This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,41 @@
1
1
  # @critical-path/mcp
2
2
 
3
+ ## 0.22.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 5dbf25b: Effort and progress roll-ups agree, count subtasks once and leave canceled work out.
8
+
9
+ - New `getTaskEstimateHours(task)` is the one place that reads an estimate (0 for milestones; an explicit 0 counts). Critical path analysis, workload, the ladder, metrics/EVM and deliverable summaries all use it, along with `getSummaryTaskIds` / `getLeafTasks`.
10
+ - **BREAKING:** a task with subtasks is a summary task. Critical path analysis schedules only leaf tasks: dependencies and deadlines on a summary apply to every leaf under it, and the summary is reported as a roll-up (`isSummary: true`; not in `criticalTaskIds`). Workload, the ladder and deliverable summaries count effort from leaves only, so an epic's estimate no longer doubles its subtasks'.
11
+ - **BREAKING:** canceled tasks leave estimate totals and progress denominators in the ladder and deliverable summaries (their logged hours still count), so a project can reach 100% and `completed`. Canceled tasks have zero planned and earned value in EVM. The ladder and deliverable summaries use inferred progress (`inferTaskProgress`) like task metrics.
12
+ - Unestimated tasks are listed in `unestimatedTaskIds`, and the hours assumed for them are configurable: `defaultEstimateHours` per call (`?defaultEstimateHours=` over HTTP, client and MCP options) or `criticalPathDefaultEstimateHours` on the engine. Default 1, as before.
13
+
14
+ ### Patch Changes
15
+
16
+ - Updated dependencies [5dbf25b]
17
+ - @critical-path/core@0.55.0
18
+ - @critical-path/client@0.26.0
19
+
20
+ ## 0.21.0
21
+
22
+ ### Minor Changes
23
+
24
+ - 1021eb5: Status, workflow and effort integrity.
25
+
26
+ - **BREAKING:** a task's `status` must be one of its project's statuses (`statusDefinitions`, else the workflow's), on create and update (`400` otherwise). Unknown keys are no longer guessed from their spelling (`unfinished` was treated as completed); `resolveStatusDefinition` returns `not_started` for them.
27
+ - **BREAKING:** derived task fields are rejected in request bodies and left out of `CreateTaskInput`: `semanticStatus`, `loggedHours`, `actualHours`, `billableHours`, `actualDurationSeconds`, `actualDurationMinutes`, `billableDurationMinutes`, `inProgressSince`, `blockedSince`, `blockedDurationSeconds`. `semanticStatus` is always derived from the status, so CPM, metrics and lifecycle agree. Hours come from time entries.
28
+ - `actualHours` is no longer overwritten with wall-clock time when a task leaves in-progress (logged effort was being lost). Elapsed time stays in `actualDurationSeconds` / `actualDurationMinutes`.
29
+ - **BREAKING:** changing a project's statuses (`workflowId`, `workflow` or `statusDefinitions`) requires `statusMapping` for every status its tasks are in that the project will no longer have (`engine.updateProject(id, updates, { statusMapping })`, or `statusMapping` in the `PATCH /projects/:id` body); tasks are moved in the same operation. Deleting a workflow that a project uses, or removing a status tasks are in, is refused with the new `ConflictError` (`409`).
30
+ - New projects are pinned to the workflow they start with, so a later default does not move them.
31
+ - MCP: new `log_time` tool; `update_task` no longer takes `loggedHours`.
32
+
33
+ ### Patch Changes
34
+
35
+ - Updated dependencies [1021eb5]
36
+ - @critical-path/core@0.54.0
37
+ - @critical-path/client@0.25.4
38
+
3
39
  ## 0.20.1
4
40
 
5
41
  ### Patch Changes
package/README.md CHANGED
@@ -178,7 +178,8 @@ handle.unregister();
178
178
  | `list_tasks` | core | Finding tasks; returns `{ tasks, nextCursor }` | `{ projectId?, status?, priority?, assigneeId?, iterationId?, deliverableId?, containerId?, parentId? ('none' = top-level), limit?, cursor? }` |
179
179
  | `get_task` | core | One task's full record; with `includeDependencies`, what it waits for (`dependsOn`) and what waits for it (`dependents`) | `{ id, includeDependencies? }` |
180
180
  | `create_task` | core | Adding work (auto-scoped in WebMCP) | `{ projectId?, title, description?, priority?, status?, estimatedHours?, allocation?, deadline?, isMilestone? }` |
181
- | `update_task` | core | Changing status, priority, assignee, estimates, logged hours, deadline | `{ id, title?, status?, priority?, assigneeId?, allocation?, loggedHours?, deadline?, isMilestone? }` |
181
+ | `update_task` | core | Changing status, priority, assignee, estimates, deadline | `{ id, title?, status?, priority?, assigneeId?, allocation?, deadline?, isMilestone? }` |
182
+ | `log_time` | core | Recording hours worked (the only way to add logged hours) | `{ taskId, hours, description?, isBillable?, loggedAt? }` |
182
183
  | `delete_task` | core | Permanent deletion (`destructiveHint`) | `{ id }` |
183
184
  | `add_dependency` | core | Making a task wait for another, so the critical path orders them; idempotent, refuses loops | `{ taskId, dependsOnTaskId, type? ('blocking' \| 'relates_to') }` |
184
185
  | `remove_dependency` | core | Removing that link, by the same two task ids; returns `{ removed, dependencyIds }` | `{ taskId, dependsOnTaskId, type? }` |
@@ -2,7 +2,7 @@ export const SKILL_CATALOG = [
2
2
  {
3
3
  "name": "analyze-schedule",
4
4
  "description": "Find what drives a project's end date, how much each task can slip and where people are double-booked, then recommend fixes. Use for \"when will we finish?\", \"what is critical?\" or deadline-risk questions.",
5
- "content": "---\nname: analyze-schedule\ndescription: Find what drives a project's end date, how much each task can slip and where people are double-booked, then recommend fixes. Use for \"when will we finish?\", \"what is critical?\" or deadline-risk questions.\n---\n\n# Analyze the schedule\n\n## 1. Run the schedule\n\n1. Get the `projectId` (`list_projects`).\n2. Call `calculate_critical_path` with `calendars: \"assignee\"` and `levelResources: true`, so each person works on one task at a time on their own calendar. If the user wants the ideal schedule with unlimited people, call it with no options instead.\n3. If the question spans projects that share people, call `calculate_portfolio_critical_path` with their `projectIds` (and `projectOrder` if the user ranked them) instead.\n4. For in-flight projects, pass `effort: \"remaining\"` so finished hours are not scheduled again.\n\n## 2. Read the result\n\n- `projectEndDate` is the forecast finish. With levelling, compare it with `unleveledProjectEndDate`: the gap is time lost waiting for busy people.\n- `criticalTaskIds` are the tasks with zero or negative slack. Any delay to one of them moves the end date or misses a deadline.\n- `missedDeadlineTaskIds` lists tasks forecast to finish after their `deadline`. Their `deadlineVarianceHours` says by how much (negative working hours), and the negative `totalSlack` on the tasks before them shows which work drives the miss. Entries with `isMilestone: true` are checkpoints such as releases or sign-offs.\n- Each entry in `tasks` has `slackWorkingHours`: how many working hours the task can slip without moving the end. Under about 8 hours is near-critical.\n- `levelingDelayHours` and `waitingOn` show a task that waited for its assignee to finish another task.\n- `overallocations` lists periods where a person (`assigneeId`) or team (`teamId`) is booked above `capacity`; `allocation` 1.5 means 150%.\n\nLook up titles for the task ids you mention with `get_task` or `list_tasks`; report titles, not ids. To see why a critical task cannot start earlier, call `get_task` with `includeDependencies: true`: `dependencies.dependsOn` lists what it waits for and `dependencies.dependents` what waits for it.\n\n## 3. Recommend\n\nRank fixes by how much they pull the end date in:\n\n1. **Unblock critical tasks.** A critical task with `isBlocked: true` delays everything; say what it waits for.\n2. **Move work off the bottleneck person.** If critical tasks wait on one assignee (`waitingOn`), suggest reassigning a non-critical task of theirs.\n3. **Remove false dependencies.** A critical task waiting on work it does not really need (`dependencies.dependsOn`) can start earlier once the link is removed.\n4. **Split long critical tasks** so parts can run in parallel.\n5. **Cut or defer** tasks feeding late deliverables, if dates are fixed.\n\nShow the recommendation to the user. Change tasks (`update_task`) or dependencies (`add_dependency`, `remove_dependency`) only when they ask, then run the schedule again to show the effect.\n\n## Report format\n\n- Forecast finish date, and against any deadline the user gave. If the user gives a date that is not yet on a task, offer to record it as a `deadline` (on a milestone task with `isMilestone: true` if it is a checkpoint) so later runs track it.\n- Each milestone: forecast date against its deadline.\n- Critical path: task titles in order, with assignee.\n- Top risks: near-critical tasks, blocked critical tasks, over-allocations.\n- Recommended actions, each with its expected effect.\n"
5
+ "content": "---\nname: analyze-schedule\ndescription: Find what drives a project's end date, how much each task can slip and where people are double-booked, then recommend fixes. Use for \"when will we finish?\", \"what is critical?\" or deadline-risk questions.\n---\n\n# Analyze the schedule\n\n## 1. Run the schedule\n\n1. Get the `projectId` (`list_projects`).\n2. Call `calculate_critical_path` with `calendars: \"assignee\"` and `levelResources: true`, so each person works on one task at a time on their own calendar. If the user wants the ideal schedule with unlimited people, call it with no options instead.\n3. If the question spans projects that share people, call `calculate_portfolio_critical_path` with their `projectIds` (and `projectOrder` if the user ranked them) instead.\n4. For in-flight projects, pass `effort: \"remaining\"` so finished hours are not scheduled again.\n\n## 2. Read the result\n\n- `projectEndDate` is the forecast finish. With levelling, compare it with `unleveledProjectEndDate`: the gap is time lost waiting for busy people.\n- `criticalTaskIds` are the tasks with zero or negative slack. Any delay to one of them moves the end date or misses a deadline.\n- `unestimatedTaskIds` lists unfinished tasks with no estimate; each was assumed to take `defaultEstimateHours` (1 by default), so say the forecast is uncertain and suggest estimating them. Entries with `isSummary: true` are parent tasks shown as the span of their subtasks.\n- `missedDeadlineTaskIds` lists tasks forecast to finish after their `deadline`. Their `deadlineVarianceHours` says by how much (negative working hours), and the negative `totalSlack` on the tasks before them shows which work drives the miss. Entries with `isMilestone: true` are checkpoints such as releases or sign-offs.\n- Each entry in `tasks` has `slackWorkingHours`: how many working hours the task can slip without moving the end. Under about 8 hours is near-critical.\n- `levelingDelayHours` and `waitingOn` show a task that waited for its assignee to finish another task.\n- `overallocations` lists periods where a person (`assigneeId`) or team (`teamId`) is booked above `capacity`; `allocation` 1.5 means 150%.\n\nLook up titles for the task ids you mention with `get_task` or `list_tasks`; report titles, not ids. To see why a critical task cannot start earlier, call `get_task` with `includeDependencies: true`: `dependencies.dependsOn` lists what it waits for and `dependencies.dependents` what waits for it.\n\n## 3. Recommend\n\nRank fixes by how much they pull the end date in:\n\n1. **Unblock critical tasks.** A critical task with `isBlocked: true` delays everything; say what it waits for.\n2. **Move work off the bottleneck person.** If critical tasks wait on one assignee (`waitingOn`), suggest reassigning a non-critical task of theirs.\n3. **Remove false dependencies.** A critical task waiting on work it does not really need (`dependencies.dependsOn`) can start earlier once the link is removed.\n4. **Split long critical tasks** so parts can run in parallel.\n5. **Cut or defer** tasks feeding late deliverables, if dates are fixed.\n\nShow the recommendation to the user. Change tasks (`update_task`) or dependencies (`add_dependency`, `remove_dependency`) only when they ask, then run the schedule again to show the effect.\n\n## Report format\n\n- Forecast finish date, and against any deadline the user gave. If the user gives a date that is not yet on a task, offer to record it as a `deadline` (on a milestone task with `isMilestone: true` if it is a checkpoint) so later runs track it.\n- Each milestone: forecast date against its deadline.\n- Critical path: task titles in order, with assignee.\n- Top risks: near-critical tasks, blocked critical tasks, over-allocations.\n- Recommended actions, each with its expected effect.\n"
6
6
  },
7
7
  {
8
8
  "name": "investigate-task",
@@ -1 +1 @@
1
- {"version":3,"file":"catalog.generated.js","sourceRoot":"","sources":["../../src/skills/catalog.generated.ts"],"names":[],"mappings":"AAGA,MAAM,CAAC,MAAM,aAAa,GAAY;IACpC;QACE,MAAM,EAAE,kBAAkB;QAC1B,aAAa,EAAE,kNAAkN;QACjO,SAAS,EAAE,+9GAA+9G;KAC3+G;IACD;QACE,MAAM,EAAE,kBAAkB;QAC1B,aAAa,EAAE,0JAA0J;QACzK,SAAS,EAAE,uhFAAuhF;KACniF;IACD;QACE,MAAM,EAAE,eAAe;QACvB,aAAa,EAAE,yKAAyK;QACxL,SAAS,EAAE,o+DAAo+D;KACh/D;IACD;QACE,MAAM,EAAE,cAAc;QACtB,aAAa,EAAE,kNAAkN;QACjO,SAAS,EAAE,u5GAAu5G;KACn6G;IACD;QACE,MAAM,EAAE,eAAe;QACvB,aAAa,EAAE,iNAAiN;QAChO,SAAS,EAAE,syEAAsyE;KAClzE;IACD;QACE,MAAM,EAAE,cAAc;QACtB,aAAa,EAAE,0KAA0K;QACzL,SAAS,EAAE,8oEAA8oE;KAC1pE;CACF,CAAC"}
1
+ {"version":3,"file":"catalog.generated.js","sourceRoot":"","sources":["../../src/skills/catalog.generated.ts"],"names":[],"mappings":"AAGA,MAAM,CAAC,MAAM,aAAa,GAAY;IACpC;QACE,MAAM,EAAE,kBAAkB;QAC1B,aAAa,EAAE,kNAAkN;QACjO,SAAS,EAAE,mvHAAmvH;KAC/vH;IACD;QACE,MAAM,EAAE,kBAAkB;QAC1B,aAAa,EAAE,0JAA0J;QACzK,SAAS,EAAE,uhFAAuhF;KACniF;IACD;QACE,MAAM,EAAE,eAAe;QACvB,aAAa,EAAE,yKAAyK;QACxL,SAAS,EAAE,o+DAAo+D;KACh/D;IACD;QACE,MAAM,EAAE,cAAc;QACtB,aAAa,EAAE,kNAAkN;QACjO,SAAS,EAAE,u5GAAu5G;KACn6G;IACD;QACE,MAAM,EAAE,eAAe;QACvB,aAAa,EAAE,iNAAiN;QAChO,SAAS,EAAE,syEAAsyE;KAClzE;IACD;QACE,MAAM,EAAE,cAAc;QACtB,aAAa,EAAE,0KAA0K;QACzL,SAAS,EAAE,8oEAA8oE;KAC1pE;CACF,CAAC"}
@@ -123,7 +123,6 @@ export declare const updateTaskTool: ToolDefinition<{
123
123
  tags?: string[];
124
124
  estimatedHours?: number;
125
125
  allocation?: number;
126
- loggedHours?: number;
127
126
  isBlocked?: boolean;
128
127
  blockedReason?: string;
129
128
  customFields?: Record<string, unknown>;
@@ -131,6 +130,13 @@ export declare const updateTaskTool: ToolDefinition<{
131
130
  export declare const deleteTaskTool: ToolDefinition<{
132
131
  id: string;
133
132
  }, any>;
133
+ export declare const logTimeTool: ToolDefinition<{
134
+ taskId: string;
135
+ hours: number;
136
+ description?: string;
137
+ isBillable?: boolean;
138
+ loggedAt?: string;
139
+ }, any>;
134
140
  export declare const addDependencyTool: ToolDefinition<{
135
141
  taskId: string;
136
142
  dependsOnTaskId: string;
@@ -168,6 +174,7 @@ export declare const calculatePortfolioCriticalPathTool: ToolDefinition<{
168
174
  levelResources?: boolean;
169
175
  levelingPriority?: "slack" | "priority" | "dueDate" | "order";
170
176
  effort?: "estimate" | "remaining";
177
+ defaultEstimateHours?: number;
171
178
  }, any>;
172
179
  export declare const calculateCriticalPathTool: ToolDefinition<{
173
180
  projectId?: string;
@@ -175,6 +182,7 @@ export declare const calculateCriticalPathTool: ToolDefinition<{
175
182
  levelResources?: boolean;
176
183
  levelingPriority?: "slack" | "priority" | "dueDate" | "order";
177
184
  effort?: "estimate" | "remaining";
185
+ defaultEstimateHours?: number;
178
186
  }, any>;
179
187
  export declare const getTimelineLadderTool: ToolDefinition<{
180
188
  projectId?: string;
@@ -1 +1 @@
1
- {"version":3,"file":"definitions.d.ts","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB,OAAO,KAAK,EAAE,kBAAkB,EAA6C,MAAM,qBAAqB,CAAC;AAEzG,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAmBhE,MAAM,MAAM,cAAc,GAAG,kBAAkB,GAAG,kBAAkB,CAAC;AAErE;;;GAGG;AACH,eAAO,MAAM,QAAQ;;;;;;CAMX,CAAC;AAEX,MAAM,MAAM,WAAW,GAAG,MAAM,OAAO,QAAQ,CAAC;AAEhD,qCAAqC;AACrC,MAAM,WAAW,eAAe;IAC9B,yCAAyC;IACzC,YAAY,EAAE,OAAO,CAAC;IACtB,8FAA8F;IAC9F,eAAe,EAAE,OAAO,CAAC;IACzB,sEAAsE;IACtE,cAAc,EAAE,OAAO,CAAC;IACxB,mEAAmE;IACnE,aAAa,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,cAAc,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd;;;OAGG;IACH,WAAW,EAAE,MAAM,CAAC;IACpB,OAAO,EAAE,WAAW,CAAC;IACrB,SAAS,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC;IAC5B,oFAAoF;IACpF,WAAW,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACrC,sGAAsG;IACtG,eAAe,EAAE,CAAC,CAAC,UAAU,CAAC;IAC9B,wGAAwG;IACxG,YAAY,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACtC,WAAW,EAAE,eAAe,CAAC;IAC7B,OAAO,EAAE,CAAC,IAAI,EAAE,OAAO,EAAE,MAAM,EAAE,cAAc,EAAE,cAAc,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,KAAK,OAAO,CAAC,OAAO,CAAC,CAAC;CAC/G;AAED,KAAK,QAAQ,CAAC,OAAO,EAAE,OAAO,IAAI,IAAI,CAAC,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,cAAc,GAAG,aAAa,CAAC,GAAG;IACzH,WAAW,CAAC,EAAE,OAAO,CAAC,eAAe,CAAC,CAAC;CACxC,CAAC;AAOF;;;GAGG;AACH,wBAAgB,UAAU,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG,EAAE,IAAI,EAAE,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,GAAG,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,CAa3H;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM;CAI9C;AAED;;;GAGG;AACH,wBAAgB,aAAa,CAAC,OAAO,EAAE,IAAI,EAAE,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,OAAO,GAAG,OAAO,CAU5F;AAGD,wBAAsB,cAAc,CAAC,MAAM,EAAE,cAAc;;GAG1D;AAED,eAAO,MAAM,gBAAgB;;EAY3B,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAcnD,CAAC;AAEH,eAAO,MAAM,iBAAiB;UAAsB,MAAM;kBAAgB,MAAM;UAAQ,MAAM;mBAAiB,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAgBpI,CAAC;AAEH,eAAO,MAAM,aAAa;gBACZ,MAAM;aACT,MAAM;eACJ,MAAM;iBACJ,MAAM;kBACL,MAAM;oBACJ,MAAM;kBACR,MAAM;eACT,MAAM;YACT,MAAM;aACL,MAAM;OAoCf,CAAC;AAEH,eAAO,MAAM,WAAW;QAAoB,MAAM;0BAAwB,OAAO;OAwC/E,CAAC;AA0BH,eAAO,MAAM,cAAc;gBACb,MAAM;WACX,MAAM;kBACC,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;eACL,MAAM;kBACH,OAAO;WACd,MAAM,EAAE;qBACE,MAAM;iBACV,MAAM;gBACP,OAAO;oBACH,MAAM;mBACP,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAuDtC,CAAC;AAEH,eAAO,MAAM,cAAc;QACrB,MAAM;YACF,MAAM;kBACA,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;eACL,MAAM;kBACH,OAAO;WACd,MAAM,EAAE;qBACE,MAAM;iBACV,MAAM;kBACL,MAAM;gBACR,OAAO;oBACH,MAAM;mBACP,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAoCtC,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAenD,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;qBAAmB,MAAM;WAAS,UAAU,GAAG,YAAY;OAwBrH,CAAC;AAEH,eAAO,MAAM,oBAAoB;YAAwB,MAAM;qBAAmB,MAAM;WAAS,UAAU,GAAG,YAAY;OAgCxH,CAAC;AAEH,eAAO,MAAM,oBAAoB;gBAA4B,MAAM;OAmBjE,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;WACX,MAAM;kBACC,MAAM;cACV,MAAM;cACN,MAAM,EAAE;mBACH,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OA2BtC,CAAC;AAEH,eAAO,MAAM,gBAAgB;YAAwB,MAAM;OAiBzD,CAAC;AAEH,eAAO,MAAM,cAAc;YAAwB,MAAM;aAAW,MAAM;mBAAiB,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAehH,CAAC;AAEH,eAAO,MAAM,kCAAkC;iBAChC,MAAM,EAAE;mBACN,MAAM,EAAE;wBACH,OAAO;gBACf,SAAS,GAAG,UAAU;qBACjB,OAAO;uBACL,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO;aACpD,UAAU,GAAG,WAAW;OA4BjC,CAAC;AAEH,eAAO,MAAM,yBAAyB;gBACxB,MAAM;gBACN,SAAS,GAAG,UAAU;qBACjB,OAAO;uBACL,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO;aACpD,UAAU,GAAG,WAAW;OAoCjC,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;YACV,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK;kBACnC,MAAM;kBACN,MAAM;OA0BpB,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;OAc1D,CAAC;AAEH,eAAO,MAAM,kBAAkB;YAAwB,MAAM;OAc3D,CAAC;AAEH,eAAO,MAAM,0BAA0B;YAAwB,MAAM;OAcnE,CAAC;AAEH,eAAO,MAAM,2BAA2B;gBAC1B,MAAM;gBACN,MAAM;cACR,MAAM;eACL,KAAK,GAAG,MAAM,GAAG,OAAO;cACzB,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ;aACzD,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS;iCAC5B,MAAM;OA6BnC,CAAC;AAEH,eAAO,MAAM,YAAY;WAAuB,MAAM;OAqBpD,CAAC;AAEH,eAAO,MAAM,SAAS,EAAE,cAAc,EAuBrC,CAAC;AAEF,eAAO,MAAM,QAAQ,uCAEpB,CAAC;AAEF,MAAM,WAAW,aAAa;IAC5B,0FAA0F;IAC1F,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,mFAAmF;IACnF,QAAQ,CAAC,EAAE,WAAW,EAAE,CAAC;IACzB,6CAA6C;IAC7C,QAAQ,CAAC,EAAE,OAAO,CAAC;CACpB;AAED;;;;GAIG;AACH,wBAAgB,WAAW,CAAC,SAAS,GAAE,aAAkB,GAAG,cAAc,EAAE,CAgB3E;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,OAAO,EAAE,MAAM;CAI5B;AAKD;;;;GAIG;AACH,wBAAsB,OAAO,CAC3B,IAAI,EAAE,cAAc,EACpB,IAAI,EAAE,OAAO,EACb,MAAM,EAAE,cAAc,EACtB,cAAc,CAAC,EAAE;IAAE,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,GACtC,OAAO,CAAC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,CAWlC"}
1
+ {"version":3,"file":"definitions.d.ts","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB,OAAO,KAAK,EAAE,kBAAkB,EAA6C,MAAM,qBAAqB,CAAC;AAEzG,OAAO,KAAK,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAoBhE,MAAM,MAAM,cAAc,GAAG,kBAAkB,GAAG,kBAAkB,CAAC;AAErE;;;GAGG;AACH,eAAO,MAAM,QAAQ;;;;;;CAMX,CAAC;AAEX,MAAM,MAAM,WAAW,GAAG,MAAM,OAAO,QAAQ,CAAC;AAEhD,qCAAqC;AACrC,MAAM,WAAW,eAAe;IAC9B,yCAAyC;IACzC,YAAY,EAAE,OAAO,CAAC;IACtB,8FAA8F;IAC9F,eAAe,EAAE,OAAO,CAAC;IACzB,sEAAsE;IACtE,cAAc,EAAE,OAAO,CAAC;IACxB,mEAAmE;IACnE,aAAa,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,cAAc,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd;;;OAGG;IACH,WAAW,EAAE,MAAM,CAAC;IACpB,OAAO,EAAE,WAAW,CAAC;IACrB,SAAS,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC;IAC5B,oFAAoF;IACpF,WAAW,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACrC,sGAAsG;IACtG,eAAe,EAAE,CAAC,CAAC,UAAU,CAAC;IAC9B,wGAAwG;IACxG,YAAY,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACtC,WAAW,EAAE,eAAe,CAAC;IAC7B,OAAO,EAAE,CAAC,IAAI,EAAE,OAAO,EAAE,MAAM,EAAE,cAAc,EAAE,cAAc,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,KAAK,OAAO,CAAC,OAAO,CAAC,CAAC;CAC/G;AAED,KAAK,QAAQ,CAAC,OAAO,EAAE,OAAO,IAAI,IAAI,CAAC,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,cAAc,GAAG,aAAa,CAAC,GAAG;IACzH,WAAW,CAAC,EAAE,OAAO,CAAC,eAAe,CAAC,CAAC;CACxC,CAAC;AAOF;;;GAGG;AACH,wBAAgB,UAAU,CAAC,OAAO,GAAG,GAAG,EAAE,OAAO,GAAG,GAAG,EAAE,IAAI,EAAE,QAAQ,CAAC,OAAO,EAAE,OAAO,CAAC,GAAG,cAAc,CAAC,OAAO,EAAE,OAAO,CAAC,CAa3H;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,QAAQ,EAAE,MAAM,EAAE,OAAO,EAAE,MAAM;CAI9C;AAED;;;GAGG;AACH,wBAAgB,aAAa,CAAC,OAAO,EAAE,IAAI,EAAE,cAAc,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,OAAO,GAAG,OAAO,CAU5F;AAGD,wBAAsB,cAAc,CAAC,MAAM,EAAE,cAAc;;GAG1D;AAED,eAAO,MAAM,gBAAgB;;EAY3B,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAcnD,CAAC;AAEH,eAAO,MAAM,iBAAiB;UAAsB,MAAM;kBAAgB,MAAM;UAAQ,MAAM;mBAAiB,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAgBpI,CAAC;AAEH,eAAO,MAAM,aAAa;gBACZ,MAAM;aACT,MAAM;eACJ,MAAM;iBACJ,MAAM;kBACL,MAAM;oBACJ,MAAM;kBACR,MAAM;eACT,MAAM;YACT,MAAM;aACL,MAAM;OAoCf,CAAC;AAEH,eAAO,MAAM,WAAW;QAAoB,MAAM;0BAAwB,OAAO;OAwC/E,CAAC;AA0BH,eAAO,MAAM,cAAc;gBACb,MAAM;WACX,MAAM;kBACC,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;eACL,MAAM;kBACH,OAAO;WACd,MAAM,EAAE;qBACE,MAAM;iBACV,MAAM;gBACP,OAAO;oBACH,MAAM;mBACP,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAuDtC,CAAC;AAEH,eAAO,MAAM,cAAc;QACrB,MAAM;YACF,MAAM;kBACA,MAAM;aACX,MAAM;eACJ,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM;iBAC3C,MAAM;cACT,MAAM;eACL,MAAM;kBACH,OAAO;WACd,MAAM,EAAE;qBACE,MAAM;iBACV,MAAM;gBACP,OAAO;oBACH,MAAM;mBACP,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAmCtC,CAAC;AAEH,eAAO,MAAM,cAAc;QAAoB,MAAM;OAenD,CAAC;AAEH,eAAO,MAAM,WAAW;YAAwB,MAAM;WAAS,MAAM;kBAAgB,MAAM;iBAAe,OAAO;eAAa,MAAM;OAelI,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;qBAAmB,MAAM;WAAS,UAAU,GAAG,YAAY;OAwBrH,CAAC;AAEH,eAAO,MAAM,oBAAoB;YAAwB,MAAM;qBAAmB,MAAM;WAAS,UAAU,GAAG,YAAY;OAgCxH,CAAC;AAEH,eAAO,MAAM,oBAAoB;gBAA4B,MAAM;OAmBjE,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;WACX,MAAM;kBACC,MAAM;cACV,MAAM;cACN,MAAM,EAAE;mBACH,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OA2BtC,CAAC;AAEH,eAAO,MAAM,gBAAgB;YAAwB,MAAM;OAiBzD,CAAC;AAEH,eAAO,MAAM,cAAc;YAAwB,MAAM;aAAW,MAAM;mBAAiB,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC;OAehH,CAAC;AAEH,eAAO,MAAM,kCAAkC;iBAChC,MAAM,EAAE;mBACN,MAAM,EAAE;wBACH,OAAO;gBACf,SAAS,GAAG,UAAU;qBACjB,OAAO;uBACL,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO;aACpD,UAAU,GAAG,WAAW;2BACV,MAAM;OAiC7B,CAAC;AAEH,eAAO,MAAM,yBAAyB;gBACxB,MAAM;gBACN,SAAS,GAAG,UAAU;qBACjB,OAAO;uBACL,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO;aACpD,UAAU,GAAG,WAAW;2BACV,MAAM;OAyC7B,CAAC;AAEH,eAAO,MAAM,qBAAqB;gBACpB,MAAM;YACV,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK;kBACnC,MAAM;kBACN,MAAM;OA0BpB,CAAC;AAEH,eAAO,MAAM,iBAAiB;YAAwB,MAAM;OAc1D,CAAC;AAEH,eAAO,MAAM,kBAAkB;YAAwB,MAAM;OAc3D,CAAC;AAEH,eAAO,MAAM,0BAA0B;YAAwB,MAAM;OAcnE,CAAC;AAEH,eAAO,MAAM,2BAA2B;gBAC1B,MAAM;gBACN,MAAM;cACR,MAAM;eACL,KAAK,GAAG,MAAM,GAAG,OAAO;cACzB,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ;aACzD,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS;iCAC5B,MAAM;OA6BnC,CAAC;AAEH,eAAO,MAAM,YAAY;WAAuB,MAAM;OAqBpD,CAAC;AAEH,eAAO,MAAM,SAAS,EAAE,cAAc,EAwBrC,CAAC;AAEF,eAAO,MAAM,QAAQ,uCAEpB,CAAC;AAEF,MAAM,WAAW,aAAa;IAC5B,0FAA0F;IAC1F,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;IACjB,mFAAmF;IACnF,QAAQ,CAAC,EAAE,WAAW,EAAE,CAAC;IACzB,6CAA6C;IAC7C,QAAQ,CAAC,EAAE,OAAO,CAAC;CACpB;AAED;;;;GAIG;AACH,wBAAgB,WAAW,CAAC,SAAS,GAAE,aAAkB,GAAG,cAAc,EAAE,CAgB3E;AAED,qBAAa,iBAAkB,SAAQ,KAAK;gBAC9B,OAAO,EAAE,MAAM;CAI5B;AAKD;;;;GAIG;AACH,wBAAsB,OAAO,CAC3B,IAAI,EAAE,cAAc,EACpB,IAAI,EAAE,OAAO,EACb,MAAM,EAAE,cAAc,EACtB,cAAc,CAAC,EAAE;IAAE,SAAS,CAAC,EAAE,MAAM,CAAA;CAAE,GACtC,OAAO,CAAC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,CAWlC"}
@@ -1,7 +1,7 @@
1
1
  import { z } from 'zod';
2
2
  import { zodToJsonSchema } from 'zod-to-json-schema';
3
3
  import { precedenceOf } from '@critical-path/core';
4
- import { ProjectOutput, TaskOutput, TaskWithDependenciesOutput, DependencyOutput, DeliverableOutput, CommentOutput, CriticalPathOutput, PortfolioCriticalPathOutput, TimelineLadderOutput, TaskLadderOutput, TaskMetricsOutput, TaskProgressHistoryOutput, WorkloadDistributionOutput, SkillOutput } from './outputs.js';
4
+ import { ProjectOutput, TaskOutput, TaskWithDependenciesOutput, DependencyOutput, DeliverableOutput, CommentOutput, TimeEntryOutput, CriticalPathOutput, PortfolioCriticalPathOutput, TimelineLadderOutput, TaskLadderOutput, TaskMetricsOutput, TaskProgressHistoryOutput, WorkloadDistributionOutput, SkillOutput } from './outputs.js';
5
5
  import { SKILLS, getSkill } from '../skills/index.js';
6
6
  /**
7
7
  * Groups of related tools. Hosts expose only the groups an agent needs (`toolsets` option), which
@@ -253,7 +253,7 @@ export const createTaskTool = defineTool({
253
253
  export const updateTaskTool = defineTool({
254
254
  name: 'update_task',
255
255
  title: 'Update Task',
256
- description: 'Change an existing task: title, description, status, priority, assignee, due date, deadline, milestone flag, estimate, logged hours, allocation, blocked state, tags or custom fields. Only the fields you pass change. Use it to move a task through its workflow or re-plan it. Returns the updated task.',
256
+ description: 'Change an existing task: title, description, status, priority, assignee, due date, deadline, milestone flag, estimate, allocation, blocked state, tags or custom fields. Only the fields you pass change. Use it to move a task through its workflow or re-plan it. Returns the updated task.',
257
257
  toolset: 'core',
258
258
  outputZodSchema: TaskOutput,
259
259
  zodSchema: z.object({
@@ -274,7 +274,6 @@ export const updateTaskTool = defineTool({
274
274
  .max(1)
275
275
  .optional()
276
276
  .describe("Share of the assignee's time the task takes, in (0, 1]; e.g. 0.5 for half-time. Estimates are effort, so a 0.5 task takes twice as long"),
277
- loggedHours: z.number().optional().describe('Total hours worked so far'),
278
277
  isBlocked: z.boolean().optional().describe('Whether the task is blocked'),
279
278
  blockedReason: z.string().optional().describe('Reason why the task is blocked'),
280
279
  customFields: z.record(z.unknown()).optional().describe('Custom field values as a JSON object (validated against the project\'s field definitions for tasks)')
@@ -300,6 +299,21 @@ export const deleteTaskTool = defineTool({
300
299
  return { success };
301
300
  }
302
301
  });
302
+ export const logTimeTool = defineTool({
303
+ name: 'log_time',
304
+ title: 'Log Time',
305
+ description: "Record time worked on a task. The task's logged hours are the sum of its time entries, so this is how hours are added (they cannot be set directly). Returns the time entry.",
306
+ toolset: 'core',
307
+ outputZodSchema: TimeEntryOutput,
308
+ zodSchema: z.object({
309
+ taskId: z.string().describe('The task worked on'),
310
+ hours: z.number().positive().describe('Hours worked, e.g. 1.5'),
311
+ description: z.string().optional().describe('What was done'),
312
+ isBillable: z.boolean().optional().describe('Whether the time is billable (default true)'),
313
+ loggedAt: z.string().optional().describe('When the work was done (ISO date-time; default now)')
314
+ }),
315
+ execute: async (args, target) => target.logTime(args)
316
+ });
303
317
  export const addDependencyTool = defineTool({
304
318
  name: 'add_dependency',
305
319
  title: 'Add Dependency',
@@ -458,7 +472,12 @@ export const calculatePortfolioCriticalPathTool = defineTool({
458
472
  effort: z
459
473
  .enum(['estimate', 'remaining'])
460
474
  .optional()
461
- .describe("'remaining' schedules only estimate minus logged hours for in-progress tasks (default: full estimates)")
475
+ .describe("'remaining' schedules only estimate minus logged hours for in-progress tasks (default: full estimates)"),
476
+ defaultEstimateHours: z
477
+ .number()
478
+ .nonnegative()
479
+ .optional()
480
+ .describe('Hours to assume for tasks with no estimate (default 1). They are listed in unestimatedTaskIds')
462
481
  }),
463
482
  annotations: { readOnlyHint: true },
464
483
  execute: async (args, target) => target.calculatePortfolioCriticalPath(args)
@@ -486,7 +505,12 @@ export const calculateCriticalPathTool = defineTool({
486
505
  effort: z
487
506
  .enum(['estimate', 'remaining'])
488
507
  .optional()
489
- .describe("'remaining' schedules only estimate minus logged hours for in-progress tasks (default: full estimates)")
508
+ .describe("'remaining' schedules only estimate minus logged hours for in-progress tasks (default: full estimates)"),
509
+ defaultEstimateHours: z
510
+ .number()
511
+ .nonnegative()
512
+ .optional()
513
+ .describe('Hours to assume for tasks with no estimate (default 1). They are listed in unestimatedTaskIds')
490
514
  }),
491
515
  annotations: { readOnlyHint: true },
492
516
  execute: async (args, target, ambientContext) => {
@@ -494,8 +518,8 @@ export const calculateCriticalPathTool = defineTool({
494
518
  if (!projectId) {
495
519
  throw new Error('projectId is required to calculate the critical path. Find one with `list_projects`.');
496
520
  }
497
- const { calendars, levelResources, levelingPriority, effort } = args;
498
- return target.calculateCriticalPath(projectId, { calendars, levelResources, levelingPriority, effort });
521
+ const { calendars, levelResources, levelingPriority, effort, defaultEstimateHours } = args;
522
+ return target.calculateCriticalPath(projectId, { calendars, levelResources, levelingPriority, effort, defaultEstimateHours });
499
523
  }
500
524
  });
501
525
  export const getTimelineLadderTool = defineTool({
@@ -623,6 +647,7 @@ export const ALL_TOOLS = [
623
647
  createTaskTool,
624
648
  updateTaskTool,
625
649
  deleteTaskTool,
650
+ logTimeTool,
626
651
  addDependencyTool,
627
652
  removeDependencyTool,
628
653
  listDeliverablesTool,
@@ -1 +1 @@
1
- {"version":3,"file":"definitions.js","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AACxB,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AAErD,OAAO,EAAE,YAAY,EAAE,MAAM,qBAAqB,CAAC;AAEnD,OAAO,EACL,aAAa,EACb,UAAU,EACV,0BAA0B,EAC1B,gBAAgB,EAChB,iBAAiB,EACjB,aAAa,EACb,kBAAkB,EAClB,2BAA2B,EAC3B,oBAAoB,EACpB,gBAAgB,EAChB,iBAAiB,EACjB,yBAAyB,EACzB,0BAA0B,EAC1B,WAAW,EACZ,MAAM,cAAc,CAAC;AACtB,OAAO,EAAE,MAAM,EAAE,QAAQ,EAAE,MAAM,oBAAoB,CAAC;AAItD;;;GAGG;AACH,MAAM,CAAC,MAAM,QAAQ,GAAG;IACtB,IAAI,EAAE,8EAA8E;IACpF,aAAa,EAAE,gCAAgC;IAC/C,UAAU,EAAE,2DAA2D;IACvE,SAAS,EAAE,wEAAwE;IACnF,QAAQ,EAAE,oDAAoD;CACtD,CAAC;AAwCX,SAAS,YAAY,CAAC,MAAoB;IACxC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,GAAG,IAAI,EAAE,GAAG,eAAe,CAAC,MAAM,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IACnH,OAAO,IAAI,CAAC;AACd,CAAC;AAED;;;GAGG;AACH,MAAM,UAAU,UAAU,CAA+B,IAAgC;IACvF,MAAM,YAAY,GAAG,IAAI,CAAC,WAAW,EAAE,YAAY,IAAI,KAAK,CAAC;IAC7D,OAAO;QACL,GAAG,IAAI;QACP,WAAW,EAAE,YAAY,CAAC,IAAI,CAAC,SAAS,CAAC;QACzC,YAAY,EAAE,YAAY,CAAC,IAAI,CAAC,eAAe,CAAC;QAChD,WAAW,EAAE;YACX,YAAY;YACZ,eAAe,EAAE,IAAI,CAAC,WAAW,EAAE,eAAe,IAAI,KAAK;YAC3D,cAAc,EAAE,IAAI,CAAC,WAAW,EAAE,cAAc,IAAI,YAAY;YAChE,aAAa,EAAE,IAAI,CAAC,WAAW,EAAE,aAAa,IAAI,KAAK;SACxD;KACF,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,QAAgB,EAAE,OAAe;QAC3C,KAAK,CAAC,+BAA+B,QAAQ,MAAM,OAAO,EAAE,CAAC,CAAC;QAC9D,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED;;;GAGG;AACH,MAAM,UAAU,aAAa,CAAU,IAA6B,EAAE,IAAa;IACjF,yFAAyF;IACzF,MAAM,MAAM,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IAC7D,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;QACpB,MAAM,OAAO,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM;aAChC,GAAG,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,QAAQ,KAAK,KAAK,CAAC,OAAO,EAAE,CAAC;aACvE,IAAI,CAAC,IAAI,CAAC,CAAC;QACd,MAAM,IAAI,iBAAiB,CAAC,IAAI,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;IAClD,CAAC;IACD,OAAO,MAAM,CAAC,IAAe,CAAC;AAChC,CAAC;AAED,+CAA+C;AAC/C,MAAM,CAAC,KAAK,UAAU,cAAc,CAAC,MAAsB;IACzD,MAAM,QAAQ,GAAG,OAAO,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,KAAK,KAAK,QAAQ,CAAC;IAChF,OAAO,EAAE,QAAQ,EAAE,CAAC;AACtB,CAAC;AAED,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAC;IACzC,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EACT,oIAAoI;IACtI,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC;IACvB,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;QAC/B,OAAO,EAAE,QAAQ,EAAE,MAAM,MAAM,CAAC,WAAW,EAAE,EAAE,CAAC;IAClD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,2OAA2O;IAC7O,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAC1C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAA+F;IACxI,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EACT,qKAAqK;IACvK,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAChD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;QAC7E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,aAAa,GAAG,UAAU,CAWpC;IACD,IAAI,EAAE,YAAY;IAClB,KAAK,EAAE,YAAY;IACnB,WAAW,EACT,kYAAkY;IACpY,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,EAAE,CAAC;IACvG,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QACjE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACnE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACvG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACnE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0BAA0B,CAAC;QACzE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACjF,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACxG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtF,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;KAC1E,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS;YACtD,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS;YAC/C,QAAQ,EAAE,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS;YACrD,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,GAAG,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,QAAQ,EAAE,IAAI,CAAC,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACvF,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,MAAM,EAAE,IAAI,CAAC,MAAM;SACpB,CAAC,CAAC;QACH,OAAO,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC;IAC5D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAgD;IACnF,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EACT,8WAA8W;IAChX,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,0BAA0B;IAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,mBAAmB,EAAE,CAAC;aACnB,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,gGAAgG,CAAC;KAC9G,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,IAAI,IAAI,CAAC,IAAI,CAAC,mBAAmB;YAAE,OAAO,IAAI,CAAC;QACpD,MAAM,KAAK,GAAG,MAAM,kBAAkB,CAAC,MAAM,EAAE,IAAI,CAAC,EAAE,CAAC,CAAC;QACxD,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,CAAC,GAAG,KAAK,CAAC,aAAa,EAAE,GAAG,KAAK,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;QAChH,sFAAsF;QACtF,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC5C,MAAM,OAAO,GAAG,UAAU,CAAC,MAAM,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,eAAe,CAAC,CAAC,CAAC,UAAU,CAAC,MAAM,CAAC;YAC/F,IAAI,OAAO,CAAC,GAAG,CAAC,OAAO,CAAC,IAAI,OAAO,KAAK,IAAI,CAAC,EAAE;gBAAE,SAAS;YAC1D,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE,CAAC,IAAI,CAAC,CAAC;YAC9D,IAAI,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,OAAO,EAAE,KAAK,CAAC,CAAC;QACzC,CAAC;QACD,MAAM,SAAS,GAAqB,EAAE,CAAC;QACvC,MAAM,UAAU,GAAqB,EAAE,CAAC;QACxC,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC5C,MAAM,EAAE,OAAO,EAAE,SAAS,EAAE,GAAG,mBAAmB,CAAC,UAAU,CAAC,CAAC;YAC/D,MAAM,OAAO,GAAG,OAAO,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC;YAC1D,MAAM,KAAK,GAAG,OAAO,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;YACnC,6CAA6C;YAC7C,IAAI,CAAC,KAAK,IAAI,OAAO,KAAK,IAAI,CAAC,EAAE;gBAAE,SAAS;YAC5C,MAAM,IAAI,GAAG,EAAE,YAAY,EAAE,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,IAAI,EAAE,QAAQ,CAAC,UAAU,CAAC,EAAE,CAAC;YACrI,CAAC,OAAO,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC5D,CAAC;QACD,OAAO,EAAE,GAAG,IAAI,EAAE,YAAY,EAAE,EAAE,SAAS,EAAE,UAAU,EAAE,EAAE,CAAC;IAC9D,CAAC;CACF,CAAC,CAAC;AAUH,gGAAgG;AAChG,SAAS,mBAAmB,CAAC,UAA0B;IACrD,MAAM,IAAI,GAAG,YAAY,CAAC,UAAU,CAAC,CAAC;IACtC,4DAA4D;IAC5D,OAAO,IAAI,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,CAAC,KAAK,EAAE,SAAS,EAAE,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,UAAU,CAAC,MAAM,EAAE,SAAS,EAAE,UAAU,CAAC,eAAe,EAAE,CAAC;AACxI,CAAC;AAED,MAAM,QAAQ,GAAG,CAAC,UAA0B,EAA0B,EAAE,CAAC,CAAC,UAAU,CAAC,IAAI,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;AAExI,KAAK,UAAU,kBAAkB,CAAC,MAAsB,EAAE,MAAc;IACtE,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;IAClD,OAAO,QAAQ;QACb,CAAC,CAAE,MAA6B,CAAC,sBAAsB,CAAC,MAAM,CAAC;QAC/D,CAAC,CAAE,MAA6B,CAAC,mBAAmB,CAAC,MAAM,CAAC,CAAC;AACjE,CAAC;AAED,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAgBrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,4MAA4M;IAC9M,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,UAAU;IAC3B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACzG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC/C,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gEAAgE,CAAC;QACxG,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC;QAClH,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACvE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qJAAqJ,CAAC;QAC/L,WAAW,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2HAA2H,CAAC;QACzK,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACxE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QAC7E,UAAU,EAAE,CAAC;aACV,MAAM,EAAE;aACR,EAAE,CAAC,CAAC,CAAC;aACL,GAAG,CAAC,CAAC,CAAC;aACN,QAAQ,EAAE;aACV,QAAQ,CAAC,yIAAyI,CAAC;QACtJ,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;QAC/E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,oHAAoH,CAAC,CAAC;QACxI,CAAC;QACD,MAAM,KAAK,GAAQ;YACjB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,kEAAkE;YAClE,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC/C,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,MAAM;YACjC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,EAAE;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,YAAY,EAAE,IAAI,CAAC,YAAY;YAC/B,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,aAAa,EAAE,IAAI,CAAC,aAAa;SAClC,CAAC;QACF,OAAO,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;IAClC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAiBrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,6SAA6S;IAC/S,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,UAAU;IAC3B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,WAAW,CAAC;QAClD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4DAA4D,CAAC;QACpG,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,cAAc,CAAC;QACjG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,+BAA+B,CAAC;QAC3E,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qJAAqJ,CAAC;QAC/L,WAAW,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2HAA2H,CAAC;QACzK,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAClE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QAC3E,UAAU,EAAE,CAAC;aACV,MAAM,EAAE;aACR,EAAE,CAAC,CAAC,CAAC;aACL,GAAG,CAAC,CAAC,CAAC;aACN,QAAQ,EAAE;aACV,QAAQ,CAAC,yIAAyI,CAAC;QACtJ,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACxE,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;QAC/E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACxC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,4LAA4L;IAC9L,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC;IACnD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACjD,CAAC;IACF,WAAW,EAAE,EAAE,eAAe,EAAE,IAAI,EAAE,cAAc,EAAE,IAAI,EAAE;IAC5D,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjD,OAAO,EAAE,OAAO,EAAE,CAAC;IACrB,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAgF;IACzH,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EACT,+UAA+U;IACjV,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,gBAAgB;IACjC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QACvE,IAAI,EAAE,CAAC;aACJ,IAAI,CAAC,CAAC,UAAU,EAAE,YAAY,CAAC,CAAC;aAChC,QAAQ,EAAE;aACV,QAAQ,CAAC,4FAA4F,CAAC;KAC1G,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,IAAI,GAAG,IAAI,CAAC,IAAI,IAAI,UAAU,CAAC;QACrC,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;QAClD,IAAI,QAAQ,EAAE,CAAC;YACb,OAAQ,MAA6B,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,eAAe,EAAE,IAAI,CAAC,eAAe,EAAE,IAAI,EAAE,CAAC,CAAC;QAC5H,CAAC;QACD,OAAQ,MAA6B,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,EAAE,EAAE,eAAe,EAAE,IAAI,CAAC,eAAe,EAAE,IAAI,EAAE,CAAC,CAAC;IACpH,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAgF;IAC5H,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,gTAAgT;IAClT,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC;QACxB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QAC5F,aAAa,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,4BAA4B,CAAC;KAC1E,CAAC;IACF,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAC7D,IAAI,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,YAAY,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gDAAgD,CAAC;KAC/G,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,KAAK,GAAG,MAAM,kBAAkB,CAAC,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;QAC5D,MAAM,OAAO,GAAG,KAAK,CAAC,YAAY,CAAC,MAAM,CAAC,CAAC,UAAU,EAAE,EAAE;YACvD,MAAM,EAAE,OAAO,EAAE,SAAS,EAAE,GAAG,mBAAmB,CAAC,UAAU,CAAC,CAAC;YAC/D,OAAO,OAAO,KAAK,IAAI,CAAC,MAAM,IAAI,SAAS,KAAK,IAAI,CAAC,eAAe,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,IAAI,QAAQ,CAAC,UAAU,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC;QAC7H,CAAC,CAAC,CAAC;QACH,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,aAAa,GAAa,EAAE,CAAC;QACnC,KAAK,MAAM,UAAU,IAAI,OAAO,EAAE,CAAC;YACjC,MAAM,OAAO,GAAG,QAAQ;gBACtB,CAAC,CAAC,MAAO,MAA6B,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC;gBACtE,CAAC,CAAC,MAAO,MAA6B,CAAC,gBAAgB,CAAC,UAAU,CAAC,MAAM,EAAE,UAAU,CAAC,EAAE,CAAC,CAAC;YAC5F,IAAI,OAAO;gBAAE,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,CAAC;QACD,OAAO,EAAE,OAAO,EAAE,aAAa,CAAC,MAAM,EAAE,aAAa,EAAE,CAAC;IAC1D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAyB;IACrE,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,0OAA0O;IAC5O,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,YAAY,EAAE,CAAC,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC;IACvE,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACnG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,4EAA4E,CAAC,CAAC;QAC9G,IAAI,iBAAiB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,eAAe,KAAK,UAAU,EAAE,CAAC;YACzF,OAAO,EAAE,YAAY,EAAE,MAAO,MAAc,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC;QAC5E,CAAC;QACD,OAAO,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC;IAC9B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAO5C;IACD,IAAI,EAAE,oBAAoB;IAC1B,KAAK,EAAE,oBAAoB;IAC3B,WAAW,EACT,oTAAoT;IACtT,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,iBAAiB;IAClC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACrD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gDAAgD,CAAC;QAC7F,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;QACpG,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,+EAA+E,CAAC,CAAC;QACjH,IAAI,mBAAmB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,iBAAiB,KAAK,UAAU,EAAE,CAAC;YAC7F,OAAQ,MAAc,CAAC,iBAAiB,CAAC;gBACvC,GAAG,IAAI;gBACP,SAAS;aACV,CAAC,CAAC;QACL,CAAC;QACD,MAAM,IAAI,KAAK,CAAC,4DAA4D,CAAC,CAAC;IAChF,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAqB;IAC7D,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EACT,yHAAyH;IAC3H,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,IAAI,aAAa,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACjF,OAAO,EAAE,QAAQ,EAAE,MAAO,MAAc,CAAC,WAAW,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;QACtE,CAAC;QACD,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;IAC1B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAA8E;IACpH,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,sMAAsM;IACxM,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QAC1C,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACrD,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,YAAY,EAAE,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC;IAC5G,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kCAAkC,GAAG,UAAU,CAQzD;IACD,IAAI,EAAE,mCAAmC;IACzC,KAAK,EAAE,mCAAmC;IAC1C,WAAW,EACT,kVAAkV;IACpV,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,2BAA2B;IAC5C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2DAA2D,CAAC;QAChH,YAAY,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0EAA0E,CAAC;QACjI,iBAAiB,EAAE,CAAC;aACjB,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,oIAAoI,CAAC;QACjJ,SAAS,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,SAAS,EAAE,UAAU,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qEAAqE,CAAC;QACrI,cAAc,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4EAA4E,CAAC;QAC7H,gBAAgB,EAAE,CAAC;aAChB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC;aAC/C,QAAQ,EAAE;aACV,QAAQ,CAAC,mGAAmG,CAAC;QAChH,MAAM,EAAE,CAAC;aACN,IAAI,CAAC,CAAC,UAAU,EAAE,WAAW,CAAC,CAAC;aAC/B,QAAQ,EAAE;aACV,QAAQ,CAAC,wGAAwG,CAAC;KACtH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,CAAE,MAAc,CAAC,8BAA8B,CAAC,IAAI,CAAC;CACtF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,UAAU,CAMhD;IACD,IAAI,EAAE,yBAAyB;IAC/B,KAAK,EAAE,yBAAyB;IAChC,WAAW,EACT,ofAAof;IACtf,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,kBAAkB;IACnC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,SAAS,EAAE,CAAC;aACT,IAAI,CAAC,CAAC,SAAS,EAAE,UAAU,CAAC,CAAC;aAC7B,QAAQ,EAAE;aACV,QAAQ,CAAC,gHAAgH,CAAC;QAC7H,cAAc,EAAE,CAAC;aACd,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,qFAAqF,CAAC;QAClG,gBAAgB,EAAE,CAAC;aAChB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC;aAC/C,QAAQ,EAAE;aACV,QAAQ,CAAC,mGAAmG,CAAC;QAChH,MAAM,EAAE,CAAC;aACN,IAAI,CAAC,CAAC,UAAU,EAAE,WAAW,CAAC,CAAC;aAC/B,QAAQ,EAAE;aACV,QAAQ,CAAC,wGAAwG,CAAC;KACtH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,sFAAsF,CAAC,CAAC;QAC1G,CAAC;QACD,MAAM,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,GAAG,IAAI,CAAC;QACrE,OAAQ,MAAc,CAAC,qBAAqB,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,CAAC,CAAC;IACnH,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAK5C;IACD,IAAI,EAAE,qBAAqB;IAC3B,KAAK,EAAE,oCAAoC;IAC3C,WAAW,EACT,8ZAA8Z;IACha,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,oBAAoB;IACrC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QACpI,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qCAAqC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,kFAAkF,CAAC,CAAC;QACtG,CAAC;QACD,OAAQ,MAAc,CAAC,iBAAiB,CAAC,SAAS,EAAE;YAClD,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;SAC9B,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAqB;IAC9D,IAAI,EAAE,iBAAiB;IACvB,KAAK,EAAE,sBAAsB;IAC7B,WAAW,EACT,2UAA2U;IAC7U,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,gBAAgB;IACjC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACpD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,UAAU,CAAqB;IAC/D,IAAI,EAAE,kBAAkB;IACxB,KAAK,EAAE,kBAAkB;IACzB,WAAW,EACT,kQAAkQ;IACpQ,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,iBAAiB;IAClC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,cAAc,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACrD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAqB;IACvE,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EACT,iUAAiU;IACnU,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,yBAAyB;IAC1C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,sBAAsB,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,UAAU,CAQlD;IACD,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EACT,kWAAkW;IACpW,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,0BAA0B;IAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sEAAsE,CAAC;QACjH,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACxE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACpE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACpG,OAAO,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,QAAQ,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtH,MAAM,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACzG,0BAA0B,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACpH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,OAAQ,MAAc,CAAC,uBAAuB,CAAC,SAAS,EAAE;YACxD,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,0BAA0B,EAAE,IAAI,CAAC,0BAA0B;SAC5D,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,YAAY,GAAG,UAAU,CAAoB;IACxD,IAAI,EAAE,WAAW;IACjB,KAAK,EAAE,WAAW;IAClB,WAAW,EACT,gXAAgX;IAClX,OAAO,EAAE,UAAU;IACnB,eAAe,EAAE,WAAW;IAC5B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0DAA0D,CAAC;KACjG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,EAAE;QACtB,IAAI,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC;YACf,OAAO,EAAE,MAAM,EAAE,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,EAAE,WAAW,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC,EAAE,CAAC;QACpF,CAAC;QACD,MAAM,KAAK,GAAG,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAClC,IAAI,CAAC,KAAK,EAAE,CAAC;YACX,MAAM,IAAI,KAAK,CAAC,UAAU,IAAI,CAAC,IAAI,kCAAkC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChH,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,SAAS,GAAqB;IACzC,gBAAgB;IAChB,cAAc;IACd,iBAAiB;IACjB,aAAa;IACb,WAAW;IACX,cAAc;IACd,cAAc;IACd,cAAc;IACd,iBAAiB;IACjB,oBAAoB;IACpB,oBAAoB;IACpB,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,yBAAyB;IACzB,kCAAkC;IAClC,qBAAqB;IACrB,iBAAiB;IACjB,kBAAkB;IAClB,0BAA0B;IAC1B,2BAA2B;IAC3B,YAAY;CACb,CAAC;AAEF,MAAM,CAAC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAC7B,SAAS,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAC3C,CAAC;AAWF;;;;GAIG;AACH,MAAM,UAAU,WAAW,CAAC,YAA2B,EAAE;IACvD,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,QAAQ,EAAE,GAAG,SAAS,CAAC;IAChD,MAAM,YAAY,GAAG,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;IACzE,IAAI,YAAY,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC5B,MAAM,IAAI,KAAK,CAAC,kCAAkC,YAAY,CAAC,IAAI,CAAC,IAAI,CAAC,kBAAkB,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACzI,CAAC;IACD,MAAM,WAAW,GAAG,CAAC,QAAQ,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,IAAI,QAAQ,CAAC,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC3B,MAAM,IAAI,KAAK,CAAC,qCAAqC,WAAW,CAAC,IAAI,CAAC,IAAI,CAAC,qBAAqB,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACvI,CAAC;IACD,MAAM,QAAQ,GAAG,CAAC,KAAK,IAAI,CAAC,QAAQ,CAAC;IACrC,OAAO,SAAS,CAAC,MAAM,CACrB,CAAC,IAAI,EAAE,EAAE,CACP,CAAC,QAAQ,IAAI,KAAK,EAAE,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,IAAI,QAAQ,EAAE,QAAQ,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAC5E,CAAC,CAAC,QAAQ,IAAI,IAAI,CAAC,WAAW,CAAC,YAAY,CAAC,CAC/C,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED,MAAM,WAAW,GACf,yKAAyK,CAAC;AAE5K;;;;GAIG;AACH,MAAM,CAAC,KAAK,UAAU,OAAO,CAC3B,IAAoB,EACpB,IAAa,EACb,MAAsB,EACtB,cAAuC;IAEvC,IAAI,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,EAAE,MAAM,EAAE,cAAc,CAAC,CAAC;QACrF,IAAI,MAAM,KAAK,IAAI,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;YAC5C,MAAM,IAAI,iBAAiB,CAAC,qBAAqB,IAAI,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,GAAG,CAAC,CAAC;QAClF,CAAC;QACD,8FAA8F;QAC9F,OAAO,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC;IAC5C,CAAC;IAAC,OAAO,GAAQ,EAAE,CAAC;QAClB,MAAM,IAAI,KAAK,CAAC,gBAAgB,CAAC,IAAI,EAAE,GAAG,CAAC,CAAC,CAAC;IAC/C,CAAC;AACH,CAAC;AAED,SAAS,gBAAgB,CAAC,IAAoB,EAAE,GAAQ;IACtD,MAAM,OAAO,GAAW,GAAG,EAAE,OAAO,IAAI,MAAM,CAAC,GAAG,CAAC,CAAC;IACpD,IAAI,GAAG,YAAY,iBAAiB,EAAE,CAAC;QACrC,OAAO,GAAG,OAAO,qDAAqD,IAAI,CAAC,IAAI,sBAAsB,CAAC;IACxG,CAAC;IACD,IAAI,GAAG,YAAY,iBAAiB,IAAI,GAAG,EAAE,IAAI,KAAK,eAAe,IAAI,GAAG,EAAE,MAAM,KAAK,GAAG,IAAI,YAAY,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC;QAC3H,OAAO,GAAG,OAAO,IAAI,WAAW,EAAE,CAAC;IACrC,CAAC;IACD,IAAI,GAAG,EAAE,IAAI,KAAK,yBAAyB,IAAI,WAAW,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC;QACzE,OAAO,GAAG,OAAO,kKAAkK,CAAC;IACtL,CAAC;IACD,IAAI,GAAG,EAAE,IAAI,KAAK,gBAAgB,IAAI,GAAG,EAAE,MAAM,KAAK,GAAG,EAAE,CAAC;QAC1D,OAAO,GAAG,OAAO,2EAA2E,CAAC;IAC/F,CAAC;IACD,OAAO,OAAO,CAAC;AACjB,CAAC"}
1
+ {"version":3,"file":"definitions.js","sourceRoot":"","sources":["../../src/tools/definitions.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AACxB,OAAO,EAAE,eAAe,EAAE,MAAM,oBAAoB,CAAC;AAErD,OAAO,EAAE,YAAY,EAAE,MAAM,qBAAqB,CAAC;AAEnD,OAAO,EACL,aAAa,EACb,UAAU,EACV,0BAA0B,EAC1B,gBAAgB,EAChB,iBAAiB,EACjB,aAAa,EACb,eAAe,EACf,kBAAkB,EAClB,2BAA2B,EAC3B,oBAAoB,EACpB,gBAAgB,EAChB,iBAAiB,EACjB,yBAAyB,EACzB,0BAA0B,EAC1B,WAAW,EACZ,MAAM,cAAc,CAAC;AACtB,OAAO,EAAE,MAAM,EAAE,QAAQ,EAAE,MAAM,oBAAoB,CAAC;AAItD;;;GAGG;AACH,MAAM,CAAC,MAAM,QAAQ,GAAG;IACtB,IAAI,EAAE,8EAA8E;IACpF,aAAa,EAAE,gCAAgC;IAC/C,UAAU,EAAE,2DAA2D;IACvE,SAAS,EAAE,wEAAwE;IACnF,QAAQ,EAAE,oDAAoD;CACtD,CAAC;AAwCX,SAAS,YAAY,CAAC,MAAoB;IACxC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,GAAG,IAAI,EAAE,GAAG,eAAe,CAAC,MAAM,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAA4B,CAAC;IACnH,OAAO,IAAI,CAAC;AACd,CAAC;AAED;;;GAGG;AACH,MAAM,UAAU,UAAU,CAA+B,IAAgC;IACvF,MAAM,YAAY,GAAG,IAAI,CAAC,WAAW,EAAE,YAAY,IAAI,KAAK,CAAC;IAC7D,OAAO;QACL,GAAG,IAAI;QACP,WAAW,EAAE,YAAY,CAAC,IAAI,CAAC,SAAS,CAAC;QACzC,YAAY,EAAE,YAAY,CAAC,IAAI,CAAC,eAAe,CAAC;QAChD,WAAW,EAAE;YACX,YAAY;YACZ,eAAe,EAAE,IAAI,CAAC,WAAW,EAAE,eAAe,IAAI,KAAK;YAC3D,cAAc,EAAE,IAAI,CAAC,WAAW,EAAE,cAAc,IAAI,YAAY;YAChE,aAAa,EAAE,IAAI,CAAC,WAAW,EAAE,aAAa,IAAI,KAAK;SACxD;KACF,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,QAAgB,EAAE,OAAe;QAC3C,KAAK,CAAC,+BAA+B,QAAQ,MAAM,OAAO,EAAE,CAAC,CAAC;QAC9D,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED;;;GAGG;AACH,MAAM,UAAU,aAAa,CAAU,IAA6B,EAAE,IAAa;IACjF,yFAAyF;IACzF,MAAM,MAAM,GAAG,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IAC7D,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;QACpB,MAAM,OAAO,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM;aAChC,GAAG,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,GAAG,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,QAAQ,KAAK,KAAK,CAAC,OAAO,EAAE,CAAC;aACvE,IAAI,CAAC,IAAI,CAAC,CAAC;QACd,MAAM,IAAI,iBAAiB,CAAC,IAAI,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;IAClD,CAAC;IACD,OAAO,MAAM,CAAC,IAAe,CAAC;AAChC,CAAC;AAED,+CAA+C;AAC/C,MAAM,CAAC,KAAK,UAAU,cAAc,CAAC,MAAsB;IACzD,MAAM,QAAQ,GAAG,OAAO,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,KAAK,KAAK,QAAQ,CAAC;IAChF,OAAO,EAAE,QAAQ,EAAE,CAAC;AACtB,CAAC;AAED,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAC;IACzC,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EACT,oIAAoI;IACtI,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC;IACvB,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,EAAE;QAC/B,OAAO,EAAE,QAAQ,EAAE,MAAM,MAAM,CAAC,WAAW,EAAE,EAAE,CAAC;IAClD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,2OAA2O;IAC7O,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;KAC1C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAA+F;IACxI,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EACT,qKAAqK;IACvK,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAChD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wCAAwC,CAAC;QAC7E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;IACpC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,aAAa,GAAG,UAAU,CAWpC;IACD,IAAI,EAAE,YAAY;IAClB,KAAK,EAAE,YAAY;IACnB,WAAW,EACT,kYAAkY;IACpY,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,EAAE,CAAC;IACvG,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QACjE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACnE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACvG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACnE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0BAA0B,CAAC;QACzE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACjF,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACxG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtF,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;KAC1E,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS;YACtD,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS;YAC/C,QAAQ,EAAE,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS;YACrD,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,GAAG,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,QAAQ,EAAE,IAAI,CAAC,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACvF,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,MAAM,EAAE,IAAI,CAAC,MAAM;SACpB,CAAC,CAAC;QACH,OAAO,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,CAAC;IAC5D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAgD;IACnF,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EACT,8WAA8W;IAChX,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,0BAA0B;IAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,mBAAmB,EAAE,CAAC;aACnB,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,gGAAgG,CAAC;KAC9G,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,IAAI,IAAI,CAAC,IAAI,CAAC,mBAAmB;YAAE,OAAO,IAAI,CAAC;QACpD,MAAM,KAAK,GAAG,MAAM,kBAAkB,CAAC,MAAM,EAAE,IAAI,CAAC,EAAE,CAAC,CAAC;QACxD,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,CAAC,GAAG,KAAK,CAAC,aAAa,EAAE,GAAG,KAAK,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;QAChH,sFAAsF;QACtF,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC5C,MAAM,OAAO,GAAG,UAAU,CAAC,MAAM,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,eAAe,CAAC,CAAC,CAAC,UAAU,CAAC,MAAM,CAAC;YAC/F,IAAI,OAAO,CAAC,GAAG,CAAC,OAAO,CAAC,IAAI,OAAO,KAAK,IAAI,CAAC,EAAE;gBAAE,SAAS;YAC1D,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE,CAAC,IAAI,CAAC,CAAC;YAC9D,IAAI,KAAK;gBAAE,OAAO,CAAC,GAAG,CAAC,OAAO,EAAE,KAAK,CAAC,CAAC;QACzC,CAAC;QACD,MAAM,SAAS,GAAqB,EAAE,CAAC;QACvC,MAAM,UAAU,GAAqB,EAAE,CAAC;QACxC,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC5C,MAAM,EAAE,OAAO,EAAE,SAAS,EAAE,GAAG,mBAAmB,CAAC,UAAU,CAAC,CAAC;YAC/D,MAAM,OAAO,GAAG,OAAO,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC;YAC1D,MAAM,KAAK,GAAG,OAAO,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;YACnC,6CAA6C;YAC7C,IAAI,CAAC,KAAK,IAAI,OAAO,KAAK,IAAI,CAAC,EAAE;gBAAE,SAAS;YAC5C,MAAM,IAAI,GAAG,EAAE,YAAY,EAAE,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,EAAE,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,IAAI,EAAE,QAAQ,CAAC,UAAU,CAAC,EAAE,CAAC;YACrI,CAAC,OAAO,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC5D,CAAC;QACD,OAAO,EAAE,GAAG,IAAI,EAAE,YAAY,EAAE,EAAE,SAAS,EAAE,UAAU,EAAE,EAAE,CAAC;IAC9D,CAAC;CACF,CAAC,CAAC;AAUH,gGAAgG;AAChG,SAAS,mBAAmB,CAAC,UAA0B;IACrD,MAAM,IAAI,GAAG,YAAY,CAAC,UAAU,CAAC,CAAC;IACtC,4DAA4D;IAC5D,OAAO,IAAI,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,CAAC,KAAK,EAAE,SAAS,EAAE,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,UAAU,CAAC,MAAM,EAAE,SAAS,EAAE,UAAU,CAAC,eAAe,EAAE,CAAC;AACxI,CAAC;AAED,MAAM,QAAQ,GAAG,CAAC,UAA0B,EAA0B,EAAE,CAAC,CAAC,UAAU,CAAC,IAAI,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;AAExI,KAAK,UAAU,kBAAkB,CAAC,MAAsB,EAAE,MAAc;IACtE,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;IAClD,OAAO,QAAQ;QACb,CAAC,CAAE,MAA6B,CAAC,sBAAsB,CAAC,MAAM,CAAC;QAC/D,CAAC,CAAE,MAA6B,CAAC,mBAAmB,CAAC,MAAM,CAAC,CAAC;AACjE,CAAC;AAED,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAgBrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,4MAA4M;IAC9M,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,UAAU;IAC3B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QACzG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAC/C,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QAC9E,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gEAAgE,CAAC;QACxG,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC;QAClH,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACvE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qJAAqJ,CAAC;QAC/L,WAAW,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2HAA2H,CAAC;QACzK,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACxE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QAC7E,UAAU,EAAE,CAAC;aACV,MAAM,EAAE;aACR,EAAE,CAAC,CAAC,CAAC;aACL,GAAG,CAAC,CAAC,CAAC;aACN,QAAQ,EAAE;aACV,QAAQ,CAAC,yIAAyI,CAAC;QACtJ,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;QAC/E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,oHAAoH,CAAC,CAAC;QACxI,CAAC;QACD,MAAM,KAAK,GAAQ;YACjB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,kEAAkE;YAClE,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC/C,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,MAAM;YACjC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,IAAI,EAAE,IAAI,CAAC,IAAI,IAAI,EAAE;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,YAAY,EAAE,IAAI,CAAC,YAAY;YAC/B,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,aAAa,EAAE,IAAI,CAAC,aAAa;SAClC,CAAC;QACF,OAAO,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;IAClC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAgBrC;IACD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,+RAA+R;IACjS,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,UAAU;IAC3B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QACtC,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,WAAW,CAAC;QAClD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4BAA4B,CAAC;QACzE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4DAA4D,CAAC;QACpG,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,EAAE,KAAK,EAAE,MAAM,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,cAAc,CAAC;QACjG,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,+BAA+B,CAAC;QAC3E,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qJAAqJ,CAAC;QAC/L,WAAW,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2HAA2H,CAAC;QACzK,IAAI,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,mBAAmB,CAAC;QAClE,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QAC3E,UAAU,EAAE,CAAC;aACV,MAAM,EAAE;aACR,EAAE,CAAC,CAAC,CAAC;aACL,GAAG,CAAC,CAAC,CAAC;aACN,QAAQ,EAAE;aACV,QAAQ,CAAC,yIAAyI,CAAC;QACtJ,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACzE,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gCAAgC,CAAC;QAC/E,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,EAAE,EAAE,EAAE,GAAG,OAAO,EAAE,GAAG,IAAI,CAAC;QAChC,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACxC,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAAiB;IACvD,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,4LAA4L;IAC9L,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,OAAO,EAAE,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC;IACnD,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;KACjD,CAAC;IACF,WAAW,EAAE,EAAE,eAAe,EAAE,IAAI,EAAE,cAAc,EAAE,IAAI,EAAE;IAC5D,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjD,OAAO,EAAE,OAAO,EAAE,CAAC;IACrB,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,UAAU,CAAmG;IACtI,IAAI,EAAE,UAAU;IAChB,KAAK,EAAE,UAAU;IACjB,WAAW,EACT,8KAA8K;IAChL,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,eAAe;IAChC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACjD,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;QAC/D,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,eAAe,CAAC;QAC5D,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6CAA6C,CAAC;QAC1F,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qDAAqD,CAAC;KAChG,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC;CACtD,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAgF;IACzH,IAAI,EAAE,gBAAgB;IACtB,KAAK,EAAE,gBAAgB;IACvB,WAAW,EACT,+UAA+U;IACjV,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,gBAAgB;IACjC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,iCAAiC,CAAC;QACvE,IAAI,EAAE,CAAC;aACJ,IAAI,CAAC,CAAC,UAAU,EAAE,YAAY,CAAC,CAAC;aAChC,QAAQ,EAAE;aACV,QAAQ,CAAC,4FAA4F,CAAC;KAC1G,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,IAAI,GAAG,IAAI,CAAC,IAAI,IAAI,UAAU,CAAC;QACrC,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;QAClD,IAAI,QAAQ,EAAE,CAAC;YACb,OAAQ,MAA6B,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,eAAe,EAAE,IAAI,CAAC,eAAe,EAAE,IAAI,EAAE,CAAC,CAAC;QAC5H,CAAC;QACD,OAAQ,MAA6B,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,EAAE,EAAE,eAAe,EAAE,IAAI,CAAC,eAAe,EAAE,IAAI,EAAE,CAAC,CAAC;IACpH,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAgF;IAC5H,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,gTAAgT;IAClT,OAAO,EAAE,MAAM;IACf,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC;QACxB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8DAA8D,CAAC;QAC5F,aAAa,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,4BAA4B,CAAC;KAC1E,CAAC;IACF,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;QAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAC7D,IAAI,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,YAAY,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gDAAgD,CAAC;KAC/G,CAAC;IACF,WAAW,EAAE,EAAE,cAAc,EAAE,IAAI,EAAE;IACrC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,MAAM,KAAK,GAAG,MAAM,kBAAkB,CAAC,MAAM,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;QAC5D,MAAM,OAAO,GAAG,KAAK,CAAC,YAAY,CAAC,MAAM,CAAC,CAAC,UAAU,EAAE,EAAE;YACvD,MAAM,EAAE,OAAO,EAAE,SAAS,EAAE,GAAG,mBAAmB,CAAC,UAAU,CAAC,CAAC;YAC/D,OAAO,OAAO,KAAK,IAAI,CAAC,MAAM,IAAI,SAAS,KAAK,IAAI,CAAC,eAAe,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,IAAI,QAAQ,CAAC,UAAU,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC;QAC7H,CAAC,CAAC,CAAC;QACH,MAAM,EAAE,QAAQ,EAAE,GAAG,MAAM,cAAc,CAAC,MAAM,CAAC,CAAC;QAClD,MAAM,aAAa,GAAa,EAAE,CAAC;QACnC,KAAK,MAAM,UAAU,IAAI,OAAO,EAAE,CAAC;YACjC,MAAM,OAAO,GAAG,QAAQ;gBACtB,CAAC,CAAC,MAAO,MAA6B,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC;gBACtE,CAAC,CAAC,MAAO,MAA6B,CAAC,gBAAgB,CAAC,UAAU,CAAC,MAAM,EAAE,UAAU,CAAC,EAAE,CAAC,CAAC;YAC5F,IAAI,OAAO;gBAAE,aAAa,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,CAAC;QACD,OAAO,EAAE,OAAO,EAAE,aAAa,CAAC,MAAM,EAAE,aAAa,EAAE,CAAC;IAC1D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,UAAU,CAAyB;IACrE,IAAI,EAAE,mBAAmB;IACzB,KAAK,EAAE,mBAAmB;IAC1B,WAAW,EACT,0OAA0O;IAC5O,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,YAAY,EAAE,CAAC,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC;IACvE,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACnG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,4EAA4E,CAAC,CAAC;QAC9G,IAAI,iBAAiB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,eAAe,KAAK,UAAU,EAAE,CAAC;YACzF,OAAO,EAAE,YAAY,EAAE,MAAO,MAAc,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC;QAC5E,CAAC;QACD,OAAO,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC;IAC9B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAO5C;IACD,IAAI,EAAE,oBAAoB;IAC1B,KAAK,EAAE,oBAAoB;IAC3B,WAAW,EACT,oTAAoT;IACtT,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,iBAAiB;IAClC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACrD,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,gDAAgD,CAAC;QAC7F,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QAChE,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;QACpG,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,KAAK,CAAC,+EAA+E,CAAC,CAAC;QACjH,IAAI,mBAAmB,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,iBAAiB,KAAK,UAAU,EAAE,CAAC;YAC7F,OAAQ,MAAc,CAAC,iBAAiB,CAAC;gBACvC,GAAG,IAAI;gBACP,SAAS;aACV,CAAC,CAAC;QACL,CAAC;QACD,MAAM,IAAI,KAAK,CAAC,4DAA4D,CAAC,CAAC;IAChF,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,UAAU,CAAqB;IAC7D,IAAI,EAAE,eAAe;IACrB,KAAK,EAAE,eAAe;IACtB,WAAW,EACT,yHAAyH;IAC3H,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,CAAC,CAAC,MAAM,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;IAC/D,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,IAAI,aAAa,IAAI,MAAM,IAAI,OAAQ,MAAc,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACjF,OAAO,EAAE,QAAQ,EAAE,MAAO,MAAc,CAAC,WAAW,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;QACtE,CAAC;QACD,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;IAC1B,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,cAAc,GAAG,UAAU,CAA8E;IACpH,IAAI,EAAE,aAAa;IACnB,KAAK,EAAE,aAAa;IACpB,WAAW,EACT,sMAAsM;IACxM,OAAO,EAAE,eAAe;IACxB,eAAe,EAAE,aAAa;IAC9B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;QAC1C,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;QACrD,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;KAC/J,CAAC;IACF,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAO,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,YAAY,EAAE,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC;IAC5G,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kCAAkC,GAAG,UAAU,CASzD;IACD,IAAI,EAAE,mCAAmC;IACzC,KAAK,EAAE,mCAAmC;IAC1C,WAAW,EACT,kVAAkV;IACpV,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,2BAA2B;IAC5C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2DAA2D,CAAC;QAChH,YAAY,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0EAA0E,CAAC;QACjI,iBAAiB,EAAE,CAAC;aACjB,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,oIAAoI,CAAC;QACjJ,SAAS,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,SAAS,EAAE,UAAU,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qEAAqE,CAAC;QACrI,cAAc,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,4EAA4E,CAAC;QAC7H,gBAAgB,EAAE,CAAC;aAChB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC;aAC/C,QAAQ,EAAE;aACV,QAAQ,CAAC,mGAAmG,CAAC;QAChH,MAAM,EAAE,CAAC;aACN,IAAI,CAAC,CAAC,UAAU,EAAE,WAAW,CAAC,CAAC;aAC/B,QAAQ,EAAE;aACV,QAAQ,CAAC,wGAAwG,CAAC;QACrH,oBAAoB,EAAE,CAAC;aACpB,MAAM,EAAE;aACR,WAAW,EAAE;aACb,QAAQ,EAAE;aACV,QAAQ,CAAC,+FAA+F,CAAC;KAC7G,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE,CAAE,MAAc,CAAC,8BAA8B,CAAC,IAAI,CAAC;CACtF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,UAAU,CAOhD;IACD,IAAI,EAAE,yBAAyB;IAC/B,KAAK,EAAE,yBAAyB;IAChC,WAAW,EACT,ofAAof;IACtf,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,kBAAkB;IACnC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,SAAS,EAAE,CAAC;aACT,IAAI,CAAC,CAAC,SAAS,EAAE,UAAU,CAAC,CAAC;aAC7B,QAAQ,EAAE;aACV,QAAQ,CAAC,gHAAgH,CAAC;QAC7H,cAAc,EAAE,CAAC;aACd,OAAO,EAAE;aACT,QAAQ,EAAE;aACV,QAAQ,CAAC,qFAAqF,CAAC;QAClG,gBAAgB,EAAE,CAAC;aAChB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC;aAC/C,QAAQ,EAAE;aACV,QAAQ,CAAC,mGAAmG,CAAC;QAChH,MAAM,EAAE,CAAC;aACN,IAAI,CAAC,CAAC,UAAU,EAAE,WAAW,CAAC,CAAC;aAC/B,QAAQ,EAAE;aACV,QAAQ,CAAC,wGAAwG,CAAC;QACrH,oBAAoB,EAAE,CAAC;aACpB,MAAM,EAAE;aACR,WAAW,EAAE;aACb,QAAQ,EAAE;aACV,QAAQ,CAAC,+FAA+F,CAAC;KAC7G,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,sFAAsF,CAAC,CAAC;QAC1G,CAAC;QACD,MAAM,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,oBAAoB,EAAE,GAAG,IAAI,CAAC;QAC3F,OAAQ,MAAc,CAAC,qBAAqB,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,oBAAoB,EAAE,CAAC,CAAC;IACzI,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,qBAAqB,GAAG,UAAU,CAK5C;IACD,IAAI,EAAE,qBAAqB;IAC3B,KAAK,EAAE,oCAAoC;IAC3C,WAAW,EACT,8ZAA8Z;IACha,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,oBAAoB;IACrC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QAClG,KAAK,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,KAAK,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;QACpI,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,8BAA8B,CAAC;QAC3E,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,qCAAqC,CAAC;KACnF,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,IAAI,KAAK,CAAC,kFAAkF,CAAC,CAAC;QACtG,CAAC;QACD,OAAQ,MAAc,CAAC,iBAAiB,CAAC,SAAS,EAAE;YAClD,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;SAC9B,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,UAAU,CAAqB;IAC9D,IAAI,EAAE,iBAAiB;IACvB,KAAK,EAAE,sBAAsB;IAC7B,WAAW,EACT,2UAA2U;IAC7U,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,gBAAgB;IACjC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,aAAa,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACpD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,UAAU,CAAqB;IAC/D,IAAI,EAAE,kBAAkB;IACxB,KAAK,EAAE,kBAAkB;IACzB,WAAW,EACT,kQAAkQ;IACpQ,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,iBAAiB;IAClC,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,cAAc,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACrD,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAqB;IACvE,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EACT,iUAAiU;IACnU,OAAO,EAAE,WAAW;IACpB,eAAe,EAAE,yBAAyB;IAC1C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,aAAa,CAAC;KAC3C,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,EAAE;QAC9B,OAAQ,MAAc,CAAC,sBAAsB,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IAC7D,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,UAAU,CAQlD;IACD,IAAI,EAAE,2BAA2B;IACjC,KAAK,EAAE,2BAA2B;IAClC,WAAW,EACT,kWAAkW;IACpW,OAAO,EAAE,YAAY;IACrB,eAAe,EAAE,0BAA0B;IAC3C,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,sEAAsE,CAAC;QACjH,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;QACxE,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,2BAA2B,CAAC;QACpE,QAAQ,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oCAAoC,CAAC;QACpG,OAAO,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,QAAQ,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,yBAAyB,CAAC;QACtH,MAAM,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,oBAAoB,CAAC;QACzG,0BAA0B,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,uDAAuD,CAAC;KACpH,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,cAAc,EAAE,EAAE;QAC9C,MAAM,SAAS,GAAG,IAAI,CAAC,SAAS,IAAI,cAAc,EAAE,SAAS,CAAC;QAC9D,OAAQ,MAAc,CAAC,uBAAuB,CAAC,SAAS,EAAE;YACxD,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,0BAA0B,EAAE,IAAI,CAAC,0BAA0B;SAC5D,CAAC,CAAC;IACL,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,YAAY,GAAG,UAAU,CAAoB;IACxD,IAAI,EAAE,WAAW;IACjB,KAAK,EAAE,WAAW;IAClB,WAAW,EACT,gXAAgX;IAClX,OAAO,EAAE,UAAU;IACnB,eAAe,EAAE,WAAW;IAC5B,SAAS,EAAE,CAAC,CAAC,MAAM,CAAC;QAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,EAAE,CAAC,QAAQ,CAAC,0DAA0D,CAAC;KACjG,CAAC;IACF,WAAW,EAAE,EAAE,YAAY,EAAE,IAAI,EAAE;IACnC,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,EAAE;QACtB,IAAI,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC;YACf,OAAO,EAAE,MAAM,EAAE,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,EAAE,WAAW,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC,EAAE,CAAC;QACpF,CAAC;QACD,MAAM,KAAK,GAAG,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAClC,IAAI,CAAC,KAAK,EAAE,CAAC;YACX,MAAM,IAAI,KAAK,CAAC,UAAU,IAAI,CAAC,IAAI,kCAAkC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChH,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;CACF,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,SAAS,GAAqB;IACzC,gBAAgB;IAChB,cAAc;IACd,iBAAiB;IACjB,aAAa;IACb,WAAW;IACX,cAAc;IACd,cAAc;IACd,cAAc;IACd,WAAW;IACX,iBAAiB;IACjB,oBAAoB;IACpB,oBAAoB;IACpB,qBAAqB;IACrB,gBAAgB;IAChB,cAAc;IACd,yBAAyB;IACzB,kCAAkC;IAClC,qBAAqB;IACrB,iBAAiB;IACjB,kBAAkB;IAClB,0BAA0B;IAC1B,2BAA2B;IAC3B,YAAY;CACb,CAAC;AAEF,MAAM,CAAC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAC7B,SAAS,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAC3C,CAAC;AAWF;;;;GAIG;AACH,MAAM,UAAU,WAAW,CAAC,YAA2B,EAAE;IACvD,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE,QAAQ,EAAE,GAAG,SAAS,CAAC;IAChD,MAAM,YAAY,GAAG,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;IACzE,IAAI,YAAY,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC5B,MAAM,IAAI,KAAK,CAAC,kCAAkC,YAAY,CAAC,IAAI,CAAC,IAAI,CAAC,kBAAkB,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACzI,CAAC;IACD,MAAM,WAAW,GAAG,CAAC,QAAQ,IAAI,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,IAAI,QAAQ,CAAC,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC3B,MAAM,IAAI,KAAK,CAAC,qCAAqC,WAAW,CAAC,IAAI,CAAC,IAAI,CAAC,qBAAqB,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;IACvI,CAAC;IACD,MAAM,QAAQ,GAAG,CAAC,KAAK,IAAI,CAAC,QAAQ,CAAC;IACrC,OAAO,SAAS,CAAC,MAAM,CACrB,CAAC,IAAI,EAAE,EAAE,CACP,CAAC,QAAQ,IAAI,KAAK,EAAE,QAAQ,CAAC,IAAI,CAAC,IAAI,CAAC,IAAI,QAAQ,EAAE,QAAQ,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAC5E,CAAC,CAAC,QAAQ,IAAI,IAAI,CAAC,WAAW,CAAC,YAAY,CAAC,CAC/C,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,iBAAkB,SAAQ,KAAK;IAC1C,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,mBAAmB,CAAC;IAClC,CAAC;CACF;AAED,MAAM,WAAW,GACf,yKAAyK,CAAC;AAE5K;;;;GAIG;AACH,MAAM,CAAC,KAAK,UAAU,OAAO,CAC3B,IAAoB,EACpB,IAAa,EACb,MAAsB,EACtB,cAAuC;IAEvC,IAAI,CAAC;QACH,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,EAAE,MAAM,EAAE,cAAc,CAAC,CAAC;QACrF,IAAI,MAAM,KAAK,IAAI,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;YAC5C,MAAM,IAAI,iBAAiB,CAAC,qBAAqB,IAAI,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,CAAC,GAAG,CAAC,CAAC;QAClF,CAAC;QACD,8FAA8F;QAC9F,OAAO,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC;IAC5C,CAAC;IAAC,OAAO,GAAQ,EAAE,CAAC;QAClB,MAAM,IAAI,KAAK,CAAC,gBAAgB,CAAC,IAAI,EAAE,GAAG,CAAC,CAAC,CAAC;IAC/C,CAAC;AACH,CAAC;AAED,SAAS,gBAAgB,CAAC,IAAoB,EAAE,GAAQ;IACtD,MAAM,OAAO,GAAW,GAAG,EAAE,OAAO,IAAI,MAAM,CAAC,GAAG,CAAC,CAAC;IACpD,IAAI,GAAG,YAAY,iBAAiB,EAAE,CAAC;QACrC,OAAO,GAAG,OAAO,qDAAqD,IAAI,CAAC,IAAI,sBAAsB,CAAC;IACxG,CAAC;IACD,IAAI,GAAG,YAAY,iBAAiB,IAAI,GAAG,EAAE,IAAI,KAAK,eAAe,IAAI,GAAG,EAAE,MAAM,KAAK,GAAG,IAAI,YAAY,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC;QAC3H,OAAO,GAAG,OAAO,IAAI,WAAW,EAAE,CAAC;IACrC,CAAC;IACD,IAAI,GAAG,EAAE,IAAI,KAAK,yBAAyB,IAAI,WAAW,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC;QACzE,OAAO,GAAG,OAAO,kKAAkK,CAAC;IACtL,CAAC;IACD,IAAI,GAAG,EAAE,IAAI,KAAK,gBAAgB,IAAI,GAAG,EAAE,MAAM,KAAK,GAAG,EAAE,CAAC;QAC1D,OAAO,GAAG,OAAO,2EAA2E,CAAC;IAC/F,CAAC;IACD,OAAO,OAAO,CAAC;AACjB,CAAC"}
@@ -484,6 +484,25 @@ export declare const DeliverableOutput: z.ZodObject<{
484
484
  title: z.ZodString;
485
485
  dueDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
486
486
  }, z.ZodTypeAny, "passthrough">>;
487
+ export declare const TimeEntryOutput: z.ZodObject<{
488
+ id: z.ZodString;
489
+ taskId: z.ZodString;
490
+ hours: z.ZodNumber;
491
+ userId: z.ZodOptional<z.ZodNullable<z.ZodString>>;
492
+ loggedAt: z.ZodOptional<z.ZodNullable<z.ZodString>>;
493
+ }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
494
+ id: z.ZodString;
495
+ taskId: z.ZodString;
496
+ hours: z.ZodNumber;
497
+ userId: z.ZodOptional<z.ZodNullable<z.ZodString>>;
498
+ loggedAt: z.ZodOptional<z.ZodNullable<z.ZodString>>;
499
+ }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
500
+ id: z.ZodString;
501
+ taskId: z.ZodString;
502
+ hours: z.ZodNumber;
503
+ userId: z.ZodOptional<z.ZodNullable<z.ZodString>>;
504
+ loggedAt: z.ZodOptional<z.ZodNullable<z.ZodString>>;
505
+ }, z.ZodTypeAny, "passthrough">>;
487
506
  export declare const CommentOutput: z.ZodObject<{
488
507
  id: z.ZodString;
489
508
  taskId: z.ZodString;
@@ -507,6 +526,8 @@ export declare const CriticalPathOutput: z.ZodObject<{
507
526
  totalDurationHours: z.ZodNumber;
508
527
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
509
528
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
529
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
530
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
510
531
  tasks: z.ZodArray<z.ZodObject<{
511
532
  taskId: z.ZodString;
512
533
  isCritical: z.ZodBoolean;
@@ -519,6 +540,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
519
540
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
520
541
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
521
542
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
543
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
522
544
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
523
545
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
524
546
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -533,6 +555,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
533
555
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
534
556
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
535
557
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
558
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
536
559
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
537
560
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
538
561
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -547,6 +570,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
547
570
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
548
571
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
549
572
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
573
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
550
574
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
551
575
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
552
576
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -584,6 +608,8 @@ export declare const CriticalPathOutput: z.ZodObject<{
584
608
  totalDurationHours: z.ZodNumber;
585
609
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
586
610
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
611
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
612
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
587
613
  tasks: z.ZodArray<z.ZodObject<{
588
614
  taskId: z.ZodString;
589
615
  isCritical: z.ZodBoolean;
@@ -596,6 +622,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
596
622
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
597
623
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
598
624
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
625
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
599
626
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
600
627
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
601
628
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -610,6 +637,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
610
637
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
611
638
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
612
639
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
640
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
613
641
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
614
642
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
615
643
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -624,6 +652,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
624
652
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
625
653
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
626
654
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
655
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
627
656
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
628
657
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
629
658
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -661,6 +690,8 @@ export declare const CriticalPathOutput: z.ZodObject<{
661
690
  totalDurationHours: z.ZodNumber;
662
691
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
663
692
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
693
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
694
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
664
695
  tasks: z.ZodArray<z.ZodObject<{
665
696
  taskId: z.ZodString;
666
697
  isCritical: z.ZodBoolean;
@@ -673,6 +704,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
673
704
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
674
705
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
675
706
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
707
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
676
708
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
677
709
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
678
710
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -687,6 +719,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
687
719
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
688
720
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
689
721
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
722
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
690
723
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
691
724
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
692
725
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -701,6 +734,7 @@ export declare const CriticalPathOutput: z.ZodObject<{
701
734
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
702
735
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
703
736
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
737
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
704
738
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
705
739
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
706
740
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -740,6 +774,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
740
774
  totalDurationHours: z.ZodNumber;
741
775
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
742
776
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
777
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
778
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
743
779
  tasks: z.ZodArray<z.ZodObject<{
744
780
  taskId: z.ZodString;
745
781
  isCritical: z.ZodBoolean;
@@ -752,6 +788,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
752
788
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
753
789
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
754
790
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
791
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
755
792
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
756
793
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
757
794
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -766,6 +803,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
766
803
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
767
804
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
768
805
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
806
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
769
807
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
770
808
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
771
809
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -780,6 +818,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
780
818
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
781
819
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
782
820
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
821
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
783
822
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
784
823
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
785
824
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -817,6 +856,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
817
856
  totalDurationHours: z.ZodNumber;
818
857
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
819
858
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
859
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
860
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
820
861
  tasks: z.ZodArray<z.ZodObject<{
821
862
  taskId: z.ZodString;
822
863
  isCritical: z.ZodBoolean;
@@ -829,6 +870,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
829
870
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
830
871
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
831
872
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
873
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
832
874
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
833
875
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
834
876
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -843,6 +885,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
843
885
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
844
886
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
845
887
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
888
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
846
889
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
847
890
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
848
891
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -857,6 +900,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
857
900
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
858
901
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
859
902
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
903
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
860
904
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
861
905
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
862
906
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -894,6 +938,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
894
938
  totalDurationHours: z.ZodNumber;
895
939
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
896
940
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
941
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
942
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
897
943
  tasks: z.ZodArray<z.ZodObject<{
898
944
  taskId: z.ZodString;
899
945
  isCritical: z.ZodBoolean;
@@ -906,6 +952,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
906
952
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
907
953
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
908
954
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
955
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
909
956
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
910
957
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
911
958
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -920,6 +967,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
920
967
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
921
968
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
922
969
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
970
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
923
971
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
924
972
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
925
973
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -934,6 +982,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
934
982
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
935
983
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
936
984
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
985
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
937
986
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
938
987
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
939
988
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1000,6 +1049,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1000
1049
  totalDurationHours: z.ZodNumber;
1001
1050
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1002
1051
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1052
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1053
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1003
1054
  tasks: z.ZodArray<z.ZodObject<{
1004
1055
  taskId: z.ZodString;
1005
1056
  isCritical: z.ZodBoolean;
@@ -1012,6 +1063,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1012
1063
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1013
1064
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1014
1065
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1066
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1015
1067
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1016
1068
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1017
1069
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1026,6 +1078,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1026
1078
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1027
1079
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1028
1080
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1081
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1029
1082
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1030
1083
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1031
1084
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1040,6 +1093,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1040
1093
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1041
1094
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1042
1095
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1096
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1043
1097
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1044
1098
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1045
1099
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1077,6 +1131,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1077
1131
  totalDurationHours: z.ZodNumber;
1078
1132
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1079
1133
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1134
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1135
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1080
1136
  tasks: z.ZodArray<z.ZodObject<{
1081
1137
  taskId: z.ZodString;
1082
1138
  isCritical: z.ZodBoolean;
@@ -1089,6 +1145,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1089
1145
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1090
1146
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1091
1147
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1148
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1092
1149
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1093
1150
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1094
1151
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1103,6 +1160,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1103
1160
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1104
1161
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1105
1162
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1163
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1106
1164
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1107
1165
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1108
1166
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1117,6 +1175,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1117
1175
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1118
1176
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1119
1177
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1178
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1120
1179
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1121
1180
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1122
1181
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1154,6 +1213,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1154
1213
  totalDurationHours: z.ZodNumber;
1155
1214
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1156
1215
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1216
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1217
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1157
1218
  tasks: z.ZodArray<z.ZodObject<{
1158
1219
  taskId: z.ZodString;
1159
1220
  isCritical: z.ZodBoolean;
@@ -1166,6 +1227,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1166
1227
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1167
1228
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1168
1229
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1230
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1169
1231
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1170
1232
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1171
1233
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1180,6 +1242,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1180
1242
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1181
1243
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1182
1244
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1245
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1183
1246
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1184
1247
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1185
1248
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1194,6 +1257,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1194
1257
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1195
1258
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1196
1259
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1260
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1197
1261
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1198
1262
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1199
1263
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1260,6 +1324,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1260
1324
  totalDurationHours: z.ZodNumber;
1261
1325
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1262
1326
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1327
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1328
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1263
1329
  tasks: z.ZodArray<z.ZodObject<{
1264
1330
  taskId: z.ZodString;
1265
1331
  isCritical: z.ZodBoolean;
@@ -1272,6 +1338,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1272
1338
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1273
1339
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1274
1340
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1341
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1275
1342
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1276
1343
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1277
1344
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1286,6 +1353,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1286
1353
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1287
1354
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1288
1355
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1356
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1289
1357
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1290
1358
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1291
1359
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1300,6 +1368,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1300
1368
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1301
1369
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1302
1370
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1371
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1303
1372
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1304
1373
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1305
1374
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1337,6 +1406,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1337
1406
  totalDurationHours: z.ZodNumber;
1338
1407
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1339
1408
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1409
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1410
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1340
1411
  tasks: z.ZodArray<z.ZodObject<{
1341
1412
  taskId: z.ZodString;
1342
1413
  isCritical: z.ZodBoolean;
@@ -1349,6 +1420,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1349
1420
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1350
1421
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1351
1422
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1423
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1352
1424
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1353
1425
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1354
1426
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1363,6 +1435,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1363
1435
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1364
1436
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1365
1437
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1438
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1366
1439
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1367
1440
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1368
1441
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1377,6 +1450,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1377
1450
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1378
1451
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1379
1452
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1453
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1380
1454
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1381
1455
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1382
1456
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1414,6 +1488,8 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1414
1488
  totalDurationHours: z.ZodNumber;
1415
1489
  criticalTaskIds: z.ZodArray<z.ZodString, "many">;
1416
1490
  missedDeadlineTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1491
+ unestimatedTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1492
+ cyclicTaskIds: z.ZodOptional<z.ZodNullable<z.ZodArray<z.ZodString, "many">>>;
1417
1493
  tasks: z.ZodArray<z.ZodObject<{
1418
1494
  taskId: z.ZodString;
1419
1495
  isCritical: z.ZodBoolean;
@@ -1426,6 +1502,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1426
1502
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1427
1503
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1428
1504
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1505
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1429
1506
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1430
1507
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1431
1508
  }, "passthrough", z.ZodTypeAny, z.objectOutputType<{
@@ -1440,6 +1517,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1440
1517
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1441
1518
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1442
1519
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1520
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1443
1521
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1444
1522
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1445
1523
  }, z.ZodTypeAny, "passthrough">, z.objectInputType<{
@@ -1454,6 +1532,7 @@ export declare const PortfolioCriticalPathOutput: z.ZodObject<{
1454
1532
  levelingDelayHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1455
1533
  waitingOn: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1456
1534
  isMilestone: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1535
+ isSummary: z.ZodOptional<z.ZodNullable<z.ZodBoolean>>;
1457
1536
  deadlineDate: z.ZodOptional<z.ZodNullable<z.ZodString>>;
1458
1537
  deadlineVarianceHours: z.ZodOptional<z.ZodNullable<z.ZodNumber>>;
1459
1538
  }, z.ZodTypeAny, "passthrough">>, "many">;
@@ -1 +1 @@
1
- {"version":3,"file":"outputs.d.ts","sourceRoot":"","sources":["../../src/tools/outputs.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAaxB,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;gCAKF,CAAC;AAEzB,eAAO,MAAM,UAAU;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAaF,CAAC;AAUtB,eAAO,MAAM,0BAA0B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAOlB,CAAC;AAEtB,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;gCAKgB,CAAC;AAE9C,eAAO,MAAM,iBAAiB;;;;;;;;;;;;;;;gCAKF,CAAC;AAE7B,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;gCAKG,CAAC;AA4B9B,eAAO,MAAM,kBAAkB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAW7B,CAAC;AAEH,eAAO,MAAM,2BAA2B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAKtC,CAAC;AAaH,eAAO,MAAM,oBAAoB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAgB/B,CAAC;AAEH,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAM3B,CAAC;AAEH,eAAO,MAAM,yBAAyB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAIpC,CAAC;AAEH,eAAO,MAAM,iBAAiB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAuB5B,CAAC;AAEH,eAAO,MAAM,0BAA0B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAoBrC,CAAC;AAEH,eAAO,MAAM,WAAW;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAKtB,CAAC"}
1
+ {"version":3,"file":"outputs.d.ts","sourceRoot":"","sources":["../../src/tools/outputs.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAaxB,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;gCAKF,CAAC;AAEzB,eAAO,MAAM,UAAU;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAaF,CAAC;AAUtB,eAAO,MAAM,0BAA0B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAOlB,CAAC;AAEtB,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;gCAKgB,CAAC;AAE9C,eAAO,MAAM,iBAAiB;;;;;;;;;;;;;;;gCAKF,CAAC;AAE7B,eAAO,MAAM,eAAe;;;;;;;;;;;;;;;;;;gCAMD,CAAC;AAE5B,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;gCAKG,CAAC;AA6B9B,eAAO,MAAM,kBAAkB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAa7B,CAAC;AAEH,eAAO,MAAM,2BAA2B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAKtC,CAAC;AAaH,eAAO,MAAM,oBAAoB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAgB/B,CAAC;AAEH,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAM3B,CAAC;AAEH,eAAO,MAAM,yBAAyB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAIpC,CAAC;AAEH,eAAO,MAAM,iBAAiB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAuB5B,CAAC;AAEH,eAAO,MAAM,0BAA0B;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAoBrC,CAAC;AAEH,eAAO,MAAM,WAAW;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;gCAKtB,CAAC"}
@@ -53,6 +53,13 @@ export const DeliverableOutput = obj({
53
53
  title: z.string(),
54
54
  dueDate: opt(z.string())
55
55
  }).describe('A deliverable');
56
+ export const TimeEntryOutput = obj({
57
+ id: z.string(),
58
+ taskId: z.string(),
59
+ hours: z.number(),
60
+ userId: opt(z.string()),
61
+ loggedAt: opt(z.string())
62
+ }).describe('A time entry');
56
63
  export const CommentOutput = obj({
57
64
  id: z.string(),
58
65
  taskId: z.string(),
@@ -80,6 +87,7 @@ const TaskScheduleOutput = obj({
80
87
  levelingDelayHours: opt(z.number()).describe('With levelling: hours spent waiting for the assignee'),
81
88
  waitingOn: opt(z.string()).describe('With levelling: the task this one waited for'),
82
89
  isMilestone: opt(z.boolean()).describe('True for a milestone'),
90
+ isSummary: opt(z.boolean()).describe('True for a task with subtasks: its dates and slack are roll-ups of them'),
83
91
  deadlineDate: opt(z.string()).describe("The task's deadline as an instant"),
84
92
  deadlineVarianceHours: opt(z.number()).describe('Working hours from forecast finish to deadline; negative means it will be missed')
85
93
  });
@@ -90,6 +98,8 @@ export const CriticalPathOutput = obj({
90
98
  totalDurationHours: z.number(),
91
99
  criticalTaskIds: z.array(z.string()).describe('Tasks with zero or negative slack, in schedule order'),
92
100
  missedDeadlineTaskIds: opt(z.array(z.string())).describe('Tasks forecast to finish after their deadline'),
101
+ unestimatedTaskIds: opt(z.array(z.string())).describe('Unfinished tasks with no estimate, scheduled for defaultEstimateHours'),
102
+ cyclicTaskIds: opt(z.array(z.string())).describe('Tasks on a dependency cycle; their dates are not reliable'),
93
103
  tasks: z.array(TaskScheduleOutput),
94
104
  leveled: opt(z.boolean()),
95
105
  unleveledProjectEndDate: opt(z.string()).describe('With levelling: the end date before levelling'),
@@ -1 +1 @@
1
- {"version":3,"file":"outputs.js","sourceRoot":"","sources":["../../src/tools/outputs.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB;;;;GAIG;AAEH,MAAM,GAAG,GAAG,CAA0B,KAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;AACjF,sEAAsE;AACtE,MAAM,GAAG,GAAG,CAAyB,MAAS,EAAE,EAAE,CAAC,MAAM,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,CAAC;AAChF,MAAM,SAAS,GAAG,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;AAE7C,MAAM,CAAC,MAAM,aAAa,GAAG,GAAG,CAAC;IAC/B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACvE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE;IAChB,GAAG,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,2BAA2B,CAAC;IAC1D,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC,QAAQ,CAAC,WAAW,CAAC,CAAC;AAEzB,MAAM,CAAC,MAAM,UAAU,GAAG,GAAG,CAAC;IAC5B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACvE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IAClD,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mCAAmC,CAAC;IAClE,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC3B,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACxB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8DAA8D,CAAC;IAClG,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,4BAA4B,CAAC;IACpE,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC5B,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;CAC5B,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;AAEtB,MAAM,oBAAoB,GAAG,GAAG,CAAC;IAC/B,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;IAChE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;IAC7C,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;CACjI,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAC,MAAM,CAAC;IAC1D,YAAY,EAAE,GAAG,CACf,GAAG,CAAC;QACF,SAAS,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,QAAQ,CAAC,sCAAsC,CAAC;QACzF,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,QAAQ,CAAC,0CAA0C,CAAC;KAC/F,CAAC,CACH,CAAC,QAAQ,CAAC,0CAA0C,CAAC;CACvD,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;AAEtB,MAAM,CAAC,MAAM,gBAAgB,GAAG,GAAG,CAAC;IAClC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;IAC7D,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;CACpD,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC,CAAC;AAE9C,MAAM,CAAC,MAAM,iBAAiB,GAAG,GAAG,CAAC;IACnC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CACzB,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC;AAE7B,MAAM,CAAC,MAAM,aAAa,GAAG,GAAG,CAAC;IAC/B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC1B,CAAC,CAAC,QAAQ,CAAC,gBAAgB,CAAC,CAAC;AAE9B,MAAM,oBAAoB,GAAG,GAAG,CAAC;IAC/B,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC3B,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACvB,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,2CAA2C,CAAC;IAC1E,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IAChF,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE;IACf,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC;AAEH,MAAM,kBAAkB,GAAG,GAAG,CAAC;IAC7B,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,CAAC,yDAAyD,CAAC;IAC3F,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,oFAAoF,CAAC;IACrH,iBAAiB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,6CAA6C,CAAC;IAC1F,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,eAAe,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAChC,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC9B,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;IACpG,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACnF,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;IAC9D,YAAY,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,mCAAmC,CAAC;IAC3E,qBAAqB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kFAAkF,CAAC;CACpI,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,GAAG,CAAC;IACpC,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,gBAAgB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACjC,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;IAChE,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE;IAC9B,eAAe,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;IACrG,qBAAqB,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IACzG,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,kBAAkB,CAAC;IAClC,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;IACzB,uBAAuB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IAClG,eAAe,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,CAAC,QAAQ,CAAC,+DAA+D,CAAC;CAC9H,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,GAAG,CAAC;IAC7C,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,kBAAkB,CAAC,CAAC,QAAQ,CAAC,0BAA0B,CAAC;IAC1E,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,wBAAwB,CAAC;IAClE,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;IACzB,eAAe,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC;CAC/C,CAAC,CAAC;AAEH,MAAM,WAAW,GAAG,GAAG,CAAC;IACtB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,4CAA4C,CAAC;IACvE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE;IAChB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;IAC/E,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;IAChD,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE;IACvB,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;IACxB,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,GAAG,CAAC;IACtC,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,KAAK,EAAE,GAAG,CACR,GAAG,CAAC;QACF,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;QAC/E,yBAAyB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;QACvD,mBAAmB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;QACpC,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE;QAC1B,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;QACxB,MAAM,EAAE,CAAC,CAAC,KAAK,CAAC,WAAW,CAAC;KAC7B,CAAC,CACH,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IACjC,QAAQ,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,QAAQ,CAAC,iFAAiF,CAAC;IACpH,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,SAAS,CAAC,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;CACpG,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,GAAG,CAAC;IAClC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,GAAG,CAAC,WAAW,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC;IACvE,QAAQ,EAAE,SAAS,CAAC,QAAQ,CAAC,gGAAgG,CAAC;IAC9H,QAAQ,EAAE,SAAS,CAAC,QAAQ,CAAC,8BAA8B,CAAC;IAC5D,OAAO,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,QAAQ,CAAC,0BAA0B,CAAC;CAC7D,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,GAAG,CAAC;IAC3C,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,MAAM,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IAC3G,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uEAAuE,CAAC;CAC3G,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,GAAG,CAAC;IACnC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,QAAQ,EAAE,GAAG,CAAC;QACZ,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;QAChD,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wFAAwF,CAAC;KACtH,CAAC;IACF,YAAY,EAAE,GAAG,CAAC;QAChB,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE;QAC1B,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE;QACvB,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;QAC5D,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE;QACtB,cAAc,EAAE,CAAC,CAAC,OAAO,EAAE;QAC3B,2BAA2B,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kDAAkD,CAAC;KAC1G,CAAC;IACF,GAAG,EAAE,GAAG,CAAC;QACP,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;QACxB,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE;QACvB,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,oBAAoB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uCAAuC,CAAC;QAClF,wBAAwB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,2CAA2C,CAAC;KAC3F,CAAC;IACF,eAAe,EAAE,SAAS,CAAC,QAAQ,CAAC,gDAAgD,CAAC;IACrF,eAAe,EAAE,yBAAyB;CAC3C,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,GAAG,CAAC;IAC5C,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE;IACpB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACxF,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kCAAkC,CAAC;IAC/E,OAAO,EAAE,CAAC,CAAC,KAAK,CACd,GAAG,CAAC;QACF,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kCAAkC,CAAC;QAC7D,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QAC7D,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,+BAA+B,CAAC;QAC7E,gBAAgB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,mDAAmD,CAAC;KAChG,CAAC,CACH;IACD,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;IACtB,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC9B,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CACpC,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,GAAG,CAAC;IAC7B,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC;IACnH,IAAI,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACrB,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC5B,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,2CAA2C,CAAC;CAC/E,CAAC,CAAC"}
1
+ {"version":3,"file":"outputs.js","sourceRoot":"","sources":["../../src/tools/outputs.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAExB;;;;GAIG;AAEH,MAAM,GAAG,GAAG,CAA0B,KAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE,CAAC;AACjF,sEAAsE;AACtE,MAAM,GAAG,GAAG,CAAyB,MAAS,EAAE,EAAE,CAAC,MAAM,CAAC,QAAQ,EAAE,CAAC,QAAQ,EAAE,CAAC;AAChF,MAAM,SAAS,GAAG,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;AAE7C,MAAM,CAAC,MAAM,aAAa,GAAG,GAAG,CAAC;IAC/B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACvE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE;IAChB,GAAG,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,2BAA2B,CAAC;IAC1D,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC,QAAQ,CAAC,WAAW,CAAC,CAAC;AAEzB,MAAM,CAAC,MAAM,UAAU,GAAG,GAAG,CAAC;IAC5B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACvE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IAClD,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,mCAAmC,CAAC;IAClE,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC3B,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACxB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8DAA8D,CAAC;IAClG,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,4BAA4B,CAAC;IACpE,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC5B,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;CAC5B,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;AAEtB,MAAM,oBAAoB,GAAG,GAAG,CAAC;IAC/B,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,6BAA6B,CAAC;IAChE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,gBAAgB,CAAC;IAC7C,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qGAAqG,CAAC;CACjI,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,UAAU,CAAC,MAAM,CAAC;IAC1D,YAAY,EAAE,GAAG,CACf,GAAG,CAAC;QACF,SAAS,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,QAAQ,CAAC,sCAAsC,CAAC;QACzF,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,QAAQ,CAAC,0CAA0C,CAAC;KAC/F,CAAC,CACH,CAAC,QAAQ,CAAC,0CAA0C,CAAC;CACvD,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;AAEtB,MAAM,CAAC,MAAM,gBAAgB,GAAG,GAAG,CAAC;IAClC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IAClD,eAAe,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uBAAuB,CAAC;IAC7D,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;CACpD,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC,CAAC;AAE9C,MAAM,CAAC,MAAM,iBAAiB,GAAG,GAAG,CAAC;IACnC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CACzB,CAAC,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC;AAE7B,MAAM,CAAC,MAAM,eAAe,GAAG,GAAG,CAAC;IACjC,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACvB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC1B,CAAC,CAAC,QAAQ,CAAC,cAAc,CAAC,CAAC;AAE5B,MAAM,CAAC,MAAM,aAAa,GAAG,GAAG,CAAC;IAC/B,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC1B,CAAC,CAAC,QAAQ,CAAC,gBAAgB,CAAC,CAAC;AAE9B,MAAM,oBAAoB,GAAG,GAAG,CAAC;IAC/B,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC3B,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACvB,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,2CAA2C,CAAC;IAC1E,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IAChF,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,GAAG,EAAE,CAAC,CAAC,MAAM,EAAE;IACf,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC;AAEH,MAAM,kBAAkB,GAAG,GAAG,CAAC;IAC7B,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE,CAAC,QAAQ,CAAC,yDAAyD,CAAC;IAC3F,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,oFAAoF,CAAC;IACrH,iBAAiB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,6CAA6C,CAAC;IAC1F,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,eAAe,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAChC,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC9B,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC/B,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;IACpG,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACnF,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;IAC9D,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,QAAQ,CAAC,yEAAyE,CAAC;IAC/G,YAAY,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,mCAAmC,CAAC;IAC3E,qBAAqB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kFAAkF,CAAC;CACpI,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,kBAAkB,GAAG,GAAG,CAAC;IACpC,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,gBAAgB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACjC,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;IAChE,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE;IAC9B,eAAe,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;IACrG,qBAAqB,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IACzG,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,uEAAuE,CAAC;IAC9H,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,2DAA2D,CAAC;IAC7G,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,kBAAkB,CAAC;IAClC,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;IACzB,uBAAuB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,+CAA+C,CAAC;IAClG,eAAe,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC,CAAC,CAAC,QAAQ,CAAC,+DAA+D,CAAC;CAC9H,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,2BAA2B,GAAG,GAAG,CAAC;IAC7C,QAAQ,EAAE,CAAC,CAAC,KAAK,CAAC,kBAAkB,CAAC,CAAC,QAAQ,CAAC,0BAA0B,CAAC;IAC1E,cAAc,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,wBAAwB,CAAC;IAClE,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC;IACzB,eAAe,EAAE,CAAC,CAAC,KAAK,CAAC,oBAAoB,CAAC;CAC/C,CAAC,CAAC;AAEH,MAAM,WAAW,GAAG,GAAG,CAAC;IACtB,EAAE,EAAE,CAAC,CAAC,MAAM,EAAE;IACd,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,4CAA4C,CAAC;IACvE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE;IAChB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;IAC/E,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;IAChD,UAAU,EAAE,CAAC,CAAC,OAAO,EAAE;IACvB,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;IACxB,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CAC7B,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,oBAAoB,GAAG,GAAG,CAAC;IACtC,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,KAAK,EAAE,CAAC,CAAC,MAAM,EAAE;IACjB,KAAK,EAAE,GAAG,CACR,GAAG,CAAC;QACF,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kDAAkD,CAAC;QAC/E,yBAAyB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;QACvD,mBAAmB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;QACpC,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE;QAC1B,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;QACxB,MAAM,EAAE,CAAC,CAAC,KAAK,CAAC,WAAW,CAAC;KAC7B,CAAC,CACH,CAAC,QAAQ,CAAC,qBAAqB,CAAC;IACjC,QAAQ,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,QAAQ,CAAC,iFAAiF,CAAC;IACpH,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,SAAS,CAAC,CAAC,CAAC,QAAQ,CAAC,sDAAsD,CAAC;CACpG,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,gBAAgB,GAAG,GAAG,CAAC;IAClC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,GAAG,CAAC,WAAW,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC;IACvE,QAAQ,EAAE,SAAS,CAAC,QAAQ,CAAC,gGAAgG,CAAC;IAC9H,QAAQ,EAAE,SAAS,CAAC,QAAQ,CAAC,8BAA8B,CAAC;IAC5D,OAAO,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,QAAQ,CAAC,0BAA0B,CAAC;CAC7D,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,yBAAyB,GAAG,GAAG,CAAC;IAC3C,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,MAAM,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IAC3G,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uEAAuE,CAAC;CAC3G,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,iBAAiB,GAAG,GAAG,CAAC;IACnC,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,QAAQ,EAAE,GAAG,CAAC;QACZ,kBAAkB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,OAAO,CAAC;QAChD,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wFAAwF,CAAC;KACtH,CAAC;IACF,YAAY,EAAE,GAAG,CAAC;QAChB,cAAc,EAAE,CAAC,CAAC,MAAM,EAAE;QAC1B,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE;QACvB,aAAa,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,wBAAwB,CAAC;QAC5D,SAAS,EAAE,CAAC,CAAC,OAAO,EAAE;QACtB,cAAc,EAAE,CAAC,CAAC,OAAO,EAAE;QAC3B,2BAA2B,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kDAAkD,CAAC;KAC1G,CAAC;IACF,GAAG,EAAE,GAAG,CAAC;QACP,YAAY,EAAE,CAAC,CAAC,MAAM,EAAE;QACxB,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE;QACvB,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,oBAAoB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,uCAAuC,CAAC;QAClF,wBAAwB,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,2CAA2C,CAAC;KAC3F,CAAC;IACF,eAAe,EAAE,SAAS,CAAC,QAAQ,CAAC,gDAAgD,CAAC;IACrF,eAAe,EAAE,yBAAyB;CAC3C,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,0BAA0B,GAAG,GAAG,CAAC;IAC5C,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE;IACrB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,QAAQ,EAAE,CAAC,CAAC,MAAM,EAAE;IACpB,OAAO,EAAE,CAAC,CAAC,MAAM,EAAE;IACnB,MAAM,EAAE,CAAC,CAAC,MAAM,EAAE;IAClB,UAAU,EAAE,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,8CAA8C,CAAC;IACxF,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,kCAAkC,CAAC;IAC/E,OAAO,EAAE,CAAC,CAAC,KAAK,CACd,GAAG,CAAC;QACF,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,kCAAkC,CAAC;QAC7D,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;QACtB,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,sBAAsB,CAAC;QAC7D,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,+BAA+B,CAAC;QAC7E,gBAAgB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,mDAAmD,CAAC;KAChG,CAAC,CACH;IACD,UAAU,EAAE,CAAC,CAAC,MAAM,EAAE;IACtB,aAAa,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC9B,kBAAkB,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;CACpC,CAAC,CAAC;AAEH,MAAM,CAAC,MAAM,WAAW,GAAG,GAAG,CAAC;IAC7B,MAAM,EAAE,GAAG,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,IAAI,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,WAAW,EAAE,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,gCAAgC,CAAC;IACnH,IAAI,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IACrB,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC;IAC5B,OAAO,EAAE,GAAG,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,QAAQ,CAAC,2CAA2C,CAAC;CAC/E,CAAC,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/mcp",
3
- "version": "0.20.1",
3
+ "version": "0.22.0",
4
4
  "description": "Model Context Protocol (MCP) server, client-side WebMCP tools and agent skills for Critical Path",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -36,8 +36,8 @@
36
36
  "@modelcontextprotocol/sdk": "^1.32.1",
37
37
  "zod": "^3.24.0",
38
38
  "zod-to-json-schema": "^3.25.2",
39
- "@critical-path/client": "0.25.3",
40
- "@critical-path/core": "0.53.0"
39
+ "@critical-path/client": "0.26.0",
40
+ "@critical-path/core": "0.55.0"
41
41
  },
42
42
  "devDependencies": {
43
43
  "@anthropic-ai/sdk": "^0.137.0",
@@ -16,6 +16,7 @@ description: Find what drives a project's end date, how much each task can slip
16
16
 
17
17
  - `projectEndDate` is the forecast finish. With levelling, compare it with `unleveledProjectEndDate`: the gap is time lost waiting for busy people.
18
18
  - `criticalTaskIds` are the tasks with zero or negative slack. Any delay to one of them moves the end date or misses a deadline.
19
+ - `unestimatedTaskIds` lists unfinished tasks with no estimate; each was assumed to take `defaultEstimateHours` (1 by default), so say the forecast is uncertain and suggest estimating them. Entries with `isSummary: true` are parent tasks shown as the span of their subtasks.
19
20
  - `missedDeadlineTaskIds` lists tasks forecast to finish after their `deadline`. Their `deadlineVarianceHours` says by how much (negative working hours), and the negative `totalSlack` on the tasks before them shows which work drives the miss. Entries with `isMilestone: true` are checkpoints such as releases or sign-offs.
20
21
  - Each entry in `tasks` has `slackWorkingHours`: how many working hours the task can slip without moving the end. Under about 8 hours is near-critical.
21
22
  - `levelingDelayHours` and `waitingOn` show a task that waited for its assignee to finish another task.