@critical-path/server 0.23.4 → 0.24.0
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/CHANGELOG.md +14 -0
- package/README.md +2 -0
- package/dist/index.test.js +17 -0
- package/dist/index.test.js.map +1 -1
- package/dist/openapi.d.ts.map +1 -1
- package/dist/openapi.js +1 -0
- package/dist/openapi.js.map +1 -1
- package/dist/router.d.ts +8 -0
- package/dist/router.d.ts.map +1 -1
- package/dist/router.js +33 -1
- package/dist/router.js.map +1 -1
- package/package.json +2 -2
- package/src/index.test.ts +27 -0
- package/src/openapi.ts +1 -0
- package/src/router.ts +39 -1
package/CHANGELOG.md
CHANGED
|
@@ -1,5 +1,19 @@
|
|
|
1
1
|
# @critical-path/server
|
|
2
2
|
|
|
3
|
+
## 0.24.0
|
|
4
|
+
|
|
5
|
+
### Minor Changes
|
|
6
|
+
|
|
7
|
+
- 810d8d1: Upload and request body limits.
|
|
8
|
+
|
|
9
|
+
- **@critical-path/core:** new `uploads: { maxBytes, allowedMimeTypes }` engine option, with `type/*` wildcards. It applies to direct uploads (decoded size), presigned uploads (content type) and registered attachments (declared size and type). Violations throw `ValidationError` (400).
|
|
10
|
+
- **@critical-path/server:** new `maxBodyBytes` router option (default 10 MiB). Larger bodies get `413`, checked while streaming rather than only through `Content-Length`. Previously bodies were read without any limit.
|
|
11
|
+
|
|
12
|
+
### Patch Changes
|
|
13
|
+
|
|
14
|
+
- Updated dependencies [810d8d1]
|
|
15
|
+
- @critical-path/core@0.36.0
|
|
16
|
+
|
|
3
17
|
## 0.23.4
|
|
4
18
|
|
|
5
19
|
### Patch Changes
|
package/README.md
CHANGED
|
@@ -60,6 +60,7 @@ Router options are the second argument to `createNextHandler`, `createSvelteKitH
|
|
|
60
60
|
| :--- | :--- | :--- |
|
|
61
61
|
| `getContext(request)` | none | Resolve the caller (`{ userId, userName?, actorType?, tenantId?, roles? }`). `tenantId` and `roles` feed the engine's tenant isolation and `authorize` policy. Every mutation is attributed to that user, or to `anonymous` (`ANONYMOUS_ACTOR`) when no user is resolved. Request bodies never carry identity. For SvelteKit it receives the `RequestEvent`, so `event.locals` is available. |
|
|
62
62
|
| `requireAuth` | `false` | Return `401` unless `getContext` yields a `userId`. `OPTIONS` preflight is always allowed. |
|
|
63
|
+
| `maxBodyBytes` | 10 MiB | Largest accepted request body; larger bodies get `413` (enforced while streaming, not just via `Content-Length`). |
|
|
63
64
|
| `basePath` | strip up to first `/critical-path` | Exact mount path, e.g. `/api/pm`. Requests outside it return `404`. |
|
|
64
65
|
| `cors` | `false` (no CORS headers) | `{ origins: string[] \| '*', credentials?, allowHeaders?, maxAge? }`, or `false` for no CORS headers. `credentials` cannot be combined with `'*'`. |
|
|
65
66
|
| `onError`, `exposeErrors` | see below | Unexpected error reporting. |
|
|
@@ -111,6 +112,7 @@ const doc = buildOpenApiDocument({ serverUrl: 'https://app.example.com/api/criti
|
|
|
111
112
|
| `403` | The engine's `authorize` policy denies the action (`ForbiddenError`) |
|
|
112
113
|
| `404` | Unknown route, `NotFoundError`, or `DELETE` of a resource that does not exist (successful deletes return `{ "success": true }`) |
|
|
113
114
|
| `409` | `CircularDependencyError` (body includes `cyclePath`) |
|
|
115
|
+
| `413` | Request body larger than `maxBodyBytes` |
|
|
114
116
|
| `500` | Unexpected errors. The body is always `{ "error": "Internal Server Error" }`; the real error is logged with `console.error`. |
|
|
115
117
|
|
|
116
118
|
`OPTIONS` preflight requests return `204` with CORS headers.
|
package/dist/index.test.js
CHANGED
|
@@ -857,5 +857,22 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
857
857
|
expect(feed.body.activities).toHaveLength(3);
|
|
858
858
|
expect(feed.body.nextCursor).toBeTruthy();
|
|
859
859
|
});
|
|
860
|
+
it('rejects request bodies over maxBodyBytes with 413', async () => {
|
|
861
|
+
const router = new CriticalPathRouter(undefined, { maxBodyBytes: 64 });
|
|
862
|
+
const big = JSON.stringify({ name: 'x'.repeat(200) });
|
|
863
|
+
const declared = await router.handleRequest(new Request('http://localhost/api/critical-path/projects', { method: 'POST', body: big, headers: { 'Content-Type': 'application/json' } }));
|
|
864
|
+
expect(declared.status).toBe(413);
|
|
865
|
+
// A streamed body without Content-Length is cut off once it passes the limit
|
|
866
|
+
const stream = new ReadableStream({
|
|
867
|
+
start(controller) {
|
|
868
|
+
controller.enqueue(new TextEncoder().encode(big));
|
|
869
|
+
controller.close();
|
|
870
|
+
}
|
|
871
|
+
});
|
|
872
|
+
const streamed = await router.handleRequest(new Request('http://localhost/api/critical-path/projects', { method: 'POST', body: stream, duplex: 'half' }));
|
|
873
|
+
expect(streamed.status).toBe(413);
|
|
874
|
+
const small = await router.handleRequest(new Request('http://localhost/api/critical-path/projects', { method: 'POST', body: JSON.stringify({ name: 'ok' }) }));
|
|
875
|
+
expect(small.status).toBe(201);
|
|
876
|
+
});
|
|
860
877
|
});
|
|
861
878
|
//# sourceMappingURL=index.test.js.map
|
package/dist/index.test.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AACjD,OAAO,EAAE,iBAAiB,EAAE,MAAM,oBAAoB,CAAC;AACvD,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,aAAa,EAAE,gBAAgB,EAAE,cAAc,EAA2B,MAAM,qBAAqB,CAAC;AAE/G,QAAQ,CAAC,oCAAoC,EAAE,GAAG,EAAE;IAClD,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;QAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,oBAAoB;QACpB,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,kDAAkD,EAAE;YAC9E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC;SAC5D,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACpD,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE1C,kBAAkB;QAClB,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAC/E,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;IACxD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uCAAuC,EAAE,KAAK,IAAI,EAAE;QACrD,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,wBAAwB;QACxB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAClF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC1C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,wBAAwB;QACxB,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YACvF,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC;SACzC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;QAC1E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,8BAA8B;QAC9B,MAAM,KAAK,GAAG,IAAI,OAAO,CAAC,mDAAmD,EAAE;YAC7E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,IAAI,EAAE,qBAAqB;gBAC3B,gBAAgB,EAAE,MAAM;gBACxB,QAAQ,EAAE;oBACR,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;oBACxD,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;iBACtD;gBACD,WAAW,EAAE;oBACX,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,MAAM,EAAE,WAAW,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE;iBACzE;aACF,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QAChD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,MAAM,GAAG,MAAM,KAAK,CAAC,IAAI,EAAE,CAAC;QAClC,MAAM,IAAI,GAAG,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC;QAEhC,uCAAuC;QACvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,UAAU,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACnG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAE3H,6BAA6B;QAC7B,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,cAAc,CAAC,CAAC;QACrG,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,uBAAuB,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4CAA4C;QAC5C,MAAM,eAAe,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YAC9F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;SAChD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,eAAe,CAAC,CAAC;QAC/D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACtC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;QAChE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,CAAC;QACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAE3G,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,EAAE;YAClG,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,cAAc,EAAE,CAAC;SAClD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,SAAS,GAAG,WAAW,CAAC,OAAO,CAAC,EAAE,CAAC;QAEzC,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,CAAC,CAAC;QACpG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE5C,mBAAmB;QACnB,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC/F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,yBAAyB,EAAE,CAAC;SAC7D,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;QAErE,qBAAqB;QACrB,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,SAAS;gBACnB,GAAG,EAAE,qCAAqC;gBAC1C,QAAQ,EAAE,eAAe;gBACzB,SAAS,EAAE,GAAG;gBACd,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,IAAI,CAAC,EAAE;aACnB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,YAAY,GAAG,WAAW,CAAC,UAAU,CAAC,EAAE,CAAC;QAE/C,8BAA8B;QAC9B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,8DAA8D,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACxG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE/C,uBAAuB;QACvB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,uDAAuD,YAAY,EAAE,EAAE;YACnG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,oBAAoB;QACpB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC7F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,sCAAsC;QACtC,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACvF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,UAAU;gBACpB,GAAG,EAAE,+BAA+B,GAAG,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE;gBACtD,MAAM,EAAE,IAAI,CAAC,EAAE;aAChB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,2CAA2C,CAAC,CAAC;IACtF,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iFAAiF,EAAE,KAAK,IAAI,EAAE;QAC/F,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,CAAC,CAAC;QACtF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAC5G,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,CAAC;QAE1G,2BAA2B;QAC3B,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;SACtC,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvD,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC3D,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QAEnE,oFAAoF;QACpF,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAErC,gCAAgC;QAChC,MAAM,WAAW,GAAG,IAAI,OAAO,CAC7B,oDAAoD,OAAO,CAAC,EAAE,oBAAoB,kBAAkB,CAAC,IAAI,CAAC,EAAE,EAC5G,EAAE,MAAM,EAAE,QAAQ,EAAE,CACrB,CAAC;QACF,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IACzD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;QACvE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,kBAAkB,EAAE,CAAC,CAAC;QAEzF,iCAAiC;QACjC,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,sDAAsD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,YAAY;aACrB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;QAC7D,MAAM,aAAa,GAAG,UAAU,CAAC,WAAW,CAAC,EAAE,CAAC;QAEhD,qCAAqC;QACrC,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC7B,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,kBAAkB;YACzB,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;YACf,aAAa;SACd,CAAC,CAAC;QAEH,mCAAmC;QACnC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,kEAAkE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAEjD,6BAA6B;QAC7B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,UAAU,CAAC,CAAC;QAChH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEpD,kCAAkC;QAClC,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YACpG,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC;SAC9C,CAAC,CAAC;QACH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QACvD,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,WAAW,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,mCAAmC;QACnC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YAClG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACrC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,gBAAgB,EAAE,CAAC,CAAC;QAE1F,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,yBAAyB;YAChC,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,CAAC;YACjB,QAAQ,EAAE,GAAG;SACd,CAAC,CAAC;QAEH,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,mBAAmB;YAC1B,MAAM,EAAE,aAAa;YACrB,cAAc,EAAE,EAAE;YAClB,QAAQ,EAAE,EAAE;SACb,CAAC,CAAC;QAEH,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC;YAChC,MAAM,EAAE,EAAE,CAAC,EAAE;YACb,eAAe,EAAE,EAAE,CAAC,EAAE;YACtB,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,qCAAqC;QACrC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,gBAAgB,CAAC,CAAC;QAC3G,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;QAEjE,8BAA8B;QAC9B,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,mBAAmB,CAAC,CAAC;QACjH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACnE,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,2BAA2B;QAC3B,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,SAAS,CAAC,CAAC;QACnG,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,mBAAmB,CAAC,CAAC;QAC3E,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClE,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4BAA4B;QAC5B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,UAAU,CAAC,CAAC;QACjG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;QAE9C,qCAAqC;QACrC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,mBAAmB,CAAC,CAAC;QAC1G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;QAE5E,gCAAgC;QAChC,MAAM,kBAAkB,GAAG,IAAI,OAAO,CACpC,oDAAoD,OAAO,CAAC,EAAE,0CAA0C,CACzG,CAAC;QACF,MAAM,kBAAkB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,kBAAkB,CAAC,CAAC;QAC1E,MAAM,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,mBAAmB,GAAG,MAAM,kBAAkB,CAAC,IAAI,EAAE,CAAC;QAC5D,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QACvE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAEnE,4BAA4B;QAC5B,MAAM,iBAAiB,GAAG,IAAI,OAAO,CACnC,+DAA+D,CAChE,CAAC;QACF,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,iBAAiB,CAAC,CAAC;QACxE,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3C,MAAM,kBAAkB,GAAG,MAAM,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAC1D,MAAM,CAAC,kBAAkB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;QAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,GAAG,GAAG,IAAI,OAAO,CAAC,gDAAgD,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM,EAAE,4BAA4B;gBACpC,MAAM,EAAE,OAAO;gBACf,SAAS,EAAE,OAAO;gBAClB,OAAO,EAAE,4BAA4B;gBACrC,SAAS,EAAE,IAAI;aAChB,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAChC,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,4BAA4B,CAAC,CAAC;QACvD,MAAM,CAAC,OAAO,IAAI,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAC/C,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qCAAqC,EAAE,GAAG,EAAE;QACnD,MAAM,IAAI,GAAG,yCAAyC,CAAC;QACvD,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,IAAa,EAAE,EAAE,CAC3C,IAAI,OAAO,CAAC,GAAG,IAAI,GAAG,IAAI,EAAE,EAAE;YAC5B,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC7D,CAAC,CAAC;QAEL,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;YACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC9E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAE7E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE/B,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YAC1G,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;YAEtD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC,CAAC;YACpF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;YACrE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YACnG,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAElC,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,KAAK,IAAI,EAAE;YACzE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,aAAa,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAC1D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,WAAW,EAAE,WAAW,CAAC,CAAC,CAAC;YACvE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE7B,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,MAAM,aAAa,GAAG,OAAO,CAAC,KAAK,CAAC;YACpC,OAAO,CAAC,KAAK,GAAG,GAAG,EAAE,GAAE,CAAC,CAAC;YACzB,IAAI,CAAC;gBACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,WAAW,CAAC,CAAC,CAAC;gBACxE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;gBAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjE,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,KAAK,GAAG,aAAa,CAAC;YAChC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4EAA4E,EAAE,KAAK,IAAI,EAAE;YAC1F,MAAM,SAAS,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,QAAQ,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,gBAAgB,EAAE,EAAE,CAAC,CAAC;YAEnH,MAAM,MAAM,GAAG,MAAM,IAAI,kBAAkB,EAAE,CAAC,aAAa,CAAC,SAAS,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,IAAI,GAAG,MAAM,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,CAAC,CAAC,aAAa,CAAC,SAAS,EAAE,CAAC,CAAC;YAC5G,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAClE,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC;QAC9E,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mEAAmE,EAAE,KAAK,IAAI,EAAE;QACjF,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACtC,MAAM,EAAE,GAAG,EAAE,GAAG,OAAO,CAAC;QACxB,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAElF,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChD,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IAC9C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;QAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,IAAa,EAAE,EAAE,CAC1C,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,oDAAoD,EAAE,EAAE,EAAE;YACpE,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,EAAE,UAAU,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnF,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,SAAS,EAAE,0BAA0B,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAE1G,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACpD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QACrC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACnE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,KAAK,MAAM,IAAI,IAAI,CAAC,UAAU,EAAE,OAAO,EAAE,WAAW,EAAE,UAAU,EAAE,aAAa,EAAE,cAAc,EAAE,OAAO,EAAE,YAAY,EAAE,YAAY,CAAC,EAAE,CAAC;YACtI,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,2CAA2C,IAAI,UAAU,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAC7F,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC;IACH,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,mCAAmC,EAAE,GAAG,EAAE;QACjD,MAAM,aAAa,GAAG,CAAC,OAA4D,EAAE,EAAE;YACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,OAAO,MAAM,CAAC;QAChB,CAAC,CAAC;QACF,MAAM,YAAY,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAE3F,EAAE,CAAC,8EAA8E,EAAE,KAAK,IAAI,EAAE;YAC5F,MAAM,IAAI,GAA4C,EAAE,CAAC;YACzD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,CAAC,GAAG,EAAE,OAAO,EAAE,EAAE;oBACxB,IAAI,CAAC,IAAI,CAAC,EAAE,OAAO,EAAG,GAAa,CAAC,OAAO,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC;gBACnE,CAAC;aACF,CAAC,CAAC;YAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YAC/D,MAAM,CAAC,IAAI,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,YAAY,EAAE,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC;QACnG,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mCAAmC,EAAE,KAAK,IAAI,EAAE;YACjD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,GAAG,EAAE,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,iBAAiB,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC;aAC3F,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;YAChE,IAAI,KAAK,GAAG,CAAC,CAAC;YACd,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,CAAC,KAAK,KAAK,EAAE,EAAE,CAAC,CAAC;YAClF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,kDAAkD,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAClG,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxB,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;YACvE,MAAM,OAAO,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,OAAO,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,kCAAkC,CAAC,CAAC;YAEpH,MAAM,MAAM,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;QAC1G,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,qDAAqD,EAAE,KAAK,IAAI,EAAE;YACnE,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC;YACtC,IAAI,CAAC;gBACH,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,aAAa,CAAC;gBACrC,MAAM,GAAG,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBACjD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,GAAG,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;gBAEnG,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,YAAY,CAAC;gBACpC,MAAM,IAAI,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBAClD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,IAAI,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACxG,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,QAAQ,CAAC;YAClC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,KAAK,GAAG,IAAI,aAAa,EAAE,CAAC;YAClC,KAAK,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBAC7B,MAAM,IAAI,KAAK,CAAC,iBAAiB,CAAC,CAAC;YACrC,CAAC,CAAC;YACF,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;YAE9G,MAAM,GAAG,GAAG,MAAM,OAAO,CAAC,YAAY,EAAE,CAAC,CAAC;YAC1C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YACzD,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,0CAA0C,EAAE,GAAG,EAAE;QACxD,MAAM,YAAY,GAAG,CAAC,OAAgB,EAAE,EAAE;YACxC,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;YAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;QACzE,CAAC,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,IAAY,EAAE,OAAyC,EAAE,EAAE,EAAE;YACrG,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAC1C,IAAI,IAAI,CAAC,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,eAAe,EAAE,UAAU,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;YACrE,IAAI,IAAI,CAAC,IAAI;gBAAE,OAAO,CAAC,GAAG,CAAC,cAAc,EAAE,kBAAkB,CAAC,CAAC;YAC/D,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE,EAAE,GAAG,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC;QACnH,CAAC,CAAC;QAEF,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;YAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YAClG,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC3D,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC/E,4CAA4C;YAC5C,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,CAAC,CAAC;YAC/E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBACtD,MAAM,EAAE,OAAO;gBACf,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC;aAC3C,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE;gBACjE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEvC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,aAAa,OAAO,CAAC,EAAE,YAAY,EAAE;gBACtE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;aACtC,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEzE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,MAAM,GAAG,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,cAAc,CAAC,CAAC;YACnE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,KAAK,IAAI,EAAE;YAC/D,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,GAAG,EAAE;oBACf,MAAM,IAAI,KAAK,CAAC,uBAAuB,CAAC,CAAC;gBAC3C,CAAC;gBACD,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC;YAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,gCAAgC,EAAE,KAAK,IAAI,EAAE;YAC9C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC,CAAC;YAC3E,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,kCAAkC,CAAC,CAAC,CAAC;YACvF,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC,CAAC;YACvG,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,mCAAmC,CAAC,CAAC,CAAC;YAC/F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,IAAI,EAAE,EAAE,OAAO,EAAE,CAAC,yBAAyB,CAAC,EAAE,WAAW,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE;aAC/E,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAC3F,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAC7E,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC;YAExD,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,0BAA0B,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACzH,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,CAAC,CAAC;YAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YAChG,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAElE,MAAM,CAAC,GAAG,EAAE,CAAC,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,aAAa,CAAC,CAAC;QACxH,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,iCAAiC,EAAE,GAAG,EAAE;QAC/C,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YAEtF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,IAAI,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACpF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,EAAE,IAAI,EAAE,GAAG,sBAAsB,CAAQ,MAAM,EAAE;gBACrD,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;aACrF,CAAC,CAAC;YAEH,MAAM,UAAU,GAAG,GAAG,EAAE,CACtB,IAAI,OAAO,CAAC,4CAA4C,IAAI,CAAC,EAAE,WAAW,EAAE;gBAC1E,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,aAAa,EAAE,CAAC;aACjD,CAAC,CAAC;YAEL,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,EAAE,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YACtF,MAAM,EAAE,GAAG,EAAE,GAAG,sBAAsB,CACpC,EAAE,EACF,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,CAChF,CAAC;YACF,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC;YAC7E,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrE,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;YAC1E,MAAM,MAAM,GAAG,sBAAsB,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,KAAK,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC;YACxH,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,8BAA8B,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrF,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,iCAAiC,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC1F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,yBAAyB,EAAE,GAAG,EAAE;QACvC,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,MAAc,EAAE,IAAY,EAAE,IAAa,EAAE,KAAc,EAAE,EAAE,CACvG,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE;YAC5D,MAAM;YACN,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,UAAU,KAAK,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;YACvG,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC/E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAEnF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBAC3D,KAAK,EAAE,SAAS;gBAChB,SAAS,EAAE,KAAK,CAAC,EAAE;gBACnB,EAAE,EAAE,UAAU;gBACd,SAAS,EAAE,0BAA0B;gBACrC,QAAQ,EAAE,UAAU;aACrB,CAAC,CAAC;YACH,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,EAAE,MAAM,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;YACpC,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAE/C,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACpD,MAAM,CAAC,MAAM,EAAE,KAAK,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC1C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,YAAY,EAAE,CAAC,CAAC;YAEtF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;YAC9B,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAmB,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,CAAC,UAAU,EAAE,OAAO,CAAC,CAAC,CAAC;YAE/F,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACvE,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/H,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;YACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE;oBACtB,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;oBAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;gBAC1C,CAAC;aACF,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAExF,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;YAC9F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACnC,MAAM,CAAC,CAAC,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;YAEpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,EAAE,OAAO,CAAC,CAAC;YACtH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,EAAE,OAAO,CAAC,CAAC;YACtH,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YACvC,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACvC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;YACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;YAC1G,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,CAAC,CAAC;YAClF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,WAAW,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvE,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qCAAqC,EAAE,GAAG,EAAE;QACnD,MAAM,KAAK,GAA2E;YACpF,KAAK,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE;YAC5C,GAAG,EAAE,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE;YACxC,GAAG,EAAE,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAC3C,CAAC;QACF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CACnC,EAAE,SAAS,EAAE,gBAAgB,EAAE,EAAE,EACjC;YACE,WAAW,EAAE,IAAI;YACjB,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE,CAAC,KAAK,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,IAAI,EAAE,CAAC,IAAI,IAAI;SAC3G,CACF,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,KAAa,EAAE,MAAc,EAAE,IAAY,EAAE,IAAc,EAAE,EAAE,CAC3E,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,qCAAqC,IAAI,EAAE,EAAE;YACvD,MAAM;YACN,OAAO,EAAE,EAAE,aAAa,EAAE,UAAU,KAAK,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YACjF,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;SAChD,CAAC,CACH,CAAC;QAEJ,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;YACxE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,OAAO,EAAE,MAAM,EAAE,WAAW,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,OAAO,EAAE,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC;aAC7C,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;YACzC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC;YAE9F,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAClG,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAErC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,EAAE,KAAK,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC;YACvE,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEpC,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,EAAE,KAAK,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC;YACxE,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrC,MAAM,eAAe,GAAG,MAAM,CAAC,MAAM,IAAI,CAAC,KAAK,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;YAC7E,MAAM,CAAC,eAAe,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEjD,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,OAAO,EAAE,OAAO,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;YACrG,MAAM,CAAC,YAAY,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;QAChF,MAAM,SAAS,GAAa,EAAE,CAAC;QAC/B,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,eAAe,EAAE;gBACf,KAAK,EAAE,CAAC,KAAK,EAAE,IAAY,EAAE,IAAiB,EAAE,EAAE;oBAChD,SAAS,CAAC,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,IAAc,CAAC,CAAC,KAAK,CAAC,CAAC;oBACtD,OAAO,IAAI,QAAQ,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;gBAC7C,CAAC,CAA4B;aAC9B;SACF,CAAC,CAAC;QACH,MAAM,IAAI,GAAG,CAAC,MAAc,EAAE,IAAY,EAAE,IAAc,EAAE,EAAE,CAC5D,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,qCAAqC,IAAI,EAAE,EAAE;YACvD,MAAM;YACN,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;SAChD,CAAC,CACH,CAAC;QAEJ,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE,2BAA2B,EAAE,MAAM,EAAE,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEzI,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,GAAG,EAAE,8BAA8B,EAAE,MAAM,EAAE,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QAClI,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QACjD,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAElC,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,IAAI,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;QAC7D,MAAM,CAAC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QACxD,MAAM,CAAC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEhD,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,IAAI,EAAE,qBAAqB,EAAE,CAAC,CAAC;QACjE,MAAM,MAAM,CAAC,MAAM,CAAC,QAAQ,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,SAAS,CAAC,CAAC,OAAO,CAAC,CAAC,iBAAiB,CAAC,CAAC,CAAC;QAE/C,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,QAAQ,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3E,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IAC1E,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;QAC5C,MAAM,OAAO,GAAuB;YAClC,EAAE,EAAE,SAAS;YACb,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,GAAG;YACZ,IAAI,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;gBACrB,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,MAAM,EAAE;gBACN;oBACE,MAAM,EAAE,KAAK;oBACb,IAAI,EAAE,6BAA6B;oBACnC,OAAO,EAAE,KAAK,EAAE,QAAQ,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,EAAE,EAAE;wBACvD,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,SAAS,CAAC,CAAC;wBACtD,OAAO,QAAQ,CAAC,IAAI,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,SAAS,EAAE,SAAS,EAAE,KAAK,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM,IAAI,IAAI,EAAE,CAAC,CAAC;oBAClH,CAAC;iBACF;gBACD;oBACE,MAAM,EAAE,MAAM;oBACd,IAAI,EAAE,oBAAoB;oBAC1B,OAAO,EAAE,GAAG,EAAE;wBACZ,MAAM,IAAI,cAAc,CAAC,uBAAuB,CAAC,CAAC;oBACpD,CAAC;iBACF;aACF;YACD,UAAU,EAAE,KAAK,EAAE,OAAO,EAAE,IAAI,EAAE,IAAI,EAAE,EAAE;gBACxC,IAAI,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,SAAS,CAAC,KAAK,KAAK;oBAAE,OAAO,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;gBAC1G,MAAM,QAAQ,GAAG,MAAM,IAAI,EAAE,CAAC;gBAC9B,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,UAAU,EAAE,SAAS,CAAC,CAAC;gBAC5C,OAAO,QAAQ,CAAC;YAClB,CAAC;SACF,CAAC;QACF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CACnC,EAAE,OAAO,EAAE,CAAC,OAAO,CAAC,EAAE,EACtB,EAAE,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,CACjH,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,OAAoB,EAAE,EAAE,EAAE,CACpD,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,qCAAqC,IAAI,EAAE,EAAE,IAAI,CAAC,CAAC,CAAC;QAEvF,EAAE,CAAC,qFAAqF,EAAE,KAAK,IAAI,EAAE;YACnG,MAAM,CAAC,OAAO,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,WAAW,EAAE,CAAC;YACpD,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,oBAAoB,CAAC,CAAC;YAChD,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEtE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,YAAY,OAAO,CAAC,EAAE,UAAU,EAAE,EAAE,OAAO,EAAE,EAAE,QAAQ,EAAE,KAAK,EAAE,EAAE,CAAC,CAAC;YAC3F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,SAAS,EAAE,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC;QAC3F,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;YAExD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,SAAS,EAAE,KAAK,EAAE,EAAE,CAAC,CAAC;YAC3E,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;YACxE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,oBAAoB,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YACjE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;QACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACrE,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3B,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9G,CAAC;QACD,MAAM,GAAG,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;YAC/B,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,qCAAqC,EAAE,EAAE,CAAC,CAAC,CAAC;YAC/F,OAAO,EAAE,MAAM,EAAE,GAAG,CAAC,MAAM,EAAE,IAAI,EAAE,MAAM,GAAG,CAAC,IAAI,EAAE,EAAE,CAAC;QACxD,CAAC,CAAC;QAEF,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,oBAAoB,OAAO,CAAC,EAAE,uBAAuB,CAAC,CAAC;QAC9E,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAoB,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAE5F,MAAM,KAAK,GAAG,MAAM,GAAG,CAAC,oBAAoB,OAAO,CAAC,EAAE,UAAU,CAAC,CAAC;QAClE,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACzC,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,UAAU,EAAE,CAAC;QAC3C,MAAM,MAAM,GAAG,MAAM,GAAG,CAAC,oBAAoB,OAAO,CAAC,EAAE,mBAAmB,kBAAkB,CAAC,KAAK,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACvH,4GAA4G;QAC5G,MAAM,GAAG,GAAG,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,KAAK,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,CAAC,CAAiB,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QACzF,MAAM,CAAC,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAElC,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,uBAAuB,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC9D,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,gBAAgB,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvD,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,uBAAuB,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAE9D,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,yBAAyB,OAAO,CAAC,EAAE,UAAU,CAAC,CAAC;QACtE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC7C,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,UAAU,EAAE,CAAC;IAC5C,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
|
1
|
+
{"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AACjD,OAAO,EAAE,iBAAiB,EAAE,MAAM,oBAAoB,CAAC;AACvD,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,aAAa,EAAE,gBAAgB,EAAE,cAAc,EAA2B,MAAM,qBAAqB,CAAC;AAE/G,QAAQ,CAAC,oCAAoC,EAAE,GAAG,EAAE;IAClD,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;QAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,oBAAoB;QACpB,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,kDAAkD,EAAE;YAC9E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC;SAC5D,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACpD,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE1C,kBAAkB;QAClB,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAC/E,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;IACxD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uCAAuC,EAAE,KAAK,IAAI,EAAE;QACrD,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,wBAAwB;QACxB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAClF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC1C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,wBAAwB;QACxB,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YACvF,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC;SACzC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;QAC1E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,8BAA8B;QAC9B,MAAM,KAAK,GAAG,IAAI,OAAO,CAAC,mDAAmD,EAAE;YAC7E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,IAAI,EAAE,qBAAqB;gBAC3B,gBAAgB,EAAE,MAAM;gBACxB,QAAQ,EAAE;oBACR,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;oBACxD,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;iBACtD;gBACD,WAAW,EAAE;oBACX,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,MAAM,EAAE,WAAW,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE;iBACzE;aACF,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QAChD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,MAAM,GAAG,MAAM,KAAK,CAAC,IAAI,EAAE,CAAC;QAClC,MAAM,IAAI,GAAG,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC;QAEhC,uCAAuC;QACvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,UAAU,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACnG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAE3H,6BAA6B;QAC7B,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,cAAc,CAAC,CAAC;QACrG,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,uBAAuB,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4CAA4C;QAC5C,MAAM,eAAe,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YAC9F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;SAChD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,eAAe,CAAC,CAAC;QAC/D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACtC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;QAChE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,CAAC;QACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAE3G,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,EAAE;YAClG,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,cAAc,EAAE,CAAC;SAClD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,SAAS,GAAG,WAAW,CAAC,OAAO,CAAC,EAAE,CAAC;QAEzC,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,CAAC,CAAC;QACpG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE5C,mBAAmB;QACnB,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC/F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,yBAAyB,EAAE,CAAC;SAC7D,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;QAErE,qBAAqB;QACrB,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,SAAS;gBACnB,GAAG,EAAE,qCAAqC;gBAC1C,QAAQ,EAAE,eAAe;gBACzB,SAAS,EAAE,GAAG;gBACd,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,IAAI,CAAC,EAAE;aACnB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,YAAY,GAAG,WAAW,CAAC,UAAU,CAAC,EAAE,CAAC;QAE/C,8BAA8B;QAC9B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,8DAA8D,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACxG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE/C,uBAAuB;QACvB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,uDAAuD,YAAY,EAAE,EAAE;YACnG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,oBAAoB;QACpB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC7F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,sCAAsC;QACtC,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACvF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,UAAU;gBACpB,GAAG,EAAE,+BAA+B,GAAG,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE;gBACtD,MAAM,EAAE,IAAI,CAAC,EAAE;aAChB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,2CAA2C,CAAC,CAAC;IACtF,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iFAAiF,EAAE,KAAK,IAAI,EAAE;QAC/F,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,CAAC,CAAC;QACtF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAC5G,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,CAAC;QAE1G,2BAA2B;QAC3B,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;SACtC,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvD,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC3D,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QAEnE,oFAAoF;QACpF,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAErC,gCAAgC;QAChC,MAAM,WAAW,GAAG,IAAI,OAAO,CAC7B,oDAAoD,OAAO,CAAC,EAAE,oBAAoB,kBAAkB,CAAC,IAAI,CAAC,EAAE,EAC5G,EAAE,MAAM,EAAE,QAAQ,EAAE,CACrB,CAAC;QACF,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IACzD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;QACvE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,kBAAkB,EAAE,CAAC,CAAC;QAEzF,iCAAiC;QACjC,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,sDAAsD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,YAAY;aACrB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;QAC7D,MAAM,aAAa,GAAG,UAAU,CAAC,WAAW,CAAC,EAAE,CAAC;QAEhD,qCAAqC;QACrC,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC7B,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,kBAAkB;YACzB,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;YACf,aAAa;SACd,CAAC,CAAC;QAEH,mCAAmC;QACnC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,kEAAkE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAEjD,6BAA6B;QAC7B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,UAAU,CAAC,CAAC;QAChH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEpD,kCAAkC;QAClC,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YACpG,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC;SAC9C,CAAC,CAAC;QACH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QACvD,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,WAAW,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,mCAAmC;QACnC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YAClG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACrC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,gBAAgB,EAAE,CAAC,CAAC;QAE1F,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,yBAAyB;YAChC,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,CAAC;YACjB,QAAQ,EAAE,GAAG;SACd,CAAC,CAAC;QAEH,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,mBAAmB;YAC1B,MAAM,EAAE,aAAa;YACrB,cAAc,EAAE,EAAE;YAClB,QAAQ,EAAE,EAAE;SACb,CAAC,CAAC;QAEH,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC;YAChC,MAAM,EAAE,EAAE,CAAC,EAAE;YACb,eAAe,EAAE,EAAE,CAAC,EAAE;YACtB,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,qCAAqC;QACrC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,gBAAgB,CAAC,CAAC;QAC3G,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;QAEjE,8BAA8B;QAC9B,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,mBAAmB,CAAC,CAAC;QACjH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACnE,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,2BAA2B;QAC3B,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,SAAS,CAAC,CAAC;QACnG,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,mBAAmB,CAAC,CAAC;QAC3E,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClE,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4BAA4B;QAC5B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,UAAU,CAAC,CAAC;QACjG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;QAE9C,qCAAqC;QACrC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,mBAAmB,CAAC,CAAC;QAC1G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;QAE5E,gCAAgC;QAChC,MAAM,kBAAkB,GAAG,IAAI,OAAO,CACpC,oDAAoD,OAAO,CAAC,EAAE,0CAA0C,CACzG,CAAC;QACF,MAAM,kBAAkB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,kBAAkB,CAAC,CAAC;QAC1E,MAAM,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,mBAAmB,GAAG,MAAM,kBAAkB,CAAC,IAAI,EAAE,CAAC;QAC5D,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QACvE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAEnE,4BAA4B;QAC5B,MAAM,iBAAiB,GAAG,IAAI,OAAO,CACnC,+DAA+D,CAChE,CAAC;QACF,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,iBAAiB,CAAC,CAAC;QACxE,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3C,MAAM,kBAAkB,GAAG,MAAM,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAC1D,MAAM,CAAC,kBAAkB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;QAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,GAAG,GAAG,IAAI,OAAO,CAAC,gDAAgD,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM,EAAE,4BAA4B;gBACpC,MAAM,EAAE,OAAO;gBACf,SAAS,EAAE,OAAO;gBAClB,OAAO,EAAE,4BAA4B;gBACrC,SAAS,EAAE,IAAI;aAChB,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAChC,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,4BAA4B,CAAC,CAAC;QACvD,MAAM,CAAC,OAAO,IAAI,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAC/C,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qCAAqC,EAAE,GAAG,EAAE;QACnD,MAAM,IAAI,GAAG,yCAAyC,CAAC;QACvD,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,IAAa,EAAE,EAAE,CAC3C,IAAI,OAAO,CAAC,GAAG,IAAI,GAAG,IAAI,EAAE,EAAE;YAC5B,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC7D,CAAC,CAAC;QAEL,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;YACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC9E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAE7E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE/B,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YAC1G,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;YAEtD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC,CAAC;YACpF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;YACrE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YACnG,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAElC,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,KAAK,IAAI,EAAE;YACzE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,aAAa,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAC1D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,WAAW,EAAE,WAAW,CAAC,CAAC,CAAC;YACvE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE7B,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,MAAM,aAAa,GAAG,OAAO,CAAC,KAAK,CAAC;YACpC,OAAO,CAAC,KAAK,GAAG,GAAG,EAAE,GAAE,CAAC,CAAC;YACzB,IAAI,CAAC;gBACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,WAAW,CAAC,CAAC,CAAC;gBACxE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;gBAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjE,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,KAAK,GAAG,aAAa,CAAC;YAChC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4EAA4E,EAAE,KAAK,IAAI,EAAE;YAC1F,MAAM,SAAS,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,QAAQ,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,gBAAgB,EAAE,EAAE,CAAC,CAAC;YAEnH,MAAM,MAAM,GAAG,MAAM,IAAI,kBAAkB,EAAE,CAAC,aAAa,CAAC,SAAS,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,IAAI,GAAG,MAAM,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,CAAC,CAAC,aAAa,CAAC,SAAS,EAAE,CAAC,CAAC;YAC5G,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAClE,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC;QAC9E,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mEAAmE,EAAE,KAAK,IAAI,EAAE;QACjF,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACtC,MAAM,EAAE,GAAG,EAAE,GAAG,OAAO,CAAC;QACxB,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAElF,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChD,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IAC9C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;QAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,IAAa,EAAE,EAAE,CAC1C,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,oDAAoD,EAAE,EAAE,EAAE;YACpE,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,EAAE,UAAU,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnF,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,SAAS,EAAE,0BAA0B,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAE1G,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACpD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QACrC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACnE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,KAAK,MAAM,IAAI,IAAI,CAAC,UAAU,EAAE,OAAO,EAAE,WAAW,EAAE,UAAU,EAAE,aAAa,EAAE,cAAc,EAAE,OAAO,EAAE,YAAY,EAAE,YAAY,CAAC,EAAE,CAAC;YACtI,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,2CAA2C,IAAI,UAAU,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAC7F,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC;IACH,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,mCAAmC,EAAE,GAAG,EAAE;QACjD,MAAM,aAAa,GAAG,CAAC,OAA4D,EAAE,EAAE;YACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,OAAO,MAAM,CAAC;QAChB,CAAC,CAAC;QACF,MAAM,YAAY,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAE3F,EAAE,CAAC,8EAA8E,EAAE,KAAK,IAAI,EAAE;YAC5F,MAAM,IAAI,GAA4C,EAAE,CAAC;YACzD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,CAAC,GAAG,EAAE,OAAO,EAAE,EAAE;oBACxB,IAAI,CAAC,IAAI,CAAC,EAAE,OAAO,EAAG,GAAa,CAAC,OAAO,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC;gBACnE,CAAC;aACF,CAAC,CAAC;YAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YAC/D,MAAM,CAAC,IAAI,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,YAAY,EAAE,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC;QACnG,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mCAAmC,EAAE,KAAK,IAAI,EAAE;YACjD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,GAAG,EAAE,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,iBAAiB,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC;aAC3F,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;YAChE,IAAI,KAAK,GAAG,CAAC,CAAC;YACd,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,CAAC,KAAK,KAAK,EAAE,EAAE,CAAC,CAAC;YAClF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,kDAAkD,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAClG,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxB,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;YACvE,MAAM,OAAO,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,OAAO,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,kCAAkC,CAAC,CAAC;YAEpH,MAAM,MAAM,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;QAC1G,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,qDAAqD,EAAE,KAAK,IAAI,EAAE;YACnE,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC;YACtC,IAAI,CAAC;gBACH,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,aAAa,CAAC;gBACrC,MAAM,GAAG,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBACjD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,GAAG,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;gBAEnG,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,YAAY,CAAC;gBACpC,MAAM,IAAI,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBAClD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,IAAI,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACxG,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,QAAQ,CAAC;YAClC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,KAAK,GAAG,IAAI,aAAa,EAAE,CAAC;YAClC,KAAK,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBAC7B,MAAM,IAAI,KAAK,CAAC,iBAAiB,CAAC,CAAC;YACrC,CAAC,CAAC;YACF,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;YAE9G,MAAM,GAAG,GAAG,MAAM,OAAO,CAAC,YAAY,EAAE,CAAC,CAAC;YAC1C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YACzD,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,0CAA0C,EAAE,GAAG,EAAE;QACxD,MAAM,YAAY,GAAG,CAAC,OAAgB,EAAE,EAAE;YACxC,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;YAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;QACzE,CAAC,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,IAAY,EAAE,OAAyC,EAAE,EAAE,EAAE;YACrG,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAC1C,IAAI,IAAI,CAAC,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,eAAe,EAAE,UAAU,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;YACrE,IAAI,IAAI,CAAC,IAAI;gBAAE,OAAO,CAAC,GAAG,CAAC,cAAc,EAAE,kBAAkB,CAAC,CAAC;YAC/D,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE,EAAE,GAAG,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC;QACnH,CAAC,CAAC;QAEF,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;YAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YAClG,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC3D,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC/E,4CAA4C;YAC5C,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,CAAC,CAAC;YAC/E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBACtD,MAAM,EAAE,OAAO;gBACf,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC;aAC3C,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE;gBACjE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEvC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,aAAa,OAAO,CAAC,EAAE,YAAY,EAAE;gBACtE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;aACtC,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEzE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,MAAM,GAAG,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,cAAc,CAAC,CAAC;YACnE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,KAAK,IAAI,EAAE;YAC/D,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,GAAG,EAAE;oBACf,MAAM,IAAI,KAAK,CAAC,uBAAuB,CAAC,CAAC;gBAC3C,CAAC;gBACD,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC;YAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,gCAAgC,EAAE,KAAK,IAAI,EAAE;YAC9C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC,CAAC;YAC3E,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,kCAAkC,CAAC,CAAC,CAAC;YACvF,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC,CAAC;YACvG,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,mCAAmC,CAAC,CAAC,CAAC;YAC/F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,IAAI,EAAE,EAAE,OAAO,EAAE,CAAC,yBAAyB,CAAC,EAAE,WAAW,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE;aAC/E,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAC3F,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAC7E,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC;YAExD,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,0BAA0B,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACzH,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,CAAC,CAAC;YAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YAChG,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAElE,MAAM,CAAC,GAAG,EAAE,CAAC,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,aAAa,CAAC,CAAC;QACxH,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,iCAAiC,EAAE,GAAG,EAAE;QAC/C,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YAEtF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,IAAI,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACpF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,EAAE,IAAI,EAAE,GAAG,sBAAsB,CAAQ,MAAM,EAAE;gBACrD,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;aACrF,CAAC,CAAC;YAEH,MAAM,UAAU,GAAG,GAAG,EAAE,CACtB,IAAI,OAAO,CAAC,4CAA4C,IAAI,CAAC,EAAE,WAAW,EAAE;gBAC1E,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,aAAa,EAAE,CAAC;aACjD,CAAC,CAAC;YAEL,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,EAAE,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YACtF,MAAM,EAAE,GAAG,EAAE,GAAG,sBAAsB,CACpC,EAAE,EACF,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,CAChF,CAAC;YACF,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC;YAC7E,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrE,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;YAC1E,MAAM,MAAM,GAAG,sBAAsB,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,KAAK,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC;YACxH,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,8BAA8B,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrF,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,iCAAiC,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC1F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,yBAAyB,EAAE,GAAG,EAAE;QACvC,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,MAAc,EAAE,IAAY,EAAE,IAAa,EAAE,KAAc,EAAE,EAAE,CACvG,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE;YAC5D,MAAM;YACN,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,UAAU,KAAK,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;YACvG,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC/E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAEnF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBAC3D,KAAK,EAAE,SAAS;gBAChB,SAAS,EAAE,KAAK,CAAC,EAAE;gBACnB,EAAE,EAAE,UAAU;gBACd,SAAS,EAAE,0BAA0B;gBACrC,QAAQ,EAAE,UAAU;aACrB,CAAC,CAAC;YACH,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,EAAE,MAAM,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;YACpC,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAE/C,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACpD,MAAM,CAAC,MAAM,EAAE,KAAK,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC1C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,YAAY,EAAE,CAAC,CAAC;YAEtF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;YAC9B,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAmB,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,CAAC,UAAU,EAAE,OAAO,CAAC,CAAC,CAAC;YAE/F,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACvE,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/H,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;YACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE;oBACtB,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;oBAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;gBAC1C,CAAC;aACF,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAExF,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;YAC9F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACnC,MAAM,CAAC,CAAC,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;YAEpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,EAAE,OAAO,CAAC,CAAC;YACtH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,EAAE,OAAO,CAAC,CAAC;YACtH,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YACvC,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACvC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;YACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;YAC1G,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,CAAC,CAAC;YAClF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,WAAW,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvE,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qCAAqC,EAAE,GAAG,EAAE;QACnD,MAAM,KAAK,GAA2E;YACpF,KAAK,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE;YAC5C,GAAG,EAAE,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE;YACxC,GAAG,EAAE,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAC3C,CAAC;QACF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CACnC,EAAE,SAAS,EAAE,gBAAgB,EAAE,EAAE,EACjC;YACE,WAAW,EAAE,IAAI;YACjB,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE,CAAC,KAAK,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,IAAI,EAAE,CAAC,IAAI,IAAI;SAC3G,CACF,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,KAAa,EAAE,MAAc,EAAE,IAAY,EAAE,IAAc,EAAE,EAAE,CAC3E,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,qCAAqC,IAAI,EAAE,EAAE;YACvD,MAAM;YACN,OAAO,EAAE,EAAE,aAAa,EAAE,UAAU,KAAK,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YACjF,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;SAChD,CAAC,CACH,CAAC;QAEJ,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;YACxE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,OAAO,EAAE,MAAM,EAAE,WAAW,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,OAAO,EAAE,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC;aAC7C,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;YACzC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC;YAE9F,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAClG,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAErC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,EAAE,KAAK,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC;YACvE,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEpC,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,EAAE,KAAK,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC;YACxE,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrC,MAAM,eAAe,GAAG,MAAM,CAAC,MAAM,IAAI,CAAC,KAAK,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;YAC7E,MAAM,CAAC,eAAe,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEjD,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,OAAO,EAAE,OAAO,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;YACrG,MAAM,CAAC,YAAY,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;QAChF,MAAM,SAAS,GAAa,EAAE,CAAC;QAC/B,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,eAAe,EAAE;gBACf,KAAK,EAAE,CAAC,KAAK,EAAE,IAAY,EAAE,IAAiB,EAAE,EAAE;oBAChD,SAAS,CAAC,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,IAAc,CAAC,CAAC,KAAK,CAAC,CAAC;oBACtD,OAAO,IAAI,QAAQ,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;gBAC7C,CAAC,CAA4B;aAC9B;SACF,CAAC,CAAC;QACH,MAAM,IAAI,GAAG,CAAC,MAAc,EAAE,IAAY,EAAE,IAAc,EAAE,EAAE,CAC5D,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,qCAAqC,IAAI,EAAE,EAAE;YACvD,MAAM;YACN,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;SAChD,CAAC,CACH,CAAC;QAEJ,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE,2BAA2B,EAAE,MAAM,EAAE,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEzI,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,GAAG,EAAE,8BAA8B,EAAE,MAAM,EAAE,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QAClI,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QACjD,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAElC,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,IAAI,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;QAC7D,MAAM,CAAC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QACxD,MAAM,CAAC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEhD,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,IAAI,EAAE,qBAAqB,EAAE,CAAC,CAAC;QACjE,MAAM,MAAM,CAAC,MAAM,CAAC,QAAQ,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,SAAS,CAAC,CAAC,OAAO,CAAC,CAAC,iBAAiB,CAAC,CAAC,CAAC;QAE/C,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,QAAQ,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3E,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,EAAE,aAAa,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IAC1E,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;QAC5C,MAAM,OAAO,GAAuB;YAClC,EAAE,EAAE,SAAS;YACb,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,GAAG;YACZ,IAAI,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;gBACrB,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,MAAM,EAAE;gBACN;oBACE,MAAM,EAAE,KAAK;oBACb,IAAI,EAAE,6BAA6B;oBACnC,OAAO,EAAE,KAAK,EAAE,QAAQ,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,EAAE,EAAE;wBACvD,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,SAAS,CAAC,CAAC;wBACtD,OAAO,QAAQ,CAAC,IAAI,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,SAAS,EAAE,SAAS,EAAE,KAAK,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM,IAAI,IAAI,EAAE,CAAC,CAAC;oBAClH,CAAC;iBACF;gBACD;oBACE,MAAM,EAAE,MAAM;oBACd,IAAI,EAAE,oBAAoB;oBAC1B,OAAO,EAAE,GAAG,EAAE;wBACZ,MAAM,IAAI,cAAc,CAAC,uBAAuB,CAAC,CAAC;oBACpD,CAAC;iBACF;aACF;YACD,UAAU,EAAE,KAAK,EAAE,OAAO,EAAE,IAAI,EAAE,IAAI,EAAE,EAAE;gBACxC,IAAI,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,SAAS,CAAC,KAAK,KAAK;oBAAE,OAAO,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;gBAC1G,MAAM,QAAQ,GAAG,MAAM,IAAI,EAAE,CAAC;gBAC9B,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,UAAU,EAAE,SAAS,CAAC,CAAC;gBAC5C,OAAO,QAAQ,CAAC;YAClB,CAAC;SACF,CAAC;QACF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CACnC,EAAE,OAAO,EAAE,CAAC,OAAO,CAAC,EAAE,EACtB,EAAE,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,CACjH,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,OAAoB,EAAE,EAAE,EAAE,CACpD,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,qCAAqC,IAAI,EAAE,EAAE,IAAI,CAAC,CAAC,CAAC;QAEvF,EAAE,CAAC,qFAAqF,EAAE,KAAK,IAAI,EAAE;YACnG,MAAM,CAAC,OAAO,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,WAAW,EAAE,CAAC;YACpD,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,oBAAoB,CAAC,CAAC;YAChD,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEtE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,YAAY,OAAO,CAAC,EAAE,UAAU,EAAE,EAAE,OAAO,EAAE,EAAE,QAAQ,EAAE,KAAK,EAAE,EAAE,CAAC,CAAC;YAC3F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,SAAS,EAAE,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC;QAC3F,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;YAExD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,SAAS,EAAE,KAAK,EAAE,EAAE,CAAC,CAAC;YAC3E,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;YACxE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,oBAAoB,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YACjE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;QACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACrE,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3B,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9G,CAAC;QACD,MAAM,GAAG,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;YAC/B,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,qCAAqC,EAAE,EAAE,CAAC,CAAC,CAAC;YAC/F,OAAO,EAAE,MAAM,EAAE,GAAG,CAAC,MAAM,EAAE,IAAI,EAAE,MAAM,GAAG,CAAC,IAAI,EAAE,EAAE,CAAC;QACxD,CAAC,CAAC;QAEF,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,oBAAoB,OAAO,CAAC,EAAE,uBAAuB,CAAC,CAAC;QAC9E,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAoB,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAE5F,MAAM,KAAK,GAAG,MAAM,GAAG,CAAC,oBAAoB,OAAO,CAAC,EAAE,UAAU,CAAC,CAAC;QAClE,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACzC,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,UAAU,EAAE,CAAC;QAC3C,MAAM,MAAM,GAAG,MAAM,GAAG,CAAC,oBAAoB,OAAO,CAAC,EAAE,mBAAmB,kBAAkB,CAAC,KAAK,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACvH,4GAA4G;QAC5G,MAAM,GAAG,GAAG,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,KAAK,EAAE,GAAG,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,CAAC,CAAiB,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QACzF,MAAM,CAAC,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAElC,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,uBAAuB,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC9D,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,gBAAgB,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvD,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,uBAAuB,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAE9D,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,yBAAyB,OAAO,CAAC,EAAE,UAAU,CAAC,CAAC;QACtE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC7C,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,UAAU,EAAE,CAAC;IAC5C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mDAAmD,EAAE,KAAK,IAAI,EAAE;QACjE,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC,CAAC;QACvE,MAAM,GAAG,GAAG,IAAI,CAAC,SAAS,CAAC,EAAE,IAAI,EAAE,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QAEtD,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CACzC,IAAI,OAAO,CAAC,6CAA6C,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,GAAG,EAAE,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE,EAAE,CAAC,CAC3I,CAAC;QACF,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAElC,6EAA6E;QAC7E,MAAM,MAAM,GAAG,IAAI,cAAc,CAAC;YAChC,KAAK,CAAC,UAAU;gBACd,UAAU,CAAC,OAAO,CAAC,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;gBAClD,UAAU,CAAC,KAAK,EAAE,CAAC;YACrB,CAAC;SACF,CAAC,CAAC;QACH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CACzC,IAAI,OAAO,CAAC,6CAA6C,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAiB,CAAC,CAC5H,CAAC;QACF,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAElC,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CACtC,IAAI,OAAO,CAAC,6CAA6C,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,IAAI,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC,CACrH,CAAC;QACF,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACjC,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
package/dist/openapi.d.ts.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"openapi.d.ts","sourceRoot":"","sources":["../src/openapi.ts"],"names":[],"mappings":"AAGA,KAAK,MAAM,GAAG,KAAK,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAElD,UAAU,QAAQ;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,GAAG,EAAE,MAAM,CAAC;IACZ,0DAA0D;IAC1D,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,IAAI,CAAC,EAAE;QAAE,SAAS,CAAC,IAAI,EAAE,OAAO,GAAG,OAAO,CAAA;KAAE,CAAC;IAC7C,gFAAgF;IAChF,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;CACjB;AAED,wFAAwF;AACxF,eAAO,MAAM,MAAM,EAAE,QAAQ,EAuF5B,CAAC;AAuBF,MAAM,WAAW,cAAc;IAC7B,2FAA2F;IAC3F,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,OAAO,CAAC,EAAE,MAAM,CAAC;CAClB;AAED;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,OAAO,GAAE,cAAmB,GAAG,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,
|
|
1
|
+
{"version":3,"file":"openapi.d.ts","sourceRoot":"","sources":["../src/openapi.ts"],"names":[],"mappings":"AAGA,KAAK,MAAM,GAAG,KAAK,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAElD,UAAU,QAAQ;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,GAAG,EAAE,MAAM,CAAC;IACZ,0DAA0D;IAC1D,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,IAAI,CAAC,EAAE;QAAE,SAAS,CAAC,IAAI,EAAE,OAAO,GAAG,OAAO,CAAA;KAAE,CAAC;IAC7C,gFAAgF;IAChF,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;CACjB;AAED,wFAAwF;AACxF,eAAO,MAAM,MAAM,EAAE,QAAQ,EAuF5B,CAAC;AAuBF,MAAM,WAAW,cAAc;IAC7B,2FAA2F;IAC3F,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,OAAO,CAAC,EAAE,MAAM,CAAC;CAClB;AAED;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,OAAO,GAAE,cAAmB,GAAG,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CA8C1F"}
|
package/dist/openapi.js
CHANGED
|
@@ -132,6 +132,7 @@ export function buildOpenApiDocument(options = {}) {
|
|
|
132
132
|
'403': errorResponse,
|
|
133
133
|
'404': errorResponse,
|
|
134
134
|
...(route.path.endsWith('/dependencies') && route.method === 'post' ? { '409': errorResponse } : {}),
|
|
135
|
+
...(route.body ? { '413': errorResponse } : {}),
|
|
135
136
|
'500': errorResponse
|
|
136
137
|
}
|
|
137
138
|
};
|
package/dist/openapi.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"openapi.js","sourceRoot":"","sources":["../src/openapi.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AACrD,OAAO,KAAK,OAAO,MAAM,6BAA6B,CAAC;AAiBvD,wFAAwF;AACxF,MAAM,CAAC,MAAM,MAAM,GAAe;IAChC,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IAC3H,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,yDAAyD,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAClM,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IACnH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,4BAA4B,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE;IACrK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE;IAEjG,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,YAAY,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,WAAW,EAAE,WAAW,EAAE,WAAW,EAAE;IAC5G,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,YAAY,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,OAAO,CAAC,oBAAoB,EAAE,WAAW,EAAE,UAAU,EAAE,MAAM,EAAE,GAAG,EAAE;IAChK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,WAAW,EAAE,WAAW,EAAE,UAAU,EAAE;IACxH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,OAAO,CAAC,oBAAoB,EAAE,WAAW,EAAE,UAAU,EAAE;IACjK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE;IAErG,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IACxG,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAC3J,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IACnH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE;IAC3J,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE;IAC/G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,qCAAqC,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IACjJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,OAAO,EAAE,aAAa,EAAE,aAAa,CAAC,EAAE,WAAW,EAAE,QAAQ,EAAE;IAC1L,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,gCAAgC,EAAE,OAAO,EAAE,+BAA+B,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,SAAS,EAAE,UAAU,EAAE,SAAS,EAAE,QAAQ,EAAE,4BAA4B,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IAE7O,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,kEAAkE,EAAE,GAAG,EAAE,OAAO,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,QAAQ,EAAE,UAAU,EAAE,YAAY,EAAE,aAAa,EAAE,eAAe,EAAE,aAAa,EAAE,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE;IAC1R,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,EAAE;IAC5I,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,MAAM,EAAE;IACpG,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,+CAA+C,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE;IACzK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,wHAAwH,EAAE,GAAG,EAAE,OAAO,EAAE,KAAK,EAAE,CAAC,UAAU,CAAC,EAAE;IACnN,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,0BAA0B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IAC5H,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,0BAA0B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAClM,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,uBAAuB,EAAE,GAAG,EAAE,aAAa,EAAE,WAAW,EAAE,aAAa,EAAE;IACxI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACzN,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,uBAAuB,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,OAAO,EAAE;IACpI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACxM,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,6CAA6C,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,cAAc,EAAE;IAC9H,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,OAAO,EAAE;IAC5H,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,4BAA4B,EAAE,GAAG,EAAE,OAAO,EAAE;IAC3G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,wBAAwB,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,YAAY,EAAE;IACjI,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IAC5H,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,kCAAkC,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,iBAAiB,EAAE;IAEvJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,OAAO,EAAE;IAC5F,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,EAAE;IAC5I,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,MAAM,EAAE;IACpG,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE;IACzI,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE;IAErF,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IACrK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,WAAW,EAAE,WAAW,EAAE;IAC7H,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE;IACvK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE;IAEzG,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,cAAc,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,cAAc,EAAE;IAC/I,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,aAAa,EAAE,MAAM,EAAE,GAAG,EAAE;IAC/K,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,aAAa,EAAE;IACvI,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uCAAuC,EAAE,OAAO,EAAE,4BAA4B,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,SAAS,EAAE;IACpJ,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,aAAa,EAAE;IACnL,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE;IAEjH,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IACtK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,YAAY,EAAE,WAAW,EAAE,WAAW,EAAE;IAC9H,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE;IACxK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE;IAE1G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,2DAA2D,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IAE3M,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,0BAA0B,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAC3J,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IACnH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE;IAC3J,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE;IACjG,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,iCAAiC,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,SAAS,EAAE;IACpK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iCAAiC,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,QAAQ,CAAC,EAAE,WAAW,EAAE,SAAS,EAAE;IAEvJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,CAAC,QAAQ,EAAE,WAAW,EAAE,WAAW,CAAC,EAAE,WAAW,EAAE,aAAa,EAAE;IACjK,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,OAAO,EAAE,wBAAwB,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IAC7K,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,qBAAqB,EAAE,OAAO,EAAE,yDAAyD,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACrN,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,sBAAsB,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,WAAW,EAAE;IAChL,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,aAAa,EAAE,WAAW,EAAE,YAAY,EAAE;IACnI,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,aAAa,EAAE;IAE9G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,eAAe,EAAE,KAAK,EAAE,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,aAAa,EAAE;IACvJ,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,eAAe,EAAE,IAAI,EAAE,OAAO,CAAC,aAAa,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IAEvK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,uCAAuC,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,WAAW,EAAE,SAAS,EAAE,UAAU,EAAE,SAAS,EAAE,QAAQ,EAAE,4BAA4B,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IAC7O,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,SAAS,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,QAAQ,EAAE;CAC9F,CAAC;AAEF,MAAM,aAAa,GAAG;IACpB,WAAW,EAAE,OAAO;IACpB,OAAO,EAAE;QACP,kBAAkB,EAAE;YAClB,MAAM,EAAE;gBACN,IAAI,EAAE,QAAQ;gBACd,UAAU,EAAE;oBACV,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;oBACzB,MAAM,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,UAAU,EAAE,EAAE,IAAI,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,EAAE,EAAE;iBAC5H;gBACD,QAAQ,EAAE,CAAC,OAAO,CAAC;aACpB;SACF;KACF;CACF,CAAC;AAEF,SAAS,YAAY,CAAC,MAAe;IACnC,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,GAAG,IAAI,EAAE,GAAG,eAAe,CAAC,MAAa,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IAC3H,OAAO,IAAI,CAAC;AACd,CAAC;AASD;;;GAGG;AACH,MAAM,UAAU,oBAAoB,CAAC,UAA0B,EAAE;IAC/D,MAAM,KAAK,GAA4C,EAAE,CAAC;IAE1D,KAAK,MAAM,KAAK,IAAI,MAAM,EAAE,CAAC;QAC3B,MAAM,UAAU,GAAG,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAC3E,MAAM,UAAU,GAAG;YACjB,GAAG,UAAU,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YAC/F,GAAG,CAAC,KAAK,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;gBACjC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBACzB,EAAE,EAAE,OAAO;gBACX,QAAQ,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC;gBACzB,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;aAC3B,CAAC,CAAC;SACJ,CAAC;QACF,MAAM,MAAM,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM,IAAI,GAAG,CAAC,CAAC;QAC3C,MAAM,aAAa,GAAG,KAAK,CAAC,WAAW;YACrC,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,UAAU,EAAE,EAAE,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,EAAE,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE;YAC5F,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC;QAEvB,KAAK,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,EAAE,CAAC;QACzB,KAAK,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG;YAChC,OAAO,EAAE,KAAK,CAAC,OAAO;YACtB,IAAI,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC;YACjB,GAAG,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC5C,GAAG,CAAC,KAAK,CAAC,IAAI;gBACZ,CAAC,CAAC,EAAE,WAAW,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,kBAAkB,EAAE,EAAE,MAAM,EAAE,YAAY,CAAC,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE;gBAC5G,CAAC,CAAC,EAAE,CAAC;YACP,SAAS,EAAE;gBACT,CAAC,MAAM,CAAC,EAAE,EAAE,WAAW,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,kBAAkB,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,EAAE;gBAChG,KAAK,EAAE,aAAa;gBACpB,KAAK,EAAE,aAAa;gBACpB,KAAK,EAAE,aAAa;gBACpB,KAAK,EAAE,aAAa;gBACpB,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,eAAe,CAAC,IAAI,KAAK,CAAC,MAAM,KAAK,MAAM,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;gBACpG,KAAK,EAAE,aAAa;aACrB;SACF,CAAC;IACJ,CAAC;IAED,OAAO;QACL,OAAO,EAAE,OAAO;QAChB,IAAI,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,IAAI,mBAAmB,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,OAAO,EAAE;QAC1F,GAAG,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,CAAC,EAAE,GAAG,EAAE,OAAO,CAAC,SAAS,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACvE,KAAK;KACN,CAAC;AACJ,CAAC"}
|
|
1
|
+
{"version":3,"file":"openapi.js","sourceRoot":"","sources":["../src/openapi.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AACrD,OAAO,KAAK,OAAO,MAAM,6BAA6B,CAAC;AAiBvD,wFAAwF;AACxF,MAAM,CAAC,MAAM,MAAM,GAAe;IAChC,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IAC3H,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,yDAAyD,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAClM,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IACnH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,4BAA4B,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE;IACrK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE;IAEjG,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,YAAY,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,WAAW,EAAE,WAAW,EAAE,WAAW,EAAE;IAC5G,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,YAAY,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,OAAO,CAAC,oBAAoB,EAAE,WAAW,EAAE,UAAU,EAAE,MAAM,EAAE,GAAG,EAAE;IAChK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,WAAW,EAAE,WAAW,EAAE,UAAU,EAAE;IACxH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,OAAO,CAAC,oBAAoB,EAAE,WAAW,EAAE,UAAU,EAAE;IACjK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE;IAErG,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IACxG,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAC3J,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IACnH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE;IAC3J,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE;IAC/G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,qCAAqC,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IACjJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,OAAO,EAAE,aAAa,EAAE,aAAa,CAAC,EAAE,WAAW,EAAE,QAAQ,EAAE;IAC1L,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,gCAAgC,EAAE,OAAO,EAAE,+BAA+B,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,SAAS,EAAE,UAAU,EAAE,SAAS,EAAE,QAAQ,EAAE,4BAA4B,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IAE7O,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,kEAAkE,EAAE,GAAG,EAAE,OAAO,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,QAAQ,EAAE,UAAU,EAAE,YAAY,EAAE,aAAa,EAAE,eAAe,EAAE,aAAa,EAAE,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE;IAC1R,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,EAAE;IAC5I,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,MAAM,EAAE;IACpG,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,+CAA+C,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE;IACzK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,wHAAwH,EAAE,GAAG,EAAE,OAAO,EAAE,KAAK,EAAE,CAAC,UAAU,CAAC,EAAE;IACnN,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,0BAA0B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IAC5H,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,0BAA0B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAClM,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,uBAAuB,EAAE,GAAG,EAAE,aAAa,EAAE,WAAW,EAAE,aAAa,EAAE;IACxI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACzN,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,uBAAuB,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,OAAO,EAAE;IACpI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACxM,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,6CAA6C,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,cAAc,EAAE;IAC9H,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,OAAO,EAAE;IAC5H,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,4BAA4B,EAAE,GAAG,EAAE,OAAO,EAAE;IAC3G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,wBAAwB,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,YAAY,EAAE;IACjI,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IAC5H,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,kCAAkC,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,iBAAiB,EAAE;IAEvJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,OAAO,EAAE;IAC5F,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,EAAE;IAC5I,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,MAAM,EAAE;IACpG,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE;IACzI,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE;IAErF,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IACrK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,WAAW,EAAE,WAAW,EAAE;IAC7H,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE;IACvK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE;IAEzG,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,cAAc,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,cAAc,EAAE;IAC/I,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,aAAa,EAAE,MAAM,EAAE,GAAG,EAAE;IAC/K,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,aAAa,EAAE;IACvI,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uCAAuC,EAAE,OAAO,EAAE,4BAA4B,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,SAAS,EAAE;IACpJ,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,aAAa,EAAE;IACnL,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE;IAEjH,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IACtK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,YAAY,EAAE,WAAW,EAAE,WAAW,EAAE;IAC9H,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE;IACxK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE;IAE1G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,2DAA2D,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IAE3M,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,0BAA0B,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAC3J,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IACnH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE;IAC3J,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE;IACjG,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,iCAAiC,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,SAAS,EAAE;IACpK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iCAAiC,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,QAAQ,CAAC,EAAE,WAAW,EAAE,SAAS,EAAE;IAEvJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,CAAC,QAAQ,EAAE,WAAW,EAAE,WAAW,CAAC,EAAE,WAAW,EAAE,aAAa,EAAE;IACjK,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,OAAO,EAAE,wBAAwB,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IAC7K,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,qBAAqB,EAAE,OAAO,EAAE,yDAAyD,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACrN,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,sBAAsB,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,WAAW,EAAE;IAChL,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,aAAa,EAAE,WAAW,EAAE,YAAY,EAAE;IACnI,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,aAAa,EAAE;IAE9G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,eAAe,EAAE,KAAK,EAAE,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,aAAa,EAAE;IACvJ,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,eAAe,EAAE,IAAI,EAAE,OAAO,CAAC,aAAa,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IAEvK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,uCAAuC,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,WAAW,EAAE,SAAS,EAAE,UAAU,EAAE,SAAS,EAAE,QAAQ,EAAE,4BAA4B,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IAC7O,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,SAAS,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,QAAQ,EAAE;CAC9F,CAAC;AAEF,MAAM,aAAa,GAAG;IACpB,WAAW,EAAE,OAAO;IACpB,OAAO,EAAE;QACP,kBAAkB,EAAE;YAClB,MAAM,EAAE;gBACN,IAAI,EAAE,QAAQ;gBACd,UAAU,EAAE;oBACV,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;oBACzB,MAAM,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,UAAU,EAAE,EAAE,IAAI,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,EAAE,EAAE;iBAC5H;gBACD,QAAQ,EAAE,CAAC,OAAO,CAAC;aACpB;SACF;KACF;CACF,CAAC;AAEF,SAAS,YAAY,CAAC,MAAe;IACnC,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,GAAG,IAAI,EAAE,GAAG,eAAe,CAAC,MAAa,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IAC3H,OAAO,IAAI,CAAC;AACd,CAAC;AASD;;;GAGG;AACH,MAAM,UAAU,oBAAoB,CAAC,UAA0B,EAAE;IAC/D,MAAM,KAAK,GAA4C,EAAE,CAAC;IAE1D,KAAK,MAAM,KAAK,IAAI,MAAM,EAAE,CAAC;QAC3B,MAAM,UAAU,GAAG,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAC3E,MAAM,UAAU,GAAG;YACjB,GAAG,UAAU,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YAC/F,GAAG,CAAC,KAAK,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;gBACjC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBACzB,EAAE,EAAE,OAAO;gBACX,QAAQ,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC;gBACzB,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;aAC3B,CAAC,CAAC;SACJ,CAAC;QACF,MAAM,MAAM,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM,IAAI,GAAG,CAAC,CAAC;QAC3C,MAAM,aAAa,GAAG,KAAK,CAAC,WAAW;YACrC,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,UAAU,EAAE,EAAE,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,EAAE,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE;YAC5F,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC;QAEvB,KAAK,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,EAAE,CAAC;QACzB,KAAK,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG;YAChC,OAAO,EAAE,KAAK,CAAC,OAAO;YACtB,IAAI,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC;YACjB,GAAG,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC5C,GAAG,CAAC,KAAK,CAAC,IAAI;gBACZ,CAAC,CAAC,EAAE,WAAW,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,kBAAkB,EAAE,EAAE,MAAM,EAAE,YAAY,CAAC,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE;gBAC5G,CAAC,CAAC,EAAE,CAAC;YACP,SAAS,EAAE;gBACT,CAAC,MAAM,CAAC,EAAE,EAAE,WAAW,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,kBAAkB,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,EAAE;gBAChG,KAAK,EAAE,aAAa;gBACpB,KAAK,EAAE,aAAa;gBACpB,KAAK,EAAE,aAAa;gBACpB,KAAK,EAAE,aAAa;gBACpB,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,eAAe,CAAC,IAAI,KAAK,CAAC,MAAM,KAAK,MAAM,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;gBACpG,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;gBAC/C,KAAK,EAAE,aAAa;aACrB;SACF,CAAC;IACJ,CAAC;IAED,OAAO;QACL,OAAO,EAAE,OAAO;QAChB,IAAI,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,IAAI,mBAAmB,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,OAAO,EAAE;QAC1F,GAAG,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,CAAC,EAAE,GAAG,EAAE,OAAO,CAAC,SAAS,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACvE,KAAK;KACN,CAAC;AACJ,CAAC"}
|
package/dist/router.d.ts
CHANGED
|
@@ -51,6 +51,12 @@ export interface CriticalPathRouterOptions {
|
|
|
51
51
|
* otherwise they are attributed to `ANONYMOUS_ACTOR`. Request bodies never carry identity.
|
|
52
52
|
*/
|
|
53
53
|
getContext?: (request: Request) => RequestContext | null | undefined | Promise<RequestContext | null | undefined>;
|
|
54
|
+
/**
|
|
55
|
+
* Largest accepted request body in bytes; larger bodies get `413`. Defaults to 10 MiB, which
|
|
56
|
+
* leaves room for base64 uploads to `/attachments/upload`. Use the engine's `uploads.maxBytes`
|
|
57
|
+
* to limit file sizes themselves.
|
|
58
|
+
*/
|
|
59
|
+
maxBodyBytes?: number;
|
|
54
60
|
/** Reject requests with `401` unless `getContext` returns a `userId`. Defaults to `false`. */
|
|
55
61
|
requireAuth?: boolean;
|
|
56
62
|
/**
|
|
@@ -70,6 +76,7 @@ export declare class CriticalPathRouter {
|
|
|
70
76
|
private readonly exposeErrors;
|
|
71
77
|
private readonly getContext?;
|
|
72
78
|
private readonly requireAuth;
|
|
79
|
+
private readonly maxBodyBytes;
|
|
73
80
|
private readonly basePath?;
|
|
74
81
|
private readonly cors;
|
|
75
82
|
constructor(configOrEngine?: CriticalPathConfig | CriticalPathEngine, options?: CriticalPathRouterOptions);
|
|
@@ -92,6 +99,7 @@ export declare class CriticalPathRouter {
|
|
|
92
99
|
private readBody;
|
|
93
100
|
/** The API root as seen by this request, e.g. `https://host/api/critical-path`. */
|
|
94
101
|
private openApiServerUrl;
|
|
102
|
+
/** Reads a JSON body, stopping as soon as it exceeds `maxBodyBytes`. */
|
|
95
103
|
private readJson;
|
|
96
104
|
private errorResponse;
|
|
97
105
|
private jsonResponse;
|
package/dist/router.d.ts.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"router.d.ts","sourceRoot":"","sources":["../src/router.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,kBAAkB,EAAE,KAAK,UAAU,EAAE,KAAK,kBAAkB,EAAoB,MAAM,qBAAqB,CAAC;AAIrH,oFAAoF;AACpF,eAAO,MAAM,eAAe;;;;EAA4F,CAAC;AAKzH;;;;GAIG;AACH,MAAM,WAAW,cAAc;IAC7B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,UAAU,CAAC;IACvB,iGAAiG;IACjG,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,yFAAyF;IACzF,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,CAAC,GAAG,EAAE,MAAM,GAAG,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,kBAAkB;IACjC,UAAU,CAAC,EAAE,yBAAyB,CAAC,YAAY,CAAC,CAAC;CACtD;AAED,MAAM,WAAW,WAAW;IAC1B,4FAA4F;IAC5F,OAAO,EAAE,GAAG,GAAG,MAAM,EAAE,CAAC;IACxB,yEAAyE;IACzE,WAAW,CAAC,EAAE,OAAO,CAAC;IACtB,yFAAyF;IACzF,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;IACxB,oDAAoD;IACpD,MAAM,CAAC,EAAE,MAAM,CAAC;CACjB;
|
|
1
|
+
{"version":3,"file":"router.d.ts","sourceRoot":"","sources":["../src/router.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,kBAAkB,EAAE,KAAK,UAAU,EAAE,KAAK,kBAAkB,EAAoB,MAAM,qBAAqB,CAAC;AAIrH,oFAAoF;AACpF,eAAO,MAAM,eAAe;;;;EAA4F,CAAC;AAKzH;;;;GAIG;AACH,MAAM,WAAW,cAAc;IAC7B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,UAAU,CAAC;IACvB,iGAAiG;IACjG,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,yFAAyF;IACzF,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,CAAC,GAAG,EAAE,MAAM,GAAG,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,kBAAkB;IACjC,UAAU,CAAC,EAAE,yBAAyB,CAAC,YAAY,CAAC,CAAC;CACtD;AAED,MAAM,WAAW,WAAW;IAC1B,4FAA4F;IAC5F,OAAO,EAAE,GAAG,GAAG,MAAM,EAAE,CAAC;IACxB,yEAAyE;IACzE,WAAW,CAAC,EAAE,OAAO,CAAC;IACtB,yFAAyF;IACzF,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;IACxB,oDAAoD;IACpD,MAAM,CAAC,EAAE,MAAM,CAAC;CACjB;AAgBD,MAAM,WAAW,yBAAyB;IACxC;;;;OAIG;IACH,OAAO,CAAC,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,OAAO,EAAE,OAAO,KAAK,IAAI,GAAG,QAAQ,GAAG,OAAO,CAAC,IAAI,GAAG,QAAQ,CAAC,CAAC;IAC3F;;;OAGG;IACH,YAAY,CAAC,EAAE,OAAO,CAAC;IACvB;;;;OAIG;IACH,UAAU,CAAC,EAAE,CAAC,OAAO,EAAE,OAAO,KAAK,cAAc,GAAG,IAAI,GAAG,SAAS,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,GAAG,SAAS,CAAC,CAAC;IAClH;;;;OAIG;IACH,YAAY,CAAC,EAAE,MAAM,CAAC;IACtB,8FAA8F;IAC9F,WAAW,CAAC,EAAE,OAAO,CAAC;IACtB;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB;;;OAGG;IACH,IAAI,CAAC,EAAE,WAAW,GAAG,KAAK,CAAC;CAC5B;AAMD,qBAAa,kBAAkB;IACtB,MAAM,EAAE,kBAAkB,CAAC;IAClC,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAuC;IAChE,OAAO,CAAC,QAAQ,CAAC,YAAY,CAAU;IACvC,OAAO,CAAC,QAAQ,CAAC,UAAU,CAAC,CAA0C;IACtE,OAAO,CAAC,QAAQ,CAAC,WAAW,CAAU;IACtC,OAAO,CAAC,QAAQ,CAAC,YAAY,CAAS;IACtC,OAAO,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAS;IACnC,OAAO,CAAC,QAAQ,CAAC,IAAI,CAAsB;gBAE/B,cAAc,CAAC,EAAE,kBAAkB,GAAG,kBAAkB,EAAE,OAAO,GAAE,yBAA8B;IAkB7G;;;;OAIG;IACG,aAAa,CAAC,OAAO,EAAE,OAAO,EAAE,IAAI,GAAE,kBAAuB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAKvF,gGAAgG;IAChG,OAAO,CAAC,cAAc;IAStB,OAAO,CAAC,SAAS;YA0BH,QAAQ;IA6DtB,OAAO,CAAC,gBAAgB;YAqBV,aAAa;IAqkB3B;;;OAGG;YACW,QAAQ;IAUtB,mFAAmF;IACnF,OAAO,CAAC,gBAAgB;IAKxB,wEAAwE;YAC1D,QAAQ;YA4BR,aAAa;IAyC3B,OAAO,CAAC,YAAY;CAQrB"}
|
package/dist/router.js
CHANGED
|
@@ -5,6 +5,12 @@ import { buildOpenApiDocument } from './openapi.js';
|
|
|
5
5
|
export const ANONYMOUS_ACTOR = Object.freeze({ userId: 'anonymous', username: 'Anonymous', actorType: 'user' });
|
|
6
6
|
const CORS_ALLOW_METHODS = 'GET, POST, PUT, PATCH, DELETE, OPTIONS';
|
|
7
7
|
const DEFAULT_CORS_ALLOW_HEADERS = ['Content-Type', 'Authorization'];
|
|
8
|
+
class PayloadTooLargeError extends Error {
|
|
9
|
+
constructor(limit) {
|
|
10
|
+
super(`Request body exceeds ${limit} bytes.`);
|
|
11
|
+
this.name = 'PayloadTooLargeError';
|
|
12
|
+
}
|
|
13
|
+
}
|
|
8
14
|
class BadRequestError extends Error {
|
|
9
15
|
constructor(message) {
|
|
10
16
|
super(message);
|
|
@@ -20,6 +26,7 @@ export class CriticalPathRouter {
|
|
|
20
26
|
exposeErrors;
|
|
21
27
|
getContext;
|
|
22
28
|
requireAuth;
|
|
29
|
+
maxBodyBytes;
|
|
23
30
|
basePath;
|
|
24
31
|
cors;
|
|
25
32
|
constructor(configOrEngine, options = {}) {
|
|
@@ -33,6 +40,7 @@ export class CriticalPathRouter {
|
|
|
33
40
|
this.exposeErrors = options.exposeErrors ?? isDevelopment();
|
|
34
41
|
this.getContext = options.getContext;
|
|
35
42
|
this.requireAuth = options.requireAuth ?? false;
|
|
43
|
+
this.maxBodyBytes = options.maxBodyBytes ?? 10 * 1024 * 1024;
|
|
36
44
|
this.basePath = options.basePath ? '/' + options.basePath.replace(/^\/+|\/+$/g, '') : undefined;
|
|
37
45
|
this.cors = options.cors ?? false;
|
|
38
46
|
if (this.cors && this.cors.origins === '*' && this.cors.credentials) {
|
|
@@ -791,9 +799,31 @@ export class CriticalPathRouter {
|
|
|
791
799
|
const root = url.pathname.slice(0, url.pathname.length - subpath.length).replace(/\/+$/, '');
|
|
792
800
|
return `${url.origin}${root}`;
|
|
793
801
|
}
|
|
802
|
+
/** Reads a JSON body, stopping as soon as it exceeds `maxBodyBytes`. */
|
|
794
803
|
async readJson(request) {
|
|
804
|
+
const declared = Number(request.headers.get('Content-Length'));
|
|
805
|
+
if (Number.isFinite(declared) && declared > this.maxBodyBytes)
|
|
806
|
+
throw new PayloadTooLargeError(this.maxBodyBytes);
|
|
807
|
+
let text = '';
|
|
808
|
+
if (request.body) {
|
|
809
|
+
const reader = request.body.getReader();
|
|
810
|
+
const decoder = new TextDecoder();
|
|
811
|
+
let received = 0;
|
|
812
|
+
for (;;) {
|
|
813
|
+
const { done, value } = await reader.read();
|
|
814
|
+
if (done)
|
|
815
|
+
break;
|
|
816
|
+
received += value.byteLength;
|
|
817
|
+
if (received > this.maxBodyBytes) {
|
|
818
|
+
await reader.cancel();
|
|
819
|
+
throw new PayloadTooLargeError(this.maxBodyBytes);
|
|
820
|
+
}
|
|
821
|
+
text += decoder.decode(value, { stream: true });
|
|
822
|
+
}
|
|
823
|
+
text += decoder.decode();
|
|
824
|
+
}
|
|
795
825
|
try {
|
|
796
|
-
return
|
|
826
|
+
return JSON.parse(text);
|
|
797
827
|
}
|
|
798
828
|
catch {
|
|
799
829
|
throw new BadRequestError('Request body must be valid JSON.');
|
|
@@ -816,6 +846,8 @@ export class CriticalPathRouter {
|
|
|
816
846
|
return this.jsonResponse({ error: e.message, cyclePath: e.cyclePath }, 409);
|
|
817
847
|
case 'NotFoundError':
|
|
818
848
|
return this.jsonResponse({ error: e.message }, 404);
|
|
849
|
+
case 'PayloadTooLargeError':
|
|
850
|
+
return this.jsonResponse({ error: e.message }, 413);
|
|
819
851
|
case 'ForbiddenError':
|
|
820
852
|
return this.jsonResponse({ error: e.message }, 403);
|
|
821
853
|
}
|
package/dist/router.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"router.js","sourceRoot":"","sources":["../src/router.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,kBAAkB,EAA8D,MAAM,qBAAqB,CAAC;AACrH,OAAO,KAAK,OAAO,MAAM,6BAA6B,CAAC;AACvD,OAAO,EAAE,oBAAoB,EAAE,MAAM,cAAc,CAAC;AAEpD,oFAAoF;AACpF,MAAM,CAAC,MAAM,eAAe,GAAG,MAAM,CAAC,MAAM,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE,MAAe,EAAE,CAAC,CAAC;AAEzH,MAAM,kBAAkB,GAAG,wCAAwC,CAAC;AACpE,MAAM,0BAA0B,GAAG,CAAC,cAAc,EAAE,eAAe,CAAC,CAAC;AAiCrE,MAAM,eAAgB,SAAQ,KAAK;IACjC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,iBAAiB,CAAC;IAChC,CAAC;CACF;AAkCD,SAAS,aAAa;IACpB,OAAQ,UAAkB,CAAC,OAAO,EAAE,GAAG,EAAE,QAAQ,KAAK,aAAa,CAAC;AACtE,CAAC;AAED,MAAM,OAAO,kBAAkB;IACtB,MAAM,CAAqB;IACjB,OAAO,CAAwC;IAC/C,YAAY,CAAU;IACtB,UAAU,CAA2C;IACrD,WAAW,CAAU;IACrB,QAAQ,CAAU;IAClB,IAAI,CAAsB;IAE3C,YAAY,cAAwD,EAAE,UAAqC,EAAE;QAC3G,IAAI,cAAc,YAAY,kBAAkB,EAAE,CAAC;YACjD,IAAI,CAAC,MAAM,GAAG,cAAc,CAAC;QAC/B,CAAC;aAAM,CAAC;YACN,IAAI,CAAC,MAAM,GAAG,IAAI,kBAAkB,CAAC,cAAc,CAAC,CAAC;QACvD,CAAC;QACD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC;QAC/B,IAAI,CAAC,YAAY,GAAG,OAAO,CAAC,YAAY,IAAI,aAAa,EAAE,CAAC;QAC5D,IAAI,CAAC,UAAU,GAAG,OAAO,CAAC,UAAU,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,WAAW,IAAI,KAAK,CAAC;QAChD,IAAI,CAAC,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,GAAG,GAAG,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAC,YAAY,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAChG,IAAI,CAAC,IAAI,GAAG,OAAO,CAAC,IAAI,IAAI,KAAK,CAAC;QAClC,IAAI,IAAI,CAAC,IAAI,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACpE,MAAM,IAAI,KAAK,CAAC,yFAAyF,CAAC,CAAC;QAC7G,CAAC;IACH,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,aAAa,CAAC,OAAgB,EAAE,OAA2B,EAAE;QACjE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,IAAI,CAAC,CAAC;QACpD,OAAO,IAAI,CAAC,SAAS,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;IAC3C,CAAC;IAED,gGAAgG;IACxF,cAAc,CAAC,QAAgB;QACrC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,IAAI,QAAQ,KAAK,IAAI,CAAC,QAAQ,IAAI,CAAC,QAAQ,CAAC,UAAU,CAAC,IAAI,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAAE,OAAO,IAAI,CAAC;YACzF,OAAO,QAAQ,CAAC,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QAClE,CAAC;QACD,+DAA+D;QAC/D,OAAO,QAAQ,CAAC,OAAO,CAAC,wBAAwB,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IAC5E,CAAC;IAEO,SAAS,CAAC,OAAgB,EAAE,QAAkB;QACpD,IAAI,CAAC,IAAI,CAAC,IAAI;YAAE,OAAO,QAAQ,CAAC;QAEhC,MAAM,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC7C,IAAI,WAA+B,CAAC;QACpC,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG,EAAE,CAAC;YAC9B,WAAW,GAAG,GAAG,CAAC;QACpB,CAAC;aAAM,IAAI,MAAM,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC;YACxD,WAAW,GAAG,MAAM,CAAC;QACvB,CAAC;QAED,yFAAyF;QACzF,MAAM,MAAM,GAAG,IAAI,QAAQ,CAAC,QAAQ,CAAC,IAAI,EAAE,QAAQ,CAAC,CAAC;QACrD,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG;YAAE,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;QACvE,IAAI,CAAC,WAAW;YAAE,OAAO,MAAM,CAAC;QAEhC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,EAAE,WAAW,CAAC,CAAC;QAC/D,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,EAAE,kBAAkB,CAAC,CAAC;QACvE,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,YAAY,IAAI,0BAA0B,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC;QACtH,IAAI,IAAI,CAAC,IAAI,CAAC,WAAW;YAAE,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,EAAE,MAAM,CAAC,CAAC;QAC1F,IAAI,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,SAAS,IAAI,IAAI,CAAC,IAAI,CAAC,MAAM,KAAK,SAAS,EAAE,CAAC;YACjF,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,EAAE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,KAAK,CAAC,QAAQ,CAAC,OAAgB,EAAE,IAAwB;QAC/D,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,GAAG,CAAC,QAAQ,CAAC;QAC9B,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,CAAC;QAE5C,MAAM,OAAO,GAAG,IAAI,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC9C,IAAI,OAAO,KAAK,IAAI,EAAE,CAAC;YACrB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;QACrF,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;QAEpD,uFAAuF;QACvF,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;YACzB,OAAO,IAAI,QAAQ,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC7C,CAAC;QAED,IAAI,OAA0C,CAAC;QAC/C,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,IAAI,CAAC,UAAU,IAAI,IAAI,CAAC,UAAU,CAAC;YACnD,OAAO,GAAG,OAAO,CAAC,CAAC,CAAC,MAAM,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACzD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,IAAI,CAAC,aAAa,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;QAC1C,CAAC;QACD,IAAI,IAAI,CAAC,WAAW,IAAI,CAAC,OAAO,EAAE,MAAM,EAAE,CAAC;YACzC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,yBAAyB,EAAE,EAAE,GAAG,CAAC,CAAC;QACtE,CAAC;QACD,iFAAiF;QACjF,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,SAAS,CAClC,OAAO,EAAE,MAAM;YACb,CAAC,CAAC;gBACE,MAAM,EAAE,OAAO,CAAC,MAAM;gBACtB,QAAQ,EAAE,OAAO,CAAC,QAAQ;gBAC1B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,QAAQ,EAAE,OAAO,CAAC,QAAQ;gBAC1B,KAAK,EAAE,OAAO,CAAC,KAAK;aACrB;YACH,CAAC,CAAC,EAAE,GAAG,eAAe,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,CACxD,CAAC;QAEF,IAAI,CAAC;YACH,sEAAsE;YACtE,MAAM,IAAI,CAAC,MAAM,CAAC,KAAK,CAAC;YACxB,MAAM,aAAa,GAAG,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,IAAI,SAAS,EAAE,GAAG,EAAE,CAAC;YACrE,MAAM,MAAM,GAAG,KAAK,IAAuB,EAAE;gBAC3C,MAAM,OAAO,GAAG,IAAI,CAAC,gBAAgB,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;gBACxD,IAAI,OAAO;oBAAE,OAAO,OAAO,CAAC,KAAK,CAAC,OAAO,CAAC,OAAO,EAAE,EAAE,GAAG,aAAa,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,CAAC,CAAC;gBACjG,OAAO,IAAI,CAAC,aAAa,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC;YACpG,CAAC,CAAC;YACF,4FAA4F;YAC5F,MAAM,KAAK,GAAG,IAAI,CAAC,MAAM,CAAC,OAAO;iBAC9B,aAAa,EAAE;iBACf,WAAW,CACV,CAAC,IAAI,EAAE,UAAU,EAAE,EAAE,CAAC,KAAK,IAAI,EAAE,CAAC,UAAU,CAAC,OAAO,EAAE,aAAa,EAAE,IAAI,CAAC,EAC1E,MAAM,CACP,CAAC;YACJ,OAAO,MAAM,KAAK,EAAE,CAAC;QACvB,CAAC;QAAC,OAAO,GAAY,EAAE,CAAC;YACtB,OAAO,IAAI,CAAC,aAAa,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAEO,gBAAgB,CACtB,MAAc,EACd,QAAkB;QAElB,KAAK,MAAM,KAAK,IAAI,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC;YACpD,IAAI,KAAK,CAAC,MAAM,KAAK,MAAM,IAAI,CAAC,CAAC,KAAK,CAAC,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,CAAC;gBAAE,SAAS;YACzF,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;YACtD,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM;gBAAE,SAAS;YACjD,MAAM,MAAM,GAA2B,EAAE,CAAC;YAC1C,MAAM,OAAO,GAAG,OAAO,CAAC,KAAK,CAAC,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE;gBACxC,IAAI,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC;oBACzB,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,GAAG,kBAAkB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;oBACxD,OAAO,IAAI,CAAC;gBACd,CAAC;gBACD,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,CAAC,CAAC,CAAC;YACH,IAAI,OAAO;gBAAE,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;QACxC,CAAC;QACD,OAAO,IAAI,CAAC;IACd,CAAC;IAEO,KAAK,CAAC,aAAa,CACzB,OAAgB,EAChB,EAAE,GAAG,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAQ1D;QAED,+DAA+D;QAC/D,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,IAAI,QAAQ,CAAC,MAAM,KAAK,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;YAChF,OAAO,IAAI,CAAC,YAAY,CAAC,oBAAoB,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,gBAAgB,CAAC,GAAG,EAAE,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC;QACrG,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,MAAM,MAAM,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC;gBACrE,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;oBAC7D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,MAAM,EAAE,EAAE,GAAG,CAAC,CAAC;gBACrD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,gBAAgB;QAChB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,WAAW,EAAE,CAAC;YAChC,MAAM,UAAU,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC/B,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;oBACxE,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,IAAI,CAAC,CAAC;oBACnD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,UAAU,CAAC,CAAC;oBACtD,IAAI,CAAC,QAAQ;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;oBACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,UAAU,EAAE,IAAI,CAAC,CAAC;oBAC9D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC7E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;gBAClD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,CAAC;oBACxD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;oBAC5C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;oBACjD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,eAAe,EAAE,CAAC;gBAC3C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;oBAC/D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,QAAQ,IAAI,WAAW,KAAK,iBAAiB,EAAE,CAAC;gBACzE,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,IAAI,KAAK,CAAQ,CAAC;oBAC9D,MAAM,WAAW,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,aAAa,CAAC,IAAI,SAAS,CAAC;oBACrE,MAAM,WAAW,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,aAAa,CAAC,IAAI,SAAS,CAAC;oBACrE,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,WAAW,EAAE,WAAW,EAAE,CAAC,CAAC;oBAC9F,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;gBACvC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,UAAU,IAAI,WAAW,KAAK,uBAAuB,EAAE,CAAC;gBACjF,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,OAAO,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,SAAS,CAAC;oBAC7D,MAAM,QAAQ,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,UAAU,CAAC,IAAI,SAAS,CAAQ,CAAC;oBACxE,MAAM,OAAO,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,SAAS,CAAQ,CAAC;oBACtE,MAAM,MAAM,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAQ,CAAC;oBACpE,MAAM,0BAA0B,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,4BAA4B,CAAC;wBACnF,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,4BAA4B,CAAE,CAAC;wBACjE,CAAC,CAAC,SAAS,CAAC;oBAEd,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE;wBAC/D,SAAS;wBACT,OAAO;wBACP,QAAQ;wBACR,OAAO;wBACP,MAAM;wBACN,0BAA0B;qBAC3B,CAAC,CAAC;oBACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBAC1E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;oBAC/D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,8EAA8E;QAC9E,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,OAAO,EAAE,CAAC;YAC5B,MAAM,MAAM,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC3B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAEhC,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,mBAAmB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;oBACtG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;oBAC5C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC,CAAC;gBAC/E,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC3C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,UAAU,EAAE,CAAC;gBACtC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;oBAClD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;oBACnF,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,aAAa,EAAE,CAAC;gBACzC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;oBAC5D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;oBACtF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;oBACvD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,cAAc,IAAI,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC;gBACzD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,mEAAmE;oBACnE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;oBACjE,MAAM,OAAO,GAAG,UAAU,IAAI,CAAC,UAAU,CAAC,MAAM,KAAK,MAAM,IAAI,UAAU,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC;oBACtG,IAAI,CAAC,OAAO,IAAI,CAAC,CAAC,MAAM,MAAM,CAAC,gBAAgB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;wBAC9D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACxD,CAAC;oBACD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,cAAc,EAAE,CAAC;gBAC1C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;oBAC1D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;wBACrC,MAAM;wBACN,eAAe,EAAE,IAAI,CAAC,eAAe;wBACrC,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,UAAU;qBAC9B,CAAC,CAAC;oBACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,GAAG,EAAE,EAAE,GAAG,CAAC,CAAC;gBACrD,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,OAAO,IAAI,WAAW,KAAK,WAAW,EAAE,CAAC;gBAClE,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,MAAM,CAAC,CAAC;oBACzD,IAAI,CAAC,KAAK;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACvE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,aAAa,IAAI,WAAW,KAAK,qBAAqB,EAAE,CAAC;gBAClF,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,MAAM,CAAC,CAAC;oBAC3E,MAAM,uBAAuB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,MAAM,CAAC,CAAC;oBACvF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,mBAAmB,EAAE,uBAAuB,EAAE,CAAC,CAAC;gBAC7E,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,QAAQ,EAAE,CAAC;gBACpC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;oBACtD,IAAI,CAAC,UAAU;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,SAAS,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;oBACpD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,kBAAkB,EAAE,CAAC;gBAC9C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;oBACpE,IAAI,CAAC,eAAe;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACjF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,eAAe,EAAE,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;oBAC1C,IAAI,CAAC,IAAI;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACtE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC;gBACrC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;gBAC9C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,QAAQ,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;oBAClD,IAAI,QAAQ,IAAI,QAAQ,KAAK,QAAQ,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;wBAC/D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uCAAuC,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpF,CAAC;oBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,QAAQ,EAAG,QAAuC,IAAI,QAAQ,EAAE,CAAC,CAAC;oBACpH,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,YAAY;QACZ,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,OAAO,EAAE,CAAC;YAC5B,MAAM,MAAM,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC3B,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,EAAE,CAAC;oBACtC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC3C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;oBAC1C,IAAI,CAAC,IAAI;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACtE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC;gBACrC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;gBAC9C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;oBAChD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,sBAAsB;QACtB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,WAAW,EAAE,CAAC;gBACjB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;oBACrD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC/C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,WAAW,CAAC,CAAC;oBACzD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,EAAE,IAAI,CAAC,CAAC;oBAChE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;gBACnD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,CAAC,CAAC;oBAC1D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mBAAmB;QACnB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,EAAE,CAAC;YACnC,MAAM,aAAa,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAClC,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;oBAC7D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,YAAY,EAAE,CAAC,CAAC;gBAC7C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;gBACjD,CAAC;YACH,CAAC;iBAAM,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,SAAS,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,aAAa,CAAC,CAAC;oBAClE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;oBAC/D,IAAI,CAAC,WAAW;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,aAAa,EAAE,IAAI,CAAC,CAAC;oBACpE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;gBACrD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,aAAa,CAAC,CAAC;oBAC9D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,iBAAiB;QACjB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,WAAW,EAAE,CAAC;gBACjB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;oBACrD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC/C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,WAAW,CAAC,CAAC;oBACzD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,EAAE,IAAI,CAAC,CAAC;oBAChE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;gBACnD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,CAAC,CAAC;oBAC1D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,iBAAiB;QACjB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,uBAAuB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;gBAC1G,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC;gBACjD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC,CAAC;YACpF,CAAC;QACH,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,SAAS,IAAI,WAAW,KAAK,WAAW,EAAE,CAAC;gBAC7C,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBACjE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,KAAK,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;oBAC5C,IAAI,CAAC,KAAK,EAAE,CAAC;wBACX,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mCAAmC,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,CAAC;oBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC;oBACzE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,CAAC,SAAS,EAAE,CAAC;gBACtB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;oBAC9C,IAAI,CAAC,MAAM;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,2BAA2B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACnF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;oBAClD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;gBACjD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,kBAAkB;QAClB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,aAAa,EAAE,CAAC;YAClC,MAAM,YAAY,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YACjC,IAAI,YAAY,KAAK,SAAS,EAAE,CAAC;gBAC/B,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,+BAA+B,CAAC,IAAI,CAAC,CAAC;oBACrE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,KAAK,QAAQ,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,IAAI,CAAC,CAAC;oBAC3D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,IAAI,CAAC,YAAY,EAAE,CAAC;gBACzB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAC;oBAC3D,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC,CAAC;oBAClF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;oBACvD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,CAAC,CAAC;oBAC5D,IAAI,CAAC,UAAU;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,sBAAsB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAClF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,YAAY,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,oBAAoB;QACpB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,EAAE,CAAC;YACnC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;gBAC9C,IAAI,CAAC,MAAM;oBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,2BAA2B,EAAE,EAAE,GAAG,CAAC,CAAC;gBACnF,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;gBACpD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;YACrD,CAAC;YACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,CAAC;gBACjE,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC;gBACzC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,KAAK,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,CAAC;QACH,CAAC;QAED,0BAA0B;QAC1B,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;gBACjE,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;gBACjE,MAAM,OAAO,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,SAAS,CAAC;gBAC7D,MAAM,QAAQ,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,UAAU,CAAC,IAAI,SAAS,CAAQ,CAAC;gBACxE,MAAM,OAAO,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,SAAS,CAAQ,CAAC;gBACtE,MAAM,MAAM,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAQ,CAAC;gBACpE,MAAM,0BAA0B,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,4BAA4B,CAAC;oBACnF,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,4BAA4B,CAAE,CAAC;oBACjE,CAAC,CAAC,SAAS,CAAC;gBAEd,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE;oBAC/D,SAAS;oBACT,OAAO;oBACP,QAAQ;oBACR,OAAO;oBACP,MAAM;oBACN,0BAA0B;iBAC3B,CAAC,CAAC;gBACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;YACzC,CAAC;QACH,CAAC;QAED,+BAA+B;QAC/B,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,QAAQ,EAAE,CAAC;YAC7B,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1C,MAAM,MAAM,GAAG,OAAO,IAAI,CAAC,MAAM,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,QAAQ,CAAC;gBACxE,IAAI,MAAM,CAAC,MAAM,EAAE,CAAC;oBAClB,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC;wBACpB,IAAI,EAAE,sBAA6B;wBACnC,WAAW,EAAE,IAAI,CAAC,MAAM,IAAI,IAAI,CAAC,SAAS,IAAI,QAAQ;wBACtD,OAAO,EAAE;4BACP,MAAM;4BACN,MAAM,EAAE,IAAI,CAAC,MAAM;4BACnB,SAAS,EAAE,IAAI,CAAC,SAAS;4BACzB,OAAO,EAAE,IAAI,CAAC,OAAO;4BACrB,SAAS,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI;4BACjC,SAAS,EAAE,IAAI,CAAC,GAAG,EAAE;yBACtB;qBACK,CAAC,CAAC;gBACZ,CAAC;gBACD,OAAO,IAAI,CAAC,YAAY,CAAC;oBACvB,OAAO,EAAE,IAAI;oBACb,MAAM;oBACN,SAAS,EAAE,IAAI,CAAC,GAAG,EAAE;iBACtB,CAAC,CAAC;YACL,CAAC;QACH,CAAC;QAED,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;IACrF,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,QAAQ,CACpB,OAAgB,EAChB,MAAS,EACT,YAAqC,EAAE;QAEvC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;QACzC,MAAM,IAAI,GAAG,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC;QAC9E,OAAO,OAAO,CAAC,YAAY,CAAC,MAAa,EAAE,EAAE,GAAG,IAAI,EAAE,GAAG,SAAS,EAAE,CAAC,CAAC;IACxE,CAAC;IAED,mFAAmF;IAC3E,gBAAgB,CAAC,GAAQ,EAAE,OAAe;QAChD,MAAM,IAAI,GAAG,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,EAAE,GAAG,CAAC,QAAQ,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QAC7F,OAAO,GAAG,GAAG,CAAC,MAAM,GAAG,IAAI,EAAE,CAAC;IAChC,CAAC;IAEO,KAAK,CAAC,QAAQ,CAAC,OAAgB;QACrC,IAAI,CAAC;YACH,OAAO,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QAC9B,CAAC;QAAC,MAAM,CAAC;YACP,MAAM,IAAI,eAAe,CAAC,kCAAkC,CAAC,CAAC;QAChE,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,aAAa,CAAC,GAAY,EAAE,OAAgB;QACxD,MAAM,IAAI,GAAG,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,MAAM,IAAI,GAAG,CAAC,CAAC,CAAE,GAAa,CAAC,IAAI,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/F,MAAM,CAAC,GAAG,GAA0B,CAAC;QAErC,QAAQ,IAAI,EAAE,CAAC;YACb,KAAK,iBAAiB,CAAC;YACvB,KAAK,2BAA2B;gBAC9B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,iBAAiB;gBACpB,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YAC1G,KAAK,yBAAyB;gBAC5B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,CAAC,CAAC,UAAU,EAAE,QAAQ,EAAE,CAAC,CAAC,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;YACtG,KAAK,4BAA4B;gBAC/B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;YAC5E,KAAK,yBAAyB;gBAC5B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;YAC9E,KAAK,eAAe;gBAClB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,gBAAgB;gBACnB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;QACxD,CAAC;QAED,sFAAsF;QACtF,8CAA8C;QAC9C,IAAI,IAAI,CAAC,OAAO,EAAE,CAAC;YACjB,IAAI,CAAC;gBACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;gBAChD,IAAI,MAAM,YAAY,QAAQ;oBAAE,OAAO,MAAM,CAAC;YAChD,CAAC;YAAC,OAAO,OAAO,EAAE,CAAC;gBACjB,OAAO,CAAC,KAAK,CAAC,0CAA0C,EAAE,OAAO,CAAC,CAAC;YACrE,CAAC;QACH,CAAC;aAAM,CAAC;YACN,OAAO,CAAC,KAAK,CAAC,uCAAuC,EAAE,GAAG,CAAC,CAAC;QAC9D,CAAC;QAED,MAAM,OAAO,GAAG,IAAI,CAAC,YAAY,IAAI,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,uBAAuB,CAAC;QAClG,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;IACpD,CAAC;IAEO,YAAY,CAAC,IAAa,EAAE,MAAM,GAAG,GAAG;QAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC,EAAE;YACxC,MAAM;YACN,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;aACnC;SACF,CAAC,CAAC;IACL,CAAC;CACF"}
|
|
1
|
+
{"version":3,"file":"router.js","sourceRoot":"","sources":["../src/router.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,kBAAkB,EAA8D,MAAM,qBAAqB,CAAC;AACrH,OAAO,KAAK,OAAO,MAAM,6BAA6B,CAAC;AACvD,OAAO,EAAE,oBAAoB,EAAE,MAAM,cAAc,CAAC;AAEpD,oFAAoF;AACpF,MAAM,CAAC,MAAM,eAAe,GAAG,MAAM,CAAC,MAAM,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE,MAAe,EAAE,CAAC,CAAC;AAEzH,MAAM,kBAAkB,GAAG,wCAAwC,CAAC;AACpE,MAAM,0BAA0B,GAAG,CAAC,cAAc,EAAE,eAAe,CAAC,CAAC;AAiCrE,MAAM,oBAAqB,SAAQ,KAAK;IACtC,YAAY,KAAa;QACvB,KAAK,CAAC,wBAAwB,KAAK,SAAS,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI,GAAG,sBAAsB,CAAC;IACrC,CAAC;CACF;AAED,MAAM,eAAgB,SAAQ,KAAK;IACjC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,iBAAiB,CAAC;IAChC,CAAC;CACF;AAwCD,SAAS,aAAa;IACpB,OAAQ,UAAkB,CAAC,OAAO,EAAE,GAAG,EAAE,QAAQ,KAAK,aAAa,CAAC;AACtE,CAAC;AAED,MAAM,OAAO,kBAAkB;IACtB,MAAM,CAAqB;IACjB,OAAO,CAAwC;IAC/C,YAAY,CAAU;IACtB,UAAU,CAA2C;IACrD,WAAW,CAAU;IACrB,YAAY,CAAS;IACrB,QAAQ,CAAU;IAClB,IAAI,CAAsB;IAE3C,YAAY,cAAwD,EAAE,UAAqC,EAAE;QAC3G,IAAI,cAAc,YAAY,kBAAkB,EAAE,CAAC;YACjD,IAAI,CAAC,MAAM,GAAG,cAAc,CAAC;QAC/B,CAAC;aAAM,CAAC;YACN,IAAI,CAAC,MAAM,GAAG,IAAI,kBAAkB,CAAC,cAAc,CAAC,CAAC;QACvD,CAAC;QACD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC;QAC/B,IAAI,CAAC,YAAY,GAAG,OAAO,CAAC,YAAY,IAAI,aAAa,EAAE,CAAC;QAC5D,IAAI,CAAC,UAAU,GAAG,OAAO,CAAC,UAAU,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,WAAW,IAAI,KAAK,CAAC;QAChD,IAAI,CAAC,YAAY,GAAG,OAAO,CAAC,YAAY,IAAI,EAAE,GAAG,IAAI,GAAG,IAAI,CAAC;QAC7D,IAAI,CAAC,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,GAAG,GAAG,OAAO,CAAC,QAAQ,CAAC,OAAO,CAAC,YAAY,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAChG,IAAI,CAAC,IAAI,GAAG,OAAO,CAAC,IAAI,IAAI,KAAK,CAAC;QAClC,IAAI,IAAI,CAAC,IAAI,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACpE,MAAM,IAAI,KAAK,CAAC,yFAAyF,CAAC,CAAC;QAC7G,CAAC;IACH,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,aAAa,CAAC,OAAgB,EAAE,OAA2B,EAAE;QACjE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,IAAI,CAAC,CAAC;QACpD,OAAO,IAAI,CAAC,SAAS,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;IAC3C,CAAC;IAED,gGAAgG;IACxF,cAAc,CAAC,QAAgB;QACrC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,IAAI,QAAQ,KAAK,IAAI,CAAC,QAAQ,IAAI,CAAC,QAAQ,CAAC,UAAU,CAAC,IAAI,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAAE,OAAO,IAAI,CAAC;YACzF,OAAO,QAAQ,CAAC,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QAClE,CAAC;QACD,+DAA+D;QAC/D,OAAO,QAAQ,CAAC,OAAO,CAAC,wBAAwB,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IAC5E,CAAC;IAEO,SAAS,CAAC,OAAgB,EAAE,QAAkB;QACpD,IAAI,CAAC,IAAI,CAAC,IAAI;YAAE,OAAO,QAAQ,CAAC;QAEhC,MAAM,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC7C,IAAI,WAA+B,CAAC;QACpC,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG,EAAE,CAAC;YAC9B,WAAW,GAAG,GAAG,CAAC;QACpB,CAAC;aAAM,IAAI,MAAM,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC;YACxD,WAAW,GAAG,MAAM,CAAC;QACvB,CAAC;QAED,yFAAyF;QACzF,MAAM,MAAM,GAAG,IAAI,QAAQ,CAAC,QAAQ,CAAC,IAAI,EAAE,QAAQ,CAAC,CAAC;QACrD,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,KAAK,GAAG;YAAE,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;QACvE,IAAI,CAAC,WAAW;YAAE,OAAO,MAAM,CAAC;QAEhC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,EAAE,WAAW,CAAC,CAAC;QAC/D,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,EAAE,kBAAkB,CAAC,CAAC;QACvE,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,YAAY,IAAI,0BAA0B,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC;QACtH,IAAI,IAAI,CAAC,IAAI,CAAC,WAAW;YAAE,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,EAAE,MAAM,CAAC,CAAC;QAC1F,IAAI,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,SAAS,IAAI,IAAI,CAAC,IAAI,CAAC,MAAM,KAAK,SAAS,EAAE,CAAC;YACjF,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,EAAE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,KAAK,CAAC,QAAQ,CAAC,OAAgB,EAAE,IAAwB;QAC/D,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,GAAG,CAAC,QAAQ,CAAC;QAC9B,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,CAAC;QAE5C,MAAM,OAAO,GAAG,IAAI,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC9C,IAAI,OAAO,KAAK,IAAI,EAAE,CAAC;YACrB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;QACrF,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;QAEpD,uFAAuF;QACvF,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;YACzB,OAAO,IAAI,QAAQ,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC7C,CAAC;QAED,IAAI,OAA0C,CAAC;QAC/C,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,IAAI,CAAC,UAAU,IAAI,IAAI,CAAC,UAAU,CAAC;YACnD,OAAO,GAAG,OAAO,CAAC,CAAC,CAAC,MAAM,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACzD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,IAAI,CAAC,aAAa,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;QAC1C,CAAC;QACD,IAAI,IAAI,CAAC,WAAW,IAAI,CAAC,OAAO,EAAE,MAAM,EAAE,CAAC;YACzC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,yBAAyB,EAAE,EAAE,GAAG,CAAC,CAAC;QACtE,CAAC;QACD,iFAAiF;QACjF,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,SAAS,CAClC,OAAO,EAAE,MAAM;YACb,CAAC,CAAC;gBACE,MAAM,EAAE,OAAO,CAAC,MAAM;gBACtB,QAAQ,EAAE,OAAO,CAAC,QAAQ;gBAC1B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,QAAQ,EAAE,OAAO,CAAC,QAAQ;gBAC1B,KAAK,EAAE,OAAO,CAAC,KAAK;aACrB;YACH,CAAC,CAAC,EAAE,GAAG,eAAe,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,CACxD,CAAC;QAEF,IAAI,CAAC;YACH,sEAAsE;YACtE,MAAM,IAAI,CAAC,MAAM,CAAC,KAAK,CAAC;YACxB,MAAM,aAAa,GAAG,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,IAAI,SAAS,EAAE,GAAG,EAAE,CAAC;YACrE,MAAM,MAAM,GAAG,KAAK,IAAuB,EAAE;gBAC3C,MAAM,OAAO,GAAG,IAAI,CAAC,gBAAgB,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;gBACxD,IAAI,OAAO;oBAAE,OAAO,OAAO,CAAC,KAAK,CAAC,OAAO,CAAC,OAAO,EAAE,EAAE,GAAG,aAAa,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,CAAC,CAAC;gBACjG,OAAO,IAAI,CAAC,aAAa,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC;YACpG,CAAC,CAAC;YACF,4FAA4F;YAC5F,MAAM,KAAK,GAAG,IAAI,CAAC,MAAM,CAAC,OAAO;iBAC9B,aAAa,EAAE;iBACf,WAAW,CACV,CAAC,IAAI,EAAE,UAAU,EAAE,EAAE,CAAC,KAAK,IAAI,EAAE,CAAC,UAAU,CAAC,OAAO,EAAE,aAAa,EAAE,IAAI,CAAC,EAC1E,MAAM,CACP,CAAC;YACJ,OAAO,MAAM,KAAK,EAAE,CAAC;QACvB,CAAC;QAAC,OAAO,GAAY,EAAE,CAAC;YACtB,OAAO,IAAI,CAAC,aAAa,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAEO,gBAAgB,CACtB,MAAc,EACd,QAAkB;QAElB,KAAK,MAAM,KAAK,IAAI,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC;YACpD,IAAI,KAAK,CAAC,MAAM,KAAK,MAAM,IAAI,CAAC,CAAC,KAAK,CAAC,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,CAAC;gBAAE,SAAS;YACzF,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC;YACtD,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM;gBAAE,SAAS;YACjD,MAAM,MAAM,GAA2B,EAAE,CAAC;YAC1C,MAAM,OAAO,GAAG,OAAO,CAAC,KAAK,CAAC,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE;gBACxC,IAAI,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC;oBACzB,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,GAAG,kBAAkB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;oBACxD,OAAO,IAAI,CAAC;gBACd,CAAC;gBACD,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,CAAC,CAAC,CAAC;YACH,IAAI,OAAO;gBAAE,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;QACxC,CAAC;QACD,OAAO,IAAI,CAAC;IACd,CAAC;IAEO,KAAK,CAAC,aAAa,CACzB,OAAgB,EAChB,EAAE,GAAG,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,MAAM,EAAE,OAAO,EAQ1D;QAED,+DAA+D;QAC/D,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,IAAI,QAAQ,CAAC,MAAM,KAAK,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;YAChF,OAAO,IAAI,CAAC,YAAY,CAAC,oBAAoB,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,gBAAgB,CAAC,GAAG,EAAE,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC;QACrG,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,MAAM,MAAM,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC;gBACrE,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,EAAE,OAAO,EAAE,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;oBAC7D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,MAAM,EAAE,EAAE,GAAG,CAAC,CAAC;gBACrD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,gBAAgB;QAChB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,WAAW,EAAE,CAAC;YAChC,MAAM,UAAU,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC/B,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;oBACxE,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,IAAI,CAAC,CAAC;oBACnD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,UAAU,CAAC,CAAC;oBACtD,IAAI,CAAC,QAAQ;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;oBACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,UAAU,EAAE,IAAI,CAAC,CAAC;oBAC9D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC7E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;gBAClD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,CAAC;oBACxD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;oBAC5C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;oBACjD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,eAAe,EAAE,CAAC;gBAC3C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;oBAC/D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,QAAQ,IAAI,WAAW,KAAK,iBAAiB,EAAE,CAAC;gBACzE,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,IAAI,KAAK,CAAQ,CAAC;oBAC9D,MAAM,WAAW,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,aAAa,CAAC,IAAI,SAAS,CAAC;oBACrE,MAAM,WAAW,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,aAAa,CAAC,IAAI,SAAS,CAAC;oBACrE,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,WAAW,EAAE,WAAW,EAAE,CAAC,CAAC;oBAC9F,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;gBACvC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,UAAU,IAAI,WAAW,KAAK,uBAAuB,EAAE,CAAC;gBACjF,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,OAAO,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,SAAS,CAAC;oBAC7D,MAAM,QAAQ,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,UAAU,CAAC,IAAI,SAAS,CAAQ,CAAC;oBACxE,MAAM,OAAO,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,SAAS,CAAQ,CAAC;oBACtE,MAAM,MAAM,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAQ,CAAC;oBACpE,MAAM,0BAA0B,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,4BAA4B,CAAC;wBACnF,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,4BAA4B,CAAE,CAAC;wBACjE,CAAC,CAAC,SAAS,CAAC;oBAEd,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE;wBAC/D,SAAS;wBACT,OAAO;wBACP,QAAQ;wBACR,OAAO;wBACP,MAAM;wBACN,0BAA0B;qBAC3B,CAAC,CAAC;oBACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBAC1E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;oBAC/D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,8EAA8E;QAC9E,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,OAAO,EAAE,CAAC;YAC5B,MAAM,MAAM,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC3B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAEhC,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,mBAAmB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;oBACtG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;oBAC5C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC,CAAC;gBAC/E,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC3C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,UAAU,EAAE,CAAC;gBACtC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;oBAClD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;oBACnF,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,aAAa,EAAE,CAAC;gBACzC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;oBAC5D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;oBACtF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;oBACvD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,cAAc,IAAI,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC;gBACzD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,mEAAmE;oBACnE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;oBACjE,MAAM,OAAO,GAAG,UAAU,IAAI,CAAC,UAAU,CAAC,MAAM,KAAK,MAAM,IAAI,UAAU,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC;oBACtG,IAAI,CAAC,OAAO,IAAI,CAAC,CAAC,MAAM,MAAM,CAAC,gBAAgB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;wBAC9D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACxD,CAAC;oBACD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,cAAc,EAAE,CAAC;gBAC1C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;oBAC1D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;wBACrC,MAAM;wBACN,eAAe,EAAE,IAAI,CAAC,eAAe;wBACrC,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,UAAU;qBAC9B,CAAC,CAAC;oBACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,GAAG,EAAE,EAAE,GAAG,CAAC,CAAC;gBACrD,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,OAAO,IAAI,WAAW,KAAK,WAAW,EAAE,CAAC;gBAClE,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,MAAM,CAAC,CAAC;oBACzD,IAAI,CAAC,KAAK;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACvE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,aAAa,IAAI,WAAW,KAAK,qBAAqB,EAAE,CAAC;gBAClF,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,MAAM,CAAC,CAAC;oBAC3E,MAAM,uBAAuB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,MAAM,CAAC,CAAC;oBACvF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,mBAAmB,EAAE,uBAAuB,EAAE,CAAC,CAAC;gBAC7E,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,QAAQ,EAAE,CAAC;gBACpC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;oBACtD,IAAI,CAAC,UAAU;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,SAAS,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;oBACpD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;YACH,CAAC;iBAAM,IAAI,WAAW,KAAK,kBAAkB,EAAE,CAAC;gBAC9C,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;oBACpE,IAAI,CAAC,eAAe;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACjF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,eAAe,EAAE,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;oBAC1C,IAAI,CAAC,IAAI;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACtE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC;gBACrC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;gBAC9C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,QAAQ,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;oBAClD,IAAI,QAAQ,IAAI,QAAQ,KAAK,QAAQ,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;wBAC/D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uCAAuC,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpF,CAAC;oBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,QAAQ,EAAG,QAAuC,IAAI,QAAQ,EAAE,CAAC,CAAC;oBACpH,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,YAAY;QACZ,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,OAAO,EAAE,CAAC;YAC5B,MAAM,MAAM,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC3B,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,EAAE,CAAC;oBACtC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;gBACtC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC3C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;oBAC1C,IAAI,CAAC,IAAI;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACtE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC;gBACrC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,gBAAgB,CAAC,CAAC;oBACpE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,gBAAgB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;gBAC9C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;oBAChD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,sBAAsB;QACtB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,WAAW,EAAE,CAAC;gBACjB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;oBACrD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC/C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,WAAW,CAAC,CAAC;oBACzD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,EAAE,IAAI,CAAC,CAAC;oBAChE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;gBACnD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,CAAC,CAAC;oBAC1D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mBAAmB;QACnB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,EAAE,CAAC;YACnC,MAAM,aAAa,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAClC,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;oBAC7D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,YAAY,EAAE,CAAC,CAAC;gBAC7C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;gBACjD,CAAC;YACH,CAAC;iBAAM,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,SAAS,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,aAAa,CAAC,CAAC;oBAClE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;oBAC/D,IAAI,CAAC,WAAW;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,aAAa,EAAE,IAAI,CAAC,CAAC;oBACpE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,uBAAuB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;gBACrD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,aAAa,CAAC,CAAC;oBAC9D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,iBAAiB;QACjB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,CAAC,WAAW,EAAE,CAAC;gBACjB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,CAAC;oBACpD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,8BAA8B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACzD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;oBACrD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC/C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,WAAW,CAAC,CAAC;oBACzD,IAAI,CAAC,SAAS;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,EAAE,IAAI,CAAC,CAAC;oBAChE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,qBAAqB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC9E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;gBACnD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,WAAW,CAAC,CAAC;oBAC1D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,iBAAiB;QACjB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,YAAY,EAAE,CAAC;YACjC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,KAAK,GAAG,OAAO,CAAC,YAAY,CAAC,OAAO,CAAC,uBAAuB,EAAE,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,YAAY,CAAC,CAAC,CAAC;gBAC1G,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC;gBACjD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC,CAAC;YACpF,CAAC;QACH,CAAC;QAED,eAAe;QACf,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,MAAM,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAC9B,MAAM,WAAW,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YAChC,IAAI,SAAS,IAAI,WAAW,KAAK,WAAW,EAAE,CAAC;gBAC7C,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;oBACzE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBACjE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,KAAK,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;oBAC5C,IAAI,CAAC,KAAK,EAAE,CAAC;wBACX,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mCAAmC,EAAE,EAAE,GAAG,CAAC,CAAC;oBAChF,CAAC;oBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC;oBACzE,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IAAI,CAAC,SAAS,EAAE,CAAC;gBACtB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;oBAC9C,IAAI,CAAC,MAAM;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,2BAA2B,EAAE,EAAE,GAAG,CAAC,CAAC;oBACnF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;oBAClD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;gBACzC,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;oBAC9C,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;oBACnD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC;gBACxC,CAAC;gBACD,IAAI,MAAM,KAAK,OAAO,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBAC3C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;oBACvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,mBAAmB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAC5E,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;gBACjD,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;oBACtD,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,kBAAkB;QAClB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,aAAa,EAAE,CAAC;YAClC,MAAM,YAAY,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC;YACjC,IAAI,YAAY,KAAK,SAAS,EAAE,CAAC;gBAC/B,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,uBAAuB,CAAC,CAAC;oBAC3E,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,+BAA+B,CAAC,IAAI,CAAC,CAAC;oBACrE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;gBAC1C,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,KAAK,QAAQ,EAAE,CAAC;gBACrC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,IAAI,CAAC,CAAC;oBAC3D,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,IAAI,CAAC,YAAY,EAAE,CAAC;gBACzB,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAC;oBAC3D,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;oBACjE,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC,CAAC;oBAClF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,sBAAsB,CAAC,CAAC;oBAC1E,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;oBACvD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,EAAE,GAAG,CAAC,CAAC;gBAChD,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;oBACrB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,CAAC,CAAC;oBAC5D,IAAI,CAAC,UAAU;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,sBAAsB,EAAE,EAAE,GAAG,CAAC,CAAC;oBAClF,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC;gBAC3C,CAAC;gBACD,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;oBACxB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,YAAY,CAAC,CAAC;oBAC5D,IAAI,CAAC,OAAO;wBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,EAAE,GAAG,CAAC,CAAC;oBACpE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;gBAC9C,CAAC;YACH,CAAC;QACH,CAAC;QAED,oBAAoB;QACpB,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,cAAc,EAAE,CAAC;YACnC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,MAAM,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;gBAC9C,IAAI,CAAC,MAAM;oBAAE,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,2BAA2B,EAAE,EAAE,GAAG,CAAC,CAAC;gBACnF,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;gBACpD,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;YACrD,CAAC;YACD,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,CAAC;gBACjE,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC;gBACzC,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,SAAS,EAAE,KAAK,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,CAAC;QACH,CAAC;QAED,0BAA0B;QAC1B,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,UAAU,EAAE,CAAC;YAC/B,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACrB,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;gBACjE,MAAM,SAAS,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,WAAW,CAAC,IAAI,SAAS,CAAC;gBACjE,MAAM,OAAO,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,SAAS,CAAC;gBAC7D,MAAM,QAAQ,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,UAAU,CAAC,IAAI,SAAS,CAAQ,CAAC;gBACxE,MAAM,OAAO,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,SAAS,CAAQ,CAAC;gBACtE,MAAM,MAAM,GAAG,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,SAAS,CAAQ,CAAC;gBACpE,MAAM,0BAA0B,GAAG,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,4BAA4B,CAAC;oBACnF,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,YAAY,CAAC,GAAG,CAAC,4BAA4B,CAAE,CAAC;oBACjE,CAAC,CAAC,SAAS,CAAC;gBAEd,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE;oBAC/D,SAAS;oBACT,OAAO;oBACP,QAAQ;oBACR,OAAO;oBACP,MAAM;oBACN,0BAA0B;iBAC3B,CAAC,CAAC;gBACH,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC;YACzC,CAAC;QACH,CAAC;QAED,+BAA+B;QAC/B,IAAI,QAAQ,CAAC,CAAC,CAAC,KAAK,QAAQ,EAAE,CAAC;YAC7B,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1C,MAAM,MAAM,GAAG,OAAO,IAAI,CAAC,MAAM,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,QAAQ,CAAC;gBACxE,IAAI,MAAM,CAAC,MAAM,EAAE,CAAC;oBAClB,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC;wBACpB,IAAI,EAAE,sBAA6B;wBACnC,WAAW,EAAE,IAAI,CAAC,MAAM,IAAI,IAAI,CAAC,SAAS,IAAI,QAAQ;wBACtD,OAAO,EAAE;4BACP,MAAM;4BACN,MAAM,EAAE,IAAI,CAAC,MAAM;4BACnB,SAAS,EAAE,IAAI,CAAC,SAAS;4BACzB,OAAO,EAAE,IAAI,CAAC,OAAO;4BACrB,SAAS,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI;4BACjC,SAAS,EAAE,IAAI,CAAC,GAAG,EAAE;yBACtB;qBACK,CAAC,CAAC;gBACZ,CAAC;gBACD,OAAO,IAAI,CAAC,YAAY,CAAC;oBACvB,OAAO,EAAE,IAAI;oBACb,MAAM;oBACN,SAAS,EAAE,IAAI,CAAC,GAAG,EAAE;iBACtB,CAAC,CAAC;YACL,CAAC;QACH,CAAC;QAED,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,oBAAoB,MAAM,IAAI,QAAQ,EAAE,EAAE,EAAE,GAAG,CAAC,CAAC;IACrF,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,QAAQ,CACpB,OAAgB,EAChB,MAAS,EACT,YAAqC,EAAE;QAEvC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;QACzC,MAAM,IAAI,GAAG,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC;QAC9E,OAAO,OAAO,CAAC,YAAY,CAAC,MAAa,EAAE,EAAE,GAAG,IAAI,EAAE,GAAG,SAAS,EAAE,CAAC,CAAC;IACxE,CAAC;IAED,mFAAmF;IAC3E,gBAAgB,CAAC,GAAQ,EAAE,OAAe;QAChD,MAAM,IAAI,GAAG,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,EAAE,GAAG,CAAC,QAAQ,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QAC7F,OAAO,GAAG,GAAG,CAAC,MAAM,GAAG,IAAI,EAAE,CAAC;IAChC,CAAC;IAED,wEAAwE;IAChE,KAAK,CAAC,QAAQ,CAAC,OAAgB;QACrC,MAAM,QAAQ,GAAG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,gBAAgB,CAAC,CAAC,CAAC;QAC/D,IAAI,MAAM,CAAC,QAAQ,CAAC,QAAQ,CAAC,IAAI,QAAQ,GAAG,IAAI,CAAC,YAAY;YAAE,MAAM,IAAI,oBAAoB,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QAEjH,IAAI,IAAI,GAAG,EAAE,CAAC;QACd,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;YACjB,MAAM,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC,SAAS,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,IAAI,WAAW,EAAE,CAAC;YAClC,IAAI,QAAQ,GAAG,CAAC,CAAC;YACjB,SAAS,CAAC;gBACR,MAAM,EAAE,IAAI,EAAE,KAAK,EAAE,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;gBAC5C,IAAI,IAAI;oBAAE,MAAM;gBAChB,QAAQ,IAAI,KAAK,CAAC,UAAU,CAAC;gBAC7B,IAAI,QAAQ,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC;oBACjC,MAAM,MAAM,CAAC,MAAM,EAAE,CAAC;oBACtB,MAAM,IAAI,oBAAoB,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;gBACpD,CAAC;gBACD,IAAI,IAAI,OAAO,CAAC,MAAM,CAAC,KAAK,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;YAClD,CAAC;YACD,IAAI,IAAI,OAAO,CAAC,MAAM,EAAE,CAAC;QAC3B,CAAC;QACD,IAAI,CAAC;YACH,OAAO,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC;QAC1B,CAAC;QAAC,MAAM,CAAC;YACP,MAAM,IAAI,eAAe,CAAC,kCAAkC,CAAC,CAAC;QAChE,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,aAAa,CAAC,GAAY,EAAE,OAAgB;QACxD,MAAM,IAAI,GAAG,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,MAAM,IAAI,GAAG,CAAC,CAAC,CAAE,GAAa,CAAC,IAAI,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/F,MAAM,CAAC,GAAG,GAA0B,CAAC;QAErC,QAAQ,IAAI,EAAE,CAAC;YACb,KAAK,iBAAiB,CAAC;YACvB,KAAK,2BAA2B;gBAC9B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,iBAAiB;gBACpB,OAAO,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YAC1G,KAAK,yBAAyB;gBAC5B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,CAAC,CAAC,UAAU,EAAE,QAAQ,EAAE,CAAC,CAAC,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;YACtG,KAAK,4BAA4B;gBAC/B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,QAAQ,EAAE,EAAE,GAAG,CAAC,CAAC;YAC5E,KAAK,yBAAyB;gBAC5B,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,SAAS,EAAE,EAAE,GAAG,CAAC,CAAC;YAC9E,KAAK,eAAe;gBAClB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,sBAAsB;gBACzB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;YACtD,KAAK,gBAAgB;gBACnB,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;QACxD,CAAC;QAED,sFAAsF;QACtF,8CAA8C;QAC9C,IAAI,IAAI,CAAC,OAAO,EAAE,CAAC;YACjB,IAAI,CAAC;gBACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,CAAC;gBAChD,IAAI,MAAM,YAAY,QAAQ;oBAAE,OAAO,MAAM,CAAC;YAChD,CAAC;YAAC,OAAO,OAAO,EAAE,CAAC;gBACjB,OAAO,CAAC,KAAK,CAAC,0CAA0C,EAAE,OAAO,CAAC,CAAC;YACrE,CAAC;QACH,CAAC;aAAM,CAAC;YACN,OAAO,CAAC,KAAK,CAAC,uCAAuC,EAAE,GAAG,CAAC,CAAC;QAC9D,CAAC;QAED,MAAM,OAAO,GAAG,IAAI,CAAC,YAAY,IAAI,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,uBAAuB,CAAC;QAClG,OAAO,IAAI,CAAC,YAAY,CAAC,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE,GAAG,CAAC,CAAC;IACpD,CAAC;IAEO,YAAY,CAAC,IAAa,EAAE,MAAM,GAAG,GAAG;QAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC,EAAE;YACxC,MAAM;YACN,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;aACnC;SACF,CAAC,CAAC;IACL,CAAC;CACF"}
|
package/package.json
CHANGED
|
@@ -1,6 +1,6 @@
|
|
|
1
1
|
{
|
|
2
2
|
"name": "@critical-path/server",
|
|
3
|
-
"version": "0.
|
|
3
|
+
"version": "0.24.0",
|
|
4
4
|
"description": "Web Fetch API compatible server router and adapters for Next.js App Router, SvelteKit, and Express",
|
|
5
5
|
"author": "Jack James",
|
|
6
6
|
"license": "MIT",
|
|
@@ -27,7 +27,7 @@
|
|
|
27
27
|
},
|
|
28
28
|
"dependencies": {
|
|
29
29
|
"zod-to-json-schema": "^3.25.2",
|
|
30
|
-
"@critical-path/core": "0.
|
|
30
|
+
"@critical-path/core": "0.36.0"
|
|
31
31
|
},
|
|
32
32
|
"devDependencies": {
|
|
33
33
|
"@types/node": "^24.0.0",
|
package/src/index.test.ts
CHANGED
|
@@ -1024,5 +1024,32 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
1024
1024
|
expect(feed.body.activities).toHaveLength(3);
|
|
1025
1025
|
expect(feed.body.nextCursor).toBeTruthy();
|
|
1026
1026
|
});
|
|
1027
|
+
|
|
1028
|
+
it('rejects request bodies over maxBodyBytes with 413', async () => {
|
|
1029
|
+
const router = new CriticalPathRouter(undefined, { maxBodyBytes: 64 });
|
|
1030
|
+
const big = JSON.stringify({ name: 'x'.repeat(200) });
|
|
1031
|
+
|
|
1032
|
+
const declared = await router.handleRequest(
|
|
1033
|
+
new Request('http://localhost/api/critical-path/projects', { method: 'POST', body: big, headers: { 'Content-Type': 'application/json' } })
|
|
1034
|
+
);
|
|
1035
|
+
expect(declared.status).toBe(413);
|
|
1036
|
+
|
|
1037
|
+
// A streamed body without Content-Length is cut off once it passes the limit
|
|
1038
|
+
const stream = new ReadableStream({
|
|
1039
|
+
start(controller) {
|
|
1040
|
+
controller.enqueue(new TextEncoder().encode(big));
|
|
1041
|
+
controller.close();
|
|
1042
|
+
}
|
|
1043
|
+
});
|
|
1044
|
+
const streamed = await router.handleRequest(
|
|
1045
|
+
new Request('http://localhost/api/critical-path/projects', { method: 'POST', body: stream, duplex: 'half' } as RequestInit)
|
|
1046
|
+
);
|
|
1047
|
+
expect(streamed.status).toBe(413);
|
|
1048
|
+
|
|
1049
|
+
const small = await router.handleRequest(
|
|
1050
|
+
new Request('http://localhost/api/critical-path/projects', { method: 'POST', body: JSON.stringify({ name: 'ok' }) })
|
|
1051
|
+
);
|
|
1052
|
+
expect(small.status).toBe(201);
|
|
1053
|
+
});
|
|
1027
1054
|
});
|
|
1028
1055
|
|
package/src/openapi.ts
CHANGED
|
@@ -172,6 +172,7 @@ export function buildOpenApiDocument(options: OpenApiOptions = {}): Record<strin
|
|
|
172
172
|
'403': errorResponse,
|
|
173
173
|
'404': errorResponse,
|
|
174
174
|
...(route.path.endsWith('/dependencies') && route.method === 'post' ? { '409': errorResponse } : {}),
|
|
175
|
+
...(route.body ? { '413': errorResponse } : {}),
|
|
175
176
|
'500': errorResponse
|
|
176
177
|
}
|
|
177
178
|
};
|
package/src/router.ts
CHANGED
|
@@ -39,6 +39,13 @@ export interface CorsOptions {
|
|
|
39
39
|
maxAge?: number;
|
|
40
40
|
}
|
|
41
41
|
|
|
42
|
+
class PayloadTooLargeError extends Error {
|
|
43
|
+
constructor(limit: number) {
|
|
44
|
+
super(`Request body exceeds ${limit} bytes.`);
|
|
45
|
+
this.name = 'PayloadTooLargeError';
|
|
46
|
+
}
|
|
47
|
+
}
|
|
48
|
+
|
|
42
49
|
class BadRequestError extends Error {
|
|
43
50
|
constructor(message: string) {
|
|
44
51
|
super(message);
|
|
@@ -64,6 +71,12 @@ export interface CriticalPathRouterOptions {
|
|
|
64
71
|
* otherwise they are attributed to `ANONYMOUS_ACTOR`. Request bodies never carry identity.
|
|
65
72
|
*/
|
|
66
73
|
getContext?: (request: Request) => RequestContext | null | undefined | Promise<RequestContext | null | undefined>;
|
|
74
|
+
/**
|
|
75
|
+
* Largest accepted request body in bytes; larger bodies get `413`. Defaults to 10 MiB, which
|
|
76
|
+
* leaves room for base64 uploads to `/attachments/upload`. Use the engine's `uploads.maxBytes`
|
|
77
|
+
* to limit file sizes themselves.
|
|
78
|
+
*/
|
|
79
|
+
maxBodyBytes?: number;
|
|
67
80
|
/** Reject requests with `401` unless `getContext` returns a `userId`. Defaults to `false`. */
|
|
68
81
|
requireAuth?: boolean;
|
|
69
82
|
/**
|
|
@@ -88,6 +101,7 @@ export class CriticalPathRouter {
|
|
|
88
101
|
private readonly exposeErrors: boolean;
|
|
89
102
|
private readonly getContext?: CriticalPathRouterOptions['getContext'];
|
|
90
103
|
private readonly requireAuth: boolean;
|
|
104
|
+
private readonly maxBodyBytes: number;
|
|
91
105
|
private readonly basePath?: string;
|
|
92
106
|
private readonly cors: CorsOptions | false;
|
|
93
107
|
|
|
@@ -101,6 +115,7 @@ export class CriticalPathRouter {
|
|
|
101
115
|
this.exposeErrors = options.exposeErrors ?? isDevelopment();
|
|
102
116
|
this.getContext = options.getContext;
|
|
103
117
|
this.requireAuth = options.requireAuth ?? false;
|
|
118
|
+
this.maxBodyBytes = options.maxBodyBytes ?? 10 * 1024 * 1024;
|
|
104
119
|
this.basePath = options.basePath ? '/' + options.basePath.replace(/^\/+|\/+$/g, '') : undefined;
|
|
105
120
|
this.cors = options.cors ?? false;
|
|
106
121
|
if (this.cors && this.cors.origins === '*' && this.cors.credentials) {
|
|
@@ -837,9 +852,30 @@ export class CriticalPathRouter {
|
|
|
837
852
|
return `${url.origin}${root}`;
|
|
838
853
|
}
|
|
839
854
|
|
|
855
|
+
/** Reads a JSON body, stopping as soon as it exceeds `maxBodyBytes`. */
|
|
840
856
|
private async readJson(request: Request): Promise<any> {
|
|
857
|
+
const declared = Number(request.headers.get('Content-Length'));
|
|
858
|
+
if (Number.isFinite(declared) && declared > this.maxBodyBytes) throw new PayloadTooLargeError(this.maxBodyBytes);
|
|
859
|
+
|
|
860
|
+
let text = '';
|
|
861
|
+
if (request.body) {
|
|
862
|
+
const reader = request.body.getReader();
|
|
863
|
+
const decoder = new TextDecoder();
|
|
864
|
+
let received = 0;
|
|
865
|
+
for (;;) {
|
|
866
|
+
const { done, value } = await reader.read();
|
|
867
|
+
if (done) break;
|
|
868
|
+
received += value.byteLength;
|
|
869
|
+
if (received > this.maxBodyBytes) {
|
|
870
|
+
await reader.cancel();
|
|
871
|
+
throw new PayloadTooLargeError(this.maxBodyBytes);
|
|
872
|
+
}
|
|
873
|
+
text += decoder.decode(value, { stream: true });
|
|
874
|
+
}
|
|
875
|
+
text += decoder.decode();
|
|
876
|
+
}
|
|
841
877
|
try {
|
|
842
|
-
return
|
|
878
|
+
return JSON.parse(text);
|
|
843
879
|
} catch {
|
|
844
880
|
throw new BadRequestError('Request body must be valid JSON.');
|
|
845
881
|
}
|
|
@@ -863,6 +899,8 @@ export class CriticalPathRouter {
|
|
|
863
899
|
return this.jsonResponse({ error: e.message, cyclePath: e.cyclePath }, 409);
|
|
864
900
|
case 'NotFoundError':
|
|
865
901
|
return this.jsonResponse({ error: e.message }, 404);
|
|
902
|
+
case 'PayloadTooLargeError':
|
|
903
|
+
return this.jsonResponse({ error: e.message }, 413);
|
|
866
904
|
case 'ForbiddenError':
|
|
867
905
|
return this.jsonResponse({ error: e.message }, 403);
|
|
868
906
|
}
|