@moltenship/calendar 1.0.0-rc.2 → 2.0.0
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/README.md +27 -6
- package/dist/index.d.mts +3 -3
- package/dist/index.mjs +2 -2
- package/docs/accessibility.md +305 -0
- package/docs/agents/changes.md +449 -0
- package/docs/agents/coding-agents.md +116 -0
- package/docs/agents/connect.md +444 -0
- package/docs/agents/deleting.md +296 -0
- package/docs/agents/reference.md +511 -0
- package/docs/agents/server.md +317 -0
- package/docs/agents/webmcp.md +153 -0
- package/docs/agents.md +355 -0
- package/docs/annotations.md +198 -0
- package/docs/api/changes.md +264 -0
- package/docs/api/components.md +245 -0
- package/docs/api/dnd-kit.md +265 -0
- package/docs/api/events.md +153 -0
- package/docs/api/primitives.md +218 -0
- package/docs/api/store.md +92 -0
- package/docs/api.md +57 -0
- package/docs/availability.md +576 -0
- package/docs/comparison.md +278 -0
- package/docs/concepts/anatomy.md +73 -0
- package/docs/concepts/events.md +163 -0
- package/docs/concepts/how-it-works.md +112 -0
- package/docs/concepts/state.md +244 -0
- package/docs/concepts/time.md +168 -0
- package/docs/customization.md +271 -0
- package/docs/frameworks.md +116 -0
- package/docs/guides/dnd-kit.md +333 -0
- package/docs/guides/google-calendar-sync.md +1246 -0
- package/docs/guides/google-calendar.md +367 -0
- package/docs/guides/motion.md +414 -0
- package/docs/guides/nextjs-app-router.md +630 -0
- package/docs/guides/nextjs.md +149 -0
- package/docs/guides/performance.md +103 -0
- package/docs/guides/tanstack-query.md +485 -0
- package/docs/ics/feed.md +484 -0
- package/docs/ics/import.md +183 -0
- package/docs/ics/reference.md +482 -0
- package/docs/ics.md +142 -0
- package/docs/index.md +149 -0
- package/docs/installation.md +209 -0
- package/docs/interactions.md +441 -0
- package/docs/llms.txt +99 -0
- package/docs/migrating-to-2.md +497 -0
- package/docs/quick-start.md +163 -0
- package/docs/recurrence/calendar.md +598 -0
- package/docs/recurrence/model.md +128 -0
- package/docs/recurrence/reference.md +547 -0
- package/docs/recurrence.md +122 -0
- package/docs/stylex.md +290 -0
- package/docs/temporal/daylight-saving-time.md +172 -0
- package/docs/temporal/month-grid.md +119 -0
- package/docs/temporal/reference.md +167 -0
- package/docs/temporal.md +105 -0
- package/docs/testing.md +600 -0
- package/docs/theme-builder.md +82 -0
- package/docs/theming.md +275 -0
- package/docs/undo-redo.md +347 -0
- package/docs/views/agenda.md +222 -0
- package/docs/views/custom-views.md +195 -0
- package/docs/views/month.md +110 -0
- package/docs/views/resource-columns.md +265 -0
- package/docs/views/resource-timeline.md +226 -0
- package/docs/views/scrolling.md +193 -0
- package/docs/views/week-and-day.md +258 -0
- package/docs/views/year.md +138 -0
- package/docs/views.md +69 -0
- package/package.json +42 -14
- package/skills/moltenship-time/SKILL.md +77 -0
- package/skills/moltenship-time/references/agent-ready.md +272 -0
- package/skills/moltenship-time/references/changes.md +188 -0
- package/skills/moltenship-time/references/compose.md +175 -0
- package/skills/moltenship-time/references/mistakes.md +100 -0
- package/skills/moltenship-time/references/solid.md +213 -0
- package/skills/moltenship-time/references/state.md +129 -0
- package/skills/moltenship-time/references/testing.md +176 -0
|
@@ -0,0 +1,226 @@
|
|
|
1
|
+
# Resource timeline
|
|
2
|
+
|
|
3
|
+
Rooms or people as rows and time as columns, for a day, a week or a month, with hundreds of rows.
|
|
4
|
+
|
|
5
|
+
Source: https://time.molten.sh/docs/react/views/resource-timeline
|
|
6
|
+
|
|
7
|
+
> Live example of the `timeline` view: see it at https://time.molten.sh/docs/react/views/resource-timeline
|
|
8
|
+
|
|
9
|
+
Try it in the [live demo](https://moltenship-time-demo.vercel.app): pick Timeline in the view
|
|
10
|
+
switcher.
|
|
11
|
+
|
|
12
|
+
`createTimelineDayView`, `createTimelineWeekView` and `createTimelineMonthView` show one row for
|
|
13
|
+
each resource, such as a room or a person, with time running across. A day is split into hours, and
|
|
14
|
+
a week or a month into days. Each resource's events are bars in its row. Resources with children
|
|
15
|
+
appear as groups that collapse. Only the rows and slots in view are rendered, so the timeline stays
|
|
16
|
+
fast with hundreds of resources over a whole month.
|
|
17
|
+
|
|
18
|
+
## Add it
|
|
19
|
+
|
|
20
|
+
Add the view to your app with the shadcn CLI, as described in
|
|
21
|
+
[UI source](../installation.md#ui-source-optional). The item brings the theme, the shared
|
|
22
|
+
`calendar` parts, shadcn's `button`, and `@tanstack/virtual-core`:
|
|
23
|
+
|
|
24
|
+
```bash
|
|
25
|
+
npx shadcn@latest add https://time.molten.sh/r/resource-timeline-view.json
|
|
26
|
+
```
|
|
27
|
+
|
|
28
|
+
```tsx
|
|
29
|
+
import {
|
|
30
|
+
createTimelineDayView,
|
|
31
|
+
createTimelineMonthView,
|
|
32
|
+
createTimelineWeekView,
|
|
33
|
+
} from "@/components/calendar/resource-timeline-view/resource-timeline-view";
|
|
34
|
+
|
|
35
|
+
const getEventColor = (meeting: Meeting) => meeting.color;
|
|
36
|
+
|
|
37
|
+
export const Calendar = createCalendar<Meeting, Room>()({
|
|
38
|
+
eventAdapter,
|
|
39
|
+
views: [
|
|
40
|
+
createTimelineDayView<Meeting>({ getEventColor }),
|
|
41
|
+
createTimelineWeekView<Meeting>({ getEventColor }),
|
|
42
|
+
createTimelineMonthView<Meeting>({ getEventColor }),
|
|
43
|
+
],
|
|
44
|
+
});
|
|
45
|
+
```
|
|
46
|
+
|
|
47
|
+
The views are named `timeline-day`, `timeline-week` and `timeline-month`. The week starts on
|
|
48
|
+
`weekRules.firstDay`, and the month view shows the anchor's calendar month, from the 1st to its last
|
|
49
|
+
day. Previous and Next move by a day, a week or a month.
|
|
50
|
+
|
|
51
|
+
## Resources
|
|
52
|
+
|
|
53
|
+
Pass the resources to `Root`, as for [resource columns](./resource-columns.md#resources).
|
|
54
|
+
Each one has an `id`, a `title`, and optionally a `parentId`, which puts it in a group under that
|
|
55
|
+
resource. Events list the resources they book in `resourceIds`, read through your event adapter's
|
|
56
|
+
`getResourceIds`. An event that books several resources shows in each of their rows.
|
|
57
|
+
|
|
58
|
+
```tsx
|
|
59
|
+
const rooms = [
|
|
60
|
+
{ data: null, id: "floor-1", title: "First floor" },
|
|
61
|
+
{ data: null, id: "orchid", parentId: "floor-1", title: "Orchid" },
|
|
62
|
+
{ data: null, id: "lotus", parentId: "floor-1", title: "Lotus" },
|
|
63
|
+
];
|
|
64
|
+
|
|
65
|
+
<Calendar.Root resources={rooms} defaultExpandedResourceIds={["floor-1"]} /* … */>
|
|
66
|
+
```
|
|
67
|
+
|
|
68
|
+
A group's children show while its ID is in `expandedResourceIds`. The chevron beside a group's name
|
|
69
|
+
toggles it. To control expansion yourself, pass `expandedResourceIds` and
|
|
70
|
+
`onExpandedResourceIdsChange`. Groups start collapsed unless you list them in
|
|
71
|
+
`defaultExpandedResourceIds`.
|
|
72
|
+
|
|
73
|
+
## Anatomy
|
|
74
|
+
|
|
75
|
+
`ResourceTimelineView` renders the parts below. The view builds them itself from its projection, so
|
|
76
|
+
they're not parts you compose: to change one, edit its file. The tree shows where each part lives.
|
|
77
|
+
|
|
78
|
+
> Diagram: see it at https://time.molten.sh/docs/react/views/resource-timeline
|
|
79
|
+
|
|
80
|
+
```txt title="Rendered by ResourceTimelineView"
|
|
81
|
+
ResourceTimelineView resource-timeline-view.tsx
|
|
82
|
+
└── ResourceTimelineGrid resource-timeline-grid.tsx, scrolls both ways
|
|
83
|
+
├── ResourceTimelineHeader resource-timeline-header.tsx, sticky at the top
|
|
84
|
+
│ ├── Date or month stays in view while you scroll sideways
|
|
85
|
+
│ └── Hour or day one per rendered slot
|
|
86
|
+
├── ResourceTimelineRow resource-timeline-row.tsx, one per rendered resource
|
|
87
|
+
│ ├── Resource name sticky at the inline start, with a group's toggle
|
|
88
|
+
│ └── Cell one per rendered slot
|
|
89
|
+
│ ├── Day data-date, in a week or a month
|
|
90
|
+
│ ├── Date strip data-axis="inline" and data-date, in a day
|
|
91
|
+
│ ├── ResourceTimelineEvent resource-timeline-event.tsx
|
|
92
|
+
│ └── Keyboard cursor resource-timeline-focus.tsx, on the focused cell
|
|
93
|
+
└── Now line data-slot="resource-timeline-now"
|
|
94
|
+
```
|
|
95
|
+
|
|
96
|
+
- `useTimelineVirtualizer` in `use-timeline-virtualizer.ts` decides which rows and slots render:
|
|
97
|
+
the ones in view, a few beyond, and the focused ones. Slots share the width the resource column
|
|
98
|
+
leaves until they are 56px for an hour or 48px for a day, then the view scrolls sideways. The
|
|
99
|
+
resource column is 208px wide, or 128px on narrow screens.
|
|
100
|
+
- The header and the resource column are `position: sticky` inside the one scrolling element, so
|
|
101
|
+
they move with it exactly and a row's name stays inside its row for screen readers.
|
|
102
|
+
- `timeline-placement.ts` puts each bar in the first rendered cell it covers, so a bar that starts
|
|
103
|
+
off-screen still shows. A row is as tall as its lanes, or its stacks, need, and at least 44px.
|
|
104
|
+
|
|
105
|
+
## Options
|
|
106
|
+
|
|
107
|
+
| Name | Type | Default | Description |
|
|
108
|
+
| -------------------------- | ----------------------------------------------------------------------- | ----------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
|
|
109
|
+
| `describeEvent` | `(event: TEvent) => string \| undefined` | | Extra words for each event's accessible name, such as its calendar. |
|
|
110
|
+
| `dragPreview` | `"snapped" \| "free"` | `"snapped"` | How a drag's preview moves: from slot to slot, or with the pointer over a marker of where it would land, snapping there on release. See [snapped and free drags](../interactions.md#snapped-and-free-drags). |
|
|
111
|
+
| `getEventColor` | `(event: TEvent) => CalendarEventColor \| undefined` | | The color for each event. See [event colors](../theming.md#event-colors). |
|
|
112
|
+
| `getEventIcon` | `(event: TEvent) => ReactNode` | | A small icon before each event's title, such as a repeat mark on recurring events, or nothing. It's decorative and hidden from screen readers: say the same in `describeEvent`, which adds to the event's [accessible name](../accessibility.md#event-names). |
|
|
113
|
+
| `getEventOverlapLayout` | `(event: TEvent) => "columns" \| "equal" \| "stack" \| undefined` | | In an hour timeline, an event's own layout, such as its calendar's: a group of overlapping events in a row takes it when they all agree. See [stacked rows](#stacked-rows). |
|
|
114
|
+
| `getResourceOverlapLayout` | `(resource: TResource) => "columns" \| "equal" \| "stack" \| undefined` | | In an hour timeline, a resource's layout in its row, such as `"stack"` for rooms; `undefined` keeps `overlapLayout`. |
|
|
115
|
+
| `overlapLayout` | `"columns" \| "equal" \| "stack"` | `"columns"` | In an hour timeline, how a row shares out overlapping events: a lane for each level of overlap, or `"stack"` to cascade them. See [stacked rows](#stacked-rows). |
|
|
116
|
+
| `slotUnit` | `"hour" \| "day"` | | What a column spans: hours for a day and days for a week or a month unless you set it. |
|
|
117
|
+
| `unassigned` | `"hide" \| "bucket"` | `"hide"` | Events that book no resources: hidden, or shown in an "Unassigned" row after the resources. |
|
|
118
|
+
| `renderUnavailable` | `UnavailableTimeRender` | | Replaces the shading of closed time and closed days: a function of its props and its state. See [customize the shading](../availability.md#customize-the-shading). |
|
|
119
|
+
| `resourceStatus` | `boolean \| ResourceStatusOptions` | | Shows each resource's status, such as "Busy until 3:00 PM". See [busy badge](../availability.md#busy-badge-in-resource-views). |
|
|
120
|
+
|
|
121
|
+
Set options when you create the view, or per calendar with
|
|
122
|
+
`viewOptions={{ "timeline-week": { unassigned: "bucket" } }}` on `Root`.
|
|
123
|
+
|
|
124
|
+
## What it shows
|
|
125
|
+
|
|
126
|
+
- **Header:** the hours under their date, or the days under their month with today highlighted and
|
|
127
|
+
marked `aria-current="date"`. Weekends are tinted down every row.
|
|
128
|
+
- **Rows:** each resource's name, indented under its group. Groups are tinted, and their chevron
|
|
129
|
+
shows or hides their children.
|
|
130
|
+
- **Events over days:** laid out like a [month](./month.md) row. A timed event within one
|
|
131
|
+
day shows its title and start time, as "Standup 9:30 AM", and drops the time when the day is too
|
|
132
|
+
narrow. Longer events span their days.
|
|
133
|
+
- **Events over hours:** each bar spans its exact times, on the same 24-hour wall clock as the
|
|
134
|
+
[day view](./week-and-day.md). Hours skipped when the clocks go forward are hatched, and
|
|
135
|
+
hours repeated when they go back are tinted.
|
|
136
|
+
- **Both:** an event that starts before or ends after the range is squared off at that edge.
|
|
137
|
+
Events that overlap sit in lanes, and the row grows to fit them. Over hours, a row can
|
|
138
|
+
[stack](#stacked-rows) them instead.
|
|
139
|
+
- **Current time:** a line through today at the current time, from
|
|
140
|
+
[`useNow()`](../concepts/time.md#the-current-time). A day opens scrolled to it, or to 08:00 when
|
|
141
|
+
today isn't shown.
|
|
142
|
+
- **Editing:** with `onEventChange` on `Root`, drag an event along its row to move it, or onto
|
|
143
|
+
another row to move it to that resource. A move swaps the resource you dragged from for the one
|
|
144
|
+
you dropped on and keeps the event's other resources. Drag an event's start or end edge to resize
|
|
145
|
+
it, and drag across empty time to create an event in that resource. Over days these steps are
|
|
146
|
+
whole days, and an event keeps its time; over hours they're half hours. See
|
|
147
|
+
[Interactions](../interactions.md#drag-resize-and-create).
|
|
148
|
+
- **Accessible names:** the grid is named after the range, each row after its resource, and each
|
|
149
|
+
cell after its resource, time and number of events, as in "Orchid, Monday, October 5, 2026, 2
|
|
150
|
+
events". Events end with their resource, as in "Design review, Tuesday, October 6, 10:00 – 11:30
|
|
151
|
+
AM, Orchid".
|
|
152
|
+
|
|
153
|
+
A day of rooms and people, in hours:
|
|
154
|
+
|
|
155
|
+
> Live example of the `timeline-day` view: see it at https://time.molten.sh/docs/react/views/resource-timeline
|
|
156
|
+
|
|
157
|
+
## Stacked rows
|
|
158
|
+
|
|
159
|
+
A busy room takes a lane for each level of overlap, so its row grows. In an hour timeline,
|
|
160
|
+
`overlapLayout: "stack"` cascades a row's overlapping events instead: each bar sits a third of a
|
|
161
|
+
lane below the one it covers and is drawn over it, and a deep stack steps less, so the row is never
|
|
162
|
+
more than two lanes tall. `getResourceOverlapLayout` picks it per resource, as in
|
|
163
|
+
[resource columns](./resource-columns.md#rooms-and-people):
|
|
164
|
+
|
|
165
|
+
> Live example of the `timeline-day` view: see it at https://time.molten.sh/docs/react/views/resource-timeline
|
|
166
|
+
|
|
167
|
+
```tsx
|
|
168
|
+
const view = createTimelineDayView<Meeting, Resource>({
|
|
169
|
+
getResourceOverlapLayout: (resource) => (resource.data.kind === "room" ? "stack" : undefined),
|
|
170
|
+
});
|
|
171
|
+
```
|
|
172
|
+
|
|
173
|
+
- `"columns"` and `"equal"` are the same here: a lane per level of overlap. A row has no fixed
|
|
174
|
+
height to share, so no bar narrows.
|
|
175
|
+
- A group's deepest bar sets its step, so a long booking under a busy stretch, such as a desk
|
|
176
|
+
booked all day, compresses every cascade in it. Hover or focus a covered bar to bring it up.
|
|
177
|
+
- The rules are the time grid's. A group of overlapping events takes its events' own layout,
|
|
178
|
+
from `getEventOverlapLayout`, when they all agree, and otherwise its row's. A group's layout
|
|
179
|
+
depends only on its own events. The Unassigned row follows `overlapLayout`.
|
|
180
|
+
- Bars are drawn in time order, so each covers the ones before it. A covered bar rises while you
|
|
181
|
+
hover over it or focus it, so its title shows. ← and → walk a row's bars in the same order, and
|
|
182
|
+
Enter on a cell starts at the bar the others cover, as in lanes.
|
|
183
|
+
- A day timeline lays each row out like a month row, whatever the layout, as the time grid's
|
|
184
|
+
all-day row does.
|
|
185
|
+
|
|
186
|
+
## Keyboard
|
|
187
|
+
|
|
188
|
+
Tab into a preview, or click a cell, and try these keys. The
|
|
189
|
+
[Accessibility](../accessibility.md#keyboard) page has the full map and what a screen reader hears.
|
|
190
|
+
|
|
191
|
+
| Focus | Key | Effect |
|
|
192
|
+
| -------------- | ------------------ | ------------------------------------------------------------------------ |
|
|
193
|
+
| A cell | ← → | Previous or next day, or half hour in a day |
|
|
194
|
+
| A cell | ↑ ↓ | The same time in the previous or next row |
|
|
195
|
+
| A cell | Home, End | The first or last day or half hour shown |
|
|
196
|
+
| A cell | Page Up, Page Down | Back or forward a whole day, week or month |
|
|
197
|
+
| A cell | Enter | The events covering it in that row. Escape goes back to the event's cell |
|
|
198
|
+
| An event | ← → | Previous or next event in the row |
|
|
199
|
+
| An event | ↑ ↓ | The cell at its start in the previous or next row |
|
|
200
|
+
| A group's cell | Shift+Enter | Expand or collapse the group |
|
|
201
|
+
| A day | Space | Start an all-day event there. Arrow keys extend it, and Enter saves it |
|
|
202
|
+
| A half hour | Space | Start an hour-long event there. Arrow keys extend it, and Enter saves it |
|
|
203
|
+
| An event | Space | Pick it up. Arrow keys move it along its row and to other rows |
|
|
204
|
+
| An event | Shift+Space | Pick up its end to resize it. Shift+Space again switches to its start |
|
|
205
|
+
|
|
206
|
+
Enter drops a picked-up event and Escape puts it back. Moving it to another row moves it to that
|
|
207
|
+
resource, the same change as dropping it there with the pointer, and
|
|
208
|
+
[announcements](../accessibility.md#announcements) name the resource: "Moved Design review to
|
|
209
|
+
Tuesday, October 6, 10:00 – 11:30 AM, Lotus." Focus is a resource and a time, not an element, so
|
|
210
|
+
it survives scrolling: the focused row and slot keep rendering wherever you scroll, and each key
|
|
211
|
+
brings its target into view.
|
|
212
|
+
|
|
213
|
+
## Markup for interactions
|
|
214
|
+
|
|
215
|
+
The view connects the pointer layer for you. Each resource's row has `resourceIdAttributes(id)`,
|
|
216
|
+
which sets `data-resource-id`: a drop or create inside it lands in that resource.
|
|
217
|
+
|
|
218
|
+
- **Over days:** each day cell has an inner element with `data-date`, beside the events rather than
|
|
219
|
+
around them, so dragging an event by a later day moves it from that day.
|
|
220
|
+
- **Over hours:** each row has a `data-axis="inline"` strip with `data-date` for every date, and
|
|
221
|
+
the view passes its projection's `columns` to the pointer layer, which maps a position along the
|
|
222
|
+
strip to a wall time.
|
|
223
|
+
- **Events:** they're buttons with `data-event-id`, and events you can edit have
|
|
224
|
+
`data-resize="start"` and `data-resize="end"` handles.
|
|
225
|
+
- **Sticky parts:** the header and each row's name have `data-occludes`, so the pointer layer
|
|
226
|
+
doesn't look through them to the cells scrolled beneath.
|
|
@@ -0,0 +1,193 @@
|
|
|
1
|
+
# Scrolling views
|
|
2
|
+
|
|
3
|
+
Week, day and month views that scroll without end, swiping a page at a time.
|
|
4
|
+
|
|
5
|
+
Source: https://time.molten.sh/docs/react/views/scrolling
|
|
6
|
+
|
|
7
|
+
**Week**
|
|
8
|
+
|
|
9
|
+
> Live example of the `scrolling-week` view: see it at https://time.molten.sh/docs/react/views/scrolling
|
|
10
|
+
|
|
11
|
+
**3 days**
|
|
12
|
+
|
|
13
|
+
> Live example of the `scrolling-3-day` view: see it at https://time.molten.sh/docs/react/views/scrolling
|
|
14
|
+
|
|
15
|
+
**Day**
|
|
16
|
+
|
|
17
|
+
> Live example of the `scrolling-day` view: see it at https://time.molten.sh/docs/react/views/scrolling
|
|
18
|
+
|
|
19
|
+
Try them in the [live demo](https://moltenship-time-demo.vercel.app): turn on "Scroll days, weeks,
|
|
20
|
+
months and agenda" in the settings.
|
|
21
|
+
|
|
22
|
+
The [week and day](./week-and-day.md) and [month](./month.md) views move a page at a
|
|
23
|
+
time. The scrolling versions follow your finger, as Apple's Calendar does on iPad, and swipe a page at a
|
|
24
|
+
time: the week and day views sideways, so a week comes to rest on the next week and a day on the
|
|
25
|
+
next day, and the month up and down, a month at a time. They're separate views, so the paged ones
|
|
26
|
+
keep working as they are, and you can register both. The
|
|
27
|
+
[scrolling agenda](./agenda.md#scrolling-agenda) scrolls a list of days the same way, comes
|
|
28
|
+
to rest on any day, and jumps to a date at once.
|
|
29
|
+
|
|
30
|
+
## Add them
|
|
31
|
+
|
|
32
|
+
Add the views to your app with the shadcn CLI, as described in
|
|
33
|
+
[UI source](../installation.md#ui-source-optional). The items bring what they build on:
|
|
34
|
+
`time-grid-view` and `month-view`, the theme, and the shared `calendar` parts.
|
|
35
|
+
|
|
36
|
+
```bash
|
|
37
|
+
npx shadcn@latest add \
|
|
38
|
+
https://time.molten.sh/r/scrolling-time-grid-view.json \
|
|
39
|
+
https://time.molten.sh/r/scrolling-month-view.json
|
|
40
|
+
```
|
|
41
|
+
|
|
42
|
+
Then register the views:
|
|
43
|
+
|
|
44
|
+
```tsx title="calendar.tsx"
|
|
45
|
+
import { createCalendar, iteratePlainDates, type CalendarVisibleRange } from "@moltenship/calendar";
|
|
46
|
+
import { useCallback, useMemo, useRef, useState } from "react";
|
|
47
|
+
|
|
48
|
+
import { createScrollingMonthView } from "@/components/calendar/scrolling-month-view/scrolling-month-view";
|
|
49
|
+
import {
|
|
50
|
+
createScrollingDayView,
|
|
51
|
+
createScrollingThreeDayView,
|
|
52
|
+
createScrollingWeekView,
|
|
53
|
+
} from "@/components/calendar/scrolling-time-grid-view/scrolling-time-grid-view";
|
|
54
|
+
|
|
55
|
+
import { eventAdapter, weekRules, type Meeting } from "./quick-start";
|
|
56
|
+
|
|
57
|
+
const getEventColor = (meeting: Meeting) => meeting.color;
|
|
58
|
+
|
|
59
|
+
export const Calendar = createCalendar<Meeting>()({
|
|
60
|
+
eventAdapter,
|
|
61
|
+
views: [
|
|
62
|
+
createScrollingWeekView<Meeting>({ dayView: "scrolling-day", getEventColor }),
|
|
63
|
+
createScrollingThreeDayView<Meeting>({ dayView: "scrolling-day", getEventColor }),
|
|
64
|
+
createScrollingDayView<Meeting>({ getEventColor }),
|
|
65
|
+
createScrollingMonthView<Meeting>({ dayView: "scrolling-day", getEventColor }),
|
|
66
|
+
],
|
|
67
|
+
});
|
|
68
|
+
```
|
|
69
|
+
|
|
70
|
+
The views are named `scrolling-week`, `scrolling-3-day`, `scrolling-day`, and `scrolling-month`,
|
|
71
|
+
and take the same options as their paged versions. `dayView` names the view a date opens; it
|
|
72
|
+
defaults to `"day"` in the month. For another number of days, define a view with
|
|
73
|
+
`scrollingTimeGridStrategy({ count, kind: "days" })` and `ScrollingTimeGridView`, as
|
|
74
|
+
`createScrollingThreeDayView` does; it swipes that many days at a time.
|
|
75
|
+
|
|
76
|
+
## How they move
|
|
77
|
+
|
|
78
|
+
| View | Shows | A swipe moves | Previous and Next | Today |
|
|
79
|
+
| ------------------ | --------------------------------------------------------------------------------------------------- | ------------- | ----------------- | ------------------------- |
|
|
80
|
+
| `scrolling-week` | The anchor's week, from `weekRules` | A week | A week | Today's week |
|
|
81
|
+
| `scrolling-3-day` | Three days from the anchor date | Three days | Three days | Today in the first column |
|
|
82
|
+
| `scrolling-day` | The anchor date | A day | A day | Today |
|
|
83
|
+
| `scrolling-month` | Six weeks from the week of the 1st, or up to twelve with `createScrollingMonthView(options, weeks)` | A month | A month | Today's month |
|
|
84
|
+
| `scrolling-agenda` | Four weeks from the anchor date | Free, any day | Four weeks | Today on top |
|
|
85
|
+
|
|
86
|
+
The anchor date is the scroll position. A swipe follows your finger and comes to rest on the
|
|
87
|
+
next page, or back on this one if it went less than halfway; a fling moves one page. When a
|
|
88
|
+
scroll comes to rest, the view sets `anchorDate` to what it shows, so `Calendar.Title`, `onAnchorDateChange`, and a URL that stores the date follow the
|
|
89
|
+
scroll. During a long swipe the anchor follows every half page. When the anchor changes any other
|
|
90
|
+
way, from Today, Next, or your own `setAnchorDate`, the view scrolls there: smoothly over a page or
|
|
91
|
+
two, and at once from further away, from the keyboard, or when the system asks for reduced motion.
|
|
92
|
+
With a controlled `anchorDate`, the view stays where it was scrolled until your state takes the
|
|
93
|
+
latest date `onAnchorDateChange` sent, even a few renders later; any other `anchorDate` moves the
|
|
94
|
+
view to it. If you defer the update, commit the latest date rather than each one in turn.
|
|
95
|
+
|
|
96
|
+
The month shows the anchor's month as the paged month does: six weeks from the one that holds its
|
|
97
|
+
first day, which every month fits, with the days of other months dimmed. A swipe comes to rest on
|
|
98
|
+
the next month with its first week on top, four or five weeks on, so the distance varies.
|
|
99
|
+
|
|
100
|
+
> Live example of the `scrolling-month` view: see it at https://time.molten.sh/docs/react/views/scrolling
|
|
101
|
+
|
|
102
|
+
## Loading events as you scroll
|
|
103
|
+
|
|
104
|
+
Each scrolling view renders a page of days or weeks on either side of what it shows, with their
|
|
105
|
+
events, so a swipe never reveals an empty page. Its strategy reports those dates as its
|
|
106
|
+
**load range**, and `onVisibleRangeChange` on `Root` hands them to you: after the first render, and
|
|
107
|
+
whenever the view, its dates, or the time zone change, but not when only `events` do.
|
|
108
|
+
|
|
109
|
+
Fetch events for `loadRange` and pass them in `events`. The next page is then loaded before it
|
|
110
|
+
scrolls into view:
|
|
111
|
+
|
|
112
|
+
```tsx title="scrolling-calendar.tsx"
|
|
113
|
+
const timeZone = "Europe/Berlin";
|
|
114
|
+
|
|
115
|
+
/** Fetches meetings for the dates the view needs, each date once, and keeps what arrived. */
|
|
116
|
+
export function ScrollingCalendar({
|
|
117
|
+
loadMeetings,
|
|
118
|
+
}: {
|
|
119
|
+
readonly loadMeetings: (from: Temporal.Instant, to: Temporal.Instant) => Promise<Meeting[]>;
|
|
120
|
+
}) {
|
|
121
|
+
const [loaded, setLoaded] = useState<ReadonlyMap<string, Meeting>>(new Map());
|
|
122
|
+
const requested = useRef(new Set<string>());
|
|
123
|
+
const meetings = useMemo(() => [...loaded.values()], [loaded]);
|
|
124
|
+
|
|
125
|
+
const load = useCallback(
|
|
126
|
+
({ loadRange }: CalendarVisibleRange) => {
|
|
127
|
+
const missing = [...iteratePlainDates(loadRange)].filter(
|
|
128
|
+
(date) => !requested.current.has(date.toString()),
|
|
129
|
+
);
|
|
130
|
+
if (missing.length === 0) return;
|
|
131
|
+
for (const date of missing) requested.current.add(date.toString());
|
|
132
|
+
const from = missing[0]!.toZonedDateTime(timeZone).toInstant();
|
|
133
|
+
const to = missing.at(-1)!.add({ days: 1 }).toZonedDateTime(timeZone).toInstant();
|
|
134
|
+
void loadMeetings(from, to).then((arrived) =>
|
|
135
|
+
setLoaded((current) => new Map([...current, ...arrived.map((m) => [m.id, m] as const)])),
|
|
136
|
+
);
|
|
137
|
+
},
|
|
138
|
+
[loadMeetings],
|
|
139
|
+
);
|
|
140
|
+
|
|
141
|
+
return (
|
|
142
|
+
<Calendar.Root
|
|
143
|
+
events={meetings}
|
|
144
|
+
defaultAnchorDate={Temporal.Now.plainDateISO(timeZone)}
|
|
145
|
+
onVisibleRangeChange={load}
|
|
146
|
+
timeZone={timeZone}
|
|
147
|
+
locale="en-US"
|
|
148
|
+
weekRules={weekRules}
|
|
149
|
+
>
|
|
150
|
+
<Calendar.ActiveView />
|
|
151
|
+
</Calendar.Root>
|
|
152
|
+
);
|
|
153
|
+
}
|
|
154
|
+
```
|
|
155
|
+
|
|
156
|
+
| Field | Contents |
|
|
157
|
+
| ------------------ | ------------------------------------------------------------ |
|
|
158
|
+
| `view` | The active view's name |
|
|
159
|
+
| `range` | The visible dates |
|
|
160
|
+
| `instantRange` | `range` as instants in the calendar's time zone |
|
|
161
|
+
| `loadRange` | The dates to have events for: `range` and a page either side |
|
|
162
|
+
| `loadInstantRange` | `loadRange` as instants, ready to send to an API |
|
|
163
|
+
|
|
164
|
+
Paged views report too: their `loadRange` is the visible `range`. Time still never fetches or keeps
|
|
165
|
+
events itself; keep what you've loaded in your own state. To load them with TanStack Query, see
|
|
166
|
+
[Load events with TanStack Query](../guides/tanstack-query.md).
|
|
167
|
+
|
|
168
|
+
## Keyboard
|
|
169
|
+
|
|
170
|
+
The keys work as in the [week and day](./week-and-day.md#keyboard) and
|
|
171
|
+
[month](./month.md) views, over the dates on screen. Moving past the last visible day, or
|
|
172
|
+
pressing Page Down, scrolls a whole page. Days and weeks rendered around the visible ones are hidden
|
|
173
|
+
from screen readers, so the grid reads as one week, one day, or six weeks.
|
|
174
|
+
|
|
175
|
+
## Dragging
|
|
176
|
+
|
|
177
|
+
Drag, resize, and create work as in the paged views. Dragging toward an edge keeps scrolling into
|
|
178
|
+
the days or weeks beyond, rendering them as it goes. The week and day views stop snapping while a
|
|
179
|
+
gesture is under way, and come to rest on the nearest page when you let go. The `dragPreview`
|
|
180
|
+
option picks [snapped or free drags](../interactions.md#snapped-and-free-drags) here too.
|
|
181
|
+
|
|
182
|
+
## How it's built
|
|
183
|
+
|
|
184
|
+
`useScrollingAxis` in `registry/calendar/scrolling-axis.tsx` places days, or weeks, on an axis
|
|
185
|
+
thousands of items long, and the view renders only the items near its load range. The header,
|
|
186
|
+
all-day row, and hour gutter are sticky in the same scrolling element, so they never lag behind the
|
|
187
|
+
days. The gutter's [secondary time zones](./week-and-day.md#secondary-time-zones) follow the
|
|
188
|
+
first visible day on which neither zone changes its clocks. Scroll positions are never React
|
|
189
|
+
state: the view renders again only when the anchor moves.
|
|
190
|
+
|
|
191
|
+
Server markup puts the visible dates at the start of the axis, so the page shows them before
|
|
192
|
+
scripts run. Once laid out, the axis extends before them and the scroll position follows, before
|
|
193
|
+
the browser paints. In right-to-left layouts, pass `direction="rtl"` to `Root`.
|