@critical-path/core 0.56.0 → 0.57.0
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/CHANGELOG.md +12 -0
- package/README.md +1 -1
- package/dist/domain/cpm.d.ts.map +1 -1
- package/dist/domain/cpm.js +111 -158
- package/dist/domain/cpm.js.map +1 -1
- package/dist/engine/index.d.ts +1 -1
- package/dist/engine/index.d.ts.map +1 -1
- package/dist/engine/index.js +5 -2
- package/dist/engine/index.js.map +1 -1
- package/dist/schemas/index.d.ts +9 -0
- package/dist/schemas/index.d.ts.map +1 -1
- package/dist/schemas/index.js +2 -0
- package/dist/schemas/index.js.map +1 -1
- package/dist/types/index.d.ts +12 -0
- package/dist/types/index.d.ts.map +1 -1
- package/package.json +1 -1
package/CHANGELOG.md
CHANGED
|
@@ -1,5 +1,17 @@
|
|
|
1
1
|
# @critical-path/core
|
|
2
2
|
|
|
3
|
+
## 0.57.0
|
|
4
|
+
|
|
5
|
+
### Minor Changes
|
|
6
|
+
|
|
7
|
+
- 224ad51: One scheduling engine, start constraints and dependency lag.
|
|
8
|
+
|
|
9
|
+
- **BREAKING:** project-calendar critical path analysis now runs on the same date-based passes as assignee mode (every task on the project calendar), so the two cannot drift. Offsets are unchanged; dates now show a successor starting at the next working moment after its predecessor finishes (09:00 the next morning rather than 17:00), and results include `overallocations` and `scheduleId` as in assignee mode. Without a start date the analysis has offsets only, as before.
|
|
10
|
+
- New `Task.earliestStart`: start no earlier than this date (a date-only value is the start of that day). Applies in critical path analysis and levelling, and on a summary task to every leaf under it.
|
|
11
|
+
- New `TaskDependency.lagHours`: working hours to wait after the predecessor finishes (negative for a lead), accepted by `addDependency`, `POST /tasks/:id/dependencies` and MCP `add_dependency`. Links that differ only in lag are separate dependencies; the longer wait applies.
|
|
12
|
+
- Levelling orders its backward pass topologically over dependency and resource links, so leads cannot break slack.
|
|
13
|
+
- MCP `create_task` / `update_task` accept `earliestStart`.
|
|
14
|
+
|
|
3
15
|
## 0.56.0
|
|
4
16
|
|
|
5
17
|
### Minor Changes
|
package/README.md
CHANGED
|
@@ -365,7 +365,7 @@ console.log(leveled.unleveledProjectEndDate, '->', leveled.projectEndDate);
|
|
|
365
365
|
|
|
366
366
|
With `calendars: 'assignee'` (or `criticalPathCalendars: 'assignee'` on the engine), each task uses its assignee's schedule, then its team's, then the project calendar. Passes run on dates, slack is measured in each task's calendar, and each calendar is evaluated in its own `timezone` (IANA name; default UTC), including daylight-saving changes. `levelResources: true` additionally delays tasks so nobody works on two at once (priority rule `levelingPriority`, default least slack), reporting `levelingDelayHours` and `waitingOn` per task. Tasks with `allocation` below 1 take that share of their assignee (a 16h task at 0.5 spans 32 working hours); levelling fits them within 100% per person, and `overallocations` lists who is booked above 100% and when. Teams act as pools of `headcount` people (default: member count) shared by team-only tasks and members' own tasks. Finished tasks take no time. `calculatePortfolioCriticalPath({ projectIds })` levels several projects together, sharing people and teams across them; `includeHiddenWork` also counts unreadable projects' work as `'hidden'`. `effort: 'remaining'` schedules only what is left on in-progress tasks.
|
|
367
367
|
|
|
368
|
-
Tasks with subtasks are summary tasks, reported as roll-ups of their leaves (`isSummary`); dependencies and deadlines on them apply to every leaf. Unestimated tasks use `defaultEstimateHours` (default 1) and are listed in `unestimatedTaskIds`. Tasks with `isMilestone: true` are zero-duration checkpoints (their estimates are ignored). A `deadline` on any task caps its late finish: a forecast that misses it shows as negative slack along the path driving it, with `deadlineDate` and `deadlineVarianceHours` per task and `missedDeadlineTaskIds` on the analysis. A date-only deadline means the end of that working day;
|
|
368
|
+
Tasks with subtasks are summary tasks, reported as roll-ups of their leaves (`isSummary`); dependencies and deadlines on them apply to every leaf. Unestimated tasks use `defaultEstimateHours` (default 1) and are listed in `unestimatedTaskIds`. Tasks with `isMilestone: true` are zero-duration checkpoints (their estimates are ignored). A `deadline` on any task caps its late finish: a forecast that misses it shows as negative slack along the path driving it, with `deadlineDate` and `deadlineVarianceHours` per task and `missedDeadlineTaskIds` on the analysis. A date-only deadline means the end of that working day. `earliestStart` (start no earlier than) and dependency `lagHours` (wait after the predecessor; negative for a lead) constrain the forward pass. Project-calendar mode needs a start date to apply these date constraints.
|
|
369
369
|
|
|
370
370
|
### 9. Fractional Lexical Indexing (Kanban Reordering)
|
|
371
371
|
|
package/dist/domain/cpm.d.ts.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAe3B,8GAA8G;AAC9G,eAAO,MAAM,sBAAsB,IAAI,CAAC;AAExC;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,GAAE,MAA+B,GAAG,MAAM,CAK9G;AAOD,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAErF;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAMzH;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;IACrB;;;OAGG;IACH,oBAAoB,CAAC,EAAE,MAAM,CAAC;CAC/B;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAID;;;GAGG;AACH,wBAAgB,kBAAkB,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,GAAE,YAAoC,GAAG,IAAI,CAKzG;
|
|
1
|
+
{"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAe3B,8GAA8G;AAC9G,eAAO,MAAM,sBAAsB,IAAI,CAAC;AAExC;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,GAAE,MAA+B,GAAG,MAAM,CAK9G;AAOD,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAErF;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAMzH;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;IACrB;;;OAGG;IACH,oBAAoB,CAAC,EAAE,MAAM,CAAC;CAC/B;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAID;;;GAGG;AACH,wBAAgB,kBAAkB,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,GAAE,YAAoC,GAAG,IAAI,CAKzG;AAkvBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAuC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CAmCtB"}
|
package/dist/domain/cpm.js
CHANGED
|
@@ -74,6 +74,7 @@ const milestoneFields = (task, deadline, varianceHours) => ({
|
|
|
74
74
|
...(deadline ? { deadlineDate: deadline.toISOString(), deadlineVarianceHours: round2(varianceHours) } : {})
|
|
75
75
|
});
|
|
76
76
|
const allocationField = (task) => (getTaskAllocation(task) < 1 ? { allocation: getTaskAllocation(task) } : {});
|
|
77
|
+
const edgeKey = (before, after) => `${before}\u0000${after}`;
|
|
77
78
|
const deadlinesOf = (graph, id) => graph.deadlines.get(id) ?? [];
|
|
78
79
|
/**
|
|
79
80
|
* The scheduling graph. Only leaf tasks are scheduled: a summary task (one with subtasks among
|
|
@@ -96,12 +97,14 @@ function buildGraph(tasks, dependencies) {
|
|
|
96
97
|
};
|
|
97
98
|
const summaries = new Map([...summaryIds].map((id) => [id, { task: all.get(id), leafIds: leavesOf(id) }]));
|
|
98
99
|
const deadlines = new Map();
|
|
100
|
+
const earliestStarts = new Map();
|
|
99
101
|
for (const t of tasks) {
|
|
100
|
-
|
|
101
|
-
continue;
|
|
102
|
-
for (const leaf of leavesOf(t.id))
|
|
102
|
+
for (const leaf of t.deadline ? leavesOf(t.id) : [])
|
|
103
103
|
deadlines.set(leaf, [...(deadlines.get(leaf) ?? []), t.deadline]);
|
|
104
|
+
for (const leaf of t.earliestStart ? leavesOf(t.id) : [])
|
|
105
|
+
earliestStarts.set(leaf, [...(earliestStarts.get(leaf) ?? []), t.earliestStart]);
|
|
104
106
|
}
|
|
107
|
+
const lags = new Map();
|
|
105
108
|
const taskMap = new Map(tasks.filter((t) => !summaryIds.has(t.id)).map((t) => [t.id, t]));
|
|
106
109
|
const taskIds = Array.from(taskMap.keys());
|
|
107
110
|
// Build adjacency graph:
|
|
@@ -117,12 +120,17 @@ function buildGraph(tasks, dependencies) {
|
|
|
117
120
|
const edge = precedenceOf(dep);
|
|
118
121
|
if (!edge || !all.has(edge.before) || !all.has(edge.after))
|
|
119
122
|
continue;
|
|
123
|
+
const lag = Number.isFinite(dep.lagHours) ? dep.lagHours : 0;
|
|
120
124
|
for (const before of leavesOf(edge.before)) {
|
|
121
125
|
for (const after of leavesOf(edge.after)) {
|
|
122
126
|
if (before === after)
|
|
123
127
|
continue;
|
|
124
128
|
prerequisites.get(after).add(before);
|
|
125
129
|
successors.get(before).add(after);
|
|
130
|
+
// Two links between the same tasks: the longer wait wins
|
|
131
|
+
const key = edgeKey(before, after);
|
|
132
|
+
if (lag !== 0 || lags.has(key))
|
|
133
|
+
lags.set(key, Math.max(lags.get(key) ?? -Infinity, lag));
|
|
126
134
|
}
|
|
127
135
|
}
|
|
128
136
|
}
|
|
@@ -154,7 +162,7 @@ function buildGraph(tasks, dependencies) {
|
|
|
154
162
|
const sorted = new Set(topoOrder);
|
|
155
163
|
const cyclicTaskIds = taskIds.filter((id) => !sorted.has(id));
|
|
156
164
|
topoOrder.push(...cyclicTaskIds);
|
|
157
|
-
return { taskMap, taskIds, prerequisites, successors, topoOrder, cyclicTaskIds, summaries, deadlines };
|
|
165
|
+
return { taskMap, taskIds, prerequisites, successors, topoOrder, cyclicTaskIds, summaries, deadlines, earliestStarts, lags };
|
|
158
166
|
}
|
|
159
167
|
/**
|
|
160
168
|
* Adds each summary task to `analysis` as a roll-up of the leaf tasks under it: earliest start,
|
|
@@ -257,7 +265,21 @@ function scheduleOnDates(graph, segments, options, calculatedAt) {
|
|
|
257
265
|
const deadline = taskMap.get(id).deadline;
|
|
258
266
|
return deadline ? getDeadlineInstant(deadline, calendarOf.get(id)) : undefined;
|
|
259
267
|
};
|
|
260
|
-
|
|
268
|
+
// A start constraint means "not before": the first working moment at or after it
|
|
269
|
+
const notBefore = new Map(taskIds.flatMap((id) => {
|
|
270
|
+
const instants = (graph.earliestStarts.get(id) ?? []).map((d) => nextWorkingTime(d, calendarOf.get(id)));
|
|
271
|
+
return instants.length ? [[id, new Date(Math.max(...instants.map((d) => d.getTime())))]] : [];
|
|
272
|
+
}));
|
|
273
|
+
const ctx = {
|
|
274
|
+
taskMap,
|
|
275
|
+
calendarOf,
|
|
276
|
+
durationOf,
|
|
277
|
+
deadlineOf,
|
|
278
|
+
ownDeadlineOf,
|
|
279
|
+
notBefore,
|
|
280
|
+
lagOf: (before, after) => graph.lags.get(edgeKey(before, after)) ?? 0,
|
|
281
|
+
startOf: (id) => segmentOf.get(id).start
|
|
282
|
+
};
|
|
261
283
|
const endOfProjects = (dates) => {
|
|
262
284
|
const ends = new Map(segments.map((seg) => [seg.projectId, latest(seg.taskIds.map((id) => dates.finish.get(id)), seg.start)]));
|
|
263
285
|
return (id) => ends.get(segmentOf.get(id).projectId);
|
|
@@ -303,6 +325,34 @@ function involving(overallocations, seg) {
|
|
|
303
325
|
const ids = new Set(seg.taskIds);
|
|
304
326
|
return overallocations.filter((o) => o.taskIds.some((id) => ids.has(id)));
|
|
305
327
|
}
|
|
328
|
+
/** `date` moved by `hours` working hours on `calendar` (back when negative). */
|
|
329
|
+
function shiftWorking(date, hours, calendar) {
|
|
330
|
+
if (hours > 0)
|
|
331
|
+
return addWorkingHours(date, hours, calendar);
|
|
332
|
+
if (hours < 0)
|
|
333
|
+
return subtractWorkingHours(date, -hours, calendar);
|
|
334
|
+
return date;
|
|
335
|
+
}
|
|
336
|
+
/**
|
|
337
|
+
* When a task may start, given when its predecessors finish: the latest of its project's start, its
|
|
338
|
+
* start constraint and each predecessor's finish plus the lag on that dependency.
|
|
339
|
+
*/
|
|
340
|
+
function readyTime(id, prerequisites, finish, ctx) {
|
|
341
|
+
let ready = ctx.startOf(id);
|
|
342
|
+
const floor = ctx.notBefore.get(id);
|
|
343
|
+
if (floor && floor > ready)
|
|
344
|
+
ready = floor;
|
|
345
|
+
const calendar = ctx.calendarOf.get(id);
|
|
346
|
+
for (const p of prerequisites.get(id)) {
|
|
347
|
+
const f = finish.get(p);
|
|
348
|
+
if (!f)
|
|
349
|
+
continue;
|
|
350
|
+
const after = shiftWorking(f, ctx.lagOf(p, id), calendar);
|
|
351
|
+
if (after > ready)
|
|
352
|
+
ready = after;
|
|
353
|
+
}
|
|
354
|
+
return ready;
|
|
355
|
+
}
|
|
306
356
|
function latest(dates, floor) {
|
|
307
357
|
let max = floor;
|
|
308
358
|
for (const d of dates)
|
|
@@ -331,12 +381,7 @@ function forwardPass(order, prerequisites, ctx) {
|
|
|
331
381
|
const start = new Map();
|
|
332
382
|
const finish = new Map();
|
|
333
383
|
for (const id of order) {
|
|
334
|
-
|
|
335
|
-
for (const p of prerequisites.get(id)) {
|
|
336
|
-
const f = finish.get(p);
|
|
337
|
-
if (f && f > ready)
|
|
338
|
-
ready = f;
|
|
339
|
-
}
|
|
384
|
+
const ready = readyTime(id, prerequisites, finish, ctx);
|
|
340
385
|
const calendar = ctx.calendarOf.get(id);
|
|
341
386
|
const duration = ctx.durationOf.get(id);
|
|
342
387
|
const es = startTime(ready, duration, calendar);
|
|
@@ -353,8 +398,10 @@ function backwardPass(order, successorsOf, endOf, ctx) {
|
|
|
353
398
|
let due = endOf(id);
|
|
354
399
|
for (const s of successorsOf(id)) {
|
|
355
400
|
const ls = start.get(s);
|
|
356
|
-
|
|
357
|
-
|
|
401
|
+
// The successor's late start, less the lag it waits after this task finishes
|
|
402
|
+
const by = ls && shiftWorking(ls, -ctx.lagOf(id, s), ctx.calendarOf.get(s));
|
|
403
|
+
if (by && by < due)
|
|
404
|
+
due = by;
|
|
358
405
|
}
|
|
359
406
|
const deadline = ctx.deadlineOf.get(id);
|
|
360
407
|
if (deadline && deadline < due)
|
|
@@ -424,12 +471,7 @@ function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder
|
|
|
424
471
|
eligible.add(topoOrder.find((id) => !start.has(id)));
|
|
425
472
|
const id = first(eligible);
|
|
426
473
|
eligible.delete(id);
|
|
427
|
-
|
|
428
|
-
for (const p of prerequisites.get(id)) {
|
|
429
|
-
const f = finish.get(p);
|
|
430
|
-
if (f && f > ready)
|
|
431
|
-
ready = f;
|
|
432
|
-
}
|
|
474
|
+
const ready = readyTime(id, prerequisites, finish, ctx);
|
|
433
475
|
const calendar = ctx.calendarOf.get(id);
|
|
434
476
|
const duration = ctx.durationOf.get(id);
|
|
435
477
|
const resources = duration > 0 ? resourcesOf(taskMap.get(id)) : [];
|
|
@@ -483,10 +525,36 @@ function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder
|
|
|
483
525
|
// whose finish freed its capacity.
|
|
484
526
|
for (const [taskId, blocker] of waitingOn)
|
|
485
527
|
link(blocker, taskId);
|
|
486
|
-
//
|
|
487
|
-
//
|
|
528
|
+
// The backward pass needs every successor (dependency or resource chain) before its
|
|
529
|
+
// predecessors. Edges mostly go forward in levelled start time, but a lead (negative lag) can
|
|
530
|
+
// start a successor first, so walk the edges depth-first, visiting tasks in start order.
|
|
488
531
|
const placement = new Map(placed.map((id, i) => [id, i]));
|
|
489
|
-
const
|
|
532
|
+
const byStart = [...taskIds].sort((a, b) => start.get(a).getTime() - start.get(b).getTime() || placement.get(a) - placement.get(b));
|
|
533
|
+
const backwardOrder = [];
|
|
534
|
+
const visited = new Set();
|
|
535
|
+
const visit = (root) => {
|
|
536
|
+
// Iterative post-order, so long chains cannot overflow the stack
|
|
537
|
+
const stack = [];
|
|
538
|
+
const enter = (id) => {
|
|
539
|
+
visited.add(id);
|
|
540
|
+
stack.push([id, [...successors.get(id), ...(resourceSuccessors.get(id) ?? [])][Symbol.iterator]()]);
|
|
541
|
+
};
|
|
542
|
+
enter(root);
|
|
543
|
+
while (stack.length) {
|
|
544
|
+
const [id, next] = stack[stack.length - 1];
|
|
545
|
+
const step = next.next();
|
|
546
|
+
if (step.done) {
|
|
547
|
+
stack.pop();
|
|
548
|
+
backwardOrder.push(id);
|
|
549
|
+
}
|
|
550
|
+
else if (!visited.has(step.value)) {
|
|
551
|
+
enter(step.value);
|
|
552
|
+
}
|
|
553
|
+
}
|
|
554
|
+
};
|
|
555
|
+
for (const id of byStart)
|
|
556
|
+
if (!visited.has(id))
|
|
557
|
+
visit(id);
|
|
490
558
|
return {
|
|
491
559
|
early: { start, finish },
|
|
492
560
|
waitingOn,
|
|
@@ -698,145 +766,30 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
|
|
|
698
766
|
tasks: []
|
|
699
767
|
};
|
|
700
768
|
}
|
|
701
|
-
const graph = buildGraph(tasks, dependencies);
|
|
702
|
-
const { taskMap, taskIds, prerequisites, successors, topoOrder } = graph;
|
|
703
769
|
if (options.levelResources && options.calendars !== 'assignee') {
|
|
704
770
|
throw new Error("levelResources requires calendars: 'assignee'.");
|
|
705
771
|
}
|
|
706
|
-
|
|
707
|
-
|
|
708
|
-
|
|
709
|
-
// Deadlines as project-calendar hours from the start. Without a start date there is nothing to
|
|
710
|
-
// place them against, so they are ignored. A task's late finish is capped by its own deadline and
|
|
711
|
-
// by those of the summary tasks above it; its schedule reports its own.
|
|
712
|
-
const capHours = new Map();
|
|
713
|
-
const ownDeadline = new Map();
|
|
714
|
-
const toHours = (deadline) => deadline >= projectStartDate
|
|
715
|
-
? getWorkingHoursBetween(projectStartDate, deadline, schedule)
|
|
716
|
-
: -getWorkingHoursBetween(deadline, projectStartDate, schedule);
|
|
717
|
-
if (projectStartDate) {
|
|
718
|
-
for (const id of taskIds) {
|
|
719
|
-
const caps = deadlinesOf(graph, id).map((d) => toHours(getDeadlineInstant(d, schedule)));
|
|
720
|
-
if (caps.length)
|
|
721
|
-
capHours.set(id, Math.min(...caps));
|
|
722
|
-
const own = taskMap.get(id).deadline;
|
|
723
|
-
if (own)
|
|
724
|
-
ownDeadline.set(id, getDeadlineInstant(own, schedule));
|
|
725
|
-
}
|
|
726
|
-
}
|
|
727
|
-
// --- FORWARD PASS ---
|
|
728
|
-
const earlyStart = new Map();
|
|
729
|
-
const earlyFinish = new Map();
|
|
730
|
-
for (const id of topoOrder) {
|
|
731
|
-
const task = taskMap.get(id);
|
|
732
|
-
const duration = getTaskScheduledHours(task, options.effort, options.defaultEstimateHours);
|
|
733
|
-
const prereqs = prerequisites.get(id) || new Set();
|
|
734
|
-
let maxPrereqFinish = 0;
|
|
735
|
-
for (const p of prereqs) {
|
|
736
|
-
const pFinish = earlyFinish.get(p) ?? 0;
|
|
737
|
-
if (pFinish > maxPrereqFinish) {
|
|
738
|
-
maxPrereqFinish = pFinish;
|
|
739
|
-
}
|
|
740
|
-
}
|
|
741
|
-
const es = maxPrereqFinish;
|
|
742
|
-
const ef = es + duration;
|
|
743
|
-
earlyStart.set(id, es);
|
|
744
|
-
earlyFinish.set(id, ef);
|
|
745
|
-
}
|
|
746
|
-
// Total project duration
|
|
747
|
-
let totalDurationHours = 0;
|
|
748
|
-
for (const ef of earlyFinish.values()) {
|
|
749
|
-
if (ef > totalDurationHours) {
|
|
750
|
-
totalDurationHours = ef;
|
|
751
|
-
}
|
|
752
|
-
}
|
|
753
|
-
// --- BACKWARD PASS ---
|
|
754
|
-
const lateStart = new Map();
|
|
755
|
-
const lateFinish = new Map();
|
|
756
|
-
// Process in reverse topological order
|
|
757
|
-
for (let i = topoOrder.length - 1; i >= 0; i--) {
|
|
758
|
-
const id = topoOrder[i];
|
|
759
|
-
const task = taskMap.get(id);
|
|
760
|
-
const duration = getTaskScheduledHours(task, options.effort, options.defaultEstimateHours);
|
|
761
|
-
const succs = successors.get(id) || new Set();
|
|
762
|
-
let minSuccLateStart = totalDurationHours;
|
|
763
|
-
if (succs.size > 0) {
|
|
764
|
-
minSuccLateStart = Infinity;
|
|
765
|
-
for (const s of succs) {
|
|
766
|
-
const sLateStart = lateStart.get(s);
|
|
767
|
-
if (sLateStart !== undefined && sLateStart < minSuccLateStart) {
|
|
768
|
-
minSuccLateStart = sLateStart;
|
|
769
|
-
}
|
|
770
|
-
}
|
|
771
|
-
if (!Number.isFinite(minSuccLateStart)) {
|
|
772
|
-
minSuccLateStart = totalDurationHours;
|
|
773
|
-
}
|
|
774
|
-
}
|
|
775
|
-
const lf = Math.min(minSuccLateStart, capHours.get(id) ?? Infinity);
|
|
776
|
-
const ls = lf - duration;
|
|
777
|
-
lateFinish.set(id, lf);
|
|
778
|
-
lateStart.set(id, ls);
|
|
772
|
+
// Both modes run the same date-based passes; project mode puts every task on the project calendar.
|
|
773
|
+
if (options.calendars === 'assignee' || projectStartDate) {
|
|
774
|
+
return calculateCalendarCPM(projectId, calculatedAt, buildGraph(tasks, dependencies), options);
|
|
779
775
|
}
|
|
780
|
-
//
|
|
781
|
-
|
|
782
|
-
|
|
783
|
-
|
|
784
|
-
|
|
785
|
-
|
|
786
|
-
|
|
787
|
-
|
|
788
|
-
|
|
789
|
-
|
|
790
|
-
|
|
791
|
-
|
|
792
|
-
|
|
793
|
-
|
|
794
|
-
|
|
795
|
-
|
|
796
|
-
|
|
797
|
-
|
|
798
|
-
: undefined;
|
|
799
|
-
const earlyFinishDate = projectStartDate
|
|
800
|
-
? addWorkingHours(projectStartDate, ef, schedule).toISOString()
|
|
801
|
-
: undefined;
|
|
802
|
-
const lateStartDate = projectStartDate
|
|
803
|
-
? addWorkingHours(projectStartDate, ls, schedule).toISOString()
|
|
804
|
-
: undefined;
|
|
805
|
-
const lateFinishDate = projectStartDate
|
|
806
|
-
? addWorkingHours(projectStartDate, lf, schedule).toISOString()
|
|
807
|
-
: undefined;
|
|
808
|
-
schedules.push({
|
|
809
|
-
taskId: id,
|
|
810
|
-
earlyStart: Math.round(es * 100) / 100,
|
|
811
|
-
earlyFinish: Math.round(ef * 100) / 100,
|
|
812
|
-
lateStart: Math.round(ls * 100) / 100,
|
|
813
|
-
lateFinish: Math.round(lf * 100) / 100,
|
|
814
|
-
totalSlack,
|
|
815
|
-
isCritical,
|
|
816
|
-
durationHours: duration,
|
|
817
|
-
...allocationField(task),
|
|
818
|
-
...milestoneFields(task, ownDeadline.get(id), ownDeadline.has(id) ? toHours(ownDeadline.get(id)) - ef : undefined),
|
|
819
|
-
slackWorkingHours: totalSlack,
|
|
820
|
-
earlyStartDate,
|
|
821
|
-
earlyFinishDate,
|
|
822
|
-
lateStartDate,
|
|
823
|
-
lateFinishDate
|
|
824
|
-
});
|
|
825
|
-
}
|
|
826
|
-
const projectEndDate = projectStartDate
|
|
827
|
-
? addWorkingHours(projectStartDate, totalDurationHours, schedule).toISOString()
|
|
828
|
-
: undefined;
|
|
829
|
-
return finishAnalysis({
|
|
830
|
-
projectId,
|
|
831
|
-
calculatedAt,
|
|
832
|
-
totalDurationHours: Math.round(totalDurationHours * 100) / 100,
|
|
833
|
-
totalWorkingHours: Math.round(totalDurationHours * 100) / 100,
|
|
834
|
-
projectStartDate: projectStartDate ? projectStartDate.toISOString() : undefined,
|
|
835
|
-
projectEndDate,
|
|
836
|
-
criticalTaskIds,
|
|
837
|
-
missedDeadlineTaskIds: missedDeadlines(schedules),
|
|
838
|
-
...(graph.cyclicTaskIds.length ? { cyclicTaskIds: graph.cyclicTaskIds } : {}),
|
|
839
|
-
tasks: schedules
|
|
840
|
-
}, graph, schedule, taskIds);
|
|
776
|
+
// Without a start date there is nothing to date the schedule from. It runs from a fixed anchor and
|
|
777
|
+
// reports working-hour offsets only, which do not depend on the anchor because they count working
|
|
778
|
+
// time on the one calendar. Deadlines and start constraints are dates, so they do not apply.
|
|
779
|
+
const undatedTasks = tasks.map(({ deadline: _deadline, earliestStart: _earliestStart, ...task }) => task);
|
|
780
|
+
const analysis = calculateCalendarCPM(projectId, calculatedAt, buildGraph(undatedTasks, dependencies), {
|
|
781
|
+
...options,
|
|
782
|
+
projectStartDate: UNDATED_ANCHOR
|
|
783
|
+
});
|
|
784
|
+
return withoutDates(analysis);
|
|
785
|
+
}
|
|
786
|
+
/** A Monday at UTC midnight: where an undated project-calendar schedule is laid out. */
|
|
787
|
+
const UNDATED_ANCHOR = '2001-01-01T00:00:00.000Z';
|
|
788
|
+
/** Drops the dates from an analysis laid out from `UNDATED_ANCHOR`, keeping working-hour offsets. */
|
|
789
|
+
function withoutDates({ projectStartDate: _start, projectEndDate: _end, overallocations: _overallocations, ...analysis }) {
|
|
790
|
+
return {
|
|
791
|
+
...analysis,
|
|
792
|
+
tasks: analysis.tasks.map(({ earlyStartDate: _es, earlyFinishDate: _ef, lateStartDate: _ls, lateFinishDate: _lf, ...task }) => task)
|
|
793
|
+
};
|
|
841
794
|
}
|
|
842
795
|
//# sourceMappingURL=cpm.js.map
|
package/dist/domain/cpm.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACT,YAAY,EACb,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,gBAAgB,EAAE,MAAM,oBAAoB,CAAC;AACtD,OAAO,EAAE,YAAY,EAAE,MAAM,YAAY,CAAC;AAC1C,OAAO,EAAE,oBAAoB,EAAE,iBAAiB,EAAE,MAAM,aAAa,CAAC;AAEtE,8GAA8G;AAC9G,MAAM,CAAC,MAAM,sBAAsB,GAAG,CAAC,CAAC;AAExC;;;GAGG;AACH,MAAM,UAAU,oBAAoB,CAAC,IAAU,EAAE,uBAA+B,sBAAsB;IACpG,MAAM,QAAQ,GAAG,oBAAoB,CAAC,IAAI,CAAC,CAAC;IAC5C,IAAI,QAAQ,KAAK,SAAS;QAAE,OAAO,QAAQ,CAAC;IAC5C,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC;QAAE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1F,OAAO,oBAAoB,CAAC;AAC9B,CAAC;AAED,oGAAoG;AACpG,SAAS,aAAa,CAAC,IAAU;IAC/B,OAAO,oBAAoB,CAAC,IAAI,CAAC,KAAK,SAAS,IAAI,CAAC,CAAC,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,CAAC,CAAC;AACrH,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU,EAAE,oBAA6B;IAC3E,OAAO,oBAAoB,CAAC,IAAI,EAAE,oBAAoB,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AACpF,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAKD;;;;GAIG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU,EAAE,SAAsB,UAAU,EAAE,oBAA6B;IAC/G,IAAI,cAAc,CAAC,IAAI,CAAC;QAAE,OAAO,CAAC,CAAC;IACnC,IAAI,MAAM,KAAK,WAAW,IAAI,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,cAAc,EAAE,IAAI,CAAC,cAAc,EAAE,CAAC,EAAE,CAAC;QAC7G,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,oBAAoB,CAAC,IAAI,EAAE,oBAAoB,CAAC,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;IAC3H,CAAC;IACD,OAAO,mBAAmB,CAAC,IAAI,EAAE,oBAAoB,CAAC,CAAC;AACzD,CAAC;AA4CD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD;;;GAGG;AACH,MAAM,UAAU,kBAAkB,CAAC,QAAgB,EAAE,WAAyB,qBAAqB;IACjG,MAAM,KAAK,GAAG,qBAAqB,CAAC,IAAI,CAAC,QAAQ,CAAC;QAChD,CAAC,CAAC,YAAY,CAAC,IAAI,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC,OAAO,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,IAAI,CAAC,CAAC;QAC7E,CAAC,CAAC,QAAQ,CAAC;IACb,OAAO,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC9C,CAAC;AAED,2DAA2D;AAC3D,MAAM,eAAe,GAAG,CAAC,SAAqC,EAAE,EAAE,CAChE,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;AAExF,wEAAwE;AACxE,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,QAA0B,EAAE,aAAiC,EAAE,EAAE,CAAC,CAAC;IACtG,GAAG,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,WAAW,EAAE,IAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;IAC3D,GAAG,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,YAAY,EAAE,QAAQ,CAAC,WAAW,EAAE,EAAE,qBAAqB,EAAE,MAAM,CAAC,aAAc,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;CAC7G,CAAC,CAAC;AAEH,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAkBrH,MAAM,WAAW,GAAG,CAAC,KAAgB,EAAE,EAAU,EAAE,EAAE,CAAC,KAAK,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC;AAEpF;;;;GAIG;AACH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,UAAU,GAAG,iBAAiB,CAAC,KAAK,CAAC,CAAC;IAC5C,MAAM,GAAG,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/D,MAAM,UAAU,GAAG,IAAI,GAAG,EAAoB,CAAC;IAC/C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;QACtB,IAAI,CAAC,CAAC,QAAQ,IAAI,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC;YAAE,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC1H,CAAC;IACD,MAAM,QAAQ,GAAG,CAAC,EAAU,EAAE,OAAO,IAAI,GAAG,EAAU,EAAY,EAAE;QAClE,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC;YAAE,OAAO,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QACb,OAAO,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,QAAQ,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC;IACvE,CAAC,CAAC;IACF,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,CAAC,GAAG,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,EAAE,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC5G,MAAM,SAAS,GAAG,IAAI,GAAG,EAAoB,CAAC;IAC9C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;QACtB,IAAI,CAAC,CAAC,CAAC,QAAQ;YAAE,SAAS;QAC1B,KAAK,MAAM,IAAI,IAAI,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC;YAAE,SAAS,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC;IACvG,CAAC;IAED,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxG,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,YAAY,CAAC,GAAG,CAAC,CAAC;QAC/B,IAAI,CAAC,IAAI,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,CAAC;YAAE,SAAS;QACrE,KAAK,MAAM,MAAM,IAAI,QAAQ,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;YAC3C,KAAK,MAAM,KAAK,IAAI,QAAQ,CAAC,IAAI,CAAC,KAAK,CAAC,EAAE,CAAC;gBACzC,IAAI,MAAM,KAAK,KAAK;oBAAE,SAAS;gBAC/B,aAAa,CAAC,GAAG,CAAC,KAAK,CAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;gBACtC,UAAU,CAAC,GAAG,CAAC,MAAM,CAAE,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC;YACrC,CAAC;QACH,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,gGAAgG;IAChG,iGAAiG;IACjG,MAAM,MAAM,GAAG,IAAI,GAAG,CAAC,SAAS,CAAC,CAAC;IAClC,MAAM,aAAa,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IAC9D,SAAS,CAAC,IAAI,CAAC,GAAG,aAAa,CAAC,CAAC;IAEjC,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,aAAa,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC;AACzG,CAAC;AAED;;;;;GAKG;AACH,SAAS,YAAY,CAAC,QAA8B,EAAE,KAAgB,EAAE,QAAsB;IAC5F,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/D,MAAM,OAAO,GAA+B,EAAE,CAAC;IAC/C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,KAAK,MAAM,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;QACtD,MAAM,MAAM,GAAG,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAiC,EAAE,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;QAC9G,IAAI,CAAC,MAAM,CAAC,MAAM;YAAE,SAAS;QAC7B,MAAM,GAAG,GAAG,CAAC,IAA6C,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;QAC7F,MAAM,GAAG,GAAG,CAAC,IAA6C,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;QAC7F,MAAM,KAAK,GAAG,CAAC,IAAyD,EAAE,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAe,EAAE,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;QAC5I,MAAM,CAAC,MAAM,EAAE,QAAQ,EAAE,UAAU,EAAE,YAAY,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAc,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAc,CAAC,CAAC,CAAC;QACtL,MAAM,KAAK,GAAG,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;QACvC,MAAM,eAAe,GAAG,QAAQ,CAAC,QAAQ,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,IAAI,CAAC,QAAQ,IAAI,eAAe,CAAC,CAAC,CAAC,kBAAkB,CAAC,IAAI,CAAC,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC5G,MAAM,QAAQ,GAAG,QAAQ,CAAC,CAAC,CAAC,UAAU,CAAC,IAAI,IAAI,CAAC,eAAgB,CAAC,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACnG,IAAI,QAAQ,KAAK,SAAS,IAAI,QAAQ,GAAG,CAAC,KAAK;YAAE,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,OAAO,CAAC,IAAI,CAAC;YACX,MAAM,EAAE,EAAE;YACV,SAAS,EAAE,IAAI;YACf,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YACpC,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,CAAC;YACtC,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;YAClC,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YACpC,UAAU,EAAE,KAAK;YACjB,iBAAiB,EAAE,KAAK;YACxB,UAAU,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YAC5C,aAAa,EAAE,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;YAC3E,GAAG,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,MAAM,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,aAAa,EAAE,UAAU,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,YAAY,CAAC,YAAY,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC7J,GAAG,eAAe,CAAC,EAAE,GAAG,IAAI,EAAE,WAAW,EAAE,KAAK,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC;SACxE,CAAC,CAAC;IACL,CAAC;IACD,IAAI,CAAC,OAAO,CAAC,MAAM;QAAE,OAAO,QAAQ,CAAC;IACrC,OAAO,EAAE,GAAG,QAAQ,EAAE,KAAK,EAAE,CAAC,GAAG,QAAQ,CAAC,KAAK,EAAE,GAAG,OAAO,CAAC,EAAE,qBAAqB,EAAE,CAAC,GAAG,QAAQ,CAAC,qBAAqB,EAAE,GAAG,MAAM,CAAC,EAAE,CAAC;AACxI,CAAC;AAED,8EAA8E;AAC9E,SAAS,cAAc,CAAC,QAA8B,EAAE,KAAgB,EAAE,QAAsB,EAAE,OAAiB;IACjH,MAAM,kBAAkB,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE;QAC/C,MAAM,IAAI,GAAG,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACpC,OAAO,CAAC,cAAc,CAAC,IAAI,CAAC,IAAI,aAAa,CAAC,IAAI,CAAC,CAAC;IACtD,CAAC,CAAC,CAAC;IACH,OAAO,YAAY,CAAC,EAAE,GAAG,QAAQ,EAAE,GAAG,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,kBAAkB,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,CAAC;AACtH,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC,CAAC,CAAC,CAAC;IAC7I,gGAAgG;IAChG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE;QACrB,MAAM,QAAQ,GAAG,WAAW,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,kBAAkB,CAAC,CAAC,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;QAC/F,OAAO,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAU,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IACzG,CAAC,CAAC,CACH,CAAC;IACF,MAAM,aAAa,GAAG,CAAC,EAAU,EAAE,EAAE;QACnC,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC;QAC3C,OAAO,QAAQ,CAAC,CAAC,CAAC,kBAAkB,CAAC,QAAQ,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAClF,CAAC,CAAC;IACF,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,aAAa,EAAE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK,EAAE,CAAC;IACnI,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,MAAM,GAAG,IAAI,GAAG,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC;IAC5C,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE;QACrH,MAAM,aAAa,GAAG,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;QACjE,OAAO,cAAc,CACnB,EAAE,GAAG,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,EAAE,GAAG,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAC7G,KAAK,EACL,GAAG,CAAC,QAAQ,EACZ,GAAG,CAAC,OAAO,CACZ,CAAC;IACJ,CAAC,CAAC;IAEF,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAmBD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,yBAAyB;IACzB,OAAO,CACL,MAAM,CACJ,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,IAAI,CAAC,CACP,CAAC;AACJ,CAAC;AAED;;;;GAIG;AACH,SAAS,SAAS,CAAC,KAAW,EAAE,QAAgB,EAAE,QAAsB;IACtE,IAAI,QAAQ,KAAK,CAAC,IAAI,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,OAAO,EAAE,KAAK,KAAK,CAAC,OAAO,EAAE;QAAE,OAAO,KAAK,CAAC;IACvG,OAAO,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC1C,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAChD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC1D,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,mGAAmG;AACnG,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,QAAQ,IAAI,QAAQ,GAAG,GAAG;YAAE,GAAG,GAAG,QAAQ,CAAC;QAC/C,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC9C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,aAAa,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAC/D,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,EAAE,CAAC,EAAE,aAAa,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,EAAE,EAAE,aAAa,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;YACrI,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAsBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,mEAAmE;QACnE,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;KACxE,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IAEvE,mGAAmG;IACnG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACzF,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IACxH,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC9G,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACrE,MAAM,SAAS,GAAG,CAAC,IAAsB,EAAE,EAAE,CAC3C,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,CAAC,GAAG,IAAI,GAAG,CAAC,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC5E,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ;SAC1B,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;SAC3C,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACX,GAAG,CAAC;QACJ,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACvF,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAChF,CAAC,CAAC,CAAC;IAEN,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IACxE,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,KAAK;QACf,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,iGAAiG;QACjG,eAAe,EAAE,SAAS,CAAC,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;KAClH,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,qBAAqB,EAAE,EAAE;YACzB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,KAAK,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IAC9C,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,CAAC,CAAC;IACvE,CAAC;IAED,+FAA+F;IAC/F,kGAAkG;IAClG,wEAAwE;IACxE,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAgB,CAAC;IAC5C,MAAM,OAAO,GAAG,CAAC,QAAc,EAAE,EAAE,CACjC,QAAQ,IAAI,gBAAiB;QAC3B,CAAC,CAAC,sBAAsB,CAAC,gBAAiB,EAAE,QAAQ,EAAE,QAAQ,CAAC;QAC/D,CAAC,CAAC,CAAC,sBAAsB,CAAC,QAAQ,EAAE,gBAAiB,EAAE,QAAQ,CAAC,CAAC;IACrE,IAAI,gBAAgB,EAAE,CAAC;QACrB,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,MAAM,IAAI,GAAG,WAAW,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC;YACzF,IAAI,IAAI,CAAC,MAAM;gBAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,CAAC,GAAG,CAAC,GAAG,IAAI,CAAC,CAAC,CAAC;YACrD,MAAM,GAAG,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC;YACtC,IAAI,GAAG;gBAAE,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,kBAAkB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC,CAAC;QAClE,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;QAC3F,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;QAC3F,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,IAAI,CAAC,GAAG,CAAC,gBAAgB,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,QAAQ,CAAC,CAAC;QACpE,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;QAE3F,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,GAAG,eAAe,CAAC,IAAI,EAAE,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;YACnH,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO,cAAc,CAAC;QACpB,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,GAAG,CAAC,KAAK,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,KAAK,CAAC,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC7E,KAAK,EAAE,SAAS;KACjB,EAAE,KAAK,EAAE,QAAQ,EAAE,OAAO,CAAC,CAAC;AAC/B,CAAC"}
|
|
1
|
+
{"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACT,YAAY,EACb,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,gBAAgB,EAAE,MAAM,oBAAoB,CAAC;AACtD,OAAO,EAAE,YAAY,EAAE,MAAM,YAAY,CAAC;AAC1C,OAAO,EAAE,oBAAoB,EAAE,iBAAiB,EAAE,MAAM,aAAa,CAAC;AAEtE,8GAA8G;AAC9G,MAAM,CAAC,MAAM,sBAAsB,GAAG,CAAC,CAAC;AAExC;;;GAGG;AACH,MAAM,UAAU,oBAAoB,CAAC,IAAU,EAAE,uBAA+B,sBAAsB;IACpG,MAAM,QAAQ,GAAG,oBAAoB,CAAC,IAAI,CAAC,CAAC;IAC5C,IAAI,QAAQ,KAAK,SAAS;QAAE,OAAO,QAAQ,CAAC;IAC5C,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC;QAAE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1F,OAAO,oBAAoB,CAAC;AAC9B,CAAC;AAED,oGAAoG;AACpG,SAAS,aAAa,CAAC,IAAU;IAC/B,OAAO,oBAAoB,CAAC,IAAI,CAAC,KAAK,SAAS,IAAI,CAAC,CAAC,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,CAAC,CAAC;AACrH,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU,EAAE,oBAA6B;IAC3E,OAAO,oBAAoB,CAAC,IAAI,EAAE,oBAAoB,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AACpF,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAKD;;;;GAIG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU,EAAE,SAAsB,UAAU,EAAE,oBAA6B;IAC/G,IAAI,cAAc,CAAC,IAAI,CAAC;QAAE,OAAO,CAAC,CAAC;IACnC,IAAI,MAAM,KAAK,WAAW,IAAI,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,cAAc,EAAE,IAAI,CAAC,cAAc,EAAE,CAAC,EAAE,CAAC;QAC7G,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,oBAAoB,CAAC,IAAI,EAAE,oBAAoB,CAAC,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;IAC3H,CAAC;IACD,OAAO,mBAAmB,CAAC,IAAI,EAAE,oBAAoB,CAAC,CAAC;AACzD,CAAC;AA4CD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD;;;GAGG;AACH,MAAM,UAAU,kBAAkB,CAAC,QAAgB,EAAE,WAAyB,qBAAqB;IACjG,MAAM,KAAK,GAAG,qBAAqB,CAAC,IAAI,CAAC,QAAQ,CAAC;QAChD,CAAC,CAAC,YAAY,CAAC,IAAI,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC,OAAO,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,IAAI,CAAC,CAAC;QAC7E,CAAC,CAAC,QAAQ,CAAC;IACb,OAAO,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC9C,CAAC;AAED,2DAA2D;AAC3D,MAAM,eAAe,GAAG,CAAC,SAAqC,EAAE,EAAE,CAChE,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;AAExF,wEAAwE;AACxE,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,QAA0B,EAAE,aAAiC,EAAE,EAAE,CAAC,CAAC;IACtG,GAAG,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,WAAW,EAAE,IAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;IAC3D,GAAG,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,YAAY,EAAE,QAAQ,CAAC,WAAW,EAAE,EAAE,qBAAqB,EAAE,MAAM,CAAC,aAAc,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;CAC7G,CAAC,CAAC;AAEH,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAsBrH,MAAM,OAAO,GAAG,CAAC,MAAc,EAAE,KAAa,EAAE,EAAE,CAAC,GAAG,MAAM,SAAS,KAAK,EAAE,CAAC;AAE7E,MAAM,WAAW,GAAG,CAAC,KAAgB,EAAE,EAAU,EAAE,EAAE,CAAC,KAAK,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC;AAEpF;;;;GAIG;AACH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,UAAU,GAAG,iBAAiB,CAAC,KAAK,CAAC,CAAC;IAC5C,MAAM,GAAG,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/D,MAAM,UAAU,GAAG,IAAI,GAAG,EAAoB,CAAC;IAC/C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;QACtB,IAAI,CAAC,CAAC,QAAQ,IAAI,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC;YAAE,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC1H,CAAC;IACD,MAAM,QAAQ,GAAG,CAAC,EAAU,EAAE,OAAO,IAAI,GAAG,EAAU,EAAY,EAAE;QAClE,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC;YAAE,OAAO,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QACb,OAAO,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,QAAQ,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC;IACvE,CAAC,CAAC;IACF,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,CAAC,GAAG,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,EAAE,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC5G,MAAM,SAAS,GAAG,IAAI,GAAG,EAAoB,CAAC;IAC9C,MAAM,cAAc,GAAG,IAAI,GAAG,EAAoB,CAAC;IACnD,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;QACtB,KAAK,MAAM,IAAI,IAAI,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE;YAAE,SAAS,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC,QAAS,CAAC,CAAC,CAAC;QACxH,KAAK,MAAM,IAAI,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE;YAAE,cAAc,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,GAAG,CAAC,cAAc,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC,aAAc,CAAC,CAAC,CAAC;IAC9I,CAAC;IACD,MAAM,IAAI,GAAG,IAAI,GAAG,EAAkB,CAAC;IAEvC,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxG,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,YAAY,CAAC,GAAG,CAAC,CAAC;QAC/B,IAAI,CAAC,IAAI,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,CAAC;YAAE,SAAS;QACrE,MAAM,GAAG,GAAG,MAAM,CAAC,QAAQ,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAS,CAAC,CAAC,CAAC,CAAC,CAAC;QAC9D,KAAK,MAAM,MAAM,IAAI,QAAQ,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;YAC3C,KAAK,MAAM,KAAK,IAAI,QAAQ,CAAC,IAAI,CAAC,KAAK,CAAC,EAAE,CAAC;gBACzC,IAAI,MAAM,KAAK,KAAK;oBAAE,SAAS;gBAC/B,aAAa,CAAC,GAAG,CAAC,KAAK,CAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;gBACtC,UAAU,CAAC,GAAG,CAAC,MAAM,CAAE,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC;gBACnC,yDAAyD;gBACzD,MAAM,GAAG,GAAG,OAAO,CAAC,MAAM,EAAE,KAAK,CAAC,CAAC;gBACnC,IAAI,GAAG,KAAK,CAAC,IAAI,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC;oBAAE,IAAI,CAAC,GAAG,CAAC,GAAG,EAAE,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,QAAQ,EAAE,GAAG,CAAC,CAAC,CAAC;YAC3F,CAAC;QACH,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,gGAAgG;IAChG,iGAAiG;IACjG,MAAM,MAAM,GAAG,IAAI,GAAG,CAAC,SAAS,CAAC,CAAC;IAClC,MAAM,aAAa,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IAC9D,SAAS,CAAC,IAAI,CAAC,GAAG,aAAa,CAAC,CAAC;IAEjC,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,aAAa,EAAE,SAAS,EAAE,SAAS,EAAE,cAAc,EAAE,IAAI,EAAE,CAAC;AAC/H,CAAC;AAED;;;;;GAKG;AACH,SAAS,YAAY,CAAC,QAA8B,EAAE,KAAgB,EAAE,QAAsB;IAC5F,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/D,MAAM,OAAO,GAA+B,EAAE,CAAC;IAC/C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,KAAK,MAAM,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;QACtD,MAAM,MAAM,GAAG,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAiC,EAAE,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;QAC9G,IAAI,CAAC,MAAM,CAAC,MAAM;YAAE,SAAS;QAC7B,MAAM,GAAG,GAAG,CAAC,IAA6C,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;QAC7F,MAAM,GAAG,GAAG,CAAC,IAA6C,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;QAC7F,MAAM,KAAK,GAAG,CAAC,IAAyD,EAAE,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAe,EAAE,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;QAC5I,MAAM,CAAC,MAAM,EAAE,QAAQ,EAAE,UAAU,EAAE,YAAY,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAc,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAc,CAAC,CAAC,CAAC;QACtL,MAAM,KAAK,GAAG,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;QACvC,MAAM,eAAe,GAAG,QAAQ,CAAC,QAAQ,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,IAAI,CAAC,QAAQ,IAAI,eAAe,CAAC,CAAC,CAAC,kBAAkB,CAAC,IAAI,CAAC,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC5G,MAAM,QAAQ,GAAG,QAAQ,CAAC,CAAC,CAAC,UAAU,CAAC,IAAI,IAAI,CAAC,eAAgB,CAAC,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACnG,IAAI,QAAQ,KAAK,SAAS,IAAI,QAAQ,GAAG,CAAC,KAAK;YAAE,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,OAAO,CAAC,IAAI,CAAC;YACX,MAAM,EAAE,EAAE;YACV,SAAS,EAAE,IAAI;YACf,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YACpC,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,CAAC;YACtC,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;YAClC,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YACpC,UAAU,EAAE,KAAK;YACjB,iBAAiB,EAAE,KAAK;YACxB,UAAU,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YAC5C,aAAa,EAAE,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;YAC3E,GAAG,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,MAAM,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,aAAa,EAAE,UAAU,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,YAAY,CAAC,YAAY,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC7J,GAAG,eAAe,CAAC,EAAE,GAAG,IAAI,EAAE,WAAW,EAAE,KAAK,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC;SACxE,CAAC,CAAC;IACL,CAAC;IACD,IAAI,CAAC,OAAO,CAAC,MAAM;QAAE,OAAO,QAAQ,CAAC;IACrC,OAAO,EAAE,GAAG,QAAQ,EAAE,KAAK,EAAE,CAAC,GAAG,QAAQ,CAAC,KAAK,EAAE,GAAG,OAAO,CAAC,EAAE,qBAAqB,EAAE,CAAC,GAAG,QAAQ,CAAC,qBAAqB,EAAE,GAAG,MAAM,CAAC,EAAE,CAAC;AACxI,CAAC;AAED,8EAA8E;AAC9E,SAAS,cAAc,CAAC,QAA8B,EAAE,KAAgB,EAAE,QAAsB,EAAE,OAAiB;IACjH,MAAM,kBAAkB,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE;QAC/C,MAAM,IAAI,GAAG,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACpC,OAAO,CAAC,cAAc,CAAC,IAAI,CAAC,IAAI,aAAa,CAAC,IAAI,CAAC,CAAC;IACtD,CAAC,CAAC,CAAC;IACH,OAAO,YAAY,CAAC,EAAE,GAAG,QAAQ,EAAE,GAAG,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,kBAAkB,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,CAAC;AACtH,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC,CAAC,CAAC,CAAC;IAC7I,gGAAgG;IAChG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE;QACrB,MAAM,QAAQ,GAAG,WAAW,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,kBAAkB,CAAC,CAAC,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;QAC/F,OAAO,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAU,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IACzG,CAAC,CAAC,CACH,CAAC;IACF,MAAM,aAAa,GAAG,CAAC,EAAU,EAAE,EAAE;QACnC,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC;QAC3C,OAAO,QAAQ,CAAC,CAAC,CAAC,kBAAkB,CAAC,QAAQ,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAClF,CAAC,CAAC;IACF,iFAAiF;IACjF,MAAM,SAAS,GAAG,IAAI,GAAG,CACvB,OAAO,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE;QACrB,MAAM,QAAQ,GAAG,CAAC,KAAK,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,eAAe,CAAC,CAAC,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;QAC1G,OAAO,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAU,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IACzG,CAAC,CAAC,CACH,CAAC;IACF,MAAM,GAAG,GAAgB;QACvB,OAAO;QACP,UAAU;QACV,UAAU;QACV,UAAU;QACV,aAAa;QACb,SAAS;QACT,KAAK,EAAE,CAAC,MAAM,EAAE,KAAK,EAAE,EAAE,CAAC,KAAK,CAAC,IAAI,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,EAAE,KAAK,CAAC,CAAC,IAAI,CAAC;QACrE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK;KAC1C,CAAC;IACF,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,MAAM,GAAG,IAAI,GAAG,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC;IAC5C,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE;QACrH,MAAM,aAAa,GAAG,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;QACjE,OAAO,cAAc,CACnB,EAAE,GAAG,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,EAAE,GAAG,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAC7G,KAAK,EACL,GAAG,CAAC,QAAQ,EACZ,GAAG,CAAC,OAAO,CACZ,CAAC;IACJ,CAAC,CAAC;IAEF,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAkBD,gFAAgF;AAChF,SAAS,YAAY,CAAC,IAAU,EAAE,KAAa,EAAE,QAAsB;IACrE,IAAI,KAAK,GAAG,CAAC;QAAE,OAAO,eAAe,CAAC,IAAI,EAAE,KAAK,EAAE,QAAQ,CAAC,CAAC;IAC7D,IAAI,KAAK,GAAG,CAAC;QAAE,OAAO,oBAAoB,CAAC,IAAI,EAAE,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;IACnE,OAAO,IAAI,CAAC;AACd,CAAC;AAED;;;GAGG;AACH,SAAS,SAAS,CAAC,EAAU,EAAE,aAAuC,EAAE,MAAyB,EAAE,GAAgB;IACjH,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAC5B,MAAM,KAAK,GAAG,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;IACpC,IAAI,KAAK,IAAI,KAAK,GAAG,KAAK;QAAE,KAAK,GAAG,KAAK,CAAC;IAC1C,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;IACzC,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;QACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACxB,IAAI,CAAC,CAAC;YAAE,SAAS;QACjB,MAAM,KAAK,GAAG,YAAY,CAAC,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,QAAQ,CAAC,CAAC;QAC1D,IAAI,KAAK,GAAG,KAAK;YAAE,KAAK,GAAG,KAAK,CAAC;IACnC,CAAC;IACD,OAAO,KAAK,CAAC;AACf,CAAC;AAOD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,yBAAyB;IACzB,OAAO,CACL,MAAM,CACJ,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,IAAI,CAAC,CACP,CAAC;AACJ,CAAC;AAED;;;;GAIG;AACH,SAAS,SAAS,CAAC,KAAW,EAAE,QAAgB,EAAE,QAAsB;IACtE,IAAI,QAAQ,KAAK,CAAC,IAAI,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,OAAO,EAAE,KAAK,KAAK,CAAC,OAAO,EAAE;QAAE,OAAO,KAAK,CAAC;IACvG,OAAO,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC1C,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,MAAM,KAAK,GAAG,SAAS,CAAC,EAAE,EAAE,aAAa,EAAE,MAAM,EAAE,GAAG,CAAC,CAAC;QACxD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAChD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC1D,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,mGAAmG;AACnG,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,6EAA6E;YAC7E,MAAM,EAAE,GAAG,EAAE,IAAI,YAAY,CAAC,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;YAC7E,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,QAAQ,IAAI,QAAQ,GAAG,GAAG;YAAE,GAAG,GAAG,QAAQ,CAAC;QAC/C,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,MAAM,KAAK,GAAG,SAAS,CAAC,EAAE,EAAE,aAAa,EAAE,MAAM,EAAE,GAAG,CAAC,CAAC;QACxD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC9C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,oFAAoF;IACpF,8FAA8F;IAC9F,yFAAyF;IACzF,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,OAAO,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;IACxI,MAAM,aAAa,GAAa,EAAE,CAAC;IACnC,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;IAClC,MAAM,KAAK,GAAG,CAAC,IAAY,EAAE,EAAE;QAC7B,iEAAiE;QACjE,MAAM,KAAK,GAAsC,EAAE,CAAC;QACpD,MAAM,KAAK,GAAG,CAAC,EAAU,EAAE,EAAE;YAC3B,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;YAChB,KAAK,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC;QACvG,CAAC,CAAC;QACF,KAAK,CAAC,IAAI,CAAC,CAAC;QACZ,OAAO,KAAK,CAAC,MAAM,EAAE,CAAC;YACpB,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC;YAC3C,MAAM,IAAI,GAAG,IAAI,CAAC,IAAI,EAAE,CAAC;YACzB,IAAI,IAAI,CAAC,IAAI,EAAE,CAAC;gBACd,KAAK,CAAC,GAAG,EAAE,CAAC;gBACZ,aAAa,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACzB,CAAC;iBAAM,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,CAAC,EAAE,CAAC;gBACpC,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpB,CAAC;QACH,CAAC;IACH,CAAC,CAAC;IACF,KAAK,MAAM,EAAE,IAAI,OAAO;QAAE,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC;YAAE,KAAK,CAAC,EAAE,CAAC,CAAC;IAE1D,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,aAAa,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAC/D,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,EAAE,CAAC,EAAE,aAAa,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,EAAE,EAAE,aAAa,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;YACrI,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAsBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,mEAAmE;QACnE,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;KACxE,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IAEvE,mGAAmG;IACnG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACzF,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IACxH,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC9G,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACrE,MAAM,SAAS,GAAG,CAAC,IAAsB,EAAE,EAAE,CAC3C,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,CAAC,GAAG,IAAI,GAAG,CAAC,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC5E,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ;SAC1B,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;SAC3C,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACX,GAAG,CAAC;QACJ,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACvF,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAChF,CAAC,CAAC,CAAC;IAEN,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IACxE,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,KAAK;QACf,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,iGAAiG;QACjG,eAAe,EAAE,SAAS,CAAC,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;KAClH,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,qBAAqB,EAAE,EAAE;YACzB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,mGAAmG;IACnG,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,IAAI,gBAAgB,EAAE,CAAC;QACzD,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,EAAE,OAAO,CAAC,CAAC;IACjG,CAAC;IACD,mGAAmG;IACnG,kGAAkG;IAClG,6FAA6F;IAC7F,MAAM,YAAY,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,EAAE,QAAQ,EAAE,SAAS,EAAE,aAAa,EAAE,cAAc,EAAE,GAAG,IAAI,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,CAAC;IAC1G,MAAM,QAAQ,GAAG,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,UAAU,CAAC,YAAY,EAAE,YAAY,CAAC,EAAE;QACrG,GAAG,OAAO;QACV,gBAAgB,EAAE,cAAc;KACjC,CAAC,CAAC;IACH,OAAO,YAAY,CAAC,QAAQ,CAAC,CAAC;AAChC,CAAC;AAED,wFAAwF;AACxF,MAAM,cAAc,GAAG,0BAA0B,CAAC;AAElD,qGAAqG;AACrG,SAAS,YAAY,CAAC,EAAE,gBAAgB,EAAE,MAAM,EAAE,cAAc,EAAE,IAAI,EAAE,eAAe,EAAE,gBAAgB,EAAE,GAAG,QAAQ,EAAwB;IAC5I,OAAO;QACL,GAAG,QAAQ;QACX,KAAK,EAAE,QAAQ,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,EAAE,cAAc,EAAE,GAAG,EAAE,eAAe,EAAE,GAAG,EAAE,aAAa,EAAE,GAAG,EAAE,cAAc,EAAE,GAAG,EAAE,GAAG,IAAI,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC;KACrI,CAAC;AACJ,CAAC"}
|
package/dist/engine/index.d.ts
CHANGED
|
@@ -193,7 +193,7 @@ export declare class CriticalPathEngine {
|
|
|
193
193
|
private deleteTaskChildren;
|
|
194
194
|
/** Removes a dependency between two tasks. Requires `task.update` on the dependent task's project. */
|
|
195
195
|
removeDependency(id: string): Promise<boolean>;
|
|
196
|
-
/** Adds a dependency. Adding one that already exists (same tasks and
|
|
196
|
+
/** Adds a dependency. Adding one that already exists (same tasks, type and lag) returns the existing one. */
|
|
197
197
|
addDependency(dep: Omit<TaskDependency, 'id'>): Promise<TaskDependency>;
|
|
198
198
|
/**
|
|
199
199
|
* Collects every dependency edge reachable upstream from `startTaskId`. A new edge
|