@etm-professional-control/winccoa-mcp-server 1.4.0 → 1.5.1

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (76) hide show
  1. package/.env.example +6 -2
  2. package/LEGAL_INFO.md +47 -0
  3. package/LICENSE.md +21 -0
  4. package/OSS.md +178 -0
  5. package/README.md +57 -6
  6. package/build/config/demo-project-instructions.md +28 -0
  7. package/build/config/server.config.d.ts +16 -1
  8. package/build/config/server.config.d.ts.map +1 -1
  9. package/build/config/server.config.js +60 -10
  10. package/build/config/server.config.js.map +1 -1
  11. package/build/fields/default.md +50 -0
  12. package/build/fields/oil.md +46 -0
  13. package/build/fields/transport.md +70 -0
  14. package/build/helpers/icons/IX_ICONS_LIST.txt +1407 -0
  15. package/build/helpers/icons/IconGenerator.d.ts +54 -3
  16. package/build/helpers/icons/IconGenerator.d.ts.map +1 -1
  17. package/build/helpers/icons/IconGenerator.js +104 -22
  18. package/build/helpers/icons/IconGenerator.js.map +1 -1
  19. package/build/helpers/icons/IconList.d.ts +17 -2
  20. package/build/helpers/icons/IconList.d.ts.map +1 -1
  21. package/build/helpers/icons/IconList.js +41 -19
  22. package/build/helpers/icons/IconList.js.map +1 -1
  23. package/build/helpers/pmon/PmonClient.d.ts.map +1 -1
  24. package/build/helpers/pmon/PmonClient.js +53 -27
  25. package/build/helpers/pmon/PmonClient.js.map +1 -1
  26. package/build/index_http.d.ts +14 -1
  27. package/build/index_http.d.ts.map +1 -1
  28. package/build/index_http.js +122 -45
  29. package/build/index_http.js.map +1 -1
  30. package/build/server.d.ts +37 -3
  31. package/build/server.d.ts.map +1 -1
  32. package/build/server.js +173 -122
  33. package/build/server.js.map +1 -1
  34. package/build/systemprompt.md +50 -0
  35. package/build/tool_loader.d.ts +21 -1
  36. package/build/tool_loader.d.ts.map +1 -1
  37. package/build/tool_loader.js +65 -10
  38. package/build/tool_loader.js.map +1 -1
  39. package/build/tools/archive/archive_query.d.ts.map +1 -1
  40. package/build/tools/archive/archive_query.js +2 -5
  41. package/build/tools/archive/archive_query.js.map +1 -1
  42. package/build/tools/common/common_query.d.ts.map +1 -1
  43. package/build/tools/common/common_query.js +51 -37
  44. package/build/tools/common/common_query.js.map +1 -1
  45. package/build/tools/dashboards/widget.d.ts.map +1 -1
  46. package/build/tools/dashboards/widget.js +12 -2
  47. package/build/tools/dashboards/widget.js.map +1 -1
  48. package/build/tools/datapoints/dp_basic.d.ts.map +1 -1
  49. package/build/tools/datapoints/dp_basic.js +106 -34
  50. package/build/tools/datapoints/dp_basic.js.map +1 -1
  51. package/build/tools/datapoints/dp_types.d.ts.map +1 -1
  52. package/build/tools/datapoints/dp_types.js +31 -10
  53. package/build/tools/datapoints/dp_types.js.map +1 -1
  54. package/build/tools/icons/icon.d.ts.map +1 -1
  55. package/build/tools/icons/icon.js +52 -7
  56. package/build/tools/icons/icon.js.map +1 -1
  57. package/build/tools/pv_range/pv_range_query.d.ts +12 -0
  58. package/build/tools/pv_range/pv_range_query.d.ts.map +1 -1
  59. package/build/tools/pv_range/pv_range_query.js +63 -31
  60. package/build/tools/pv_range/pv_range_query.js.map +1 -1
  61. package/build/utils/helpers.d.ts +56 -4
  62. package/build/utils/helpers.d.ts.map +1 -1
  63. package/build/utils/helpers.js +144 -14
  64. package/build/utils/helpers.js.map +1 -1
  65. package/build/utils/logger.d.ts +29 -0
  66. package/build/utils/logger.d.ts.map +1 -0
  67. package/build/utils/logger.js +56 -0
  68. package/build/utils/logger.js.map +1 -0
  69. package/build/utils/projectPath.d.ts +52 -0
  70. package/build/utils/projectPath.d.ts.map +1 -0
  71. package/build/utils/projectPath.js +102 -0
  72. package/build/utils/projectPath.js.map +1 -0
  73. package/manifest.cjs +50 -0
  74. package/package.json +84 -71
  75. package/postinstall.cjs +10 -4
  76. package/sbom.json +5500 -0
@@ -0,0 +1,46 @@
1
+ # Oil & Gas Industry Instructions
2
+
3
+ ## Overview
4
+ This configuration applies to WinCC OA systems used in Oil & Gas production, refining, and distribution facilities.
5
+
6
+ ## Safety Requirements
7
+ - **CRITICAL**: Never modify safety-critical datapoints without explicit authorization
8
+ - All changes to production systems require validation and confirmation
9
+ - Emergency shutdown systems are strictly read-only
10
+ - Interlock conditions must be verified before any process modifications
11
+
12
+ ## Operational Limits
13
+ - **Flow rates**: 0-1000 m³/h (validate against pipe capacity)
14
+ - **Pressure**: Maximum 100 bar (safety valve at 110 bar)
15
+ - **Temperature**: -20°C to +80°C operational range
16
+ - **Valve positions**: 0-100% (check for intermediate restrictions)
17
+
18
+ ## Process Control Rules
19
+ 1. **Before changing flow rates**:
20
+ - Verify upstream and downstream pressures
21
+ - Check valve positions in the flow path
22
+ - Confirm tank levels are within limits
23
+
24
+ 2. **Recipe Management**:
25
+ - Recipe percentages represent VALVE POSITIONS, not volume percentages
26
+ - Material consumption = (valve_position/100) × flow_rate × time
27
+ - Always validate total consumption against target volume
28
+
29
+ 3. **Cascade Control**:
30
+ - Changes to master controllers affect all slaves
31
+ - Verify slave controller limits before modifying master setpoints
32
+
33
+ ## Alarm Management
34
+ - Critical alarms (Priority 1-2) require immediate operator attention
35
+ - Do not suppress alarms without proper authorization
36
+ - Alarm limits should only be modified through approved change management
37
+
38
+ ## Integration Points
39
+ - OPC UA nodes under `ns=2;s=Production/*` are production critical
40
+ - Modbus registers 40001-40100 contain safety interlocks
41
+ - SQL historian updates every 10 seconds for trending data
42
+
43
+ ## Compliance Notes
44
+ - All changes are logged for regulatory compliance
45
+ - Maintain audit trail for production setpoint modifications
46
+ - Environmental limits must be respected at all times
@@ -0,0 +1,70 @@
1
+ # Transportation Systems Instructions
2
+
3
+ ## Overview
4
+ This configuration applies to WinCC OA systems used in transportation infrastructure including rail, traffic management, and logistics systems.
5
+
6
+ ## Safety Critical Systems
7
+ - **Emergency Stop Systems**: Absolutely read-only, no modifications allowed
8
+ - **Signal Interlocking**: Changes must respect interlocking logic
9
+ - **Track Switching**: Requires coordination with dispatch systems
10
+ - **Platform Safety**: Door and barrier systems have strict sequencing
11
+
12
+ ## Traffic Signal Management
13
+ - Signal states must follow proper sequencing (RED → RED+YELLOW → GREEN → YELLOW → RED)
14
+ - Pedestrian crossings have priority during their active phase
15
+ - Conflicting movements must be interlocked
16
+ - Emergency vehicle preemption overrides normal operation
17
+
18
+ ## Operational Rules
19
+
20
+ ### Rail Systems
21
+ 1. **Track Switching**:
22
+ - Verify no train in section before switching
23
+ - Check signal aspects match intended route
24
+ - Confirm switch position feedback
25
+
26
+ 2. **Signal Control**:
27
+ - Maintain safe braking distances
28
+ - Respect block occupancy
29
+ - Follow fail-safe principles (default to stop)
30
+
31
+ ### Traffic Management
32
+ 1. **Intersection Control**:
33
+ - Minimum green times must be respected
34
+ - Yellow phase duration based on approach speed
35
+ - All-red clearance intervals are mandatory
36
+
37
+ 2. **Adaptive Control**:
38
+ - Queue detectors influence timing
39
+ - Bus/tram priority requires validation
40
+ - Network coordination maintains green waves
41
+
42
+ ## Communication Systems
43
+ - CCTV systems are monitor-only unless specifically designated
44
+ - Variable message signs require approved messages
45
+ - PA systems have zone-based authorization
46
+
47
+ ## Scheduling Integration
48
+ - Timetable systems are authoritative for planned movements
49
+ - Real-time adjustments must consider knock-on effects
50
+ - Passenger information systems update automatically
51
+
52
+ ## Data Recording
53
+ - All control actions are logged with timestamp and operator
54
+ - Video recording retention follows legal requirements
55
+ - Incident data preserved for investigation
56
+
57
+ ## Maintenance Mode
58
+ - Maintenance overrides require special authorization
59
+ - Test modes must not affect live operations
60
+ - Return to normal operation requires verification
61
+
62
+ ## Environmental Considerations
63
+ - Weather stations may trigger speed restrictions
64
+ - Ice/snow detection affects signal timing
65
+ - Wind sensors can close bridges/tunnels
66
+
67
+ ## Integration Protocols
68
+ - IEC 61850 for substation automation
69
+ - NTCIP for traffic devices
70
+ - RaSTA for safety-critical rail communication