@xevy/skills 0.1.63 → 0.1.64
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
|
@@ -2,7 +2,7 @@
|
|
|
2
2
|
"name": "xevy",
|
|
3
3
|
"displayName": "Xevy",
|
|
4
4
|
"description": "Native /xevy:* SDLC workflow commands driven through the Xevy MCP server. Analyze, plan, execute, fix, and move-to-qa run locally by default and accept --cloud for the server Web Agent. Merge stays local; merge-pull-request evaluates and lands the remote PR.",
|
|
5
|
-
"version": "0.1.
|
|
5
|
+
"version": "0.1.64",
|
|
6
6
|
"author": {
|
|
7
7
|
"name": "Xevy"
|
|
8
8
|
},
|
package/package.json
CHANGED
package/skills/deploy/SKILL.md
CHANGED
|
@@ -14,12 +14,13 @@ Trigger a Coolify deploy through the Xevy MCP. `$ARGUMENTS` may start with `prev
|
|
|
14
14
|
- First word `preview` → per-task preview. `main` → project main. If unspecified (smart default): if a task is in context (`.xevy` session, an open task, or a task hint) → **preview**; otherwise → **main**. If genuinely ambiguous, ask the user.
|
|
15
15
|
|
|
16
16
|
## Preview
|
|
17
|
-
- Resolve the task (`mcp__xevy__find_task` by code). A pushed feature branch must exist
|
|
18
|
-
-
|
|
17
|
+
- Resolve the task (`mcp__xevy__find_task` by code). A pushed feature branch must exist. Call `mcp__xevy__deploy_preview({ taskId })` using recorded evidence, or optionally supply its exact pushed `branch` when not yet recorded. Conflicting branch input is rejected; never rewrite repository identity to force deployment.
|
|
18
|
+
- Association is automatic: branch-only legacy tasks check linked deployment-enabled repositories; existing scoped records and exclusions remain authoritative. No repository selector is required. Every selected branch must be verified exactly; absent branches, inaccessible repositories, missing credentials or unavailable verification are skipped. Never substitute a default branch.
|
|
19
|
+
- Report actual `queued`, `partial` or `skipped` status, URLs and each repository's reason. Partial results mean only independently verified repositories queued. If nothing queued, do not claim a build started; explain the recorded reasons.
|
|
19
20
|
|
|
20
21
|
## Main
|
|
21
22
|
- Call `mcp__xevy__deploy_main` for the current project. It deploys the project's REMOTE default branch and never pushes git branches; warn that unmerged local work won't appear until landed via PR. Report the main URL.
|
|
22
23
|
|
|
23
24
|
## Report progress
|
|
24
|
-
-
|
|
25
|
+
- Queued deploys are async (queued → building → live). Use `mcp__xevy__get_deploy_status` to report current state. Tell the user the URL may take a few minutes to become reachable.
|
|
25
26
|
- If the server reports previews are disabled, say so and stop. Never push protected branches (master/main/develop/staging) to make a deploy reflect local changes.
|
|
@@ -45,8 +45,8 @@ Review the exact PR and report evidence-based findings. This skill is **read-onl
|
|
|
45
45
|
## 4. Deliver a verdict
|
|
46
46
|
|
|
47
47
|
- Use plain-text headings and numbered or bulleted lists only; **never use Markdown tables**. Keep the developer-facing response short, actionable, and easy to copy and paste. Do the full review and maintain internal ledgers, but do not print exhaustive inventories or checklists unless requested. Avoid repeating evidence across sections.
|
|
48
|
-
- At response time, obtain the actual current datetime from the system clock and convert it to **GMT+8** (UTC+08:00), for example with `TZ=Etc/GMT-8 date --iso-8601=seconds`; do not guess it. Immediately after the opening merge indicator, include **Reviewed at:**
|
|
49
|
-
- Start with exactly one explicit merge indicator, then the linked task code immediately before the PR URL, followed by a brief reason and the reviewed head/base SHAs. Format: `**<MERGE INDICATOR>** — <TASK-CODE> — <PR-URL>`. If multiple distinct tasks are linked, list their codes comma-separated before the PR URL. If no task is resolved, use `NO LINKED TASK` before the PR URL:
|
|
48
|
+
- At response time, obtain the actual current datetime from the system clock and convert it to **GMT+8** (UTC+08:00), for example with `TZ=Etc/GMT-8 date --iso-8601=seconds`; do not guess it. Immediately after the opening merge indicator, include **Task Status:** `<status>` for the linked task (or each task when multiple are linked); if no task is linked, write **Task Status:** Not linked. Follow this with **Reviewed at:** and an ISO 8601 datetime ending in `+08:00`. If a linked task's status cannot be freshly verified, state **Task Status:** Unverified and treat its merge gate as unsatisfied. If the clock cannot be read, explicitly state that the timestamp is unavailable.
|
|
49
|
+
- Start with exactly one explicit merge indicator, then the linked task code immediately before the PR URL, followed by a brief reason and the reviewed head/base SHAs. Format: `**<MERGE INDICATOR>** — <TASK-CODE> — <PR-URL>`. If multiple distinct tasks are linked, list their codes comma-separated before the PR URL. If no task is resolved, use `NO LINKED TASK` before the PR URL. Immediately after this opening line, print `**Task Status:** <fresh current status>` (one per linked task, or `Not linked`), then `**Reviewed at:** <ISO 8601 datetime ending in +08:00>`, in that order. This opening status line does not replace the detailed linked-task status and gate results required below. If status cannot be freshly verified, print `Unverified` and treat the task gate as unsatisfied:
|
|
50
50
|
- **NOT SAFE TO MERGE** — a confirmed release blocker, conflict, failed required check, draft status, unmet review/branch-protection gate, or linked task below QA remains. For every linked task, show its identifier and freshly checked current status in the response. Only `for_qa`, `verified`, and `done` satisfy this task-status gate; `draft`, `ready`, `planned`, `in_progress`, and `qa_failed` are procedural **NOT SAFE TO MERGE** blockers even when code and checks pass. Unknown, inaccessible, or stale status is unverified and cannot satisfy the gate; refresh all linked task statuses immediately before the verdict. Continue the complete PR review and report code findings regardless of task status. Never change task records or statuses. Distinguish code-safety blockers from procedural merge gates in the reason. This takes precedence over unverified checks; still report verification gaps.
|
|
51
51
|
- **SAFE TO MERGE WITH NON-BLOCKING ISSUES** — full changed scope reviewed, no confirmed blockers or unresolved material safety questions, no conflicts, required checks passed and merge gates satisfied; only non-blocking findings remain.
|
|
52
52
|
- **SAFE TO MERGE** — the same verification and gate conditions are satisfied, with no outstanding findings in the reviewed scope. This is a scoped recommendation, not a guarantee of defect-free code.
|