@critical-path/server 0.15.0 → 0.16.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,31 @@
1
1
  # @critical-path/server
2
2
 
3
+ ## 0.16.0
4
+
5
+ ### Minor Changes
6
+
7
+ - b54e22c: Validate request bodies with shared zod schemas and publish an OpenAPI document.
8
+
9
+ **@critical-path/core**
10
+ - New `@critical-path/core/schemas` subpath with create/update schemas for every resource and `parsePayload(schema, data)`. Kept off the package root so browser bundles do not include zod. `zod` is now a dependency of core.
11
+ - `ValidationError` carries an optional `issues: { path, message }[]`.
12
+
13
+ **@critical-path/server**
14
+ - All request bodies are validated. Invalid bodies return `400` with `issues`. Server-assigned fields (`id`, `createdAt`, `updatedAt`, task `key`, owning `projectId` on updates) and unknown keys are stripped, so a `PATCH` can no longer move a task to another project.
15
+ - Comments, reactions and attachments require an author unless `getContext` resolves the caller. Attachment `mimeType` and `sizeBytes` default to `application/octet-stream` and `0` for linked files.
16
+ - New `GET /openapi.json` and `buildOpenApiDocument()` (OpenAPI 3.1, request bodies generated from the validation schemas).
17
+
18
+ **@critical-path/mcp**
19
+ - Tool `inputSchema`s are generated from their zod schemas via the new `defineTool`, removing the hand-written JSON copies.
20
+
21
+ **@critical-path/svelte**
22
+ - Rebuilt with the bundled `@critical-path/mcp` changes.
23
+
24
+ ### Patch Changes
25
+
26
+ - Updated dependencies [b54e22c]
27
+ - @critical-path/core@0.24.0
28
+
3
29
  ## 0.15.0
4
30
 
5
31
  ### Minor Changes
package/README.md CHANGED
@@ -86,11 +86,29 @@ For other Fetch runtimes (Workers, Deno, Bun, Hono), use `createUniversalHandler
86
86
 
87
87
  ---
88
88
 
89
+ ## ✅ Request Validation & OpenAPI
90
+
91
+ Every request body is parsed with the zod schemas from `@critical-path/core/schemas` before it reaches the engine:
92
+
93
+ - Wrong types or missing required fields return `400` with `issues: [{ path, message }]`.
94
+ - Server-assigned fields (`id`, `createdAt`, `updatedAt`, task `key`, and the owning `projectId` on updates) and unknown keys are stripped, so a `PATCH` cannot move a task to another project or rewrite timestamps.
95
+ - Comments, reactions and attachments need an author (`authorId`, `userId`, `uploaderId`) unless `getContext` resolves the caller, in which case the caller is used.
96
+
97
+ `GET /openapi.json` serves an OpenAPI 3.1 document whose request bodies are generated from the same schemas (behind the same auth as other routes). To publish it statically:
98
+
99
+ ```ts
100
+ import { buildOpenApiDocument } from '@critical-path/server';
101
+
102
+ const doc = buildOpenApiDocument({ serverUrl: 'https://app.example.com/api/critical-path' });
103
+ ```
104
+
105
+ ---
106
+
89
107
  ## ⚠️ Error Responses
90
108
 
91
109
  | Status | When |
92
110
  | :--- | :--- |
93
- | `400` | Malformed JSON, `ValidationError`, workflow transition or custom field validation failures |
111
+ | `400` | Malformed JSON, invalid body (with `issues`), `ValidationError`, workflow transition or custom field validation failures |
94
112
  | `401` | `requireAuth` is set and no user was resolved |
95
113
  | `404` | Unknown route, `NotFoundError`, or `DELETE` of a resource that does not exist (successful deletes return `{ "success": true }`) |
96
114
  | `409` | `CircularDependencyError` (body includes `cyclePath`) |
package/dist/index.d.ts CHANGED
@@ -2,4 +2,5 @@ export * from './router.js';
2
2
  export * from './adapters/next.js';
3
3
  export * from './adapters/sveltekit.js';
4
4
  export * from './adapters/universal.js';
5
+ export * from './openapi.js';
5
6
  //# sourceMappingURL=index.d.ts.map
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,yBAAyB,CAAC;AACxC,cAAc,yBAAyB,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,yBAAyB,CAAC;AACxC,cAAc,yBAAyB,CAAC;AACxC,cAAc,cAAc,CAAC"}
package/dist/index.js CHANGED
@@ -2,4 +2,5 @@ export * from './router.js';
2
2
  export * from './adapters/next.js';
3
3
  export * from './adapters/sveltekit.js';
4
4
  export * from './adapters/universal.js';
5
+ export * from './openapi.js';
5
6
  //# sourceMappingURL=index.js.map
package/dist/index.js.map CHANGED
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,yBAAyB,CAAC;AACxC,cAAc,yBAAyB,CAAC"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,yBAAyB,CAAC;AACxC,cAAc,yBAAyB,CAAC;AACxC,cAAc,cAAc,CAAC"}
@@ -643,5 +643,69 @@ describe('@critical-path/server Router Tests', () => {
643
643
  expect((await handle(new Request('http://localhost/other/projects'))).status).toBe(404);
644
644
  });
645
645
  });
646
+ describe('request body validation', () => {
647
+ const send = (router, method, path, body, token) => router.handleRequest(new Request(`http://localhost:3000/api/critical-path${path}`, {
648
+ method,
649
+ headers: { 'Content-Type': 'application/json', ...(token ? { Authorization: `Bearer ${token}` } : {}) },
650
+ body: JSON.stringify(body)
651
+ }));
652
+ it('ignores attempts to move tasks or rewrite server-assigned fields', async () => {
653
+ const router = new CriticalPathRouter();
654
+ const home = await router.engine.createProject({ key: 'HOME', name: 'Home' });
655
+ const other = await router.engine.createProject({ key: 'OTH', name: 'Other' });
656
+ const task = await router.engine.createTask({ projectId: home.id, title: 'Stay' });
657
+ const res = await send(router, 'PATCH', `/tasks/${task.id}`, {
658
+ title: 'Renamed',
659
+ projectId: other.id,
660
+ id: 'hijacked',
661
+ createdAt: '1999-01-01T00:00:00.000Z',
662
+ injected: '<script>'
663
+ });
664
+ expect(res.status).toBe(200);
665
+ const stored = await router.engine.getTask(task.id);
666
+ expect(stored?.title).toBe('Renamed');
667
+ expect(stored?.projectId).toBe(home.id);
668
+ expect(stored?.createdAt).toBe(task.createdAt);
669
+ expect(stored.injected).toBeUndefined();
670
+ });
671
+ it('returns 400 with field-level issues for invalid bodies', async () => {
672
+ const router = new CriticalPathRouter();
673
+ const project = await router.engine.createProject({ key: 'VAL', name: 'Validation' });
674
+ const res = await send(router, 'POST', '/tasks', { projectId: project.id, title: '', progress: 'half' });
675
+ expect(res.status).toBe(400);
676
+ const data = await res.json();
677
+ expect(data.issues.map((i) => i.path).sort()).toEqual(['progress', 'title']);
678
+ expect((await send(router, 'POST', '/projects', [])).status).toBe(400);
679
+ expect((await send(router, 'POST', '/iterations', { projectId: project.id, name: 'S1', status: 'later' })).status).toBe(400);
680
+ });
681
+ it('requires an author unless the caller is resolved, and path ids win over body ids', async () => {
682
+ const router = new CriticalPathRouter(undefined, {
683
+ getContext: (request) => {
684
+ const token = request.headers.get('Authorization')?.replace('Bearer ', '');
685
+ return token ? { userId: token } : null;
686
+ }
687
+ });
688
+ const project = await router.engine.createProject({ key: 'AUT', name: 'Authors' });
689
+ const task = await router.engine.createTask({ projectId: project.id, title: 'T' });
690
+ const decoy = await router.engine.createTask({ projectId: project.id, title: 'Decoy' });
691
+ const anonymous = await send(router, 'POST', `/tasks/${task.id}/comments`, { content: 'hi' });
692
+ expect(anonymous.status).toBe(400);
693
+ expect((await anonymous.json()).error).toContain('authorId');
694
+ const authed = await send(router, 'POST', `/tasks/${task.id}/comments`, { content: 'hi', taskId: decoy.id }, 'alice');
695
+ expect(authed.status).toBe(201);
696
+ const { comment } = await authed.json();
697
+ expect(comment.authorId).toBe('alice');
698
+ expect(comment.taskId).toBe(task.id);
699
+ });
700
+ it('keeps accepting actor claims from unauthenticated trusted callers', async () => {
701
+ const router = new CriticalPathRouter();
702
+ const project = await router.engine.createProject({ key: 'CLI', name: 'CLI' });
703
+ const task = await router.engine.createTask({ projectId: project.id, title: 'T' });
704
+ const res = await send(router, 'PATCH', `/tasks/${task.id}`, { isBlocked: true, actorId: 'agent-7', actorType: 'agent' });
705
+ expect(res.status).toBe(200);
706
+ const activities = await router.engine.store.getActivities({ taskId: task.id });
707
+ expect(activities.some((a) => a.actorId === 'agent-7')).toBe(true);
708
+ });
709
+ });
646
710
  });
647
711
  //# sourceMappingURL=index.test.js.map
@@ -1 +1 @@
1
- {"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AACjD,OAAO,EAAE,iBAAiB,EAAE,MAAM,oBAAoB,CAAC;AACvD,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AAEpD,QAAQ,CAAC,oCAAoC,EAAE,GAAG,EAAE;IAClD,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;QAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,oBAAoB;QACpB,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,kDAAkD,EAAE;YAC9E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC;SAC5D,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACpD,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE1C,kBAAkB;QAClB,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAC/E,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;IACxD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uCAAuC,EAAE,KAAK,IAAI,EAAE;QACrD,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,wBAAwB;QACxB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAClF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC1C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,wBAAwB;QACxB,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YACvF,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC;SACzC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;QAC1E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,8BAA8B;QAC9B,MAAM,KAAK,GAAG,IAAI,OAAO,CAAC,mDAAmD,EAAE;YAC7E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,IAAI,EAAE,qBAAqB;gBAC3B,gBAAgB,EAAE,MAAM;gBACxB,QAAQ,EAAE;oBACR,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;oBACxD,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;iBACtD;gBACD,WAAW,EAAE;oBACX,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,MAAM,EAAE,WAAW,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE;iBACzE;aACF,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QAChD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,MAAM,GAAG,MAAM,KAAK,CAAC,IAAI,EAAE,CAAC;QAClC,MAAM,IAAI,GAAG,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC;QAEhC,uCAAuC;QACvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,UAAU,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACnG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAE3H,6BAA6B;QAC7B,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,cAAc,CAAC,CAAC;QACrG,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,uBAAuB,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4CAA4C;QAC5C,MAAM,eAAe,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YAC9F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;SAChD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,eAAe,CAAC,CAAC;QAC/D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACtC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;QAChE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,CAAC;QACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAE3G,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,EAAE;YAClG,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,cAAc,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC;SACtF,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,SAAS,GAAG,WAAW,CAAC,OAAO,CAAC,EAAE,CAAC;QAEzC,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,CAAC,CAAC;QACpG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE5C,mBAAmB;QACnB,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC/F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,yBAAyB,EAAE,CAAC;SAC7D,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;QAErE,qBAAqB;QACrB,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,SAAS;gBACnB,GAAG,EAAE,qCAAqC;gBAC1C,QAAQ,EAAE,eAAe;gBACzB,SAAS,EAAE,GAAG;gBACd,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,UAAU,EAAE,IAAI;aACjB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,YAAY,GAAG,WAAW,CAAC,UAAU,CAAC,EAAE,CAAC;QAE/C,8BAA8B;QAC9B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,8DAA8D,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACxG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE/C,uBAAuB;QACvB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,uDAAuD,YAAY,EAAE,EAAE;YACnG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,oBAAoB;QACpB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC7F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,sCAAsC;QACtC,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACvF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,UAAU;gBACpB,GAAG,EAAE,+BAA+B,GAAG,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE;gBACtD,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,UAAU,EAAE,IAAI;aACjB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,2CAA2C,CAAC,CAAC;IACtF,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iFAAiF,EAAE,KAAK,IAAI,EAAE;QAC/F,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,CAAC,CAAC;QACtF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAC5G,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,CAAC;QAE1G,2BAA2B;QAC3B,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvD,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE3D,6DAA6D;QAC7D,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;SACtC,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAErC,gCAAgC;QAChC,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,QAAQ;YAChB,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IACzD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;QACvE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,kBAAkB,EAAE,CAAC,CAAC;QAEzF,iCAAiC;QACjC,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,sDAAsD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,YAAY;aACrB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;QAC7D,MAAM,aAAa,GAAG,UAAU,CAAC,WAAW,CAAC,EAAE,CAAC;QAEhD,qCAAqC;QACrC,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC7B,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,kBAAkB;YACzB,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;YACf,aAAa;SACd,CAAC,CAAC;QAEH,mCAAmC;QACnC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,kEAAkE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAEjD,6BAA6B;QAC7B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,UAAU,CAAC,CAAC;QAChH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEpD,kCAAkC;QAClC,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YACpG,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC;SAC9C,CAAC,CAAC;QACH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QACvD,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,WAAW,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,mCAAmC;QACnC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YAClG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACrC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,gBAAgB,EAAE,CAAC,CAAC;QAE1F,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,yBAAyB;YAChC,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,CAAC;YACjB,QAAQ,EAAE,GAAG;SACd,CAAC,CAAC;QAEH,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,mBAAmB;YAC1B,MAAM,EAAE,aAAa;YACrB,cAAc,EAAE,EAAE;YAClB,QAAQ,EAAE,EAAE;SACb,CAAC,CAAC;QAEH,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC;YAChC,MAAM,EAAE,EAAE,CAAC,EAAE;YACb,eAAe,EAAE,EAAE,CAAC,EAAE;YACtB,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,qCAAqC;QACrC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,gBAAgB,CAAC,CAAC;QAC3G,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;QAEjE,8BAA8B;QAC9B,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,mBAAmB,CAAC,CAAC;QACjH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACnE,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,2BAA2B;QAC3B,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,SAAS,CAAC,CAAC;QACnG,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,mBAAmB,CAAC,CAAC;QAC3E,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClE,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4BAA4B;QAC5B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,UAAU,CAAC,CAAC;QACjG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;QAE9C,qCAAqC;QACrC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,mBAAmB,CAAC,CAAC;QAC1G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;QAE5E,gCAAgC;QAChC,MAAM,kBAAkB,GAAG,IAAI,OAAO,CACpC,oDAAoD,OAAO,CAAC,EAAE,0CAA0C,CACzG,CAAC;QACF,MAAM,kBAAkB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,kBAAkB,CAAC,CAAC;QAC1E,MAAM,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,mBAAmB,GAAG,MAAM,kBAAkB,CAAC,IAAI,EAAE,CAAC;QAC5D,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QACvE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAEnE,4BAA4B;QAC5B,MAAM,iBAAiB,GAAG,IAAI,OAAO,CACnC,+DAA+D,CAChE,CAAC;QACF,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,iBAAiB,CAAC,CAAC;QACxE,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3C,MAAM,kBAAkB,GAAG,MAAM,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAC1D,MAAM,CAAC,kBAAkB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;QAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,GAAG,GAAG,IAAI,OAAO,CAAC,gDAAgD,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM,EAAE,4BAA4B;gBACpC,MAAM,EAAE,OAAO;gBACf,SAAS,EAAE,OAAO;gBAClB,OAAO,EAAE,4BAA4B;gBACrC,SAAS,EAAE,IAAI;aAChB,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAChC,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,4BAA4B,CAAC,CAAC;QACvD,MAAM,CAAC,OAAO,IAAI,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAC/C,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qCAAqC,EAAE,GAAG,EAAE;QACnD,MAAM,IAAI,GAAG,yCAAyC,CAAC;QACvD,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,IAAa,EAAE,EAAE,CAC3C,IAAI,OAAO,CAAC,GAAG,IAAI,GAAG,IAAI,EAAE,EAAE;YAC5B,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC7D,CAAC,CAAC;QAEL,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;YACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC9E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAE7E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE/B,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YAC1G,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;YAEtD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC,CAAC;YACpF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;YACrE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YACnG,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAElC,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,KAAK,IAAI,EAAE;YACzE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,aAAa,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAC1D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,WAAW,EAAE,WAAW,CAAC,CAAC,CAAC;YACvE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE7B,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,MAAM,aAAa,GAAG,OAAO,CAAC,KAAK,CAAC;YACpC,OAAO,CAAC,KAAK,GAAG,GAAG,EAAE,GAAE,CAAC,CAAC;YACzB,IAAI,CAAC;gBACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,WAAW,CAAC,CAAC,CAAC;gBACxE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;gBAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjE,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,KAAK,GAAG,aAAa,CAAC;YAChC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iCAAiC,EAAE,KAAK,IAAI,EAAE;YAC/C,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,QAAQ,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC;QAC7E,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mEAAmE,EAAE,KAAK,IAAI,EAAE;QACjF,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACtC,MAAM,EAAE,GAAG,EAAE,GAAG,OAAO,CAAC;QACxB,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAElF,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChD,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IAC9C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uEAAuE,EAAE,KAAK,IAAI,EAAE;QACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,IAAa,EAAE,EAAE,CAC1C,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,oDAAoD,EAAE,EAAE,EAAE;YACpE,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,EAAE,UAAU,EAAE,SAAS,EAAE,0BAA0B,EAAE,CAAC,CAAC;QAC3G,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QACrC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACnE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,KAAK,MAAM,IAAI,IAAI,CAAC,UAAU,EAAE,OAAO,EAAE,WAAW,EAAE,UAAU,EAAE,aAAa,EAAE,cAAc,EAAE,OAAO,EAAE,YAAY,EAAE,YAAY,CAAC,EAAE,CAAC;YACtI,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,2CAA2C,IAAI,UAAU,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAC7F,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC;IACH,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,mCAAmC,EAAE,GAAG,EAAE;QACjD,MAAM,aAAa,GAAG,CAAC,OAA4D,EAAE,EAAE;YACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,OAAO,MAAM,CAAC;QAChB,CAAC,CAAC;QACF,MAAM,YAAY,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAE3F,EAAE,CAAC,8EAA8E,EAAE,KAAK,IAAI,EAAE;YAC5F,MAAM,IAAI,GAA4C,EAAE,CAAC;YACzD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,CAAC,GAAG,EAAE,OAAO,EAAE,EAAE;oBACxB,IAAI,CAAC,IAAI,CAAC,EAAE,OAAO,EAAG,GAAa,CAAC,OAAO,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC;gBACnE,CAAC;aACF,CAAC,CAAC;YAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YAC/D,MAAM,CAAC,IAAI,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,YAAY,EAAE,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC;QACnG,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mCAAmC,EAAE,KAAK,IAAI,EAAE;YACjD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,GAAG,EAAE,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,iBAAiB,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC;aAC3F,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;YAChE,IAAI,KAAK,GAAG,CAAC,CAAC;YACd,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,CAAC,KAAK,KAAK,EAAE,EAAE,CAAC,CAAC;YAClF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,kDAAkD,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAClG,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxB,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;YACvE,MAAM,OAAO,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,OAAO,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,kCAAkC,CAAC,CAAC;YAEpH,MAAM,MAAM,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;QAC1G,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,qDAAqD,EAAE,KAAK,IAAI,EAAE;YACnE,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC;YACtC,IAAI,CAAC;gBACH,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,aAAa,CAAC;gBACrC,MAAM,GAAG,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBACjD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,GAAG,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;gBAEnG,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,YAAY,CAAC;gBACpC,MAAM,IAAI,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBAClD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,IAAI,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACxG,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,QAAQ,CAAC;YAClC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,KAAK,GAAG,IAAI,aAAa,EAAE,CAAC;YAClC,KAAK,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBAC7B,MAAM,IAAI,KAAK,CAAC,iBAAiB,CAAC,CAAC;YACrC,CAAC,CAAC;YACF,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;YAE9G,MAAM,GAAG,GAAG,MAAM,OAAO,CAAC,YAAY,EAAE,CAAC,CAAC;YAC1C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YACzD,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,0CAA0C,EAAE,GAAG,EAAE;QACxD,MAAM,YAAY,GAAG,CAAC,OAAgB,EAAE,EAAE;YACxC,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;YAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;QACzE,CAAC,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,IAAY,EAAE,OAAyC,EAAE,EAAE,EAAE;YACrG,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAC1C,IAAI,IAAI,CAAC,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,eAAe,EAAE,UAAU,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;YACrE,IAAI,IAAI,CAAC,IAAI;gBAAE,OAAO,CAAC,GAAG,CAAC,cAAc,EAAE,kBAAkB,CAAC,CAAC;YAC/D,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE,EAAE,GAAG,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC;QACnH,CAAC,CAAC;QAEF,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;YAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YAClG,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC3D,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC/E,4CAA4C;YAC5C,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,CAAC,CAAC;YAC/E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBACtD,MAAM,EAAE,OAAO;gBACf,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,SAAS,EAAE,KAAK,EAAE,CAAC;aAC7E,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE;gBACjE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,CAAC;aACzD,CAAC,CAAC;YACH,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEvC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,aAAa,OAAO,CAAC,EAAE,YAAY,EAAE;gBACtE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;aACtC,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEzE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,MAAM,GAAG,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,cAAc,CAAC,CAAC;YACnE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,KAAK,IAAI,EAAE;YAC/D,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,GAAG,EAAE;oBACf,MAAM,IAAI,KAAK,CAAC,uBAAuB,CAAC,CAAC;gBAC3C,CAAC;gBACD,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC;YAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,gCAAgC,EAAE,KAAK,IAAI,EAAE;YAC9C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC,CAAC;YAC3E,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,kCAAkC,CAAC,CAAC,CAAC;YACvF,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC,CAAC;YACvG,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,mCAAmC,CAAC,CAAC,CAAC;YAC/F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,IAAI,EAAE,EAAE,OAAO,EAAE,CAAC,yBAAyB,CAAC,EAAE,WAAW,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE;aAC/E,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAC3F,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAC7E,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC;YAExD,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,0BAA0B,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACzH,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,CAAC,CAAC;YAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YAChG,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAElE,MAAM,CAAC,GAAG,EAAE,CAAC,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,aAAa,CAAC,CAAC;QACxH,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,iCAAiC,EAAE,GAAG,EAAE;QAC/C,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YAEtF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,IAAI,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACpF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,EAAE,IAAI,EAAE,GAAG,sBAAsB,CAAQ,MAAM,EAAE;gBACrD,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;aACrF,CAAC,CAAC;YAEH,MAAM,UAAU,GAAG,GAAG,EAAE,CACtB,IAAI,OAAO,CAAC,4CAA4C,IAAI,CAAC,EAAE,WAAW,EAAE;gBAC1E,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC;aACtE,CAAC,CAAC;YAEL,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,EAAE,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YACtF,MAAM,EAAE,GAAG,EAAE,GAAG,sBAAsB,CACpC,EAAE,EACF,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,CAChF,CAAC;YACF,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC;YAC7E,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrE,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;YAC1E,MAAM,MAAM,GAAG,sBAAsB,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,KAAK,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC;YACxH,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,8BAA8B,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrF,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,iCAAiC,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC1F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
1
+ {"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AACjD,OAAO,EAAE,iBAAiB,EAAE,MAAM,oBAAoB,CAAC;AACvD,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,sBAAsB,EAAE,MAAM,yBAAyB,CAAC;AACjE,OAAO,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AAEpD,QAAQ,CAAC,oCAAoC,EAAE,GAAG,EAAE;IAClD,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;QAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,oBAAoB;QACpB,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,kDAAkD,EAAE;YAC9E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC;SAC5D,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACpD,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACjC,MAAM,QAAQ,GAAG,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE1C,kBAAkB;QAClB,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAC/E,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;IACxD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uCAAuC,EAAE,KAAK,IAAI,EAAE;QACrD,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,wBAAwB;QACxB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAClF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC1C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,wBAAwB;QACxB,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YACvF,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC;SACzC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;QAC1E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,8BAA8B;QAC9B,MAAM,KAAK,GAAG,IAAI,OAAO,CAAC,mDAAmD,EAAE;YAC7E,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,IAAI,EAAE,qBAAqB;gBAC3B,gBAAgB,EAAE,MAAM;gBACxB,QAAQ,EAAE;oBACR,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;oBACxD,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;iBACtD;gBACD,WAAW,EAAE;oBACX,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,MAAM,EAAE,WAAW,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE;iBACzE;aACF,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QAChD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,MAAM,GAAG,MAAM,KAAK,CAAC,IAAI,EAAE,CAAC;QAClC,MAAM,IAAI,GAAG,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC;QAEhC,uCAAuC;QACvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,UAAU,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACnG,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAE3H,6BAA6B;QAC7B,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,cAAc,CAAC,CAAC;QACrG,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,uBAAuB,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4CAA4C;QAC5C,MAAM,eAAe,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,EAAE,EAAE;YAC9F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;SAChD,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,eAAe,CAAC,CAAC;QAC/D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACtC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;QAChE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,CAAC;QACrF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAE3G,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,EAAE;YAClG,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,cAAc,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC;SACtF,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,SAAS,GAAG,WAAW,CAAC,OAAO,CAAC,EAAE,CAAC;QAEzC,8CAA8C;QAC9C,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,IAAI,CAAC,EAAE,WAAW,CAAC,CAAC;QACpG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE5C,mBAAmB;QACnB,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC/F,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,yBAAyB,EAAE,CAAC;SAC7D,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;QAErE,qBAAqB;QACrB,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,SAAS;gBACnB,GAAG,EAAE,qCAAqC;gBAC1C,QAAQ,EAAE,eAAe;gBACzB,SAAS,EAAE,GAAG;gBACd,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,UAAU,EAAE,IAAI;aACjB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,YAAY,GAAG,WAAW,CAAC,UAAU,CAAC,EAAE,CAAC;QAE/C,8BAA8B;QAC9B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,8DAA8D,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACxG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAE/C,uBAAuB;QACvB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,uDAAuD,YAAY,EAAE,EAAE;YACnG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,oBAAoB;QACpB,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,SAAS,EAAE,EAAE;YAC7F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAEnC,sCAAsC;QACtC,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,qDAAqD,EAAE;YACvF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,QAAQ,EAAE,UAAU;gBACpB,GAAG,EAAE,+BAA+B,GAAG,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE;gBACtD,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,UAAU,EAAE,IAAI;aACjB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,2CAA2C,CAAC,CAAC;IACtF,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iFAAiF,EAAE,KAAK,IAAI,EAAE;QAC/F,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,CAAC,CAAC;QACtF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAC5G,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,CAAC;QAE1G,2BAA2B;QAC3B,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvD,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE3D,6DAA6D;QAC7D,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;SACtC,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAErC,gCAAgC;QAChC,MAAM,WAAW,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,YAAY,EAAE;YAC1G,MAAM,EAAE,QAAQ;YAChB,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC;SACpD,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC;QAC5D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,MAAM,YAAY,GAAG,MAAM,WAAW,CAAC,IAAI,EAAE,CAAC;QAC9C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IACzD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;QACvE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,kBAAkB,EAAE,CAAC,CAAC;QAEzF,iCAAiC;QACjC,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,sDAAsD,EAAE;YACpF,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,SAAS,EAAE,IAAI,CAAC,EAAE;gBAClB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,YAAY;aACrB,CAAC;SACH,CAAC,CAAC;QACH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;QAC7D,MAAM,aAAa,GAAG,UAAU,CAAC,WAAW,CAAC,EAAE,CAAC;QAEhD,qCAAqC;QACrC,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YAC7B,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,kBAAkB;YACzB,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;YACf,aAAa;SACd,CAAC,CAAC;QAEH,mCAAmC;QACnC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,kEAAkE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAEjD,6BAA6B;QAC7B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,UAAU,CAAC,CAAC;QAChH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEpD,kCAAkC;QAClC,MAAM,QAAQ,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YACpG,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC;SAC9C,CAAC,CAAC;QACH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC;QACtD,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAClC,MAAM,SAAS,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;QACxC,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QACvD,MAAM,CAAC,SAAS,CAAC,WAAW,CAAC,WAAW,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,mCAAmC;QACnC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,wDAAwD,aAAa,EAAE,EAAE;YAClG,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACrC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,gBAAgB,EAAE,CAAC,CAAC;QAE1F,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,yBAAyB;YAChC,MAAM,EAAE,MAAM;YACd,cAAc,EAAE,CAAC;YACjB,QAAQ,EAAE,GAAG;SACd,CAAC,CAAC;QAEH,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC;YACxC,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,KAAK,EAAE,mBAAmB;YAC1B,MAAM,EAAE,aAAa;YACrB,cAAc,EAAE,EAAE;YAClB,QAAQ,EAAE,EAAE;SACb,CAAC,CAAC;QAEH,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC;YAChC,MAAM,EAAE,EAAE,CAAC,EAAE;YACb,eAAe,EAAE,EAAE,CAAC,EAAE;YACtB,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,qCAAqC;QACrC,MAAM,MAAM,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,gBAAgB,CAAC,CAAC;QAC3G,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;QACpC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;QAEjE,8BAA8B;QAC9B,MAAM,SAAS,GAAG,IAAI,OAAO,CAAC,oDAAoD,OAAO,CAAC,EAAE,mBAAmB,CAAC,CAAC;QACjH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;QACxD,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;QAC1C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9C,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACnE,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,2BAA2B;QAC3B,MAAM,aAAa,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,SAAS,CAAC,CAAC;QACnG,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,aAAa,CAAC,CAAC;QAChE,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACvC,MAAM,cAAc,GAAG,MAAM,aAAa,CAAC,IAAI,EAAE,CAAC;QAClD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,mBAAmB,CAAC,CAAC;QAC3E,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,QAAQ,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClE,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;QAExD,4BAA4B;QAC5B,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,UAAU,CAAC,CAAC;QACjG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC/C,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;QACnD,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;QAE9C,qCAAqC;QACrC,MAAM,UAAU,GAAG,IAAI,OAAO,CAAC,iDAAiD,EAAE,CAAC,EAAE,mBAAmB,CAAC,CAAC;QAC1G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,UAAU,CAAC,CAAC;QAC1D,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpC,MAAM,WAAW,GAAG,MAAM,UAAU,CAAC,IAAI,EAAE,CAAC;QAC5C,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;QAE5E,gCAAgC;QAChC,MAAM,kBAAkB,GAAG,IAAI,OAAO,CACpC,oDAAoD,OAAO,CAAC,EAAE,0CAA0C,CACzG,CAAC;QACF,MAAM,kBAAkB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,kBAAkB,CAAC,CAAC;QAC1E,MAAM,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,mBAAmB,GAAG,MAAM,kBAAkB,CAAC,IAAI,EAAE,CAAC;QAC5D,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QACvE,MAAM,CAAC,mBAAmB,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAEnE,4BAA4B;QAC5B,MAAM,iBAAiB,GAAG,IAAI,OAAO,CACnC,+DAA+D,CAChE,CAAC;QACF,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,iBAAiB,CAAC,CAAC;QACxE,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3C,MAAM,kBAAkB,GAAG,MAAM,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAC1D,MAAM,CAAC,kBAAkB,CAAC,QAAQ,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;QAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,GAAG,GAAG,IAAI,OAAO,CAAC,gDAAgD,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM,EAAE,4BAA4B;gBACpC,MAAM,EAAE,OAAO;gBACf,SAAS,EAAE,OAAO;gBAClB,OAAO,EAAE,4BAA4B;gBACrC,SAAS,EAAE,IAAI;aAChB,CAAC;SACH,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAChC,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,4BAA4B,CAAC,CAAC;QACvD,MAAM,CAAC,OAAO,IAAI,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;IAC/C,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qCAAqC,EAAE,GAAG,EAAE;QACnD,MAAM,IAAI,GAAG,yCAAyC,CAAC;QACvD,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,IAAa,EAAE,EAAE,CAC3C,IAAI,OAAO,CAAC,GAAG,IAAI,GAAG,IAAI,EAAE,EAAE;YAC5B,MAAM,EAAE,MAAM;YACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,OAAO,IAAI,KAAK,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC7D,CAAC,CAAC;QAEL,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;YACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC9E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,MAAM,CAAC,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAE7E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE/B,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,eAAe,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;YAC1G,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;YAEtD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC,CAAC;YACpF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACnC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;YACrE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YACnG,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAElC,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,KAAK,IAAI,EAAE;YACzE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAEpF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,aAAa,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;QAC1D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,WAAW,EAAE,WAAW,CAAC,CAAC,CAAC;YACvE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAE7B,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,MAAM,aAAa,GAAG,OAAO,CAAC,KAAK,CAAC;YACpC,OAAO,CAAC,KAAK,GAAG,GAAG,EAAE,GAAE,CAAC,CAAC;YACzB,IAAI,CAAC;gBACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,WAAW,CAAC,CAAC,CAAC;gBACxE,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;gBAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjE,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,KAAK,GAAG,aAAa,CAAC;YAChC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iCAAiC,EAAE,KAAK,IAAI,EAAE;YAC/C,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,GAAG,IAAI,QAAQ,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC;YAC5F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,8BAA8B,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC;QAC7E,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mEAAmE,EAAE,KAAK,IAAI,EAAE;QACjF,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACtC,MAAM,EAAE,GAAG,EAAE,GAAG,OAAO,CAAC;QACxB,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAElF,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChD,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IAC9C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uEAAuE,EAAE,KAAK,IAAI,EAAE;QACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,IAAa,EAAE,EAAE,CAC1C,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,oDAAoD,EAAE,EAAE,EAAE;YACpE,MAAM,EAAE,OAAO;YACf,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;YAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,EAAE,UAAU,EAAE,SAAS,EAAE,0BAA0B,EAAE,CAAC,CAAC;QAC3G,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7B,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QACrC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,CAAC,CAAC,MAAM,KAAK,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACnE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,KAAK,MAAM,IAAI,IAAI,CAAC,UAAU,EAAE,OAAO,EAAE,WAAW,EAAE,UAAU,EAAE,aAAa,EAAE,cAAc,EAAE,OAAO,EAAE,YAAY,EAAE,YAAY,CAAC,EAAE,CAAC;YACtI,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,2CAA2C,IAAI,UAAU,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAC7F,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC;IACH,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,mCAAmC,EAAE,GAAG,EAAE;QACjD,MAAM,aAAa,GAAG,CAAC,OAA4D,EAAE,EAAE;YACrF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBACrC,MAAM,IAAI,KAAK,CAAC,kCAAkC,CAAC,CAAC;YACtD,CAAC,CAAC;YACF,OAAO,MAAM,CAAC;QAChB,CAAC,CAAC;QACF,MAAM,YAAY,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,kDAAkD,CAAC,CAAC;QAE3F,EAAE,CAAC,8EAA8E,EAAE,KAAK,IAAI,EAAE;YAC5F,MAAM,IAAI,GAA4C,EAAE,CAAC;YACzD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,CAAC,GAAG,EAAE,OAAO,EAAE,EAAE;oBACxB,IAAI,CAAC,IAAI,CAAC,EAAE,OAAO,EAAG,GAAa,CAAC,OAAO,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC;gBACnE,CAAC;aACF,CAAC,CAAC;YAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YAC/D,MAAM,CAAC,IAAI,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,YAAY,EAAE,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC;QACnG,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mCAAmC,EAAE,KAAK,IAAI,EAAE;YACjD,MAAM,MAAM,GAAG,aAAa,CAAC;gBAC3B,OAAO,EAAE,GAAG,EAAE,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,iBAAiB,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC;aAC3F,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC;YACvD,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;YAChE,IAAI,KAAK,GAAG,CAAC,CAAC;YACd,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,CAAC,KAAK,KAAK,EAAE,EAAE,CAAC,CAAC;YAClF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,aAAa,CACpC,IAAI,OAAO,CAAC,kDAAkD,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAClG,CAAC;YACF,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACxB,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;YACvE,MAAM,OAAO,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,OAAO,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,kCAAkC,CAAC,CAAC;YAEpH,MAAM,MAAM,GAAG,aAAa,CAAC,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;QAC1G,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,qDAAqD,EAAE,KAAK,IAAI,EAAE;YACnE,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC;YACtC,IAAI,CAAC;gBACH,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,aAAa,CAAC;gBACrC,MAAM,GAAG,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBACjD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,GAAG,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;gBAEnG,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,YAAY,CAAC;gBACpC,MAAM,IAAI,GAAG,aAAa,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,GAAE,CAAC,EAAE,CAAC,CAAC;gBAClD,MAAM,CAAC,CAAC,MAAM,CAAC,MAAM,IAAI,CAAC,aAAa,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACxG,CAAC;oBAAS,CAAC;gBACT,OAAO,CAAC,GAAG,CAAC,QAAQ,GAAG,QAAQ,CAAC;YAClC,CAAC;QACH,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0CAA0C,EAAE,KAAK,IAAI,EAAE;YACxD,MAAM,KAAK,GAAG,IAAI,aAAa,EAAE,CAAC;YAClC,KAAK,CAAC,WAAW,GAAG,KAAK,IAAI,EAAE;gBAC7B,MAAM,IAAI,KAAK,CAAC,iBAAiB,CAAC,CAAC;YACrC,CAAC,CAAC;YACF,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,OAAO,GAAG,iBAAiB,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;YAE9G,MAAM,GAAG,GAAG,MAAM,OAAO,CAAC,YAAY,EAAE,CAAC,CAAC;YAC1C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YACzD,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,0CAA0C,EAAE,GAAG,EAAE;QACxD,MAAM,YAAY,GAAG,CAAC,OAAgB,EAAE,EAAE;YACxC,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;YAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;QACzE,CAAC,CAAC;QACF,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,IAAY,EAAE,OAAyC,EAAE,EAAE,EAAE;YACrG,MAAM,OAAO,GAAG,IAAI,OAAO,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAC1C,IAAI,IAAI,CAAC,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,eAAe,EAAE,UAAU,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC;YACrE,IAAI,IAAI,CAAC,IAAI;gBAAE,OAAO,CAAC,GAAG,CAAC,cAAc,EAAE,kBAAkB,CAAC,CAAC;YAC/D,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE,EAAE,GAAG,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC;QACnH,CAAC,CAAC;QAEF,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;YAC3E,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YAClG,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC3D,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC/E,4CAA4C;YAC5C,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACpF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,UAAU,EAAE,YAAY,EAAE,CAAC,CAAC;YAC/E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBACtD,MAAM,EAAE,OAAO;gBACf,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,SAAS,EAAE,KAAK,EAAE,CAAC;aAC7E,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAEjC,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE;gBACjE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,CAAC;aACzD,CAAC,CAAC;YACH,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEvC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,aAAa,OAAO,CAAC,EAAE,YAAY,EAAE;gBACtE,MAAM,EAAE,MAAM;gBACd,KAAK,EAAE,OAAO;gBACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC;aACtC,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,CAAC,CAAC,MAAM,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAEzE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,MAAM,GAAG,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,cAAc,CAAC,CAAC;YACnE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,KAAK,IAAI,EAAE;YAC/D,MAAM,MAAM,GAAc,EAAE,CAAC;YAC7B,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,GAAG,EAAE;oBACf,MAAM,IAAI,KAAK,CAAC,uBAAuB,CAAC,CAAC;gBAC3C,CAAC;gBACD,OAAO,EAAE,CAAC,GAAG,EAAE,EAAE,CAAC,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC;aACxC,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,CAAC,CAAC;YAC5C,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,MAAM,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,gCAAgC,EAAE,KAAK,IAAI,EAAE;YAC9C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC,CAAC;YAC3E,MAAM,EAAE,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,kCAAkC,CAAC,CAAC,CAAC;YACvF,MAAM,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC,CAAC;YACvG,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACjC,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,mCAAmC,CAAC,CAAC,CAAC;YAC/F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,IAAI,EAAE,EAAE,OAAO,EAAE,CAAC,yBAAyB,CAAC,EAAE,WAAW,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE;aAC/E,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAC3F,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,kCAAkC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAC7E,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC;YAExD,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,0BAA0B,EAAE,EAAE,CAAC,CAAC;YACpG,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAErE,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YACzH,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,GAAG,CAAC,wBAAwB,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,CAAC,CAAC;YAClE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,EAAE,MAAM,EAAE,yBAAyB,EAAE,EAAE,CAAC,CAAC;YAChG,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,6BAA6B,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC;YAElE,MAAM,CAAC,GAAG,EAAE,CAAC,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,IAAI,EAAE,EAAE,OAAO,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,aAAa,CAAC,CAAC;QACxH,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,iCAAiC,EAAE,GAAG,EAAE;QAC/C,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YAEtF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE,EAAE,WAAW,EAAE,IAAI,EAAE,CAAC,CAAC;YACxE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,IAAI,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;YACpF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,EAAE,IAAI,EAAE,GAAG,sBAAsB,CAAQ,MAAM,EAAE;gBACrD,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;aACrF,CAAC,CAAC;YAEH,MAAM,UAAU,GAAG,GAAG,EAAE,CACtB,IAAI,OAAO,CAAC,4CAA4C,IAAI,CAAC,EAAE,WAAW,EAAE;gBAC1E,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC;aACtE,CAAC,CAAC;YAEL,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,EAAE,OAAO,EAAE,UAAU,EAAE,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,EAAE,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wEAAwE,EAAE,KAAK,IAAI,EAAE;YACtF,MAAM,EAAE,GAAG,EAAE,GAAG,sBAAsB,CACpC,EAAE,EACF,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,CAChF,CAAC;YACF,MAAM,GAAG,GAAG,GAAG,EAAE,CAAC,IAAI,OAAO,CAAC,6CAA6C,CAAC,CAAC;YAC7E,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrE,MAAM,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,OAAO,EAAE,GAAG,EAAE,EAAE,MAAM,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACrF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;YAC1E,MAAM,MAAM,GAAG,sBAAsB,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,KAAK,EAAE,WAAW,EAAE,IAAI,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC;YACxH,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,8BAA8B,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACrF,MAAM,CAAC,CAAC,MAAM,MAAM,CAAC,IAAI,OAAO,CAAC,iCAAiC,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC1F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,yBAAyB,EAAE,GAAG,EAAE;QACvC,MAAM,IAAI,GAAG,CAAC,MAA0B,EAAE,MAAc,EAAE,IAAY,EAAE,IAAa,EAAE,KAAc,EAAE,EAAE,CACvG,MAAM,CAAC,aAAa,CAClB,IAAI,OAAO,CAAC,0CAA0C,IAAI,EAAE,EAAE;YAC5D,MAAM;YACN,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,UAAU,KAAK,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;YACvG,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CACH,CAAC;QAEJ,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;YAC/E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAEnF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE;gBAC3D,KAAK,EAAE,SAAS;gBAChB,SAAS,EAAE,KAAK,CAAC,EAAE;gBACnB,EAAE,EAAE,UAAU;gBACd,SAAS,EAAE,0BAA0B;gBACrC,QAAQ,EAAE,UAAU;aACrB,CAAC,CAAC;YACH,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACpD,MAAM,CAAC,MAAM,EAAE,KAAK,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACxC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;YAC/C,MAAM,CAAE,MAAc,CAAC,QAAQ,CAAC,CAAC,aAAa,EAAE,CAAC;QACnD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,YAAY,EAAE,CAAC,CAAC;YAEtF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,CAAC,CAAC;YACzG,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,IAAI,GAAG,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;YAC9B,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAmB,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,CAAC,UAAU,EAAE,OAAO,CAAC,CAAC,CAAC;YAE/F,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACvE,MAAM,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,IAAI,EAAE,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/H,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kFAAkF,EAAE,KAAK,IAAI,EAAE;YAChG,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;gBAC/C,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE;oBACtB,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;oBAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;gBAC1C,CAAC;aACF,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;YACnF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YACnF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;YAExF,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC;YAC9F,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YACnC,MAAM,CAAC,CAAC,MAAM,SAAS,CAAC,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YAE7D,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,MAAM,EAAE,UAAU,IAAI,CAAC,EAAE,WAAW,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,EAAE,OAAO,CAAC,CAAC;YACtH,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAChC,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YACvC,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACvC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mEAAmE,EAAE,KAAK,IAAI,EAAE;YACjF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,KAAK,EAAE,CAAC,CAAC;YAC/E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAEnF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,UAAU,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,OAAO,EAAE,SAAS,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YAC1H,MAAM,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC7B,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAChF,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACrE,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
@@ -0,0 +1,30 @@
1
+ type Method = 'get' | 'post' | 'patch' | 'delete';
2
+ interface RouteDoc {
3
+ method: Method;
4
+ path: string;
5
+ summary: string;
6
+ tag: string;
7
+ /** Query parameters; names ending in `!` are required. */
8
+ query?: string[];
9
+ body?: {
10
+ safeParse(data: unknown): unknown;
11
+ };
12
+ /** Key of the JSON response envelope, e.g. `task` for `{ "task": { ... } }`. */
13
+ responseKey?: string;
14
+ status?: number;
15
+ }
16
+ /** Every route served by `CriticalPathRouter`. Kept in sync by the route drift test. */
17
+ export declare const ROUTES: RouteDoc[];
18
+ export interface OpenApiOptions {
19
+ /** Public URL the API is served from, e.g. `https://app.example.com/api/critical-path`. */
20
+ serverUrl?: string;
21
+ title?: string;
22
+ version?: string;
23
+ }
24
+ /**
25
+ * Builds an OpenAPI 3.1 document for the router. Request bodies are generated from the same zod
26
+ * schemas the router validates with, so the contract cannot drift from enforcement.
27
+ */
28
+ export declare function buildOpenApiDocument(options?: OpenApiOptions): Record<string, unknown>;
29
+ export {};
30
+ //# sourceMappingURL=openapi.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"openapi.d.ts","sourceRoot":"","sources":["../src/openapi.ts"],"names":[],"mappings":"AAGA,KAAK,MAAM,GAAG,KAAK,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAElD,UAAU,QAAQ;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,GAAG,EAAE,MAAM,CAAC;IACZ,0DAA0D;IAC1D,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,IAAI,CAAC,EAAE;QAAE,SAAS,CAAC,IAAI,EAAE,OAAO,GAAG,OAAO,CAAA;KAAE,CAAC;IAC7C,gFAAgF;IAChF,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;CACjB;AAED,wFAAwF;AACxF,eAAO,MAAM,MAAM,EAAE,QAAQ,EAgF5B,CAAC;AAuBF,MAAM,WAAW,cAAc;IAC7B,2FAA2F;IAC3F,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,OAAO,CAAC,EAAE,MAAM,CAAC;CAClB;AAED;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,OAAO,GAAE,cAAmB,GAAG,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CA4C1F"}
@@ -0,0 +1,139 @@
1
+ import { zodToJsonSchema } from 'zod-to-json-schema';
2
+ import * as schemas from '@critical-path/core/schemas';
3
+ /** Every route served by `CriticalPathRouter`. Kept in sync by the route drift test. */
4
+ export const ROUTES = [
5
+ { method: 'get', path: '/workflows', summary: 'List workflows', tag: 'Workflows', responseKey: 'workflows' },
6
+ { method: 'post', path: '/workflows', summary: 'Create a workflow', tag: 'Workflows', body: schemas.CreateWorkflowSchema, responseKey: 'workflow', status: 201 },
7
+ { method: 'get', path: '/workflows/{workflowId}', summary: 'Get a workflow', tag: 'Workflows', responseKey: 'workflow' },
8
+ { method: 'patch', path: '/workflows/{workflowId}', summary: 'Update a workflow', tag: 'Workflows', body: schemas.UpdateWorkflowSchema, responseKey: 'workflow' },
9
+ { method: 'delete', path: '/workflows/{workflowId}', summary: 'Delete a workflow', tag: 'Workflows' },
10
+ { method: 'get', path: '/projects', summary: 'List projects', tag: 'Projects', responseKey: 'projects' },
11
+ { method: 'post', path: '/projects', summary: 'Create a project', tag: 'Projects', body: schemas.CreateProjectSchema, responseKey: 'project', status: 201 },
12
+ { method: 'get', path: '/projects/{projectId}', summary: 'Get a project', tag: 'Projects', responseKey: 'project' },
13
+ { method: 'patch', path: '/projects/{projectId}', summary: 'Update a project', tag: 'Projects', body: schemas.UpdateProjectSchema, responseKey: 'project' },
14
+ { method: 'delete', path: '/projects/{projectId}', summary: 'Delete a project and its tasks', tag: 'Projects' },
15
+ { method: 'get', path: '/projects/{projectId}/critical-path', summary: 'Critical path (CPM) analysis', tag: 'Analysis', responseKey: 'analysis' },
16
+ { method: 'get', path: '/projects/{projectId}/ladder', summary: 'Timeline ladder of abstraction', tag: 'Analysis', query: ['level', 'containerId', 'iterationId'], responseKey: 'ladder' },
17
+ { method: 'get', path: '/projects/{projectId}/workload', summary: 'Project workload distribution', tag: 'Analysis', query: ['startDate', 'endDate', 'interval', 'groupBy', 'metric', 'defaultWeeklyCapacityHours'], responseKey: 'workload' },
18
+ { method: 'get', path: '/tasks', summary: 'List tasks', tag: 'Tasks', query: ['projectId'], responseKey: 'tasks' },
19
+ { method: 'post', path: '/tasks', summary: 'Create a task', tag: 'Tasks', body: schemas.CreateTaskSchema, responseKey: 'task', status: 201 },
20
+ { method: 'get', path: '/tasks/{taskId}', summary: 'Get a task', tag: 'Tasks', responseKey: 'task' },
21
+ { method: 'patch', path: '/tasks/{taskId}', summary: 'Update a task (enforces workflow transitions)', tag: 'Tasks', body: schemas.UpdateTaskSchema, responseKey: 'task' },
22
+ { method: 'delete', path: '/tasks/{taskId}', summary: 'Delete a task', tag: 'Tasks' },
23
+ { method: 'get', path: '/tasks/{taskId}/comments', summary: 'List task comments', tag: 'Comments', responseKey: 'comments' },
24
+ { method: 'post', path: '/tasks/{taskId}/comments', summary: 'Comment on a task', tag: 'Comments', body: schemas.CreateCommentSchema.omit({ taskId: true }), responseKey: 'comment', status: 201 },
25
+ { method: 'get', path: '/tasks/{taskId}/attachments', summary: 'List task attachments', tag: 'Attachments', responseKey: 'attachments' },
26
+ { method: 'post', path: '/tasks/{taskId}/attachments', summary: 'Attach a file link to a task', tag: 'Attachments', body: schemas.CreateAttachmentSchema.omit({ taskId: true }), responseKey: 'attachment', status: 201 },
27
+ { method: 'get', path: '/tasks/{taskId}/dependencies', summary: 'Task dependency graph', tag: 'Dependencies', responseKey: 'graph' },
28
+ { method: 'post', path: '/tasks/{taskId}/dependencies', summary: 'Add a dependency (409 on cycles)', tag: 'Dependencies', body: schemas.CreateDependencySchema, responseKey: 'dependency', status: 201 },
29
+ { method: 'get', path: '/tasks/{taskId}/lifecycle', summary: 'Derived lifecycle state', tag: 'Tasks', responseKey: 'state' },
30
+ { method: 'get', path: '/tasks/{taskId}/transitions', summary: 'Allowed status transitions', tag: 'Tasks' },
31
+ { method: 'get', path: '/tasks/{taskId}/ladder', summary: 'Single-task ladder view', tag: 'Analysis', responseKey: 'taskLadder' },
32
+ { method: 'get', path: '/tasks/{taskId}/metrics', summary: 'Task metrics and EVM', tag: 'Analysis', responseKey: 'metrics' },
33
+ { method: 'get', path: '/tasks/{taskId}/progress-history', summary: 'Reconstructed progress history', tag: 'Analysis', responseKey: 'progressHistory' },
34
+ { method: 'get', path: '/teams', summary: 'List teams', tag: 'Teams', responseKey: 'teams' },
35
+ { method: 'post', path: '/teams', summary: 'Create a team', tag: 'Teams', body: schemas.CreateTeamSchema, responseKey: 'team', status: 201 },
36
+ { method: 'get', path: '/teams/{teamId}', summary: 'Get a team', tag: 'Teams', responseKey: 'team' },
37
+ { method: 'patch', path: '/teams/{teamId}', summary: 'Update a team', tag: 'Teams', body: schemas.UpdateTeamSchema, responseKey: 'team' },
38
+ { method: 'delete', path: '/teams/{teamId}', summary: 'Delete a team', tag: 'Teams' },
39
+ { method: 'get', path: '/containers', summary: 'List containers', tag: 'Containers', query: ['projectId!'], responseKey: 'containers' },
40
+ { method: 'post', path: '/containers', summary: 'Create a container', tag: 'Containers', body: schemas.CreateContainerSchema, responseKey: 'container', status: 201 },
41
+ { method: 'get', path: '/containers/{containerId}', summary: 'Get a container', tag: 'Containers', responseKey: 'container' },
42
+ { method: 'patch', path: '/containers/{containerId}', summary: 'Update a container', tag: 'Containers', body: schemas.UpdateContainerSchema, responseKey: 'container' },
43
+ { method: 'delete', path: '/containers/{containerId}', summary: 'Delete a container', tag: 'Containers' },
44
+ { method: 'get', path: '/deliverables', summary: 'List deliverables', tag: 'Deliverables', query: ['projectId!'], responseKey: 'deliverables' },
45
+ { method: 'post', path: '/deliverables', summary: 'Create a deliverable', tag: 'Deliverables', body: schemas.CreateDeliverableSchema, responseKey: 'deliverable', status: 201 },
46
+ { method: 'get', path: '/deliverables/{deliverableId}', summary: 'Get a deliverable', tag: 'Deliverables', responseKey: 'deliverable' },
47
+ { method: 'get', path: '/deliverables/{deliverableId}/summary', summary: 'Deliverable rollup summary', tag: 'Deliverables', responseKey: 'summary' },
48
+ { method: 'patch', path: '/deliverables/{deliverableId}', summary: 'Update a deliverable', tag: 'Deliverables', body: schemas.UpdateDeliverableSchema, responseKey: 'deliverable' },
49
+ { method: 'delete', path: '/deliverables/{deliverableId}', summary: 'Delete a deliverable', tag: 'Deliverables' },
50
+ { method: 'get', path: '/iterations', summary: 'List iterations', tag: 'Iterations', query: ['projectId!'], responseKey: 'iterations' },
51
+ { method: 'post', path: '/iterations', summary: 'Create an iteration', tag: 'Iterations', body: schemas.CreateIterationSchema, responseKey: 'iteration', status: 201 },
52
+ { method: 'get', path: '/iterations/{iterationId}', summary: 'Get an iteration', tag: 'Iterations', responseKey: 'iteration' },
53
+ { method: 'patch', path: '/iterations/{iterationId}', summary: 'Update an iteration', tag: 'Iterations', body: schemas.UpdateIterationSchema, responseKey: 'iteration' },
54
+ { method: 'delete', path: '/iterations/{iterationId}', summary: 'Delete an iteration', tag: 'Iterations' },
55
+ { method: 'get', path: '/activities', summary: 'Activity (audit) stream', tag: 'Activity', query: ['projectId', 'taskId'], responseKey: 'activities' },
56
+ { method: 'get', path: '/comments', summary: 'List comments for a task', tag: 'Comments', query: ['taskId!'], responseKey: 'comments' },
57
+ { method: 'post', path: '/comments', summary: 'Create a comment', tag: 'Comments', body: schemas.CreateCommentSchema, responseKey: 'comment', status: 201 },
58
+ { method: 'get', path: '/comments/{commentId}', summary: 'Get a comment', tag: 'Comments', responseKey: 'comment' },
59
+ { method: 'patch', path: '/comments/{commentId}', summary: 'Update a comment', tag: 'Comments', body: schemas.UpdateCommentSchema, responseKey: 'comment' },
60
+ { method: 'delete', path: '/comments/{commentId}', summary: 'Delete a comment', tag: 'Comments' },
61
+ { method: 'post', path: '/comments/{commentId}/reactions', summary: 'Add a reaction', tag: 'Comments', body: schemas.CommentReactionSchema, responseKey: 'comment' },
62
+ { method: 'delete', path: '/comments/{commentId}/reactions', summary: 'Remove a reaction', tag: 'Comments', query: ['emoji', 'userId'], responseKey: 'comment' },
63
+ { method: 'get', path: '/attachments', summary: 'List attachments', tag: 'Attachments', query: ['taskId', 'projectId', 'commentId'], responseKey: 'attachments' },
64
+ { method: 'post', path: '/attachments', summary: 'Register an attachment', tag: 'Attachments', body: schemas.CreateAttachmentSchema, responseKey: 'attachment', status: 201 },
65
+ { method: 'post', path: '/attachments/upload', summary: 'Upload a file through the configured FileStorageAdapter', tag: 'Attachments', body: schemas.UploadAttachmentSchema, responseKey: 'attachment', status: 201 },
66
+ { method: 'post', path: '/attachments/presign', summary: 'Request a presigned upload URL', tag: 'Attachments', body: schemas.PresignAttachmentSchema, responseKey: 'presigned' },
67
+ { method: 'get', path: '/attachments/{attachmentId}', summary: 'Get an attachment', tag: 'Attachments', responseKey: 'attachment' },
68
+ { method: 'delete', path: '/attachments/{attachmentId}', summary: 'Delete an attachment', tag: 'Attachments' },
69
+ { method: 'get', path: '/time-entries', summary: 'List time entries for a task', tag: 'Time Tracking', query: ['taskId!'], responseKey: 'timeEntries' },
70
+ { method: 'post', path: '/time-entries', summary: 'Log time against a task', tag: 'Time Tracking', body: schemas.LogTimeSchema, responseKey: 'timeEntry', status: 201 },
71
+ { method: 'get', path: '/workload', summary: 'Workload distribution across projects', tag: 'Analysis', query: ['projectId', 'startDate', 'endDate', 'interval', 'groupBy', 'metric', 'defaultWeeklyCapacityHours'], responseKey: 'workload' },
72
+ { method: 'post', path: '/status', summary: 'Publish an agent status update', tag: 'Agents' }
73
+ ];
74
+ const errorResponse = {
75
+ description: 'Error',
76
+ content: {
77
+ 'application/json': {
78
+ schema: {
79
+ type: 'object',
80
+ properties: {
81
+ error: { type: 'string' },
82
+ issues: { type: 'array', items: { type: 'object', properties: { path: { type: 'string' }, message: { type: 'string' } } } }
83
+ },
84
+ required: ['error']
85
+ }
86
+ }
87
+ }
88
+ };
89
+ function toJsonSchema(schema) {
90
+ const { $schema: _ignored, ...json } = zodToJsonSchema(schema, { $refStrategy: 'none' });
91
+ return json;
92
+ }
93
+ /**
94
+ * Builds an OpenAPI 3.1 document for the router. Request bodies are generated from the same zod
95
+ * schemas the router validates with, so the contract cannot drift from enforcement.
96
+ */
97
+ export function buildOpenApiDocument(options = {}) {
98
+ const paths = {};
99
+ for (const route of ROUTES) {
100
+ const pathParams = [...route.path.matchAll(/\{(\w+)\}/g)].map((m) => m[1]);
101
+ const parameters = [
102
+ ...pathParams.map((name) => ({ name, in: 'path', required: true, schema: { type: 'string' } })),
103
+ ...(route.query ?? []).map((q) => ({
104
+ name: q.replace(/!$/, ''),
105
+ in: 'query',
106
+ required: q.endsWith('!'),
107
+ schema: { type: 'string' }
108
+ }))
109
+ ];
110
+ const status = String(route.status ?? 200);
111
+ const successSchema = route.responseKey
112
+ ? { type: 'object', properties: { [route.responseKey]: {} }, required: [route.responseKey] }
113
+ : { type: 'object' };
114
+ paths[route.path] ??= {};
115
+ paths[route.path][route.method] = {
116
+ summary: route.summary,
117
+ tags: [route.tag],
118
+ ...(parameters.length ? { parameters } : {}),
119
+ ...(route.body
120
+ ? { requestBody: { required: true, content: { 'application/json': { schema: toJsonSchema(route.body) } } } }
121
+ : {}),
122
+ responses: {
123
+ [status]: { description: 'Success', content: { 'application/json': { schema: successSchema } } },
124
+ '400': errorResponse,
125
+ '401': errorResponse,
126
+ '404': errorResponse,
127
+ ...(route.path.endsWith('/dependencies') && route.method === 'post' ? { '409': errorResponse } : {}),
128
+ '500': errorResponse
129
+ }
130
+ };
131
+ }
132
+ return {
133
+ openapi: '3.1.0',
134
+ info: { title: options.title ?? 'Critical Path API', version: options.version ?? '1.0.0' },
135
+ ...(options.serverUrl ? { servers: [{ url: options.serverUrl }] } : {}),
136
+ paths
137
+ };
138
+ }
139
+ //# sourceMappingURL=openapi.js.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"openapi.js","sourceRoot":"","sources":["../src/openapi.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AACrD,OAAO,KAAK,OAAO,MAAM,6BAA6B,CAAC;AAiBvD,wFAAwF;AACxF,MAAM,CAAC,MAAM,MAAM,GAAe;IAChC,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,YAAY,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,WAAW,EAAE,WAAW,EAAE,WAAW,EAAE;IAC5G,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,YAAY,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,OAAO,CAAC,oBAAoB,EAAE,WAAW,EAAE,UAAU,EAAE,MAAM,EAAE,GAAG,EAAE;IAChK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,WAAW,EAAE,WAAW,EAAE,UAAU,EAAE;IACxH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE,IAAI,EAAE,OAAO,CAAC,oBAAoB,EAAE,WAAW,EAAE,UAAU,EAAE;IACjK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,WAAW,EAAE;IAErG,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IACxG,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAC3J,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IACnH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE;IAC3J,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE;IAC/G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,qCAAqC,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IACjJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,OAAO,EAAE,aAAa,EAAE,aAAa,CAAC,EAAE,WAAW,EAAE,QAAQ,EAAE;IAC1L,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,gCAAgC,EAAE,OAAO,EAAE,+BAA+B,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,SAAS,EAAE,UAAU,EAAE,SAAS,EAAE,QAAQ,EAAE,4BAA4B,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IAE7O,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,KAAK,EAAE,CAAC,WAAW,CAAC,EAAE,WAAW,EAAE,OAAO,EAAE;IAClH,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,EAAE;IAC5I,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,MAAM,EAAE;IACpG,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,+CAA+C,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE;IACzK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE;IACrF,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,0BAA0B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE;IAC5H,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,0BAA0B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAClM,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,uBAAuB,EAAE,GAAG,EAAE,aAAa,EAAE,WAAW,EAAE,aAAa,EAAE;IACxI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACzN,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,uBAAuB,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,OAAO,EAAE;IACpI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,8BAA8B,EAAE,OAAO,EAAE,kCAAkC,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACxM,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,OAAO,EAAE;IAC5H,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,4BAA4B,EAAE,GAAG,EAAE,OAAO,EAAE;IAC3G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,wBAAwB,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,YAAY,EAAE;IACjI,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,yBAAyB,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IAC5H,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,kCAAkC,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,iBAAiB,EAAE;IAEvJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,OAAO,EAAE;IAC5F,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,EAAE;IAC5I,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,YAAY,EAAE,GAAG,EAAE,OAAO,EAAE,WAAW,EAAE,MAAM,EAAE;IACpG,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,OAAO,CAAC,gBAAgB,EAAE,WAAW,EAAE,MAAM,EAAE;IACzI,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iBAAiB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,OAAO,EAAE;IAErF,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IACrK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,WAAW,EAAE,WAAW,EAAE;IAC7H,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE;IACvK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,oBAAoB,EAAE,GAAG,EAAE,YAAY,EAAE;IAEzG,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,cAAc,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,cAAc,EAAE;IAC/I,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,aAAa,EAAE,MAAM,EAAE,GAAG,EAAE;IAC/K,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,aAAa,EAAE;IACvI,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uCAAuC,EAAE,OAAO,EAAE,4BAA4B,EAAE,GAAG,EAAE,cAAc,EAAE,WAAW,EAAE,SAAS,EAAE;IACpJ,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,aAAa,EAAE;IACnL,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,+BAA+B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,cAAc,EAAE;IAEjH,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,iBAAiB,EAAE,GAAG,EAAE,YAAY,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IACtK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,YAAY,EAAE,WAAW,EAAE,WAAW,EAAE;IAC9H,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,WAAW,EAAE;IACxK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,2BAA2B,EAAE,OAAO,EAAE,qBAAqB,EAAE,GAAG,EAAE,YAAY,EAAE;IAE1G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,QAAQ,CAAC,EAAE,WAAW,EAAE,YAAY,EAAE;IAEtJ,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,0BAA0B,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IACvI,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE,MAAM,EAAE,GAAG,EAAE;IAC3J,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,eAAe,EAAE,GAAG,EAAE,UAAU,EAAE,WAAW,EAAE,SAAS,EAAE;IACnH,EAAE,MAAM,EAAE,OAAO,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,mBAAmB,EAAE,WAAW,EAAE,SAAS,EAAE;IAC3J,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,uBAAuB,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,UAAU,EAAE;IACjG,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,iCAAiC,EAAE,OAAO,EAAE,gBAAgB,EAAE,GAAG,EAAE,UAAU,EAAE,IAAI,EAAE,OAAO,CAAC,qBAAqB,EAAE,WAAW,EAAE,SAAS,EAAE;IACpK,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,iCAAiC,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,OAAO,EAAE,QAAQ,CAAC,EAAE,WAAW,EAAE,SAAS,EAAE;IAEhK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,OAAO,EAAE,kBAAkB,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,CAAC,QAAQ,EAAE,WAAW,EAAE,WAAW,CAAC,EAAE,WAAW,EAAE,aAAa,EAAE;IACjK,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,cAAc,EAAE,OAAO,EAAE,wBAAwB,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IAC7K,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,qBAAqB,EAAE,OAAO,EAAE,yDAAyD,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,sBAAsB,EAAE,WAAW,EAAE,YAAY,EAAE,MAAM,EAAE,GAAG,EAAE;IACrN,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,sBAAsB,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,aAAa,EAAE,IAAI,EAAE,OAAO,CAAC,uBAAuB,EAAE,WAAW,EAAE,WAAW,EAAE;IAChL,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,mBAAmB,EAAE,GAAG,EAAE,aAAa,EAAE,WAAW,EAAE,YAAY,EAAE;IACnI,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,6BAA6B,EAAE,OAAO,EAAE,sBAAsB,EAAE,GAAG,EAAE,aAAa,EAAE;IAE9G,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,8BAA8B,EAAE,GAAG,EAAE,eAAe,EAAE,KAAK,EAAE,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,aAAa,EAAE;IACvJ,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,OAAO,EAAE,yBAAyB,EAAE,GAAG,EAAE,eAAe,EAAE,IAAI,EAAE,OAAO,CAAC,aAAa,EAAE,WAAW,EAAE,WAAW,EAAE,MAAM,EAAE,GAAG,EAAE;IAEvK,EAAE,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,OAAO,EAAE,uCAAuC,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,CAAC,WAAW,EAAE,WAAW,EAAE,SAAS,EAAE,UAAU,EAAE,SAAS,EAAE,QAAQ,EAAE,4BAA4B,CAAC,EAAE,WAAW,EAAE,UAAU,EAAE;IAC7O,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,SAAS,EAAE,OAAO,EAAE,gCAAgC,EAAE,GAAG,EAAE,QAAQ,EAAE;CAC9F,CAAC;AAEF,MAAM,aAAa,GAAG;IACpB,WAAW,EAAE,OAAO;IACpB,OAAO,EAAE;QACP,kBAAkB,EAAE;YAClB,MAAM,EAAE;gBACN,IAAI,EAAE,QAAQ;gBACd,UAAU,EAAE;oBACV,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;oBACzB,MAAM,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,UAAU,EAAE,EAAE,IAAI,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,EAAE,EAAE;iBAC5H;gBACD,QAAQ,EAAE,CAAC,OAAO,CAAC;aACpB;SACF;KACF;CACF,CAAC;AAEF,SAAS,YAAY,CAAC,MAAe;IACnC,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,GAAG,IAAI,EAAE,GAAG,eAAe,CAAC,MAAa,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IAC3H,OAAO,IAAI,CAAC;AACd,CAAC;AASD;;;GAGG;AACH,MAAM,UAAU,oBAAoB,CAAC,UAA0B,EAAE;IAC/D,MAAM,KAAK,GAA4C,EAAE,CAAC;IAE1D,KAAK,MAAM,KAAK,IAAI,MAAM,EAAE,CAAC;QAC3B,MAAM,UAAU,GAAG,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAC3E,MAAM,UAAU,GAAG;YACjB,GAAG,UAAU,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YAC/F,GAAG,CAAC,KAAK,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;gBACjC,IAAI,EAAE,CAAC,CAAC,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBACzB,EAAE,EAAE,OAAO;gBACX,QAAQ,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC;gBACzB,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;aAC3B,CAAC,CAAC;SACJ,CAAC;QACF,MAAM,MAAM,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM,IAAI,GAAG,CAAC,CAAC;QAC3C,MAAM,aAAa,GAAG,KAAK,CAAC,WAAW;YACrC,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,UAAU,EAAE,EAAE,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,EAAE,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE;YAC5F,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC;QAEvB,KAAK,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,EAAE,CAAC;QACzB,KAAK,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG;YAChC,OAAO,EAAE,KAAK,CAAC,OAAO;YACtB,IAAI,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC;YACjB,GAAG,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC5C,GAAG,CAAC,KAAK,CAAC,IAAI;gBACZ,CAAC,CAAC,EAAE,WAAW,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,OAAO,EAAE,EAAE,kBAAkB,EAAE,EAAE,MAAM,EAAE,YAAY,CAAC,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,EAAE;gBAC5G,CAAC,CAAC,EAAE,CAAC;YACP,SAAS,EAAE;gBACT,CAAC,MAAM,CAAC,EAAE,EAAE,WAAW,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,kBAAkB,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,EAAE;gBAChG,KAAK,EAAE,aAAa;gBACpB,KAAK,EAAE,aAAa;gBACpB,KAAK,EAAE,aAAa;gBACpB,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,eAAe,CAAC,IAAI,KAAK,CAAC,MAAM,KAAK,MAAM,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;gBACpG,KAAK,EAAE,aAAa;aACrB;SACF,CAAC;IACJ,CAAC;IAED,OAAO;QACL,OAAO,EAAE,OAAO;QAChB,IAAI,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,IAAI,mBAAmB,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,OAAO,EAAE;QAC1F,GAAG,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,CAAC,EAAE,GAAG,EAAE,OAAO,CAAC,SAAS,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACvE,KAAK;KACN,CAAC;AACJ,CAAC"}
@@ -0,0 +1,2 @@
1
+ export {};
2
+ //# sourceMappingURL=openapi.test.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"openapi.test.d.ts","sourceRoot":"","sources":["../src/openapi.test.ts"],"names":[],"mappings":""}