@yunhozz/arc 0.5.5 → 0.5.6

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (39) hide show
  1. package/MANIFEST.sha256 +38 -38
  2. package/claude/skill/SKILL.md +1 -1
  3. package/claude/skill/references/coordination.md +1 -1
  4. package/claude/skill/references/handoff-prep.md +4 -4
  5. package/claude/skill/references/handoff.md +5 -5
  6. package/claude/skill/references/planning.md +72 -24
  7. package/codex/skill/SKILL.md +1 -1
  8. package/codex/skill/references/coordination.md +1 -1
  9. package/codex/skill/references/handoff-prep.md +4 -4
  10. package/codex/skill/references/handoff.md +5 -5
  11. package/codex/skill/references/planning.md +72 -24
  12. package/gemini/skill/SKILL.md +1 -1
  13. package/gemini/skill/references/coordination.md +1 -1
  14. package/gemini/skill/references/handoff-prep.md +4 -4
  15. package/gemini/skill/references/handoff.md +5 -5
  16. package/gemini/skill/references/planning.md +72 -24
  17. package/grok/skill/SKILL.md +1 -1
  18. package/grok/skill/references/coordination.md +1 -1
  19. package/grok/skill/references/handoff-prep.md +4 -4
  20. package/grok/skill/references/handoff.md +5 -5
  21. package/grok/skill/references/planning.md +72 -24
  22. package/lib/policy/role-policy.json +1 -1
  23. package/lib/prompts/agent-fragments.json +2 -2
  24. package/lib/runtime/assignment.mjs +3 -2
  25. package/lib/runtime/cooperative.mjs +36 -3
  26. package/lib/runtime/evaluate.mjs +21 -6
  27. package/lib/runtime/gate.mjs +2 -1
  28. package/lib/runtime/schema.mjs +16 -0
  29. package/lib/runtime/target-preparation.mjs +7 -2
  30. package/lib/runtime/verification.mjs +1 -1
  31. package/package.json +1 -1
  32. package/shared/skill/runtime/assignment.mjs +3 -2
  33. package/shared/skill/runtime/cooperative.mjs +36 -3
  34. package/shared/skill/runtime/evaluate.mjs +21 -6
  35. package/shared/skill/runtime/gate.mjs +2 -1
  36. package/shared/skill/runtime/role-policy.json +1 -1
  37. package/shared/skill/runtime/schema.mjs +16 -0
  38. package/shared/skill/runtime/target-preparation.mjs +7 -2
  39. package/shared/skill/runtime/verification.mjs +1 -1
package/MANIFEST.sha256 CHANGED
@@ -6,15 +6,15 @@ d41edeb8c6631dee30c67c705d4edad977aa1631627ec9de59c013f8990f4018 bin/arc-upgrad
6
6
  957ac26119b2afa654f03b224215ce450d5e34e57f88c7475b0134e1f24e7b2a claude/agents/arc-reviewer.md
7
7
  cff8c534a281ae4b573c91572f06b9a3c668b56db67d2a3f0368ce03645e6416 claude/agents/arc-scouter.md
8
8
  dc92e45a6df1f2a1e2e9eaf08b43fcc37eb464c7bdba33157ca5baa4d053fa64 claude/agents/arc-tester.md
9
- 0773172d038d369320ff7136dd76aaf91ed3fd715699f0e69f7338aeb188b6f9 claude/skill/SKILL.md
9
+ b04cbd143a7a208343b4e5f7168ca4fbc19ce57efb789fdf11a9ef507f3a0d5d claude/skill/SKILL.md
10
10
  7073692b58dbfe3e0762a3d0d098c0810239a62a573b5e096bd04398e785dfd1 claude/skill/references/arc-visual-companion.md
11
11
  ad5db95124316afa83f78a254292beb7e066e88d3fb491a93d809d36695e2864 claude/skill/references/commit.md
12
- cd042e3279492d4478f3dfe5076da0a662e1bebe4494dac7d7f88fcbd1256763 claude/skill/references/coordination.md
12
+ 43bc9e5a39a98200f2065e5cd24d4323db5d26d053fedda6548ea2172fbbd755 claude/skill/references/coordination.md
13
13
  2f979d92fff18b7c47b526f9c598c87792a9d80fff6f89fbb1931d906b08eabf claude/skill/references/git-recovery.md
14
- 3bd94d0c5e051cb6a61ea1b97f6fd351bb38f45c6e18e4ee2d5afa65fd1c17d3 claude/skill/references/handoff-prep.md
15
- 86873b36275d6368451850c9ecf13f19c72cd825cab23812509c1ae920475efc claude/skill/references/handoff.md
14
+ c0d0523e602c6f76c4fd4abd8aa6a5a725df8534dcd7424ef8bf9876c441ebf5 claude/skill/references/handoff-prep.md
15
+ f218374b5eeb10c64f7a69f5a573af892bbcb0de48c4f68f0bb22bf674e77ac4 claude/skill/references/handoff.md
16
16
  228c75b1088370ba6117eed8f661e81862963c3a001943f9d5d770e95718fdfa claude/skill/references/limits.md
17
- eb8a2a2bff832e611a74d5983f4675e380a5f4efb7dcf07daa696cfe7ed0b64d claude/skill/references/planning.md
17
+ fc4c4eed0d20636ef591f20d2dd360a506b0faf8976800befb487fd5cff75e48 claude/skill/references/planning.md
18
18
  86d6d8f986834b1d160912cb3bdcb964f46c72fb27201854dde31c28795f025a claude/skill/references/verification.md
19
19
  62623e91224770323b47df5ddbc8b6096e3ad54c4076e542a551594ede26ccac claude/skill/references/worktree-creation.md
20
20
  e4445f3582c55861907e11dfe97ea9e87c69bcc3ff773d3d583914c198f1d024 claude/skill/scripts/apply-models.py
@@ -24,15 +24,15 @@ d274b553638206106fcaefc70aedb851b148062f6c32de83151d3c2fd583a0c8 codex/agents/a
24
24
  d6bb83328387189912356c5e344533792fd68ae7208adca77d74e1388da02c52 codex/agents/arc-reviewer.toml
25
25
  1f4c53930f0beca8bf6a8066a07f153506a8bdd89cc56e0c995443cb3ef62619 codex/agents/arc-scouter.toml
26
26
  ac65c4a1bc6a9438e11e5e9b615559229d9aa12ee85ffba0cc3848e33a4a5be3 codex/agents/arc-tester.toml
27
- cf94216e1ce8fd019c2afcc05a682b52109ac1941cf79a7df5f43aa26d85d27b codex/skill/SKILL.md
27
+ 298282fefd71bf5c31d56ac821f1689845b00278f60a3f3b9c274b194c31163d codex/skill/SKILL.md
28
28
  43aab56a8230903c7c8be08031388db666804d369dc1fcce9ac67a5932a238aa codex/skill/references/arc-visual-companion.md
29
29
  6b5d9be17318ff98b49e618e805af0d48461838984a0285cef58cf5a76d55246 codex/skill/references/commit.md
30
- acef7205f589a742a2d54ffba57f757892d465d4e20d88f3684665ded8a4fa55 codex/skill/references/coordination.md
30
+ 6e60a9e9ccc42ad2e9bac6dad6d0e9dc91912978fb21cab19442764b4dfd2912 codex/skill/references/coordination.md
31
31
  ccb714d196f4f59518f399868aa5ee5accdf96986918aed7fc3a2d7464fef662 codex/skill/references/git-recovery.md
32
- 7232f4fdd11efed5ba5d28ab33773468bbe670bc962bd7a77041541a7251d010 codex/skill/references/handoff-prep.md
33
- 6fa2dc01c960011c430e2dacda72803f7fcd1e89768cdb6145c9c10e05c6df95 codex/skill/references/handoff.md
32
+ 6e2206b6362fa0aa183e9eb60900a45e4867e330ef61b319643051346f080b0a codex/skill/references/handoff-prep.md
33
+ 8cc6de769559000ddc0ee3374274be8fb2bb63d845274c58cd0447b545991cb8 codex/skill/references/handoff.md
34
34
  53a49be84d37edf3f05cf8bf93c136f51889cc6f39f1b08e4d8704d2de7cf6c5 codex/skill/references/limits.md
35
- 0842f3396ac570784854062e83ee8f3a0a8dc82858236f711f170e5fbd5e1c69 codex/skill/references/planning.md
35
+ d0b0cf6a82fb12051a7802167e6b98a64eb3d95368e8f335df7889bb15ab4470 codex/skill/references/planning.md
36
36
  0d86d0a5ce0ea2996d8a3d0afa24adcb0cce3b2633a1fc2c7d54f3209d4a167b codex/skill/references/verification.md
37
37
  321f6196fe06dae5fdb3834489ec0ddfbd7671791f10d86ca44859385125e7a4 codex/skill/references/worktree-creation.md
38
38
  57e93213dc97465757294cb9d0ae2f4eb2f1384b955c4ca2a39f2fa38f7a9bd7 codex/skill/scripts/apply-models.py
@@ -44,15 +44,15 @@ c44ecfa6548a7aa82ed6f710a8d01a98675e371b3f53a804a130cc9e9c84eb72 gemini/agents/
44
44
  7cb6da9d5e8bfca1b245a0e3832a3a8e638085e6567de6f271df259966a2d213 gemini/agents/arc-scouter.md
45
45
  e617e373424c08fdc6f7d15781d8ccdeabba9506d861355f53327f651d77a66d gemini/agents/arc-tester.md
46
46
  d9fff57cf884a2cee6b6bacb309d63d4469bf4ce48e0a2af4678f034577fc5a5 gemini/instructions.md
47
- e9808ac9127bd64658e8f7c5807577071ca8fa17bf7d0fc8bb3cf69d4474e536 gemini/skill/SKILL.md
47
+ aec7b77377e7e039322e986a82303dd9d96561a8010e0ed54d5d2460400718e5 gemini/skill/SKILL.md
48
48
  7073692b58dbfe3e0762a3d0d098c0810239a62a573b5e096bd04398e785dfd1 gemini/skill/references/arc-visual-companion.md
49
49
  a5bf555fc9d9755183f45e326ede8b70c7ef2035b9d8b298cfcce88f5145d996 gemini/skill/references/commit.md
50
- b3586169cda1a4ed934bc772727f200cc803b36c74afd78899b496a49baca0fb gemini/skill/references/coordination.md
50
+ 98954868c9c727366033b64c6f1b7c806b5176f28f95adf199642059632f0658 gemini/skill/references/coordination.md
51
51
  a7ce238d9910c2aacbe0e3421b352c3cdc5e1a0995ba37ac41db03788960d75c gemini/skill/references/git-recovery.md
52
- 2bf14d8e43faaebc45ce9ca4a3c3c95f9e2d962596baa4cec01d4521169ecde4 gemini/skill/references/handoff-prep.md
53
- 73f1969d4f6ae8df84e58d0a9a4f873a71289a2c1f0753504078542ec619697c gemini/skill/references/handoff.md
52
+ 2bf1e614bf7122b86cb5483fc6031725f68098225dc8a23769770e33531e7e63 gemini/skill/references/handoff-prep.md
53
+ 77a0f4d539df3e0051061c0e42ff985c253da29375fd983a8c9acc3bc62a8840 gemini/skill/references/handoff.md
54
54
  f801fcf4e8662f042aafc3fbf2935d29357d6a9a87de4ddf0213cf7d80056edc gemini/skill/references/limits.md
55
- 8ce2c17d194d390889f1b6a4a93cdb2171b47527b13bc3c45173f7f39d1c6525 gemini/skill/references/planning.md
55
+ 327117874fb5f69d0307b19ef8b356bba10e243c6cde1643ad236afefd9c201a gemini/skill/references/planning.md
56
56
  ed6ce1b6dccc855e5ae3afdb4c9ff7d02bc7975a2b9dc6c7b67f7a6890b0f5ac gemini/skill/references/verification.md
57
57
  fff6cc0a3dd0f53a763e798b819b87a424ebfb70a9a282ecbc84a37112de7d04 gemini/skill/references/worktree-creation.md
58
58
  ef23a91009b22d9aa3dca0d652487cb5cd043766d09aec8c065cb85dd1d64340 grok/AGENTS.md
@@ -62,15 +62,15 @@ aabf1681132792f827cf5dc8acc87a89cc1d377c0ef7096dc4efd8fc4f7dfa1b grok/agents/ar
62
62
  a2487521d8979ee403792f82b7fc6de26da35a8f62af52d423919ea4faa7b8a0 grok/agents/arc-scouter.md
63
63
  534d79de52ff95137862612277dc0b43777f712fee1da26e781cf9231ad96bcf grok/agents/arc-tester.md
64
64
  23fbf593092be3f99c35cb802670e26d4fd954c52e5f5a195d4da89ffcedf294 grok/instructions.md
65
- 27b2e7b3034c96865de3d92c85cbd90595989940bd891d8c1d23ce1186a207ed grok/skill/SKILL.md
65
+ 0d3a52a99150fe111d1de0738daa745367f8b1e98fd042dfcd64ec0313d1c4da grok/skill/SKILL.md
66
66
  7073692b58dbfe3e0762a3d0d098c0810239a62a573b5e096bd04398e785dfd1 grok/skill/references/arc-visual-companion.md
67
67
  306521aa8be555f26ab8dc825701fcda6c5df50750d8f46088b4c417733a2d22 grok/skill/references/commit.md
68
- a2f9fe1c77f220cb5db8b4bf252170161eb46ff5a0d564c2c2141f02f307afff grok/skill/references/coordination.md
68
+ 56cb8730b9a4386be2f854d090d368d77f7de10f8455d82c0278514137f11584 grok/skill/references/coordination.md
69
69
  b62414951e00a7e3d16fd43f04df5454d2c8641342fc8ad237b84489f9ea0a28 grok/skill/references/git-recovery.md
70
- 468d5bd8c7008284f3b0009aa31198428255ad8f6a7a1dae4f4b8316c46b6bba grok/skill/references/handoff-prep.md
71
- b369cc522bd73c17b507c7a00e8ebe8b829b0831ce2802fd3b4b2019cba7a430 grok/skill/references/handoff.md
70
+ 8da19ddf916729b853cf567618ca8495d47b3f9ec9d1dadbcb2433eb3e5924b0 grok/skill/references/handoff-prep.md
71
+ 19108682cbe1438f667697af03dc3add521590233828e425e7df991d1d05590e grok/skill/references/handoff.md
72
72
  04a72a71769db83738073df27fedf4f40cdc2d2b129574d970126d13479b9c05 grok/skill/references/limits.md
73
- fe622f5c5a6ac50426d60e42275e7fe860ac7fa9977658e6a3870b1a3ba38546 grok/skill/references/planning.md
73
+ e8d10ed62272b9b7f55f3c3b405b481e5ad8302cb4e8e6e4864b68d530ba8ae1 grok/skill/references/planning.md
74
74
  0a3eeaeeb1de477d798cd2fbce039f17dadc7b138dbfd054f973507831e2af5e grok/skill/references/verification.md
75
75
  cece78cdb9a2617401d229a73289a24a56244c588bc73a868ce1c73170db8a27 grok/skill/references/worktree-creation.md
76
76
  800964b417c573aa7b2a07a76759a4750652222de63a985bc133d50194739358 install.command
@@ -138,23 +138,23 @@ d091d7310eb42aaafb0b2406167b13dfee7aea3e36cd24cb67531202c6b763b3 lib/platforms/
138
138
  79f72116e4f26572844cc6fb1f986955745c4094413f1bdc4d3dfa335fa0c6f8 lib/platforms/index.mjs
139
139
  0714f3f61d0523a7f9f7f60f4a6c8e3e588c1652dcdf69b1a7aff0b15d1d84fa lib/policy/placement.mjs
140
140
  63488ce02ddbbb5923983531a81db5e0f0523d823f0e844571fa222a2a5f8fad lib/policy/render.mjs
141
- 0bffaf6de1d1951615f018ab0ab9cb0be2c68d92b7eea7933649981421d502e2 lib/policy/role-policy.json
142
- a8f0f5931b939dcfa1a759b5e37274e74f1d4bd8075a9ca650645d8f522f9ba0 lib/prompts/agent-fragments.json
141
+ 680ea596a5d4a780fb2876b6843680bf09de8a3f97069471b2fc1ab8e578f7aa lib/policy/role-policy.json
142
+ bd3b6040660fa8b104070f1ff14d18304abc3c3614267773e8ff458192e66e24 lib/prompts/agent-fragments.json
143
143
  6f3f81a25df80d14a8928cb22dab42576639dc0c065b19c0ded1c7d8a9966d51 lib/prompts/render.mjs
144
144
  6816acd10da3ab8db1276d7ae2712b99e0c97111f57ba2d547a2cc5c3f9e165b lib/release/artifact.mjs
145
145
  be9fb9d8163306c7f5255cd28e4bfb8751402e1b24135f8f10bca6454c74bf4a lib/runtime/acceptance.mjs
146
146
  99a2edbbb4993307f99adc4a606fd965398eb312f01bbd49a616d2f232a7213e lib/runtime/adapters/claude.mjs
147
147
  3e2de23ac10e3c6445ba4b4415568a7c7c1a2292f10b9f6917e7b2d81877d81d lib/runtime/adapters/codex.mjs
148
- a90abc679322f3b90ea4c1a9762dcd20877497991a09aec5fef68f787d63306b lib/runtime/assignment.mjs
148
+ c1226285ab5411dfb8365cefdbcd18dbf50ef664b90f11bb88d03fbe5a26df3f lib/runtime/assignment.mjs
149
149
  55a4ea30673f98529d7c959292cca24319c905641cbc0f76b89f0a9685751494 lib/runtime/bootstrap.mjs
150
150
  548e78bcfc01b6c3c46ba5698414f9faafcfcf73f9e9e0c24c41420343b40239 lib/runtime/capabilities.mjs
151
151
  028c3cdb169dc29f8713c63475a7f8463d317438a33bd7c5a4316c97d8f08795 lib/runtime/cli.mjs
152
152
  1e58eb7c9dac6320d1999f472191efa96d679bfb515237264a8a664d210ec206 lib/runtime/command.mjs
153
153
  a8bc7f2960ff5e32688c843a12b5a5ee84477c4634a88680370e358e4ffecb9d lib/runtime/cooperative-schema.mjs
154
- c87b5f20a2d3d1a27cf035b52909ef07a05f154bf4224d696a55bdff025171bd lib/runtime/cooperative.mjs
155
- 643f45da15439a4b7950ba6b2cc1d91673c13f3a31044b0f2e41fc25a7b00876 lib/runtime/evaluate.mjs
154
+ 3dfb8ac9a1f23d35b3d2cdd9a9ca73a0f23d40ec758300dd5847003204535c1b lib/runtime/cooperative.mjs
155
+ e7714c2edd87641a6cca6ad208810530fe5c2651ffd7216de7456ef3c7344546 lib/runtime/evaluate.mjs
156
156
  c73244c65aad793559555f7998adfda5b5c2db2831bdb6420861d3564b31ead2 lib/runtime/external.mjs
157
- 6e29b5f6701e9355e138cb7896999511daebcef39dfc4de1fb7ad703ba13d3a7 lib/runtime/gate.mjs
157
+ 4c62d2d2f527493d57c3a95311c940fda53213137ebb4a775f6c5c93b80b3465 lib/runtime/gate.mjs
158
158
  5d8e7ac39d5e4e08357ef45579be677f4cb578df6302e2407db669885e1f20d1 lib/runtime/gemini-stream.mjs
159
159
  f501815eb8adef4582846cb067973e50fc4ece668aa70ae880803c80f39a07df lib/runtime/git-evidence.mjs
160
160
  494470cf70121ddac8d716586b0c05b1f0977f3eada8c0323ed34dc157b0db8e lib/runtime/git-query.mjs
@@ -174,12 +174,12 @@ aa89670136aa7728e3722a3fad3dafe34ac55809f6b3d7da82f324ee7660c19f lib/runtime/ro
174
174
  b411506319e53d121899604d089c189ba8fde2107ee2166ef0379b0c621de083 lib/runtime/role-routing-config.mjs
175
175
  e91dae72cd731928c6adcc0c8edebcf6e271d8604f232aff3c530c681eef7b6e lib/runtime/role-routing.mjs
176
176
  49426d4c9704e7cb70d24c159afbcd83f09dd4fdf5dc06aff365d390105f9d50 lib/runtime/role-supervisor.mjs
177
- 6b11f279cf72d579304f94819f69812b32c65cf3ba4817abbed5bf5ad7b50786 lib/runtime/schema.mjs
177
+ 4f2440ad8154ebac9b353ed49fa17d7a33b4532f4c5e8ab3de9b1699e7b25c36 lib/runtime/schema.mjs
178
178
  71b562ab7d8a3077ee16ea0709d425b841780825611edea21028997580383aa1 lib/runtime/scope.mjs
179
179
  4622d5be1be3da5f186bc1ee308c61293dd51078576024e164775dfb99f38c12 lib/runtime/store.mjs
180
- b29a9f9a9a60836271545e3f75346d51d7d0bf1ac1eccbfa3a624717f78beebb lib/runtime/target-preparation.mjs
180
+ bad72856e99133a81b39fc21744b40b91b51ef975d4c41ffa538c1f30039094a lib/runtime/target-preparation.mjs
181
181
  a6d29825f19fb828dafe171af7a7a5f502435da8ef2844538c08f602eb864d6a lib/runtime/tool-access.mjs
182
- 1f3c50ef29d11c225f68428e0c42e2ddbc7e097ad7ebd4c3bd7e25c526c7b286 lib/runtime/verification.mjs
182
+ 50fb72bbb24600ee5d91d43add41ccb24468c55ab1b17d45d906081373d61b23 lib/runtime/verification.mjs
183
183
  7e75d9bb51eac4bd1a6fccf45fb195c526bb3bc43cf0b04398b85ff7723f8689 lib/safe-fs/index.mjs
184
184
  4174dfcfcd4d69a5486b91108ec03279cfd50644109c7457aa87f9ac877fb1ac lib/safe-fs/native.mjs
185
185
  3d0362613b644a7cf12049992fc300ad1833e25e1c5160ccd46775ba17ec7c9d lib/tui/app.mjs
@@ -215,7 +215,7 @@ f270e1c7e74a025f0122d614522e71ab73bdffb11e471a91347cf9273d18d333 lib/watch/norm
215
215
  8de37fa4c68f08b4725561c99e7ca6e4ff0c7a19b96be1d3938feca1d6a084bd lib/watch/worktree-menu.mjs
216
216
  ff9c33c8b3c2bd466d54ffbe4c7139ccd87c79c7de34a6c4cde92e9f6e9b42d2 native/binding.c
217
217
  205bedc1dee1a9ffa58124c6e21256a1f0cbe24f06f7c8d7cb0b99524cfab9d0 native/binding.gyp
218
- 5fca216c018b2f2b26b3fd397164ef83702ab056a5bc4d29359d2ace6e6710a8 package.json
218
+ d3778e2394fa8a4fa36610d9d500a02724deb792e2df4f9957405f19fa62a4e1 package.json
219
219
  208c65cfde244d39ce45c3cf1b0acb128f04d21199b6b3fb5466e62db5b64af9 prebuilds/darwin-arm64/arc_safe_fs.node
220
220
  572887ac794d10a8b921d8168ea2328e31f05b45987611ff02c83114dba901af prebuilds/darwin-x64/arc_safe_fs.node
221
221
  2bb9443021f9d873712b26321de733eddd6794c45f0bc79e2d5dc98669196635 prebuilds/index.json
@@ -248,16 +248,16 @@ a6c67c1900064347c2a329990dd3c555657c51c3ec53b259a08aa01a2c26139a shared/skill/r
248
248
  be9fb9d8163306c7f5255cd28e4bfb8751402e1b24135f8f10bca6454c74bf4a shared/skill/runtime/acceptance.mjs
249
249
  99a2edbbb4993307f99adc4a606fd965398eb312f01bbd49a616d2f232a7213e shared/skill/runtime/adapters/claude.mjs
250
250
  3e2de23ac10e3c6445ba4b4415568a7c7c1a2292f10b9f6917e7b2d81877d81d shared/skill/runtime/adapters/codex.mjs
251
- a90abc679322f3b90ea4c1a9762dcd20877497991a09aec5fef68f787d63306b shared/skill/runtime/assignment.mjs
251
+ c1226285ab5411dfb8365cefdbcd18dbf50ef664b90f11bb88d03fbe5a26df3f shared/skill/runtime/assignment.mjs
252
252
  55a4ea30673f98529d7c959292cca24319c905641cbc0f76b89f0a9685751494 shared/skill/runtime/bootstrap.mjs
253
253
  548e78bcfc01b6c3c46ba5698414f9faafcfcf73f9e9e0c24c41420343b40239 shared/skill/runtime/capabilities.mjs
254
254
  028c3cdb169dc29f8713c63475a7f8463d317438a33bd7c5a4316c97d8f08795 shared/skill/runtime/cli.mjs
255
255
  1e58eb7c9dac6320d1999f472191efa96d679bfb515237264a8a664d210ec206 shared/skill/runtime/command.mjs
256
256
  a8bc7f2960ff5e32688c843a12b5a5ee84477c4634a88680370e358e4ffecb9d shared/skill/runtime/cooperative-schema.mjs
257
- c87b5f20a2d3d1a27cf035b52909ef07a05f154bf4224d696a55bdff025171bd shared/skill/runtime/cooperative.mjs
258
- 643f45da15439a4b7950ba6b2cc1d91673c13f3a31044b0f2e41fc25a7b00876 shared/skill/runtime/evaluate.mjs
257
+ 3dfb8ac9a1f23d35b3d2cdd9a9ca73a0f23d40ec758300dd5847003204535c1b shared/skill/runtime/cooperative.mjs
258
+ e7714c2edd87641a6cca6ad208810530fe5c2651ffd7216de7456ef3c7344546 shared/skill/runtime/evaluate.mjs
259
259
  c73244c65aad793559555f7998adfda5b5c2db2831bdb6420861d3564b31ead2 shared/skill/runtime/external.mjs
260
- 6e29b5f6701e9355e138cb7896999511daebcef39dfc4de1fb7ad703ba13d3a7 shared/skill/runtime/gate.mjs
260
+ 4c62d2d2f527493d57c3a95311c940fda53213137ebb4a775f6c5c93b80b3465 shared/skill/runtime/gate.mjs
261
261
  5d8e7ac39d5e4e08357ef45579be677f4cb578df6302e2407db669885e1f20d1 shared/skill/runtime/gemini-stream.mjs
262
262
  f501815eb8adef4582846cb067973e50fc4ece668aa70ae880803c80f39a07df shared/skill/runtime/git-evidence.mjs
263
263
  494470cf70121ddac8d716586b0c05b1f0977f3eada8c0323ed34dc157b0db8e shared/skill/runtime/git-query.mjs
@@ -274,16 +274,16 @@ b80c7862721a1b9401b7165c6ff0519ec4b85ac46c5fd44442f58e7d5a907b9c shared/skill/r
274
274
  95d8e858063bc36f6f131db210d1d47763409a6ed09eba42fb6c19f36f8b04a0 shared/skill/runtime/role-dispatch-policy.mjs
275
275
  aa89670136aa7728e3722a3fad3dafe34ac55809f6b3d7da82f324ee7660c19f shared/skill/runtime/role-dispatch-store.mjs
276
276
  602e17f94fe5038802bd64db835c75e4f7bce895109f61fd83cf640d6163aca1 shared/skill/runtime/role-observe.mjs
277
- 0bffaf6de1d1951615f018ab0ab9cb0be2c68d92b7eea7933649981421d502e2 shared/skill/runtime/role-policy.json
277
+ 680ea596a5d4a780fb2876b6843680bf09de8a3f97069471b2fc1ab8e578f7aa shared/skill/runtime/role-policy.json
278
278
  b411506319e53d121899604d089c189ba8fde2107ee2166ef0379b0c621de083 shared/skill/runtime/role-routing-config.mjs
279
279
  e91dae72cd731928c6adcc0c8edebcf6e271d8604f232aff3c530c681eef7b6e shared/skill/runtime/role-routing.mjs
280
280
  49426d4c9704e7cb70d24c159afbcd83f09dd4fdf5dc06aff365d390105f9d50 shared/skill/runtime/role-supervisor.mjs
281
- 6b11f279cf72d579304f94819f69812b32c65cf3ba4817abbed5bf5ad7b50786 shared/skill/runtime/schema.mjs
281
+ 4f2440ad8154ebac9b353ed49fa17d7a33b4532f4c5e8ab3de9b1699e7b25c36 shared/skill/runtime/schema.mjs
282
282
  71b562ab7d8a3077ee16ea0709d425b841780825611edea21028997580383aa1 shared/skill/runtime/scope.mjs
283
283
  4622d5be1be3da5f186bc1ee308c61293dd51078576024e164775dfb99f38c12 shared/skill/runtime/store.mjs
284
- b29a9f9a9a60836271545e3f75346d51d7d0bf1ac1eccbfa3a624717f78beebb shared/skill/runtime/target-preparation.mjs
284
+ bad72856e99133a81b39fc21744b40b91b51ef975d4c41ffa538c1f30039094a shared/skill/runtime/target-preparation.mjs
285
285
  a6d29825f19fb828dafe171af7a7a5f502435da8ef2844538c08f602eb864d6a shared/skill/runtime/tool-access.mjs
286
- 1f3c50ef29d11c225f68428e0c42e2ddbc7e097ad7ebd4c3bd7e25c526c7b286 shared/skill/runtime/verification.mjs
286
+ 50fb72bbb24600ee5d91d43add41ccb24468c55ab1b17d45d906081373d61b23 shared/skill/runtime/verification.mjs
287
287
  fa5659948374d4f555594f47f6da073b40dc503e921aeeece30df4362b3051a5 vendor/toml/LICENSE
288
288
  ef924a2a42c7f16761e7098c3ed8e04195ecbcb02d5c369db0aee76f251a409c vendor/toml/dist/date.js
289
289
  76f8e47f5fc57273748242d59570656d7c921a80bceb2291ca5a4d7a723e9f29 vendor/toml/dist/error.js
@@ -15,7 +15,7 @@ description: Coordinate scoped research planning implementation verification and
15
15
 
16
16
  **Role routing gate:** Before any specialist creation or assignment, check whether `../../arc-role-platform-routing.prepared.json` exists relative to this skill directory. If it exists, run `routing-status` and follow [coordination](references/coordination.md#composite-platform-role-dispatch) for every role, using only the returned native profile or bridge. NEVER substitute a generic or built-in agent (for example `general-purpose`, `fork` or `default`), an `arc-<role>`/`arc_<role>` name, another model or another platform. If routing is unavailable, held or unverified, hold that role and report it. Without the marker, use the standalone role names.
17
17
 
18
- **Pre-action gate record:** Before a task's first specialist creation or assignment, its first repository edit, or any decision to skip the Planner design stage, read the applicable references first, then post one line in a user-visible progress message with `mode` (standalone, or composite with routing revision), `run` (Run mode in effect: `supervised` or `full-auto`), `class` (work type), `path` (direct with all F1–F8 proven, Spike, Bounded or Architectural), `design` (Planner design required, approved or omitted, and why), `depth` (plan required, or the omission reason), `risk` (level and reason) and `refs` (reference sections actually read). A field that a later stage decides (for example `path` or `depth` before Planner design) is recorded as `pending` with that stage; for work with no edits or design, such as Scouter-only research, `path`, `design` and `depth` are `n/a` with the reason; any other empty or unverified field holds that action. Post a new line when a recorded fact changes. Feature, behavior and bug-fix implementation starts with Planner design unless the direct path is selected with all F1–F8 proven.
18
+ **Pre-action gate record:** Before a task's first specialist creation or assignment, its first repository edit, or any decision to skip the Planner design stage, read the applicable references first, then post one line in a user-visible progress message with `mode` (standalone, or composite with routing revision), `run` (Run mode in effect: `supervised` or `full-auto`), `class` (work type), `path` (direct with all F1–F8 proven, Spike, Bounded or Architectural), `design` (Planner design required, approved, start confirmed (Architectural) or omitted, and why), `depth` (plan required, or the omission reason), `risk` (level and reason) and `refs` (reference sections actually read). A field that a later stage decides (for example `path` or `depth` before Planner design) is recorded as `pending` with that stage; for work with no edits or design, such as Scouter-only research, `path`, `design` and `depth` are `n/a` with the reason; any other empty or unverified field holds that action. Post a new line when a recorded fact changes. Feature, behavior and bug-fix implementation starts with Planner design unless the direct path is selected with all F1–F8 proven.
19
19
 
20
20
  Each top-level task (one plan task, or the entire request without a plan) receives a fresh Implementer. Each task requiring Tester receives fresh Tester, never reused from another task. Every Tester brief, including correction rechecks and resumed assignments, MUST state `mode: task` or `mode: final` under [verification](references/verification.md#test-scope-and-result-comparison). Same-task corrections and rechecks use the current Implementer and, for Tester findings or required Tester rechecks, the current Tester while assignment remains valid. Once final overall Reviewer review begins on plan work, every Reviewer finding, including behavior, repeats Implementer → Reviewer without Tester reassignment until resolved; keep corrections uncommitted through rechecks. Tester findings remain Implementer → Tester; final-mode Tester work concludes before that review begins. Tester findings alone create no new task. Restart exceptions follow coordination and verification.
21
21
 
@@ -89,7 +89,7 @@ The [task envelope](handoff.md#orchestrator-direct-path-for-small-tasks) fits th
89
89
 
90
90
  ## Planner dispatch efficiency
91
91
 
92
- Before Planner dispatch, evaluate F1–F8 direct-path eligibility and Bounded plan-omission eligibility independently. Enter each path only when all of that path's existing conditions are proven; if neither path qualifies, use normal full evaluation. Orchestrator can read a few already identified files; route material research and broad static exploration to Scouter. Planner briefs carry path/line-verified evidence and a Read/Grep exploration budget (default about 15 for Bounded and about 30 for Architectural when no task-specific number is set; state a number before depth is chosen or for Spike work); additional broad exploration goes to Scouter, not Planner. NEVER reuse a Planner across stages. Within the design/brainstorming stage one Planner handles the initial draft, its consolidated correction and any eligible further call; within a spec or plan stage, that stage's Planner is reused only for a budget-hold delta. After design approval, the spec stage and the plan stage each use a fresh Planner whose brief contains every required field plus saved document paths and approved versions; cite a prior brief only when it is an accessible file. A Planner return that stops at the budget with a Scouter request is an input hold, not a missing or failed draft: after Scouter evidence arrives, resend that stage's brief as a delta to the same stage Planner, which counts as new input. In the design stage, a resend after a return without a draft uses the consolidated-correction opportunity; later further calls still need new input. Orchestrator MAY set a handback size limit in the brief.
92
+ Before Planner dispatch, evaluate F1–F8 direct-path eligibility and Bounded plan-omission eligibility independently. Enter each path only when all of that path's existing conditions are proven; if neither path qualifies, use normal full evaluation. Orchestrator can read a few already identified files; route material research and broad static exploration to Scouter. Planner briefs carry path/line-verified evidence and a Read/Grep exploration budget (default about 15 for Bounded and about 30 for Architectural when no task-specific number is set; state a number before depth is chosen or for Spike work); additional broad exploration goes to Scouter, not Planner. NEVER reuse a Planner across stages, except that on the Architectural path the design Planner continues as the spec Planner after [start confirmation](planning.md#architectural-start-confirmation) while role, context and source remain valid. Within the design/brainstorming stage one Planner handles every [design conversation](planning.md#design-conversation) response, the final design, its consolidated correction and any eligible further call; within a spec or plan stage, that stage's Planner is reused only for a budget-hold delta. Every plan stage, and an Architectural spec stage without that continuation, uses a fresh Planner whose brief contains every required field plus saved document paths and approved versions (for the Architectural plan stage, the reviewed spec path, version and SHA-256); cite a prior brief only when it is an accessible file. A Planner return that stops at the budget with a Scouter request is an input hold, not a missing or failed draft: after Scouter evidence arrives, resend that stage's brief as a delta to the same stage Planner, which counts as new input. In the design stage, conversation responses are expected returns and use no correction opportunity; calls after the final-design correction still need new input. Orchestrator MAY set a handback size limit in the brief.
93
93
 
94
94
  <a id="models"></a>
95
95
  ## Models
@@ -9,7 +9,7 @@ Offer three options: current checkout, new task branch in that checkout, or new
9
9
  <a id="execution-target-request-gate"></a>
10
10
  ### Execution-target request gate
11
11
 
12
- Before requesting choice, verify/record planned document scope, absolute paths/coverage, design/plan depth/valid omissions, dependencies and order. Completed documents/individual approvals are not yet required; unfinished drafts alone do not block asking. Include required artifacts, not mandatory specs everywhere. Settle scope/dependencies needed to identify the target without requiring choice evidence before asking.
12
+ Before requesting choice, verify/record planned document scope, absolute paths/coverage, design/plan depth/valid omissions, dependencies and order. Completed documents/approvals are not yet required; unfinished drafts alone do not block asking. Include required artifacts, not mandatory specs everywhere. Settle scope/dependencies needed to identify the target without requiring choice evidence before asking.
13
13
 
14
14
  Present each supported option with:
15
15
 
@@ -30,7 +30,7 @@ Before branch/worktree preparation, obtain the complete first required draft and
30
30
  3. Staged/unstaged/untracked state, preservation and ownership.
31
31
  4. Exact command/paths/approved scope; no unresolved failure or partial completion.
32
32
 
33
- Missing or mismatched evidence blocks mutation. Initial preparation verifies planned scope/inputs without requiring complete approved documents. Document staging/commit also verifies the full set, individual approvals/versions/dependencies and actual index. Read-only Git remains allowed. External skills' early commits grant no authority.
33
+ Missing or mismatched evidence blocks mutation. Initial preparation verifies planned scope/inputs without requiring complete approved documents. Document staging/commit also verifies the full set, applicable approvals (Architectural combined spec+plan approval; Bounded plan approval)/versions/dependencies and actual index. Read-only Git remains allowed. External skills' early commits grant no authority.
34
34
 
35
35
  After branch/commit operations verify path/branch/HEAD/preservation/result before dependent action. After staging verify index paths/diff and finalized message. Unrelated staged paths block changes. Revalidate affected evidence after a change or failure; NEVER retroactively authorize pre-gate actions.
36
36
 
@@ -66,7 +66,7 @@ After explicit selection or valid reuse, verify absolute workspace, branch/detac
66
66
  <a id="planning-document-commit"></a>
67
67
  ### Planning document commit
68
68
 
69
- Begin after target preparation and all applicable documents are written/individually approved. Paths requiring both spec and plan (Architectural or spec-required Bounded) permit no document commit on spec approval alone; after every planned spec/plan is individually approved, record the remaining ones in one planning-document commit. Plan-less paths commit their own approved document set. Verify full set/evidence/versions before staging/commit. New branches require successful switch, actual branch, unchanged path/preservation. Current checkout requires selected branch/detached HEAD/path/changes.
69
+ Begin after target preparation and all applicable documents are written and approved. Architectural paths permit no document commit before the one combined spec+plan approval; after it, record the spec and every plan in one planning-document commit. Bounded plan-required paths commit their approved plans in one planning-document commit. Plan-less paths commit their own approved document set. Verify full set/evidence/versions before staging/commit. New branches require successful switch, actual branch, unchanged path/preservation. Current checkout requires selected branch/detached HEAD/path/changes.
70
70
  For worktrees verify actual registration/`EnterWorktree` session attachment/identity/base/branch and directly written documents or protected legacy/restart transfers before target docs commits. Commit remaining approvals once at target; no automatic source docs commit.
71
71
 
72
72
  1. Verify already committed approvals by SHA, actual message/paths/content and selected-checkout validity; reuse without recommitting.
@@ -83,7 +83,7 @@ Skip only when depth rules required no documents and none were created; record w
83
83
 
84
84
  After initial document batching, follow [planning](planning.md#plan-updates-during-execution) for spec/plan revisions and same-task progress records. Orchestrator alone manages pending revisions and Git; preserve unrelated work and actual approval chronology.
85
85
 
86
- 1. Classify progress records versus contract/mechanical plan revisions. Verify applicable approvals, actual approval time, ordered written-spec/dependent-plan approval, preparation and holds; contract revisions require a fresh Implementer for remaining work. NEVER authorize past work retroactively.
86
+ 1. Classify progress records versus contract/mechanical plan revisions. Verify applicable approvals under [planning](planning.md#plan-updates-during-execution) (combined spec+plan revision approval, plan approval, or spec approval with recorded no-plan-impact), actual approval time, preparation and holds; contract revisions require a fresh Implementer for remaining work. NEVER authorize past work retroactively.
87
87
  2. After approval edit the same document, append its revision-history row and leave it uncommitted. Record each pending revision with its approved content hash and approval in the canonical `.git/arc/handoff/<workflow>/` record: `gitPath`, `fromVersion`, `toVersion`, `contentHash` (approved content SHA-256), `approvalRef`, `approvedAt` (actual time), `classification` (`contract|mechanical`), `reason`, `affectedTaskIds`, `status` (`pending|committed`). Preserve each full approved version at `.git/arc/handoff/<workflow>/plan-revisions/<flattened-gitPath>.v<N>.md`; NEVER overwrite prior approvals or copies.
88
88
  3. In every role brief identify the Orchestrator-owned pending revision, working-tree version and `contentHash`. If another task's progress records were committed after approval, also include in the brief the SHA-256 of the working-tree document content, which is the approved content plus those progress records. Implementer and Tester preserve it untouched as neither their own work nor unrelated user changes.
89
89
  4. Include all pending revisions in the accepted commit of the first top-level task executed or reconfirmed against the revised version, otherwise a current task or final Reviewer follow-up commit. Only before overall completion, a standalone `docs(plan)` closing commit MAY include all pending revisions/trailers and no implementation files when no implementation work remains; keep canonical supporting evidence. Exclude pending revision hunks from independent prior-version task commits; hold the commit if separation is unsafe. Add `Plan-Revision: <gitPath> v<from> -> v<to>`, `Plan-Approved-At: <gitPath> v<N> <actual ISO 8601 approval time>` and `Plan-Reason: <gitPath> v<N> <reason>`: one revision trailer per document, approval/reason trailers per version after from through to; repeat keys as needed and preserve existing Git trailers. Use ASCII `->`. Plan-level progress records follow [commit](commit.md#execution-time-plan-document-updates) and alone never justify the closing commit.
@@ -24,7 +24,7 @@ Before every Implementer start or restart, verify access to the supplied absolut
24
24
 
25
25
  The first required spec/plan draft follows choice and verified source evidence and precedes actual preparation; saving follows verified preparation. Initial design MAY precede choice. Preparation alone authorizes no Implementer. All approvals/full documents/verified batch or valid absence/final Git checks remain. Separate planned scope/paths, actual preparation and drafting/save/approval/commit, recording chronology/gaps.
26
26
 
27
- After initial design approval record explicit selection: current checkout, new task branch from verified base there, or managed worktree/task branch. Without choice/valid reuse, wait. Reuse through unchanged-scope/target drafting/implementation. Authorized HEAD/dirty changes alone do not invalidate choice; verify preservation/ownership. Changed scope/target requires fresh choice before dependent drafting/preparation without waiting for full documents. NEVER fall back automatically.
27
+ After initial design approval, or within the Architectural [start confirmation](planning.md#architectural-start-confirmation), record explicit selection: current checkout, new task branch from verified base there, or managed worktree/task branch. Without choice/valid reuse, wait. Reuse through unchanged-scope/target drafting/implementation. Authorized HEAD/dirty changes alone do not invalidate choice; verify preservation/ownership. Changed scope/target requires fresh choice before dependent drafting/preparation without waiting for full documents. NEVER fall back automatically.
28
28
 
29
29
  <a id="implementer-handoff-gate"></a>
30
30
  ### Implementer handoff gate
@@ -167,7 +167,7 @@ Evaluate target choice validity separately from evidence validity. Approved HEAD
167
167
  <a id="cooperative-cli-verification-handoff"></a>
168
168
  ## Cooperative CLI verification handoff
169
169
 
170
- Supported spec+plan handoffs include registered task contract, exact check descriptor, task/final scope, `status.changeFingerprints`, independent actor attestations, intent ID/result messageRef/verdict. Authorized roles execute after `prepare` and record through `result`; CLI records prove no identity/compliance.
170
+ Supported plan-mode handoffs include registered task contract, exact check descriptor, task/final scope, `status.changeFingerprints`, independent actor attestations, intent ID/result messageRef/verdict. Authorized roles execute after `prepare` and record through `result`; CLI records prove no identity/compliance.
171
171
 
172
172
  Include spec/plan paths in cooperative `task.paths` to commit task progress records and pending revisions; missing paths hold the commit until an approved scope revision, and the cooperative CLI does not support the standalone `docs(plan)` closing commit, so include pending revisions in task or follow-up commits. When `task.paths` includes the plan path, the cooperative CLI holds R-8 separation commits (staging progress records without revision hunks) at both preflight and result verification; while revisions are pending, prior-version tasks cannot be committed through the CLI. Plan-level progress records follow the same `task.paths` rule; when no task or follow-up commit follows, they stay only in the canonical record, and the cooperative CLI adds no support for them.
173
173
 
@@ -190,9 +190,9 @@ In approved plan mode all mutations pass stdin JSON through `node "$ARC_RUNTIME_
190
190
 
191
191
  Entry installation/update migrates no common-directory state or approvals. Preserve runtime/hash/target/actor/revision gates; drift holds evidence for current recovery/approval. New workflows prove no historical compliance.
192
192
 
193
- 1. Verify approved spec/plan docs-only commit, exact set/Git objects/current bytes. Only then run `init`, approval `record`, `prepare`, even if approval preceded commit.
193
+ 1. Verify the approved planning-document docs-only commit (Architectural spec/plan; Bounded plan), exact set/Git objects/current bytes. Only then run `init`, approval `record`, `prepare`, even if approval preceded commit.
194
194
  2. At final HEAD `init` with `mode: "plan"`, `actor: {id: "operator"}`, `selection: {messageRef, contentHash}`.
195
- 3. Record confirmed approval as `{requestId, expectedRevision, actor, evidence: {kind: "approval", messageRef, data: {approvalVersion, documentVersion, documents}}}`. `documents` is exactly spec/plan with `{kind, path, gitPath, contentHash, approvalRef, commit}`; `contentHash`=`sha256:<hex>`, `approvalRef` matches approval `messageRef`. HEAD drift needs fresh observation/renewed approval, not reconnection to old intent.
195
+ 3. Record confirmed approval as `{requestId, expectedRevision, actor, evidence: {kind: "approval", messageRef, data: {approvalVersion, documentVersion, documents}}}`. `documents` is exactly the prepared document set (spec/plan for Architectural, plan for Bounded) with `{kind, path, gitPath, contentHash, approvalRef, commit}`; `contentHash`=`sha256:<hex>`, `approvalRef` matches approval `messageRef`. HEAD drift needs fresh observation/renewed approval, not reconnection to old intent.
196
196
  4. `prepare` with `{requestId, expectedRevision, actor, operation: "assign-agent", taskId, arguments: {role: "implementer", paths, operations: ["edit"], documents, approvalRef, approvalVersion, documentVersion, correlation}}`. Absolute `paths` remain in checkout. Confirm `allow`, `persisted: true` and saved intent.
197
197
  5. Invoke native assignment with saved task/scope/correlation.
198
198
  6. Record `{requestId, expectedRevision, actor, intentId, result: {status, messageRef, data: {correlation, taskId, agentId}}}`. `intentId` is prepare requestId. Distinguish `succeeded`, `failed`, `unknown`, `mismatch`. Success needs returned agent ID; unknown/mismatch holds duplicate assignment for investigation.
@@ -202,7 +202,7 @@ Approval/assignment are `operator-attested`, not native identity/event authentic
202
202
  <a id="external-operations-and-recovery-in-the-cooperative-cli"></a>
203
203
  ## External operations and recovery in the cooperative CLI
204
204
 
205
- Three phases cover state/documents/assignment; scope/verification/acceptance/focused commits; external approval/results/audit recovery. Inspect nine areas/limits with `status.support`. Support is spec+plan `plan`, not no-plan/omission. CLI executes no native/provider/push/merge/deploy/publish calls.
205
+ Three phases cover state/documents/assignment; scope/verification/acceptance/focused commits; external approval/results/audit recovery. Inspect nine areas/limits with `status.support`. Support is `plan` mode with the Architectural spec+plan or Bounded plan-only set, not no-plan/omission. CLI executes no native/provider/push/merge/deploy/publish calls.
206
206
 
207
207
  Operator-confirmed approvals/results are `operator-attested`, `nativeVerified: false`, `remoteVerified: false`; no outside-call blocking or independent remote verification.
208
208
 
@@ -22,7 +22,7 @@ If explicitly requested probe+implementation is fully specified, classify the wh
22
22
  <a id="formal-drafting-boundary"></a>
23
23
  ## Formal drafting boundary
24
24
 
25
- Initial design/brainstorming MAY precede target choice. Before the first required spec/plan draft, record verified source workspace/repository, branch/HEAD, changes/ownership, explicit choice, approved scope/depth/document set and planned relative paths. Planner returns the complete first draft and self-review in chat before target preparation. Revalidate source and selected target at the focused preparation gate, prepare the chosen target, compare actual target and preservation, then review and save in the verified prepared target. Planned paths prove no preparation. Missing or mismatched evidence holds affected work; preparation alone never starts Implementer.
25
+ Initial design/brainstorming MAY precede target choice. On the Architectural path, [start confirmation](#architectural-start-confirmation) supplies the approved scope/depth/document set and the explicit choice that the next sentence requires. Before the first required spec/plan draft, record verified source workspace/repository, branch/HEAD, changes/ownership, explicit choice, approved scope/depth/document set and planned relative paths. Planner returns the complete first draft and self-review in chat before target preparation. Revalidate source and selected target at the focused preparation gate, prepare the chosen target, compare actual target and preservation, then review and save in the verified prepared target. Planned paths prove no preparation. Missing or mismatched evidence holds affected work; preparation alone never starts Implementer.
26
26
 
27
27
  Small-task direct edits follow only [handoff](handoff.md#orchestrator-direct-path-for-small-tasks), stopping/reclassifying changed scope/risk. Otherwise follow this reference. `brainstorming`/`writing-plans` instruct existing roles, not extra agents; ARC routing/approval overrides alternate executors. Missing required skills block their stage. Integration includes saving, reviewing and directly revising the same spec or plan after the complete Planner first draft; design/brainstorming retain their Planner drafting path.
28
28
 
@@ -37,11 +37,45 @@ Before Planner dispatch, evaluate F1–F8 direct-path eligibility and Bounded pl
37
37
 
38
38
  1. Preflight relevant policy/references/profiles/tests/parity/manifest/conflicts. Apply formal-target and coordination provenance/input/local-skill gates, including required paths, approved bounded read alternatives and return conditions. Missing inputs/conflicts hold drafting. Read recovery grants no preparation/check/write/approval authority.
39
39
  2. Maintain a compact ledger of original requirements/IDs, approved/open decisions, exclusions and scope deltas. Consolidate intervening user changes into one brief delta. Separate approvals, path/line-verified facts, assumptions and open decisions.
40
- 3. NEVER reuse a Planner instance across stages. Within the design/brainstorming stage, reuse one Planner instance for the initial draft, its consolidated correction and any eligible further call while role, context and source remain valid; within a spec or plan stage, reuse that stage's Planner only for a budget-hold delta. After design approval, the spec stage and the plan stage each use a fresh Planner; its initial brief contains every required field plus saved document paths and approved versions, and cites a prior brief only when that brief is an accessible file. Send one complete stage-specific initial brief. Include verified source/HEAD/ownership, selected target intent and planned paths (or prepared target for later stages), and scope/exclusions/depth/dependencies/shared contracts/criteria/checks/evidence/holds. Include preceding approved versions and paths, current behavior and connected source/generated/runtime/installer/docs, policy conflicts/resolution direction and exact deliverable. Visual work includes approved sources/versions/criteria/open interpretations. Follow-up briefs send changed fields and cite an accessible prior brief for unchanged fields; inaccessible conversations or hashes alone cannot replace required inputs. Reuse evidence only for the same source set, absolute locator, resolved path, content fingerprint, purpose, approval scope and accessible context. When source, target or scope changed, reconfirm affected inputs.
41
- 4. Planner returns the complete proportional first draft and self-review. Bounded plan density follows the Planner profile's ARC adaptation (per task ID/title, goal/scope/files, predecessors, criteria and required checks; short self-review checklist), while Architectural plans keep full writing-plans.md density. Briefs carry the Read/Grep exploration budget and MAY set a handback size limit. A return that stops at the exploration budget with a Scouter request is an input hold, not a missing or failed first draft; resend the stage brief as a delta with the Scouter evidence to the same stage Planner. In the design stage, a resend after a return without a draft uses the consolidated-correction opportunity. Orchestrator saves and reviews it against the fixed checklist: scope/evidence; targets/ownership/paths; policy/conflicts; task boundaries/dependencies/criteria; checks/evidence/holds; roles/approval/commit boundaries; completeness. For spec or plan, Orchestrator directly revises the same document, including substantive omissions, before requesting approval. New product decisions outside approved scope require user input first; Orchestrator then revises the document. Missing or failed first drafts stop the stage and do not transfer initial authorship.
42
- 5. For design and brainstorming, finish the checklist before one consolidated correction covering every substantive omission with criterion/defect/evidence/expected fix. Use deltas/`unchanged`; NEVER split by omission. Further calls after correction need approved material scope/evidence changes or concrete unmet checklist items plus meaningful new input/criterion progress. State changed input/target criterion/expected artifact/progress. Existing-scope omissions need no renewed scope approval. Repeated unmet criteria without new input/evidence/progress hold the stage; report criterion/observation/exact unblock decision. DO NOT repeat resolved questions or count rewording/agent replacement as progress.
43
-
44
- For design and brainstorming, allow initial draft and one consolidated correction. Orchestrator handles reformatting, re-expression, save and patch errors without Planner calls. Separate substantive work uses normal gates. Design/spec/plan stages remain separately ordered; spec approval precedes dependent planning. Add no fixed call cap/profile count condition or incomplete-draft acceptance.
40
+ 3. NEVER reuse a Planner instance across stages, except the Architectural continuation below. Within the design/brainstorming stage, reuse one Planner instance for every [design conversation](#design-conversation) response, the final design, its consolidated correction and any eligible further call while role, context and source remain valid; within a spec or plan stage, reuse that stage's Planner only for a budget-hold delta. On the Architectural path, the design Planner returns the start summary instead of a final design and, after [start confirmation](#architectural-start-confirmation), continues as the spec Planner through a spec-stage delta brief while role, context and source remain valid. Every plan stage, and an Architectural spec stage without that continuation, uses a fresh Planner; its initial brief contains every required field plus saved document paths and approved versions (for the Architectural plan stage, the reviewed spec path, version and SHA-256), and cites a prior brief only when that brief is an accessible file. Send one complete stage-specific initial brief. Include verified source/HEAD/ownership, selected target intent and planned paths (or prepared target for later stages), and scope/exclusions/depth/dependencies/shared contracts/criteria/checks/evidence/holds. Include preceding approved versions and paths, current behavior and connected source/generated/runtime/installer/docs, policy conflicts/resolution direction and exact deliverable. Visual work includes approved sources/versions/criteria/open interpretations. Follow-up briefs send changed fields and cite an accessible prior brief for unchanged fields; inaccessible conversations or hashes alone cannot replace required inputs. Reuse evidence only for the same source set, absolute locator, resolved path, content fingerprint, purpose, approval scope and accessible context. When source, target or scope changed, reconfirm affected inputs.
41
+ 4. Planner returns the complete proportional first draft and self-review. Bounded plan density follows the Planner profile's ARC adaptation (per task ID/title, goal/scope/files, predecessors, criteria and required checks; short self-review checklist), while Architectural plans keep full writing-plans.md density. Briefs carry the Read/Grep exploration budget and MAY set a handback size limit. A return that stops at the exploration budget with a Scouter request is an input hold, not a missing or failed first draft; resend the stage brief as a delta with the Scouter evidence to the same stage Planner. In the design stage, [design conversation](#design-conversation) responses are expected returns and use no correction opportunity. Orchestrator saves and reviews it against the fixed checklist: scope/evidence; targets/ownership/paths; policy/conflicts; task boundaries/dependencies/criteria; checks/evidence/holds; roles/approval/commit boundaries; completeness; inventory/scope notation (final design, Architectural start summary and Architectural spec: complete [decision inventory](#decision-inventory); every document: every file or contract marked change or no change (reason), no ambiguous scope wording). For spec or plan, Orchestrator directly revises the same document, including substantive omissions, before requesting approval. New product decisions outside approved scope require user input first; Orchestrator then revises the document. Missing or failed first drafts stop the stage and do not transfer initial authorship.
42
+ 5. For design and brainstorming, finish the checklist on the final design before one consolidated correction covering every substantive omission with criterion/defect/evidence/expected fix. Use deltas/`unchanged`; NEVER split by omission. Further calls after correction need approved material scope/evidence changes or concrete unmet checklist items plus meaningful new input/criterion progress. State changed input/target criterion/expected artifact/progress. Existing-scope omissions need no renewed scope approval. Repeated unmet criteria without new input/evidence/progress hold the stage; report criterion/observation/exact unblock decision. DO NOT repeat resolved questions or count rewording/agent replacement as progress.
43
+
44
+ For design and brainstorming, converse under [design conversation](#design-conversation) and allow one consolidated correction on the final design. On the Architectural path the conversation ends with the start summary instead of a final design; the summary receives no consolidated correction, and Orchestrator's review and direct revision apply to the spec draft. Orchestrator handles reformatting, re-expression, save and patch errors without Planner calls. Separate substantive work uses normal gates. Design, spec and plan stages remain separately ordered: Architectural plan drafting starts only after the spec is saved, reviewed and revised and its reviewed path, version and SHA-256 are fixed; NEVER draft spec and plan concurrently. Add no fixed call cap/profile count condition or incomplete-draft acceptance.
45
+
46
+ <a id="design-conversation"></a>
47
+ ### Design conversation
48
+
49
+ These rules apply to feature/design/behavior design and brainstorming. Spike, the direct path (F1–F8) and non-behavior paths keep their existing rules and need no conversation. Planner never talks to the user directly: Planner → Orchestrator → user → Orchestrator → the same design Planner.
50
+
51
+ 1. Response shape: each design Planner response is exactly one of: one question; 2–3 approaches with a recommendation and a selection question; one design section with a confirmation question; or the final design (Architectural: the start summary). Planner splits each response into a user message and Orchestrator notes; Orchestrator relays the user message unchanged.
52
+ 2. When to ask: ask one question at a time, only when the answer changes the outcome and neither the sources nor the conversation already answer it. Otherwise state "my judgment" with its reason so the user can correct it.
53
+ 3. Reason first: when the user's reason is unknown, first ask one open question without options; offer options only after hearing the reason.
54
+ 4. Short path and opt-out: when the request is clear enough, the first response may carry a short design and ask for approval (Architectural: a short start summary and ask for start confirmation). When the user says to just proceed, stop asking, decide the remaining items as author judgments and list them in the final design or start summary.
55
+ 5. Relay: Orchestrator relays each user answer verbatim to the same design Planner and marks any interpretation it adds separately.
56
+ 6. No spinning: every call carries a new user answer or new evidence. DO NOT repeat a question without progress; without progress, report the blocked criterion, observed facts and the decision needed to unblock, and hold.
57
+ 7. Reuse and correction: reuse the same design Planner while role, context and source remain valid. Conversation responses are expected returns, not missing or failed drafts, and use no correction opportunity. Orchestrator's fixed-checklist review and one consolidated correction apply to the final design. On the Architectural path the consolidated correction does not apply to the start summary; Orchestrator checks its decision inventory and scope notation before presenting it, and the spec draft takes Orchestrator's review and direct revision.
58
+ 8. Full Auto: under [Full Auto](#full-auto-run-mode), Orchestrator records answers decidable within the original request as auto-decisions and sends only questions that need a new decision to the user; [approval.run-mode] limits apply unchanged.
59
+
60
+ <a id="architectural-start-confirmation"></a>
61
+ ### Architectural start confirmation
62
+
63
+ 1. Scope: on the Architectural path there is no design document and no design approval. Bounded keeps its design approval; Spike, the direct path (F1–F8) and non-behavior paths are unchanged.
64
+ 2. Start summary: when the [design conversation](#design-conversation) ends, the design Planner returns a short start summary instead of a final design: scope to change, user decisions, author judgments, already-answered items, open checks, path/depth/risk judgment, document set with planned relative paths, and every file or contract marked change or no change (reason). It carries the [decision inventory](#decision-inventory).
65
+ 3. Confirmation: Orchestrator checks the summary's decision inventory and scope notation, presents it and, in one confirmation, obtains the user's scope confirmation and explicit target choice under [handoff](handoff.md). The summary is neither saved nor committed. The confirmed summary supplies the approved scope/depth/document set and explicit choice required by the [formal drafting boundary](#formal-drafting-boundary).
66
+ 4. Continuation: Orchestrator sends the same Planner a spec-stage delta brief with verified source/branch/HEAD/ownership, the target choice, confirmed scope/depth, document set, planned paths and exploration budget; that Planner returns the complete first spec draft and self-review. If that Planner is unavailable or its role, context or source is no longer valid, assign a fresh spec Planner with a complete initial brief.
67
+ 5. Records: the spec records the conversation's user decisions and author judgments; later author judgments join the same list. A genuinely new decision during spec or plan drafting goes to the user; Orchestrator records the answer in the spec, rechecks spec↔plan consistency and redrafts affected documents. No design approval is requested.
68
+ 6. Full Auto: under [Full Auto](#full-auto-run-mode), scope confirmation within the original request may be auto-decided; target choice follows the Execution-target choice row; [approval.run-mode] limits apply unchanged.
69
+
70
+ <a id="decision-inventory"></a>
71
+ ### Decision inventory and question classification
72
+
73
+ 1. Decision inventory: before returning the final design or Architectural start summary, Planner lists what spec and plan drafting must decide, such as changed files, data formats, table notation, tests and generated artifacts, and classifies each item as a user decision (asked in the conversation; the answer is recorded in the design, or for Architectural in the start summary and then the spec), an author judgment (a minor item that does not change the deliverable; record "my judgment" and the reason) or already answered (cite the existing source or conversation). Bounded short designs carry a proportional inventory of a few lines; the per-file scope notation stays mandatory.
74
+ 2. Scope notation: designs, specs and plans mark every file or contract "change" or "no change (reason)". DO NOT use ambiguous scope wording such as "review only" or "if needed".
75
+ 3. Final design: the final design and its design approval request attach the author-judgment list. On the Architectural path the start summary and its start-confirmation request attach it, and the spec records the user decisions and author judgments.
76
+ 4. Spec and plan questions: spec and plan Planners classify each question raised while drafting. Answered by the design (Architectural: the confirmed start summary): follow it and cite the basis. Minor: decide it as an author judgment and record it in the document's author-judgment list with ID, judgment and reason; it is not an open decision. Genuinely new decision (changes the deliverable and is absent from the design or confirmed start summary): return it as an open decision with why the design review or start confirmation missed it; Orchestrator routes it to the user.
77
+ 5. Approval attachments: the Architectural [combined approval](#architectural-combined-approval) request attaches the complete author-judgment lists of the spec and every plan, and the Bounded plan approval request attaches the author judgments made since design approval. The approval unit is unchanged.
78
+ 6. Full Auto: author judgments are not open decisions when [Full Auto](#full-auto-run-mode) counts zero open decisions.
45
79
 
46
80
  <a id="design-and-planning"></a>
47
81
  <a id="design-path-and-plan-depth"></a>
@@ -50,14 +84,25 @@ For design and brainstorming, allow initial draft and one consolidated correctio
50
84
  Record depth separately from risk. Risk controls checks/review, not design paths/plan approval. Bounded/omission is not low risk; Architectural adds no Tester/Reviewer at every stage. Apply risk rules and specific obligations.
51
85
 
52
86
  1. Before feature/design/behavior work, assign brief/evidence/local `brainstorming` to Planner. Planner proposes context/path/options/tradeoffs/criteria/assumptions/questions; Orchestrator selects path, integrates, announces scope, routes revisions and obtains approval. NEVER run drafting skills itself. Direct path uses scope record only.
53
- 2. Spike distinguishes probe-only from specific combined scope. Bounded approves short design before Implementer; direct edits use approved scope record. Architectural approves design, then complete Planner spec/self-review, Orchestrator save/review and written-spec approval before planning. Planner is read-only and requests no approval.
54
- 3. Assess plan depth after design/spec approval and before Implementer, separately from files/LOC/Bounded label. Architectural always uses `writing-plans` and written-plan approval regardless of size/locality/risk. Bounded skips only for one local change, no dependent stages/cross-component shared state/lifecycle/integration-order concerns and one verification path. Otherwise require a plan. Labels/no-plan requests do not bypass judgment, which also records Bounded spec necessity.
87
+ 2. Spike distinguishes probe-only from specific combined scope. Bounded approves short design before Implementer; direct edits use approved scope record. Architectural replaces design approval with one [start confirmation](#architectural-start-confirmation), then complete Planner spec/self-review and Orchestrator save/review/revision without a separate spec approval request; a fresh plan Planner then drafts from the reviewed spec, and the spec and every plan receive one [combined approval](#architectural-combined-approval). Planner is read-only and requests no approval.
88
+ 3. Assess plan depth after design approval (Architectural: start confirmation) and before Implementer, separately from files/LOC/Bounded label. Architectural always uses `writing-plans` and the combined spec+plan approval regardless of size/locality/risk. Bounded skips only for one local change, no dependent stages/cross-component shared state/lifecycle/integration-order concerns and one verification path. Otherwise require a plan. Labels/no-plan requests do not bypass judgment.
55
89
  4. Record dependencies/depth reasons; also post the design path, depth and risk judgments in the SKILL.md Pre-action gate record. Planner returns complete plan/assumptions/open decisions/checks/self-review. Orchestrator saves/reviews/obtains approval before Implementer at user path or `docs/superpowers/plans/YYYY-MM-DD-<feature-name>.md`. Default spec path is `docs/superpowers/specs/YYYY-MM-DD-<topic>-design.md`.
56
90
  5. Every Implementer first start/restart needs applicable approvals/artifacts/brief/findings and full handoff. Non-behavior docs/config omit only inapplicable stages. Direct edits need approved scope record and same first-edit gates.
57
91
 
58
- If Bounded requires written spec, record necessity/scope using approved short design as basis. Planner returns proportional full spec/self-review; After actual preparation, Orchestrator saves/reviews/obtains individual approval in the prepared target before the dependent plan. Short design approval never substitutes. This applies recorded judgment, not new spec necessity. Required plans alone imply no written spec.
92
+ Bounded has no spec stage, spec approval or spec-necessity record. If Bounded work appears to need a spec-level document, do not write one inside Bounded: reassess the design path as Architectural, inform the user and obtain the path-change approval required by existing rules before dependent drafting. Required plans alone imply no written spec.
93
+
94
+ Only Planner authors the first complete spec or plan draft and self-review. Orchestrator reviews and directly revises the same document before approval. Unavailable/failed Planner stops first drafting rather than transferring authorship. Design approval or start confirmation does not transfer initial authorship.
59
95
 
60
- Only Planner authors the first complete spec or plan draft and self-review. Orchestrator reviews and directly revises the same document before approval. Unavailable/failed Planner stops first drafting rather than transferring authorship. Design approval does not transfer initial authorship.
96
+ <a id="architectural-combined-approval"></a>
97
+ ## Architectural combined approval
98
+
99
+ 1. Sequential drafting (R0): Assign the fresh plan Planner only after the spec Planner returned the complete draft and self-review, Orchestrator saved it in the prepared target, reviewed it and made needed revisions, and the reviewed spec's path, version and SHA-256 are fixed and cited in the plan brief. NEVER draft a plan early or dispatch spec and plan Planners in parallel. Request no approval between the spec and plan stages.
100
+ 2. Approval unit (R1): Before requesting approval, verify spec↔plan consistency: every spec requirement and acceptance criterion maps to plan tasks or final verification, and the plan cites the current spec version and SHA-256. Request one combined approval for the exact versions and SHA-256 of the spec and every in-scope plan, attaching the complete author-judgment lists of the spec and every plan ([decision inventory](#decision-inventory)); record it once and make every document's `approvalRef` cite it.
101
+ 3. Partial answers (R2): A reply approving only part of the set, such as approving the spec while asking for plan changes, is a revision request. Orchestrator revises the documents directly, asking the user first for decisions outside approved scope; after any spec change it rechecks spec↔plan consistency; then it requests combined approval for the whole revised set. Partial approvals never carry over.
102
+ 4. Invalidation (R3): Any content change to any document after the approval request voids that request; request combined approval again for the current set.
103
+ 5. Spec ownership in the plan stage (R4): The plan Planner never edits the spec; it returns needed spec changes classified under [question classification](#decision-inventory). Within the confirmed start scope Orchestrator revises the spec directly; a genuinely new decision outside it needs user input, which Orchestrator records in the spec; it then rechecks spec↔plan consistency and the affected documents are redrafted.
104
+ 6. Rework (R5): If spec rejection requires substantive plan rework, use a fresh plan Planner under the normal Planner gate; Orchestrator handles formatting, re-expression, save and patch errors.
105
+ 7. Commit and Implementer (R6): Before combined approval, commit no planning document and start no Implementer. After it, make one planning-document commit under [handoff-prep](handoff-prep.md#planning-document-commit).
61
106
 
62
107
  For initial fast judgment apply the [fast gate](handoff.md#orchestrator-direct-path-for-small-tasks); its sufficient conditions do not change these depth decisions.
63
108
 
@@ -84,32 +129,32 @@ Example: with A → B → C, independent D and two slots, start A/D. After A's c
84
129
  <a id="document-save-evidence-gates"></a>
85
130
  ## Document-save evidence gates
86
131
 
87
- Before first Architectural spec, required Bounded spec or plan save, read this and record accessible brief/canonical evidence. Saving creates reviewable files, not approval/commits.
132
+ Before the first Architectural spec save or any plan save, read this and record accessible brief/canonical evidence. Saving creates reviewable files, not approval/commits.
88
133
 
89
134
  | Save | Required evidence |
90
135
  |---|---|
91
- | Spec | Approved design scope/evidence, complete Planner draft/self-review, Orchestrator integration/save/review ownership and absolute path. Required Bounded specs also need depth judgment, short design, necessity/scope |
92
- | Plan | Approved design and required approved spec/version/evidence, depth judgment, plan list/dependencies, complete Planner draft/self-review, ownership and absolute path |
136
+ | Spec | Confirmed start scope/evidence ([start confirmation](#architectural-start-confirmation)), complete Planner draft/self-review, Orchestrator integration/save/review ownership and absolute path. Architectural only |
137
+ | Plan | Bounded: approved design; Architectural: confirmed start scope and the reviewed spec path/version/SHA-256 and review evidence; depth judgment, plan list/dependencies, complete Planner draft/self-review, ownership and absolute path |
93
138
 
94
- Saving for review does not require prior written-spec approval, but does require valid target choice/actual preparation. Individually approved specs enter the document set before dependent planning. NEVER call uncommitted files committed. Missing or mismatched evidence stops the affected save.
139
+ Saving for review requires no prior document approval, but does require valid target choice/actual preparation. The reviewed Architectural spec enters the document set before dependent planning; approval follows once for the full set. NEVER call uncommitted files committed. Missing or mismatched evidence stops the affected save.
95
140
 
96
141
  <a id="complete-planning-document-set"></a>
97
142
  ## Complete planning-document set
98
143
 
99
- Include all current-scope required specs/plans, excluding future projects. Record scope/depth/absolute paths/coverage/versions/status/dependencies/order/omissions/reasons/pending drafting and approvals. Complete means every required document written/individually approved and no unresolved decision requiring another document. Omit no required artifact.
144
+ Include all current-scope required specs/plans, excluding future projects. Record scope/depth/absolute paths/coverage/versions/status/dependencies/order/omissions/reasons/pending drafting and approvals. Complete means every required document written and approved (Architectural: one combined spec+plan approval; Bounded: plan approval) and no unresolved decision requiring another document. Omit no required artifact.
100
145
 
101
- A required plan implies no spec. Bounded follows recorded judgment; spec stages cover Architectural/required Bounded only, plan stages required plans only. Add no spec duty to Spike/plan-skip/non-behavior paths.
146
+ A required plan implies no spec. Spec stages cover Architectural only; plan stages cover required plans only. Add no spec duty to Spike/plan-skip/non-behavior paths.
102
147
 
103
- Order: initial design approval → explicit target and source snapshot → first required draft/self-review → focused preparation gate → actual preparation/comparison → save/review/individual approval → dependent plans drafting/save/review/individual approval → full set → verify existing commits/batch remaining approvals → final Git → Implementer. Omission skips only inapplicable documents with rationale. Complete documents precede staging/commit/handoff, not initial preparation/choice request. Partial approvals authorize no early implementation.
148
+ Order: initial design approval → explicit target and source snapshot → first required draft/self-review → focused preparation gate → actual preparation/comparison → save/review/revision → Architectural: dependent plan drafting/save/review/revision → spec↔plan consistency check → one combined approval; Bounded: plan approval → full set → verify existing commits/batch remaining approvals → final Git → Implementer. On the Architectural path, [start confirmation](#architectural-start-confirmation) takes the place of initial design approval in this order and carries the explicit target choice. Omission skips only inapplicable documents with rationale. Complete documents precede staging/commit/handoff, not initial preparation/choice request. Partial approvals authorize no early implementation.
104
149
 
105
- Defer local `brainstorming`'s early spec commit: save/self-review/approve uncommitted spec, approve all plans, then final batch. Modify no external skill. `writing-plans` implementation commits grant neither planning-document commits nor early Implementer.
150
+ Defer local `brainstorming`'s early spec commit: save/self-review/review the uncommitted spec, draft/save/review all plans, obtain the combined approval, then final batch. Modify no external skill. `writing-plans` implementation commits grant neither planning-document commits nor early Implementer.
106
151
 
107
152
  | Path | Approval/preparation |
108
153
  |---|---|
109
154
  | Spike | Approve question/method/scope/criteria/constraints; no forced unknown-implementation docs. Implementer probes require handoff; read-only Orchestrator/Planner probes without Implementer do not trigger it |
110
155
  | Bounded, plan skipped | Approve short design; record omission conditions. Complete approvals, target choice, actual docs or valid absence, then handoff |
111
- | Bounded, plan required | Approve design/all required plans; approve necessary specs before dependent planning. Draft the first required document before target preparation; complete set before batch/handoff |
112
- | Architectural | Design → written spec → all `writing-plans` plans. First spec draft before target preparation; full set before batch/final checks/handoff |
156
+ | Bounded, plan required | Approve design and all required plans; no spec. Draft the first required plan before target preparation; complete set before batch/handoff |
157
+ | Architectural | Start confirmation → reviewed written spec → all `writing-plans` plans → one combined spec+plan approval. First spec draft before target preparation; full set before batch/final checks/handoff |
113
158
  | Non-behavior docs/config | Record scope/criteria/inapplicability. Preserve target/Git/docs-or-absence/handoff |
114
159
 
115
160
  New planning scope requires list/depth/dependency reassessment and approvals before dependent drafting/commit. Approved-body changes need revised approval except task progress records below. New implementation scope holds execution until docs/approvals/preparation complete. Running Implementer stops before newly dependent edits; inspect actual changes/Git without retrospective preparation claims. Reflect approved versions through pending revisions below. Unchanged-document restarts follow handoff lifetime.
@@ -119,7 +164,9 @@ New planning scope requires list/depth/dependency reassessment and approvals bef
119
164
 
120
165
  Task progress records (checkboxes, notes, results, evidence and completion status) preserving the approved contract need no new approval; record classification/reason/actual time. Plan-level progress records (final verification results, final Reviewer round verdicts and finding dispositions with user-decision references, and overall completion status) follow [commit](commit.md#execution-time-plan-document-updates): they ride the plan's next task acceptance or final Reviewer follow-up commit, or a standalone closing commit made for pending revisions; otherwise they stay only in the canonical record. After task completion Orchestrator includes that task's own records with its accepted implementation work in the same focused commit, excluding other tasks. DO NOT amend the original planning commit or create a separate docs/fixup commit for those records. Accepted no-change tasks follow the no-change path without empty commits. Removing checks, invented success, unsupported acceptance or mixed scope changes are not progress records.
121
166
 
122
- Changes to goals, task boundaries, scope, criteria, method, risk, dependencies or checks require revised approval before affected work. Hold, obtain ordered design/spec/plan approvals and prepare target/ownership/checks/handoff. Other body corrections follow version approval; classify typos/paths/commands/explanations by semantic effect. Every non-progress content change, including a mechanical correction, is a plan revision requiring applicable approval/preparation. A contract revision requires a fresh Implementer for remaining work; obtain written-spec approval before a dependent plan revision.
167
+ Changes to goals, task boundaries, scope, criteria, method, risk, dependencies or checks require revised approval before affected work. Hold, obtain the applicable design approval (Bounded; Architectural records the new decision in the revised spec) and document approvals below and prepare target/ownership/checks/handoff. Other body corrections follow version approval; classify typos/paths/commands/explanations by semantic effect. Every non-progress content change, including a mechanical correction, is a plan revision requiring applicable approval/preparation. A contract revision requires a fresh Implementer for remaining work.
168
+
169
+ Execution-time document revisions take this approval: a spec change with affected plans needs one combined revision approval for the spec and those plans; a plan-only change needs plan approval; a spec-only change needs spec approval after Orchestrator records why no plan is affected. Partial approvals never carry over.
123
170
 
124
171
  After approval Orchestrator edits the same file, appends a revision-history row and leaves the revision uncommitted. Apply cumulative revisions to that file and append another row. At document end use `Version | Approval time | Classification | Affected tasks | Reason`; keep rows append-only, with no SHA. Add v1 at the first revision using the actual initial approval time. Preserve actual approval chronology, not retroactive authorization; later committed content proves no earlier approval.
125
172
 
@@ -157,7 +204,7 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
157
204
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
158
205
  - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
159
206
  - [planning.plan-revision] Task progress records (checkboxes, notes, results, evidence and status) preserving the approved contract need no new user approval; Orchestrator includes the completed task's own records in its accepted implementation commit and records classification, reason and actual time as applicable. Plan-level progress records preserving the approved contract also need no new user approval and alone never trigger the standalone docs(plan) closing commit. All other spec/plan content changes, contract or mechanical, require applicable approval and preparation; changes to goals, scope, criteria, method, risk, dependencies or required verification need revised-version approval, preparation and holds on affected work before it continues, with a fresh Implementer for remaining work. After approval Orchestrator edits the same document, appends a revision-history row and leaves it uncommitted as an Orchestrator-owned pending revision, recording version, content hash, approval reference, actual time, classification, reason, affected tasks and the full approved content in the canonical handoff record. Orchestrator includes all pending revisions with Plan-Revision, Plan-Approved-At and Plan-Reason trailers in the accepted commit of the first top-level task executed or reconfirmed against the revised version, otherwise in a current task or final Reviewer follow-up commit; only when no implementation work remains before overall completion MAY it make one standalone docs(plan) closing commit without implementation files. Exclude revision hunks from commits of independent tasks accepted on a prior version, or hold that commit when separation is unsafe. NEVER amend or rewrite planning or implementation commits, create any other docs/fixup commit or authorize past work retroactively. After commit verify the committed document content matches the latest approved content apart from classified progress records of that commit's task or committed for other tasks after approval, or plan-level progress records carried by that commit, and that no pending revision remains. Follow planning, handoff-prep, commit and verification for the full contract.
160
- - [planning.planner-brief] Follow planning.md's Planner drafting preparation and review procedure, including preflight, ledger, evidence classification, target preparation, preceding approvals, provenance and reference gates. Before Planner dispatch, evaluate F1–F8 direct-path eligibility and Bounded plan-omission eligibility independently. Enter each path only when all of that path's existing conditions are proven; if neither path qualifies, use normal full evaluation. Send one complete stage-specific initial brief. Reuse the same Planner instance only within the design/brainstorming stage while its role, context and source remain valid; after design approval, use a fresh Planner instance for each spec and plan stage, whose initial brief contains every required field, saved document paths and approved versions. Follow-up briefs send changed fields and cite an accessible prior brief for unchanged fields. Reuse evidence only for the same source set, absolute locator, resolved path, content fingerprint, purpose and approval scope in an accessible matching context. When source, target or scope changed, reconfirm affected inputs. Planner returns a complete proportional first draft and self-review. Orchestrator reviews and directly revises the same spec or plan when needed. A missing or failed first draft does not transfer initial authorship to Orchestrator. New product decisions outside approved scope require user input before Orchestrator revises the document. For design and brainstorming, allow the initial draft and one consolidated correction. Orchestrator reviews once with the fixed checklist and sends one consolidated correction using changed fields only. Further calls require user-approved material scope/evidence changes or concrete unmet checklist items after correction, plus meaningful new input or criterion-state progress. State changed input, target criterion, expected artifact and expected progress. Repeated unmet criteria without new input, evidence or progress hold the stage; report the criterion, observed evidence and exact unblock input/decision. DO NOT split omissions, repeat resolved items or count rewording/agent replacement as progress. DO NOT invoke Planner only for reformatting, re-expression, save errors or patch-application errors; Orchestrator handles these. Evaluate separate substantive work under the normal Planner gate. Preserve separate sequential design/spec/plan approvals. Add no fixed call cap or profile call-count conditions, and NEVER accept an incomplete draft. Keep user progress brief and based on Planner status without relaying draft content. At approval, present the integrated, saved and reviewed Markdown without repeating its body in chat.
207
+ - [planning.planner-brief] Follow planning.md's Planner drafting preparation and review procedure, including preflight, ledger, evidence classification, target preparation, preceding approvals, provenance and reference gates. Before Planner dispatch, evaluate F1–F8 direct-path eligibility and Bounded plan-omission eligibility independently. Enter each path only when all of that path's existing conditions are proven; if neither path qualifies, use normal full evaluation. Send one complete stage-specific initial brief. Reuse the same Planner instance only within the design/brainstorming stage while its role, context and source remain valid, except that on the Architectural path that Planner continues as the spec Planner after start confirmation through a spec-stage delta brief; use a fresh Planner instance for each plan stage, and for an Architectural spec stage when that Planner is unavailable or its role, context or source is no longer valid, whose initial brief contains every required field, saved document paths and approved versions (for the Architectural plan stage, the reviewed spec path, version and SHA-256). Follow-up briefs send changed fields and cite an accessible prior brief for unchanged fields. Reuse evidence only for the same source set, absolute locator, resolved path, content fingerprint, purpose and approval scope in an accessible matching context. When source, target or scope changed, reconfirm affected inputs. Planner returns a complete proportional first draft and self-review. Orchestrator reviews and directly revises the same spec or plan when needed. A missing or failed first draft does not transfer initial authorship to Orchestrator. New product decisions outside approved scope require user input before Orchestrator revises the document. For design and brainstorming, follow planning.md's design conversation: each Planner response is exactly one of one question, 2–3 approaches with a recommendation and a selection question, one design section with a confirmation question, or the final design (Architectural: the start summary). Ask one question at a time only when the answer changes the outcome and is not already answered; otherwise state the judgment and its reason. Ask an open question about the user's reason before offering options. A clear request may receive a short design for approval at once; when the user says to proceed, stop asking and list the remaining author judgments in the final design or start summary. Relay user answers verbatim and mark added interpretation separately. Every call needs a new user answer or new evidence; without progress, report the blocked criterion, observed facts and needed decision, and hold. Conversation responses use no correction opportunity. Orchestrator reviews the final design once with the fixed checklist, including decision-inventory completeness and no ambiguous scope wording, and sends one consolidated correction using changed fields only. On the Architectural path the start summary receives no consolidated correction; Orchestrator checks its decision inventory and scope notation before presenting it, and the spec draft takes Orchestrator's review and direct revision. Further calls require user-approved material scope/evidence changes or concrete unmet checklist items after correction, plus meaningful new input or criterion-state progress. State changed input, target criterion, expected artifact and expected progress. Repeated unmet criteria without new input, evidence or progress hold the stage; report the criterion, observed evidence and exact unblock input/decision. DO NOT split omissions, repeat resolved items or count rewording/agent replacement as progress. DO NOT invoke Planner only for reformatting, re-expression, save errors or patch-application errors; Orchestrator handles these. Evaluate separate substantive work under the normal Planner gate. For Bounded work, obtain design approval before plan drafting. For Architectural work, obtain one start confirmation (scope and explicit target; no design document or design approval) before spec drafting, let the design Planner continue as the spec Planner (a fresh spec Planner when it is unavailable or invalid), then draft the plan with a fresh Planner, assigning the plan Planner only after the spec is saved and reviewed and its path, version and SHA-256 are fixed; NEVER draft them concurrently; then obtain one combined spec+plan approval. Bounded work has no spec stage; required plans keep their own approval. Add no fixed call cap or profile call-count conditions, and NEVER accept an incomplete draft. Keep user progress brief and based on Planner status without relaying draft content. At approval, present the integrated, saved and reviewed Markdown without repeating its body in chat.
161
208
  - [platform.claude] Existing per-role tool allowlists reduce available tools; Bash and role contracts are not a filesystem sandbox. ARC supplies no native observer hook or Bash Git guard; Git restrictions remain prompt-level role contracts.
162
209
  [ARC role policy: contract end]
163
210
 
@@ -168,7 +215,7 @@ Installed workflow connects plan-mode document commits to initial Implementer as
168
215
 
169
216
  Entry updates migrate no state/renew no approvals; drift requires current evidence. Scope is repository cooperative decisions/records, not native hook/provider/installer installation or blocking direct tools. `no-plan`/omission stays unsupported through Phases 2/3, implying neither policy violation nor new document duty.
170
217
 
171
- Record approved spec/plan SHA-256, shared docs-only commit and document/approval versions. CLI verifies exact Git-object paths/current bytes before assignment intent. New workflows/late commits prove no past compliance. Prior history/outside execution stays unverified. Approval/native results are `operator-attested`; agent IDs are not authenticated identity.
218
+ Record approved planning-document SHA-256 (Architectural spec and plans; Bounded plans), shared docs-only commit and document/approval versions. CLI verifies exact Git-object paths/current bytes before assignment intent. New workflows/late commits prove no past compliance. Prior history/outside execution stays unverified. Approval/native results are `operator-attested`; agent IDs are not authenticated identity.
172
219
 
173
220
  <a id="full-auto-run-mode"></a>
174
221
  ## Full Auto run mode
@@ -181,7 +228,8 @@ Applies only when the installed SKILL.md contains `**Run mode:** Full Auto.` and
181
228
  | Branch name collision | auto | Next numeric suffix (`-2`, `-3`, …) |
182
229
  | Planner options and questions | auto | Recommended option; record assumptions in the brief |
183
230
  | Design and short-design approval | auto | After Orchestrator review |
184
- | Written spec approval | auto | After Orchestrator review |
231
+ | Architectural start confirmation | auto | Scope only within the original request, otherwise user; target follows the Execution-target choice row |
232
+ | Architectural spec+plan combined approval | auto | Only with zero open decisions; otherwise user |
185
233
  | Plan approval | auto | Only with zero open decisions; otherwise user |
186
234
  | Spec/plan revision within the original scope | auto | Scope-expanding revisions → user |
187
235
  | Non-blocking final Reviewer finding disposition | auto | Fix or no-fix decision only: recommended disposition within approved scope; scope-expanding fixes → user; Reviewer recheck and acceptance stay unchanged |
@@ -15,7 +15,7 @@ description: Keep simple, self-contained questions with the chat-selected Orches
15
15
 
16
16
  **Role routing gate:** Before any specialist creation or assignment, check whether `../../arc-role-platform-routing.prepared.json` exists relative to this skill directory. If it exists, run `routing-status` and follow [coordination](references/coordination.md#composite-platform-role-dispatch) for every role, using only the returned native profile or bridge. NEVER substitute a generic or built-in agent (for example `general-purpose`, `fork` or `default`), an `arc-<role>`/`arc_<role>` name, another model or another platform. If routing is unavailable, held or unverified, hold that role and report it. Without the marker, use the standalone role names.
17
17
 
18
- **Pre-action gate record:** Before a task's first specialist creation or assignment, its first repository edit, or any decision to skip the Planner design stage, read the applicable references first, then post one line in a user-visible progress message with `mode` (standalone, or composite with routing revision), `run` (Run mode in effect: `supervised` or `full-auto`), `class` (work type), `path` (direct with all F1–F8 proven, Spike, Bounded or Architectural), `design` (Planner design required, approved or omitted, and why), `depth` (plan required, or the omission reason), `risk` (level and reason) and `refs` (reference sections actually read). A field that a later stage decides (for example `path` or `depth` before Planner design) is recorded as `pending` with that stage; for work with no edits or design, such as Scouter-only research, `path`, `design` and `depth` are `n/a` with the reason; any other empty or unverified field holds that action. Post a new line when a recorded fact changes. Feature, behavior and bug-fix implementation starts with Planner design unless the direct path is selected with all F1–F8 proven.
18
+ **Pre-action gate record:** Before a task's first specialist creation or assignment, its first repository edit, or any decision to skip the Planner design stage, read the applicable references first, then post one line in a user-visible progress message with `mode` (standalone, or composite with routing revision), `run` (Run mode in effect: `supervised` or `full-auto`), `class` (work type), `path` (direct with all F1–F8 proven, Spike, Bounded or Architectural), `design` (Planner design required, approved, start confirmed (Architectural) or omitted, and why), `depth` (plan required, or the omission reason), `risk` (level and reason) and `refs` (reference sections actually read). A field that a later stage decides (for example `path` or `depth` before Planner design) is recorded as `pending` with that stage; for work with no edits or design, such as Scouter-only research, `path`, `design` and `depth` are `n/a` with the reason; any other empty or unverified field holds that action. Post a new line when a recorded fact changes. Feature, behavior and bug-fix implementation starts with Planner design unless the direct path is selected with all F1–F8 proven.
19
19
 
20
20
  Each top-level task (one plan task, or the entire request without a plan) receives a fresh Implementer. Each task requiring Tester receives fresh Tester, never reused from another task. Every Tester brief, including correction rechecks and resumed assignments, MUST state `mode: task` or `mode: final` under [verification](references/verification.md#test-scope-and-result-comparison). Same-task corrections and rechecks use the current Implementer and, for Tester findings or required Tester rechecks, the current Tester while assignment remains valid. Once final overall Reviewer review begins on plan work, every Reviewer finding, including behavior, repeats Implementer → Reviewer without Tester reassignment until resolved; keep corrections uncommitted through rechecks. Tester findings remain Implementer → Tester; final-mode Tester work concludes before that review begins. Tester findings alone create no new task. Restart exceptions follow coordination and verification.
21
21