@critical-path/core 0.55.0 → 0.57.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (46) hide show
  1. package/CHANGELOG.md +26 -0
  2. package/README.md +1 -1
  3. package/dist/domain/authorization.d.ts.map +1 -1
  4. package/dist/domain/authorization.js +3 -0
  5. package/dist/domain/authorization.js.map +1 -1
  6. package/dist/domain/cpm.d.ts.map +1 -1
  7. package/dist/domain/cpm.js +111 -158
  8. package/dist/domain/cpm.js.map +1 -1
  9. package/dist/domain/events.d.ts +18 -2
  10. package/dist/domain/events.d.ts.map +1 -1
  11. package/dist/domain/events.js +2 -0
  12. package/dist/domain/events.js.map +1 -1
  13. package/dist/engine/index.d.ts +15 -1
  14. package/dist/engine/index.d.ts.map +1 -1
  15. package/dist/engine/index.js +104 -29
  16. package/dist/engine/index.js.map +1 -1
  17. package/dist/schemas/index.d.ts +301 -153
  18. package/dist/schemas/index.d.ts.map +1 -1
  19. package/dist/schemas/index.js +55 -21
  20. package/dist/schemas/index.js.map +1 -1
  21. package/dist/store/firebase.d.ts +56 -13
  22. package/dist/store/firebase.d.ts.map +1 -1
  23. package/dist/store/firebase.js +83 -71
  24. package/dist/store/firebase.js.map +1 -1
  25. package/dist/store/index.d.ts +5 -0
  26. package/dist/store/index.d.ts.map +1 -1
  27. package/dist/store/index.js +11 -0
  28. package/dist/store/index.js.map +1 -1
  29. package/dist/store/sqlite.d.ts +2 -0
  30. package/dist/store/sqlite.d.ts.map +1 -1
  31. package/dist/store/sqlite.js +15 -0
  32. package/dist/store/sqlite.js.map +1 -1
  33. package/dist/testing/conformance.d.ts.map +1 -1
  34. package/dist/testing/conformance.js +6 -0
  35. package/dist/testing/conformance.js.map +1 -1
  36. package/dist/types/index.d.ts +16 -2
  37. package/dist/types/index.d.ts.map +1 -1
  38. package/dist/utils/index.d.ts +1 -0
  39. package/dist/utils/index.d.ts.map +1 -1
  40. package/dist/utils/index.js +1 -0
  41. package/dist/utils/index.js.map +1 -1
  42. package/dist/utils/update.d.ts +7 -0
  43. package/dist/utils/update.d.ts.map +1 -0
  44. package/dist/utils/update.js +16 -0
  45. package/dist/utils/update.js.map +1 -0
  46. package/package.json +1 -1
package/CHANGELOG.md CHANGED
@@ -1,5 +1,31 @@
1
1
  # @critical-path/core
2
2
 
3
+ ## 0.57.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 224ad51: One scheduling engine, start constraints and dependency lag.
8
+
9
+ - **BREAKING:** project-calendar critical path analysis now runs on the same date-based passes as assignee mode (every task on the project calendar), so the two cannot drift. Offsets are unchanged; dates now show a successor starting at the next working moment after its predecessor finishes (09:00 the next morning rather than 17:00), and results include `overallocations` and `scheduleId` as in assignee mode. Without a start date the analysis has offsets only, as before.
10
+ - New `Task.earliestStart`: start no earlier than this date (a date-only value is the start of that day). Applies in critical path analysis and levelling, and on a summary task to every leaf under it.
11
+ - New `TaskDependency.lagHours`: working hours to wait after the predecessor finishes (negative for a lead), accepted by `addDependency`, `POST /tasks/:id/dependencies` and MCP `add_dependency`. Links that differ only in lag are separate dependencies; the longer wait applies.
12
+ - Levelling orders its backward pass topologically over dependency and resource links, so leads cannot break slack.
13
+ - MCP `create_task` / `update_task` accept `earliestStart`.
14
+
15
+ ## 0.56.0
16
+
17
+ ### Minor Changes
18
+
19
+ - 42ecdb9: Clearing fields over HTTP, validated dates, and correctable time entries.
20
+
21
+ - Update bodies accept `null` to remove an optional field (tasks, projects, deliverables, containers, iterations and time entries); parsing turns it into `undefined`, which every store treats as removal. Required fields (titles, names, task `status` and `priority`) still reject it. New `applyUpdate(record, updates)` applies payloads the same way for optimistic UI state; the React and Svelte task and deliverable state use it.
22
+ - **BREAKING:** every date field in request bodies must be an ISO date or date-time (`400` otherwise). Free-text dates used to be stored and then broke levelling, metrics and the ladder.
23
+ - Time entries can be corrected and deleted: `engine.getTimeEntry` / `updateTimeEntry` / `deleteTimeEntry`, `GET | PATCH | DELETE /time-entries/:id`, and the matching client methods. The task's hour totals move by the difference, and `time.updated` / `time.deleted` events are published. A new `time.manage` permission (project managers and admins) covers other people's entries; anyone with `time.log` can manage their own.
24
+ - `logTime` always requires the task to exist (it used to store orphan entries when no policy was enforced), and logs inside a transaction where the store supports one.
25
+ - **BREAKING (custom adapters):** `TimeEntryRepository` gains `getTimeEntry(id)` and `updateTimeEntry(id, updates)`.
26
+ - `FirebaseStore` updates every document inside `runTransaction` when the db supports it and implements `incrementTaskHours`, so concurrent updates and time logs are no longer lost. Pass Firestore's `FieldValue` as the new `fieldValue` option to add hour totals with `FieldValue.increment` (atomic, no contention) instead of transactions.
27
+ - MCP: new `update_time_entry` and `delete_time_entry` tools.
28
+
3
29
  ## 0.55.0
4
30
 
5
31
  ### Minor Changes
package/README.md CHANGED
@@ -365,7 +365,7 @@ console.log(leveled.unleveledProjectEndDate, '->', leveled.projectEndDate);
365
365
 
366
366
  With `calendars: 'assignee'` (or `criticalPathCalendars: 'assignee'` on the engine), each task uses its assignee's schedule, then its team's, then the project calendar. Passes run on dates, slack is measured in each task's calendar, and each calendar is evaluated in its own `timezone` (IANA name; default UTC), including daylight-saving changes. `levelResources: true` additionally delays tasks so nobody works on two at once (priority rule `levelingPriority`, default least slack), reporting `levelingDelayHours` and `waitingOn` per task. Tasks with `allocation` below 1 take that share of their assignee (a 16h task at 0.5 spans 32 working hours); levelling fits them within 100% per person, and `overallocations` lists who is booked above 100% and when. Teams act as pools of `headcount` people (default: member count) shared by team-only tasks and members' own tasks. Finished tasks take no time. `calculatePortfolioCriticalPath({ projectIds })` levels several projects together, sharing people and teams across them; `includeHiddenWork` also counts unreadable projects' work as `'hidden'`. `effort: 'remaining'` schedules only what is left on in-progress tasks.
367
367
 
368
- Tasks with subtasks are summary tasks, reported as roll-ups of their leaves (`isSummary`); dependencies and deadlines on them apply to every leaf. Unestimated tasks use `defaultEstimateHours` (default 1) and are listed in `unestimatedTaskIds`. Tasks with `isMilestone: true` are zero-duration checkpoints (their estimates are ignored). A `deadline` on any task caps its late finish: a forecast that misses it shows as negative slack along the path driving it, with `deadlineDate` and `deadlineVarianceHours` per task and `missedDeadlineTaskIds` on the analysis. A date-only deadline means the end of that working day; project-calendar mode needs a start date to apply deadlines.
368
+ Tasks with subtasks are summary tasks, reported as roll-ups of their leaves (`isSummary`); dependencies and deadlines on them apply to every leaf. Unestimated tasks use `defaultEstimateHours` (default 1) and are listed in `unestimatedTaskIds`. Tasks with `isMilestone: true` are zero-duration checkpoints (their estimates are ignored). A `deadline` on any task caps its late finish: a forecast that misses it shows as negative slack along the path driving it, with `deadlineDate` and `deadlineVarianceHours` per task and `missedDeadlineTaskIds` on the analysis. A date-only deadline means the end of that working day. `earliestStart` (start no earlier than) and dependency `lagHours` (wait after the predecessor; negative for a lead) constrain the forward pass. Project-calendar mode needs a start date to apply these date constraints.
369
369
 
370
370
  ### 9. Fractional Lexical Indexing (Kanban Reordering)
371
371
 
@@ -1 +1 @@
1
- {"version":3,"file":"authorization.d.ts","sourceRoot":"","sources":["../../src/domain/authorization.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,KAAK,EACL,mBAAmB,EACnB,mBAAmB,EAEnB,WAAW,EACZ,MAAM,mBAAmB,CAAC;AAsB3B,mDAAmD;AACnD,eAAO,MAAM,wBAAwB,EAAE,MAAM,CAAC,WAAW,EAAE,SAAS,mBAAmB,EAAE,CAKxF,CAAC;AAEF,MAAM,WAAW,iBAAiB;IAChC,mEAAmE;IACnE,eAAe,CAAC,EAAE,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,SAAS,mBAAmB,EAAE,CAAC,CAAC,CAAC;IAC/E,0GAA0G;IAC1G,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC;IAC1B;;;OAGG;IACH,iBAAiB,CAAC,EAAE,CAAC,KAAK,EAAE,KAAK,KAAK,OAAO,CAAC;IAC9C,8EAA8E;IAC9E,kBAAkB,CAAC,EAAE,CAAC,KAAK,EAAE,KAAK,KAAK,OAAO,CAAC;CAChD;AAED;;;;GAIG;AACH,wBAAgB,gBAAgB,CAAC,OAAO,GAAE,iBAAsB,GAAG,mBAAmB,CA6BrF"}
1
+ {"version":3,"file":"authorization.d.ts","sourceRoot":"","sources":["../../src/domain/authorization.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,KAAK,EACL,mBAAmB,EACnB,mBAAmB,EAEnB,WAAW,EACZ,MAAM,mBAAmB,CAAC;AAuB3B,mDAAmD;AACnD,eAAO,MAAM,wBAAwB,EAAE,MAAM,CAAC,WAAW,EAAE,SAAS,mBAAmB,EAAE,CAKxF,CAAC;AAEF,MAAM,WAAW,iBAAiB;IAChC,mEAAmE;IACnE,eAAe,CAAC,EAAE,OAAO,CAAC,MAAM,CAAC,WAAW,EAAE,SAAS,mBAAmB,EAAE,CAAC,CAAC,CAAC;IAC/E,0GAA0G;IAC1G,cAAc,CAAC,EAAE,MAAM,EAAE,CAAC;IAC1B;;;OAGG;IACH,iBAAiB,CAAC,EAAE,CAAC,KAAK,EAAE,KAAK,KAAK,OAAO,CAAC;IAC9C,8EAA8E;IAC9E,kBAAkB,CAAC,EAAE,CAAC,KAAK,EAAE,KAAK,KAAK,OAAO,CAAC;CAChD;AAED;;;;GAIG;AACH,wBAAgB,gBAAgB,CAAC,OAAO,GAAE,iBAAsB,GAAG,mBAAmB,CA8BrF"}
@@ -11,6 +11,7 @@ const PROJECT_MANAGER = [
11
11
  ...CONTRIBUTOR,
12
12
  'task.delete',
13
13
  'plan.manage',
14
+ 'time.manage',
14
15
  'project.update',
15
16
  'project.manage_members',
16
17
  'comment.moderate',
@@ -59,6 +60,8 @@ export function createRolePolicy(options = {}) {
59
60
  return true;
60
61
  if (action === 'attachment.delete' && ownsResource && granted.has('attachment.create'))
61
62
  return true;
63
+ if (action === 'time.manage' && ownsResource && granted.has('time.log'))
64
+ return true;
62
65
  return false;
63
66
  };
64
67
  }
@@ -1 +1 @@
1
- {"version":3,"file":"authorization.js","sourceRoot":"","sources":["../../src/domain/authorization.ts"],"names":[],"mappings":"AAQA,MAAM,MAAM,GAA0B,CAAC,cAAc,CAAC,CAAC;AACvD,MAAM,WAAW,GAA0B;IACzC,GAAG,MAAM;IACT,aAAa;IACb,aAAa;IACb,gBAAgB;IAChB,mBAAmB;IACnB,UAAU;CACX,CAAC;AACF,MAAM,eAAe,GAA0B;IAC7C,GAAG,WAAW;IACd,aAAa;IACb,aAAa;IACb,gBAAgB;IAChB,wBAAwB;IACxB,kBAAkB;IAClB,mBAAmB;CACpB,CAAC;AACF,MAAM,aAAa,GAA0B,CAAC,GAAG,eAAe,EAAE,gBAAgB,EAAE,uBAAuB,CAAC,CAAC;AAE7G,mDAAmD;AACnD,MAAM,CAAC,MAAM,wBAAwB,GAAwD;IAC3F,MAAM,EAAE,MAAM;IACd,WAAW,EAAE,WAAW;IACxB,eAAe,EAAE,eAAe;IAChC,KAAK,EAAE,aAAa;CACrB,CAAC;AAgBF;;;;GAIG;AACH,MAAM,UAAU,gBAAgB,CAAC,UAA6B,EAAE;IAC9D,MAAM,WAAW,GAAG,EAAE,GAAG,wBAAwB,EAAE,GAAG,OAAO,CAAC,eAAe,EAAE,CAAC;IAChF,MAAM,cAAc,GAAG,OAAO,CAAC,cAAc,IAAI,CAAC,OAAO,CAAC,CAAC;IAC3D,MAAM,WAAW,GAAG,CAAC,KAAY,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,iBAAiB,GAAG,OAAO,CAAC,iBAAiB,IAAI,CAAC,CAAC,KAAY,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,KAAK,WAAW,CAAC,CAAC;IACxG,MAAM,kBAAkB,GAAG,OAAO,CAAC,kBAAkB,IAAI,WAAW,CAAC;IAErE,OAAO,CAAC,EAAE,KAAK,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAwB,EAAW,EAAE;QACtF,IAAI,WAAW,CAAC,KAAK,CAAC;YAAE,OAAO,IAAI,CAAC;QACpC,IAAI,MAAM,KAAK,gBAAgB;YAAE,OAAO,iBAAiB,CAAC,KAAK,CAAC,CAAC;QACjE,IAAI,MAAM,KAAK,kBAAkB;YAAE,OAAO,kBAAkB,CAAC,KAAK,CAAC,CAAC;QACpE,IAAI,CAAC,OAAO;YAAE,OAAO,KAAK,CAAC;QAE3B,8DAA8D;QAC9D,MAAM,KAAK,GAAG,CAAC,OAAO,CAAC,OAAO,IAAI,EAAE,CAAC;aAClC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,KAAK,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,MAAM,KAAK,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;aAChG,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;QACtB,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC;YAAE,OAAO,KAAK,CAAC;QAErC,MAAM,OAAO,GAAG,IAAI,GAAG,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,WAAW,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC,CAAC,CAAC;QAC1E,IAAI,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC;YAAE,OAAO,IAAI,CAAC;QAErC,8EAA8E;QAC9E,MAAM,YAAY,GAAG,QAAQ,EAAE,OAAO,KAAK,SAAS,IAAI,QAAQ,CAAC,OAAO,KAAK,KAAK,CAAC,MAAM,CAAC;QAC1F,IAAI,MAAM,KAAK,kBAAkB,IAAI,YAAY,IAAI,OAAO,CAAC,GAAG,CAAC,gBAAgB,CAAC;YAAE,OAAO,IAAI,CAAC;QAChG,IAAI,MAAM,KAAK,mBAAmB,IAAI,YAAY,IAAI,OAAO,CAAC,GAAG,CAAC,mBAAmB,CAAC;YAAE,OAAO,IAAI,CAAC;QAEpG,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;AACJ,CAAC"}
1
+ {"version":3,"file":"authorization.js","sourceRoot":"","sources":["../../src/domain/authorization.ts"],"names":[],"mappings":"AAQA,MAAM,MAAM,GAA0B,CAAC,cAAc,CAAC,CAAC;AACvD,MAAM,WAAW,GAA0B;IACzC,GAAG,MAAM;IACT,aAAa;IACb,aAAa;IACb,gBAAgB;IAChB,mBAAmB;IACnB,UAAU;CACX,CAAC;AACF,MAAM,eAAe,GAA0B;IAC7C,GAAG,WAAW;IACd,aAAa;IACb,aAAa;IACb,aAAa;IACb,gBAAgB;IAChB,wBAAwB;IACxB,kBAAkB;IAClB,mBAAmB;CACpB,CAAC;AACF,MAAM,aAAa,GAA0B,CAAC,GAAG,eAAe,EAAE,gBAAgB,EAAE,uBAAuB,CAAC,CAAC;AAE7G,mDAAmD;AACnD,MAAM,CAAC,MAAM,wBAAwB,GAAwD;IAC3F,MAAM,EAAE,MAAM;IACd,WAAW,EAAE,WAAW;IACxB,eAAe,EAAE,eAAe;IAChC,KAAK,EAAE,aAAa;CACrB,CAAC;AAgBF;;;;GAIG;AACH,MAAM,UAAU,gBAAgB,CAAC,UAA6B,EAAE;IAC9D,MAAM,WAAW,GAAG,EAAE,GAAG,wBAAwB,EAAE,GAAG,OAAO,CAAC,eAAe,EAAE,CAAC;IAChF,MAAM,cAAc,GAAG,OAAO,CAAC,cAAc,IAAI,CAAC,OAAO,CAAC,CAAC;IAC3D,MAAM,WAAW,GAAG,CAAC,KAAY,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,KAAK,IAAI,EAAE,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,iBAAiB,GAAG,OAAO,CAAC,iBAAiB,IAAI,CAAC,CAAC,KAAY,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,KAAK,WAAW,CAAC,CAAC;IACxG,MAAM,kBAAkB,GAAG,OAAO,CAAC,kBAAkB,IAAI,WAAW,CAAC;IAErE,OAAO,CAAC,EAAE,KAAK,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAwB,EAAW,EAAE;QACtF,IAAI,WAAW,CAAC,KAAK,CAAC;YAAE,OAAO,IAAI,CAAC;QACpC,IAAI,MAAM,KAAK,gBAAgB;YAAE,OAAO,iBAAiB,CAAC,KAAK,CAAC,CAAC;QACjE,IAAI,MAAM,KAAK,kBAAkB;YAAE,OAAO,kBAAkB,CAAC,KAAK,CAAC,CAAC;QACpE,IAAI,CAAC,OAAO;YAAE,OAAO,KAAK,CAAC;QAE3B,8DAA8D;QAC9D,MAAM,KAAK,GAAG,CAAC,OAAO,CAAC,OAAO,IAAI,EAAE,CAAC;aAClC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,KAAK,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,MAAM,KAAK,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;aAChG,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;QACtB,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC;YAAE,OAAO,KAAK,CAAC;QAErC,MAAM,OAAO,GAAG,IAAI,GAAG,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,WAAW,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC,CAAC,CAAC;QAC1E,IAAI,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC;YAAE,OAAO,IAAI,CAAC;QAErC,8EAA8E;QAC9E,MAAM,YAAY,GAAG,QAAQ,EAAE,OAAO,KAAK,SAAS,IAAI,QAAQ,CAAC,OAAO,KAAK,KAAK,CAAC,MAAM,CAAC;QAC1F,IAAI,MAAM,KAAK,kBAAkB,IAAI,YAAY,IAAI,OAAO,CAAC,GAAG,CAAC,gBAAgB,CAAC;YAAE,OAAO,IAAI,CAAC;QAChG,IAAI,MAAM,KAAK,mBAAmB,IAAI,YAAY,IAAI,OAAO,CAAC,GAAG,CAAC,mBAAmB,CAAC;YAAE,OAAO,IAAI,CAAC;QACpG,IAAI,MAAM,KAAK,aAAa,IAAI,YAAY,IAAI,OAAO,CAAC,GAAG,CAAC,UAAU,CAAC;YAAE,OAAO,IAAI,CAAC;QAErF,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;AACJ,CAAC"}
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAe3B,8GAA8G;AAC9G,eAAO,MAAM,sBAAsB,IAAI,CAAC;AAExC;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,GAAE,MAA+B,GAAG,MAAM,CAK9G;AAOD,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAErF;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAMzH;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;IACrB;;;OAGG;IACH,oBAAoB,CAAC,EAAE,MAAM,CAAC;CAC/B;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAID;;;GAGG;AACH,wBAAgB,kBAAkB,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,GAAE,YAAoC,GAAG,IAAI,CAKzG;AA0qBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAuC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CAmLtB"}
1
+ {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAe3B,8GAA8G;AAC9G,eAAO,MAAM,sBAAsB,IAAI,CAAC;AAExC;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,GAAE,MAA+B,GAAG,MAAM,CAK9G;AAOD,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAErF;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAMzH;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;IACrB;;;OAGG;IACH,oBAAoB,CAAC,EAAE,MAAM,CAAC;CAC/B;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAID;;;GAGG;AACH,wBAAgB,kBAAkB,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,GAAE,YAAoC,GAAG,IAAI,CAKzG;AAkvBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAuC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CAmCtB"}
@@ -74,6 +74,7 @@ const milestoneFields = (task, deadline, varianceHours) => ({
74
74
  ...(deadline ? { deadlineDate: deadline.toISOString(), deadlineVarianceHours: round2(varianceHours) } : {})
75
75
  });
76
76
  const allocationField = (task) => (getTaskAllocation(task) < 1 ? { allocation: getTaskAllocation(task) } : {});
77
+ const edgeKey = (before, after) => `${before}\u0000${after}`;
77
78
  const deadlinesOf = (graph, id) => graph.deadlines.get(id) ?? [];
78
79
  /**
79
80
  * The scheduling graph. Only leaf tasks are scheduled: a summary task (one with subtasks among
@@ -96,12 +97,14 @@ function buildGraph(tasks, dependencies) {
96
97
  };
97
98
  const summaries = new Map([...summaryIds].map((id) => [id, { task: all.get(id), leafIds: leavesOf(id) }]));
98
99
  const deadlines = new Map();
100
+ const earliestStarts = new Map();
99
101
  for (const t of tasks) {
100
- if (!t.deadline)
101
- continue;
102
- for (const leaf of leavesOf(t.id))
102
+ for (const leaf of t.deadline ? leavesOf(t.id) : [])
103
103
  deadlines.set(leaf, [...(deadlines.get(leaf) ?? []), t.deadline]);
104
+ for (const leaf of t.earliestStart ? leavesOf(t.id) : [])
105
+ earliestStarts.set(leaf, [...(earliestStarts.get(leaf) ?? []), t.earliestStart]);
104
106
  }
107
+ const lags = new Map();
105
108
  const taskMap = new Map(tasks.filter((t) => !summaryIds.has(t.id)).map((t) => [t.id, t]));
106
109
  const taskIds = Array.from(taskMap.keys());
107
110
  // Build adjacency graph:
@@ -117,12 +120,17 @@ function buildGraph(tasks, dependencies) {
117
120
  const edge = precedenceOf(dep);
118
121
  if (!edge || !all.has(edge.before) || !all.has(edge.after))
119
122
  continue;
123
+ const lag = Number.isFinite(dep.lagHours) ? dep.lagHours : 0;
120
124
  for (const before of leavesOf(edge.before)) {
121
125
  for (const after of leavesOf(edge.after)) {
122
126
  if (before === after)
123
127
  continue;
124
128
  prerequisites.get(after).add(before);
125
129
  successors.get(before).add(after);
130
+ // Two links between the same tasks: the longer wait wins
131
+ const key = edgeKey(before, after);
132
+ if (lag !== 0 || lags.has(key))
133
+ lags.set(key, Math.max(lags.get(key) ?? -Infinity, lag));
126
134
  }
127
135
  }
128
136
  }
@@ -154,7 +162,7 @@ function buildGraph(tasks, dependencies) {
154
162
  const sorted = new Set(topoOrder);
155
163
  const cyclicTaskIds = taskIds.filter((id) => !sorted.has(id));
156
164
  topoOrder.push(...cyclicTaskIds);
157
- return { taskMap, taskIds, prerequisites, successors, topoOrder, cyclicTaskIds, summaries, deadlines };
165
+ return { taskMap, taskIds, prerequisites, successors, topoOrder, cyclicTaskIds, summaries, deadlines, earliestStarts, lags };
158
166
  }
159
167
  /**
160
168
  * Adds each summary task to `analysis` as a roll-up of the leaf tasks under it: earliest start,
@@ -257,7 +265,21 @@ function scheduleOnDates(graph, segments, options, calculatedAt) {
257
265
  const deadline = taskMap.get(id).deadline;
258
266
  return deadline ? getDeadlineInstant(deadline, calendarOf.get(id)) : undefined;
259
267
  };
260
- const ctx = { taskMap, calendarOf, durationOf, deadlineOf, ownDeadlineOf, startOf: (id) => segmentOf.get(id).start };
268
+ // A start constraint means "not before": the first working moment at or after it
269
+ const notBefore = new Map(taskIds.flatMap((id) => {
270
+ const instants = (graph.earliestStarts.get(id) ?? []).map((d) => nextWorkingTime(d, calendarOf.get(id)));
271
+ return instants.length ? [[id, new Date(Math.max(...instants.map((d) => d.getTime())))]] : [];
272
+ }));
273
+ const ctx = {
274
+ taskMap,
275
+ calendarOf,
276
+ durationOf,
277
+ deadlineOf,
278
+ ownDeadlineOf,
279
+ notBefore,
280
+ lagOf: (before, after) => graph.lags.get(edgeKey(before, after)) ?? 0,
281
+ startOf: (id) => segmentOf.get(id).start
282
+ };
261
283
  const endOfProjects = (dates) => {
262
284
  const ends = new Map(segments.map((seg) => [seg.projectId, latest(seg.taskIds.map((id) => dates.finish.get(id)), seg.start)]));
263
285
  return (id) => ends.get(segmentOf.get(id).projectId);
@@ -303,6 +325,34 @@ function involving(overallocations, seg) {
303
325
  const ids = new Set(seg.taskIds);
304
326
  return overallocations.filter((o) => o.taskIds.some((id) => ids.has(id)));
305
327
  }
328
+ /** `date` moved by `hours` working hours on `calendar` (back when negative). */
329
+ function shiftWorking(date, hours, calendar) {
330
+ if (hours > 0)
331
+ return addWorkingHours(date, hours, calendar);
332
+ if (hours < 0)
333
+ return subtractWorkingHours(date, -hours, calendar);
334
+ return date;
335
+ }
336
+ /**
337
+ * When a task may start, given when its predecessors finish: the latest of its project's start, its
338
+ * start constraint and each predecessor's finish plus the lag on that dependency.
339
+ */
340
+ function readyTime(id, prerequisites, finish, ctx) {
341
+ let ready = ctx.startOf(id);
342
+ const floor = ctx.notBefore.get(id);
343
+ if (floor && floor > ready)
344
+ ready = floor;
345
+ const calendar = ctx.calendarOf.get(id);
346
+ for (const p of prerequisites.get(id)) {
347
+ const f = finish.get(p);
348
+ if (!f)
349
+ continue;
350
+ const after = shiftWorking(f, ctx.lagOf(p, id), calendar);
351
+ if (after > ready)
352
+ ready = after;
353
+ }
354
+ return ready;
355
+ }
306
356
  function latest(dates, floor) {
307
357
  let max = floor;
308
358
  for (const d of dates)
@@ -331,12 +381,7 @@ function forwardPass(order, prerequisites, ctx) {
331
381
  const start = new Map();
332
382
  const finish = new Map();
333
383
  for (const id of order) {
334
- let ready = ctx.startOf(id);
335
- for (const p of prerequisites.get(id)) {
336
- const f = finish.get(p);
337
- if (f && f > ready)
338
- ready = f;
339
- }
384
+ const ready = readyTime(id, prerequisites, finish, ctx);
340
385
  const calendar = ctx.calendarOf.get(id);
341
386
  const duration = ctx.durationOf.get(id);
342
387
  const es = startTime(ready, duration, calendar);
@@ -353,8 +398,10 @@ function backwardPass(order, successorsOf, endOf, ctx) {
353
398
  let due = endOf(id);
354
399
  for (const s of successorsOf(id)) {
355
400
  const ls = start.get(s);
356
- if (ls && ls < due)
357
- due = ls;
401
+ // The successor's late start, less the lag it waits after this task finishes
402
+ const by = ls && shiftWorking(ls, -ctx.lagOf(id, s), ctx.calendarOf.get(s));
403
+ if (by && by < due)
404
+ due = by;
358
405
  }
359
406
  const deadline = ctx.deadlineOf.get(id);
360
407
  if (deadline && deadline < due)
@@ -424,12 +471,7 @@ function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder
424
471
  eligible.add(topoOrder.find((id) => !start.has(id)));
425
472
  const id = first(eligible);
426
473
  eligible.delete(id);
427
- let ready = ctx.startOf(id);
428
- for (const p of prerequisites.get(id)) {
429
- const f = finish.get(p);
430
- if (f && f > ready)
431
- ready = f;
432
- }
474
+ const ready = readyTime(id, prerequisites, finish, ctx);
433
475
  const calendar = ctx.calendarOf.get(id);
434
476
  const duration = ctx.durationOf.get(id);
435
477
  const resources = duration > 0 ? resourcesOf(taskMap.get(id)) : [];
@@ -483,10 +525,36 @@ function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder
483
525
  // whose finish freed its capacity.
484
526
  for (const [taskId, blocker] of waitingOn)
485
527
  link(blocker, taskId);
486
- // Every edge (dependency or resource chain) goes forward in levelled start time; ties are
487
- // zero-duration tasks, ordered by placement.
528
+ // The backward pass needs every successor (dependency or resource chain) before its
529
+ // predecessors. Edges mostly go forward in levelled start time, but a lead (negative lag) can
530
+ // start a successor first, so walk the edges depth-first, visiting tasks in start order.
488
531
  const placement = new Map(placed.map((id, i) => [id, i]));
489
- const backwardOrder = [...taskIds].sort((a, b) => start.get(b).getTime() - start.get(a).getTime() || placement.get(b) - placement.get(a));
532
+ const byStart = [...taskIds].sort((a, b) => start.get(a).getTime() - start.get(b).getTime() || placement.get(a) - placement.get(b));
533
+ const backwardOrder = [];
534
+ const visited = new Set();
535
+ const visit = (root) => {
536
+ // Iterative post-order, so long chains cannot overflow the stack
537
+ const stack = [];
538
+ const enter = (id) => {
539
+ visited.add(id);
540
+ stack.push([id, [...successors.get(id), ...(resourceSuccessors.get(id) ?? [])][Symbol.iterator]()]);
541
+ };
542
+ enter(root);
543
+ while (stack.length) {
544
+ const [id, next] = stack[stack.length - 1];
545
+ const step = next.next();
546
+ if (step.done) {
547
+ stack.pop();
548
+ backwardOrder.push(id);
549
+ }
550
+ else if (!visited.has(step.value)) {
551
+ enter(step.value);
552
+ }
553
+ }
554
+ };
555
+ for (const id of byStart)
556
+ if (!visited.has(id))
557
+ visit(id);
490
558
  return {
491
559
  early: { start, finish },
492
560
  waitingOn,
@@ -698,145 +766,30 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
698
766
  tasks: []
699
767
  };
700
768
  }
701
- const graph = buildGraph(tasks, dependencies);
702
- const { taskMap, taskIds, prerequisites, successors, topoOrder } = graph;
703
769
  if (options.levelResources && options.calendars !== 'assignee') {
704
770
  throw new Error("levelResources requires calendars: 'assignee'.");
705
771
  }
706
- if (options.calendars === 'assignee') {
707
- return calculateCalendarCPM(projectId, calculatedAt, graph, options);
708
- }
709
- // Deadlines as project-calendar hours from the start. Without a start date there is nothing to
710
- // place them against, so they are ignored. A task's late finish is capped by its own deadline and
711
- // by those of the summary tasks above it; its schedule reports its own.
712
- const capHours = new Map();
713
- const ownDeadline = new Map();
714
- const toHours = (deadline) => deadline >= projectStartDate
715
- ? getWorkingHoursBetween(projectStartDate, deadline, schedule)
716
- : -getWorkingHoursBetween(deadline, projectStartDate, schedule);
717
- if (projectStartDate) {
718
- for (const id of taskIds) {
719
- const caps = deadlinesOf(graph, id).map((d) => toHours(getDeadlineInstant(d, schedule)));
720
- if (caps.length)
721
- capHours.set(id, Math.min(...caps));
722
- const own = taskMap.get(id).deadline;
723
- if (own)
724
- ownDeadline.set(id, getDeadlineInstant(own, schedule));
725
- }
726
- }
727
- // --- FORWARD PASS ---
728
- const earlyStart = new Map();
729
- const earlyFinish = new Map();
730
- for (const id of topoOrder) {
731
- const task = taskMap.get(id);
732
- const duration = getTaskScheduledHours(task, options.effort, options.defaultEstimateHours);
733
- const prereqs = prerequisites.get(id) || new Set();
734
- let maxPrereqFinish = 0;
735
- for (const p of prereqs) {
736
- const pFinish = earlyFinish.get(p) ?? 0;
737
- if (pFinish > maxPrereqFinish) {
738
- maxPrereqFinish = pFinish;
739
- }
740
- }
741
- const es = maxPrereqFinish;
742
- const ef = es + duration;
743
- earlyStart.set(id, es);
744
- earlyFinish.set(id, ef);
745
- }
746
- // Total project duration
747
- let totalDurationHours = 0;
748
- for (const ef of earlyFinish.values()) {
749
- if (ef > totalDurationHours) {
750
- totalDurationHours = ef;
751
- }
752
- }
753
- // --- BACKWARD PASS ---
754
- const lateStart = new Map();
755
- const lateFinish = new Map();
756
- // Process in reverse topological order
757
- for (let i = topoOrder.length - 1; i >= 0; i--) {
758
- const id = topoOrder[i];
759
- const task = taskMap.get(id);
760
- const duration = getTaskScheduledHours(task, options.effort, options.defaultEstimateHours);
761
- const succs = successors.get(id) || new Set();
762
- let minSuccLateStart = totalDurationHours;
763
- if (succs.size > 0) {
764
- minSuccLateStart = Infinity;
765
- for (const s of succs) {
766
- const sLateStart = lateStart.get(s);
767
- if (sLateStart !== undefined && sLateStart < minSuccLateStart) {
768
- minSuccLateStart = sLateStart;
769
- }
770
- }
771
- if (!Number.isFinite(minSuccLateStart)) {
772
- minSuccLateStart = totalDurationHours;
773
- }
774
- }
775
- const lf = Math.min(minSuccLateStart, capHours.get(id) ?? Infinity);
776
- const ls = lf - duration;
777
- lateFinish.set(id, lf);
778
- lateStart.set(id, ls);
772
+ // Both modes run the same date-based passes; project mode puts every task on the project calendar.
773
+ if (options.calendars === 'assignee' || projectStartDate) {
774
+ return calculateCalendarCPM(projectId, calculatedAt, buildGraph(tasks, dependencies), options);
779
775
  }
780
- // --- SLACK & CRITICAL PATH ---
781
- const schedules = [];
782
- const criticalTaskIds = [];
783
- for (const id of taskIds) {
784
- const es = earlyStart.get(id) ?? 0;
785
- const ef = earlyFinish.get(id) ?? 0;
786
- const ls = lateStart.get(id) ?? 0;
787
- const lf = lateFinish.get(id) ?? 0;
788
- const rawSlack = lf - ef;
789
- const totalSlack = Math.round(rawSlack * 100) / 100;
790
- const isCritical = totalSlack <= 0.001;
791
- if (isCritical) {
792
- criticalTaskIds.push(id);
793
- }
794
- const task = taskMap.get(id);
795
- const duration = getTaskScheduledHours(task, options.effort, options.defaultEstimateHours);
796
- const earlyStartDate = projectStartDate
797
- ? addWorkingHours(projectStartDate, es, schedule).toISOString()
798
- : undefined;
799
- const earlyFinishDate = projectStartDate
800
- ? addWorkingHours(projectStartDate, ef, schedule).toISOString()
801
- : undefined;
802
- const lateStartDate = projectStartDate
803
- ? addWorkingHours(projectStartDate, ls, schedule).toISOString()
804
- : undefined;
805
- const lateFinishDate = projectStartDate
806
- ? addWorkingHours(projectStartDate, lf, schedule).toISOString()
807
- : undefined;
808
- schedules.push({
809
- taskId: id,
810
- earlyStart: Math.round(es * 100) / 100,
811
- earlyFinish: Math.round(ef * 100) / 100,
812
- lateStart: Math.round(ls * 100) / 100,
813
- lateFinish: Math.round(lf * 100) / 100,
814
- totalSlack,
815
- isCritical,
816
- durationHours: duration,
817
- ...allocationField(task),
818
- ...milestoneFields(task, ownDeadline.get(id), ownDeadline.has(id) ? toHours(ownDeadline.get(id)) - ef : undefined),
819
- slackWorkingHours: totalSlack,
820
- earlyStartDate,
821
- earlyFinishDate,
822
- lateStartDate,
823
- lateFinishDate
824
- });
825
- }
826
- const projectEndDate = projectStartDate
827
- ? addWorkingHours(projectStartDate, totalDurationHours, schedule).toISOString()
828
- : undefined;
829
- return finishAnalysis({
830
- projectId,
831
- calculatedAt,
832
- totalDurationHours: Math.round(totalDurationHours * 100) / 100,
833
- totalWorkingHours: Math.round(totalDurationHours * 100) / 100,
834
- projectStartDate: projectStartDate ? projectStartDate.toISOString() : undefined,
835
- projectEndDate,
836
- criticalTaskIds,
837
- missedDeadlineTaskIds: missedDeadlines(schedules),
838
- ...(graph.cyclicTaskIds.length ? { cyclicTaskIds: graph.cyclicTaskIds } : {}),
839
- tasks: schedules
840
- }, graph, schedule, taskIds);
776
+ // Without a start date there is nothing to date the schedule from. It runs from a fixed anchor and
777
+ // reports working-hour offsets only, which do not depend on the anchor because they count working
778
+ // time on the one calendar. Deadlines and start constraints are dates, so they do not apply.
779
+ const undatedTasks = tasks.map(({ deadline: _deadline, earliestStart: _earliestStart, ...task }) => task);
780
+ const analysis = calculateCalendarCPM(projectId, calculatedAt, buildGraph(undatedTasks, dependencies), {
781
+ ...options,
782
+ projectStartDate: UNDATED_ANCHOR
783
+ });
784
+ return withoutDates(analysis);
785
+ }
786
+ /** A Monday at UTC midnight: where an undated project-calendar schedule is laid out. */
787
+ const UNDATED_ANCHOR = '2001-01-01T00:00:00.000Z';
788
+ /** Drops the dates from an analysis laid out from `UNDATED_ANCHOR`, keeping working-hour offsets. */
789
+ function withoutDates({ projectStartDate: _start, projectEndDate: _end, overallocations: _overallocations, ...analysis }) {
790
+ return {
791
+ ...analysis,
792
+ tasks: analysis.tasks.map(({ earlyStartDate: _es, earlyFinishDate: _ef, lateStartDate: _ls, lateFinishDate: _lf, ...task }) => task)
793
+ };
841
794
  }
842
795
  //# sourceMappingURL=cpm.js.map