@critical-path/mcp 0.3.0 → 0.4.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,10 +1,34 @@
1
1
  # @critical-path/mcp
2
2
 
3
+ ## 0.4.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 9c31e8d: Introduce comprehensive Task Metrics, Inferred Actuals, Progress Inference, Earned Value Management (EVM), and Time-Series Progress History Curve Profiling.
8
+ - **Inferred Actuals**: Automatic start/completion auto-stamping on workflow transitions with fallback inference from activity logs, plus automatic completion timestamp clearing on task re-open.
9
+ - **Reality Delta**: Multi-dimensional variance analysis comparing planned estimates to logged hours (`effortVarianceHours`, `durationVarianceHours`, `accuracyRatio`, `isOverdue`, `isOverEstimate`).
10
+ - **Progress Inference**: Deterministic priority waterfall resolving completion progress across explicit values, checklist/todo completion ratios, logged effort, and elapsed schedule time.
11
+ - **Earned Value Management (EVM)**: Task-level PV, EV, AC, CV, SV, CPI, and SPI calculations.
12
+ - **Time-Series History & Curve Shapes**: Historical timeline reconstruction from activity logs with piecewise interpolation curve classification (`linear`, `s_curve`, `early_surge`, `late_rush`, `stalled`).
13
+ - **Full-Stack Integration**: REST endpoints (`/tasks/:id/metrics`, `/tasks/:id/progress-history`), Client SDK methods, React `useTaskMetrics` hook, Svelte 5 `TaskMetricsState`, and MCP tools (`get_task_metrics`, `get_task_progress_history`).
14
+
15
+ ### Patch Changes
16
+
17
+ - Updated dependencies [9c31e8d]
18
+ - @critical-path/core@0.17.0
19
+ - @critical-path/client@0.11.0
20
+
21
+ ## 0.3.1
22
+
23
+ ### Patch Changes
24
+
25
+ - b4b2c98: Generalize tool descriptions for timeline ladder of abstraction tools.
26
+
3
27
  ## 0.3.0
4
28
 
5
29
  ### Minor Changes
6
30
 
7
- - e2a7eef: Introduce Bret Victor's Ladder of Abstraction and Critical Path Method (CPM) timeline synthesis to the framework data model:
31
+ - e2a7eef: Introduce Ladder of Abstraction and Critical Path Method (CPM) timeline synthesis to the framework data model:
8
32
  - **Core Domain**: Multi-scale timeline synthesis model across Macro phase rollups, Standard CPM Gantt schedule (early/late bounds, float/slack calculation, bottleneck identification), and Concrete grounding (deliverables, file attachments, daily effort distribution, and reality deltas). Added `calculateCriticalPath`, `getTimelineLadder`, and `getTaskLadder` to `CriticalPathEngine`.
9
33
  - **Server Router**: HTTP endpoints `GET /projects/:id/critical-path`, `GET /projects/:id/ladder`, and `GET /tasks/:id/ladder`.
10
34
  - **Client SDK**: `CriticalPathClient` methods `calculateCriticalPath`, `getTimelineLadder`, and `getTaskLadder`.
package/README.md CHANGED
@@ -160,7 +160,7 @@ handle.unregister();
160
160
  | `list_comments` | Retrieve task comments | `{ taskId }` |
161
161
  | `add_comment` | Post a comment to a task | `{ taskId, content, authorId }` |
162
162
  | `calculate_critical_path` | Calculate CPM schedule, float/slack & bottleneck tasks | `{ projectId? }` |
163
- | `get_timeline_ladder` | Multi-scale Bret Victor Ladder of Abstraction (macro/standard/concrete) | `{ projectId?, level?, containerId?, iterationId? }` |
163
+ | `get_timeline_ladder` | Multi-scale Ladder of Abstraction (macro/standard/concrete) | `{ projectId?, level?, containerId?, iterationId? }` |
164
164
  | `get_task_ladder` | Single-task ladder view connecting phase, CPM Gantt, and concrete evidence | `{ taskId }` |
165
165
 
166
166
  ---
@@ -77,7 +77,7 @@ describe('@critical-path/mcp', () => {
77
77
  });
78
78
  it('calculates critical path and returns timeline ladder via MCP tools', async () => {
79
79
  const createProjTool = TOOL_MAP.get('create_project');
80
- const project = await createProjTool.execute({ name: 'Bret Victor MCP', key: 'BVM' }, engine);
80
+ const project = await createProjTool.execute({ name: 'Timeline Ladder MCP', key: 'TLM' }, engine);
81
81
  const createTaskTool = TOOL_MAP.get('create_task');
82
82
  const t1 = await createTaskTool.execute({
83
83
  projectId: project.id,
@@ -112,6 +112,19 @@ describe('@critical-path/mcp', () => {
112
112
  const taskLadderResult = await taskLadderTool.execute({ taskId: t2.id }, engine);
113
113
  expect(taskLadderResult.taskId).toBe(t2.id);
114
114
  expect(taskLadderResult.standard.title).toBe('Step 2: Polish');
115
+ expect(taskLadderResult.metrics).toBeDefined();
116
+ // 4. get_task_metrics tool
117
+ const taskMetricsTool = TOOL_MAP.get('get_task_metrics');
118
+ const taskMetricsResult = await taskMetricsTool.execute({ taskId: t2.id }, engine);
119
+ expect(taskMetricsResult.taskId).toBe(t2.id);
120
+ expect(taskMetricsResult.realityDelta.estimatedHours).toBe(6);
121
+ expect(taskMetricsResult.progress).toBeDefined();
122
+ expect(taskMetricsResult.evm).toBeDefined();
123
+ // 5. get_task_progress_history tool
124
+ const taskHistoryTool = TOOL_MAP.get('get_task_progress_history');
125
+ const taskHistoryResult = await taskHistoryTool.execute({ taskId: t2.id }, engine);
126
+ expect(taskHistoryResult.taskId).toBe(t2.id);
127
+ expect(taskHistoryResult.points.length).toBeGreaterThanOrEqual(1);
115
128
  });
116
129
  });
117
130
  describe('Standard MCP Server Creation', () => {
@@ -1 +1 @@
1
- {"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,UAAU,EAAE,MAAM,QAAQ,CAAC;AAC1D,OAAO,EAAE,kBAAkB,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AACxE,OAAO,EACL,SAAS,EACT,QAAQ,EACR,2BAA2B,EAC3B,mBAAmB,EACnB,sBAAsB,EACvB,MAAM,YAAY,CAAC;AAEpB,QAAQ,CAAC,oBAAoB,EAAE,GAAG,EAAE;IAClC,IAAI,MAA0B,CAAC;IAE/B,UAAU,CAAC,GAAG,EAAE;QACd,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,KAAK,EAAE,IAAI,aAAa,EAAE,EAAE,CAAC,CAAC;IAClE,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;QAChC,EAAE,CAAC,6CAA6C,EAAE,GAAG,EAAE;YACrD,MAAM,SAAS,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YAC/C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;YAC7C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;YAC9C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,YAAY,CAAC,CAAC;YAC1C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YACxC,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YACjD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,oBAAoB,CAAC,CAAC;YAClD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;YAC7C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,yBAAyB,CAAC,CAAC;YACvD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,qBAAqB,CAAC,CAAC;YACnD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,iBAAiB,CAAC,CAAC;QACjD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;YAC5E,oBAAoB;YACpB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,gBAAgB,CAAE,CAAC;YACvD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C,EAAE,IAAI,EAAE,iBAAiB,EAAE,GAAG,EAAE,KAAK,EAAE,EACvC,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YAE7C,mBAAmB;YACnB,MAAM,YAAY,GAAG,QAAQ,CAAC,GAAG,CAAC,eAAe,CAAE,CAAC;YACpD,MAAM,QAAQ,GAAG,MAAM,YAAY,CAAC,OAAO,CAAC,EAAE,EAAE,MAAM,CAAC,CAAC;YACxD,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACjC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAExC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,IAAI,GAAG,MAAM,cAAc,CAAC,OAAO,CACvC;gBACE,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,uBAAuB;gBAC9B,QAAQ,EAAE,QAAQ;gBAClB,IAAI,EAAE,CAAC,OAAO,EAAE,KAAK,CAAC;aACvB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC9B,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjD,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAErC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C;gBACE,EAAE,EAAE,IAAI,CAAC,EAAE;gBACX,MAAM,EAAE,aAAa;gBACrB,cAAc,EAAE,CAAC;aAClB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAEvC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C;gBACE,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,OAAO,EAAE,qCAAqC;gBAC9C,QAAQ,EAAE,SAAS;aACpB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,qCAAqC,CAAC,CAAC;YAEpE,4BAA4B;YAC5B,MAAM,aAAa,GAAG,QAAQ,CAAC,GAAG,CAAC,YAAY,CAAE,CAAC;YAClD,MAAM,QAAQ,GAAG,MAAM,aAAa,CAAC,OAAO,CAC1C,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,EAChD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEjC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,MAAM,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAElC,MAAM,WAAW,GAAG,MAAM,aAAa,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,WAAW,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACtC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,oEAAoE,EAAE,KAAK,IAAI,EAAE;YAClF,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,gBAAgB,CAAE,CAAC;YACvD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,iBAAiB,EAAE,GAAG,EAAE,KAAK,EAAE,EAAE,MAAM,CAAC,CAAC;YAE9F,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,EAAE,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC;gBACtC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,mBAAmB;gBAC1B,MAAM,EAAE,MAAM;gBACd,cAAc,EAAE,CAAC;aAClB,EAAE,MAAM,CAAC,CAAC;YAEX,MAAM,EAAE,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC;gBACtC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,gBAAgB;gBACvB,MAAM,EAAE,aAAa;gBACrB,cAAc,EAAE,CAAC;aAClB,EAAE,MAAM,CAAC,CAAC;YAEX,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,EAAE,CAAC,EAAE;gBACb,eAAe,EAAE,EAAE,CAAC,EAAE;gBACtB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,kCAAkC;YAClC,MAAM,OAAO,GAAG,QAAQ,CAAC,GAAG,CAAC,yBAAyB,CAAE,CAAC;YACzD,MAAM,SAAS,GAAG,MAAM,OAAO,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YAC3E,MAAM,CAAC,SAAS,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9C,MAAM,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1D,8BAA8B;YAC9B,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,qBAAqB,CAAE,CAAC;YACxD,MAAM,YAAY,GAAG,MAAM,UAAU,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,EAAE,MAAM,CAAC,CAAC;YAC/F,MAAM,CAAC,YAAY,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;YACzC,MAAM,CAAC,YAAY,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9D,MAAM,CAAC,YAAY,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEpD,0BAA0B;YAC1B,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,iBAAiB,CAAE,CAAC;YACxD,MAAM,gBAAgB,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACjF,MAAM,CAAC,gBAAgB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC5C,MAAM,CAAC,gBAAgB,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;QACjE,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;QAC5C,EAAE,CAAC,kDAAkD,EAAE,GAAG,EAAE;YAC1D,MAAM,MAAM,GAAG,2BAA2B,CAAC;gBACzC,MAAM;gBACN,IAAI,EAAE,iBAAiB;gBACvB,OAAO,EAAE,OAAO;aACjB,CAAC,CAAC;YACH,MAAM,CAAC,MAAM,CAAC,CAAC,WAAW,EAAE,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,GAAG,EAAE;YACzD,MAAM,CAAC,GAAG,EAAE,CAAC,2BAA2B,CAAC,EAAS,CAAC,CAAC,CAAC,OAAO,CAC1D,0CAA0C,CAC3C,CAAC;QACJ,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qBAAqB,EAAE,GAAG,EAAE;QACnC,IAAI,OAAY,CAAC;QACjB,IAAI,OAAY,CAAC;QAEjB,UAAU,CAAC,GAAG,EAAE;YACd,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,GAAG,EAAE,CAAC;QACf,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8EAA8E,EAAE,GAAG,EAAE;YACtF,MAAM,IAAI,GAAG,sBAAsB,CAAC,OAAO,CAAC,CAAC;YAC7C,MAAM,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,CAAC;YAC3B,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,IAAK,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QACrD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,qBAAqB,EAAE,CAAC,CAAC;YAE5E,uCAAuC;YACvC,MAAM,UAAU,GAAQ;gBACtB,WAAW,EAAE,GAAG,EAAE,CAAC,MAAM,CAAC,WAAW,EAAE;gBACvC,UAAU,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC;gBACjD,aAAa,EAAE,CAAC,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,aAAa,CAAC,CAAC,CAAC;gBAClD,QAAQ,EAAE,CAAC,GAAY,EAAE,EAAE,CAAC,MAAM,CAAC,QAAQ,CAAC,GAAG,CAAC;gBAChD,OAAO,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC;gBAC3C,UAAU,EAAE,CAAC,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;gBAC5C,UAAU,EAAE,CAAC,EAAU,EAAE,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,CAAC,CAAC;gBAC5D,UAAU,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC;aAClD,CAAC;YAEF,MAAM,MAAM,GAAG,mBAAmB,CAAC;gBACjC,MAAM,EAAE,UAAU;gBAClB,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,QAAQ,EAAE,OAAO;gBACjB,MAAM,EAAE,OAAO;aAChB,CAAC,CAAC;YAEH,MAAM,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAC9D,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC,WAAW,EAAE,CAAC;YAE3C,MAAM,UAAU,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,MAAM,CAAC,CAAC;YAEnE,4EAA4E;YAC5E,MAAM,WAAW,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,WAAW,CAAC,aAAa,EAAE;gBACxE,KAAK,EAAE,yBAAyB;aACjC,CAAC,CAAC;YACH,MAAM,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAC/C,MAAM,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAE1D,yBAAyB;YACzB,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,CAAC,WAAW,EAAE,CAAC;YACvD,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAEpE,UAAU;YACV,MAAM,CAAC,UAAU,EAAE,CAAC;YACpB,MAAM,eAAe,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAC9D,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,CAAC,aAAa,EAAE,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,UAAU,GAAG,IAAI,eAAe,EAAE,CAAC;YACzC,MAAM,UAAU,GAAQ;gBACtB,QAAQ,EAAE,GAAG,EAAE,CAAC,OAAO,CAAC,OAAO,CAAC,EAAE,CAAC;aACpC,CAAC;YAEF,mBAAmB,CAAC;gBAClB,MAAM,EAAE,UAAU;gBAClB,MAAM,EAAE,UAAU,CAAC,MAAM;gBACzB,QAAQ,EAAE,OAAO;gBACjB,MAAM,EAAE,OAAO;aAChB,CAAC,CAAC;YAEH,IAAI,KAAK,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAClD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAExC,UAAU,CAAC,KAAK,EAAE,CAAC;YAEnB,KAAK,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAC9C,MAAM,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
1
+ {"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,UAAU,EAAE,MAAM,QAAQ,CAAC;AAC1D,OAAO,EAAE,kBAAkB,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AACxE,OAAO,EACL,SAAS,EACT,QAAQ,EACR,2BAA2B,EAC3B,mBAAmB,EACnB,sBAAsB,EACvB,MAAM,YAAY,CAAC;AAEpB,QAAQ,CAAC,oBAAoB,EAAE,GAAG,EAAE;IAClC,IAAI,MAA0B,CAAC;IAE/B,UAAU,CAAC,GAAG,EAAE;QACd,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,KAAK,EAAE,IAAI,aAAa,EAAE,EAAE,CAAC,CAAC;IAClE,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;QAChC,EAAE,CAAC,6CAA6C,EAAE,GAAG,EAAE;YACrD,MAAM,SAAS,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YAC/C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;YAC7C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,gBAAgB,CAAC,CAAC;YAC9C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,YAAY,CAAC,CAAC;YAC1C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YACxC,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YACjD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,oBAAoB,CAAC,CAAC;YAClD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;YAC7C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,yBAAyB,CAAC,CAAC;YACvD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,qBAAqB,CAAC,CAAC;YACnD,MAAM,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,iBAAiB,CAAC,CAAC;QACjD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;YAC5E,oBAAoB;YACpB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,gBAAgB,CAAE,CAAC;YACvD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C,EAAE,IAAI,EAAE,iBAAiB,EAAE,GAAG,EAAE,KAAK,EAAE,EACvC,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACjC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YAE7C,mBAAmB;YACnB,MAAM,YAAY,GAAG,QAAQ,CAAC,GAAG,CAAC,eAAe,CAAE,CAAC;YACpD,MAAM,QAAQ,GAAG,MAAM,YAAY,CAAC,OAAO,CAAC,EAAE,EAAE,MAAM,CAAC,CAAC;YACxD,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACjC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAExC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,IAAI,GAAG,MAAM,cAAc,CAAC,OAAO,CACvC;gBACE,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,uBAAuB;gBAC9B,QAAQ,EAAE,QAAQ;gBAClB,IAAI,EAAE,CAAC,OAAO,EAAE,KAAK,CAAC;aACvB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC9B,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC;YACjD,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAErC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C;gBACE,EAAE,EAAE,IAAI,CAAC,EAAE;gBACX,MAAM,EAAE,aAAa;gBACrB,cAAc,EAAE,CAAC;aAClB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;YAC3C,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAEvC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAC1C;gBACE,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,OAAO,EAAE,qCAAqC;gBAC9C,QAAQ,EAAE,SAAS;aACpB,EACD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,qCAAqC,CAAC,CAAC;YAEpE,4BAA4B;YAC5B,MAAM,aAAa,GAAG,QAAQ,CAAC,GAAG,CAAC,YAAY,CAAE,CAAC;YAClD,MAAM,QAAQ,GAAG,MAAM,aAAa,CAAC,OAAO,CAC1C,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,EAChD,MAAM,CACP,CAAC;YACF,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEjC,iBAAiB;YACjB,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,MAAM,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAElC,MAAM,WAAW,GAAG,MAAM,aAAa,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,WAAW,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACtC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,oEAAoE,EAAE,KAAK,IAAI,EAAE;YAClF,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,gBAAgB,CAAE,CAAC;YACvD,MAAM,OAAO,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,qBAAqB,EAAE,GAAG,EAAE,KAAK,EAAE,EAAE,MAAM,CAAC,CAAC;YAElG,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,aAAa,CAAE,CAAC;YACpD,MAAM,EAAE,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC;gBACtC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,mBAAmB;gBAC1B,MAAM,EAAE,MAAM;gBACd,cAAc,EAAE,CAAC;aAClB,EAAE,MAAM,CAAC,CAAC;YAEX,MAAM,EAAE,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC;gBACtC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,gBAAgB;gBACvB,MAAM,EAAE,aAAa;gBACrB,cAAc,EAAE,CAAC;aAClB,EAAE,MAAM,CAAC,CAAC;YAEX,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,EAAE,CAAC,EAAE;gBACb,eAAe,EAAE,EAAE,CAAC,EAAE;gBACtB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,kCAAkC;YAClC,MAAM,OAAO,GAAG,QAAQ,CAAC,GAAG,CAAC,yBAAyB,CAAE,CAAC;YACzD,MAAM,SAAS,GAAG,MAAM,OAAO,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YAC3E,MAAM,CAAC,SAAS,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9C,MAAM,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1D,8BAA8B;YAC9B,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,qBAAqB,CAAE,CAAC;YACxD,MAAM,YAAY,GAAG,MAAM,UAAU,CAAC,OAAO,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,EAAE,MAAM,CAAC,CAAC;YAC/F,MAAM,CAAC,YAAY,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;YACzC,MAAM,CAAC,YAAY,CAAC,KAAK,CAAC,yBAAyB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC9D,MAAM,CAAC,YAAY,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEpD,0BAA0B;YAC1B,MAAM,cAAc,GAAG,QAAQ,CAAC,GAAG,CAAC,iBAAiB,CAAE,CAAC;YACxD,MAAM,gBAAgB,GAAG,MAAM,cAAc,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACjF,MAAM,CAAC,gBAAgB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC5C,MAAM,CAAC,gBAAgB,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;YAC/D,MAAM,CAAC,gBAAgB,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC;YAE/C,2BAA2B;YAC3B,MAAM,eAAe,GAAG,QAAQ,CAAC,GAAG,CAAC,kBAAkB,CAAE,CAAC;YAC1D,MAAM,iBAAiB,GAAG,MAAM,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC7C,MAAM,CAAC,iBAAiB,CAAC,YAAY,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAC9D,MAAM,CAAC,iBAAiB,CAAC,QAAQ,CAAC,CAAC,WAAW,EAAE,CAAC;YACjD,MAAM,CAAC,iBAAiB,CAAC,GAAG,CAAC,CAAC,WAAW,EAAE,CAAC;YAE5C,oCAAoC;YACpC,MAAM,eAAe,GAAG,QAAQ,CAAC,GAAG,CAAC,2BAA2B,CAAE,CAAC;YACnE,MAAM,iBAAiB,GAAG,MAAM,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,CAAC,CAAC;YACnF,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;YAC7C,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;QACpE,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;QAC5C,EAAE,CAAC,kDAAkD,EAAE,GAAG,EAAE;YAC1D,MAAM,MAAM,GAAG,2BAA2B,CAAC;gBACzC,MAAM;gBACN,IAAI,EAAE,iBAAiB;gBACvB,OAAO,EAAE,OAAO;aACjB,CAAC,CAAC;YACH,MAAM,CAAC,MAAM,CAAC,CAAC,WAAW,EAAE,CAAC;QAC/B,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,GAAG,EAAE;YACzD,MAAM,CAAC,GAAG,EAAE,CAAC,2BAA2B,CAAC,EAAS,CAAC,CAAC,CAAC,OAAO,CAC1D,0CAA0C,CAC3C,CAAC;QACJ,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,qBAAqB,EAAE,GAAG,EAAE;QACnC,IAAI,OAAY,CAAC;QACjB,IAAI,OAAY,CAAC;QAEjB,UAAU,CAAC,GAAG,EAAE;YACd,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,GAAG,EAAE,CAAC;QACf,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,8EAA8E,EAAE,GAAG,EAAE;YACtF,MAAM,IAAI,GAAG,sBAAsB,CAAC,OAAO,CAAC,CAAC;YAC7C,MAAM,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,CAAC;YAC3B,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,IAAK,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QACrD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;YACtE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,qBAAqB,EAAE,CAAC,CAAC;YAE5E,uCAAuC;YACvC,MAAM,UAAU,GAAQ;gBACtB,WAAW,EAAE,GAAG,EAAE,CAAC,MAAM,CAAC,WAAW,EAAE;gBACvC,UAAU,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC;gBACjD,aAAa,EAAE,CAAC,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,aAAa,CAAC,CAAC,CAAC;gBAClD,QAAQ,EAAE,CAAC,GAAY,EAAE,EAAE,CAAC,MAAM,CAAC,QAAQ,CAAC,GAAG,CAAC;gBAChD,OAAO,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC;gBAC3C,UAAU,EAAE,CAAC,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;gBAC5C,UAAU,EAAE,CAAC,EAAU,EAAE,CAAM,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,CAAC,CAAC;gBAC5D,UAAU,EAAE,CAAC,EAAU,EAAE,EAAE,CAAC,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC;aAClD,CAAC;YAEF,MAAM,MAAM,GAAG,mBAAmB,CAAC;gBACjC,MAAM,EAAE,UAAU;gBAClB,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,QAAQ,EAAE,OAAO;gBACjB,MAAM,EAAE,OAAO;aAChB,CAAC,CAAC;YAEH,MAAM,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAC9D,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC,WAAW,EAAE,CAAC;YAE3C,MAAM,UAAU,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YACzD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,kBAAkB,EAAE,CAAC,MAAM,CAAC,CAAC;YAEnE,4EAA4E;YAC5E,MAAM,WAAW,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,WAAW,CAAC,aAAa,EAAE;gBACxE,KAAK,EAAE,yBAAyB;aACjC,CAAC,CAAC;YACH,MAAM,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAC/C,MAAM,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,yBAAyB,CAAC,CAAC;YAE1D,yBAAyB;YACzB,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,CAAC,WAAW,EAAE,CAAC;YACvD,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YAEpE,UAAU;YACV,MAAM,CAAC,UAAU,EAAE,CAAC;YACpB,MAAM,eAAe,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAC9D,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,MAAM,CAAC,OAAO,CAAC,wBAAwB,CAAC,CAAC,aAAa,EAAE,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;YAC7D,MAAM,UAAU,GAAG,IAAI,eAAe,EAAE,CAAC;YACzC,MAAM,UAAU,GAAQ;gBACtB,QAAQ,EAAE,GAAG,EAAE,CAAC,OAAO,CAAC,OAAO,CAAC,EAAE,CAAC;aACpC,CAAC;YAEF,mBAAmB,CAAC;gBAClB,MAAM,EAAE,UAAU;gBAClB,MAAM,EAAE,UAAU,CAAC,MAAM;gBACzB,QAAQ,EAAE,OAAO;gBACjB,MAAM,EAAE,OAAO;aAChB,CAAC,CAAC;YAEH,IAAI,KAAK,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAClD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAExC,UAAU,CAAC,KAAK,EAAE,CAAC;YAEnB,KAAK,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC,QAAQ,EAAE,CAAC;YAC9C,MAAM,CAAC,KAAK,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChC,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
@@ -93,6 +93,12 @@ export declare const getTimelineLadderTool: ToolDefinition<{
93
93
  export declare const getTaskLadderTool: ToolDefinition<{
94
94
  taskId: string;
95
95
  }>;
96
+ export declare const getTaskMetricsTool: ToolDefinition<{
97
+ taskId: string;
98
+ }>;
99
+ export declare const getTaskProgressHistoryTool: ToolDefinition<{
100
+ taskId: string;
101
+ }>;
96
102
  export declare const ALL_TOOLS: ToolDefinition[];
97
103
  export declare const TOOL_MAP: Map<string, ToolDefinition<any, any>>;
98
104
  //# sourceMappingURL=definitions.d.ts.map
@@ -1 +1 @@
1
- {"version":3,"file":"definitions.d.ts","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AACxB,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,qBAAqB,CAAC;AAC9D,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAEhE,MAAM,MAAM,cAAc,GAAG,kBAAkB,GAAG,kBAAkB,CAAC;AAErE,MAAM,WAAW,cAAc,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC;IAC5B,WAAW,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACrC,WAAW,CAAC,EAAE;QACZ,YAAY,CAAC,EAAE,OAAO,CAAC;QACvB,oBAAoB,CAAC,EAAE,OAAO,CAAC;KAChC,CAAC;IACF,OAAO,EAAE,CAAC,IAAI,EAAE,OAAO,EAAE,MAAM,EAAE,cAAc,EAAE,cAAc,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,KAAK,OAAO,CAAC,OAAO,CAAC,CAAC;CAC/G;AAGD,wBAAsB,cAAc,CAAC,MAAM,EAAE,cAAc;;GAG1D;AAED,eAAO,MAAM,gBAAgB,EAAE,cAc9B,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAAE,EAAE,EAAE,MAAM,CAAA;CAAE,CAmBzD,CAAC;AAEF,eAAO,MAAM,iBAAiB,EAAE,cAAc,CAAC;IAAE,IAAI,EAAE,MAAM,CAAC;IAAC,WAAW,CAAC,EAAE,MAAM,CAAC;IAAC,GAAG,CAAC,EAAE,MAAM,CAAA;CAAE,CAsBlG,CAAC;AAEF,eAAO,MAAM,aAAa,EAAE,cAAc,CAAC;IACzC,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB,CAuCA,CAAC;AAEF,eAAO,MAAM,WAAW,EAAE,cAAc,CAAC;IAAE,EAAE,EAAE,MAAM,CAAA;CAAE,CAmBtD,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAC1C,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;IACzD,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,cAAc,CAAC,EAAE,MAAM,CAAC;CACzB,CAiDA,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAC1C,EAAE,EAAE,MAAM,CAAC;IACX,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;IACzD,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB,CAqCA,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAAE,EAAE,EAAE,MAAM,CAAA;CAAE,CAoBzD,CAAC;AAEF,eAAO,MAAM,oBAAoB,EAAE,cAAc,CAAC;IAAE,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,CAuBvE,CAAC;AAEF,eAAO,MAAM,qBAAqB,EAAE,cAAc,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;CACpB,CAkCA,CAAC;AAEF,eAAO,MAAM,gBAAgB,EAAE,cAAc,CAAC;IAAE,MAAM,EAAE,MAAM,CAAA;CAAE,CAsB/D,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAAE,MAAM,EAAE,MAAM,CAAC;IAAC,OAAO,EAAE,MAAM,CAAC;IAAC,QAAQ,EAAE,MAAM,CAAA;CAAE,CA0BhG,CAAC;AAEF,eAAO,MAAM,yBAAyB,EAAE,cAAc,CAAC;IAAE,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,CAsB5E,CAAC;AAEF,eAAO,MAAM,qBAAqB,EAAE,cAAc,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK,CAAC;IAClD,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB,CAgCA,CAAC;AAEF,eAAO,MAAM,iBAAiB,EAAE,cAAc,CAAC;IAAE,MAAM,EAAE,MAAM,CAAA;CAAE,CAmBhE,CAAC;AAEF,eAAO,MAAM,SAAS,EAAE,cAAc,EAgBrC,CAAC;AAEF,eAAO,MAAM,QAAQ,uCAEpB,CAAC"}
1
+ {"version":3,"file":"definitions.d.ts","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AACxB,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,qBAAqB,CAAC;AAC9D,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAEhE,MAAM,MAAM,cAAc,GAAG,kBAAkB,GAAG,kBAAkB,CAAC;AAErE,MAAM,WAAW,cAAc,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC;IAC5B,WAAW,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACrC,WAAW,CAAC,EAAE;QACZ,YAAY,CAAC,EAAE,OAAO,CAAC;QACvB,oBAAoB,CAAC,EAAE,OAAO,CAAC;KAChC,CAAC;IACF,OAAO,EAAE,CAAC,IAAI,EAAE,OAAO,EAAE,MAAM,EAAE,cAAc,EAAE,cAAc,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,KAAK,OAAO,CAAC,OAAO,CAAC,CAAC;CAC/G;AAGD,wBAAsB,cAAc,CAAC,MAAM,EAAE,cAAc;;GAG1D;AAED,eAAO,MAAM,gBAAgB,EAAE,cAc9B,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAAE,EAAE,EAAE,MAAM,CAAA;CAAE,CAmBzD,CAAC;AAEF,eAAO,MAAM,iBAAiB,EAAE,cAAc,CAAC;IAAE,IAAI,EAAE,MAAM,CAAC;IAAC,WAAW,CAAC,EAAE,MAAM,CAAC;IAAC,GAAG,CAAC,EAAE,MAAM,CAAA;CAAE,CAsBlG,CAAC;AAEF,eAAO,MAAM,aAAa,EAAE,cAAc,CAAC;IACzC,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB,CAuCA,CAAC;AAEF,eAAO,MAAM,WAAW,EAAE,cAAc,CAAC;IAAE,EAAE,EAAE,MAAM,CAAA;CAAE,CAmBtD,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAC1C,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;IACzD,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,cAAc,CAAC,EAAE,MAAM,CAAC;CACzB,CAiDA,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAC1C,EAAE,EAAE,MAAM,CAAC;IACX,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;IACzD,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB,CAqCA,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAAE,EAAE,EAAE,MAAM,CAAA;CAAE,CAoBzD,CAAC;AAEF,eAAO,MAAM,oBAAoB,EAAE,cAAc,CAAC;IAAE,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,CAuBvE,CAAC;AAEF,eAAO,MAAM,qBAAqB,EAAE,cAAc,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;CACpB,CAkCA,CAAC;AAEF,eAAO,MAAM,gBAAgB,EAAE,cAAc,CAAC;IAAE,MAAM,EAAE,MAAM,CAAA;CAAE,CAsB/D,CAAC;AAEF,eAAO,MAAM,cAAc,EAAE,cAAc,CAAC;IAAE,MAAM,EAAE,MAAM,CAAC;IAAC,OAAO,EAAE,MAAM,CAAC;IAAC,QAAQ,EAAE,MAAM,CAAA;CAAE,CA0BhG,CAAC;AAEF,eAAO,MAAM,yBAAyB,EAAE,cAAc,CAAC;IAAE,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,CAsB5E,CAAC;AAEF,eAAO,MAAM,qBAAqB,EAAE,cAAc,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,KAAK,CAAC,EAAE,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK,CAAC;IAClD,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB,CAgCA,CAAC;AAEF,eAAO,MAAM,iBAAiB,EAAE,cAAc,CAAC;IAAE,MAAM,EAAE,MAAM,CAAA;CAAE,CAmBhE,CAAC;AAEF,eAAO,MAAM,kBAAkB,EAAE,cAAc,CAAC;IAAE,MAAM,EAAE,MAAM,CAAA;CAAE,CAmBjE,CAAC;AAEF,eAAO,MAAM,0BAA0B,EAAE,cAAc,CAAC;IAAE,MAAM,EAAE,MAAM,CAAA;CAAE,CAmBzE,CAAC;AAEF,eAAO,MAAM,SAAS,EAAE,cAAc,EAkBrC,CAAC;AAEF,eAAO,MAAM,QAAQ,uCAEpB,CAAC"}
@@ -368,7 +368,7 @@ export const calculateCriticalPathTool = {
368
368
  export const getTimelineLadderTool = {
369
369
  name: 'get_timeline_ladder',
370
370
  title: 'Get Timeline Ladder of Abstraction',
371
- description: 'Retrieve Bret Victor Ladder of Abstraction for a project timeline across macro phase envelopes, standard Gantt tasks & CPM, and concrete deliverables/time/attachments.',
371
+ description: 'Retrieve Ladder of Abstraction for a project timeline across macro phase envelopes, standard Gantt tasks & CPM, and concrete deliverables/time/attachments.',
372
372
  zodSchema: z.object({
373
373
  projectId: z.string().optional().describe('Project ID (falls back to ambient context if omitted)'),
374
374
  level: z.enum(['macro', 'standard', 'concrete', 'all']).optional().describe('Abstraction level (macro, standard, concrete, or all)'),
@@ -401,7 +401,7 @@ export const getTimelineLadderTool = {
401
401
  export const getTaskLadderTool = {
402
402
  name: 'get_task_ladder',
403
403
  title: 'Get Task Ladder View',
404
- description: 'Retrieve multi-scale Bret Victor ladder view for a single task, connecting its macro phase, standard CPM timeline position, and concrete work evidence.',
404
+ description: 'Retrieve multi-scale ladder view for a single task, connecting its macro phase, standard CPM timeline position, and concrete work evidence.',
405
405
  zodSchema: z.object({
406
406
  taskId: z.string().describe('The task ID')
407
407
  }),
@@ -418,6 +418,46 @@ export const getTaskLadderTool = {
418
418
  return target.getTaskLadder(args.taskId);
419
419
  }
420
420
  };
421
+ export const getTaskMetricsTool = {
422
+ name: 'get_task_metrics',
423
+ title: 'Get Task Metrics',
424
+ description: 'Retrieve multi-dimensional task metrics including inferred actuals, active working duration, effort/duration/schedule variances, progress inference, and Earned Value Management (EVM) metrics.',
425
+ zodSchema: z.object({
426
+ taskId: z.string().describe('The task ID')
427
+ }),
428
+ inputSchema: {
429
+ type: 'object',
430
+ properties: {
431
+ taskId: { type: 'string', description: 'The task ID' }
432
+ },
433
+ required: ['taskId'],
434
+ additionalProperties: false
435
+ },
436
+ annotations: { readOnlyHint: true },
437
+ execute: async (args, target) => {
438
+ return target.getTaskMetrics(args.taskId);
439
+ }
440
+ };
441
+ export const getTaskProgressHistoryTool = {
442
+ name: 'get_task_progress_history',
443
+ title: 'Get Task Progress History',
444
+ description: 'Retrieve time-series progress data points and curve shape classification (linear, s_curve, early_surge, late_rush, stalled) for a task.',
445
+ zodSchema: z.object({
446
+ taskId: z.string().describe('The task ID')
447
+ }),
448
+ inputSchema: {
449
+ type: 'object',
450
+ properties: {
451
+ taskId: { type: 'string', description: 'The task ID' }
452
+ },
453
+ required: ['taskId'],
454
+ additionalProperties: false
455
+ },
456
+ annotations: { readOnlyHint: true },
457
+ execute: async (args, target) => {
458
+ return target.getTaskProgressHistory(args.taskId);
459
+ }
460
+ };
421
461
  export const ALL_TOOLS = [
422
462
  listProjectsTool,
423
463
  getProjectTool,
@@ -433,7 +473,9 @@ export const ALL_TOOLS = [
433
473
  addCommentTool,
434
474
  calculateCriticalPathTool,
435
475
  getTimelineLadderTool,
436
- getTaskLadderTool
476
+ getTaskLadderTool,
477
+ getTaskMetricsTool,
478
+ getTaskProgressHistoryTool
437
479
  ];
438
480
  export const TOOL_MAP = new Map(ALL_TOOLS.map((tool) => [tool.name, tool]));
439
481
  //# sourceMappingURL=definitions.js.map
@@ -1 +1 @@
1
- {"version":3,"file":"definitions.js","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAmBxB,+CAA+C;AAC/C,MAAM,CAAC,KAAK,UAAU,cAAc,CAAC,MAAsB;IACzD,MAAM,QAAQ,GAAG,OAAO,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,KAAK,KAAK,QAAQ,CAAC;IAChF,OAAO,EAAE,QAAQ,EAAE,CAAC;AACtB,CAAC;AAED,MAAM,CAAC,MAAM,gBAAgB,GAAmB;IAC9C,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EAAE,yCAAyC;IACtD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC;IACvB,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE,EAAE;QACd,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;QAC/B,OAAO,MAAM,CAAC,WAAW,EAAE,CAAC;IAC9B,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAAmC;IAC5D,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,8CAA8C;IAC3D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAC1C,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,gBAAgB,EAAE;SACtD;QACD,QAAQ,EAAE,CAAC,IAAI,CAAC;QAChB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,iBAAiB,GAAyE;IACrG,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EAAE,iCAAiC;IAC9C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAChD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;KAC9E,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,IAAI,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,qBAAqB,EAAE;YAC5D,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,4BAA4B,EAAE;YAC1E,GAAG,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,wCAAwC,EAAE;SAC/E;QACD,QAAQ,EAAE,CAAC,MAAM,CAAC;QAClB,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;IACpC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,aAAa,GAKrB;IACH,IAAI,EAAE,YAAY;IAClB,KAAK,EAAE,YAAY;IACnB,WAAW,EAAE,4EAA4E;IACzF,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QACjE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACnE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACvG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACpE,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,sBAAsB,EAAE;YAClE,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,2BAA2B,EAAE;YACpE,QAAQ,EAAE;gBACR,IAAI,EAAE,QAAQ;gBACd,IAAI,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC;gBACjD,WAAW,EAAE,oBAAoB;aAClC;YACD,UAAU,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,uBAAuB,EAAE;SACrE;QACD,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC7C,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC;YAChB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC;QACxD,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,IAAI,CAAC,QAAQ,CAAC,CAAC;QAC5D,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,IAAI,CAAC,UAAU,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,WAAW,GAAmC;IACzD,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EAAE,yBAAyB;IACtC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KACvC,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACnD;QACD,QAAQ,EAAE,CAAC,IAAI,CAAC;QAChB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAUtB;IACH,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,qCAAqC;IAClD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACzG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC/C,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sDAAsD,CAAC;QAC9F,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC;QAClH,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACvE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACxE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;KAC9E,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,mDAAmD,EAAE;YAC/F,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,mBAAmB,EAAE;YAC3D,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,sBAAsB,EAAE;YACpE,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,YAAY,EAAE;YACrD,QAAQ,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,EAAE;YAC/E,UAAU,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,qBAAqB,EAAE;YAClE,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,6BAA6B,EAAE;YACvE,IAAI,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE;YAClD,cAAc,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;SACnC;QACD,QAAQ,EAAE,CAAC,OAAO,CAAC;QACnB,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,qFAAqF,CAAC,CAAC;QACzG,CAAC;QACD,MAAM,KAAK,GAAQ;YACjB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,MAAM;YACjC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,EAAE;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;SACpC,CAAC;QACF,OAAO,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;IAClC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAWtB;IACH,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,6EAA6E;IAC1F,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC5B,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC7B,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE;QACxE,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QACjC,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC9B,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE;QACpC,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QACrC,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;KACnC,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE;YAC9C,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YACzB,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC/B,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC1B,QAAQ,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,EAAE;YAC/E,UAAU,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC9B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC3B,IAAI,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE;YAClD,cAAc,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAClC,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;SAChC;QACD,QAAQ,EAAE,CAAC,IAAI,CAAC;QAChB,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACxC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAAmC;IAC5D,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,sBAAsB;IACnC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACjD,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACnD;QACD,QAAQ,EAAE,CAAC,IAAI,CAAC;QAChB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,oBAAoB,EAAE,IAAI,EAAE;IAC3C,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjD,OAAO,EAAE,OAAO,EAAE,CAAC;IACrB,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,oBAAoB,GAA2C;IAC1E,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EAAE,6CAA6C;IAC1D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,YAAY,CAAC;KACxD,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,YAAY,EAAE;SACzD;QACD,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,6CAA6C,CAAC,CAAC;QAC/E,IAAI,iBAAiB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,eAAe,KAAK,UAAU,EAAE,CAAC;YACzF,OAAQ,MAAc,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QACpD,CAAC;QACD,OAAO,EAAE,CAAC;IACZ,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,qBAAqB,GAM7B;IACH,IAAI,EAAE,oBAAoB;IAC1B,KAAK,EAAE,oBAAoB;IAC3B,WAAW,EAAE,kDAAkD;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAChC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;QACjB,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC9B,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE;KACxC,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC7B,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YACzB,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC/B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC3B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE;SACtD;QACD,QAAQ,EAAE,CAAC,OAAO,CAAC;QACnB,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;QAClF,IAAI,mBAAmB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,iBAAiB,KAAK,UAAU,EAAE,CAAC;YAC7F,OAAQ,MAAc,CAAC,iBAAiB,CAAC;gBACvC,GAAG,IAAI;gBACP,SAAS;aACV,CAAC,CAAC;QACL,CAAC;QACD,MAAM,IAAI,KAAK,CAAC,4DAA4D,CAAC,CAAC;IAChF,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,gBAAgB,GAAuC;IAClE,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EAAE,uCAAuC;IACpD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACvD;QACD,QAAQ,EAAE,CAAC,QAAQ,CAAC;QACpB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,IAAI,aAAa,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACjF,OAAQ,MAAc,CAAC,WAAW,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAClD,CAAC;QACD,OAAO,EAAE,CAAC;IACZ,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAA0E;IACnG,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,0BAA0B;IACvC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QAC1C,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACrD,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAChD,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;YACtD,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,uBAAuB,EAAE;YACjE,QAAQ,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,gBAAgB,EAAE;SAC5D;QACD,QAAQ,EAAE,CAAC,QAAQ,EAAE,SAAS,EAAE,UAAU,CAAC;QAC3C,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,UAAU,CAAC;YAChC,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;SACxB,CAAC,CAAC;IACL,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,yBAAyB,GAA2C;IAC/E,IAAI,EAAE,yBAAyB;IAC/B,KAAK,EAAE,yBAAyB;IAChC,WAAW,EAAE,kIAAkI;IAC/I,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACnG,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,uDAAuD,EAAE;SACpG;QACD,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,mDAAmD,CAAC,CAAC;QACvE,CAAC;QACD,OAAQ,MAAc,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;IAC1D,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,qBAAqB,GAK7B;IACH,IAAI,EAAE,qBAAqB;IAC3B,KAAK,EAAE,oCAAoC;IAC3C,WAAW,EAAE,yKAAyK;IACtL,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QACpI,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qCAAqC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,uDAAuD,EAAE;YACnG,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,EAAE,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,EAAE,WAAW,EAAE,mBAAmB,EAAE;YAC3G,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,8BAA8B,EAAE;YAC5E,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,qCAAqC,EAAE;SACpF;QACD,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,+CAA+C,CAAC,CAAC;QACnE,CAAC;QACD,OAAQ,MAAc,CAAC,iBAAiB,CAAC,SAAS,EAAE;YAClD,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;SAC9B,CAAC,CAAC;IACL,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,iBAAiB,GAAuC;IACnE,IAAI,EAAE,iBAAiB;IACvB,KAAK,EAAE,sBAAsB;IAC7B,WAAW,EAAE,yJAAyJ;IACtK,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACvD;QACD,QAAQ,EAAE,CAAC,QAAQ,CAAC;QACpB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACpD,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,SAAS,GAAqB;IACzC,gBAAgB;IAChB,cAAc;IACd,iBAAiB;IACjB,aAAa;IACb,WAAW;IACX,cAAc;IACd,cAAc;IACd,cAAc;IACd,oBAAoB;IACpB,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,yBAAyB;IACzB,qBAAqB;IACrB,iBAAiB;CAClB,CAAC;AAEF,MAAM,CAAC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAC7B,SAAS,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAC3C,CAAC"}
1
+ {"version":3,"file":"definitions.js","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAmBxB,+CAA+C;AAC/C,MAAM,CAAC,KAAK,UAAU,cAAc,CAAC,MAAsB;IACzD,MAAM,QAAQ,GAAG,OAAO,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,KAAK,KAAK,QAAQ,CAAC;IAChF,OAAO,EAAE,QAAQ,EAAE,CAAC;AACtB,CAAC;AAED,MAAM,CAAC,MAAM,gBAAgB,GAAmB;IAC9C,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EAAE,yCAAyC;IACtD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC;IACvB,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE,EAAE;QACd,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;QAC/B,OAAO,MAAM,CAAC,WAAW,EAAE,CAAC;IAC9B,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAAmC;IAC5D,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,8CAA8C;IAC3D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAC1C,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,gBAAgB,EAAE;SACtD;QACD,QAAQ,EAAE,CAAC,IAAI,CAAC;QAChB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,iBAAiB,GAAyE;IACrG,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EAAE,iCAAiC;IAC9C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAChD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;KAC9E,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,IAAI,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,qBAAqB,EAAE;YAC5D,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,4BAA4B,EAAE;YAC1E,GAAG,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,wCAAwC,EAAE;SAC/E;QACD,QAAQ,EAAE,CAAC,MAAM,CAAC;QAClB,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;IACpC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,aAAa,GAKrB;IACH,IAAI,EAAE,YAAY;IAClB,KAAK,EAAE,YAAY;IACnB,WAAW,EAAE,4EAA4E;IACzF,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QACjE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACnE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACvG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACpE,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,sBAAsB,EAAE;YAClE,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,2BAA2B,EAAE;YACpE,QAAQ,EAAE;gBACR,IAAI,EAAE,QAAQ;gBACd,IAAI,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC;gBACjD,WAAW,EAAE,oBAAoB;aAClC;YACD,UAAU,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,uBAAuB,EAAE;SACrE;QACD,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC7C,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC;YAChB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC;QACxD,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,IAAI,CAAC,QAAQ,CAAC,CAAC;QAC5D,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,IAAI,CAAC,UAAU,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,WAAW,GAAmC;IACzD,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EAAE,yBAAyB;IACtC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KACvC,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACnD;QACD,QAAQ,EAAE,CAAC,IAAI,CAAC;QAChB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAUtB;IACH,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,qCAAqC;IAClD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACzG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC/C,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sDAAsD,CAAC;QAC9F,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC;QAClH,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACvE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACxE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;KAC9E,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,mDAAmD,EAAE;YAC/F,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,mBAAmB,EAAE;YAC3D,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,sBAAsB,EAAE;YACpE,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,YAAY,EAAE;YACrD,QAAQ,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,EAAE;YAC/E,UAAU,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,qBAAqB,EAAE;YAClE,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,6BAA6B,EAAE;YACvE,IAAI,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE;YAClD,cAAc,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;SACnC;QACD,QAAQ,EAAE,CAAC,OAAO,CAAC;QACnB,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,qFAAqF,CAAC,CAAC;QACzG,CAAC;QACD,MAAM,KAAK,GAAQ;YACjB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,MAAM;YACjC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,EAAE;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;SACpC,CAAC;QACF,OAAO,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;IAClC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAWtB;IACH,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,6EAA6E;IAC1F,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC5B,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC7B,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE;QACxE,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QACjC,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC9B,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE;QACpC,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QACrC,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;KACnC,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE;YAC9C,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YACzB,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC/B,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC1B,QAAQ,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,EAAE,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,EAAE;YAC/E,UAAU,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC9B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC3B,IAAI,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE;YAClD,cAAc,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAClC,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;SAChC;QACD,QAAQ,EAAE,CAAC,IAAI,CAAC;QAChB,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACxC,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAAmC;IAC5D,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,sBAAsB;IACnC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACjD,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACnD;QACD,QAAQ,EAAE,CAAC,IAAI,CAAC;QAChB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,oBAAoB,EAAE,IAAI,EAAE;IAC3C,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjD,OAAO,EAAE,OAAO,EAAE,CAAC;IACrB,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,oBAAoB,GAA2C;IAC1E,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EAAE,6CAA6C;IAC1D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,YAAY,CAAC;KACxD,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,YAAY,EAAE;SACzD;QACD,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,6CAA6C,CAAC,CAAC;QAC/E,IAAI,iBAAiB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,eAAe,KAAK,UAAU,EAAE,CAAC;YACzF,OAAQ,MAAc,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QACpD,CAAC;QACD,OAAO,EAAE,CAAC;IACZ,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,qBAAqB,GAM7B;IACH,IAAI,EAAE,oBAAoB;IAC1B,KAAK,EAAE,oBAAoB;IAC3B,WAAW,EAAE,kDAAkD;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAChC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;QACjB,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAClC,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE;QAC9B,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE;KACxC,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC7B,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YACzB,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC/B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE;YAC3B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,EAAE;SACtD;QACD,QAAQ,EAAE,CAAC,OAAO,CAAC;QACnB,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;QAClF,IAAI,mBAAmB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,iBAAiB,KAAK,UAAU,EAAE,CAAC;YAC7F,OAAQ,MAAc,CAAC,iBAAiB,CAAC;gBACvC,GAAG,IAAI;gBACP,SAAS;aACV,CAAC,CAAC;QACL,CAAC;QACD,MAAM,IAAI,KAAK,CAAC,4DAA4D,CAAC,CAAC;IAChF,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,gBAAgB,GAAuC;IAClE,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EAAE,uCAAuC;IACpD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACvD;QACD,QAAQ,EAAE,CAAC,QAAQ,CAAC;QACpB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,IAAI,aAAa,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACjF,OAAQ,MAAc,CAAC,WAAW,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAClD,CAAC;QACD,OAAO,EAAE,CAAC;IACZ,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,cAAc,GAA0E;IACnG,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EAAE,0BAA0B;IACvC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QAC1C,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACrD,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAChD,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;YACtD,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,uBAAuB,EAAE;YACjE,QAAQ,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,gBAAgB,EAAE;SAC5D;QACD,QAAQ,EAAE,CAAC,QAAQ,EAAE,SAAS,EAAE,UAAU,CAAC;QAC3C,oBAAoB,EAAE,KAAK;KAC5B;IACD,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,UAAU,CAAC;YAChC,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;SACxB,CAAC,CAAC;IACL,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,yBAAyB,GAA2C;IAC/E,IAAI,EAAE,yBAAyB;IAC/B,KAAK,EAAE,yBAAyB;IAChC,WAAW,EAAE,kIAAkI;IAC/I,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACnG,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,uDAAuD,EAAE;SACpG;QACD,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,mDAAmD,CAAC,CAAC;QACvE,CAAC;QACD,OAAQ,MAAc,CAAC,qBAAqB,CAAC,SAAS,CAAC,CAAC;IAC1D,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,qBAAqB,GAK7B;IACH,IAAI,EAAE,qBAAqB;IAC3B,KAAK,EAAE,oCAAoC;IAC3C,WAAW,EAAE,6JAA6J;IAC1K,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QACpI,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qCAAqC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,SAAS,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,uDAAuD,EAAE;YACnG,KAAK,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,EAAE,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,EAAE,WAAW,EAAE,mBAAmB,EAAE;YAC3G,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,8BAA8B,EAAE;YAC5E,WAAW,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,qCAAqC,EAAE;SACpF;QACD,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,+CAA+C,CAAC,CAAC;QACnE,CAAC;QACD,OAAQ,MAAc,CAAC,iBAAiB,CAAC,SAAS,EAAE;YAClD,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;SAC9B,CAAC,CAAC;IACL,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,iBAAiB,GAAuC;IACnE,IAAI,EAAE,iBAAiB;IACvB,KAAK,EAAE,sBAAsB;IAC7B,WAAW,EAAE,6IAA6I;IAC1J,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACvD;QACD,QAAQ,EAAE,CAAC,QAAQ,CAAC;QACpB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACpD,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,kBAAkB,GAAuC;IACpE,IAAI,EAAE,kBAAkB;IACxB,KAAK,EAAE,kBAAkB;IACzB,WAAW,EAAE,iMAAiM;IAC9M,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACvD;QACD,QAAQ,EAAE,CAAC,QAAQ,CAAC;QACpB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,cAAc,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACrD,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,0BAA0B,GAAuC;IAC5E,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EAAE,yIAAyI;IACtJ,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE;QACX,IAAI,EAAE,QAAQ;QACd,UAAU,EAAE;YACV,MAAM,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,WAAW,EAAE,aAAa,EAAE;SACvD;QACD,QAAQ,EAAE,CAAC,QAAQ,CAAC;QACpB,oBAAoB,EAAE,KAAK;KAC5B;IACD,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,sBAAsB,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7D,CAAC;CACF,CAAC;AAEF,MAAM,CAAC,MAAM,SAAS,GAAqB;IACzC,gBAAgB;IAChB,cAAc;IACd,iBAAiB;IACjB,aAAa;IACb,WAAW;IACX,cAAc;IACd,cAAc;IACd,cAAc;IACd,oBAAoB;IACpB,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,yBAAyB;IACzB,qBAAqB;IACrB,iBAAiB;IACjB,kBAAkB;IAClB,0BAA0B;CAC3B,CAAC;AAEF,MAAM,CAAC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAC7B,SAAS,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAC3C,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/mcp",
3
- "version": "0.3.0",
3
+ "version": "0.4.0",
4
4
  "description": "Standard Model Context Protocol (MCP) server and client-side WebMCP support for Critical Path",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -34,8 +34,8 @@
34
34
  "dependencies": {
35
35
  "@modelcontextprotocol/sdk": "^1.6.0",
36
36
  "zod": "^3.24.0",
37
- "@critical-path/client": "0.10.0",
38
- "@critical-path/core": "0.16.0"
37
+ "@critical-path/client": "0.11.0",
38
+ "@critical-path/core": "0.17.0"
39
39
  },
40
40
  "devDependencies": {
41
41
  "@types/node": "^24.0.0",
package/src/index.test.ts CHANGED
@@ -110,7 +110,7 @@ describe('@critical-path/mcp', () => {
110
110
 
111
111
  it('calculates critical path and returns timeline ladder via MCP tools', async () => {
112
112
  const createProjTool = TOOL_MAP.get('create_project')!;
113
- const project = await createProjTool.execute({ name: 'Bret Victor MCP', key: 'BVM' }, engine);
113
+ const project = await createProjTool.execute({ name: 'Timeline Ladder MCP', key: 'TLM' }, engine);
114
114
 
115
115
  const createTaskTool = TOOL_MAP.get('create_task')!;
116
116
  const t1 = await createTaskTool.execute({
@@ -151,6 +151,21 @@ describe('@critical-path/mcp', () => {
151
151
  const taskLadderResult = await taskLadderTool.execute({ taskId: t2.id }, engine);
152
152
  expect(taskLadderResult.taskId).toBe(t2.id);
153
153
  expect(taskLadderResult.standard.title).toBe('Step 2: Polish');
154
+ expect(taskLadderResult.metrics).toBeDefined();
155
+
156
+ // 4. get_task_metrics tool
157
+ const taskMetricsTool = TOOL_MAP.get('get_task_metrics')!;
158
+ const taskMetricsResult = await taskMetricsTool.execute({ taskId: t2.id }, engine);
159
+ expect(taskMetricsResult.taskId).toBe(t2.id);
160
+ expect(taskMetricsResult.realityDelta.estimatedHours).toBe(6);
161
+ expect(taskMetricsResult.progress).toBeDefined();
162
+ expect(taskMetricsResult.evm).toBeDefined();
163
+
164
+ // 5. get_task_progress_history tool
165
+ const taskHistoryTool = TOOL_MAP.get('get_task_progress_history')!;
166
+ const taskHistoryResult = await taskHistoryTool.execute({ taskId: t2.id }, engine);
167
+ expect(taskHistoryResult.taskId).toBe(t2.id);
168
+ expect(taskHistoryResult.points.length).toBeGreaterThanOrEqual(1);
154
169
  });
155
170
  });
156
171
 
@@ -435,7 +435,7 @@ export const getTimelineLadderTool: ToolDefinition<{
435
435
  }> = {
436
436
  name: 'get_timeline_ladder',
437
437
  title: 'Get Timeline Ladder of Abstraction',
438
- description: 'Retrieve Bret Victor Ladder of Abstraction for a project timeline across macro phase envelopes, standard Gantt tasks & CPM, and concrete deliverables/time/attachments.',
438
+ description: 'Retrieve Ladder of Abstraction for a project timeline across macro phase envelopes, standard Gantt tasks & CPM, and concrete deliverables/time/attachments.',
439
439
  zodSchema: z.object({
440
440
  projectId: z.string().optional().describe('Project ID (falls back to ambient context if omitted)'),
441
441
  level: z.enum(['macro', 'standard', 'concrete', 'all']).optional().describe('Abstraction level (macro, standard, concrete, or all)'),
@@ -469,7 +469,7 @@ export const getTimelineLadderTool: ToolDefinition<{
469
469
  export const getTaskLadderTool: ToolDefinition<{ taskId: string }> = {
470
470
  name: 'get_task_ladder',
471
471
  title: 'Get Task Ladder View',
472
- description: 'Retrieve multi-scale Bret Victor ladder view for a single task, connecting its macro phase, standard CPM timeline position, and concrete work evidence.',
472
+ description: 'Retrieve multi-scale ladder view for a single task, connecting its macro phase, standard CPM timeline position, and concrete work evidence.',
473
473
  zodSchema: z.object({
474
474
  taskId: z.string().describe('The task ID')
475
475
  }),
@@ -487,6 +487,48 @@ export const getTaskLadderTool: ToolDefinition<{ taskId: string }> = {
487
487
  }
488
488
  };
489
489
 
490
+ export const getTaskMetricsTool: ToolDefinition<{ taskId: string }> = {
491
+ name: 'get_task_metrics',
492
+ title: 'Get Task Metrics',
493
+ description: 'Retrieve multi-dimensional task metrics including inferred actuals, active working duration, effort/duration/schedule variances, progress inference, and Earned Value Management (EVM) metrics.',
494
+ zodSchema: z.object({
495
+ taskId: z.string().describe('The task ID')
496
+ }),
497
+ inputSchema: {
498
+ type: 'object',
499
+ properties: {
500
+ taskId: { type: 'string', description: 'The task ID' }
501
+ },
502
+ required: ['taskId'],
503
+ additionalProperties: false
504
+ },
505
+ annotations: { readOnlyHint: true },
506
+ execute: async (args, target) => {
507
+ return (target as any).getTaskMetrics(args.taskId);
508
+ }
509
+ };
510
+
511
+ export const getTaskProgressHistoryTool: ToolDefinition<{ taskId: string }> = {
512
+ name: 'get_task_progress_history',
513
+ title: 'Get Task Progress History',
514
+ description: 'Retrieve time-series progress data points and curve shape classification (linear, s_curve, early_surge, late_rush, stalled) for a task.',
515
+ zodSchema: z.object({
516
+ taskId: z.string().describe('The task ID')
517
+ }),
518
+ inputSchema: {
519
+ type: 'object',
520
+ properties: {
521
+ taskId: { type: 'string', description: 'The task ID' }
522
+ },
523
+ required: ['taskId'],
524
+ additionalProperties: false
525
+ },
526
+ annotations: { readOnlyHint: true },
527
+ execute: async (args, target) => {
528
+ return (target as any).getTaskProgressHistory(args.taskId);
529
+ }
530
+ };
531
+
490
532
  export const ALL_TOOLS: ToolDefinition[] = [
491
533
  listProjectsTool,
492
534
  getProjectTool,
@@ -502,7 +544,9 @@ export const ALL_TOOLS: ToolDefinition[] = [
502
544
  addCommentTool,
503
545
  calculateCriticalPathTool,
504
546
  getTimelineLadderTool,
505
- getTaskLadderTool
547
+ getTaskLadderTool,
548
+ getTaskMetricsTool,
549
+ getTaskProgressHistoryTool
506
550
  ];
507
551
 
508
552
  export const TOOL_MAP = new Map<string, ToolDefinition>(