@critical-path/mcp 0.21.0 → 0.23.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,42 @@
1
1
  # @critical-path/mcp
2
2
 
3
+ ## 0.23.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 42ecdb9: Clearing fields over HTTP, validated dates, and correctable time entries.
8
+
9
+ - Update bodies accept `null` to remove an optional field (tasks, projects, deliverables, containers, iterations and time entries); parsing turns it into `undefined`, which every store treats as removal. Required fields (titles, names, task `status` and `priority`) still reject it. New `applyUpdate(record, updates)` applies payloads the same way for optimistic UI state; the React and Svelte task and deliverable state use it.
10
+ - **BREAKING:** every date field in request bodies must be an ISO date or date-time (`400` otherwise). Free-text dates used to be stored and then broke levelling, metrics and the ladder.
11
+ - Time entries can be corrected and deleted: `engine.getTimeEntry` / `updateTimeEntry` / `deleteTimeEntry`, `GET | PATCH | DELETE /time-entries/:id`, and the matching client methods. The task's hour totals move by the difference, and `time.updated` / `time.deleted` events are published. A new `time.manage` permission (project managers and admins) covers other people's entries; anyone with `time.log` can manage their own.
12
+ - `logTime` always requires the task to exist (it used to store orphan entries when no policy was enforced), and logs inside a transaction where the store supports one.
13
+ - **BREAKING (custom adapters):** `TimeEntryRepository` gains `getTimeEntry(id)` and `updateTimeEntry(id, updates)`.
14
+ - `FirebaseStore` updates every document inside `runTransaction` when the db supports it and implements `incrementTaskHours`, so concurrent updates and time logs are no longer lost. Pass Firestore's `FieldValue` as the new `fieldValue` option to add hour totals with `FieldValue.increment` (atomic, no contention) instead of transactions.
15
+ - MCP: new `update_time_entry` and `delete_time_entry` tools.
16
+
17
+ ### Patch Changes
18
+
19
+ - Updated dependencies [42ecdb9]
20
+ - @critical-path/core@0.56.0
21
+ - @critical-path/client@0.27.0
22
+
23
+ ## 0.22.0
24
+
25
+ ### Minor Changes
26
+
27
+ - 5dbf25b: Effort and progress roll-ups agree, count subtasks once and leave canceled work out.
28
+
29
+ - New `getTaskEstimateHours(task)` is the one place that reads an estimate (0 for milestones; an explicit 0 counts). Critical path analysis, workload, the ladder, metrics/EVM and deliverable summaries all use it, along with `getSummaryTaskIds` / `getLeafTasks`.
30
+ - **BREAKING:** a task with subtasks is a summary task. Critical path analysis schedules only leaf tasks: dependencies and deadlines on a summary apply to every leaf under it, and the summary is reported as a roll-up (`isSummary: true`; not in `criticalTaskIds`). Workload, the ladder and deliverable summaries count effort from leaves only, so an epic's estimate no longer doubles its subtasks'.
31
+ - **BREAKING:** canceled tasks leave estimate totals and progress denominators in the ladder and deliverable summaries (their logged hours still count), so a project can reach 100% and `completed`. Canceled tasks have zero planned and earned value in EVM. The ladder and deliverable summaries use inferred progress (`inferTaskProgress`) like task metrics.
32
+ - Unestimated tasks are listed in `unestimatedTaskIds`, and the hours assumed for them are configurable: `defaultEstimateHours` per call (`?defaultEstimateHours=` over HTTP, client and MCP options) or `criticalPathDefaultEstimateHours` on the engine. Default 1, as before.
33
+
34
+ ### Patch Changes
35
+
36
+ - Updated dependencies [5dbf25b]
37
+ - @critical-path/core@0.55.0
38
+ - @critical-path/client@0.26.0
39
+
3
40
  ## 0.21.0
4
41
 
5
42
  ### Minor Changes
package/README.md CHANGED
@@ -180,6 +180,8 @@ handle.unregister();
180
180
  | `create_task` | core | Adding work (auto-scoped in WebMCP) | `{ projectId?, title, description?, priority?, status?, estimatedHours?, allocation?, deadline?, isMilestone? }` |
181
181
  | `update_task` | core | Changing status, priority, assignee, estimates, deadline | `{ id, title?, status?, priority?, assigneeId?, allocation?, deadline?, isMilestone? }` |
182
182
  | `log_time` | core | Recording hours worked (the only way to add logged hours) | `{ taskId, hours, description?, isBillable?, loggedAt? }` |
183
+ | `update_time_entry` | core | Correcting logged time (the task's hours move by the difference) | `{ id, hours?, description?, isBillable?, loggedAt? }` |
184
+ | `delete_time_entry` | core | Removing time logged by mistake | `{ id }` |
183
185
  | `delete_task` | core | Permanent deletion (`destructiveHint`) | `{ id }` |
184
186
  | `add_dependency` | core | Making a task wait for another, so the critical path orders them; idempotent, refuses loops | `{ taskId, dependsOnTaskId, type? ('blocking' \| 'relates_to') }` |
185
187
  | `remove_dependency` | core | Removing that link, by the same two task ids; returns `{ removed, dependencyIds }` | `{ taskId, dependsOnTaskId, type? }` |
@@ -2,7 +2,7 @@ export const SKILL_CATALOG = [
2
2
  {
3
3
  "name": "analyze-schedule",
4
4
  "description": "Find what drives a project's end date, how much each task can slip and where people are double-booked, then recommend fixes. Use for \"when will we finish?\", \"what is critical?\" or deadline-risk questions.",
5
- "content": "---\nname: analyze-schedule\ndescription: Find what drives a project's end date, how much each task can slip and where people are double-booked, then recommend fixes. Use for \"when will we finish?\", \"what is critical?\" or deadline-risk questions.\n---\n\n# Analyze the schedule\n\n## 1. Run the schedule\n\n1. Get the `projectId` (`list_projects`).\n2. Call `calculate_critical_path` with `calendars: \"assignee\"` and `levelResources: true`, so each person works on one task at a time on their own calendar. If the user wants the ideal schedule with unlimited people, call it with no options instead.\n3. If the question spans projects that share people, call `calculate_portfolio_critical_path` with their `projectIds` (and `projectOrder` if the user ranked them) instead.\n4. For in-flight projects, pass `effort: \"remaining\"` so finished hours are not scheduled again.\n\n## 2. Read the result\n\n- `projectEndDate` is the forecast finish. With levelling, compare it with `unleveledProjectEndDate`: the gap is time lost waiting for busy people.\n- `criticalTaskIds` are the tasks with zero or negative slack. Any delay to one of them moves the end date or misses a deadline.\n- `missedDeadlineTaskIds` lists tasks forecast to finish after their `deadline`. Their `deadlineVarianceHours` says by how much (negative working hours), and the negative `totalSlack` on the tasks before them shows which work drives the miss. Entries with `isMilestone: true` are checkpoints such as releases or sign-offs.\n- Each entry in `tasks` has `slackWorkingHours`: how many working hours the task can slip without moving the end. Under about 8 hours is near-critical.\n- `levelingDelayHours` and `waitingOn` show a task that waited for its assignee to finish another task.\n- `overallocations` lists periods where a person (`assigneeId`) or team (`teamId`) is booked above `capacity`; `allocation` 1.5 means 150%.\n\nLook up titles for the task ids you mention with `get_task` or `list_tasks`; report titles, not ids. To see why a critical task cannot start earlier, call `get_task` with `includeDependencies: true`: `dependencies.dependsOn` lists what it waits for and `dependencies.dependents` what waits for it.\n\n## 3. Recommend\n\nRank fixes by how much they pull the end date in:\n\n1. **Unblock critical tasks.** A critical task with `isBlocked: true` delays everything; say what it waits for.\n2. **Move work off the bottleneck person.** If critical tasks wait on one assignee (`waitingOn`), suggest reassigning a non-critical task of theirs.\n3. **Remove false dependencies.** A critical task waiting on work it does not really need (`dependencies.dependsOn`) can start earlier once the link is removed.\n4. **Split long critical tasks** so parts can run in parallel.\n5. **Cut or defer** tasks feeding late deliverables, if dates are fixed.\n\nShow the recommendation to the user. Change tasks (`update_task`) or dependencies (`add_dependency`, `remove_dependency`) only when they ask, then run the schedule again to show the effect.\n\n## Report format\n\n- Forecast finish date, and against any deadline the user gave. If the user gives a date that is not yet on a task, offer to record it as a `deadline` (on a milestone task with `isMilestone: true` if it is a checkpoint) so later runs track it.\n- Each milestone: forecast date against its deadline.\n- Critical path: task titles in order, with assignee.\n- Top risks: near-critical tasks, blocked critical tasks, over-allocations.\n- Recommended actions, each with its expected effect.\n"
5
+ "content": "---\nname: analyze-schedule\ndescription: Find what drives a project's end date, how much each task can slip and where people are double-booked, then recommend fixes. Use for \"when will we finish?\", \"what is critical?\" or deadline-risk questions.\n---\n\n# Analyze the schedule\n\n## 1. Run the schedule\n\n1. Get the `projectId` (`list_projects`).\n2. Call `calculate_critical_path` with `calendars: \"assignee\"` and `levelResources: true`, so each person works on one task at a time on their own calendar. If the user wants the ideal schedule with unlimited people, call it with no options instead.\n3. If the question spans projects that share people, call `calculate_portfolio_critical_path` with their `projectIds` (and `projectOrder` if the user ranked them) instead.\n4. For in-flight projects, pass `effort: \"remaining\"` so finished hours are not scheduled again.\n\n## 2. Read the result\n\n- `projectEndDate` is the forecast finish. With levelling, compare it with `unleveledProjectEndDate`: the gap is time lost waiting for busy people.\n- `criticalTaskIds` are the tasks with zero or negative slack. Any delay to one of them moves the end date or misses a deadline.\n- `unestimatedTaskIds` lists unfinished tasks with no estimate; each was assumed to take `defaultEstimateHours` (1 by default), so say the forecast is uncertain and suggest estimating them. Entries with `isSummary: true` are parent tasks shown as the span of their subtasks.\n- `missedDeadlineTaskIds` lists tasks forecast to finish after their `deadline`. Their `deadlineVarianceHours` says by how much (negative working hours), and the negative `totalSlack` on the tasks before them shows which work drives the miss. Entries with `isMilestone: true` are checkpoints such as releases or sign-offs.\n- Each entry in `tasks` has `slackWorkingHours`: how many working hours the task can slip without moving the end. Under about 8 hours is near-critical.\n- `levelingDelayHours` and `waitingOn` show a task that waited for its assignee to finish another task.\n- `overallocations` lists periods where a person (`assigneeId`) or team (`teamId`) is booked above `capacity`; `allocation` 1.5 means 150%.\n\nLook up titles for the task ids you mention with `get_task` or `list_tasks`; report titles, not ids. To see why a critical task cannot start earlier, call `get_task` with `includeDependencies: true`: `dependencies.dependsOn` lists what it waits for and `dependencies.dependents` what waits for it.\n\n## 3. Recommend\n\nRank fixes by how much they pull the end date in:\n\n1. **Unblock critical tasks.** A critical task with `isBlocked: true` delays everything; say what it waits for.\n2. **Move work off the bottleneck person.** If critical tasks wait on one assignee (`waitingOn`), suggest reassigning a non-critical task of theirs.\n3. **Remove false dependencies.** A critical task waiting on work it does not really need (`dependencies.dependsOn`) can start earlier once the link is removed.\n4. **Split long critical tasks** so parts can run in parallel.\n5. **Cut or defer** tasks feeding late deliverables, if dates are fixed.\n\nShow the recommendation to the user. Change tasks (`update_task`) or dependencies (`add_dependency`, `remove_dependency`) only when they ask, then run the schedule again to show the effect.\n\n## Report format\n\n- Forecast finish date, and against any deadline the user gave. If the user gives a date that is not yet on a task, offer to record it as a `deadline` (on a milestone task with `isMilestone: true` if it is a checkpoint) so later runs track it.\n- Each milestone: forecast date against its deadline.\n- Critical path: task titles in order, with assignee.\n- Top risks: near-critical tasks, blocked critical tasks, over-allocations.\n- Recommended actions, each with its expected effect.\n"
6
6
  },
7
7
  {
8
8
  "name": "investigate-task",
@@ -1 +1 @@
1
- {"version":3,"file":"catalog.generated.js","sourceRoot":"","sources":["../../src/skills/catalog.generated.ts"],"names":[],"mappings":"AAGA,MAAM,CAAC,MAAM,aAAa,GAAY;IACpC;QACE,MAAM,EAAE,kBAAkB;QAC1B,aAAa,EAAE,kNAAkN;QACjO,SAAS,EAAE,+9GAA+9G;KAC3+G;IACD;QACE,MAAM,EAAE,kBAAkB;QAC1B,aAAa,EAAE,0JAA0J;QACzK,SAAS,EAAE,uhFAAuhF;KACniF;IACD;QACE,MAAM,EAAE,eAAe;QACvB,aAAa,EAAE,yKAAyK;QACxL,SAAS,EAAE,o+DAAo+D;KACh/D;IACD;QACE,MAAM,EAAE,cAAc;QACtB,aAAa,EAAE,kNAAkN;QACjO,SAAS,EAAE,u5GAAu5G;KACn6G;IACD;QACE,MAAM,EAAE,eAAe;QACvB,aAAa,EAAE,iNAAiN;QAChO,SAAS,EAAE,syEAAsyE;KAClzE;IACD;QACE,MAAM,EAAE,cAAc;QACtB,aAAa,EAAE,0KAA0K;QACzL,SAAS,EAAE,8oEAA8oE;KAC1pE;CACF,CAAC"}
1
+ {"version":3,"file":"catalog.generated.js","sourceRoot":"","sources":["../../src/skills/catalog.generated.ts"],"names":[],"mappings":"AAGA,MAAM,CAAC,MAAM,aAAa,GAAY;IACpC;QACE,MAAM,EAAE,kBAAkB;QAC1B,aAAa,EAAE,kNAAkN;QACjO,SAAS,EAAE,mvHAAmvH;KAC/vH;IACD;QACE,MAAM,EAAE,kBAAkB;QAC1B,aAAa,EAAE,0JAA0J;QACzK,SAAS,EAAE,uhFAAuhF;KACniF;IACD;QACE,MAAM,EAAE,eAAe;QACvB,aAAa,EAAE,yKAAyK;QACxL,SAAS,EAAE,o+DAAo+D;KACh/D;IACD;QACE,MAAM,EAAE,cAAc;QACtB,aAAa,EAAE,kNAAkN;QACjO,SAAS,EAAE,u5GAAu5G;KACn6G;IACD;QACE,MAAM,EAAE,eAAe;QACvB,aAAa,EAAE,iNAAiN;QAChO,SAAS,EAAE,syEAAsyE;KAClzE;IACD;QACE,MAAM,EAAE,cAAc;QACtB,aAAa,EAAE,0KAA0K;QACzL,SAAS,EAAE,8oEAA8oE;KAC1pE;CACF,CAAC"}
@@ -137,6 +137,16 @@ export declare const logTimeTool: ToolDefinition<{
137
137
  isBillable?: boolean;
138
138
  loggedAt?: string;
139
139
  }, any>;
140
+ export declare const updateTimeEntryTool: ToolDefinition<{
141
+ id: string;
142
+ hours?: number;
143
+ description?: string;
144
+ isBillable?: boolean;
145
+ loggedAt?: string;
146
+ }, any>;
147
+ export declare const deleteTimeEntryTool: ToolDefinition<{
148
+ id: string;
149
+ }, any>;
140
150
  export declare const addDependencyTool: ToolDefinition<{
141
151
  taskId: string;
142
152
  dependsOnTaskId: string;
@@ -174,6 +184,7 @@ export declare const calculatePortfolioCriticalPathTool: ToolDefinition<{
174
184
  levelResources?: boolean;
175
185
  levelingPriority?: "slack" | "priority" | "dueDate" | "order";
176
186
  effort?: "estimate" | "remaining";
187
+ defaultEstimateHours?: number;
177
188
  }, any>;
178
189
  export declare const calculateCriticalPathTool: ToolDefinition<{
179
190
  projectId?: string;
@@ -181,6 +192,7 @@ export declare const calculateCriticalPathTool: ToolDefinition<{
181
192
  levelResources?: boolean;
182
193
  levelingPriority?: "slack" | "priority" | "dueDate" | "order";
183
194
  effort?: "estimate" | "remaining";
195
+ defaultEstimateHours?: number;
184
196
  }, any>;
185
197
  export declare const getTimelineLadderTool: ToolDefinition<{
186
198
  projectId?: string;
@@ -1 +1 @@
1
- {"version":3,"file":"definitions.d.ts","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB,OAAO,KAAK,EAAE,kBAAkB,EAA6C,MAAM,qBAAqB,CAAC;AAEzG,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAoBhE,MAAM,MAAM,cAAc,GAAG,kBAAkB,GAAG,kBAAkB,CAAC;AAErE;;;GAGG;AACH,eAAO,MAAM,QAAQ;;;;;;CAMX,CAAC;AAEX,MAAM,MAAM,WAAW,GAAG,MAAM,OAAO,QAAQ,CAAC;AAEhD,qCAAqC;AACrC,MAAM,WAAW,eAAe;IAC9B,yCAAyC;IACzC,YAAY,EAAE,OAAO,CAAC;IACtB,8FAA8F;IAC9F,eAAe,EAAE,OAAO,CAAC;IACzB,sEAAsE;IACtE,cAAc,EAAE,OAAO,CAAC;IACxB,mEAAmE;IACnE,aAAa,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,cAAc,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd;;;OAGG;IACH,WAAW,EAAE,MAAM,CAAC;IACpB,OAAO,EAAE,WAAW,CAAC;IACrB,SAAS,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC;IAC5B,oFAAoF;IACpF,WAAW,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACrC,sGAAsG;IACtG,eAAe,EAAE,CAAC,CAAC,UAAU,CAAC;IAC9B,wGAAwG;IACxG,YAAY,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACtC,WAAW,EAAE,eAAe,CAAC;IAC7B,OAAO,EAAE,CAAC,IAAI,EAAE,OAAO,EAAE,MAAM,EAAE,cAAc,EAAE,cAAc,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,KAAK,OAAO,CAAC,OAAO,CAAC,CAAC;CAC/G;AAED,KAAK,QAAQ,CAAC,OAAO,EAAE,OAAO,IAAI,IAAI,CAAC,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,cAAc,GAAG,aAAa,CAAC,GAAG;IACzH,WAAW,CAAC,EAAE,OAAO,CAAC,eAAe,CAAC,CAAC;CACxC,CAAC;AAOF;;;GAGG;AACH,wBAAgB,UAAU,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG,EAAE,IAAI,EAAE,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,GAAG,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,CAa3H;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM;CAI9C;AAED;;;GAGG;AACH,wBAAgB,aAAa,CAAC,OAAO,EAAE,IAAI,EAAE,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,OAAO,GAAG,OAAO,CAU5F;AAGD,wBAAsB,cAAc,CAAC,MAAM,EAAE,cAAc;;GAG1D;AAED,eAAO,MAAM,gBAAgB;;EAY3B,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAcnD,CAAC;AAEH,eAAO,MAAM,iBAAiB;UAAsB,MAAM;kBAAgB,MAAM;UAAQ,MAAM;mBAAiB,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAgBpI,CAAC;AAEH,eAAO,MAAM,aAAa;gBACZ,MAAM;aACT,MAAM;eACJ,MAAM;iBACJ,MAAM;kBACL,MAAM;oBACJ,MAAM;kBACR,MAAM;eACT,MAAM;YACT,MAAM;aACL,MAAM;OAoCf,CAAC;AAEH,eAAO,MAAM,WAAW;QAAoB,MAAM;0BAAwB,OAAO;OAwC/E,CAAC;AA0BH,eAAO,MAAM,cAAc;gBACb,MAAM;WACX,MAAM;kBACC,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;eACL,MAAM;kBACH,OAAO;WACd,MAAM,EAAE;qBACE,MAAM;iBACV,MAAM;gBACP,OAAO;oBACH,MAAM;mBACP,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAuDtC,CAAC;AAEH,eAAO,MAAM,cAAc;QACrB,MAAM;YACF,MAAM;kBACA,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;eACL,MAAM;kBACH,OAAO;WACd,MAAM,EAAE;qBACE,MAAM;iBACV,MAAM;gBACP,OAAO;oBACH,MAAM;mBACP,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAmCtC,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAenD,CAAC;AAEH,eAAO,MAAM,WAAW;YAAwB,MAAM;WAAS,MAAM;kBAAgB,MAAM;iBAAe,OAAO;eAAa,MAAM;OAelI,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;qBAAmB,MAAM;WAAS,UAAU,GAAG,YAAY;OAwBrH,CAAC;AAEH,eAAO,MAAM,oBAAoB;YAAwB,MAAM;qBAAmB,MAAM;WAAS,UAAU,GAAG,YAAY;OAgCxH,CAAC;AAEH,eAAO,MAAM,oBAAoB;gBAA4B,MAAM;OAmBjE,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;WACX,MAAM;kBACC,MAAM;cACV,MAAM;cACN,MAAM,EAAE;mBACH,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OA2BtC,CAAC;AAEH,eAAO,MAAM,gBAAgB;YAAwB,MAAM;OAiBzD,CAAC;AAEH,eAAO,MAAM,cAAc;YAAwB,MAAM;aAAW,MAAM;mBAAiB,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAehH,CAAC;AAEH,eAAO,MAAM,kCAAkC;iBAChC,MAAM,EAAE;mBACN,MAAM,EAAE;wBACH,OAAO;gBACf,SAAS,GAAG,UAAU;qBACjB,OAAO;uBACL,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO;aACpD,UAAU,GAAG,WAAW;OA4BjC,CAAC;AAEH,eAAO,MAAM,yBAAyB;gBACxB,MAAM;gBACN,SAAS,GAAG,UAAU;qBACjB,OAAO;uBACL,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO;aACpD,UAAU,GAAG,WAAW;OAoCjC,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;YACV,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK;kBACnC,MAAM;kBACN,MAAM;OA0BpB,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;OAc1D,CAAC;AAEH,eAAO,MAAM,kBAAkB;YAAwB,MAAM;OAc3D,CAAC;AAEH,eAAO,MAAM,0BAA0B;YAAwB,MAAM;OAcnE,CAAC;AAEH,eAAO,MAAM,2BAA2B;gBAC1B,MAAM;gBACN,MAAM;cACR,MAAM;eACL,KAAK,GAAG,MAAM,GAAG,OAAO;cACzB,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ;aACzD,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS;iCAC5B,MAAM;OA6BnC,CAAC;AAEH,eAAO,MAAM,YAAY;WAAuB,MAAM;OAqBpD,CAAC;AAEH,eAAO,MAAM,SAAS,EAAE,cAAc,EAwBrC,CAAC;AAEF,eAAO,MAAM,QAAQ,uCAEpB,CAAC;AAEF,MAAM,WAAW,aAAa;IAC5B,0FAA0F;IAC1F,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,mFAAmF;IACnF,QAAQ,CAAC,EAAE,WAAW,EAAE,CAAC;IACzB,6CAA6C;IAC7C,QAAQ,CAAC,EAAE,OAAO,CAAC;CACpB;AAED;;;;GAIG;AACH,wBAAgB,WAAW,CAAC,SAAS,GAAE,aAAkB,GAAG,cAAc,EAAE,CAgB3E;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,OAAO,EAAE,MAAM;CAI5B;AAKD;;;;GAIG;AACH,wBAAsB,OAAO,CAC3B,IAAI,EAAE,cAAc,EACpB,IAAI,EAAE,OAAO,EACb,MAAM,EAAE,cAAc,EACtB,cAAc,CAAC,EAAE;IAAE,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,GACtC,OAAO,CAAC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,CAWlC"}
1
+ {"version":3,"file":"definitions.d.ts","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB,OAAO,KAAK,EAAE,kBAAkB,EAA6C,MAAM,qBAAqB,CAAC;AAEzG,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAoBhE,MAAM,MAAM,cAAc,GAAG,kBAAkB,GAAG,kBAAkB,CAAC;AAErE;;;GAGG;AACH,eAAO,MAAM,QAAQ;;;;;;CAMX,CAAC;AAEX,MAAM,MAAM,WAAW,GAAG,MAAM,OAAO,QAAQ,CAAC;AAEhD,qCAAqC;AACrC,MAAM,WAAW,eAAe;IAC9B,yCAAyC;IACzC,YAAY,EAAE,OAAO,CAAC;IACtB,8FAA8F;IAC9F,eAAe,EAAE,OAAO,CAAC;IACzB,sEAAsE;IACtE,cAAc,EAAE,OAAO,CAAC;IACxB,mEAAmE;IACnE,aAAa,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,cAAc,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd;;;OAGG;IACH,WAAW,EAAE,MAAM,CAAC;IACpB,OAAO,EAAE,WAAW,CAAC;IACrB,SAAS,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC;IAC5B,oFAAoF;IACpF,WAAW,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACrC,sGAAsG;IACtG,eAAe,EAAE,CAAC,CAAC,UAAU,CAAC;IAC9B,wGAAwG;IACxG,YAAY,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACtC,WAAW,EAAE,eAAe,CAAC;IAC7B,OAAO,EAAE,CAAC,IAAI,EAAE,OAAO,EAAE,MAAM,EAAE,cAAc,EAAE,cAAc,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,KAAK,OAAO,CAAC,OAAO,CAAC,CAAC;CAC/G;AAED,KAAK,QAAQ,CAAC,OAAO,EAAE,OAAO,IAAI,IAAI,CAAC,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,cAAc,GAAG,aAAa,CAAC,GAAG;IACzH,WAAW,CAAC,EAAE,OAAO,CAAC,eAAe,CAAC,CAAC;CACxC,CAAC;AAOF;;;GAGG;AACH,wBAAgB,UAAU,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG,EAAE,IAAI,EAAE,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,GAAG,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,CAa3H;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM;CAI9C;AAED;;;GAGG;AACH,wBAAgB,aAAa,CAAC,OAAO,EAAE,IAAI,EAAE,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,OAAO,GAAG,OAAO,CAU5F;AAGD,wBAAsB,cAAc,CAAC,MAAM,EAAE,cAAc;;GAG1D;AAED,eAAO,MAAM,gBAAgB;;EAY3B,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAcnD,CAAC;AAEH,eAAO,MAAM,iBAAiB;UAAsB,MAAM;kBAAgB,MAAM;UAAQ,MAAM;mBAAiB,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAgBpI,CAAC;AAEH,eAAO,MAAM,aAAa;gBACZ,MAAM;aACT,MAAM;eACJ,MAAM;iBACJ,MAAM;kBACL,MAAM;oBACJ,MAAM;kBACR,MAAM;eACT,MAAM;YACT,MAAM;aACL,MAAM;OAoCf,CAAC;AAEH,eAAO,MAAM,WAAW;QAAoB,MAAM;0BAAwB,OAAO;OAwC/E,CAAC;AA0BH,eAAO,MAAM,cAAc;gBACb,MAAM;WACX,MAAM;kBACC,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;eACL,MAAM;kBACH,OAAO;WACd,MAAM,EAAE;qBACE,MAAM;iBACV,MAAM;gBACP,OAAO;oBACH,MAAM;mBACP,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAuDtC,CAAC;AAEH,eAAO,MAAM,cAAc;QACrB,MAAM;YACF,MAAM;kBACA,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;eACL,MAAM;kBACH,OAAO;WACd,MAAM,EAAE;qBACE,MAAM;iBACV,MAAM;gBACP,OAAO;oBACH,MAAM;mBACP,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAmCtC,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAenD,CAAC;AAEH,eAAO,MAAM,WAAW;YAAwB,MAAM;WAAS,MAAM;kBAAgB,MAAM;iBAAe,OAAO;eAAa,MAAM;OAelI,CAAC;AAEH,eAAO,MAAM,mBAAmB;QAAoB,MAAM;YAAU,MAAM;kBAAgB,MAAM;iBAAe,OAAO;eAAa,MAAM;OAmBvI,CAAC;AAEH,eAAO,MAAM,mBAAmB;QAAoB,MAAM;OASxD,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;qBAAmB,MAAM;WAAS,UAAU,GAAG,YAAY;OAwBrH,CAAC;AAEH,eAAO,MAAM,oBAAoB;YAAwB,MAAM;qBAAmB,MAAM;WAAS,UAAU,GAAG,YAAY;OAgCxH,CAAC;AAEH,eAAO,MAAM,oBAAoB;gBAA4B,MAAM;OAmBjE,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;WACX,MAAM;kBACC,MAAM;cACV,MAAM;cACN,MAAM,EAAE;mBACH,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OA2BtC,CAAC;AAEH,eAAO,MAAM,gBAAgB;YAAwB,MAAM;OAiBzD,CAAC;AAEH,eAAO,MAAM,cAAc;YAAwB,MAAM;aAAW,MAAM;mBAAiB,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAehH,CAAC;AAEH,eAAO,MAAM,kCAAkC;iBAChC,MAAM,EAAE;mBACN,MAAM,EAAE;wBACH,OAAO;gBACf,SAAS,GAAG,UAAU;qBACjB,OAAO;uBACL,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO;aACpD,UAAU,GAAG,WAAW;2BACV,MAAM;OAiC7B,CAAC;AAEH,eAAO,MAAM,yBAAyB;gBACxB,MAAM;gBACN,SAAS,GAAG,UAAU;qBACjB,OAAO;uBACL,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO;aACpD,UAAU,GAAG,WAAW;2BACV,MAAM;OAyC7B,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;YACV,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK;kBACnC,MAAM;kBACN,MAAM;OA0BpB,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;OAc1D,CAAC;AAEH,eAAO,MAAM,kBAAkB;YAAwB,MAAM;OAc3D,CAAC;AAEH,eAAO,MAAM,0BAA0B;YAAwB,MAAM;OAcnE,CAAC;AAEH,eAAO,MAAM,2BAA2B;gBAC1B,MAAM;gBACN,MAAM;cACR,MAAM;eACL,KAAK,GAAG,MAAM,GAAG,OAAO;cACzB,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ;aACzD,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS;iCAC5B,MAAM;OA6BnC,CAAC;AAEH,eAAO,MAAM,YAAY;WAAuB,MAAM;OAqBpD,CAAC;AAEH,eAAO,MAAM,SAAS,EAAE,cAAc,EA0BrC,CAAC;AAEF,eAAO,MAAM,QAAQ,uCAEpB,CAAC;AAEF,MAAM,WAAW,aAAa;IAC5B,0FAA0F;IAC1F,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,mFAAmF;IACnF,QAAQ,CAAC,EAAE,WAAW,EAAE,CAAC;IACzB,6CAA6C;IAC7C,QAAQ,CAAC,EAAE,OAAO,CAAC;CACpB;AAED;;;;GAIG;AACH,wBAAgB,WAAW,CAAC,SAAS,GAAE,aAAkB,GAAG,cAAc,EAAE,CAgB3E;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,OAAO,EAAE,MAAM;CAI5B;AAKD;;;;GAIG;AACH,wBAAsB,OAAO,CAC3B,IAAI,EAAE,cAAc,EACpB,IAAI,EAAE,OAAO,EACb,MAAM,EAAE,cAAc,EACtB,cAAc,CAAC,EAAE;IAAE,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,GACtC,OAAO,CAAC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,CAWlC"}
@@ -314,6 +314,35 @@ export const logTimeTool = defineTool({
314
314
  }),
315
315
  execute: async (args, target) => target.logTime(args)
316
316
  });
317
+ export const updateTimeEntryTool = defineTool({
318
+ name: 'update_time_entry',
319
+ title: 'Update Time Entry',
320
+ description: "Correct a time entry logged with `log_time` (its id is in that result). The task's logged hours move by the difference. You can change your own entries; other people's need a project manager. Returns the entry.",
321
+ toolset: 'core',
322
+ outputZodSchema: TimeEntryOutput,
323
+ zodSchema: z.object({
324
+ id: z.string().describe('The time entry id'),
325
+ hours: z.number().positive().optional().describe('Corrected hours'),
326
+ description: z.string().optional().describe('What was done'),
327
+ isBillable: z.boolean().optional().describe('Whether the time is billable'),
328
+ loggedAt: z.string().optional().describe('When the work was done (ISO date-time)')
329
+ }),
330
+ annotations: { idempotentHint: true },
331
+ execute: async (args, target) => {
332
+ const { id, ...updates } = args;
333
+ return target.updateTimeEntry(id, updates);
334
+ }
335
+ });
336
+ export const deleteTimeEntryTool = defineTool({
337
+ name: 'delete_time_entry',
338
+ title: 'Delete Time Entry',
339
+ description: "Delete a time entry logged by mistake; its hours come off the task. Confirm with the user first. Returns { success }.",
340
+ toolset: 'core',
341
+ outputZodSchema: z.object({ success: z.boolean() }),
342
+ zodSchema: z.object({ id: z.string().describe('The time entry id') }),
343
+ annotations: { destructiveHint: true, idempotentHint: true },
344
+ execute: async (args, target) => ({ success: await target.deleteTimeEntry(args.id) })
345
+ });
317
346
  export const addDependencyTool = defineTool({
318
347
  name: 'add_dependency',
319
348
  title: 'Add Dependency',
@@ -472,7 +501,12 @@ export const calculatePortfolioCriticalPathTool = defineTool({
472
501
  effort: z
473
502
  .enum(['estimate', 'remaining'])
474
503
  .optional()
475
- .describe("'remaining' schedules only estimate minus logged hours for in-progress tasks (default: full estimates)")
504
+ .describe("'remaining' schedules only estimate minus logged hours for in-progress tasks (default: full estimates)"),
505
+ defaultEstimateHours: z
506
+ .number()
507
+ .nonnegative()
508
+ .optional()
509
+ .describe('Hours to assume for tasks with no estimate (default 1). They are listed in unestimatedTaskIds')
476
510
  }),
477
511
  annotations: { readOnlyHint: true },
478
512
  execute: async (args, target) => target.calculatePortfolioCriticalPath(args)
@@ -500,7 +534,12 @@ export const calculateCriticalPathTool = defineTool({
500
534
  effort: z
501
535
  .enum(['estimate', 'remaining'])
502
536
  .optional()
503
- .describe("'remaining' schedules only estimate minus logged hours for in-progress tasks (default: full estimates)")
537
+ .describe("'remaining' schedules only estimate minus logged hours for in-progress tasks (default: full estimates)"),
538
+ defaultEstimateHours: z
539
+ .number()
540
+ .nonnegative()
541
+ .optional()
542
+ .describe('Hours to assume for tasks with no estimate (default 1). They are listed in unestimatedTaskIds')
504
543
  }),
505
544
  annotations: { readOnlyHint: true },
506
545
  execute: async (args, target, ambientContext) => {
@@ -508,8 +547,8 @@ export const calculateCriticalPathTool = defineTool({
508
547
  if (!projectId) {
509
548
  throw new Error('projectId is required to calculate the critical path. Find one with `list_projects`.');
510
549
  }
511
- const { calendars, levelResources, levelingPriority, effort } = args;
512
- return target.calculateCriticalPath(projectId, { calendars, levelResources, levelingPriority, effort });
550
+ const { calendars, levelResources, levelingPriority, effort, defaultEstimateHours } = args;
551
+ return target.calculateCriticalPath(projectId, { calendars, levelResources, levelingPriority, effort, defaultEstimateHours });
513
552
  }
514
553
  });
515
554
  export const getTimelineLadderTool = defineTool({
@@ -638,6 +677,8 @@ export const ALL_TOOLS = [
638
677
  updateTaskTool,
639
678
  deleteTaskTool,
640
679
  logTimeTool,
680
+ updateTimeEntryTool,
681
+ deleteTimeEntryTool,
641
682
  addDependencyTool,
642
683
  removeDependencyTool,
643
684
  listDeliverablesTool,
@@ -1 +1 @@
1
- {"version":3,"file":"definitions.js","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AACxB,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AAErD,OAAO,EAAE,YAAY,EAAE,MAAM,qBAAqB,CAAC;AAEnD,OAAO,EACL,aAAa,EACb,UAAU,EACV,0BAA0B,EAC1B,gBAAgB,EAChB,iBAAiB,EACjB,aAAa,EACb,eAAe,EACf,kBAAkB,EAClB,2BAA2B,EAC3B,oBAAoB,EACpB,gBAAgB,EAChB,iBAAiB,EACjB,yBAAyB,EACzB,0BAA0B,EAC1B,WAAW,EACZ,MAAM,cAAc,CAAC;AACtB,OAAO,EAAE,MAAM,EAAE,QAAQ,EAAE,MAAM,oBAAoB,CAAC;AAItD;;;GAGG;AACH,MAAM,CAAC,MAAM,QAAQ,GAAG;IACtB,IAAI,EAAE,8EAA8E;IACpF,aAAa,EAAE,gCAAgC;IAC/C,UAAU,EAAE,2DAA2D;IACvE,SAAS,EAAE,wEAAwE;IACnF,QAAQ,EAAE,oDAAoD;CACtD,CAAC;AAwCX,SAAS,YAAY,CAAC,MAAoB;IACxC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,GAAG,IAAI,EAAE,GAAG,eAAe,CAAC,MAAM,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IACnH,OAAO,IAAI,CAAC;AACd,CAAC;AAED;;;GAGG;AACH,MAAM,UAAU,UAAU,CAA+B,IAAgC;IACvF,MAAM,YAAY,GAAG,IAAI,CAAC,WAAW,EAAE,YAAY,IAAI,KAAK,CAAC;IAC7D,OAAO;QACL,GAAG,IAAI;QACP,WAAW,EAAE,YAAY,CAAC,IAAI,CAAC,SAAS,CAAC;QACzC,YAAY,EAAE,YAAY,CAAC,IAAI,CAAC,eAAe,CAAC;QAChD,WAAW,EAAE;YACX,YAAY;YACZ,eAAe,EAAE,IAAI,CAAC,WAAW,EAAE,eAAe,IAAI,KAAK;YAC3D,cAAc,EAAE,IAAI,CAAC,WAAW,EAAE,cAAc,IAAI,YAAY;YAChE,aAAa,EAAE,IAAI,CAAC,WAAW,EAAE,aAAa,IAAI,KAAK;SACxD;KACF,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,QAAgB,EAAE,OAAe;QAC3C,KAAK,CAAC,+BAA+B,QAAQ,MAAM,OAAO,EAAE,CAAC,CAAC;QAC9D,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED;;;GAGG;AACH,MAAM,UAAU,aAAa,CAAU,IAA6B,EAAE,IAAa;IACjF,yFAAyF;IACzF,MAAM,MAAM,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IAC7D,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;QACpB,MAAM,OAAO,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM;aAChC,GAAG,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,QAAQ,KAAK,KAAK,CAAC,OAAO,EAAE,CAAC;aACvE,IAAI,CAAC,IAAI,CAAC,CAAC;QACd,MAAM,IAAI,iBAAiB,CAAC,IAAI,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;IAClD,CAAC;IACD,OAAO,MAAM,CAAC,IAAe,CAAC;AAChC,CAAC;AAED,+CAA+C;AAC/C,MAAM,CAAC,KAAK,UAAU,cAAc,CAAC,MAAsB;IACzD,MAAM,QAAQ,GAAG,OAAO,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,KAAK,KAAK,QAAQ,CAAC;IAChF,OAAO,EAAE,QAAQ,EAAE,CAAC;AACtB,CAAC;AAED,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAC;IACzC,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EACT,oIAAoI;IACtI,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC;IACvB,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;QAC/B,OAAO,EAAE,QAAQ,EAAE,MAAM,MAAM,CAAC,WAAW,EAAE,EAAE,CAAC;IAClD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,2OAA2O;IAC7O,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAC1C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAA+F;IACxI,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EACT,qKAAqK;IACvK,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAChD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;QAC7E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,aAAa,GAAG,UAAU,CAWpC;IACD,IAAI,EAAE,YAAY;IAClB,KAAK,EAAE,YAAY;IACnB,WAAW,EACT,kYAAkY;IACpY,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,EAAE,CAAC;IACvG,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QACjE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACnE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACvG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACnE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0BAA0B,CAAC;QACzE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACjF,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACxG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtF,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;KAC1E,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS;YACtD,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS;YAC/C,QAAQ,EAAE,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS;YACrD,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,GAAG,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,QAAQ,EAAE,IAAI,CAAC,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACvF,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,MAAM,EAAE,IAAI,CAAC,MAAM;SACpB,CAAC,CAAC;QACH,OAAO,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC;IAC5D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAgD;IACnF,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EACT,8WAA8W;IAChX,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,0BAA0B;IAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,mBAAmB,EAAE,CAAC;aACnB,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,gGAAgG,CAAC;KAC9G,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,IAAI,IAAI,CAAC,IAAI,CAAC,mBAAmB;YAAE,OAAO,IAAI,CAAC;QACpD,MAAM,KAAK,GAAG,MAAM,kBAAkB,CAAC,MAAM,EAAE,IAAI,CAAC,EAAE,CAAC,CAAC;QACxD,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,CAAC,GAAG,KAAK,CAAC,aAAa,EAAE,GAAG,KAAK,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;QAChH,sFAAsF;QACtF,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC5C,MAAM,OAAO,GAAG,UAAU,CAAC,MAAM,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,eAAe,CAAC,CAAC,CAAC,UAAU,CAAC,MAAM,CAAC;YAC/F,IAAI,OAAO,CAAC,GAAG,CAAC,OAAO,CAAC,IAAI,OAAO,KAAK,IAAI,CAAC,EAAE;gBAAE,SAAS;YAC1D,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE,CAAC,IAAI,CAAC,CAAC;YAC9D,IAAI,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,OAAO,EAAE,KAAK,CAAC,CAAC;QACzC,CAAC;QACD,MAAM,SAAS,GAAqB,EAAE,CAAC;QACvC,MAAM,UAAU,GAAqB,EAAE,CAAC;QACxC,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC5C,MAAM,EAAE,OAAO,EAAE,SAAS,EAAE,GAAG,mBAAmB,CAAC,UAAU,CAAC,CAAC;YAC/D,MAAM,OAAO,GAAG,OAAO,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC;YAC1D,MAAM,KAAK,GAAG,OAAO,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;YACnC,6CAA6C;YAC7C,IAAI,CAAC,KAAK,IAAI,OAAO,KAAK,IAAI,CAAC,EAAE;gBAAE,SAAS;YAC5C,MAAM,IAAI,GAAG,EAAE,YAAY,EAAE,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,IAAI,EAAE,QAAQ,CAAC,UAAU,CAAC,EAAE,CAAC;YACrI,CAAC,OAAO,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC5D,CAAC;QACD,OAAO,EAAE,GAAG,IAAI,EAAE,YAAY,EAAE,EAAE,SAAS,EAAE,UAAU,EAAE,EAAE,CAAC;IAC9D,CAAC;CACF,CAAC,CAAC;AAUH,gGAAgG;AAChG,SAAS,mBAAmB,CAAC,UAA0B;IACrD,MAAM,IAAI,GAAG,YAAY,CAAC,UAAU,CAAC,CAAC;IACtC,4DAA4D;IAC5D,OAAO,IAAI,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,CAAC,KAAK,EAAE,SAAS,EAAE,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,UAAU,CAAC,MAAM,EAAE,SAAS,EAAE,UAAU,CAAC,eAAe,EAAE,CAAC;AACxI,CAAC;AAED,MAAM,QAAQ,GAAG,CAAC,UAA0B,EAA0B,EAAE,CAAC,CAAC,UAAU,CAAC,IAAI,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;AAExI,KAAK,UAAU,kBAAkB,CAAC,MAAsB,EAAE,MAAc;IACtE,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;IAClD,OAAO,QAAQ;QACb,CAAC,CAAE,MAA6B,CAAC,sBAAsB,CAAC,MAAM,CAAC;QAC/D,CAAC,CAAE,MAA6B,CAAC,mBAAmB,CAAC,MAAM,CAAC,CAAC;AACjE,CAAC;AAED,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAgBrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,4MAA4M;IAC9M,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,UAAU;IAC3B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACzG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC/C,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gEAAgE,CAAC;QACxG,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC;QAClH,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACvE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qJAAqJ,CAAC;QAC/L,WAAW,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2HAA2H,CAAC;QACzK,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACxE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QAC7E,UAAU,EAAE,CAAC;aACV,MAAM,EAAE;aACR,EAAE,CAAC,CAAC,CAAC;aACL,GAAG,CAAC,CAAC,CAAC;aACN,QAAQ,EAAE;aACV,QAAQ,CAAC,yIAAyI,CAAC;QACtJ,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;QAC/E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,oHAAoH,CAAC,CAAC;QACxI,CAAC;QACD,MAAM,KAAK,GAAQ;YACjB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,kEAAkE;YAClE,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC/C,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,MAAM;YACjC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,EAAE;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,YAAY,EAAE,IAAI,CAAC,YAAY;YAC/B,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,aAAa,EAAE,IAAI,CAAC,aAAa;SAClC,CAAC;QACF,OAAO,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;IAClC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAgBrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,+RAA+R;IACjS,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,UAAU;IAC3B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,WAAW,CAAC;QAClD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4DAA4D,CAAC;QACpG,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,cAAc,CAAC;QACjG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,+BAA+B,CAAC;QAC3E,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qJAAqJ,CAAC;QAC/L,WAAW,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2HAA2H,CAAC;QACzK,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAClE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QAC3E,UAAU,EAAE,CAAC;aACV,MAAM,EAAE;aACR,EAAE,CAAC,CAAC,CAAC;aACL,GAAG,CAAC,CAAC,CAAC;aACN,QAAQ,EAAE;aACV,QAAQ,CAAC,yIAAyI,CAAC;QACtJ,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;QAC/E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACxC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,4LAA4L;IAC9L,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC;IACnD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACjD,CAAC;IACF,WAAW,EAAE,EAAE,eAAe,EAAE,IAAI,EAAE,cAAc,EAAE,IAAI,EAAE;IAC5D,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjD,OAAO,EAAE,OAAO,EAAE,CAAC;IACrB,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAmG;IACtI,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EACT,8KAA8K;IAChL,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,eAAe;IAChC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACjD,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;QAC/D,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,eAAe,CAAC;QAC5D,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6CAA6C,CAAC;QAC1F,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qDAAqD,CAAC;KAChG,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC;CACtD,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAgF;IACzH,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EACT,+UAA+U;IACjV,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,gBAAgB;IACjC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QACvE,IAAI,EAAE,CAAC;aACJ,IAAI,CAAC,CAAC,UAAU,EAAE,YAAY,CAAC,CAAC;aAChC,QAAQ,EAAE;aACV,QAAQ,CAAC,4FAA4F,CAAC;KAC1G,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,IAAI,GAAG,IAAI,CAAC,IAAI,IAAI,UAAU,CAAC;QACrC,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;QAClD,IAAI,QAAQ,EAAE,CAAC;YACb,OAAQ,MAA6B,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,eAAe,EAAE,IAAI,CAAC,eAAe,EAAE,IAAI,EAAE,CAAC,CAAC;QAC5H,CAAC;QACD,OAAQ,MAA6B,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,EAAE,EAAE,eAAe,EAAE,IAAI,CAAC,eAAe,EAAE,IAAI,EAAE,CAAC,CAAC;IACpH,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAgF;IAC5H,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,gTAAgT;IAClT,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC;QACxB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QAC5F,aAAa,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,4BAA4B,CAAC;KAC1E,CAAC;IACF,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAC7D,IAAI,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,YAAY,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gDAAgD,CAAC;KAC/G,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,KAAK,GAAG,MAAM,kBAAkB,CAAC,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;QAC5D,MAAM,OAAO,GAAG,KAAK,CAAC,YAAY,CAAC,MAAM,CAAC,CAAC,UAAU,EAAE,EAAE;YACvD,MAAM,EAAE,OAAO,EAAE,SAAS,EAAE,GAAG,mBAAmB,CAAC,UAAU,CAAC,CAAC;YAC/D,OAAO,OAAO,KAAK,IAAI,CAAC,MAAM,IAAI,SAAS,KAAK,IAAI,CAAC,eAAe,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,IAAI,QAAQ,CAAC,UAAU,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC;QAC7H,CAAC,CAAC,CAAC;QACH,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,aAAa,GAAa,EAAE,CAAC;QACnC,KAAK,MAAM,UAAU,IAAI,OAAO,EAAE,CAAC;YACjC,MAAM,OAAO,GAAG,QAAQ;gBACtB,CAAC,CAAC,MAAO,MAA6B,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC;gBACtE,CAAC,CAAC,MAAO,MAA6B,CAAC,gBAAgB,CAAC,UAAU,CAAC,MAAM,EAAE,UAAU,CAAC,EAAE,CAAC,CAAC;YAC5F,IAAI,OAAO;gBAAE,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,CAAC;QACD,OAAO,EAAE,OAAO,EAAE,aAAa,CAAC,MAAM,EAAE,aAAa,EAAE,CAAC;IAC1D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAyB;IACrE,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,0OAA0O;IAC5O,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,YAAY,EAAE,CAAC,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC;IACvE,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACnG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,4EAA4E,CAAC,CAAC;QAC9G,IAAI,iBAAiB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,eAAe,KAAK,UAAU,EAAE,CAAC;YACzF,OAAO,EAAE,YAAY,EAAE,MAAO,MAAc,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC;QAC5E,CAAC;QACD,OAAO,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC;IAC9B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAO5C;IACD,IAAI,EAAE,oBAAoB;IAC1B,KAAK,EAAE,oBAAoB;IAC3B,WAAW,EACT,oTAAoT;IACtT,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,iBAAiB;IAClC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACrD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gDAAgD,CAAC;QAC7F,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;QACpG,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,+EAA+E,CAAC,CAAC;QACjH,IAAI,mBAAmB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,iBAAiB,KAAK,UAAU,EAAE,CAAC;YAC7F,OAAQ,MAAc,CAAC,iBAAiB,CAAC;gBACvC,GAAG,IAAI;gBACP,SAAS;aACV,CAAC,CAAC;QACL,CAAC;QACD,MAAM,IAAI,KAAK,CAAC,4DAA4D,CAAC,CAAC;IAChF,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAqB;IAC7D,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EACT,yHAAyH;IAC3H,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,IAAI,aAAa,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACjF,OAAO,EAAE,QAAQ,EAAE,MAAO,MAAc,CAAC,WAAW,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;QACtE,CAAC;QACD,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;IAC1B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAA8E;IACpH,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,sMAAsM;IACxM,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QAC1C,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACrD,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,YAAY,EAAE,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC;IAC5G,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kCAAkC,GAAG,UAAU,CAQzD;IACD,IAAI,EAAE,mCAAmC;IACzC,KAAK,EAAE,mCAAmC;IAC1C,WAAW,EACT,kVAAkV;IACpV,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,2BAA2B;IAC5C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2DAA2D,CAAC;QAChH,YAAY,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0EAA0E,CAAC;QACjI,iBAAiB,EAAE,CAAC;aACjB,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,oIAAoI,CAAC;QACjJ,SAAS,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,SAAS,EAAE,UAAU,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qEAAqE,CAAC;QACrI,cAAc,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4EAA4E,CAAC;QAC7H,gBAAgB,EAAE,CAAC;aAChB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC;aAC/C,QAAQ,EAAE;aACV,QAAQ,CAAC,mGAAmG,CAAC;QAChH,MAAM,EAAE,CAAC;aACN,IAAI,CAAC,CAAC,UAAU,EAAE,WAAW,CAAC,CAAC;aAC/B,QAAQ,EAAE;aACV,QAAQ,CAAC,wGAAwG,CAAC;KACtH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,CAAE,MAAc,CAAC,8BAA8B,CAAC,IAAI,CAAC;CACtF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,UAAU,CAMhD;IACD,IAAI,EAAE,yBAAyB;IAC/B,KAAK,EAAE,yBAAyB;IAChC,WAAW,EACT,ofAAof;IACtf,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,kBAAkB;IACnC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,SAAS,EAAE,CAAC;aACT,IAAI,CAAC,CAAC,SAAS,EAAE,UAAU,CAAC,CAAC;aAC7B,QAAQ,EAAE;aACV,QAAQ,CAAC,gHAAgH,CAAC;QAC7H,cAAc,EAAE,CAAC;aACd,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,qFAAqF,CAAC;QAClG,gBAAgB,EAAE,CAAC;aAChB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC;aAC/C,QAAQ,EAAE;aACV,QAAQ,CAAC,mGAAmG,CAAC;QAChH,MAAM,EAAE,CAAC;aACN,IAAI,CAAC,CAAC,UAAU,EAAE,WAAW,CAAC,CAAC;aAC/B,QAAQ,EAAE;aACV,QAAQ,CAAC,wGAAwG,CAAC;KACtH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,sFAAsF,CAAC,CAAC;QAC1G,CAAC;QACD,MAAM,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,GAAG,IAAI,CAAC;QACrE,OAAQ,MAAc,CAAC,qBAAqB,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,CAAC,CAAC;IACnH,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAK5C;IACD,IAAI,EAAE,qBAAqB;IAC3B,KAAK,EAAE,oCAAoC;IAC3C,WAAW,EACT,8ZAA8Z;IACha,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,oBAAoB;IACrC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QACpI,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qCAAqC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,kFAAkF,CAAC,CAAC;QACtG,CAAC;QACD,OAAQ,MAAc,CAAC,iBAAiB,CAAC,SAAS,EAAE;YAClD,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;SAC9B,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAqB;IAC9D,IAAI,EAAE,iBAAiB;IACvB,KAAK,EAAE,sBAAsB;IAC7B,WAAW,EACT,2UAA2U;IAC7U,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,gBAAgB;IACjC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACpD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,UAAU,CAAqB;IAC/D,IAAI,EAAE,kBAAkB;IACxB,KAAK,EAAE,kBAAkB;IACzB,WAAW,EACT,kQAAkQ;IACpQ,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,iBAAiB;IAClC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,cAAc,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACrD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAqB;IACvE,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EACT,iUAAiU;IACnU,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,yBAAyB;IAC1C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,sBAAsB,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,UAAU,CAQlD;IACD,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EACT,kWAAkW;IACpW,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,0BAA0B;IAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sEAAsE,CAAC;QACjH,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACxE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACpE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACpG,OAAO,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,QAAQ,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtH,MAAM,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACzG,0BAA0B,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACpH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,OAAQ,MAAc,CAAC,uBAAuB,CAAC,SAAS,EAAE;YACxD,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,0BAA0B,EAAE,IAAI,CAAC,0BAA0B;SAC5D,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,YAAY,GAAG,UAAU,CAAoB;IACxD,IAAI,EAAE,WAAW;IACjB,KAAK,EAAE,WAAW;IAClB,WAAW,EACT,gXAAgX;IAClX,OAAO,EAAE,UAAU;IACnB,eAAe,EAAE,WAAW;IAC5B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0DAA0D,CAAC;KACjG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,EAAE;QACtB,IAAI,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC;YACf,OAAO,EAAE,MAAM,EAAE,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,EAAE,WAAW,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC,EAAE,CAAC;QACpF,CAAC;QACD,MAAM,KAAK,GAAG,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAClC,IAAI,CAAC,KAAK,EAAE,CAAC;YACX,MAAM,IAAI,KAAK,CAAC,UAAU,IAAI,CAAC,IAAI,kCAAkC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChH,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,SAAS,GAAqB;IACzC,gBAAgB;IAChB,cAAc;IACd,iBAAiB;IACjB,aAAa;IACb,WAAW;IACX,cAAc;IACd,cAAc;IACd,cAAc;IACd,WAAW;IACX,iBAAiB;IACjB,oBAAoB;IACpB,oBAAoB;IACpB,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,yBAAyB;IACzB,kCAAkC;IAClC,qBAAqB;IACrB,iBAAiB;IACjB,kBAAkB;IAClB,0BAA0B;IAC1B,2BAA2B;IAC3B,YAAY;CACb,CAAC;AAEF,MAAM,CAAC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAC7B,SAAS,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAC3C,CAAC;AAWF;;;;GAIG;AACH,MAAM,UAAU,WAAW,CAAC,YAA2B,EAAE;IACvD,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,QAAQ,EAAE,GAAG,SAAS,CAAC;IAChD,MAAM,YAAY,GAAG,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;IACzE,IAAI,YAAY,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC5B,MAAM,IAAI,KAAK,CAAC,kCAAkC,YAAY,CAAC,IAAI,CAAC,IAAI,CAAC,kBAAkB,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACzI,CAAC;IACD,MAAM,WAAW,GAAG,CAAC,QAAQ,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,IAAI,QAAQ,CAAC,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC3B,MAAM,IAAI,KAAK,CAAC,qCAAqC,WAAW,CAAC,IAAI,CAAC,IAAI,CAAC,qBAAqB,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACvI,CAAC;IACD,MAAM,QAAQ,GAAG,CAAC,KAAK,IAAI,CAAC,QAAQ,CAAC;IACrC,OAAO,SAAS,CAAC,MAAM,CACrB,CAAC,IAAI,EAAE,EAAE,CACP,CAAC,QAAQ,IAAI,KAAK,EAAE,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,IAAI,QAAQ,EAAE,QAAQ,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAC5E,CAAC,CAAC,QAAQ,IAAI,IAAI,CAAC,WAAW,CAAC,YAAY,CAAC,CAC/C,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED,MAAM,WAAW,GACf,yKAAyK,CAAC;AAE5K;;;;GAIG;AACH,MAAM,CAAC,KAAK,UAAU,OAAO,CAC3B,IAAoB,EACpB,IAAa,EACb,MAAsB,EACtB,cAAuC;IAEvC,IAAI,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,EAAE,MAAM,EAAE,cAAc,CAAC,CAAC;QACrF,IAAI,MAAM,KAAK,IAAI,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;YAC5C,MAAM,IAAI,iBAAiB,CAAC,qBAAqB,IAAI,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,GAAG,CAAC,CAAC;QAClF,CAAC;QACD,8FAA8F;QAC9F,OAAO,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC;IAC5C,CAAC;IAAC,OAAO,GAAQ,EAAE,CAAC;QAClB,MAAM,IAAI,KAAK,CAAC,gBAAgB,CAAC,IAAI,EAAE,GAAG,CAAC,CAAC,CAAC;IAC/C,CAAC;AACH,CAAC;AAED,SAAS,gBAAgB,CAAC,IAAoB,EAAE,GAAQ;IACtD,MAAM,OAAO,GAAW,GAAG,EAAE,OAAO,IAAI,MAAM,CAAC,GAAG,CAAC,CAAC;IACpD,IAAI,GAAG,YAAY,iBAAiB,EAAE,CAAC;QACrC,OAAO,GAAG,OAAO,qDAAqD,IAAI,CAAC,IAAI,sBAAsB,CAAC;IACxG,CAAC;IACD,IAAI,GAAG,YAAY,iBAAiB,IAAI,GAAG,EAAE,IAAI,KAAK,eAAe,IAAI,GAAG,EAAE,MAAM,KAAK,GAAG,IAAI,YAAY,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC;QAC3H,OAAO,GAAG,OAAO,IAAI,WAAW,EAAE,CAAC;IACrC,CAAC;IACD,IAAI,GAAG,EAAE,IAAI,KAAK,yBAAyB,IAAI,WAAW,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC;QACzE,OAAO,GAAG,OAAO,kKAAkK,CAAC;IACtL,CAAC;IACD,IAAI,GAAG,EAAE,IAAI,KAAK,gBAAgB,IAAI,GAAG,EAAE,MAAM,KAAK,GAAG,EAAE,CAAC;QAC1D,OAAO,GAAG,OAAO,2EAA2E,CAAC;IAC/F,CAAC;IACD,OAAO,OAAO,CAAC;AACjB,CAAC"}
1
+ {"version":3,"file":"definitions.js","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AACxB,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AAErD,OAAO,EAAE,YAAY,EAAE,MAAM,qBAAqB,CAAC;AAEnD,OAAO,EACL,aAAa,EACb,UAAU,EACV,0BAA0B,EAC1B,gBAAgB,EAChB,iBAAiB,EACjB,aAAa,EACb,eAAe,EACf,kBAAkB,EAClB,2BAA2B,EAC3B,oBAAoB,EACpB,gBAAgB,EAChB,iBAAiB,EACjB,yBAAyB,EACzB,0BAA0B,EAC1B,WAAW,EACZ,MAAM,cAAc,CAAC;AACtB,OAAO,EAAE,MAAM,EAAE,QAAQ,EAAE,MAAM,oBAAoB,CAAC;AAItD;;;GAGG;AACH,MAAM,CAAC,MAAM,QAAQ,GAAG;IACtB,IAAI,EAAE,8EAA8E;IACpF,aAAa,EAAE,gCAAgC;IAC/C,UAAU,EAAE,2DAA2D;IACvE,SAAS,EAAE,wEAAwE;IACnF,QAAQ,EAAE,oDAAoD;CACtD,CAAC;AAwCX,SAAS,YAAY,CAAC,MAAoB;IACxC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,GAAG,IAAI,EAAE,GAAG,eAAe,CAAC,MAAM,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IACnH,OAAO,IAAI,CAAC;AACd,CAAC;AAED;;;GAGG;AACH,MAAM,UAAU,UAAU,CAA+B,IAAgC;IACvF,MAAM,YAAY,GAAG,IAAI,CAAC,WAAW,EAAE,YAAY,IAAI,KAAK,CAAC;IAC7D,OAAO;QACL,GAAG,IAAI;QACP,WAAW,EAAE,YAAY,CAAC,IAAI,CAAC,SAAS,CAAC;QACzC,YAAY,EAAE,YAAY,CAAC,IAAI,CAAC,eAAe,CAAC;QAChD,WAAW,EAAE;YACX,YAAY;YACZ,eAAe,EAAE,IAAI,CAAC,WAAW,EAAE,eAAe,IAAI,KAAK;YAC3D,cAAc,EAAE,IAAI,CAAC,WAAW,EAAE,cAAc,IAAI,YAAY;YAChE,aAAa,EAAE,IAAI,CAAC,WAAW,EAAE,aAAa,IAAI,KAAK;SACxD;KACF,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,QAAgB,EAAE,OAAe;QAC3C,KAAK,CAAC,+BAA+B,QAAQ,MAAM,OAAO,EAAE,CAAC,CAAC;QAC9D,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED;;;GAGG;AACH,MAAM,UAAU,aAAa,CAAU,IAA6B,EAAE,IAAa;IACjF,yFAAyF;IACzF,MAAM,MAAM,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IAC7D,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;QACpB,MAAM,OAAO,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM;aAChC,GAAG,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,QAAQ,KAAK,KAAK,CAAC,OAAO,EAAE,CAAC;aACvE,IAAI,CAAC,IAAI,CAAC,CAAC;QACd,MAAM,IAAI,iBAAiB,CAAC,IAAI,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;IAClD,CAAC;IACD,OAAO,MAAM,CAAC,IAAe,CAAC;AAChC,CAAC;AAED,+CAA+C;AAC/C,MAAM,CAAC,KAAK,UAAU,cAAc,CAAC,MAAsB;IACzD,MAAM,QAAQ,GAAG,OAAO,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,KAAK,KAAK,QAAQ,CAAC;IAChF,OAAO,EAAE,QAAQ,EAAE,CAAC;AACtB,CAAC;AAED,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAC;IACzC,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EACT,oIAAoI;IACtI,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC;IACvB,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;QAC/B,OAAO,EAAE,QAAQ,EAAE,MAAM,MAAM,CAAC,WAAW,EAAE,EAAE,CAAC;IAClD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,2OAA2O;IAC7O,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAC1C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAA+F;IACxI,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EACT,qKAAqK;IACvK,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAChD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;QAC7E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,aAAa,GAAG,UAAU,CAWpC;IACD,IAAI,EAAE,YAAY;IAClB,KAAK,EAAE,YAAY;IACnB,WAAW,EACT,kYAAkY;IACpY,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,EAAE,CAAC;IACvG,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QACjE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACnE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACvG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACnE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0BAA0B,CAAC;QACzE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACjF,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACxG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtF,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;KAC1E,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS;YACtD,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS;YAC/C,QAAQ,EAAE,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS;YACrD,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,GAAG,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,QAAQ,EAAE,IAAI,CAAC,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACvF,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,MAAM,EAAE,IAAI,CAAC,MAAM;SACpB,CAAC,CAAC;QACH,OAAO,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC;IAC5D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAgD;IACnF,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EACT,8WAA8W;IAChX,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,0BAA0B;IAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,mBAAmB,EAAE,CAAC;aACnB,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,gGAAgG,CAAC;KAC9G,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,IAAI,IAAI,CAAC,IAAI,CAAC,mBAAmB;YAAE,OAAO,IAAI,CAAC;QACpD,MAAM,KAAK,GAAG,MAAM,kBAAkB,CAAC,MAAM,EAAE,IAAI,CAAC,EAAE,CAAC,CAAC;QACxD,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,CAAC,GAAG,KAAK,CAAC,aAAa,EAAE,GAAG,KAAK,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;QAChH,sFAAsF;QACtF,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC5C,MAAM,OAAO,GAAG,UAAU,CAAC,MAAM,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,eAAe,CAAC,CAAC,CAAC,UAAU,CAAC,MAAM,CAAC;YAC/F,IAAI,OAAO,CAAC,GAAG,CAAC,OAAO,CAAC,IAAI,OAAO,KAAK,IAAI,CAAC,EAAE;gBAAE,SAAS;YAC1D,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE,CAAC,IAAI,CAAC,CAAC;YAC9D,IAAI,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,OAAO,EAAE,KAAK,CAAC,CAAC;QACzC,CAAC;QACD,MAAM,SAAS,GAAqB,EAAE,CAAC;QACvC,MAAM,UAAU,GAAqB,EAAE,CAAC;QACxC,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC5C,MAAM,EAAE,OAAO,EAAE,SAAS,EAAE,GAAG,mBAAmB,CAAC,UAAU,CAAC,CAAC;YAC/D,MAAM,OAAO,GAAG,OAAO,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC;YAC1D,MAAM,KAAK,GAAG,OAAO,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;YACnC,6CAA6C;YAC7C,IAAI,CAAC,KAAK,IAAI,OAAO,KAAK,IAAI,CAAC,EAAE;gBAAE,SAAS;YAC5C,MAAM,IAAI,GAAG,EAAE,YAAY,EAAE,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,IAAI,EAAE,QAAQ,CAAC,UAAU,CAAC,EAAE,CAAC;YACrI,CAAC,OAAO,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC5D,CAAC;QACD,OAAO,EAAE,GAAG,IAAI,EAAE,YAAY,EAAE,EAAE,SAAS,EAAE,UAAU,EAAE,EAAE,CAAC;IAC9D,CAAC;CACF,CAAC,CAAC;AAUH,gGAAgG;AAChG,SAAS,mBAAmB,CAAC,UAA0B;IACrD,MAAM,IAAI,GAAG,YAAY,CAAC,UAAU,CAAC,CAAC;IACtC,4DAA4D;IAC5D,OAAO,IAAI,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,CAAC,KAAK,EAAE,SAAS,EAAE,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,UAAU,CAAC,MAAM,EAAE,SAAS,EAAE,UAAU,CAAC,eAAe,EAAE,CAAC;AACxI,CAAC;AAED,MAAM,QAAQ,GAAG,CAAC,UAA0B,EAA0B,EAAE,CAAC,CAAC,UAAU,CAAC,IAAI,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;AAExI,KAAK,UAAU,kBAAkB,CAAC,MAAsB,EAAE,MAAc;IACtE,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;IAClD,OAAO,QAAQ;QACb,CAAC,CAAE,MAA6B,CAAC,sBAAsB,CAAC,MAAM,CAAC;QAC/D,CAAC,CAAE,MAA6B,CAAC,mBAAmB,CAAC,MAAM,CAAC,CAAC;AACjE,CAAC;AAED,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAgBrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,4MAA4M;IAC9M,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,UAAU;IAC3B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACzG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC/C,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gEAAgE,CAAC;QACxG,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC;QAClH,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACvE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qJAAqJ,CAAC;QAC/L,WAAW,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2HAA2H,CAAC;QACzK,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACxE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QAC7E,UAAU,EAAE,CAAC;aACV,MAAM,EAAE;aACR,EAAE,CAAC,CAAC,CAAC;aACL,GAAG,CAAC,CAAC,CAAC;aACN,QAAQ,EAAE;aACV,QAAQ,CAAC,yIAAyI,CAAC;QACtJ,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;QAC/E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,oHAAoH,CAAC,CAAC;QACxI,CAAC;QACD,MAAM,KAAK,GAAQ;YACjB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,kEAAkE;YAClE,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC/C,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,MAAM;YACjC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,EAAE;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,YAAY,EAAE,IAAI,CAAC,YAAY;YAC/B,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,aAAa,EAAE,IAAI,CAAC,aAAa;SAClC,CAAC;QACF,OAAO,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;IAClC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAgBrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,+RAA+R;IACjS,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,UAAU;IAC3B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,WAAW,CAAC;QAClD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4DAA4D,CAAC;QACpG,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,cAAc,CAAC;QACjG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,+BAA+B,CAAC;QAC3E,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qJAAqJ,CAAC;QAC/L,WAAW,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2HAA2H,CAAC;QACzK,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAClE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QAC3E,UAAU,EAAE,CAAC;aACV,MAAM,EAAE;aACR,EAAE,CAAC,CAAC,CAAC;aACL,GAAG,CAAC,CAAC,CAAC;aACN,QAAQ,EAAE;aACV,QAAQ,CAAC,yIAAyI,CAAC;QACtJ,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;QAC/E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACxC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,4LAA4L;IAC9L,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC;IACnD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACjD,CAAC;IACF,WAAW,EAAE,EAAE,eAAe,EAAE,IAAI,EAAE,cAAc,EAAE,IAAI,EAAE;IAC5D,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjD,OAAO,EAAE,OAAO,EAAE,CAAC;IACrB,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAmG;IACtI,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EACT,8KAA8K;IAChL,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,eAAe;IAChC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACjD,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;QAC/D,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,eAAe,CAAC;QAC5D,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6CAA6C,CAAC;QAC1F,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qDAAqD,CAAC;KAChG,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC;CACtD,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,mBAAmB,GAAG,UAAU,CAAgG;IAC3I,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,oNAAoN;IACtN,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,eAAe;IAChC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC5C,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iBAAiB,CAAC;QACnE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,eAAe,CAAC;QAC5D,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC7C,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,mBAAmB,GAAG,UAAU,CAAiB;IAC5D,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EAAE,uHAAuH;IACpI,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC;IACnD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC,EAAE,CAAC;IACrE,WAAW,EAAE,EAAE,eAAe,EAAE,IAAI,EAAE,cAAc,EAAE,IAAI,EAAE;IAC5D,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,CAAC,CAAC,EAAE,OAAO,EAAE,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;CACtF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAgF;IACzH,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EACT,+UAA+U;IACjV,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,gBAAgB;IACjC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QACvE,IAAI,EAAE,CAAC;aACJ,IAAI,CAAC,CAAC,UAAU,EAAE,YAAY,CAAC,CAAC;aAChC,QAAQ,EAAE;aACV,QAAQ,CAAC,4FAA4F,CAAC;KAC1G,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,IAAI,GAAG,IAAI,CAAC,IAAI,IAAI,UAAU,CAAC;QACrC,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;QAClD,IAAI,QAAQ,EAAE,CAAC;YACb,OAAQ,MAA6B,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,eAAe,EAAE,IAAI,CAAC,eAAe,EAAE,IAAI,EAAE,CAAC,CAAC;QAC5H,CAAC;QACD,OAAQ,MAA6B,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,EAAE,EAAE,eAAe,EAAE,IAAI,CAAC,eAAe,EAAE,IAAI,EAAE,CAAC,CAAC;IACpH,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAgF;IAC5H,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,gTAAgT;IAClT,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC;QACxB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QAC5F,aAAa,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,4BAA4B,CAAC;KAC1E,CAAC;IACF,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAC7D,IAAI,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,YAAY,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gDAAgD,CAAC;KAC/G,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,KAAK,GAAG,MAAM,kBAAkB,CAAC,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;QAC5D,MAAM,OAAO,GAAG,KAAK,CAAC,YAAY,CAAC,MAAM,CAAC,CAAC,UAAU,EAAE,EAAE;YACvD,MAAM,EAAE,OAAO,EAAE,SAAS,EAAE,GAAG,mBAAmB,CAAC,UAAU,CAAC,CAAC;YAC/D,OAAO,OAAO,KAAK,IAAI,CAAC,MAAM,IAAI,SAAS,KAAK,IAAI,CAAC,eAAe,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,IAAI,QAAQ,CAAC,UAAU,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC;QAC7H,CAAC,CAAC,CAAC;QACH,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,aAAa,GAAa,EAAE,CAAC;QACnC,KAAK,MAAM,UAAU,IAAI,OAAO,EAAE,CAAC;YACjC,MAAM,OAAO,GAAG,QAAQ;gBACtB,CAAC,CAAC,MAAO,MAA6B,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC;gBACtE,CAAC,CAAC,MAAO,MAA6B,CAAC,gBAAgB,CAAC,UAAU,CAAC,MAAM,EAAE,UAAU,CAAC,EAAE,CAAC,CAAC;YAC5F,IAAI,OAAO;gBAAE,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,CAAC;QACD,OAAO,EAAE,OAAO,EAAE,aAAa,CAAC,MAAM,EAAE,aAAa,EAAE,CAAC;IAC1D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAyB;IACrE,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,0OAA0O;IAC5O,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,YAAY,EAAE,CAAC,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC;IACvE,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACnG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,4EAA4E,CAAC,CAAC;QAC9G,IAAI,iBAAiB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,eAAe,KAAK,UAAU,EAAE,CAAC;YACzF,OAAO,EAAE,YAAY,EAAE,MAAO,MAAc,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC;QAC5E,CAAC;QACD,OAAO,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC;IAC9B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAO5C;IACD,IAAI,EAAE,oBAAoB;IAC1B,KAAK,EAAE,oBAAoB;IAC3B,WAAW,EACT,oTAAoT;IACtT,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,iBAAiB;IAClC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACrD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gDAAgD,CAAC;QAC7F,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;QACpG,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,+EAA+E,CAAC,CAAC;QACjH,IAAI,mBAAmB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,iBAAiB,KAAK,UAAU,EAAE,CAAC;YAC7F,OAAQ,MAAc,CAAC,iBAAiB,CAAC;gBACvC,GAAG,IAAI;gBACP,SAAS;aACV,CAAC,CAAC;QACL,CAAC;QACD,MAAM,IAAI,KAAK,CAAC,4DAA4D,CAAC,CAAC;IAChF,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAqB;IAC7D,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EACT,yHAAyH;IAC3H,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,IAAI,aAAa,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACjF,OAAO,EAAE,QAAQ,EAAE,MAAO,MAAc,CAAC,WAAW,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;QACtE,CAAC;QACD,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;IAC1B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAA8E;IACpH,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,sMAAsM;IACxM,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QAC1C,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACrD,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,YAAY,EAAE,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC;IAC5G,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kCAAkC,GAAG,UAAU,CASzD;IACD,IAAI,EAAE,mCAAmC;IACzC,KAAK,EAAE,mCAAmC;IAC1C,WAAW,EACT,kVAAkV;IACpV,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,2BAA2B;IAC5C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2DAA2D,CAAC;QAChH,YAAY,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0EAA0E,CAAC;QACjI,iBAAiB,EAAE,CAAC;aACjB,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,oIAAoI,CAAC;QACjJ,SAAS,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,SAAS,EAAE,UAAU,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qEAAqE,CAAC;QACrI,cAAc,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4EAA4E,CAAC;QAC7H,gBAAgB,EAAE,CAAC;aAChB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC;aAC/C,QAAQ,EAAE;aACV,QAAQ,CAAC,mGAAmG,CAAC;QAChH,MAAM,EAAE,CAAC;aACN,IAAI,CAAC,CAAC,UAAU,EAAE,WAAW,CAAC,CAAC;aAC/B,QAAQ,EAAE;aACV,QAAQ,CAAC,wGAAwG,CAAC;QACrH,oBAAoB,EAAE,CAAC;aACpB,MAAM,EAAE;aACR,WAAW,EAAE;aACb,QAAQ,EAAE;aACV,QAAQ,CAAC,+FAA+F,CAAC;KAC7G,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,CAAE,MAAc,CAAC,8BAA8B,CAAC,IAAI,CAAC;CACtF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,UAAU,CAOhD;IACD,IAAI,EAAE,yBAAyB;IAC/B,KAAK,EAAE,yBAAyB;IAChC,WAAW,EACT,ofAAof;IACtf,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,kBAAkB;IACnC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,SAAS,EAAE,CAAC;aACT,IAAI,CAAC,CAAC,SAAS,EAAE,UAAU,CAAC,CAAC;aAC7B,QAAQ,EAAE;aACV,QAAQ,CAAC,gHAAgH,CAAC;QAC7H,cAAc,EAAE,CAAC;aACd,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,qFAAqF,CAAC;QAClG,gBAAgB,EAAE,CAAC;aAChB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC;aAC/C,QAAQ,EAAE;aACV,QAAQ,CAAC,mGAAmG,CAAC;QAChH,MAAM,EAAE,CAAC;aACN,IAAI,CAAC,CAAC,UAAU,EAAE,WAAW,CAAC,CAAC;aAC/B,QAAQ,EAAE;aACV,QAAQ,CAAC,wGAAwG,CAAC;QACrH,oBAAoB,EAAE,CAAC;aACpB,MAAM,EAAE;aACR,WAAW,EAAE;aACb,QAAQ,EAAE;aACV,QAAQ,CAAC,+FAA+F,CAAC;KAC7G,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,sFAAsF,CAAC,CAAC;QAC1G,CAAC;QACD,MAAM,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,oBAAoB,EAAE,GAAG,IAAI,CAAC;QAC3F,OAAQ,MAAc,CAAC,qBAAqB,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,oBAAoB,EAAE,CAAC,CAAC;IACzI,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAK5C;IACD,IAAI,EAAE,qBAAqB;IAC3B,KAAK,EAAE,oCAAoC;IAC3C,WAAW,EACT,8ZAA8Z;IACha,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,oBAAoB;IACrC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QACpI,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qCAAqC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,kFAAkF,CAAC,CAAC;QACtG,CAAC;QACD,OAAQ,MAAc,CAAC,iBAAiB,CAAC,SAAS,EAAE;YAClD,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;SAC9B,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAqB;IAC9D,IAAI,EAAE,iBAAiB;IACvB,KAAK,EAAE,sBAAsB;IAC7B,WAAW,EACT,2UAA2U;IAC7U,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,gBAAgB;IACjC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACpD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,UAAU,CAAqB;IAC/D,IAAI,EAAE,kBAAkB;IACxB,KAAK,EAAE,kBAAkB;IACzB,WAAW,EACT,kQAAkQ;IACpQ,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,iBAAiB;IAClC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,cAAc,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACrD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAqB;IACvE,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EACT,iUAAiU;IACnU,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,yBAAyB;IAC1C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,sBAAsB,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,UAAU,CAQlD;IACD,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EACT,kWAAkW;IACpW,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,0BAA0B;IAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sEAAsE,CAAC;QACjH,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACxE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACpE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACpG,OAAO,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,QAAQ,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtH,MAAM,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACzG,0BAA0B,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACpH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,OAAQ,MAAc,CAAC,uBAAuB,CAAC,SAAS,EAAE;YACxD,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,0BAA0B,EAAE,IAAI,CAAC,0BAA0B;SAC5D,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,YAAY,GAAG,UAAU,CAAoB;IACxD,IAAI,EAAE,WAAW;IACjB,KAAK,EAAE,WAAW;IAClB,WAAW,EACT,gXAAgX;IAClX,OAAO,EAAE,UAAU;IACnB,eAAe,EAAE,WAAW;IAC5B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0DAA0D,CAAC;KACjG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,EAAE;QACtB,IAAI,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC;YACf,OAAO,EAAE,MAAM,EAAE,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,EAAE,WAAW,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC,EAAE,CAAC;QACpF,CAAC;QACD,MAAM,KAAK,GAAG,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAClC,IAAI,CAAC,KAAK,EAAE,CAAC;YACX,MAAM,IAAI,KAAK,CAAC,UAAU,IAAI,CAAC,IAAI,kCAAkC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChH,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,SAAS,GAAqB;IACzC,gBAAgB;IAChB,cAAc;IACd,iBAAiB;IACjB,aAAa;IACb,WAAW;IACX,cAAc;IACd,cAAc;IACd,cAAc;IACd,WAAW;IACX,mBAAmB;IACnB,mBAAmB;IACnB,iBAAiB;IACjB,oBAAoB;IACpB,oBAAoB;IACpB,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,yBAAyB;IACzB,kCAAkC;IAClC,qBAAqB;IACrB,iBAAiB;IACjB,kBAAkB;IAClB,0BAA0B;IAC1B,2BAA2B;IAC3B,YAAY;CACb,CAAC;AAEF,MAAM,CAAC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAC7B,SAAS,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAC3C,CAAC;AAWF;;;;GAIG;AACH,MAAM,UAAU,WAAW,CAAC,YAA2B,EAAE;IACvD,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,QAAQ,EAAE,GAAG,SAAS,CAAC;IAChD,MAAM,YAAY,GAAG,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;IACzE,IAAI,YAAY,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC5B,MAAM,IAAI,KAAK,CAAC,kCAAkC,YAAY,CAAC,IAAI,CAAC,IAAI,CAAC,kBAAkB,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACzI,CAAC;IACD,MAAM,WAAW,GAAG,CAAC,QAAQ,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,IAAI,QAAQ,CAAC,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC3B,MAAM,IAAI,KAAK,CAAC,qCAAqC,WAAW,CAAC,IAAI,CAAC,IAAI,CAAC,qBAAqB,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACvI,CAAC;IACD,MAAM,QAAQ,GAAG,CAAC,KAAK,IAAI,CAAC,QAAQ,CAAC;IACrC,OAAO,SAAS,CAAC,MAAM,CACrB,CAAC,IAAI,EAAE,EAAE,CACP,CAAC,QAAQ,IAAI,KAAK,EAAE,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,IAAI,QAAQ,EAAE,QAAQ,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAC5E,CAAC,CAAC,QAAQ,IAAI,IAAI,CAAC,WAAW,CAAC,YAAY,CAAC,CAC/C,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED,MAAM,WAAW,GACf,yKAAyK,CAAC;AAE5K;;;;GAIG;AACH,MAAM,CAAC,KAAK,UAAU,OAAO,CAC3B,IAAoB,EACpB,IAAa,EACb,MAAsB,EACtB,cAAuC;IAEvC,IAAI,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,EAAE,MAAM,EAAE,cAAc,CAAC,CAAC;QACrF,IAAI,MAAM,KAAK,IAAI,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;YAC5C,MAAM,IAAI,iBAAiB,CAAC,qBAAqB,IAAI,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,GAAG,CAAC,CAAC;QAClF,CAAC;QACD,8FAA8F;QAC9F,OAAO,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC;IAC5C,CAAC;IAAC,OAAO,GAAQ,EAAE,CAAC;QAClB,MAAM,IAAI,KAAK,CAAC,gBAAgB,CAAC,IAAI,EAAE,GAAG,CAAC,CAAC,CAAC;IAC/C,CAAC;AACH,CAAC;AAED,SAAS,gBAAgB,CAAC,IAAoB,EAAE,GAAQ;IACtD,MAAM,OAAO,GAAW,GAAG,EAAE,OAAO,IAAI,MAAM,CAAC,GAAG,CAAC,CAAC;IACpD,IAAI,GAAG,YAAY,iBAAiB,EAAE,CAAC;QACrC,OAAO,GAAG,OAAO,qDAAqD,IAAI,CAAC,IAAI,sBAAsB,CAAC;IACxG,CAAC;IACD,IAAI,GAAG,YAAY,iBAAiB,IAAI,GAAG,EAAE,IAAI,KAAK,eAAe,IAAI,GAAG,EAAE,MAAM,KAAK,GAAG,IAAI,YAAY,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC;QAC3H,OAAO,GAAG,OAAO,IAAI,WAAW,EAAE,CAAC;IACrC,CAAC;IACD,IAAI,GAAG,EAAE,IAAI,KAAK,yBAAyB,IAAI,WAAW,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC;QACzE,OAAO,GAAG,OAAO,kKAAkK,CAAC;IACtL,CAAC;IACD,IAAI,GAAG,EAAE,IAAI,KAAK,gBAAgB,IAAI,GAAG,EAAE,MAAM,KAAK,GAAG,EAAE,CAAC;QAC1D,OAAO,GAAG,OAAO,2EAA2E,CAAC;IAC/F,CAAC;IACD,OAAO,OAAO,CAAC;AACjB,CAAC"}
@@ -526,6 +526,8 @@ export declare const CriticalPathOutput: z.ZodObject<{
526
526
  totalDurationHours: z.ZodNumber;
527
527
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
528
528
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
529
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
530
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
529
531
  tasks: z.ZodArray<z.ZodObject<{
530
532
  taskId: z.ZodString;
531
533
  isCritical: z.ZodBoolean;
@@ -538,6 +540,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
538
540
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
539
541
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
540
542
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
543
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
541
544
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
542
545
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
543
546
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -552,6 +555,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
552
555
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
553
556
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
554
557
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
558
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
555
559
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
556
560
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
557
561
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -566,6 +570,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
566
570
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
567
571
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
568
572
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
573
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
569
574
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
570
575
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
571
576
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -603,6 +608,8 @@ export declare const CriticalPathOutput: z.ZodObject<{
603
608
  totalDurationHours: z.ZodNumber;
604
609
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
605
610
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
611
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
612
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
606
613
  tasks: z.ZodArray<z.ZodObject<{
607
614
  taskId: z.ZodString;
608
615
  isCritical: z.ZodBoolean;
@@ -615,6 +622,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
615
622
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
616
623
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
617
624
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
625
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
618
626
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
619
627
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
620
628
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -629,6 +637,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
629
637
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
630
638
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
631
639
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
640
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
632
641
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
633
642
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
634
643
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -643,6 +652,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
643
652
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
644
653
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
645
654
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
655
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
646
656
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
647
657
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
648
658
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -680,6 +690,8 @@ export declare const CriticalPathOutput: z.ZodObject<{
680
690
  totalDurationHours: z.ZodNumber;
681
691
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
682
692
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
693
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
694
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
683
695
  tasks: z.ZodArray<z.ZodObject<{
684
696
  taskId: z.ZodString;
685
697
  isCritical: z.ZodBoolean;
@@ -692,6 +704,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
692
704
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
693
705
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
694
706
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
707
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
695
708
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
696
709
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
697
710
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -706,6 +719,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
706
719
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
707
720
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
708
721
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
722
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
709
723
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
710
724
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
711
725
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -720,6 +734,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
720
734
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
721
735
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
722
736
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
737
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
723
738
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
724
739
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
725
740
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -759,6 +774,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
759
774
  totalDurationHours: z.ZodNumber;
760
775
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
761
776
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
777
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
778
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
762
779
  tasks: z.ZodArray<z.ZodObject<{
763
780
  taskId: z.ZodString;
764
781
  isCritical: z.ZodBoolean;
@@ -771,6 +788,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
771
788
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
772
789
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
773
790
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
791
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
774
792
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
775
793
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
776
794
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -785,6 +803,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
785
803
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
786
804
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
787
805
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
806
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
788
807
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
789
808
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
790
809
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -799,6 +818,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
799
818
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
800
819
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
801
820
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
821
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
802
822
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
803
823
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
804
824
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -836,6 +856,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
836
856
  totalDurationHours: z.ZodNumber;
837
857
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
838
858
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
859
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
860
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
839
861
  tasks: z.ZodArray<z.ZodObject<{
840
862
  taskId: z.ZodString;
841
863
  isCritical: z.ZodBoolean;
@@ -848,6 +870,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
848
870
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
849
871
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
850
872
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
873
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
851
874
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
852
875
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
853
876
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -862,6 +885,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
862
885
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
863
886
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
864
887
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
888
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
865
889
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
866
890
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
867
891
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -876,6 +900,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
876
900
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
877
901
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
878
902
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
903
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
879
904
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
880
905
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
881
906
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -913,6 +938,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
913
938
  totalDurationHours: z.ZodNumber;
914
939
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
915
940
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
941
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
942
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
916
943
  tasks: z.ZodArray<z.ZodObject<{
917
944
  taskId: z.ZodString;
918
945
  isCritical: z.ZodBoolean;
@@ -925,6 +952,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
925
952
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
926
953
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
927
954
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
955
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
928
956
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
929
957
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
930
958
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -939,6 +967,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
939
967
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
940
968
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
941
969
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
970
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
942
971
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
943
972
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
944
973
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -953,6 +982,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
953
982
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
954
983
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
955
984
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
985
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
956
986
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
957
987
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
958
988
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1019,6 +1049,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1019
1049
  totalDurationHours: z.ZodNumber;
1020
1050
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1021
1051
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1052
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1053
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1022
1054
  tasks: z.ZodArray<z.ZodObject<{
1023
1055
  taskId: z.ZodString;
1024
1056
  isCritical: z.ZodBoolean;
@@ -1031,6 +1063,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1031
1063
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1032
1064
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1033
1065
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1066
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1034
1067
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1035
1068
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1036
1069
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1045,6 +1078,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1045
1078
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1046
1079
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1047
1080
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1081
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1048
1082
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1049
1083
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1050
1084
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1059,6 +1093,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1059
1093
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1060
1094
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1061
1095
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1096
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1062
1097
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1063
1098
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1064
1099
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1096,6 +1131,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1096
1131
  totalDurationHours: z.ZodNumber;
1097
1132
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1098
1133
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1134
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1135
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1099
1136
  tasks: z.ZodArray<z.ZodObject<{
1100
1137
  taskId: z.ZodString;
1101
1138
  isCritical: z.ZodBoolean;
@@ -1108,6 +1145,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1108
1145
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1109
1146
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1110
1147
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1148
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1111
1149
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1112
1150
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1113
1151
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1122,6 +1160,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1122
1160
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1123
1161
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1124
1162
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1163
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1125
1164
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1126
1165
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1127
1166
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1136,6 +1175,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1136
1175
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1137
1176
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1138
1177
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1178
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1139
1179
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1140
1180
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1141
1181
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1173,6 +1213,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1173
1213
  totalDurationHours: z.ZodNumber;
1174
1214
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1175
1215
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1216
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1217
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1176
1218
  tasks: z.ZodArray<z.ZodObject<{
1177
1219
  taskId: z.ZodString;
1178
1220
  isCritical: z.ZodBoolean;
@@ -1185,6 +1227,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1185
1227
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1186
1228
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1187
1229
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1230
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1188
1231
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1189
1232
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1190
1233
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1199,6 +1242,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1199
1242
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1200
1243
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1201
1244
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1245
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1202
1246
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1203
1247
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1204
1248
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1213,6 +1257,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1213
1257
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1214
1258
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1215
1259
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1260
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1216
1261
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1217
1262
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1218
1263
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1279,6 +1324,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1279
1324
  totalDurationHours: z.ZodNumber;
1280
1325
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1281
1326
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1327
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1328
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1282
1329
  tasks: z.ZodArray<z.ZodObject<{
1283
1330
  taskId: z.ZodString;
1284
1331
  isCritical: z.ZodBoolean;
@@ -1291,6 +1338,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1291
1338
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1292
1339
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1293
1340
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1341
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1294
1342
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1295
1343
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1296
1344
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1305,6 +1353,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1305
1353
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1306
1354
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1307
1355
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1356
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1308
1357
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1309
1358
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1310
1359
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1319,6 +1368,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1319
1368
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1320
1369
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1321
1370
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1371
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1322
1372
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1323
1373
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1324
1374
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1356,6 +1406,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1356
1406
  totalDurationHours: z.ZodNumber;
1357
1407
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1358
1408
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1409
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1410
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1359
1411
  tasks: z.ZodArray<z.ZodObject<{
1360
1412
  taskId: z.ZodString;
1361
1413
  isCritical: z.ZodBoolean;
@@ -1368,6 +1420,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1368
1420
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1369
1421
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1370
1422
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1423
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1371
1424
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1372
1425
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1373
1426
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1382,6 +1435,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1382
1435
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1383
1436
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1384
1437
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1438
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1385
1439
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1386
1440
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1387
1441
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1396,6 +1450,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1396
1450
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1397
1451
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1398
1452
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1453
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1399
1454
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1400
1455
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1401
1456
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1433,6 +1488,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1433
1488
  totalDurationHours: z.ZodNumber;
1434
1489
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1435
1490
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1491
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1492
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1436
1493
  tasks: z.ZodArray<z.ZodObject<{
1437
1494
  taskId: z.ZodString;
1438
1495
  isCritical: z.ZodBoolean;
@@ -1445,6 +1502,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1445
1502
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1446
1503
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1447
1504
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1505
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1448
1506
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1449
1507
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1450
1508
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1459,6 +1517,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1459
1517
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1460
1518
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1461
1519
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1520
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1462
1521
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1463
1522
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1464
1523
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1473,6 +1532,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1473
1532
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1474
1533
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1475
1534
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1535
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1476
1536
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1477
1537
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1478
1538
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1 +1 @@
1
- {"version":3,"file":"outputs.d.ts","sourceRoot":"","sources":["../../src/tools/outputs.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAaxB,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;gCAKF,CAAC;AAEzB,eAAO,MAAM,UAAU;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAaF,CAAC;AAUtB,eAAO,MAAM,0BAA0B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAOlB,CAAC;AAEtB,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;gCAKgB,CAAC;AAE9C,eAAO,MAAM,iBAAiB;;;;;;;;;;;;;;;gCAKF,CAAC;AAE7B,eAAO,MAAM,eAAe;;;;;;;;;;;;;;;;;;gCAMD,CAAC;AAE5B,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;gCAKG,CAAC;AA4B9B,eAAO,MAAM,kBAAkB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAW7B,CAAC;AAEH,eAAO,MAAM,2BAA2B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAKtC,CAAC;AAaH,eAAO,MAAM,oBAAoB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAgB/B,CAAC;AAEH,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAM3B,CAAC;AAEH,eAAO,MAAM,yBAAyB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAIpC,CAAC;AAEH,eAAO,MAAM,iBAAiB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAuB5B,CAAC;AAEH,eAAO,MAAM,0BAA0B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAoBrC,CAAC;AAEH,eAAO,MAAM,WAAW;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAKtB,CAAC"}
1
+ {"version":3,"file":"outputs.d.ts","sourceRoot":"","sources":["../../src/tools/outputs.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAaxB,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;gCAKF,CAAC;AAEzB,eAAO,MAAM,UAAU;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAaF,CAAC;AAUtB,eAAO,MAAM,0BAA0B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAOlB,CAAC;AAEtB,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;gCAKgB,CAAC;AAE9C,eAAO,MAAM,iBAAiB;;;;;;;;;;;;;;;gCAKF,CAAC;AAE7B,eAAO,MAAM,eAAe;;;;;;;;;;;;;;;;;;gCAMD,CAAC;AAE5B,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;gCAKG,CAAC;AA6B9B,eAAO,MAAM,kBAAkB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAa7B,CAAC;AAEH,eAAO,MAAM,2BAA2B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAKtC,CAAC;AAaH,eAAO,MAAM,oBAAoB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAgB/B,CAAC;AAEH,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAM3B,CAAC;AAEH,eAAO,MAAM,yBAAyB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAIpC,CAAC;AAEH,eAAO,MAAM,iBAAiB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAuB5B,CAAC;AAEH,eAAO,MAAM,0BAA0B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAoBrC,CAAC;AAEH,eAAO,MAAM,WAAW;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAKtB,CAAC"}
@@ -87,6 +87,7 @@ const TaskScheduleOutput = obj({
87
87
  levelingDelayHours: opt(z.number()).describe('With levelling: hours spent waiting for the assignee'),
88
88
  waitingOn: opt(z.string()).describe('With levelling: the task this one waited for'),
89
89
  isMilestone: opt(z.boolean()).describe('True for a milestone'),
90
+ isSummary: opt(z.boolean()).describe('True for a task with subtasks: its dates and slack are roll-ups of them'),
90
91
  deadlineDate: opt(z.string()).describe("The task's deadline as an instant"),
91
92
  deadlineVarianceHours: opt(z.number()).describe('Working hours from forecast finish to deadline; negative means it will be missed')
92
93
  });
@@ -97,6 +98,8 @@ export const CriticalPathOutput = obj({
97
98
  totalDurationHours: z.number(),
98
99
  criticalTaskIds: z.array(z.string()).describe('Tasks with zero or negative slack, in schedule order'),
99
100
  missedDeadlineTaskIds: opt(z.array(z.string())).describe('Tasks forecast to finish after their deadline'),
101
+ unestimatedTaskIds: opt(z.array(z.string())).describe('Unfinished tasks with no estimate, scheduled for defaultEstimateHours'),
102
+ cyclicTaskIds: opt(z.array(z.string())).describe('Tasks on a dependency cycle; their dates are not reliable'),
100
103
  tasks: z.array(TaskScheduleOutput),
101
104
  leveled: opt(z.boolean()),
102
105
  unleveledProjectEndDate: opt(z.string()).describe('With levelling: the end date before levelling'),
@@ -1 +1 @@
1
- {"version":3,"file":"outputs.js","sourceRoot":"","sources":["../../src/tools/outputs.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB;;;;GAIG;AAEH,MAAM,GAAG,GAAG,CAA0B,KAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;AACjF,sEAAsE;AACtE,MAAM,GAAG,GAAG,CAAyB,MAAS,EAAE,EAAE,CAAC,MAAM,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,CAAC;AAChF,MAAM,SAAS,GAAG,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;AAE7C,MAAM,CAAC,MAAM,aAAa,GAAG,GAAG,CAAC;IAC/B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACvE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE;IAChB,GAAG,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,2BAA2B,CAAC;IAC1D,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC,QAAQ,CAAC,WAAW,CAAC,CAAC;AAEzB,MAAM,CAAC,MAAM,UAAU,GAAG,GAAG,CAAC;IAC5B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACvE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IAClD,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mCAAmC,CAAC;IAClE,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC3B,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACxB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8DAA8D,CAAC;IAClG,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,4BAA4B,CAAC;IACpE,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC5B,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;CAC5B,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;AAEtB,MAAM,oBAAoB,GAAG,GAAG,CAAC;IAC/B,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;IAChE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;IAC7C,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;CACjI,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAC,MAAM,CAAC;IAC1D,YAAY,EAAE,GAAG,CACf,GAAG,CAAC;QACF,SAAS,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,QAAQ,CAAC,sCAAsC,CAAC;QACzF,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,QAAQ,CAAC,0CAA0C,CAAC;KAC/F,CAAC,CACH,CAAC,QAAQ,CAAC,0CAA0C,CAAC;CACvD,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;AAEtB,MAAM,CAAC,MAAM,gBAAgB,GAAG,GAAG,CAAC;IAClC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;IAC7D,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;CACpD,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC,CAAC;AAE9C,MAAM,CAAC,MAAM,iBAAiB,GAAG,GAAG,CAAC;IACnC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CACzB,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC;AAE7B,MAAM,CAAC,MAAM,eAAe,GAAG,GAAG,CAAC;IACjC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACvB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC1B,CAAC,CAAC,QAAQ,CAAC,cAAc,CAAC,CAAC;AAE5B,MAAM,CAAC,MAAM,aAAa,GAAG,GAAG,CAAC;IAC/B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC1B,CAAC,CAAC,QAAQ,CAAC,gBAAgB,CAAC,CAAC;AAE9B,MAAM,oBAAoB,GAAG,GAAG,CAAC;IAC/B,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC3B,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACvB,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,2CAA2C,CAAC;IAC1E,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IAChF,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE;IACf,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC;AAEH,MAAM,kBAAkB,GAAG,GAAG,CAAC;IAC7B,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,CAAC,yDAAyD,CAAC;IAC3F,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,oFAAoF,CAAC;IACrH,iBAAiB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,6CAA6C,CAAC;IAC1F,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,eAAe,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAChC,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC9B,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;IACpG,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACnF,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;IAC9D,YAAY,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,mCAAmC,CAAC;IAC3E,qBAAqB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kFAAkF,CAAC;CACpI,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,GAAG,CAAC;IACpC,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,gBAAgB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACjC,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;IAChE,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE;IAC9B,eAAe,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;IACrG,qBAAqB,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IACzG,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,kBAAkB,CAAC;IAClC,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;IACzB,uBAAuB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IAClG,eAAe,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,CAAC,QAAQ,CAAC,+DAA+D,CAAC;CAC9H,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,GAAG,CAAC;IAC7C,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,kBAAkB,CAAC,CAAC,QAAQ,CAAC,0BAA0B,CAAC;IAC1E,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,wBAAwB,CAAC;IAClE,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;IACzB,eAAe,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC;CAC/C,CAAC,CAAC;AAEH,MAAM,WAAW,GAAG,GAAG,CAAC;IACtB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,4CAA4C,CAAC;IACvE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE;IAChB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;IAC/E,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;IAChD,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE;IACvB,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;IACxB,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,GAAG,CAAC;IACtC,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,KAAK,EAAE,GAAG,CACR,GAAG,CAAC;QACF,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;QAC/E,yBAAyB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;QACvD,mBAAmB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;QACpC,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE;QAC1B,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;QACxB,MAAM,EAAE,CAAC,CAAC,KAAK,CAAC,WAAW,CAAC;KAC7B,CAAC,CACH,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IACjC,QAAQ,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,QAAQ,CAAC,iFAAiF,CAAC;IACpH,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,SAAS,CAAC,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;CACpG,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,GAAG,CAAC;IAClC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,GAAG,CAAC,WAAW,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC;IACvE,QAAQ,EAAE,SAAS,CAAC,QAAQ,CAAC,gGAAgG,CAAC;IAC9H,QAAQ,EAAE,SAAS,CAAC,QAAQ,CAAC,8BAA8B,CAAC;IAC5D,OAAO,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,QAAQ,CAAC,0BAA0B,CAAC;CAC7D,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,GAAG,CAAC;IAC3C,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,MAAM,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IAC3G,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uEAAuE,CAAC;CAC3G,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,GAAG,CAAC;IACnC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,QAAQ,EAAE,GAAG,CAAC;QACZ,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;QAChD,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wFAAwF,CAAC;KACtH,CAAC;IACF,YAAY,EAAE,GAAG,CAAC;QAChB,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE;QAC1B,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE;QACvB,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;QAC5D,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE;QACtB,cAAc,EAAE,CAAC,CAAC,OAAO,EAAE;QAC3B,2BAA2B,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kDAAkD,CAAC;KAC1G,CAAC;IACF,GAAG,EAAE,GAAG,CAAC;QACP,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;QACxB,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE;QACvB,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,oBAAoB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uCAAuC,CAAC;QAClF,wBAAwB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,2CAA2C,CAAC;KAC3F,CAAC;IACF,eAAe,EAAE,SAAS,CAAC,QAAQ,CAAC,gDAAgD,CAAC;IACrF,eAAe,EAAE,yBAAyB;CAC3C,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,GAAG,CAAC;IAC5C,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE;IACpB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACxF,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kCAAkC,CAAC;IAC/E,OAAO,EAAE,CAAC,CAAC,KAAK,CACd,GAAG,CAAC;QACF,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kCAAkC,CAAC;QAC7D,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QAC7D,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,+BAA+B,CAAC;QAC7E,gBAAgB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,mDAAmD,CAAC;KAChG,CAAC,CACH;IACD,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;IACtB,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC9B,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CACpC,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,GAAG,CAAC;IAC7B,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC;IACnH,IAAI,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACrB,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC5B,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,2CAA2C,CAAC;CAC/E,CAAC,CAAC"}
1
+ {"version":3,"file":"outputs.js","sourceRoot":"","sources":["../../src/tools/outputs.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB;;;;GAIG;AAEH,MAAM,GAAG,GAAG,CAA0B,KAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;AACjF,sEAAsE;AACtE,MAAM,GAAG,GAAG,CAAyB,MAAS,EAAE,EAAE,CAAC,MAAM,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,CAAC;AAChF,MAAM,SAAS,GAAG,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;AAE7C,MAAM,CAAC,MAAM,aAAa,GAAG,GAAG,CAAC;IAC/B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACvE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE;IAChB,GAAG,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,2BAA2B,CAAC;IAC1D,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC,QAAQ,CAAC,WAAW,CAAC,CAAC;AAEzB,MAAM,CAAC,MAAM,UAAU,GAAG,GAAG,CAAC;IAC5B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACvE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IAClD,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mCAAmC,CAAC;IAClE,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC3B,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACxB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8DAA8D,CAAC;IAClG,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,4BAA4B,CAAC;IACpE,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC5B,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;CAC5B,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;AAEtB,MAAM,oBAAoB,GAAG,GAAG,CAAC;IAC/B,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;IAChE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;IAC7C,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;CACjI,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAC,MAAM,CAAC;IAC1D,YAAY,EAAE,GAAG,CACf,GAAG,CAAC;QACF,SAAS,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,QAAQ,CAAC,sCAAsC,CAAC;QACzF,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,QAAQ,CAAC,0CAA0C,CAAC;KAC/F,CAAC,CACH,CAAC,QAAQ,CAAC,0CAA0C,CAAC;CACvD,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;AAEtB,MAAM,CAAC,MAAM,gBAAgB,GAAG,GAAG,CAAC;IAClC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;IAC7D,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;CACpD,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC,CAAC;AAE9C,MAAM,CAAC,MAAM,iBAAiB,GAAG,GAAG,CAAC;IACnC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CACzB,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC;AAE7B,MAAM,CAAC,MAAM,eAAe,GAAG,GAAG,CAAC;IACjC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACvB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC1B,CAAC,CAAC,QAAQ,CAAC,cAAc,CAAC,CAAC;AAE5B,MAAM,CAAC,MAAM,aAAa,GAAG,GAAG,CAAC;IAC/B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC1B,CAAC,CAAC,QAAQ,CAAC,gBAAgB,CAAC,CAAC;AAE9B,MAAM,oBAAoB,GAAG,GAAG,CAAC;IAC/B,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC3B,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACvB,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,2CAA2C,CAAC;IAC1E,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IAChF,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE;IACf,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC;AAEH,MAAM,kBAAkB,GAAG,GAAG,CAAC;IAC7B,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,CAAC,yDAAyD,CAAC;IAC3F,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,oFAAoF,CAAC;IACrH,iBAAiB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,6CAA6C,CAAC;IAC1F,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,eAAe,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAChC,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC9B,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;IACpG,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACnF,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;IAC9D,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,yEAAyE,CAAC;IAC/G,YAAY,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,mCAAmC,CAAC;IAC3E,qBAAqB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kFAAkF,CAAC;CACpI,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,GAAG,CAAC;IACpC,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,gBAAgB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACjC,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;IAChE,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE;IAC9B,eAAe,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;IACrG,qBAAqB,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IACzG,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,uEAAuE,CAAC;IAC9H,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,2DAA2D,CAAC;IAC7G,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,kBAAkB,CAAC;IAClC,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;IACzB,uBAAuB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IAClG,eAAe,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,CAAC,QAAQ,CAAC,+DAA+D,CAAC;CAC9H,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,GAAG,CAAC;IAC7C,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,kBAAkB,CAAC,CAAC,QAAQ,CAAC,0BAA0B,CAAC;IAC1E,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,wBAAwB,CAAC;IAClE,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;IACzB,eAAe,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC;CAC/C,CAAC,CAAC;AAEH,MAAM,WAAW,GAAG,GAAG,CAAC;IACtB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,4CAA4C,CAAC;IACvE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE;IAChB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;IAC/E,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;IAChD,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE;IACvB,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;IACxB,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,GAAG,CAAC;IACtC,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,KAAK,EAAE,GAAG,CACR,GAAG,CAAC;QACF,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;QAC/E,yBAAyB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;QACvD,mBAAmB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;QACpC,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE;QAC1B,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;QACxB,MAAM,EAAE,CAAC,CAAC,KAAK,CAAC,WAAW,CAAC;KAC7B,CAAC,CACH,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IACjC,QAAQ,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,QAAQ,CAAC,iFAAiF,CAAC;IACpH,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,SAAS,CAAC,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;CACpG,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,GAAG,CAAC;IAClC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,GAAG,CAAC,WAAW,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC;IACvE,QAAQ,EAAE,SAAS,CAAC,QAAQ,CAAC,gGAAgG,CAAC;IAC9H,QAAQ,EAAE,SAAS,CAAC,QAAQ,CAAC,8BAA8B,CAAC;IAC5D,OAAO,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,QAAQ,CAAC,0BAA0B,CAAC;CAC7D,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,GAAG,CAAC;IAC3C,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,MAAM,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IAC3G,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uEAAuE,CAAC;CAC3G,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,GAAG,CAAC;IACnC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,QAAQ,EAAE,GAAG,CAAC;QACZ,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;QAChD,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wFAAwF,CAAC;KACtH,CAAC;IACF,YAAY,EAAE,GAAG,CAAC;QAChB,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE;QAC1B,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE;QACvB,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;QAC5D,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE;QACtB,cAAc,EAAE,CAAC,CAAC,OAAO,EAAE;QAC3B,2BAA2B,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kDAAkD,CAAC;KAC1G,CAAC;IACF,GAAG,EAAE,GAAG,CAAC;QACP,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;QACxB,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE;QACvB,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,oBAAoB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uCAAuC,CAAC;QAClF,wBAAwB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,2CAA2C,CAAC;KAC3F,CAAC;IACF,eAAe,EAAE,SAAS,CAAC,QAAQ,CAAC,gDAAgD,CAAC;IACrF,eAAe,EAAE,yBAAyB;CAC3C,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,GAAG,CAAC;IAC5C,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE;IACpB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACxF,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kCAAkC,CAAC;IAC/E,OAAO,EAAE,CAAC,CAAC,KAAK,CACd,GAAG,CAAC;QACF,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kCAAkC,CAAC;QAC7D,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QAC7D,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,+BAA+B,CAAC;QAC7E,gBAAgB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,mDAAmD,CAAC;KAChG,CAAC,CACH;IACD,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;IACtB,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC9B,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CACpC,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,GAAG,CAAC;IAC7B,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC;IACnH,IAAI,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACrB,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC5B,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,2CAA2C,CAAC;CAC/E,CAAC,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/mcp",
3
- "version": "0.21.0",
3
+ "version": "0.23.0",
4
4
  "description": "Model Context Protocol (MCP) server, client-side WebMCP tools and agent skills for Critical Path",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -36,8 +36,8 @@
36
36
  "@modelcontextprotocol/sdk": "^1.32.1",
37
37
  "zod": "^3.24.0",
38
38
  "zod-to-json-schema": "^3.25.2",
39
- "@critical-path/client": "0.25.4",
40
- "@critical-path/core": "0.54.0"
39
+ "@critical-path/core": "0.56.0",
40
+ "@critical-path/client": "0.27.0"
41
41
  },
42
42
  "devDependencies": {
43
43
  "@anthropic-ai/sdk": "^0.137.0",
@@ -16,6 +16,7 @@ description: Find what drives a project's end date, how much each task can slip
16
16
 
17
17
  - `projectEndDate` is the forecast finish. With levelling, compare it with `unleveledProjectEndDate`: the gap is time lost waiting for busy people.
18
18
  - `criticalTaskIds` are the tasks with zero or negative slack. Any delay to one of them moves the end date or misses a deadline.
19
+ - `unestimatedTaskIds` lists unfinished tasks with no estimate; each was assumed to take `defaultEstimateHours` (1 by default), so say the forecast is uncertain and suggest estimating them. Entries with `isSummary: true` are parent tasks shown as the span of their subtasks.
19
20
  - `missedDeadlineTaskIds` lists tasks forecast to finish after their `deadline`. Their `deadlineVarianceHours` says by how much (negative working hours), and the negative `totalSlack` on the tasks before them shows which work drives the miss. Entries with `isMilestone: true` are checkpoints such as releases or sign-offs.
20
21
  - Each entry in `tasks` has `slackWorkingHours`: how many working hours the task can slip without moving the end. Under about 8 hours is near-critical.
21
22
  - `levelingDelayHours` and `waitingOn` show a task that waited for its assignee to finish another task.