@seedtactics/insight-client 17.0.4 → 17.0.5
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/dist/assets/{index-B0B_a7c8.js → index-BqTNkPt2.js} +1 -1
- package/dist/components/station-monitor/StationToolbar.js +2 -1
- package/dist/index.html +1 -1
- package/docs/client-efficiency.md +158 -291
- package/docs/client-engineering.md +29 -36
- package/docs/client-launch.md +35 -34
- package/docs/client-operations.md +40 -61
- package/docs/client-quality.md +32 -47
- package/docs/client-sales.md +22 -39
- package/docs/client-scanners.md +21 -27
- package/docs/client-station-monitor.md +75 -100
- package/docs/client-tools-programs.md +30 -59
- package/docs/improve-fms.md +55 -121
- package/docs/makino.md +10 -11
- package/docs/material-quarantine.md +40 -54
- package/docs/material-tracking.md +65 -183
- package/docs/mazak.md +31 -49
- package/docs/niigata.md +61 -89
- package/docs/operator-procedures.md +83 -96
- package/docs/part-instructions.md +43 -57
- package/docs/screenshots/insight-analysis-pallets.png +0 -0
- package/docs/screenshots/insight-analysis-part-completed.png +0 -0
- package/docs/screenshots/insight-analysis-sankey.png +0 -0
- package/docs/screenshots/insight-analysis-station-oee.png +0 -0
- package/docs/screenshots/insight-basket-work.png +0 -0
- package/docs/screenshots/insight-buffer-occupancy.png +0 -0
- package/docs/screenshots/insight-closeout.png +0 -0
- package/docs/screenshots/insight-cost-percentages.png +0 -0
- package/docs/screenshots/insight-dashboard.png +0 -0
- package/docs/screenshots/insight-inspection.png +0 -0
- package/docs/screenshots/insight-load-station-details.png +0 -0
- package/docs/screenshots/insight-load-station.png +0 -0
- package/docs/screenshots/insight-loadcycle-graph.png +0 -0
- package/docs/screenshots/insight-machinecycle-graph.png +0 -0
- package/docs/screenshots/insight-machinecycle-table.png +0 -0
- package/docs/screenshots/insight-machinecycles.png +0 -0
- package/docs/screenshots/insight-machinehours.png +0 -0
- package/docs/screenshots/insight-machineoutliers.png +0 -0
- package/docs/screenshots/insight-monthly-schedules.png +0 -0
- package/docs/screenshots/insight-operations-material.png +0 -0
- package/docs/screenshots/insight-operations-overview.png +0 -0
- package/docs/screenshots/insight-operations-reports.png +0 -0
- package/docs/screenshots/insight-part-cost.png +0 -0
- package/docs/screenshots/insight-program-report.png +0 -0
- package/docs/screenshots/insight-quality-material-details.png +0 -0
- package/docs/screenshots/insight-quality-material.png +0 -0
- package/docs/screenshots/insight-quality-sankey.png +0 -0
- package/docs/screenshots/insight-quality-similar-paths.png +0 -0
- package/docs/screenshots/insight-quarantine.png +0 -0
- package/docs/screenshots/insight-queue-details.png +0 -0
- package/docs/screenshots/insight-queues-jobs-table.png +0 -0
- package/docs/screenshots/insight-queues.png +0 -0
- package/docs/screenshots/insight-sim-day-usage.png +0 -0
- package/docs/screenshots/insight-system-overview.png +0 -0
- package/docs/screenshots/insight-tool-replacements.png +0 -0
- package/docs/screenshots/insight-tool-report.png +0 -0
- package/docs/screenshots/insight-workorder-gantt.png +0 -0
- package/docs/screenshots/insight-workorders.png +0 -0
- package/docs/security.md +98 -131
- package/docs/server-config.md +39 -22
- package/docs/server-errors.md +26 -18
- package/package.json +1 -1
- package/docs/screenshots/insight-all-material.png +0 -0
- package/docs/screenshots/insight-choose-analysis-month.png +0 -0
- package/docs/screenshots/insight-loadstation-small.jpg +0 -0
- package/docs/screenshots/insight-quality-quarantine.png +0 -0
- package/docs/screenshots/insight-station-system-overview-buttons.png +0 -0
- package/docs/screenshots/insight-station-system-overview.png +0 -0
- package/docs/screenshots/insight-toolbar-btns.png +0 -0
package/docs/client-launch.md
CHANGED
|
@@ -2,53 +2,54 @@
|
|
|
2
2
|
title: FMS Insight Client
|
|
3
3
|
nav: FMS Insight Client > Launch
|
|
4
4
|
description: >-
|
|
5
|
-
FMS Insight
|
|
6
|
-
|
|
7
|
-
relevant information.
|
|
5
|
+
Open FMS Insight in a current browser on a computer, tablet, or phone, and choose the pages
|
|
6
|
+
relevant to your role.
|
|
8
7
|
---
|
|
9
8
|
|
|
10
|
-
|
|
9
|
+
FMS Insight provides pages for operators, supervisors, engineers, quality staff, and planners. Open
|
|
10
|
+
the page that fits your role and bookmark it for day-to-day use. The pages support touchscreens and
|
|
11
|
+
connected [barcode scanners](/fms-insight/client-scanners).
|
|
11
12
|
|
|
12
|
-
|
|
13
|
-
|
|
14
|
-
users which display relevant information. We suggest that each user bookmarks the relevant page; for
|
|
15
|
-
example, engineers in the quality department should just bookmark the quality page in FMS Insight,
|
|
16
|
-
visiting it directly to monitor the cell. All FMS Insight pages support a connected
|
|
17
|
-
[barcode scanner](client-scanners) to scan the serial number of a part.
|
|
13
|
+
Pages, station names, and available actions depend on the installation. The examples in these docs
|
|
14
|
+
use sample data; your cell may provide additional pages or use different terminology.
|
|
18
15
|
|
|
19
16
|
## Shop Floor
|
|
20
17
|
|
|
21
|
-
|
|
22
|
-
|
|
23
|
-
|
|
24
|
-
unload and at the inspection stand it shows what inspections were triggered.
|
|
18
|
+
The [station pages](/fms-insight/client-station-monitor) show the work at each operator station. For
|
|
19
|
+
example, the load station shows material to load and unload, and the inspection station shows
|
|
20
|
+
requested inspections and recorded results.
|
|
25
21
|
|
|
26
|
-
|
|
27
|
-
|
|
28
|
-
remaining schedule in the cell controller.
|
|
22
|
+
The [Tools and Programs pages](/fms-insight/client-tools-programs) show current tool life, tool use
|
|
23
|
+
per program, and estimated tool use for the remaining scheduled work.
|
|
29
24
|
|
|
30
25
|
## Daily Monitoring
|
|
31
26
|
|
|
32
|
-
|
|
33
|
-
|
|
34
|
-
[engineering/programming](client-engineering),
|
|
35
|
-
[sales](client-sales).
|
|
27
|
+
For day-to-day monitoring, choose the pages for
|
|
28
|
+
[factory floor supervisors](/fms-insight/client-operations),
|
|
29
|
+
[engineering/programming](/fms-insight/client-engineering),
|
|
30
|
+
[quality control](/fms-insight/client-quality), and [sales](/fms-insight/client-sales).
|
|
36
31
|
|
|
37
|
-
##
|
|
32
|
+
## Regular Review
|
|
38
33
|
|
|
39
|
-
|
|
40
|
-
|
|
41
|
-
|
|
42
|
-
displays a monthly summary of the cell, displays cost/piece, and helps identify areas for
|
|
43
|
-
improvement.
|
|
34
|
+
The [Analysis pages](/fms-insight/client-efficiency) summarize production, resource use, and cost
|
|
35
|
+
per piece over the last 30 days or a calendar month. Use them for a
|
|
36
|
+
[regular review](/fms-insight/improve-fms) of cell performance and potential improvements.
|
|
44
37
|
|
|
45
|
-
##
|
|
38
|
+
## Opening FMS Insight
|
|
46
39
|
|
|
47
40
|
Once installed, the FMS Insight client can be launched by connecting to the server using a browser.
|
|
48
|
-
|
|
49
|
-
|
|
50
|
-
|
|
41
|
+
Use a current browser such as Firefox, Chrome, Edge, or Safari, including on supported tablets and
|
|
42
|
+
phones. Use the Insight address provided for your installation, including HTTPS and sign-in where
|
|
43
|
+
configured. Client devices need access to this address and any identity-provider endpoints used for
|
|
44
|
+
login. They do not need direct access to the machine network; see
|
|
45
|
+
[network access and security](/fms-insight/security).
|
|
46
|
+
|
|
47
|
+
At an operator station, the relevant page can be set as the browser homepage or opened automatically
|
|
48
|
+
in full-screen mode. Keep the device and browser updated through the site's normal IT management.
|
|
49
|
+
|
|
50
|
+
By default, FMS Insight listens on port 5000 and uses `http` so you can visit
|
|
51
|
+
`http://<ip address or name of Insight server>:5000` from your browser. From the computer on which
|
|
51
52
|
you installed FMS Insight server, you can open the FMS Insight client by visiting
|
|
52
|
-
[http://localhost:5000](http://localhost:5000).
|
|
53
|
-
|
|
54
|
-
|
|
53
|
+
[http://localhost:5000](http://localhost:5000). The port and HTTPS settings can be changed in the
|
|
54
|
+
[server configuration](/fms-insight/server-config). Firewall rules should allow approved devices to
|
|
55
|
+
reach the endpoint chosen for the installation.
|
|
@@ -2,84 +2,63 @@
|
|
|
2
2
|
title: Daily FMS Cell Operations
|
|
3
3
|
nav: FMS Insight Client > Operations
|
|
4
4
|
description: >-
|
|
5
|
-
|
|
6
|
-
|
|
7
|
-
operating smoothly.
|
|
5
|
+
Monitor current cell activity, material, production, and recent performance from the Operations
|
|
6
|
+
pages.
|
|
8
7
|
---
|
|
9
8
|
|
|
10
|
-
|
|
9
|
+
The Operations pages give the floor supervisor a shared view of the cell and recent production.
|
|
10
|
+
Bookmark the dashboard for daily monitoring. Use the page navigation to switch between the
|
|
11
|
+
Dashboard, Cell, Material, and Reports; individual reports appear in a sidebar or a selector on
|
|
12
|
+
smaller screens. Available reports depend on the installation.
|
|
11
13
|
|
|
12
|
-
|
|
13
|
-
the past few days of cell operation and allow the supervisor to keep the cell operating smoothly.
|
|
14
|
-
(Anything older than a couple days should not be analyzed on the shop floor the heat of the moment
|
|
15
|
-
but instead be addressed in a [monthly review](improve-fms).)
|
|
14
|
+
## Dashboard
|
|
16
15
|
|
|
17
|
-
|
|
18
|
-
are also tabs for monitoring the operators at the load station, the machine cycle times, and all the
|
|
19
|
-
material in the system.
|
|
16
|
+

|
|
20
17
|
|
|
21
|
-
|
|
18
|
+
The progress bars compare completed production with the simulation for active schedules. Each
|
|
19
|
+
completed process counts separately, so these totals are not a count of finished, accepted parts.
|
|
20
|
+
The simulated total is the quantity expected by the current time from the downloaded schedule.
|
|
21
|
+
Differences are a starting point for investigation rather than proof of a particular problem.
|
|
22
|
+
|
|
23
|
+
The chart places recent actual cycles beside simulated station use, with a vertical line marking the
|
|
24
|
+
current time. Green bars show actual activity, gray bars show planned activity, and lighter green
|
|
25
|
+
shows estimated remaining time for work in progress. Longer cycles can have a dark green or red
|
|
26
|
+
extension, with red highlighting statistical outliers. Select a cycle for details.
|
|
22
27
|
|
|
23
|
-
|
|
24
|
-
|
|
25
|
-
The dashboard shows an overview of the current status of the cell. The supervisor should keep the
|
|
26
|
-
dashboard open since it allows at a quick glance to understand if the cell is running well.
|
|
27
|
-
|
|
28
|
-
On the top are two progress bars which show the completed parts and simulated parts for all active
|
|
29
|
-
schedules. The completed parts progress bar shows actual completed parts (finished unloading) and
|
|
30
|
-
counts each process as a separate completed part. The simulated parts progress bar shows the
|
|
31
|
-
expected number of completed parts at the current time based on the simulation. While these two
|
|
32
|
-
progress bars likely won't match exactly, they should be close to each other if the cell is running
|
|
33
|
-
smoothly. More details about schedules are available on the _Schedules_ tab.
|
|
34
|
-
|
|
35
|
-
Below the progress bars is a bar chart of load and machine cycles for the past 12 hours and future 8
|
|
36
|
-
hours. The x-axis is the time of day with a vertical black line for the current time. The y-axis is
|
|
37
|
-
the load stations and machines. Each load station or machine shows a green bar for a each actual
|
|
38
|
-
completed cycle and a gray bar for each simulated cycle. For machine cycles which are currently
|
|
39
|
-
executing or load/unloads in progress, a light-green bar is shown for the expected remaining time in
|
|
40
|
-
that cycle.
|
|
41
|
-
|
|
42
|
-
The color of each bar indicates the status of the cycle compared to the statistics of previous
|
|
43
|
-
cycles in the past month. If the cycle is at or below the expected cycle time, it will be shown in
|
|
44
|
-
green. If the cycle is longer than the expected cycle but still within the statistical deviation,
|
|
45
|
-
the portion of the cycle beyond the expected time will be shown in dark green. If the cycle is
|
|
46
|
-
longer than the expected cycle and outside the statistical deviation, it is classified as an outlier
|
|
47
|
-
and the portion of the cycle beyond the expected time will be shown in red. In addition, a list of
|
|
48
|
-
all the outlier cycles (those with red) can be viewed in the reports tab.
|
|
28
|
+
Simulated activity is a forecast from the schedule. It does not continuously reschedule itself to
|
|
29
|
+
match delays on the floor.
|
|
49
30
|
|
|
50
31
|
## Cell
|
|
51
32
|
|
|
52
|
-

|
|
53
34
|
|
|
54
|
-
The Cell
|
|
55
|
-
|
|
56
|
-
|
|
57
|
-
[shop floor](client-station-monitor).
|
|
35
|
+
The Cell view shows machines, load stations, pallets, and their material. Where supported, baskets
|
|
36
|
+
and their locations are also included. Open a material card for its details. This is the same system
|
|
37
|
+
overview available on the [station pages](/fms-insight/client-station-monitor#system-overview).
|
|
58
38
|
|
|
59
39
|
## Material
|
|
60
40
|
|
|
61
|
-

|
|
62
42
|
|
|
63
|
-
The Material
|
|
64
|
-
|
|
65
|
-
the material currently in all the queues is also included.
|
|
43
|
+
The Material view groups material by pallets, baskets where used, and configured queues. It is
|
|
44
|
+
useful for seeing both work inside automation and material waiting outside it.
|
|
66
45
|
|
|
67
|
-
Material can be moved between
|
|
68
|
-
|
|
69
|
-
|
|
70
|
-
|
|
71
|
-
[shop floor](client-station-monitor) using the Queues page.
|
|
46
|
+
Material can be moved between permitted quarantine queues using the card's drag handle. Changes to
|
|
47
|
+
production queues belong on the [Queues station page](/fms-insight/client-station-monitor#queues),
|
|
48
|
+
where operators can check the physical material. Actions are also restricted by the material's
|
|
49
|
+
current state.
|
|
72
50
|
|
|
73
51
|
## Reports
|
|
74
52
|
|
|
75
|
-

|
|
76
54
|
|
|
77
|
-
|
|
78
|
-
|
|
79
|
-
|
|
80
|
-
experience, the floor supervisor should focus only on keeping the cell running; longer-term analysis
|
|
81
|
-
is best done by a one-a-month or once-a-quarter review.
|
|
55
|
+
Reports cover recent load and machine cycles, outliers, hours, inspections, closeouts, schedules,
|
|
56
|
+
workorders, and production. Part Summary brings together production information by part. Some
|
|
57
|
+
installations also offer rebooking requests for additional production.
|
|
82
58
|
|
|
83
|
-
|
|
84
|
-
|
|
85
|
-
[
|
|
59
|
+
The same information is available through dedicated pages for
|
|
60
|
+
[engineering](/fms-insight/client-engineering), [quality](/fms-insight/client-quality),
|
|
61
|
+
[tools and programs](/fms-insight/client-tools-programs), and [sales](/fms-insight/client-sales).
|
|
62
|
+
Choose the page that fits the question: a recent cycle for a current interruption, a material
|
|
63
|
+
history for a traceability issue, or [monthly analysis](/fms-insight/client-efficiency) to look for
|
|
64
|
+
longer-term patterns.
|
package/docs/client-quality.md
CHANGED
|
@@ -2,69 +2,54 @@
|
|
|
2
2
|
title: FMS Quality Daily Monitoring
|
|
3
3
|
nav: FMS Insight Client > Quality
|
|
4
4
|
description: >-
|
|
5
|
-
|
|
6
|
-
|
|
7
|
-
similar material using the same machines or pallets.
|
|
5
|
+
Look up material history, compare manufacturing paths and inspection results, and review material
|
|
6
|
+
held for a quality decision.
|
|
8
7
|
---
|
|
9
8
|
|
|
10
|
-
|
|
11
|
-
|
|
12
|
-
|
|
13
|
-
about the past few days of inspections and cell operation and allow the engineers visibility into
|
|
14
|
-
the cell's operation. (Anything older than a couple days should not be analyzed in the heat of the
|
|
15
|
-
moment but instead be addressed in a [monthly review](improve-fms).)
|
|
16
|
-
|
|
17
|
-
We suggest that the quality dashboard is bookmarked by the engineers and visited directly. All data
|
|
18
|
-
available here is also available in the reports tab of the [operations page](client-operations). The
|
|
19
|
-
quality page just provides a dedicated place for engineers to bookmark and visit directly.
|
|
9
|
+
The Quality pages bring together material histories, inspection results, and material on hold.
|
|
10
|
+
Bookmark this page for quality investigations; the same reports are also available through
|
|
11
|
+
[Operations](/fms-insight/client-operations#reports).
|
|
20
12
|
|
|
21
13
|
## Material
|
|
22
14
|
|
|
23
|
-

|
|
24
16
|
|
|
25
|
-
|
|
26
|
-
material
|
|
27
|
-
manually entered, [scanned](client-scanners), or selected from the list of recent failed serials.
|
|
17
|
+
Enter or [scan](/fms-insight/client-scanners) a serial, or select a recent failed inspection, to
|
|
18
|
+
review the material's history. This lookup can also be used after a part has left the cell.
|
|
28
19
|
|
|
29
|
-

|
|
30
21
|
|
|
31
|
-
|
|
32
|
-
|
|
22
|
+
The record shows the available production events, machines, pallets or baskets, inspections, and
|
|
23
|
+
notes. Use **Lookup Similar Paths** to investigate other material that followed related routes.
|
|
24
|
+
Review the displayed search period and extend it when the investigation requires more history.
|
|
33
25
|
|
|
34
|
-

|
|
35
27
|
|
|
36
|
-
The
|
|
37
|
-
path
|
|
28
|
+
The results group material by path and inspection type. Expand a row to see the individual serials.
|
|
29
|
+
Sharing a path helps identify material to investigate; it does not establish that every piece has
|
|
30
|
+
the same defect.
|
|
38
31
|
|
|
39
32
|
## Paths
|
|
40
33
|
|
|
41
|
-
|
|
42
|
-
the data either via a Sankey chart or a table and shows signaled, succeeded, and failed inspections.
|
|
43
|
-
It can be used to visualize the paths that have occurred recently via the Sankey diagram or
|
|
44
|
-
investigating the paths in detail via the table. Anything older than 7 days is available as part of
|
|
45
|
-
the [monthly review](improve-fms) on the [flexibility analysis page](client-efficiency).
|
|
46
|
-
|
|
47
|
-

|
|
34
|
+

|
|
48
35
|
|
|
49
|
-
The
|
|
50
|
-
|
|
51
|
-
|
|
52
|
-
machine for each process or sequence, plus the final inspection result.) The counts of the various
|
|
53
|
-
paths are then charted using a Sankey diagram, where the widths of the bars are drawn scaled based
|
|
54
|
-
on the quantity of parts which took that path, with parts "flowing" from left to right. Any link can
|
|
55
|
-
be moused over to obtain additional information in a tooltip.
|
|
36
|
+
The Paths view summarizes the last seven days by part and inspection type. Select both to view a
|
|
37
|
+
Sankey diagram or a table. For older periods, use the
|
|
38
|
+
[monthly quality report](/fms-insight/client-efficiency#quality).
|
|
56
39
|
|
|
57
|
-
|
|
58
|
-
|
|
59
|
-
|
|
60
|
-
|
|
61
|
-
successfully inspected parts.
|
|
40
|
+
In the diagram, material flows from left to right through its recorded pallet and machine path to
|
|
41
|
+
its inspection outcome. Wider links represent more pieces. Hover a link for details or switch to the
|
|
42
|
+
table to inspect individual paths and serials. Not every piece is selected for inspection, so
|
|
43
|
+
uninspected material must not be interpreted as an inspection success.
|
|
62
44
|
|
|
63
45
|
## Quarantine Material
|
|
64
46
|
|
|
65
|
-
|
|
66
|
-
|
|
67
|
-
|
|
68
|
-
|
|
47
|
+
Where [quarantine](/fms-insight/material-quarantine) is configured, this view shows material in the
|
|
48
|
+
quarantine queues. Open a card to review its history and add notes, or drag its handle to move
|
|
49
|
+
waiting material between permitted queues. Use the
|
|
50
|
+
[Queues station page](/fms-insight/client-station-monitor#queues) when returning released material
|
|
51
|
+
to production.
|
|
69
52
|
|
|
70
|
-
|
|
53
|
+
Moving material between queues does not by itself record an inspection result or a decision to scrap
|
|
54
|
+
or release the material. Follow the installation's disposition procedure so the material's location
|
|
55
|
+
and quality records remain aligned.
|
package/docs/client-sales.md
CHANGED
|
@@ -2,56 +2,39 @@
|
|
|
2
2
|
title: FMS Insight Sales Daily Monitoring
|
|
3
3
|
nav: FMS Insight Client > Sales
|
|
4
4
|
description: >-
|
|
5
|
-
|
|
6
|
-
|
|
5
|
+
Review workorders and the latest simulation's estimates of completion dates and future machine
|
|
6
|
+
use.
|
|
7
7
|
---
|
|
8
8
|
|
|
9
|
-
|
|
10
|
-
|
|
11
|
-
The _Sales_ page helps to determine estimates of when existing workorders will be complete and when
|
|
12
|
-
available capacity for new orders will become available. We suggest anyone interested bookmark this
|
|
13
|
-
page and visit it directly.
|
|
9
|
+
The Sales pages show workorder progress and, where supplied, simulation estimates for upcoming
|
|
10
|
+
production. They help sales and planning staff discuss delivery dates and available capacity.
|
|
14
11
|
|
|
15
12
|
## Workorders
|
|
16
13
|
|
|
17
|
-

|
|
18
15
|
|
|
19
|
-
The
|
|
20
|
-
|
|
21
|
-
|
|
22
|
-
by supervisors, salespeople, or operators on the shop floor. Comments are intended to be used to
|
|
23
|
-
communicate information about the workorder between the various stakeholders.
|
|
16
|
+
The table lists current workorders and their quantities and dates. Expand a workorder to review
|
|
17
|
+
assigned material, recorded station time, and comments. Comments provide a shared place for
|
|
18
|
+
operators, supervisors, and sales staff to record information about the order.
|
|
24
19
|
|
|
25
|
-
|
|
26
|
-
|
|
27
|
-
|
|
28
|
-
and are calculated only while running the simulation to determine the daily schedule. Thus, they do
|
|
29
|
-
not update throughout the day and will not reflect any changes to workorder priority, new
|
|
30
|
-
workorders, completed parts, or any other changes to the cell. Only once a new simulation is run
|
|
31
|
-
will the projected dates be updated.
|
|
20
|
+
Projected start and filled dates appear when the downloaded schedule includes workorder simulation
|
|
21
|
+
results. These dates describe the simulation at the time it was run. They do not continuously update
|
|
22
|
+
for delays, priority changes, or new orders; a new simulation is needed to revise the forecast.
|
|
32
23
|
|
|
33
|
-

|
|
34
25
|
|
|
35
|
-
|
|
36
|
-
|
|
37
|
-
on the y-axis.
|
|
26
|
+
Where projected dates are available, switch to the Gantt chart to compare workorders over time.
|
|
27
|
+
Treat the dates as estimates based on the modeled part mix, routes, and available resources.
|
|
38
28
|
|
|
39
29
|
## Projected Usage
|
|
40
30
|
|
|
41
|
-

|
|
47
32
|
|
|
48
|
-
|
|
49
|
-
|
|
50
|
-
|
|
51
|
-
|
|
33
|
+
The projected usage calendar shows the simulation's expected machine utilization for remaining
|
|
34
|
+
workorders. Darker days indicate greater use; hover a day for its value. This report requires
|
|
35
|
+
simulation details in the downloaded schedule and, like the projected workorder dates, changes when
|
|
36
|
+
new simulation results are supplied.
|
|
52
37
|
|
|
53
|
-
|
|
54
|
-
|
|
55
|
-
|
|
56
|
-
this is only an estimate and if the priorities of workorders change, a new workorder could be
|
|
57
|
-
entered to run before existing workorders.
|
|
38
|
+
Use the calendar to identify periods worth considering for additional work. A lightly loaded day is
|
|
39
|
+
not a delivery promise: the new part's qualified machines, tooling, material, and priority still
|
|
40
|
+
need to be considered in the schedule.
|
package/docs/client-scanners.md
CHANGED
|
@@ -2,40 +2,34 @@
|
|
|
2
2
|
title: Barcode Scanners
|
|
3
3
|
nav: FMS Insight Client > Scanners
|
|
4
4
|
description: >-
|
|
5
|
-
All FMS Insight pages
|
|
5
|
+
All FMS Insight pages support barcode or QR code scanners for easy material tracking on the shop
|
|
6
6
|
floor.
|
|
7
7
|
---
|
|
8
8
|
|
|
9
|
-
|
|
10
|
-
|
|
11
|
-
|
|
12
|
-
|
|
13
|
-
[inspection station monitor](client-station-monitor) is open and a part's serial is scanned, the
|
|
14
|
-
dialog for this serial will be opened to show the material details, log of events, and buttons to
|
|
15
|
-
complete the inspection. (The exact same dialog which is opened if you click on a piece of material
|
|
16
|
-
on the screen.) In this way, the scanner can be used to more quickly locate the material card and
|
|
17
|
-
open the details about it.
|
|
9
|
+
Scan a part's serial to open its material details, event history, and the actions available on the
|
|
10
|
+
current page. This opens the same dialog as selecting the material card. For example, scanning at an
|
|
11
|
+
[inspection station](/fms-insight/client-station-monitor#inspection) opens the inspection actions
|
|
12
|
+
for that piece.
|
|
18
13
|
|
|
19
14
|
## Manual Serial Entry
|
|
20
15
|
|
|
21
|
-
|
|
22
|
-
|
|
23
|
-
|
|
16
|
+
Select the magnifying glass in the top-right of the page, then enter a serial to open its material
|
|
17
|
+
details.
|
|
18
|
+
|
|
19
|
+
## Configuring a Handheld Scanner
|
|
20
|
+
|
|
21
|
+
Most USB and Bluetooth scanners act as keyboards. Configure the scanner to send `F1` or `!*` before
|
|
22
|
+
the serial and `Enter` afterward. Insight must receive the serial and `Enter` within three seconds
|
|
23
|
+
of the prefix.
|
|
24
24
|
|
|
25
|
-
|
|
25
|
+
By default, Insight uses the text before the first comma as the serial. An installation's
|
|
26
|
+
integration can interpret additional barcode data.
|
|
26
27
|
|
|
27
|
-
|
|
28
|
-
|
|
29
|
-
FMS Insight website listens for a keyboard press of either F1 or the combination of !\* and when it
|
|
30
|
-
detects this, starts a scan. Any keyboard presses of letters and numbers followed by the Enter key
|
|
31
|
-
(within 10 seconds) is treated as a serial. By default, only characters up to the first comma or
|
|
32
|
-
semi-colon are used, which allows the QR-code to contain extra data (this can be modified in a
|
|
33
|
-
custom plugin).
|
|
28
|
+
To test without a scanner, open an Insight page, press `F1`, type a valid serial, and press `Enter`
|
|
29
|
+
within three seconds.
|
|
34
30
|
|
|
35
|
-
|
|
36
|
-
press Enter (must be within 10 seconds). The material detail dialog will appear with the serial that
|
|
37
|
-
you typed.
|
|
31
|
+
## Camera Scanning
|
|
38
32
|
|
|
39
|
-
|
|
40
|
-
|
|
41
|
-
|
|
33
|
+
When Insight is served over HTTPS, the toolbar also offers a camera scanner. Allow camera access in
|
|
34
|
+
the browser, then use it to scan a supported code. A handheld scanner or manual serial entry remains
|
|
35
|
+
useful on devices without a camera.
|