@critical-path/react 0.12.2 → 0.13.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,50 @@
1
1
  # @critical-path/react
2
2
 
3
+ ## 0.13.0
4
+
5
+ ### Minor Changes
6
+
7
+ - fd79762: **BREAKING:** strict request bodies, no identity in payloads, and CORS off by default.
8
+
9
+ **@critical-path/core**
10
+ - Request schemas are strict: unknown keys, server-assigned fields and identity fields are rejected instead of stripped.
11
+ - Identity is never read from payloads. `updateTask` no longer reads `actorId`/`actorName`/`actorType`/`actor` from the update object; pass them as the third `options` argument or use `withActor`. `addComment`, `addCommentReaction`, `removeCommentReaction` and `createAttachment` take the actor from `withActor`, falling back to an optional `authorId`/`userId`/`uploaderId`, then `'system'`.
12
+ - Schemas export request body types (`CreateTaskBody`, `UpdateTaskBody`, ...).
13
+
14
+ **@critical-path/server**
15
+ - Bodies containing unknown, server-assigned or identity fields return `400`.
16
+ - Every request runs as the `getContext` user, or `ANONYMOUS_ACTOR` (`anonymous`). Authors of comments, reactions, attachments and time entries are no longer accepted from bodies.
17
+ - `DELETE /comments/:id/reactions` takes `?emoji=` only.
18
+ - CORS is off by default (`cors: false`). Pass `cors: { origins: [...] }` to allow cross-origin browsers.
19
+
20
+ **@critical-path/client**
21
+ - Method parameters use the server's body types, so identity fields no longer type-check. `addCommentReaction`/`removeCommentReaction` take `{ emoji }`; `addTodo`/`toggleTodo` drop the actor options argument.
22
+ - New `updateProject`, `deleteProject` and `addDependency`. `uploadAttachmentFile` base64-encodes binary data (previously it sent unusable JSON for `Uint8Array`/`ArrayBuffer`).
23
+ - CLI: `--author`, `--actor-id`, `--actor-name`, `--agent-name` and `CRITICAL_PATH_AUTHOR_ID`/`ACTOR_ID`/`AGENT_NAME` are removed; identity comes from the `--key` token via the server's `getContext`.
24
+
25
+ **@critical-path/mcp**
26
+ - Tool arguments are strict: undeclared arguments return an `isError` result.
27
+ - `add_comment` no longer takes `authorId`. With an `engine`, writes are attributed to the new `actor` server option (default `DEFAULT_MCP_ACTOR`).
28
+
29
+ **@critical-path/react / @critical-path/svelte**
30
+ - `addReaction`/`removeReaction` take `(commentId, emoji)`; comment and attachment inputs no longer accept `authorId`/`uploaderId`. Task, comment and deliverable update parameters use the schema body types.
31
+
32
+ ### Patch Changes
33
+
34
+ - Updated dependencies [fd79762]
35
+ - @critical-path/core@0.25.0
36
+ - @critical-path/client@0.15.0
37
+ - @critical-path/mcp@0.10.0
38
+
39
+ ## 0.12.3
40
+
41
+ ### Patch Changes
42
+
43
+ - Updated dependencies [b54e22c]
44
+ - @critical-path/core@0.24.0
45
+ - @critical-path/mcp@0.9.0
46
+ - @critical-path/client@0.14.9
47
+
3
48
  ## 0.12.2
4
49
 
5
50
  ### Patch Changes
package/README.md CHANGED
@@ -76,8 +76,8 @@ export function TaskDiscussion({ taskId }: { taskId: string }) {
76
76
  <div key={comment.id} className="comment">
77
77
  <p>{comment.content}</p>
78
78
  <div className="reactions flex gap-2">
79
- <button onClick={() => addReaction(comment.id, '👍', 'user_1')}>👍</button>
80
- <button onClick={() => addReaction(comment.id, '🚀', 'user_1')}>🚀</button>
79
+ <button onClick={() => addReaction(comment.id, '👍')}>👍</button>
80
+ <button onClick={() => addReaction(comment.id, '🚀')}>🚀</button>
81
81
  <span>{comment.reactions?.length || 0} reactions</span>
82
82
  </div>
83
83
  </div>
package/dist/hooks.d.ts CHANGED
@@ -1,3 +1,4 @@
1
+ import type { CreateAttachmentBody, CreateCommentBody, CreateTaskBody, UpdateCommentBody, UpdateDeliverableBody, UpdateTaskBody } from '@critical-path/core/schemas';
1
2
  import type { Project, Task, TaskStatus, Workflow, Comment, Attachment, Deliverable, DeliverableSummary, CreateDeliverableInput, StatusDefinition, CriticalPathAnalysis, TimelineLadder, TimelineLadderOptions, TaskLadderView, AbstractionLevel, TaskMetrics, TaskProgressHistory, WorkloadDistribution, WorkloadDistributionOptions, WorkloadInterval, WorkloadGroupBy, WorkloadMetric } from '@critical-path/core';
2
3
  export declare function useWorkflows(): {
3
4
  workflows: Workflow[];
@@ -26,8 +27,8 @@ export declare function useTasks(projectId?: string): {
26
27
  loading: boolean;
27
28
  error: Error | null;
28
29
  refresh: () => Promise<void>;
29
- createTask: (input: Omit<Task, "id" | "createdAt" | "updatedAt">) => Promise<Task>;
30
- updateTask: (taskId: string, updates: Partial<Task>) => Promise<Task>;
30
+ createTask: (input: CreateTaskBody) => Promise<Task>;
31
+ updateTask: (taskId: string, updates: UpdateTaskBody) => Promise<Task>;
31
32
  updateTaskStatus: (taskId: string, status: TaskStatus) => Promise<Task>;
32
33
  deleteTask: (taskId: string) => Promise<void>;
33
34
  };
@@ -42,7 +43,7 @@ export declare function useKanban(projectId?: string, options?: UseKanbanOptions
42
43
  error: Error | null;
43
44
  refresh: () => Promise<void>;
44
45
  moveTask: (taskId: string, targetStatus: TaskStatus) => Promise<Task>;
45
- createTask: (input: Omit<Task, "id" | "createdAt" | "updatedAt">) => Promise<Task>;
46
+ createTask: (input: CreateTaskBody) => Promise<Task>;
46
47
  };
47
48
  export interface ThreadedComment extends Comment {
48
49
  replies: ThreadedComment[];
@@ -53,17 +54,11 @@ export declare function useComments(taskId: string): {
53
54
  loading: boolean;
54
55
  error: Error | null;
55
56
  refresh: () => Promise<void>;
56
- addComment: (input: Omit<Comment, "id" | "taskId" | "createdAt" | "updatedAt">) => Promise<Comment>;
57
- updateComment: (id: string, updates: Partial<Comment>) => Promise<Comment>;
57
+ addComment: (input: Omit<CreateCommentBody, "taskId">) => Promise<Comment>;
58
+ updateComment: (id: string, updates: UpdateCommentBody) => Promise<Comment>;
58
59
  deleteComment: (id: string) => Promise<void>;
59
- addReaction: (commentId: string, reactionOrEmoji: {
60
- emoji: string;
61
- userId: string;
62
- } | string, maybeUserId?: string) => Promise<Comment>;
63
- removeReaction: (commentId: string, reactionOrEmoji: {
64
- emoji: string;
65
- userId: string;
66
- } | string, maybeUserId?: string) => Promise<Comment>;
60
+ addReaction: (commentId: string, emoji: string) => Promise<Comment>;
61
+ removeReaction: (commentId: string, emoji: string) => Promise<Comment>;
67
62
  };
68
63
  export declare function useAttachments(filter?: {
69
64
  taskId?: string;
@@ -83,7 +78,7 @@ export declare function useDeliverables(projectId?: string): {
83
78
  error: Error | null;
84
79
  refresh: () => Promise<void>;
85
80
  createDeliverable: (input: CreateDeliverableInput) => Promise<Deliverable>;
86
- updateDeliverable: (id: string, updates: Partial<Deliverable>) => Promise<Deliverable>;
81
+ updateDeliverable: (id: string, updates: UpdateDeliverableBody) => Promise<Deliverable>;
87
82
  deleteDeliverable: (id: string) => Promise<void>;
88
83
  };
89
84
  export declare function useDeliverableSummary(deliverableId?: string): {
@@ -115,21 +110,15 @@ export declare function useTaskActivity(taskId?: string): {
115
110
  loading: boolean;
116
111
  error: Error | null;
117
112
  refresh: () => Promise<void>;
118
- addComment: (input: Omit<Comment, "id" | "taskId" | "createdAt" | "updatedAt">, attachmentInputs?: Array<Omit<Attachment, "id" | "taskId" | "commentId" | "createdAt" | "updatedAt">>) => Promise<{
113
+ addComment: (input: Omit<CreateCommentBody, "taskId">, attachmentInputs?: Array<Omit<CreateAttachmentBody, "taskId" | "commentId">>) => Promise<{
119
114
  comment: Comment;
120
115
  attachments: Attachment[];
121
116
  }>;
122
117
  addAttachment: (input: Omit<Attachment, "id" | "taskId" | "createdAt" | "updatedAt">) => Promise<Attachment>;
123
118
  deleteComment: (id: string) => Promise<void>;
124
119
  deleteAttachment: (id: string) => Promise<void>;
125
- addReaction: (commentId: string, reactionOrEmoji: {
126
- emoji: string;
127
- userId: string;
128
- } | string, maybeUserId?: string) => Promise<Comment>;
129
- removeReaction: (commentId: string, reactionOrEmoji: {
130
- emoji: string;
131
- userId: string;
132
- } | string, maybeUserId?: string) => Promise<Comment>;
120
+ addReaction: (commentId: string, emoji: string) => Promise<Comment>;
121
+ removeReaction: (commentId: string, emoji: string) => Promise<Comment>;
133
122
  };
134
123
  export declare function useCriticalPath(projectId: string | undefined): {
135
124
  analysis: CriticalPathAnalysis | null;
@@ -1 +1 @@
1
- {"version":3,"file":"hooks.d.ts","sourceRoot":"","sources":["../src/hooks.ts"],"names":[],"mappings":"AACA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,UAAU,EACV,QAAQ,EACR,OAAO,EAEP,UAAU,EACV,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,gBAAgB,EAEhB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,gBAAgB,EAChB,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAK7B,wBAAgB,YAAY;;;;;4BAuBW,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;yBAYnD,MAAM,WAAW,OAAO,CAAC,QAAQ,CAAC;yBAYlC,MAAM;EAYzC;AAED,wBAAgB,kBAAkB,CAAC,MAAM,CAAC,EAAE,MAAM;;;;;EA4BjD;AAED,wBAAgB,WAAW;;;;;2BAuBW,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;EAyBpF;AAED,wBAAgB,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM;;;;;wBA0BR,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;yBA8B3C,MAAM,WAAW,OAAO,CAAC,IAAI,CAAC;+BAqExB,MAAM,UAAU,UAAU;yBAIhC,MAAM;EAmDzC;AAED,MAAM,WAAW,gBAAgB;IAC/B,OAAO,CAAC,EAAE,UAAU,GAAG,UAAU,CAAC;IAClC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;CACxC;AAED,wBAAgB,SAAS,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,gBAAgB;;;;;;uBA8CtC,MAAM,gBAAgB,UAAU;wBA/M/B,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;EAoN9E;AAED,MAAM,WAAW,eAAgB,SAAQ,OAAO;IAC9C,OAAO,EAAE,eAAe,EAAE,CAAC;CAC5B;AAED,wBAAgB,WAAW,CAAC,MAAM,EAAE,MAAM;;;;;;wBA4BP,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC;wBAY1D,MAAM,WAAW,OAAO,CAAC,OAAO,CAAC;wBAYjC,MAAM;6BAY1B,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;gCAkBT,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;EAoDvB;AAED,wBAAgB,cAAc,CAAC,MAAM,CAAC,EAAE;IAAE,MAAM,CAAC,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE;;;;;8BAyB1D,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;2BAYrD,MAAM;EAmB3C;AAED,wBAAgB,eAAe,CAAC,SAAS,CAAC,EAAE,MAAM;;;;;+BA4BR,sBAAsB;4BAYzB,MAAM,WAAW,OAAO,CAAC,WAAW,CAAC;4BAYrC,MAAM;EAoB5C;AAED,wBAAgB,qBAAqB,CAAC,aAAa,CAAC,EAAE,MAAM;;;;;EAkC3D;AAED,MAAM,WAAW,gBAAgB;IAC/B,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,cAAc,CAAC,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,MAAM,EAAE,GAAG,KAAK,IAAI,CAAC;CACtE;AAED,wBAAgB,SAAS,CAAC,OAAO,GAAE,gBAAqB;;;;EA0CvD;AAED,MAAM,WAAW,8BAA+B,SAAQ,OAAO;IAC7D,WAAW,EAAE,UAAU,EAAE,CAAC;IAC1B,OAAO,EAAE,8BAA8B,EAAE,CAAC;CAC3C;AAED,wBAAgB,eAAe,CAAC,MAAM,CAAC,EAAE,MAAM;;;;;;;;wBAyEpC,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC,qBAC9C,KAAK,CAAC,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;;;;2BAiCnE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC;wBAehE,MAAM;2BAiBH,MAAM;6BAkB7B,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;gCAkBT,MAAM,mBACA;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,MAAM,gBAC7C,MAAM;EAgCvB;AAED,wBAAgB,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,SAAS;;;;;EAkC5D;AAED,wBAAgB,iBAAiB,CAC/B,SAAS,EAAE,MAAM,GAAG,SAAS,EAC7B,cAAc,GAAE,qBAA0B;;;;;;;;;;;;;;;EA4C3C;AAED,wBAAgB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,SAAS;;;;;;;;;EAsCvD;AAED,wBAAgB,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,SAAS;;;;;;;;;;;EA8CxD;AAED,wBAAgB,uBAAuB,CACrC,SAAS,CAAC,EAAE,MAAM,EAClB,cAAc,GAAE,2BAAgC;;;;;;;;;;;;;;;;;EA2DjD"}
1
+ {"version":3,"file":"hooks.d.ts","sourceRoot":"","sources":["../src/hooks.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EAAE,oBAAoB,EAAE,iBAAiB,EAAE,cAAc,EAAE,iBAAiB,EAAE,qBAAqB,EAAE,cAAc,EAAE,MAAM,6BAA6B,CAAC;AAErK,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,UAAU,EACV,QAAQ,EACR,OAAO,EAEP,UAAU,EACV,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,gBAAgB,EAEhB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,gBAAgB,EAChB,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAK7B,wBAAgB,YAAY;;;;;4BAuBW,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;yBAYnD,MAAM,WAAW,OAAO,CAAC,QAAQ,CAAC;yBAYlC,MAAM;EAYzC;AAED,wBAAgB,kBAAkB,CAAC,MAAM,CAAC,EAAE,MAAM;;;;;EA4BjD;AAED,wBAAgB,WAAW;;;;;2BAuBW,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;EAyBpF;AAED,wBAAgB,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM;;;;;wBA0BR,cAAc;yBAiCb,MAAM,WAAW,cAAc;+BAqEzB,MAAM,UAAU,UAAU;yBAIhC,MAAM;EAmDzC;AAED,MAAM,WAAW,gBAAgB;IAC/B,OAAO,CAAC,EAAE,UAAU,GAAG,UAAU,CAAC;IAClC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;CACxC;AAED,wBAAgB,SAAS,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,gBAAgB;;;;;;uBA8CtC,MAAM,gBAAgB,UAAU;wBAlN/B,cAAc;EAuNhD;AAED,MAAM,WAAW,eAAgB,SAAQ,OAAO;IAC9C,OAAO,EAAE,eAAe,EAAE,CAAC;CAC5B;AAED,wBAAgB,WAAW,CAAC,MAAM,EAAE,MAAM;;;;;;wBA4BP,IAAI,CAAC,iBAAiB,EAAE,QAAQ,CAAC;wBAYjC,MAAM,WAAW,iBAAiB;wBAYlC,MAAM;6BAY1B,MAAM,SACV,MAAM;gCAeF,MAAM,SACV,MAAM;EAiDhB;AAED,wBAAgB,cAAc,CAAC,MAAM,CAAC,EAAE;IAAE,MAAM,CAAC,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAC;IAAC,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE;;;;;8BAyB1D,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC;2BAYrD,MAAM;EAmB3C;AAED,wBAAgB,eAAe,CAAC,SAAS,CAAC,EAAE,MAAM;;;;;+BA4BR,sBAAsB;4BAYzB,MAAM,WAAW,qBAAqB;4BAYtC,MAAM;EAoB5C;AAED,wBAAgB,qBAAqB,CAAC,aAAa,CAAC,EAAE,MAAM;;;;;EAkC3D;AAED,MAAM,WAAW,gBAAgB;IAC/B,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,cAAc,CAAC,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE,MAAM,EAAE,GAAG,KAAK,IAAI,CAAC;CACtE;AAED,wBAAgB,SAAS,CAAC,OAAO,GAAE,gBAAqB;;;;EA0CvD;AAED,MAAM,WAAW,8BAA+B,SAAQ,OAAO;IAC7D,WAAW,EAAE,UAAU,EAAE,CAAC;IAC1B,OAAO,EAAE,8BAA8B,EAAE,CAAC;CAC3C;AAED,wBAAgB,eAAe,CAAC,MAAM,CAAC,EAAE,MAAM;;;;;;;;wBAyEpC,IAAI,CAAC,iBAAiB,EAAE,QAAQ,CAAC,qBACrB,KAAK,CAAC,IAAI,CAAC,oBAAoB,EAAE,QAAQ,GAAG,WAAW,CAAC,CAAC;;;;2BAiC1C,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,QAAQ,GAAG,WAAW,GAAG,WAAW,CAAC;wBAehE,MAAM;2BAiBH,MAAM;6BAkB7B,MAAM,SACV,MAAM;gCAeF,MAAM,SACV,MAAM;EA6BhB;AAED,wBAAgB,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,SAAS;;;;;EAkC5D;AAED,wBAAgB,iBAAiB,CAC/B,SAAS,EAAE,MAAM,GAAG,SAAS,EAC7B,cAAc,GAAE,qBAA0B;;;;;;;;;;;;;;;EA4C3C;AAED,wBAAgB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,SAAS;;;;;;;;;EAsCvD;AAED,wBAAgB,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,SAAS;;;;;;;;;;;EA8CxD;AAED,wBAAgB,uBAAuB,CACrC,SAAS,CAAC,EAAE,MAAM,EAClB,cAAc,GAAE,2BAAgC;;;;;;;;;;;;;;;;;EA2DjD"}
package/dist/hooks.js CHANGED
@@ -164,6 +164,9 @@ export function useTasks(projectId) {
164
164
  const now = new Date().toISOString();
165
165
  const tempTask = {
166
166
  ...input,
167
+ // Placeholders until the server responds with the workflow's real defaults
168
+ status: input.status ?? 'todo',
169
+ priority: input.priority ?? 'medium',
167
170
  id: tempId,
168
171
  createdAt: now,
169
172
  updatedAt: now
@@ -407,11 +410,9 @@ export function useComments(taskId) {
407
410
  throw errorObj;
408
411
  }
409
412
  };
410
- const addReaction = async (commentId, reactionOrEmoji, maybeUserId) => {
413
+ const addReaction = async (commentId, emoji) => {
411
414
  try {
412
- const payload = typeof reactionOrEmoji === 'string'
413
- ? { emoji: reactionOrEmoji, userId: maybeUserId }
414
- : reactionOrEmoji;
415
+ const payload = { emoji };
415
416
  const updated = await client.addCommentReaction(commentId, payload);
416
417
  setComments((prev) => prev.map((c) => (c.id === commentId ? updated : c)));
417
418
  return updated;
@@ -422,11 +423,9 @@ export function useComments(taskId) {
422
423
  throw errorObj;
423
424
  }
424
425
  };
425
- const removeReaction = async (commentId, reactionOrEmoji, maybeUserId) => {
426
+ const removeReaction = async (commentId, emoji) => {
426
427
  try {
427
- const payload = typeof reactionOrEmoji === 'string'
428
- ? { emoji: reactionOrEmoji, userId: maybeUserId }
429
- : reactionOrEmoji;
428
+ const payload = { emoji };
430
429
  const updated = await client.removeCommentReaction(commentId, payload);
431
430
  setComments((prev) => prev.map((c) => (c.id === commentId ? updated : c)));
432
431
  return updated;
@@ -809,11 +808,9 @@ export function useTaskActivity(taskId) {
809
808
  throw errorObj;
810
809
  }
811
810
  };
812
- const addReaction = async (commentId, reactionOrEmoji, maybeUserId) => {
811
+ const addReaction = async (commentId, emoji) => {
813
812
  try {
814
- const payload = typeof reactionOrEmoji === 'string'
815
- ? { emoji: reactionOrEmoji, userId: maybeUserId }
816
- : reactionOrEmoji;
813
+ const payload = { emoji };
817
814
  const updated = await client.addCommentReaction(commentId, payload);
818
815
  setComments((prev) => prev.map((c) => (c.id === commentId ? updated : c)));
819
816
  return updated;
@@ -824,11 +821,9 @@ export function useTaskActivity(taskId) {
824
821
  throw errorObj;
825
822
  }
826
823
  };
827
- const removeReaction = async (commentId, reactionOrEmoji, maybeUserId) => {
824
+ const removeReaction = async (commentId, emoji) => {
828
825
  try {
829
- const payload = typeof reactionOrEmoji === 'string'
830
- ? { emoji: reactionOrEmoji, userId: maybeUserId }
831
- : reactionOrEmoji;
826
+ const payload = { emoji };
832
827
  const updated = await client.removeCommentReaction(commentId, payload);
833
828
  setComments((prev) => prev.map((c) => (c.id === commentId ? updated : c)));
834
829
  return updated;
package/dist/hooks.js.map CHANGED
@@ -1 +1 @@
1
- {"version":3,"file":"hooks.js","sourceRoot":"","sources":["../src/hooks.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,WAAW,EAAE,OAAO,EAAE,MAAM,EAAE,MAAM,OAAO,CAAC;AA2B1E,OAAO,EAAE,uBAAuB,EAAE,YAAY,EAAE,MAAM,qBAAqB,CAAC;AAC5E,OAAO,EAAE,mBAAmB,EAAE,MAAM,wBAAwB,CAAC;AAC7D,OAAO,EAAE,qBAAqB,EAAE,MAAM,eAAe,CAAC;AAEtD,MAAM,UAAU,YAAY;IAC1B,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,SAAS,EAAE,YAAY,CAAC,GAAG,QAAQ,CAAa,EAAE,CAAC,CAAC;IAC3D,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,cAAc,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC5C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;YACzC,YAAY,CAAC,IAAI,CAAC,CAAC;YACnB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,CAAC;IAEb,SAAS,CAAC,GAAG,EAAE;QACb,cAAc,EAAE,CAAC;IACnB,CAAC,EAAE,CAAC,cAAc,CAAC,CAAC,CAAC;IAErB,MAAM,cAAc,GAAG,KAAK,EAAE,KAAuD,EAAE,EAAE;QACvF,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC;YACnD,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC3C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAAE,EAAU,EAAE,OAA0B,EAAE,EAAE;QACtE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YACzD,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC1C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YAChC,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC1D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,cAAc,EAAE,cAAc,EAAE,cAAc,EAAE,cAAc,EAAE,CAAC;AAChH,CAAC;AAED,MAAM,UAAU,kBAAkB,CAAC,MAAe;IAChD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,kBAAkB,EAAE,qBAAqB,CAAC,GAAG,QAAQ,CAAW,EAAE,CAAC,CAAC;IAC3E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IAC9C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,gBAAgB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC9C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,qBAAqB,CAAC,EAAE,CAAC,CAAC;YAC1B,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,MAAM,CAAC,CAAC;YAC5D,qBAAqB,CAAC,IAAI,CAAC,CAAC;YAC5B,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,gBAAgB,EAAE,CAAC;IACrB,CAAC,EAAE,CAAC,gBAAgB,CAAC,CAAC,CAAC;IAEvB,OAAO,EAAE,kBAAkB,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,gBAAgB,EAAE,CAAC;AAC3E,CAAC;AAED,MAAM,UAAU,WAAW;IACzB,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;YACxC,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,CAAC;IAEb,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,aAAa,GAAG,KAAK,EAAE,KAAsD,EAAE,EAAE;QACrF,MAAM,MAAM,GAAG,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,WAAW,GAAY;YAC3B,GAAG,KAAK;YACR,EAAE,EAAE,MAAM;YACV,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC;QAEF,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,WAAW,CAAC,CAAC,CAAC;QAE9C,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;YAClD,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACxE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC;YAC3D,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,aAAa,EAAE,aAAa,EAAE,CAAC;AAC7E,CAAC;AAED,MAAM,UAAU,QAAQ,CAAC,SAAkB;IACzC,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAS,EAAE,CAAC,CAAC;IAC/C,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,UAAU,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QACxC,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC9C,QAAQ,CAAC,IAAI,CAAC,CAAC;YACf,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,MAAM,mBAAmB,GAAG,MAAM,CAA6B,IAAI,GAAG,EAAE,CAAC,CAAC;IAC1E,MAAM,kBAAkB,GAAG,MAAM,CAAsB,IAAI,GAAG,EAAE,CAAC,CAAC;IAElE,SAAS,CAAC,GAAG,EAAE;QACb,UAAU,EAAE,CAAC;IACf,CAAC,EAAE,CAAC,UAAU,CAAC,CAAC,CAAC;IAEjB,MAAM,UAAU,GAAG,KAAK,EAAE,KAAmD,EAAE,EAAE;QAC/E,MAAM,MAAM,GAAG,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,QAAQ,GAAS;YACrB,GAAG,KAAK;YACR,EAAE,EAAE,MAAM;YACV,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC;QAEF,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,QAAQ,CAAC,CAAC,CAAC;QAExC,MAAM,OAAO,GAAG,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzC,mBAAmB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;QAEjD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC;YAC9B,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,EAAE,OAAO,CAAC,EAAE,CAAC,CAAC;YACnD,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC;YACxD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;gBAAS,CAAC;YACT,mBAAmB,CAAC,OAAO,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC;QAC7C,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,UAAU,GAAG,KAAK,EAAE,MAAc,EAAE,OAAsB,EAAE,EAAE;QAClE,IAAI,QAAQ,GAAG,MAAM,CAAC;QACtB,IAAI,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,CAAC;YAC3C,QAAQ,GAAG,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAE,CAAC;QACrD,CAAC;QAED,IAAI,YAA8B,CAAC;QAEnC,yDAAyD;QACzD,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;YAChB,YAAY,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;YACtE,IAAI,CAAC,YAAY;gBAAE,OAAO,IAAI,CAAC;YAC/B,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CACpB,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM;gBAClC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,GAAG,OAAO,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE;gBAC3D,CAAC,CAAC,CAAC,CACN,CAAC;QACJ,CAAC,CAAC,CAAC;QAEH,mEAAmE;QACnE,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;YAC3B,MAAM,cAAc,GAClB,mBAAmB,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC;gBACzC,CAAC,mBAAmB,CAAC,OAAO,CAAC,IAAI,KAAK,CAAC;oBACrC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,mBAAmB,CAAC,OAAO,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,CAAC;oBACrD,CAAC,CAAC,SAAS,CAAC,CAAC;YAEjB,IAAI,cAAc,EAAE,CAAC;gBACnB,IAAI,CAAC;oBACH,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC;oBACrC,IAAI,OAAO,IAAI,OAAO,CAAC,EAAE,EAAE,CAAC;wBAC1B,QAAQ,GAAG,OAAO,CAAC,EAAE,CAAC;wBACtB,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;oBACnD,CAAC;gBACH,CAAC;gBAAC,MAAM,CAAC;oBACP,MAAM,IAAI,KAAK,CAAC,oDAAoD,MAAM,GAAG,CAAC,CAAC;gBACjF,CAAC;YACH,CAAC;QACH,CAAC;QAED,sGAAsG;QACtG,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;YAC3B,IAAI,YAA8B,CAAC;YACnC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;gBAChB,YAAY,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;gBACtE,OAAO,IAAI,CAAC;YACd,CAAC,CAAC,CAAC;YACH,OAAO,CAAC,YAAY,IAAI,EAAE,EAAE,EAAE,QAAQ,EAAE,GAAG,OAAO,EAAE,CAAS,CAAC;QAChE,CAAC;QAED,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,QAAQ,EAAE,OAAO,CAAC,CAAC;YAC3D,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAChB,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CACtE,CAAC;YACF,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,YAAY,EAAE,CAAC;gBACjB,MAAM,UAAU,GAAG,YAAY,CAAC;gBAChC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAChB,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CACzE,CAAC;YACJ,CAAC;YACD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,MAAc,EAAE,MAAkB,EAAE,EAAE;QACpE,OAAO,UAAU,CAAC,MAAM,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;IACxC,CAAC,CAAC;IAEF,MAAM,UAAU,GAAG,KAAK,EAAE,MAAc,EAAE,EAAE;QAC1C,IAAI,QAAQ,GAAG,MAAM,CAAC;QACtB,IAAI,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,CAAC;YAC3C,QAAQ,GAAG,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAE,CAAC;QACrD,CAAC;QAED,IAAI,YAA8B,CAAC;QACnC,IAAI,aAAa,GAAG,CAAC,CAAC,CAAC;QAEvB,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;YAChB,aAAa,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;YAC5E,IAAI,aAAa,KAAK,CAAC,CAAC,EAAE,CAAC;gBACzB,YAAY,GAAG,IAAI,CAAC,aAAa,CAAC,CAAC;YACrC,CAAC;YACD,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;YAC3B,MAAM,cAAc,GAAG,mBAAmB,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YACjE,IAAI,cAAc,EAAE,CAAC;gBACnB,IAAI,CAAC;oBACH,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC;oBACrC,IAAI,OAAO,IAAI,OAAO,CAAC,EAAE,EAAE,CAAC;wBAC1B,MAAM,MAAM,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;oBACtC,CAAC;gBACH,CAAC;gBAAC,MAAM,CAAC;oBACP,kDAAkD;gBACpD,CAAC;YACH,CAAC;YACD,OAAO;QACT,CAAC;QAED,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,CAAC;QACpC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,YAAY,IAAI,aAAa,KAAK,CAAC,CAAC,EAAE,CAAC;gBACzC,MAAM,WAAW,GAAG,YAAY,CAAC;gBACjC,MAAM,aAAa,GAAG,aAAa,CAAC;gBACpC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;oBAChB,MAAM,QAAQ,GAAG,CAAC,GAAG,IAAI,CAAC,CAAC;oBAC3B,QAAQ,CAAC,MAAM,CAAC,aAAa,EAAE,CAAC,EAAE,WAAW,CAAC,CAAC;oBAC/C,OAAO,QAAQ,CAAC;gBAClB,CAAC,CAAC,CAAC;YACL,CAAC;YACD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,gBAAgB,EAAE,UAAU,EAAE,CAAC;AAC9G,CAAC;AAOD,MAAM,UAAU,SAAS,CAAC,SAAkB,EAAE,OAA0B;IACtE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,gBAAgB,EAAE,UAAU,EAAE,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC;IAE7F,MAAM,OAAO,GAAG,OAAO,CAAyB,GAAG,EAAE;QACnD,IAAI,OAAO,EAAE,OAAO,KAAK,UAAU,EAAE,CAAC;YACpC,MAAM,YAAY,GAAmC;gBACnD,WAAW,EAAE,EAAE;gBACf,WAAW,EAAE,EAAE;gBACf,SAAS,EAAE,EAAE;gBACb,QAAQ,EAAE,EAAE;aACb,CAAC;YACF,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;gBACzB,MAAM,QAAQ,GAAG,IAAI,CAAC,cAAc,IAAI,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,CAAC,CAAC,QAAQ,CAAC;gBAClH,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;oBAC3B,YAAY,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;gBACpC,CAAC;qBAAM,CAAC;oBACN,YAAY,CAAC,WAAW,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;gBACtC,CAAC;YACH,CAAC;YACD,OAAO,YAAY,CAAC;QACtB,CAAC;QAED,MAAM,YAAY,GAA2B,EAAE,CAAC;QAChD,IAAI,OAAO,EAAE,iBAAiB,IAAI,OAAO,CAAC,iBAAiB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YACvE,KAAK,MAAM,GAAG,IAAI,OAAO,CAAC,iBAAiB,EAAE,CAAC;gBAC5C,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,GAAG,EAAE,CAAC;YAC7B,CAAC;QACH,CAAC;aAAM,CAAC;YACN,YAAY,CAAC,OAAO,GAAG,EAAE,CAAC;YAC1B,YAAY,CAAC,IAAI,GAAG,EAAE,CAAC;YACvB,YAAY,CAAC,WAAW,GAAG,EAAE,CAAC;YAC9B,YAAY,CAAC,SAAS,GAAG,EAAE,CAAC;YAC5B,YAAY,CAAC,IAAI,GAAG,EAAE,CAAC;YACvB,YAAY,CAAC,QAAQ,GAAG,EAAE,CAAC;QAC7B,CAAC;QAED,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,IAAI,CAAC,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;gBAC/B,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,GAAG,EAAE,CAAC;YACjC,CAAC;YACD,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvC,CAAC;QAED,OAAO,YAAY,CAAC;IACtB,CAAC,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,iBAAiB,CAAC,CAAC,CAAC;IAE1D,MAAM,QAAQ,GAAG,KAAK,EAAE,MAAc,EAAE,YAAwB,EAAE,EAAE;QAClE,OAAO,gBAAgB,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IAChD,CAAC,CAAC;IAEF,OAAO,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC;AAC3E,CAAC;AAMD,MAAM,UAAU,WAAW,CAAC,MAAc;IACxC,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,WAAW,CAAC,EAAE,CAAC,CAAC;YAChB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;YAC9C,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,UAAU,GAAG,KAAK,EAAE,KAAiE,EAAE,EAAE;QAC7F,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9D,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC1C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,OAAyB,EAAE,EAAE;QACpE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YACxD,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACpE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QACzC,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAC/B,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QACzD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,WAAW,GAAG,KAAK,EACvB,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACpE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAC1B,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACvE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,kCAAkC;IAClC,MAAM,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE;QAC3B,MAAM,GAAG,GAAG,IAAI,GAAG,EAA2B,CAAC;QAC/C,MAAM,KAAK,GAAsB,EAAE,CAAC;QAEpC,4BAA4B;QAC5B,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,CAAC,CAAC;QACvC,CAAC;QAED,uCAAuC;QACvC,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAE,CAAC;YAChC,IAAI,CAAC,CAAC,QAAQ,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,EAAE,CAAC;gBACtC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAE,CAAC,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAC9C,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACvB,CAAC;QACH,CAAC;QAED,OAAO,KAAK,CAAC;IACf,CAAC,EAAE,CAAC,QAAQ,CAAC,CAAC,CAAC;IAEf,OAAO;QACL,QAAQ;QACR,OAAO;QACP,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;QACtB,UAAU;QACV,aAAa;QACb,aAAa;QACb,WAAW;QACX,cAAc;KACf,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,cAAc,CAAC,MAAoE;IACjG,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,WAAW,EAAE,cAAc,CAAC,GAAG,QAAQ,CAAe,EAAE,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,IAAI,EAAE,CAAC,CAAC;IAE/C,MAAM,gBAAgB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC9C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;YACjD,cAAc,CAAC,IAAI,CAAC,CAAC;YACrB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,gBAAgB,EAAE,CAAC;IACrB,CAAC,EAAE,CAAC,gBAAgB,CAAC,CAAC,CAAC;IAEvB,MAAM,gBAAgB,GAAG,KAAK,EAAE,KAAyD,EAAE,EAAE;QAC3F,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,KAAK,CAAC,CAAC;YACrD,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,OAAO,EAAE,GAAG,IAAI,CAAC,CAAC,CAAC;YAC7C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC5C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;YAClC,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC5D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEA,OAAO;QACP,WAAW;QACX,OAAO;QACP,KAAK;QACL,OAAO,EAAE,gBAAgB;QACzB,gBAAgB;QAChB,gBAAgB;KACjB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,eAAe,CAAC,SAAkB;IAChD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,YAAY,EAAE,eAAe,CAAC,GAAG,QAAQ,CAAgB,EAAE,CAAC,CAAC;IACpE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,iBAAiB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC/C,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,eAAe,CAAC,EAAE,CAAC,CAAC;YACpB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;YACrD,eAAe,CAAC,IAAI,CAAC,CAAC;YACtB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,iBAAiB,EAAE,CAAC;IACtB,CAAC,EAAE,CAAC,iBAAiB,CAAC,CAAC,CAAC;IAExB,MAAM,iBAAiB,GAAG,KAAK,EAAE,KAA6B,EAAE,EAAE;QAChE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,KAAK,CAAC,CAAC;YACtD,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC9C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,iBAAiB,GAAG,KAAK,EAAE,EAAU,EAAE,OAA6B,EAAE,EAAE;QAC5E,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YAC5D,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACxE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,iBAAiB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC7C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;YACnC,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC7D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO;QACL,YAAY;QACZ,OAAO;QACP,KAAK;QACL,OAAO,EAAE,iBAAiB;QAC1B,iBAAiB;QACjB,iBAAiB;QACjB,iBAAiB;KAClB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,qBAAqB,CAAC,aAAsB;IAC1D,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAA4B,IAAI,CAAC,CAAC;IACxE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,YAAY,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC1C,IAAI,CAAC,aAAa,EAAE,CAAC;YACnB,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,aAAa,CAAC,CAAC;YAC/D,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,aAAa,CAAC,CAAC,CAAC;IAE5B,SAAS,CAAC,GAAG,EAAE;QACb,YAAY,EAAE,CAAC;IACjB,CAAC,EAAE,CAAC,YAAY,CAAC,CAAC,CAAC;IAEnB,OAAO;QACL,OAAO;QACP,OAAO;QACP,KAAK;QACL,OAAO,EAAE,YAAY;KACtB,CAAC;AACJ,CAAC;AASD,MAAM,UAAU,SAAS,CAAC,UAA4B,EAAE;IACtD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,EAAE,SAAS,EAAE,KAAK,EAAE,OAAO,GAAG,IAAI,EAAE,cAAc,EAAE,GAAG,OAAO,CAAC;IACrE,MAAM,CAAC,UAAU,EAAE,aAAa,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IACpD,MAAM,CAAC,eAAe,EAAE,kBAAkB,CAAC,GAAG,QAAQ,CAAW,EAAE,CAAC,CAAC;IACrE,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,SAAS,CAAC,GAAG,EAAE;QACb,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,aAAa,CAAC,KAAK,CAAC,CAAC;YACrB,kBAAkB,CAAC,EAAE,CAAC,CAAC;YACvB,OAAO;QACT,CAAC;QAED,IAAI,CAAC;YACH,MAAM,MAAM,GAAG,mBAAmB,CAAC;gBACjC,MAAM;gBACN,SAAS;gBACT,KAAK;gBACL,cAAc;aACf,CAAC,CAAC;YAEH,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,kBAAkB,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC;YACnE,QAAQ,CAAC,IAAI,CAAC,CAAC;YAEf,OAAO,GAAG,EAAE;gBACV,MAAM,CAAC,UAAU,EAAE,CAAC;gBACpB,aAAa,CAAC,KAAK,CAAC,CAAC;gBACrB,kBAAkB,CAAC,EAAE,CAAC,CAAC;YACzB,CAAC,CAAC;QACJ,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9D,aAAa,CAAC,KAAK,CAAC,CAAC;QACvB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,cAAc,CAAC,CAAC,CAAC;IAExD,OAAO;QACL,UAAU;QACV,KAAK,EAAE,eAAe;QACtB,KAAK;KACN,CAAC;AACJ,CAAC;AAOD,MAAM,UAAU,eAAe,CAAC,MAAe;IAC7C,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,WAAW,EAAE,cAAc,CAAC,GAAG,QAAQ,CAAe,EAAE,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IAC9C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,WAAW,CAAC,EAAE,CAAC,CAAC;YAChB,cAAc,CAAC,EAAE,CAAC,CAAC;YACnB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,CAAC,eAAe,EAAE,kBAAkB,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;gBAC9D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC;gBAC1B,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC;aAClC,CAAC,CAAC;YACH,WAAW,CAAC,eAAe,CAAC,CAAC;YAC7B,cAAc,CAAC,kBAAkB,CAAC,CAAC;YACnC,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,OAAO,GAAG,OAAO,CAAmC,GAAG,EAAE;QAC7D,MAAM,GAAG,GAAG,IAAI,GAAG,EAA0C,CAAC;QAC9D,MAAM,KAAK,GAAqC,EAAE,CAAC;QAEnD,MAAM,oBAAoB,GAAG,IAAI,GAAG,EAAwB,CAAC;QAC7D,KAAK,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC;YAC5B,IAAI,CAAC,CAAC,SAAS,EAAE,CAAC;gBAChB,IAAI,CAAC,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC;oBAC3C,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACjD,CAAC;QACH,CAAC;QAED,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE;gBACZ,GAAG,CAAC;gBACJ,WAAW,EAAE,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,IAAI,EAAE;gBACjD,OAAO,EAAE,EAAE;aACZ,CAAC,CAAC;QACL,CAAC;QAED,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAE,CAAC;YAChC,IAAI,CAAC,CAAC,QAAQ,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,EAAE,CAAC;gBACtC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAE,CAAC,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAC9C,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACvB,CAAC;QACH,CAAC;QAED,OAAO,KAAK,CAAC;IACf,CAAC,EAAE,CAAC,QAAQ,EAAE,WAAW,CAAC,CAAC,CAAC;IAE5B,MAAM,qBAAqB,GAAG,OAAO,CAAe,GAAG,EAAE;QACvD,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;IACjD,CAAC,EAAE,CAAC,WAAW,CAAC,CAAC,CAAC;IAElB,MAAM,UAAU,GAAG,KAAK,EACtB,KAAiE,EACjE,gBAAqG,EACrG,EAAE;QACF,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,oDAAoD,CAAC,CAAC;QACxE,CAAC;QACD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9D,IAAI,kBAAkB,GAAiB,EAAE,CAAC;YAE1C,IAAI,gBAAgB,IAAI,gBAAgB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBACpD,kBAAkB,GAAG,MAAM,OAAO,CAAC,GAAG,CACpC,gBAAgB,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAC3B,MAAM,CAAC,gBAAgB,CAAC;oBACtB,GAAG,GAAG;oBACN,MAAM;oBACN,SAAS,EAAE,OAAO,CAAC,EAAE;iBACtB,CAAC,CACH,CACF,CAAC;YACJ,CAAC;YAED,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC1C,IAAI,kBAAkB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBAClC,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,GAAG,kBAAkB,CAAC,CAAC,CAAC;YAC7D,CAAC;YACD,OAAO,EAAE,OAAO,EAAE,WAAW,EAAE,kBAAkB,EAAE,CAAC;QACtD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,KAAoE,EAAE,EAAE;QACnG,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,uDAAuD,CAAC,CAAC;QAC3E,CAAC;QACD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YACpE,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,OAAO,EAAE,GAAG,IAAI,CAAC,CAAC,CAAC;YAC7C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QACzC,IAAI,gBAAgB,GAAc,EAAE,CAAC;QACrC,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE;YACnB,gBAAgB,GAAG,IAAI,CAAC;YACxB,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACjC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,WAAW,CAAC,gBAAgB,CAAC,CAAC;YAC9B,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC5C,IAAI,mBAAmB,GAAiB,EAAE,CAAC;QAC3C,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE;YACtB,mBAAmB,GAAG,IAAI,CAAC;YAC3B,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACpC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,cAAc,CAAC,mBAAmB,CAAC,CAAC;YACpC,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,WAAW,GAAG,KAAK,EACvB,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACpE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAC1B,SAAiB,EACjB,eAA2D,EAC3D,WAAoB,EACpB,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GACX,OAAO,eAAe,KAAK,QAAQ;gBACjC,CAAC,CAAC,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,WAAY,EAAE;gBAClD,CAAC,CAAC,eAAe,CAAC;YACtB,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACvE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO;QACL,QAAQ;QACR,WAAW;QACX,OAAO;QACP,qBAAqB;QACrB,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;QACtB,UAAU;QACV,aAAa;QACb,aAAa;QACb,gBAAgB;QAChB,WAAW;QACX,cAAc;KACf,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,eAAe,CAAC,SAA6B;IAC3D,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAA8B,IAAI,CAAC,CAAC;IAC5E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,iBAAiB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC/C,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;YAC3D,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,iBAAiB,EAAE,CAAC;IACtB,CAAC,EAAE,CAAC,iBAAiB,CAAC,CAAC,CAAC;IAExB,OAAO;QACL,QAAQ;QACR,OAAO;QACP,KAAK;QACL,OAAO,EAAE,iBAAiB;KAC3B,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,iBAAiB,CAC/B,SAA6B,EAC7B,iBAAwC,EAAE;IAE1C,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAmB,cAAc,CAAC,KAAK,IAAI,KAAK,CAAC,CAAC;IACpF,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,GAAG,QAAQ,CAAwB,IAAI,CAAC,CAAC;IAClE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,WAAW,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QACzC,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,SAAS,CAAC,IAAI,CAAC,CAAC;YAChB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,SAAS,EAAE;gBACrD,GAAG,cAAc;gBACjB,KAAK;aACN,CAAC,CAAC;YACH,SAAS,CAAC,IAAI,CAAC,CAAC;YAChB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,EAAE,KAAK,EAAE,cAAc,CAAC,WAAW,EAAE,cAAc,CAAC,WAAW,CAAC,CAAC,CAAC;IAEvF,SAAS,CAAC,GAAG,EAAE;QACb,WAAW,EAAE,CAAC;IAChB,CAAC,EAAE,CAAC,WAAW,CAAC,CAAC,CAAC;IAElB,OAAO;QACL,MAAM;QACN,KAAK;QACL,QAAQ;QACR,KAAK,EAAE,MAAM,EAAE,KAAK,IAAI,IAAI;QAC5B,QAAQ,EAAE,MAAM,EAAE,QAAQ,IAAI,IAAI;QAClC,QAAQ,EAAE,MAAM,EAAE,QAAQ,IAAI,IAAI;QAClC,OAAO;QACP,KAAK;QACL,OAAO,EAAE,WAAW;KACrB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,aAAa,CAAC,MAA0B;IACtD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,UAAU,EAAE,aAAa,CAAC,GAAG,QAAQ,CAAwB,IAAI,CAAC,CAAC;IAC1E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,eAAe,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;YAChD,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,eAAe,EAAE,CAAC;IACpB,CAAC,EAAE,CAAC,eAAe,CAAC,CAAC,CAAC;IAEtB,OAAO;QACL,UAAU;QACV,UAAU,EAAE,UAAU,EAAE,UAAU,IAAI,IAAI;QAC1C,QAAQ,EAAE,UAAU,EAAE,QAAQ,IAAI,IAAI;QACtC,QAAQ,EAAE,UAAU,EAAE,QAAQ,IAAI,IAAI;QACtC,OAAO,EAAE,UAAU,EAAE,OAAO,IAAI,IAAI;QACpC,OAAO;QACP,KAAK;QACL,OAAO,EAAE,eAAe;KACzB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,cAAc,CAAC,MAA0B;IACvD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAqB,IAAI,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAA6B,IAAI,CAAC,CAAC;IACzE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,YAAY,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC1C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;gBAC/B,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC;gBAC7B,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC;aACtC,CAAC,CAAC;YACH,UAAU,CAAC,CAAC,CAAC,CAAC;YACd,UAAU,CAAC,CAAC,CAAC,CAAC;YACd,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,YAAY,EAAE,CAAC;IACjB,CAAC,EAAE,CAAC,YAAY,CAAC,CAAC,CAAC;IAEnB,OAAO;QACL,OAAO;QACP,OAAO;QACP,eAAe,EAAE,OAAO,EAAE,eAAe,IAAI,IAAI;QACjD,YAAY,EAAE,OAAO,EAAE,YAAY,IAAI,IAAI;QAC3C,QAAQ,EAAE,OAAO,EAAE,QAAQ,IAAI,IAAI;QACnC,GAAG,EAAE,OAAO,EAAE,GAAG,IAAI,IAAI;QACzB,YAAY,EAAE,OAAO,EAAE,YAAY,IAAI,IAAI;QAC3C,OAAO;QACP,KAAK;QACL,OAAO,EAAE,YAAY;KACtB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,uBAAuB,CACrC,SAAkB,EAClB,iBAA8C,EAAE;IAEhD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAmB,cAAc,CAAC,QAAQ,IAAI,MAAM,CAAC,CAAC;IAC9F,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAkB,cAAc,CAAC,OAAO,IAAI,UAAU,CAAC,CAAC;IAC9F,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,GAAG,QAAQ,CAAiB,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,CAAC;IACzF,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAA8B,IAAI,CAAC,CAAC;IAC5E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE;gBAC3D,GAAG,cAAc;gBACjB,QAAQ;gBACR,OAAO;gBACP,MAAM;aACP,CAAC,CAAC;YACH,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE;QACD,MAAM;QACN,SAAS;QACT,QAAQ;QACR,OAAO;QACP,MAAM;QACN,cAAc,CAAC,SAAS;QACxB,cAAc,CAAC,OAAO;QACtB,cAAc,CAAC,0BAA0B;KAC1C,CAAC,CAAC;IAEH,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,OAAO;QACL,QAAQ;QACR,QAAQ;QACR,WAAW;QACX,OAAO;QACP,UAAU;QACV,MAAM;QACN,SAAS;QACT,OAAO,EAAE,QAAQ,EAAE,OAAO,IAAI,EAAE;QAChC,UAAU,EAAE,QAAQ,EAAE,UAAU,IAAI,EAAE;QACtC,YAAY,EAAE,QAAQ,EAAE,YAAY,IAAI,EAAE;QAC1C,UAAU,EAAE,QAAQ,EAAE,UAAU,IAAI,CAAC;QACrC,aAAa,EAAE,QAAQ,EAAE,aAAa,IAAI,CAAC;QAC3C,kBAAkB,EAAE,QAAQ,EAAE,kBAAkB;QAChD,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;KACvB,CAAC;AACJ,CAAC"}
1
+ {"version":3,"file":"hooks.js","sourceRoot":"","sources":["../src/hooks.ts"],"names":[],"mappings":"AACA,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,WAAW,EAAE,OAAO,EAAE,MAAM,EAAE,MAAM,OAAO,CAAC;AA2B1E,OAAO,EAAE,uBAAuB,EAAE,YAAY,EAAE,MAAM,qBAAqB,CAAC;AAC5E,OAAO,EAAE,mBAAmB,EAAE,MAAM,wBAAwB,CAAC;AAC7D,OAAO,EAAE,qBAAqB,EAAE,MAAM,eAAe,CAAC;AAEtD,MAAM,UAAU,YAAY;IAC1B,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,SAAS,EAAE,YAAY,CAAC,GAAG,QAAQ,CAAa,EAAE,CAAC,CAAC;IAC3D,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,cAAc,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC5C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;YACzC,YAAY,CAAC,IAAI,CAAC,CAAC;YACnB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,CAAC;IAEb,SAAS,CAAC,GAAG,EAAE;QACb,cAAc,EAAE,CAAC;IACnB,CAAC,EAAE,CAAC,cAAc,CAAC,CAAC,CAAC;IAErB,MAAM,cAAc,GAAG,KAAK,EAAE,KAAuD,EAAE,EAAE;QACvF,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,KAAK,CAAC,CAAC;YACnD,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC3C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAAE,EAAU,EAAE,OAA0B,EAAE,EAAE;QACtE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YACzD,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC1C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YAChC,YAAY,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC1D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,cAAc,EAAE,cAAc,EAAE,cAAc,EAAE,cAAc,EAAE,CAAC;AAChH,CAAC;AAED,MAAM,UAAU,kBAAkB,CAAC,MAAe;IAChD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,kBAAkB,EAAE,qBAAqB,CAAC,GAAG,QAAQ,CAAW,EAAE,CAAC,CAAC;IAC3E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IAC9C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,gBAAgB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC9C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,qBAAqB,CAAC,EAAE,CAAC,CAAC;YAC1B,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,MAAM,CAAC,CAAC;YAC5D,qBAAqB,CAAC,IAAI,CAAC,CAAC;YAC5B,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,gBAAgB,EAAE,CAAC;IACrB,CAAC,EAAE,CAAC,gBAAgB,CAAC,CAAC,CAAC;IAEvB,OAAO,EAAE,kBAAkB,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,gBAAgB,EAAE,CAAC;AAC3E,CAAC;AAED,MAAM,UAAU,WAAW;IACzB,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;YACxC,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,CAAC,CAAC,CAAC;IAEb,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,aAAa,GAAG,KAAK,EAAE,KAAsD,EAAE,EAAE;QACrF,MAAM,MAAM,GAAG,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,WAAW,GAAY;YAC3B,GAAG,KAAK;YACR,EAAE,EAAE,MAAM;YACV,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC;QAEF,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,WAAW,CAAC,CAAC,CAAC;QAE9C,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;YAClD,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACxE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC;YAC3D,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,aAAa,EAAE,aAAa,EAAE,CAAC;AAC7E,CAAC;AAED,MAAM,UAAU,QAAQ,CAAC,SAAkB;IACzC,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAS,EAAE,CAAC,CAAC;IAC/C,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,UAAU,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QACxC,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC9C,QAAQ,CAAC,IAAI,CAAC,CAAC;YACf,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,MAAM,mBAAmB,GAAG,MAAM,CAA6B,IAAI,GAAG,EAAE,CAAC,CAAC;IAC1E,MAAM,kBAAkB,GAAG,MAAM,CAAsB,IAAI,GAAG,EAAE,CAAC,CAAC;IAElE,SAAS,CAAC,GAAG,EAAE;QACb,UAAU,EAAE,CAAC;IACf,CAAC,EAAE,CAAC,UAAU,CAAC,CAAC,CAAC;IAEjB,MAAM,UAAU,GAAG,KAAK,EAAE,KAAqB,EAAE,EAAE;QACjD,MAAM,MAAM,GAAG,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,QAAQ,GAAS;YACrB,GAAG,KAAK;YACR,2EAA2E;YAC3E,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,MAAM;YAC9B,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,QAAQ;YACpC,EAAE,EAAE,MAAM;YACV,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC;QAEF,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,QAAQ,CAAC,CAAC,CAAC;QAExC,MAAM,OAAO,GAAG,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzC,mBAAmB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;QAEjD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC;YAC9B,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,EAAE,OAAO,CAAC,EAAE,CAAC,CAAC;YACnD,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACrE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC;YACxD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;gBAAS,CAAC;YACT,mBAAmB,CAAC,OAAO,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC;QAC7C,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,UAAU,GAAG,KAAK,EAAE,MAAc,EAAE,OAAuB,EAAE,EAAE;QACnE,IAAI,QAAQ,GAAG,MAAM,CAAC;QACtB,IAAI,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,CAAC;YAC3C,QAAQ,GAAG,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAE,CAAC;QACrD,CAAC;QAED,IAAI,YAA8B,CAAC;QAEnC,yDAAyD;QACzD,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;YAChB,YAAY,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;YACtE,IAAI,CAAC,YAAY;gBAAE,OAAO,IAAI,CAAC;YAC/B,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CACpB,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM;gBAClC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,GAAG,OAAO,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE;gBAC3D,CAAC,CAAC,CAAC,CACN,CAAC;QACJ,CAAC,CAAC,CAAC;QAEH,mEAAmE;QACnE,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;YAC3B,MAAM,cAAc,GAClB,mBAAmB,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC;gBACzC,CAAC,mBAAmB,CAAC,OAAO,CAAC,IAAI,KAAK,CAAC;oBACrC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,mBAAmB,CAAC,OAAO,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,CAAC;oBACrD,CAAC,CAAC,SAAS,CAAC,CAAC;YAEjB,IAAI,cAAc,EAAE,CAAC;gBACnB,IAAI,CAAC;oBACH,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC;oBACrC,IAAI,OAAO,IAAI,OAAO,CAAC,EAAE,EAAE,CAAC;wBAC1B,QAAQ,GAAG,OAAO,CAAC,EAAE,CAAC;wBACtB,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;oBACnD,CAAC;gBACH,CAAC;gBAAC,MAAM,CAAC;oBACP,MAAM,IAAI,KAAK,CAAC,oDAAoD,MAAM,GAAG,CAAC,CAAC;gBACjF,CAAC;YACH,CAAC;QACH,CAAC;QAED,sGAAsG;QACtG,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;YAC3B,IAAI,YAA8B,CAAC;YACnC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;gBAChB,YAAY,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;gBACtE,OAAO,IAAI,CAAC;YACd,CAAC,CAAC,CAAC;YACH,OAAO,CAAC,YAAY,IAAI,EAAE,EAAE,EAAE,QAAQ,EAAE,GAAG,OAAO,EAAE,CAAS,CAAC;QAChE,CAAC;QAED,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,QAAQ,EAAE,OAAO,CAAC,CAAC;YAC3D,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAChB,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CACtE,CAAC;YACF,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,YAAY,EAAE,CAAC;gBACjB,MAAM,UAAU,GAAG,YAAY,CAAC;gBAChC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE,CAChB,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CACzE,CAAC;YACJ,CAAC;YACD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,MAAc,EAAE,MAAkB,EAAE,EAAE;QACpE,OAAO,UAAU,CAAC,MAAM,EAAE,EAAE,MAAM,EAAE,CAAC,CAAC;IACxC,CAAC,CAAC;IAEF,MAAM,UAAU,GAAG,KAAK,EAAE,MAAc,EAAE,EAAE;QAC1C,IAAI,QAAQ,GAAG,MAAM,CAAC;QACtB,IAAI,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,CAAC;YAC3C,QAAQ,GAAG,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAE,CAAC;QACrD,CAAC;QAED,IAAI,YAA8B,CAAC;QACnC,IAAI,aAAa,GAAG,CAAC,CAAC,CAAC;QAEvB,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;YAChB,aAAa,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;YAC5E,IAAI,aAAa,KAAK,CAAC,CAAC,EAAE,CAAC;gBACzB,YAAY,GAAG,IAAI,CAAC,aAAa,CAAC,CAAC;YACrC,CAAC;YACD,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,QAAQ,IAAI,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;YAC3B,MAAM,cAAc,GAAG,mBAAmB,CAAC,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YACjE,IAAI,cAAc,EAAE,CAAC;gBACnB,IAAI,CAAC;oBACH,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC;oBACrC,IAAI,OAAO,IAAI,OAAO,CAAC,EAAE,EAAE,CAAC;wBAC1B,MAAM,MAAM,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;oBACtC,CAAC;gBACH,CAAC;gBAAC,MAAM,CAAC;oBACP,kDAAkD;gBACpD,CAAC;YACH,CAAC;YACD,OAAO;QACT,CAAC;QAED,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,CAAC;QACpC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,YAAY,IAAI,aAAa,KAAK,CAAC,CAAC,EAAE,CAAC;gBACzC,MAAM,WAAW,GAAG,YAAY,CAAC;gBACjC,MAAM,aAAa,GAAG,aAAa,CAAC;gBACpC,QAAQ,CAAC,CAAC,IAAI,EAAE,EAAE;oBAChB,MAAM,QAAQ,GAAG,CAAC,GAAG,IAAI,CAAC,CAAC;oBAC3B,QAAQ,CAAC,MAAM,CAAC,aAAa,EAAE,CAAC,EAAE,WAAW,CAAC,CAAC;oBAC/C,OAAO,QAAQ,CAAC;gBAClB,CAAC,CAAC,CAAC;YACL,CAAC;YACD,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,gBAAgB,EAAE,UAAU,EAAE,CAAC;AAC9G,CAAC;AAOD,MAAM,UAAU,SAAS,CAAC,SAAkB,EAAE,OAA0B;IACtE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,gBAAgB,EAAE,UAAU,EAAE,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC;IAE7F,MAAM,OAAO,GAAG,OAAO,CAAyB,GAAG,EAAE;QACnD,IAAI,OAAO,EAAE,OAAO,KAAK,UAAU,EAAE,CAAC;YACpC,MAAM,YAAY,GAAmC;gBACnD,WAAW,EAAE,EAAE;gBACf,WAAW,EAAE,EAAE;gBACf,SAAS,EAAE,EAAE;gBACb,QAAQ,EAAE,EAAE;aACb,CAAC;YACF,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;gBACzB,MAAM,QAAQ,GAAG,IAAI,CAAC,cAAc,IAAI,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,CAAC,CAAC,QAAQ,CAAC;gBAClH,IAAI,YAAY,CAAC,QAAQ,CAAC,EAAE,CAAC;oBAC3B,YAAY,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;gBACpC,CAAC;qBAAM,CAAC;oBACN,YAAY,CAAC,WAAW,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;gBACtC,CAAC;YACH,CAAC;YACD,OAAO,YAAY,CAAC;QACtB,CAAC;QAED,MAAM,YAAY,GAA2B,EAAE,CAAC;QAChD,IAAI,OAAO,EAAE,iBAAiB,IAAI,OAAO,CAAC,iBAAiB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YACvE,KAAK,MAAM,GAAG,IAAI,OAAO,CAAC,iBAAiB,EAAE,CAAC;gBAC5C,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,GAAG,EAAE,CAAC;YAC7B,CAAC;QACH,CAAC;aAAM,CAAC;YACN,YAAY,CAAC,OAAO,GAAG,EAAE,CAAC;YAC1B,YAAY,CAAC,IAAI,GAAG,EAAE,CAAC;YACvB,YAAY,CAAC,WAAW,GAAG,EAAE,CAAC;YAC9B,YAAY,CAAC,SAAS,GAAG,EAAE,CAAC;YAC5B,YAAY,CAAC,IAAI,GAAG,EAAE,CAAC;YACvB,YAAY,CAAC,QAAQ,GAAG,EAAE,CAAC;QAC7B,CAAC;QAED,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,IAAI,CAAC,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;gBAC/B,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,GAAG,EAAE,CAAC;YACjC,CAAC;YACD,YAAY,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvC,CAAC;QAED,OAAO,YAAY,CAAC;IACtB,CAAC,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,iBAAiB,CAAC,CAAC,CAAC;IAE1D,MAAM,QAAQ,GAAG,KAAK,EAAE,MAAc,EAAE,YAAwB,EAAE,EAAE;QAClE,OAAO,gBAAgB,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IAChD,CAAC,CAAC;IAEF,OAAO,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,UAAU,EAAE,CAAC;AAC3E,CAAC;AAMD,MAAM,UAAU,WAAW,CAAC,MAAc;IACxC,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,WAAW,CAAC,EAAE,CAAC,CAAC;YAChB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;YAC9C,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,UAAU,GAAG,KAAK,EAAE,KAAwC,EAAE,EAAE;QACpE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9D,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC1C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,OAA0B,EAAE,EAAE;QACrE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YACxD,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACpE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QACzC,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAC/B,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QACzD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,WAAW,GAAG,KAAK,EACvB,SAAiB,EACjB,KAAa,EACb,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,EAAE,KAAK,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACpE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAC1B,SAAiB,EACjB,KAAa,EACb,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,EAAE,KAAK,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACvE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,kCAAkC;IAClC,MAAM,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE;QAC3B,MAAM,GAAG,GAAG,IAAI,GAAG,EAA2B,CAAC;QAC/C,MAAM,KAAK,GAAsB,EAAE,CAAC;QAEpC,4BAA4B;QAC5B,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,CAAC,CAAC;QACvC,CAAC;QAED,uCAAuC;QACvC,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAE,CAAC;YAChC,IAAI,CAAC,CAAC,QAAQ,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,EAAE,CAAC;gBACtC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAE,CAAC,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAC9C,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACvB,CAAC;QACH,CAAC;QAED,OAAO,KAAK,CAAC;IACf,CAAC,EAAE,CAAC,QAAQ,CAAC,CAAC,CAAC;IAEf,OAAO;QACL,QAAQ;QACR,OAAO;QACP,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;QACtB,UAAU;QACV,aAAa;QACb,aAAa;QACb,WAAW;QACX,cAAc;KACf,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,cAAc,CAAC,MAAoE;IACjG,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,WAAW,EAAE,cAAc,CAAC,GAAG,QAAQ,CAAe,EAAE,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,IAAI,EAAE,CAAC,CAAC;IAE/C,MAAM,gBAAgB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC9C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;YACjD,cAAc,CAAC,IAAI,CAAC,CAAC;YACrB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,gBAAgB,EAAE,CAAC;IACrB,CAAC,EAAE,CAAC,gBAAgB,CAAC,CAAC,CAAC;IAEvB,MAAM,gBAAgB,GAAG,KAAK,EAAE,KAAyD,EAAE,EAAE;QAC3F,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,KAAK,CAAC,CAAC;YACrD,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,OAAO,EAAE,GAAG,IAAI,CAAC,CAAC,CAAC;YAC7C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC5C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;YAClC,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC5D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEA,OAAO;QACP,WAAW;QACX,OAAO;QACP,KAAK;QACL,OAAO,EAAE,gBAAgB;QACzB,gBAAgB;QAChB,gBAAgB;KACjB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,eAAe,CAAC,SAAkB;IAChD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,YAAY,EAAE,eAAe,CAAC,GAAG,QAAQ,CAAgB,EAAE,CAAC,CAAC;IACpE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,iBAAiB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC/C,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,eAAe,CAAC,EAAE,CAAC,CAAC;YACpB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;YACrD,eAAe,CAAC,IAAI,CAAC,CAAC;YACtB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,iBAAiB,EAAE,CAAC;IACtB,CAAC,EAAE,CAAC,iBAAiB,CAAC,CAAC,CAAC;IAExB,MAAM,iBAAiB,GAAG,KAAK,EAAE,KAA6B,EAAE,EAAE;QAChE,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,KAAK,CAAC,CAAC;YACtD,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC9C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,iBAAiB,GAAG,KAAK,EAAE,EAAU,EAAE,OAA8B,EAAE,EAAE;QAC7E,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;YAC5D,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YACxE,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,iBAAiB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC7C,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;YACnC,eAAe,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC;QAC7D,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO;QACL,YAAY;QACZ,OAAO;QACP,KAAK;QACL,OAAO,EAAE,iBAAiB;QAC1B,iBAAiB;QACjB,iBAAiB;QACjB,iBAAiB;KAClB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,qBAAqB,CAAC,aAAsB;IAC1D,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAA4B,IAAI,CAAC,CAAC;IACxE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,YAAY,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC1C,IAAI,CAAC,aAAa,EAAE,CAAC;YACnB,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,aAAa,CAAC,CAAC;YAC/D,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,aAAa,CAAC,CAAC,CAAC;IAE5B,SAAS,CAAC,GAAG,EAAE;QACb,YAAY,EAAE,CAAC;IACjB,CAAC,EAAE,CAAC,YAAY,CAAC,CAAC,CAAC;IAEnB,OAAO;QACL,OAAO;QACP,OAAO;QACP,KAAK;QACL,OAAO,EAAE,YAAY;KACtB,CAAC;AACJ,CAAC;AASD,MAAM,UAAU,SAAS,CAAC,UAA4B,EAAE;IACtD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,EAAE,SAAS,EAAE,KAAK,EAAE,OAAO,GAAG,IAAI,EAAE,cAAc,EAAE,GAAG,OAAO,CAAC;IACrE,MAAM,CAAC,UAAU,EAAE,aAAa,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IACpD,MAAM,CAAC,eAAe,EAAE,kBAAkB,CAAC,GAAG,QAAQ,CAAW,EAAE,CAAC,CAAC;IACrE,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,SAAS,CAAC,GAAG,EAAE;QACb,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,aAAa,CAAC,KAAK,CAAC,CAAC;YACrB,kBAAkB,CAAC,EAAE,CAAC,CAAC;YACvB,OAAO;QACT,CAAC;QAED,IAAI,CAAC;YACH,MAAM,MAAM,GAAG,mBAAmB,CAAC;gBACjC,MAAM;gBACN,SAAS;gBACT,KAAK;gBACL,cAAc;aACf,CAAC,CAAC;YAEH,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,kBAAkB,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC;YACnE,QAAQ,CAAC,IAAI,CAAC,CAAC;YAEf,OAAO,GAAG,EAAE;gBACV,MAAM,CAAC,UAAU,EAAE,CAAC;gBACpB,aAAa,CAAC,KAAK,CAAC,CAAC;gBACrB,kBAAkB,CAAC,EAAE,CAAC,CAAC;YACzB,CAAC,CAAC;QACJ,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9D,aAAa,CAAC,KAAK,CAAC,CAAC;QACvB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,cAAc,CAAC,CAAC,CAAC;IAExD,OAAO;QACL,UAAU;QACV,KAAK,EAAE,eAAe;QACtB,KAAK;KACN,CAAC;AACJ,CAAC;AAOD,MAAM,UAAU,eAAe,CAAC,MAAe;IAC7C,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAY,EAAE,CAAC,CAAC;IACxD,MAAM,CAAC,WAAW,EAAE,cAAc,CAAC,GAAG,QAAQ,CAAe,EAAE,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,KAAK,CAAC,CAAC;IAC9C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,WAAW,CAAC,EAAE,CAAC,CAAC;YAChB,cAAc,CAAC,EAAE,CAAC,CAAC;YACnB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,CAAC,eAAe,EAAE,kBAAkB,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;gBAC9D,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC;gBAC1B,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC;aAClC,CAAC,CAAC;YACH,WAAW,CAAC,eAAe,CAAC,CAAC;YAC7B,cAAc,CAAC,kBAAkB,CAAC,CAAC;YACnC,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,MAAM,OAAO,GAAG,OAAO,CAAmC,GAAG,EAAE;QAC7D,MAAM,GAAG,GAAG,IAAI,GAAG,EAA0C,CAAC;QAC9D,MAAM,KAAK,GAAqC,EAAE,CAAC;QAEnD,MAAM,oBAAoB,GAAG,IAAI,GAAG,EAAwB,CAAC;QAC7D,KAAK,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC;YAC5B,IAAI,CAAC,CAAC,SAAS,EAAE,CAAC;gBAChB,IAAI,CAAC,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC;oBAC3C,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;gBAC5C,CAAC;gBACD,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACjD,CAAC;QACH,CAAC;QAED,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE;gBACZ,GAAG,CAAC;gBACJ,WAAW,EAAE,oBAAoB,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,IAAI,EAAE;gBACjD,OAAO,EAAE,EAAE;aACZ,CAAC,CAAC;QACL,CAAC;QAED,KAAK,MAAM,CAAC,IAAI,QAAQ,EAAE,CAAC;YACzB,MAAM,QAAQ,GAAG,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAE,CAAC;YAChC,IAAI,CAAC,CAAC,QAAQ,IAAI,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,EAAE,CAAC;gBACtC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAE,CAAC,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAC9C,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACvB,CAAC;QACH,CAAC;QAED,OAAO,KAAK,CAAC;IACf,CAAC,EAAE,CAAC,QAAQ,EAAE,WAAW,CAAC,CAAC,CAAC;IAE5B,MAAM,qBAAqB,GAAG,OAAO,CAAe,GAAG,EAAE;QACvD,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;IACjD,CAAC,EAAE,CAAC,WAAW,CAAC,CAAC,CAAC;IAElB,MAAM,UAAU,GAAG,KAAK,EACtB,KAAwC,EACxC,gBAA4E,EAC5E,EAAE;QACF,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,oDAAoD,CAAC,CAAC;QACxE,CAAC;QACD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YAC9D,IAAI,kBAAkB,GAAiB,EAAE,CAAC;YAE1C,IAAI,gBAAgB,IAAI,gBAAgB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBACpD,kBAAkB,GAAG,MAAM,OAAO,CAAC,GAAG,CACpC,gBAAgB,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAC3B,MAAM,CAAC,gBAAgB,CAAC;oBACtB,GAAG,GAAG;oBACN,MAAM;oBACN,SAAS,EAAE,OAAO,CAAC,EAAE;iBACtB,CAAC,CACH,CACF,CAAC;YACJ,CAAC;YAED,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,OAAO,CAAC,CAAC,CAAC;YAC1C,IAAI,kBAAkB,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBAClC,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,GAAG,IAAI,EAAE,GAAG,kBAAkB,CAAC,CAAC,CAAC;YAC7D,CAAC;YACD,OAAO,EAAE,OAAO,EAAE,WAAW,EAAE,kBAAkB,EAAE,CAAC;QACtD,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,KAAoE,EAAE,EAAE;QACnG,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,uDAAuD,CAAC,CAAC;QAC3E,CAAC;QACD,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,GAAG,KAAK,EAAE,MAAM,EAAE,CAAC,CAAC;YACpE,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,OAAO,EAAE,GAAG,IAAI,CAAC,CAAC,CAAC;YAC7C,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,aAAa,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QACzC,IAAI,gBAAgB,GAAc,EAAE,CAAC;QACrC,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE;YACnB,gBAAgB,GAAG,IAAI,CAAC;YACxB,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACjC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,WAAW,CAAC,gBAAgB,CAAC,CAAC;YAC9B,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,gBAAgB,GAAG,KAAK,EAAE,EAAU,EAAE,EAAE;QAC5C,IAAI,mBAAmB,GAAiB,EAAE,CAAC;QAC3C,cAAc,CAAC,CAAC,IAAI,EAAE,EAAE;YACtB,mBAAmB,GAAG,IAAI,CAAC;YAC3B,OAAO,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC;QACzC,CAAC,CAAC,CAAC;QAEH,IAAI,CAAC;YACH,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACpC,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,cAAc,CAAC,mBAAmB,CAAC,CAAC;YACpC,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,WAAW,GAAG,KAAK,EACvB,SAAiB,EACjB,KAAa,EACb,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,EAAE,KAAK,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACpE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,cAAc,GAAG,KAAK,EAC1B,SAAiB,EACjB,KAAa,EACb,EAAE;QACF,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,EAAE,KAAK,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC;YACvE,WAAW,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3E,OAAO,OAAO,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,QAAQ,GAAG,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;YACrE,QAAQ,CAAC,QAAQ,CAAC,CAAC;YACnB,MAAM,QAAQ,CAAC;QACjB,CAAC;IACH,CAAC,CAAC;IAEF,OAAO;QACL,QAAQ;QACR,WAAW;QACX,OAAO;QACP,qBAAqB;QACrB,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;QACtB,UAAU;QACV,aAAa;QACb,aAAa;QACb,gBAAgB;QAChB,WAAW;QACX,cAAc;KACf,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,eAAe,CAAC,SAA6B;IAC3D,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAA8B,IAAI,CAAC,CAAC;IAC5E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,iBAAiB,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC/C,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;YAC3D,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,CAAC;IAExB,SAAS,CAAC,GAAG,EAAE;QACb,iBAAiB,EAAE,CAAC;IACtB,CAAC,EAAE,CAAC,iBAAiB,CAAC,CAAC,CAAC;IAExB,OAAO;QACL,QAAQ;QACR,OAAO;QACP,KAAK;QACL,OAAO,EAAE,iBAAiB;KAC3B,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,iBAAiB,CAC/B,SAA6B,EAC7B,iBAAwC,EAAE;IAE1C,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAmB,cAAc,CAAC,KAAK,IAAI,KAAK,CAAC,CAAC;IACpF,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,GAAG,QAAQ,CAAwB,IAAI,CAAC,CAAC;IAClE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,WAAW,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QACzC,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,SAAS,CAAC,IAAI,CAAC,CAAC;YAChB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,SAAS,EAAE;gBACrD,GAAG,cAAc;gBACjB,KAAK;aACN,CAAC,CAAC;YACH,SAAS,CAAC,IAAI,CAAC,CAAC;YAChB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,SAAS,EAAE,KAAK,EAAE,cAAc,CAAC,WAAW,EAAE,cAAc,CAAC,WAAW,CAAC,CAAC,CAAC;IAEvF,SAAS,CAAC,GAAG,EAAE;QACb,WAAW,EAAE,CAAC;IAChB,CAAC,EAAE,CAAC,WAAW,CAAC,CAAC,CAAC;IAElB,OAAO;QACL,MAAM;QACN,KAAK;QACL,QAAQ;QACR,KAAK,EAAE,MAAM,EAAE,KAAK,IAAI,IAAI;QAC5B,QAAQ,EAAE,MAAM,EAAE,QAAQ,IAAI,IAAI;QAClC,QAAQ,EAAE,MAAM,EAAE,QAAQ,IAAI,IAAI;QAClC,OAAO;QACP,KAAK;QACL,OAAO,EAAE,WAAW;KACrB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,aAAa,CAAC,MAA0B;IACtD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,UAAU,EAAE,aAAa,CAAC,GAAG,QAAQ,CAAwB,IAAI,CAAC,CAAC;IAC1E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,eAAe,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;YAChD,aAAa,CAAC,IAAI,CAAC,CAAC;YACpB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,eAAe,EAAE,CAAC;IACpB,CAAC,EAAE,CAAC,eAAe,CAAC,CAAC,CAAC;IAEtB,OAAO;QACL,UAAU;QACV,UAAU,EAAE,UAAU,EAAE,UAAU,IAAI,IAAI;QAC1C,QAAQ,EAAE,UAAU,EAAE,QAAQ,IAAI,IAAI;QACtC,QAAQ,EAAE,UAAU,EAAE,QAAQ,IAAI,IAAI;QACtC,OAAO,EAAE,UAAU,EAAE,OAAO,IAAI,IAAI;QACpC,OAAO;QACP,KAAK;QACL,OAAO,EAAE,eAAe;KACzB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,cAAc,CAAC,MAA0B;IACvD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAqB,IAAI,CAAC,CAAC;IACjE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAA6B,IAAI,CAAC,CAAC;IACzE,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,YAAY,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC1C,IAAI,CAAC,MAAM,EAAE,CAAC;YACZ,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,UAAU,CAAC,KAAK,CAAC,CAAC;YAClB,OAAO;QACT,CAAC;QACD,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;gBAC/B,MAAM,CAAC,cAAc,CAAC,MAAM,CAAC;gBAC7B,MAAM,CAAC,sBAAsB,CAAC,MAAM,CAAC;aACtC,CAAC,CAAC;YACH,UAAU,CAAC,CAAC,CAAC,CAAC;YACd,UAAU,CAAC,CAAC,CAAC,CAAC;YACd,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,CAAC;IAErB,SAAS,CAAC,GAAG,EAAE;QACb,YAAY,EAAE,CAAC;IACjB,CAAC,EAAE,CAAC,YAAY,CAAC,CAAC,CAAC;IAEnB,OAAO;QACL,OAAO;QACP,OAAO;QACP,eAAe,EAAE,OAAO,EAAE,eAAe,IAAI,IAAI;QACjD,YAAY,EAAE,OAAO,EAAE,YAAY,IAAI,IAAI;QAC3C,QAAQ,EAAE,OAAO,EAAE,QAAQ,IAAI,IAAI;QACnC,GAAG,EAAE,OAAO,EAAE,GAAG,IAAI,IAAI;QACzB,YAAY,EAAE,OAAO,EAAE,YAAY,IAAI,IAAI;QAC3C,OAAO;QACP,KAAK;QACL,OAAO,EAAE,YAAY;KACtB,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,uBAAuB,CACrC,SAAkB,EAClB,iBAA8C,EAAE;IAEhD,MAAM,MAAM,GAAG,qBAAqB,EAAE,CAAC;IACvC,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAAmB,cAAc,CAAC,QAAQ,IAAI,MAAM,CAAC,CAAC;IAC9F,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAkB,cAAc,CAAC,OAAO,IAAI,UAAU,CAAC,CAAC;IAC9F,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,GAAG,QAAQ,CAAiB,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,CAAC;IACzF,MAAM,CAAC,QAAQ,EAAE,WAAW,CAAC,GAAG,QAAQ,CAA8B,IAAI,CAAC,CAAC;IAC5E,MAAM,CAAC,OAAO,EAAE,UAAU,CAAC,GAAG,QAAQ,CAAC,IAAI,CAAC,CAAC;IAC7C,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,QAAQ,CAAe,IAAI,CAAC,CAAC;IAEvD,MAAM,aAAa,GAAG,WAAW,CAAC,KAAK,IAAI,EAAE;QAC3C,IAAI,CAAC;YACH,UAAU,CAAC,IAAI,CAAC,CAAC;YACjB,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,SAAS,EAAE;gBAC3D,GAAG,cAAc;gBACjB,QAAQ;gBACR,OAAO;gBACP,MAAM;aACP,CAAC,CAAC;YACH,WAAW,CAAC,IAAI,CAAC,CAAC;YAClB,QAAQ,CAAC,IAAI,CAAC,CAAC;QACjB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,QAAQ,CAAC,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QAChE,CAAC;gBAAS,CAAC;YACT,UAAU,CAAC,KAAK,CAAC,CAAC;QACpB,CAAC;IACH,CAAC,EAAE;QACD,MAAM;QACN,SAAS;QACT,QAAQ;QACR,OAAO;QACP,MAAM;QACN,cAAc,CAAC,SAAS;QACxB,cAAc,CAAC,OAAO;QACtB,cAAc,CAAC,0BAA0B;KAC1C,CAAC,CAAC;IAEH,SAAS,CAAC,GAAG,EAAE;QACb,aAAa,EAAE,CAAC;IAClB,CAAC,EAAE,CAAC,aAAa,CAAC,CAAC,CAAC;IAEpB,OAAO;QACL,QAAQ;QACR,QAAQ;QACR,WAAW;QACX,OAAO;QACP,UAAU;QACV,MAAM;QACN,SAAS;QACT,OAAO,EAAE,QAAQ,EAAE,OAAO,IAAI,EAAE;QAChC,UAAU,EAAE,QAAQ,EAAE,UAAU,IAAI,EAAE;QACtC,YAAY,EAAE,QAAQ,EAAE,YAAY,IAAI,EAAE;QAC1C,UAAU,EAAE,QAAQ,EAAE,UAAU,IAAI,CAAC;QACrC,aAAa,EAAE,QAAQ,EAAE,aAAa,IAAI,CAAC;QAC3C,kBAAkB,EAAE,QAAQ,EAAE,kBAAkB;QAChD,OAAO;QACP,KAAK;QACL,OAAO,EAAE,aAAa;KACvB,CAAC;AACJ,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/react",
3
- "version": "0.12.2",
3
+ "version": "0.13.0",
4
4
  "description": "React Context Provider and Hooks for Critical Path headless project management framework",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -18,9 +18,9 @@
18
18
  }
19
19
  },
20
20
  "dependencies": {
21
- "@critical-path/mcp": "0.8.0",
22
- "@critical-path/client": "0.14.8",
23
- "@critical-path/core": "0.23.0"
21
+ "@critical-path/client": "0.15.0",
22
+ "@critical-path/mcp": "0.10.0",
23
+ "@critical-path/core": "0.25.0"
24
24
  },
25
25
  "peerDependencies": {
26
26
  "react": "^18.0.0 || ^19.0.0"
package/src/hooks.ts CHANGED
@@ -1,3 +1,4 @@
1
+ import type { CreateAttachmentBody, CreateCommentBody, CreateTaskBody, UpdateCommentBody, UpdateDeliverableBody, UpdateTaskBody } from '@critical-path/core/schemas';
1
2
  import { useState, useEffect, useCallback, useMemo, useRef } from 'react';
2
3
  import type {
3
4
  Project,
@@ -196,11 +197,14 @@ export function useTasks(projectId?: string) {
196
197
  fetchTasks();
197
198
  }, [fetchTasks]);
198
199
 
199
- const createTask = async (input: Omit<Task, 'id' | 'createdAt' | 'updatedAt'>) => {
200
+ const createTask = async (input: CreateTaskBody) => {
200
201
  const tempId = `temp_${Date.now()}_${Math.random().toString(36).substring(2, 7)}`;
201
202
  const now = new Date().toISOString();
202
203
  const tempTask: Task = {
203
204
  ...input,
205
+ // Placeholders until the server responds with the workflow's real defaults
206
+ status: input.status ?? 'todo',
207
+ priority: input.priority ?? 'medium',
204
208
  id: tempId,
205
209
  createdAt: now,
206
210
  updatedAt: now
@@ -226,7 +230,7 @@ export function useTasks(projectId?: string) {
226
230
  }
227
231
  };
228
232
 
229
- const updateTask = async (taskId: string, updates: Partial<Task>) => {
233
+ const updateTask = async (taskId: string, updates: UpdateTaskBody) => {
230
234
  let targetId = taskId;
231
235
  if (tempToRealIdMapRef.current.has(taskId)) {
232
236
  targetId = tempToRealIdMapRef.current.get(taskId)!;
@@ -442,7 +446,7 @@ export function useComments(taskId: string) {
442
446
  fetchComments();
443
447
  }, [fetchComments]);
444
448
 
445
- const addComment = async (input: Omit<Comment, 'id' | 'taskId' | 'createdAt' | 'updatedAt'>) => {
449
+ const addComment = async (input: Omit<CreateCommentBody, 'taskId'>) => {
446
450
  try {
447
451
  const created = await client.addComment({ ...input, taskId });
448
452
  setComments((prev) => [...prev, created]);
@@ -454,7 +458,7 @@ export function useComments(taskId: string) {
454
458
  }
455
459
  };
456
460
 
457
- const updateComment = async (id: string, updates: Partial<Comment>) => {
461
+ const updateComment = async (id: string, updates: UpdateCommentBody) => {
458
462
  try {
459
463
  const updated = await client.updateComment(id, updates);
460
464
  setComments((prev) => prev.map((c) => (c.id === id ? updated : c)));
@@ -479,14 +483,10 @@ export function useComments(taskId: string) {
479
483
 
480
484
  const addReaction = async (
481
485
  commentId: string,
482
- reactionOrEmoji: { emoji: string; userId: string } | string,
483
- maybeUserId?: string
486
+ emoji: string
484
487
  ) => {
485
488
  try {
486
- const payload =
487
- typeof reactionOrEmoji === 'string'
488
- ? { emoji: reactionOrEmoji, userId: maybeUserId! }
489
- : reactionOrEmoji;
489
+ const payload = { emoji };
490
490
  const updated = await client.addCommentReaction(commentId, payload);
491
491
  setComments((prev) => prev.map((c) => (c.id === commentId ? updated : c)));
492
492
  return updated;
@@ -499,14 +499,10 @@ export function useComments(taskId: string) {
499
499
 
500
500
  const removeReaction = async (
501
501
  commentId: string,
502
- reactionOrEmoji: { emoji: string; userId: string } | string,
503
- maybeUserId?: string
502
+ emoji: string
504
503
  ) => {
505
504
  try {
506
- const payload =
507
- typeof reactionOrEmoji === 'string'
508
- ? { emoji: reactionOrEmoji, userId: maybeUserId! }
509
- : reactionOrEmoji;
505
+ const payload = { emoji };
510
506
  const updated = await client.removeCommentReaction(commentId, payload);
511
507
  setComments((prev) => prev.map((c) => (c.id === commentId ? updated : c)));
512
508
  return updated;
@@ -652,7 +648,7 @@ export function useDeliverables(projectId?: string) {
652
648
  }
653
649
  };
654
650
 
655
- const updateDeliverable = async (id: string, updates: Partial<Deliverable>) => {
651
+ const updateDeliverable = async (id: string, updates: UpdateDeliverableBody) => {
656
652
  try {
657
653
  const updated = await client.updateDeliverable(id, updates);
658
654
  setDeliverables((prev) => prev.map((d) => (d.id === id ? updated : d)));
@@ -851,8 +847,8 @@ export function useTaskActivity(taskId?: string) {
851
847
  }, [attachments]);
852
848
 
853
849
  const addComment = async (
854
- input: Omit<Comment, 'id' | 'taskId' | 'createdAt' | 'updatedAt'>,
855
- attachmentInputs?: Array<Omit<Attachment, 'id' | 'taskId' | 'commentId' | 'createdAt' | 'updatedAt'>>
850
+ input: Omit<CreateCommentBody, 'taskId'>,
851
+ attachmentInputs?: Array<Omit<CreateAttachmentBody, 'taskId' | 'commentId'>>
856
852
  ) => {
857
853
  if (!taskId) {
858
854
  throw new Error('useTaskActivity requires a taskId to add comments.');
@@ -936,14 +932,10 @@ export function useTaskActivity(taskId?: string) {
936
932
 
937
933
  const addReaction = async (
938
934
  commentId: string,
939
- reactionOrEmoji: { emoji: string; userId: string } | string,
940
- maybeUserId?: string
935
+ emoji: string
941
936
  ) => {
942
937
  try {
943
- const payload =
944
- typeof reactionOrEmoji === 'string'
945
- ? { emoji: reactionOrEmoji, userId: maybeUserId! }
946
- : reactionOrEmoji;
938
+ const payload = { emoji };
947
939
  const updated = await client.addCommentReaction(commentId, payload);
948
940
  setComments((prev) => prev.map((c) => (c.id === commentId ? updated : c)));
949
941
  return updated;
@@ -956,14 +948,10 @@ export function useTaskActivity(taskId?: string) {
956
948
 
957
949
  const removeReaction = async (
958
950
  commentId: string,
959
- reactionOrEmoji: { emoji: string; userId: string } | string,
960
- maybeUserId?: string
951
+ emoji: string
961
952
  ) => {
962
953
  try {
963
- const payload =
964
- typeof reactionOrEmoji === 'string'
965
- ? { emoji: reactionOrEmoji, userId: maybeUserId! }
966
- : reactionOrEmoji;
954
+ const payload = { emoji };
967
955
  const updated = await client.removeCommentReaction(commentId, payload);
968
956
  setComments((prev) => prev.map((c) => (c.id === commentId ? updated : c)));
969
957
  return updated;