@critical-path/react 0.9.0 → 0.10.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,10 +1,36 @@
1
1
  # @critical-path/react
2
2
 
3
+ ## 0.10.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 9c31e8d: Introduce comprehensive Task Metrics, Inferred Actuals, Progress Inference, Earned Value Management (EVM), and Time-Series Progress History Curve Profiling.
8
+ - **Inferred Actuals**: Automatic start/completion auto-stamping on workflow transitions with fallback inference from activity logs, plus automatic completion timestamp clearing on task re-open.
9
+ - **Reality Delta**: Multi-dimensional variance analysis comparing planned estimates to logged hours (`effortVarianceHours`, `durationVarianceHours`, `accuracyRatio`, `isOverdue`, `isOverEstimate`).
10
+ - **Progress Inference**: Deterministic priority waterfall resolving completion progress across explicit values, checklist/todo completion ratios, logged effort, and elapsed schedule time.
11
+ - **Earned Value Management (EVM)**: Task-level PV, EV, AC, CV, SV, CPI, and SPI calculations.
12
+ - **Time-Series History & Curve Shapes**: Historical timeline reconstruction from activity logs with piecewise interpolation curve classification (`linear`, `s_curve`, `early_surge`, `late_rush`, `stalled`).
13
+ - **Full-Stack Integration**: REST endpoints (`/tasks/:id/metrics`, `/tasks/:id/progress-history`), Client SDK methods, React `useTaskMetrics` hook, Svelte 5 `TaskMetricsState`, and MCP tools (`get_task_metrics`, `get_task_progress_history`).
14
+
15
+ ### Patch Changes
16
+
17
+ - Updated dependencies [9c31e8d]
18
+ - @critical-path/core@0.17.0
19
+ - @critical-path/client@0.11.0
20
+ - @critical-path/mcp@0.4.0
21
+
22
+ ## 0.9.1
23
+
24
+ ### Patch Changes
25
+
26
+ - Updated dependencies [b4b2c98]
27
+ - @critical-path/mcp@0.3.1
28
+
3
29
  ## 0.9.0
4
30
 
5
31
  ### Minor Changes
6
32
 
7
- - e2a7eef: Introduce Bret Victor's Ladder of Abstraction and Critical Path Method (CPM) timeline synthesis to the framework data model:
33
+ - e2a7eef: Introduce Ladder of Abstraction and Critical Path Method (CPM) timeline synthesis to the framework data model:
8
34
  - **Core Domain**: Multi-scale timeline synthesis model across Macro phase rollups, Standard CPM Gantt schedule (early/late bounds, float/slack calculation, bottleneck identification), and Concrete grounding (deliverables, file attachments, daily effort distribution, and reality deltas). Added `calculateCriticalPath`, `getTimelineLadder`, and `getTaskLadder` to `CriticalPathEngine`.
9
35
  - **Server Router**: HTTP endpoints `GET /projects/:id/critical-path`, `GET /projects/:id/ladder`, and `GET /tasks/:id/ladder`.
10
36
  - **Client SDK**: `CriticalPathClient` methods `calculateCriticalPath`, `getTimelineLadder`, and `getTaskLadder`.
package/README.md CHANGED
@@ -114,7 +114,7 @@ export function ActivityStream({ taskId }: { taskId: string }) {
114
114
  }
115
115
  ```
116
116
 
117
- ### 5. Bret Victor's Ladder of Abstraction (`useTimelineLadder` & `useCriticalPath`)
117
+ ### 5. Ladder of Abstraction (`useTimelineLadder` & `useCriticalPath`)
118
118
 
119
119
  Fluidly traverse between Macro phase health, Standard Gantt tasks with CPM critical paths, and Concrete deliverables/effort:
120
120
 
package/dist/hooks.d.ts CHANGED
@@ -1,4 +1,4 @@
1
- import type { Project, Task, TaskStatus, Workflow, Comment, Attachment, Deliverable, DeliverableSummary, CreateDeliverableInput, StatusDefinition, CriticalPathAnalysis, TimelineLadder, TimelineLadderOptions, TaskLadderView, AbstractionLevel } from '@critical-path/core';
1
+ import type { Project, Task, TaskStatus, Workflow, Comment, Attachment, Deliverable, DeliverableSummary, CreateDeliverableInput, StatusDefinition, CriticalPathAnalysis, TimelineLadder, TimelineLadderOptions, TaskLadderView, AbstractionLevel, TaskMetrics, TaskProgressHistory } from '@critical-path/core';
2
2
  export declare function useWorkflows(): {
3
3
  workflows: Workflow[];
4
4
  loading: boolean;
@@ -158,6 +158,19 @@ export declare function useTaskLadder(taskId: string | undefined): {
158
158
  macroPhase: import("@critical-path/core").MacroPhaseRollup | null;
159
159
  standard: import("@critical-path/core").StandardTaskTimelineItem | null;
160
160
  concrete: import("@critical-path/core").ConcreteTaskEvidence | null;
161
+ metrics: TaskMetrics | null;
162
+ loading: boolean;
163
+ error: Error | null;
164
+ refresh: () => Promise<void>;
165
+ };
166
+ export declare function useTaskMetrics(taskId: string | undefined): {
167
+ metrics: TaskMetrics | null;
168
+ history: TaskProgressHistory | null;
169
+ inferredActuals: import("@critical-path/core").TaskInferredActuals | null;
170
+ realityDelta: import("@critical-path/core").RealityDelta | null;
171
+ progress: import("@critical-path/core").TaskProgressInference | null;
172
+ evm: import("@critical-path/core").TaskEVM | null;
173
+ curveProfile: import("@critical-path/core").ProgressCurveProfile | null;
161
174
  loading: boolean;
162
175
  error: Error | null;
163
176
  refresh: () => Promise<void>;
@@ -1 +1 @@
1
- {"version":3,"file":"hooks.d.ts","sourceRoot":"","sources":["../src/hooks.ts"],"names":[],"mappings":"AACA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,UAAU,EACV,QAAQ,EACR,OAAO,EAEP,UAAU,EACV,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,gBAAgB,EAEhB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,gBAAgB,EACjB,MAAM,qBAAqB,CAAC;AAK7B,wBAAgB,YAAY;;;;;4BAuBW,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;yBAYnD,MAAM,WAAW,OAAO,CAAC,QAAQ,CAAC;yBAYlC,MAAM;EAYzC;AAED,wBAAgB,kBAAkB,CAAC,MAAM,CAAC,EAAE,MAAM;;;;;EA4BjD;AAED,wBAAgB,WAAW;;;;;2BAuBW,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;EAyBpF;AAED,wBAAgB,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM;;;;;wBAuBR,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;yBAwB3C,MAAM,WAAW,OAAO,CAAC,IAAI,CAAC;+BA4BxB,MAAM,UAAU,UAAU;yBAIhC,MAAM;EA+BzC;AAED,MAAM,WAAW,gBAAgB;IAC/B,OAAO,CAAC,EAAE,UAAU,GAAG,UAAU,CAAC;IAClC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;CACxC;AAED,wBAAgB,SAAS,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,gBAAgB;;;;;;uBA8CtC,MAAM,gBAAgB,UAAU;wBA5I/B,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;EAiJ9E;AAED,MAAM,WAAW,eAAgB,SAAQ,OAAO;IAC9C,OAAO,EAAE,eAAe,EAAE,CAAC;CAC5B;AAED,wBAAgB,WAAW,CAAC,MAAM,EAAE,MAAM;;;;;;wBA4BP,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC;wBAY1D,MAAM,WAAW,OAAO,CAAC,OAAO,CAAC;wBAYjC,MAAM;6BAY1B,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;gCAkBT,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;EAoDvB;AAED,wBAAgB,cAAc,CAAC,MAAM,CAAC,EAAE;IAAE,MAAM,CAAC,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE;;;;;8BAyB1D,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;2BAYrD,MAAM;EAmB3C;AAED,wBAAgB,eAAe,CAAC,SAAS,CAAC,EAAE,MAAM;;;;;+BA4BR,sBAAsB;4BAYzB,MAAM,WAAW,OAAO,CAAC,WAAW,CAAC;4BAYrC,MAAM;EAoB5C;AAED,wBAAgB,qBAAqB,CAAC,aAAa,CAAC,EAAE,MAAM;;;;;EAkC3D;AAED,MAAM,WAAW,gBAAgB;IAC/B,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,cAAc,CAAC,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,MAAM,EAAE,GAAG,KAAK,IAAI,CAAC;CACtE;AAED,wBAAgB,SAAS,CAAC,OAAO,GAAE,gBAAqB;;;;EA0CvD;AAED,MAAM,WAAW,8BAA+B,SAAQ,OAAO;IAC7D,WAAW,EAAE,UAAU,EAAE,CAAC;IAC1B,OAAO,EAAE,8BAA8B,EAAE,CAAC;CAC3C;AAED,wBAAgB,eAAe,CAAC,MAAM,CAAC,EAAE,MAAM;;;;;;;;wBAyEpC,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC,qBAC9C,KAAK,CAAC,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;;;;2BAiCnE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC;wBAehE,MAAM;2BAiBH,MAAM;6BAkB7B,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;gCAkBT,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;EAgCvB;AAED,wBAAgB,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,SAAS;;;;;EAkC5D;AAED,wBAAgB,iBAAiB,CAC/B,SAAS,EAAE,MAAM,GAAG,SAAS,EAC7B,cAAc,GAAE,qBAA0B;;;;;;;;;;;;;;;EA4C3C;AAED,wBAAgB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,SAAS;;;;;;;;EAqCvD"}
1
+ {"version":3,"file":"hooks.d.ts","sourceRoot":"","sources":["../src/hooks.ts"],"names":[],"mappings":"AACA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,UAAU,EACV,QAAQ,EACR,OAAO,EAEP,UAAU,EACV,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,gBAAgB,EAEhB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,gBAAgB,EAChB,WAAW,EACX,mBAAmB,EACpB,MAAM,qBAAqB,CAAC;AAK7B,wBAAgB,YAAY;;;;;4BAuBW,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;yBAYnD,MAAM,WAAW,OAAO,CAAC,QAAQ,CAAC;yBAYlC,MAAM;EAYzC;AAED,wBAAgB,kBAAkB,CAAC,MAAM,CAAC,EAAE,MAAM;;;;;EA4BjD;AAED,wBAAgB,WAAW;;;;;2BAuBW,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;EAyBpF;AAED,wBAAgB,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM;;;;;wBAuBR,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;yBAwB3C,MAAM,WAAW,OAAO,CAAC,IAAI,CAAC;+BA4BxB,MAAM,UAAU,UAAU;yBAIhC,MAAM;EA+BzC;AAED,MAAM,WAAW,gBAAgB;IAC/B,OAAO,CAAC,EAAE,UAAU,GAAG,UAAU,CAAC;IAClC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;CACxC;AAED,wBAAgB,SAAS,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,gBAAgB;;;;;;uBA8CtC,MAAM,gBAAgB,UAAU;wBA5I/B,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;EAiJ9E;AAED,MAAM,WAAW,eAAgB,SAAQ,OAAO;IAC9C,OAAO,EAAE,eAAe,EAAE,CAAC;CAC5B;AAED,wBAAgB,WAAW,CAAC,MAAM,EAAE,MAAM;;;;;;wBA4BP,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC;wBAY1D,MAAM,WAAW,OAAO,CAAC,OAAO,CAAC;wBAYjC,MAAM;6BAY1B,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;gCAkBT,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;EAoDvB;AAED,wBAAgB,cAAc,CAAC,MAAM,CAAC,EAAE;IAAE,MAAM,CAAC,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE;;;;;8BAyB1D,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;2BAYrD,MAAM;EAmB3C;AAED,wBAAgB,eAAe,CAAC,SAAS,CAAC,EAAE,MAAM;;;;;+BA4BR,sBAAsB;4BAYzB,MAAM,WAAW,OAAO,CAAC,WAAW,CAAC;4BAYrC,MAAM;EAoB5C;AAED,wBAAgB,qBAAqB,CAAC,aAAa,CAAC,EAAE,MAAM;;;;;EAkC3D;AAED,MAAM,WAAW,gBAAgB;IAC/B,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,cAAc,CAAC,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,MAAM,EAAE,GAAG,KAAK,IAAI,CAAC;CACtE;AAED,wBAAgB,SAAS,CAAC,OAAO,GAAE,gBAAqB;;;;EA0CvD;AAED,MAAM,WAAW,8BAA+B,SAAQ,OAAO;IAC7D,WAAW,EAAE,UAAU,EAAE,CAAC;IAC1B,OAAO,EAAE,8BAA8B,EAAE,CAAC;CAC3C;AAED,wBAAgB,eAAe,CAAC,MAAM,CAAC,EAAE,MAAM;;;;;;;;wBAyEpC,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC,qBAC9C,KAAK,CAAC,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;;;;2BAiCnE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC;wBAehE,MAAM;2BAiBH,MAAM;6BAkB7B,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;gCAkBT,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;EAgCvB;AAED,wBAAgB,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,SAAS;;;;;EAkC5D;AAED,wBAAgB,iBAAiB,CAC/B,SAAS,EAAE,MAAM,GAAG,SAAS,EAC7B,cAAc,GAAE,qBAA0B;;;;;;;;;;;;;;;EA4C3C;AAED,wBAAgB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,SAAS;;;;;;;;;EAsCvD;AAED,wBAAgB,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,SAAS;;;;;;;;;;;EA8CxD"}
package/dist/hooks.js CHANGED
@@ -904,9 +904,56 @@ export function useTaskLadder(taskId) {
904
904
  macroPhase: taskLadder?.macroPhase ?? null,
905
905
  standard: taskLadder?.standard ?? null,
906
906
  concrete: taskLadder?.concrete ?? null,
907
+ metrics: taskLadder?.metrics ?? null,
907
908
  loading,
908
909
  error,
909
910
  refresh: fetchTaskLadder
910
911
  };
911
912
  }
913
+ export function useTaskMetrics(taskId) {
914
+ const client = useCriticalPathClient();
915
+ const [metrics, setMetrics] = useState(null);
916
+ const [history, setHistory] = useState(null);
917
+ const [loading, setLoading] = useState(true);
918
+ const [error, setError] = useState(null);
919
+ const fetchMetrics = useCallback(async () => {
920
+ if (!taskId) {
921
+ setMetrics(null);
922
+ setHistory(null);
923
+ setLoading(false);
924
+ return;
925
+ }
926
+ try {
927
+ setLoading(true);
928
+ const [m, h] = await Promise.all([
929
+ client.getTaskMetrics(taskId),
930
+ client.getTaskProgressHistory(taskId)
931
+ ]);
932
+ setMetrics(m);
933
+ setHistory(h);
934
+ setError(null);
935
+ }
936
+ catch (err) {
937
+ setError(err instanceof Error ? err : new Error(String(err)));
938
+ }
939
+ finally {
940
+ setLoading(false);
941
+ }
942
+ }, [client, taskId]);
943
+ useEffect(() => {
944
+ fetchMetrics();
945
+ }, [fetchMetrics]);
946
+ return {
947
+ metrics,
948
+ history,
949
+ inferredActuals: metrics?.inferredActuals ?? null,
950
+ realityDelta: metrics?.realityDelta ?? null,
951
+ progress: metrics?.progress ?? null,
952
+ evm: metrics?.evm ?? null,
953
+ curveProfile: history?.curveProfile ?? null,
954
+ loading,
955
+ error,
956
+ refresh: fetchMetrics
957
+ };
958
+ }
912
959
  //# sourceMappingURL=hooks.js.map
package/dist/hooks.js.map CHANGED
@@ -1 +1 @@
1
- {"version":3,"file":"hooks.js","sourceRoot":"","sources":["../src/hooks.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,WAAW,EAAE,OAAO,EAAE,MAAM,OAAO,CAAC;AAoBlE,OAAO,EAAE,uBAAuB,EAAE,MAAM,qBAAqB,CAAC;AAC9D,OAAO,EAAE,mBAAmB,EAAE,MAAM,wBAAwB,CAAC;AAC7D,OAAO,EAAE,qBAAqB,EAAE,MAAM,eAAe,CAAC;AAEtD,MAAM,UAAU,YAAY;IAC1B,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,SAAS,EAAE,YAAY,CAAC,GAAG,QAAQ,CAAa,EAAE,CAAC,CAAC;IAC3D,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,cAAc,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC5C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;YACzC,YAAY,CAAC,IAAI,CAAC,CAAC;YACnB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,CAAC;IAEb,SAAS,CAAC,GAAG,EAAE;QACb,cAAc,EAAE,CAAC;IACnB,CAAC,EAAE,CAAC,cAAc,CAAC,CAAC,CAAC;IAErB,MAAM,cAAc,GAAG,KAAK,EAAE,KAAuD,EAAE,EAAE;QACvF,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC;YACnD,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC3C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAAE,EAAU,EAAE,OAA0B,EAAE,EAAE;QACtE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YACzD,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC1C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YAChC,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC1D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,cAAc,EAAE,cAAc,EAAE,cAAc,EAAE,cAAc,EAAE,CAAC;AAChH,CAAC;AAED,MAAM,UAAU,kBAAkB,CAAC,MAAe;IAChD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,kBAAkB,EAAE,qBAAqB,CAAC,GAAG,QAAQ,CAAW,EAAE,CAAC,CAAC;IAC3E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IAC9C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,gBAAgB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC9C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,qBAAqB,CAAC,EAAE,CAAC,CAAC;YAC1B,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,MAAM,CAAC,CAAC;YAC5D,qBAAqB,CAAC,IAAI,CAAC,CAAC;YAC5B,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,gBAAgB,EAAE,CAAC;IACrB,CAAC,EAAE,CAAC,gBAAgB,CAAC,CAAC,CAAC;IAEvB,OAAO,EAAE,kBAAkB,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,gBAAgB,EAAE,CAAC;AAC3E,CAAC;AAED,MAAM,UAAU,WAAW;IACzB,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;YACxC,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,CAAC;IAEb,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,aAAa,GAAG,KAAK,EAAE,KAAsD,EAAE,EAAE;QACrF,MAAM,MAAM,GAAG,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,WAAW,GAAY;YAC3B,GAAG,KAAK;YACR,EAAE,EAAE,MAAM;YACV,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC;QAEF,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,WAAW,CAAC,CAAC,CAAC;QAE9C,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;YAClD,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACxE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC;YAC3D,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,aAAa,EAAE,aAAa,EAAE,CAAC;AAC7E,CAAC;AAED,MAAM,UAAU,QAAQ,CAAC,SAAkB;IACzC,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAS,EAAE,CAAC,CAAC;IAC/C,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,UAAU,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QACxC,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC9C,QAAQ,CAAC,IAAI,CAAC,CAAC;YACf,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,UAAU,EAAE,CAAC;IACf,CAAC,EAAE,CAAC,UAAU,CAAC,CAAC,CAAC;IAEjB,MAAM,UAAU,GAAG,KAAK,EAAE,KAAmD,EAAE,EAAE;QAC/E,MAAM,MAAM,GAAG,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,QAAQ,GAAS;YACrB,GAAG,KAAK;YACR,EAAE,EAAE,MAAM;YACV,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC;QAEF,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,QAAQ,CAAC,CAAC,CAAC;QAExC,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;YAC/C,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC;YACxD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,UAAU,GAAG,KAAK,EAAE,MAAc,EAAE,OAAsB,EAAE,EAAE;QAClE,IAAI,YAA8B,CAAC;QAEnC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;YAChB,YAAY,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;YACjD,IAAI,CAAC,YAAY;gBAAE,OAAO,IAAI,CAAC;YAC/B,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CACpB,CAAC,CAAC,EAAE,KAAK,MAAM;gBACb,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,GAAG,OAAO,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE;gBAC3D,CAAC,CAAC,CAAC,CACN,CAAC;QACJ,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;YACzD,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,YAAY,EAAE,CAAC;gBACjB,MAAM,UAAU,GAAG,YAAY,CAAC;gBAChC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC1E,CAAC;YACD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,MAAc,EAAE,MAAkB,EAAE,EAAE;QACpE,OAAO,UAAU,CAAC,MAAM,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;IACxC,CAAC,CAAC;IAEF,MAAM,UAAU,GAAG,KAAK,EAAE,MAAc,EAAE,EAAE;QAC1C,IAAI,YAA8B,CAAC;QACnC,IAAI,aAAa,GAAG,CAAC,CAAC,CAAC;QAEvB,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;YAChB,aAAa,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;YACvD,IAAI,aAAa,KAAK,CAAC,CAAC,EAAE,CAAC;gBACzB,YAAY,GAAG,IAAI,CAAC,aAAa,CAAC,CAAC;YACrC,CAAC;YACD,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QAC7C,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;QAClC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,YAAY,IAAI,aAAa,KAAK,CAAC,CAAC,EAAE,CAAC;gBACzC,MAAM,WAAW,GAAG,YAAY,CAAC;gBACjC,MAAM,aAAa,GAAG,aAAa,CAAC;gBACpC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;oBAChB,MAAM,QAAQ,GAAG,CAAC,GAAG,IAAI,CAAC,CAAC;oBAC3B,QAAQ,CAAC,MAAM,CAAC,aAAa,EAAE,CAAC,EAAE,WAAW,CAAC,CAAC;oBAC/C,OAAO,QAAQ,CAAC;gBAClB,CAAC,CAAC,CAAC;YACL,CAAC;YACD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,gBAAgB,EAAE,UAAU,EAAE,CAAC;AAC9G,CAAC;AAOD,MAAM,UAAU,SAAS,CAAC,SAAkB,EAAE,OAA0B;IACtE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,gBAAgB,EAAE,UAAU,EAAE,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC;IAE7F,MAAM,OAAO,GAAG,OAAO,CAAyB,GAAG,EAAE;QACnD,IAAI,OAAO,EAAE,OAAO,KAAK,UAAU,EAAE,CAAC;YACpC,MAAM,YAAY,GAAmC;gBACnD,WAAW,EAAE,EAAE;gBACf,WAAW,EAAE,EAAE;gBACf,SAAS,EAAE,EAAE;gBACb,QAAQ,EAAE,EAAE;aACb,CAAC;YACF,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;gBACzB,MAAM,QAAQ,GAAG,IAAI,CAAC,cAAc,IAAI,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,CAAC,CAAC,QAAQ,CAAC;gBAClH,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;oBAC3B,YAAY,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;gBACpC,CAAC;qBAAM,CAAC;oBACN,YAAY,CAAC,WAAW,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;gBACtC,CAAC;YACH,CAAC;YACD,OAAO,YAAY,CAAC;QACtB,CAAC;QAED,MAAM,YAAY,GAA2B,EAAE,CAAC;QAChD,IAAI,OAAO,EAAE,iBAAiB,IAAI,OAAO,CAAC,iBAAiB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YACvE,KAAK,MAAM,GAAG,IAAI,OAAO,CAAC,iBAAiB,EAAE,CAAC;gBAC5C,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,GAAG,EAAE,CAAC;YAC7B,CAAC;QACH,CAAC;aAAM,CAAC;YACN,YAAY,CAAC,OAAO,GAAG,EAAE,CAAC;YAC1B,YAAY,CAAC,IAAI,GAAG,EAAE,CAAC;YACvB,YAAY,CAAC,WAAW,GAAG,EAAE,CAAC;YAC9B,YAAY,CAAC,SAAS,GAAG,EAAE,CAAC;YAC5B,YAAY,CAAC,IAAI,GAAG,EAAE,CAAC;YACvB,YAAY,CAAC,QAAQ,GAAG,EAAE,CAAC;QAC7B,CAAC;QAED,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,IAAI,CAAC,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;gBAC/B,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,GAAG,EAAE,CAAC;YACjC,CAAC;YACD,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvC,CAAC;QAED,OAAO,YAAY,CAAC;IACtB,CAAC,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,iBAAiB,CAAC,CAAC,CAAC;IAE1D,MAAM,QAAQ,GAAG,KAAK,EAAE,MAAc,EAAE,YAAwB,EAAE,EAAE;QAClE,OAAO,gBAAgB,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IAChD,CAAC,CAAC;IAEF,OAAO,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC;AAC3E,CAAC;AAMD,MAAM,UAAU,WAAW,CAAC,MAAc;IACxC,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,WAAW,CAAC,EAAE,CAAC,CAAC;YAChB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;YAC9C,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,UAAU,GAAG,KAAK,EAAE,KAAiE,EAAE,EAAE;QAC7F,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9D,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC1C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,OAAyB,EAAE,EAAE;QACpE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YACxD,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACpE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QACzC,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAC/B,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QACzD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,WAAW,GAAG,KAAK,EACvB,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACpE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAC1B,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACvE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,kCAAkC;IAClC,MAAM,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE;QAC3B,MAAM,GAAG,GAAG,IAAI,GAAG,EAA2B,CAAC;QAC/C,MAAM,KAAK,GAAsB,EAAE,CAAC;QAEpC,4BAA4B;QAC5B,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,CAAC,CAAC;QACvC,CAAC;QAED,uCAAuC;QACvC,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAE,CAAC;YAChC,IAAI,CAAC,CAAC,QAAQ,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,EAAE,CAAC;gBACtC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAE,CAAC,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAC9C,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACvB,CAAC;QACH,CAAC;QAED,OAAO,KAAK,CAAC;IACf,CAAC,EAAE,CAAC,QAAQ,CAAC,CAAC,CAAC;IAEf,OAAO;QACL,QAAQ;QACR,OAAO;QACP,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;QACtB,UAAU;QACV,aAAa;QACb,aAAa;QACb,WAAW;QACX,cAAc;KACf,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,cAAc,CAAC,MAAoE;IACjG,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,WAAW,EAAE,cAAc,CAAC,GAAG,QAAQ,CAAe,EAAE,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,IAAI,EAAE,CAAC,CAAC;IAE/C,MAAM,gBAAgB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC9C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;YACjD,cAAc,CAAC,IAAI,CAAC,CAAC;YACrB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,gBAAgB,EAAE,CAAC;IACrB,CAAC,EAAE,CAAC,gBAAgB,CAAC,CAAC,CAAC;IAEvB,MAAM,gBAAgB,GAAG,KAAK,EAAE,KAAyD,EAAE,EAAE;QAC3F,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,KAAK,CAAC,CAAC;YACrD,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,OAAO,EAAE,GAAG,IAAI,CAAC,CAAC,CAAC;YAC7C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC5C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;YAClC,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC5D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEA,OAAO;QACP,WAAW;QACX,OAAO;QACP,KAAK;QACL,OAAO,EAAE,gBAAgB;QACzB,gBAAgB;QAChB,gBAAgB;KACjB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,eAAe,CAAC,SAAkB;IAChD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,YAAY,EAAE,eAAe,CAAC,GAAG,QAAQ,CAAgB,EAAE,CAAC,CAAC;IACpE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,iBAAiB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC/C,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,eAAe,CAAC,EAAE,CAAC,CAAC;YACpB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;YACrD,eAAe,CAAC,IAAI,CAAC,CAAC;YACtB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,iBAAiB,EAAE,CAAC;IACtB,CAAC,EAAE,CAAC,iBAAiB,CAAC,CAAC,CAAC;IAExB,MAAM,iBAAiB,GAAG,KAAK,EAAE,KAA6B,EAAE,EAAE;QAChE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,KAAK,CAAC,CAAC;YACtD,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC9C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,iBAAiB,GAAG,KAAK,EAAE,EAAU,EAAE,OAA6B,EAAE,EAAE;QAC5E,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YAC5D,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACxE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,iBAAiB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC7C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;YACnC,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC7D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO;QACL,YAAY;QACZ,OAAO;QACP,KAAK;QACL,OAAO,EAAE,iBAAiB;QAC1B,iBAAiB;QACjB,iBAAiB;QACjB,iBAAiB;KAClB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,qBAAqB,CAAC,aAAsB;IAC1D,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAA4B,IAAI,CAAC,CAAC;IACxE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,YAAY,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC1C,IAAI,CAAC,aAAa,EAAE,CAAC;YACnB,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,aAAa,CAAC,CAAC;YAC/D,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,aAAa,CAAC,CAAC,CAAC;IAE5B,SAAS,CAAC,GAAG,EAAE;QACb,YAAY,EAAE,CAAC;IACjB,CAAC,EAAE,CAAC,YAAY,CAAC,CAAC,CAAC;IAEnB,OAAO;QACL,OAAO;QACP,OAAO;QACP,KAAK;QACL,OAAO,EAAE,YAAY;KACtB,CAAC;AACJ,CAAC;AASD,MAAM,UAAU,SAAS,CAAC,UAA4B,EAAE;IACtD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,EAAE,SAAS,EAAE,KAAK,EAAE,OAAO,GAAG,IAAI,EAAE,cAAc,EAAE,GAAG,OAAO,CAAC;IACrE,MAAM,CAAC,UAAU,EAAE,aAAa,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IACpD,MAAM,CAAC,eAAe,EAAE,kBAAkB,CAAC,GAAG,QAAQ,CAAW,EAAE,CAAC,CAAC;IACrE,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,SAAS,CAAC,GAAG,EAAE;QACb,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,aAAa,CAAC,KAAK,CAAC,CAAC;YACrB,kBAAkB,CAAC,EAAE,CAAC,CAAC;YACvB,OAAO;QACT,CAAC;QAED,IAAI,CAAC;YACH,MAAM,MAAM,GAAG,mBAAmB,CAAC;gBACjC,MAAM;gBACN,SAAS;gBACT,KAAK;gBACL,cAAc;aACf,CAAC,CAAC;YAEH,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,kBAAkB,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC;YACnE,QAAQ,CAAC,IAAI,CAAC,CAAC;YAEf,OAAO,GAAG,EAAE;gBACV,MAAM,CAAC,UAAU,EAAE,CAAC;gBACpB,aAAa,CAAC,KAAK,CAAC,CAAC;gBACrB,kBAAkB,CAAC,EAAE,CAAC,CAAC;YACzB,CAAC,CAAC;QACJ,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9D,aAAa,CAAC,KAAK,CAAC,CAAC;QACvB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,cAAc,CAAC,CAAC,CAAC;IAExD,OAAO;QACL,UAAU;QACV,KAAK,EAAE,eAAe;QACtB,KAAK;KACN,CAAC;AACJ,CAAC;AAOD,MAAM,UAAU,eAAe,CAAC,MAAe;IAC7C,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,WAAW,EAAE,cAAc,CAAC,GAAG,QAAQ,CAAe,EAAE,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IAC9C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,WAAW,CAAC,EAAE,CAAC,CAAC;YAChB,cAAc,CAAC,EAAE,CAAC,CAAC;YACnB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,CAAC,eAAe,EAAE,kBAAkB,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;gBAC9D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC;gBAC1B,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC;aAClC,CAAC,CAAC;YACH,WAAW,CAAC,eAAe,CAAC,CAAC;YAC7B,cAAc,CAAC,kBAAkB,CAAC,CAAC;YACnC,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,OAAO,GAAG,OAAO,CAAmC,GAAG,EAAE;QAC7D,MAAM,GAAG,GAAG,IAAI,GAAG,EAA0C,CAAC;QAC9D,MAAM,KAAK,GAAqC,EAAE,CAAC;QAEnD,MAAM,oBAAoB,GAAG,IAAI,GAAG,EAAwB,CAAC;QAC7D,KAAK,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC;YAC5B,IAAI,CAAC,CAAC,SAAS,EAAE,CAAC;gBAChB,IAAI,CAAC,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC;oBAC3C,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACjD,CAAC;QACH,CAAC;QAED,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE;gBACZ,GAAG,CAAC;gBACJ,WAAW,EAAE,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,IAAI,EAAE;gBACjD,OAAO,EAAE,EAAE;aACZ,CAAC,CAAC;QACL,CAAC;QAED,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAE,CAAC;YAChC,IAAI,CAAC,CAAC,QAAQ,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,EAAE,CAAC;gBACtC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAE,CAAC,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAC9C,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACvB,CAAC;QACH,CAAC;QAED,OAAO,KAAK,CAAC;IACf,CAAC,EAAE,CAAC,QAAQ,EAAE,WAAW,CAAC,CAAC,CAAC;IAE5B,MAAM,qBAAqB,GAAG,OAAO,CAAe,GAAG,EAAE;QACvD,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;IACjD,CAAC,EAAE,CAAC,WAAW,CAAC,CAAC,CAAC;IAElB,MAAM,UAAU,GAAG,KAAK,EACtB,KAAiE,EACjE,gBAAqG,EACrG,EAAE;QACF,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,oDAAoD,CAAC,CAAC;QACxE,CAAC;QACD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9D,IAAI,kBAAkB,GAAiB,EAAE,CAAC;YAE1C,IAAI,gBAAgB,IAAI,gBAAgB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBACpD,kBAAkB,GAAG,MAAM,OAAO,CAAC,GAAG,CACpC,gBAAgB,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAC3B,MAAM,CAAC,gBAAgB,CAAC;oBACtB,GAAG,GAAG;oBACN,MAAM;oBACN,SAAS,EAAE,OAAO,CAAC,EAAE;iBACtB,CAAC,CACH,CACF,CAAC;YACJ,CAAC;YAED,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC1C,IAAI,kBAAkB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBAClC,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,GAAG,kBAAkB,CAAC,CAAC,CAAC;YAC7D,CAAC;YACD,OAAO,EAAE,OAAO,EAAE,WAAW,EAAE,kBAAkB,EAAE,CAAC;QACtD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,KAAoE,EAAE,EAAE;QACnG,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,uDAAuD,CAAC,CAAC;QAC3E,CAAC;QACD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YACpE,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,OAAO,EAAE,GAAG,IAAI,CAAC,CAAC,CAAC;YAC7C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QACzC,IAAI,gBAAgB,GAAc,EAAE,CAAC;QACrC,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE;YACnB,gBAAgB,GAAG,IAAI,CAAC;YACxB,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACjC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,WAAW,CAAC,gBAAgB,CAAC,CAAC;YAC9B,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC5C,IAAI,mBAAmB,GAAiB,EAAE,CAAC;QAC3C,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE;YACtB,mBAAmB,GAAG,IAAI,CAAC;YAC3B,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACpC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,cAAc,CAAC,mBAAmB,CAAC,CAAC;YACpC,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,WAAW,GAAG,KAAK,EACvB,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACpE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAC1B,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACvE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO;QACL,QAAQ;QACR,WAAW;QACX,OAAO;QACP,qBAAqB;QACrB,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;QACtB,UAAU;QACV,aAAa;QACb,aAAa;QACb,gBAAgB;QAChB,WAAW;QACX,cAAc;KACf,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,eAAe,CAAC,SAA6B;IAC3D,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAA8B,IAAI,CAAC,CAAC;IAC5E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,iBAAiB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC/C,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;YAC3D,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,iBAAiB,EAAE,CAAC;IACtB,CAAC,EAAE,CAAC,iBAAiB,CAAC,CAAC,CAAC;IAExB,OAAO;QACL,QAAQ;QACR,OAAO;QACP,KAAK;QACL,OAAO,EAAE,iBAAiB;KAC3B,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,iBAAiB,CAC/B,SAA6B,EAC7B,iBAAwC,EAAE;IAE1C,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAmB,cAAc,CAAC,KAAK,IAAI,KAAK,CAAC,CAAC;IACpF,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,GAAG,QAAQ,CAAwB,IAAI,CAAC,CAAC;IAClE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,WAAW,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QACzC,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,SAAS,CAAC,IAAI,CAAC,CAAC;YAChB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,SAAS,EAAE;gBACrD,GAAG,cAAc;gBACjB,KAAK;aACN,CAAC,CAAC;YACH,SAAS,CAAC,IAAI,CAAC,CAAC;YAChB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,EAAE,KAAK,EAAE,cAAc,CAAC,WAAW,EAAE,cAAc,CAAC,WAAW,CAAC,CAAC,CAAC;IAEvF,SAAS,CAAC,GAAG,EAAE;QACb,WAAW,EAAE,CAAC;IAChB,CAAC,EAAE,CAAC,WAAW,CAAC,CAAC,CAAC;IAElB,OAAO;QACL,MAAM;QACN,KAAK;QACL,QAAQ;QACR,KAAK,EAAE,MAAM,EAAE,KAAK,IAAI,IAAI;QAC5B,QAAQ,EAAE,MAAM,EAAE,QAAQ,IAAI,IAAI;QAClC,QAAQ,EAAE,MAAM,EAAE,QAAQ,IAAI,IAAI;QAClC,OAAO;QACP,KAAK;QACL,OAAO,EAAE,WAAW;KACrB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,aAAa,CAAC,MAA0B;IACtD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,UAAU,EAAE,aAAa,CAAC,GAAG,QAAQ,CAAwB,IAAI,CAAC,CAAC;IAC1E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,eAAe,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;YAChD,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,eAAe,EAAE,CAAC;IACpB,CAAC,EAAE,CAAC,eAAe,CAAC,CAAC,CAAC;IAEtB,OAAO;QACL,UAAU;QACV,UAAU,EAAE,UAAU,EAAE,UAAU,IAAI,IAAI;QAC1C,QAAQ,EAAE,UAAU,EAAE,QAAQ,IAAI,IAAI;QACtC,QAAQ,EAAE,UAAU,EAAE,QAAQ,IAAI,IAAI;QACtC,OAAO;QACP,KAAK;QACL,OAAO,EAAE,eAAe;KACzB,CAAC;AACJ,CAAC"}
1
+ {"version":3,"file":"hooks.js","sourceRoot":"","sources":["../src/hooks.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,WAAW,EAAE,OAAO,EAAE,MAAM,OAAO,CAAC;AAsBlE,OAAO,EAAE,uBAAuB,EAAE,MAAM,qBAAqB,CAAC;AAC9D,OAAO,EAAE,mBAAmB,EAAE,MAAM,wBAAwB,CAAC;AAC7D,OAAO,EAAE,qBAAqB,EAAE,MAAM,eAAe,CAAC;AAEtD,MAAM,UAAU,YAAY;IAC1B,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,SAAS,EAAE,YAAY,CAAC,GAAG,QAAQ,CAAa,EAAE,CAAC,CAAC;IAC3D,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,cAAc,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC5C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;YACzC,YAAY,CAAC,IAAI,CAAC,CAAC;YACnB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,CAAC;IAEb,SAAS,CAAC,GAAG,EAAE;QACb,cAAc,EAAE,CAAC;IACnB,CAAC,EAAE,CAAC,cAAc,CAAC,CAAC,CAAC;IAErB,MAAM,cAAc,GAAG,KAAK,EAAE,KAAuD,EAAE,EAAE;QACvF,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC;YACnD,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC3C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAAE,EAAU,EAAE,OAA0B,EAAE,EAAE;QACtE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YACzD,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC1C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YAChC,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC1D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,cAAc,EAAE,cAAc,EAAE,cAAc,EAAE,cAAc,EAAE,CAAC;AAChH,CAAC;AAED,MAAM,UAAU,kBAAkB,CAAC,MAAe;IAChD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,kBAAkB,EAAE,qBAAqB,CAAC,GAAG,QAAQ,CAAW,EAAE,CAAC,CAAC;IAC3E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IAC9C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,gBAAgB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC9C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,qBAAqB,CAAC,EAAE,CAAC,CAAC;YAC1B,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,MAAM,CAAC,CAAC;YAC5D,qBAAqB,CAAC,IAAI,CAAC,CAAC;YAC5B,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,gBAAgB,EAAE,CAAC;IACrB,CAAC,EAAE,CAAC,gBAAgB,CAAC,CAAC,CAAC;IAEvB,OAAO,EAAE,kBAAkB,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,gBAAgB,EAAE,CAAC;AAC3E,CAAC;AAED,MAAM,UAAU,WAAW;IACzB,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;YACxC,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,CAAC;IAEb,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,aAAa,GAAG,KAAK,EAAE,KAAsD,EAAE,EAAE;QACrF,MAAM,MAAM,GAAG,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,WAAW,GAAY;YAC3B,GAAG,KAAK;YACR,EAAE,EAAE,MAAM;YACV,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC;QAEF,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,WAAW,CAAC,CAAC,CAAC;QAE9C,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;YAClD,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACxE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC;YAC3D,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,aAAa,EAAE,aAAa,EAAE,CAAC;AAC7E,CAAC;AAED,MAAM,UAAU,QAAQ,CAAC,SAAkB;IACzC,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAS,EAAE,CAAC,CAAC;IAC/C,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,UAAU,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QACxC,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC9C,QAAQ,CAAC,IAAI,CAAC,CAAC;YACf,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,UAAU,EAAE,CAAC;IACf,CAAC,EAAE,CAAC,UAAU,CAAC,CAAC,CAAC;IAEjB,MAAM,UAAU,GAAG,KAAK,EAAE,KAAmD,EAAE,EAAE;QAC/E,MAAM,MAAM,GAAG,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,QAAQ,GAAS;YACrB,GAAG,KAAK;YACR,EAAE,EAAE,MAAM;YACV,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC;QAEF,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,QAAQ,CAAC,CAAC,CAAC;QAExC,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;YAC/C,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC;YACxD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,UAAU,GAAG,KAAK,EAAE,MAAc,EAAE,OAAsB,EAAE,EAAE;QAClE,IAAI,YAA8B,CAAC;QAEnC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;YAChB,YAAY,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;YACjD,IAAI,CAAC,YAAY;gBAAE,OAAO,IAAI,CAAC;YAC/B,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CACpB,CAAC,CAAC,EAAE,KAAK,MAAM;gBACb,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,GAAG,OAAO,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE;gBAC3D,CAAC,CAAC,CAAC,CACN,CAAC;QACJ,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;YACzD,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,YAAY,EAAE,CAAC;gBACjB,MAAM,UAAU,GAAG,YAAY,CAAC;gBAChC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC1E,CAAC;YACD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,MAAc,EAAE,MAAkB,EAAE,EAAE;QACpE,OAAO,UAAU,CAAC,MAAM,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;IACxC,CAAC,CAAC;IAEF,MAAM,UAAU,GAAG,KAAK,EAAE,MAAc,EAAE,EAAE;QAC1C,IAAI,YAA8B,CAAC;QACnC,IAAI,aAAa,GAAG,CAAC,CAAC,CAAC;QAEvB,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;YAChB,aAAa,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;YACvD,IAAI,aAAa,KAAK,CAAC,CAAC,EAAE,CAAC;gBACzB,YAAY,GAAG,IAAI,CAAC,aAAa,CAAC,CAAC;YACrC,CAAC;YACD,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QAC7C,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;QAClC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,YAAY,IAAI,aAAa,KAAK,CAAC,CAAC,EAAE,CAAC;gBACzC,MAAM,WAAW,GAAG,YAAY,CAAC;gBACjC,MAAM,aAAa,GAAG,aAAa,CAAC;gBACpC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;oBAChB,MAAM,QAAQ,GAAG,CAAC,GAAG,IAAI,CAAC,CAAC;oBAC3B,QAAQ,CAAC,MAAM,CAAC,aAAa,EAAE,CAAC,EAAE,WAAW,CAAC,CAAC;oBAC/C,OAAO,QAAQ,CAAC;gBAClB,CAAC,CAAC,CAAC;YACL,CAAC;YACD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,gBAAgB,EAAE,UAAU,EAAE,CAAC;AAC9G,CAAC;AAOD,MAAM,UAAU,SAAS,CAAC,SAAkB,EAAE,OAA0B;IACtE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,gBAAgB,EAAE,UAAU,EAAE,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC;IAE7F,MAAM,OAAO,GAAG,OAAO,CAAyB,GAAG,EAAE;QACnD,IAAI,OAAO,EAAE,OAAO,KAAK,UAAU,EAAE,CAAC;YACpC,MAAM,YAAY,GAAmC;gBACnD,WAAW,EAAE,EAAE;gBACf,WAAW,EAAE,EAAE;gBACf,SAAS,EAAE,EAAE;gBACb,QAAQ,EAAE,EAAE;aACb,CAAC;YACF,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;gBACzB,MAAM,QAAQ,GAAG,IAAI,CAAC,cAAc,IAAI,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,CAAC,CAAC,QAAQ,CAAC;gBAClH,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;oBAC3B,YAAY,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;gBACpC,CAAC;qBAAM,CAAC;oBACN,YAAY,CAAC,WAAW,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;gBACtC,CAAC;YACH,CAAC;YACD,OAAO,YAAY,CAAC;QACtB,CAAC;QAED,MAAM,YAAY,GAA2B,EAAE,CAAC;QAChD,IAAI,OAAO,EAAE,iBAAiB,IAAI,OAAO,CAAC,iBAAiB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YACvE,KAAK,MAAM,GAAG,IAAI,OAAO,CAAC,iBAAiB,EAAE,CAAC;gBAC5C,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,GAAG,EAAE,CAAC;YAC7B,CAAC;QACH,CAAC;aAAM,CAAC;YACN,YAAY,CAAC,OAAO,GAAG,EAAE,CAAC;YAC1B,YAAY,CAAC,IAAI,GAAG,EAAE,CAAC;YACvB,YAAY,CAAC,WAAW,GAAG,EAAE,CAAC;YAC9B,YAAY,CAAC,SAAS,GAAG,EAAE,CAAC;YAC5B,YAAY,CAAC,IAAI,GAAG,EAAE,CAAC;YACvB,YAAY,CAAC,QAAQ,GAAG,EAAE,CAAC;QAC7B,CAAC;QAED,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,IAAI,CAAC,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;gBAC/B,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,GAAG,EAAE,CAAC;YACjC,CAAC;YACD,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvC,CAAC;QAED,OAAO,YAAY,CAAC;IACtB,CAAC,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,iBAAiB,CAAC,CAAC,CAAC;IAE1D,MAAM,QAAQ,GAAG,KAAK,EAAE,MAAc,EAAE,YAAwB,EAAE,EAAE;QAClE,OAAO,gBAAgB,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IAChD,CAAC,CAAC;IAEF,OAAO,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC;AAC3E,CAAC;AAMD,MAAM,UAAU,WAAW,CAAC,MAAc;IACxC,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,WAAW,CAAC,EAAE,CAAC,CAAC;YAChB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;YAC9C,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,UAAU,GAAG,KAAK,EAAE,KAAiE,EAAE,EAAE;QAC7F,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9D,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC1C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,OAAyB,EAAE,EAAE;QACpE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YACxD,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACpE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QACzC,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAC/B,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QACzD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,WAAW,GAAG,KAAK,EACvB,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACpE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAC1B,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACvE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,kCAAkC;IAClC,MAAM,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE;QAC3B,MAAM,GAAG,GAAG,IAAI,GAAG,EAA2B,CAAC;QAC/C,MAAM,KAAK,GAAsB,EAAE,CAAC;QAEpC,4BAA4B;QAC5B,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,CAAC,CAAC;QACvC,CAAC;QAED,uCAAuC;QACvC,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAE,CAAC;YAChC,IAAI,CAAC,CAAC,QAAQ,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,EAAE,CAAC;gBACtC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAE,CAAC,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAC9C,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACvB,CAAC;QACH,CAAC;QAED,OAAO,KAAK,CAAC;IACf,CAAC,EAAE,CAAC,QAAQ,CAAC,CAAC,CAAC;IAEf,OAAO;QACL,QAAQ;QACR,OAAO;QACP,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;QACtB,UAAU;QACV,aAAa;QACb,aAAa;QACb,WAAW;QACX,cAAc;KACf,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,cAAc,CAAC,MAAoE;IACjG,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,WAAW,EAAE,cAAc,CAAC,GAAG,QAAQ,CAAe,EAAE,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,IAAI,EAAE,CAAC,CAAC;IAE/C,MAAM,gBAAgB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC9C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;YACjD,cAAc,CAAC,IAAI,CAAC,CAAC;YACrB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,gBAAgB,EAAE,CAAC;IACrB,CAAC,EAAE,CAAC,gBAAgB,CAAC,CAAC,CAAC;IAEvB,MAAM,gBAAgB,GAAG,KAAK,EAAE,KAAyD,EAAE,EAAE;QAC3F,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,KAAK,CAAC,CAAC;YACrD,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,OAAO,EAAE,GAAG,IAAI,CAAC,CAAC,CAAC;YAC7C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC5C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;YAClC,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC5D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEA,OAAO;QACP,WAAW;QACX,OAAO;QACP,KAAK;QACL,OAAO,EAAE,gBAAgB;QACzB,gBAAgB;QAChB,gBAAgB;KACjB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,eAAe,CAAC,SAAkB;IAChD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,YAAY,EAAE,eAAe,CAAC,GAAG,QAAQ,CAAgB,EAAE,CAAC,CAAC;IACpE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,iBAAiB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC/C,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,eAAe,CAAC,EAAE,CAAC,CAAC;YACpB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;YACrD,eAAe,CAAC,IAAI,CAAC,CAAC;YACtB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,iBAAiB,EAAE,CAAC;IACtB,CAAC,EAAE,CAAC,iBAAiB,CAAC,CAAC,CAAC;IAExB,MAAM,iBAAiB,GAAG,KAAK,EAAE,KAA6B,EAAE,EAAE;QAChE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,KAAK,CAAC,CAAC;YACtD,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC9C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,iBAAiB,GAAG,KAAK,EAAE,EAAU,EAAE,OAA6B,EAAE,EAAE;QAC5E,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YAC5D,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACxE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,iBAAiB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC7C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;YACnC,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC7D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO;QACL,YAAY;QACZ,OAAO;QACP,KAAK;QACL,OAAO,EAAE,iBAAiB;QAC1B,iBAAiB;QACjB,iBAAiB;QACjB,iBAAiB;KAClB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,qBAAqB,CAAC,aAAsB;IAC1D,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAA4B,IAAI,CAAC,CAAC;IACxE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,YAAY,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC1C,IAAI,CAAC,aAAa,EAAE,CAAC;YACnB,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,aAAa,CAAC,CAAC;YAC/D,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,aAAa,CAAC,CAAC,CAAC;IAE5B,SAAS,CAAC,GAAG,EAAE;QACb,YAAY,EAAE,CAAC;IACjB,CAAC,EAAE,CAAC,YAAY,CAAC,CAAC,CAAC;IAEnB,OAAO;QACL,OAAO;QACP,OAAO;QACP,KAAK;QACL,OAAO,EAAE,YAAY;KACtB,CAAC;AACJ,CAAC;AASD,MAAM,UAAU,SAAS,CAAC,UAA4B,EAAE;IACtD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,EAAE,SAAS,EAAE,KAAK,EAAE,OAAO,GAAG,IAAI,EAAE,cAAc,EAAE,GAAG,OAAO,CAAC;IACrE,MAAM,CAAC,UAAU,EAAE,aAAa,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IACpD,MAAM,CAAC,eAAe,EAAE,kBAAkB,CAAC,GAAG,QAAQ,CAAW,EAAE,CAAC,CAAC;IACrE,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,SAAS,CAAC,GAAG,EAAE;QACb,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,aAAa,CAAC,KAAK,CAAC,CAAC;YACrB,kBAAkB,CAAC,EAAE,CAAC,CAAC;YACvB,OAAO;QACT,CAAC;QAED,IAAI,CAAC;YACH,MAAM,MAAM,GAAG,mBAAmB,CAAC;gBACjC,MAAM;gBACN,SAAS;gBACT,KAAK;gBACL,cAAc;aACf,CAAC,CAAC;YAEH,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,kBAAkB,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC;YACnE,QAAQ,CAAC,IAAI,CAAC,CAAC;YAEf,OAAO,GAAG,EAAE;gBACV,MAAM,CAAC,UAAU,EAAE,CAAC;gBACpB,aAAa,CAAC,KAAK,CAAC,CAAC;gBACrB,kBAAkB,CAAC,EAAE,CAAC,CAAC;YACzB,CAAC,CAAC;QACJ,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9D,aAAa,CAAC,KAAK,CAAC,CAAC;QACvB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,cAAc,CAAC,CAAC,CAAC;IAExD,OAAO;QACL,UAAU;QACV,KAAK,EAAE,eAAe;QACtB,KAAK;KACN,CAAC;AACJ,CAAC;AAOD,MAAM,UAAU,eAAe,CAAC,MAAe;IAC7C,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,WAAW,EAAE,cAAc,CAAC,GAAG,QAAQ,CAAe,EAAE,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IAC9C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,WAAW,CAAC,EAAE,CAAC,CAAC;YAChB,cAAc,CAAC,EAAE,CAAC,CAAC;YACnB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,CAAC,eAAe,EAAE,kBAAkB,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;gBAC9D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC;gBAC1B,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC;aAClC,CAAC,CAAC;YACH,WAAW,CAAC,eAAe,CAAC,CAAC;YAC7B,cAAc,CAAC,kBAAkB,CAAC,CAAC;YACnC,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,OAAO,GAAG,OAAO,CAAmC,GAAG,EAAE;QAC7D,MAAM,GAAG,GAAG,IAAI,GAAG,EAA0C,CAAC;QAC9D,MAAM,KAAK,GAAqC,EAAE,CAAC;QAEnD,MAAM,oBAAoB,GAAG,IAAI,GAAG,EAAwB,CAAC;QAC7D,KAAK,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC;YAC5B,IAAI,CAAC,CAAC,SAAS,EAAE,CAAC;gBAChB,IAAI,CAAC,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC;oBAC3C,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACjD,CAAC;QACH,CAAC;QAED,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE;gBACZ,GAAG,CAAC;gBACJ,WAAW,EAAE,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,IAAI,EAAE;gBACjD,OAAO,EAAE,EAAE;aACZ,CAAC,CAAC;QACL,CAAC;QAED,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAE,CAAC;YAChC,IAAI,CAAC,CAAC,QAAQ,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,EAAE,CAAC;gBACtC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAE,CAAC,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAC9C,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACvB,CAAC;QACH,CAAC;QAED,OAAO,KAAK,CAAC;IACf,CAAC,EAAE,CAAC,QAAQ,EAAE,WAAW,CAAC,CAAC,CAAC;IAE5B,MAAM,qBAAqB,GAAG,OAAO,CAAe,GAAG,EAAE;QACvD,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;IACjD,CAAC,EAAE,CAAC,WAAW,CAAC,CAAC,CAAC;IAElB,MAAM,UAAU,GAAG,KAAK,EACtB,KAAiE,EACjE,gBAAqG,EACrG,EAAE;QACF,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,oDAAoD,CAAC,CAAC;QACxE,CAAC;QACD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9D,IAAI,kBAAkB,GAAiB,EAAE,CAAC;YAE1C,IAAI,gBAAgB,IAAI,gBAAgB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBACpD,kBAAkB,GAAG,MAAM,OAAO,CAAC,GAAG,CACpC,gBAAgB,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAC3B,MAAM,CAAC,gBAAgB,CAAC;oBACtB,GAAG,GAAG;oBACN,MAAM;oBACN,SAAS,EAAE,OAAO,CAAC,EAAE;iBACtB,CAAC,CACH,CACF,CAAC;YACJ,CAAC;YAED,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC1C,IAAI,kBAAkB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBAClC,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,GAAG,kBAAkB,CAAC,CAAC,CAAC;YAC7D,CAAC;YACD,OAAO,EAAE,OAAO,EAAE,WAAW,EAAE,kBAAkB,EAAE,CAAC;QACtD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,KAAoE,EAAE,EAAE;QACnG,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,uDAAuD,CAAC,CAAC;QAC3E,CAAC;QACD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YACpE,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,OAAO,EAAE,GAAG,IAAI,CAAC,CAAC,CAAC;YAC7C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QACzC,IAAI,gBAAgB,GAAc,EAAE,CAAC;QACrC,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE;YACnB,gBAAgB,GAAG,IAAI,CAAC;YACxB,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACjC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,WAAW,CAAC,gBAAgB,CAAC,CAAC;YAC9B,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC5C,IAAI,mBAAmB,GAAiB,EAAE,CAAC;QAC3C,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE;YACtB,mBAAmB,GAAG,IAAI,CAAC;YAC3B,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACpC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,cAAc,CAAC,mBAAmB,CAAC,CAAC;YACpC,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,WAAW,GAAG,KAAK,EACvB,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACpE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAC1B,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACvE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO;QACL,QAAQ;QACR,WAAW;QACX,OAAO;QACP,qBAAqB;QACrB,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;QACtB,UAAU;QACV,aAAa;QACb,aAAa;QACb,gBAAgB;QAChB,WAAW;QACX,cAAc;KACf,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,eAAe,CAAC,SAA6B;IAC3D,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAA8B,IAAI,CAAC,CAAC;IAC5E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,iBAAiB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC/C,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;YAC3D,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,iBAAiB,EAAE,CAAC;IACtB,CAAC,EAAE,CAAC,iBAAiB,CAAC,CAAC,CAAC;IAExB,OAAO;QACL,QAAQ;QACR,OAAO;QACP,KAAK;QACL,OAAO,EAAE,iBAAiB;KAC3B,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,iBAAiB,CAC/B,SAA6B,EAC7B,iBAAwC,EAAE;IAE1C,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAmB,cAAc,CAAC,KAAK,IAAI,KAAK,CAAC,CAAC;IACpF,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,GAAG,QAAQ,CAAwB,IAAI,CAAC,CAAC;IAClE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,WAAW,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QACzC,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,SAAS,CAAC,IAAI,CAAC,CAAC;YAChB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,SAAS,EAAE;gBACrD,GAAG,cAAc;gBACjB,KAAK;aACN,CAAC,CAAC;YACH,SAAS,CAAC,IAAI,CAAC,CAAC;YAChB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,EAAE,KAAK,EAAE,cAAc,CAAC,WAAW,EAAE,cAAc,CAAC,WAAW,CAAC,CAAC,CAAC;IAEvF,SAAS,CAAC,GAAG,EAAE;QACb,WAAW,EAAE,CAAC;IAChB,CAAC,EAAE,CAAC,WAAW,CAAC,CAAC,CAAC;IAElB,OAAO;QACL,MAAM;QACN,KAAK;QACL,QAAQ;QACR,KAAK,EAAE,MAAM,EAAE,KAAK,IAAI,IAAI;QAC5B,QAAQ,EAAE,MAAM,EAAE,QAAQ,IAAI,IAAI;QAClC,QAAQ,EAAE,MAAM,EAAE,QAAQ,IAAI,IAAI;QAClC,OAAO;QACP,KAAK;QACL,OAAO,EAAE,WAAW;KACrB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,aAAa,CAAC,MAA0B;IACtD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,UAAU,EAAE,aAAa,CAAC,GAAG,QAAQ,CAAwB,IAAI,CAAC,CAAC;IAC1E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,eAAe,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;YAChD,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,eAAe,EAAE,CAAC;IACpB,CAAC,EAAE,CAAC,eAAe,CAAC,CAAC,CAAC;IAEtB,OAAO;QACL,UAAU;QACV,UAAU,EAAE,UAAU,EAAE,UAAU,IAAI,IAAI;QAC1C,QAAQ,EAAE,UAAU,EAAE,QAAQ,IAAI,IAAI;QACtC,QAAQ,EAAE,UAAU,EAAE,QAAQ,IAAI,IAAI;QACtC,OAAO,EAAE,UAAU,EAAE,OAAO,IAAI,IAAI;QACpC,OAAO;QACP,KAAK;QACL,OAAO,EAAE,eAAe;KACzB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,cAAc,CAAC,MAA0B;IACvD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAqB,IAAI,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAA6B,IAAI,CAAC,CAAC;IACzE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,YAAY,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC1C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;gBAC/B,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC;gBAC7B,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC;aACtC,CAAC,CAAC;YACH,UAAU,CAAC,CAAC,CAAC,CAAC;YACd,UAAU,CAAC,CAAC,CAAC,CAAC;YACd,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,YAAY,EAAE,CAAC;IACjB,CAAC,EAAE,CAAC,YAAY,CAAC,CAAC,CAAC;IAEnB,OAAO;QACL,OAAO;QACP,OAAO;QACP,eAAe,EAAE,OAAO,EAAE,eAAe,IAAI,IAAI;QACjD,YAAY,EAAE,OAAO,EAAE,YAAY,IAAI,IAAI;QAC3C,QAAQ,EAAE,OAAO,EAAE,QAAQ,IAAI,IAAI;QACnC,GAAG,EAAE,OAAO,EAAE,GAAG,IAAI,IAAI;QACzB,YAAY,EAAE,OAAO,EAAE,YAAY,IAAI,IAAI;QAC3C,OAAO;QACP,KAAK;QACL,OAAO,EAAE,YAAY;KACtB,CAAC;AACJ,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/react",
3
- "version": "0.9.0",
3
+ "version": "0.10.0",
4
4
  "description": "React Context Provider and Hooks for Critical Path headless project management framework",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -18,9 +18,9 @@
18
18
  }
19
19
  },
20
20
  "dependencies": {
21
- "@critical-path/client": "0.10.0",
22
- "@critical-path/mcp": "0.3.0",
23
- "@critical-path/core": "0.16.0"
21
+ "@critical-path/core": "0.17.0",
22
+ "@critical-path/mcp": "0.4.0",
23
+ "@critical-path/client": "0.11.0"
24
24
  },
25
25
  "peerDependencies": {
26
26
  "react": "^18.0.0 || ^19.0.0"
package/src/hooks.ts CHANGED
@@ -16,7 +16,9 @@ import type {
16
16
  TimelineLadder,
17
17
  TimelineLadderOptions,
18
18
  TaskLadderView,
19
- AbstractionLevel
19
+ AbstractionLevel,
20
+ TaskMetrics,
21
+ TaskProgressHistory
20
22
  } from '@critical-path/core';
21
23
  import { resolveStatusDefinition } from '@critical-path/core';
22
24
  import { registerWebMcpTools } from '@critical-path/mcp/web';
@@ -1031,11 +1033,60 @@ export function useTaskLadder(taskId: string | undefined) {
1031
1033
  macroPhase: taskLadder?.macroPhase ?? null,
1032
1034
  standard: taskLadder?.standard ?? null,
1033
1035
  concrete: taskLadder?.concrete ?? null,
1036
+ metrics: taskLadder?.metrics ?? null,
1034
1037
  loading,
1035
1038
  error,
1036
1039
  refresh: fetchTaskLadder
1037
1040
  };
1038
1041
  }
1039
1042
 
1043
+ export function useTaskMetrics(taskId: string | undefined) {
1044
+ const client = useCriticalPathClient();
1045
+ const [metrics, setMetrics] = useState<TaskMetrics | null>(null);
1046
+ const [history, setHistory] = useState<TaskProgressHistory | null>(null);
1047
+ const [loading, setLoading] = useState(true);
1048
+ const [error, setError] = useState<Error | null>(null);
1049
+
1050
+ const fetchMetrics = useCallback(async () => {
1051
+ if (!taskId) {
1052
+ setMetrics(null);
1053
+ setHistory(null);
1054
+ setLoading(false);
1055
+ return;
1056
+ }
1057
+ try {
1058
+ setLoading(true);
1059
+ const [m, h] = await Promise.all([
1060
+ client.getTaskMetrics(taskId),
1061
+ client.getTaskProgressHistory(taskId)
1062
+ ]);
1063
+ setMetrics(m);
1064
+ setHistory(h);
1065
+ setError(null);
1066
+ } catch (err) {
1067
+ setError(err instanceof Error ? err : new Error(String(err)));
1068
+ } finally {
1069
+ setLoading(false);
1070
+ }
1071
+ }, [client, taskId]);
1072
+
1073
+ useEffect(() => {
1074
+ fetchMetrics();
1075
+ }, [fetchMetrics]);
1076
+
1077
+ return {
1078
+ metrics,
1079
+ history,
1080
+ inferredActuals: metrics?.inferredActuals ?? null,
1081
+ realityDelta: metrics?.realityDelta ?? null,
1082
+ progress: metrics?.progress ?? null,
1083
+ evm: metrics?.evm ?? null,
1084
+ curveProfile: history?.curveProfile ?? null,
1085
+ loading,
1086
+ error,
1087
+ refresh: fetchMetrics
1088
+ };
1089
+ }
1090
+
1040
1091
 
1041
1092