@metasession.co/devaudit-sdlc 0.3.33 → 0.3.35

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@metasession.co/devaudit-sdlc",
3
- "version": "0.3.33",
3
+ "version": "0.3.35",
4
4
  "description": "DevAudit SDLC CLI Engine — cross-agent terminal-driven SDLC orchestrator.",
5
5
  "bin": {
6
6
  "devaudit-sdlc": "./src/bin/devaudit-sdlc.js"
@@ -414,7 +414,7 @@ EOF
414
414
 
415
415
  ### Step 9: Update the Software Requirements Specification (If Applicable)
416
416
 
417
- If the requirement adds, changes, or removes **observable behaviour**, update the project's Software Requirements Specification (`docs/SRS.md`) — or `docs/REQUIREMENTS.md` if the project has not adopted the SRS — to reflect the intended change. The SRS is the MoSCoW-prioritised, Given/When/Then source that developers and the `e2e-test-engineer` skill derive tests from, so keeping it current is what carries the requirement through into test cases.
417
+ If the requirement adds, changes, or removes **observable behaviour**, update the project's Software Requirements Specification (`docs/SRS.md`) — or `docs/REQUIREMENTS.md` if the project has not adopted the SRS — to reflect the intended change. The SRS is the MoSCoW-prioritised, Given/When/Then source that developers and the `e2e-test-engineer` skill derive tests from, so keeping it current is what carries the requirement through into test cases. This isn't a manual-only step: the `requirements-aligner` skill fuzzy-matches this plan's AC table against `docs/SRS.md` and proposes new `REQ-AREA-NNN` stubs or flags drift — the operator edits its proposals into final prose rather than authoring from a blank page.
418
418
 
419
419
  Only act if the document exists; do not introduce an SRS on a project that has not adopted one.
420
420
 
@@ -123,6 +123,8 @@ All must pass. Evidence must reflect a green suite.
123
123
 
124
124
  After confirming all gates pass, generate the test execution summary. This documents what ran, the results, and maps back to the test plan.
125
125
 
126
+ **This file will be authored before the integration PR exists, so it will necessarily say things like `"CI Run: local"` or reference gates as not-yet-run-in-CI at this point — that's expected here.** It is not expected to still say that once the release PR (develop→main) opens. Before that PR merges, come back and replace any `[run ID or "local"]` placeholder with the real CI workflow run link, and update the closing assessment so it reflects what actually happened — not the pre-PR draft state. `validate-test-summary.sh` enforces this at the release-PR gate and will fail the PR on placeholder language like `"not yet a CI run"`, `"CI run: not yet available"`, or `"Production promotion remains blocked"` surviving that far (devaudit-installer#607) — the file that ships as this REQ's ISO 29119-3 §3.5.6 Test Completion Report must reflect the release that actually happened.
127
+
126
128
  ```bash
127
129
  cat > compliance/evidence/REQ-XXX/test-execution-summary.md << 'EOF'
128
130
  # Test Execution Summary — REQ-XXX