@critical-path/server 0.15.0 → 0.17.0
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/CHANGELOG.md +60 -0
- package/README.md +22 -4
- package/dist/index.d.ts +1 -0
- package/dist/index.d.ts.map +1 -1
- package/dist/index.js +1 -0
- package/dist/index.js.map +1 -1
- package/dist/index.test.js +93 -24
- package/dist/index.test.js.map +1 -1
- package/dist/openapi.d.ts +30 -0
- package/dist/openapi.d.ts.map +1 -0
- package/dist/openapi.js +139 -0
- package/dist/openapi.js.map +1 -0
- package/dist/openapi.test.d.ts +2 -0
- package/dist/openapi.test.d.ts.map +1 -0
- package/dist/openapi.test.js +86 -0
- package/dist/openapi.test.js.map +1 -0
- package/dist/router.d.ts +19 -3
- package/dist/router.d.ts.map +1 -1
- package/dist/router.js +60 -51
- package/dist/router.js.map +1 -1
- package/package.json +3 -2
- package/src/index.test.ts +116 -24
- package/src/index.ts +1 -0
- package/src/openapi.test.ts +95 -0
- package/src/openapi.ts +178 -0
- package/src/router.ts +76 -53
- package/tsconfig.tsbuildinfo +1 -1
package/CHANGELOG.md
CHANGED
|
@@ -1,5 +1,65 @@
|
|
|
1
1
|
# @critical-path/server
|
|
2
2
|
|
|
3
|
+
## 0.17.0
|
|
4
|
+
|
|
5
|
+
### Minor Changes
|
|
6
|
+
|
|
7
|
+
- fd79762: **BREAKING:** strict request bodies, no identity in payloads, and CORS off by default.
|
|
8
|
+
|
|
9
|
+
**@critical-path/core**
|
|
10
|
+
- Request schemas are strict: unknown keys, server-assigned fields and identity fields are rejected instead of stripped.
|
|
11
|
+
- Identity is never read from payloads. `updateTask` no longer reads `actorId`/`actorName`/`actorType`/`actor` from the update object; pass them as the third `options` argument or use `withActor`. `addComment`, `addCommentReaction`, `removeCommentReaction` and `createAttachment` take the actor from `withActor`, falling back to an optional `authorId`/`userId`/`uploaderId`, then `'system'`.
|
|
12
|
+
- Schemas export request body types (`CreateTaskBody`, `UpdateTaskBody`, ...).
|
|
13
|
+
|
|
14
|
+
**@critical-path/server**
|
|
15
|
+
- Bodies containing unknown, server-assigned or identity fields return `400`.
|
|
16
|
+
- Every request runs as the `getContext` user, or `ANONYMOUS_ACTOR` (`anonymous`). Authors of comments, reactions, attachments and time entries are no longer accepted from bodies.
|
|
17
|
+
- `DELETE /comments/:id/reactions` takes `?emoji=` only.
|
|
18
|
+
- CORS is off by default (`cors: false`). Pass `cors: { origins: [...] }` to allow cross-origin browsers.
|
|
19
|
+
|
|
20
|
+
**@critical-path/client**
|
|
21
|
+
- Method parameters use the server's body types, so identity fields no longer type-check. `addCommentReaction`/`removeCommentReaction` take `{ emoji }`; `addTodo`/`toggleTodo` drop the actor options argument.
|
|
22
|
+
- New `updateProject`, `deleteProject` and `addDependency`. `uploadAttachmentFile` base64-encodes binary data (previously it sent unusable JSON for `Uint8Array`/`ArrayBuffer`).
|
|
23
|
+
- CLI: `--author`, `--actor-id`, `--actor-name`, `--agent-name` and `CRITICAL_PATH_AUTHOR_ID`/`ACTOR_ID`/`AGENT_NAME` are removed; identity comes from the `--key` token via the server's `getContext`.
|
|
24
|
+
|
|
25
|
+
**@critical-path/mcp**
|
|
26
|
+
- Tool arguments are strict: undeclared arguments return an `isError` result.
|
|
27
|
+
- `add_comment` no longer takes `authorId`. With an `engine`, writes are attributed to the new `actor` server option (default `DEFAULT_MCP_ACTOR`).
|
|
28
|
+
|
|
29
|
+
**@critical-path/react / @critical-path/svelte**
|
|
30
|
+
- `addReaction`/`removeReaction` take `(commentId, emoji)`; comment and attachment inputs no longer accept `authorId`/`uploaderId`. Task, comment and deliverable update parameters use the schema body types.
|
|
31
|
+
|
|
32
|
+
### Patch Changes
|
|
33
|
+
|
|
34
|
+
- Updated dependencies [fd79762]
|
|
35
|
+
- @critical-path/core@0.25.0
|
|
36
|
+
|
|
37
|
+
## 0.16.0
|
|
38
|
+
|
|
39
|
+
### Minor Changes
|
|
40
|
+
|
|
41
|
+
- b54e22c: Validate request bodies with shared zod schemas and publish an OpenAPI document.
|
|
42
|
+
|
|
43
|
+
**@critical-path/core**
|
|
44
|
+
- New `@critical-path/core/schemas` subpath with create/update schemas for every resource and `parsePayload(schema, data)`. Kept off the package root so browser bundles do not include zod. `zod` is now a dependency of core.
|
|
45
|
+
- `ValidationError` carries an optional `issues: { path, message }[]`.
|
|
46
|
+
|
|
47
|
+
**@critical-path/server**
|
|
48
|
+
- All request bodies are validated. Invalid bodies return `400` with `issues`. Server-assigned fields (`id`, `createdAt`, `updatedAt`, task `key`, owning `projectId` on updates) and unknown keys are stripped, so a `PATCH` can no longer move a task to another project.
|
|
49
|
+
- Comments, reactions and attachments require an author unless `getContext` resolves the caller. Attachment `mimeType` and `sizeBytes` default to `application/octet-stream` and `0` for linked files.
|
|
50
|
+
- New `GET /openapi.json` and `buildOpenApiDocument()` (OpenAPI 3.1, request bodies generated from the validation schemas).
|
|
51
|
+
|
|
52
|
+
**@critical-path/mcp**
|
|
53
|
+
- Tool `inputSchema`s are generated from their zod schemas via the new `defineTool`, removing the hand-written JSON copies.
|
|
54
|
+
|
|
55
|
+
**@critical-path/svelte**
|
|
56
|
+
- Rebuilt with the bundled `@critical-path/mcp` changes.
|
|
57
|
+
|
|
58
|
+
### Patch Changes
|
|
59
|
+
|
|
60
|
+
- Updated dependencies [b54e22c]
|
|
61
|
+
- @critical-path/core@0.24.0
|
|
62
|
+
|
|
3
63
|
## 0.15.0
|
|
4
64
|
|
|
5
65
|
### Minor Changes
|
package/README.md
CHANGED
|
@@ -62,10 +62,10 @@ Router options are the second argument to `createNextHandler`, `createSvelteKitH
|
|
|
62
62
|
|
|
63
63
|
| Option | Default | Description |
|
|
64
64
|
| :--- | :--- | :--- |
|
|
65
|
-
| `getContext(request)` | none | Resolve the caller (`{ userId, userName?, actorType?, ...extra }`).
|
|
65
|
+
| `getContext(request)` | none | Resolve the caller (`{ userId, userName?, actorType?, ...extra }`). Every mutation is attributed to that user, or to `anonymous` (`ANONYMOUS_ACTOR`) when no user is resolved. Request bodies never carry identity. For SvelteKit it receives the `RequestEvent`, so `event.locals` is available. |
|
|
66
66
|
| `requireAuth` | `false` | Return `401` unless `getContext` yields a `userId`. `OPTIONS` preflight is always allowed. |
|
|
67
67
|
| `basePath` | strip up to first `/critical-path` | Exact mount path, e.g. `/api/pm`. Requests outside it return `404`. |
|
|
68
|
-
| `cors` | `
|
|
68
|
+
| `cors` | `false` (no CORS headers) | `{ origins: string[] \| '*', credentials?, allowHeaders?, maxAge? }`, or `false` for no CORS headers. `credentials` cannot be combined with `'*'`. |
|
|
69
69
|
| `onError`, `exposeErrors` | see below | Unexpected error reporting. |
|
|
70
70
|
|
|
71
71
|
```ts
|
|
@@ -77,7 +77,7 @@ export const { GET, POST, PUT, PATCH, DELETE, OPTIONS } = createNextHandler(
|
|
|
77
77
|
return session?.user ? { userId: session.user.id } : null;
|
|
78
78
|
},
|
|
79
79
|
requireAuth: true,
|
|
80
|
-
cors: { origins: ['https://app.example.com'], credentials: true }
|
|
80
|
+
cors: { origins: ['https://app.example.com'], credentials: true } // omit for same-origin apps
|
|
81
81
|
}
|
|
82
82
|
);
|
|
83
83
|
```
|
|
@@ -86,11 +86,29 @@ For other Fetch runtimes (Workers, Deno, Bun, Hono), use `createUniversalHandler
|
|
|
86
86
|
|
|
87
87
|
---
|
|
88
88
|
|
|
89
|
+
## ✅ Request Validation & OpenAPI
|
|
90
|
+
|
|
91
|
+
Every request body is parsed with the zod schemas from `@critical-path/core/schemas` before it reaches the engine:
|
|
92
|
+
|
|
93
|
+
- Wrong types or missing required fields return `400` with `issues: [{ path, message }]`.
|
|
94
|
+
- Bodies are strict: server-assigned fields (`id`, `createdAt`, `updatedAt`, task `key`, the owning `projectId` on updates), identity fields (`actorId`, `authorId`, `userId`, `uploaderId`) and unknown keys are rejected with `400`, so a `PATCH` cannot move a task to another project or rewrite timestamps.
|
|
95
|
+
- Authors of comments, reactions, attachments and time entries are the resolved caller, or `anonymous`. Remove a reaction with `DELETE /comments/:id/reactions?emoji=👍`.
|
|
96
|
+
|
|
97
|
+
`GET /openapi.json` serves an OpenAPI 3.1 document whose request bodies are generated from the same schemas (behind the same auth as other routes). To publish it statically:
|
|
98
|
+
|
|
99
|
+
```ts
|
|
100
|
+
import { buildOpenApiDocument } from '@critical-path/server';
|
|
101
|
+
|
|
102
|
+
const doc = buildOpenApiDocument({ serverUrl: 'https://app.example.com/api/critical-path' });
|
|
103
|
+
```
|
|
104
|
+
|
|
105
|
+
---
|
|
106
|
+
|
|
89
107
|
## ⚠️ Error Responses
|
|
90
108
|
|
|
91
109
|
| Status | When |
|
|
92
110
|
| :--- | :--- |
|
|
93
|
-
| `400` | Malformed JSON, `ValidationError`, workflow transition or custom field validation failures |
|
|
111
|
+
| `400` | Malformed JSON, invalid body (with `issues`), `ValidationError`, workflow transition or custom field validation failures |
|
|
94
112
|
| `401` | `requireAuth` is set and no user was resolved |
|
|
95
113
|
| `404` | Unknown route, `NotFoundError`, or `DELETE` of a resource that does not exist (successful deletes return `{ "success": true }`) |
|
|
96
114
|
| `409` | `CircularDependencyError` (body includes `cyclePath`) |
|
package/dist/index.d.ts
CHANGED
package/dist/index.d.ts.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,yBAAyB,CAAC;AACxC,cAAc,yBAAyB,CAAC"}
|
|
1
|
+
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,yBAAyB,CAAC;AACxC,cAAc,yBAAyB,CAAC;AACxC,cAAc,cAAc,CAAC"}
|
package/dist/index.js
CHANGED
package/dist/index.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,yBAAyB,CAAC;AACxC,cAAc,yBAAyB,CAAC"}
|
|
1
|
+
{"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,yBAAyB,CAAC;AACxC,cAAc,yBAAyB,CAAC;AACxC,cAAc,cAAc,CAAC"}
|
package/dist/index.test.js
CHANGED
|
@@ -95,7 +95,7 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
95
95
|
const postCmtReq = new Request(`http://localhost:3000/api/critical-path/tasks/${task.id}/comments`, {
|
|
96
96
|
method: 'POST',
|
|
97
97
|
headers: { 'Content-Type': 'application/json' },
|
|
98
|
-
body: JSON.stringify({ content: 'Root comment'
|
|
98
|
+
body: JSON.stringify({ content: 'Root comment' })
|
|
99
99
|
});
|
|
100
100
|
const postCmtRes = await router.handleRequest(postCmtReq);
|
|
101
101
|
expect(postCmtRes.status).toBe(201);
|
|
@@ -127,8 +127,7 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
127
127
|
mimeType: 'text/markdown',
|
|
128
128
|
sizeBytes: 100,
|
|
129
129
|
taskId: task.id,
|
|
130
|
-
projectId: proj.id
|
|
131
|
-
uploaderId: 'u1'
|
|
130
|
+
projectId: proj.id
|
|
132
131
|
})
|
|
133
132
|
});
|
|
134
133
|
const postAttRes = await router.handleRequest(postAttReq);
|
|
@@ -160,8 +159,7 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
160
159
|
body: JSON.stringify({
|
|
161
160
|
filename: 'huge.pdf',
|
|
162
161
|
url: `data:application/pdf;base64,${'B'.repeat(3000)}`,
|
|
163
|
-
taskId: task.id
|
|
164
|
-
uploaderId: 'u1'
|
|
162
|
+
taskId: task.id
|
|
165
163
|
})
|
|
166
164
|
});
|
|
167
165
|
const invalidAttRes = await router.handleRequest(invalidAttReq);
|
|
@@ -178,27 +176,24 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
178
176
|
const addReactReq = new Request(`http://localhost:3000/api/critical-path/comments/${comment.id}/reactions`, {
|
|
179
177
|
method: 'POST',
|
|
180
178
|
headers: { 'Content-Type': 'application/json' },
|
|
181
|
-
body: JSON.stringify({ emoji: '❤️'
|
|
179
|
+
body: JSON.stringify({ emoji: '❤️' })
|
|
182
180
|
});
|
|
183
181
|
const addReactRes = await router.handleRequest(addReactReq);
|
|
184
182
|
expect(addReactRes.status).toBe(200);
|
|
185
183
|
const addReactData = await addReactRes.json();
|
|
186
184
|
expect(addReactData.comment.reactions).toHaveLength(1);
|
|
187
185
|
expect(addReactData.comment.reactions[0].emoji).toBe('❤️');
|
|
188
|
-
|
|
186
|
+
expect(addReactData.comment.reactions[0].userId).toBe('anonymous');
|
|
187
|
+
// 2. Add reaction validation error (missing emoji, or identity claimed in the body)
|
|
189
188
|
const badReactReq = new Request(`http://localhost:3000/api/critical-path/comments/${comment.id}/reactions`, {
|
|
190
189
|
method: 'POST',
|
|
191
190
|
headers: { 'Content-Type': 'application/json' },
|
|
192
|
-
body: JSON.stringify({ emoji: '❤️' })
|
|
191
|
+
body: JSON.stringify({ emoji: '❤️', userId: 'u2' })
|
|
193
192
|
});
|
|
194
193
|
const badReactRes = await router.handleRequest(badReactReq);
|
|
195
194
|
expect(badReactRes.status).toBe(400);
|
|
196
195
|
// 3. Remove reaction via DELETE
|
|
197
|
-
const delReactReq = new Request(`http://localhost:3000/api/critical-path/comments/${comment.id}/reactions`, {
|
|
198
|
-
method: 'DELETE',
|
|
199
|
-
headers: { 'Content-Type': 'application/json' },
|
|
200
|
-
body: JSON.stringify({ emoji: '❤️', userId: 'u2' })
|
|
201
|
-
});
|
|
196
|
+
const delReactReq = new Request(`http://localhost:3000/api/critical-path/comments/${comment.id}/reactions?emoji=${encodeURIComponent('❤️')}`, { method: 'DELETE' });
|
|
202
197
|
const delReactRes = await router.handleRequest(delReactReq);
|
|
203
198
|
expect(delReactRes.status).toBe(200);
|
|
204
199
|
const delReactData = await delReactRes.json();
|
|
@@ -419,11 +414,14 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
419
414
|
console.error = originalError;
|
|
420
415
|
}
|
|
421
416
|
});
|
|
422
|
-
it('answers CORS preflight requests', async () => {
|
|
423
|
-
const
|
|
424
|
-
const
|
|
425
|
-
expect(
|
|
426
|
-
expect(
|
|
417
|
+
it('answers CORS preflight requests, sending CORS headers only when configured', async () => {
|
|
418
|
+
const preflight = () => new Request(`${base}/tasks`, { method: 'OPTIONS', headers: { Origin: 'https://x.test' } });
|
|
419
|
+
const closed = await new CriticalPathRouter().handleRequest(preflight());
|
|
420
|
+
expect(closed.status).toBe(204);
|
|
421
|
+
expect(closed.headers.get('Access-Control-Allow-Origin')).toBeNull();
|
|
422
|
+
const open = await new CriticalPathRouter(undefined, { cors: { origins: '*' } }).handleRequest(preflight());
|
|
423
|
+
expect(open.headers.get('Access-Control-Allow-Origin')).toBe('*');
|
|
424
|
+
expect(open.headers.get('Access-Control-Allow-Methods')).toContain('PATCH');
|
|
427
425
|
});
|
|
428
426
|
});
|
|
429
427
|
it('createNextHandler supports both callable and destructured exports', async () => {
|
|
@@ -433,7 +431,7 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
433
431
|
expect((await handler(req())).status).toBe(200);
|
|
434
432
|
expect((await GET(req())).status).toBe(200);
|
|
435
433
|
});
|
|
436
|
-
it('updates projects via PATCH
|
|
434
|
+
it('updates projects via PATCH and rejects id or timestamp overrides', async () => {
|
|
437
435
|
const router = new CriticalPathRouter();
|
|
438
436
|
const proj = await router.engine.createProject({ key: 'UPD', name: 'Before' });
|
|
439
437
|
const patch = (id, body) => router.handleRequest(new Request(`http://localhost:3000/api/critical-path/projects/${id}`, {
|
|
@@ -441,7 +439,9 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
441
439
|
headers: { 'Content-Type': 'application/json' },
|
|
442
440
|
body: JSON.stringify(body)
|
|
443
441
|
}));
|
|
444
|
-
|
|
442
|
+
expect((await patch(proj.id, { name: 'After', id: 'hijacked' })).status).toBe(400);
|
|
443
|
+
expect((await patch(proj.id, { name: 'After', createdAt: '1999-01-01T00:00:00.000Z' })).status).toBe(400);
|
|
444
|
+
const res = await patch(proj.id, { name: 'After' });
|
|
445
445
|
expect(res.status).toBe(200);
|
|
446
446
|
const { project } = await res.json();
|
|
447
447
|
expect(project.id).toBe(proj.id);
|
|
@@ -544,20 +544,20 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
544
544
|
// Preflight is answered without credentials
|
|
545
545
|
expect((await call(router, '/projects', { method: 'OPTIONS' })).status).toBe(204);
|
|
546
546
|
});
|
|
547
|
-
it('attributes mutations to the context user
|
|
547
|
+
it('attributes mutations to the context user', async () => {
|
|
548
548
|
const router = new CriticalPathRouter(undefined, { getContext: tokenContext });
|
|
549
549
|
const project = await router.engine.createProject({ key: 'CTX', name: 'Context' });
|
|
550
550
|
const task = await router.engine.createTask({ projectId: project.id, title: 'T' });
|
|
551
551
|
const patched = await call(router, `/tasks/${task.id}`, {
|
|
552
552
|
method: 'PATCH',
|
|
553
553
|
token: 'alice',
|
|
554
|
-
body: JSON.stringify({ title: 'Renamed'
|
|
554
|
+
body: JSON.stringify({ title: 'Renamed' })
|
|
555
555
|
});
|
|
556
556
|
expect(patched.status).toBe(200);
|
|
557
557
|
const commented = await call(router, `/tasks/${task.id}/comments`, {
|
|
558
558
|
method: 'POST',
|
|
559
559
|
token: 'alice',
|
|
560
|
-
body: JSON.stringify({ content: 'hi'
|
|
560
|
+
body: JSON.stringify({ content: 'hi' })
|
|
561
561
|
});
|
|
562
562
|
const { comment } = await commented.json();
|
|
563
563
|
expect(comment.authorId).toBe('alice');
|
|
@@ -624,7 +624,7 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
624
624
|
const commentReq = () => new Request(`http://localhost/api/critical-path/tasks/${task.id}/comments`, {
|
|
625
625
|
method: 'POST',
|
|
626
626
|
headers: { 'Content-Type': 'application/json' },
|
|
627
|
-
body: JSON.stringify({ content: 'from svelte'
|
|
627
|
+
body: JSON.stringify({ content: 'from svelte' })
|
|
628
628
|
});
|
|
629
629
|
expect((await POST({ request: commentReq(), locals: {} })).status).toBe(401);
|
|
630
630
|
const res = await POST({ request: commentReq(), locals: { user: { id: 'svelte-user' } } });
|
|
@@ -643,5 +643,74 @@ describe('@critical-path/server Router Tests', () => {
|
|
|
643
643
|
expect((await handle(new Request('http://localhost/other/projects'))).status).toBe(404);
|
|
644
644
|
});
|
|
645
645
|
});
|
|
646
|
+
describe('request body validation', () => {
|
|
647
|
+
const send = (router, method, path, body, token) => router.handleRequest(new Request(`http://localhost:3000/api/critical-path${path}`, {
|
|
648
|
+
method,
|
|
649
|
+
headers: { 'Content-Type': 'application/json', ...(token ? { Authorization: `Bearer ${token}` } : {}) },
|
|
650
|
+
body: JSON.stringify(body)
|
|
651
|
+
}));
|
|
652
|
+
it('rejects attempts to move tasks or rewrite server-assigned fields', async () => {
|
|
653
|
+
const router = new CriticalPathRouter();
|
|
654
|
+
const home = await router.engine.createProject({ key: 'HOME', name: 'Home' });
|
|
655
|
+
const other = await router.engine.createProject({ key: 'OTH', name: 'Other' });
|
|
656
|
+
const task = await router.engine.createTask({ projectId: home.id, title: 'Stay' });
|
|
657
|
+
const res = await send(router, 'PATCH', `/tasks/${task.id}`, {
|
|
658
|
+
title: 'Renamed',
|
|
659
|
+
projectId: other.id,
|
|
660
|
+
id: 'hijacked',
|
|
661
|
+
createdAt: '1999-01-01T00:00:00.000Z',
|
|
662
|
+
injected: '<script>'
|
|
663
|
+
});
|
|
664
|
+
expect(res.status).toBe(400);
|
|
665
|
+
const { issues } = await res.json();
|
|
666
|
+
expect(issues[0].message).toMatch(/Unrecognized key/);
|
|
667
|
+
expect(issues[0].message).toMatch(/projectId/);
|
|
668
|
+
const stored = await router.engine.getTask(task.id);
|
|
669
|
+
expect(stored?.title).toBe('Stay');
|
|
670
|
+
expect(stored?.projectId).toBe(home.id);
|
|
671
|
+
});
|
|
672
|
+
it('returns 400 with field-level issues for invalid bodies', async () => {
|
|
673
|
+
const router = new CriticalPathRouter();
|
|
674
|
+
const project = await router.engine.createProject({ key: 'VAL', name: 'Validation' });
|
|
675
|
+
const res = await send(router, 'POST', '/tasks', { projectId: project.id, title: '', progress: 'half' });
|
|
676
|
+
expect(res.status).toBe(400);
|
|
677
|
+
const data = await res.json();
|
|
678
|
+
expect(data.issues.map((i) => i.path).sort()).toEqual(['progress', 'title']);
|
|
679
|
+
expect((await send(router, 'POST', '/projects', [])).status).toBe(400);
|
|
680
|
+
expect((await send(router, 'POST', '/iterations', { projectId: project.id, name: 'S1', status: 'later' })).status).toBe(400);
|
|
681
|
+
});
|
|
682
|
+
it('takes authorship from the caller (or anonymous), never the body, and path ids win', async () => {
|
|
683
|
+
const router = new CriticalPathRouter(undefined, {
|
|
684
|
+
getContext: (request) => {
|
|
685
|
+
const token = request.headers.get('Authorization')?.replace('Bearer ', '');
|
|
686
|
+
return token ? { userId: token } : null;
|
|
687
|
+
}
|
|
688
|
+
});
|
|
689
|
+
const project = await router.engine.createProject({ key: 'AUT', name: 'Authors' });
|
|
690
|
+
const task = await router.engine.createTask({ projectId: project.id, title: 'T' });
|
|
691
|
+
const decoy = await router.engine.createTask({ projectId: project.id, title: 'Decoy' });
|
|
692
|
+
const anonymous = await send(router, 'POST', `/tasks/${task.id}/comments`, { content: 'hi' });
|
|
693
|
+
expect(anonymous.status).toBe(201);
|
|
694
|
+
expect((await anonymous.json()).comment.authorId).toBe('anonymous');
|
|
695
|
+
const spoofed = await send(router, 'POST', `/tasks/${task.id}/comments`, { content: 'hi', authorId: 'ceo' }, 'alice');
|
|
696
|
+
expect(spoofed.status).toBe(400);
|
|
697
|
+
const authed = await send(router, 'POST', `/tasks/${task.id}/comments`, { content: 'hi', taskId: decoy.id }, 'alice');
|
|
698
|
+
expect(authed.status).toBe(201);
|
|
699
|
+
const { comment } = await authed.json();
|
|
700
|
+
expect(comment.authorId).toBe('alice');
|
|
701
|
+
expect(comment.taskId).toBe(task.id);
|
|
702
|
+
});
|
|
703
|
+
it('attributes unauthenticated writes to the anonymous actor and rejects actor claims', async () => {
|
|
704
|
+
const router = new CriticalPathRouter();
|
|
705
|
+
const project = await router.engine.createProject({ key: 'ANO', name: 'Anonymous' });
|
|
706
|
+
const task = await router.engine.createTask({ projectId: project.id, title: 'T' });
|
|
707
|
+
const claimed = await send(router, 'PATCH', `/tasks/${task.id}`, { isBlocked: true, actorId: 'agent-7' });
|
|
708
|
+
expect(claimed.status).toBe(400);
|
|
709
|
+
const res = await send(router, 'PATCH', `/tasks/${task.id}`, { isBlocked: true });
|
|
710
|
+
expect(res.status).toBe(200);
|
|
711
|
+
const activities = await router.engine.store.getActivities({ taskId: task.id });
|
|
712
|
+
expect(activities.some((a) => a.actorId === 'anonymous')).toBe(true);
|
|
713
|
+
});
|
|
714
|
+
});
|
|
646
715
|
});
|
|
647
716
|
//# sourceMappingURL=index.test.js.map
|
package/dist/index.test.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AACjD,OAAO,EAAE,iBAAiB,EAAE,MAAM,oBAAoB,CAAC;AACvD,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AAEpD,QAAQ,CAAC,oCAAoC,EAAE,GAAG,EAAE;IAClD,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;QAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,oBAAoB;QACpB,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,kDAAkD,EAAE;YAC9E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC;SAC5D,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACpD,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE1C,kBAAkB;QAClB,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAC/E,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;IACxD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uCAAuC,EAAE,KAAK,IAAI,EAAE;QACrD,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,wBAAwB;QACxB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAClF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC1C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,wBAAwB;QACxB,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YACvF,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC;SACzC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;QAC1E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,8BAA8B;QAC9B,MAAM,KAAK,GAAG,IAAI,OAAO,CAAC,mDAAmD,EAAE;YAC7E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,IAAI,EAAE,qBAAqB;gBAC3B,gBAAgB,EAAE,MAAM;gBACxB,QAAQ,EAAE;oBACR,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;oBACxD,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;iBACtD;gBACD,WAAW,EAAE;oBACX,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,MAAM,EAAE,WAAW,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE;iBACzE;aACF,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QAChD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,MAAM,GAAG,MAAM,KAAK,CAAC,IAAI,EAAE,CAAC;QAClC,MAAM,IAAI,GAAG,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC;QAEhC,uCAAuC;QACvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,UAAU,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACnG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAE3H,6BAA6B;QAC7B,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,cAAc,CAAC,CAAC;QACrG,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,uBAAuB,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4CAA4C;QAC5C,MAAM,eAAe,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YAC9F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;SAChD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,eAAe,CAAC,CAAC;QAC/D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACtC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;QAChE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,CAAC;QACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAE3G,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,EAAE;YAClG,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,cAAc,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC;SACtF,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,SAAS,GAAG,WAAW,CAAC,OAAO,CAAC,EAAE,CAAC;QAEzC,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,CAAC,CAAC;QACpG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE5C,mBAAmB;QACnB,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC/F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,yBAAyB,EAAE,CAAC;SAC7D,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;QAErE,qBAAqB;QACrB,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,SAAS;gBACnB,GAAG,EAAE,qCAAqC;gBAC1C,QAAQ,EAAE,eAAe;gBACzB,SAAS,EAAE,GAAG;gBACd,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,UAAU,EAAE,IAAI;aACjB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,YAAY,GAAG,WAAW,CAAC,UAAU,CAAC,EAAE,CAAC;QAE/C,8BAA8B;QAC9B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,8DAA8D,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACxG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE/C,uBAAuB;QACvB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,uDAAuD,YAAY,EAAE,EAAE;YACnG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,oBAAoB;QACpB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC7F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,sCAAsC;QACtC,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACvF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,UAAU;gBACpB,GAAG,EAAE,+BAA+B,GAAG,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE;gBACtD,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,UAAU,EAAE,IAAI;aACjB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,2CAA2C,CAAC,CAAC;IACtF,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iFAAiF,EAAE,KAAK,IAAI,EAAE;QAC/F,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,CAAC,CAAC;QACtF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAC5G,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,CAAC;QAE1G,2BAA2B;QAC3B,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvD,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE3D,6DAA6D;QAC7D,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;SACtC,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAErC,gCAAgC;QAChC,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,QAAQ;YAChB,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IACzD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;QACvE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,kBAAkB,EAAE,CAAC,CAAC;QAEzF,iCAAiC;QACjC,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,sDAAsD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,YAAY;aACrB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;QAC7D,MAAM,aAAa,GAAG,UAAU,CAAC,WAAW,CAAC,EAAE,CAAC;QAEhD,qCAAqC;QACrC,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC7B,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,kBAAkB;YACzB,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;YACf,aAAa;SACd,CAAC,CAAC;QAEH,mCAAmC;QACnC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,kEAAkE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAEjD,6BAA6B;QAC7B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,UAAU,CAAC,CAAC;QAChH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEpD,kCAAkC;QAClC,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YACpG,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC;SAC9C,CAAC,CAAC;QACH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QACvD,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,WAAW,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,mCAAmC;QACnC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YAClG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACrC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,gBAAgB,EAAE,CAAC,CAAC;QAE1F,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,yBAAyB;YAChC,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,CAAC;YACjB,QAAQ,EAAE,GAAG;SACd,CAAC,CAAC;QAEH,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,mBAAmB;YAC1B,MAAM,EAAE,aAAa;YACrB,cAAc,EAAE,EAAE;YAClB,QAAQ,EAAE,EAAE;SACb,CAAC,CAAC;QAEH,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC;YAChC,MAAM,EAAE,EAAE,CAAC,EAAE;YACb,eAAe,EAAE,EAAE,CAAC,EAAE;YACtB,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,qCAAqC;QACrC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,gBAAgB,CAAC,CAAC;QAC3G,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;QAEjE,8BAA8B;QAC9B,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,mBAAmB,CAAC,CAAC;QACjH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACnE,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,2BAA2B;QAC3B,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,SAAS,CAAC,CAAC;QACnG,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,mBAAmB,CAAC,CAAC;QAC3E,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClE,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4BAA4B;QAC5B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,UAAU,CAAC,CAAC;QACjG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;QAE9C,qCAAqC;QACrC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,mBAAmB,CAAC,CAAC;QAC1G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;QAE5E,gCAAgC;QAChC,MAAM,kBAAkB,GAAG,IAAI,OAAO,CACpC,oDAAoD,OAAO,CAAC,EAAE,0CAA0C,CACzG,CAAC;QACF,MAAM,kBAAkB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,kBAAkB,CAAC,CAAC;QAC1E,MAAM,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,mBAAmB,GAAG,MAAM,kBAAkB,CAAC,IAAI,EAAE,CAAC;QAC5D,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QACvE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAEnE,4BAA4B;QAC5B,MAAM,iBAAiB,GAAG,IAAI,OAAO,CACnC,+DAA+D,CAChE,CAAC;QACF,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,iBAAiB,CAAC,CAAC;QACxE,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3C,MAAM,kBAAkB,GAAG,MAAM,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAC1D,MAAM,CAAC,kBAAkB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;QAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,GAAG,GAAG,IAAI,OAAO,CAAC,gDAAgD,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM,EAAE,4BAA4B;gBACpC,MAAM,EAAE,OAAO;gBACf,SAAS,EAAE,OAAO;gBAClB,OAAO,EAAE,4BAA4B;gBACrC,SAAS,EAAE,IAAI;aAChB,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAChC,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,4BAA4B,CAAC,CAAC;QACvD,MAAM,CAAC,OAAO,IAAI,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAC/C,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qCAAqC,EAAE,GAAG,EAAE;QACnD,MAAM,IAAI,GAAG,yCAAyC,CAAC;QACvD,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,IAAa,EAAE,EAAE,CAC3C,IAAI,OAAO,CAAC,GAAG,IAAI,GAAG,IAAI,EAAE,EAAE;YAC5B,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC7D,CAAC,CAAC;QAEL,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;YACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC9E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAE7E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE/B,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YAC1G,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;YAEtD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC,CAAC;YACpF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;YACrE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YACnG,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAElC,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,KAAK,IAAI,EAAE;YACzE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,aAAa,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAC1D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,WAAW,EAAE,WAAW,CAAC,CAAC,CAAC;YACvE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE7B,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,MAAM,aAAa,GAAG,OAAO,CAAC,KAAK,CAAC;YACpC,OAAO,CAAC,KAAK,GAAG,GAAG,EAAE,GAAE,CAAC,CAAC;YACzB,IAAI,CAAC;gBACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,WAAW,CAAC,CAAC,CAAC;gBACxE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;gBAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjE,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,KAAK,GAAG,aAAa,CAAC;YAChC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iCAAiC,EAAE,KAAK,IAAI,EAAE;YAC/C,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,QAAQ,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC;QAC7E,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mEAAmE,EAAE,KAAK,IAAI,EAAE;QACjF,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACtC,MAAM,EAAE,GAAG,EAAE,GAAG,OAAO,CAAC;QACxB,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAElF,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChD,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IAC9C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uEAAuE,EAAE,KAAK,IAAI,EAAE;QACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,IAAa,EAAE,EAAE,CAC1C,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,oDAAoD,EAAE,EAAE,EAAE;YACpE,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,EAAE,UAAU,EAAE,SAAS,EAAE,0BAA0B,EAAE,CAAC,CAAC;QAC3G,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QACrC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACnE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,KAAK,MAAM,IAAI,IAAI,CAAC,UAAU,EAAE,OAAO,EAAE,WAAW,EAAE,UAAU,EAAE,aAAa,EAAE,cAAc,EAAE,OAAO,EAAE,YAAY,EAAE,YAAY,CAAC,EAAE,CAAC;YACtI,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,2CAA2C,IAAI,UAAU,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAC7F,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC;IACH,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,mCAAmC,EAAE,GAAG,EAAE;QACjD,MAAM,aAAa,GAAG,CAAC,OAA4D,EAAE,EAAE;YACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,OAAO,MAAM,CAAC;QAChB,CAAC,CAAC;QACF,MAAM,YAAY,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAE3F,EAAE,CAAC,8EAA8E,EAAE,KAAK,IAAI,EAAE;YAC5F,MAAM,IAAI,GAA4C,EAAE,CAAC;YACzD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,CAAC,GAAG,EAAE,OAAO,EAAE,EAAE;oBACxB,IAAI,CAAC,IAAI,CAAC,EAAE,OAAO,EAAG,GAAa,CAAC,OAAO,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC;gBACnE,CAAC;aACF,CAAC,CAAC;YAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YAC/D,MAAM,CAAC,IAAI,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,YAAY,EAAE,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC;QACnG,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mCAAmC,EAAE,KAAK,IAAI,EAAE;YACjD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,GAAG,EAAE,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,iBAAiB,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC;aAC3F,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;YAChE,IAAI,KAAK,GAAG,CAAC,CAAC;YACd,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,CAAC,KAAK,KAAK,EAAE,EAAE,CAAC,CAAC;YAClF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,kDAAkD,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAClG,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxB,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;YACvE,MAAM,OAAO,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,OAAO,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,kCAAkC,CAAC,CAAC;YAEpH,MAAM,MAAM,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;QAC1G,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,qDAAqD,EAAE,KAAK,IAAI,EAAE;YACnE,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC;YACtC,IAAI,CAAC;gBACH,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,aAAa,CAAC;gBACrC,MAAM,GAAG,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBACjD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,GAAG,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;gBAEnG,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,YAAY,CAAC;gBACpC,MAAM,IAAI,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBAClD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,IAAI,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACxG,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,QAAQ,CAAC;YAClC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,KAAK,GAAG,IAAI,aAAa,EAAE,CAAC;YAClC,KAAK,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBAC7B,MAAM,IAAI,KAAK,CAAC,iBAAiB,CAAC,CAAC;YACrC,CAAC,CAAC;YACF,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;YAE9G,MAAM,GAAG,GAAG,MAAM,OAAO,CAAC,YAAY,EAAE,CAAC,CAAC;YAC1C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YACzD,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,0CAA0C,EAAE,GAAG,EAAE;QACxD,MAAM,YAAY,GAAG,CAAC,OAAgB,EAAE,EAAE;YACxC,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;YAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;QACzE,CAAC,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,IAAY,EAAE,OAAyC,EAAE,EAAE,EAAE;YACrG,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAC1C,IAAI,IAAI,CAAC,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,eAAe,EAAE,UAAU,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;YACrE,IAAI,IAAI,CAAC,IAAI;gBAAE,OAAO,CAAC,GAAG,CAAC,cAAc,EAAE,kBAAkB,CAAC,CAAC;YAC/D,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE,EAAE,GAAG,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC;QACnH,CAAC,CAAC;QAEF,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;YAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YAClG,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC3D,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC/E,4CAA4C;YAC5C,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,CAAC,CAAC;YAC/E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBACtD,MAAM,EAAE,OAAO;gBACf,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,SAAS,EAAE,KAAK,EAAE,CAAC;aAC7E,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE;gBACjE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,CAAC;aACzD,CAAC,CAAC;YACH,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEvC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,aAAa,OAAO,CAAC,EAAE,YAAY,EAAE;gBACtE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;aACtC,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEzE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,MAAM,GAAG,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,cAAc,CAAC,CAAC;YACnE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,KAAK,IAAI,EAAE;YAC/D,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,GAAG,EAAE;oBACf,MAAM,IAAI,KAAK,CAAC,uBAAuB,CAAC,CAAC;gBAC3C,CAAC;gBACD,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC;YAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,gCAAgC,EAAE,KAAK,IAAI,EAAE;YAC9C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC,CAAC;YAC3E,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,kCAAkC,CAAC,CAAC,CAAC;YACvF,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC,CAAC;YACvG,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,mCAAmC,CAAC,CAAC,CAAC;YAC/F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,IAAI,EAAE,EAAE,OAAO,EAAE,CAAC,yBAAyB,CAAC,EAAE,WAAW,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE;aAC/E,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAC3F,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAC7E,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC;YAExD,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,0BAA0B,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACzH,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,CAAC,CAAC;YAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YAChG,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAElE,MAAM,CAAC,GAAG,EAAE,CAAC,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,aAAa,CAAC,CAAC;QACxH,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,iCAAiC,EAAE,GAAG,EAAE;QAC/C,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YAEtF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,IAAI,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACpF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,EAAE,IAAI,EAAE,GAAG,sBAAsB,CAAQ,MAAM,EAAE;gBACrD,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;aACrF,CAAC,CAAC;YAEH,MAAM,UAAU,GAAG,GAAG,EAAE,CACtB,IAAI,OAAO,CAAC,4CAA4C,IAAI,CAAC,EAAE,WAAW,EAAE;gBAC1E,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC;aACtE,CAAC,CAAC;YAEL,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,EAAE,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YACtF,MAAM,EAAE,GAAG,EAAE,GAAG,sBAAsB,CACpC,EAAE,EACF,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,CAChF,CAAC;YACF,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC;YAC7E,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrE,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;YAC1E,MAAM,MAAM,GAAG,sBAAsB,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,KAAK,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC;YACxH,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,8BAA8B,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrF,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,iCAAiC,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC1F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
|
1
|
+
{"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AACjD,OAAO,EAAE,iBAAiB,EAAE,MAAM,oBAAoB,CAAC;AACvD,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AAEpD,QAAQ,CAAC,oCAAoC,EAAE,GAAG,EAAE;IAClD,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;QAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,oBAAoB;QACpB,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,kDAAkD,EAAE;YAC9E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC;SAC5D,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACpD,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE1C,kBAAkB;QAClB,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAC/E,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;IACxD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uCAAuC,EAAE,KAAK,IAAI,EAAE;QACrD,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,wBAAwB;QACxB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAClF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC1C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,wBAAwB;QACxB,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YACvF,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC;SACzC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;QAC1E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,8BAA8B;QAC9B,MAAM,KAAK,GAAG,IAAI,OAAO,CAAC,mDAAmD,EAAE;YAC7E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,IAAI,EAAE,qBAAqB;gBAC3B,gBAAgB,EAAE,MAAM;gBACxB,QAAQ,EAAE;oBACR,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;oBACxD,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;iBACtD;gBACD,WAAW,EAAE;oBACX,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,MAAM,EAAE,WAAW,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE;iBACzE;aACF,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QAChD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,MAAM,GAAG,MAAM,KAAK,CAAC,IAAI,EAAE,CAAC;QAClC,MAAM,IAAI,GAAG,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC;QAEhC,uCAAuC;QACvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,UAAU,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACnG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAE3H,6BAA6B;QAC7B,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,cAAc,CAAC,CAAC;QACrG,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,uBAAuB,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4CAA4C;QAC5C,MAAM,eAAe,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YAC9F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;SAChD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,eAAe,CAAC,CAAC;QAC/D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACtC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;QAChE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,CAAC;QACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAE3G,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,EAAE;YAClG,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,cAAc,EAAE,CAAC;SAClD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,SAAS,GAAG,WAAW,CAAC,OAAO,CAAC,EAAE,CAAC;QAEzC,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,CAAC,CAAC;QACpG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE5C,mBAAmB;QACnB,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC/F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,yBAAyB,EAAE,CAAC;SAC7D,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;QAErE,qBAAqB;QACrB,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,SAAS;gBACnB,GAAG,EAAE,qCAAqC;gBAC1C,QAAQ,EAAE,eAAe;gBACzB,SAAS,EAAE,GAAG;gBACd,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,IAAI,CAAC,EAAE;aACnB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,YAAY,GAAG,WAAW,CAAC,UAAU,CAAC,EAAE,CAAC;QAE/C,8BAA8B;QAC9B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,8DAA8D,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACxG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE/C,uBAAuB;QACvB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,uDAAuD,YAAY,EAAE,EAAE;YACnG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,oBAAoB;QACpB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC7F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,sCAAsC;QACtC,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACvF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,UAAU;gBACpB,GAAG,EAAE,+BAA+B,GAAG,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE;gBACtD,MAAM,EAAE,IAAI,CAAC,EAAE;aAChB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,2CAA2C,CAAC,CAAC;IACtF,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iFAAiF,EAAE,KAAK,IAAI,EAAE;QAC/F,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,CAAC,CAAC;QACtF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAC5G,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,CAAC;QAE1G,2BAA2B;QAC3B,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;SACtC,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvD,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC3D,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QAEnE,oFAAoF;QACpF,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAErC,gCAAgC;QAChC,MAAM,WAAW,GAAG,IAAI,OAAO,CAC7B,oDAAoD,OAAO,CAAC,EAAE,oBAAoB,kBAAkB,CAAC,IAAI,CAAC,EAAE,EAC5G,EAAE,MAAM,EAAE,QAAQ,EAAE,CACrB,CAAC;QACF,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IACzD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;QACvE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,kBAAkB,EAAE,CAAC,CAAC;QAEzF,iCAAiC;QACjC,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,sDAAsD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,YAAY;aACrB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;QAC7D,MAAM,aAAa,GAAG,UAAU,CAAC,WAAW,CAAC,EAAE,CAAC;QAEhD,qCAAqC;QACrC,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC7B,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,kBAAkB;YACzB,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;YACf,aAAa;SACd,CAAC,CAAC;QAEH,mCAAmC;QACnC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,kEAAkE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAEjD,6BAA6B;QAC7B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,UAAU,CAAC,CAAC;QAChH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEpD,kCAAkC;QAClC,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YACpG,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC;SAC9C,CAAC,CAAC;QACH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QACvD,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,WAAW,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,mCAAmC;QACnC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YAClG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACrC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,gBAAgB,EAAE,CAAC,CAAC;QAE1F,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,yBAAyB;YAChC,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,CAAC;YACjB,QAAQ,EAAE,GAAG;SACd,CAAC,CAAC;QAEH,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,mBAAmB;YAC1B,MAAM,EAAE,aAAa;YACrB,cAAc,EAAE,EAAE;YAClB,QAAQ,EAAE,EAAE;SACb,CAAC,CAAC;QAEH,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC;YAChC,MAAM,EAAE,EAAE,CAAC,EAAE;YACb,eAAe,EAAE,EAAE,CAAC,EAAE;YACtB,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,qCAAqC;QACrC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,gBAAgB,CAAC,CAAC;QAC3G,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;QAEjE,8BAA8B;QAC9B,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,mBAAmB,CAAC,CAAC;QACjH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACnE,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,2BAA2B;QAC3B,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,SAAS,CAAC,CAAC;QACnG,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,mBAAmB,CAAC,CAAC;QAC3E,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClE,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4BAA4B;QAC5B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,UAAU,CAAC,CAAC;QACjG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;QAE9C,qCAAqC;QACrC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,mBAAmB,CAAC,CAAC;QAC1G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;QAE5E,gCAAgC;QAChC,MAAM,kBAAkB,GAAG,IAAI,OAAO,CACpC,oDAAoD,OAAO,CAAC,EAAE,0CAA0C,CACzG,CAAC;QACF,MAAM,kBAAkB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,kBAAkB,CAAC,CAAC;QAC1E,MAAM,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,mBAAmB,GAAG,MAAM,kBAAkB,CAAC,IAAI,EAAE,CAAC;QAC5D,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QACvE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAEnE,4BAA4B;QAC5B,MAAM,iBAAiB,GAAG,IAAI,OAAO,CACnC,+DAA+D,CAChE,CAAC;QACF,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,iBAAiB,CAAC,CAAC;QACxE,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3C,MAAM,kBAAkB,GAAG,MAAM,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAC1D,MAAM,CAAC,kBAAkB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;QAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,GAAG,GAAG,IAAI,OAAO,CAAC,gDAAgD,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM,EAAE,4BAA4B;gBACpC,MAAM,EAAE,OAAO;gBACf,SAAS,EAAE,OAAO;gBAClB,OAAO,EAAE,4BAA4B;gBACrC,SAAS,EAAE,IAAI;aAChB,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAChC,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,4BAA4B,CAAC,CAAC;QACvD,MAAM,CAAC,OAAO,IAAI,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAC/C,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qCAAqC,EAAE,GAAG,EAAE;QACnD,MAAM,IAAI,GAAG,yCAAyC,CAAC;QACvD,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,IAAa,EAAE,EAAE,CAC3C,IAAI,OAAO,CAAC,GAAG,IAAI,GAAG,IAAI,EAAE,EAAE;YAC5B,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC7D,CAAC,CAAC;QAEL,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;YACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC9E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAE7E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE/B,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YAC1G,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;YAEtD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC,CAAC;YACpF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;YACrE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YACnG,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAElC,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,KAAK,IAAI,EAAE;YACzE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,aAAa,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAC1D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,WAAW,EAAE,WAAW,CAAC,CAAC,CAAC;YACvE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE7B,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,MAAM,aAAa,GAAG,OAAO,CAAC,KAAK,CAAC;YACpC,OAAO,CAAC,KAAK,GAAG,GAAG,EAAE,GAAE,CAAC,CAAC;YACzB,IAAI,CAAC;gBACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,WAAW,CAAC,CAAC,CAAC;gBACxE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;gBAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjE,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,KAAK,GAAG,aAAa,CAAC;YAChC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4EAA4E,EAAE,KAAK,IAAI,EAAE;YAC1F,MAAM,SAAS,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,QAAQ,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,gBAAgB,EAAE,EAAE,CAAC,CAAC;YAEnH,MAAM,MAAM,GAAG,MAAM,IAAI,kBAAkB,EAAE,CAAC,aAAa,CAAC,SAAS,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,IAAI,GAAG,MAAM,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,CAAC,CAAC,aAAa,CAAC,SAAS,EAAE,CAAC,CAAC;YAC5G,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAClE,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC;QAC9E,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mEAAmE,EAAE,KAAK,IAAI,EAAE;QACjF,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACtC,MAAM,EAAE,GAAG,EAAE,GAAG,OAAO,CAAC;QACxB,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAElF,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChD,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IAC9C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;QAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,IAAa,EAAE,EAAE,CAC1C,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,oDAAoD,EAAE,EAAE,EAAE;YACpE,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,EAAE,UAAU,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnF,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,SAAS,EAAE,0BAA0B,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAE1G,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACpD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QACrC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACnE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,KAAK,MAAM,IAAI,IAAI,CAAC,UAAU,EAAE,OAAO,EAAE,WAAW,EAAE,UAAU,EAAE,aAAa,EAAE,cAAc,EAAE,OAAO,EAAE,YAAY,EAAE,YAAY,CAAC,EAAE,CAAC;YACtI,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,2CAA2C,IAAI,UAAU,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAC7F,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC;IACH,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,mCAAmC,EAAE,GAAG,EAAE;QACjD,MAAM,aAAa,GAAG,CAAC,OAA4D,EAAE,EAAE;YACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,OAAO,MAAM,CAAC;QAChB,CAAC,CAAC;QACF,MAAM,YAAY,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAE3F,EAAE,CAAC,8EAA8E,EAAE,KAAK,IAAI,EAAE;YAC5F,MAAM,IAAI,GAA4C,EAAE,CAAC;YACzD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,CAAC,GAAG,EAAE,OAAO,EAAE,EAAE;oBACxB,IAAI,CAAC,IAAI,CAAC,EAAE,OAAO,EAAG,GAAa,CAAC,OAAO,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC;gBACnE,CAAC;aACF,CAAC,CAAC;YAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YAC/D,MAAM,CAAC,IAAI,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,YAAY,EAAE,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC;QACnG,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mCAAmC,EAAE,KAAK,IAAI,EAAE;YACjD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,GAAG,EAAE,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,iBAAiB,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC;aAC3F,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;YAChE,IAAI,KAAK,GAAG,CAAC,CAAC;YACd,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,CAAC,KAAK,KAAK,EAAE,EAAE,CAAC,CAAC;YAClF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,kDAAkD,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAClG,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxB,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;YACvE,MAAM,OAAO,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,OAAO,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,kCAAkC,CAAC,CAAC;YAEpH,MAAM,MAAM,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;QAC1G,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,qDAAqD,EAAE,KAAK,IAAI,EAAE;YACnE,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC;YACtC,IAAI,CAAC;gBACH,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,aAAa,CAAC;gBACrC,MAAM,GAAG,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBACjD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,GAAG,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;gBAEnG,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,YAAY,CAAC;gBACpC,MAAM,IAAI,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBAClD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,IAAI,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACxG,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,QAAQ,CAAC;YAClC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,KAAK,GAAG,IAAI,aAAa,EAAE,CAAC;YAClC,KAAK,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBAC7B,MAAM,IAAI,KAAK,CAAC,iBAAiB,CAAC,CAAC;YACrC,CAAC,CAAC;YACF,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;YAE9G,MAAM,GAAG,GAAG,MAAM,OAAO,CAAC,YAAY,EAAE,CAAC,CAAC;YAC1C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YACzD,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,0CAA0C,EAAE,GAAG,EAAE;QACxD,MAAM,YAAY,GAAG,CAAC,OAAgB,EAAE,EAAE;YACxC,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;YAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;QACzE,CAAC,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,IAAY,EAAE,OAAyC,EAAE,EAAE,EAAE;YACrG,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAC1C,IAAI,IAAI,CAAC,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,eAAe,EAAE,UAAU,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;YACrE,IAAI,IAAI,CAAC,IAAI;gBAAE,OAAO,CAAC,GAAG,CAAC,cAAc,EAAE,kBAAkB,CAAC,CAAC;YAC/D,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE,EAAE,GAAG,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC;QACnH,CAAC,CAAC;QAEF,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;YAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YAClG,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC3D,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC/E,4CAA4C;YAC5C,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,CAAC,CAAC;YAC/E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBACtD,MAAM,EAAE,OAAO;gBACf,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC;aAC3C,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE;gBACjE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEvC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,aAAa,OAAO,CAAC,EAAE,YAAY,EAAE;gBACtE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;aACtC,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEzE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,MAAM,GAAG,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,cAAc,CAAC,CAAC;YACnE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,KAAK,IAAI,EAAE;YAC/D,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,GAAG,EAAE;oBACf,MAAM,IAAI,KAAK,CAAC,uBAAuB,CAAC,CAAC;gBAC3C,CAAC;gBACD,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC;YAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,gCAAgC,EAAE,KAAK,IAAI,EAAE;YAC9C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC,CAAC;YAC3E,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,kCAAkC,CAAC,CAAC,CAAC;YACvF,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC,CAAC;YACvG,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,mCAAmC,CAAC,CAAC,CAAC;YAC/F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,IAAI,EAAE,EAAE,OAAO,EAAE,CAAC,yBAAyB,CAAC,EAAE,WAAW,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE;aAC/E,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAC3F,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAC7E,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC;YAExD,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,0BAA0B,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACzH,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,CAAC,CAAC;YAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YAChG,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAElE,MAAM,CAAC,GAAG,EAAE,CAAC,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,aAAa,CAAC,CAAC;QACxH,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,iCAAiC,EAAE,GAAG,EAAE;QAC/C,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YAEtF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,IAAI,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACpF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,EAAE,IAAI,EAAE,GAAG,sBAAsB,CAAQ,MAAM,EAAE;gBACrD,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;aACrF,CAAC,CAAC;YAEH,MAAM,UAAU,GAAG,GAAG,EAAE,CACtB,IAAI,OAAO,CAAC,4CAA4C,IAAI,CAAC,EAAE,WAAW,EAAE;gBAC1E,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,aAAa,EAAE,CAAC;aACjD,CAAC,CAAC;YAEL,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,EAAE,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YACtF,MAAM,EAAE,GAAG,EAAE,GAAG,sBAAsB,CACpC,EAAE,EACF,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,CAChF,CAAC;YACF,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC;YAC7E,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrE,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;YAC1E,MAAM,MAAM,GAAG,sBAAsB,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,KAAK,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC;YACxH,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,8BAA8B,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrF,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,iCAAiC,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC1F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,yBAAyB,EAAE,GAAG,EAAE;QACvC,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,MAAc,EAAE,IAAY,EAAE,IAAa,EAAE,KAAc,EAAE,EAAE,CACvG,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE;YAC5D,MAAM;YACN,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,UAAU,KAAK,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;YACvG,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC/E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAEnF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBAC3D,KAAK,EAAE,SAAS;gBAChB,SAAS,EAAE,KAAK,CAAC,EAAE;gBACnB,EAAE,EAAE,UAAU;gBACd,SAAS,EAAE,0BAA0B;gBACrC,QAAQ,EAAE,UAAU;aACrB,CAAC,CAAC;YACH,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,EAAE,MAAM,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;YACpC,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAE/C,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACpD,MAAM,CAAC,MAAM,EAAE,KAAK,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC1C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,YAAY,EAAE,CAAC,CAAC;YAEtF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;YAC9B,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAmB,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,CAAC,UAAU,EAAE,OAAO,CAAC,CAAC,CAAC;YAE/F,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACvE,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/H,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;YACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE;oBACtB,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;oBAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;gBAC1C,CAAC;aACF,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAExF,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;YAC9F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACnC,MAAM,CAAC,CAAC,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;YAEpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,EAAE,OAAO,CAAC,CAAC;YACtH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,EAAE,OAAO,CAAC,CAAC;YACtH,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YACvC,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACvC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;YACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;YAC1G,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,CAAC,CAAC;YAClF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,WAAW,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvE,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
|
@@ -0,0 +1,30 @@
|
|
|
1
|
+
type Method = 'get' | 'post' | 'patch' | 'delete';
|
|
2
|
+
interface RouteDoc {
|
|
3
|
+
method: Method;
|
|
4
|
+
path: string;
|
|
5
|
+
summary: string;
|
|
6
|
+
tag: string;
|
|
7
|
+
/** Query parameters; names ending in `!` are required. */
|
|
8
|
+
query?: string[];
|
|
9
|
+
body?: {
|
|
10
|
+
safeParse(data: unknown): unknown;
|
|
11
|
+
};
|
|
12
|
+
/** Key of the JSON response envelope, e.g. `task` for `{ "task": { ... } }`. */
|
|
13
|
+
responseKey?: string;
|
|
14
|
+
status?: number;
|
|
15
|
+
}
|
|
16
|
+
/** Every route served by `CriticalPathRouter`. Kept in sync by the route drift test. */
|
|
17
|
+
export declare const ROUTES: RouteDoc[];
|
|
18
|
+
export interface OpenApiOptions {
|
|
19
|
+
/** Public URL the API is served from, e.g. `https://app.example.com/api/critical-path`. */
|
|
20
|
+
serverUrl?: string;
|
|
21
|
+
title?: string;
|
|
22
|
+
version?: string;
|
|
23
|
+
}
|
|
24
|
+
/**
|
|
25
|
+
* Builds an OpenAPI 3.1 document for the router. Request bodies are generated from the same zod
|
|
26
|
+
* schemas the router validates with, so the contract cannot drift from enforcement.
|
|
27
|
+
*/
|
|
28
|
+
export declare function buildOpenApiDocument(options?: OpenApiOptions): Record<string, unknown>;
|
|
29
|
+
export {};
|
|
30
|
+
//# sourceMappingURL=openapi.d.ts.map
|
|
@@ -0,0 +1 @@
|
|
|
1
|
+
{"version":3,"file":"openapi.d.ts","sourceRoot":"","sources":["../src/openapi.ts"],"names":[],"mappings":"AAGA,KAAK,MAAM,GAAG,KAAK,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAElD,UAAU,QAAQ;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,GAAG,EAAE,MAAM,CAAC;IACZ,0DAA0D;IAC1D,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,IAAI,CAAC,EAAE;QAAE,SAAS,CAAC,IAAI,EAAE,OAAO,GAAG,OAAO,CAAA;KAAE,CAAC;IAC7C,gFAAgF;IAChF,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;CACjB;AAED,wFAAwF;AACxF,eAAO,MAAM,MAAM,EAAE,QAAQ,EAgF5B,CAAC;AAuBF,MAAM,WAAW,cAAc;IAC7B,2FAA2F;IAC3F,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,OAAO,CAAC,EAAE,MAAM,CAAC;CAClB;AAED;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,OAAO,GAAE,cAAmB,GAAG,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CA4C1F"}
|