@sjawhar/pi-legion 10.8.1 → 10.8.3
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/dist/legion.js
CHANGED
|
@@ -16171,7 +16171,7 @@ function ompCapabilityHost() {
|
|
|
16171
16171
|
// package.json
|
|
16172
16172
|
var package_default = {
|
|
16173
16173
|
name: "@sjawhar/pi-legion",
|
|
16174
|
-
version: "10.8.
|
|
16174
|
+
version: "10.8.3",
|
|
16175
16175
|
license: "Apache-2.0",
|
|
16176
16176
|
type: "module",
|
|
16177
16177
|
omp: {
|
|
@@ -403,7 +403,7 @@ active phase worker.
|
|
|
403
403
|
| `carried-gate-opened` | Only a root whose catch-up said `carried` gets it. Its `version` and `reason`: a human approved the old root's spec document at `version`, which opened the gate this root carried; the daemon has released any READY it refused and started any child waiting on it. It is not `design-approved`: do not proceed to section 2 or release a wave because of it, and start nothing. |
|
|
404
404
|
| `child-status` | A child of your tree left the workflow or re-entered it; the notice's reason names the child and its new status. `todo` (a human's move, your `release_children`, or your `rerun_child`) means the child runs again under your tree from planning, and the daemon starts it; you start nothing. `backlog`, `icebox` or `triage` (a human's move, or your `park_child`) means the daemon has suspended the child's workers, and it advances no further until it is set back to `todo`. What the rest of the tree does is your decision. |
|
|
405
405
|
| `child-closed` | Read the child completion and remaining open children. Re-scope open work, park obsolete work with `park_child`, and release an appropriate next wave with `release_children`. When a worker waits on this child for a missing surface (see `phase-finished`), tell it to continue with `envoy_publish` to its role topic. The last child's close is not the end-game (section 3). |
|
|
406
|
-
| `child-release-stalled` | Its `reason` names a child your `release_children` released while Dispatch already showed it `todo`, and that child's parent, whose release has not reached the daemon after three tries.
|
|
406
|
+
| `child-release-stalled` | Its `reason` names a child your `release_children` released while Dispatch already showed it `todo`, and that child's parent, whose release has not reached the daemon after three tries. Read the parent's record with the `legion` tool's `read_record` (`issue` the parent); run `release_children` for the child again once the parent is recorded in your tree, and tell the controller if it never is. |
|
|
407
407
|
| `design-approved` | Its `version` is the approved one. A human approved the root spec document at its current version; the gate is open. Proceed to section 2 — except on a root whose catch-up said `handed_over`: its workers already run their phases, so start nothing; the approval releases any READY the gate refused. One whose `version` is the version a human's own answer to a decision block wrote, after an earlier approval (Dispatch carried that approval to it, section 1), opens nothing new: carry on, and release no wave because of it. |
|
|
408
408
|
| `design-changes-requested` | Its `version` and `reason`. A human asked for changes to the root spec at `version`, for `reason`. Revise the spec as the reason asks and request approval again as section 1 says; stay parked; the gate is closed. |
|
|
409
409
|
| `phase-finished` | The daemon has already moved the issue to its next phase by its fixed table and started that phase's role; you start nothing. Read the committed handoff for the finishing phase; if it shows unresolved gaps, tell the role now working the issue (`envoy_publish` to its role topic). A `planner` notice that names a departure from the spec's design defers to section 1's full condition: when the approved Summary, Acceptance, scope and settled decisions still hold, the plan is the record; otherwise change the root spec and request approval again as section 1 says. A `reviewer` notice whose GitHub review is `CHANGES_REQUESTED` needs nothing from you: the daemon has returned the issue to `implementing` (Dispatch `in_progress`) and started the **implementer**, whose correction goes through the tester and the reviewer again, never straight to retro. A `reviewer` notice with an `APPROVED` review means the daemon has started retro (step 5). An `implementer` notice for `production_check` is its production report: read the record on the pull request and the issue, then run step 7. A `tester` notice with `verdict: "fail"` — its handoff carries `implementerProof.verdict: "rejected"`, or a failure naming the production-like proof — has gone back to the **implementer** by the daemon's table; never supply the proof from another role. A worker that reports no surface reaches the changed path sends that report instead of completing its phase, so the daemon starts nothing more on that issue and the worker stays idle in its session, not suspended: file a child issue in this tree to build the surface (infrastructure, tooling, or a skill), and when that child's `child-closed` arrives, tell the waiting worker to continue with `envoy_publish` to its role topic. That report is never a reason to advance the phase. |
|
|
@@ -55,6 +55,6 @@ minutes apart. Do not poll to create the second read; use the next normal contro
|
|
|
55
55
|
that no live owner is available with `envoy_sessions` before changing the issue.
|
|
56
56
|
|
|
57
57
|
For work that the plan or its handoff says moves to Legion when its session stops, preserve its
|
|
58
|
-
existing labels, add `legion`, then
|
|
58
|
+
existing labels, add `legion`, then set it `todo` with the `legion` tool's `set_status`. The label comes first: it is what
|
|
59
59
|
lets the daemon admit the root. Do not apply that recovery to an issue already in an active Legion
|
|
60
60
|
tree; its architect and daemon own its lifecycle. Update the weekly-plan owner row after the move.
|