@critical-path/core 0.54.0 → 0.55.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,16 @@
1
1
  # @critical-path/core
2
2
 
3
+ ## 0.55.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 5dbf25b: Effort and progress roll-ups agree, count subtasks once and leave canceled work out.
8
+
9
+ - New `getTaskEstimateHours(task)` is the one place that reads an estimate (0 for milestones; an explicit 0 counts). Critical path analysis, workload, the ladder, metrics/EVM and deliverable summaries all use it, along with `getSummaryTaskIds` / `getLeafTasks`.
10
+ - **BREAKING:** a task with subtasks is a summary task. Critical path analysis schedules only leaf tasks: dependencies and deadlines on a summary apply to every leaf under it, and the summary is reported as a roll-up (`isSummary: true`; not in `criticalTaskIds`). Workload, the ladder and deliverable summaries count effort from leaves only, so an epic's estimate no longer doubles its subtasks'.
11
+ - **BREAKING:** canceled tasks leave estimate totals and progress denominators in the ladder and deliverable summaries (their logged hours still count), so a project can reach 100% and `completed`. Canceled tasks have zero planned and earned value in EVM. The ladder and deliverable summaries use inferred progress (`inferTaskProgress`) like task metrics.
12
+ - Unestimated tasks are listed in `unestimatedTaskIds`, and the hours assumed for them are configurable: `defaultEstimateHours` per call (`?defaultEstimateHours=` over HTTP, client and MCP options) or `criticalPathDefaultEstimateHours` on the engine. Default 1, as before.
13
+
3
14
  ## 0.54.0
4
15
 
5
16
  ### Minor Changes
package/README.md CHANGED
@@ -365,7 +365,7 @@ console.log(leveled.unleveledProjectEndDate, '->', leveled.projectEndDate);
365
365
 
366
366
  With `calendars: 'assignee'` (or `criticalPathCalendars: 'assignee'` on the engine), each task uses its assignee's schedule, then its team's, then the project calendar. Passes run on dates, slack is measured in each task's calendar, and each calendar is evaluated in its own `timezone` (IANA name; default UTC), including daylight-saving changes. `levelResources: true` additionally delays tasks so nobody works on two at once (priority rule `levelingPriority`, default least slack), reporting `levelingDelayHours` and `waitingOn` per task. Tasks with `allocation` below 1 take that share of their assignee (a 16h task at 0.5 spans 32 working hours); levelling fits them within 100% per person, and `overallocations` lists who is booked above 100% and when. Teams act as pools of `headcount` people (default: member count) shared by team-only tasks and members' own tasks. Finished tasks take no time. `calculatePortfolioCriticalPath({ projectIds })` levels several projects together, sharing people and teams across them; `includeHiddenWork` also counts unreadable projects' work as `'hidden'`. `effort: 'remaining'` schedules only what is left on in-progress tasks.
367
367
 
368
- Tasks with `isMilestone: true` are zero-duration checkpoints (their estimates are ignored). A `deadline` on any task caps its late finish: a forecast that misses it shows as negative slack along the path driving it, with `deadlineDate` and `deadlineVarianceHours` per task and `missedDeadlineTaskIds` on the analysis. A date-only deadline means the end of that working day; project-calendar mode needs a start date to apply deadlines.
368
+ Tasks with subtasks are summary tasks, reported as roll-ups of their leaves (`isSummary`); dependencies and deadlines on them apply to every leaf. Unestimated tasks use `defaultEstimateHours` (default 1) and are listed in `unestimatedTaskIds`. Tasks with `isMilestone: true` are zero-duration checkpoints (their estimates are ignored). A `deadline` on any task caps its late finish: a forecast that misses it shows as negative slack along the path driving it, with `deadlineDate` and `deadlineVarianceHours` per task and `missedDeadlineTaskIds` on the analysis. A date-only deadline means the end of that working day; project-calendar mode needs a start date to apply deadlines.
369
369
 
370
370
  ### 9. Fractional Lexical Indexing (Kanban Reordering)
371
371
 
@@ -1,9 +1,15 @@
1
1
  import type { Task, TaskDependency, CriticalPathAnalysis, WorkSchedule, User, Team, PortfolioCriticalPathAnalysis } from '../types/index.js';
2
- export declare function getTaskDurationHours(task: Task): number;
2
+ /** Hours assumed for a task with no estimate and no logged effort (see `CPMOptions.defaultEstimateHours`). */
3
+ export declare const DEFAULT_ESTIMATE_HOURS = 1;
4
+ /**
5
+ * Effort critical path analysis and workload plan for a task: its estimate (`getTaskEstimateHours`;
6
+ * 0 for milestones), else the effort logged on it, else `defaultEstimateHours`.
7
+ */
8
+ export declare function getTaskDurationHours(task: Task, defaultEstimateHours?: number): number;
3
9
  /** The task's `allocation`, clamped to (0, 1]; 1 when unset or invalid. */
4
10
  export declare function getTaskAllocation(task: Task): number;
5
11
  /** Working hours a task spans: its effort divided by its allocation. */
6
- export declare function getTaskElapsedHours(task: Task): number;
12
+ export declare function getTaskElapsedHours(task: Task, defaultEstimateHours?: number): number;
7
13
  /** True for completed or canceled tasks (by `semanticStatus`, else the default `done`/`canceled` statuses). */
8
14
  export declare function isTaskFinished(task: Task): boolean;
9
15
  /** What effort critical path analysis schedules: the full estimate, or what remains on in-progress tasks. */
@@ -13,7 +19,7 @@ export type EffortBasis = 'estimate' | 'remaining';
13
19
  * more time and occupies nobody), otherwise its effort divided by its allocation. With
14
20
  * `effort: 'remaining'`, an in-progress task's effort is `max(0, estimate - loggedHours)`.
15
21
  */
16
- export declare function getTaskScheduledHours(task: Task, effort?: EffortBasis): number;
22
+ export declare function getTaskScheduledHours(task: Task, effort?: EffortBasis, defaultEstimateHours?: number): number;
17
23
  export interface CPMOptions {
18
24
  projectStartDate?: string | Date;
19
25
  /** The project calendar. Default: `DEFAULT_WORK_SCHEDULE`. */
@@ -47,6 +53,11 @@ export interface CPMOptions {
47
53
  * no time either way.
48
54
  */
49
55
  effort?: EffortBasis;
56
+ /**
57
+ * Hours assumed for an unfinished task with no estimate and no logged effort. Default 1. Such
58
+ * tasks are listed in `unestimatedTaskIds`, so a half-estimated plan does not look certain.
59
+ */
60
+ defaultEstimateHours?: number;
50
61
  }
51
62
  export type LevelingPriority = 'slack' | 'priority' | 'dueDate' | 'order';
52
63
  /** The calendar a task runs on in assignee mode: assignee, then task team, then project. */
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAc3B,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAcvD;AAED,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAEtD;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,GAAG,MAAM,CAM1F;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;CACtB;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAID;;;GAGG;AACH,wBAAgB,kBAAkB,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,GAAE,YAAoC,GAAG,IAAI,CAKzG;AA2kBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAsC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CAqLtB"}
1
+ {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAe3B,8GAA8G;AAC9G,eAAO,MAAM,sBAAsB,IAAI,CAAC;AAExC;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,GAAE,MAA+B,GAAG,MAAM,CAK9G;AAOD,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAErF;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,EAAE,oBAAoB,CAAC,EAAE,MAAM,GAAG,MAAM,CAMzH;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;IACrB;;;OAGG;IACH,oBAAoB,CAAC,EAAE,MAAM,CAAC;CAC/B;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAID;;;GAGG;AACH,wBAAgB,kBAAkB,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,GAAE,YAAoC,GAAG,IAAI,CAKzG;AA0qBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAuC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CAmLtB"}
@@ -1,21 +1,24 @@
1
1
  import { DEFAULT_WORK_SCHEDULE, addWorkingHours, subtractWorkingHours, getWorkingHoursBetween, nextWorkingTime, previousWorkingTime, parseDate, toDateString } from './calendar.js';
2
2
  import { isTaskInProgress } from '../utils/status.js';
3
3
  import { precedenceOf } from './graph.js';
4
- export function getTaskDurationHours(task) {
5
- // A milestone is a point in time: it never takes effort, whatever its estimates say
6
- if (task.isMilestone)
7
- return 0;
8
- if (typeof task.estimatedHours === 'number' && task.estimatedHours >= 0) {
9
- return task.estimatedHours;
10
- }
11
- if (typeof task.estimatedDurationMinutes === 'number' && task.estimatedDurationMinutes >= 0) {
12
- return task.estimatedDurationMinutes / 60;
13
- }
14
- if (typeof task.actualHours === 'number' && task.actualHours > 0) {
4
+ import { getTaskEstimateHours, getSummaryTaskIds } from './effort.js';
5
+ /** Hours assumed for a task with no estimate and no logged effort (see `CPMOptions.defaultEstimateHours`). */
6
+ export const DEFAULT_ESTIMATE_HOURS = 1;
7
+ /**
8
+ * Effort critical path analysis and workload plan for a task: its estimate (`getTaskEstimateHours`;
9
+ * 0 for milestones), else the effort logged on it, else `defaultEstimateHours`.
10
+ */
11
+ export function getTaskDurationHours(task, defaultEstimateHours = DEFAULT_ESTIMATE_HOURS) {
12
+ const estimate = getTaskEstimateHours(task);
13
+ if (estimate !== undefined)
14
+ return estimate;
15
+ if (typeof task.actualHours === 'number' && task.actualHours > 0)
15
16
  return task.actualHours;
16
- }
17
- // Default to 1 hour for non-empty tasks without explicit estimate
18
- return 1;
17
+ return defaultEstimateHours;
18
+ }
19
+ /** True when `getTaskDurationHours` falls back to the default: no estimate and no logged effort. */
20
+ function isUnestimated(task) {
21
+ return getTaskEstimateHours(task) === undefined && !(typeof task.actualHours === 'number' && task.actualHours > 0);
19
22
  }
20
23
  /** The task's `allocation`, clamped to (0, 1]; 1 when unset or invalid. */
21
24
  export function getTaskAllocation(task) {
@@ -23,8 +26,8 @@ export function getTaskAllocation(task) {
23
26
  return typeof a === 'number' && a > 0 && a <= 1 ? a : 1;
24
27
  }
25
28
  /** Working hours a task spans: its effort divided by its allocation. */
26
- export function getTaskElapsedHours(task) {
27
- return getTaskDurationHours(task) / getTaskAllocation(task);
29
+ export function getTaskElapsedHours(task, defaultEstimateHours) {
30
+ return getTaskDurationHours(task, defaultEstimateHours) / getTaskAllocation(task);
28
31
  }
29
32
  /** True for completed or canceled tasks (by `semanticStatus`, else the default `done`/`canceled` statuses). */
30
33
  export function isTaskFinished(task) {
@@ -37,13 +40,13 @@ export function isTaskFinished(task) {
37
40
  * more time and occupies nobody), otherwise its effort divided by its allocation. With
38
41
  * `effort: 'remaining'`, an in-progress task's effort is `max(0, estimate - loggedHours)`.
39
42
  */
40
- export function getTaskScheduledHours(task, effort = 'estimate') {
43
+ export function getTaskScheduledHours(task, effort = 'estimate', defaultEstimateHours) {
41
44
  if (isTaskFinished(task))
42
45
  return 0;
43
46
  if (effort === 'remaining' && isTaskInProgress({ status: task.status, semanticStatus: task.semanticStatus })) {
44
- return Math.max(0, getTaskDurationHours(task) - (task.loggedHours ?? 0)) / getTaskAllocation(task);
47
+ return Math.max(0, getTaskDurationHours(task, defaultEstimateHours) - (task.loggedHours ?? 0)) / getTaskAllocation(task);
45
48
  }
46
- return getTaskElapsedHours(task);
49
+ return getTaskElapsedHours(task, defaultEstimateHours);
47
50
  }
48
51
  /** The calendar a task runs on in assignee mode: assignee, then task team, then project. */
49
52
  export function resolveTaskSchedule(task, context) {
@@ -71,8 +74,35 @@ const milestoneFields = (task, deadline, varianceHours) => ({
71
74
  ...(deadline ? { deadlineDate: deadline.toISOString(), deadlineVarianceHours: round2(varianceHours) } : {})
72
75
  });
73
76
  const allocationField = (task) => (getTaskAllocation(task) < 1 ? { allocation: getTaskAllocation(task) } : {});
77
+ const deadlinesOf = (graph, id) => graph.deadlines.get(id) ?? [];
78
+ /**
79
+ * The scheduling graph. Only leaf tasks are scheduled: a summary task (one with subtasks among
80
+ * `tasks`) spans its subtasks, so a dependency on it applies to every leaf under it, and its
81
+ * deadline caps those leaves. Summaries are reported afterwards as roll-ups (`addSummaries`).
82
+ */
74
83
  function buildGraph(tasks, dependencies) {
75
- const taskMap = new Map(tasks.map((t) => [t.id, t]));
84
+ const summaryIds = getSummaryTaskIds(tasks);
85
+ const all = new Map(tasks.map((t) => [t.id, t]));
86
+ const childrenOf = new Map();
87
+ for (const t of tasks) {
88
+ if (t.parentId && summaryIds.has(t.parentId))
89
+ childrenOf.set(t.parentId, [...(childrenOf.get(t.parentId) ?? []), t.id]);
90
+ }
91
+ const leavesOf = (id, seen = new Set()) => {
92
+ if (!summaryIds.has(id) || seen.has(id))
93
+ return [id];
94
+ seen.add(id);
95
+ return childrenOf.get(id).flatMap((child) => leavesOf(child, seen));
96
+ };
97
+ const summaries = new Map([...summaryIds].map((id) => [id, { task: all.get(id), leafIds: leavesOf(id) }]));
98
+ const deadlines = new Map();
99
+ for (const t of tasks) {
100
+ if (!t.deadline)
101
+ continue;
102
+ for (const leaf of leavesOf(t.id))
103
+ deadlines.set(leaf, [...(deadlines.get(leaf) ?? []), t.deadline]);
104
+ }
105
+ const taskMap = new Map(tasks.filter((t) => !summaryIds.has(t.id)).map((t) => [t.id, t]));
76
106
  const taskIds = Array.from(taskMap.keys());
77
107
  // Build adjacency graph:
78
108
  // prerequisites[v] = tasks that v depends on (must finish before v starts)
@@ -85,9 +115,15 @@ function buildGraph(tasks, dependencies) {
85
115
  }
86
116
  for (const dep of dependencies) {
87
117
  const edge = precedenceOf(dep);
88
- if (edge && taskMap.has(edge.before) && taskMap.has(edge.after) && edge.before !== edge.after) {
89
- prerequisites.get(edge.after).add(edge.before);
90
- successors.get(edge.before).add(edge.after);
118
+ if (!edge || !all.has(edge.before) || !all.has(edge.after))
119
+ continue;
120
+ for (const before of leavesOf(edge.before)) {
121
+ for (const after of leavesOf(edge.after)) {
122
+ if (before === after)
123
+ continue;
124
+ prerequisites.get(after).add(before);
125
+ successors.get(before).add(after);
126
+ }
91
127
  }
92
128
  }
93
129
  // Topological sorting via Kahn's algorithm
@@ -118,7 +154,58 @@ function buildGraph(tasks, dependencies) {
118
154
  const sorted = new Set(topoOrder);
119
155
  const cyclicTaskIds = taskIds.filter((id) => !sorted.has(id));
120
156
  topoOrder.push(...cyclicTaskIds);
121
- return { taskMap, taskIds, prerequisites, successors, topoOrder, cyclicTaskIds };
157
+ return { taskMap, taskIds, prerequisites, successors, topoOrder, cyclicTaskIds, summaries, deadlines };
158
+ }
159
+ /**
160
+ * Adds each summary task to `analysis` as a roll-up of the leaf tasks under it: earliest start,
161
+ * latest finish, least slack, critical when any leaf is. Summaries are not added to
162
+ * `criticalTaskIds`, whose tasks are the scheduled (leaf) ones. A summary's own deadline is
163
+ * reported against its latest finish.
164
+ */
165
+ function addSummaries(analysis, graph, schedule) {
166
+ const byId = new Map(analysis.tasks.map((t) => [t.taskId, t]));
167
+ const rollups = [];
168
+ const missed = [];
169
+ for (const [id, { task, leafIds }] of graph.summaries) {
170
+ const leaves = leafIds.map((leaf) => byId.get(leaf)).filter((t) => Boolean(t));
171
+ if (!leaves.length)
172
+ continue;
173
+ const min = (pick) => Math.min(...leaves.map(pick));
174
+ const max = (pick) => Math.max(...leaves.map(pick));
175
+ const dates = (pick) => leaves.map(pick).filter((d) => Boolean(d)).sort();
176
+ const [starts, finishes, lateStarts, lateFinishes] = [dates((t) => t.earlyStartDate), dates((t) => t.earlyFinishDate), dates((t) => t.lateStartDate), dates((t) => t.lateFinishDate)];
177
+ const slack = min((t) => t.totalSlack);
178
+ const earlyFinishDate = finishes[finishes.length - 1];
179
+ const deadline = task.deadline && earlyFinishDate ? getDeadlineInstant(task.deadline, schedule) : undefined;
180
+ const variance = deadline ? slackHours(new Date(earlyFinishDate), deadline, schedule) : undefined;
181
+ if (variance !== undefined && variance < -0.001)
182
+ missed.push(id);
183
+ rollups.push({
184
+ taskId: id,
185
+ isSummary: true,
186
+ earlyStart: min((t) => t.earlyStart),
187
+ earlyFinish: max((t) => t.earlyFinish),
188
+ lateStart: min((t) => t.lateStart),
189
+ lateFinish: max((t) => t.lateFinish),
190
+ totalSlack: slack,
191
+ slackWorkingHours: slack,
192
+ isCritical: leaves.some((t) => t.isCritical),
193
+ durationHours: round2(max((t) => t.earlyFinish) - min((t) => t.earlyStart)),
194
+ ...(starts.length ? { earlyStartDate: starts[0], earlyFinishDate, lateStartDate: lateStarts[0], lateFinishDate: lateFinishes[lateFinishes.length - 1] } : {}),
195
+ ...milestoneFields({ ...task, isMilestone: false }, deadline, variance)
196
+ });
197
+ }
198
+ if (!rollups.length)
199
+ return analysis;
200
+ return { ...analysis, tasks: [...analysis.tasks, ...rollups], missedDeadlineTaskIds: [...analysis.missedDeadlineTaskIds, ...missed] };
201
+ }
202
+ /** Completes a project's analysis: unestimated tasks and summary roll-ups. */
203
+ function finishAnalysis(analysis, graph, schedule, taskIds) {
204
+ const unestimatedTaskIds = taskIds.filter((id) => {
205
+ const task = graph.taskMap.get(id);
206
+ return !isTaskFinished(task) && isUnestimated(task);
207
+ });
208
+ return addSummaries({ ...analysis, ...(unestimatedTaskIds.length ? { unestimatedTaskIds } : {}) }, graph, schedule);
122
209
  }
123
210
  /**
124
211
  * Assignee-calendar CPM. Passes run on dates, because working-hour offsets mean different
@@ -160,12 +247,17 @@ function scheduleOnDates(graph, segments, options, calculatedAt) {
160
247
  const task = taskMap.get(id);
161
248
  return [id, options.calendars === 'assignee' ? resolveTaskSchedule(task, { ...options, schedule: seg.schedule }) : seg.schedule];
162
249
  }));
163
- const durationOf = new Map(taskIds.map((id) => [id, getTaskScheduledHours(taskMap.get(id), options.effort)]));
250
+ const durationOf = new Map(taskIds.map((id) => [id, getTaskScheduledHours(taskMap.get(id), options.effort, options.defaultEstimateHours)]));
251
+ // A task's late finish is capped by its own deadline and by those of the summary tasks above it
164
252
  const deadlineOf = new Map(taskIds.flatMap((id) => {
165
- const deadline = taskMap.get(id).deadline;
166
- return deadline ? [[id, getDeadlineInstant(deadline, calendarOf.get(id))]] : [];
253
+ const instants = deadlinesOf(graph, id).map((d) => getDeadlineInstant(d, calendarOf.get(id)));
254
+ return instants.length ? [[id, new Date(Math.min(...instants.map((d) => d.getTime())))]] : [];
167
255
  }));
168
- const ctx = { taskMap, calendarOf, durationOf, deadlineOf, startOf: (id) => segmentOf.get(id).start };
256
+ const ownDeadlineOf = (id) => {
257
+ const deadline = taskMap.get(id).deadline;
258
+ return deadline ? getDeadlineInstant(deadline, calendarOf.get(id)) : undefined;
259
+ };
260
+ const ctx = { taskMap, calendarOf, durationOf, deadlineOf, ownDeadlineOf, startOf: (id) => segmentOf.get(id).start };
169
261
  const endOfProjects = (dates) => {
170
262
  const ends = new Map(segments.map((seg) => [seg.projectId, latest(seg.taskIds.map((id) => dates.finish.get(id)), seg.start)]));
171
263
  return (id) => ends.get(segmentOf.get(id).projectId);
@@ -176,7 +268,7 @@ function scheduleOnDates(graph, segments, options, calculatedAt) {
176
268
  const cyclic = new Set(graph.cyclicTaskIds);
177
269
  const analyse = (seg, e, l, extra) => {
178
270
  const cyclicTaskIds = seg.taskIds.filter((id) => cyclic.has(id));
179
- return { ...buildAnalysis(seg, calculatedAt, e, l, ctx, extra), ...(cyclicTaskIds.length ? { cyclicTaskIds } : {}) };
271
+ return finishAnalysis({ ...buildAnalysis(seg, calculatedAt, e, l, ctx, extra), ...(cyclicTaskIds.length ? { cyclicTaskIds } : {}) }, graph, seg.schedule, seg.taskIds);
180
272
  };
181
273
  if (!options.levelResources) {
182
274
  const overallocations = findOverallocations(taskMap, early, resourcesOf);
@@ -490,7 +582,7 @@ function findOverallocations(taskMap, dates, resourcesOf) {
490
582
  return result;
491
583
  }
492
584
  function buildAnalysis({ projectId, start: projectStart, schedule: projectSchedule, taskIds }, calculatedAt, early, late, ctx, extra = () => ({})) {
493
- const { calendarOf, durationOf, deadlineOf, taskMap } = ctx;
585
+ const { calendarOf, durationOf, ownDeadlineOf, taskMap } = ctx;
494
586
  const offset = (date) => date >= projectStart
495
587
  ? getWorkingHoursBetween(projectStart, date, projectSchedule)
496
588
  : -getWorkingHoursBetween(date, projectStart, projectSchedule);
@@ -520,7 +612,7 @@ function buildAnalysis({ projectId, start: projectStart, schedule: projectSchedu
520
612
  lateFinishDate: lf.toISOString(),
521
613
  ...(calendar.id ? { scheduleId: calendar.id } : {}),
522
614
  ...allocationField(taskMap.get(id)),
523
- ...milestoneFields(taskMap.get(id), deadlineOf.get(id), deadlineOf.has(id) ? slackHours(ef, deadlineOf.get(id), calendar) : undefined),
615
+ ...milestoneFields(taskMap.get(id), ownDeadlineOf(id), ownDeadlineOf(id) ? slackHours(ef, ownDeadlineOf(id), calendar) : undefined),
524
616
  ...extra(id)
525
617
  });
526
618
  }
@@ -555,7 +647,8 @@ export function calculatePortfolioCPM(projects, dependencies, options = {}) {
555
647
  projectId: p.projectId,
556
648
  start: startOrToday(p.projectStartDate),
557
649
  schedule: p.schedule || DEFAULT_WORK_SCHEDULE,
558
- taskIds: p.tasks.map((t) => t.id)
650
+ // Summary tasks are not scheduled; they are added back as roll-ups
651
+ taskIds: p.tasks.map((t) => t.id).filter((id) => graph.taskMap.has(id))
559
652
  }));
560
653
  const result = scheduleOnDates(graph, segments, options, calculatedAt);
561
654
  // Background projects are dropped from the results; hidden ones also have their task ids redacted.
@@ -614,16 +707,21 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
614
707
  return calculateCalendarCPM(projectId, calculatedAt, graph, options);
615
708
  }
616
709
  // Deadlines as project-calendar hours from the start. Without a start date there is nothing to
617
- // place them against, so they are ignored.
618
- const deadlineHours = new Map();
710
+ // place them against, so they are ignored. A task's late finish is capped by its own deadline and
711
+ // by those of the summary tasks above it; its schedule reports its own.
712
+ const capHours = new Map();
713
+ const ownDeadline = new Map();
714
+ const toHours = (deadline) => deadline >= projectStartDate
715
+ ? getWorkingHoursBetween(projectStartDate, deadline, schedule)
716
+ : -getWorkingHoursBetween(deadline, projectStartDate, schedule);
619
717
  if (projectStartDate) {
620
- for (const task of tasks) {
621
- if (!task.deadline)
622
- continue;
623
- const deadline = getDeadlineInstant(task.deadline, schedule);
624
- deadlineHours.set(task.id, deadline >= projectStartDate
625
- ? getWorkingHoursBetween(projectStartDate, deadline, schedule)
626
- : -getWorkingHoursBetween(deadline, projectStartDate, schedule));
718
+ for (const id of taskIds) {
719
+ const caps = deadlinesOf(graph, id).map((d) => toHours(getDeadlineInstant(d, schedule)));
720
+ if (caps.length)
721
+ capHours.set(id, Math.min(...caps));
722
+ const own = taskMap.get(id).deadline;
723
+ if (own)
724
+ ownDeadline.set(id, getDeadlineInstant(own, schedule));
627
725
  }
628
726
  }
629
727
  // --- FORWARD PASS ---
@@ -631,7 +729,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
631
729
  const earlyFinish = new Map();
632
730
  for (const id of topoOrder) {
633
731
  const task = taskMap.get(id);
634
- const duration = getTaskScheduledHours(task, options.effort);
732
+ const duration = getTaskScheduledHours(task, options.effort, options.defaultEstimateHours);
635
733
  const prereqs = prerequisites.get(id) || new Set();
636
734
  let maxPrereqFinish = 0;
637
735
  for (const p of prereqs) {
@@ -659,7 +757,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
659
757
  for (let i = topoOrder.length - 1; i >= 0; i--) {
660
758
  const id = topoOrder[i];
661
759
  const task = taskMap.get(id);
662
- const duration = getTaskScheduledHours(task, options.effort);
760
+ const duration = getTaskScheduledHours(task, options.effort, options.defaultEstimateHours);
663
761
  const succs = successors.get(id) || new Set();
664
762
  let minSuccLateStart = totalDurationHours;
665
763
  if (succs.size > 0) {
@@ -674,7 +772,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
674
772
  minSuccLateStart = totalDurationHours;
675
773
  }
676
774
  }
677
- const lf = Math.min(minSuccLateStart, deadlineHours.get(id) ?? Infinity);
775
+ const lf = Math.min(minSuccLateStart, capHours.get(id) ?? Infinity);
678
776
  const ls = lf - duration;
679
777
  lateFinish.set(id, lf);
680
778
  lateStart.set(id, ls);
@@ -694,7 +792,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
694
792
  criticalTaskIds.push(id);
695
793
  }
696
794
  const task = taskMap.get(id);
697
- const duration = getTaskScheduledHours(task, options.effort);
795
+ const duration = getTaskScheduledHours(task, options.effort, options.defaultEstimateHours);
698
796
  const earlyStartDate = projectStartDate
699
797
  ? addWorkingHours(projectStartDate, es, schedule).toISOString()
700
798
  : undefined;
@@ -717,7 +815,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
717
815
  isCritical,
718
816
  durationHours: duration,
719
817
  ...allocationField(task),
720
- ...milestoneFields(task, deadlineHours.has(id) ? getDeadlineInstant(task.deadline, schedule) : undefined, deadlineHours.has(id) ? deadlineHours.get(id) - ef : undefined),
818
+ ...milestoneFields(task, ownDeadline.get(id), ownDeadline.has(id) ? toHours(ownDeadline.get(id)) - ef : undefined),
721
819
  slackWorkingHours: totalSlack,
722
820
  earlyStartDate,
723
821
  earlyFinishDate,
@@ -728,7 +826,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
728
826
  const projectEndDate = projectStartDate
729
827
  ? addWorkingHours(projectStartDate, totalDurationHours, schedule).toISOString()
730
828
  : undefined;
731
- return {
829
+ return finishAnalysis({
732
830
  projectId,
733
831
  calculatedAt,
734
832
  totalDurationHours: Math.round(totalDurationHours * 100) / 100,
@@ -739,6 +837,6 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
739
837
  missedDeadlineTaskIds: missedDeadlines(schedules),
740
838
  ...(graph.cyclicTaskIds.length ? { cyclicTaskIds: graph.cyclicTaskIds } : {}),
741
839
  tasks: schedules
742
- };
840
+ }, graph, schedule, taskIds);
743
841
  }
744
842
  //# sourceMappingURL=cpm.js.map
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACT,YAAY,EACb,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,gBAAgB,EAAE,MAAM,oBAAoB,CAAC;AACtD,OAAO,EAAE,YAAY,EAAE,MAAM,YAAY,CAAC;AAE1C,MAAM,UAAU,oBAAoB,CAAC,IAAU;IAC7C,oFAAoF;IACpF,IAAI,IAAI,CAAC,WAAW;QAAE,OAAO,CAAC,CAAC;IAC/B,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,kEAAkE;IAClE,OAAO,CAAC,CAAC;AACX,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU;IAC5C,OAAO,oBAAoB,CAAC,IAAI,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AAC9D,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAKD;;;;GAIG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU,EAAE,SAAsB,UAAU;IAChF,IAAI,cAAc,CAAC,IAAI,CAAC;QAAE,OAAO,CAAC,CAAC;IACnC,IAAI,MAAM,KAAK,WAAW,IAAI,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,cAAc,EAAE,IAAI,CAAC,cAAc,EAAE,CAAC,EAAE,CAAC;QAC7G,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;IACrG,CAAC;IACD,OAAO,mBAAmB,CAAC,IAAI,CAAC,CAAC;AACnC,CAAC;AAuCD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD;;;GAGG;AACH,MAAM,UAAU,kBAAkB,CAAC,QAAgB,EAAE,WAAyB,qBAAqB;IACjG,MAAM,KAAK,GAAG,qBAAqB,CAAC,IAAI,CAAC,QAAQ,CAAC;QAChD,CAAC,CAAC,YAAY,CAAC,IAAI,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC,OAAO,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,IAAI,CAAC,CAAC;QAC7E,CAAC,CAAC,QAAQ,CAAC;IACb,OAAO,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC9C,CAAC;AAED,2DAA2D;AAC3D,MAAM,eAAe,GAAG,CAAC,SAAqC,EAAE,EAAE,CAChE,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;AAExF,wEAAwE;AACxE,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,QAA0B,EAAE,aAAiC,EAAE,EAAE,CAAC,CAAC;IACtG,GAAG,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,WAAW,EAAE,IAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;IAC3D,GAAG,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,YAAY,EAAE,QAAQ,CAAC,WAAW,EAAE,EAAE,qBAAqB,EAAE,MAAM,CAAC,aAAc,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;CAC7G,CAAC,CAAC;AAEH,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAcrH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,YAAY,CAAC,GAAG,CAAC,CAAC;QAC/B,IAAI,IAAI,IAAI,OAAO,CAAC,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,CAAC,IAAI,IAAI,CAAC,MAAM,KAAK,IAAI,CAAC,KAAK,EAAE,CAAC;YAC9F,aAAa,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,CAAE,CAAC,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAChD,UAAU,CAAC,GAAG,CAAC,IAAI,CAAC,MAAM,CAAE,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAC/C,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,gGAAgG;IAChG,iGAAiG;IACjG,MAAM,MAAM,GAAG,IAAI,GAAG,CAAC,SAAS,CAAC,CAAC;IAClC,MAAM,aAAa,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IAC9D,SAAS,CAAC,IAAI,CAAC,GAAG,aAAa,CAAC,CAAC;IAEjC,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,aAAa,EAAE,CAAC;AACnF,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/G,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE;QACrB,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC;QAC3C,OAAO,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,kBAAkB,CAAC,QAAQ,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAU,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC5F,CAAC,CAAC,CACH,CAAC;IACF,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK,EAAE,CAAC;IACpH,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,MAAM,GAAG,IAAI,GAAG,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC;IAC5C,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE;QACrH,MAAM,aAAa,GAAG,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;QACjE,OAAO,EAAE,GAAG,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,EAAE,GAAG,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;IACvH,CAAC,CAAC;IAEF,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAiBD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,yBAAyB;IACzB,OAAO,CACL,MAAM,CACJ,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,IAAI,CAAC,CACP,CAAC;AACJ,CAAC;AAED;;;;GAIG;AACH,SAAS,SAAS,CAAC,KAAW,EAAE,QAAgB,EAAE,QAAsB;IACtE,IAAI,QAAQ,KAAK,CAAC,IAAI,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,OAAO,EAAE,KAAK,KAAK,CAAC,OAAO,EAAE;QAAE,OAAO,KAAK,CAAC;IACvG,OAAO,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC1C,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAChD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC1D,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,mGAAmG;AACnG,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,QAAQ,IAAI,QAAQ,GAAG,GAAG;YAAE,GAAG,GAAG,QAAQ,CAAC;QAC/C,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC9C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAC5D,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,EAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;YACxI,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAsBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAClC,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IAEvE,mGAAmG;IACnG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACzF,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IACxH,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC9G,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACrE,MAAM,SAAS,GAAG,CAAC,IAAsB,EAAE,EAAE,CAC3C,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,CAAC,GAAG,IAAI,GAAG,CAAC,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC5E,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ;SAC1B,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;SAC3C,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACX,GAAG,CAAC;QACJ,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACvF,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAChF,CAAC,CAAC,CAAC;IAEN,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IACxE,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,KAAK;QACf,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,iGAAiG;QACjG,eAAe,EAAE,SAAS,CAAC,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;KAClH,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,qBAAqB,EAAE,EAAE;YACzB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,KAAK,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IAC9C,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,CAAC,CAAC;IACvE,CAAC;IAED,+FAA+F;IAC/F,2CAA2C;IAC3C,MAAM,aAAa,GAAG,IAAI,GAAG,EAAkB,CAAC;IAChD,IAAI,gBAAgB,EAAE,CAAC;QACrB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,IAAI,CAAC,IAAI,CAAC,QAAQ;gBAAE,SAAS;YAC7B,MAAM,QAAQ,GAAG,kBAAkB,CAAC,IAAI,CAAC,QAAQ,EAAE,QAAQ,CAAC,CAAC;YAC7D,aAAa,CAAC,GAAG,CACf,IAAI,CAAC,EAAE,EACP,QAAQ,IAAI,gBAAgB;gBAC1B,CAAC,CAAC,sBAAsB,CAAC,gBAAgB,EAAE,QAAQ,EAAE,QAAQ,CAAC;gBAC9D,CAAC,CAAC,CAAC,sBAAsB,CAAC,QAAQ,EAAE,gBAAgB,EAAE,QAAQ,CAAC,CAClE,CAAC;QACJ,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,IAAI,CAAC,GAAG,CAAC,gBAAgB,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,QAAQ,CAAC,CAAC;QACzE,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAE7D,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,GAAG,eAAe,CAChB,IAAI,EACJ,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,kBAAkB,CAAC,IAAI,CAAC,QAAS,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,EAChF,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,GAAG,EAAE,CAAC,CAAC,CAAC,SAAS,CAChE;YACD,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,GAAG,CAAC,KAAK,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,KAAK,CAAC,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC7E,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC"}
1
+ {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACT,YAAY,EACb,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,gBAAgB,EAAE,MAAM,oBAAoB,CAAC;AACtD,OAAO,EAAE,YAAY,EAAE,MAAM,YAAY,CAAC;AAC1C,OAAO,EAAE,oBAAoB,EAAE,iBAAiB,EAAE,MAAM,aAAa,CAAC;AAEtE,8GAA8G;AAC9G,MAAM,CAAC,MAAM,sBAAsB,GAAG,CAAC,CAAC;AAExC;;;GAGG;AACH,MAAM,UAAU,oBAAoB,CAAC,IAAU,EAAE,uBAA+B,sBAAsB;IACpG,MAAM,QAAQ,GAAG,oBAAoB,CAAC,IAAI,CAAC,CAAC;IAC5C,IAAI,QAAQ,KAAK,SAAS;QAAE,OAAO,QAAQ,CAAC;IAC5C,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC;QAAE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1F,OAAO,oBAAoB,CAAC;AAC9B,CAAC;AAED,oGAAoG;AACpG,SAAS,aAAa,CAAC,IAAU;IAC/B,OAAO,oBAAoB,CAAC,IAAI,CAAC,KAAK,SAAS,IAAI,CAAC,CAAC,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,CAAC,CAAC;AACrH,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU,EAAE,oBAA6B;IAC3E,OAAO,oBAAoB,CAAC,IAAI,EAAE,oBAAoB,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AACpF,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAKD;;;;GAIG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU,EAAE,SAAsB,UAAU,EAAE,oBAA6B;IAC/G,IAAI,cAAc,CAAC,IAAI,CAAC;QAAE,OAAO,CAAC,CAAC;IACnC,IAAI,MAAM,KAAK,WAAW,IAAI,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,cAAc,EAAE,IAAI,CAAC,cAAc,EAAE,CAAC,EAAE,CAAC;QAC7G,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,oBAAoB,CAAC,IAAI,EAAE,oBAAoB,CAAC,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;IAC3H,CAAC;IACD,OAAO,mBAAmB,CAAC,IAAI,EAAE,oBAAoB,CAAC,CAAC;AACzD,CAAC;AA4CD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD;;;GAGG;AACH,MAAM,UAAU,kBAAkB,CAAC,QAAgB,EAAE,WAAyB,qBAAqB;IACjG,MAAM,KAAK,GAAG,qBAAqB,CAAC,IAAI,CAAC,QAAQ,CAAC;QAChD,CAAC,CAAC,YAAY,CAAC,IAAI,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC,OAAO,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,IAAI,CAAC,CAAC;QAC7E,CAAC,CAAC,QAAQ,CAAC;IACb,OAAO,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC9C,CAAC;AAED,2DAA2D;AAC3D,MAAM,eAAe,GAAG,CAAC,SAAqC,EAAE,EAAE,CAChE,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;AAExF,wEAAwE;AACxE,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,QAA0B,EAAE,aAAiC,EAAE,EAAE,CAAC,CAAC;IACtG,GAAG,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,WAAW,EAAE,IAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;IAC3D,GAAG,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,YAAY,EAAE,QAAQ,CAAC,WAAW,EAAE,EAAE,qBAAqB,EAAE,MAAM,CAAC,aAAc,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;CAC7G,CAAC,CAAC;AAEH,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAkBrH,MAAM,WAAW,GAAG,CAAC,KAAgB,EAAE,EAAU,EAAE,EAAE,CAAC,KAAK,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC;AAEpF;;;;GAIG;AACH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,UAAU,GAAG,iBAAiB,CAAC,KAAK,CAAC,CAAC;IAC5C,MAAM,GAAG,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/D,MAAM,UAAU,GAAG,IAAI,GAAG,EAAoB,CAAC;IAC/C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;QACtB,IAAI,CAAC,CAAC,QAAQ,IAAI,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC;YAAE,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,CAAC,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC1H,CAAC;IACD,MAAM,QAAQ,GAAG,CAAC,EAAU,EAAE,OAAO,IAAI,GAAG,EAAU,EAAY,EAAE;QAClE,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC;YAAE,OAAO,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QACb,OAAO,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC,CAAC,KAAK,EAAE,EAAE,CAAC,QAAQ,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC;IACvE,CAAC,CAAC;IACF,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,CAAC,GAAG,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,EAAE,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC5G,MAAM,SAAS,GAAG,IAAI,GAAG,EAAoB,CAAC;IAC9C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;QACtB,IAAI,CAAC,CAAC,CAAC,QAAQ;YAAE,SAAS;QAC1B,KAAK,MAAM,IAAI,IAAI,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC;YAAE,SAAS,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,EAAE,CAAC,EAAE,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC;IACvG,CAAC;IAED,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxG,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,YAAY,CAAC,GAAG,CAAC,CAAC;QAC/B,IAAI,CAAC,IAAI,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,CAAC;YAAE,SAAS;QACrE,KAAK,MAAM,MAAM,IAAI,QAAQ,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,CAAC;YAC3C,KAAK,MAAM,KAAK,IAAI,QAAQ,CAAC,IAAI,CAAC,KAAK,CAAC,EAAE,CAAC;gBACzC,IAAI,MAAM,KAAK,KAAK;oBAAE,SAAS;gBAC/B,aAAa,CAAC,GAAG,CAAC,KAAK,CAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;gBACtC,UAAU,CAAC,GAAG,CAAC,MAAM,CAAE,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC;YACrC,CAAC;QACH,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,gGAAgG;IAChG,iGAAiG;IACjG,MAAM,MAAM,GAAG,IAAI,GAAG,CAAC,SAAS,CAAC,CAAC;IAClC,MAAM,aAAa,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IAC9D,SAAS,CAAC,IAAI,CAAC,GAAG,aAAa,CAAC,CAAC;IAEjC,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,aAAa,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC;AACzG,CAAC;AAED;;;;;GAKG;AACH,SAAS,YAAY,CAAC,QAA8B,EAAE,KAAgB,EAAE,QAAsB;IAC5F,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/D,MAAM,OAAO,GAA+B,EAAE,CAAC;IAC/C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,KAAK,MAAM,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;QACtD,MAAM,MAAM,GAAG,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAiC,EAAE,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;QAC9G,IAAI,CAAC,MAAM,CAAC,MAAM;YAAE,SAAS;QAC7B,MAAM,GAAG,GAAG,CAAC,IAA6C,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;QAC7F,MAAM,GAAG,GAAG,CAAC,IAA6C,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC;QAC7F,MAAM,KAAK,GAAG,CAAC,IAAyD,EAAE,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAe,EAAE,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;QAC5I,MAAM,CAAC,MAAM,EAAE,QAAQ,EAAE,UAAU,EAAE,YAAY,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAc,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,CAAC,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAc,CAAC,CAAC,CAAC;QACtL,MAAM,KAAK,GAAG,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;QACvC,MAAM,eAAe,GAAG,QAAQ,CAAC,QAAQ,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,IAAI,CAAC,QAAQ,IAAI,eAAe,CAAC,CAAC,CAAC,kBAAkB,CAAC,IAAI,CAAC,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC5G,MAAM,QAAQ,GAAG,QAAQ,CAAC,CAAC,CAAC,UAAU,CAAC,IAAI,IAAI,CAAC,eAAgB,CAAC,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACnG,IAAI,QAAQ,KAAK,SAAS,IAAI,QAAQ,GAAG,CAAC,KAAK;YAAE,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjE,OAAO,CAAC,IAAI,CAAC;YACX,MAAM,EAAE,EAAE;YACV,SAAS,EAAE,IAAI;YACf,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YACpC,WAAW,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,CAAC;YACtC,SAAS,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;YAClC,UAAU,EAAE,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YACpC,UAAU,EAAE,KAAK;YACjB,iBAAiB,EAAE,KAAK;YACxB,UAAU,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC;YAC5C,aAAa,EAAE,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC;YAC3E,GAAG,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,MAAM,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,aAAa,EAAE,UAAU,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,YAAY,CAAC,YAAY,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YAC7J,GAAG,eAAe,CAAC,EAAE,GAAG,IAAI,EAAE,WAAW,EAAE,KAAK,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC;SACxE,CAAC,CAAC;IACL,CAAC;IACD,IAAI,CAAC,OAAO,CAAC,MAAM;QAAE,OAAO,QAAQ,CAAC;IACrC,OAAO,EAAE,GAAG,QAAQ,EAAE,KAAK,EAAE,CAAC,GAAG,QAAQ,CAAC,KAAK,EAAE,GAAG,OAAO,CAAC,EAAE,qBAAqB,EAAE,CAAC,GAAG,QAAQ,CAAC,qBAAqB,EAAE,GAAG,MAAM,CAAC,EAAE,CAAC;AACxI,CAAC;AAED,8EAA8E;AAC9E,SAAS,cAAc,CAAC,QAA8B,EAAE,KAAgB,EAAE,QAAsB,EAAE,OAAiB;IACjH,MAAM,kBAAkB,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE;QAC/C,MAAM,IAAI,GAAG,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACpC,OAAO,CAAC,cAAc,CAAC,IAAI,CAAC,IAAI,aAAa,CAAC,IAAI,CAAC,CAAC;IACtD,CAAC,CAAC,CAAC;IACH,OAAO,YAAY,CAAC,EAAE,GAAG,QAAQ,EAAE,GAAG,CAAC,kBAAkB,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,kBAAkB,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,CAAC;AACtH,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC,CAAC,CAAC,CAAC;IAC7I,gGAAgG;IAChG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE;QACrB,MAAM,QAAQ,GAAG,WAAW,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,kBAAkB,CAAC,CAAC,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;QAC/F,OAAO,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAU,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IACzG,CAAC,CAAC,CACH,CAAC;IACF,MAAM,aAAa,GAAG,CAAC,EAAU,EAAE,EAAE;QACnC,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC;QAC3C,OAAO,QAAQ,CAAC,CAAC,CAAC,kBAAkB,CAAC,QAAQ,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAClF,CAAC,CAAC;IACF,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,aAAa,EAAE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK,EAAE,CAAC;IACnI,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,MAAM,GAAG,IAAI,GAAG,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC;IAC5C,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE;QACrH,MAAM,aAAa,GAAG,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;QACjE,OAAO,cAAc,CACnB,EAAE,GAAG,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,EAAE,GAAG,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAC7G,KAAK,EACL,GAAG,CAAC,QAAQ,EACZ,GAAG,CAAC,OAAO,CACZ,CAAC;IACJ,CAAC,CAAC;IAEF,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAmBD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,yBAAyB;IACzB,OAAO,CACL,MAAM,CACJ,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,IAAI,CAAC,CACP,CAAC;AACJ,CAAC;AAED;;;;GAIG;AACH,SAAS,SAAS,CAAC,KAAW,EAAE,QAAgB,EAAE,QAAsB;IACtE,IAAI,QAAQ,KAAK,CAAC,IAAI,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,OAAO,EAAE,KAAK,KAAK,CAAC,OAAO,EAAE;QAAE,OAAO,KAAK,CAAC;IACvG,OAAO,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC1C,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAChD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC1D,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,mGAAmG;AACnG,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,QAAQ,IAAI,QAAQ,GAAG,GAAG;YAAE,GAAG,GAAG,QAAQ,CAAC;QAC/C,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC9C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,aAAa,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAC/D,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,EAAE,CAAC,EAAE,aAAa,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,EAAE,EAAE,aAAa,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;YACrI,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAsBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,mEAAmE;QACnE,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;KACxE,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IAEvE,mGAAmG;IACnG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACzF,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IACxH,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC9G,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACrE,MAAM,SAAS,GAAG,CAAC,IAAsB,EAAE,EAAE,CAC3C,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,CAAC,GAAG,IAAI,GAAG,CAAC,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC5E,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ;SAC1B,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;SAC3C,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACX,GAAG,CAAC;QACJ,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACvF,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAChF,CAAC,CAAC,CAAC;IAEN,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IACxE,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,KAAK;QACf,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,iGAAiG;QACjG,eAAe,EAAE,SAAS,CAAC,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;KAClH,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,qBAAqB,EAAE,EAAE;YACzB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,KAAK,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IAC9C,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,KAAK,EAAE,OAAO,CAAC,CAAC;IACvE,CAAC;IAED,+FAA+F;IAC/F,kGAAkG;IAClG,wEAAwE;IACxE,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAgB,CAAC;IAC5C,MAAM,OAAO,GAAG,CAAC,QAAc,EAAE,EAAE,CACjC,QAAQ,IAAI,gBAAiB;QAC3B,CAAC,CAAC,sBAAsB,CAAC,gBAAiB,EAAE,QAAQ,EAAE,QAAQ,CAAC;QAC/D,CAAC,CAAC,CAAC,sBAAsB,CAAC,QAAQ,EAAE,gBAAiB,EAAE,QAAQ,CAAC,CAAC;IACrE,IAAI,gBAAgB,EAAE,CAAC;QACrB,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,MAAM,IAAI,GAAG,WAAW,CAAC,KAAK,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC;YACzF,IAAI,IAAI,CAAC,MAAM;gBAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,CAAC,GAAG,CAAC,GAAG,IAAI,CAAC,CAAC,CAAC;YACrD,MAAM,GAAG,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC;YACtC,IAAI,GAAG;gBAAE,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,kBAAkB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC,CAAC;QAClE,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;QAC3F,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;QAC3F,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,IAAI,CAAC,GAAG,CAAC,gBAAgB,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,QAAQ,CAAC,CAAC;QACpE,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,oBAAoB,CAAC,CAAC;QAE3F,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,GAAG,eAAe,CAAC,IAAI,EAAE,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;YACnH,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO,cAAc,CAAC;QACpB,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,GAAG,CAAC,KAAK,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,KAAK,CAAC,aAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC7E,KAAK,EAAE,SAAS;KACjB,EAAE,KAAK,EAAE,QAAQ,EAAE,OAAO,CAAC,CAAC;AAC/B,CAAC"}
@@ -0,0 +1,17 @@
1
+ import type { Task } from '../types/index.js';
2
+ /**
3
+ * Hours a task is estimated at: 0 for a milestone, else `estimatedHours`, else
4
+ * `estimatedDurationMinutes / 60`. `undefined` when the task has no estimate; an explicit 0 is an
5
+ * estimate. This is the one place that reads a task's estimate: critical path analysis, workload,
6
+ * the ladder, metrics and deliverable summaries all go through it.
7
+ */
8
+ export declare function getTaskEstimateHours(task: Pick<Task, 'isMilestone' | 'estimatedHours' | 'estimatedDurationMinutes'>): number | undefined;
9
+ /**
10
+ * Ids of the tasks in `tasks` that have subtasks in `tasks`. A summary task's effort, progress and
11
+ * schedule are those of its subtasks, so roll-ups count only the other (leaf) tasks and critical
12
+ * path analysis reports summaries as roll-ups of their leaves.
13
+ */
14
+ export declare function getSummaryTaskIds(tasks: ReadonlyArray<Pick<Task, 'id' | 'parentId'>>): Set<string>;
15
+ /** The tasks that carry effort: every task except summary tasks (see `getSummaryTaskIds`). */
16
+ export declare function getLeafTasks<T extends Pick<Task, 'id' | 'parentId'>>(tasks: T[]): T[];
17
+ //# sourceMappingURL=effort.d.ts.map