端可进入并完成查看</td></tr><tr><td>辅助流程</td><td>PC</td><td>管理员</td><td>工作台/辅助列表</td><td>/project?flow_type=aux</td><td>管理员角色可见</td><td>管理员可进入,其他用户隐藏</td></tr><tr><td>辅助流程</td><td>H5</td><td>不适用:仅后台管理员处理</td><td>不提供 H5 入口</td><td>不适用:仅 PC 后台页面</td><td>H5 隐藏</td><td>移动端无入口且不能访问</td></tr></table>
74
+ <h2>8.2 权限设计</h2>
75
+ <table><tr><th>流程</th><th>对象/字段</th><th>环节</th><th>用户/角色</th><th>可见</th><th>可编辑</th><th>操作权限</th><th>验收</th></tr><tr><td>主流程</td><td>流程项目与导航</td><td>全流程</td><td>申请人、负责人、管理员</td><td>按角色和项目关系可见</td><td>按当前环节只读或可编辑</td><td>创建、查看、编辑、删除、提交、审批、导航均按角色授权;无权限禁止</td><td>分别使用有权限与无权限用户验证</td></tr><tr><td>主流程</td><td>申请表字段</td><td>创建、处理</td><td>申请人、负责人</td><td>字段按环节可见</td><td>申请人创建时可编辑,负责人处理时部分字段只读</td><td>字段查看与编辑受控;无权限字段隐藏</td><td>逐环节验证字段可见和可编辑状态</td></tr><tr><td>辅助流程</td><td>流程项目与导航</td><td>全流程</td><td>管理员</td><td>仅管理员可见</td><td>处理环节可编辑</td><td>创建、查看、编辑、删除、提交、审批、导航均仅管理员可用;其他用户禁止</td><td>管理员成功、普通用户无权限</td></tr><tr><td>辅助流程</td><td>辅助表字段</td><td>创建、办结</td><td>管理员</td><td>字段仅管理员可见</td><td>创建时可编辑,办结后只读</td><td>字段查看与编辑受控;其他用户字段隐藏</td><td>验证办结前后字段权限变化</td></tr></table>
76
+ <h1>9. BPMAX 可配置能力与需定制能力边界</h1>
77
+ <p>BPMAX 配置可实现;配置 + 脚本/API/现有插件;需定制插件/外部服务。</p>
78
+ <h1>10. 一期验收路径、风险与待确认事项</h1>
79
+ <p>验收、风险、待确认。</p>