@critical-path/server 0.31.0 → 0.32.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,21 @@
1
1
  # @critical-path/server
2
2
 
3
+ ## 0.32.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 5dbf25b: Effort and progress roll-ups agree, count subtasks once and leave canceled work out.
8
+
9
+ - New `getTaskEstimateHours(task)` is the one place that reads an estimate (0 for milestones; an explicit 0 counts). Critical path analysis, workload, the ladder, metrics/EVM and deliverable summaries all use it, along with `getSummaryTaskIds` / `getLeafTasks`.
10
+ - **BREAKING:** a task with subtasks is a summary task. Critical path analysis schedules only leaf tasks: dependencies and deadlines on a summary apply to every leaf under it, and the summary is reported as a roll-up (`isSummary: true`; not in `criticalTaskIds`). Workload, the ladder and deliverable summaries count effort from leaves only, so an epic's estimate no longer doubles its subtasks'.
11
+ - **BREAKING:** canceled tasks leave estimate totals and progress denominators in the ladder and deliverable summaries (their logged hours still count), so a project can reach 100% and `completed`. Canceled tasks have zero planned and earned value in EVM. The ladder and deliverable summaries use inferred progress (`inferTaskProgress`) like task metrics.
12
+ - Unestimated tasks are listed in `unestimatedTaskIds`, and the hours assumed for them are configurable: `defaultEstimateHours` per call (`?defaultEstimateHours=` over HTTP, client and MCP options) or `criticalPathDefaultEstimateHours` on the engine. Default 1, as before.
13
+
14
+ ### Patch Changes
15
+
16
+ - Updated dependencies [5dbf25b]
17
+ - @critical-path/core@0.55.0
18
+
3
19
  ## 0.31.0
4
20
 
5
21
  ### Minor Changes
package/dist/router.js CHANGED
@@ -911,6 +911,11 @@ function criticalPathQuery(url) {
911
911
  }
912
912
  const levelingPriority = (url.searchParams.get('levelingPriority') || undefined);
913
913
  const effort = (url.searchParams.get('effort') || undefined);
914
- return { calendars, ...(level !== null ? { levelResources: level === 'true' } : {}), levelingPriority, effort };
914
+ const defaultEstimate = url.searchParams.get('defaultEstimateHours');
915
+ const defaultEstimateHours = defaultEstimate !== null ? Number(defaultEstimate) : undefined;
916
+ if (defaultEstimate !== null && (defaultEstimate.trim() === '' || !(Number.isFinite(defaultEstimateHours) && defaultEstimateHours >= 0))) {
917
+ throw new ValidationError('defaultEstimateHours must be a number of hours, 0 or more.');
918
+ }
919
+ return { calendars, ...(level !== null ? { levelResources: level === 'true' } : {}), levelingPriority, effort, defaultEstimateHours };
915
920
  }
916
921
  //# sourceMappingURL=router.js.map
@@ -1 +1 @@
1
- {"version":3,"file":"router.js","sourceRoot":"","sources":["../src/router.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,kBAAkB,EAAE,eAAe,EAAqF,MAAM,qBAAqB,CAAC;AAC7J,OAAO,KAAK,OAAO,MAAM,6BAA6B,CAAC;AACvD,OAAO,EAAE,oBAAoB,EAAE,MAAM,EAAE,MAAM,cAAc,CAAC;AAE5D,oFAAoF;AACpF,MAAM,CAAC,MAAM,eAAe,GAAG,MAAM,CAAC,MAAM,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE,MAAe,EAAE,CAAC,CAAC;AAEzH,MAAM,kBAAkB,GAAG,wCAAwC,CAAC;AACpE,MAAM,0BAA0B,GAAG,CAAC,cAAc,EAAE,eAAe,CAAC,CAAC;AAiCrE,MAAM,yBAA0B,SAAQ,KAAK;IAC3C;QACE,KAAK,CAAC,+DAA+D,CAAC,CAAC;QACvE,IAAI,CAAC,IAAI,GAAG,2BAA2B,CAAC;IAC1C,CAAC;CACF;AAED,oEAAoE;AACpE,MAAM,aAAa,GAA4C;IAC7D,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE;IACxC,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uCAAuC,EAAE;IAChE,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6CAA6C,EAAE;IACtE,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE;IAChD,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,qCAAqC,EAAE;CAC/D,CAAC;AAEF,MAAM,eAAe,GAAG,CAAC,GAAG,MAAM,EAAE,GAAG,aAAa,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;IAChE,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,WAAW,EAAE;IAC9B,OAAO,EAAE,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC;CAC3C,CAAC,CAAC,CAAC;AAEJ;;;GAGG;AACH,SAAS,cAAc,CAAC,QAAkB;IACxC,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;IAClC,KAAK,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,eAAe,EAAE,CAAC;QAClD,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM;YAAE,SAAS;QACjD,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,IAAI,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,CAAC;YAAE,SAAS;QACxF,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;QACpB,IAAI,MAAM,KAAK,OAAO;YAAE,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC;IAC7C,CAAC;IACD,OAAO,OAAO,CAAC;AACjB,CAAC;AAED,MAAM,oBAAqB,SAAQ,KAAK;IACtC,YAAY,KAAa;QACvB,KAAK,CAAC,wBAAwB,KAAK,SAAS,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI,GAAG,sBAAsB,CAAC;IACrC,CAAC;CACF;AAED,MAAM,eAAgB,SAAQ,KAAK;IACjC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,iBAAiB,CAAC;IAChC,CAAC;CACF;AAwCD,SAAS,aAAa;IACpB,OAAQ,UAAkB,CAAC,OAAO,EAAE,GAAG,EAAE,QAAQ,KAAK,aAAa,CAAC;AACtE,CAAC;AAED,MAAM,OAAO,kBAAkB;IACtB,MAAM,CAAqB;IACjB,OAAO,CAAwC;IAC/C,YAAY,CAAU;IACtB,UAAU,CAA2C;IACrD,WAAW,CAAU;IACrB,YAAY,CAAS;IACrB,QAAQ,CAAU;IAClB,IAAI,CAAsB;IAE3C,YAAY,cAAwD,EAAE,UAAqC,EAAE;QAC3G,IAAI,cAAc,YAAY,kBAAkB,EAAE,CAAC;YACjD,IAAI,CAAC,MAAM,GAAG,cAAc,CAAC;QAC/B,CAAC;aAAM,CAAC;YACN,IAAI,CAAC,MAAM,GAAG,IAAI,kBAAkB,CAAC,cAAc,CAAC,CAAC;QACvD,CAAC;QACD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC;QAC/B,IAAI,CAAC,YAAY,GAAG,OAAO,CAAC,YAAY,IAAI,aAAa,EAAE,CAAC;QAC5D,IAAI,CAAC,UAAU,GAAG,OAAO,CAAC,UAAU,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,WAAW,IAAI,KAAK,CAAC;QAChD,IAAI,CAAC,YAAY,GAAG,OAAO,CAAC,YAAY,IAAI,EAAE,GAAG,IAAI,GAAG,IAAI,CAAC;QAC7D,IAAI,CAAC,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,GAAG,GAAG,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAC,YAAY,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAChG,IAAI,CAAC,IAAI,GAAG,OAAO,CAAC,IAAI,IAAI,KAAK,CAAC;QAClC,IAAI,IAAI,CAAC,IAAI,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACpE,MAAM,IAAI,KAAK,CAAC,yFAAyF,CAAC,CAAC;QAC7G,CAAC;IACH,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,aAAa,CAAC,OAAgB,EAAE,OAA2B,EAAE;QACjE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,IAAI,CAAC,CAAC;QACpD,OAAO,IAAI,CAAC,SAAS,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;IAC3C,CAAC;IAED,gGAAgG;IACxF,cAAc,CAAC,QAAgB;QACrC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,IAAI,QAAQ,KAAK,IAAI,CAAC,QAAQ,IAAI,CAAC,QAAQ,CAAC,UAAU,CAAC,IAAI,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAAE,OAAO,IAAI,CAAC;YACzF,OAAO,QAAQ,CAAC,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QAClE,CAAC;QACD,+DAA+D;QAC/D,OAAO,QAAQ,CAAC,OAAO,CAAC,wBAAwB,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IAC5E,CAAC;IAEO,SAAS,CAAC,OAAgB,EAAE,QAAkB;QACpD,IAAI,CAAC,IAAI,CAAC,IAAI;YAAE,OAAO,QAAQ,CAAC;QAEhC,MAAM,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC7C,IAAI,WAA+B,CAAC;QACpC,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG,EAAE,CAAC;YAC9B,WAAW,GAAG,GAAG,CAAC;QACpB,CAAC;aAAM,IAAI,MAAM,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC;YACxD,WAAW,GAAG,MAAM,CAAC;QACvB,CAAC;QAED,yFAAyF;QACzF,MAAM,MAAM,GAAG,IAAI,QAAQ,CAAC,QAAQ,CAAC,IAAI,EAAE,QAAQ,CAAC,CAAC;QACrD,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG;YAAE,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;QACvE,IAAI,CAAC,WAAW;YAAE,OAAO,MAAM,CAAC;QAEhC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,EAAE,WAAW,CAAC,CAAC;QAC/D,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,EAAE,kBAAkB,CAAC,CAAC;QACvE,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,YAAY,IAAI,0BAA0B,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC;QACtH,IAAI,IAAI,CAAC,IAAI,CAAC,WAAW;YAAE,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,EAAE,MAAM,CAAC,CAAC;QAC1F,IAAI,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,SAAS,IAAI,IAAI,CAAC,IAAI,CAAC,MAAM,KAAK,SAAS,EAAE,CAAC;YACjF,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,EAAE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,KAAK,CAAC,QAAQ,CAAC,OAAgB,EAAE,IAAwB;QAC/D,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,GAAG,CAAC,QAAQ,CAAC;QAC9B,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,CAAC;QAE5C,MAAM,OAAO,GAAG,IAAI,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC9C,IAAI,OAAO,KAAK,IAAI,EAAE,CAAC;YACrB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;QACrF,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;QAEpD,uFAAuF;QACvF,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;YACzB,OAAO,IAAI,QAAQ,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC7C,CAAC;QAED,IAAI,OAA0C,CAAC;QAC/C,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,IAAI,CAAC,UAAU,IAAI,IAAI,CAAC,UAAU,CAAC;YACnD,OAAO,GAAG,OAAO,CAAC,CAAC,CAAC,MAAM,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACzD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,IAAI,CAAC,aAAa,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;QAC1C,CAAC;QACD,IAAI,IAAI,CAAC,WAAW,IAAI,CAAC,OAAO,EAAE,MAAM,EAAE,CAAC;YACzC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,yBAAyB,EAAE,EAAE,GAAG,CAAC,CAAC;QACtE,CAAC;QACD,iFAAiF;QACjF,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,SAAS,CAClC,OAAO,EAAE,MAAM;YACb,CAAC,CAAC;gBACE,MAAM,EAAE,OAAO,CAAC,MAAM;gBACtB,QAAQ,EAAE,OAAO,CAAC,QAAQ;gBAC1B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,QAAQ,EAAE,OAAO,CAAC,QAAQ;gBAC1B,KAAK,EAAE,OAAO,CAAC,KAAK;aACrB;YACH,CAAC,CAAC,EAAE,GAAG,eAAe,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,CACxD,CAAC;QAEF,IAAI,CAAC;YACH,sEAAsE;YACtE,MAAM,IAAI,CAAC,MAAM,CAAC,KAAK,CAAC;YACxB,MAAM,aAAa,GAAG,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,IAAI,SAAS,EAAE,GAAG,EAAE,CAAC;YACrE,MAAM,MAAM,GAAG,KAAK,IAAuB,EAAE;gBAC3C,MAAM,OAAO,GAAG,IAAI,CAAC,gBAAgB,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;gBACxD,IAAI,OAAO;oBAAE,OAAO,OAAO,CAAC,KAAK,CAAC,OAAO,CAAC,OAAO,EAAE,EAAE,GAAG,aAAa,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,CAAC,CAAC;gBACjG,OAAO,IAAI,CAAC,aAAa,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC;YACpG,CAAC,CAAC;YACF,4FAA4F;YAC5F,MAAM,KAAK,GAAG,IAAI,CAAC,MAAM,CAAC,OAAO;iBAC9B,aAAa,EAAE;iBACf,WAAW,CACV,CAAC,IAAI,EAAE,UAAU,EAAE,EAAE,CAAC,KAAK,IAAI,EAAE,CAAC,UAAU,CAAC,OAAO,EAAE,aAAa,EAAE,IAAI,CAAC,EAC1E,MAAM,CACP,CAAC;YACJ,OAAO,MAAM,KAAK,EAAE,CAAC;QACvB,CAAC;QAAC,OAAO,GAAY,EAAE,CAAC;YACtB,OAAO,IAAI,CAAC,aAAa,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAEO,gBAAgB,CACtB,MAAc,EACd,QAAkB;QAElB,KAAK,MAAM,KAAK,IAAI,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC;YACpD,IAAI,KAAK,CAAC,MAAM,KAAK,MAAM,IAAI,CAAC,CAAC,KAAK,CAAC,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,CAAC;gBAAE,SAAS;YACzF,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;YACtD,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM;gBAAE,SAAS;YACjD,MAAM,MAAM,GAA2B,EAAE,CAAC;YAC1C,MAAM,OAAO,GAAG,OAAO,CAAC,KAAK,CAAC,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE;gBACxC,IAAI,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC;oBACzB,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,GAAG,kBAAkB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;oBACxD,OAAO,IAAI,CAAC;gBACd,CAAC;gBACD,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,CAAC,CAAC,CAAC;YACH,IAAI,OAAO;gBAAE,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;QACxC,CAAC;QACD,OAAO,IAAI,CAAC;IACd,CAAC;IAEO,KAAK,CAAC,aAAa,CACzB,OAAgB,EAChB,EAAE,GAAG,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAQ1D;QAED,kFAAkF;QAClF,gFAAgF;QAChF,MAAM,OAAO,GAAG,cAAc,CAAC,QAAQ,CAAC,CAAC;QACzC,IAAI,OAAO,CAAC,IAAI,KAAK,CAAC;YAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;QAC3G,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,UAAU,MAAM,oBAAoB,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;YACnG,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,OAAO,EAAE,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC;YAC9D,OAAO,QAAQ,CAAC;QAClB,CAAC;QAED,+DAA+D;QAC/D,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,IAAI,QAAQ,CAAC,MAAM,KAAK,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;YAChF,OAAO,IAAI,CAAC,YAAY,CAAC,oBAAoB,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,gBAAgB,CAAC,GAAG,EAAE,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC;QACrG,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,MAAM,MAAM,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC;gBACrE,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;oBAC7D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,MAAM,EAAE,EAAE,GAAG,CAAC,CAAC;gBACrD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,gBAAgB;QAChB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,WAAW,EAAE,CAAC;YAChC,MAAM,UAAU,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC/B,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;oBACxE,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,IAAI,CAAC,CAAC;oBACnD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,UAAU,CAAC,CAAC;oBACtD,IAAI,CAAC,QAAQ;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;oBACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,UAAU,EAAE,IAAI,CAAC,CAAC;oBAC9D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC7E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;gBAClD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,CAAC;oBACxD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;oBAC5C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;oBACjD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,eAAe,EAAE,CAAC;gBAC3C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,iBAAiB,CAAC,GAAG,CAAC,CAAC,CAAC;oBACvF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,QAAQ,IAAI,WAAW,KAAK,iBAAiB,EAAE,CAAC;gBACzE,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,iBAAiB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;oBACpG,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,SAAS,EAAE,KAAK,CAAC,CAAC;oBAChE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;gBACvC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,UAAU,IAAI,WAAW,KAAK,uBAAuB,EAAE,CAAC;gBACjF,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,mBAAmB,CAAC,IAAI,CAAC,EAAE,SAAS,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;oBAChI,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE,KAAK,CAAC,CAAC;oBACxE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,EAAE,aAAa,EAAE,GAAG,OAAO,EAAE,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBAChG,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,OAAO,EAAE,EAAE,aAAa,EAAE,CAAC,CAAC;oBAClF,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,8EAA8E;QAC9E,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,OAAO,EAAE,CAAC;YAC5B,MAAM,MAAM,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC3B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAEhC,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,mBAAmB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;oBACtG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;oBAC5C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC,CAAC;gBAC/E,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC3C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,UAAU,EAAE,CAAC;gBACtC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;oBAClD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;oBACnF,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,aAAa,EAAE,CAAC;gBACzC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;oBAC5D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;oBACtF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;oBACvD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,cAAc,IAAI,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC;gBACzD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,mEAAmE;oBACnE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;oBACjE,MAAM,OAAO,GAAG,UAAU,IAAI,CAAC,UAAU,CAAC,MAAM,KAAK,MAAM,IAAI,UAAU,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC;oBACtG,IAAI,CAAC,OAAO,IAAI,CAAC,CAAC,MAAM,MAAM,CAAC,gBAAgB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;wBAC9D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACxD,CAAC;oBACD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,cAAc,EAAE,CAAC;gBAC1C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;oBAC1D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;wBACrC,MAAM;wBACN,eAAe,EAAE,IAAI,CAAC,eAAe;wBACrC,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,UAAU;wBAC7B,GAAG,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,YAAY,EAAE,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;qBAClE,CAAC,CAAC;oBACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,GAAG,EAAE,EAAE,GAAG,CAAC,CAAC;gBACrD,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,OAAO,IAAI,WAAW,KAAK,WAAW,EAAE,CAAC;gBAClE,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,MAAM,CAAC,CAAC;oBACzD,IAAI,CAAC,KAAK;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACvE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,aAAa,IAAI,WAAW,KAAK,qBAAqB,EAAE,CAAC;gBAClF,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,MAAM,CAAC,CAAC;oBAC3E,MAAM,uBAAuB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,MAAM,CAAC,CAAC;oBACvF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,mBAAmB,EAAE,uBAAuB,EAAE,CAAC,CAAC;gBAC7E,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,QAAQ,EAAE,CAAC;gBACpC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;oBACtD,IAAI,CAAC,UAAU;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,SAAS,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;oBACpD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,kBAAkB,EAAE,CAAC;gBAC9C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;oBACpE,IAAI,CAAC,eAAe;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACjF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,eAAe,EAAE,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;oBAC1C,IAAI,CAAC,IAAI;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACtE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC;gBACrC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;gBAC9C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,QAAQ,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;oBAClD,IAAI,QAAQ,IAAI,QAAQ,KAAK,QAAQ,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;wBAC/D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uCAAuC,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpF,CAAC;oBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,QAAQ,EAAG,QAAuC,IAAI,QAAQ,EAAE,CAAC,CAAC;oBACpH,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,YAAY;QACZ,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,OAAO,EAAE,CAAC;YAC5B,MAAM,MAAM,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC3B,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,EAAE,CAAC;oBACtC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC3C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;oBAC1C,IAAI,CAAC,IAAI;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACtE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC;gBACrC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;gBAC9C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;oBAChD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,sBAAsB;QACtB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,WAAW,EAAE,CAAC;gBACjB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;oBACrD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC/C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,WAAW,CAAC,CAAC;oBACzD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,EAAE,IAAI,CAAC,CAAC;oBAChE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;gBACnD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,CAAC,CAAC;oBAC1D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mBAAmB;QACnB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,EAAE,CAAC;YACnC,MAAM,aAAa,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAClC,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;oBAC7D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,YAAY,EAAE,CAAC,CAAC;gBAC7C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;gBACjD,CAAC;YACH,CAAC;iBAAM,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,SAAS,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,aAAa,CAAC,CAAC;oBAClE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;oBAC/D,IAAI,CAAC,WAAW;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,aAAa,EAAE,IAAI,CAAC,CAAC;oBACpE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;gBACrD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,aAAa,CAAC,CAAC;oBAC9D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,iBAAiB;QACjB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,WAAW,EAAE,CAAC;gBACjB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;oBACrD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC/C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,WAAW,CAAC,CAAC;oBACzD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,EAAE,IAAI,CAAC,CAAC;oBAChE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;gBACnD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,CAAC,CAAC;oBAC1D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,iBAAiB;QACjB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,uBAAuB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;gBAC1G,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC;gBACjD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC,CAAC;YACpF,CAAC;QACH,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,SAAS,IAAI,WAAW,KAAK,WAAW,EAAE,CAAC;gBAC7C,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBACjE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,KAAK,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;oBAC5C,IAAI,CAAC,KAAK,EAAE,CAAC;wBACX,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mCAAmC,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,CAAC;oBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC;oBACzE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,CAAC,SAAS,EAAE,CAAC;gBACtB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;oBAC9C,IAAI,CAAC,MAAM;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,2BAA2B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACnF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;oBAClD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;gBACjD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,kBAAkB;QAClB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,aAAa,EAAE,CAAC;YAClC,MAAM,YAAY,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YACjC,IAAI,YAAY,KAAK,SAAS,EAAE,CAAC;gBAC/B,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,+BAA+B,CAAC,IAAI,CAAC,CAAC;oBACrE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,KAAK,QAAQ,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,IAAI,CAAC,CAAC;oBAC3D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,IAAI,CAAC,YAAY,EAAE,CAAC;gBACzB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAC;oBAC3D,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC,CAAC;oBAClF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;oBACvD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,CAAC,CAAC;oBAC5D,IAAI,CAAC,UAAU;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,sBAAsB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAClF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,YAAY,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,oBAAoB;QACpB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,EAAE,CAAC;YACnC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;gBAC9C,IAAI,CAAC,MAAM;oBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,2BAA2B,EAAE,EAAE,GAAG,CAAC,CAAC;gBACnF,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;gBACpD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;YACrD,CAAC;YACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,CAAC;gBACjE,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC;gBACzC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,KAAK,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,CAAC;QACH,CAAC;QAED,gCAAgC;QAChC,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,WAAW,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,eAAe,IAAI,QAAQ,CAAC,MAAM,KAAK,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;YAChH,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAE,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,IAAI,CAAC,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;YAC3G,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,mBAAmB,CAAC,CAAC;YACzD,IAAI,MAAM,KAAK,IAAI,IAAI,MAAM,KAAK,MAAM,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC/D,MAAM,IAAI,eAAe,CAAC,8CAA8C,CAAC,CAAC;YAC5E,CAAC;YACD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,8BAA8B,CAAC;gBAC5D,GAAG,iBAAiB,CAAC,GAAG,CAAC;gBACzB,UAAU,EAAE,IAAI,CAAC,YAAY,CAAC;gBAC9B,YAAY,EAAE,IAAI,CAAC,cAAc,CAAC;gBAClC,iBAAiB,EAAE,MAAM,KAAK,MAAM;aACrC,CAAC,CAAC;YACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;QAC1C,CAAC;QAED,0BAA0B;QAC1B,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,EAAE,SAAS,EAAE,GAAG,KAAK,EAAE,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,mBAAmB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;gBACxH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE,KAAK,CAAC,CAAC;gBACxE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;YACzC,CAAC;QACH,CAAC;QAED,+BAA+B;QAC/B,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,QAAQ,EAAE,CAAC;YAC7B,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;gBAC3E,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;gBACrC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,SAAS,EAAE,IAAI,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC1F,CAAC;QACH,CAAC;QAED,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;IACrF,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,QAAQ,CACpB,OAAgB,EAChB,MAAS,EACT,YAAqC,EAAE;QAEvC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;QACzC,MAAM,IAAI,GAAG,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC;QAC9E,OAAO,OAAO,CAAC,YAAY,CAAC,MAAa,EAAE,EAAE,GAAG,IAAI,EAAE,GAAG,SAAS,EAAE,CAAC,CAAC;IACxE,CAAC;IAED,mFAAmF;IAC3E,gBAAgB,CAAC,GAAQ,EAAE,OAAe;QAChD,MAAM,IAAI,GAAG,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,EAAE,GAAG,CAAC,QAAQ,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QAC7F,OAAO,GAAG,GAAG,CAAC,MAAM,GAAG,IAAI,EAAE,CAAC;IAChC,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,QAAQ,CAAC,OAAgB;QACrC,MAAM,QAAQ,GAAG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,gBAAgB,CAAC,CAAC,CAAC;QAC/D,IAAI,MAAM,CAAC,QAAQ,CAAC,QAAQ,CAAC,IAAI,QAAQ,GAAG,IAAI,CAAC,YAAY;YAAE,MAAM,IAAI,oBAAoB,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QAEjH,IAAI,IAAI,GAAG,EAAE,CAAC;QACd,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;YACjB,MAAM,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC,SAAS,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,IAAI,WAAW,EAAE,CAAC;YAClC,IAAI,QAAQ,GAAG,CAAC,CAAC;YACjB,SAAS,CAAC;gBACR,MAAM,EAAE,IAAI,EAAE,KAAK,EAAE,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;gBAC5C,IAAI,IAAI;oBAAE,MAAM;gBAChB,QAAQ,IAAI,KAAK,CAAC,UAAU,CAAC;gBAC7B,IAAI,QAAQ,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC;oBACjC,MAAM,MAAM,CAAC,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,oBAAoB,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;gBACpD,CAAC;gBACD,IAAI,IAAI,OAAO,CAAC,MAAM,CAAC,KAAK,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;YAClD,CAAC;YACD,IAAI,IAAI,OAAO,CAAC,MAAM,EAAE,CAAC;QAC3B,CAAC;QACD,MAAM,IAAI,GAAG,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,cAAc,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAC5F,IAAI,IAAI,CAAC,IAAI,EAAE,IAAI,IAAI,KAAK,kBAAkB,IAAI,CAAC,IAAI,CAAC,QAAQ,CAAC,OAAO,CAAC,EAAE,CAAC;YAC1E,MAAM,IAAI,yBAAyB,EAAE,CAAC;QACxC,CAAC;QACD,IAAI,CAAC;YACH,OAAO,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC;QAC1B,CAAC;QAAC,MAAM,CAAC;YACP,MAAM,IAAI,eAAe,CAAC,kCAAkC,CAAC,CAAC;QAChE,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,aAAa,CAAC,GAAY,EAAE,OAAgB;QACxD,MAAM,IAAI,GAAG,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,MAAM,IAAI,GAAG,CAAC,CAAC,CAAE,GAAa,CAAC,IAAI,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/F,MAAM,CAAC,GAAG,GAA0B,CAAC;QAErC,QAAQ,IAAI,EAAE,CAAC;YACb,KAAK,iBAAiB,CAAC;YACvB,KAAK,2BAA2B;gBAC9B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,iBAAiB;gBACpB,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YAC1G,KAAK,yBAAyB;gBAC5B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,CAAC,CAAC,UAAU,EAAE,QAAQ,EAAE,CAAC,CAAC,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;YACtG,KAAK,4BAA4B;gBAC/B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;YAC5E,KAAK,yBAAyB;gBAC5B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;YAC9E,KAAK,eAAe;gBAClB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,eAAe;gBAClB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,sBAAsB;gBACzB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,2BAA2B;gBAC9B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,gBAAgB;gBACnB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;QACxD,CAAC;QAED,sFAAsF;QACtF,8CAA8C;QAC9C,IAAI,IAAI,CAAC,OAAO,EAAE,CAAC;YACjB,IAAI,CAAC;gBACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;gBAChD,IAAI,MAAM,YAAY,QAAQ;oBAAE,OAAO,MAAM,CAAC;YAChD,CAAC;YAAC,OAAO,OAAO,EAAE,CAAC;gBACjB,OAAO,CAAC,KAAK,CAAC,0CAA0C,EAAE,OAAO,CAAC,CAAC;YACrE,CAAC;QACH,CAAC;aAAM,CAAC;YACN,OAAO,CAAC,KAAK,CAAC,uCAAuC,EAAE,GAAG,CAAC,CAAC;QAC9D,CAAC;QAED,MAAM,OAAO,GAAG,IAAI,CAAC,YAAY,IAAI,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,uBAAuB,CAAC;QAClG,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;IACpD,CAAC;IAEO,YAAY,CAAC,IAAa,EAAE,MAAM,GAAG,GAAG;QAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC,EAAE;YACxC,MAAM;YACN,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;aACnC;SACF,CAAC,CAAC;IACL,CAAC;CACF;AAED,sGAAsG;AACtG,SAAS,iBAAiB,CAAC,GAAQ;IACjC,MAAM,SAAS,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAuC,CAAC;IACzG,MAAM,KAAK,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,gBAAgB,CAAC,CAAC;IACrD,IAAI,KAAK,KAAK,IAAI,IAAI,KAAK,KAAK,MAAM,IAAI,KAAK,KAAK,OAAO,EAAE,CAAC;QAC5D,MAAM,IAAI,eAAe,CAAC,2CAA2C,CAAC,CAAC;IACzE,CAAC;IACD,MAAM,gBAAgB,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,kBAAkB,CAAC,IAAI,SAAS,CAAiC,CAAC;IACjH,MAAM,MAAM,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAyC,CAAC;IACrG,OAAO,EAAE,SAAS,EAAE,GAAG,CAAC,KAAK,KAAK,IAAI,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,KAAK,KAAK,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,gBAAgB,EAAE,MAAM,EAAE,CAAC;AAClH,CAAC"}
1
+ {"version":3,"file":"router.js","sourceRoot":"","sources":["../src/router.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,kBAAkB,EAAE,eAAe,EAAqF,MAAM,qBAAqB,CAAC;AAC7J,OAAO,KAAK,OAAO,MAAM,6BAA6B,CAAC;AACvD,OAAO,EAAE,oBAAoB,EAAE,MAAM,EAAE,MAAM,cAAc,CAAC;AAE5D,oFAAoF;AACpF,MAAM,CAAC,MAAM,eAAe,GAAG,MAAM,CAAC,MAAM,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE,MAAe,EAAE,CAAC,CAAC;AAEzH,MAAM,kBAAkB,GAAG,wCAAwC,CAAC;AACpE,MAAM,0BAA0B,GAAG,CAAC,cAAc,EAAE,eAAe,CAAC,CAAC;AAiCrE,MAAM,yBAA0B,SAAQ,KAAK;IAC3C;QACE,KAAK,CAAC,+DAA+D,CAAC,CAAC;QACvE,IAAI,CAAC,IAAI,GAAG,2BAA2B,CAAC;IAC1C,CAAC;CACF;AAED,oEAAoE;AACpE,MAAM,aAAa,GAA4C;IAC7D,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE;IACxC,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uCAAuC,EAAE;IAChE,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6CAA6C,EAAE;IACtE,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE;IAChD,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,qCAAqC,EAAE;CAC/D,CAAC;AAEF,MAAM,eAAe,GAAG,CAAC,GAAG,MAAM,EAAE,GAAG,aAAa,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;IAChE,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,WAAW,EAAE;IAC9B,OAAO,EAAE,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC;CAC3C,CAAC,CAAC,CAAC;AAEJ;;;GAGG;AACH,SAAS,cAAc,CAAC,QAAkB;IACxC,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;IAClC,KAAK,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,eAAe,EAAE,CAAC;QAClD,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM;YAAE,SAAS;QACjD,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,IAAI,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,CAAC;YAAE,SAAS;QACxF,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;QACpB,IAAI,MAAM,KAAK,OAAO;YAAE,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC;IAC7C,CAAC;IACD,OAAO,OAAO,CAAC;AACjB,CAAC;AAED,MAAM,oBAAqB,SAAQ,KAAK;IACtC,YAAY,KAAa;QACvB,KAAK,CAAC,wBAAwB,KAAK,SAAS,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI,GAAG,sBAAsB,CAAC;IACrC,CAAC;CACF;AAED,MAAM,eAAgB,SAAQ,KAAK;IACjC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,iBAAiB,CAAC;IAChC,CAAC;CACF;AAwCD,SAAS,aAAa;IACpB,OAAQ,UAAkB,CAAC,OAAO,EAAE,GAAG,EAAE,QAAQ,KAAK,aAAa,CAAC;AACtE,CAAC;AAED,MAAM,OAAO,kBAAkB;IACtB,MAAM,CAAqB;IACjB,OAAO,CAAwC;IAC/C,YAAY,CAAU;IACtB,UAAU,CAA2C;IACrD,WAAW,CAAU;IACrB,YAAY,CAAS;IACrB,QAAQ,CAAU;IAClB,IAAI,CAAsB;IAE3C,YAAY,cAAwD,EAAE,UAAqC,EAAE;QAC3G,IAAI,cAAc,YAAY,kBAAkB,EAAE,CAAC;YACjD,IAAI,CAAC,MAAM,GAAG,cAAc,CAAC;QAC/B,CAAC;aAAM,CAAC;YACN,IAAI,CAAC,MAAM,GAAG,IAAI,kBAAkB,CAAC,cAAc,CAAC,CAAC;QACvD,CAAC;QACD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC;QAC/B,IAAI,CAAC,YAAY,GAAG,OAAO,CAAC,YAAY,IAAI,aAAa,EAAE,CAAC;QAC5D,IAAI,CAAC,UAAU,GAAG,OAAO,CAAC,UAAU,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,WAAW,IAAI,KAAK,CAAC;QAChD,IAAI,CAAC,YAAY,GAAG,OAAO,CAAC,YAAY,IAAI,EAAE,GAAG,IAAI,GAAG,IAAI,CAAC;QAC7D,IAAI,CAAC,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,GAAG,GAAG,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAC,YAAY,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAChG,IAAI,CAAC,IAAI,GAAG,OAAO,CAAC,IAAI,IAAI,KAAK,CAAC;QAClC,IAAI,IAAI,CAAC,IAAI,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACpE,MAAM,IAAI,KAAK,CAAC,yFAAyF,CAAC,CAAC;QAC7G,CAAC;IACH,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,aAAa,CAAC,OAAgB,EAAE,OAA2B,EAAE;QACjE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,IAAI,CAAC,CAAC;QACpD,OAAO,IAAI,CAAC,SAAS,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;IAC3C,CAAC;IAED,gGAAgG;IACxF,cAAc,CAAC,QAAgB;QACrC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,IAAI,QAAQ,KAAK,IAAI,CAAC,QAAQ,IAAI,CAAC,QAAQ,CAAC,UAAU,CAAC,IAAI,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAAE,OAAO,IAAI,CAAC;YACzF,OAAO,QAAQ,CAAC,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QAClE,CAAC;QACD,+DAA+D;QAC/D,OAAO,QAAQ,CAAC,OAAO,CAAC,wBAAwB,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IAC5E,CAAC;IAEO,SAAS,CAAC,OAAgB,EAAE,QAAkB;QACpD,IAAI,CAAC,IAAI,CAAC,IAAI;YAAE,OAAO,QAAQ,CAAC;QAEhC,MAAM,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC7C,IAAI,WAA+B,CAAC;QACpC,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG,EAAE,CAAC;YAC9B,WAAW,GAAG,GAAG,CAAC;QACpB,CAAC;aAAM,IAAI,MAAM,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC;YACxD,WAAW,GAAG,MAAM,CAAC;QACvB,CAAC;QAED,yFAAyF;QACzF,MAAM,MAAM,GAAG,IAAI,QAAQ,CAAC,QAAQ,CAAC,IAAI,EAAE,QAAQ,CAAC,CAAC;QACrD,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG;YAAE,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;QACvE,IAAI,CAAC,WAAW;YAAE,OAAO,MAAM,CAAC;QAEhC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,EAAE,WAAW,CAAC,CAAC;QAC/D,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,EAAE,kBAAkB,CAAC,CAAC;QACvE,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,YAAY,IAAI,0BAA0B,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC;QACtH,IAAI,IAAI,CAAC,IAAI,CAAC,WAAW;YAAE,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,EAAE,MAAM,CAAC,CAAC;QAC1F,IAAI,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,SAAS,IAAI,IAAI,CAAC,IAAI,CAAC,MAAM,KAAK,SAAS,EAAE,CAAC;YACjF,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,EAAE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,KAAK,CAAC,QAAQ,CAAC,OAAgB,EAAE,IAAwB;QAC/D,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,GAAG,CAAC,QAAQ,CAAC;QAC9B,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,CAAC;QAE5C,MAAM,OAAO,GAAG,IAAI,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC9C,IAAI,OAAO,KAAK,IAAI,EAAE,CAAC;YACrB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;QACrF,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;QAEpD,uFAAuF;QACvF,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;YACzB,OAAO,IAAI,QAAQ,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC7C,CAAC;QAED,IAAI,OAA0C,CAAC;QAC/C,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,IAAI,CAAC,UAAU,IAAI,IAAI,CAAC,UAAU,CAAC;YACnD,OAAO,GAAG,OAAO,CAAC,CAAC,CAAC,MAAM,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACzD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,IAAI,CAAC,aAAa,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;QAC1C,CAAC;QACD,IAAI,IAAI,CAAC,WAAW,IAAI,CAAC,OAAO,EAAE,MAAM,EAAE,CAAC;YACzC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,yBAAyB,EAAE,EAAE,GAAG,CAAC,CAAC;QACtE,CAAC;QACD,iFAAiF;QACjF,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,SAAS,CAClC,OAAO,EAAE,MAAM;YACb,CAAC,CAAC;gBACE,MAAM,EAAE,OAAO,CAAC,MAAM;gBACtB,QAAQ,EAAE,OAAO,CAAC,QAAQ;gBAC1B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,QAAQ,EAAE,OAAO,CAAC,QAAQ;gBAC1B,KAAK,EAAE,OAAO,CAAC,KAAK;aACrB;YACH,CAAC,CAAC,EAAE,GAAG,eAAe,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,CACxD,CAAC;QAEF,IAAI,CAAC;YACH,sEAAsE;YACtE,MAAM,IAAI,CAAC,MAAM,CAAC,KAAK,CAAC;YACxB,MAAM,aAAa,GAAG,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,IAAI,SAAS,EAAE,GAAG,EAAE,CAAC;YACrE,MAAM,MAAM,GAAG,KAAK,IAAuB,EAAE;gBAC3C,MAAM,OAAO,GAAG,IAAI,CAAC,gBAAgB,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;gBACxD,IAAI,OAAO;oBAAE,OAAO,OAAO,CAAC,KAAK,CAAC,OAAO,CAAC,OAAO,EAAE,EAAE,GAAG,aAAa,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,CAAC,CAAC;gBACjG,OAAO,IAAI,CAAC,aAAa,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC;YACpG,CAAC,CAAC;YACF,4FAA4F;YAC5F,MAAM,KAAK,GAAG,IAAI,CAAC,MAAM,CAAC,OAAO;iBAC9B,aAAa,EAAE;iBACf,WAAW,CACV,CAAC,IAAI,EAAE,UAAU,EAAE,EAAE,CAAC,KAAK,IAAI,EAAE,CAAC,UAAU,CAAC,OAAO,EAAE,aAAa,EAAE,IAAI,CAAC,EAC1E,MAAM,CACP,CAAC;YACJ,OAAO,MAAM,KAAK,EAAE,CAAC;QACvB,CAAC;QAAC,OAAO,GAAY,EAAE,CAAC;YACtB,OAAO,IAAI,CAAC,aAAa,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAEO,gBAAgB,CACtB,MAAc,EACd,QAAkB;QAElB,KAAK,MAAM,KAAK,IAAI,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC;YACpD,IAAI,KAAK,CAAC,MAAM,KAAK,MAAM,IAAI,CAAC,CAAC,KAAK,CAAC,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,CAAC;gBAAE,SAAS;YACzF,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;YACtD,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM;gBAAE,SAAS;YACjD,MAAM,MAAM,GAA2B,EAAE,CAAC;YAC1C,MAAM,OAAO,GAAG,OAAO,CAAC,KAAK,CAAC,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE;gBACxC,IAAI,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC;oBACzB,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,GAAG,kBAAkB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;oBACxD,OAAO,IAAI,CAAC;gBACd,CAAC;gBACD,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,CAAC,CAAC,CAAC;YACH,IAAI,OAAO;gBAAE,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;QACxC,CAAC;QACD,OAAO,IAAI,CAAC;IACd,CAAC;IAEO,KAAK,CAAC,aAAa,CACzB,OAAgB,EAChB,EAAE,GAAG,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAQ1D;QAED,kFAAkF;QAClF,gFAAgF;QAChF,MAAM,OAAO,GAAG,cAAc,CAAC,QAAQ,CAAC,CAAC;QACzC,IAAI,OAAO,CAAC,IAAI,KAAK,CAAC;YAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;QAC3G,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,UAAU,MAAM,oBAAoB,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;YACnG,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,OAAO,EAAE,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC;YAC9D,OAAO,QAAQ,CAAC;QAClB,CAAC;QAED,+DAA+D;QAC/D,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,IAAI,QAAQ,CAAC,MAAM,KAAK,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;YAChF,OAAO,IAAI,CAAC,YAAY,CAAC,oBAAoB,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,gBAAgB,CAAC,GAAG,EAAE,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC;QACrG,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,MAAM,MAAM,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC;gBACrE,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;oBAC7D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,MAAM,EAAE,EAAE,GAAG,CAAC,CAAC;gBACrD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,gBAAgB;QAChB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,WAAW,EAAE,CAAC;YAChC,MAAM,UAAU,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC/B,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;oBACxE,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,IAAI,CAAC,CAAC;oBACnD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,UAAU,CAAC,CAAC;oBACtD,IAAI,CAAC,QAAQ;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;oBACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,UAAU,EAAE,IAAI,CAAC,CAAC;oBAC9D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC7E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;gBAClD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,CAAC;oBACxD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;oBAC5C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;oBACjD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,eAAe,EAAE,CAAC;gBAC3C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,iBAAiB,CAAC,GAAG,CAAC,CAAC,CAAC;oBACvF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,QAAQ,IAAI,WAAW,KAAK,iBAAiB,EAAE,CAAC;gBACzE,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,iBAAiB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;oBACpG,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,SAAS,EAAE,KAAK,CAAC,CAAC;oBAChE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;gBACvC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,UAAU,IAAI,WAAW,KAAK,uBAAuB,EAAE,CAAC;gBACjF,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,mBAAmB,CAAC,IAAI,CAAC,EAAE,SAAS,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;oBAChI,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE,KAAK,CAAC,CAAC;oBACxE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,EAAE,aAAa,EAAE,GAAG,OAAO,EAAE,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBAChG,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,OAAO,EAAE,EAAE,aAAa,EAAE,CAAC,CAAC;oBAClF,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,8EAA8E;QAC9E,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,OAAO,EAAE,CAAC;YAC5B,MAAM,MAAM,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC3B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAEhC,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,mBAAmB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;oBACtG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;oBAC5C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC,CAAC;gBAC/E,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC3C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,UAAU,EAAE,CAAC;gBACtC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;oBAClD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;oBACnF,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,aAAa,EAAE,CAAC;gBACzC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;oBAC5D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;oBACtF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;oBACvD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,cAAc,IAAI,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC;gBACzD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,mEAAmE;oBACnE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;oBACjE,MAAM,OAAO,GAAG,UAAU,IAAI,CAAC,UAAU,CAAC,MAAM,KAAK,MAAM,IAAI,UAAU,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC;oBACtG,IAAI,CAAC,OAAO,IAAI,CAAC,CAAC,MAAM,MAAM,CAAC,gBAAgB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;wBAC9D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACxD,CAAC;oBACD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,cAAc,EAAE,CAAC;gBAC1C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;oBAC1D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;wBACrC,MAAM;wBACN,eAAe,EAAE,IAAI,CAAC,eAAe;wBACrC,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,UAAU;wBAC7B,GAAG,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,YAAY,EAAE,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;qBAClE,CAAC,CAAC;oBACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,GAAG,EAAE,EAAE,GAAG,CAAC,CAAC;gBACrD,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,OAAO,IAAI,WAAW,KAAK,WAAW,EAAE,CAAC;gBAClE,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,MAAM,CAAC,CAAC;oBACzD,IAAI,CAAC,KAAK;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACvE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,aAAa,IAAI,WAAW,KAAK,qBAAqB,EAAE,CAAC;gBAClF,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,MAAM,CAAC,CAAC;oBAC3E,MAAM,uBAAuB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,MAAM,CAAC,CAAC;oBACvF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,mBAAmB,EAAE,uBAAuB,EAAE,CAAC,CAAC;gBAC7E,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,QAAQ,EAAE,CAAC;gBACpC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;oBACtD,IAAI,CAAC,UAAU;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,SAAS,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;oBACpD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,kBAAkB,EAAE,CAAC;gBAC9C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;oBACpE,IAAI,CAAC,eAAe;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACjF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,eAAe,EAAE,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;oBAC1C,IAAI,CAAC,IAAI;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACtE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC;gBACrC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;gBAC9C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,QAAQ,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;oBAClD,IAAI,QAAQ,IAAI,QAAQ,KAAK,QAAQ,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;wBAC/D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uCAAuC,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpF,CAAC;oBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,QAAQ,EAAG,QAAuC,IAAI,QAAQ,EAAE,CAAC,CAAC;oBACpH,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,YAAY;QACZ,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,OAAO,EAAE,CAAC;YAC5B,MAAM,MAAM,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC3B,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,EAAE,CAAC;oBACtC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC3C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;oBAC1C,IAAI,CAAC,IAAI;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACtE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC;gBACrC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;gBAC9C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;oBAChD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,sBAAsB;QACtB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,WAAW,EAAE,CAAC;gBACjB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;oBACrD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC/C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,WAAW,CAAC,CAAC;oBACzD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,EAAE,IAAI,CAAC,CAAC;oBAChE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;gBACnD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,CAAC,CAAC;oBAC1D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mBAAmB;QACnB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,EAAE,CAAC;YACnC,MAAM,aAAa,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAClC,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;oBAC7D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,YAAY,EAAE,CAAC,CAAC;gBAC7C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;gBACjD,CAAC;YACH,CAAC;iBAAM,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,SAAS,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,aAAa,CAAC,CAAC;oBAClE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;oBAC/D,IAAI,CAAC,WAAW;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,aAAa,EAAE,IAAI,CAAC,CAAC;oBACpE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;gBACrD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,aAAa,CAAC,CAAC;oBAC9D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,iBAAiB;QACjB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,WAAW,EAAE,CAAC;gBACjB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;oBACrD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC/C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,WAAW,CAAC,CAAC;oBACzD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,EAAE,IAAI,CAAC,CAAC;oBAChE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;gBACnD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,CAAC,CAAC;oBAC1D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,iBAAiB;QACjB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,uBAAuB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;gBAC1G,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC;gBACjD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC,CAAC;YACpF,CAAC;QACH,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,SAAS,IAAI,WAAW,KAAK,WAAW,EAAE,CAAC;gBAC7C,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBACjE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,KAAK,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;oBAC5C,IAAI,CAAC,KAAK,EAAE,CAAC;wBACX,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mCAAmC,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,CAAC;oBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC;oBACzE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,CAAC,SAAS,EAAE,CAAC;gBACtB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;oBAC9C,IAAI,CAAC,MAAM;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,2BAA2B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACnF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;oBAClD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;gBACjD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,kBAAkB;QAClB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,aAAa,EAAE,CAAC;YAClC,MAAM,YAAY,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YACjC,IAAI,YAAY,KAAK,SAAS,EAAE,CAAC;gBAC/B,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,+BAA+B,CAAC,IAAI,CAAC,CAAC;oBACrE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,KAAK,QAAQ,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,IAAI,CAAC,CAAC;oBAC3D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,IAAI,CAAC,YAAY,EAAE,CAAC;gBACzB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAC;oBAC3D,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC,CAAC;oBAClF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;oBACvD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,CAAC,CAAC;oBAC5D,IAAI,CAAC,UAAU;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,sBAAsB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAClF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,YAAY,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,oBAAoB;QACpB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,EAAE,CAAC;YACnC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;gBAC9C,IAAI,CAAC,MAAM;oBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,2BAA2B,EAAE,EAAE,GAAG,CAAC,CAAC;gBACnF,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;gBACpD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;YACrD,CAAC;YACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,CAAC;gBACjE,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC;gBACzC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,KAAK,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,CAAC;QACH,CAAC;QAED,gCAAgC;QAChC,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,WAAW,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,eAAe,IAAI,QAAQ,CAAC,MAAM,KAAK,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;YAChH,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAE,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,IAAI,CAAC,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;YAC3G,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,mBAAmB,CAAC,CAAC;YACzD,IAAI,MAAM,KAAK,IAAI,IAAI,MAAM,KAAK,MAAM,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC/D,MAAM,IAAI,eAAe,CAAC,8CAA8C,CAAC,CAAC;YAC5E,CAAC;YACD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,8BAA8B,CAAC;gBAC5D,GAAG,iBAAiB,CAAC,GAAG,CAAC;gBACzB,UAAU,EAAE,IAAI,CAAC,YAAY,CAAC;gBAC9B,YAAY,EAAE,IAAI,CAAC,cAAc,CAAC;gBAClC,iBAAiB,EAAE,MAAM,KAAK,MAAM;aACrC,CAAC,CAAC;YACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;QAC1C,CAAC;QAED,0BAA0B;QAC1B,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,EAAE,SAAS,EAAE,GAAG,KAAK,EAAE,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,mBAAmB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;gBACxH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE,KAAK,CAAC,CAAC;gBACxE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;YACzC,CAAC;QACH,CAAC;QAED,+BAA+B;QAC/B,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,QAAQ,EAAE,CAAC;YAC7B,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;gBAC3E,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;gBACrC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,SAAS,EAAE,IAAI,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC1F,CAAC;QACH,CAAC;QAED,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;IACrF,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,QAAQ,CACpB,OAAgB,EAChB,MAAS,EACT,YAAqC,EAAE;QAEvC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;QACzC,MAAM,IAAI,GAAG,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC;QAC9E,OAAO,OAAO,CAAC,YAAY,CAAC,MAAa,EAAE,EAAE,GAAG,IAAI,EAAE,GAAG,SAAS,EAAE,CAAC,CAAC;IACxE,CAAC;IAED,mFAAmF;IAC3E,gBAAgB,CAAC,GAAQ,EAAE,OAAe;QAChD,MAAM,IAAI,GAAG,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,EAAE,GAAG,CAAC,QAAQ,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QAC7F,OAAO,GAAG,GAAG,CAAC,MAAM,GAAG,IAAI,EAAE,CAAC;IAChC,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,QAAQ,CAAC,OAAgB;QACrC,MAAM,QAAQ,GAAG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,gBAAgB,CAAC,CAAC,CAAC;QAC/D,IAAI,MAAM,CAAC,QAAQ,CAAC,QAAQ,CAAC,IAAI,QAAQ,GAAG,IAAI,CAAC,YAAY;YAAE,MAAM,IAAI,oBAAoB,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QAEjH,IAAI,IAAI,GAAG,EAAE,CAAC;QACd,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;YACjB,MAAM,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC,SAAS,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,IAAI,WAAW,EAAE,CAAC;YAClC,IAAI,QAAQ,GAAG,CAAC,CAAC;YACjB,SAAS,CAAC;gBACR,MAAM,EAAE,IAAI,EAAE,KAAK,EAAE,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;gBAC5C,IAAI,IAAI;oBAAE,MAAM;gBAChB,QAAQ,IAAI,KAAK,CAAC,UAAU,CAAC;gBAC7B,IAAI,QAAQ,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC;oBACjC,MAAM,MAAM,CAAC,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,oBAAoB,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;gBACpD,CAAC;gBACD,IAAI,IAAI,OAAO,CAAC,MAAM,CAAC,KAAK,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;YAClD,CAAC;YACD,IAAI,IAAI,OAAO,CAAC,MAAM,EAAE,CAAC;QAC3B,CAAC;QACD,MAAM,IAAI,GAAG,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,cAAc,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAC5F,IAAI,IAAI,CAAC,IAAI,EAAE,IAAI,IAAI,KAAK,kBAAkB,IAAI,CAAC,IAAI,CAAC,QAAQ,CAAC,OAAO,CAAC,EAAE,CAAC;YAC1E,MAAM,IAAI,yBAAyB,EAAE,CAAC;QACxC,CAAC;QACD,IAAI,CAAC;YACH,OAAO,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC;QAC1B,CAAC;QAAC,MAAM,CAAC;YACP,MAAM,IAAI,eAAe,CAAC,kCAAkC,CAAC,CAAC;QAChE,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,aAAa,CAAC,GAAY,EAAE,OAAgB;QACxD,MAAM,IAAI,GAAG,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,MAAM,IAAI,GAAG,CAAC,CAAC,CAAE,GAAa,CAAC,IAAI,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/F,MAAM,CAAC,GAAG,GAA0B,CAAC;QAErC,QAAQ,IAAI,EAAE,CAAC;YACb,KAAK,iBAAiB,CAAC;YACvB,KAAK,2BAA2B;gBAC9B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,iBAAiB;gBACpB,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YAC1G,KAAK,yBAAyB;gBAC5B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,CAAC,CAAC,UAAU,EAAE,QAAQ,EAAE,CAAC,CAAC,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;YACtG,KAAK,4BAA4B;gBAC/B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;YAC5E,KAAK,yBAAyB;gBAC5B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;YAC9E,KAAK,eAAe;gBAClB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,eAAe;gBAClB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,sBAAsB;gBACzB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,2BAA2B;gBAC9B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,gBAAgB;gBACnB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;QACxD,CAAC;QAED,sFAAsF;QACtF,8CAA8C;QAC9C,IAAI,IAAI,CAAC,OAAO,EAAE,CAAC;YACjB,IAAI,CAAC;gBACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;gBAChD,IAAI,MAAM,YAAY,QAAQ;oBAAE,OAAO,MAAM,CAAC;YAChD,CAAC;YAAC,OAAO,OAAO,EAAE,CAAC;gBACjB,OAAO,CAAC,KAAK,CAAC,0CAA0C,EAAE,OAAO,CAAC,CAAC;YACrE,CAAC;QACH,CAAC;aAAM,CAAC;YACN,OAAO,CAAC,KAAK,CAAC,uCAAuC,EAAE,GAAG,CAAC,CAAC;QAC9D,CAAC;QAED,MAAM,OAAO,GAAG,IAAI,CAAC,YAAY,IAAI,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,uBAAuB,CAAC;QAClG,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;IACpD,CAAC;IAEO,YAAY,CAAC,IAAa,EAAE,MAAM,GAAG,GAAG;QAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC,EAAE;YACxC,MAAM;YACN,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;aACnC;SACF,CAAC,CAAC;IACL,CAAC;CACF;AAED,sGAAsG;AACtG,SAAS,iBAAiB,CAAC,GAAQ;IACjC,MAAM,SAAS,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAuC,CAAC;IACzG,MAAM,KAAK,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,gBAAgB,CAAC,CAAC;IACrD,IAAI,KAAK,KAAK,IAAI,IAAI,KAAK,KAAK,MAAM,IAAI,KAAK,KAAK,OAAO,EAAE,CAAC;QAC5D,MAAM,IAAI,eAAe,CAAC,2CAA2C,CAAC,CAAC;IACzE,CAAC;IACD,MAAM,gBAAgB,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,kBAAkB,CAAC,IAAI,SAAS,CAAiC,CAAC;IACjH,MAAM,MAAM,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAyC,CAAC;IACrG,MAAM,eAAe,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,sBAAsB,CAAC,CAAC;IACrE,MAAM,oBAAoB,GAAG,eAAe,KAAK,IAAI,CAAC,CAAC,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAC5F,IAAI,eAAe,KAAK,IAAI,IAAI,CAAC,eAAe,CAAC,IAAI,EAAE,KAAK,EAAE,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,oBAAoB,CAAC,IAAI,oBAAqB,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC;QAC1I,MAAM,IAAI,eAAe,CAAC,4DAA4D,CAAC,CAAC;IAC1F,CAAC;IACD,OAAO,EAAE,SAAS,EAAE,GAAG,CAAC,KAAK,KAAK,IAAI,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,KAAK,KAAK,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,gBAAgB,EAAE,MAAM,EAAE,oBAAoB,EAAE,CAAC;AACxI,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/server",
3
- "version": "0.31.0",
3
+ "version": "0.32.0",
4
4
  "description": "Web Fetch API compatible server router and adapters for Next.js App Router, SvelteKit, and Express",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -27,7 +27,7 @@
27
27
  },
28
28
  "dependencies": {
29
29
  "zod-to-json-schema": "^3.25.2",
30
- "@critical-path/core": "0.54.0"
30
+ "@critical-path/core": "0.55.0"
31