@critical-path/core 0.51.0 → 0.52.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/README.md CHANGED
@@ -2,6 +2,9 @@
2
2
 
3
3
  > The foundational domain engine, Domain-Driven Design (DDD) aggregate roots, domain event bus, graph cycle detection, and storage adapters for **Critical Path**.
4
4
 
5
+ > **Upgrading?** Upgrade every `@critical-path/*` package together. Coding agents: follow [UPGRADING.md](https://github.com/Pixerate/critical-path/blob/main/UPGRADING.md); breaking changes are marked **BREAKING** in this package's `CHANGELOG.md`.
6
+
7
+
5
8
  ---
6
9
 
7
10
  ## 📦 Features
@@ -361,6 +364,8 @@ console.log(leveled.unleveledProjectEndDate, '->', leveled.projectEndDate);
361
364
 
362
365
  With `calendars: 'assignee'` (or `criticalPathCalendars: 'assignee'` on the engine), each task uses its assignee's schedule, then its team's, then the project calendar. Passes run on dates, slack is measured in each task's calendar, and each calendar is evaluated in its own `timezone` (IANA name; default UTC), including daylight-saving changes. `levelResources: true` additionally delays tasks so nobody works on two at once (priority rule `levelingPriority`, default least slack), reporting `levelingDelayHours` and `waitingOn` per task. Tasks with `allocation` below 1 take that share of their assignee (a 16h task at 0.5 spans 32 working hours); levelling fits them within 100% per person, and `overallocations` lists who is booked above 100% and when. Teams act as pools of `headcount` people (default: member count) shared by team-only tasks and members' own tasks. Finished tasks take no time. `calculatePortfolioCriticalPath({ projectIds })` levels several projects together, sharing people and teams across them; `includeHiddenWork` also counts unreadable projects' work as `'hidden'`. `effort: 'remaining'` schedules only what is left on in-progress tasks.
363
366
 
367
+ Tasks with `isMilestone: true` are zero-duration checkpoints (their estimates are ignored). A `deadline` on any task caps its late finish: a forecast that misses it shows as negative slack along the path driving it, with `deadlineDate` and `deadlineVarianceHours` per task and `missedDeadlineTaskIds` on the analysis. A date-only deadline means the end of that working day; project-calendar mode needs a start date to apply deadlines.
368
+
364
369
  ### 9. Fractional Lexical Indexing (Kanban Reordering)
365
370
 
366
371
  ```ts
@@ -55,6 +55,11 @@ export declare function resolveTaskSchedule(task: Task, context: {
55
55
  teams?: Team[];
56
56
  schedule?: WorkSchedule;
57
57
  }): WorkSchedule;
58
+ /**
59
+ * The instant a task's `deadline` falls on for `calendar`: the last working moment at or before it.
60
+ * A date-only deadline means the end of that day, so `2026-10-09` is the close of work on the 9th.
61
+ */
62
+ export declare function getDeadlineInstant(deadline: string, calendar?: WorkSchedule): Date;
58
63
  export interface PortfolioProjectInput {
59
64
  projectId: string;
60
65
  tasks: Task[];
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAY3B,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAYvD;AAED,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAEtD;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,GAAG,MAAM,CAM1F;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;CACtB;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAmjBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAsC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CA4JtB"}
1
+ {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAa3B,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAcvD;AAED,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAEtD;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,GAAG,MAAM,CAM1F;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;CACtB;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAID;;;GAGG;AACH,wBAAgB,kBAAkB,CAAC,QAAQ,EAAE,MAAM,EAAE,QAAQ,GAAE,YAAoC,GAAG,IAAI,CAKzG;AAqlBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAsC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CAmLtB"}
@@ -1,6 +1,9 @@
1
- import { DEFAULT_WORK_SCHEDULE, addWorkingHours, subtractWorkingHours, getWorkingHoursBetween, nextWorkingTime, previousWorkingTime, parseDate } from './calendar.js';
1
+ import { DEFAULT_WORK_SCHEDULE, addWorkingHours, subtractWorkingHours, getWorkingHoursBetween, nextWorkingTime, previousWorkingTime, parseDate, toDateString } from './calendar.js';
2
2
  import { isTaskInProgress } from '../utils/status.js';
3
3
  export function getTaskDurationHours(task) {
4
+ // A milestone is a point in time: it never takes effort, whatever its estimates say
5
+ if (task.isMilestone)
6
+ return 0;
4
7
  if (typeof task.estimatedHours === 'number' && task.estimatedHours >= 0) {
5
8
  return task.estimatedHours;
6
9
  }
@@ -49,6 +52,23 @@ export function resolveTaskSchedule(task, context) {
49
52
  DEFAULT_WORK_SCHEDULE);
50
53
  }
51
54
  const round2 = (n) => Math.round(n * 100) / 100;
55
+ /**
56
+ * The instant a task's `deadline` falls on for `calendar`: the last working moment at or before it.
57
+ * A date-only deadline means the end of that day, so `2026-10-09` is the close of work on the 9th.
58
+ */
59
+ export function getDeadlineInstant(deadline, calendar = DEFAULT_WORK_SCHEDULE) {
60
+ const limit = /^\d{4}-\d{2}-\d{2}$/.test(deadline)
61
+ ? toDateString(new Date(parseDate(deadline).getTime() + 24 * 60 * 60 * 1000))
62
+ : deadline;
63
+ return previousWorkingTime(limit, calendar);
64
+ }
65
+ /** Tasks whose forecast finish is after their deadline. */
66
+ const missedDeadlines = (schedules) => schedules.filter((s) => (s.deadlineVarianceHours ?? 0) < -0.001).map((s) => s.taskId);
67
+ /** Output fields that describe a task's milestone flag and deadline. */
68
+ const milestoneFields = (task, deadline, varianceHours) => ({
69
+ ...(task.isMilestone ? { isMilestone: true } : {}),
70
+ ...(deadline ? { deadlineDate: deadline.toISOString(), deadlineVarianceHours: round2(varianceHours) } : {})
71
+ });
52
72
  const allocationField = (task) => (getTaskAllocation(task) < 1 ? { allocation: getTaskAllocation(task) } : {});
53
73
  function buildGraph(tasks, dependencies) {
54
74
  const taskMap = new Map(tasks.map((t) => [t.id, t]));
@@ -154,7 +174,11 @@ function scheduleOnDates(graph, segments, options, calculatedAt) {
154
174
  return [id, options.calendars === 'assignee' ? resolveTaskSchedule(task, { ...options, schedule: seg.schedule }) : seg.schedule];
155
175
  }));
156
176
  const durationOf = new Map(taskIds.map((id) => [id, getTaskScheduledHours(taskMap.get(id), options.effort)]));
157
- const ctx = { taskMap, calendarOf, durationOf, startOf: (id) => segmentOf.get(id).start };
177
+ const deadlineOf = new Map(taskIds.flatMap((id) => {
178
+ const deadline = taskMap.get(id).deadline;
179
+ return deadline ? [[id, getDeadlineInstant(deadline, calendarOf.get(id))]] : [];
180
+ }));
181
+ const ctx = { taskMap, calendarOf, durationOf, deadlineOf, startOf: (id) => segmentOf.get(id).start };
158
182
  const endOfProjects = (dates) => {
159
183
  const ends = new Map(segments.map((seg) => [seg.projectId, latest(seg.taskIds.map((id) => dates.finish.get(id)), seg.start)]));
160
184
  return (id) => ends.get(segmentOf.get(id).projectId);
@@ -204,9 +228,20 @@ function latest(dates, floor) {
204
228
  return max;
205
229
  }
206
230
  function slackHours(earlyFinish, lateFinish, calendar) {
207
- return round2(lateFinish >= earlyFinish
231
+ // `|| 0` turns -0 into 0
232
+ return (round2(lateFinish >= earlyFinish
208
233
  ? getWorkingHoursBetween(earlyFinish, lateFinish, calendar)
209
- : -getWorkingHoursBetween(lateFinish, earlyFinish, calendar));
234
+ : -getWorkingHoursBetween(lateFinish, earlyFinish, calendar)) || 0);
235
+ }
236
+ /**
237
+ * When a task that becomes ready at `ready` starts: the next working time, except that a
238
+ * zero-duration task (a milestone, or finished work) stays at the moment its predecessors finish
239
+ * when that is working time or the close of a window, rather than moving to the next morning.
240
+ */
241
+ function startTime(ready, duration, calendar) {
242
+ if (duration === 0 && previousWorkingTime(ready, calendar).getTime() === ready.getTime())
243
+ return ready;
244
+ return nextWorkingTime(ready, calendar);
210
245
  }
211
246
  /** Earliest dates ignoring resource limits. */
212
247
  function forwardPass(order, prerequisites, ctx) {
@@ -220,13 +255,14 @@ function forwardPass(order, prerequisites, ctx) {
220
255
  ready = f;
221
256
  }
222
257
  const calendar = ctx.calendarOf.get(id);
223
- const es = nextWorkingTime(ready, calendar);
258
+ const duration = ctx.durationOf.get(id);
259
+ const es = startTime(ready, duration, calendar);
224
260
  start.set(id, es);
225
- finish.set(id, addWorkingHours(es, ctx.durationOf.get(id), calendar));
261
+ finish.set(id, addWorkingHours(es, duration, calendar));
226
262
  }
227
263
  return { start, finish };
228
264
  }
229
- /** Latest dates; `order` must list every successor before its predecessors. */
265
+ /** Latest dates; `order` must list every successor before its predecessors. Deadlines cap them. */
230
266
  function backwardPass(order, successorsOf, endOf, ctx) {
231
267
  const start = new Map();
232
268
  const finish = new Map();
@@ -237,6 +273,9 @@ function backwardPass(order, successorsOf, endOf, ctx) {
237
273
  if (ls && ls < due)
238
274
  due = ls;
239
275
  }
276
+ const deadline = ctx.deadlineOf.get(id);
277
+ if (deadline && deadline < due)
278
+ due = deadline;
240
279
  const calendar = ctx.calendarOf.get(id);
241
280
  const lf = previousWorkingTime(due, calendar);
242
281
  finish.set(id, lf);
@@ -312,7 +351,7 @@ function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder
312
351
  const duration = ctx.durationOf.get(id);
313
352
  const resources = duration > 0 ? resourcesOf(taskMap.get(id)) : [];
314
353
  const allocation = getTaskAllocation(taskMap.get(id));
315
- let es = nextWorkingTime(ready, calendar);
354
+ let es = startTime(ready, duration, calendar);
316
355
  let ef = addWorkingHours(es, duration, calendar);
317
356
  for (;;) {
318
357
  let release;
@@ -460,7 +499,7 @@ function findOverallocations(taskMap, dates, resourcesOf) {
460
499
  return result;
461
500
  }
462
501
  function buildAnalysis({ projectId, start: projectStart, schedule: projectSchedule, taskIds }, calculatedAt, early, late, ctx, extra = () => ({})) {
463
- const { calendarOf, durationOf, taskMap } = ctx;
502
+ const { calendarOf, durationOf, deadlineOf, taskMap } = ctx;
464
503
  const offset = (date) => date >= projectStart
465
504
  ? getWorkingHoursBetween(projectStart, date, projectSchedule)
466
505
  : -getWorkingHoursBetween(date, projectStart, projectSchedule);
@@ -490,6 +529,7 @@ function buildAnalysis({ projectId, start: projectStart, schedule: projectSchedu
490
529
  lateFinishDate: lf.toISOString(),
491
530
  ...(calendar.id ? { scheduleId: calendar.id } : {}),
492
531
  ...allocationField(taskMap.get(id)),
532
+ ...milestoneFields(taskMap.get(id), deadlineOf.get(id), deadlineOf.has(id) ? slackHours(ef, deadlineOf.get(id), calendar) : undefined),
493
533
  ...extra(id)
494
534
  });
495
535
  }
@@ -503,6 +543,7 @@ function buildAnalysis({ projectId, start: projectStart, schedule: projectSchedu
503
543
  projectStartDate: projectStart.toISOString(),
504
544
  projectEndDate: projectEnd.toISOString(),
505
545
  criticalTaskIds,
546
+ missedDeadlineTaskIds: missedDeadlines(schedules),
506
547
  tasks: schedules
507
548
  };
508
549
  }
@@ -569,6 +610,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
569
610
  projectStartDate: projectStartDate ? projectStartDate.toISOString() : undefined,
570
611
  projectEndDate: projectStartDate ? projectStartDate.toISOString() : undefined,
571
612
  criticalTaskIds: [],
613
+ missedDeadlineTaskIds: [],
572
614
  tasks: []
573
615
  };
574
616
  }
@@ -579,6 +621,19 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
579
621
  if (options.calendars === 'assignee') {
580
622
  return calculateCalendarCPM(projectId, calculatedAt, { taskMap, taskIds, prerequisites, successors, topoOrder }, options);
581
623
  }
624
+ // Deadlines as project-calendar hours from the start. Without a start date there is nothing to
625
+ // place them against, so they are ignored.
626
+ const deadlineHours = new Map();
627
+ if (projectStartDate) {
628
+ for (const task of tasks) {
629
+ if (!task.deadline)
630
+ continue;
631
+ const deadline = getDeadlineInstant(task.deadline, schedule);
632
+ deadlineHours.set(task.id, deadline >= projectStartDate
633
+ ? getWorkingHoursBetween(projectStartDate, deadline, schedule)
634
+ : -getWorkingHoursBetween(deadline, projectStartDate, schedule));
635
+ }
636
+ }
582
637
  // --- FORWARD PASS ---
583
638
  const earlyStart = new Map();
584
639
  const earlyFinish = new Map();
@@ -627,7 +682,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
627
682
  minSuccLateStart = totalDurationHours;
628
683
  }
629
684
  }
630
- const lf = minSuccLateStart;
685
+ const lf = Math.min(minSuccLateStart, deadlineHours.get(id) ?? Infinity);
631
686
  const ls = lf - duration;
632
687
  lateFinish.set(id, lf);
633
688
  lateStart.set(id, ls);
@@ -670,6 +725,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
670
725
  isCritical,
671
726
  durationHours: duration,
672
727
  ...allocationField(task),
728
+ ...milestoneFields(task, deadlineHours.has(id) ? getDeadlineInstant(task.deadline, schedule) : undefined, deadlineHours.has(id) ? deadlineHours.get(id) - ef : undefined),
673
729
  slackWorkingHours: totalSlack,
674
730
  earlyStartDate,
675
731
  earlyFinishDate,
@@ -688,6 +744,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
688
744
  projectStartDate: projectStartDate ? projectStartDate.toISOString() : undefined,
689
745
  projectEndDate,
690
746
  criticalTaskIds,
747
+ missedDeadlineTaskIds: missedDeadlines(schedules),
691
748
  tasks: schedules
692
749
  };
693
750
  }
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACV,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,gBAAgB,EAAE,MAAM,oBAAoB,CAAC;AAEtD,MAAM,UAAU,oBAAoB,CAAC,IAAU;IAC7C,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,kEAAkE;IAClE,OAAO,CAAC,CAAC;AACX,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU;IAC5C,OAAO,oBAAoB,CAAC,IAAI,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AAC9D,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAKD;;;;GAIG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU,EAAE,SAAsB,UAAU;IAChF,IAAI,cAAc,CAAC,IAAI,CAAC;QAAE,OAAO,CAAC,CAAC;IACnC,IAAI,MAAM,KAAK,WAAW,IAAI,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,cAAc,EAAE,IAAI,CAAC,cAAc,EAAE,CAAC,EAAE,CAAC;QAC7G,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;IACrG,CAAC;IACD,OAAO,mBAAmB,CAAC,IAAI,CAAC,CAAC;AACnC,CAAC;AAuCD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAYrH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,IAAI,QAAQ,GAAkB,IAAI,CAAC;QACnC,IAAI,QAAQ,GAAkB,IAAI,CAAC;QAEnC,IAAI,GAAG,CAAC,IAAI,KAAK,UAAU,EAAE,CAAC;YAC5B,gEAAgE;YAChE,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;YAC/B,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;QACxB,CAAC;aAAM,IAAI,GAAG,CAAC,IAAI,KAAK,YAAY,EAAE,CAAC;YACrC,mEAAmE;YACnE,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;YACtB,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;QACjC,CAAC;QAED,IAAI,QAAQ,IAAI,QAAQ,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACpG,aAAa,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YAC3C,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,mFAAmF;IACnF,IAAI,SAAS,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC;gBAC5B,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACrB,CAAC;QACH,CAAC;IACH,CAAC;IAED,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,CAAC;AACpE,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/G,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK,EAAE,CAAC;IACxG,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE,CACrH,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,CAAC;IAErD,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAeD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,OAAO,MAAM,CACX,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,CAAC;AACJ,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC5C,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IACzE,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,+EAA+E;AAC/E,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC1C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAChD,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAsBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAClC,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IAEvE,mGAAmG;IACnG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACzF,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IACxH,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC9G,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACrE,MAAM,SAAS,GAAG,CAAC,IAAsB,EAAE,EAAE,CAC3C,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,CAAC,GAAG,IAAI,GAAG,CAAC,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC5E,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ;SAC1B,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;SAC3C,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACX,GAAG,CAAC;QACJ,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACvF,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAChF,CAAC,CAAC,CAAC;IAEN,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IACxE,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,KAAK;QACf,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,iGAAiG;QACjG,eAAe,EAAE,SAAS,CAAC,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;KAClH,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IACnG,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5H,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,gBAAgB,CAAC;QAC5B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAE7D,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC"}
1
+ {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACT,YAAY,EACb,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,gBAAgB,EAAE,MAAM,oBAAoB,CAAC;AAEtD,MAAM,UAAU,oBAAoB,CAAC,IAAU;IAC7C,oFAAoF;IACpF,IAAI,IAAI,CAAC,WAAW;QAAE,OAAO,CAAC,CAAC;IAC/B,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,kEAAkE;IAClE,OAAO,CAAC,CAAC;AACX,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU;IAC5C,OAAO,oBAAoB,CAAC,IAAI,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AAC9D,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAKD;;;;GAIG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU,EAAE,SAAsB,UAAU;IAChF,IAAI,cAAc,CAAC,IAAI,CAAC;QAAE,OAAO,CAAC,CAAC;IACnC,IAAI,MAAM,KAAK,WAAW,IAAI,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,cAAc,EAAE,IAAI,CAAC,cAAc,EAAE,CAAC,EAAE,CAAC;QAC7G,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;IACrG,CAAC;IACD,OAAO,mBAAmB,CAAC,IAAI,CAAC,CAAC;AACnC,CAAC;AAuCD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD;;;GAGG;AACH,MAAM,UAAU,kBAAkB,CAAC,QAAgB,EAAE,WAAyB,qBAAqB;IACjG,MAAM,KAAK,GAAG,qBAAqB,CAAC,IAAI,CAAC,QAAQ,CAAC;QAChD,CAAC,CAAC,YAAY,CAAC,IAAI,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,CAAC,OAAO,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,IAAI,CAAC,CAAC;QAC7E,CAAC,CAAC,QAAQ,CAAC;IACb,OAAO,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC9C,CAAC;AAED,2DAA2D;AAC3D,MAAM,eAAe,GAAG,CAAC,SAAqC,EAAE,EAAE,CAChE,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;AAExF,wEAAwE;AACxE,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,QAA0B,EAAE,aAAiC,EAAE,EAAE,CAAC,CAAC;IACtG,GAAG,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,WAAW,EAAE,IAAa,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;IAC3D,GAAG,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,YAAY,EAAE,QAAQ,CAAC,WAAW,EAAE,EAAE,qBAAqB,EAAE,MAAM,CAAC,aAAc,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;CAC7G,CAAC,CAAC;AAEH,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAYrH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,IAAI,QAAQ,GAAkB,IAAI,CAAC;QACnC,IAAI,QAAQ,GAAkB,IAAI,CAAC;QAEnC,IAAI,GAAG,CAAC,IAAI,KAAK,UAAU,EAAE,CAAC;YAC5B,gEAAgE;YAChE,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;YAC/B,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;QACxB,CAAC;aAAM,IAAI,GAAG,CAAC,IAAI,KAAK,YAAY,EAAE,CAAC;YACrC,mEAAmE;YACnE,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;YACtB,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;QACjC,CAAC;QAED,IAAI,QAAQ,IAAI,QAAQ,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACpG,aAAa,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YAC3C,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,mFAAmF;IACnF,IAAI,SAAS,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC;gBAC5B,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACrB,CAAC;QACH,CAAC;IACH,CAAC;IAED,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,CAAC;AACpE,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/G,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE;QACrB,MAAM,QAAQ,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC;QAC3C,OAAO,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,kBAAkB,CAAC,QAAQ,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAU,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC5F,CAAC,CAAC,CACH,CAAC;IACF,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK,EAAE,CAAC;IACpH,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE,CACrH,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,CAAC;IAErD,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAiBD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,yBAAyB;IACzB,OAAO,CACL,MAAM,CACJ,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,IAAI,CAAC,CACP,CAAC;AACJ,CAAC;AAED;;;;GAIG;AACH,SAAS,SAAS,CAAC,KAAW,EAAE,QAAgB,EAAE,QAAsB;IACtE,IAAI,QAAQ,KAAK,CAAC,IAAI,mBAAmB,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,OAAO,EAAE,KAAK,KAAK,CAAC,OAAO,EAAE;QAAE,OAAO,KAAK,CAAC;IACvG,OAAO,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;AAC1C,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAChD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC1D,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,mGAAmG;AACnG,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,QAAQ,IAAI,QAAQ,GAAG,GAAG;YAAE,GAAG,GAAG,QAAQ,CAAC;QAC/C,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,SAAS,CAAC,KAAK,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC9C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAC5D,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,EAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;YACxI,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAsBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAClC,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IAEvE,mGAAmG;IACnG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACzF,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IACxH,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC9G,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACrE,MAAM,SAAS,GAAG,CAAC,IAAsB,EAAE,EAAE,CAC3C,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,CAAC,GAAG,IAAI,GAAG,CAAC,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC5E,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ;SAC1B,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;SAC3C,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACX,GAAG,CAAC;QACJ,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACvF,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAChF,CAAC,CAAC,CAAC;IAEN,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IACxE,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,KAAK;QACf,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,iGAAiG;QACjG,eAAe,EAAE,SAAS,CAAC,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;KAClH,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,qBAAqB,EAAE,EAAE;YACzB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IACnG,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5H,CAAC;IAED,+FAA+F;IAC/F,2CAA2C;IAC3C,MAAM,aAAa,GAAG,IAAI,GAAG,EAAkB,CAAC;IAChD,IAAI,gBAAgB,EAAE,CAAC;QACrB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,IAAI,CAAC,IAAI,CAAC,QAAQ;gBAAE,SAAS;YAC7B,MAAM,QAAQ,GAAG,kBAAkB,CAAC,IAAI,CAAC,QAAQ,EAAE,QAAQ,CAAC,CAAC;YAC7D,aAAa,CAAC,GAAG,CACf,IAAI,CAAC,EAAE,EACP,QAAQ,IAAI,gBAAgB;gBAC1B,CAAC,CAAC,sBAAsB,CAAC,gBAAgB,EAAE,QAAQ,EAAE,QAAQ,CAAC;gBAC9D,CAAC,CAAC,CAAC,sBAAsB,CAAC,QAAQ,EAAE,gBAAgB,EAAE,QAAQ,CAAC,CAClE,CAAC;QACJ,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,IAAI,CAAC,GAAG,CAAC,gBAAgB,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,QAAQ,CAAC,CAAC;QACzE,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAE7D,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,GAAG,eAAe,CAChB,IAAI,EACJ,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,kBAAkB,CAAC,IAAI,CAAC,QAAS,EAAE,QAAQ,CAAC,CAAC,CAAC,CAAC,SAAS,EAChF,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,GAAG,EAAE,CAAC,CAAC,CAAC,SAAS,CAChE;YACD,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,qBAAqB,EAAE,eAAe,CAAC,SAAS,CAAC;QACjD,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC"}
@@ -1 +1 @@
1
- {"version":3,"file":"workload.d.ts","sourceRoot":"","sources":["../../src/domain/workload.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,SAAS,EACT,IAAI,EACJ,IAAI,EAKJ,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAQ3B,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,WAAW,CAAC,EAAE,SAAS,EAAE,CAAC;IAC1B,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AA+DD,wBAAgB,6BAA6B,CAC3C,OAAO,EAAE,eAAe,EACxB,OAAO,GAAE,2BAAgC,GACxC,oBAAoB,CAoXtB"}
1
+ {"version":3,"file":"workload.d.ts","sourceRoot":"","sources":["../../src/domain/workload.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,SAAS,EACT,IAAI,EACJ,IAAI,EAKJ,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAS3B,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,WAAW,CAAC,EAAE,SAAS,EAAE,CAAC;IAC1B,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAmDD,wBAAgB,6BAA6B,CAC3C,OAAO,EAAE,eAAe,EACxB,OAAO,GAAE,2BAAgC,GACxC,oBAAoB,CAoXtB"}
@@ -1,4 +1,5 @@
1
1
  import { DEFAULT_WORK_SCHEDULE, getWorkingDaysList, getNetAvailableCapacity, getWorkingHoursInDay } from './calendar.js';
2
+ import { getTaskDurationHours } from './cpm.js';
2
3
  function toDateString(d) {
3
4
  return d.toISOString().split('T')[0];
4
5
  }
@@ -40,18 +41,6 @@ function getBucketKey(d, interval) {
40
41
  }
41
42
  return toDateString(startOfMonth(d));
42
43
  }
43
- function getTaskDurationHours(task) {
44
- if (typeof task.estimatedHours === 'number' && task.estimatedHours >= 0) {
45
- return task.estimatedHours;
46
- }
47
- if (typeof task.estimatedDurationMinutes === 'number' && task.estimatedDurationMinutes >= 0) {
48
- return task.estimatedDurationMinutes / 60;
49
- }
50
- if (typeof task.actualHours === 'number' && task.actualHours > 0) {
51
- return task.actualHours;
52
- }
53
- return 1;
54
- }
55
44
  export function calculateWorkloadDistribution(context, options = {}) {
56
45
  const { tasks, timeEntries = [], users = [], teams = [], projectId } = context;
57
46
  const interval = options.interval || 'week';
@@ -1 +1 @@
1
- {"version":3,"file":"workload.js","sourceRoot":"","sources":["../../src/domain/workload.ts"],"names":[],"mappings":"AAYA,OAAO,EACL,qBAAqB,EACrB,kBAAkB,EAClB,uBAAuB,EACvB,oBAAoB,EACrB,MAAM,eAAe,CAAC;AAUvB,SAAS,YAAY,CAAC,CAAO;IAC3B,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;AACvC,CAAC;AAED,SAAS,aAAa,CAAC,SAAiB;IACtC,MAAM,KAAK,GAAG,SAAS,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;IACjD,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC;AACxG,CAAC;AAED,SAAS,OAAO,CAAC,CAAO,EAAE,IAAY;IACpC,MAAM,GAAG,GAAG,IAAI,IAAI,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;IAClC,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,UAAU,EAAE,GAAG,IAAI,CAAC,CAAC;IACxC,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,WAAW,CAAC,CAAO;IAC1B,MAAM,IAAI,GAAG,IAAI,IAAI,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;IACnC,MAAM,GAAG,GAAG,IAAI,CAAC,SAAS,EAAE,CAAC;IAC7B,wDAAwD;IACxD,MAAM,IAAI,GAAG,IAAI,CAAC,UAAU,EAAE,GAAG,GAAG,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IAC5D,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,cAAc,EAAE,EAAE,IAAI,CAAC,WAAW,EAAE,EAAE,IAAI,CAAC,CAAC,CAAC;AAC7E,CAAC;AAED,SAAS,YAAY,CAAC,CAAO;IAC3B,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC;AACpE,CAAC;AAED,SAAS,cAAc,CAAC,CAAO,EAAE,QAA0B;IACzD,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;QACvB,OAAO,OAAO,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IACvB,CAAC;IACD,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;QACxB,OAAO,OAAO,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IACvB,CAAC;IACD,wBAAwB;IACxB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC,WAAW,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AACxE,CAAC;AAED,SAAS,YAAY,CAAC,CAAO,EAAE,QAA0B;IACvD,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;QACvB,OAAO,YAAY,CAAC,CAAC,CAAC,CAAC;IACzB,CAAC;IACD,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;QACxB,OAAO,YAAY,CAAC,WAAW,CAAC,CAAC,CAAC,CAAC,CAAC;IACtC,CAAC;IACD,OAAO,YAAY,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC,CAAC;AACvC,CAAC;AAED,SAAS,oBAAoB,CAAC,IAAU;IACtC,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,OAAO,CAAC,CAAC;AACX,CAAC;AAED,MAAM,UAAU,6BAA6B,CAC3C,OAAwB,EACxB,UAAuC,EAAE;IAEzC,MAAM,EAAE,KAAK,EAAE,WAAW,GAAG,EAAE,EAAE,KAAK,GAAG,EAAE,EAAE,KAAK,GAAG,EAAE,EAAE,SAAS,EAAE,GAAG,OAAO,CAAC;IAC/E,MAAM,QAAQ,GAAqB,OAAO,CAAC,QAAQ,IAAI,MAAM,CAAC;IAC9D,MAAM,OAAO,GAAoB,OAAO,CAAC,OAAO,IAAI,UAAU,CAAC;IAC/D,MAAM,MAAM,GAAmB,OAAO,CAAC,MAAM,IAAI,SAAS,CAAC;IAC3D,MAAM,qBAAqB,GAAG,OAAO,CAAC,0BAA0B,IAAI,EAAE,CAAC;IAEvE,0CAA0C;IAC1C,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAEnE,0BAA0B;IAC1B,IAAI,OAAO,GAAgB,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACvF,IAAI,OAAO,GAAgB,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IAEnF,IAAI,CAAC,OAAO,IAAI,CAAC,OAAO,EAAE,CAAC;QACzB,MAAM,KAAK,GAAa,EAAE,CAAC;QAC3B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,IAAI,CAAC,CAAC,gBAAgB;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,gBAAgB,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAChF,IAAI,CAAC,CAAC,eAAe;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC9E,IAAI,CAAC,CAAC,OAAO;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC9D,IAAI,CAAC,CAAC,aAAa;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,aAAa,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC1E,IAAI,CAAC,CAAC,SAAS;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAClE,+FAA+F;YAC/F,4FAA4F;YAC5F,4DAA4D;YAC5D,MAAM,KAAK,GAAG,CAAC,CAAC,gBAAgB,IAAI,CAAC,CAAC,eAAe,IAAI,CAAC,CAAC,SAAS,CAAC;YACrE,IAAI,CAAC,CAAC,CAAC,OAAO,IAAI,KAAK,EAAE,CAAC;gBACxB,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,aAAa,CAAC,KAAK,CAAC,EAAE,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,IAAI,CAAC,oBAAoB,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC3G,CAAC;QACH,CAAC;QACD,KAAK,MAAM,EAAE,IAAI,WAAW,EAAE,CAAC;YAC7B,IAAI,EAAE,CAAC,QAAQ;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,QAAQ,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QAED,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YACrB,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC;YACrD,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC;QACvD,CAAC;aAAM,CAAC;YACN,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC;YACvB,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;YACzC,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;QAC3C,CAAC;IACH,CAAC;IAED,4BAA4B;IAC5B,IAAI,OAAO,GAAG,OAAO,EAAE,CAAC;QACtB,OAAO,GAAG,IAAI,IAAI,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,iCAAiC;IACjC,IAAI,MAAM,GAAG,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,CAAC,CAAC,CAAC,YAAY,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC;IACjH,MAAM,QAAQ,GAAG,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,CAAC,CAAC,CAAC,YAAY,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC;IAWrH,MAAM,UAAU,GAAqB,EAAE,CAAC;IACxC,MAAM,SAAS,GAAG,IAAI,GAAG,EAA0B,CAAC;IAEpD,OAAO,MAAM,IAAI,QAAQ,IAAI,UAAU,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACrD,MAAM,OAAO,GAAG,YAAY,CAAC,MAAM,CAAC,CAAC;QACrC,MAAM,QAAQ,GAAG,cAAc,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;QAClD,MAAM,CAAC,GAAmB;YACxB,IAAI,EAAE,OAAO;YACb,SAAS,EAAE,IAAI,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;YACrC,OAAO,EAAE,QAAQ;YACjB,SAAS,EAAE,MAAM,CAAC,OAAO,EAAE;YAC3B,MAAM,EAAE,EAAE;SACX,CAAC;QACF,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnB,SAAS,CAAC,GAAG,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;QAC1B,MAAM,GAAG,QAAQ,CAAC;IACpB,CAAC;IAED,MAAM,YAAY,GAAG,IAAI,GAAG,EAAU,CAAC;IAEvC,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,SAAqB,EAAU,EAAE;QACpE,QAAQ,OAAO,EAAE,CAAC;YAChB,KAAK,UAAU;gBACb,IAAI,SAAS,EAAE,MAAM;oBAAE,OAAO,SAAS,CAAC,MAAM,CAAC;gBAC/C,OAAO,IAAI,CAAC,UAAU,IAAI,YAAY,CAAC;YACzC,KAAK,MAAM;gBACT,OAAO,IAAI,CAAC,MAAM,IAAK,IAAI,CAAC,YAAY,EAAE,MAAiB,IAAI,YAAY,CAAC;YAC9E,KAAK,UAAU;gBACb,OAAO,IAAI,CAAC,QAAQ,IAAK,IAAI,CAAC,YAAY,EAAE,IAAe,IAAI,UAAU,CAAC;YAC5E,KAAK,UAAU;gBACb,OAAO,IAAI,CAAC,QAAQ,IAAI,MAAM,CAAC;YACjC,KAAK,QAAQ;gBACX,OAAO,IAAI,CAAC,MAAM,IAAI,MAAM,CAAC;YAC/B;gBACE,OAAO,YAAY,CAAC;QACxB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,QAAQ,GAAG,CAAC,MAAsB,EAAE,GAAW,EAAE,KAAa,EAAE,EAAE;QACtE,IAAI,KAAK,IAAI,CAAC;YAAE,OAAO;QACvB,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;QACtB,MAAM,CAAC,MAAM,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC;IACzD,CAAC,CAAC;IAEF,MAAM,QAAQ,GAAG,YAAY,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IAC1C,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAEnE,2CAA2C;IAC3C,IAAI,MAAM,KAAK,QAAQ,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;QAChD,KAAK,MAAM,KAAK,IAAI,WAAW,EAAE,CAAC;YAChC,IAAI,CAAC,KAAK,CAAC,KAAK,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC;gBAAE,SAAS;YAC/C,MAAM,SAAS,GAAG,aAAa,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC;YAChD,MAAM,IAAI,GAAG,YAAY,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;YAC/C,MAAM,MAAM,GAAG,SAAS,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;YACnC,IAAI,MAAM,EAAE,CAAC;gBACX,MAAM,cAAc,GAAG,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,MAAM,CAAC,IAAK;oBACnD,EAAE,EAAE,KAAK,CAAC,MAAM;oBAChB,SAAS,EAAE,SAAS,IAAI,EAAE;oBAC1B,KAAK,EAAE,EAAE;oBACT,MAAM,EAAE,aAAa;oBACrB,QAAQ,EAAE,QAAQ;oBAClB,SAAS,EAAE,KAAK,CAAC,QAAQ;oBACzB,SAAS,EAAE,KAAK,CAAC,QAAQ;iBACjB,CAAC;gBACX,MAAM,MAAM,GAAG,eAAe,CAAC,cAAc,EAAE,KAAK,CAAC,CAAC;gBACtD,QAAQ,CAAC,MAAM,EAAE,MAAM,EAAE,KAAK,CAAC,KAAK,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;IACH,CAAC;IAED,8DAA8D;IAC9D,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;QAC7E,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,oBAAoB,CAAC,IAAI,CAAC,CAAC;YAC7C,MAAM,MAAM,GAAG,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC;YACrC,IAAI,iBAAiB,GAAG,CAAC,CAAC;YAE1B,IAAI,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC3B,iBAAiB,GAAG,SAAS,CAAC;YAChC,CAAC;iBAAM,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;gBAC1D,IAAI,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,EAAE,CAAC;oBAC9E,iBAAiB,GAAG,CAAC,CAAC;gBACxB,CAAC;qBAAM,CAAC;oBACN,iBAAiB,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,SAAS,GAAG,MAAM,CAAC,CAAC;gBACtD,CAAC;YACH,CAAC;YAED,IAAI,iBAAiB,IAAI,CAAC;gBAAE,SAAS;YAErC,MAAM,MAAM,GAAG,eAAe,CAAC,IAAI,CAAC,CAAC;YAErC,4BAA4B;YAC5B,IAAI,SAAS,GAAG,IAAI,CAAC,gBAAgB;gBACnC,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,gBAAgB,CAAC;gBACtC,CAAC,CAAC,IAAI,CAAC,eAAe;oBACpB,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,CAAC;oBACrC,CAAC,CAAC,IAAI,CAAC,SAAS;wBACd,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,SAAS,CAAC;wBAC/B,CAAC,CAAC,OAAO,CAAC;YAEhB,IAAI,OAAO,GAAG,IAAI,CAAC,OAAO;gBACxB,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,OAAO,CAAC;gBAC7B,CAAC,CAAC,SAAS;oBACT,CAAC,CAAC,OAAO,CAAC,SAAS,EAAE,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,IAAI,CAAC,iBAAiB,GAAG,CAAC,CAAC,CAAC,CAAC;oBACnE,CAAC,CAAC,OAAO,CAAC;YAEd,6GAA6G;YAC7G,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;gBACzB,MAAM,KAAK,GAAG,aAAa,CAAC,QAAQ,CAAC,CAAC;gBACtC,IAAI,SAAS,GAAG,KAAK,EAAE,CAAC;oBACtB,SAAS,GAAG,KAAK,CAAC;gBACpB,CAAC;gBACD,IAAI,OAAO,GAAG,SAAS,EAAE,CAAC;oBACxB,OAAO,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC;gBAClC,CAAC;YACH,CAAC;YAED,IAAI,OAAO,GAAG,SAAS,EAAE,CAAC;gBACxB,OAAO,GAAG,SAAS,CAAC;YACtB,CAAC;YAED,sDAAsD;YACtD,MAAM,YAAY,GAChB,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;gBAC7D,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,GAAG,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;gBAC3D,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;gBACrD,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;gBACnD,OAAO,CAAC,QAAQ;gBAChB,qBAAqB,CAAC;YAExB,MAAM,WAAW,GAAG,kBAAkB,CAAC,YAAY,CAAC,SAAS,CAAC,EAAE,YAAY,CAAC,OAAO,CAAC,EAAE,YAAY,CAAC,CAAC;YACrG,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,CAAC;YAErC,IAAI,WAAW,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBAC3B,MAAM,kBAAkB,GAAG,iBAAiB,GAAG,WAAW,CAAC,MAAM,CAAC;gBAElE,KAAK,MAAM,MAAM,IAAI,UAAU,EAAE,CAAC;oBAChC,MAAM,WAAW,GAAG,MAAM,CAAC,SAAS,CAAC,OAAO,EAAE,CAAC;oBAC/C,MAAM,SAAS,GAAG,MAAM,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC;oBAE3C,IAAI,mBAAmB,GAAG,CAAC,CAAC;oBAC5B,KAAK,MAAM,KAAK,IAAI,WAAW,EAAE,CAAC;wBAChC,MAAM,MAAM,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC,OAAO,EAAE,CAAC;wBAC9C,IAAI,MAAM,IAAI,WAAW,IAAI,MAAM,GAAG,SAAS,EAAE,CAAC;4BAChD,mBAAmB,EAAE,CAAC;wBACxB,CAAC;oBACH,CAAC;oBAED,IAAI,mBAAmB,GAAG,CAAC,EAAE,CAAC;wBAC5B,MAAM,YAAY,GAAG,mBAAmB,GAAG,kBAAkB,CAAC;wBAC9D,QAAQ,CAAC,MAAM,EAAE,MAAM,EAAE,YAAY,CAAC,CAAC;oBACzC,CAAC;gBACH,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,sFAAsF;gBACtF,MAAM,SAAS,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,OAAO,CAAC,OAAO,EAAE,GAAG,SAAS,CAAC,OAAO,EAAE,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC;gBACpG,MAAM,WAAW,GAAG,iBAAiB,GAAG,SAAS,CAAC;gBAElD,KAAK,MAAM,MAAM,IAAI,UAAU,EAAE,CAAC;oBAChC,MAAM,aAAa,GAAG,OAAO,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC;oBAClD,MAAM,YAAY,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,OAAO,EAAE,EAAE,MAAM,CAAC,SAAS,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,OAAO,CAAC,OAAO,EAAE,EAAE,aAAa,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;oBAElF,IAAI,YAAY,IAAI,UAAU,EAAE,CAAC;wBAC/B,MAAM,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,UAAU,CAAC,OAAO,EAAE,GAAG,YAAY,CAAC,OAAO,EAAE,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC;wBAC/F,MAAM,YAAY,GAAG,WAAW,GAAG,WAAW,CAAC;wBAC/C,QAAQ,CAAC,MAAM,EAAE,MAAM,EAAE,YAAY,CAAC,CAAC;oBACzC,CAAC;gBACH,CAAC;YACH,CAAC;QACH,CAAC;IACH,CAAC;IAED,yEAAyE;IACzE,IAAI,OAAO,KAAK,UAAU,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC/C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,YAAY,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QACzB,CAAC;IACH,CAAC;IACD,IAAI,OAAO,KAAK,MAAM,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC3C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,YAAY,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QACzB,CAAC;IACH,CAAC;IAED,MAAM,UAAU,GAAG,KAAK,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,IAAI,EAAE,CAAC;IAEnD,sCAAsC;IACtC,MAAM,YAAY,GAA2B,EAAE,CAAC;IAChD,KAAK,MAAM,GAAG,IAAI,UAAU,EAAE,CAAC;QAC7B,IAAI,OAAO,KAAK,UAAU,EAAE,CAAC;YAC3B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;YAC3B,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,GAAG,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC;QAC7E,CAAC;aAAM,IAAI,OAAO,KAAK,MAAM,EAAE,CAAC;YAC9B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;YAC3B,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,GAAG,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC;QAC7E,CAAC;aAAM,CAAC;YACN,YAAY,CAAC,GAAG,CAAC,GAAG,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,WAAW,EAAE,GAAG,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,EAAE,GAAG,CAAC,CAAC;QACpF,CAAC;IACH,CAAC;IAED,4CAA4C;IAC5C,IAAI,qBAAqB,GAAG,CAAC,CAAC;IAC9B,IAAI,wBAAwB,GAAG,CAAC,CAAC;IAEjC,MAAM,OAAO,GAAqB,UAAU,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACtD,MAAM,MAAM,GAA2B,EAAE,CAAC;QAC1C,MAAM,QAAQ,GAA2B,EAAE,CAAC;QAC5C,IAAI,gBAAgB,GAAG,CAAC,CAAC;QACzB,IAAI,mBAAmB,GAAG,CAAC,CAAC;QAE5B,KAAK,MAAM,GAAG,IAAI,UAAU,EAAE,CAAC;YAC7B,MAAM,QAAQ,GAAG,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,YAAY,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACtD,MAAM,CAAC,GAAG,CAAC,GAAG,YAAY,CAAC;YAC3B,gBAAgB,IAAI,YAAY,CAAC;YAEjC,uBAAuB;YACvB,MAAM,cAAc,GAClB,CAAC,OAAO,KAAK,UAAU,IAAI,CAAC,OAAO,CAAC,aAAa,EAAE,CAAC,GAAG,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;gBACxF,CAAC,OAAO,KAAK,MAAM,IAAI,CAAC,OAAO,CAAC,aAAa,EAAE,CAAC,GAAG,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;gBACpF,OAAO,CAAC,QAAQ;gBAChB,qBAAqB,CAAC;YAExB,IAAI,SAAS,GAAG,qBAAqB,CAAC;YACtC,IAAI,OAAO,CAAC,iBAAiB,IAAI,OAAO,OAAO,CAAC,iBAAiB,CAAC,GAAG,CAAC,KAAK,QAAQ,EAAE,CAAC;gBACpF,SAAS,GAAG,OAAO,CAAC,iBAAiB,CAAC,GAAG,CAAC,CAAC;YAC7C,CAAC;iBAAM,IAAI,OAAO,KAAK,UAAU,EAAE,CAAC;gBAClC,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;gBAC3B,IAAI,CAAC,EAAE,mBAAmB;oBAAE,SAAS,GAAG,CAAC,CAAC,mBAAmB,CAAC;qBACzD,IAAI,GAAG,KAAK,YAAY;oBAAE,SAAS,GAAG,CAAC,CAAC;YAC/C,CAAC;iBAAM,IAAI,OAAO,KAAK,MAAM,EAAE,CAAC;gBAC9B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;gBAC3B,IAAI,CAAC,EAAE,mBAAmB,EAAE,CAAC;oBAC3B,SAAS,GAAG,CAAC,CAAC,mBAAmB,CAAC;gBACpC,CAAC;qBAAM,IAAI,CAAC,EAAE,SAAS,EAAE,MAAM,EAAE,CAAC;oBAChC,SAAS,GAAG,CAAC,CAAC,SAAS,CAAC,MAAM,GAAG,qBAAqB,CAAC;gBACzD,CAAC;qBAAM,IAAI,GAAG,KAAK,YAAY,EAAE,CAAC;oBAChC,SAAS,GAAG,CAAC,CAAC;gBAChB,CAAC;YACH,CAAC;YAED,IAAI,SAAS,GAAG,CAAC,CAAC;YAClB,IAAI,GAAG,KAAK,YAAY,EAAE,CAAC;gBACzB,SAAS,GAAG,CAAC,CAAC;YAChB,CAAC;iBAAM,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;gBAC/B,MAAM,UAAU,GAAG,uBAAuB,CAAC,YAAY,CAAC,EAAE,CAAC,SAAS,CAAC,EAAE,YAAY,CAAC,OAAO,CAAC,EAAE,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,cAAc,CAAC,CAAC;gBAC9H,MAAM,QAAQ,GAAG,CAAC,cAAc,CAAC,kBAAkB,IAAI,CAAC,CAAC,GAAG,CAAC,CAAC;gBAC9D,MAAM,KAAK,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;gBACtD,SAAS,GAAG,IAAI,CAAC,KAAK,CAAC,UAAU,GAAG,KAAK,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACzD,CAAC;iBAAM,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;gBAC9B,MAAM,QAAQ,GAAG,oBAAoB,CAAC,YAAY,CAAC,EAAE,CAAC,SAAS,CAAC,EAAE,cAAc,CAAC,CAAC;gBAClF,MAAM,QAAQ,GAAG,CAAC,cAAc,CAAC,kBAAkB,IAAI,CAAC,CAAC,GAAG,CAAC,CAAC;gBAC9D,MAAM,KAAK,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;gBACtD,SAAS,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,KAAK,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvD,CAAC;iBAAM,IAAI,QAAQ,KAAK,OAAO,EAAE,CAAC;gBAChC,MAAM,WAAW,GAAG,uBAAuB,CAAC,YAAY,CAAC,EAAE,CAAC,SAAS,CAAC,EAAE,YAAY,CAAC,OAAO,CAAC,EAAE,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,cAAc,CAAC,CAAC;gBAC/H,MAAM,QAAQ,GAAG,CAAC,cAAc,CAAC,kBAAkB,IAAI,CAAC,CAAC,GAAG,CAAC,CAAC;gBAC9D,MAAM,KAAK,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;gBACtD,SAAS,GAAG,IAAI,CAAC,KAAK,CAAC,WAAW,GAAG,KAAK,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YAC1D,CAAC;YAED,QAAQ,CAAC,GAAG,CAAC,GAAG,SAAS,CAAC;YAC1B,mBAAmB,IAAI,SAAS,CAAC;QACnC,CAAC;QAED,gBAAgB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QAC5D,mBAAmB,GAAG,IAAI,CAAC,KAAK,CAAC,mBAAmB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QAClE,qBAAqB,IAAI,gBAAgB,CAAC;QAC1C,wBAAwB,IAAI,mBAAmB,CAAC;QAEhD,MAAM,gBAAgB,GACpB,mBAAmB,GAAG,CAAC;YACrB,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,GAAG,mBAAmB,CAAC,GAAG,IAAI,CAAC,GAAG,IAAI;YACpE,CAAC,CAAC,SAAS,CAAC;QAEhB,OAAO;YACL,IAAI,EAAE,EAAE,CAAC,IAAI;YACb,SAAS,EAAE,EAAE,CAAC,SAAS;YACvB,UAAU,EAAE,gBAAgB;YAC5B,MAAM;YACN,QAAQ;YACR,aAAa,EAAE,mBAAmB;YAClC,gBAAgB;SACjB,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,qBAAqB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;IACtE,wBAAwB,GAAG,IAAI,CAAC,KAAK,CAAC,wBAAwB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;IAE5E,MAAM,kBAAkB,GACtB,wBAAwB,GAAG,CAAC;QAC1B,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,qBAAqB,GAAG,wBAAwB,CAAC,GAAG,IAAI,CAAC,GAAG,IAAI;QAC9E,CAAC,CAAC,SAAS,CAAC;IAEhB,OAAO;QACL,SAAS;QACT,SAAS,EAAE,YAAY,CAAC,OAAO,CAAC;QAChC,OAAO,EAAE,YAAY,CAAC,OAAO,CAAC;QAC9B,QAAQ;QACR,OAAO;QACP,MAAM;QACN,UAAU;QACV,YAAY;QACZ,OAAO;QACP,UAAU,EAAE,qBAAqB;QACjC,aAAa,EAAE,wBAAwB;QACvC,kBAAkB;KACnB,CAAC;AACJ,CAAC"}
1
+ {"version":3,"file":"workload.js","sourceRoot":"","sources":["../../src/domain/workload.ts"],"names":[],"mappings":"AAYA,OAAO,EACL,qBAAqB,EACrB,kBAAkB,EAClB,uBAAuB,EACvB,oBAAoB,EACrB,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,oBAAoB,EAAE,MAAM,UAAU,CAAC;AAUhD,SAAS,YAAY,CAAC,CAAO;IAC3B,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;AACvC,CAAC;AAED,SAAS,aAAa,CAAC,SAAiB;IACtC,MAAM,KAAK,GAAG,SAAS,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;IACjD,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC;AACxG,CAAC;AAED,SAAS,OAAO,CAAC,CAAO,EAAE,IAAY;IACpC,MAAM,GAAG,GAAG,IAAI,IAAI,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;IAClC,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,UAAU,EAAE,GAAG,IAAI,CAAC,CAAC;IACxC,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,WAAW,CAAC,CAAO;IAC1B,MAAM,IAAI,GAAG,IAAI,IAAI,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;IACnC,MAAM,GAAG,GAAG,IAAI,CAAC,SAAS,EAAE,CAAC;IAC7B,wDAAwD;IACxD,MAAM,IAAI,GAAG,IAAI,CAAC,UAAU,EAAE,GAAG,GAAG,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IAC5D,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,cAAc,EAAE,EAAE,IAAI,CAAC,WAAW,EAAE,EAAE,IAAI,CAAC,CAAC,CAAC;AAC7E,CAAC;AAED,SAAS,YAAY,CAAC,CAAO;IAC3B,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC;AACpE,CAAC;AAED,SAAS,cAAc,CAAC,CAAO,EAAE,QAA0B;IACzD,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;QACvB,OAAO,OAAO,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IACvB,CAAC;IACD,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;QACxB,OAAO,OAAO,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IACvB,CAAC;IACD,wBAAwB;IACxB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC,WAAW,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AACxE,CAAC;AAED,SAAS,YAAY,CAAC,CAAO,EAAE,QAA0B;IACvD,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;QACvB,OAAO,YAAY,CAAC,CAAC,CAAC,CAAC;IACzB,CAAC;IACD,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;QACxB,OAAO,YAAY,CAAC,WAAW,CAAC,CAAC,CAAC,CAAC,CAAC;IACtC,CAAC;IACD,OAAO,YAAY,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC,CAAC;AACvC,CAAC;AAGD,MAAM,UAAU,6BAA6B,CAC3C,OAAwB,EACxB,UAAuC,EAAE;IAEzC,MAAM,EAAE,KAAK,EAAE,WAAW,GAAG,EAAE,EAAE,KAAK,GAAG,EAAE,EAAE,KAAK,GAAG,EAAE,EAAE,SAAS,EAAE,GAAG,OAAO,CAAC;IAC/E,MAAM,QAAQ,GAAqB,OAAO,CAAC,QAAQ,IAAI,MAAM,CAAC;IAC9D,MAAM,OAAO,GAAoB,OAAO,CAAC,OAAO,IAAI,UAAU,CAAC;IAC/D,MAAM,MAAM,GAAmB,OAAO,CAAC,MAAM,IAAI,SAAS,CAAC;IAC3D,MAAM,qBAAqB,GAAG,OAAO,CAAC,0BAA0B,IAAI,EAAE,CAAC;IAEvE,0CAA0C;IAC1C,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAEnE,0BAA0B;IAC1B,IAAI,OAAO,GAAgB,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACvF,IAAI,OAAO,GAAgB,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IAEnF,IAAI,CAAC,OAAO,IAAI,CAAC,OAAO,EAAE,CAAC;QACzB,MAAM,KAAK,GAAa,EAAE,CAAC;QAC3B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,IAAI,CAAC,CAAC,gBAAgB;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,gBAAgB,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAChF,IAAI,CAAC,CAAC,eAAe;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC9E,IAAI,CAAC,CAAC,OAAO;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC9D,IAAI,CAAC,CAAC,aAAa;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,aAAa,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC1E,IAAI,CAAC,CAAC,SAAS;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAClE,+FAA+F;YAC/F,4FAA4F;YAC5F,4DAA4D;YAC5D,MAAM,KAAK,GAAG,CAAC,CAAC,gBAAgB,IAAI,CAAC,CAAC,eAAe,IAAI,CAAC,CAAC,SAAS,CAAC;YACrE,IAAI,CAAC,CAAC,CAAC,OAAO,IAAI,KAAK,EAAE,CAAC;gBACxB,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,aAAa,CAAC,KAAK,CAAC,EAAE,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,IAAI,CAAC,oBAAoB,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC3G,CAAC;QACH,CAAC;QACD,KAAK,MAAM,EAAE,IAAI,WAAW,EAAE,CAAC;YAC7B,IAAI,EAAE,CAAC,QAAQ;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,QAAQ,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QAED,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YACrB,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC;YACrD,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC;QACvD,CAAC;aAAM,CAAC;YACN,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC;YACvB,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;YACzC,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;QAC3C,CAAC;IACH,CAAC;IAED,4BAA4B;IAC5B,IAAI,OAAO,GAAG,OAAO,EAAE,CAAC;QACtB,OAAO,GAAG,IAAI,IAAI,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,iCAAiC;IACjC,IAAI,MAAM,GAAG,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,CAAC,CAAC,CAAC,YAAY,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC;IACjH,MAAM,QAAQ,GAAG,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,CAAC,CAAC,CAAC,YAAY,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC;IAWrH,MAAM,UAAU,GAAqB,EAAE,CAAC;IACxC,MAAM,SAAS,GAAG,IAAI,GAAG,EAA0B,CAAC;IAEpD,OAAO,MAAM,IAAI,QAAQ,IAAI,UAAU,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACrD,MAAM,OAAO,GAAG,YAAY,CAAC,MAAM,CAAC,CAAC;QACrC,MAAM,QAAQ,GAAG,cAAc,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;QAClD,MAAM,CAAC,GAAmB;YACxB,IAAI,EAAE,OAAO;YACb,SAAS,EAAE,IAAI,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;YACrC,OAAO,EAAE,QAAQ;YACjB,SAAS,EAAE,MAAM,CAAC,OAAO,EAAE;YAC3B,MAAM,EAAE,EAAE;SACX,CAAC;QACF,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnB,SAAS,CAAC,GAAG,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;QAC1B,MAAM,GAAG,QAAQ,CAAC;IACpB,CAAC;IAED,MAAM,YAAY,GAAG,IAAI,GAAG,EAAU,CAAC;IAEvC,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,SAAqB,EAAU,EAAE;QACpE,QAAQ,OAAO,EAAE,CAAC;YAChB,KAAK,UAAU;gBACb,IAAI,SAAS,EAAE,MAAM;oBAAE,OAAO,SAAS,CAAC,MAAM,CAAC;gBAC/C,OAAO,IAAI,CAAC,UAAU,IAAI,YAAY,CAAC;YACzC,KAAK,MAAM;gBACT,OAAO,IAAI,CAAC,MAAM,IAAK,IAAI,CAAC,YAAY,EAAE,MAAiB,IAAI,YAAY,CAAC;YAC9E,KAAK,UAAU;gBACb,OAAO,IAAI,CAAC,QAAQ,IAAK,IAAI,CAAC,YAAY,EAAE,IAAe,IAAI,UAAU,CAAC;YAC5E,KAAK,UAAU;gBACb,OAAO,IAAI,CAAC,QAAQ,IAAI,MAAM,CAAC;YACjC,KAAK,QAAQ;gBACX,OAAO,IAAI,CAAC,MAAM,IAAI,MAAM,CAAC;YAC/B;gBACE,OAAO,YAAY,CAAC;QACxB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,QAAQ,GAAG,CAAC,MAAsB,EAAE,GAAW,EAAE,KAAa,EAAE,EAAE;QACtE,IAAI,KAAK,IAAI,CAAC;YAAE,OAAO;QACvB,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;QACtB,MAAM,CAAC,MAAM,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC;IACzD,CAAC,CAAC;IAEF,MAAM,QAAQ,GAAG,YAAY,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IAC1C,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAEnE,2CAA2C;IAC3C,IAAI,MAAM,KAAK,QAAQ,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;QAChD,KAAK,MAAM,KAAK,IAAI,WAAW,EAAE,CAAC;YAChC,IAAI,CAAC,KAAK,CAAC,KAAK,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC;gBAAE,SAAS;YAC/C,MAAM,SAAS,GAAG,aAAa,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC;YAChD,MAAM,IAAI,GAAG,YAAY,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;YAC/C,MAAM,MAAM,GAAG,SAAS,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;YACnC,IAAI,MAAM,EAAE,CAAC;gBACX,MAAM,cAAc,GAAG,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,MAAM,CAAC,IAAK;oBACnD,EAAE,EAAE,KAAK,CAAC,MAAM;oBAChB,SAAS,EAAE,SAAS,IAAI,EAAE;oBAC1B,KAAK,EAAE,EAAE;oBACT,MAAM,EAAE,aAAa;oBACrB,QAAQ,EAAE,QAAQ;oBAClB,SAAS,EAAE,KAAK,CAAC,QAAQ;oBACzB,SAAS,EAAE,KAAK,CAAC,QAAQ;iBACjB,CAAC;gBACX,MAAM,MAAM,GAAG,eAAe,CAAC,cAAc,EAAE,KAAK,CAAC,CAAC;gBACtD,QAAQ,CAAC,MAAM,EAAE,MAAM,EAAE,KAAK,CAAC,KAAK,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;IACH,CAAC;IAED,8DAA8D;IAC9D,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;QAC7E,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,oBAAoB,CAAC,IAAI,CAAC,CAAC;YAC7C,MAAM,MAAM,GAAG,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC;YACrC,IAAI,iBAAiB,GAAG,CAAC,CAAC;YAE1B,IAAI,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC3B,iBAAiB,GAAG,SAAS,CAAC;YAChC,CAAC;iBAAM,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;gBAC1D,IAAI,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,EAAE,CAAC;oBAC9E,iBAAiB,GAAG,CAAC,CAAC;gBACxB,CAAC;qBAAM,CAAC;oBACN,iBAAiB,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,SAAS,GAAG,MAAM,CAAC,CAAC;gBACtD,CAAC;YACH,CAAC;YAED,IAAI,iBAAiB,IAAI,CAAC;gBAAE,SAAS;YAErC,MAAM,MAAM,GAAG,eAAe,CAAC,IAAI,CAAC,CAAC;YAErC,4BAA4B;YAC5B,IAAI,SAAS,GAAG,IAAI,CAAC,gBAAgB;gBACnC,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,gBAAgB,CAAC;gBACtC,CAAC,CAAC,IAAI,CAAC,eAAe;oBACpB,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,CAAC;oBACrC,CAAC,CAAC,IAAI,CAAC,SAAS;wBACd,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,SAAS,CAAC;wBAC/B,CAAC,CAAC,OAAO,CAAC;YAEhB,IAAI,OAAO,GAAG,IAAI,CAAC,OAAO;gBACxB,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,OAAO,CAAC;gBAC7B,CAAC,CAAC,SAAS;oBACT,CAAC,CAAC,OAAO,CAAC,SAAS,EAAE,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,IAAI,CAAC,iBAAiB,GAAG,CAAC,CAAC,CAAC,CAAC;oBACnE,CAAC,CAAC,OAAO,CAAC;YAEd,6GAA6G;YAC7G,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;gBACzB,MAAM,KAAK,GAAG,aAAa,CAAC,QAAQ,CAAC,CAAC;gBACtC,IAAI,SAAS,GAAG,KAAK,EAAE,CAAC;oBACtB,SAAS,GAAG,KAAK,CAAC;gBACpB,CAAC;gBACD,IAAI,OAAO,GAAG,SAAS,EAAE,CAAC;oBACxB,OAAO,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC;gBAClC,CAAC;YACH,CAAC;YAED,IAAI,OAAO,GAAG,SAAS,EAAE,CAAC;gBACxB,OAAO,GAAG,SAAS,CAAC;YACtB,CAAC;YAED,sDAAsD;YACtD,MAAM,YAAY,GAChB,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;gBAC7D,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,GAAG,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;gBAC3D,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;gBACrD,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;gBACnD,OAAO,CAAC,QAAQ;gBAChB,qBAAqB,CAAC;YAExB,MAAM,WAAW,GAAG,kBAAkB,CAAC,YAAY,CAAC,SAAS,CAAC,EAAE,YAAY,CAAC,OAAO,CAAC,EAAE,YAAY,CAAC,CAAC;YACrG,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,CAAC;YAErC,IAAI,WAAW,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBAC3B,MAAM,kBAAkB,GAAG,iBAAiB,GAAG,WAAW,CAAC,MAAM,CAAC;gBAElE,KAAK,MAAM,MAAM,IAAI,UAAU,EAAE,CAAC;oBAChC,MAAM,WAAW,GAAG,MAAM,CAAC,SAAS,CAAC,OAAO,EAAE,CAAC;oBAC/C,MAAM,SAAS,GAAG,MAAM,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC;oBAE3C,IAAI,mBAAmB,GAAG,CAAC,CAAC;oBAC5B,KAAK,MAAM,KAAK,IAAI,WAAW,EAAE,CAAC;wBAChC,MAAM,MAAM,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC,OAAO,EAAE,CAAC;wBAC9C,IAAI,MAAM,IAAI,WAAW,IAAI,MAAM,GAAG,SAAS,EAAE,CAAC;4BAChD,mBAAmB,EAAE,CAAC;wBACxB,CAAC;oBACH,CAAC;oBAED,IAAI,mBAAmB,GAAG,CAAC,EAAE,CAAC;wBAC5B,MAAM,YAAY,GAAG,mBAAmB,GAAG,kBAAkB,CAAC;wBAC9D,QAAQ,CAAC,MAAM,EAAE,MAAM,EAAE,YAAY,CAAC,CAAC;oBACzC,CAAC;gBACH,CAAC;YACH,CAAC;iBAAM,CAAC;gBACN,sFAAsF;gBACtF,MAAM,SAAS,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,OAAO,CAAC,OAAO,EAAE,GAAG,SAAS,CAAC,OAAO,EAAE,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC;gBACpG,MAAM,WAAW,GAAG,iBAAiB,GAAG,SAAS,CAAC;gBAElD,KAAK,MAAM,MAAM,IAAI,UAAU,EAAE,CAAC;oBAChC,MAAM,aAAa,GAAG,OAAO,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC;oBAClD,MAAM,YAAY,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,OAAO,EAAE,EAAE,MAAM,CAAC,SAAS,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;oBACzF,MAAM,UAAU,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,OAAO,CAAC,OAAO,EAAE,EAAE,aAAa,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;oBAElF,IAAI,YAAY,IAAI,UAAU,EAAE,CAAC;wBAC/B,MAAM,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,UAAU,CAAC,OAAO,EAAE,GAAG,YAAY,CAAC,OAAO,EAAE,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC;wBAC/F,MAAM,YAAY,GAAG,WAAW,GAAG,WAAW,CAAC;wBAC/C,QAAQ,CAAC,MAAM,EAAE,MAAM,EAAE,YAAY,CAAC,CAAC;oBACzC,CAAC;gBACH,CAAC;YACH,CAAC;QACH,CAAC;IACH,CAAC;IAED,yEAAyE;IACzE,IAAI,OAAO,KAAK,UAAU,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC/C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,YAAY,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QACzB,CAAC;IACH,CAAC;IACD,IAAI,OAAO,KAAK,MAAM,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC3C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,YAAY,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QACzB,CAAC;IACH,CAAC;IAED,MAAM,UAAU,GAAG,KAAK,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,IAAI,EAAE,CAAC;IAEnD,sCAAsC;IACtC,MAAM,YAAY,GAA2B,EAAE,CAAC;IAChD,KAAK,MAAM,GAAG,IAAI,UAAU,EAAE,CAAC;QAC7B,IAAI,OAAO,KAAK,UAAU,EAAE,CAAC;YAC3B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;YAC3B,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,GAAG,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC;QAC7E,CAAC;aAAM,IAAI,OAAO,KAAK,MAAM,EAAE,CAAC;YAC9B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;YAC3B,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,GAAG,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC;QAC7E,CAAC;aAAM,CAAC;YACN,YAAY,CAAC,GAAG,CAAC,GAAG,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,WAAW,EAAE,GAAG,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,EAAE,GAAG,CAAC,CAAC;QACpF,CAAC;IACH,CAAC;IAED,4CAA4C;IAC5C,IAAI,qBAAqB,GAAG,CAAC,CAAC;IAC9B,IAAI,wBAAwB,GAAG,CAAC,CAAC;IAEjC,MAAM,OAAO,GAAqB,UAAU,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACtD,MAAM,MAAM,GAA2B,EAAE,CAAC;QAC1C,MAAM,QAAQ,GAA2B,EAAE,CAAC;QAC5C,IAAI,gBAAgB,GAAG,CAAC,CAAC;QACzB,IAAI,mBAAmB,GAAG,CAAC,CAAC;QAE5B,KAAK,MAAM,GAAG,IAAI,UAAU,EAAE,CAAC;YAC7B,MAAM,QAAQ,GAAG,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,YAAY,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACtD,MAAM,CAAC,GAAG,CAAC,GAAG,YAAY,CAAC;YAC3B,gBAAgB,IAAI,YAAY,CAAC;YAEjC,uBAAuB;YACvB,MAAM,cAAc,GAClB,CAAC,OAAO,KAAK,UAAU,IAAI,CAAC,OAAO,CAAC,aAAa,EAAE,CAAC,GAAG,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;gBACxF,CAAC,OAAO,KAAK,MAAM,IAAI,CAAC,OAAO,CAAC,aAAa,EAAE,CAAC,GAAG,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;gBACpF,OAAO,CAAC,QAAQ;gBAChB,qBAAqB,CAAC;YAExB,IAAI,SAAS,GAAG,qBAAqB,CAAC;YACtC,IAAI,OAAO,CAAC,iBAAiB,IAAI,OAAO,OAAO,CAAC,iBAAiB,CAAC,GAAG,CAAC,KAAK,QAAQ,EAAE,CAAC;gBACpF,SAAS,GAAG,OAAO,CAAC,iBAAiB,CAAC,GAAG,CAAC,CAAC;YAC7C,CAAC;iBAAM,IAAI,OAAO,KAAK,UAAU,EAAE,CAAC;gBAClC,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;gBAC3B,IAAI,CAAC,EAAE,mBAAmB;oBAAE,SAAS,GAAG,CAAC,CAAC,mBAAmB,CAAC;qBACzD,IAAI,GAAG,KAAK,YAAY;oBAAE,SAAS,GAAG,CAAC,CAAC;YAC/C,CAAC;iBAAM,IAAI,OAAO,KAAK,MAAM,EAAE,CAAC;gBAC9B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;gBAC3B,IAAI,CAAC,EAAE,mBAAmB,EAAE,CAAC;oBAC3B,SAAS,GAAG,CAAC,CAAC,mBAAmB,CAAC;gBACpC,CAAC;qBAAM,IAAI,CAAC,EAAE,SAAS,EAAE,MAAM,EAAE,CAAC;oBAChC,SAAS,GAAG,CAAC,CAAC,SAAS,CAAC,MAAM,GAAG,qBAAqB,CAAC;gBACzD,CAAC;qBAAM,IAAI,GAAG,KAAK,YAAY,EAAE,CAAC;oBAChC,SAAS,GAAG,CAAC,CAAC;gBAChB,CAAC;YACH,CAAC;YAED,IAAI,SAAS,GAAG,CAAC,CAAC;YAClB,IAAI,GAAG,KAAK,YAAY,EAAE,CAAC;gBACzB,SAAS,GAAG,CAAC,CAAC;YAChB,CAAC;iBAAM,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;gBAC/B,MAAM,UAAU,GAAG,uBAAuB,CAAC,YAAY,CAAC,EAAE,CAAC,SAAS,CAAC,EAAE,YAAY,CAAC,OAAO,CAAC,EAAE,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,cAAc,CAAC,CAAC;gBAC9H,MAAM,QAAQ,GAAG,CAAC,cAAc,CAAC,kBAAkB,IAAI,CAAC,CAAC,GAAG,CAAC,CAAC;gBAC9D,MAAM,KAAK,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;gBACtD,SAAS,GAAG,IAAI,CAAC,KAAK,CAAC,UAAU,GAAG,KAAK,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACzD,CAAC;iBAAM,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;gBAC9B,MAAM,QAAQ,GAAG,oBAAoB,CAAC,YAAY,CAAC,EAAE,CAAC,SAAS,CAAC,EAAE,cAAc,CAAC,CAAC;gBAClF,MAAM,QAAQ,GAAG,CAAC,cAAc,CAAC,kBAAkB,IAAI,CAAC,CAAC,GAAG,CAAC,CAAC;gBAC9D,MAAM,KAAK,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;gBACtD,SAAS,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,KAAK,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvD,CAAC;iBAAM,IAAI,QAAQ,KAAK,OAAO,EAAE,CAAC;gBAChC,MAAM,WAAW,GAAG,uBAAuB,CAAC,YAAY,CAAC,EAAE,CAAC,SAAS,CAAC,EAAE,YAAY,CAAC,OAAO,CAAC,EAAE,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,cAAc,CAAC,CAAC;gBAC/H,MAAM,QAAQ,GAAG,CAAC,cAAc,CAAC,kBAAkB,IAAI,CAAC,CAAC,GAAG,CAAC,CAAC;gBAC9D,MAAM,KAAK,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,SAAS,GAAG,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC;gBACtD,SAAS,GAAG,IAAI,CAAC,KAAK,CAAC,WAAW,GAAG,KAAK,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YAC1D,CAAC;YAED,QAAQ,CAAC,GAAG,CAAC,GAAG,SAAS,CAAC;YAC1B,mBAAmB,IAAI,SAAS,CAAC;QACnC,CAAC;QAED,gBAAgB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QAC5D,mBAAmB,GAAG,IAAI,CAAC,KAAK,CAAC,mBAAmB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QAClE,qBAAqB,IAAI,gBAAgB,CAAC;QAC1C,wBAAwB,IAAI,mBAAmB,CAAC;QAEhD,MAAM,gBAAgB,GACpB,mBAAmB,GAAG,CAAC;YACrB,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,GAAG,mBAAmB,CAAC,GAAG,IAAI,CAAC,GAAG,IAAI;YACpE,CAAC,CAAC,SAAS,CAAC;QAEhB,OAAO;YACL,IAAI,EAAE,EAAE,CAAC,IAAI;YACb,SAAS,EAAE,EAAE,CAAC,SAAS;YACvB,UAAU,EAAE,gBAAgB;YAC5B,MAAM;YACN,QAAQ;YACR,aAAa,EAAE,mBAAmB;YAClC,gBAAgB;SACjB,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,qBAAqB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;IACtE,wBAAwB,GAAG,IAAI,CAAC,KAAK,CAAC,wBAAwB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;IAE5E,MAAM,kBAAkB,GACtB,wBAAwB,GAAG,CAAC;QAC1B,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,qBAAqB,GAAG,wBAAwB,CAAC,GAAG,IAAI,CAAC,GAAG,IAAI;QAC9E,CAAC,CAAC,SAAS,CAAC;IAEhB,OAAO;QACL,SAAS;QACT,SAAS,EAAE,YAAY,CAAC,OAAO,CAAC;QAChC,OAAO,EAAE,YAAY,CAAC,OAAO,CAAC;QAC9B,QAAQ;QACR,OAAO;QACP,MAAM;QACN,UAAU;QACV,YAAY;QACZ,OAAO;QACP,UAAU,EAAE,qBAAqB;QACjC,aAAa,EAAE,wBAAwB;QACvC,kBAAkB;KACnB,CAAC;AACJ,CAAC"}
@@ -1040,6 +1040,8 @@ export declare const CreateTaskSchema: z.ZodObject<{
1040
1040
  actualEndDate: z.ZodOptional<z.ZodString>;
1041
1041
  completedAt: z.ZodOptional<z.ZodString>;
1042
1042
  dueDate: z.ZodOptional<z.ZodString>;
1043
+ deadline: z.ZodOptional<z.ZodEffects<z.ZodString, string, string>>;
1044
+ isMilestone: z.ZodOptional<z.ZodBoolean>;
1043
1045
  estimatedHours: z.ZodOptional<z.ZodNumber>;
1044
1046
  allocation: z.ZodOptional<z.ZodNumber>;
1045
1047
  loggedHours: z.ZodOptional<z.ZodNumber>;
@@ -1106,6 +1108,8 @@ export declare const CreateTaskSchema: z.ZodObject<{
1106
1108
  actualEndDate?: string | undefined;
1107
1109
  completedAt?: string | undefined;
1108
1110
  dueDate?: string | undefined;
1111
+ deadline?: string | undefined;
1112
+ isMilestone?: boolean | undefined;
1109
1113
  estimatedHours?: number | undefined;
1110
1114
  allocation?: number | undefined;
1111
1115
  loggedHours?: number | undefined;
@@ -1158,6 +1162,8 @@ export declare const CreateTaskSchema: z.ZodObject<{
1158
1162
  actualEndDate?: string | undefined;
1159
1163
  completedAt?: string | undefined;
1160
1164
  dueDate?: string | undefined;
1165
+ deadline?: string | undefined;
1166
+ isMilestone?: boolean | undefined;
1161
1167
  estimatedHours?: number | undefined;
1162
1168
  allocation?: number | undefined;
1163
1169
  loggedHours?: number | undefined;
@@ -1221,6 +1227,8 @@ export declare const UpdateTaskSchema: z.ZodObject<{
1221
1227
  actualEndDate: z.ZodOptional<z.ZodOptional<z.ZodString>>;
1222
1228
  completedAt: z.ZodOptional<z.ZodOptional<z.ZodString>>;
1223
1229
  dueDate: z.ZodOptional<z.ZodOptional<z.ZodString>>;
1230
+ deadline: z.ZodOptional<z.ZodOptional<z.ZodEffects<z.ZodString, string, string>>>;
1231
+ isMilestone: z.ZodOptional<z.ZodOptional<z.ZodBoolean>>;
1224
1232
  estimatedHours: z.ZodOptional<z.ZodOptional<z.ZodNumber>>;
1225
1233
  allocation: z.ZodOptional<z.ZodOptional<z.ZodNumber>>;
1226
1234
  loggedHours: z.ZodOptional<z.ZodOptional<z.ZodNumber>>;
@@ -1285,6 +1293,8 @@ export declare const UpdateTaskSchema: z.ZodObject<{
1285
1293
  actualEndDate?: string | undefined;
1286
1294
  completedAt?: string | undefined;
1287
1295
  dueDate?: string | undefined;
1296
+ deadline?: string | undefined;
1297
+ isMilestone?: boolean | undefined;
1288
1298
  estimatedHours?: number | undefined;
1289
1299
  allocation?: number | undefined;
1290
1300
  loggedHours?: number | undefined;
@@ -1336,6 +1346,8 @@ export declare const UpdateTaskSchema: z.ZodObject<{
1336
1346
  actualEndDate?: string | undefined;
1337
1347
  completedAt?: string | undefined;
1338
1348
  dueDate?: string | undefined;
1349
+ deadline?: string | undefined;
1350
+ isMilestone?: boolean | undefined;
1339
1351
  estimatedHours?: number | undefined;
1340
1352
  allocation?: number | undefined;
1341
1353
  loggedHours?: number | undefined;
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/schemas/index.ts"],"names":[],"mappings":"AAAA;;;;;;;;;GASG;AACH,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAMxB;;;GAGG;AACH,wBAAgB,YAAY,CAAC,CAAC,SAAS,CAAC,CAAC,UAAU,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,OAAO,GAAG,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,CAS1F;AAUD,eAAO,MAAM,oBAAoB,oEAAkE,CAAC;AACpG,eAAO,MAAM,gBAAgB,wCAAsC,CAAC;AAEpE,eAAO,MAAM,sBAAsB;;;;;;;;;;;;EAIjC,CAAC;AAEH,eAAO,MAAM,kBAAkB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAe7B,CAAC;AAEH,eAAO,MAAM,2BAA2B;;;;IAItC,2EAA2E;;;;;;;;;;;;;;;;;;;;;EAK3E,CAAC;AAEH,eAAO,MAAM,wBAAwB;;;;;;;;;;;;;;;;;;;;;EAOnC,CAAC;AAOH,eAAO,MAAM,oBAAoB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAkB/B,CAAC;AACH,eAAO,MAAM,oBAAoB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAAiC,CAAC;AAInE,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;QA5C9B,2EAA2E;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAqE3E,CAAC;AACH,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;QAtE9B,2EAA2E;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAsEb,CAAC;AAiEjE,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAAuD,CAAC;AAErF,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAAqC,CAAC;AAInE,eAAO,MAAM,uBAAuB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAMqD,CAAC;AAC1F,MAAM,MAAM,qBAAqB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,uBAAuB,CAAC,CAAC;AAI5E,eAAO,MAAM,sBAAsB;;;;;;;;;;;;EAIjC,CAAC;AAiBH,eAAO,MAAM,uBAAuB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAA8D,CAAC;AACnG,eAAO,MAAM,uBAAuB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAA4C,CAAC;AAIjF,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAS3B,CAAC;AACH,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAA6B,CAAC;AAY3D,eAAO,MAAM,qBAAqB;;;;;;;;;;;;;;;;;;;;;;;;EAA4D,CAAC;AAC/F,eAAO,MAAM,qBAAqB;;;;;;;;;;;;;;;;;;;;;EAA0C,CAAC;AAa7E,eAAO,MAAM,qBAAqB;;;;;;;;;;;;;;;;;;;;;;;;;;;EAA4D,CAAC;AAC/F,eAAO,MAAM,qBAAqB;;;;;;;;;;;;;;;;;;;;;;;;EAAsG,CAAC;AAIzI,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;EAO9B,CAAC;AACH,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;EAAuG,CAAC;AAExI,eAAO,MAAM,qBAAqB;;;;;;EAEhC,CAAC;AAYH,eAAO,MAAM,sBAAsB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EASjC,CAAC;AAEH,eAAO,MAAM,sBAAsB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAOjC,CAAC;AAEH,eAAO,MAAM,uBAAuB;IAClC,uFAAuF;;IAEvF,wEAAwE;;;;;;;;;;;;;;EAIxE,CAAC;AAIH,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;;;;;;;EAOxB,CAAC;AASH,mHAAmH;AACnH,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAW9B,CAAC;AAIH,yEAAyE;AACzE,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;;;;EAQ9B,CAAC;AAEH,mDAAmD;AACnD,eAAO,MAAM,iBAAiB;;;;;;;;;;;;EAI5B,CAAC;AAEH,0CAA0C;AAC1C,eAAO,MAAM,uBAAuB;;;;;;;;;;;;;;;EAKlC,CAAC;AAIH,eAAO,MAAM,mBAAmB;;IAE9B,2FAA2F;;IAE3F,wEAAwE;;IAExE,yFAAyF;;;;;;;;;;;;;;;;;;EAIzF,CAAC;AACH,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;EAAgC,CAAC;AAEjE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AACjE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AACjE,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACvE,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AAEvE,+EAA+E;AAC/E,MAAM,MAAM,kBAAkB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,oBAAoB,CAAC,CAAC;AACtE,MAAM,MAAM,kBAAkB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,oBAAoB,CAAC,CAAC;AACtE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,cAAc,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AAC9D,MAAM,MAAM,cAAc,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AAC9D,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,sBAAsB,CAAC,CAAC;AAC1E,MAAM,MAAM,qBAAqB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,uBAAuB,CAAC,CAAC;AAC5E,MAAM,MAAM,qBAAqB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,uBAAuB,CAAC,CAAC;AAC5E,MAAM,MAAM,cAAc,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AAC9D,MAAM,MAAM,cAAc,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AAC9D,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,sBAAsB,CAAC,CAAC;AAC1E,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,sBAAsB,CAAC,CAAC;AAC1E,MAAM,MAAM,qBAAqB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,uBAAuB,CAAC,CAAC;AAC5E,MAAM,MAAM,WAAW,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,aAAa,CAAC,CAAC;AACxD,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACtE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/schemas/index.ts"],"names":[],"mappings":"AAAA;;;;;;;;;GASG;AACH,OAAO,EAAE,CAAC,EAAE,MAAM,KAAK,CAAC;AAMxB;;;GAGG;AACH,wBAAgB,YAAY,CAAC,CAAC,SAAS,CAAC,CAAC,UAAU,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,OAAO,GAAG,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,CAS1F;AAeD,eAAO,MAAM,oBAAoB,oEAAkE,CAAC;AACpG,eAAO,MAAM,gBAAgB,wCAAsC,CAAC;AAEpE,eAAO,MAAM,sBAAsB;;;;;;;;;;;;EAIjC,CAAC;AAEH,eAAO,MAAM,kBAAkB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAe7B,CAAC;AAEH,eAAO,MAAM,2BAA2B;;;;IAItC,2EAA2E;;;;;;;;;;;;;;;;;;;;;EAK3E,CAAC;AAEH,eAAO,MAAM,wBAAwB;;;;;;;;;;;;;;;;;;;;;EAOnC,CAAC;AAOH,eAAO,MAAM,oBAAoB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAkB/B,CAAC;AACH,eAAO,MAAM,oBAAoB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAAiC,CAAC;AAInE,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;QA5C9B,2EAA2E;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAqE3E,CAAC;AACH,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;QAtE9B,2EAA2E;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAsEb,CAAC;AAmEjE,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAAuD,CAAC;AAErF,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAAqC,CAAC;AAInE,eAAO,MAAM,uBAAuB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAMqD,CAAC;AAC1F,MAAM,MAAM,qBAAqB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,uBAAuB,CAAC,CAAC;AAI5E,eAAO,MAAM,sBAAsB;;;;;;;;;;;;EAIjC,CAAC;AAiBH,eAAO,MAAM,uBAAuB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAA8D,CAAC;AACnG,eAAO,MAAM,uBAAuB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAA4C,CAAC;AAIjF,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAS3B,CAAC;AACH,eAAO,MAAM,gBAAgB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAA6B,CAAC;AAY3D,eAAO,MAAM,qBAAqB;;;;;;;;;;;;;;;;;;;;;;;;EAA4D,CAAC;AAC/F,eAAO,MAAM,qBAAqB;;;;;;;;;;;;;;;;;;;;;EAA0C,CAAC;AAa7E,eAAO,MAAM,qBAAqB;;;;;;;;;;;;;;;;;;;;;;;;;;;EAA4D,CAAC;AAC/F,eAAO,MAAM,qBAAqB;;;;;;;;;;;;;;;;;;;;;;;;EAAsG,CAAC;AAIzI,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;EAO9B,CAAC;AACH,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;EAAuG,CAAC;AAExI,eAAO,MAAM,qBAAqB;;;;;;EAEhC,CAAC;AAYH,eAAO,MAAM,sBAAsB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EASjC,CAAC;AAEH,eAAO,MAAM,sBAAsB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAOjC,CAAC;AAEH,eAAO,MAAM,uBAAuB;IAClC,uFAAuF;;IAEvF,wEAAwE;;;;;;;;;;;;;;EAIxE,CAAC;AAIH,eAAO,MAAM,aAAa;;;;;;;;;;;;;;;;;;;;;EAOxB,CAAC;AASH,mHAAmH;AACnH,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;EAW9B,CAAC;AAIH,yEAAyE;AACzE,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;;;;EAQ9B,CAAC;AAEH,mDAAmD;AACnD,eAAO,MAAM,iBAAiB;;;;;;;;;;;;EAI5B,CAAC;AAEH,0CAA0C;AAC1C,eAAO,MAAM,uBAAuB;;;;;;;;;;;;;;;EAKlC,CAAC;AAIH,eAAO,MAAM,mBAAmB;;IAE9B,2FAA2F;;IAE3F,wEAAwE;;IAExE,yFAAyF;;;;;;;;;;;;;;;;;;EAIzF,CAAC;AACH,eAAO,MAAM,mBAAmB;;;;;;;;;;;;;;;;;;;;;EAAgC,CAAC;AAEjE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AACjE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AACjE,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACvE,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AAEvE,+EAA+E;AAC/E,MAAM,MAAM,kBAAkB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,oBAAoB,CAAC,CAAC;AACtE,MAAM,MAAM,kBAAkB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,oBAAoB,CAAC,CAAC;AACtE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,cAAc,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AAC9D,MAAM,MAAM,cAAc,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AAC9D,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,sBAAsB,CAAC,CAAC;AAC1E,MAAM,MAAM,qBAAqB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,uBAAuB,CAAC,CAAC;AAC5E,MAAM,MAAM,qBAAqB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,uBAAuB,CAAC,CAAC;AAC5E,MAAM,MAAM,cAAc,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AAC9D,MAAM,MAAM,cAAc,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,gBAAgB,CAAC,CAAC;AAC9D,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,qBAAqB,CAAC,CAAC;AACxE,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,sBAAsB,CAAC,CAAC;AAC1E,MAAM,MAAM,oBAAoB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,sBAAsB,CAAC,CAAC;AAC1E,MAAM,MAAM,qBAAqB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,uBAAuB,CAAC,CAAC;AAC5E,MAAM,MAAM,WAAW,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,aAAa,CAAC,CAAC;AACxD,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACpE,MAAM,MAAM,mBAAmB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC;AACtE,MAAM,MAAM,iBAAiB,GAAG,CAAC,CAAC,KAAK,CAAC,OAAO,mBAAmB,CAAC,CAAC"}
@@ -34,6 +34,11 @@ function strictObject(shape) {
34
34
  }
35
35
  const isoString = z.string();
36
36
  const nonEmpty = z.string().min(1);
37
+ /** A date (`2026-10-05`) or date-time (`2026-10-05T17:00`, optionally with `Z` or an offset). */
38
+ const isoDateOrDateTime = z
39
+ .string()
40
+ .regex(/^\d{4}-\d{2}-\d{2}(T\d{2}:\d{2}(:\d{2}(\.\d+)?)?(Z|[+-]\d{2}:\d{2})?)?$/, 'must be an ISO date or date-time')
41
+ .refine((value) => !Number.isNaN(new Date(value).getTime()), 'must be a valid date');
37
42
  export const SemanticStatusSchema = z.enum(['not_started', 'in_progress', 'completed', 'canceled']);
38
43
  export const AuthorTypeSchema = z.enum(['user', 'agent', 'system']);
39
44
  export const StatusDefinitionSchema = strictObject({
@@ -149,6 +154,8 @@ const taskFields = {
149
154
  actualEndDate: isoString.optional(),
150
155
  completedAt: isoString.optional(),
151
156
  dueDate: isoString.optional(),
157
+ deadline: isoDateOrDateTime.optional(),
158
+ isMilestone: z.boolean().optional(),
152
159
  estimatedHours: z.number().nonnegative().optional(),
153
160
  allocation: z.number().gt(0).max(1).optional(),
154
161
  loggedHours: z.number().nonnegative().optional(),