@yunhozz/arc 0.5.3 → 0.5.5

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (53) hide show
  1. package/MANIFEST.sha256 +52 -52
  2. package/README.md +5 -5
  3. package/claude/agents/arc-implementer.md +1 -1
  4. package/claude/agents/arc-planner.md +1 -1
  5. package/claude/agents/arc-reviewer.md +1 -1
  6. package/claude/agents/arc-scouter.md +1 -1
  7. package/claude/agents/arc-tester.md +1 -1
  8. package/claude/skill/SKILL.md +1 -1
  9. package/claude/skill/references/commit.md +1 -1
  10. package/claude/skill/references/handoff-prep.md +1 -1
  11. package/claude/skill/references/handoff.md +1 -1
  12. package/claude/skill/references/planning.md +2 -2
  13. package/claude/skill/references/verification.md +15 -9
  14. package/codex/agents/arc-implementer.toml +1 -1
  15. package/codex/agents/arc-planner.toml +1 -1
  16. package/codex/agents/arc-reviewer.toml +1 -1
  17. package/codex/agents/arc-scouter.toml +1 -1
  18. package/codex/agents/arc-tester.toml +1 -1
  19. package/codex/skill/SKILL.md +1 -1
  20. package/codex/skill/references/commit.md +1 -1
  21. package/codex/skill/references/handoff-prep.md +1 -1
  22. package/codex/skill/references/handoff.md +1 -1
  23. package/codex/skill/references/planning.md +2 -2
  24. package/codex/skill/references/verification.md +15 -9
  25. package/gemini/agents/arc-implementer.md +1 -1
  26. package/gemini/agents/arc-planner.md +1 -1
  27. package/gemini/agents/arc-reviewer.md +1 -1
  28. package/gemini/agents/arc-scouter.md +1 -1
  29. package/gemini/agents/arc-tester.md +1 -1
  30. package/gemini/skill/SKILL.md +1 -1
  31. package/gemini/skill/references/commit.md +1 -1
  32. package/gemini/skill/references/handoff-prep.md +1 -1
  33. package/gemini/skill/references/handoff.md +1 -1
  34. package/gemini/skill/references/planning.md +2 -2
  35. package/gemini/skill/references/verification.md +15 -9
  36. package/grok/agents/arc-implementer.md +1 -1
  37. package/grok/agents/arc-planner.md +1 -1
  38. package/grok/agents/arc-reviewer.md +1 -1
  39. package/grok/agents/arc-scouter.md +1 -1
  40. package/grok/agents/arc-tester.md +1 -1
  41. package/grok/skill/SKILL.md +1 -1
  42. package/grok/skill/references/commit.md +1 -1
  43. package/grok/skill/references/handoff-prep.md +1 -1
  44. package/grok/skill/references/handoff.md +1 -1
  45. package/grok/skill/references/planning.md +2 -2
  46. package/grok/skill/references/verification.md +15 -9
  47. package/lib/installer/language.mjs +13 -0
  48. package/lib/installer/plan.mjs +2 -1
  49. package/lib/policy/role-policy.json +1 -1
  50. package/lib/prompts/agent-fragments.json +4 -4
  51. package/lib/prompts/render.mjs +1 -1
  52. package/package.json +1 -1
  53. package/shared/skill/runtime/role-policy.json +1 -1
@@ -17,7 +17,7 @@ description: Keep simple, self-contained questions with the chat-selected Orches
17
17
 
18
18
  **Pre-action gate record:** Before a task's first specialist creation or assignment, its first repository edit, or any decision to skip the Planner design stage, read the applicable references first, then post one line in a user-visible progress message with `mode` (standalone, or composite with routing revision), `run` (Run mode in effect: `supervised` or `full-auto`), `class` (work type), `path` (direct with all F1–F8 proven, Spike, Bounded or Architectural), `design` (Planner design required, approved or omitted, and why), `depth` (plan required, or the omission reason), `risk` (level and reason) and `refs` (reference sections actually read). A field that a later stage decides (for example `path` or `depth` before Planner design) is recorded as `pending` with that stage; for work with no edits or design, such as Scouter-only research, `path`, `design` and `depth` are `n/a` with the reason; any other empty or unverified field holds that action. Post a new line when a recorded fact changes. Feature, behavior and bug-fix implementation starts with Planner design unless the direct path is selected with all F1–F8 proven.
19
19
 
20
- Each top-level task (one plan task, or the entire request without a plan) receives a fresh Implementer. Each task requiring Tester receives fresh Tester, never reused from another task. Every Tester brief, including correction rechecks and resumed assignments, MUST state `mode: task` or `mode: final` under [verification](references/verification.md#test-scope-and-result-comparison). Same-task corrections and rechecks use the current Implementer and, for Tester findings or required Tester rechecks, the current Tester while assignment remains valid. Once final overall Reviewer review begins on plan work, every Reviewer finding, including behavior, repeats Implementer → Reviewer without Tester reassignment until resolved; keep corrections uncommitted through rechecks. Separate Tester findings remain Implementer → Tester. Tester findings alone create no new task. Restart exceptions follow coordination and verification.
20
+ Each top-level task (one plan task, or the entire request without a plan) receives a fresh Implementer. Each task requiring Tester receives fresh Tester, never reused from another task. Every Tester brief, including correction rechecks and resumed assignments, MUST state `mode: task` or `mode: final` under [verification](references/verification.md#test-scope-and-result-comparison). Same-task corrections and rechecks use the current Implementer and, for Tester findings or required Tester rechecks, the current Tester while assignment remains valid. Once final overall Reviewer review begins on plan work, every Reviewer finding, including behavior, repeats Implementer → Reviewer without Tester reassignment until resolved; keep corrections uncommitted through rechecks. Tester findings remain Implementer → Tester; final-mode Tester work concludes before that review begins. Tester findings alone create no new task. Restart exceptions follow coordination and verification.
21
21
 
22
22
  Follow user and project instructions. Orchestrator uses the current conversation model for simple self-contained questions and coordinates substantive multistep implementation, configuration, tests and mixed work. It handles research directly when material is already in context or a quick read of a few known files suffices. Other material research and analysis, and bounded static exploration of code, documents, data, logs and reports, go to configured Scouter. A narrow lookup brief supplies known paths and specific facts without synthesis. Route by object or deliverable, not verbs alone.
23
23
 
@@ -23,7 +23,7 @@ For final Reviewer findings on committed plan work, define follow-up task/requir
23
23
 
24
24
  Local commit authority never permits early planning-document commits. Pre-Implementer approvals/explicit target/batch preparation remain. NEVER amend planning or implementation commits or retroactively authorize past work. Structural checks prove no live compliance.
25
25
 
26
- Use Conventional Commits `<type>(<scope>): <description>` with concise specific English description, no trailing period, lowercase scope when useful and one logical task. Body/footer only when needed; preserve Git trailers.
26
+ Use Conventional Commits `<type>(<scope>): <description>` with a concise specific description, no trailing period, lowercase scope when useful and one logical task. {{ARC_COMMIT_LANGUAGE_POLICY}} Body/footer only when needed; preserve Git trailers.
27
27
 
28
28
  <a id="execution-time-plan-document-updates"></a>
29
29
  ## Execution-time plan document updates
@@ -70,7 +70,7 @@ Begin after target preparation and all applicable documents are written/individu
70
70
  For worktrees verify actual app management/current-chat attachment/identity/base/branch and directly written documents or protected legacy/restart transfers before target docs commits. Commit remaining approvals once at target; no automatic source docs commit.
71
71
 
72
72
  1. Verify already committed approvals by SHA, actual message/paths/content and selected-checkout validity; reuse without recommitting.
73
- 2. Record remaining approved versions/paths. Finalize a specific English Conventional Commit message before the first commit.
73
+ 2. Record remaining approved versions/paths. Finalize a specific Conventional Commit message under [commit](commit.md#automatic-commit-after-plan-task-acceptance) before the first commit.
74
74
  3. Batch all remaining approved documents into one focused docs commit. Staged paths/diff MUST match exactly; unrelated staging blocks commit. No implementation files.
75
75
  4. If all validly committed, verify only. NEVER duplicate/empty-commit/amend/reset/recommit merely to combine SHAs. DO NOT use temporary messages followed by routine `git commit --amend`.
76
76
  5. Failure/staged-content mismatch stops handoff. Inspect branch/HEAD/index/partial completion and resolve before resuming; NEVER commit implementation instead.
@@ -179,7 +179,7 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
179
179
  - [role.implementer-implementation] Edit only assigned, approved files and run focused checks under the existing TDD contract. Report changed files, RED/GREEN or approved exception evidence, results, limits and follow-up. DO NOT plan, perform Tester or Reviewer verification of your own work, accept the task or declare overall completion. Git mutations remain forbidden after successful implementation. Implementer and fresh Tester handoffs include the exact approved visual source, version, approval and access state; criterion IDs, required properties and comparison method; and actual-output identity, revision and comparison basis. Record pass, mismatch or unverified with accessible evidence and limits. Implementer self-report does not replace fresh Tester and its actual comparison. A missing output-to-revision link is unverified; record a visible difference separately as mismatch without inferring current branch UI state. Missing source/output, inaccessible evidence or unapproved interpretation holds the affected visual claim for Orchestrator. DO NOT silently substitute or redesign.
180
180
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
181
181
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
182
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
182
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
183
183
  - [platform.codex] Role restrictions are prompt-level contracts, not a filesystem sandbox. ARC supplies no native observer hook or role-specific Git guard. Existing shell capabilities are retained because static read access after shell reduction has not been verified; Implementer and Tester need shell for approved checks.
184
184
  [ARC role policy: contract end]
185
185
 
@@ -68,7 +68,7 @@ For initial fast judgment apply the [fast gate](handoff.md#orchestrator-direct-p
68
68
 
69
69
  Apply Planner rules: ID/title, goal/scope/files, predecessors/dependencies, criteria, required pre-acceptance Tester/checks/evidence and holds. Tasks MUST be independently implementable/verifiable/acceptable. Inseparable policy/profile/tests/manifest contracts start in one task. If inseparability appears later, stop for revised scope/planning/approvals; NEVER merge distinct approved tasks during execution.
70
70
 
71
- Substeps/checkboxes/RED-GREEN/commands are not commits. One top-level task becomes one focused commit after acceptance; [commit](commit.md) governs no-change/hold/resume. Reviewer is never a per-task check. Final whole verification has separate scope/timing; significant work lists one Reviewer after all task acceptances/risk checks. Task boundaries alone add no Tester. Apply only to required plans; omission paths gain no plan obligation. Plans list per-task related tests with reasons and a final verification section per [verification](verification.md#test-scope-and-result-comparison).
71
+ Substeps/checkboxes/RED-GREEN/commands are not commits. One top-level task becomes one focused commit after acceptance; [commit](commit.md) governs no-change/hold/resume. Reviewer is never a per-task check. Final whole verification has separate scope/timing; significant work lists one Reviewer after all task acceptances/risk checks and concluded final-mode Tester work. Task boundaries alone add no Tester. Apply only to required plans; omission paths gain no plan obligation. Plans list per-task related tests with reasons and a final verification section per [verification](verification.md#test-scope-and-result-comparison).
72
72
 
73
73
  Include the provisional trigger judgment with the substitute-check list and reasons in the plan's final verification section.
74
74
 
@@ -158,7 +158,7 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
158
158
  - [approval.run-mode] The installed ARC Run mode is Supervised unless the installed skill states Full Auto. In Full Auto, an Orchestrator decision recorded as `auto-decided (Full Auto)` with gate, choice, reason and evidence counts as the explicit choice or approval for that listed gate only; briefs cite it as `full-auto:<doc>@<version>` or the recorded decision. It never authorizes new product decisions outside the original request, external actions, resolution of failures, holds, unknown state or ownership conflicts, preservation-rule Git actions, permission or sandbox changes, or unknown slots and exhausted capacity, and it changes no plan-depth, commit, Tester, Reviewer or acceptance rule. A user request to stop or use Supervised applies from the next gate.
159
159
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
160
160
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
161
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
161
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
162
162
  - [planning.plan-revision] Task progress records (checkboxes, notes, results, evidence and status) preserving the approved contract need no new user approval; Orchestrator includes the completed task's own records in its accepted implementation commit and records classification, reason and actual time as applicable. Plan-level progress records preserving the approved contract also need no new user approval and alone never trigger the standalone docs(plan) closing commit. All other spec/plan content changes, contract or mechanical, require applicable approval and preparation; changes to goals, scope, criteria, method, risk, dependencies or required verification need revised-version approval, preparation and holds on affected work before it continues, with a fresh Implementer for remaining work. After approval Orchestrator edits the same document, appends a revision-history row and leaves it uncommitted as an Orchestrator-owned pending revision, recording version, content hash, approval reference, actual time, classification, reason, affected tasks and the full approved content in the canonical handoff record. Orchestrator includes all pending revisions with Plan-Revision, Plan-Approved-At and Plan-Reason trailers in the accepted commit of the first top-level task executed or reconfirmed against the revised version, otherwise in a current task or final Reviewer follow-up commit; only when no implementation work remains before overall completion MAY it make one standalone docs(plan) closing commit without implementation files. Exclude revision hunks from commits of independent tasks accepted on a prior version, or hold that commit when separation is unsafe. NEVER amend or rewrite planning or implementation commits, create any other docs/fixup commit or authorize past work retroactively. After commit verify the committed document content matches the latest approved content apart from classified progress records of that commit's task or committed for other tasks after approval, or plan-level progress records carried by that commit, and that no pending revision remains. Follow planning, handoff-prep, commit and verification for the full contract.
163
163
  - [planning.planner-brief] Follow planning.md's Planner drafting preparation and review procedure, including preflight, ledger, evidence classification, target preparation, preceding approvals, provenance and reference gates. Before Planner dispatch, evaluate F1–F8 direct-path eligibility and Bounded plan-omission eligibility independently. Enter each path only when all of that path's existing conditions are proven; if neither path qualifies, use normal full evaluation. Send one complete stage-specific initial brief. Reuse the same Planner instance only within the design/brainstorming stage while its role, context and source remain valid; after design approval, use a fresh Planner instance for each spec and plan stage, whose initial brief contains every required field, saved document paths and approved versions. Follow-up briefs send changed fields and cite an accessible prior brief for unchanged fields. Reuse evidence only for the same source set, absolute locator, resolved path, content fingerprint, purpose and approval scope in an accessible matching context. When source, target or scope changed, reconfirm affected inputs. Planner returns a complete proportional first draft and self-review. Orchestrator reviews and directly revises the same spec or plan when needed. A missing or failed first draft does not transfer initial authorship to Orchestrator. New product decisions outside approved scope require user input before Orchestrator revises the document. For design and brainstorming, allow the initial draft and one consolidated correction. Orchestrator reviews once with the fixed checklist and sends one consolidated correction using changed fields only. Further calls require user-approved material scope/evidence changes or concrete unmet checklist items after correction, plus meaningful new input or criterion-state progress. State changed input, target criterion, expected artifact and expected progress. Repeated unmet criteria without new input, evidence or progress hold the stage; report the criterion, observed evidence and exact unblock input/decision. DO NOT split omissions, repeat resolved items or count rewording/agent replacement as progress. DO NOT invoke Planner only for reformatting, re-expression, save errors or patch-application errors; Orchestrator handles these. Evaluate separate substantive work under the normal Planner gate. Preserve separate sequential design/spec/plan approvals. Add no fixed call cap or profile call-count conditions, and NEVER accept an incomplete draft. Keep user progress brief and based on Planner status without relaying draft content. At approval, present the integrated, saved and reviewed Markdown without repeating its body in chat.
164
164
  - [platform.codex] Role restrictions are prompt-level contracts, not a filesystem sandbox. ARC supplies no native observer hook or role-specific Git guard. Existing shell capabilities are retained because static read access after shell reduction has not been verified; Implementer and Tester need shell for approved checks.
@@ -19,7 +19,11 @@ Tester briefs MUST include the required field `mode: task | final`. One assignme
19
19
 
20
20
  **Task mode** assigns a fresh Tester for each top-level task requiring Tester verification. Task checks and rechecks verify uncommitted work and run only tests related to the change: test files that directly exercise a changed module, contract tests that the change requires updating, and the matching check scripts. The brief lists the minimum set; executors MAY add only items in these three categories, each with a reason. Other additions need Orchestrator authorization. Report every selected item and why. Read only to confirm the brief and identify tests in those categories. In task mode, never run full regression or substitute checks. In task mode, do not search reverse dependencies. Failures follow Implementer → Tester recheck, reusing the current Tester for the same task. This rule takes precedence over the upstream TDD per-task project-suite instruction; upstream text is unchanged. Report every failure observed in any run by name.
21
21
 
22
- **Final mode** runs once after all tasks are accepted and committed, as one fresh Tester assignment at the verified HEAD of the execution target worktree. Run (1) all contract tests, (2) all check scripts, (3) the related tests of re-changed files and (4) substitute checks for applicable triggers. Final mode does not rerun the union of tests that task Tester already passed. A re-changed file is a file that a task's Tester verified, as a changed file or a related test file it ran, and that a later commit changed after that task's focused commit (`git diff --name-only <task commit> HEAD`), plus every non-documentation file changed in base..HEAD by a commit that no task Tester verified. Orchestrator computes the list and cites it in the brief; Tester cross-checks it with read-only `git diff`, MAY add items only within the three categories above with reasons, and reports the reason when the list is empty. Tester records `git status --porcelain` at start and end; a state that is not clean is an environment block that holds final verification. While it runs, neither Orchestrator nor any Implementer writes in that workspace; the read-only final Reviewer MAY run concurrently. A new failure from final verification follows Implementer → Tester even after the final Reviewer has started; Reviewer evidence for affected files becomes stale and needs a refreshed-diff recheck.
22
+ **Final mode** runs once after all tasks are accepted and committed, as one fresh Tester assignment at the verified HEAD of the execution target worktree. Run (1) all contract tests, (2) all check scripts, (3) the related tests of re-changed files and (4) substitute checks for applicable triggers. Final mode does not rerun the union of tests that task Tester already passed. A re-changed file is a file that a task's Tester verified, as a changed file or a related test file it ran, and that a later commit changed after that task's focused commit (`git diff --name-only <task commit> HEAD`), plus every non-documentation file changed in base..HEAD by a commit that no task Tester verified. Orchestrator computes the list and cites it in the brief; Tester cross-checks it with read-only `git diff`, MAY add items only within the three categories above with reasons, and reports the reason when the list is empty. Tester records `git status --porcelain` at start and end; a state that is not clean is an environment block that holds final verification. While it runs, neither Orchestrator nor any Implementer writes in that workspace. A new failure from final verification follows Implementer → Tester. The final Reviewer starts only after final-mode Tester work concludes: the final Tester report is delivered, every new failure is resolved through Implementer → Tester recheck, every new-failure candidate and intermittent candidate is dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned under **Undeterminable scope** below. Reviewer output produced before that point is not the initial final review.
23
+
24
+ **Command execution:** Implementer and Tester briefs MUST NOT prescribe detached execution such as `&`, `nohup` or `setsid`; they require long commands to run in the foreground and be waited on in the same session until an exit code. Orchestrator does not run a Tester's assigned suites in its place unless Tester reports an environment block with evidence and the user chooses that run.
25
+
26
+ **Suite parallelism:** A Tester runs each multi-file suite command with the test runner's built-in parallel mode inside that one foreground command; a parallel mode that needs a package or plugin not already installed counts as no parallel mode. It runs a suite sequentially only when its tests are known to interfere with each other or the runner has no parallel mode, and reports the reason. Briefs MUST NOT split a suite into sequential groups for any other reason; splitting across Testers follows **Full regression shards** below. This changes how a command runs, not which tests run.
23
27
 
24
28
  Read-only reverse dependency search is allowed in final mode. Use the project's affected tool only in list or dry-run form with no writes, installs or cache generation; otherwise report an environment block and continue with the next step of the impact procedure.
25
29
 
@@ -45,9 +49,11 @@ Select substitute checks in this impact procedure order:
45
49
 
46
50
  A suspected dynamic reference goes directly to step 5.
47
51
 
48
- **Undeterminable scope** requires Tester to report each item, cause, substitute checks run and remaining unverified scope. Orchestrator asks the user to (i) approve full regression, (ii) substitute the project CI full test results, or (iii) disposition as unverified. Until the user decides, final acceptance is held, while Reviewer and independent work continue. Resolution of unknown state is never auto-decided in Full Auto. A disposition as unverified does not turn a criterion into proven.
52
+ **Undeterminable scope** requires Tester to report each item, cause, substitute checks run and remaining unverified scope. Orchestrator asks the user to (i) approve full regression, (ii) substitute the project CI full test results, or (iii) disposition as unverified. Until the user decides, final acceptance and the final Reviewer are held, while independent work continues. Resolution of unknown state is never auto-decided in Full Auto. A disposition as unverified does not turn a criterion into proven.
53
+
54
+ **Approved full regression** requires explicit user approval, and the current final-mode Tester runs it as a follow-up; no new Tester is assigned except shard Testers under **Full regression shards** below. On resume, bridge resumes the same dispatch and native continues the same assignment. For bridge, each segment starts a new lease.timeoutMinutes timer. When resuming either route, if the same assignment cannot continue, report an environment block and hold; the user decides whether to assign a new Tester. Approval is valid only for that workflow and HEAD and expires when HEAD changes. If HEAD changes before the final Reviewer starts, an expired approval needs re-approval and a rerun at the new HEAD, or a fresh disposition under **Undeterminable scope**, before the Reviewer starts. The approved full regression runs once per approval. Approved full regression failures follow the base check below.
49
55
 
50
- **Approved full regression** requires explicit user approval, and the current final-mode Tester runs it as a follow-up; no new Tester is assigned. On resume, bridge resumes the same dispatch and native continues the same assignment. For bridge, each segment starts a new lease.timeoutMinutes timer. When resuming either route, if the same assignment cannot continue, report an environment block and hold; the user decides whether to assign a new Tester. Approval is valid only for that workflow and HEAD and expires when HEAD changes. The approved full regression runs once. Approved full regression failures follow the base check below.
56
+ **Full regression shards:** Orchestrator MAY split an approved full regression into shards only when, from recorded prior run times, it is likely to exceed one Tester's time limit for its route, such as the bridge `arc_tester` 60-minute lease, or when independent suites, such as a sequential Python suite and a Node suite, can run at the same time; it records the reason. A shard is one whole suite command or a set of whole test files, never a subset of test names. Before dispatch Orchestrator lists every test file and suite command of the approved full regression at the verified HEAD as the inventory and writes a shard manifest that assigns each item to exactly one shard, so that the shards do not overlap and their union equals the inventory. Tests known to share state, such as fixed ports, the same temporary or workspace paths, the git common directory or global configuration, go in one shard. The current final-mode Tester runs one shard as its follow-up; each other shard goes to a fresh Tester whose `mode: final` brief adds `shard: <id> of <n>`, the shard's files or command and the manifest. The current final-mode Tester's follow-up brief also adds `shard: <id> of <n>` and its shard's files or command. Each shard Tester runs only its shard with no other final-mode checks, reports the files it actually ran and classifies failures only by the static check under **Baseline** below. All shards run at the same verified HEAD in the same workspace; each Tester records `git status --porcelain` at start and end, and no one writes in that workspace until every shard ends. Orchestrator reserves the whole shard batch under [limits](limits.md#counting-and-reservations) and serializes shards that do not fit; each shard Tester is a created and active instance, and the follow-up adds none. When the runner has a parallelism option, Orchestrator sets it per shard so that the combined workers stay within the host's available parallelism. After every shard has reported, Orchestrator sends the shard failures that need a base run to the current final-mode Tester, which reruns each alone at HEAD, with no other test command running in that workspace, up to the brief's isolated rerun limit; a pass alone is an intermittent candidate, and a failure alone follows the base check below; this rerun classifies the failure and is not the intermittency check under **Result comparison**. A rerun at HEAD that the environment blocks leaves that failure a new-failure candidate for Orchestrator disposition. Orchestrator merges the shard results and verifies that every inventory item has complete results exactly once; an item without complete results is a new-failure candidate and leaves the run incomplete. A blocked or timed-out shard follows the resume rule above; its items stay unverified, and the user decides whether a new Tester runs only the items without complete results. Sharding splits the one approved run and adds no run. The approved full regression is complete only when every shard has reported, coverage is verified and every shard failure is classified or dispositioned. Record the reason, inventory, manifest, Tester IDs and per-shard results with the approved full regression record.
51
57
 
52
58
  **CI substitution** requires results for the same commit SHA as the verified HEAD or a matching tree hash with evidence, all jobs completed, accessible per-test-name results, results collected read-only by Orchestrator and cited in the brief, and an explicit user approval record. Use CI results as evidence only for the tests and scope they cover when every condition is met; otherwise a new-failure candidate or unverified is the applicable classification. This collection grants no external action authority.
53
59
 
@@ -67,11 +73,11 @@ Edits belong to Implementer except the [small direct path](handoff.md#orchestrat
67
73
  | Small, low risk | Implementer or direct edit → Orchestrator focused checks → acceptance |
68
74
  | Ordinary behavior | Implementer → independent Tester → acceptance |
69
75
  | Significant/high risk, no plan | Implementer → Tester/rechecks → final full-change Reviewer → acceptance |
70
- | Significant/high risk, plan | Per task Implementer → required fresh Tester → acceptance/commit; final independent whole-change Reviewer once after all accepted tasks/required checks/rechecks |
76
+ | Significant/high risk, plan | Per task Implementer → required fresh Tester → acceptance/commit; final independent whole-change Reviewer once after all accepted tasks/required checks/rechecks and concluded final-mode Tester work |
71
77
 
72
78
  Ordinary/significant tasks need fresh Tester before acceptance. Low risk requires narrow/understood/reversible/focused-verifiable work. Ordinary behavior fails these without significant triggers. Shared role/behavior contracts/state, lifecycle/integration order, security/permissions, data loss/migration, public interfaces and costly install/deploy/rollback are significant. Substantial behavior/contracts are significant regardless of file count. Unclear risk requires investigation/higher flow. Environment failure waives no check or depth judgment.
73
79
 
74
- - Task boundaries alone add no Tester/review. Reviewer is never a plan-task/commit prerequisite. Plans review once at final relevant state after task acceptances/checks; no-plan Reviewer follows Tester before acceptance.
80
+ - Task boundaries alone add no Tester/review. Reviewer is never a plan-task/commit prerequisite. Plans review once at final relevant state after task acceptances/checks and concluded final-mode Tester work; no-plan Reviewer follows Tester before acceptance.
75
81
  - Preserve specific commitments. Risky unverified dependencies need Tester/resolved or explicitly dispositioned findings before implementation.
76
82
  - Reuse evidence only for matching scope/state/independence/freshness/flow position. Changes/failures/missing-conflicting evidence invalidate affected reuse.
77
83
  - Tester independently checks without edits. Reviewer performs no Tester/planning/editing/delegation/completion decisions. Orchestrator routes fixes to Implementer and required Tester rechecks; direct-check failures return to normal flow. Accept after findings/gaps resolved or dispositioned.
@@ -84,7 +90,7 @@ Distinguish environment failures from code failures and report exact limits and
84
90
  <a id="final-plan-reviewer-correction-loop"></a>
85
91
  ### Final plan Reviewer correction loop
86
92
 
87
- Only final overall Reviewer findings on plan work, including behavior, follow Implementer → Reviewer without Tester reassignment until resolved. One initial full review permits necessary rechecks. Before it, risk checks/Tester failures/unmet criteria still need Implementer → Tester. No-plan flow remains unchanged.
93
+ Only final overall Reviewer findings on plan work, including behavior, follow Implementer → Reviewer without Tester reassignment until resolved. One initial full review permits necessary rechecks. Before it, risk checks/final-mode Tester work/Tester failures/unmet criteria still need Implementer → Tester and conclude. No-plan flow remains unchanged.
88
94
 
89
95
  Expanded scope/separate obligations/gaps hold affected work for resolution/approval. Orchestrator assigns/accepts; Reviewer stays read-only without Tester/acceptance. NEVER present old Tester as post-fix execution. Report actual actor/target/check/result/limits only.
90
96
 
@@ -103,7 +109,7 @@ Task acceptance differs from final verification/acceptance. Connect criteria/obs
103
109
 
104
110
  DO NOT delay independently acceptable tasks solely for final-only checks or defer currently required checks to accept early. State final integration scope/timing separately. Whole-plan Reviewer is part of final verification; task commits prove no unperformed final checks. Orchestrator decides final acceptance with Tester/Reviewer/integration evidence/findings and unverified/disposition records. Shared evidence MUST satisfy all reuse rules. Before the overall completion report and any push, PR or merge authorization request, Orchestrator verifies that plan-level progress records are carried by the verified next commit of the plan or, when none follows, recorded only in the canonical handoff record with the plan document unchanged and a clean working tree. While a user decision on a non-blocking final Reviewer finding is pending, hold overall completion; a fix decision follows plan revision and a new task whose accepted commit carries the records, and a no-fix disposition stays canonical only when no later commit follows.
105
111
 
106
- Committed-plan final Reviewer findings need a follow-up task/planning/approvals. Keep corrections uncommitted; refresh committed state plus uncommitted diff/files in Reviewer artifacts/briefs. Reuse/assign independent Reviewer and repeat Implementer → Reviewer until resolved, then accept/commit one focused follow-up. Final Tester findings still use Implementer → Tester. No automatic amend/reset/duplicate originals; scope growth retains planning/approvals.
112
+ Committed-plan final Reviewer findings need a follow-up task/planning/approvals. Keep corrections uncommitted; refresh committed state plus uncommitted diff/files in Reviewer artifacts/briefs. Reuse/assign independent Reviewer and repeat Implementer → Reviewer until resolved, then accept/commit one focused follow-up. Final-mode Tester findings use Implementer → Tester and conclude before the initial final review. No automatic amend/reset/duplicate originals; scope growth retains planning/approvals.
107
113
 
108
114
 
109
115
 
@@ -146,7 +152,7 @@ Failed checks/reviews leave findings. Open separately via `data: {action: "open"
146
152
 
147
153
  Final-mode Tester results are not cooperative checks; record them in the plan-level progress record and the canonical handoff record. Record undeterminable dispositions, approved full regression and CI substitution there as well.
148
154
 
149
- Final review uses `operation: "review"`, `scope: "final"`, `actor.role: "reviewer"`, `descriptor: {kind: "source-review", paths: [...]}` without taskId. Initial final review needs all tasks accepted/current required Tester, never task acceptance/commit prerequisite. Plan-final findings repeat Implementer resolution→Reviewer without Tester reassignment; old Tester is not subsequent-fix execution. Separate unresolved Tester remains.
155
+ Final review uses `operation: "review"`, `scope: "final"`, `actor.role: "reviewer"`, `descriptor: {kind: "source-review", paths: [...]}` without taskId. Initial final review needs all tasks accepted/current required Tester/concluded final-mode Tester work, never task acceptance/commit prerequisite. Plan-final findings repeat Implementer resolution→Reviewer without Tester reassignment; old Tester is not subsequent-fix execution. Separate unresolved Tester remains.
150
156
 
151
157
  Scope/document/approval records preserve history. `data.affectedTaskIds` invalidates those tasks/dependents and task/check/acceptance evidence; omitted IDs hold all. Final evidence becomes stale. Preserve unaffected independent evidence. Orchestrator determines semantic impact. Affected tasks need new current-scope approval/contracts before preparation, not revived old approvals; fresh checks/reviews/revalidation too. Current evidence supersedes failures without deletion. Acceptance/commit/completion stay Orchestrator decisions.
152
158
 
@@ -168,7 +174,7 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
168
174
  - [git.orchestrator-accept-commit] Only Orchestrator accepts work and performs Git mutations. One approved top-level plan task becomes one focused implementation commit after criteria, required checks and findings are satisfied. Orchestrator accepts, then includes that task's own progress records made after task completion (checkboxes, notes, results, evidence and status) with its implementation work in that commit, without a separate docs/fixup commit or planning-commit amendment for those records. Exclude other tasks; pending approved spec/plan revisions follow planning.plan-revision and preserve the no-change path without empty commits. Plan-level progress records (final verification results, final Reviewer verdicts and finding dispositions, overall completion status) are the sole exception: include them in the plan's next task acceptance or final Reviewer follow-up commit; when no implementation work remains and no standalone closing commit for pending revisions is made, keep them only in the canonical handoff record without changing the plan document or creating a commit. Orchestrator commits without separate user commit approval. Reports, passing checks and Reviewer opinions do not replace acceptance. Preserve unrelated changes and ownership; verify the resulting SHA, content, HEAD and remaining changes. Existing small-task direct and plan-omission paths remain unchanged.
169
175
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
170
176
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
171
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
177
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
172
178
  - [planning.plan-revision] Task progress records (checkboxes, notes, results, evidence and status) preserving the approved contract need no new user approval; Orchestrator includes the completed task's own records in its accepted implementation commit and records classification, reason and actual time as applicable. Plan-level progress records preserving the approved contract also need no new user approval and alone never trigger the standalone docs(plan) closing commit. All other spec/plan content changes, contract or mechanical, require applicable approval and preparation; changes to goals, scope, criteria, method, risk, dependencies or required verification need revised-version approval, preparation and holds on affected work before it continues, with a fresh Implementer for remaining work. After approval Orchestrator edits the same document, appends a revision-history row and leaves it uncommitted as an Orchestrator-owned pending revision, recording version, content hash, approval reference, actual time, classification, reason, affected tasks and the full approved content in the canonical handoff record. Orchestrator includes all pending revisions with Plan-Revision, Plan-Approved-At and Plan-Reason trailers in the accepted commit of the first top-level task executed or reconfirmed against the revised version, otherwise in a current task or final Reviewer follow-up commit; only when no implementation work remains before overall completion MAY it make one standalone docs(plan) closing commit without implementation files. Exclude revision hunks from commits of independent tasks accepted on a prior version, or hold that commit when separation is unsafe. NEVER amend or rewrite planning or implementation commits, create any other docs/fixup commit or authorize past work retroactively. After commit verify the committed document content matches the latest approved content apart from classified progress records of that commit's task or committed for other tasks after approval, or plan-level progress records carried by that commit, and that no pending revision remains. Follow planning, handoff-prep, commit and verification for the full contract.
173
179
  - [platform.codex] Role restrictions are prompt-level contracts, not a filesystem sandbox. ARC supplies no native observer hook or role-specific Git guard. Existing shell capabilities are retained because static read access after shell reduction has not been verified; Implementer and Tester need shell for approved checks.
174
180
  [ARC role policy: contract end]
@@ -33,6 +33,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
33
33
  - [role.implementer-implementation] Edit only assigned, approved files and run focused checks under the existing TDD contract. Report changed files, RED/GREEN or approved exception evidence, results, limits and follow-up. DO NOT plan, perform Tester or Reviewer verification of your own work, accept the task or declare overall completion. Git mutations remain forbidden after successful implementation. Implementer and fresh Tester handoffs include the exact approved visual source, version, approval and access state; criterion IDs, required properties and comparison method; and actual-output identity, revision and comparison basis. Record pass, mismatch or unverified with accessible evidence and limits. Implementer self-report does not replace fresh Tester and its actual comparison. A missing output-to-revision link is unverified; record a visible difference separately as mismatch without inferring current branch UI state. Missing source/output, inaccessible evidence or unapproved interpretation holds the affected visual claim for Orchestrator. DO NOT silently substitute or redesign.
34
34
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
35
35
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
36
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
36
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
37
37
  - [platform.gemini] Role restrictions are prompt-level contracts, not a filesystem sandbox. Native tool restriction fields, observer hooks and Git guards are unverified. Use only available authorized tools; ARC does not write Gemini settings.json.
38
38
  [ARC role policy: contract end]
@@ -43,6 +43,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
43
43
  - [role.planner-draft-only] Return design/brainstorming drafts and complete first spec/plan drafts with dependencies, criteria, holds and verification needs in the response. During initial drafting and revisions, report progress only to Orchestrator: briefly state the stage, feedback being applied, actual blocker or next step, without draft prose or excerpts. Return the complete first draft and self-review for Orchestrator review; Orchestrator directly revises the same spec or plan when needed. Raw responses may appear in app/tool surfaces; prompt policy cannot hide them. DO NOT save documents, implement, run checks, prepare targets, request user approval or decide acceptance. The first required document draft uses the verified source and selected target intent before target preparation. Require a verified prepared target before saving or handoff. Route decisions to Orchestrator.
44
44
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
45
45
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
46
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
46
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
47
47
  - [platform.gemini] Role restrictions are prompt-level contracts, not a filesystem sandbox. Native tool restriction fields, observer hooks and Git guards are unverified. Use only available authorized tools; ARC does not write Gemini settings.json.
48
48
  [ARC role policy: contract end]
@@ -35,6 +35,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
35
35
  - [role.reviewer-independent] Independently inspect assigned final changes and evidence, and report actionable findings and limits. Remain read-only: DO NOT execute Tester tests, edit files, perform Git mutations or decide acceptance.
36
36
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
37
37
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
38
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
38
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
39
39
  - [platform.gemini] Role restrictions are prompt-level contracts, not a filesystem sandbox. Native tool restriction fields, observer hooks and Git guards are unverified. Use only available authorized tools; ARC does not write Gemini settings.json.
40
40
  [ARC role policy: contract end]
@@ -34,6 +34,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
34
34
  - [role.scouter-read-only] Research assigned static sources and report findings, evidence and limits. DO NOT edit, install, execute checks, prepare targets, inspect live operational state or change external state. DO NOT decide design, verification, review or acceptance.
35
35
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
36
36
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
37
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
37
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
38
38
  - [platform.gemini] Role restrictions are prompt-level contracts, not a filesystem sandbox. Native tool restriction fields, observer hooks and Git guards are unverified. Use only available authorized tools; ARC does not write Gemini settings.json.
39
39
  [ARC role policy: contract end]
@@ -33,6 +33,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
33
33
  - [role.tester-verification] Run approved checks and report commands, observations, reproduction, evidence and limits. Create only essential temporary data/logs/reports within brief-authorized locations and lifetimes. DO NOT edit product source, tests, fixtures or configuration to pass checks, deploy or accept work. Persistent product-state checks need explicit scope and cleanup ownership. Return failures for Implementer correction and required Tester recheck. Implementer and fresh Tester handoffs include the exact approved visual source, version, approval and access state; criterion IDs, required properties and comparison method; and actual-output identity, revision and comparison basis. Record pass, mismatch or unverified with accessible evidence and limits. Implementer self-report does not replace fresh Tester and its actual comparison. A missing output-to-revision link is unverified; record a visible difference separately as mismatch without inferring current branch UI state. Missing source/output, inaccessible evidence or unapproved interpretation holds the affected visual claim for Orchestrator. DO NOT silently substitute or redesign.
34
34
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
35
35
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
36
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
36
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
37
37
  - [platform.gemini] Role restrictions are prompt-level contracts, not a filesystem sandbox. Native tool restriction fields, observer hooks and Git guards are unverified. Use only available authorized tools; ARC does not write Gemini settings.json.
38
38
  [ARC role policy: contract end]
@@ -17,7 +17,7 @@ description: Coordinate scoped research planning implementation verification and
17
17
 
18
18
  **Pre-action gate record:** Before a task's first specialist creation or assignment, its first repository edit, or any decision to skip the Planner design stage, read the applicable references first, then post one line in a user-visible progress message with `mode` (standalone, or composite with routing revision), `run` (Run mode in effect: `supervised` or `full-auto`), `class` (work type), `path` (direct with all F1–F8 proven, Spike, Bounded or Architectural), `design` (Planner design required, approved or omitted, and why), `depth` (plan required, or the omission reason), `risk` (level and reason) and `refs` (reference sections actually read). A field that a later stage decides (for example `path` or `depth` before Planner design) is recorded as `pending` with that stage; for work with no edits or design, such as Scouter-only research, `path`, `design` and `depth` are `n/a` with the reason; any other empty or unverified field holds that action. Post a new line when a recorded fact changes. Feature, behavior and bug-fix implementation starts with Planner design unless the direct path is selected with all F1–F8 proven.
19
19
 
20
- Each top-level task (one plan task, or the entire request without a plan) receives a fresh Implementer. Each task requiring Tester receives fresh Tester, never reused from another task. Every Tester brief, including correction rechecks and resumed assignments, MUST state `mode: task` or `mode: final` under [verification](references/verification.md#test-scope-and-result-comparison). Same-task corrections and rechecks use the current Implementer and, for Tester findings or required Tester rechecks, the current Tester while assignment remains valid. Once final overall Reviewer review begins on plan work, every Reviewer finding, including behavior, repeats Implementer → Reviewer without Tester reassignment until resolved; keep corrections uncommitted through rechecks. Separate Tester findings remain Implementer → Tester. Tester findings alone create no new task. Restart exceptions follow coordination and verification.
20
+ Each top-level task (one plan task, or the entire request without a plan) receives a fresh Implementer. Each task requiring Tester receives fresh Tester, never reused from another task. Every Tester brief, including correction rechecks and resumed assignments, MUST state `mode: task` or `mode: final` under [verification](references/verification.md#test-scope-and-result-comparison). Same-task corrections and rechecks use the current Implementer and, for Tester findings or required Tester rechecks, the current Tester while assignment remains valid. Once final overall Reviewer review begins on plan work, every Reviewer finding, including behavior, repeats Implementer → Reviewer without Tester reassignment until resolved; keep corrections uncommitted through rechecks. Tester findings remain Implementer → Tester; final-mode Tester work concludes before that review begins. Tester findings alone create no new task. Restart exceptions follow coordination and verification.
21
21
 
22
22
  Follow user and project instructions. Orchestrator uses the current conversation model for simple self-contained questions answerable from context or one quick read without edits and coordinates substantive multistep implementation, configuration, tests and mixed work. It handles research directly when material is already in context or a quick read of a few known files suffices. Other material research and analysis, and bounded static exploration of code, documents, data, logs and reports, go to configured Scouter. A narrow lookup brief supplies known paths and specific facts without synthesis. Route by object or deliverable, not verbs alone.
23
23
 
@@ -23,7 +23,7 @@ For final Reviewer findings on committed plan work, define follow-up task/requir
23
23
 
24
24
  Local commit authority never permits early planning-document commits. Pre-Implementer approvals/explicit target/batch preparation remain. NEVER amend planning or implementation commits or retroactively authorize past work. Structural checks prove no live compliance.
25
25
 
26
- Use Conventional Commits `<type>(<scope>): <description>` with concise specific English description, no trailing period, lowercase scope when useful and one logical task. Body/footer only when needed; preserve Git trailers.
26
+ Use Conventional Commits `<type>(<scope>): <description>` with a concise specific description, no trailing period, lowercase scope when useful and one logical task. {{ARC_COMMIT_LANGUAGE_POLICY}} Body/footer only when needed; preserve Git trailers.
27
27
 
28
28
  <a id="execution-time-plan-document-updates"></a>
29
29
  ## Execution-time plan document updates
@@ -70,7 +70,7 @@ Begin after target preparation and all applicable documents are written/individu
70
70
  For worktrees verify actual registration/a verified native attachment mechanism session attachment/identity/base/branch and directly written documents or protected legacy/restart transfers before target docs commits. Commit remaining approvals once at target; no automatic source docs commit.
71
71
 
72
72
  1. Verify already committed approvals by SHA, actual message/paths/content and selected-checkout validity; reuse without recommitting.
73
- 2. Record remaining approved versions/paths. Finalize a specific English Conventional Commit message before the first commit.
73
+ 2. Record remaining approved versions/paths. Finalize a specific Conventional Commit message under [commit](commit.md#automatic-commit-after-plan-task-acceptance) before the first commit.
74
74
  3. Batch all remaining approved documents into one focused docs commit. Staged paths/diff MUST match exactly; unrelated staging blocks commit. No implementation files.
75
75
  4. If all validly committed, verify only. NEVER duplicate/empty-commit/amend/reset/recommit merely to combine SHAs. DO NOT use temporary messages followed by routine `git commit --amend`.
76
76
  5. Failure/staged-content mismatch stops handoff. Inspect branch/HEAD/index/partial completion and resolve before resuming; NEVER commit implementation instead.
@@ -179,7 +179,7 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
179
179
  - [role.implementer-implementation] Edit only assigned, approved files and run focused checks under the existing TDD contract. Report changed files, RED/GREEN or approved exception evidence, results, limits and follow-up. DO NOT plan, perform Tester or Reviewer verification of your own work, accept the task or declare overall completion. Git mutations remain forbidden after successful implementation. Implementer and fresh Tester handoffs include the exact approved visual source, version, approval and access state; criterion IDs, required properties and comparison method; and actual-output identity, revision and comparison basis. Record pass, mismatch or unverified with accessible evidence and limits. Implementer self-report does not replace fresh Tester and its actual comparison. A missing output-to-revision link is unverified; record a visible difference separately as mismatch without inferring current branch UI state. Missing source/output, inaccessible evidence or unapproved interpretation holds the affected visual claim for Orchestrator. DO NOT silently substitute or redesign.
180
180
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
181
181
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
182
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
182
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
183
183
  - [platform.gemini] Role restrictions are prompt-level contracts, not a filesystem sandbox. Native tool restriction fields, observer hooks and Git guards are unverified. Use only available authorized tools; ARC does not write Gemini settings.json.
184
184
  [ARC role policy: contract end]
185
185
 
@@ -66,7 +66,7 @@ For initial fast judgment apply the [fast gate](handoff.md#orchestrator-direct-p
66
66
 
67
67
  Apply Planner rules: ID/title, goal/scope/files, predecessors/dependencies, criteria, required pre-acceptance Tester/checks/evidence and holds. Tasks MUST be independently implementable/verifiable/acceptable. Inseparable policy/profile/tests/manifest contracts start in one task. If inseparability appears later, stop for revised scope/planning/approvals; NEVER merge distinct approved tasks during execution.
68
68
 
69
- Substeps/checkboxes/RED-GREEN/commands are not commits. One top-level task becomes one focused commit after acceptance; [commit](commit.md) governs no-change/hold/resume. Reviewer is never a per-task check. Final whole verification has separate scope/timing; significant work lists one Reviewer after all task acceptances/risk checks. Task boundaries alone add no Tester. Apply only to required plans; omission paths gain no plan obligation. Plans list per-task related tests with reasons and a final verification section per [verification](verification.md#test-scope-and-result-comparison).
69
+ Substeps/checkboxes/RED-GREEN/commands are not commits. One top-level task becomes one focused commit after acceptance; [commit](commit.md) governs no-change/hold/resume. Reviewer is never a per-task check. Final whole verification has separate scope/timing; significant work lists one Reviewer after all task acceptances/risk checks and concluded final-mode Tester work. Task boundaries alone add no Tester. Apply only to required plans; omission paths gain no plan obligation. Plans list per-task related tests with reasons and a final verification section per [verification](verification.md#test-scope-and-result-comparison).
70
70
 
71
71
  Include the provisional trigger judgment with the substitute-check list and reasons in the plan's final verification section.
72
72
 
@@ -155,7 +155,7 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
155
155
  - [approval.run-mode] The installed ARC Run mode is Supervised unless the installed skill states Full Auto. In Full Auto, an Orchestrator decision recorded as `auto-decided (Full Auto)` with gate, choice, reason and evidence counts as the explicit choice or approval for that listed gate only; briefs cite it as `full-auto:<doc>@<version>` or the recorded decision. It never authorizes new product decisions outside the original request, external actions, resolution of failures, holds, unknown state or ownership conflicts, preservation-rule Git actions, permission or sandbox changes, or unknown slots and exhausted capacity, and it changes no plan-depth, commit, Tester, Reviewer or acceptance rule. A user request to stop or use Supervised applies from the next gate.
156
156
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
157
157
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
158
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
158
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
159
159
  - [planning.plan-revision] Task progress records (checkboxes, notes, results, evidence and status) preserving the approved contract need no new user approval; Orchestrator includes the completed task's own records in its accepted implementation commit and records classification, reason and actual time as applicable. Plan-level progress records preserving the approved contract also need no new user approval and alone never trigger the standalone docs(plan) closing commit. All other spec/plan content changes, contract or mechanical, require applicable approval and preparation; changes to goals, scope, criteria, method, risk, dependencies or required verification need revised-version approval, preparation and holds on affected work before it continues, with a fresh Implementer for remaining work. After approval Orchestrator edits the same document, appends a revision-history row and leaves it uncommitted as an Orchestrator-owned pending revision, recording version, content hash, approval reference, actual time, classification, reason, affected tasks and the full approved content in the canonical handoff record. Orchestrator includes all pending revisions with Plan-Revision, Plan-Approved-At and Plan-Reason trailers in the accepted commit of the first top-level task executed or reconfirmed against the revised version, otherwise in a current task or final Reviewer follow-up commit; only when no implementation work remains before overall completion MAY it make one standalone docs(plan) closing commit without implementation files. Exclude revision hunks from commits of independent tasks accepted on a prior version, or hold that commit when separation is unsafe. NEVER amend or rewrite planning or implementation commits, create any other docs/fixup commit or authorize past work retroactively. After commit verify the committed document content matches the latest approved content apart from classified progress records of that commit's task or committed for other tasks after approval, or plan-level progress records carried by that commit, and that no pending revision remains. Follow planning, handoff-prep, commit and verification for the full contract.
160
160
  - [planning.planner-brief] Follow planning.md's Planner drafting preparation and review procedure, including preflight, ledger, evidence classification, target preparation, preceding approvals, provenance and reference gates. Before Planner dispatch, evaluate F1–F8 direct-path eligibility and Bounded plan-omission eligibility independently. Enter each path only when all of that path's existing conditions are proven; if neither path qualifies, use normal full evaluation. Send one complete stage-specific initial brief. Reuse the same Planner instance only within the design/brainstorming stage while its role, context and source remain valid; after design approval, use a fresh Planner instance for each spec and plan stage, whose initial brief contains every required field, saved document paths and approved versions. Follow-up briefs send changed fields and cite an accessible prior brief for unchanged fields. Reuse evidence only for the same source set, absolute locator, resolved path, content fingerprint, purpose and approval scope in an accessible matching context. When source, target or scope changed, reconfirm affected inputs. Planner returns a complete proportional first draft and self-review. Orchestrator reviews and directly revises the same spec or plan when needed. A missing or failed first draft does not transfer initial authorship to Orchestrator. New product decisions outside approved scope require user input before Orchestrator revises the document. For design and brainstorming, allow the initial draft and one consolidated correction. Orchestrator reviews once with the fixed checklist and sends one consolidated correction using changed fields only. Further calls require user-approved material scope/evidence changes or concrete unmet checklist items after correction, plus meaningful new input or criterion-state progress. State changed input, target criterion, expected artifact and expected progress. Repeated unmet criteria without new input, evidence or progress hold the stage; report the criterion, observed evidence and exact unblock input/decision. DO NOT split omissions, repeat resolved items or count rewording/agent replacement as progress. DO NOT invoke Planner only for reformatting, re-expression, save errors or patch-application errors; Orchestrator handles these. Evaluate separate substantive work under the normal Planner gate. Preserve separate sequential design/spec/plan approvals. Add no fixed call cap or profile call-count conditions, and NEVER accept an incomplete draft. Keep user progress brief and based on Planner status without relaying draft content. At approval, present the integrated, saved and reviewed Markdown without repeating its body in chat.
161
161
  - [platform.gemini] Role restrictions are prompt-level contracts, not a filesystem sandbox. Native tool restriction fields, observer hooks and Git guards are unverified. Use only available authorized tools; ARC does not write Gemini settings.json.
@@ -21,7 +21,11 @@ Tester briefs MUST include the required field `mode: task | final`. One assignme
21
21
 
22
22
  **Task mode** assigns a fresh Tester for each top-level task requiring Tester verification. Task checks and rechecks verify uncommitted work and run only tests related to the change: test files that directly exercise a changed module, contract tests that the change requires updating, and the matching check scripts. The brief lists the minimum set; executors MAY add only items in these three categories, each with a reason. Other additions need Orchestrator authorization. Report every selected item and why. Read only to confirm the brief and identify tests in those categories. In task mode, never run full regression or substitute checks. In task mode, do not search reverse dependencies. Failures follow Implementer → Tester recheck, reusing the current Tester for the same task. This rule takes precedence over the upstream TDD per-task project-suite instruction; upstream text is unchanged. Report every failure observed in any run by name.
23
23
 
24
- **Final mode** runs once after all tasks are accepted and committed, as one fresh Tester assignment at the verified HEAD of the execution target worktree. Run (1) all contract tests, (2) all check scripts, (3) the related tests of re-changed files and (4) substitute checks for applicable triggers. Final mode does not rerun the union of tests that task Tester already passed. A re-changed file is a file that a task's Tester verified, as a changed file or a related test file it ran, and that a later commit changed after that task's focused commit (`git diff --name-only <task commit> HEAD`), plus every non-documentation file changed in base..HEAD by a commit that no task Tester verified. Orchestrator computes the list and cites it in the brief; Tester cross-checks it with read-only `git diff`, MAY add items only within the three categories above with reasons, and reports the reason when the list is empty. Tester records `git status --porcelain` at start and end; a state that is not clean is an environment block that holds final verification. While it runs, neither Orchestrator nor any Implementer writes in that workspace; the read-only final Reviewer MAY run concurrently. A new failure from final verification follows Implementer → Tester even after the final Reviewer has started; Reviewer evidence for affected files becomes stale and needs a refreshed-diff recheck.
24
+ **Final mode** runs once after all tasks are accepted and committed, as one fresh Tester assignment at the verified HEAD of the execution target worktree. Run (1) all contract tests, (2) all check scripts, (3) the related tests of re-changed files and (4) substitute checks for applicable triggers. Final mode does not rerun the union of tests that task Tester already passed. A re-changed file is a file that a task's Tester verified, as a changed file or a related test file it ran, and that a later commit changed after that task's focused commit (`git diff --name-only <task commit> HEAD`), plus every non-documentation file changed in base..HEAD by a commit that no task Tester verified. Orchestrator computes the list and cites it in the brief; Tester cross-checks it with read-only `git diff`, MAY add items only within the three categories above with reasons, and reports the reason when the list is empty. Tester records `git status --porcelain` at start and end; a state that is not clean is an environment block that holds final verification. While it runs, neither Orchestrator nor any Implementer writes in that workspace. A new failure from final verification follows Implementer → Tester. The final Reviewer starts only after final-mode Tester work concludes: the final Tester report is delivered, every new failure is resolved through Implementer → Tester recheck, every new-failure candidate and intermittent candidate is dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned under **Undeterminable scope** below. Reviewer output produced before that point is not the initial final review.
25
+
26
+ **Command execution:** Implementer and Tester briefs MUST NOT prescribe detached execution such as `&`, `nohup` or `setsid`; they require long commands to run in the foreground and be waited on in the same session until an exit code. Orchestrator does not run a Tester's assigned suites in its place unless Tester reports an environment block with evidence and the user chooses that run.
27
+
28
+ **Suite parallelism:** A Tester runs each multi-file suite command with the test runner's built-in parallel mode inside that one foreground command; a parallel mode that needs a package or plugin not already installed counts as no parallel mode. It runs a suite sequentially only when its tests are known to interfere with each other or the runner has no parallel mode, and reports the reason. Briefs MUST NOT split a suite into sequential groups for any other reason; splitting across Testers follows **Full regression shards** below. This changes how a command runs, not which tests run.
25
29
 
26
30
  Read-only reverse dependency search is allowed in final mode. Use the project's affected tool only in list or dry-run form with no writes, installs or cache generation; otherwise report an environment block and continue with the next step of the impact procedure.
27
31
 
@@ -47,9 +51,11 @@ Select substitute checks in this impact procedure order:
47
51
 
48
52
  A suspected dynamic reference goes directly to step 5.
49
53
 
50
- **Undeterminable scope** requires Tester to report each item, cause, substitute checks run and remaining unverified scope. Orchestrator asks the user to (i) approve full regression, (ii) substitute the project CI full test results, or (iii) disposition as unverified. Until the user decides, final acceptance is held, while Reviewer and independent work continue. Resolution of unknown state is never auto-decided in Full Auto. A disposition as unverified does not turn a criterion into proven.
54
+ **Undeterminable scope** requires Tester to report each item, cause, substitute checks run and remaining unverified scope. Orchestrator asks the user to (i) approve full regression, (ii) substitute the project CI full test results, or (iii) disposition as unverified. Until the user decides, final acceptance and the final Reviewer are held, while independent work continues. Resolution of unknown state is never auto-decided in Full Auto. A disposition as unverified does not turn a criterion into proven.
55
+
56
+ **Approved full regression** requires explicit user approval, and the current final-mode Tester runs it as a follow-up; no new Tester is assigned except shard Testers under **Full regression shards** below. On resume, bridge resumes the same dispatch and native continues the same assignment. For bridge, each segment starts a new lease.timeoutMinutes timer. When resuming either route, if the same assignment cannot continue, report an environment block and hold; the user decides whether to assign a new Tester. Approval is valid only for that workflow and HEAD and expires when HEAD changes. If HEAD changes before the final Reviewer starts, an expired approval needs re-approval and a rerun at the new HEAD, or a fresh disposition under **Undeterminable scope**, before the Reviewer starts. The approved full regression runs once per approval. Approved full regression failures follow the base check below.
51
57
 
52
- **Approved full regression** requires explicit user approval, and the current final-mode Tester runs it as a follow-up; no new Tester is assigned. On resume, bridge resumes the same dispatch and native continues the same assignment. For bridge, each segment starts a new lease.timeoutMinutes timer. When resuming either route, if the same assignment cannot continue, report an environment block and hold; the user decides whether to assign a new Tester. Approval is valid only for that workflow and HEAD and expires when HEAD changes. The approved full regression runs once. Approved full regression failures follow the base check below.
58
+ **Full regression shards:** Orchestrator MAY split an approved full regression into shards only when, from recorded prior run times, it is likely to exceed one Tester's time limit for its route, such as the bridge `arc_tester` 60-minute lease, or when independent suites, such as a sequential Python suite and a Node suite, can run at the same time; it records the reason. A shard is one whole suite command or a set of whole test files, never a subset of test names. Before dispatch Orchestrator lists every test file and suite command of the approved full regression at the verified HEAD as the inventory and writes a shard manifest that assigns each item to exactly one shard, so that the shards do not overlap and their union equals the inventory. Tests known to share state, such as fixed ports, the same temporary or workspace paths, the git common directory or global configuration, go in one shard. The current final-mode Tester runs one shard as its follow-up; each other shard goes to a fresh Tester whose `mode: final` brief adds `shard: <id> of <n>`, the shard's files or command and the manifest. The current final-mode Tester's follow-up brief also adds `shard: <id> of <n>` and its shard's files or command. Each shard Tester runs only its shard with no other final-mode checks, reports the files it actually ran and classifies failures only by the static check under **Baseline** below. All shards run at the same verified HEAD in the same workspace; each Tester records `git status --porcelain` at start and end, and no one writes in that workspace until every shard ends. Orchestrator reserves the whole shard batch under [limits](limits.md#counting-and-reservations) and serializes shards that do not fit; each shard Tester is a created and active instance, and the follow-up adds none. When the runner has a parallelism option, Orchestrator sets it per shard so that the combined workers stay within the host's available parallelism. After every shard has reported, Orchestrator sends the shard failures that need a base run to the current final-mode Tester, which reruns each alone at HEAD, with no other test command running in that workspace, up to the brief's isolated rerun limit; a pass alone is an intermittent candidate, and a failure alone follows the base check below; this rerun classifies the failure and is not the intermittency check under **Result comparison**. A rerun at HEAD that the environment blocks leaves that failure a new-failure candidate for Orchestrator disposition. Orchestrator merges the shard results and verifies that every inventory item has complete results exactly once; an item without complete results is a new-failure candidate and leaves the run incomplete. A blocked or timed-out shard follows the resume rule above; its items stay unverified, and the user decides whether a new Tester runs only the items without complete results. Sharding splits the one approved run and adds no run. The approved full regression is complete only when every shard has reported, coverage is verified and every shard failure is classified or dispositioned. Record the reason, inventory, manifest, Tester IDs and per-shard results with the approved full regression record.
53
59
 
54
60
  **CI substitution** requires results for the same commit SHA as the verified HEAD or a matching tree hash with evidence, all jobs completed, accessible per-test-name results, results collected read-only by Orchestrator and cited in the brief, and an explicit user approval record. Use CI results as evidence only for the tests and scope they cover when every condition is met; otherwise a new-failure candidate or unverified is the applicable classification. This collection grants no external action authority.
55
61
 
@@ -69,11 +75,11 @@ Edits belong to Implementer except the [small direct path](handoff.md#orchestrat
69
75
  | Small, low risk | Implementer or direct edit → Orchestrator focused checks → acceptance |
70
76
  | Ordinary behavior | Implementer → independent Tester → acceptance |
71
77
  | Significant/high risk, no plan | Implementer → Tester/rechecks → final full-change Reviewer → acceptance |
72
- | Significant/high risk, plan | Per task Implementer → required fresh Tester → acceptance/commit; final independent whole-change Reviewer once after all accepted tasks/required checks/rechecks |
78
+ | Significant/high risk, plan | Per task Implementer → required fresh Tester → acceptance/commit; final independent whole-change Reviewer once after all accepted tasks/required checks/rechecks and concluded final-mode Tester work |
73
79
 
74
80
  Ordinary/significant tasks need fresh Tester before acceptance. Low risk requires narrow/understood/reversible/focused-verifiable work. Ordinary behavior fails these without significant triggers. Shared role/behavior contracts/state, lifecycle/integration order, security/permissions, data loss/migration, public interfaces and costly install/deploy/rollback are significant. Substantial behavior/contracts are significant regardless of file count. Unclear risk requires investigation/higher flow. Environment failure waives no check or depth judgment.
75
81
 
76
- - Task boundaries alone add no Tester/review. Reviewer is never a plan-task/commit prerequisite. Plans review once at final relevant state after task acceptances/checks; no-plan Reviewer follows Tester before acceptance.
82
+ - Task boundaries alone add no Tester/review. Reviewer is never a plan-task/commit prerequisite. Plans review once at final relevant state after task acceptances/checks and concluded final-mode Tester work; no-plan Reviewer follows Tester before acceptance.
77
83
  - Preserve specific commitments. Risky unverified dependencies need Tester/resolved or explicitly dispositioned findings before implementation.
78
84
  - Reuse evidence only for matching scope/state/independence/freshness/flow position. Changes/failures/missing-conflicting evidence invalidate affected reuse.
79
85
  - Tester independently checks without edits. Reviewer performs no Tester/planning/editing/delegation/completion decisions. Orchestrator routes fixes to Implementer and required Tester rechecks; direct-check failures return to normal flow. Accept after findings/gaps resolved or dispositioned.
@@ -86,7 +92,7 @@ Distinguish environment failures from code failures and report exact limits and
86
92
  <a id="final-plan-reviewer-correction-loop"></a>
87
93
  ### Final plan Reviewer correction loop
88
94
 
89
- Only final overall Reviewer findings on plan work, including behavior, follow Implementer → Reviewer without Tester reassignment until resolved. One initial full review permits necessary rechecks. Before it, risk checks/Tester failures/unmet criteria still need Implementer → Tester. No-plan flow remains unchanged.
95
+ Only final overall Reviewer findings on plan work, including behavior, follow Implementer → Reviewer without Tester reassignment until resolved. One initial full review permits necessary rechecks. Before it, risk checks/final-mode Tester work/Tester failures/unmet criteria still need Implementer → Tester and conclude. No-plan flow remains unchanged.
90
96
 
91
97
  Expanded scope/separate obligations/gaps hold affected work for resolution/approval. Orchestrator assigns/accepts; Reviewer stays read-only without Tester/acceptance. NEVER present old Tester as post-fix execution. Report actual actor/target/check/result/limits only.
92
98
 
@@ -105,7 +111,7 @@ Task acceptance differs from final verification/acceptance. Connect criteria/obs
105
111
 
106
112
  DO NOT delay independently acceptable tasks solely for final-only checks or defer currently required checks to accept early. State final integration scope/timing separately. Whole-plan Reviewer is part of final verification; task commits prove no unperformed final checks. Orchestrator decides final acceptance with Tester/Reviewer/integration evidence/findings and unverified/disposition records. Shared evidence MUST satisfy all reuse rules. Before the overall completion report and any push, PR or merge authorization request, Orchestrator verifies that plan-level progress records are carried by the verified next commit of the plan or, when none follows, recorded only in the canonical handoff record with the plan document unchanged and a clean working tree. While a user decision on a non-blocking final Reviewer finding is pending, hold overall completion; a fix decision follows plan revision and a new task whose accepted commit carries the records, and a no-fix disposition stays canonical only when no later commit follows.
107
113
 
108
- Committed-plan final Reviewer findings need a follow-up task/planning/approvals. Keep corrections uncommitted; refresh committed state plus uncommitted diff/files in Reviewer artifacts/briefs. Reuse/assign independent Reviewer and repeat Implementer → Reviewer until resolved, then accept/commit one focused follow-up. Final Tester findings still use Implementer → Tester. No automatic amend/reset/duplicate originals; scope growth retains planning/approvals.
114
+ Committed-plan final Reviewer findings need a follow-up task/planning/approvals. Keep corrections uncommitted; refresh committed state plus uncommitted diff/files in Reviewer artifacts/briefs. Reuse/assign independent Reviewer and repeat Implementer → Reviewer until resolved, then accept/commit one focused follow-up. Final-mode Tester findings use Implementer → Tester and conclude before the initial final review. No automatic amend/reset/duplicate originals; scope growth retains planning/approvals.
109
115
 
110
116
  Orchestrator writes approved-base final base..HEAD diff/changed-file list to `<git-common-dir>/arc/review/<slug>.diff`, using handoff slug and absolute brief citation; inline if small/write denied. Reviewer reads artifact, not Git commands, stating limits.
111
117
 
@@ -148,7 +154,7 @@ Failed checks/reviews leave findings. Open separately via `data: {action: "open"
148
154
 
149
155
  Final-mode Tester results are not cooperative checks; record them in the plan-level progress record and the canonical handoff record. Record undeterminable dispositions, approved full regression and CI substitution there as well.
150
156
 
151
- Final review uses `operation: "review"`, `scope: "final"`, `actor.role: "reviewer"`, `descriptor: {kind: "source-review", paths: [...]}` without taskId. Initial final review needs all tasks accepted/current required Tester, never task acceptance/commit prerequisite. Plan-final findings repeat Implementer resolution→Reviewer without Tester reassignment; old Tester is not subsequent-fix execution. Separate unresolved Tester remains.
157
+ Final review uses `operation: "review"`, `scope: "final"`, `actor.role: "reviewer"`, `descriptor: {kind: "source-review", paths: [...]}` without taskId. Initial final review needs all tasks accepted/current required Tester/concluded final-mode Tester work, never task acceptance/commit prerequisite. Plan-final findings repeat Implementer resolution→Reviewer without Tester reassignment; old Tester is not subsequent-fix execution. Separate unresolved Tester remains.
152
158
 
153
159
  Scope/document/approval records preserve history. `data.affectedTaskIds` invalidates those tasks/dependents and task/check/acceptance evidence; omitted IDs hold all. Final evidence becomes stale. Preserve unaffected independent evidence. Orchestrator determines semantic impact. Affected tasks need new current-scope approval/contracts before preparation, not revived old approvals; fresh checks/reviews/revalidation too. Current evidence supersedes failures without deletion. Acceptance/commit/completion stay Orchestrator decisions.
154
160
 
@@ -170,7 +176,7 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
170
176
  - [git.orchestrator-accept-commit] Only Orchestrator accepts work and performs Git mutations. One approved top-level plan task becomes one focused implementation commit after criteria, required checks and findings are satisfied. Orchestrator accepts, then includes that task's own progress records made after task completion (checkboxes, notes, results, evidence and status) with its implementation work in that commit, without a separate docs/fixup commit or planning-commit amendment for those records. Exclude other tasks; pending approved spec/plan revisions follow planning.plan-revision and preserve the no-change path without empty commits. Plan-level progress records (final verification results, final Reviewer verdicts and finding dispositions, overall completion status) are the sole exception: include them in the plan's next task acceptance or final Reviewer follow-up commit; when no implementation work remains and no standalone closing commit for pending revisions is made, keep them only in the canonical handoff record without changing the plan document or creating a commit. Orchestrator commits without separate user commit approval. Reports, passing checks and Reviewer opinions do not replace acceptance. Preserve unrelated changes and ownership; verify the resulting SHA, content, HEAD and remaining changes. Existing small-task direct and plan-omission paths remain unchanged.
171
177
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
172
178
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
173
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
179
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
174
180
  - [planning.plan-revision] Task progress records (checkboxes, notes, results, evidence and status) preserving the approved contract need no new user approval; Orchestrator includes the completed task's own records in its accepted implementation commit and records classification, reason and actual time as applicable. Plan-level progress records preserving the approved contract also need no new user approval and alone never trigger the standalone docs(plan) closing commit. All other spec/plan content changes, contract or mechanical, require applicable approval and preparation; changes to goals, scope, criteria, method, risk, dependencies or required verification need revised-version approval, preparation and holds on affected work before it continues, with a fresh Implementer for remaining work. After approval Orchestrator edits the same document, appends a revision-history row and leaves it uncommitted as an Orchestrator-owned pending revision, recording version, content hash, approval reference, actual time, classification, reason, affected tasks and the full approved content in the canonical handoff record. Orchestrator includes all pending revisions with Plan-Revision, Plan-Approved-At and Plan-Reason trailers in the accepted commit of the first top-level task executed or reconfirmed against the revised version, otherwise in a current task or final Reviewer follow-up commit; only when no implementation work remains before overall completion MAY it make one standalone docs(plan) closing commit without implementation files. Exclude revision hunks from commits of independent tasks accepted on a prior version, or hold that commit when separation is unsafe. NEVER amend or rewrite planning or implementation commits, create any other docs/fixup commit or authorize past work retroactively. After commit verify the committed document content matches the latest approved content apart from classified progress records of that commit's task or committed for other tasks after approval, or plan-level progress records carried by that commit, and that no pending revision remains. Follow planning, handoff-prep, commit and verification for the full contract.
175
181
  - [platform.gemini] Role restrictions are prompt-level contracts, not a filesystem sandbox. Native tool restriction fields, observer hooks and Git guards are unverified. Use only available authorized tools; ARC does not write Gemini settings.json.
176
182
  [ARC role policy: contract end]
@@ -33,6 +33,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
33
33
  - [role.implementer-implementation] Edit only assigned, approved files and run focused checks under the existing TDD contract. Report changed files, RED/GREEN or approved exception evidence, results, limits and follow-up. DO NOT plan, perform Tester or Reviewer verification of your own work, accept the task or declare overall completion. Git mutations remain forbidden after successful implementation. Implementer and fresh Tester handoffs include the exact approved visual source, version, approval and access state; criterion IDs, required properties and comparison method; and actual-output identity, revision and comparison basis. Record pass, mismatch or unverified with accessible evidence and limits. Implementer self-report does not replace fresh Tester and its actual comparison. A missing output-to-revision link is unverified; record a visible difference separately as mismatch without inferring current branch UI state. Missing source/output, inaccessible evidence or unapproved interpretation holds the affected visual claim for Orchestrator. DO NOT silently substitute or redesign.
34
34
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
35
35
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
36
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
36
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
37
37
  - [platform.grok] Role restrictions are prompt-level contracts, not a filesystem sandbox. Grok sandboxing, native tool restriction fields, observer hooks and Git guards are unverified, and Grok may continue without its sandbox. Use only available authorized tools; ARC disables Grok Claude compatibility (agents, skills, rules in config.toml; also MCPs and hooks for bridge children), but whether Grok sessions honor these settings is unverified.
38
38
  [ARC role policy: contract end]
@@ -43,6 +43,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
43
43
  - [role.planner-draft-only] Return design/brainstorming drafts and complete first spec/plan drafts with dependencies, criteria, holds and verification needs in the response. During initial drafting and revisions, report progress only to Orchestrator: briefly state the stage, feedback being applied, actual blocker or next step, without draft prose or excerpts. Return the complete first draft and self-review for Orchestrator review; Orchestrator directly revises the same spec or plan when needed. Raw responses may appear in app/tool surfaces; prompt policy cannot hide them. DO NOT save documents, implement, run checks, prepare targets, request user approval or decide acceptance. The first required document draft uses the verified source and selected target intent before target preparation. Require a verified prepared target before saving or handoff. Route decisions to Orchestrator.
44
44
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
45
45
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
46
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
46
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
47
47
  - [platform.grok] Role restrictions are prompt-level contracts, not a filesystem sandbox. Grok sandboxing, native tool restriction fields, observer hooks and Git guards are unverified, and Grok may continue without its sandbox. Use only available authorized tools; ARC disables Grok Claude compatibility (agents, skills, rules in config.toml; also MCPs and hooks for bridge children), but whether Grok sessions honor these settings is unverified.
48
48
  [ARC role policy: contract end]
@@ -35,6 +35,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
35
35
  - [role.reviewer-independent] Independently inspect assigned final changes and evidence, and report actionable findings and limits. Remain read-only: DO NOT execute Tester tests, edit files, perform Git mutations or decide acceptance.
36
36
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
37
37
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
38
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
38
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
39
39
  - [platform.grok] Role restrictions are prompt-level contracts, not a filesystem sandbox. Grok sandboxing, native tool restriction fields, observer hooks and Git guards are unverified, and Grok may continue without its sandbox. Use only available authorized tools; ARC disables Grok Claude compatibility (agents, skills, rules in config.toml; also MCPs and hooks for bridge children), but whether Grok sessions honor these settings is unverified.
40
40
  [ARC role policy: contract end]
@@ -34,6 +34,6 @@ Generated from lib/policy/role-policy.json; do not edit this managed section man
34
34
  - [role.scouter-read-only] Research assigned static sources and report findings, evidence and limits. DO NOT edit, install, execute checks, prepare targets, inspect live operational state or change external state. DO NOT decide design, verification, review or acceptance.
35
35
  - [review.significant-no-plan] Significant/high-risk work without a plan follows Implementer → Tester and required Tester rechecks → Reviewer of the final full change → Orchestrator acceptance. DO NOT omit Reviewer because no plan exists. This adds no plan obligation.
36
36
  - [review.significant-plan] Significant/high-risk plan work follows Implementer → required fresh Tester → Orchestrator acceptance and focused commit for each task. After all tasks are accepted and required Tester is complete, Reviewer reviews the final full change once. Reviewer is not a per-task or per-commit gate. Preserve required checks and necessary finding rechecks.
37
- - [review.final-plan-recheck] Complete required Tester and Tester failure rechecks before the initial final overall Reviewer review. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Separate Tester findings and new failures from final verification, which may run concurrently with the final Reviewer, follow Implementer → Tester; Reviewer evidence for affected files then needs a refreshed-diff recheck. Preserve required Tester outside this final Reviewer exception.
37
+ - [review.final-plan-recheck] Complete required Tester, Tester failure rechecks and final-mode Tester work before the initial final overall Reviewer review; final-mode Tester work concludes when its report is delivered, its new failures are resolved through Implementer → Tester recheck, its new-failure and intermittent candidates are dispositioned, any approved full regression is complete and every undeterminable-scope item is dispositioned. Once that review begins on plan work, every final Reviewer finding, including behavior, follows Implementer → Reviewer without Tester reassignment until resolved. Keep corrections uncommitted through Reviewer rechecks, then accept and create one focused follow-up commit. Tester findings and new failures from final verification follow Implementer → Tester before that review begins. Preserve required Tester outside this final Reviewer exception.
38
38
  - [platform.grok] Role restrictions are prompt-level contracts, not a filesystem sandbox. Grok sandboxing, native tool restriction fields, observer hooks and Git guards are unverified, and Grok may continue without its sandbox. Use only available authorized tools; ARC disables Grok Claude compatibility (agents, skills, rules in config.toml; also MCPs and hooks for bridge children), but whether Grok sessions honor these settings is unverified.
39
39
  [ARC role policy: contract end]