@critical-path/mcp 0.9.0 → 0.10.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,40 @@
1
1
  # @critical-path/mcp
2
2
 
3
+ ## 0.10.0
4
+
5
+ ### Minor Changes
6
+
7
+ - fd79762: **BREAKING:** strict request bodies, no identity in payloads, and CORS off by default.
8
+
9
+ **@critical-path/core**
10
+ - Request schemas are strict: unknown keys, server-assigned fields and identity fields are rejected instead of stripped.
11
+ - Identity is never read from payloads. `updateTask` no longer reads `actorId`/`actorName`/`actorType`/`actor` from the update object; pass them as the third `options` argument or use `withActor`. `addComment`, `addCommentReaction`, `removeCommentReaction` and `createAttachment` take the actor from `withActor`, falling back to an optional `authorId`/`userId`/`uploaderId`, then `'system'`.
12
+ - Schemas export request body types (`CreateTaskBody`, `UpdateTaskBody`, ...).
13
+
14
+ **@critical-path/server**
15
+ - Bodies containing unknown, server-assigned or identity fields return `400`.
16
+ - Every request runs as the `getContext` user, or `ANONYMOUS_ACTOR` (`anonymous`). Authors of comments, reactions, attachments and time entries are no longer accepted from bodies.
17
+ - `DELETE /comments/:id/reactions` takes `?emoji=` only.
18
+ - CORS is off by default (`cors: false`). Pass `cors: { origins: [...] }` to allow cross-origin browsers.
19
+
20
+ **@critical-path/client**
21
+ - Method parameters use the server's body types, so identity fields no longer type-check. `addCommentReaction`/`removeCommentReaction` take `{ emoji }`; `addTodo`/`toggleTodo` drop the actor options argument.
22
+ - New `updateProject`, `deleteProject` and `addDependency`. `uploadAttachmentFile` base64-encodes binary data (previously it sent unusable JSON for `Uint8Array`/`ArrayBuffer`).
23
+ - CLI: `--author`, `--actor-id`, `--actor-name`, `--agent-name` and `CRITICAL_PATH_AUTHOR_ID`/`ACTOR_ID`/`AGENT_NAME` are removed; identity comes from the `--key` token via the server's `getContext`.
24
+
25
+ **@critical-path/mcp**
26
+ - Tool arguments are strict: undeclared arguments return an `isError` result.
27
+ - `add_comment` no longer takes `authorId`. With an `engine`, writes are attributed to the new `actor` server option (default `DEFAULT_MCP_ACTOR`).
28
+
29
+ **@critical-path/react / @critical-path/svelte**
30
+ - `addReaction`/`removeReaction` take `(commentId, emoji)`; comment and attachment inputs no longer accept `authorId`/`uploaderId`. Task, comment and deliverable update parameters use the schema body types.
31
+
32
+ ### Patch Changes
33
+
34
+ - Updated dependencies [fd79762]
35
+ - @critical-path/core@0.25.0
36
+ - @critical-path/client@0.15.0
37
+
3
38
  ## 0.9.0
4
39
 
5
40
  ### Minor Changes
package/README.md CHANGED
@@ -172,12 +172,14 @@ handle.unregister();
172
172
  | `list_deliverables` | List project milestone deliverables | `{ projectId? }` |
173
173
  | `create_deliverable` | Create a milestone deliverable | `{ projectId?, title, dueDate? }` |
174
174
  | `list_comments` | Retrieve task comments | `{ taskId }` |
175
- | `add_comment` | Post a comment to a task | `{ taskId, content, authorId }` |
175
+ | `add_comment` | Post a comment to a task (authored by the server's actor) | `{ taskId, content }` |
176
176
  | `calculate_critical_path` | Calculate CPM schedule, float/slack & bottleneck tasks | `{ projectId? }` |
177
177
  | `get_timeline_ladder` | Multi-scale Ladder of Abstraction (macro/standard/concrete) | `{ projectId?, level?, containerId?, iterationId? }` |
178
178
  | `get_task_ladder` | Single-task ladder view connecting phase, CPM Gantt, and concrete evidence | `{ taskId }` |
179
179
 
180
- Each tool's JSON `inputSchema` is generated from its zod schema with `defineTool`, so what the model sees always matches what is enforced. Tool arguments are validated against each tool's zod schema before execution, on both the standard server and WebMCP. Invalid arguments return an `isError` result, and fields a tool does not declare are stripped (for example, `projectId` cannot be changed through `update_task`). When you pass `tools: [...]` to `createCriticalPathMcpServer`, tools outside that list are neither listed nor callable. `delete_task` is advertised with the MCP `destructiveHint` annotation.
180
+ Each tool's JSON `inputSchema` is generated from its zod schema with `defineTool`, so what the model sees always matches what is enforced. Tool arguments are validated against each tool's zod schema before execution, on both the standard server and WebMCP. Invalid or undeclared arguments return an `isError` result naming the problem (for example, `projectId` cannot be passed to `update_task`).
181
+
182
+ **Identity:** with an `engine`, changes are attributed to the server's `actor` option (default `DEFAULT_MCP_ACTOR`, `mcp-agent`); tools never take author or actor arguments. With a `client`, the API's authentication decides who the caller is. When you pass `tools: [...]` to `createCriticalPathMcpServer`, tools outside that list are neither listed nor callable. `delete_task` is advertised with the MCP `destructiveHint` annotation.
181
183
 
182
184
  ---
183
185
 
@@ -164,7 +164,7 @@ describe('@critical-path/mcp', () => {
164
164
  await expect(client.callTool({ name: 'delete_task', arguments: { id: task.id } })).rejects.toThrow(/not registered/);
165
165
  expect(await engine.getTask(task.id)).not.toBeNull();
166
166
  });
167
- it('validates tool arguments and strips undeclared fields', async () => {
167
+ it('validates tool arguments and rejects undeclared fields', async () => {
168
168
  const source = await engine.createProject({ name: 'Source', key: 'SRC' });
169
169
  const other = await engine.createProject({ name: 'Other', key: 'OTH' });
170
170
  const task = await engine.createTask({ projectId: source.id, title: 'Stay put' });
@@ -172,13 +172,25 @@ describe('@critical-path/mcp', () => {
172
172
  const invalid = await client.callTool({ name: 'get_task', arguments: { id: 42 } });
173
173
  expect(invalid.isError).toBe(true);
174
174
  expect(invalid.content[0].text).toContain('Invalid arguments');
175
- await client.callTool({
175
+ const undeclared = await client.callTool({
176
176
  name: 'update_task',
177
177
  arguments: { id: task.id, title: 'Renamed', projectId: other.id }
178
178
  });
179
- const updated = await engine.getTask(task.id);
180
- expect(updated?.title).toBe('Renamed');
181
- expect(updated?.projectId).toBe(source.id);
179
+ expect(undeclared.isError).toBe(true);
180
+ expect(undeclared.content[0].text).toContain('projectId');
181
+ const unchanged = await engine.getTask(task.id);
182
+ expect(unchanged?.title).toBe('Stay put');
183
+ expect(unchanged?.projectId).toBe(source.id);
184
+ });
185
+ it('attributes engine writes to the configured actor', async () => {
186
+ const project = await engine.createProject({ name: 'Actors', key: 'ACT' });
187
+ const task = await engine.createTask({ projectId: project.id, title: 'T' });
188
+ const defaultClient = await connect({ engine });
189
+ const first = await defaultClient.callTool({ name: 'add_comment', arguments: { taskId: task.id, content: 'hi' } });
190
+ expect(JSON.parse(first.content[0].text).authorId).toBe('mcp-agent');
191
+ const namedClient = await connect({ engine, actor: { userId: 'claude', actorType: 'agent' } });
192
+ const second = await namedClient.callTool({ name: 'add_comment', arguments: { taskId: task.id, content: 'hi' } });
193
+ expect(JSON.parse(second.content[0].text).authorId).toBe('claude');
182
194
  });
183
195
  it('marks destructive tools with MCP annotations', async () => {
184
196
  const client = await connect({ engine });
@@ -1 +1 @@
1
- {"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,UAAU,EAAE,MAAM,QAAQ,CAAC;AAC1D,OAAO,EAAE,kBAAkB,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AACxE,OAAO,EAAE,MAAM,EAAE,MAAM,2CAA2C,CAAC;AACnE,OAAO,EAAE,iBAAiB,EAAE,MAAM,uCAAuC,CAAC;AAC1E,OAAO,EACL,SAAS,EACT,QAAQ,EACR,2BAA2B,EAC3B,mBAAmB,EACnB,sBAAsB,EACvB,MAAM,YAAY,CAAC;AAEpB,QAAQ,CAAC,oBAAoB,EAAE,GAAG,EAAE;IAClC,IAAI,MAA0B,CAAC;IAE/B,UAAU,CAAC,GAAG,EAAE;QACd,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,KAAK,EAAE,IAAI,aAAa,EAAE,EAAE,CAAC,CAAC;IAClE,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;QAChC,EAAE,CAAC,6CAA6C,EAAE,GAAG,EAAE;YACrD,MAAM,SAAS,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YAC/C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;YAC7C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;YAC9C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,YAAY,CAAC,CAAC;YAC1C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YACxC,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YACjD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,oBAAoB,CAAC,CAAC;YAClD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;YAC7C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,yBAAyB,CAAC,CAAC;YACvD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,qBAAqB,CAAC,CAAC;YACnD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,iBAAiB,CAAC,CAAC;YAC/C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,2BAA2B,CAAC,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;YAC5E,oBAAoB;YACpB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,gBAAgB,CAAE,CAAC;YACvD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C,EAAE,IAAI,EAAE,iBAAiB,EAAE,GAAG,EAAE,KAAK,EAAE,EACvC,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YAE7C,mBAAmB;YACnB,MAAM,YAAY,GAAG,QAAQ,CAAC,GAAG,CAAC,eAAe,CAAE,CAAC;YACpD,MAAM,QAAQ,GAAG,MAAM,YAAY,CAAC,OAAO,CAAC,EAAE,EAAE,MAAM,CAAC,CAAC;YACxD,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACjC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAExC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,IAAI,GAAG,MAAM,cAAc,CAAC,OAAO,CACvC;gBACE,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,uBAAuB;gBAC9B,QAAQ,EAAE,QAAQ;gBAClB,IAAI,EAAE,CAAC,OAAO,EAAE,KAAK,CAAC;aACvB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC9B,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjD,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAErC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C;gBACE,EAAE,EAAE,IAAI,CAAC,EAAE;gBACX,MAAM,EAAE,aAAa;gBACrB,cAAc,EAAE,CAAC;aAClB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAEvC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C;gBACE,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,OAAO,EAAE,qCAAqC;gBAC9C,QAAQ,EAAE,SAAS;aACpB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,qCAAqC,CAAC,CAAC;YAEpE,4BAA4B;YAC5B,MAAM,aAAa,GAAG,QAAQ,CAAC,GAAG,CAAC,YAAY,CAAE,CAAC;YAClD,MAAM,QAAQ,GAAG,MAAM,aAAa,CAAC,OAAO,CAC1C,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,EAChD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEjC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,MAAM,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAElC,MAAM,WAAW,GAAG,MAAM,aAAa,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,WAAW,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACtC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,oEAAoE,EAAE,KAAK,IAAI,EAAE;YAClF,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,gBAAgB,CAAE,CAAC;YACvD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,qBAAqB,EAAE,GAAG,EAAE,KAAK,EAAE,EAAE,MAAM,CAAC,CAAC;YAElG,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,EAAE,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC;gBACtC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,mBAAmB;gBAC1B,MAAM,EAAE,MAAM;gBACd,cAAc,EAAE,CAAC;aAClB,EAAE,MAAM,CAAC,CAAC;YAEX,MAAM,EAAE,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC;gBACtC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,gBAAgB;gBACvB,MAAM,EAAE,aAAa;gBACrB,cAAc,EAAE,CAAC;aAClB,EAAE,MAAM,CAAC,CAAC;YAEX,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,EAAE,CAAC,EAAE;gBACb,eAAe,EAAE,EAAE,CAAC,EAAE;gBACtB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,kCAAkC;YAClC,MAAM,OAAO,GAAG,QAAQ,CAAC,GAAG,CAAC,yBAAyB,CAAE,CAAC;YACzD,MAAM,SAAS,GAAG,MAAM,OAAO,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YAC3E,MAAM,CAAC,SAAS,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9C,MAAM,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1D,8BAA8B;YAC9B,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,qBAAqB,CAAE,CAAC;YACxD,MAAM,YAAY,GAAG,MAAM,UAAU,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,EAAE,MAAM,CAAC,CAAC;YAC/F,MAAM,CAAC,YAAY,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;YACzC,MAAM,CAAC,YAAY,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9D,MAAM,CAAC,YAAY,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEpD,0BAA0B;YAC1B,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,iBAAiB,CAAE,CAAC;YACxD,MAAM,gBAAgB,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACjF,MAAM,CAAC,gBAAgB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC5C,MAAM,CAAC,gBAAgB,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;YAC/D,MAAM,CAAC,gBAAgB,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;YAE/C,2BAA2B;YAC3B,MAAM,eAAe,GAAG,QAAQ,CAAC,GAAG,CAAC,kBAAkB,CAAE,CAAC;YAC1D,MAAM,iBAAiB,GAAG,MAAM,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC7C,MAAM,CAAC,iBAAiB,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAC9D,MAAM,CAAC,iBAAiB,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;YACjD,MAAM,CAAC,iBAAiB,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;YAE5C,oCAAoC;YACpC,MAAM,eAAe,GAAG,QAAQ,CAAC,GAAG,CAAC,2BAA2B,CAAE,CAAC;YACnE,MAAM,iBAAiB,GAAG,MAAM,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC7C,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;YAElE,oCAAoC;YACpC,MAAM,YAAY,GAAG,QAAQ,CAAC,GAAG,CAAC,2BAA2B,CAAE,CAAC;YAChE,MAAM,cAAc,GAAG,MAAM,YAAY,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,EAAE,MAAM,CAAC,CAAC;YACvG,MAAM,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAClD,MAAM,CAAC,cAAc,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACzD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QACvD,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;QAC5C,EAAE,CAAC,kDAAkD,EAAE,GAAG,EAAE;YAC1D,MAAM,MAAM,GAAG,2BAA2B,CAAC;gBACzC,MAAM;gBACN,IAAI,EAAE,iBAAiB;gBACvB,OAAO,EAAE,OAAO;aACjB,CAAC,CAAC;YACH,MAAM,CAAC,MAAM,CAAC,CAAC,WAAW,EAAE,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,GAAG,EAAE;YACzD,MAAM,CAAC,GAAG,EAAE,CAAC,2BAA2B,CAAC,EAAS,CAAC,CAAC,CAAC,OAAO,CAC1D,0CAA0C,CAC3C,CAAC;QACJ,CAAC,CAAC,CAAC;QACH,KAAK,UAAU,OAAO,CAAC,OAA0D;YAC/E,MAAM,MAAM,GAAG,2BAA2B,CAAC,OAAO,CAAC,CAAC;YACpD,MAAM,MAAM,GAAG,IAAI,MAAM,CAAC,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;YACrE,MAAM,CAAC,eAAe,EAAE,eAAe,CAAC,GAAG,iBAAiB,CAAC,gBAAgB,EAAE,CAAC;YAChF,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,eAAe,CAAC,EAAE,MAAM,CAAC,OAAO,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtF,OAAO,MAAM,CAAC;QAChB,CAAC;QAED,EAAE,CAAC,oDAAoD,EAAE,KAAK,IAAI,EAAE;YAClE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,SAAS,EAAE,GAAG,EAAE,KAAK,EAAE,CAAC,CAAC;YAC5E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC,CAAC;YAClF,MAAM,MAAM,GAAG,MAAM,OAAO,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;YAEhE,MAAM,EAAE,KAAK,EAAE,GAAG,MAAM,MAAM,CAAC,SAAS,EAAE,CAAC;YAC3C,MAAM,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC;YAEzD,MAAM,MAAM,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,IAAI,EAAE,aAAa,EAAE,SAAS,EAAE,EAAE,EAAE,EAAE,IAAI,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAChG,gBAAgB,CACjB,CAAC;YACF,MAAM,CAAC,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;QACvD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;YACrE,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,GAAG,EAAE,KAAK,EAAE,CAAC,CAAC;YAC1E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,GAAG,EAAE,KAAK,EAAE,CAAC,CAAC;YACxE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,CAAC,CAAC;YAClF,MAAM,MAAM,GAAG,MAAM,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;YAEzC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,EAAE,IAAI,EAAE,UAAU,EAAE,SAAS,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,CAAC,CAAC;YACnF,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAE,OAAO,CAAC,OAAmC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YAE5F,MAAM,MAAM,CAAC,QAAQ,CAAC;gBACpB,IAAI,EAAE,aAAa;gBACnB,SAAS,EAAE,EAAE,EAAE,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,SAAS,EAAE,SAAS,EAAE,KAAK,CAAC,EAAE,EAAE;aAClE,CAAC,CAAC;YACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9C,MAAM,CAAC,OAAO,EAAE,KAAK,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;YACvC,MAAM,CAAC,OAAO,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC7C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8CAA8C,EAAE,KAAK,IAAI,EAAE;YAC5D,MAAM,MAAM,GAAG,MAAM,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;YACzC,MAAM,EAAE,KAAK,EAAE,GAAG,MAAM,MAAM,CAAC,SAAS,EAAE,CAAC;YAC3C,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,KAAK,aAAa,CAAC,EAAE,WAAW,EAAE,eAAe,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC7F,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,KAAK,YAAY,CAAC,EAAE,WAAW,EAAE,YAAY,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC3F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qBAAqB,EAAE,GAAG,EAAE;QACnC,IAAI,OAAY,CAAC;QACjB,IAAI,OAAY,CAAC;QAEjB,UAAU,CAAC,GAAG,EAAE;YACd,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,GAAG,EAAE,CAAC;QACf,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8EAA8E,EAAE,GAAG,EAAE;YACtF,MAAM,IAAI,GAAG,sBAAsB,CAAC,OAAO,CAAC,CAAC;YAC7C,MAAM,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,CAAC;YAC3B,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,IAAK,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QACrD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,qBAAqB,EAAE,CAAC,CAAC;YAE5E,uCAAuC;YACvC,MAAM,UAAU,GAAQ;gBACtB,WAAW,EAAE,GAAG,EAAE,CAAC,MAAM,CAAC,WAAW,EAAE;gBACvC,UAAU,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC;gBACjD,aAAa,EAAE,CAAC,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,aAAa,CAAC,CAAC,CAAC;gBAClD,QAAQ,EAAE,CAAC,GAAY,EAAE,EAAE,CAAC,MAAM,CAAC,QAAQ,CAAC,GAAG,CAAC;gBAChD,OAAO,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC;gBAC3C,UAAU,EAAE,CAAC,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;gBAC5C,UAAU,EAAE,CAAC,EAAU,EAAE,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,CAAC,CAAC;gBAC5D,UAAU,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC;aAClD,CAAC;YAEF,MAAM,MAAM,GAAG,mBAAmB,CAAC;gBACjC,MAAM,EAAE,UAAU;gBAClB,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,QAAQ,EAAE,OAAO;gBACjB,MAAM,EAAE,OAAO;aAChB,CAAC,CAAC;YAEH,MAAM,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAC9D,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC,WAAW,EAAE,CAAC;YAE3C,MAAM,UAAU,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,MAAM,CAAC,CAAC;YAEnE,4EAA4E;YAC5E,MAAM,WAAW,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,WAAW,CAAC,aAAa,EAAE;gBACxE,KAAK,EAAE,yBAAyB;aACjC,CAAC,CAAC;YACH,MAAM,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAC/C,MAAM,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAE1D,yBAAyB;YACzB,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,CAAC,WAAW,EAAE,CAAC;YACvD,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAEpE,UAAU;YACV,MAAM,CAAC,UAAU,EAAE,CAAC;YACpB,MAAM,eAAe,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAC9D,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,CAAC,aAAa,EAAE,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,UAAU,GAAG,IAAI,eAAe,EAAE,CAAC;YACzC,MAAM,UAAU,GAAQ;gBACtB,QAAQ,EAAE,GAAG,EAAE,CAAC,OAAO,CAAC,OAAO,CAAC,EAAE,CAAC;aACpC,CAAC;YAEF,mBAAmB,CAAC;gBAClB,MAAM,EAAE,UAAU;gBAClB,MAAM,EAAE,UAAU,CAAC,MAAM;gBACzB,QAAQ,EAAE,OAAO;gBACjB,MAAM,EAAE,OAAO;aAChB,CAAC,CAAC;YAEH,IAAI,KAAK,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAClD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAExC,UAAU,CAAC,KAAK,EAAE,CAAC;YAEnB,KAAK,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAC9C,MAAM,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
1
+ {"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,UAAU,EAAE,MAAM,QAAQ,CAAC;AAC1D,OAAO,EAAE,kBAAkB,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AACxE,OAAO,EAAE,MAAM,EAAE,MAAM,2CAA2C,CAAC;AACnE,OAAO,EAAE,iBAAiB,EAAE,MAAM,uCAAuC,CAAC;AAC1E,OAAO,EACL,SAAS,EACT,QAAQ,EACR,2BAA2B,EAC3B,mBAAmB,EACnB,sBAAsB,EACvB,MAAM,YAAY,CAAC;AAEpB,QAAQ,CAAC,oBAAoB,EAAE,GAAG,EAAE;IAClC,IAAI,MAA0B,CAAC;IAE/B,UAAU,CAAC,GAAG,EAAE;QACd,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,KAAK,EAAE,IAAI,aAAa,EAAE,EAAE,CAAC,CAAC;IAClE,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;QAChC,EAAE,CAAC,6CAA6C,EAAE,GAAG,EAAE;YACrD,MAAM,SAAS,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YAC/C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;YAC7C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;YAC9C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,YAAY,CAAC,CAAC;YAC1C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YACxC,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YACjD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,oBAAoB,CAAC,CAAC;YAClD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;YAC7C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,yBAAyB,CAAC,CAAC;YACvD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,qBAAqB,CAAC,CAAC;YACnD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,iBAAiB,CAAC,CAAC;YAC/C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,2BAA2B,CAAC,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;YAC5E,oBAAoB;YACpB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,gBAAgB,CAAE,CAAC;YACvD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C,EAAE,IAAI,EAAE,iBAAiB,EAAE,GAAG,EAAE,KAAK,EAAE,EACvC,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YAE7C,mBAAmB;YACnB,MAAM,YAAY,GAAG,QAAQ,CAAC,GAAG,CAAC,eAAe,CAAE,CAAC;YACpD,MAAM,QAAQ,GAAG,MAAM,YAAY,CAAC,OAAO,CAAC,EAAE,EAAE,MAAM,CAAC,CAAC;YACxD,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACjC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAExC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,IAAI,GAAG,MAAM,cAAc,CAAC,OAAO,CACvC;gBACE,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,uBAAuB;gBAC9B,QAAQ,EAAE,QAAQ;gBAClB,IAAI,EAAE,CAAC,OAAO,EAAE,KAAK,CAAC;aACvB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC9B,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjD,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAErC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C;gBACE,EAAE,EAAE,IAAI,CAAC,EAAE;gBACX,MAAM,EAAE,aAAa;gBACrB,cAAc,EAAE,CAAC;aAClB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAEvC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C;gBACE,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,OAAO,EAAE,qCAAqC;gBAC9C,QAAQ,EAAE,SAAS;aACpB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,qCAAqC,CAAC,CAAC;YAEpE,4BAA4B;YAC5B,MAAM,aAAa,GAAG,QAAQ,CAAC,GAAG,CAAC,YAAY,CAAE,CAAC;YAClD,MAAM,QAAQ,GAAG,MAAM,aAAa,CAAC,OAAO,CAC1C,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,EAChD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEjC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,MAAM,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAElC,MAAM,WAAW,GAAG,MAAM,aAAa,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,WAAW,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACtC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,oEAAoE,EAAE,KAAK,IAAI,EAAE;YAClF,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,gBAAgB,CAAE,CAAC;YACvD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,qBAAqB,EAAE,GAAG,EAAE,KAAK,EAAE,EAAE,MAAM,CAAC,CAAC;YAElG,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,EAAE,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC;gBACtC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,mBAAmB;gBAC1B,MAAM,EAAE,MAAM;gBACd,cAAc,EAAE,CAAC;aAClB,EAAE,MAAM,CAAC,CAAC;YAEX,MAAM,EAAE,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC;gBACtC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,gBAAgB;gBACvB,MAAM,EAAE,aAAa;gBACrB,cAAc,EAAE,CAAC;aAClB,EAAE,MAAM,CAAC,CAAC;YAEX,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,EAAE,CAAC,EAAE;gBACb,eAAe,EAAE,EAAE,CAAC,EAAE;gBACtB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,kCAAkC;YAClC,MAAM,OAAO,GAAG,QAAQ,CAAC,GAAG,CAAC,yBAAyB,CAAE,CAAC;YACzD,MAAM,SAAS,GAAG,MAAM,OAAO,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YAC3E,MAAM,CAAC,SAAS,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9C,MAAM,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1D,8BAA8B;YAC9B,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,qBAAqB,CAAE,CAAC;YACxD,MAAM,YAAY,GAAG,MAAM,UAAU,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,EAAE,MAAM,CAAC,CAAC;YAC/F,MAAM,CAAC,YAAY,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;YACzC,MAAM,CAAC,YAAY,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9D,MAAM,CAAC,YAAY,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEpD,0BAA0B;YAC1B,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,iBAAiB,CAAE,CAAC;YACxD,MAAM,gBAAgB,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACjF,MAAM,CAAC,gBAAgB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC5C,MAAM,CAAC,gBAAgB,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;YAC/D,MAAM,CAAC,gBAAgB,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;YAE/C,2BAA2B;YAC3B,MAAM,eAAe,GAAG,QAAQ,CAAC,GAAG,CAAC,kBAAkB,CAAE,CAAC;YAC1D,MAAM,iBAAiB,GAAG,MAAM,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC7C,MAAM,CAAC,iBAAiB,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAC9D,MAAM,CAAC,iBAAiB,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;YACjD,MAAM,CAAC,iBAAiB,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;YAE5C,oCAAoC;YACpC,MAAM,eAAe,GAAG,QAAQ,CAAC,GAAG,CAAC,2BAA2B,CAAE,CAAC;YACnE,MAAM,iBAAiB,GAAG,MAAM,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC7C,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;YAElE,oCAAoC;YACpC,MAAM,YAAY,GAAG,QAAQ,CAAC,GAAG,CAAC,2BAA2B,CAAE,CAAC;YAChE,MAAM,cAAc,GAAG,MAAM,YAAY,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,EAAE,MAAM,CAAC,CAAC;YACvG,MAAM,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAClD,MAAM,CAAC,cAAc,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACzD,MAAM,CAAC,cAAc,CAAC,UAAU,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QACvD,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;QAC5C,EAAE,CAAC,kDAAkD,EAAE,GAAG,EAAE;YAC1D,MAAM,MAAM,GAAG,2BAA2B,CAAC;gBACzC,MAAM;gBACN,IAAI,EAAE,iBAAiB;gBACvB,OAAO,EAAE,OAAO;aACjB,CAAC,CAAC;YACH,MAAM,CAAC,MAAM,CAAC,CAAC,WAAW,EAAE,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,GAAG,EAAE;YACzD,MAAM,CAAC,GAAG,EAAE,CAAC,2BAA2B,CAAC,EAAS,CAAC,CAAC,CAAC,OAAO,CAC1D,0CAA0C,CAC3C,CAAC;QACJ,CAAC,CAAC,CAAC;QACH,KAAK,UAAU,OAAO,CAAC,OAA0D;YAC/E,MAAM,MAAM,GAAG,2BAA2B,CAAC,OAAO,CAAC,CAAC;YACpD,MAAM,MAAM,GAAG,IAAI,MAAM,CAAC,EAAE,IAAI,EAAE,aAAa,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;YACrE,MAAM,CAAC,eAAe,EAAE,eAAe,CAAC,GAAG,iBAAiB,CAAC,gBAAgB,EAAE,CAAC;YAChF,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,eAAe,CAAC,EAAE,MAAM,CAAC,OAAO,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtF,OAAO,MAAM,CAAC;QAChB,CAAC;QAED,EAAE,CAAC,oDAAoD,EAAE,KAAK,IAAI,EAAE;YAClE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,SAAS,EAAE,GAAG,EAAE,KAAK,EAAE,CAAC,CAAC;YAC5E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC,CAAC;YAClF,MAAM,MAAM,GAAG,MAAM,OAAO,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;YAEhE,MAAM,EAAE,KAAK,EAAE,GAAG,MAAM,MAAM,CAAC,SAAS,EAAE,CAAC;YAC3C,MAAM,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC;YAEzD,MAAM,MAAM,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,IAAI,EAAE,aAAa,EAAE,SAAS,EAAE,EAAE,EAAE,EAAE,IAAI,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAChG,gBAAgB,CACjB,CAAC;YACF,MAAM,CAAC,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;QACvD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,GAAG,EAAE,KAAK,EAAE,CAAC,CAAC;YAC1E,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,OAAO,EAAE,GAAG,EAAE,KAAK,EAAE,CAAC,CAAC;YACxE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,CAAC,CAAC;YAClF,MAAM,MAAM,GAAG,MAAM,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;YAEzC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,EAAE,IAAI,EAAE,UAAU,EAAE,SAAS,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,CAAC,CAAC;YACnF,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAE,OAAO,CAAC,OAAmC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YAE5F,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC;gBACvC,IAAI,EAAE,aAAa;gBACnB,SAAS,EAAE,EAAE,EAAE,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,SAAS,EAAE,SAAS,EAAE,KAAK,CAAC,EAAE,EAAE;aAClE,CAAC,CAAC;YACH,MAAM,CAAC,UAAU,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACtC,MAAM,CAAE,UAAU,CAAC,OAAmC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,SAAS,CAAC,WAAW,CAAC,CAAC;YACvF,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAChD,MAAM,CAAC,SAAS,EAAE,KAAK,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;YAC1C,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC/C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,KAAK,IAAI,EAAE;YAChE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,GAAG,EAAE,KAAK,EAAE,CAAC,CAAC;YAC3E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;YAE5E,MAAM,aAAa,GAAG,MAAM,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;YAChD,MAAM,KAAK,GAAG,MAAM,aAAa,CAAC,QAAQ,CAAC,EAAE,IAAI,EAAE,aAAa,EAAE,SAAS,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC;YACnH,MAAM,CAAC,IAAI,CAAC,KAAK,CAAE,KAAK,CAAC,OAAmC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;YAElG,MAAM,WAAW,GAAG,MAAM,OAAO,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,SAAS,EAAE,OAAO,EAAE,EAAE,CAAC,CAAC;YAC/F,MAAM,MAAM,GAAG,MAAM,WAAW,CAAC,QAAQ,CAAC,EAAE,IAAI,EAAE,aAAa,EAAE,SAAS,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,EAAE,CAAC,CAAC;YAClH,MAAM,CAAC,IAAI,CAAC,KAAK,CAAE,MAAM,CAAC,OAAmC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QAClG,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8CAA8C,EAAE,KAAK,IAAI,EAAE;YAC5D,MAAM,MAAM,GAAG,MAAM,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC;YACzC,MAAM,EAAE,KAAK,EAAE,GAAG,MAAM,MAAM,CAAC,SAAS,EAAE,CAAC;YAC3C,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,KAAK,aAAa,CAAC,EAAE,WAAW,EAAE,eAAe,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC7F,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,KAAK,YAAY,CAAC,EAAE,WAAW,EAAE,YAAY,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC3F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qBAAqB,EAAE,GAAG,EAAE;QACnC,IAAI,OAAY,CAAC;QACjB,IAAI,OAAY,CAAC;QAEjB,UAAU,CAAC,GAAG,EAAE;YACd,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,GAAG,EAAE,CAAC;QACf,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8EAA8E,EAAE,GAAG,EAAE;YACtF,MAAM,IAAI,GAAG,sBAAsB,CAAC,OAAO,CAAC,CAAC;YAC7C,MAAM,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,CAAC;YAC3B,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,IAAK,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QACrD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,qBAAqB,EAAE,CAAC,CAAC;YAE5E,uCAAuC;YACvC,MAAM,UAAU,GAAQ;gBACtB,WAAW,EAAE,GAAG,EAAE,CAAC,MAAM,CAAC,WAAW,EAAE;gBACvC,UAAU,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC;gBACjD,aAAa,EAAE,CAAC,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,aAAa,CAAC,CAAC,CAAC;gBAClD,QAAQ,EAAE,CAAC,GAAY,EAAE,EAAE,CAAC,MAAM,CAAC,QAAQ,CAAC,GAAG,CAAC;gBAChD,OAAO,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC;gBAC3C,UAAU,EAAE,CAAC,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;gBAC5C,UAAU,EAAE,CAAC,EAAU,EAAE,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,CAAC,CAAC;gBAC5D,UAAU,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC;aAClD,CAAC;YAEF,MAAM,MAAM,GAAG,mBAAmB,CAAC;gBACjC,MAAM,EAAE,UAAU;gBAClB,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,QAAQ,EAAE,OAAO;gBACjB,MAAM,EAAE,OAAO;aAChB,CAAC,CAAC;YAEH,MAAM,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAC9D,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC,WAAW,EAAE,CAAC;YAE3C,MAAM,UAAU,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,MAAM,CAAC,CAAC;YAEnE,4EAA4E;YAC5E,MAAM,WAAW,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,WAAW,CAAC,aAAa,EAAE;gBACxE,KAAK,EAAE,yBAAyB;aACjC,CAAC,CAAC;YACH,MAAM,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAC/C,MAAM,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAE1D,yBAAyB;YACzB,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,CAAC,WAAW,EAAE,CAAC;YACvD,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAEpE,UAAU;YACV,MAAM,CAAC,UAAU,EAAE,CAAC;YACpB,MAAM,eAAe,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAC9D,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,CAAC,aAAa,EAAE,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,UAAU,GAAG,IAAI,eAAe,EAAE,CAAC;YACzC,MAAM,UAAU,GAAQ;gBACtB,QAAQ,EAAE,GAAG,EAAE,CAAC,OAAO,CAAC,OAAO,CAAC,EAAE,CAAC;aACpC,CAAC;YAEF,mBAAmB,CAAC;gBAClB,MAAM,EAAE,UAAU;gBAClB,MAAM,EAAE,UAAU,CAAC,MAAM;gBACzB,QAAQ,EAAE,OAAO;gBACjB,MAAM,EAAE,OAAO;aAChB,CAAC,CAAC;YAEH,IAAI,KAAK,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAClD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAExC,UAAU,CAAC,KAAK,EAAE,CAAC;YAEnB,KAAK,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAC9C,MAAM,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
@@ -1,5 +1,5 @@
1
1
  import { Server } from '@modelcontextprotocol/sdk/server/index.js';
2
- import type { CriticalPathEngine } from '@critical-path/core';
2
+ import type { Actor, CriticalPathEngine } from '@critical-path/core';
3
3
  import type { CriticalPathClient } from '@critical-path/client';
4
4
  export interface CriticalPathMcpServerOptions {
5
5
  engine?: CriticalPathEngine;
@@ -7,7 +7,14 @@ export interface CriticalPathMcpServerOptions {
7
7
  name?: string;
8
8
  version?: string;
9
9
  tools?: string[];
10
+ /**
11
+ * Identity that changes made through an `engine` are attributed to (activity log, comment
12
+ * authors, ...). Defaults to `DEFAULT_MCP_ACTOR`. With a `client`, identity comes from the API's
13
+ * authentication (e.g. the `Authorization` header passed to the client) instead.
14
+ */
15
+ actor?: Actor;
10
16
  }
17
+ export declare const DEFAULT_MCP_ACTOR: Actor;
11
18
  export declare function createCriticalPathMcpServer(options: CriticalPathMcpServerOptions): Server;
12
19
  export declare function startStdioServer(server: Server): Promise<void>;
13
20
  //# sourceMappingURL=index.d.ts.map
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/server/index.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,MAAM,EAAE,MAAM,2CAA2C,CAAC;AAYnE,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,qBAAqB,CAAC;AAC9D,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAGhE,MAAM,WAAW,4BAA4B;IAC3C,MAAM,CAAC,EAAE,kBAAkB,CAAC;IAC5B,MAAM,CAAC,EAAE,kBAAkB,CAAC;IAC5B,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;CAClB;AAED,wBAAgB,2BAA2B,CAAC,OAAO,EAAE,4BAA4B,GAAG,MAAM,CAyOzF;AAED,wBAAsB,gBAAgB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC,CAGpE"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/server/index.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,MAAM,EAAE,MAAM,2CAA2C,CAAC;AAYnE,OAAO,KAAK,EAAE,KAAK,EAAE,kBAAkB,EAAE,MAAM,qBAAqB,CAAC;AACrE,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAGhE,MAAM,WAAW,4BAA4B;IAC3C,MAAM,CAAC,EAAE,kBAAkB,CAAC;IAC5B,MAAM,CAAC,EAAE,kBAAkB,CAAC;IAC5B,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB;;;;OAIG;IACH,KAAK,CAAC,EAAE,KAAK,CAAC;CACf;AAED,eAAO,MAAM,iBAAiB,EAAE,KAAyF,CAAC;AAE1H,wBAAgB,2BAA2B,CAAC,OAAO,EAAE,4BAA4B,GAAG,MAAM,CA2OzF;AAED,wBAAsB,gBAAgB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC,CAGpE"}
@@ -2,8 +2,11 @@ import { Server } from '@modelcontextprotocol/sdk/server/index.js';
2
2
  import { StdioServerTransport } from '@modelcontextprotocol/sdk/server/stdio.js';
3
3
  import { CallToolRequestSchema, ListToolsRequestSchema, ListResourcesRequestSchema, ReadResourceRequestSchema, ListPromptsRequestSchema, GetPromptRequestSchema, ErrorCode, McpError } from '@modelcontextprotocol/sdk/types.js';
4
4
  import { ALL_TOOLS, parseToolArgs } from '../tools/definitions.js';
5
+ export const DEFAULT_MCP_ACTOR = Object.freeze({ userId: 'mcp-agent', username: 'MCP Agent', actorType: 'agent' });
5
6
  export function createCriticalPathMcpServer(options) {
6
- const target = options.engine || options.client;
7
+ const target = options.engine
8
+ ? options.engine.withActor(options.actor ?? DEFAULT_MCP_ACTOR)
9
+ : options.client;
7
10
  if (!target) {
8
11
  throw new Error('Either engine or client must be provided to createCriticalPathMcpServer.');
9
12
  }
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/server/index.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,MAAM,EAAE,MAAM,2CAA2C,CAAC;AACnE,OAAO,EAAE,oBAAoB,EAAE,MAAM,2CAA2C,CAAC;AACjF,OAAO,EACL,qBAAqB,EACrB,sBAAsB,EACtB,0BAA0B,EAC1B,yBAAyB,EACzB,wBAAwB,EACxB,sBAAsB,EACtB,SAAS,EACT,QAAQ,EACT,MAAM,oCAAoC,CAAC;AAG5C,OAAO,EAAE,SAAS,EAAE,aAAa,EAAuB,MAAM,yBAAyB,CAAC;AAUxF,MAAM,UAAU,2BAA2B,CAAC,OAAqC;IAC/E,MAAM,MAAM,GAA+B,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,CAAC;IAC5E,IAAI,CAAC,MAAM,EAAE,CAAC;QACZ,MAAM,IAAI,KAAK,CAAC,0EAA0E,CAAC,CAAC;IAC9F,CAAC;IAED,MAAM,UAAU,GAAG,OAAO,CAAC,IAAI,IAAI,mBAAmB,CAAC;IACvD,MAAM,aAAa,GAAG,OAAO,CAAC,OAAO,IAAI,OAAO,CAAC;IAEjD,MAAM,WAAW,GAAG,OAAO,CAAC,KAAK;QAC/B,CAAC,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,OAAO,CAAC,KAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;QAC1D,CAAC,CAAC,SAAS,CAAC;IACd,MAAM,aAAa,GAAG,IAAI,GAAG,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC,CAAC;IAE5E,MAAM,MAAM,GAAG,IAAI,MAAM,CACvB;QACE,IAAI,EAAE,UAAU;QAChB,OAAO,EAAE,aAAa;KACvB,EACD;QACE,YAAY,EAAE;YACZ,KAAK,EAAE,EAAE;YACT,SAAS,EAAE,EAAE;YACb,OAAO,EAAE,EAAE;SACZ;KACF,CACF,CAAC;IAEF,kBAAkB;IAClB,MAAM,CAAC,iBAAiB,CAAC,sBAAsB,EAAE,KAAK,IAAI,EAAE;QAC1D,OAAO;YACL,KAAK,EAAE,WAAW,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC;gBAChC,IAAI,EAAE,IAAI,CAAC,IAAI;gBACf,KAAK,EAAE,IAAI,CAAC,KAAK;gBACjB,WAAW,EAAE,IAAI,CAAC,WAAW;gBAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;gBAC7B,WAAW,EAAE;oBACX,KAAK,EAAE,IAAI,CAAC,KAAK;oBACjB,YAAY,EAAE,IAAI,CAAC,WAAW,EAAE,YAAY,IAAI,KAAK;oBACrD,eAAe,EAAE,IAAI,CAAC,WAAW,EAAE,oBAAoB,IAAI,KAAK;iBACjE;aACF,CAAC,CAAC;SACJ,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,oBAAoB;IACpB,MAAM,CAAC,iBAAiB,CAAC,qBAAqB,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE;QAChE,MAAM,EAAE,IAAI,EAAE,SAAS,EAAE,IAAI,EAAE,GAAG,OAAO,CAAC,MAAM,CAAC;QACjD,+FAA+F;QAC/F,MAAM,IAAI,GAAG,aAAa,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;QAErC,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,SAAS,IAAI,yCAAyC,CAAC,CAAC;QACvG,CAAC;QAED,IAAI,CAAC;YACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,EAAE,MAAM,CAAC,CAAC;YACrE,OAAO;gBACL,OAAO,EAAE;oBACP;wBACE,IAAI,EAAE,MAAM;wBACZ,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;qBACtC;iBACF;aACF,CAAC;QACJ,CAAC;QAAC,OAAO,GAAQ,EAAE,CAAC;YAClB,OAAO;gBACL,OAAO,EAAE;oBACP;wBACE,IAAI,EAAE,MAAM;wBACZ,IAAI,EAAE,yBAAyB,IAAI,MAAM,GAAG,EAAE,OAAO,IAAI,MAAM,CAAC,GAAG,CAAC,EAAE;qBACvE;iBACF;gBACD,OAAO,EAAE,IAAI;aACd,CAAC;QACJ,CAAC;IACH,CAAC,CAAC,CAAC;IAEH,uBAAuB;IACvB,MAAM,CAAC,iBAAiB,CAAC,0BAA0B,EAAE,KAAK,IAAI,EAAE;QAC9D,OAAO;YACL,SAAS,EAAE;gBACT;oBACE,GAAG,EAAE,yBAAyB;oBAC9B,IAAI,EAAE,wBAAwB;oBAC9B,QAAQ,EAAE,kBAAkB;oBAC5B,WAAW,EAAE,oDAAoD;iBAClE;gBACD;oBACE,GAAG,EAAE,sBAAsB;oBAC3B,IAAI,EAAE,qBAAqB;oBAC3B,QAAQ,EAAE,kBAAkB;oBAC5B,WAAW,EAAE,wCAAwC;iBACtD;aACF;SACF,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,sBAAsB;IACtB,MAAM,CAAC,iBAAiB,CAAC,yBAAyB,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE;QACpE,MAAM,GAAG,GAAG,OAAO,CAAC,MAAM,CAAC,GAAG,CAAC;QAE/B,IAAI,GAAG,KAAK,yBAAyB,EAAE,CAAC;YACtC,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;YAC5C,OAAO;gBACL,QAAQ,EAAE;oBACR;wBACE,GAAG;wBACH,QAAQ,EAAE,kBAAkB;wBAC5B,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,EAAE,IAAI,EAAE,CAAC,CAAC;qBACxC;iBACF;aACF,CAAC;QACJ,CAAC;QAED,IAAI,GAAG,KAAK,sBAAsB,EAAE,CAAC;YACnC,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,EAAE,CAAC;YACtC,OAAO;gBACL,QAAQ,EAAE;oBACR;wBACE,GAAG;wBACH,QAAQ,EAAE,kBAAkB;wBAC5B,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC;qBACrC;iBACF;aACF,CAAC;QACJ,CAAC;QAED,MAAM,SAAS,GAAG,GAAG,CAAC,KAAK,CAAC,mCAAmC,CAAC,CAAC;QACjE,IAAI,SAAS,EAAE,CAAC;YACd,MAAM,MAAM,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;YAC5B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAC1C,IAAI,CAAC,IAAI,EAAE,CAAC;gBACV,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,iBAAiB,MAAM,cAAc,CAAC,CAAC;YACtF,CAAC;YACD,OAAO;gBACL,QAAQ,EAAE;oBACR;wBACE,GAAG;wBACH,QAAQ,EAAE,kBAAkB;wBAC5B,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,EAAE,IAAI,EAAE,CAAC,CAAC;qBACpC;iBACF;aACF,CAAC;QACJ,CAAC;QAED,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,yBAAyB,GAAG,EAAE,CAAC,CAAC;IAC/E,CAAC,CAAC,CAAC;IAEH,qBAAqB;IACrB,MAAM,CAAC,iBAAiB,CAAC,wBAAwB,EAAE,KAAK,IAAI,EAAE;QAC5D,OAAO;YACL,OAAO,EAAE;gBACP;oBACE,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,wEAAwE;oBACrF,SAAS,EAAE;wBACT;4BACE,IAAI,EAAE,WAAW;4BACjB,WAAW,EAAE,oCAAoC;4BACjD,QAAQ,EAAE,IAAI;yBACf;qBACF;iBACF;gBACD;oBACE,IAAI,EAAE,aAAa;oBACnB,WAAW,EAAE,2EAA2E;oBACxF,SAAS,EAAE;wBACT;4BACE,IAAI,EAAE,QAAQ;4BACd,WAAW,EAAE,uBAAuB;4BACpC,QAAQ,EAAE,IAAI;yBACf;qBACF;iBACF;aACF;SACF,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,uBAAuB;IACvB,MAAM,CAAC,iBAAiB,CAAC,sBAAsB,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE;QACjE,MAAM,EAAE,IAAI,EAAE,SAAS,EAAE,IAAI,EAAE,GAAG,OAAO,CAAC,MAAM,CAAC;QAEjD,IAAI,IAAI,KAAK,mBAAmB,EAAE,CAAC;YACjC,MAAM,SAAS,GAAG,IAAI,EAAE,SAAS,CAAC;YAClC,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,aAAa,EAAE,mCAAmC,CAAC,CAAC;YACnF,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;YACnD,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAE/C,OAAO;gBACL,WAAW,EAAE,uBAAuB,OAAO,EAAE,IAAI,IAAI,SAAS,EAAE;gBAChE,QAAQ,EAAE;oBACR;wBACE,IAAI,EAAE,MAAM;wBACZ,OAAO,EAAE;4BACP,IAAI,EAAE,MAAM;4BACZ,IAAI,EAAE,iDAAiD,OAAO,EAAE,IAAI,IAAI,SAAS,wBAAwB,IAAI,CAAC,SAAS,CAAC,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,cAAc,KAAK,CAAC,MAAM,aAAa,IAAI,CAAC,SAAS,CAAC,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC,oNAAoN;yBACna;qBACF;iBACF;aACF,CAAC;QACJ,CAAC;QAED,IAAI,IAAI,KAAK,aAAa,EAAE,CAAC;YAC3B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,CAAC;YAC5B,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,aAAa,EAAE,gCAAgC,CAAC,CAAC;YAChF,CAAC;YACD,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAC1C,IAAI,CAAC,IAAI,EAAE,CAAC;gBACV,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,SAAS,MAAM,cAAc,CAAC,CAAC;YAC9E,CAAC;YAED,OAAO;gBACL,WAAW,EAAE,gBAAgB,IAAI,CAAC,KAAK,GAAG;gBAC1C,QAAQ,EAAE;oBACR;wBACE,IAAI,EAAE,MAAM;wBACZ,OAAO,EAAE;4BACP,IAAI,EAAE,MAAM;4BACZ,IAAI,EAAE,mDAAmD,IAAI,CAAC,SAAS,CAAC,IAAI,EAAE,IAAI,EAAE,CAAC,CAAC,gJAAgJ;yBACvO;qBACF;iBACF;aACF,CAAC;QACJ,CAAC;QAED,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,WAAW,IAAI,mBAAmB,CAAC,CAAC;IACnF,CAAC,CAAC,CAAC;IAEH,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,MAAM,CAAC,KAAK,UAAU,gBAAgB,CAAC,MAAc;IACnD,MAAM,SAAS,GAAG,IAAI,oBAAoB,EAAE,CAAC;IAC7C,MAAM,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;AAClC,CAAC"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/server/index.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,MAAM,EAAE,MAAM,2CAA2C,CAAC;AACnE,OAAO,EAAE,oBAAoB,EAAE,MAAM,2CAA2C,CAAC;AACjF,OAAO,EACL,qBAAqB,EACrB,sBAAsB,EACtB,0BAA0B,EAC1B,yBAAyB,EACzB,wBAAwB,EACxB,sBAAsB,EACtB,SAAS,EACT,QAAQ,EACT,MAAM,oCAAoC,CAAC;AAG5C,OAAO,EAAE,SAAS,EAAE,aAAa,EAAuB,MAAM,yBAAyB,CAAC;AAgBxF,MAAM,CAAC,MAAM,iBAAiB,GAAU,MAAM,CAAC,MAAM,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;AAE1H,MAAM,UAAU,2BAA2B,CAAC,OAAqC;IAC/E,MAAM,MAAM,GAA+B,OAAO,CAAC,MAAM;QACvD,CAAC,CAAC,OAAO,CAAC,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,KAAK,IAAI,iBAAiB,CAAC;QAC9D,CAAC,CAAC,OAAO,CAAC,MAAM,CAAC;IACnB,IAAI,CAAC,MAAM,EAAE,CAAC;QACZ,MAAM,IAAI,KAAK,CAAC,0EAA0E,CAAC,CAAC;IAC9F,CAAC;IAED,MAAM,UAAU,GAAG,OAAO,CAAC,IAAI,IAAI,mBAAmB,CAAC;IACvD,MAAM,aAAa,GAAG,OAAO,CAAC,OAAO,IAAI,OAAO,CAAC;IAEjD,MAAM,WAAW,GAAG,OAAO,CAAC,KAAK;QAC/B,CAAC,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,OAAO,CAAC,KAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;QAC1D,CAAC,CAAC,SAAS,CAAC;IACd,MAAM,aAAa,GAAG,IAAI,GAAG,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC,CAAC;IAE5E,MAAM,MAAM,GAAG,IAAI,MAAM,CACvB;QACE,IAAI,EAAE,UAAU;QAChB,OAAO,EAAE,aAAa;KACvB,EACD;QACE,YAAY,EAAE;YACZ,KAAK,EAAE,EAAE;YACT,SAAS,EAAE,EAAE;YACb,OAAO,EAAE,EAAE;SACZ;KACF,CACF,CAAC;IAEF,kBAAkB;IAClB,MAAM,CAAC,iBAAiB,CAAC,sBAAsB,EAAE,KAAK,IAAI,EAAE;QAC1D,OAAO;YACL,KAAK,EAAE,WAAW,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC;gBAChC,IAAI,EAAE,IAAI,CAAC,IAAI;gBACf,KAAK,EAAE,IAAI,CAAC,KAAK;gBACjB,WAAW,EAAE,IAAI,CAAC,WAAW;gBAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;gBAC7B,WAAW,EAAE;oBACX,KAAK,EAAE,IAAI,CAAC,KAAK;oBACjB,YAAY,EAAE,IAAI,CAAC,WAAW,EAAE,YAAY,IAAI,KAAK;oBACrD,eAAe,EAAE,IAAI,CAAC,WAAW,EAAE,oBAAoB,IAAI,KAAK;iBACjE;aACF,CAAC,CAAC;SACJ,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,oBAAoB;IACpB,MAAM,CAAC,iBAAiB,CAAC,qBAAqB,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE;QAChE,MAAM,EAAE,IAAI,EAAE,SAAS,EAAE,IAAI,EAAE,GAAG,OAAO,CAAC,MAAM,CAAC;QACjD,+FAA+F;QAC/F,MAAM,IAAI,GAAG,aAAa,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;QAErC,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,SAAS,IAAI,yCAAyC,CAAC,CAAC;QACvG,CAAC;QAED,IAAI,CAAC;YACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,EAAE,MAAM,CAAC,CAAC;YACrE,OAAO;gBACL,OAAO,EAAE;oBACP;wBACE,IAAI,EAAE,MAAM;wBACZ,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;qBACtC;iBACF;aACF,CAAC;QACJ,CAAC;QAAC,OAAO,GAAQ,EAAE,CAAC;YAClB,OAAO;gBACL,OAAO,EAAE;oBACP;wBACE,IAAI,EAAE,MAAM;wBACZ,IAAI,EAAE,yBAAyB,IAAI,MAAM,GAAG,EAAE,OAAO,IAAI,MAAM,CAAC,GAAG,CAAC,EAAE;qBACvE;iBACF;gBACD,OAAO,EAAE,IAAI;aACd,CAAC;QACJ,CAAC;IACH,CAAC,CAAC,CAAC;IAEH,uBAAuB;IACvB,MAAM,CAAC,iBAAiB,CAAC,0BAA0B,EAAE,KAAK,IAAI,EAAE;QAC9D,OAAO;YACL,SAAS,EAAE;gBACT;oBACE,GAAG,EAAE,yBAAyB;oBAC9B,IAAI,EAAE,wBAAwB;oBAC9B,QAAQ,EAAE,kBAAkB;oBAC5B,WAAW,EAAE,oDAAoD;iBAClE;gBACD;oBACE,GAAG,EAAE,sBAAsB;oBAC3B,IAAI,EAAE,qBAAqB;oBAC3B,QAAQ,EAAE,kBAAkB;oBAC5B,WAAW,EAAE,wCAAwC;iBACtD;aACF;SACF,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,sBAAsB;IACtB,MAAM,CAAC,iBAAiB,CAAC,yBAAyB,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE;QACpE,MAAM,GAAG,GAAG,OAAO,CAAC,MAAM,CAAC,GAAG,CAAC;QAE/B,IAAI,GAAG,KAAK,yBAAyB,EAAE,CAAC;YACtC,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;YAC5C,OAAO;gBACL,QAAQ,EAAE;oBACR;wBACE,GAAG;wBACH,QAAQ,EAAE,kBAAkB;wBAC5B,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,EAAE,IAAI,EAAE,CAAC,CAAC;qBACxC;iBACF;aACF,CAAC;QACJ,CAAC;QAED,IAAI,GAAG,KAAK,sBAAsB,EAAE,CAAC;YACnC,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,EAAE,CAAC;YACtC,OAAO;gBACL,QAAQ,EAAE;oBACR;wBACE,GAAG;wBACH,QAAQ,EAAE,kBAAkB;wBAC5B,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC;qBACrC;iBACF;aACF,CAAC;QACJ,CAAC;QAED,MAAM,SAAS,GAAG,GAAG,CAAC,KAAK,CAAC,mCAAmC,CAAC,CAAC;QACjE,IAAI,SAAS,EAAE,CAAC;YACd,MAAM,MAAM,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;YAC5B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAC1C,IAAI,CAAC,IAAI,EAAE,CAAC;gBACV,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,iBAAiB,MAAM,cAAc,CAAC,CAAC;YACtF,CAAC;YACD,OAAO;gBACL,QAAQ,EAAE;oBACR;wBACE,GAAG;wBACH,QAAQ,EAAE,kBAAkB;wBAC5B,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,EAAE,IAAI,EAAE,CAAC,CAAC;qBACpC;iBACF;aACF,CAAC;QACJ,CAAC;QAED,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,yBAAyB,GAAG,EAAE,CAAC,CAAC;IAC/E,CAAC,CAAC,CAAC;IAEH,qBAAqB;IACrB,MAAM,CAAC,iBAAiB,CAAC,wBAAwB,EAAE,KAAK,IAAI,EAAE;QAC5D,OAAO;YACL,OAAO,EAAE;gBACP;oBACE,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,wEAAwE;oBACrF,SAAS,EAAE;wBACT;4BACE,IAAI,EAAE,WAAW;4BACjB,WAAW,EAAE,oCAAoC;4BACjD,QAAQ,EAAE,IAAI;yBACf;qBACF;iBACF;gBACD;oBACE,IAAI,EAAE,aAAa;oBACnB,WAAW,EAAE,2EAA2E;oBACxF,SAAS,EAAE;wBACT;4BACE,IAAI,EAAE,QAAQ;4BACd,WAAW,EAAE,uBAAuB;4BACpC,QAAQ,EAAE,IAAI;yBACf;qBACF;iBACF;aACF;SACF,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,uBAAuB;IACvB,MAAM,CAAC,iBAAiB,CAAC,sBAAsB,EAAE,KAAK,EAAE,OAAO,EAAE,EAAE;QACjE,MAAM,EAAE,IAAI,EAAE,SAAS,EAAE,IAAI,EAAE,GAAG,OAAO,CAAC,MAAM,CAAC;QAEjD,IAAI,IAAI,KAAK,mBAAmB,EAAE,CAAC;YACjC,MAAM,SAAS,GAAG,IAAI,EAAE,SAAS,CAAC;YAClC,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,aAAa,EAAE,mCAAmC,CAAC,CAAC;YACnF,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;YACnD,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAE/C,OAAO;gBACL,WAAW,EAAE,uBAAuB,OAAO,EAAE,IAAI,IAAI,SAAS,EAAE;gBAChE,QAAQ,EAAE;oBACR;wBACE,IAAI,EAAE,MAAM;wBACZ,OAAO,EAAE;4BACP,IAAI,EAAE,MAAM;4BACZ,IAAI,EAAE,iDAAiD,OAAO,EAAE,IAAI,IAAI,SAAS,wBAAwB,IAAI,CAAC,SAAS,CAAC,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,cAAc,KAAK,CAAC,MAAM,aAAa,IAAI,CAAC,SAAS,CAAC,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC,oNAAoN;yBACna;qBACF;iBACF;aACF,CAAC;QACJ,CAAC;QAED,IAAI,IAAI,KAAK,aAAa,EAAE,CAAC;YAC3B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,CAAC;YAC5B,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,aAAa,EAAE,gCAAgC,CAAC,CAAC;YAChF,CAAC;YACD,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAC1C,IAAI,CAAC,IAAI,EAAE,CAAC;gBACV,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,SAAS,MAAM,cAAc,CAAC,CAAC;YAC9E,CAAC;YAED,OAAO;gBACL,WAAW,EAAE,gBAAgB,IAAI,CAAC,KAAK,GAAG;gBAC1C,QAAQ,EAAE;oBACR;wBACE,IAAI,EAAE,MAAM;wBACZ,OAAO,EAAE;4BACP,IAAI,EAAE,MAAM;4BACZ,IAAI,EAAE,mDAAmD,IAAI,CAAC,SAAS,CAAC,IAAI,EAAE,IAAI,EAAE,CAAC,CAAC,gJAAgJ;yBACvO;qBACF;iBACF;aACF,CAAC;QACJ,CAAC;QAED,MAAM,IAAI,QAAQ,CAAC,SAAS,CAAC,cAAc,EAAE,WAAW,IAAI,mBAAmB,CAAC,CAAC;IACnF,CAAC,CAAC,CAAC;IAEH,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,MAAM,CAAC,KAAK,UAAU,gBAAgB,CAAC,MAAc;IACnD,MAAM,SAAS,GAAG,IAAI,oBAAoB,EAAE,CAAC;IAC7C,MAAM,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;AAClC,CAAC"}
@@ -26,7 +26,7 @@ export declare class ToolArgumentError extends Error {
26
26
  constructor(toolName: string, details: string);
27
27
  }
28
28
  /**
29
- * Validates raw tool arguments against the tool's zod schema. Unknown keys are stripped,
29
+ * Validates raw tool arguments against the tool's zod schema. Unknown keys are rejected,
30
30
  * so callers cannot pass fields the tool does not declare.
31
31
  */
32
32
  export declare function parseToolArgs<TParams>(tool: ToolDefinition<TParams>, args: unknown): TParams;
@@ -97,7 +97,6 @@ export declare const listCommentsTool: ToolDefinition<{
97
97
  export declare const addCommentTool: ToolDefinition<{
98
98
  taskId: string;
99
99
  content: string;
100
- authorId: string;
101
100
  }, any>;
102
101
  export declare const calculateCriticalPathTool: ToolDefinition<{
103
102
  projectId?: string;
@@ -1 +1 @@
1
- {"version":3,"file":"definitions.d.ts","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,qBAAqB,CAAC;AAC9D,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAEhE,MAAM,MAAM,cAAc,GAAG,kBAAkB,GAAG,kBAAkB,CAAC;AAErE,MAAM,WAAW,cAAc,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC;IAC5B,oFAAoF;IACpF,WAAW,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACrC,WAAW,CAAC,EAAE;QACZ,YAAY,CAAC,EAAE,OAAO,CAAC;QACvB,oBAAoB,CAAC,EAAE,OAAO,CAAC;KAChC,CAAC;IACF,OAAO,EAAE,CAAC,IAAI,EAAE,OAAO,EAAE,MAAM,EAAE,cAAc,EAAE,cAAc,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,KAAK,OAAO,CAAC,OAAO,CAAC,CAAC;CAC/G;AAED;;;GAGG;AACH,wBAAgB,UAAU,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG,EACrD,IAAI,EAAE,IAAI,CAAC,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,EAAE,aAAa,CAAC,GAC1D,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,CAGlC;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM;CAI9C;AAED;;;GAGG;AACH,wBAAgB,aAAa,CAAC,OAAO,EAAE,IAAI,EAAE,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,OAAO,GAAG,OAAO,CAS5F;AAGD,wBAAsB,cAAc,CAAC,MAAM,EAAE,cAAc;;GAG1D;AAED,eAAO,MAAM,gBAAgB,8DAS3B,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAWnD,CAAC;AAEH,eAAO,MAAM,iBAAiB;UAAsB,MAAM;kBAAgB,MAAM;UAAQ,MAAM;OAY5F,CAAC;AAEH,eAAO,MAAM,aAAa;gBACZ,MAAM;aACT,MAAM;eACJ,MAAM;iBACJ,MAAM;OA0BnB,CAAC;AAEH,eAAO,MAAM,WAAW;QAAoB,MAAM;OAWhD,CAAC;AAEH,eAAO,MAAM,cAAc;gBACb,MAAM;WACX,MAAM;kBACC,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;WACT,MAAM,EAAE;qBACE,MAAM;gBACX,OAAO;oBACH,MAAM;OAsCtB,CAAC;AAEH,eAAO,MAAM,cAAc;QACrB,MAAM;YACF,MAAM;kBACA,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;WACT,MAAM,EAAE;qBACE,MAAM;kBACT,MAAM;gBACR,OAAO;oBACH,MAAM;OAuBtB,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAYnD,CAAC;AAEH,eAAO,MAAM,oBAAoB;gBAA4B,MAAM;OAgBjE,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;WACX,MAAM;kBACC,MAAM;cACV,MAAM;cACN,MAAM,EAAE;OAuBlB,CAAC;AAEH,eAAO,MAAM,gBAAgB;YAAwB,MAAM;OAczD,CAAC;AAEH,eAAO,MAAM,cAAc;YAAwB,MAAM;aAAW,MAAM;cAAY,MAAM;OAgB1F,CAAC;AAEH,eAAO,MAAM,yBAAyB;gBAA4B,MAAM;OAetE,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;YACV,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK;kBACnC,MAAM;kBACN,MAAM;OAuBpB,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;OAW1D,CAAC;AAEH,eAAO,MAAM,kBAAkB;YAAwB,MAAM;OAW3D,CAAC;AAEH,eAAO,MAAM,0BAA0B;YAAwB,MAAM;OAWnE,CAAC;AAEH,eAAO,MAAM,2BAA2B;gBAC1B,MAAM;gBACN,MAAM;cACR,MAAM;eACL,KAAK,GAAG,MAAM,GAAG,OAAO;cACzB,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ;aACzD,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS;iCAC5B,MAAM;OA0BnC,CAAC;AAEH,eAAO,MAAM,SAAS,EAAE,cAAc,EAmBrC,CAAC;AAEF,eAAO,MAAM,QAAQ,uCAEpB,CAAC"}
1
+ {"version":3,"file":"definitions.d.ts","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,qBAAqB,CAAC;AAC9D,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAEhE,MAAM,MAAM,cAAc,GAAG,kBAAkB,GAAG,kBAAkB,CAAC;AAErE,MAAM,WAAW,cAAc,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC;IAC5B,oFAAoF;IACpF,WAAW,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACrC,WAAW,CAAC,EAAE;QACZ,YAAY,CAAC,EAAE,OAAO,CAAC;QACvB,oBAAoB,CAAC,EAAE,OAAO,CAAC;KAChC,CAAC;IACF,OAAO,EAAE,CAAC,IAAI,EAAE,OAAO,EAAE,MAAM,EAAE,cAAc,EAAE,cAAc,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,KAAK,OAAO,CAAC,OAAO,CAAC,CAAC;CAC/G;AAED;;;GAGG;AACH,wBAAgB,UAAU,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG,EACrD,IAAI,EAAE,IAAI,CAAC,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,EAAE,aAAa,CAAC,GAC1D,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,CAGlC;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM;CAI9C;AAED;;;GAGG;AACH,wBAAgB,aAAa,CAAC,OAAO,EAAE,IAAI,EAAE,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,OAAO,GAAG,OAAO,CAU5F;AAGD,wBAAsB,cAAc,CAAC,MAAM,EAAE,cAAc;;GAG1D;AAED,eAAO,MAAM,gBAAgB,8DAS3B,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAWnD,CAAC;AAEH,eAAO,MAAM,iBAAiB;UAAsB,MAAM;kBAAgB,MAAM;UAAQ,MAAM;OAY5F,CAAC;AAEH,eAAO,MAAM,aAAa;gBACZ,MAAM;aACT,MAAM;eACJ,MAAM;iBACJ,MAAM;OA0BnB,CAAC;AAEH,eAAO,MAAM,WAAW;QAAoB,MAAM;OAWhD,CAAC;AAEH,eAAO,MAAM,cAAc;gBACb,MAAM;WACX,MAAM;kBACC,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;WACT,MAAM,EAAE;qBACE,MAAM;gBACX,OAAO;oBACH,MAAM;OAsCtB,CAAC;AAEH,eAAO,MAAM,cAAc;QACrB,MAAM;YACF,MAAM;kBACA,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;WACT,MAAM,EAAE;qBACE,MAAM;kBACT,MAAM;gBACR,OAAO;oBACH,MAAM;OAuBtB,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAYnD,CAAC;AAEH,eAAO,MAAM,oBAAoB;gBAA4B,MAAM;OAgBjE,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;WACX,MAAM;kBACC,MAAM;cACV,MAAM;cACN,MAAM,EAAE;OAuBlB,CAAC;AAEH,eAAO,MAAM,gBAAgB;YAAwB,MAAM;OAczD,CAAC;AAEH,eAAO,MAAM,cAAc;YAAwB,MAAM;aAAW,MAAM;OAWxE,CAAC;AAEH,eAAO,MAAM,yBAAyB;gBAA4B,MAAM;OAetE,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;YACV,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK;kBACnC,MAAM;kBACN,MAAM;OAuBpB,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;OAW1D,CAAC;AAEH,eAAO,MAAM,kBAAkB;YAAwB,MAAM;OAW3D,CAAC;AAEH,eAAO,MAAM,0BAA0B;YAAwB,MAAM;OAWnE,CAAC;AAEH,eAAO,MAAM,2BAA2B;gBAC1B,MAAM;gBACN,MAAM;cACR,MAAM;eACL,KAAK,GAAG,MAAM,GAAG,OAAO;cACzB,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ;aACzD,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS;iCAC5B,MAAM;OA0BnC,CAAC;AAEH,eAAO,MAAM,SAAS,EAAE,cAAc,EAmBrC,CAAC;AAEF,eAAO,MAAM,QAAQ,uCAEpB,CAAC"}
@@ -15,11 +15,12 @@ export class ToolArgumentError extends Error {
15
15
  }
16
16
  }
17
17
  /**
18
- * Validates raw tool arguments against the tool's zod schema. Unknown keys are stripped,
18
+ * Validates raw tool arguments against the tool's zod schema. Unknown keys are rejected,
19
19
  * so callers cannot pass fields the tool does not declare.
20
20
  */
21
21
  export function parseToolArgs(tool, args) {
22
- const result = tool.zodSchema.safeParse(args ?? {});
22
+ // Strict: unknown arguments are reported to the model instead of being silently dropped.
23
+ const result = tool.zodSchema.strict().safeParse(args ?? {});
23
24
  if (!result.success) {
24
25
  const details = result.error.issues
25
26
  .map((issue) => `${issue.path.join('.') || '(root)'}: ${issue.message}`)
@@ -240,18 +241,13 @@ export const listCommentsTool = defineTool({
240
241
  export const addCommentTool = defineTool({
241
242
  name: 'add_comment',
242
243
  title: 'Add Comment',
243
- description: 'Add a comment to a task.',
244
+ description: 'Add a comment to a task. The comment is attributed to the identity this MCP server runs as.',
244
245
  zodSchema: z.object({
245
246
  taskId: z.string().describe('The task ID'),
246
- content: z.string().describe('Comment body/markdown'),
247
- authorId: z.string().describe('Author user ID')
247
+ content: z.string().describe('Comment body/markdown')
248
248
  }),
249
249
  execute: async (args, target) => {
250
- return target.addComment({
251
- taskId: args.taskId,
252
- content: args.content,
253
- authorId: args.authorId
254
- });
250
+ return target.addComment({ taskId: args.taskId, content: args.content });
255
251
  }
256
252
  });
257
253
  export const calculateCriticalPathTool = defineTool({
@@ -1 +1 @@
1
- {"version":3,"file":"definitions.js","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AACxB,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AAoBrD;;;GAGG;AACH,MAAM,UAAU,UAAU,CACxB,IAA2D;IAE3D,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,GAAG,WAAW,EAAE,GAAG,eAAe,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IAClI,OAAO,EAAE,GAAG,IAAI,EAAE,WAAW,EAAE,CAAC;AAClC,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,QAAgB,EAAE,OAAe;QAC3C,KAAK,CAAC,+BAA+B,QAAQ,MAAM,OAAO,EAAE,CAAC,CAAC;QAC9D,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED;;;GAGG;AACH,MAAM,UAAU,aAAa,CAAU,IAA6B,EAAE,IAAa;IACjF,MAAM,MAAM,GAAG,IAAI,CAAC,SAAS,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IACpD,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;QACpB,MAAM,OAAO,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM;aAChC,GAAG,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,QAAQ,KAAK,KAAK,CAAC,OAAO,EAAE,CAAC;aACvE,IAAI,CAAC,IAAI,CAAC,CAAC;QACd,MAAM,IAAI,iBAAiB,CAAC,IAAI,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;IAClD,CAAC;IACD,OAAO,MAAM,CAAC,IAAe,CAAC;AAChC,CAAC;AAED,+CAA+C;AAC/C,MAAM,CAAC,KAAK,UAAU,cAAc,CAAC,MAAsB;IACzD,MAAM,QAAQ,GAAG,OAAO,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,KAAK,KAAK,QAAQ,CAAC;IAChF,OAAO,EAAE,QAAQ,EAAE,CAAC;AACtB,CAAC;AAED,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAC;IACzC,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EAAE,yCAAyC;IACtD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC;IACvB,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;QAC/B,OAAO,MAAM,CAAC,WAAW,EAAE,CAAC;IAC9B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,8CAA8C;IAC3D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAC1C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAuD;IAChG,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EAAE,iCAAiC;IAC9C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAChD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;KAC9E,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,aAAa,GAAG,UAAU,CAKpC;IACD,IAAI,EAAE,YAAY;IAClB,KAAK,EAAE,YAAY;IACnB,WAAW,EAAE,4EAA4E;IACzF,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QACjE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACnE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACvG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACpE,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC7C,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC;YAChB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC;QACxD,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,IAAI,CAAC,QAAQ,CAAC,CAAC;QAC5D,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,IAAI,CAAC,UAAU,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAiB;IACpD,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EAAE,yBAAyB;IACtC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KACvC,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAYrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,qCAAqC;IAClD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACzG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC/C,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sDAAsD,CAAC;QAC9F,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC;QAClH,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACvE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACxE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QAC7E,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;KAChF,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,qFAAqF,CAAC,CAAC;QACzG,CAAC;QACD,MAAM,KAAK,GAAQ;YACjB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,MAAM;YACjC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,EAAE;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,aAAa,EAAE,IAAI,CAAC,aAAa;SAClC,CAAC;QACF,OAAO,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;IAClC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAarC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,6EAA6E;IAC1F,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC5B,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC7B,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE;QACxE,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QACjC,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC9B,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE;QACpC,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QACrC,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;KAChF,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACxC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,sBAAsB;IACnC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACjD,CAAC;IACF,WAAW,EAAE,EAAE,oBAAoB,EAAE,IAAI,EAAE;IAC3C,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjD,OAAO,EAAE,OAAO,EAAE,CAAC;IACrB,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAyB;IACrE,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EAAE,6CAA6C;IAC1D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,YAAY,CAAC;KACxD,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,6CAA6C,CAAC,CAAC;QAC/E,IAAI,iBAAiB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,eAAe,KAAK,UAAU,EAAE,CAAC;YACzF,OAAQ,MAAc,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QACpD,CAAC;QACD,OAAO,EAAE,CAAC;IACZ,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAM5C;IACD,IAAI,EAAE,oBAAoB;IAC1B,KAAK,EAAE,oBAAoB;IAC3B,WAAW,EAAE,kDAAkD;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAChC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;QACjB,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC9B,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE;KACxC,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;QAClF,IAAI,mBAAmB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,iBAAiB,KAAK,UAAU,EAAE,CAAC;YAC7F,OAAQ,MAAc,CAAC,iBAAiB,CAAC;gBACvC,GAAG,IAAI;gBACP,SAAS;aACV,CAAC,CAAC;QACL,CAAC;QACD,MAAM,IAAI,KAAK,CAAC,4DAA4D,CAAC,CAAC;IAChF,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAqB;IAC7D,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EAAE,uCAAuC;IACpD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,IAAI,aAAa,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACjF,OAAQ,MAAc,CAAC,WAAW,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAClD,CAAC;QACD,OAAO,EAAE,CAAC;IACZ,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAwD;IAC9F,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,0BAA0B;IACvC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QAC1C,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACrD,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAChD,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,UAAU,CAAC;YAChC,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;SACxB,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,UAAU,CAAyB;IAC1E,IAAI,EAAE,yBAAyB;IAC/B,KAAK,EAAE,yBAAyB;IAChC,WAAW,EAAE,kIAAkI;IAC/I,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACnG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,mDAAmD,CAAC,CAAC;QACvE,CAAC;QACD,OAAQ,MAAc,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;IAC1D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAK5C;IACD,IAAI,EAAE,qBAAqB;IAC3B,KAAK,EAAE,oCAAoC;IAC3C,WAAW,EAAE,6JAA6J;IAC1K,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QACpI,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qCAAqC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,+CAA+C,CAAC,CAAC;QACnE,CAAC;QACD,OAAQ,MAAc,CAAC,iBAAiB,CAAC,SAAS,EAAE;YAClD,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;SAC9B,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAqB;IAC9D,IAAI,EAAE,iBAAiB;IACvB,KAAK,EAAE,sBAAsB;IAC7B,WAAW,EAAE,6IAA6I;IAC1J,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACpD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,UAAU,CAAqB;IAC/D,IAAI,EAAE,kBAAkB;IACxB,KAAK,EAAE,kBAAkB;IACzB,WAAW,EAAE,iMAAiM;IAC9M,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,cAAc,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACrD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAqB;IACvE,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EAAE,yIAAyI;IACtJ,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,sBAAsB,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,UAAU,CAQlD;IACD,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EAAE,gIAAgI;IAC7I,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sEAAsE,CAAC;QACjH,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACxE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACpE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACpG,OAAO,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,QAAQ,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtH,MAAM,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACzG,0BAA0B,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACpH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,OAAQ,MAAc,CAAC,uBAAuB,CAAC,SAAS,EAAE;YACxD,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,0BAA0B,EAAE,IAAI,CAAC,0BAA0B;SAC5D,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,SAAS,GAAqB;IACzC,gBAAgB;IAChB,cAAc;IACd,iBAAiB;IACjB,aAAa;IACb,WAAW;IACX,cAAc;IACd,cAAc;IACd,cAAc;IACd,oBAAoB;IACpB,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,yBAAyB;IACzB,qBAAqB;IACrB,iBAAiB;IACjB,kBAAkB;IAClB,0BAA0B;IAC1B,2BAA2B;CAC5B,CAAC;AAEF,MAAM,CAAC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAC7B,SAAS,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAC3C,CAAC"}
1
+ {"version":3,"file":"definitions.js","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AACxB,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AAoBrD;;;GAGG;AACH,MAAM,UAAU,UAAU,CACxB,IAA2D;IAE3D,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,GAAG,WAAW,EAAE,GAAG,eAAe,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IAClI,OAAO,EAAE,GAAG,IAAI,EAAE,WAAW,EAAE,CAAC;AAClC,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,QAAgB,EAAE,OAAe;QAC3C,KAAK,CAAC,+BAA+B,QAAQ,MAAM,OAAO,EAAE,CAAC,CAAC;QAC9D,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED;;;GAGG;AACH,MAAM,UAAU,aAAa,CAAU,IAA6B,EAAE,IAAa;IACjF,yFAAyF;IACzF,MAAM,MAAM,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IAC7D,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;QACpB,MAAM,OAAO,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM;aAChC,GAAG,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,QAAQ,KAAK,KAAK,CAAC,OAAO,EAAE,CAAC;aACvE,IAAI,CAAC,IAAI,CAAC,CAAC;QACd,MAAM,IAAI,iBAAiB,CAAC,IAAI,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;IAClD,CAAC;IACD,OAAO,MAAM,CAAC,IAAe,CAAC;AAChC,CAAC;AAED,+CAA+C;AAC/C,MAAM,CAAC,KAAK,UAAU,cAAc,CAAC,MAAsB;IACzD,MAAM,QAAQ,GAAG,OAAO,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,KAAK,KAAK,QAAQ,CAAC;IAChF,OAAO,EAAE,QAAQ,EAAE,CAAC;AACtB,CAAC;AAED,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAC;IACzC,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EAAE,yCAAyC;IACtD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC;IACvB,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;QAC/B,OAAO,MAAM,CAAC,WAAW,EAAE,CAAC;IAC9B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,8CAA8C;IAC3D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAC1C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAuD;IAChG,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EAAE,iCAAiC;IAC9C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAChD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;KAC9E,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,aAAa,GAAG,UAAU,CAKpC;IACD,IAAI,EAAE,YAAY;IAClB,KAAK,EAAE,YAAY;IACnB,WAAW,EAAE,4EAA4E;IACzF,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QACjE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACnE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACvG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACpE,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC7C,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC;YAChB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC;QACxD,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,IAAI,CAAC,QAAQ,CAAC,CAAC;QAC5D,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,IAAI,CAAC,UAAU,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAiB;IACpD,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EAAE,yBAAyB;IACtC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KACvC,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAYrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,qCAAqC;IAClD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACzG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC/C,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sDAAsD,CAAC;QAC9F,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC;QAClH,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACvE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACxE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QAC7E,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;KAChF,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,qFAAqF,CAAC,CAAC;QACzG,CAAC;QACD,MAAM,KAAK,GAAQ;YACjB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,MAAM;YACjC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,EAAE;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,aAAa,EAAE,IAAI,CAAC,aAAa;SAClC,CAAC;QACF,OAAO,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;IAClC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAarC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,6EAA6E;IAC1F,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC5B,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC7B,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE;QACxE,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QACjC,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC9B,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE;QACpC,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QACrC,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;KAChF,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACxC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,sBAAsB;IACnC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACjD,CAAC;IACF,WAAW,EAAE,EAAE,oBAAoB,EAAE,IAAI,EAAE;IAC3C,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjD,OAAO,EAAE,OAAO,EAAE,CAAC;IACrB,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAyB;IACrE,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EAAE,6CAA6C;IAC1D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,YAAY,CAAC;KACxD,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,6CAA6C,CAAC,CAAC;QAC/E,IAAI,iBAAiB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,eAAe,KAAK,UAAU,EAAE,CAAC;YACzF,OAAQ,MAAc,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QACpD,CAAC;QACD,OAAO,EAAE,CAAC;IACZ,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAM5C;IACD,IAAI,EAAE,oBAAoB;IAC1B,KAAK,EAAE,oBAAoB;IAC3B,WAAW,EAAE,kDAAkD;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAChC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;QACjB,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC9B,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE;KACxC,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;QAClF,IAAI,mBAAmB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,iBAAiB,KAAK,UAAU,EAAE,CAAC;YAC7F,OAAQ,MAAc,CAAC,iBAAiB,CAAC;gBACvC,GAAG,IAAI;gBACP,SAAS;aACV,CAAC,CAAC;QACL,CAAC;QACD,MAAM,IAAI,KAAK,CAAC,4DAA4D,CAAC,CAAC;IAChF,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAqB;IAC7D,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EAAE,uCAAuC;IACpD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,IAAI,aAAa,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACjF,OAAQ,MAAc,CAAC,WAAW,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAClD,CAAC;QACD,OAAO,EAAE,CAAC;IACZ,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAsC;IAC5E,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,6FAA6F;IAC1G,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QAC1C,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACtD,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,CAAC,CAAC;IAC3E,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,UAAU,CAAyB;IAC1E,IAAI,EAAE,yBAAyB;IAC/B,KAAK,EAAE,yBAAyB;IAChC,WAAW,EAAE,kIAAkI;IAC/I,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACnG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,mDAAmD,CAAC,CAAC;QACvE,CAAC;QACD,OAAQ,MAAc,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;IAC1D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAK5C;IACD,IAAI,EAAE,qBAAqB;IAC3B,KAAK,EAAE,oCAAoC;IAC3C,WAAW,EAAE,6JAA6J;IAC1K,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QACpI,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qCAAqC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,+CAA+C,CAAC,CAAC;QACnE,CAAC;QACD,OAAQ,MAAc,CAAC,iBAAiB,CAAC,SAAS,EAAE;YAClD,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;SAC9B,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAqB;IAC9D,IAAI,EAAE,iBAAiB;IACvB,KAAK,EAAE,sBAAsB;IAC7B,WAAW,EAAE,6IAA6I;IAC1J,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACpD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,UAAU,CAAqB;IAC/D,IAAI,EAAE,kBAAkB;IACxB,KAAK,EAAE,kBAAkB;IACzB,WAAW,EAAE,iMAAiM;IAC9M,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,cAAc,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACrD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAqB;IACvE,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EAAE,yIAAyI;IACtJ,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,sBAAsB,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,UAAU,CAQlD;IACD,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EAAE,gIAAgI;IAC7I,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sEAAsE,CAAC;QACjH,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACxE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACpE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACpG,OAAO,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,QAAQ,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtH,MAAM,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACzG,0BAA0B,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACpH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,OAAQ,MAAc,CAAC,uBAAuB,CAAC,SAAS,EAAE;YACxD,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,0BAA0B,EAAE,IAAI,CAAC,0BAA0B;SAC5D,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,SAAS,GAAqB;IACzC,gBAAgB;IAChB,cAAc;IACd,iBAAiB;IACjB,aAAa;IACb,WAAW;IACX,cAAc;IACd,cAAc;IACd,cAAc;IACd,oBAAoB;IACpB,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,yBAAyB;IACzB,qBAAqB;IACrB,iBAAiB;IACjB,kBAAkB;IAClB,0BAA0B;IAC1B,2BAA2B;CAC5B,CAAC;AAEF,MAAM,CAAC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAC7B,SAAS,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAC3C,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/mcp",
3
- "version": "0.9.0",
3
+ "version": "0.10.0",
4
4
  "description": "Standard Model Context Protocol (MCP) server and client-side WebMCP support for Critical Path",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -35,8 +35,8 @@
35
35
  "@modelcontextprotocol/sdk": "^1.6.0",
36
36
  "zod": "^3.24.0",
37
37
  "zod-to-json-schema": "^3.25.2",
38
- "@critical-path/client": "0.14.9",
39
- "@critical-path/core": "0.24.0"
38
+ "@critical-path/client": "0.15.0",
39
+ "@critical-path/core": "0.25.0"
40
40
  },
41
41
  "devDependencies": {
42
42
  "@types/node": "^24.0.0",
package/src/index.test.ts CHANGED
@@ -216,7 +216,7 @@ describe('@critical-path/mcp', () => {
216
216
  expect(await engine.getTask(task.id)).not.toBeNull();
217
217
  });
218
218
 
219
- it('validates tool arguments and strips undeclared fields', async () => {
219
+ it('validates tool arguments and rejects undeclared fields', async () => {
220
220
  const source = await engine.createProject({ name: 'Source', key: 'SRC' });
221
221
  const other = await engine.createProject({ name: 'Other', key: 'OTH' });
222
222
  const task = await engine.createTask({ projectId: source.id, title: 'Stay put' });
@@ -226,13 +226,28 @@ describe('@critical-path/mcp', () => {
226
226
  expect(invalid.isError).toBe(true);
227
227
  expect((invalid.content as Array<{ text: string }>)[0].text).toContain('Invalid arguments');
228
228
 
229
- await client.callTool({
229
+ const undeclared = await client.callTool({
230
230
  name: 'update_task',
231
231
  arguments: { id: task.id, title: 'Renamed', projectId: other.id }
232
232
  });
233
- const updated = await engine.getTask(task.id);
234
- expect(updated?.title).toBe('Renamed');
235
- expect(updated?.projectId).toBe(source.id);
233
+ expect(undeclared.isError).toBe(true);
234
+ expect((undeclared.content as Array<{ text: string }>)[0].text).toContain('projectId');
235
+ const unchanged = await engine.getTask(task.id);
236
+ expect(unchanged?.title).toBe('Stay put');
237
+ expect(unchanged?.projectId).toBe(source.id);
238
+ });
239
+
240
+ it('attributes engine writes to the configured actor', async () => {
241
+ const project = await engine.createProject({ name: 'Actors', key: 'ACT' });
242
+ const task = await engine.createTask({ projectId: project.id, title: 'T' });
243
+
244
+ const defaultClient = await connect({ engine });
245
+ const first = await defaultClient.callTool({ name: 'add_comment', arguments: { taskId: task.id, content: 'hi' } });
246
+ expect(JSON.parse((first.content as Array<{ text: string }>)[0].text).authorId).toBe('mcp-agent');
247
+
248
+ const namedClient = await connect({ engine, actor: { userId: 'claude', actorType: 'agent' } });
249
+ const second = await namedClient.callTool({ name: 'add_comment', arguments: { taskId: task.id, content: 'hi' } });
250
+ expect(JSON.parse((second.content as Array<{ text: string }>)[0].text).authorId).toBe('claude');
236
251
  });
237
252
 
238
253
  it('marks destructive tools with MCP annotations', async () => {
@@ -10,7 +10,7 @@ import {
10
10
  ErrorCode,
11
11
  McpError
12
12
  } from '@modelcontextprotocol/sdk/types.js';
13
- import type { CriticalPathEngine } from '@critical-path/core';
13
+ import type { Actor, CriticalPathEngine } from '@critical-path/core';
14
14
  import type { CriticalPathClient } from '@critical-path/client';
15
15
  import { ALL_TOOLS, parseToolArgs, type BackendContext } from '../tools/definitions.js';
16
16
 
@@ -20,10 +20,20 @@ export interface CriticalPathMcpServerOptions {
20
20
  name?: string;
21
21
  version?: string;
22
22
  tools?: string[];
23
+ /**
24
+ * Identity that changes made through an `engine` are attributed to (activity log, comment
25
+ * authors, ...). Defaults to `DEFAULT_MCP_ACTOR`. With a `client`, identity comes from the API's
26
+ * authentication (e.g. the `Authorization` header passed to the client) instead.
27
+ */
28
+ actor?: Actor;
23
29
  }
24
30
 
31
+ export const DEFAULT_MCP_ACTOR: Actor = Object.freeze({ userId: 'mcp-agent', username: 'MCP Agent', actorType: 'agent' });
32
+
25
33
  export function createCriticalPathMcpServer(options: CriticalPathMcpServerOptions): Server {
26
- const target: BackendContext | undefined = options.engine || options.client;
34
+ const target: BackendContext | undefined = options.engine
35
+ ? options.engine.withActor(options.actor ?? DEFAULT_MCP_ACTOR)
36
+ : options.client;
27
37
  if (!target) {
28
38
  throw new Error('Either engine or client must be provided to createCriticalPathMcpServer.');
29
39
  }
@@ -38,11 +38,12 @@ export class ToolArgumentError extends Error {
38
38
  }
39
39
 
40
40
  /**
41
- * Validates raw tool arguments against the tool's zod schema. Unknown keys are stripped,
41
+ * Validates raw tool arguments against the tool's zod schema. Unknown keys are rejected,
42
42
  * so callers cannot pass fields the tool does not declare.
43
43
  */
44
44
  export function parseToolArgs<TParams>(tool: ToolDefinition<TParams>, args: unknown): TParams {
45
- const result = tool.zodSchema.safeParse(args ?? {});
45
+ // Strict: unknown arguments are reported to the model instead of being silently dropped.
46
+ const result = tool.zodSchema.strict().safeParse(args ?? {});
46
47
  if (!result.success) {
47
48
  const details = result.error.issues
48
49
  .map((issue) => `${issue.path.join('.') || '(root)'}: ${issue.message}`)
@@ -307,21 +308,16 @@ export const listCommentsTool = defineTool<{ taskId: string }>({
307
308
  }
308
309
  });
309
310
 
310
- export const addCommentTool = defineTool<{ taskId: string; content: string; authorId: string }>({
311
+ export const addCommentTool = defineTool<{ taskId: string; content: string }>({
311
312
  name: 'add_comment',
312
313
  title: 'Add Comment',
313
- description: 'Add a comment to a task.',
314
+ description: 'Add a comment to a task. The comment is attributed to the identity this MCP server runs as.',
314
315
  zodSchema: z.object({
315
316
  taskId: z.string().describe('The task ID'),
316
- content: z.string().describe('Comment body/markdown'),
317
- authorId: z.string().describe('Author user ID')
317
+ content: z.string().describe('Comment body/markdown')
318
318
  }),
319
319
  execute: async (args, target) => {
320
- return (target as any).addComment({
321
- taskId: args.taskId,
322
- content: args.content,
323
- authorId: args.authorId
324
- });
320
+ return target.addComment({ taskId: args.taskId, content: args.content });
325
321
  }
326
322
  });
327
323