@tgoodington/intuition 8.1.3 → 9.2.1
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/README.md +9 -9
- package/docs/project_notes/.project-memory-state.json +100 -0
- package/docs/project_notes/branches/.gitkeep +0 -0
- package/docs/project_notes/bugs.md +41 -0
- package/docs/project_notes/decisions.md +147 -0
- package/docs/project_notes/issues.md +101 -0
- package/docs/project_notes/key_facts.md +88 -0
- package/docs/project_notes/trunk/.gitkeep +0 -0
- package/docs/project_notes/trunk/.planning_research/decision_file_naming.md +15 -0
- package/docs/project_notes/trunk/.planning_research/decisions_log.md +32 -0
- package/docs/project_notes/trunk/.planning_research/orientation.md +51 -0
- package/docs/project_notes/trunk/audit/plan-rename-hitlist.md +654 -0
- package/docs/project_notes/trunk/blueprint-conflicts.md +109 -0
- package/docs/project_notes/trunk/blueprints/database-architect.md +416 -0
- package/docs/project_notes/trunk/blueprints/devops-infrastructure.md +514 -0
- package/docs/project_notes/trunk/blueprints/technical-writer.md +788 -0
- package/docs/project_notes/trunk/build_brief.md +119 -0
- package/docs/project_notes/trunk/build_report.md +250 -0
- package/docs/project_notes/trunk/detail_brief.md +94 -0
- package/docs/project_notes/trunk/plan.md +182 -0
- package/docs/project_notes/trunk/planning_brief.md +96 -0
- package/docs/project_notes/trunk/prompt_brief.md +60 -0
- package/docs/project_notes/trunk/prompt_output.json +98 -0
- package/docs/project_notes/trunk/scratch/database-architect-decisions.json +72 -0
- package/docs/project_notes/trunk/scratch/database-architect-research-plan.md +10 -0
- package/docs/project_notes/trunk/scratch/database-architect-stage1.md +226 -0
- package/docs/project_notes/trunk/scratch/devops-infrastructure-decisions.json +71 -0
- package/docs/project_notes/trunk/scratch/devops-infrastructure-research-plan.md +7 -0
- package/docs/project_notes/trunk/scratch/devops-infrastructure-stage1.md +164 -0
- package/docs/project_notes/trunk/scratch/technical-writer-decisions.json +88 -0
- package/docs/project_notes/trunk/scratch/technical-writer-research-plan.md +7 -0
- package/docs/project_notes/trunk/scratch/technical-writer-stage1.md +266 -0
- package/docs/project_notes/trunk/team_assignment.json +108 -0
- package/docs/project_notes/trunk/test_brief.md +75 -0
- package/docs/project_notes/trunk/test_report.md +26 -0
- package/docs/project_notes/trunk/verification/devops-infrastructure-verification.md +172 -0
- package/docs/v9/decision-framework-direction.md +142 -0
- package/docs/v9/decision-framework-implementation.md +114 -0
- package/docs/v9/domain-adaptive-team-architecture.md +1016 -0
- package/docs/v9/test/SESSION_SUMMARY.md +117 -0
- package/docs/v9/test/TEST_PLAN.md +119 -0
- package/docs/v9/test/blueprints/legal-analyst.md +166 -0
- package/docs/v9/test/output/07_cover_letter.md +41 -0
- package/docs/v9/test/phase2/mock_plan.md +89 -0
- package/docs/v9/test/phase2/producers.json +32 -0
- package/docs/v9/test/phase2/specialists/database-architect.specialist.md +10 -0
- package/docs/v9/test/phase2/specialists/financial-analyst.specialist.md +10 -0
- package/docs/v9/test/phase2/specialists/legal-analyst.specialist.md +10 -0
- package/docs/v9/test/phase2/specialists/technical-writer.specialist.md +10 -0
- package/docs/v9/test/phase2/team_assignment.json +61 -0
- package/docs/v9/test/phase3/blueprints/legal-analyst.md +840 -0
- package/docs/v9/test/phase3/legal-analyst-full.specialist.md +111 -0
- package/docs/v9/test/phase3/project_context/nh_landlord_tenant_notes.md +35 -0
- package/docs/v9/test/phase3/project_context/property_facts.md +32 -0
- package/docs/v9/test/phase3b/blueprints/legal-analyst.md +1715 -0
- package/docs/v9/test/phase3b/legal-analyst.specialist.md +153 -0
- package/docs/v9/test/phase3b/scratch/legal-analyst-stage1.md +270 -0
- package/docs/v9/test/phase4/TEST_PLAN.md +32 -0
- package/docs/v9/test/phase4/blueprints/financial-analyst-T2.md +538 -0
- package/docs/v9/test/phase4/blueprints/legal-analyst-T4.md +253 -0
- package/docs/v9/test/phase4/cross-blueprint-check.md +280 -0
- package/docs/v9/test/phase4/scratch/financial-analyst-T2-stage1.md +67 -0
- package/docs/v9/test/phase4/scratch/legal-analyst-T4-stage1.md +54 -0
- package/docs/v9/test/phase4/specialists/financial-analyst.specialist.md +156 -0
- package/docs/v9/test/phase4/specialists/legal-analyst.specialist.md +153 -0
- package/docs/v9/test/phase5/TEST_PLAN.md +35 -0
- package/docs/v9/test/phase5/blueprints/code-architect-hw-vetter.md +375 -0
- package/docs/v9/test/phase5/output/04_compliance_checklist.md +149 -0
- package/docs/v9/test/phase5/output/hardware-vetter-SKILL-v2.md +561 -0
- package/docs/v9/test/phase5/output/hardware-vetter-SKILL.md +459 -0
- package/docs/v9/test/phase5/producers/code-writer.producer.md +49 -0
- package/docs/v9/test/phase5/producers/document-writer.producer.md +62 -0
- package/docs/v9/test/phase5/regression-comparison-v2.md +60 -0
- package/docs/v9/test/phase5/regression-comparison.md +197 -0
- package/docs/v9/test/phase5/review-5A-specialist.md +213 -0
- package/docs/v9/test/phase5/specialist-test/TEST_PLAN.md +60 -0
- package/docs/v9/test/phase5/specialist-test/blueprint-comparison.md +252 -0
- package/docs/v9/test/phase5/specialist-test/blueprints/code-architect-hw-vetter.md +916 -0
- package/docs/v9/test/phase5/specialist-test/scratch/code-architect-stage1.md +427 -0
- package/docs/v9/test/phase5/specialists/code-architect.specialist.md +168 -0
- package/docs/v9/test/phase5b/TEST_PLAN.md +219 -0
- package/docs/v9/test/phase5b/blueprints/5B-10-stage2-with-decisions.md +286 -0
- package/docs/v9/test/phase5b/decisions/5B-2-accept-all-decisions.json +68 -0
- package/docs/v9/test/phase5b/decisions/5B-3-promote-decisions.json +70 -0
- package/docs/v9/test/phase5b/decisions/5B-4-individual-decisions.json +68 -0
- package/docs/v9/test/phase5b/decisions/5B-5-triage-decisions.json +110 -0
- package/docs/v9/test/phase5b/decisions/5B-6-fallback-decisions.json +40 -0
- package/docs/v9/test/phase5b/decisions/5B-8-partial-decisions.json +46 -0
- package/docs/v9/test/phase5b/decisions/5B-9-complete-decisions.json +54 -0
- package/docs/v9/test/phase5b/scratch/code-architect-stage1.md +133 -0
- package/docs/v9/test/phase5b/specialists/code-architect.specialist.md +202 -0
- package/docs/v9/test/phase5b/stage1-many-decisions.md +139 -0
- package/docs/v9/test/phase5b/stage1-no-assumptions.md +70 -0
- package/docs/v9/test/phase5b/stage1-with-assumptions.md +86 -0
- package/docs/v9/test/phase5b/test-5B-1-results.md +157 -0
- package/docs/v9/test/phase5b/test-5B-10-results.md +130 -0
- package/docs/v9/test/phase5b/test-5B-2-results.md +75 -0
- package/docs/v9/test/phase5b/test-5B-3-results.md +104 -0
- package/docs/v9/test/phase5b/test-5B-4-results.md +114 -0
- package/docs/v9/test/phase5b/test-5B-5-results.md +126 -0
- package/docs/v9/test/phase5b/test-5B-6-results.md +60 -0
- package/docs/v9/test/phase5b/test-5B-7-results.md +141 -0
- package/docs/v9/test/phase5b/test-5B-8-results.md +115 -0
- package/docs/v9/test/phase5b/test-5B-9-results.md +76 -0
- package/docs/v9/test/producers/document-writer.producer.md +62 -0
- package/docs/v9/test/specialists/legal-analyst.specialist.md +58 -0
- package/package.json +4 -2
- package/producers/code-writer/code-writer.producer.md +86 -0
- package/producers/data-file-writer/data-file-writer.producer.md +116 -0
- package/producers/document-writer/document-writer.producer.md +117 -0
- package/producers/form-filler/form-filler.producer.md +99 -0
- package/producers/presentation-creator/presentation-creator.producer.md +109 -0
- package/producers/spreadsheet-builder/spreadsheet-builder.producer.md +107 -0
- package/scripts/install-skills.js +97 -9
- package/scripts/uninstall-skills.js +7 -2
- package/skills/intuition-agent-advisor/SKILL.md +327 -220
- package/skills/intuition-assemble/SKILL.md +261 -0
- package/skills/intuition-build/SKILL.md +379 -319
- package/skills/intuition-debugger/SKILL.md +390 -390
- package/skills/intuition-design/SKILL.md +385 -381
- package/skills/intuition-detail/SKILL.md +377 -0
- package/skills/intuition-engineer/SKILL.md +307 -303
- package/skills/intuition-handoff/SKILL.md +264 -222
- package/skills/intuition-handoff/references/handoff_core.md +54 -54
- package/skills/intuition-initialize/SKILL.md +21 -6
- package/skills/intuition-initialize/references/agents_template.md +118 -118
- package/skills/intuition-initialize/references/claude_template.md +134 -134
- package/skills/intuition-initialize/references/intuition_readme_template.md +4 -4
- package/skills/intuition-initialize/references/state_template.json +17 -2
- package/skills/{intuition-plan → intuition-outline}/SKILL.md +561 -481
- package/skills/{intuition-plan → intuition-outline}/references/magellan_core.md +16 -16
- package/skills/{intuition-plan → intuition-outline}/references/templates/plan_template.md +6 -6
- package/skills/intuition-prompt/SKILL.md +374 -312
- package/skills/intuition-start/SKILL.md +46 -13
- package/skills/intuition-start/references/start_core.md +60 -60
- package/skills/intuition-test/SKILL.md +345 -0
- package/specialists/api-designer/api-designer.specialist.md +291 -0
- package/specialists/business-analyst/business-analyst.specialist.md +270 -0
- package/specialists/copywriter/copywriter.specialist.md +268 -0
- package/specialists/database-architect/database-architect.specialist.md +275 -0
- package/specialists/devops-infrastructure/devops-infrastructure.specialist.md +314 -0
- package/specialists/financial-analyst/financial-analyst.specialist.md +269 -0
- package/specialists/frontend-component/frontend-component.specialist.md +293 -0
- package/specialists/instructional-designer/instructional-designer.specialist.md +285 -0
- package/specialists/legal-analyst/legal-analyst.specialist.md +260 -0
- package/specialists/marketing-strategist/marketing-strategist.specialist.md +281 -0
- package/specialists/project-manager/project-manager.specialist.md +266 -0
- package/specialists/research-analyst/research-analyst.specialist.md +273 -0
- package/specialists/security-auditor/security-auditor.specialist.md +354 -0
- package/specialists/technical-writer/technical-writer.specialist.md +275 -0
- /package/skills/{intuition-plan → intuition-outline}/references/sub_agents.md +0 -0
- /package/skills/{intuition-plan → intuition-outline}/references/templates/confidence_scoring.md +0 -0
- /package/skills/{intuition-plan → intuition-outline}/references/templates/plan_format.md +0 -0
- /package/skills/{intuition-plan → intuition-outline}/references/templates/planning_process.md +0 -0
|
@@ -0,0 +1,253 @@
|
|
|
1
|
+
# Blueprint: Landlord Registration & Compliance Checklist
|
|
2
|
+
|
|
3
|
+
## 1. Task Reference
|
|
4
|
+
|
|
5
|
+
- **Task**: 4 — Landlord Registration & Compliance Checklist
|
|
6
|
+
- **Domain**: legal/regulatory
|
|
7
|
+
- **Depth**: Light
|
|
8
|
+
- **Dependencies**: None
|
|
9
|
+
- **Output File**: `deliverables/04_compliance_checklist.md`
|
|
10
|
+
- **Acceptance Criteria**:
|
|
11
|
+
1. Every required registration/permit identified with issuing authority
|
|
12
|
+
2. Each item marked with status (required/recommended/optional)
|
|
13
|
+
3. Estimated timeline and fees documented
|
|
14
|
+
4. Checklist format suitable for tracking completion
|
|
15
|
+
|
|
16
|
+
## 2. Research Findings
|
|
17
|
+
|
|
18
|
+
### Concord NH Landlord Registration
|
|
19
|
+
- City requires landlord/agent registration filed with City Clerk's Office, 41 Green St ($15 fee)
|
|
20
|
+
- Source: [concordnh.gov/996/Landlord-Agent-Registration](https://www.concordnh.gov/996/Landlord-Agent-Registration)
|
|
21
|
+
|
|
22
|
+
### Building Permits & Certificate of Occupancy
|
|
23
|
+
- ADU construction requires building permit + separate trade permits (electrical, plumbing, mechanical)
|
|
24
|
+
- Certificate of Occupancy issued after all inspections complete
|
|
25
|
+
- Code Administration Division, 37 Green St, (603) 225-8580
|
|
26
|
+
- Fee amounts calculated per-project; not published as flat rates
|
|
27
|
+
- Source: [concordnh.gov/963/Permits-Fees](https://www.concordnh.gov/963/Permits-Fees)
|
|
28
|
+
|
|
29
|
+
### Lead Paint Disclosure (Federal + State)
|
|
30
|
+
- Pre-1978 property (built 1971): EPA lead paint disclosure mandatory
|
|
31
|
+
- RSA 540-B + 42 U.S.C. 4852d (Residential Lead-Based Paint Hazard Reduction Act)
|
|
32
|
+
- Must provide EPA pamphlet, signed disclosure form, retain records 3 years
|
|
33
|
+
- RRP Rule: renovations on pre-1978 property must use EPA-certified firm
|
|
34
|
+
|
|
35
|
+
### Fire & Life Safety
|
|
36
|
+
- NH RSA 153:10a: CO detectors required every level, battery backup + electrical power
|
|
37
|
+
- Smoke detectors required per NH fire code
|
|
38
|
+
- Fire separation between ADU and primary residence mandatory per Concord ADU rules
|
|
39
|
+
- Concord Fire Department inspection available via online permit portal
|
|
40
|
+
|
|
41
|
+
### Insurance
|
|
42
|
+
- No NH state mandate for landlord insurance
|
|
43
|
+
- Strongly recommended: landlord/rental property policy
|
|
44
|
+
- Renter's insurance requirement permissible as lease term
|
|
45
|
+
|
|
46
|
+
### Housing Maintenance Code
|
|
47
|
+
- Concord Chapter 27: Housing Maintenance and Occupancy Code
|
|
48
|
+
- Complaint-based enforcement — no mandatory pre-rental inspection program identified
|
|
49
|
+
- Standards cover ventilation, sanitation, fire safety, structural integrity
|
|
50
|
+
|
|
51
|
+
### ADU-Specific Requirements
|
|
52
|
+
- Max 2 bedrooms, max 1,500 sq ft
|
|
53
|
+
- Sewage disposal approval required (RSA 485-A) — municipal sewer likely available
|
|
54
|
+
- One ADU per lot; must be attached to or on same lot as single-family home
|
|
55
|
+
- Interior door connection required if ADU within/attached to main dwelling
|
|
56
|
+
|
|
57
|
+
## 3. Approach
|
|
58
|
+
|
|
59
|
+
Organize compliance items into five lifecycle categories that mirror the natural order a landlord would follow: pre-construction permitting, construction completion inspections, landlord registrations and legal disclosures, safety compliance, and insurance/ongoing obligations. Each item is presented as a checklist row with checkbox, issuing authority, status classification, estimated timeline, estimated cost, and notes. Items where fees or specific requirements could not be confirmed from research are flagged with [VERIFY].
|
|
60
|
+
|
|
61
|
+
## 4. Decisions Made
|
|
62
|
+
|
|
63
|
+
Light mode — all decisions made autonomously.
|
|
64
|
+
|
|
65
|
+
| Decision | Rationale |
|
|
66
|
+
|----------|-----------|
|
|
67
|
+
| Five-category organization | Mirrors landlord's chronological workflow from construction through ongoing compliance |
|
|
68
|
+
| Include pre-construction items even though some are already complete | Provides complete record; completed items can be checked off |
|
|
69
|
+
| Mark ZBA variance as "already complete" | Per property_facts.md, variance was granted February 2026 |
|
|
70
|
+
| Flag owner-occupancy discrepancy but note it is moot | Research found conflicting info but owners live on-site regardless |
|
|
71
|
+
| Include RRP (lead renovation) rule | 1971 structure — renovation itself triggers EPA certified contractor requirement |
|
|
72
|
+
| Include insurance as "recommended" not "required" | No NH state mandate, but strongly advisable for rental property |
|
|
73
|
+
| Include renter's insurance requirement as optional lease term | Not legally required but common landlord practice |
|
|
74
|
+
|
|
75
|
+
## 5. Deliverable Specification
|
|
76
|
+
|
|
77
|
+
The checklist document has the following structure and exact content:
|
|
78
|
+
|
|
79
|
+
### Document Title
|
|
80
|
+
"Landlord Registration & Compliance Checklist — 24 Meadow St ADU, Concord NH"
|
|
81
|
+
|
|
82
|
+
### Document Header
|
|
83
|
+
Property: 24 Meadow St, Concord, NH 03301
|
|
84
|
+
Owners: Taylor & Katelyn Goodington
|
|
85
|
+
Structure: ADU (1-bedroom) — garage conversion with 8-foot rear extension
|
|
86
|
+
Original construction year: 1971 (pre-1978 — lead paint rules apply)
|
|
87
|
+
|
|
88
|
+
### Status Legend
|
|
89
|
+
- **REQUIRED** — legally mandated; failure to comply may result in fines, inability to rent, or liability
|
|
90
|
+
- **RECOMMENDED** — not legally mandated but strongly advisable for risk management
|
|
91
|
+
- **OPTIONAL** — beneficial practice; at landlord's discretion
|
|
92
|
+
|
|
93
|
+
---
|
|
94
|
+
|
|
95
|
+
### Category 1: Pre-Construction Permits
|
|
96
|
+
|
|
97
|
+
| # | Item | Issuing Authority | Status | Est. Timeline | Est. Fee | Notes |
|
|
98
|
+
|---|------|-------------------|--------|---------------|----------|-------|
|
|
99
|
+
| 1.1 | ZBA Variance for rear extension | Concord Zoning Board of Adjustment | REQUIRED | COMPLETE (Feb 2026) | [VERIFY — typically $100-$250] | Granted February 2026 per property records |
|
|
100
|
+
| 1.2 | Building Permit — ADU construction | Concord Code Administration Division, 37 Green St, (603) 225-8580 | REQUIRED | 2-4 weeks for review after submission | [VERIFY — calculated based on project valuation; contact Code Admin] | Submit via online permit portal. Plans must show fire separation, egress, structural details. |
|
|
101
|
+
| 1.3 | Electrical Permit | Concord Code Administration Division | REQUIRED | Concurrent with building permit | [VERIFY — separate fee from building permit] | Separate trade permit; separate inspector |
|
|
102
|
+
| 1.4 | Plumbing Permit | Concord Code Administration Division | REQUIRED | Concurrent with building permit | [VERIFY — separate fee from building permit] | Separate trade permit; separate inspector |
|
|
103
|
+
| 1.5 | Mechanical Permit (HVAC) | Concord Code Administration Division | REQUIRED | Concurrent with building permit | [VERIFY — separate fee from building permit] | Required if installing heating/cooling systems |
|
|
104
|
+
| 1.6 | Sewage Disposal System Approval | NH Dept of Environmental Services (RSA 485-A) | REQUIRED | [VERIFY — timeline depends on municipal vs. septic] | [VERIFY] | If connecting to municipal sewer, confirm capacity approval. If septic, separate system or approved common leach field required. |
|
|
105
|
+
| 1.7 | EPA-Certified Renovation Firm (RRP Rule) | U.S. EPA / NH DHHS | REQUIRED | Verify before construction begins | No fee to landlord (contractor bears certification cost) | Pre-1978 structure: all renovation work must be performed by EPA-certified firm using lead-safe work practices. 40 CFR 745. |
|
|
106
|
+
|
|
107
|
+
### Category 2: Construction Completion & Inspections
|
|
108
|
+
|
|
109
|
+
| # | Item | Issuing Authority | Status | Est. Timeline | Est. Fee | Notes |
|
|
110
|
+
|---|------|-------------------|--------|---------------|----------|-------|
|
|
111
|
+
| 2.1 | Framing Inspection | Concord Code Administration Division | REQUIRED | During construction (schedule 24 hrs ahead) | Included in building permit fee | Must pass before closing walls |
|
|
112
|
+
| 2.2 | Electrical Rough-In Inspection | Concord Electrical Inspector | REQUIRED | During construction | Included in electrical permit fee | Before walls closed |
|
|
113
|
+
| 2.3 | Plumbing Rough-In Inspection | Concord Plumbing Inspector | REQUIRED | During construction | Included in plumbing permit fee | Before walls closed |
|
|
114
|
+
| 2.4 | Mechanical Inspection | Concord Mechanical Inspector | REQUIRED | During construction | Included in mechanical permit fee | HVAC system inspection |
|
|
115
|
+
| 2.5 | Insulation Inspection | Concord Code Administration Division | REQUIRED | After insulation, before drywall | Included in building permit fee | Energy code compliance |
|
|
116
|
+
| 2.6 | Fire Separation Inspection | Concord Fire Department / Code Admin | REQUIRED | During construction | [VERIFY — may be included in building permit or separate fire inspection fee] | Fire-rated separation between ADU and primary residence is mandatory per Concord ADU ordinance |
|
|
117
|
+
| 2.7 | Final Building Inspection | Concord Code Administration Division | REQUIRED | After construction complete | Included in building permit fee | All systems complete and operational |
|
|
118
|
+
| 2.8 | Final Electrical Inspection | Concord Electrical Inspector | REQUIRED | After construction complete | Included in electrical permit fee | Fixtures, outlets, panel complete |
|
|
119
|
+
| 2.9 | Final Plumbing Inspection | Concord Plumbing Inspector | REQUIRED | After construction complete | Included in plumbing permit fee | Fixtures operational, no leaks |
|
|
120
|
+
| 2.10 | Certificate of Occupancy (CO) | Concord Code Administration Division | REQUIRED | Issued after all inspections pass; typically 1-2 weeks after final inspection | [VERIFY — fee may be included in building permit or separate] | CANNOT legally rent the ADU without a valid CO. This is the gating requirement for all rental activity. |
|
|
121
|
+
|
|
122
|
+
### Category 3: Landlord Registration & Legal Disclosures
|
|
123
|
+
|
|
124
|
+
| # | Item | Issuing Authority | Status | Est. Timeline | Est. Fee | Notes |
|
|
125
|
+
|---|------|-------------------|--------|---------------|----------|-------|
|
|
126
|
+
| 3.1 | Landlord/Agent Registration | Concord City Clerk's Office, 41 Green St | REQUIRED | File before first tenant; same-day processing | $15 filing fee | Check payable to City of Concord. Required for rental property owners; designates agent for service. |
|
|
127
|
+
| 3.2 | Lead Paint Disclosure Form | Federal requirement (42 U.S.C. 4852d); RSA 540-B | REQUIRED | Complete before lease signing | No fee (use EPA standard form) | Pre-1978 property. Landlord and tenant must sign EPA-approved disclosure form. Landlord must disclose all known lead hazards. Retain signed copy for 3 years. |
|
|
128
|
+
| 3.3 | EPA Lead Paint Pamphlet | U.S. EPA | REQUIRED | Provide to tenant before lease signing | No fee (download from EPA.gov) | "Protect Your Family from Lead in Your Home" — must be provided to every tenant, including at lease renewal. |
|
|
129
|
+
| 3.4 | Security Deposit Receipt | NH RSA 540-A | REQUIRED | Within 30 days of receiving deposit | No fee | Must provide written receipt with NH bank name and account number. Deposit held in separate escrow account. |
|
|
130
|
+
| 3.5 | Landlord Identity Disclosure | NH law | REQUIRED | In lease or at tenancy start | No fee | Must provide tenant with name and address of landlord or authorized agent for service of process and notices. |
|
|
131
|
+
| 3.6 | Utility Responsibility Disclosure | Best practice / lease term | RECOMMENDED | Include in lease | No fee | Specify which utilities landlord vs. tenant pays. Critical if ADU is not sub-metered — lease must address allocation method. |
|
|
132
|
+
| 3.7 | Radon Disclosure | NH recommended practice | RECOMMENDED | Before lease signing | No fee (test kit ~$15-$30 if testing) | NH does not strictly require radon disclosure for rentals, but EPA recommends testing and disclosure. Basement/ground-level ADU exposure possible. [VERIFY — confirm whether Concord has local radon disclosure requirement] |
|
|
133
|
+
|
|
134
|
+
### Category 4: Safety Compliance
|
|
135
|
+
|
|
136
|
+
| # | Item | Issuing Authority | Status | Est. Timeline | Est. Fee | Notes |
|
|
137
|
+
|---|------|-------------------|--------|---------------|----------|-------|
|
|
138
|
+
| 4.1 | Smoke Detectors — installed and operational | NH Fire Code / Concord Fire Dept | REQUIRED | Before occupancy | ~$20-$50 per detector | Required on every level and in every sleeping area. Must be hardwired with battery backup in new construction. |
|
|
139
|
+
| 4.2 | Carbon Monoxide (CO) Detectors | NH RSA 153:10a | REQUIRED | Before occupancy | ~$30-$60 per detector | Required on every level. Must have battery backup and be electrically powered (hardwired or plug-in). Exempt only if no attached garage AND no fuel-fired appliances — this ADU has an attached garage, so NOT exempt. |
|
|
140
|
+
| 4.3 | Fire Separation Between Units | Concord ADU ordinance / Building Code | REQUIRED | Verified during construction inspections | Included in construction cost | Fire-rated wall/ceiling assembly between ADU and primary residence. Interior connecting door required if ADU is within/attached to main dwelling. |
|
|
141
|
+
| 4.4 | Egress Windows / Emergency Escape | NH Building Code (IRC adoption) | REQUIRED | Verified during building inspection | Included in construction cost | Every sleeping room must have emergency escape/rescue opening meeting code dimensions. |
|
|
142
|
+
| 4.5 | Fire Extinguisher | General safety practice | RECOMMENDED | Before occupancy | ~$20-$40 | Not legally mandated for residential rental but advisable. |
|
|
143
|
+
| 4.6 | Concord Fire Department Inspection | Concord Fire Department | RECOMMENDED | Schedule via permit portal; [VERIFY — may be required as part of CO process] | [VERIFY — fee if separate from building permit process] | Some municipalities require fire dept sign-off before CO is issued. Confirm with Concord Fire Dept whether this is required or voluntary for ADU. |
|
|
144
|
+
|
|
145
|
+
### Category 5: Insurance & Ongoing Obligations
|
|
146
|
+
|
|
147
|
+
| # | Item | Issuing Authority | Status | Est. Timeline | Est. Fee | Notes |
|
|
148
|
+
|---|------|-------------------|--------|---------------|----------|-------|
|
|
149
|
+
| 5.1 | Landlord / Rental Property Insurance Policy | Private insurance carrier | RECOMMENDED | Obtain before first tenant occupancy | [VERIFY — varies by carrier; typical $800-$1,500/year for small rental] | No NH state mandate, but essential risk management. Covers structure, liability, loss of rental income. Homeowner's policy typically does NOT cover rental activity — separate landlord policy needed. |
|
|
150
|
+
| 5.2 | Umbrella Liability Policy | Private insurance carrier | RECOMMENDED | Obtain concurrent with landlord policy | [VERIFY — varies; typical $200-$400/year for $1M coverage] | Additional liability protection beyond landlord policy limits. Advisable when renting on same property where owners reside. |
|
|
151
|
+
| 5.3 | Require Tenant Renter's Insurance | Lease term (landlord's discretion) | OPTIONAL | Include as lease requirement | No cost to landlord | Can require tenant to maintain renter's insurance and name landlord as additional insured. Common practice. |
|
|
152
|
+
| 5.4 | Security Deposit Escrow Account | NH bank (RSA 540-A) | REQUIRED | Open before collecting any deposit | No fee (standard bank account) | Must be separate account at a NH bank. Must pay tenant interest at bank's rate. |
|
|
153
|
+
| 5.5 | Annual Lead Paint Disclosure Renewal | Federal / RSA 540-B | REQUIRED | At each lease renewal | No fee | Must re-provide lead paint disclosure and pamphlet at lease renewal. |
|
|
154
|
+
| 5.6 | Housing Code Compliance (Ongoing) | Concord Code Administration — Housing Division | REQUIRED | Ongoing throughout tenancy | No fee unless violations found | Concord Chapter 27: Housing Maintenance and Occupancy Code. Complaint-based enforcement. Landlord must maintain property to code standards (ventilation, sanitation, structural integrity, fire safety). |
|
|
155
|
+
| 5.7 | Landlord Registration Renewal | Concord City Clerk's Office | REQUIRED | [VERIFY — confirm whether annual renewal required or one-time filing] | [VERIFY — $15 if annual] | Check with City Clerk whether registration is one-time or requires periodic renewal. |
|
|
156
|
+
|
|
157
|
+
---
|
|
158
|
+
|
|
159
|
+
### Summary Counts
|
|
160
|
+
|
|
161
|
+
| Status | Count |
|
|
162
|
+
|--------|-------|
|
|
163
|
+
| REQUIRED | 26 items |
|
|
164
|
+
| RECOMMENDED | 6 items |
|
|
165
|
+
| OPTIONAL | 1 item |
|
|
166
|
+
| **Total** | **33 items** |
|
|
167
|
+
|
|
168
|
+
### Critical Path Items (Must Complete Before Renting)
|
|
169
|
+
|
|
170
|
+
These items are gating — the ADU cannot be legally rented until all are satisfied:
|
|
171
|
+
|
|
172
|
+
1. Building permit obtained and all construction inspections passed (Items 1.2-1.6, 2.1-2.9)
|
|
173
|
+
2. Certificate of Occupancy issued (Item 2.10)
|
|
174
|
+
3. Landlord/Agent Registration filed (Item 3.1)
|
|
175
|
+
4. Lead paint disclosure completed and signed (Items 3.2, 3.3)
|
|
176
|
+
5. Smoke and CO detectors installed and operational (Items 4.1, 4.2)
|
|
177
|
+
6. Security deposit escrow account established (Item 5.4)
|
|
178
|
+
|
|
179
|
+
### [VERIFY] Items Summary
|
|
180
|
+
|
|
181
|
+
The following items require verification with the relevant authority, as specific details could not be confirmed from available research:
|
|
182
|
+
|
|
183
|
+
| Item | What to Verify | Contact |
|
|
184
|
+
|------|---------------|---------|
|
|
185
|
+
| 1.1 | ZBA variance fee (for records) | Concord Planning Division |
|
|
186
|
+
| 1.2-1.5 | Building and trade permit fees | Code Admin, (603) 225-8580 |
|
|
187
|
+
| 1.6 | Sewage disposal approval process for municipal sewer | NH DES / Concord Utilities |
|
|
188
|
+
| 2.6 | Fire separation inspection — separate fee or included | Code Admin / Fire Dept |
|
|
189
|
+
| 2.10 | CO fee — separate or included in building permit | Code Admin |
|
|
190
|
+
| 3.7 | Concord-specific radon disclosure requirement | Code Admin / City Clerk |
|
|
191
|
+
| 4.6 | Whether fire dept inspection is required for CO | Concord Fire Dept, via permit portal |
|
|
192
|
+
| 5.1, 5.2 | Insurance premium estimates for this specific property | Insurance broker |
|
|
193
|
+
| 5.7 | Whether landlord registration requires annual renewal | City Clerk, (603) 225-8610 |
|
|
194
|
+
|
|
195
|
+
## 6. Acceptance Mapping
|
|
196
|
+
|
|
197
|
+
| Criterion | How Addressed |
|
|
198
|
+
|-----------|---------------|
|
|
199
|
+
| 1. Every required registration/permit identified with issuing authority | 33 checklist items across 5 categories, each with specific issuing authority name, address, and phone where available |
|
|
200
|
+
| 2. Each item marked with status (required/recommended/optional) | Every item has REQUIRED, RECOMMENDED, or OPTIONAL status with clear definitions in legend |
|
|
201
|
+
| 3. Estimated timeline and fees documented | Each item includes estimated timeline and fee columns; unverifiable fees flagged with [VERIFY] |
|
|
202
|
+
| 4. Checklist format suitable for tracking completion | Table format with item numbers; checkboxes in final deliverable; critical path summary; [VERIFY] tracking table |
|
|
203
|
+
|
|
204
|
+
## 7. Integration Points
|
|
205
|
+
|
|
206
|
+
- **Task 1 (Lease Agreement)**: The lease must incorporate several items from this checklist:
|
|
207
|
+
- Lead paint disclosure addendum (Items 3.2, 3.3)
|
|
208
|
+
- Security deposit terms and bank disclosure (Items 3.4, 5.4)
|
|
209
|
+
- Landlord identity disclosure (Item 3.5)
|
|
210
|
+
- Utility responsibility disclosure (Item 3.6)
|
|
211
|
+
- Renter's insurance requirement if adopted (Item 5.3)
|
|
212
|
+
- Radon disclosure if applicable (Item 3.7)
|
|
213
|
+
- **Task 2 (if property setup/construction related)**: Pre-construction permits and inspection sequence
|
|
214
|
+
- **General**: Certificate of Occupancy (Item 2.10) is a prerequisite for any rental activity — all other tasks' deliverables are moot without it
|
|
215
|
+
|
|
216
|
+
## 8. Open Items
|
|
217
|
+
|
|
218
|
+
| Type | Item | Resolution |
|
|
219
|
+
|------|------|------------|
|
|
220
|
+
| [VERIFY] | Concord building permit fee schedule | Contact Code Admin (603) 225-8580 or check online portal |
|
|
221
|
+
| [VERIFY] | Whether Concord fire dept inspection required for CO | Contact Fire Dept via permit portal |
|
|
222
|
+
| [VERIFY] | Landlord registration renewal frequency | Contact City Clerk (603) 225-8610 |
|
|
223
|
+
| [VERIFY] | Concord radon disclosure requirement | Contact Code Admin or City Clerk |
|
|
224
|
+
| [VERIFY] | Insurance premium estimates | Obtain quotes from insurance broker |
|
|
225
|
+
| [VERIFY] | Sewage/sewer connection approval process | Contact NH DES or Concord Utilities |
|
|
226
|
+
| [VERIFY] | Owner-occupancy requirement discrepancy | Research found conflicting info (backyardadus.com says required; property_facts.md says not required). Moot for this property since owners live on-site, but lease should note if relevant. |
|
|
227
|
+
| Execution | All checklist items need actual completion tracking | Producer adds checkbox column for tracking |
|
|
228
|
+
|
|
229
|
+
## 9. Producer Handoff
|
|
230
|
+
|
|
231
|
+
- **Output format**: Markdown document
|
|
232
|
+
- **Producer**: document-writer
|
|
233
|
+
- **Filename**: `deliverables/04_compliance_checklist.md`
|
|
234
|
+
- **Content blocks in order**:
|
|
235
|
+
1. Title and property header (address, owners, structure details, construction year, lead paint flag)
|
|
236
|
+
2. Status legend (REQUIRED / RECOMMENDED / OPTIONAL definitions)
|
|
237
|
+
3. How to use this checklist (brief instructions — check items as completed, verify [VERIFY] items with listed contacts)
|
|
238
|
+
4. Category 1 table: Pre-Construction Permits (7 items)
|
|
239
|
+
5. Category 2 table: Construction Completion & Inspections (10 items)
|
|
240
|
+
6. Category 3 table: Landlord Registration & Legal Disclosures (7 items)
|
|
241
|
+
7. Category 4 table: Safety Compliance (6 items)
|
|
242
|
+
8. Category 5 table: Insurance & Ongoing Obligations (7 items)
|
|
243
|
+
9. Summary counts table
|
|
244
|
+
10. Critical Path Items list (gating requirements before rental)
|
|
245
|
+
11. [VERIFY] Items table with what to verify and contact info
|
|
246
|
+
12. Key contacts reference (Code Admin, City Clerk, Fire Dept, NH DES — addresses and phone numbers)
|
|
247
|
+
13. Legal disclaimer: "This checklist is for informational planning purposes. Consult with a licensed attorney and/or the relevant municipal offices to confirm current requirements."
|
|
248
|
+
|
|
249
|
+
- **Formatting notes**:
|
|
250
|
+
- Each category table has columns: checkbox (empty `[ ]`), item #, description, issuing authority, status, est. timeline, est. fee, notes
|
|
251
|
+
- Use bold for status values
|
|
252
|
+
- [VERIFY] flags rendered in brackets and bold
|
|
253
|
+
- Keep table cells concise; move lengthy details to notes column
|
|
@@ -0,0 +1,280 @@
|
|
|
1
|
+
# Cross-Blueprint Consistency Check
|
|
2
|
+
|
|
3
|
+
## Blueprints Reviewed
|
|
4
|
+
|
|
5
|
+
1. **Legal-Analyst.md (Task 1)** — Draft Residential Lease Agreement (Phase 3b)
|
|
6
|
+
2. **Legal-Analyst-T4.md (Task 4)** — Landlord Registration & Compliance Checklist (Phase 4)
|
|
7
|
+
3. **Financial-Analyst-T2.md (Task 2)** — Rental Market Analysis (Phase 4)
|
|
8
|
+
|
|
9
|
+
---
|
|
10
|
+
|
|
11
|
+
## Consistency Findings
|
|
12
|
+
|
|
13
|
+
### Consistent Assumptions
|
|
14
|
+
|
|
15
|
+
#### Property Profile — Fully Aligned
|
|
16
|
+
All three blueprints share and consistently describe the property:
|
|
17
|
+
|
|
18
|
+
- **Address**: 24 Meadow St, Concord, NH 03301 — confirmed in all three (Legal-Analyst Section 2, Legal-Analyst-T4 Section 2, Financial-Analyst-T2 Section 2)
|
|
19
|
+
- **Owners**: Taylor & Katelyn Goodington — confirmed in all three
|
|
20
|
+
- **Structure**: ADU (1-bedroom) in garage conversion with 8-foot rear extension — confirmed in all three
|
|
21
|
+
- **Original construction year**: 1971 (pre-1978, triggers lead paint rules) — confirmed in all three
|
|
22
|
+
- **ADU legal basis**: NH RSA 674:72 (HB 577, effective July 2025) — confirmed in both Legal-Analyst and Legal-Analyst-T4
|
|
23
|
+
- **Owner-occupancy**: Owners live in primary residence on same property — confirmed in Legal-Analyst Section 2 and Financial-Analyst-T2 Section 2
|
|
24
|
+
- **Zoning**: RS District, Concord allows ADUs in all residential districts — confirmed in Legal-Analyst Section 2 and Legal-Analyst-T4 (implied)
|
|
25
|
+
|
|
26
|
+
#### Lead Paint Disclosure — Fully Aligned
|
|
27
|
+
- **Trigger**: Pre-1978 structure (1971 construction) requires federal EPA disclosure and NH RSA 540-B compliance
|
|
28
|
+
- Legal-Analyst Section 2.1.2, Acceptance Criteria #2: "Lead paint disclosure included (pre-1978 structure)"
|
|
29
|
+
- Legal-Analyst-T4 Section 2 (Lead Paint Disclosure): EPA disclosure mandatory, RSA 540-B + 42 U.S.C. 4852d
|
|
30
|
+
- Financial-Analyst-T2 Section 2 (Regulatory Factors): "Lead paint disclosure required (1971 structure) — mitigated if full abatement occurs during construction [VERIFY]"
|
|
31
|
+
|
|
32
|
+
**Note**: Financial-Analyst-T2 flags potential mitigation via abatement, which is accurate but conditional. Legal blueprints assume disclosure regardless.
|
|
33
|
+
|
|
34
|
+
#### Security Deposit Terms — Fully Aligned
|
|
35
|
+
- **Statutory limit**: One month's rent or $100, whichever is greater
|
|
36
|
+
- Financial-Analyst-T2 Section 2 (Regulatory Factors): "Security deposit capped at one month's rent or $100 (whichever greater)"
|
|
37
|
+
- Legal-Analyst-T4 Section 2 (Category 3): Item 3.4 "Security Deposit Receipt — Within 30 days of receiving deposit" and "Deposit held in separate escrow account"
|
|
38
|
+
- Legal-Analyst Section 2.1.3: Confirms NH RSA 540-A statutory framework for security deposits
|
|
39
|
+
|
|
40
|
+
#### Lease Term — Consistent
|
|
41
|
+
- Financial-Analyst-T2 Section 5 (Sheet 4 — Seasonal Analysis): Recommends "12-month lease recommended regardless of listing season"
|
|
42
|
+
- Legal-Analyst Acceptance Criteria mention lease compliance but do not specify term length (planning documents typically leave this to market analysis)
|
|
43
|
+
- No contradictions found
|
|
44
|
+
|
|
45
|
+
#### Shared Driveway & Utilities — Aligned with Conditions
|
|
46
|
+
- Legal-Analyst Section 2 (Property Profile): "Shared elements: Driveway, yard (boundaries per site diagram), utilities (sub-metering recommended)"
|
|
47
|
+
- Financial-Analyst-T2 Section 2 (Regulatory Factors): "Utilities: tenant-paid via sub-metering (per user decision)"
|
|
48
|
+
- Legal-Analyst-T4 Section 3 (Category 3), Item 3.6: "Utility Responsibility Disclosure — Best practice / lease term — RECOMMENDED — Specify which utilities landlord vs. tenant pays. Critical if ADU is not sub-metered — lease must address allocation method."
|
|
49
|
+
|
|
50
|
+
**Consistency**: All three acknowledge shared driveway and recommend sub-metering for utilities. Legal-Analyst-T4 adds critical point: if NOT sub-metered, lease must explicitly address allocation.
|
|
51
|
+
|
|
52
|
+
#### Fire Safety & Separation — Fully Aligned
|
|
53
|
+
- Legal-Analyst Section 2.2 (Statutory Framework): "Fire separation between ADU and primary residence mandatory per Concord ADU rules"
|
|
54
|
+
- Legal-Analyst-T4 Section 2 (Fire & Life Safety): "Fire separation between ADU and primary residence mandatory per Concord ADU rules"
|
|
55
|
+
- Legal-Analyst-T4 Section 3 (Category 2, Item 2.6): "Fire Separation Inspection — mandatory per Concord ADU ordinance"
|
|
56
|
+
- Legal-Analyst-T4 Section 3 (Category 4, Item 4.3): "Fire Separation Between Units — Concord ADU ordinance / Building Code — REQUIRED"
|
|
57
|
+
|
|
58
|
+
**All three aligned** on this mandatory requirement.
|
|
59
|
+
|
|
60
|
+
#### Smoke & CO Detectors — Fully Aligned
|
|
61
|
+
- Legal-Analyst-T4 Section 2 (Fire & Life Safety): "NH RSA 153:10a: CO detectors required every level, battery backup + electrical power; Smoke detectors required per NH fire code"
|
|
62
|
+
- Legal-Analyst-T4 Section 3 (Category 4, Items 4.1-4.2): Both listed as REQUIRED
|
|
63
|
+
- Legal-Analyst Section 2.2 mentions safety requirements but does not enumerate specific detector types (appropriate for lease document)
|
|
64
|
+
- **No contradictions**: Compliance checklist correctly specifies technical requirements from statute.
|
|
65
|
+
|
|
66
|
+
#### Rental Type — Fully Aligned
|
|
67
|
+
- Legal-Analyst Section 2 (Property Profile): "Rental type: Long-term residential (not short-term/Airbnb)"
|
|
68
|
+
- Financial-Analyst-T2 Section 2 (Property Profile): "Long-term rental only (not short-term/Airbnb)"
|
|
69
|
+
- **Consistency**: Both exclude short-term rental model.
|
|
70
|
+
|
|
71
|
+
#### Owner-Occupied Protection — Aligned
|
|
72
|
+
- Legal-Analyst Section 2 (Zoning): "Concord allows ADUs in all residential districts, no owner-occupancy requirement"
|
|
73
|
+
- Financial-Analyst-T2 Section 2 (Regulatory Factors): "Owner-occupied primary residence on same property"
|
|
74
|
+
- Legal-Analyst-T4 Section 4 (Decisions Made), Item: "Flag owner-occupancy discrepancy but note it is moot" — Property_facts.md shows owners live on-site regardless
|
|
75
|
+
- **Consistency**: All three confirm owner-occupancy; Legal-Analyst-T4 notes earlier conflicting research has been resolved (owners do live on-site).
|
|
76
|
+
|
|
77
|
+
---
|
|
78
|
+
|
|
79
|
+
### Inconsistencies Found
|
|
80
|
+
|
|
81
|
+
#### INCONSISTENCY #1: Utility Structure Assumptions — MEDIUM Severity
|
|
82
|
+
|
|
83
|
+
**What**: The blueprints differ on who pays utilities in their baseline assumptions.
|
|
84
|
+
|
|
85
|
+
**Evidence**:
|
|
86
|
+
- **Legal-Analyst Section 2** states: "utilities (sub-metering recommended)" — treats sub-metering as recommended but doesn't mandate it
|
|
87
|
+
- **Legal-Analyst-T4 Section 3, Item 3.6** states: "Specify which utilities landlord vs. tenant pays. Critical if ADU is **not** sub-metered — lease must address allocation method."
|
|
88
|
+
- **Financial-Analyst-T2 Section 2 (Regulatory Factors)** declares: "Utilities: **tenant-paid via sub-metering (per user decision)**" — assumes sub-metering is **decided** (Option B selected)
|
|
89
|
+
- **Financial-Analyst-T2 Section 4 (Decision 1)** elaborates: The analysis is built on the assumption that sub-metering is selected and tenant pays utilities. All rent figures in the market analysis exclude utilities.
|
|
90
|
+
|
|
91
|
+
**Conflict**: Financial-Analyst-T2 **commits** to sub-metering as the chosen approach, while Legal-Analyst and Legal-Analyst-T4 treat it as conditional/recommended. This creates misalignment:
|
|
92
|
+
- If sub-metering is NOT installed (e.g., due to construction complexity), the rent recommendations in Financial-Analyst-T2 would be **too high** (they assume tenant pays utilities).
|
|
93
|
+
- Conversely, if sub-metering IS the firm decision, Legal-Analyst-T4 Section 3, Item 3.6 should remove the "if not sub-metered" caveat.
|
|
94
|
+
|
|
95
|
+
**Severity**: **MEDIUM** — The inconsistency is not a contradiction in fact, but a difference in **assumption commitment level**. All three blueprints acknowledge sub-metering is possible; only Financial-Analyst-T2 treats it as decided. This must be clarified before the lease is drafted.
|
|
96
|
+
|
|
97
|
+
**Suggested Resolution**:
|
|
98
|
+
- Confirm with user/project stakeholder: Is sub-metering the **decided** utility model or still under consideration?
|
|
99
|
+
- If decided: Update Legal-Analyst and Legal-Analyst-T4 to reflect sub-metering as baseline, not conditional.
|
|
100
|
+
- If conditional: Update Financial-Analyst-T2 to include scenario analysis (rent under sub-metering vs. rent if utilities included).
|
|
101
|
+
|
|
102
|
+
---
|
|
103
|
+
|
|
104
|
+
#### INCONSISTENCY #2: Lead Paint Abatement Scope — MEDIUM Severity
|
|
105
|
+
|
|
106
|
+
**What**: Blueprints differ on whether lead paint will be "fully abated" during construction.
|
|
107
|
+
|
|
108
|
+
**Evidence**:
|
|
109
|
+
- **Financial-Analyst-T2 Section 2 (Regulatory Factors)** states: "Lead paint disclosure required (1971 structure) — **mitigated if full abatement occurs during construction [VERIFY]**"
|
|
110
|
+
- This implies: If full abatement happens, disclosure requirement may be reduced or waived.
|
|
111
|
+
- **Legal-Analyst Section 2 (Acceptance Criteria)** states: "#2. Lead paint disclosure included (pre-1978 structure)" — no conditional language
|
|
112
|
+
- **Legal-Analyst Section 2.1.2 (Lead Paint Disclosure)** states: "Federal and State Law: Full disclosure required under 42 U.S.C. 4852d (Residential Lead-Based Paint Hazard Reduction Act) and NH RSA 540-B. Disclosure is **always required at lease signing**, regardless of remediation status."
|
|
113
|
+
|
|
114
|
+
**Conflict**: Financial-Analyst-T2 suggests disclosure can be "mitigated" by abatement; Legal-Analyst correctly states disclosure is **always required** under federal law, regardless of remediation. The [VERIFY] flag indicates uncertainty in the market analysis.
|
|
115
|
+
|
|
116
|
+
**Severity**: **MEDIUM** — The Financial-Analyst-T2 language is imprecise and could mislead stakeholders into thinking disclosure is optional if abatement occurs. Federal law (42 U.S.C. 4852d) requires disclosure at lease signing **always**, even if lead has been remediated.
|
|
117
|
+
|
|
118
|
+
**Suggested Resolution**:
|
|
119
|
+
- Update Financial-Analyst-T2 Section 2 (Regulatory Factors) to clarify: "Lead paint disclosure **required** (1971 structure). Disclosure is mandatory under 42 U.S.C. 4852d regardless of abatement scope. Lead abatement may reduce risk profile but does not eliminate disclosure obligation."
|
|
120
|
+
- Remove the conditional language "mitigated if full abatement occurs."
|
|
121
|
+
- Update the [VERIFY] flag to focus on: "Confirm scope and type of lead abatement (if any) for tenant disclosure."
|
|
122
|
+
|
|
123
|
+
---
|
|
124
|
+
|
|
125
|
+
### Missing Cross-References
|
|
126
|
+
|
|
127
|
+
#### MISSING REFERENCE #1: Lease Agreement Should Cite Compliance Checklist Items
|
|
128
|
+
|
|
129
|
+
**Issue**: Legal-Analyst (Task 1) does not explicitly reference that certain compliance items from Legal-Analyst-T4 (Task 4) must be incorporated into the lease document.
|
|
130
|
+
|
|
131
|
+
**Evidence**:
|
|
132
|
+
- Legal-Analyst-T4 Section 7 (Integration Points) states: "**Task 1 (Lease Agreement)**: The lease must incorporate several items from this checklist:
|
|
133
|
+
- Lead paint disclosure addendum (Items 3.2, 3.3)
|
|
134
|
+
- Security deposit terms and bank disclosure (Items 3.4, 5.4)
|
|
135
|
+
- Landlord identity disclosure (Item 3.5)
|
|
136
|
+
- Utility responsibility disclosure (Item 3.6)
|
|
137
|
+
- Renter's insurance requirement if adopted (Item 5.3)
|
|
138
|
+
- Radon disclosure if applicable (Item 3.7)"
|
|
139
|
+
|
|
140
|
+
- Legal-Analyst makes no explicit statement that it will reference or coordinate with Task 4's compliance checklist.
|
|
141
|
+
|
|
142
|
+
**Impact**: Legal-Analyst (the lease blueprint) could miss required legal disclosures if it does not read or coordinate with the compliance checklist. The lease author needs visibility to Legal-Analyst-T4.
|
|
143
|
+
|
|
144
|
+
**Suggested Resolution**: Add a statement to Legal-Analyst Section 7 (or equivalent) stating: "This lease must incorporate all legally required disclosures and terms identified in Task 4 (Landlord Registration & Compliance Checklist), specifically: [list from Legal-Analyst-T4 Section 7]."
|
|
145
|
+
|
|
146
|
+
---
|
|
147
|
+
|
|
148
|
+
#### MISSING REFERENCE #2: Market Analysis Should Cite Lease & Compliance Context
|
|
149
|
+
|
|
150
|
+
**Issue**: Financial-Analyst-T2 does not reference that pricing recommendations depend on assumptions made in the lease (e.g., utility responsibility, security deposit structure, insurance requirements).
|
|
151
|
+
|
|
152
|
+
**Evidence**:
|
|
153
|
+
- Financial-Analyst-T2 provides rent price ranges ($1,250–$1,550) and justifies them using comparable comps and adjustment factors.
|
|
154
|
+
- However, it does not note that if the lease structure changes (e.g., landlord absorbs utilities instead of sub-metering), the recommended rent would need to decrease.
|
|
155
|
+
- Financial-Analyst-T2 Section 7 (Integration Points) references Task 3 (Listing Copy) and Task 5 (Expense Tracker), but **does not reference Task 1 (Lease)** or **Task 4 (Compliance)**.
|
|
156
|
+
|
|
157
|
+
**Impact**: Task 3 (Listing Copy) and Task 5 (Expense Tracker) consumers will read the market analysis but may not understand that rent recommendations are contingent on the lease terms and compliance assumptions established in Tasks 1 and 4.
|
|
158
|
+
|
|
159
|
+
**Suggested Resolution**: Add to Financial-Analyst-T2 Section 2 (Research Findings) or Section 7 (Integration Points): "Pricing assumes sub-metered utility model (tenant-paid) and standard NH security deposit structure per Task 1 (Lease Agreement) and Task 4 (Compliance Checklist). If lease structure changes (e.g., landlord-paid utilities), rent recommendations must be adjusted downward."
|
|
160
|
+
|
|
161
|
+
---
|
|
162
|
+
|
|
163
|
+
### Dependency Gaps
|
|
164
|
+
|
|
165
|
+
#### DEPENDENCY GAP #1: Legal-Analyst Needs Explicit Utility Model from User
|
|
166
|
+
|
|
167
|
+
**Issue**: Legal-Analyst (Task 1) needs to know whether utilities will be sub-metered before drafting the lease.
|
|
168
|
+
|
|
169
|
+
**Evidence**:
|
|
170
|
+
- Legal-Analyst Section 2 (Property Profile) states utilities are "sub-metering recommended" but doesn't commit to the model.
|
|
171
|
+
- The lease must specify utility responsibility (Legal-Analyst Section 2.1.4: ADU-Specific Provisions).
|
|
172
|
+
- Financial-Analyst-T2 has already assumed sub-metering is decided (Section 4, Decision 1).
|
|
173
|
+
|
|
174
|
+
**Gap**: If Financial-Analyst-T2's assumption is correct, Legal-Analyst should be informed of this decision so the lease clearly states "Tenant pays utilities via sub-meter." If the decision has not yet been made, Financial-Analyst-T2's pricing is premature.
|
|
175
|
+
|
|
176
|
+
**Suggested Resolution**:
|
|
177
|
+
- Before Legal-Analyst is executed, confirm and document: Will utilities be sub-metered (Option B) or included in rent (Option A)?
|
|
178
|
+
- Pass this decision to both Legal-Analyst and Legal-Analyst-T4 as a constraint.
|
|
179
|
+
|
|
180
|
+
---
|
|
181
|
+
|
|
182
|
+
#### DEPENDENCY GAP #2: Legal-Analyst-T4 Flags Multiple [VERIFY] Items That Impact Other Tasks
|
|
183
|
+
|
|
184
|
+
**Issue**: Legal-Analyst-T4 (Compliance Checklist) contains 9 [VERIFY] items (Section 8) that must be resolved before downstream tasks (lease drafting, pricing, expense planning) can finalize.
|
|
185
|
+
|
|
186
|
+
**Examples**:
|
|
187
|
+
- [VERIFY] Concord building permit fee schedule (impacts Task 5 expense planning)
|
|
188
|
+
- [VERIFY] Whether Concord fire dept inspection required for CO (impacts construction timeline, which impacts lease start date)
|
|
189
|
+
- [VERIFY] Landlord registration renewal frequency (impacts ongoing compliance, which impacts lease renewal clauses)
|
|
190
|
+
- [VERIFY] Concord radon disclosure requirement (impacts lease disclosures in Task 1)
|
|
191
|
+
- [VERIFY] Insurance premium estimates (impacts Task 5 expense projections)
|
|
192
|
+
- [VERIFY] Sewage/sewer connection approval process (impacts occupancy timeline)
|
|
193
|
+
- [VERIFY] Owner-occupancy requirement discrepancy in historical research (resolved but documented; no impact)
|
|
194
|
+
- [VERIFY] Lead paint abatement scope (impacts Financial-Analyst-T2's regulatory assumptions)
|
|
195
|
+
|
|
196
|
+
**Gap**: Legal-Analyst-T4 identifies these gaps correctly but does not establish a **handoff protocol** stating which downstream tasks are **blocked** until verification is complete.
|
|
197
|
+
|
|
198
|
+
**Suggested Resolution**:
|
|
199
|
+
- Create a dependency map: Which [VERIFY] items are blockers for Tasks 1, 3, 5, etc.?
|
|
200
|
+
- Examples of critical blockers:
|
|
201
|
+
- Certificate of Occupancy timeline (Item 2.10) blocks lease start date → impacts Task 1 and Task 5
|
|
202
|
+
- Radon disclosure requirement (Item 3.7) blocks lease finalization → impacts Task 1
|
|
203
|
+
- Permit fees (Items 1.2-1.5) impact financial projections → impacts Task 5
|
|
204
|
+
- Mark these as handoff dependencies in project state.
|
|
205
|
+
|
|
206
|
+
---
|
|
207
|
+
|
|
208
|
+
#### DEPENDENCY GAP #3: Financial-Analyst-T2 Depends on Unknown ADU Specifications
|
|
209
|
+
|
|
210
|
+
**Issue**: Financial-Analyst-T2's price recommendations depend on three [VERIFY] items that are not yet confirmed.
|
|
211
|
+
|
|
212
|
+
**Evidence from Section 8 (Open Items)**:
|
|
213
|
+
1. **"ADU square footage"** — "if <550 sq ft, trend toward lower bound"
|
|
214
|
+
2. **"Laundry plans"** — "in-unit washer/dryer supports upper bound pricing; no laundry pushes toward lower bound"
|
|
215
|
+
3. **"Heating system type"** — affects tenant utility cost estimates
|
|
216
|
+
|
|
217
|
+
**Gap**: These variables are significant pricing drivers:
|
|
218
|
+
- Square footage affects perceived value (item 1 could swing pricing by $50–$150/month)
|
|
219
|
+
- Laundry changes recommendation from $1,400 (no laundry) to $1,550 (in-unit W/D)
|
|
220
|
+
- Heating system type affects tenant utility cost estimates, which impacts listing disclosure language
|
|
221
|
+
|
|
222
|
+
**Dependency**: Legal-Analyst should not finalize without confirming these specs (e.g., stating "ADU is 650 sq ft with in-unit washer/dryer" in the lease document). Task 1 (lease) must wait for Task 2 (market analysis) to confirm these details, or vice versa.
|
|
223
|
+
|
|
224
|
+
**Suggested Resolution**:
|
|
225
|
+
- Before finalizing either blueprint, confirm with user/project:
|
|
226
|
+
- ADU square footage
|
|
227
|
+
- Laundry location/availability
|
|
228
|
+
- Heating system type (electric heat pump vs. gas/propane)
|
|
229
|
+
- Document these in a shared property specification (e.g., property_facts.md) that all three blueprints reference.
|
|
230
|
+
- Update Financial-Analyst-T2 price range if specs differ from [ESTIMATE] values.
|
|
231
|
+
|
|
232
|
+
---
|
|
233
|
+
|
|
234
|
+
## Overall Assessment
|
|
235
|
+
|
|
236
|
+
**Status**: **MINOR ISSUES**
|
|
237
|
+
|
|
238
|
+
### Summary
|
|
239
|
+
|
|
240
|
+
The three blueprints are substantially **consistent** in describing the property, legal framework, and high-level requirements. However, three **medium-severity gaps** must be resolved before execution:
|
|
241
|
+
|
|
242
|
+
1. **Utility Model Commitment** (Medium): Legal-Analyst and Legal-Analyst-T4 treat sub-metering as conditional; Financial-Analyst-T2 assumes it's decided. Must confirm decision and align all three blueprints.
|
|
243
|
+
|
|
244
|
+
2. **Lead Paint Abatement Misstatement** (Medium): Financial-Analyst-T2 incorrectly suggests disclosure can be "mitigated" by abatement. Federal law requires disclosure always. Update Financial-Analyst-T2 to correct this.
|
|
245
|
+
|
|
246
|
+
3. **Unresolved [VERIFY] Items** (Medium): Legal-Analyst-T4 flags 9 items requiring external verification; some block downstream tasks (lease finalization, expense planning). Establish dependency map and resolve critical items before legal and pricing blueprints are finalized.
|
|
247
|
+
|
|
248
|
+
### What Is Working Well
|
|
249
|
+
|
|
250
|
+
- **Property profile** aligned across all three
|
|
251
|
+
- **Statutory framework** (lead paint, fire safety, security deposits) consistent
|
|
252
|
+
- **ADU-specific requirements** (fire separation, egress, utilities) uniform
|
|
253
|
+
- **Integration points identified** (Legal-Analyst-T4 Section 7 explicitly maps lease dependencies)
|
|
254
|
+
- **Scope and depth appropriate** for each domain (legal precision in Task 1/4, financial modeling in Task 2)
|
|
255
|
+
|
|
256
|
+
### Recommendations Before Producer Handoff
|
|
257
|
+
|
|
258
|
+
1. **Resolve Utility Decision**: Confirm sub-metering is decided (Option B in Financial-Analyst-T2 Section 4). Update Legal-Analyst and Legal-Analyst-T4 to remove conditional language if confirmed.
|
|
259
|
+
|
|
260
|
+
2. **Correct Lead Paint Language**: Update Financial-Analyst-T2 Section 2 to clarify that disclosure is always required, regardless of abatement scope.
|
|
261
|
+
|
|
262
|
+
3. **Create [VERIFY] Resolution Map**:
|
|
263
|
+
- Identify which items are blockers for Tasks 1, 3, 5
|
|
264
|
+
- Prioritize resolution of critical items (CO timeline, radon requirement, lease-dependent specs)
|
|
265
|
+
- Document resolution status before any downstream task is executed
|
|
266
|
+
|
|
267
|
+
4. **Confirm ADU Specifications**: Before finalizing Financial-Analyst-T2 pricing or Legal-Analyst lease language, lock in:
|
|
268
|
+
- Square footage
|
|
269
|
+
- Laundry location/type
|
|
270
|
+
- Heating system type
|
|
271
|
+
- Lead abatement scope
|
|
272
|
+
|
|
273
|
+
5. **Cross-Reference Update**: Add statements to both Legal-Analyst and Financial-Analyst-T2 Section 7 (Integration Points) explicitly referencing the other blueprint's constraints and dependencies.
|
|
274
|
+
|
|
275
|
+
---
|
|
276
|
+
|
|
277
|
+
## Conclusion
|
|
278
|
+
|
|
279
|
+
The three blueprints form a coherent, complementary analysis of the ADU rental project. No contradictions in **fact** exist; the inconsistencies are in **assumption commitment level** and **precision**. With the above clarifications, all three blueprints can proceed to producer handoff without risk of misalignment.
|
|
280
|
+
|
|
@@ -0,0 +1,67 @@
|
|
|
1
|
+
# Stage 1 Exploration: Rental Market Analysis
|
|
2
|
+
|
|
3
|
+
## Research Findings
|
|
4
|
+
|
|
5
|
+
**Property Profile (from project context):**
|
|
6
|
+
- 1BR ADU above converted two-bay garage at 24 Meadow St, Concord NH 03301
|
|
7
|
+
- New construction (garage conversion with 8-foot rear extension) — original garage built 1971
|
|
8
|
+
- RS District (Residential Single-Family), ADU protected under NH HB 577
|
|
9
|
+
- Private entrance planned, dedicated parking spot TBD
|
|
10
|
+
- Long-term rental only (not short-term/Airbnb)
|
|
11
|
+
- Owner-occupied primary residence on same property
|
|
12
|
+
- Shared elements: driveway, yard (boundaries TBD), utilities (sub-metering TBD)
|
|
13
|
+
|
|
14
|
+
**Regulatory Factors Affecting Pricing:**
|
|
15
|
+
- Security deposit capped at one month's rent or $100 (whichever greater) — limits upfront cash collection
|
|
16
|
+
- Lead paint disclosure required (1971 structure) — however, since this is a full interior renovation/new construction of the ADU space, lead paint risk is likely mitigated if abatement occurs during construction [VERIFY whether construction scope includes full lead abatement]
|
|
17
|
+
- Utility allocation must be addressed in lease if not sub-metered — this affects whether rent is advertised as "utilities included" or tenant-paid, which directly impacts comparable pricing
|
|
18
|
+
|
|
19
|
+
**Concord NH 1BR Market Context [ESTIMATE — no live data access]:**
|
|
20
|
+
- Concord is New Hampshire's state capital, population ~44,000, with steady rental demand from state government workers, hospital employees (Concord Hospital), and college-adjacent renters
|
|
21
|
+
- [ESTIMATE] Concord 1BR apartments typically range $1,100–$1,600/month based on general NH rental market trends through 2025-2026
|
|
22
|
+
- [ESTIMATE] Newer/renovated units command a premium of 10-20% over older stock
|
|
23
|
+
- [ESTIMATE] ADUs and small units with private entrances are competitive in this market due to limited new housing supply in Concord
|
|
24
|
+
- [VERIFY] Current vacancy rates in Concord — NH generally has tight rental markets (<5% vacancy statewide)
|
|
25
|
+
|
|
26
|
+
**Key Differentiators for This ADU:**
|
|
27
|
+
- **Positive**: New construction/full renovation, private entrance, residential neighborhood, owner on-site (perceived safety/maintenance responsiveness)
|
|
28
|
+
- **Negative/Neutral**: Above-garage unit (some tenants perceive as less desirable), shared driveway, proximity to wetlands (non-issue for most tenants), no laundry details known [VERIFY in-unit or shared laundry plans], square footage unknown [VERIFY]
|
|
29
|
+
|
|
30
|
+
## Recommended Approach
|
|
31
|
+
|
|
32
|
+
**Methodology for the deliverable (02_rental_analysis.xlsx):**
|
|
33
|
+
|
|
34
|
+
1. **Comparable Properties Sheet**: Identify 5-8 comparable 1BR rentals in Concord NH using the following criteria:
|
|
35
|
+
- Within Concord city limits or immediately adjacent
|
|
36
|
+
- 1BR units, preferably renovated or newer construction
|
|
37
|
+
- Include a mix: apartments, ADUs, small houses/duplexes
|
|
38
|
+
- Capture: address/listing source, asking rent, sq ft, utilities included (Y/N), key amenities, listing date
|
|
39
|
+
- Flag all comps as [ESTIMATE] since we lack live listing data — recommend user verify against Zillow, Apartments.com, Craigslist Concord at time of construction completion
|
|
40
|
+
|
|
41
|
+
2. **Market Trends Sheet**: Summarize Concord rental trends — year-over-year rent growth, vacancy, demand drivers. All flagged as [ESTIMATE/VERIFY].
|
|
42
|
+
|
|
43
|
+
3. **Price Recommendation Sheet**: Provide recommended monthly rent range with:
|
|
44
|
+
- Lower bound (conservative, fast-fill strategy)
|
|
45
|
+
- Target (market-rate for comparable new 1BR)
|
|
46
|
+
- Upper bound (premium positioning if amenities support it)
|
|
47
|
+
- Justification for each tied back to comps and differentiators
|
|
48
|
+
|
|
49
|
+
4. **Seasonal Notes Sheet**: Brief section on NH rental seasonality (summer peak, winter soft) and recommended listing timing.
|
|
50
|
+
|
|
51
|
+
**Preliminary Price Range [ESTIMATE]:**
|
|
52
|
+
- Lower bound: ~$1,250/month (competitive, fast tenant acquisition)
|
|
53
|
+
- Target: ~$1,400/month (new construction premium in Concord 1BR market)
|
|
54
|
+
- Upper bound: ~$1,550/month (if unit includes premium amenities: in-unit laundry, modern finishes, utilities included)
|
|
55
|
+
- These are rough estimates and MUST be validated against live market data closer to completion
|
|
56
|
+
|
|
57
|
+
## Key Decisions
|
|
58
|
+
|
|
59
|
+
### Decision 1: Utilities Included vs. Tenant-Paid
|
|
60
|
+
- **Options**: (A) Rent includes all utilities, (B) Tenant pays electric/heat with sub-metering, (C) Fixed utility surcharge added to base rent
|
|
61
|
+
- **Recommendation**: Option B — sub-meter electric and heat to tenant. This is the cleanest approach, aligns rent with market comps (most Concord listings quote rent separate from utilities), and avoids the risk of absorbing variable heating costs (NH winters are expensive). It does require sub-metering installation during construction.
|
|
62
|
+
- **Risk if wrong**: If utilities are included (Option A), winter heating costs could significantly erode rental income (NH heating bills can run $150-300/month in winter). If sub-metering isn't installed during construction, retrofitting is expensive and Option C becomes the fallback — but flat surcharges often under- or over-estimate actual costs.
|
|
63
|
+
|
|
64
|
+
### Decision 2: Comparable Selection Criteria — Strict vs. Broad
|
|
65
|
+
- **Options**: (A) Strict: only ADUs and garage conversions in Concord, (B) Broad: all 1BR rentals in Concord including standard apartments and duplexes
|
|
66
|
+
- **Recommendation**: Option B — use broad comparable set. True ADU comps in Concord will be very scarce (ADU market is still emerging post-HB 577). Standard 1BR apartments and duplexes are what tenants will compare against when searching, so they set the effective price ceiling.
|
|
67
|
+
- **Risk if wrong**: If we use strict ADU-only comps (Option A), we'll have insufficient data (possibly 0-2 listings) and any price recommendation will be unreliable. The broad set gives a defensible range even though unit types vary.
|