@critical-path/core 0.45.0 → 0.46.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/README.md CHANGED
@@ -355,7 +355,7 @@ const leveled = await engine.calculateCriticalPath('proj_123', { calendars: 'ass
355
355
  console.log(leveled.unleveledProjectEndDate, '->', leveled.projectEndDate);
356
356
  ```
357
357
 
358
- With `calendars: 'assignee'` (or `criticalPathCalendars: 'assignee'` on the engine), each task uses its assignee's schedule, then its team's, then the project calendar. Passes run on dates, slack is measured in each task's calendar, and each calendar is evaluated in its own `timezone` (IANA name; default UTC), including daylight-saving changes. `levelResources: true` additionally delays tasks so nobody works on two at once (priority rule `levelingPriority`, default least slack), reporting `levelingDelayHours` and `waitingOn` per task. Tasks with `allocation` below 1 take that share of their assignee (a 16h task at 0.5 spans 32 working hours); levelling fits them within 100% per person, and `overallocations` lists who is booked above 100% and when. Teams act as pools of `headcount` people (default: member count) shared by team-only tasks and members' own tasks. Finished tasks take no time. `calculatePortfolioCriticalPath({ projectIds })` levels several projects together, sharing people and teams across them.
358
+ With `calendars: 'assignee'` (or `criticalPathCalendars: 'assignee'` on the engine), each task uses its assignee's schedule, then its team's, then the project calendar. Passes run on dates, slack is measured in each task's calendar, and each calendar is evaluated in its own `timezone` (IANA name; default UTC), including daylight-saving changes. `levelResources: true` additionally delays tasks so nobody works on two at once (priority rule `levelingPriority`, default least slack), reporting `levelingDelayHours` and `waitingOn` per task. Tasks with `allocation` below 1 take that share of their assignee (a 16h task at 0.5 spans 32 working hours); levelling fits them within 100% per person, and `overallocations` lists who is booked above 100% and when. Teams act as pools of `headcount` people (default: member count) shared by team-only tasks and members' own tasks. Finished tasks take no time. `calculatePortfolioCriticalPath({ projectIds })` levels several projects together, sharing people and teams across them; `includeHiddenWork` also counts unreadable projects' work as `'hidden'`. `effort: 'remaining'` schedules only what is left on in-progress tasks.
359
359
 
360
360
  ### 9. Fractional Lexical Indexing (Kanban Reordering)
361
361
 
@@ -6,11 +6,14 @@ export declare function getTaskAllocation(task: Task): number;
6
6
  export declare function getTaskElapsedHours(task: Task): number;
7
7
  /** True for completed or canceled tasks (by `semanticStatus`, else the default `done`/`canceled` statuses). */
8
8
  export declare function isTaskFinished(task: Task): boolean;
9
+ /** What effort critical path analysis schedules: the full estimate, or what remains on in-progress tasks. */
10
+ export type EffortBasis = 'estimate' | 'remaining';
9
11
  /**
10
12
  * Working hours critical path analysis schedules for a task: 0 when it is finished (it needs no
11
- * more time and occupies nobody), otherwise its elapsed hours.
13
+ * more time and occupies nobody), otherwise its effort divided by its allocation. With
14
+ * `effort: 'remaining'`, an in-progress task's effort is `max(0, estimate - loggedHours)`.
12
15
  */
13
- export declare function getTaskScheduledHours(task: Task): number;
16
+ export declare function getTaskScheduledHours(task: Task, effort?: EffortBasis): number;
14
17
  export interface CPMOptions {
15
18
  projectStartDate?: string | Date;
16
19
  /** The project calendar. Default: `DEFAULT_WORK_SCHEDULE`. */
@@ -38,6 +41,12 @@ export interface CPMOptions {
38
41
  * due date, then slack) or `'order'` (creation order).
39
42
  */
40
43
  levelingPriority?: LevelingPriority;
44
+ /**
45
+ * `'estimate'` (default) schedules each unfinished task's full estimate. `'remaining'` schedules
46
+ * only what is left on in-progress tasks: `max(0, estimate - loggedHours)`. Finished tasks take
47
+ * no time either way.
48
+ */
49
+ effort?: EffortBasis;
41
50
  }
42
51
  export type LevelingPriority = 'slack' | 'priority' | 'dueDate' | 'order';
43
52
  /** The calendar a task runs on in assignee mode: assignee, then task team, then project. */
@@ -53,6 +62,12 @@ export interface PortfolioProjectInput {
53
62
  projectStartDate?: string | Date;
54
63
  /** The project calendar. Default: `DEFAULT_WORK_SCHEDULE`. */
55
64
  schedule?: WorkSchedule;
65
+ /**
66
+ * Background work: the project's tasks take up people and team capacity but the project is
67
+ * left out of the results. `'hidden'` also replaces its task ids with `'hidden'` wherever they
68
+ * would appear (`waitingOn`, over-allocations); `'visible'` keeps them.
69
+ */
70
+ background?: 'visible' | 'hidden';
56
71
  }
57
72
  export interface PortfolioCPMOptions extends Omit<CPMOptions, 'projectStartDate' | 'schedule'> {
58
73
  /** Project ids in priority order; when levelling, their tasks get people first. Unlisted projects come last. */
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAW3B,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAYvD;AAED,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAEtD;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED;;;GAGG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAExD;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;CACrC;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAmjBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;CACzB;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAqB/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CA4JtB"}
1
+ {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAY3B,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAYvD;AAED,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAEtD;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,GAAG,MAAM,CAM1F;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;CACtB;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAmjBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAsC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CA4JtB"}
@@ -1,4 +1,5 @@
1
1
  import { DEFAULT_WORK_SCHEDULE, addWorkingHours, subtractWorkingHours, getWorkingHoursBetween, nextWorkingTime, previousWorkingTime, parseDate } from './calendar.js';
2
+ import { isTaskInProgress } from '../utils/status.js';
2
3
  export function getTaskDurationHours(task) {
3
4
  if (typeof task.estimatedHours === 'number' && task.estimatedHours >= 0) {
4
5
  return task.estimatedHours;
@@ -29,10 +30,16 @@ export function isTaskFinished(task) {
29
30
  }
30
31
  /**
31
32
  * Working hours critical path analysis schedules for a task: 0 when it is finished (it needs no
32
- * more time and occupies nobody), otherwise its elapsed hours.
33
+ * more time and occupies nobody), otherwise its effort divided by its allocation. With
34
+ * `effort: 'remaining'`, an in-progress task's effort is `max(0, estimate - loggedHours)`.
33
35
  */
34
- export function getTaskScheduledHours(task) {
35
- return isTaskFinished(task) ? 0 : getTaskElapsedHours(task);
36
+ export function getTaskScheduledHours(task, effort = 'estimate') {
37
+ if (isTaskFinished(task))
38
+ return 0;
39
+ if (effort === 'remaining' && isTaskInProgress({ status: task.status, semanticStatus: task.semanticStatus })) {
40
+ return Math.max(0, getTaskDurationHours(task) - (task.loggedHours ?? 0)) / getTaskAllocation(task);
41
+ }
42
+ return getTaskElapsedHours(task);
36
43
  }
37
44
  /** The calendar a task runs on in assignee mode: assignee, then task team, then project. */
38
45
  export function resolveTaskSchedule(task, context) {
@@ -146,7 +153,7 @@ function scheduleOnDates(graph, segments, options, calculatedAt) {
146
153
  const task = taskMap.get(id);
147
154
  return [id, options.calendars === 'assignee' ? resolveTaskSchedule(task, { ...options, schedule: seg.schedule }) : seg.schedule];
148
155
  }));
149
- const durationOf = new Map(taskIds.map((id) => [id, getTaskScheduledHours(taskMap.get(id))]));
156
+ const durationOf = new Map(taskIds.map((id) => [id, getTaskScheduledHours(taskMap.get(id), options.effort)]));
150
157
  const ctx = { taskMap, calendarOf, durationOf, startOf: (id) => segmentOf.get(id).start };
151
158
  const endOfProjects = (dates) => {
152
159
  const ends = new Map(segments.map((seg) => [seg.projectId, latest(seg.taskIds.map((id) => dates.finish.get(id)), seg.start)]));
@@ -519,13 +526,27 @@ export function calculatePortfolioCPM(projects, dependencies, options = {}) {
519
526
  taskIds: p.tasks.map((t) => t.id)
520
527
  }));
521
528
  const result = scheduleOnDates(graph, segments, options, calculatedAt);
522
- const ends = result.projects.map((a) => a.projectEndDate).filter(Boolean).sort();
529
+ // Background projects are dropped from the results; hidden ones also have their task ids redacted.
530
+ const background = new Set(projects.filter((p) => p.background).map((p) => p.projectId));
531
+ const hiddenTasks = new Set(projects.filter((p) => p.background === 'hidden').flatMap((p) => p.tasks.map((t) => t.id)));
532
+ const backgroundTask = new Set(projects.filter((p) => p.background).flatMap((p) => p.tasks.map((t) => t.id)));
533
+ const redact = (id) => (hiddenTasks.has(id) ? 'hidden' : id);
534
+ const redactAll = (list) => list.map((o) => ({ ...o, taskIds: [...new Set(o.taskIds.map(redact))] }));
535
+ const shown = result.projects
536
+ .filter((a) => !background.has(a.projectId))
537
+ .map((a) => ({
538
+ ...a,
539
+ tasks: a.tasks.map((t) => (t.waitingOn ? { ...t, waitingOn: redact(t.waitingOn) } : t)),
540
+ ...(a.overallocations ? { overallocations: redactAll(a.overallocations) } : {})
541
+ }));
542
+ const ends = shown.map((a) => a.projectEndDate).filter(Boolean).sort();
523
543
  return {
524
544
  calculatedAt,
525
- projects: result.projects,
545
+ projects: shown,
526
546
  ...(ends.length ? { projectEndDate: ends[ends.length - 1] } : {}),
527
547
  ...(options.levelResources ? { leveled: true } : {}),
528
- overallocations: result.overallocations
548
+ // Only periods that involve a task in the results; other projects' own clashes are not reported.
549
+ overallocations: redactAll(result.overallocations.filter((o) => o.taskIds.some((id) => !backgroundTask.has(id))))
529
550
  };
530
551
  }
531
552
  /**
@@ -563,7 +584,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
563
584
  const earlyFinish = new Map();
564
585
  for (const id of topoOrder) {
565
586
  const task = taskMap.get(id);
566
- const duration = getTaskScheduledHours(task);
587
+ const duration = getTaskScheduledHours(task, options.effort);
567
588
  const prereqs = prerequisites.get(id) || new Set();
568
589
  let maxPrereqFinish = 0;
569
590
  for (const p of prereqs) {
@@ -591,7 +612,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
591
612
  for (let i = topoOrder.length - 1; i >= 0; i--) {
592
613
  const id = topoOrder[i];
593
614
  const task = taskMap.get(id);
594
- const duration = getTaskScheduledHours(task);
615
+ const duration = getTaskScheduledHours(task, options.effort);
595
616
  const succs = successors.get(id) || new Set();
596
617
  let minSuccLateStart = totalDurationHours;
597
618
  if (succs.size > 0) {
@@ -626,7 +647,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
626
647
  criticalTaskIds.push(id);
627
648
  }
628
649
  const task = taskMap.get(id);
629
- const duration = getTaskScheduledHours(task);
650
+ const duration = getTaskScheduledHours(task, options.effort);
630
651
  const earlyStartDate = projectStartDate
631
652
  ? addWorkingHours(projectStartDate, es, schedule).toISOString()
632
653
  : undefined;
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACV,MAAM,eAAe,CAAC;AAEvB,MAAM,UAAU,oBAAoB,CAAC,IAAU;IAC7C,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,kEAAkE;IAClE,OAAO,CAAC,CAAC;AACX,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU;IAC5C,OAAO,oBAAoB,CAAC,IAAI,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AAC9D,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAED;;;GAGG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU;IAC9C,OAAO,cAAc,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,CAAC,CAAC;AAC9D,CAAC;AAiCD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAYrH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,IAAI,QAAQ,GAAkB,IAAI,CAAC;QACnC,IAAI,QAAQ,GAAkB,IAAI,CAAC;QAEnC,IAAI,GAAG,CAAC,IAAI,KAAK,UAAU,EAAE,CAAC;YAC5B,gEAAgE;YAChE,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;YAC/B,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;QACxB,CAAC;aAAM,IAAI,GAAG,CAAC,IAAI,KAAK,YAAY,EAAE,CAAC;YACrC,mEAAmE;YACnE,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;YACtB,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;QACjC,CAAC;QAED,IAAI,QAAQ,IAAI,QAAQ,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACpG,aAAa,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YAC3C,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,mFAAmF;IACnF,IAAI,SAAS,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC;gBAC5B,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACrB,CAAC;QACH,CAAC;IACH,CAAC;IAED,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,CAAC;AACpE,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/F,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK,EAAE,CAAC;IACxG,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE,CACrH,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,CAAC;IAErD,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAeD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,OAAO,MAAM,CACX,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,CAAC;AACJ,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC5C,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IACzE,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,+EAA+E;AAC/E,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC1C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAChD,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAgBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAClC,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACvE,MAAM,IAAI,GAAG,MAAM,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IAClF,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,MAAM,CAAC,QAAQ;QACzB,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,eAAe,EAAE,MAAM,CAAC,eAAe;KACxC,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IACnG,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5H,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,CAAC,CAAC;QAC7C,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,CAAC,CAAC;QAC7C,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,gBAAgB,CAAC;QAC5B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,CAAC,CAAC;QAE7C,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC"}
1
+ {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACV,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,gBAAgB,EAAE,MAAM,oBAAoB,CAAC;AAEtD,MAAM,UAAU,oBAAoB,CAAC,IAAU;IAC7C,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,kEAAkE;IAClE,OAAO,CAAC,CAAC;AACX,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU;IAC5C,OAAO,oBAAoB,CAAC,IAAI,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AAC9D,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAKD;;;;GAIG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU,EAAE,SAAsB,UAAU;IAChF,IAAI,cAAc,CAAC,IAAI,CAAC;QAAE,OAAO,CAAC,CAAC;IACnC,IAAI,MAAM,KAAK,WAAW,IAAI,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,cAAc,EAAE,IAAI,CAAC,cAAc,EAAE,CAAC,EAAE,CAAC;QAC7G,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;IACrG,CAAC;IACD,OAAO,mBAAmB,CAAC,IAAI,CAAC,CAAC;AACnC,CAAC;AAuCD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAYrH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,IAAI,QAAQ,GAAkB,IAAI,CAAC;QACnC,IAAI,QAAQ,GAAkB,IAAI,CAAC;QAEnC,IAAI,GAAG,CAAC,IAAI,KAAK,UAAU,EAAE,CAAC;YAC5B,gEAAgE;YAChE,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;YAC/B,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;QACxB,CAAC;aAAM,IAAI,GAAG,CAAC,IAAI,KAAK,YAAY,EAAE,CAAC;YACrC,mEAAmE;YACnE,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;YACtB,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;QACjC,CAAC;QAED,IAAI,QAAQ,IAAI,QAAQ,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACpG,aAAa,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YAC3C,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,mFAAmF;IACnF,IAAI,SAAS,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC;gBAC5B,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACrB,CAAC;QACH,CAAC;IACH,CAAC;IAED,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,CAAC;AACpE,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/G,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK,EAAE,CAAC;IACxG,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE,CACrH,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,CAAC;IAErD,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAeD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,OAAO,MAAM,CACX,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,CAAC;AACJ,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC5C,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IACzE,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,+EAA+E;AAC/E,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC1C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAChD,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAsBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAClC,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IAEvE,mGAAmG;IACnG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACzF,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IACxH,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC9G,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACrE,MAAM,SAAS,GAAG,CAAC,IAAsB,EAAE,EAAE,CAC3C,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,CAAC,GAAG,IAAI,GAAG,CAAC,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC5E,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ;SAC1B,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;SAC3C,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACX,GAAG,CAAC;QACJ,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACvF,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAChF,CAAC,CAAC,CAAC;IAEN,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IACxE,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,KAAK;QACf,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,iGAAiG;QACjG,eAAe,EAAE,SAAS,CAAC,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;KAClH,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IACnG,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5H,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,gBAAgB,CAAC;QAC5B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAE7D,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC"}
@@ -10,6 +10,12 @@ export interface PortfolioCriticalPathOptions extends CPMOptions {
10
10
  projectIds?: string[];
11
11
  /** Project ids in priority order for levelling; unlisted projects come last. */
12
12
  projectOrder?: string[];
13
+ /**
14
+ * Also count work from every other project in the caller's tenant (including ones they cannot
15
+ * read) toward people's and teams' capacity, without including those projects in the results.
16
+ * Tasks from unreadable projects appear only as `'hidden'`. Requires `workspace.manage`.
17
+ */
18
+ includeHiddenWork?: boolean;
13
19
  }
14
20
  import { type MetricOptions } from '../domain/metrics.js';
15
21
  export declare class CriticalPathEngine {
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,QAAQ,EACR,IAAI,EACJ,KAAK,EAEL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EAEf,qBAAqB,EACrB,SAAS,EACT,OAAO,EACP,aAAa,EACb,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,6BAA6B,EAC7B,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,KAAK,aAAa,EAAE,KAAK,IAAI,EAAE,KAAK,SAAS,EAAE,MAAM,mBAAmB,CAAC;AACjH,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EAuCf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAE,iBAAiB,EAAoB,MAAM,2BAA2B,CAAC;AAIhF,OAAO,EAAuC,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAExF,oDAAoD;AACpD,MAAM,WAAW,4BAA6B,SAAQ,UAAU;IAC9D,uEAAuE;IACvE,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,gFAAgF;IAChF,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAGD,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAM9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,+GAA+G;IAC/G,SAAgB,QAAQ,EAAE,iBAAiB,CAAC;IAC5C,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;IAC9B,wFAAwF;IACxF,OAAO,CAAC,QAAQ,CAAC,qBAAqB,CAAC,CAAU;gBAErC,MAAM,GAAE,kBAAuB;IAoC3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,iEAAiE;YACnD,YAAY;IAQ1B,OAAO,CAAC,SAAS;IAMjB;;;OAGG;IACH,OAAO,KAAK,SAAS,GAEpB;IAED,gGAAgG;IAChG,OAAO,CAAC,QAAQ,CAAC,cAAc,CAAC,CAAuB;IAEvD;;;;;OAKG;YACW,aAAa;IAwC3B,qGAAqG;IACrG,OAAO,CAAC,QAAQ;IAOhB,OAAO,CAAC,aAAa;YAKP,SAAS;IAWvB;;;OAGG;IACH,OAAO,CAAC,QAAQ,CAAC,cAAc,CAAwC;IAEvE,OAAO,CAAC,YAAY;IAepB,yFAAyF;YAC3E,eAAe;YAOf,cAAc;IAK5B;;;OAGG;YACW,oBAAoB;YAapB,sBAAsB;IAIpC,kGAAkG;YACpF,cAAc;YAgBd,eAAe;YAIf,kBAAkB;YAMlB,qBAAqB;IAInC,wFAAwF;IACxF,OAAO,CAAC,aAAa;YAMP,UAAU;YASV,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAKjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA4BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAiBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAOjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAK/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IA+BzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA+BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAInC,gBAAgB;IA6CxB,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAMnD;;;OAGG;IACG,UAAU,CAAC,KAAK,GAAE,SAAc,GAAG,OAAO,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAQ5D,sFAAsF;IAChF,eAAe,CAAC,KAAK,GAAE,aAAkB,GAAG,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAW3D,kBAAkB;IAK1B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IA+ErD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EACtB,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YA8TT,8BAA8B;IAyE5C;;;;OAIG;IACG,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,GAAE;QAAE,QAAQ,CAAC,EAAE,QAAQ,GAAG,QAAQ,CAAA;KAAO,GAAG,OAAO,CAAC,OAAO,CAAC;YAIlF,aAAa;IAsC3B,mFAAmF;YACrE,kBAAkB;IAiChC,sGAAsG;IAChG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB9C,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA8B7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAgCpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IA4C1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAM/C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKpF,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,UAAU,CACd,KAAK,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAC1F,OAAO,CAAC,OAAO,CAAC;IA0Bb,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4B7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8CzG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC5G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAUlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;YAM7C,uBAAuB;IAO/B,gBAAgB,CACpB,KAAK,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,YAAY,CAAC,GAAG;QAAE,UAAU,CAAC,EAAE,MAAM,CAAA;KAAE,GACjG,OAAO,CAAC,UAAU,CAAC;IAwBhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsC9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IAuChB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiCrD;;;;OAIG;IACG,+BAA+B,CAAC,OAAO,EAAE;QAC7C,SAAS,EAAE,MAAM,CAAC;QAClB,QAAQ,EAAE,MAAM,CAAC;QACjB,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,gBAAgB,CAAC,EAAE,MAAM,CAAC;KAC3B,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAkBlC,6FAA6F;IAC7F,OAAO,CAAC,mBAAmB;IAgB3B;;;;OAIG;YACW,uBAAuB;IAW/B,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAKzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAgBpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAiBxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAMvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAgBjG,gGAAgG;IAC1F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAIrC,kBAAkB;IAoBhC,gGAAgG;YAClF,mBAAmB;IAW3B,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAMvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAiDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAIvC,oBAAoB;IA6B5B,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAMnD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAwBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAuCzF,6FAA6F;IACvF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAIrC,kBAAkB;IAkB1B,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAqBhC;;;;;;;OAOG;IACG,8BAA8B,CAAC,OAAO,GAAE,4BAAiC,GAAG,OAAO,CAAC,6BAA6B,CAAC;IAyCxH,4EAA4E;IAC5E,OAAO,CAAC,eAAe;IAgBvB,oDAAoD;YACtC,gBAAgB;IAQ9B,sFAAsF;YACxE,UAAU;IAOlB,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAyDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IA4BhC;;;OAGG;IACG,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAUjC,sFAAsF;YACxE,eAAe;IAS7B,OAAO,CAAC,eAAe;IAIvB,mGAAmG;IAC7F,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAMvC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAM3D;;;OAGG;IACG,aAAa,CAAC,KAAK,EAAE;QACzB,IAAI,EAAE,MAAM,CAAC;QACb,GAAG,EAAE,MAAM,CAAC;QACZ,MAAM,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,MAAM,CAAC,EAAE,OAAO,CAAC;KAClB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAgBjD,aAAa,CACjB,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,OAAO,EAAE,MAAM,GAAG,KAAK,GAAG,QAAQ,GAAG,QAAQ,GAAG,QAAQ,CAAC,CAAC,GAC/E,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAY1B,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOjD,OAAO,CAAC,kBAAkB;IAQ1B,2FAA2F;YAC7E,kBAAkB;CAkBjC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,QAAQ,EACR,IAAI,EACJ,KAAK,EAEL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EAEf,qBAAqB,EACrB,SAAS,EACT,OAAO,EACP,aAAa,EACb,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,6BAA6B,EAC7B,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,KAAK,aAAa,EAAE,KAAK,IAAI,EAAE,KAAK,SAAS,EAAE,MAAM,mBAAmB,CAAC;AACjH,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EAuCf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAE,iBAAiB,EAAoB,MAAM,2BAA2B,CAAC;AAIhF,OAAO,EAAuC,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAExF,oDAAoD;AACpD,MAAM,WAAW,4BAA6B,SAAQ,UAAU;IAC9D,uEAAuE;IACvE,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,gFAAgF;IAChF,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;IACxB;;;;OAIG;IACH,iBAAiB,CAAC,EAAE,OAAO,CAAC;CAC7B;AAGD,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAM9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,+GAA+G;IAC/G,SAAgB,QAAQ,EAAE,iBAAiB,CAAC;IAC5C,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;IAC9B,wFAAwF;IACxF,OAAO,CAAC,QAAQ,CAAC,qBAAqB,CAAC,CAAU;gBAErC,MAAM,GAAE,kBAAuB;IAoC3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,iEAAiE;YACnD,YAAY;IAQ1B,OAAO,CAAC,SAAS;IAMjB;;;OAGG;IACH,OAAO,KAAK,SAAS,GAEpB;IAED,gGAAgG;IAChG,OAAO,CAAC,QAAQ,CAAC,cAAc,CAAC,CAAuB;IAEvD;;;;;OAKG;YACW,aAAa;IAwC3B,qGAAqG;IACrG,OAAO,CAAC,QAAQ;IAOhB,OAAO,CAAC,aAAa;YAKP,SAAS;IAWvB;;;OAGG;IACH,OAAO,CAAC,QAAQ,CAAC,cAAc,CAAwC;IAEvE,OAAO,CAAC,YAAY;IAepB,yFAAyF;YAC3E,eAAe;YAOf,cAAc;IAK5B;;;OAGG;YACW,oBAAoB;YAapB,sBAAsB;IAIpC,kGAAkG;YACpF,cAAc;YAgBd,eAAe;YAIf,kBAAkB;YAMlB,qBAAqB;IAInC,wFAAwF;IACxF,OAAO,CAAC,aAAa;YAMP,UAAU;YASV,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAKjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA4BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAiBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAOjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAK/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IA+BzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA+BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAInC,gBAAgB;IA6CxB,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAMnD;;;OAGG;IACG,UAAU,CAAC,KAAK,GAAE,SAAc,GAAG,OAAO,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAQ5D,sFAAsF;IAChF,eAAe,CAAC,KAAK,GAAE,aAAkB,GAAG,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAW3D,kBAAkB;IAK1B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IA+ErD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EACtB,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YA8TT,8BAA8B;IAyE5C;;;;OAIG;IACG,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,GAAE;QAAE,QAAQ,CAAC,EAAE,QAAQ,GAAG,QAAQ,CAAA;KAAO,GAAG,OAAO,CAAC,OAAO,CAAC;YAIlF,aAAa;IAsC3B,mFAAmF;YACrE,kBAAkB;IAiChC,sGAAsG;IAChG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB9C,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA8B7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAgCpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IA4C1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAM/C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKpF,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,UAAU,CACd,KAAK,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAC1F,OAAO,CAAC,OAAO,CAAC;IA0Bb,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4B7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8CzG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC5G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAUlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;YAM7C,uBAAuB;IAO/B,gBAAgB,CACpB,KAAK,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,YAAY,CAAC,GAAG;QAAE,UAAU,CAAC,EAAE,MAAM,CAAA;KAAE,GACjG,OAAO,CAAC,UAAU,CAAC;IAwBhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsC9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IAuChB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiCrD;;;;OAIG;IACG,+BAA+B,CAAC,OAAO,EAAE;QAC7C,SAAS,EAAE,MAAM,CAAC;QAClB,QAAQ,EAAE,MAAM,CAAC;QACjB,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,gBAAgB,CAAC,EAAE,MAAM,CAAC;KAC3B,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAkBlC,6FAA6F;IAC7F,OAAO,CAAC,mBAAmB;IAgB3B;;;;OAIG;YACW,uBAAuB;IAW/B,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAKzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAgBpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAiBxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAMvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAgBjG,gGAAgG;IAC1F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAIrC,kBAAkB;IAoBhC,gGAAgG;YAClF,mBAAmB;IAW3B,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAMvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAiDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAIvC,oBAAoB;IA6B5B,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAMnD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAwBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAuCzF,6FAA6F;IACvF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAIrC,kBAAkB;IAkB1B,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAsBhC;;;;;;;OAOG;IACG,8BAA8B,CAAC,OAAO,GAAE,4BAAiC,GAAG,OAAO,CAAC,6BAA6B,CAAC;IAsDxH,4EAA4E;IAC5E,OAAO,CAAC,eAAe;IAoBvB,oDAAoD;YACtC,gBAAgB;IAQ9B,sFAAsF;YACxE,UAAU;IAOlB,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAyDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IA4BhC;;;OAGG;IACG,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAUjC,sFAAsF;YACxE,eAAe;IAS7B,OAAO,CAAC,eAAe;IAIvB,mGAAmG;IAC7F,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAMvC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAM3D;;;OAGG;IACG,aAAa,CAAC,KAAK,EAAE;QACzB,IAAI,EAAE,MAAM,CAAC;QACb,GAAG,EAAE,MAAM,CAAC;QACZ,MAAM,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,MAAM,CAAC,EAAE,OAAO,CAAC;KAClB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAgBjD,aAAa,CACjB,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,OAAO,EAAE,MAAM,GAAG,KAAK,GAAG,QAAQ,GAAG,QAAQ,GAAG,QAAQ,CAAC,CAAC,GAC/E,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAY1B,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOjD,OAAO,CAAC,kBAAkB;IAQ1B,2FAA2F;YAC7E,kBAAkB;CAkBjC"}
@@ -1974,9 +1974,9 @@ export class CriticalPathEngine {
1974
1974
  const dependencies = await this.loadDependencies(tasks);
1975
1975
  const schedule = options.schedule || project?.schedule || this.config.defaultSchedule;
1976
1976
  const projectStartDate = options.projectStartDate || project?.startDate;
1977
- const { calendars, levelResources, levelingPriority } = this.resolveCpmModes(options);
1977
+ const { calendars, levelResources, levelingPriority, effort } = this.resolveCpmModes(options);
1978
1978
  if (calendars === 'project')
1979
- return calculateCPM(projectId, tasks, dependencies, { schedule, projectStartDate });
1979
+ return calculateCPM(projectId, tasks, dependencies, { schedule, projectStartDate, effort });
1980
1980
  const { users, teams } = await this.loadPeople(options, [project?.tenantId]);
1981
1981
  return calculateCPM(projectId, tasks, dependencies, {
1982
1982
  schedule,
@@ -1985,7 +1985,8 @@ export class CriticalPathEngine {
1985
1985
  users,
1986
1986
  teams,
1987
1987
  levelResources,
1988
- levelingPriority
1988
+ levelingPriority,
1989
+ effort
1989
1990
  });
1990
1991
  }
1991
1992
  /**
@@ -1997,7 +1998,7 @@ export class CriticalPathEngine {
1997
1998
  * Rejects runs above `portfolioTaskLimit` tasks (default 5000).
1998
1999
  */
1999
2000
  async calculatePortfolioCriticalPath(options = {}) {
2000
- const { calendars, levelResources, levelingPriority } = this.resolveCpmModes(options);
2001
+ const { calendars, levelResources, levelingPriority, effort } = this.resolveCpmModes(options);
2001
2002
  let projects;
2002
2003
  if (options.projectIds) {
2003
2004
  const ids = [...new Set(options.projectIds)];
@@ -2015,7 +2016,17 @@ export class CriticalPathEngine {
2015
2016
  else {
2016
2017
  projects = await this.getProjects();
2017
2018
  }
2018
- const tasksByProject = await Promise.all(projects.map((p) => this.store.getTasks(p.id)));
2019
+ let background = [];
2020
+ if (options.includeHiddenWork) {
2021
+ await this.requireWorkspaceAccess('workspace.manage');
2022
+ const tenantId = this.actor?.tenantId;
2023
+ const inResults = new Set(projects.map((p) => p.id));
2024
+ const readable = new Set((await this.getProjects()).map((p) => p.id));
2025
+ background = (await this.store.getProjects(tenantId ? { tenantId } : undefined))
2026
+ .filter((p) => !inResults.has(p.id))
2027
+ .map((project) => ({ project, mode: readable.has(project.id) ? 'visible' : 'hidden' }));
2028
+ }
2029
+ const tasksByProject = await Promise.all([...projects, ...background.map((b) => b.project)].map((p) => this.store.getTasks(p.id)));
2019
2030
  const total = tasksByProject.reduce((sum, tasks) => sum + tasks.length, 0);
2020
2031
  const limit = this.config.portfolioTaskLimit ?? 5000;
2021
2032
  if (total > limit) {
@@ -2026,12 +2037,14 @@ export class CriticalPathEngine {
2026
2037
  // Dependencies on tasks outside the included projects are dropped, like those projects.
2027
2038
  const dependencies = (await this.loadDependencies(allTasks)).filter((d) => included.has(d.taskId) && included.has(d.dependsOnTaskId));
2028
2039
  const { users, teams } = calendars === 'assignee' ? await this.loadPeople(options, projects.map((p) => p.tenantId)) : { users: [], teams: [] };
2029
- return calculatePortfolioCPM(projects.map((p, i) => ({
2040
+ const inputs = [...projects.map((project) => ({ project, mode: undefined })), ...background];
2041
+ return calculatePortfolioCPM(inputs.map(({ project: p, mode }, i) => ({
2030
2042
  projectId: p.id,
2031
2043
  tasks: tasksByProject[i],
2032
2044
  projectStartDate: p.startDate || options.projectStartDate,
2033
- schedule: p.schedule || options.schedule || this.config.defaultSchedule
2034
- })), dependencies, { calendars, users, teams, levelResources, levelingPriority, projectOrder: options.projectOrder });
2045
+ schedule: p.schedule || options.schedule || this.config.defaultSchedule,
2046
+ ...(mode ? { background: mode } : {})
2047
+ })), dependencies, { calendars, users, teams, levelResources, levelingPriority, effort, projectOrder: options.projectOrder });
2035
2048
  }
2036
2049
  /** Validated calendar and levelling modes, with engine defaults applied. */
2037
2050
  resolveCpmModes(options) {
@@ -2047,7 +2060,11 @@ export class CriticalPathEngine {
2047
2060
  if (levelingPriority && !['slack', 'priority', 'dueDate', 'order'].includes(levelingPriority)) {
2048
2061
  throw new ValidationError(`Unknown levelingPriority "${levelingPriority}"; use "slack", "priority", "dueDate" or "order".`);
2049
2062
  }
2050
- return { calendars, levelResources, levelingPriority };
2063
+ const effort = options.effort ?? this.config.criticalPathEffort ?? 'estimate';
2064
+ if (effort !== 'estimate' && effort !== 'remaining') {
2065
+ throw new ValidationError(`Unknown effort "${effort}"; use "estimate" or "remaining".`);
2066
+ }
2067
+ return { calendars, levelResources, levelingPriority, effort };
2051
2068
  }
2052
2069
  /** Every dependency touching `tasks`, once each. */
2053
2070
  async loadDependencies(tasks) {
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AA0CA,OAAO,EAAkB,aAAa,EAAiD,MAAM,mBAAmB,CAAC;AACjH,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EAuCf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,8BAA8B,EAAE,MAAM,4BAA4B,CAAC;AACvG,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,eAAe,EAAE,aAAa,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrF,OAAO,EAAE,iBAAiB,EAAE,gBAAgB,EAAE,MAAM,2BAA2B,CAAC;AAChF,OAAO,EAAE,eAAe,EAAE,mBAAmB,EAAE,MAAM,4BAA4B,CAAC;AAClF,OAAO,EAAE,qBAAqB,EAAE,MAAM,0BAA0B,CAAC;AAEjE,OAAO,EAAE,YAAY,EAAE,qBAAqB,EAAmB,MAAM,kBAAkB,CAAC;AASxF,OAAO,EAAE,gBAAgB,EAAE,MAAM,qBAAqB,CAAC;AACvD,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,wGAAwG;AACxG,MAAM,kBAAkB,GAAG,MAAM,CAAC,IAAI,CAAC,gBAAgB,CAAC,KAAK,CAA2C,CAAC;AAEzG,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvC,+GAA+G;IAC/F,QAAQ,CAAoB;IAC5B,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IACzD,2FAA2F;IAC3E,KAAK,CAAS;IAC9B,wFAAwF;IACvE,qBAAqB,CAAW;IAEjD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,MAAM,CAAC,KAAK,KAAK,SAAS,IAAI,CAAC,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI,CAAC,EAAE,CAAC;YAC9F,0EAA0E;YAC1E,MAAM,IAAI,KAAK,CACb,yHAAyH,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,KAAK,CAAC,GAAG,CACzJ,CAAC;QACJ,CAAC;QACD,IAAI,CAAC,KAAK,GAAG,MAAM,CAAC,KAAK,IAAI,IAAI,aAAa,EAAE,CAAC;QAEjD,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QACnC,IAAI,CAAC,QAAQ,GAAG,IAAI,iBAAiB,CACnC;YACE,YAAY,EAAE,GAAG,EAAE,CAAC,IAAI,CAAC,eAAe,EAAE;YAC1C,aAAa,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC;SACzD,EACD,MAAM,CAAC,eAAe,CACvB,CAAC;QACF,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC,GAAG,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QACnE,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC,GAAG,EAAE,CAAC,KAAK,EAAE,EAAE;YACnC,IAAI,KAAK,CAAC,IAAI,CAAC,UAAU,CAAC,OAAO,CAAC;gBAAE,IAAI,CAAC,cAAc,CAAC,KAAK,EAAE,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;QACrC,yGAAyG;QACzG,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,EAAE,GAAE,CAAC,CAAC,CAAC;IAC7B,CAAC;IAED;;;;;;OAMG;IACH,SAAS,CAAC,KAAY;QACpB,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACzD,MAAM,CAAC,cAAc,CAAC,MAAM,EAAE,OAAO,EAAE,EAAE,KAAK,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,GAAG,KAAK,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACjG,OAAO,MAAM,CAAC;IAChB,CAAC;IAED,iEAAiE;IACzD,KAAK,CAAC,YAAY,CAAoC,KAAmC;QAC/F,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC;YACxB,GAAG,KAAK;YACR,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SAChC,CAAC,CAAC;IACV,CAAC;IAEO,SAAS,CAAC,QAAgB;QAChC,OAAO,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;IACxC,CAAC;IAED,sFAAsF;IAEtF;;;OAGG;IACH,IAAY,SAAS;QACnB,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,qBAAqB,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,SAAS,IAAI,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC;IAC3G,CAAC;IAED,gGAAgG;IAC/E,cAAc,CAAwB;IAEvD;;;;;OAKG;IACK,KAAK,CAAC,aAAa,CAAI,EAA8C;QAC3E,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,WAAW;YAAE,OAAO,EAAE,CAAC,IAAI,CAAC,CAAC;QACpE,MAAM,OAAO,GAAyB,EAAE,CAAC;QACzC,MAAM,KAAK,GAAG,CAAmB,MAAS,EAAE,OAAiB,EAAK,EAAE,CAClE,IAAI,KAAK,CAAC,MAAM,EAAE;YAChB,GAAG,CAAC,CAAC,EAAE,QAAQ;gBACb,MAAM,KAAK,GAAG,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,QAAQ,CAAC,CAAC;gBACvC,IAAI,OAAO,KAAK,KAAK,UAAU;oBAAE,OAAO,KAAK,CAAC;gBAC9C,IAAI,OAAO,CAAC,QAAQ,CAAC,QAAkB,CAAC,EAAE,CAAC;oBACzC,OAAO,KAAK,EAAE,GAAG,IAAe,EAAE,EAAE;wBAClC,OAAO,CAAC,IAAI,CAAC,GAAG,EAAE,CAAC,KAAK,CAAC,KAAK,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC,CAAC;oBAC3C,CAAC,CAAC;gBACJ,CAAC;gBACD,OAAO,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACvB,CAAC;SACF,CAAC,CAAC;QAEL,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,KAAK,EAAE,EAAE,EAAE,EAAE;YACvD,OAAO,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC,0BAA0B;YAC9C,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;YACvD,MAAM,CAAC,gBAAgB,CAAC,IAAI,EAAE;gBAC5B,KAAK,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE;gBACpB,cAAc,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE;gBAClC,MAAM,EAAE,EAAE,KAAK,EAAE,KAAK,CAAC,IAAI,CAAC,MAAM,EAAE,CAAC,SAAS,CAAC,CAAC,EAAE;gBAClD,OAAO,EAAE,EAAE,KAAK,EAAE,KAAK,CAAC,IAAI,CAAC,OAAO,EAAE,CAAC,oBAAoB,EAAE,oBAAoB,EAAE,oBAAoB,CAAC,CAAC,EAAE;gBAC3G,WAAW,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,WAAW,IAAI,KAAK,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC,QAAQ,CAAC,CAAC,EAAE;aAChF,CAAC,CAAC;YACH,OAAO,EAAE,CAAC,IAAI,CAAC,CAAC;QAClB,CAAC,CAAC,CAAC;QAEH,KAAK,MAAM,MAAM,IAAI,OAAO,EAAE,CAAC;YAC7B,IAAI,CAAC;gBACH,MAAM,MAAM,EAAE,CAAC;YACjB,CAAC;YAAC,OAAO,KAAK,EAAE,CAAC;gBACf,OAAO,CAAC,IAAI,CAAC,4CAA4C,EAAE,KAAK,CAAC,CAAC;YACpE,CAAC;QACH,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAED,qGAAqG;IAC7F,QAAQ;QACd,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACvD,MAAM,CAAC,cAAc,CAAC,IAAI,EAAE,uBAAuB,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC;QACtE,OAAO,IAAI,CAAC;IACd,CAAC;IAEO,aAAa,CAAC,MAAgD;QACpE,MAAM,MAAM,GAAG,IAAI,CAAC,KAAK,EAAE,QAAQ,CAAC;QACpC,OAAO,CAAC,MAAM,IAAI,MAAM,EAAE,QAAQ,KAAK,MAAM,CAAC;IAChD,CAAC;IAEO,KAAK,CAAC,SAAS,CACrB,MAA2B,EAC3B,OAAiB,EACjB,QAAwE;QAExE,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,IAAI,OAAO,IAAI,CAAC,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC;YAAE,OAAO,KAAK,CAAC;QAC1D,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC;QACrC,OAAO,MAAM,CAAC,CAAC,CAAC,MAAM,MAAM,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAM,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,MAAM,IAAI,CAAC,YAAY,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7H,CAAC;IAED;;;OAGG;IACc,cAAc,GAAG,IAAI,GAAG,EAA6B,CAAC;IAE/D,YAAY;QAClB,IAAI,CAAC,IAAI,CAAC,KAAK;YAAE,OAAO,OAAO,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,GAAG,IAAI,CAAC,KAAK,CAAC;QACxC,MAAM,GAAG,GAAG,GAAG,QAAQ,IAAI,EAAE,IAAI,MAAM,EAAE,CAAC;QAC1C,IAAI,KAAK,GAAG,IAAI,CAAC,cAAc,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;QACzC,IAAI,CAAC,KAAK,EAAE,CAAC;YACX,KAAK,GAAG,IAAI,CAAC,KAAK;iBACf,QAAQ,EAAE;iBACV,IAAI,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,IAAI,SAAS,CAAC,KAAK,QAAQ,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YAC7H,IAAI,CAAC,cAAc,CAAC,GAAG,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;YACpC,KAAK,CAAC,KAAK,CAAC,GAAG,EAAE,CAAC,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;QACrD,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;IAED,yFAAyF;IACjF,KAAK,CAAC,eAAe,CAAC,SAA6B;QACzD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAC1B,OAAO,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC;IAC1E,CAAC;IAEO,KAAK,CAAC,cAAc,CAAC,SAA6B;QACxD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,OAAO,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC,KAAK,IAAI,CAAC;IAC1D,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,oBAAoB,CAChC,MAA2B,EAC3B,SAA6B,EAC7B,QAAwE;QAExE,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO;QAC5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QACtD,IAAI,CAAC,OAAO;YAAE,MAAM,IAAI,aAAa,CAAC,YAAY,SAAS,cAAc,CAAC,CAAC;QAC3E,IAAI,MAAM,KAAK,cAAc,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,OAAO,EAAE,QAAQ,CAAC,CAAC,EAAE,CAAC;YACpF,MAAM,IAAI,cAAc,CAAC,kBAAkB,MAAM,gBAAgB,SAAS,IAAI,CAAC,CAAC;QAClF,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,sBAAsB,CAAC,MAA6C;QAChF,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC;YAAE,MAAM,IAAI,cAAc,CAAC,kBAAkB,MAAM,GAAG,CAAC,CAAC;IAC7F,CAAC;IAED,kGAAkG;IAC1F,KAAK,CAAC,cAAc,CAC1B,KAAU,EACV,WAA0E;QAE1E,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,KAAK,CAAC;QAClC,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAmB,CAAC;QAC5C,MAAM,MAAM,GAAQ,EAAE,CAAC;QACvB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,MAAM,WAAW,CAAC,IAAI,CAAC,CAAC;YAC1C,IAAI,CAAC,SAAS;gBAAE,SAAS;YACzB,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC,CAAC;YAC5F,IAAI,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC;gBAAE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACjD,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,MAA0B;QACtD,OAAO,MAAM,CAAC,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC;IAC5E,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,SAA6B;QAC5D,IAAI,CAAC,SAAS;YAAE,OAAO,SAAS,CAAC;QACjC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,OAAO,IAAI,CAAC,eAAe,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAC/C,CAAC;IAEO,KAAK,CAAC,qBAAqB,CAAC,CAA8D;QAChG,OAAO,CAAC,CAAC,SAAS,IAAI,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,IAAI,CAAC,kBAAkB,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IAC/G,CAAC;IAED,wFAAwF;IAChF,aAAa,CAAkC,OAAU;QAC/D,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,IAAI,OAAO,CAAC;YAAE,OAAO,OAAO,CAAC;QAC5D,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,GAAG,IAAI,EAAE,GAAG,OAAO,CAAC;QAChD,OAAO,IAAS,CAAC;IACnB,CAAC;IAEO,KAAK,CAAC,UAAU,CAAC,MAA0B;QACjD,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,MAAM,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACjD,CAAC;QACD,KAAK,MAAM,MAAM,IAAI,IAAI,CAAC,OAAO,CAAC,UAAU,EAAE,EAAE,CAAC;YAC/C,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC;QAC5B,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,OAAO,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,OAAO,QAAQ,IAAI,IAAI,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,GAAG,QAAQ,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,QAAQ,EAAE,CAAC,CAAC;QACjI,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAC5C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,OAAO,GAAG,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAC5C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QAEtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC9E,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,6DAA6D;QAC7D,MAAM,SAAS,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,EAAE,QAAQ,CAAC,CAAC;QACpG,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,sEAAsE;QACtE,MAAM,QAAQ,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACnF,OAAO,IAAI,CAAC,cAAc,CAAC,QAAQ,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACpD,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACtD,OAAO,IAAI,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,IAAI,CAAC,sBAAsB,CAAC,gBAAgB,CAAC,CAAC;QACpD,8BAA8B,CAAC,OAAO,CAAC,sBAAsB,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACnG,kGAAkG;QAClG,MAAM,KAAK,GAAG,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,EAAE,CAAC;QAC5F,mDAAmD;QACnD,IAAI,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,KAAK,CAAC,OAAO,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,IAAI,CAAC,KAAM,CAAC,MAAM,CAAC,EAAE,CAAC;YACpH,KAAK,CAAC,OAAO,GAAG,CAAC,GAAG,CAAC,KAAK,CAAC,OAAO,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QAC3F,CAAC;QACD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QACtD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,OAAO,IAAI,QAAQ,CAAC;YACpD,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACtD,IAAI,SAAS,IAAI,OAAO;YAAE,MAAM,IAAI,CAAC,oBAAoB,CAAC,wBAAwB,EAAE,EAAE,CAAC,CAAC;QACxF,8BAA8B,CAAC,OAAO,CAAC,sBAAsB,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACnG,OAAO,GAAG,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC,CAAC;IACrE,CAAC;IAEO,KAAK,CAAC,gBAAgB,CAAC,EAAU;QACvC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACtD,yFAAyF;QACzF,MAAM,OAAO,GAAG,IAAI,CAAC,QAAQ,EAAE,CAAC;QAEhC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC;QAC5C,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,iFAAiF;YACjF,MAAM,OAAO,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACpC,CAAC;QACD,MAAM,cAAc,GAAG,CACrB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,KAAK,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAC5F,CAAC,MAAM,CAAC,CAAC,MAAM,EAAoB,EAAE,CAAC,MAAM,KAAK,IAAI,CAAC,CAAC;QAExD,KAAK,MAAM,SAAS,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;YAAE,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC3G,KAAK,MAAM,SAAS,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;YAAE,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC3G,KAAK,MAAM,WAAW,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC;YAAE,MAAM,OAAO,CAAC,iBAAiB,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAChH,KAAK,MAAM,UAAU,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,EAAE,EAAE,CAAC;YAAE,MAAM,OAAO,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAE3H,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,cAAc,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC7F,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,EAAE;gBACb,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,gBAAgB,EAAE,cAAc,CAAC,MAAM,EAAE;aAC1E,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,IAAI,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,OAAO,SAAS,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,KAAK,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;IAC5E,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,QAAmB,EAAE;QACpC,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;YACpB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QACrG,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,MAAM,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IAC1G,CAAC;IAED,sFAAsF;IACtF,KAAK,CAAC,eAAe,CAAC,QAAuB,EAAE;QAC7C,IAAI,KAAK,CAAC,MAAM,EAAE,CAAC;YACjB,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAChG,CAAC;QACD,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;YACpB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAC1G,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC;QAC9D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,MAAM,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IAC/G,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,SAAoB;QACnD,MAAM,QAAQ,GAAG,CAAC,MAAM,IAAI,CAAC,WAAW,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QAC7D,OAAO,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,QAAQ,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC;IAChF,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,CAAC,UAAU,EAAE,CAAC;YACxC,SAAS,GAAG,EAAE,GAAG,SAAS,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC;QAC9D,CAAC;QACD,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,IAAI,cAAc,CAAC,SAAS,IAAI,cAAc,CAAC,SAAS,KAAK,SAAS,CAAC,SAAS,EAAE,CAAC;YACjF,MAAM,IAAI,eAAe,CAAC,oEAAoE,CAAC,CAAC;QAClG,CAAC;QACD,MAAM,SAAS,GAAG,SAAS,CAAC,SAAS,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,4FAA4F;QAC5F,0EAA0E;QAC1E,MAAM,KAAK,GAA6B,EAAE,CAAC;QAC3C,KAAK,MAAM,KAAK,IAAI,kBAAkB,EAAE,CAAC;YACvC,MAAM,KAAK,GAAG,cAAc,CAAC,KAAK,CAAC,IAAI,SAAS,CAAC,KAAK,CAAC,CAAC;YACxD,IAAI,KAAK,KAAK,SAAS;gBAAG,KAAiC,CAAC,KAAK,CAAC,GAAG,KAAK,CAAC;QAC7E,CAAC;QAED,yGAAyG;QACzG,yBAAyB,CAAC,OAAO,EAAE,sBAAsB,EAAE,KAAK,CAAC,YAAY,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QAEnH,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,UAAU,GAAG,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC;QACxD,MAAM,SAAS,GAAG,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC;QACrD,MAAM,SAAS,GAAG,KAAK,CAAC,SAAS,IAAI,KAAK,CAAC;QAE3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,GAAG,KAAK;YACR,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,MAAM,EAAE,aAAa;YACrB,cAAc,EAAE,KAAK,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ;YAC1D,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,eAAe,EAAE,KAAK,CAAC,eAAe,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YACxE,aAAa,EAAE,KAAK,CAAC,aAAa,IAAI,CAAC,SAAS,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YACxG,WAAW,EAAE,KAAK,CAAC,WAAW,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YAC/D,WAAW,EAAE,KAAK,CAAC,WAAW,IAAI,CAAC;YACnC,eAAe,EAAE,KAAK,CAAC,eAAe,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YACxE,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,CAAC,SAAS,IAAI,UAAU,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YAC/E,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACjD,SAAS;YACT,aAAa,EAAE,KAAK,CAAC,aAAa,IAAI,IAAI;YAC1C,IAAI,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE;YACtB,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,UAAU,IAAI,QAAQ,CAAC;YACvD,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAAsB,EACtB,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,4FAA4F;QAC5F,OAAO,GAAG,OAAO,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,OAAO,EAAE,OAAO,IAAI,OAAO,EAAE,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;QACvE,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,QAAQ,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAClG,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,SAAS,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAChG,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC;QACvF,MAAM,WAAW,GAAG,OAAO,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,oFAAoF;QACpF,+CAA+C;QAC/C,MAAM,EACJ,EAAE,EAAE,GAAG,EACP,SAAS,EAAE,UAAU,EACrB,SAAS,EAAE,UAAU,EACrB,GAAG,gBAAgB,EACpB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAkB,CAAC;QAE7E,yCAAyC;QACzC,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,gBAAgB,CAAC,MAAM,CAAC,CAAC;YACpG,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,gBAAgB,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YAC5F,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,gBAAgB,CAAC,YAAY,EAAE,CAAC;YAClC,yBAAyB,CACvB,OAAO,EAAE,sBAAsB,EAC/B,EAAE,GAAG,QAAQ,CAAC,YAAY,EAAE,GAAG,gBAAgB,CAAC,YAAY,EAAE,EAC9D,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CACnC,CAAC;QACJ,CAAC;QAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;QACF,MAAM,YAAY,GAAG,gBAAgB,CAAC,MAAM;YAC1C,CAAC,CAAC,uBAAuB,CACrB,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD;YACH,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,iBAAiB,GAAG,YAAY,EAAE,QAAQ,IAAI,iBAAiB,CAAC,QAAQ,CAAC;QAE/E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,IAAI,YAAY,EAAE,CAAC;YAC3F,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,YAAY,CAAC,QAAQ,CAAC;YAE3F,gFAAgF;YAChF,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5F,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;gBAED,MAAM,YAAY,GAAG,gBAAgB,CAAC,YAAY,IAAI,QAAQ,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;YAED,2GAA2G;YAC3G,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5C,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,MAAM,aAAa,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;oBAC5D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;oBACrC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;gBAChC,IAAI,aAAa,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACpD,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;gBACD,yFAAyF;gBACzF,IACE,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,EACvF,CAAC;oBACD,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;wBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;oBAC7C,CAAC;oBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;wBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;oBAC3C,CAAC;oBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;wBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;oBAChC,CAAC;gBACH,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,YAAY,CAAC,QAAQ,KAAK,aAAa,EACvC,CAAC;gBACD,yFAAyF;gBACzF,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;oBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;gBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;oBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;gBAChC,CAAC;YACH,CAAC;YAED,oCAAoC;YACpC,IAAI,YAAY,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBAC1C,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC;oBAClC,gBAAgB,CAAC,WAAW,GAAG,GAAG,CAAC;gBACrC,CAAC;gBACD,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBAC9E,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;gBAChD,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mGAAmG;QACnG,IAAI,iBAAiB,KAAK,aAAa,EAAE,CAAC;YACxC,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC/C,MAAM,YAAY,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;gBAC3D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;gBACrC,CAAC,CAAC,UAAU,CAAC;YAEf,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;gBAChC,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACnC,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;gBACvC,MAAM,YAAY,GAAG,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,SAAS,KAAK,KAAK,IAAI,CAAC,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC,EAAE,CAAC;YAC5G,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;QACvC,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAGH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;wBAChF,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;wBAC7B,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;4BAC5B,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;4BAC5D,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC,OAAO,EAAE,CAAC;4BACnC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;gCACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;gCAC7D,OAAO,CAAC,sBAAsB,GAAG,CAAC,UAAU,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;4BAC7F,CAAC;4BACD,OAAO,CAAC,YAAY,GAAG,IAAI,CAAC;wBAC9B,CAAC;oBACH,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;wBAChC,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;wBACjC,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;gBAEL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,UAA8C,EAAE;QAC3E,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC,CAAC;IAC3E,CAAC;IAEO,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,UAA8C,EAAE;QACtF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QACrD,MAAM,IAAI,CAAC,kBAAkB,CAAC,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,QAAQ,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;YACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mFAAmF;IAC3E,KAAK,CAAC,kBAAkB,CAAC,IAAU,EAAE,QAA6B;QACxE,MAAM,OAAO,GAAG,IAAI,CAAC,QAAQ,EAAE,CAAC;QAEhC,MAAM,QAAQ,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC;QACnG,KAAK,MAAM,KAAK,IAAI,QAAQ,EAAE,CAAC;YAC7B,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBAC1B,MAAM,OAAO,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,CAAC,CAAC;YACnD,CAAC;iBAAM,CAAC;gBACN,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC,CAAC;YACjE,CAAC;QACH,CAAC;QAED,KAAK,MAAM,UAAU,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;YACnE,MAAM,OAAO,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,CAAC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,WAAW,GAAG;YAClB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YACzD,GAAG,CAAC,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE;SACnG,CAAC;QACF,KAAK,MAAM,YAAY,IAAI,IAAI,GAAG,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;YACjE,MAAM,OAAO,CAAC,gBAAgB,CAAC,YAAY,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,MAAM,OAAO,IAAI,QAAQ,EAAE,CAAC;YAC/B,MAAM,OAAO,CAAC,aAAa,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,CAAC;QAED,KAAK,MAAM,KAAK,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;YAC7D,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC7C,CAAC;IACH,CAAC;IAED,sGAAsG;IACtG,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,CAAC,UAAU;YAAE,OAAO,KAAK,CAAC;QAC9B,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;YACnD,IAAI,CAAC,IAAI;gBAAE,OAAO,KAAK,CAAC;YACxB,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACjE,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,KAAK,GAA+B;gBACxC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;gBACpC,OAAO,EAAE,EAAE,UAAU,EAAE;aACxB,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QACnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,CAAC,IAAI,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAC1G,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,GAAG,CAAC,MAAM,cAAc,CAAC,CAAC;YACtE,IAAI,CAAC,QAAQ;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,GAAG,CAAC,eAAe,cAAc,CAAC,CAAC;YACnF,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACjE,CAAC;QACD,iDAAiD;QACjD,MAAM,aAAa,GAAG,MAAM,IAAI,CAAC,2BAA2B,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;QAClF,MAAM,UAAU,GAAG,qBAAqB,CAAC,aAAa,EAAE,GAAG,CAAC,CAAC;QAC7D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,2BAA2B,CAAC,WAAmB;QAC3D,MAAM,KAAK,GAAG,IAAI,GAAG,EAA0B,CAAC;QAChD,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;QAClC,IAAI,QAAQ,GAAG,CAAC,WAAW,CAAC,CAAC;QAE7B,OAAO,QAAQ,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YAC3B,MAAM,IAAI,GAAa,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;YACxF,QAAQ,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1C,KAAK,MAAM,IAAI,IAAI,OAAO,EAAE,CAAC;gBAC3B,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;oBACrB,+EAA+E;oBAC/E,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC;wBAAE,SAAS;oBACrC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;oBACnB,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,IAAI,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC;wBACzE,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC;oBAC/B,CAAC;gBACH,CAAC;YACH,CAAC;YACD,QAAQ,GAAG,IAAI,CAAC;QAClB,CAAC;QAED,OAAO,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,CAAC;YACpD,OAAO,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,EAAE,eAAe,EAAE,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC;QAC9E,CAAC;QACD,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAC7E,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAC/E,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACtD,MAAM,IAAI,eAAe,CAAC,yCAAyC,CAAC,CAAC;QACvE,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,KAAK,CAAC,MAAM,cAAc,CAAC,CAAC;YACxE,MAAM,IAAI,CAAC,oBAAoB,CAAC,UAAU,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC9D,CAAC;QACD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YAC1E,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAC1B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC;IAClG,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAC1D,OAAO,IAAI,CAAC,cAAc,CAAC,UAAU,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;IAC/F,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;IAC3C,CAAC;IAED,KAAK,CAAC,UAAU,CACd,KAA2F;QAE3F,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;YAC9C,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,KAAK,CAAC,MAAM,cAAc,CAAC,CAAC;YACxE,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACpE,CAAC;QACD,MAAM,OAAO,GAAoD,IAAI,CAAC,KAAK;YACzE,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YACvF,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,QAAQ,EAAE,CAAC;QACvD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,kBAAkB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE;YAC/F,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,QAAQ,CAAC,QAAQ;SAC3B,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,kBAAkB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE;YAC/F,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,QAAQ,CAAC,QAAQ;SAC3B,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,KAAyC;QACnF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAE/F,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,KAAyC;QACtF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAE/F,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAC3F,IAAI,CAAC,qBAAqB,CAAC,CAAC,CAAC,CAC9B,CAAC;QACF,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,CAAC,UAAU;YAAE,OAAO,IAAI,CAAC;QAC7B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,qBAAqB,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC;IACvG,CAAC;IAEO,KAAK,CAAC,uBAAuB,CAAC,IAAiE;QACrG,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO;QAC5B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,eAAe,CAAC,wDAAwD,CAAC,CAAC;QACpG,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,SAAS,CAAC,CAAC;IAClE,CAAC;IAED,KAAK,CAAC,gBAAgB,CACpB,KAAkG;QAElG,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1C,IAAI,CAAC,mBAAmB,CAAC,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,SAAS,CAAC,CAAC;QAC1D,IAAI,IAAI,CAAC,KAAK;YAAE,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1D,MAAM,UAAU,GAAuD,IAAI,CAAC,KAAK;YAC/E,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YAC3F,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,QAAQ,EAAE,CAAC;QAC3D,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,MAAM,IAAI,CAAC,qBAAqB,CAAC,QAAQ,CAAC,EAAE;YAC/F,IAAI,EAAE,YAAY;YAClB,OAAO,EAAE,QAAQ,CAAC,UAAU;SAC7B,CAAC,CAAC;QAEH,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,YAAY,EAAE,EAAE;oBAChB,UAAU,EAAE,QAAQ,CAAC,UAAU;oBAC/B,GAAG,EAAE,QAAQ,CAAC,GAAG;oBACjB,SAAS,EAAE,MAAM,IAAI,CAAC,qBAAqB,CAAC,QAAQ,CAAC;iBACtD;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QACD,gFAAgF;QAChF,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1C,qGAAqG;QACrG,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,KAAK,CAAC,CAAC;QAC1D,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,EAAE,CAAC;YAC7B,MAAM,IAAI,eAAe,CAAC,wDAAwD,CAAC,CAAC;QACtF,CAAC;QAED,yFAAyF;QACzF,MAAM,IAAI,GAAG,mBAAmB,CAAC,KAAK,CAAC,IAAI,EAAE,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC7E,IAAI,CAAC,mBAAmB,CAAC,KAAK,CAAC,QAAQ,IAAI,0BAA0B,EAAE,IAAI,CAAC,UAAU,CAAC,CAAC;QAExF,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI;YACJ,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,SAAS,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,YAAY,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,UAAU;SACxG,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,aAAa,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QACnE,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,+BAA+B,CAAC,OAKrC;QACC,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,IAAI,CAAC,OAAO,CAAC,SAAS;YAAE,MAAM,IAAI,eAAe,CAAC,8CAA8C,CAAC,CAAC;QAClG,IAAI,CAAC,mBAAmB,CAAC,OAAO,CAAC,WAAW,IAAI,0BAA0B,CAAC,CAAC;QAC5E,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAC1E,CAAC;aAAM,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC;YAC7D,MAAM,IAAI,aAAa,CAAC,YAAY,OAAO,CAAC,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC;YAC5C,UAAU,EAAE,eAAe,CAAC,YAAY,OAAO,CAAC,SAAS,EAAE,EAAE,OAAO,CAAC,QAAQ,CAAC;YAC9E,WAAW,EAAE,OAAO,CAAC,WAAW;YAChC,gBAAgB,EAAE,OAAO,CAAC,gBAAgB;SAC3C,CAAC,CAAC;IACL,CAAC;IAED,6FAA6F;IACrF,mBAAmB,CAAC,QAAgB,EAAE,SAAkB;QAC9D,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC;QACnC,IAAI,CAAC,MAAM;YAAE,OAAO;QACpB,IAAI,MAAM,CAAC,QAAQ,KAAK,SAAS,IAAI,SAAS,KAAK,SAAS,IAAI,SAAS,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;YAC5F,MAAM,IAAI,eAAe,CAAC,WAAW,SAAS,0BAA0B,MAAM,CAAC,QAAQ,SAAS,CAAC,CAAC;QACpG,CAAC;QACD,IAAI,MAAM,CAAC,gBAAgB,EAAE,CAAC;YAC5B,MAAM,IAAI,GAAG,QAAQ,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACzD,MAAM,OAAO,GAAG,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,EAAE;gBACvD,MAAM,CAAC,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;gBAChC,OAAO,CAAC,CAAC,QAAQ,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,CAAC;YACzE,CAAC,CAAC,CAAC;YACH,IAAI,CAAC,OAAO;gBAAE,MAAM,IAAI,eAAe,CAAC,cAAc,IAAI,mBAAmB,CAAC,CAAC;QACjF,CAAC;IACH,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,uBAAuB,CAAC,IAAsF;QAC1H,IAAI,CAAC,IAAI,CAAC,UAAU;YAAE,OAAO;QAC7B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,MAAM,MAAM,GAAG,YAAY,SAAS,GAAG,CAAC;QACxC,MAAM,QAAQ,GAAG,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;QAC5C,IAAI,CAAC,SAAS,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,UAAU,CAAC,MAAM,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,GAAG,CAAC,EAAE,CAAC;YACvG,MAAM,IAAI,eAAe,CAAC,6BAA6B,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,uBAAuB,wBAAwB,CAAC,CAAC;QAC/H,CAAC;IACH,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,OAAO,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC;IACpD,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,OAAO,IAAI,IAAI,IAAI,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,EAAE,CAAC,CAAC;QACrH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC,CAAC;QAC7E,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAmB;gBACxC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAC/C,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAmB;gBACxC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,OAAO,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC1E,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7E,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACpD,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gGAAgG;IAChG,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC,CAAC;IACvE,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACzC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,aAAa,EAAE,EAAE,CAAC,CAAC;QACtE,KAAK,MAAM,KAAK,IAAI,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,EAAE,CAAC,EAAE,CAAC;YAC1G,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC,CAAC;QACtE,CAAC;QACD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjF,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gGAAgG;IACxF,KAAK,CAAC,mBAAmB,CAC/B,SAAiB,EACjB,KAAsD,EACtD,EAAU;QAEV,KAAK,MAAM,IAAI,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,EAAE,CAAC;YACxD,IAAI,IAAI,CAAC,KAAK,CAAC,KAAK,EAAE;gBAAE,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;QACvF,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACxD,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAC9B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,CAAC,IAAI,CAAC;IACjF,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,KAAK,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACpH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QAC/C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YACzC,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,oBAAoB,CAAC,EAAE,CAAC,CAAC,CAAC;IACzE,CAAC;IAEO,KAAK,CAAC,oBAAoB,CAAC,EAAU;QAC3C,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QAC/C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC;QAExE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QAC7D,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7E,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,IAAI,CAAC,YAAY,CAAwB;YAC7C,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QACnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACpD,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACnC,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACnC,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,6FAA6F;IAC7F,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC,CAAC;IACvE,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACzC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,aAAa,EAAE,EAAE,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjF,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC3D,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,gBAAgB,CAAC,KAAK,CAAC,CAAC;QACxD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,MAAM,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,GAAG,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC;QACtF,IAAI,SAAS,KAAK,SAAS;YAAE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;QACjH,MAAM,EAAE,KAAK,EAAE,KAAK,EAAE,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,OAAO,EAAE,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,CAAC;QAC7E,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE;YAClD,QAAQ;YACR,gBAAgB;YAChB,SAAS;YACT,KAAK;YACL,KAAK;YACL,cAAc;YACd,gBAAgB;SACjB,CAAC,CAAC;IACL,CAAC;IAED;;;;;;;OAOG;IACH,KAAK,CAAC,8BAA8B,CAAC,UAAwC,EAAE;QAC7E,MAAM,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,GAAG,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC;QACtF,IAAI,QAAmB,CAAC;QACxB,IAAI,OAAO,CAAC,UAAU,EAAE,CAAC;YACvB,MAAM,GAAG,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,CAAC;YAC7C,IAAI,GAAG,CAAC,MAAM,KAAK,CAAC;gBAAE,MAAM,IAAI,eAAe,CAAC,+BAA+B,CAAC,CAAC;YACjF,QAAQ,GAAG,EAAE,CAAC;YACd,KAAK,MAAM,EAAE,IAAI,GAAG,EAAE,CAAC;gBACrB,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC;gBACpD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBAChD,IAAI,CAAC,OAAO;oBAAE,MAAM,IAAI,aAAa,CAAC,YAAY,EAAE,cAAc,CAAC,CAAC;gBACpE,QAAQ,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YACzB,CAAC;QACH,CAAC;aAAM,CAAC;YACN,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,EAAE,CAAC;QACtC,CAAC;QAED,MAAM,cAAc,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QACzF,MAAM,KAAK,GAAG,cAAc,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,KAAK,EAAE,EAAE,CAAC,GAAG,GAAG,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC;QAC3E,MAAM,KAAK,GAAG,IAAI,CAAC,MAAM,CAAC,kBAAkB,IAAI,IAAI,CAAC;QACrD,IAAI,KAAK,GAAG,KAAK,EAAE,CAAC;YAClB,MAAM,IAAI,eAAe,CAAC,6BAA6B,KAAK,8BAA8B,KAAK,sDAAsD,CAAC,CAAC;QACzJ,CAAC;QACD,MAAM,QAAQ,GAAG,cAAc,CAAC,IAAI,EAAE,CAAC;QACvC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;QACpD,wFAAwF;QACxF,MAAM,YAAY,GAAG,CAAC,MAAM,IAAI,CAAC,gBAAgB,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,IAAI,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QAEtI,MAAM,EAAE,KAAK,EAAE,KAAK,EAAE,GAAG,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,OAAO,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAC/I,OAAO,qBAAqB,CAC1B,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC;YACtB,SAAS,EAAE,CAAC,CAAC,EAAE;YACf,KAAK,EAAE,cAAc,CAAC,CAAC,CAAC;YACxB,gBAAgB,EAAE,CAAC,CAAC,SAAS,IAAI,OAAO,CAAC,gBAAgB;YACzD,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe;SACxE,CAAC,CAAC,EACH,YAAY,EACZ,EAAE,SAAS,EAAE,KAAK,EAAE,KAAK,EAAE,cAAc,EAAE,gBAAgB,EAAE,YAAY,EAAE,OAAO,CAAC,YAAY,EAAE,CAClG,CAAC;IACJ,CAAC;IAED,4EAA4E;IACpE,eAAe,CAAC,OAAmB;QACzC,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,IAAI,IAAI,CAAC,MAAM,CAAC,qBAAqB,IAAI,SAAS,CAAC;QACtF,IAAI,SAAS,KAAK,SAAS,IAAI,SAAS,KAAK,UAAU,EAAE,CAAC;YACxD,MAAM,IAAI,eAAe,CAAC,2BAA2B,SAAS,iCAAiC,CAAC,CAAC;QACnG,CAAC;QACD,MAAM,cAAc,GAAG,OAAO,CAAC,cAAc,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,0BAA0B,IAAI,SAAS,KAAK,UAAU,CAAC,CAAC;QACxH,IAAI,cAAc,IAAI,SAAS,KAAK,UAAU,EAAE,CAAC;YAC/C,MAAM,IAAI,eAAe,CAAC,gDAAgD,CAAC,CAAC;QAC9E,CAAC;QACD,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC;QAClD,IAAI,gBAAgB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;YAC9F,MAAM,IAAI,eAAe,CAAC,6BAA6B,gBAAgB,mDAAmD,CAAC,CAAC;QAC9H,CAAC;QACD,OAAO,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,CAAC;IACzD,CAAC;IAED,oDAAoD;IAC5C,KAAK,CAAC,gBAAgB,CAAC,KAAa;QAC1C,MAAM,IAAI,GAAG,IAAI,GAAG,EAA0B,CAAC;QAC/C,KAAK,MAAM,IAAI,IAAI,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACzF,KAAK,MAAM,CAAC,IAAI,IAAI;gBAAE,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;QAC1C,CAAC;QACD,OAAO,CAAC,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC;IAC5B,CAAC;IAED,sFAAsF;IAC9E,KAAK,CAAC,UAAU,CAAC,OAAmB,EAAE,SAAoC;QAChF,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,OAAO,CAAC,KAAK,IAAI,IAAI,CAAC,QAAQ,EAAE,EAAE,OAAO,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC;QACxH,MAAM,OAAO,GAAG,IAAI,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,IAAI,SAAS,CAAC,CAAC,CAAC;QAC9D,MAAM,KAAK,GAAG,OAAO,CAAC,KAAK,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,IAAI,SAAS,CAAC,CAAC,CAAC;QACtG,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC3D,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,aAAa,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,IAAI,SAAS;YAAE,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC1E,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC7C,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,EAAE,CAAC;QACpC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,EAAE,CAAC;QACpC,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAED,gBAAgB;IAEhB;;;OAGG;IACH,KAAK,CAAC,QAAQ;QACZ,MAAM,UAAU,GAAG,OAAO,IAAI,CAAC,MAAM,CAAC,KAAK,KAAK,UAAU,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,KAAK,IAAI,EAAE,CAAC;QAC3H,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,IAAI,EAAE,CAAC;QACpD,MAAM,IAAI,GAAG,IAAI,GAAG,EAAgB,CAAC;QACrC,KAAK,MAAM,IAAI,IAAI,CAAC,GAAG,MAAM,EAAE,GAAG,UAAU,CAAC;YAAE,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,CAAC;QACvE,OAAO,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,mBAAmB;IAEnB,sFAAsF;IAC9E,KAAK,CAAC,eAAe;QAC3B,MAAM,UAAU,GAAc,CAAC,IAAI,CAAC,MAAM,CAAC,QAAQ,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC;YACxE,GAAG,CAAC;YACJ,EAAE,EAAE,UAAU,CAAC,EAAE;YACjB,SAAS,EAAE,IAAI,IAAI,CAAC,CAAC,CAAC,CAAC,WAAW,EAAE;SACrC,CAAC,CAAC,CAAC;QACJ,OAAO,CAAC,GAAG,UAAU,EAAE,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC;IAC9D,CAAC;IAEO,eAAe,CAAC,EAAE,MAAM,EAAE,GAAG,OAAO,EAAW;QACrD,OAAO,EAAE,GAAG,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC;IAC7C,CAAC;IAED,mGAAmG;IACnG,KAAK,CAAC,WAAW;QACf,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,OAAO,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,CAAC;IAC3F,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,OAAO,OAAO,IAAI,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACvF,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,KAMnB;QACC,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,MAAM,GAAG,KAAK,CAAC,MAAM,IAAI,qBAAqB,EAAE,CAAC;QACvD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,GAAG,EAAE,KAAK,CAAC,GAAG;YACd,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,MAAM;YACN,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI;YAC5B,QAAQ,EAAE,IAAI,CAAC,KAAK,EAAE,QAAQ;SAC/B,CAAC,CAAC;QACH,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,EAAE,OAAO,EAAE,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IAC5D,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,EAAU,EACV,OAAgF;QAEhF,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAAE,OAAO,IAAI,CAAC;QAC9C,IAAI,OAAO,CAAC,GAAG;YAAE,IAAI,CAAC,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;QACtD,MAAM,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,OAAO,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAC5C,EAAE,EACF,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,SAAS,CAAC,CAAC,CAC7G,CAAC;QACF,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAAE,OAAO,KAAK,CAAC;QAC/C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,kBAAkB,CAAC,GAAW;QACpC,IAAI,CAAC;YACH,gBAAgB,CAAC,GAAG,EAAE,IAAI,CAAC,MAAM,CAAC,eAAe,EAAE,gBAAgB,CAAC,CAAC;QACvE,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,IAAI,eAAe,CAAE,GAAa,CAAC,OAAO,CAAC,CAAC;QACpD,CAAC;IACH,CAAC;IAED,2FAA2F;IACnF,KAAK,CAAC,kBAAkB,CAAC,KAAkB;QACjD,MAAM,CAAC,GAAG,KAAK,CAAC,OAA8B,CAAC;QAC/C,MAAM,KAAK,GAAG,CAAC,CAAC,OAAO,IAAI,CAAC,CAAC,QAAQ,IAAI,CAAC,CAAC,IAAI,CAAC;QAChD,IAAI,KAAK;YAAE,OAAO,KAAK,CAAC,QAAQ,IAAI,SAAS,CAAC;QAC9C,oEAAoE;QACpE,IAAI,UAAU,IAAI,CAAC;YAAE,OAAO,CAAC,CAAC,QAAQ,IAAI,SAAS,CAAC;QAEpD,MAAM,SAAS,GACb,CAAC,CAAC,SAAS;YACX,CAAC,CAAC,IAAI,EAAE,SAAS;YACjB,CAAC,CAAC,WAAW,EAAE,SAAS;YACxB,CAAC,CAAC,SAAS,EAAE,SAAS;YACtB,CAAC,CAAC,SAAS,EAAE,SAAS;YACtB,CAAC,CAAC,UAAU,EAAE,SAAS;YACvB,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,OAAO,EAAE,MAAM,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,IAAI,CAAC,CAAC,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC;QACrI,IAAI,CAAC,SAAS;YAAE,OAAO,SAAS,CAAC;QACjC,OAAO,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,EAAE,QAAQ,IAAI,SAAS,CAAC;IACzE,CAAC;CACF"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AA0CA,OAAO,EAAkB,aAAa,EAAiD,MAAM,mBAAmB,CAAC;AACjH,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EAuCf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,8BAA8B,EAAE,MAAM,4BAA4B,CAAC;AACvG,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,eAAe,EAAE,aAAa,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrF,OAAO,EAAE,iBAAiB,EAAE,gBAAgB,EAAE,MAAM,2BAA2B,CAAC;AAChF,OAAO,EAAE,eAAe,EAAE,mBAAmB,EAAE,MAAM,4BAA4B,CAAC;AAClF,OAAO,EAAE,qBAAqB,EAAE,MAAM,0BAA0B,CAAC;AAEjE,OAAO,EAAE,YAAY,EAAE,qBAAqB,EAAmB,MAAM,kBAAkB,CAAC;AAexF,OAAO,EAAE,gBAAgB,EAAE,MAAM,qBAAqB,CAAC;AACvD,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,wGAAwG;AACxG,MAAM,kBAAkB,GAAG,MAAM,CAAC,IAAI,CAAC,gBAAgB,CAAC,KAAK,CAA2C,CAAC;AAEzG,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvC,+GAA+G;IAC/F,QAAQ,CAAoB;IAC5B,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IACzD,2FAA2F;IAC3E,KAAK,CAAS;IAC9B,wFAAwF;IACvE,qBAAqB,CAAW;IAEjD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,MAAM,CAAC,KAAK,KAAK,SAAS,IAAI,CAAC,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI,CAAC,EAAE,CAAC;YAC9F,0EAA0E;YAC1E,MAAM,IAAI,KAAK,CACb,yHAAyH,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,KAAK,CAAC,GAAG,CACzJ,CAAC;QACJ,CAAC;QACD,IAAI,CAAC,KAAK,GAAG,MAAM,CAAC,KAAK,IAAI,IAAI,aAAa,EAAE,CAAC;QAEjD,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QACnC,IAAI,CAAC,QAAQ,GAAG,IAAI,iBAAiB,CACnC;YACE,YAAY,EAAE,GAAG,EAAE,CAAC,IAAI,CAAC,eAAe,EAAE;YAC1C,aAAa,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC;SACzD,EACD,MAAM,CAAC,eAAe,CACvB,CAAC;QACF,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC,GAAG,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QACnE,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC,GAAG,EAAE,CAAC,KAAK,EAAE,EAAE;YACnC,IAAI,KAAK,CAAC,IAAI,CAAC,UAAU,CAAC,OAAO,CAAC;gBAAE,IAAI,CAAC,cAAc,CAAC,KAAK,EAAE,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;QACrC,yGAAyG;QACzG,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,EAAE,GAAE,CAAC,CAAC,CAAC;IAC7B,CAAC;IAED;;;;;;OAMG;IACH,SAAS,CAAC,KAAY;QACpB,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACzD,MAAM,CAAC,cAAc,CAAC,MAAM,EAAE,OAAO,EAAE,EAAE,KAAK,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,GAAG,KAAK,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACjG,OAAO,MAAM,CAAC;IAChB,CAAC;IAED,iEAAiE;IACzD,KAAK,CAAC,YAAY,CAAoC,KAAmC;QAC/F,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC;YACxB,GAAG,KAAK;YACR,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SAChC,CAAC,CAAC;IACV,CAAC;IAEO,SAAS,CAAC,QAAgB;QAChC,OAAO,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;IACxC,CAAC;IAED,sFAAsF;IAEtF;;;OAGG;IACH,IAAY,SAAS;QACnB,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,qBAAqB,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,SAAS,IAAI,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC;IAC3G,CAAC;IAED,gGAAgG;IAC/E,cAAc,CAAwB;IAEvD;;;;;OAKG;IACK,KAAK,CAAC,aAAa,CAAI,EAA8C;QAC3E,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,WAAW;YAAE,OAAO,EAAE,CAAC,IAAI,CAAC,CAAC;QACpE,MAAM,OAAO,GAAyB,EAAE,CAAC;QACzC,MAAM,KAAK,GAAG,CAAmB,MAAS,EAAE,OAAiB,EAAK,EAAE,CAClE,IAAI,KAAK,CAAC,MAAM,EAAE;YAChB,GAAG,CAAC,CAAC,EAAE,QAAQ;gBACb,MAAM,KAAK,GAAG,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,QAAQ,CAAC,CAAC;gBACvC,IAAI,OAAO,KAAK,KAAK,UAAU;oBAAE,OAAO,KAAK,CAAC;gBAC9C,IAAI,OAAO,CAAC,QAAQ,CAAC,QAAkB,CAAC,EAAE,CAAC;oBACzC,OAAO,KAAK,EAAE,GAAG,IAAe,EAAE,EAAE;wBAClC,OAAO,CAAC,IAAI,CAAC,GAAG,EAAE,CAAC,KAAK,CAAC,KAAK,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC,CAAC;oBAC3C,CAAC,CAAC;gBACJ,CAAC;gBACD,OAAO,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACvB,CAAC;SACF,CAAC,CAAC;QAEL,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,KAAK,EAAE,EAAE,EAAE,EAAE;YACvD,OAAO,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC,0BAA0B;YAC9C,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;YACvD,MAAM,CAAC,gBAAgB,CAAC,IAAI,EAAE;gBAC5B,KAAK,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE;gBACpB,cAAc,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE;gBAClC,MAAM,EAAE,EAAE,KAAK,EAAE,KAAK,CAAC,IAAI,CAAC,MAAM,EAAE,CAAC,SAAS,CAAC,CAAC,EAAE;gBAClD,OAAO,EAAE,EAAE,KAAK,EAAE,KAAK,CAAC,IAAI,CAAC,OAAO,EAAE,CAAC,oBAAoB,EAAE,oBAAoB,EAAE,oBAAoB,CAAC,CAAC,EAAE;gBAC3G,WAAW,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,WAAW,IAAI,KAAK,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC,QAAQ,CAAC,CAAC,EAAE;aAChF,CAAC,CAAC;YACH,OAAO,EAAE,CAAC,IAAI,CAAC,CAAC;QAClB,CAAC,CAAC,CAAC;QAEH,KAAK,MAAM,MAAM,IAAI,OAAO,EAAE,CAAC;YAC7B,IAAI,CAAC;gBACH,MAAM,MAAM,EAAE,CAAC;YACjB,CAAC;YAAC,OAAO,KAAK,EAAE,CAAC;gBACf,OAAO,CAAC,IAAI,CAAC,4CAA4C,EAAE,KAAK,CAAC,CAAC;YACpE,CAAC;QACH,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAED,qGAAqG;IAC7F,QAAQ;QACd,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACvD,MAAM,CAAC,cAAc,CAAC,IAAI,EAAE,uBAAuB,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC;QACtE,OAAO,IAAI,CAAC;IACd,CAAC;IAEO,aAAa,CAAC,MAAgD;QACpE,MAAM,MAAM,GAAG,IAAI,CAAC,KAAK,EAAE,QAAQ,CAAC;QACpC,OAAO,CAAC,MAAM,IAAI,MAAM,EAAE,QAAQ,KAAK,MAAM,CAAC;IAChD,CAAC;IAEO,KAAK,CAAC,SAAS,CACrB,MAA2B,EAC3B,OAAiB,EACjB,QAAwE;QAExE,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,IAAI,OAAO,IAAI,CAAC,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC;YAAE,OAAO,KAAK,CAAC;QAC1D,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC;QACrC,OAAO,MAAM,CAAC,CAAC,CAAC,MAAM,MAAM,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAM,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,MAAM,IAAI,CAAC,YAAY,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7H,CAAC;IAED;;;OAGG;IACc,cAAc,GAAG,IAAI,GAAG,EAA6B,CAAC;IAE/D,YAAY;QAClB,IAAI,CAAC,IAAI,CAAC,KAAK;YAAE,OAAO,OAAO,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,GAAG,IAAI,CAAC,KAAK,CAAC;QACxC,MAAM,GAAG,GAAG,GAAG,QAAQ,IAAI,EAAE,IAAI,MAAM,EAAE,CAAC;QAC1C,IAAI,KAAK,GAAG,IAAI,CAAC,cAAc,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;QACzC,IAAI,CAAC,KAAK,EAAE,CAAC;YACX,KAAK,GAAG,IAAI,CAAC,KAAK;iBACf,QAAQ,EAAE;iBACV,IAAI,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,IAAI,SAAS,CAAC,KAAK,QAAQ,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YAC7H,IAAI,CAAC,cAAc,CAAC,GAAG,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;YACpC,KAAK,CAAC,KAAK,CAAC,GAAG,EAAE,CAAC,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC;QACrD,CAAC;QACD,OAAO,KAAK,CAAC;IACf,CAAC;IAED,yFAAyF;IACjF,KAAK,CAAC,eAAe,CAAC,SAA6B;QACzD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAC1B,OAAO,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC;IAC1E,CAAC;IAEO,KAAK,CAAC,cAAc,CAAC,SAA6B;QACxD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,OAAO,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC,KAAK,IAAI,CAAC;IAC1D,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,oBAAoB,CAChC,MAA2B,EAC3B,SAA6B,EAC7B,QAAwE;QAExE,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO;QAC5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QACtD,IAAI,CAAC,OAAO;YAAE,MAAM,IAAI,aAAa,CAAC,YAAY,SAAS,cAAc,CAAC,CAAC;QAC3E,IAAI,MAAM,KAAK,cAAc,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,OAAO,EAAE,QAAQ,CAAC,CAAC,EAAE,CAAC;YACpF,MAAM,IAAI,cAAc,CAAC,kBAAkB,MAAM,gBAAgB,SAAS,IAAI,CAAC,CAAC;QAClF,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,sBAAsB,CAAC,MAA6C;QAChF,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC;YAAE,MAAM,IAAI,cAAc,CAAC,kBAAkB,MAAM,GAAG,CAAC,CAAC;IAC7F,CAAC;IAED,kGAAkG;IAC1F,KAAK,CAAC,cAAc,CAC1B,KAAU,EACV,WAA0E;QAE1E,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,KAAK,CAAC;QAClC,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAmB,CAAC;QAC5C,MAAM,MAAM,GAAQ,EAAE,CAAC;QACvB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,MAAM,WAAW,CAAC,IAAI,CAAC,CAAC;YAC1C,IAAI,CAAC,SAAS;gBAAE,SAAS;YACzB,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC,CAAC;YAC5F,IAAI,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC;gBAAE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACjD,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,MAA0B;QACtD,OAAO,MAAM,CAAC,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC;IAC5E,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,SAA6B;QAC5D,IAAI,CAAC,SAAS;YAAE,OAAO,SAAS,CAAC;QACjC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,OAAO,IAAI,CAAC,eAAe,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAC/C,CAAC;IAEO,KAAK,CAAC,qBAAqB,CAAC,CAA8D;QAChG,OAAO,CAAC,CAAC,SAAS,IAAI,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,IAAI,CAAC,kBAAkB,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IAC/G,CAAC;IAED,wFAAwF;IAChF,aAAa,CAAkC,OAAU;QAC/D,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,IAAI,OAAO,CAAC;YAAE,OAAO,OAAO,CAAC;QAC5D,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,GAAG,IAAI,EAAE,GAAG,OAAO,CAAC;QAChD,OAAO,IAAS,CAAC;IACnB,CAAC;IAEO,KAAK,CAAC,UAAU,CAAC,MAA0B;QACjD,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,MAAM,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACjD,CAAC;QACD,KAAK,MAAM,MAAM,IAAI,IAAI,CAAC,OAAO,CAAC,UAAU,EAAE,EAAE,CAAC;YAC/C,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC;QAC5B,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,OAAO,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,OAAO,QAAQ,IAAI,IAAI,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,GAAG,QAAQ,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,QAAQ,EAAE,CAAC,CAAC;QACjI,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAC5C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,OAAO,GAAG,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAC5C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QAEtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC9E,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,6DAA6D;QAC7D,MAAM,SAAS,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,EAAE,QAAQ,CAAC,CAAC;QACpG,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,sEAAsE;QACtE,MAAM,QAAQ,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACnF,OAAO,IAAI,CAAC,cAAc,CAAC,QAAQ,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACpD,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACtD,OAAO,IAAI,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,IAAI,CAAC,sBAAsB,CAAC,gBAAgB,CAAC,CAAC;QACpD,8BAA8B,CAAC,OAAO,CAAC,sBAAsB,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACnG,kGAAkG;QAClG,MAAM,KAAK,GAAG,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,EAAE,CAAC;QAC5F,mDAAmD;QACnD,IAAI,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,KAAK,CAAC,OAAO,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,IAAI,CAAC,KAAM,CAAC,MAAM,CAAC,EAAE,CAAC;YACpH,KAAK,CAAC,OAAO,GAAG,CAAC,GAAG,CAAC,KAAK,CAAC,OAAO,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QAC3F,CAAC;QACD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QACtD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,OAAO,IAAI,QAAQ,CAAC;YACpD,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACtD,IAAI,SAAS,IAAI,OAAO;YAAE,MAAM,IAAI,CAAC,oBAAoB,CAAC,wBAAwB,EAAE,EAAE,CAAC,CAAC;QACxF,8BAA8B,CAAC,OAAO,CAAC,sBAAsB,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACnG,OAAO,GAAG,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC,CAAC;IACrE,CAAC;IAEO,KAAK,CAAC,gBAAgB,CAAC,EAAU;QACvC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACtD,yFAAyF;QACzF,MAAM,OAAO,GAAG,IAAI,CAAC,QAAQ,EAAE,CAAC;QAEhC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC;QAC5C,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,iFAAiF;YACjF,MAAM,OAAO,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACpC,CAAC;QACD,MAAM,cAAc,GAAG,CACrB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,KAAK,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAC5F,CAAC,MAAM,CAAC,CAAC,MAAM,EAAoB,EAAE,CAAC,MAAM,KAAK,IAAI,CAAC,CAAC;QAExD,KAAK,MAAM,SAAS,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;YAAE,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC3G,KAAK,MAAM,SAAS,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;YAAE,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC3G,KAAK,MAAM,WAAW,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC;YAAE,MAAM,OAAO,CAAC,iBAAiB,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAChH,KAAK,MAAM,UAAU,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,EAAE,EAAE,CAAC;YAAE,MAAM,OAAO,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAE3H,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,cAAc,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC7F,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,EAAE;gBACb,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,gBAAgB,EAAE,cAAc,CAAC,MAAM,EAAE;aAC1E,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,IAAI,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,OAAO,SAAS,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,KAAK,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;IAC5E,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,QAAmB,EAAE;QACpC,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;YACpB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QACrG,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,MAAM,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IAC1G,CAAC;IAED,sFAAsF;IACtF,KAAK,CAAC,eAAe,CAAC,QAAuB,EAAE;QAC7C,IAAI,KAAK,CAAC,MAAM,EAAE,CAAC;YACjB,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAChG,CAAC;QACD,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;YACpB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAC1G,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC;QAC9D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,MAAM,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IAC/G,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,SAAoB;QACnD,MAAM,QAAQ,GAAG,CAAC,MAAM,IAAI,CAAC,WAAW,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QAC7D,OAAO,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,QAAQ,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC;IAChF,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,CAAC,UAAU,EAAE,CAAC;YACxC,SAAS,GAAG,EAAE,GAAG,SAAS,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC;QAC9D,CAAC;QACD,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,IAAI,cAAc,CAAC,SAAS,IAAI,cAAc,CAAC,SAAS,KAAK,SAAS,CAAC,SAAS,EAAE,CAAC;YACjF,MAAM,IAAI,eAAe,CAAC,oEAAoE,CAAC,CAAC;QAClG,CAAC;QACD,MAAM,SAAS,GAAG,SAAS,CAAC,SAAS,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,4FAA4F;QAC5F,0EAA0E;QAC1E,MAAM,KAAK,GAA6B,EAAE,CAAC;QAC3C,KAAK,MAAM,KAAK,IAAI,kBAAkB,EAAE,CAAC;YACvC,MAAM,KAAK,GAAG,cAAc,CAAC,KAAK,CAAC,IAAI,SAAS,CAAC,KAAK,CAAC,CAAC;YACxD,IAAI,KAAK,KAAK,SAAS;gBAAG,KAAiC,CAAC,KAAK,CAAC,GAAG,KAAK,CAAC;QAC7E,CAAC;QAED,yGAAyG;QACzG,yBAAyB,CAAC,OAAO,EAAE,sBAAsB,EAAE,KAAK,CAAC,YAAY,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QAEnH,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,UAAU,GAAG,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC;QACxD,MAAM,SAAS,GAAG,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC;QACrD,MAAM,SAAS,GAAG,KAAK,CAAC,SAAS,IAAI,KAAK,CAAC;QAE3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,GAAG,KAAK;YACR,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,MAAM,EAAE,aAAa;YACrB,cAAc,EAAE,KAAK,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ;YAC1D,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,eAAe,EAAE,KAAK,CAAC,eAAe,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YACxE,aAAa,EAAE,KAAK,CAAC,aAAa,IAAI,CAAC,SAAS,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YACxG,WAAW,EAAE,KAAK,CAAC,WAAW,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YAC/D,WAAW,EAAE,KAAK,CAAC,WAAW,IAAI,CAAC;YACnC,eAAe,EAAE,KAAK,CAAC,eAAe,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YACxE,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,CAAC,SAAS,IAAI,UAAU,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC;YAC/E,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACjD,SAAS;YACT,aAAa,EAAE,KAAK,CAAC,aAAa,IAAI,IAAI;YAC1C,IAAI,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE;YACtB,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,UAAU,IAAI,QAAQ,CAAC;YACvD,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAAsB,EACtB,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,4FAA4F;QAC5F,OAAO,GAAG,OAAO,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,OAAO,EAAE,OAAO,IAAI,OAAO,EAAE,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;QACvE,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,QAAQ,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAClG,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,SAAS,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAChG,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC;QACvF,MAAM,WAAW,GAAG,OAAO,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,oFAAoF;QACpF,+CAA+C;QAC/C,MAAM,EACJ,EAAE,EAAE,GAAG,EACP,SAAS,EAAE,UAAU,EACrB,SAAS,EAAE,UAAU,EACrB,GAAG,gBAAgB,EACpB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAkB,CAAC;QAE7E,yCAAyC;QACzC,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,gBAAgB,CAAC,MAAM,CAAC,CAAC;YACpG,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,gBAAgB,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YAC5F,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,gBAAgB,CAAC,YAAY,EAAE,CAAC;YAClC,yBAAyB,CACvB,OAAO,EAAE,sBAAsB,EAC/B,EAAE,GAAG,QAAQ,CAAC,YAAY,EAAE,GAAG,gBAAgB,CAAC,YAAY,EAAE,EAC9D,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CACnC,CAAC;QACJ,CAAC;QAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;QACF,MAAM,YAAY,GAAG,gBAAgB,CAAC,MAAM;YAC1C,CAAC,CAAC,uBAAuB,CACrB,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD;YACH,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,iBAAiB,GAAG,YAAY,EAAE,QAAQ,IAAI,iBAAiB,CAAC,QAAQ,CAAC;QAE/E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,IAAI,YAAY,EAAE,CAAC;YAC3F,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,YAAY,CAAC,QAAQ,CAAC;YAE3F,gFAAgF;YAChF,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5F,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;gBAED,MAAM,YAAY,GAAG,gBAAgB,CAAC,YAAY,IAAI,QAAQ,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;YAED,2GAA2G;YAC3G,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5C,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,MAAM,aAAa,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;oBAC5D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;oBACrC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;gBAChC,IAAI,aAAa,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACpD,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;gBACD,yFAAyF;gBACzF,IACE,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,EACvF,CAAC;oBACD,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;wBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;oBAC7C,CAAC;oBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;wBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;oBAC3C,CAAC;oBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;wBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;oBAChC,CAAC;gBACH,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,YAAY,CAAC,QAAQ,KAAK,aAAa,EACvC,CAAC;gBACD,yFAAyF;gBACzF,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;oBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;gBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;oBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;gBAChC,CAAC;YACH,CAAC;YAED,oCAAoC;YACpC,IAAI,YAAY,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBAC1C,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC;oBAClC,gBAAgB,CAAC,WAAW,GAAG,GAAG,CAAC;gBACrC,CAAC;gBACD,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBAC9E,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;gBAChD,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mGAAmG;QACnG,IAAI,iBAAiB,KAAK,aAAa,EAAE,CAAC;YACxC,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC/C,MAAM,YAAY,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;gBAC3D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;gBACrC,CAAC,CAAC,UAAU,CAAC;YAEf,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;gBAChC,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACnC,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;gBACvC,MAAM,YAAY,GAAG,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,SAAS,KAAK,KAAK,IAAI,CAAC,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC,EAAE,CAAC;YAC5G,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;QACvC,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAGH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;wBAChF,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;wBAC7B,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;4BAC5B,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;4BAC5D,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC,OAAO,EAAE,CAAC;4BACnC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;gCACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;gCAC7D,OAAO,CAAC,sBAAsB,GAAG,CAAC,UAAU,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;4BAC7F,CAAC;4BACD,OAAO,CAAC,YAAY,GAAG,IAAI,CAAC;wBAC9B,CAAC;oBACH,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;wBAChC,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;wBACjC,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;gBAEL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,UAA8C,EAAE;QAC3E,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC,CAAC;IAC3E,CAAC;IAEO,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,UAA8C,EAAE;QACtF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QACrD,MAAM,IAAI,CAAC,kBAAkB,CAAC,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,QAAQ,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;YACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mFAAmF;IAC3E,KAAK,CAAC,kBAAkB,CAAC,IAAU,EAAE,QAA6B;QACxE,MAAM,OAAO,GAAG,IAAI,CAAC,QAAQ,EAAE,CAAC;QAEhC,MAAM,QAAQ,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC;QACnG,KAAK,MAAM,KAAK,IAAI,QAAQ,EAAE,CAAC;YAC7B,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBAC1B,MAAM,OAAO,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,CAAC,CAAC;YACnD,CAAC;iBAAM,CAAC;gBACN,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC,CAAC;YACjE,CAAC;QACH,CAAC;QAED,KAAK,MAAM,UAAU,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;YACnE,MAAM,OAAO,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,CAAC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,WAAW,GAAG;YAClB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YACzD,GAAG,CAAC,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE;SACnG,CAAC;QACF,KAAK,MAAM,YAAY,IAAI,IAAI,GAAG,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;YACjE,MAAM,OAAO,CAAC,gBAAgB,CAAC,YAAY,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,MAAM,OAAO,IAAI,QAAQ,EAAE,CAAC;YAC/B,MAAM,OAAO,CAAC,aAAa,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,CAAC;QAED,KAAK,MAAM,KAAK,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;YAC7D,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC7C,CAAC;IACH,CAAC;IAED,sGAAsG;IACtG,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,CAAC,UAAU;YAAE,OAAO,KAAK,CAAC;QAC9B,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;YACnD,IAAI,CAAC,IAAI;gBAAE,OAAO,KAAK,CAAC;YACxB,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACjE,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,KAAK,GAA+B;gBACxC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;gBACpC,OAAO,EAAE,EAAE,UAAU,EAAE;aACxB,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QACnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,CAAC,IAAI,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAC1G,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,GAAG,CAAC,MAAM,cAAc,CAAC,CAAC;YACtE,IAAI,CAAC,QAAQ;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,GAAG,CAAC,eAAe,cAAc,CAAC,CAAC;YACnF,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACjE,CAAC;QACD,iDAAiD;QACjD,MAAM,aAAa,GAAG,MAAM,IAAI,CAAC,2BAA2B,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;QAClF,MAAM,UAAU,GAAG,qBAAqB,CAAC,aAAa,EAAE,GAAG,CAAC,CAAC;QAC7D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,2BAA2B,CAAC,WAAmB;QAC3D,MAAM,KAAK,GAAG,IAAI,GAAG,EAA0B,CAAC;QAChD,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;QAClC,IAAI,QAAQ,GAAG,CAAC,WAAW,CAAC,CAAC;QAE7B,OAAO,QAAQ,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YAC3B,MAAM,IAAI,GAAa,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;YACxF,QAAQ,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1C,KAAK,MAAM,IAAI,IAAI,OAAO,EAAE,CAAC;gBAC3B,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;oBACrB,+EAA+E;oBAC/E,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC;wBAAE,SAAS;oBACrC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;oBACnB,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,IAAI,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC;wBACzE,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC;oBAC/B,CAAC;gBACH,CAAC;YACH,CAAC;YACD,QAAQ,GAAG,IAAI,CAAC;QAClB,CAAC;QAED,OAAO,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,CAAC;YACpD,OAAO,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,EAAE,eAAe,EAAE,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC;QAC9E,CAAC;QACD,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAC7E,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAC/E,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACtD,MAAM,IAAI,eAAe,CAAC,yCAAyC,CAAC,CAAC;QACvE,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,KAAK,CAAC,MAAM,cAAc,CAAC,CAAC;YACxE,MAAM,IAAI,CAAC,oBAAoB,CAAC,UAAU,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC9D,CAAC;QACD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YAC1E,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAC1B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC;IAClG,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAC1D,OAAO,IAAI,CAAC,cAAc,CAAC,UAAU,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;IAC/F,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;IAC3C,CAAC;IAED,KAAK,CAAC,UAAU,CACd,KAA2F;QAE3F,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;YAC9C,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,KAAK,CAAC,MAAM,cAAc,CAAC,CAAC;YACxE,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACpE,CAAC;QACD,MAAM,OAAO,GAAoD,IAAI,CAAC,KAAK;YACzE,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YACvF,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,QAAQ,EAAE,CAAC;QACvD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,kBAAkB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE;YAC/F,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,QAAQ,CAAC,QAAQ;SAC3B,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,kBAAkB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE;YAC/F,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,QAAQ,CAAC,QAAQ;SAC3B,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,KAAyC;QACnF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAE/F,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,KAAyC;QACtF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAE/F,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAC3F,IAAI,CAAC,qBAAqB,CAAC,CAAC,CAAC,CAC9B,CAAC;QACF,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,CAAC,UAAU;YAAE,OAAO,IAAI,CAAC;QAC7B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,qBAAqB,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC;IACvG,CAAC;IAEO,KAAK,CAAC,uBAAuB,CAAC,IAAiE;QACrG,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO;QAC5B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,eAAe,CAAC,wDAAwD,CAAC,CAAC;QACpG,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,SAAS,CAAC,CAAC;IAClE,CAAC;IAED,KAAK,CAAC,gBAAgB,CACpB,KAAkG;QAElG,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1C,IAAI,CAAC,mBAAmB,CAAC,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,SAAS,CAAC,CAAC;QAC1D,IAAI,IAAI,CAAC,KAAK;YAAE,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1D,MAAM,UAAU,GAAuD,IAAI,CAAC,KAAK;YAC/E,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YAC3F,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,QAAQ,EAAE,CAAC;QAC3D,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,MAAM,IAAI,CAAC,qBAAqB,CAAC,QAAQ,CAAC,EAAE;YAC/F,IAAI,EAAE,YAAY;YAClB,OAAO,EAAE,QAAQ,CAAC,UAAU;SAC7B,CAAC,CAAC;QAEH,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,YAAY,EAAE,EAAE;oBAChB,UAAU,EAAE,QAAQ,CAAC,UAAU;oBAC/B,GAAG,EAAE,QAAQ,CAAC,GAAG;oBACjB,SAAS,EAAE,MAAM,IAAI,CAAC,qBAAqB,CAAC,QAAQ,CAAC;iBACtD;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QACD,gFAAgF;QAChF,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1C,qGAAqG;QACrG,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,KAAK,CAAC,CAAC;QAC1D,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,EAAE,CAAC;YAC7B,MAAM,IAAI,eAAe,CAAC,wDAAwD,CAAC,CAAC;QACtF,CAAC;QAED,yFAAyF;QACzF,MAAM,IAAI,GAAG,mBAAmB,CAAC,KAAK,CAAC,IAAI,EAAE,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC7E,IAAI,CAAC,mBAAmB,CAAC,KAAK,CAAC,QAAQ,IAAI,0BAA0B,EAAE,IAAI,CAAC,UAAU,CAAC,CAAC;QAExF,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI;YACJ,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,SAAS,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,YAAY,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,UAAU;SACxG,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,aAAa,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QACnE,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,+BAA+B,CAAC,OAKrC;QACC,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,IAAI,CAAC,OAAO,CAAC,SAAS;YAAE,MAAM,IAAI,eAAe,CAAC,8CAA8C,CAAC,CAAC;QAClG,IAAI,CAAC,mBAAmB,CAAC,OAAO,CAAC,WAAW,IAAI,0BAA0B,CAAC,CAAC;QAC5E,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAC1E,CAAC;aAAM,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC;YAC7D,MAAM,IAAI,aAAa,CAAC,YAAY,OAAO,CAAC,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC;YAC5C,UAAU,EAAE,eAAe,CAAC,YAAY,OAAO,CAAC,SAAS,EAAE,EAAE,OAAO,CAAC,QAAQ,CAAC;YAC9E,WAAW,EAAE,OAAO,CAAC,WAAW;YAChC,gBAAgB,EAAE,OAAO,CAAC,gBAAgB;SAC3C,CAAC,CAAC;IACL,CAAC;IAED,6FAA6F;IACrF,mBAAmB,CAAC,QAAgB,EAAE,SAAkB;QAC9D,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC;QACnC,IAAI,CAAC,MAAM;YAAE,OAAO;QACpB,IAAI,MAAM,CAAC,QAAQ,KAAK,SAAS,IAAI,SAAS,KAAK,SAAS,IAAI,SAAS,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;YAC5F,MAAM,IAAI,eAAe,CAAC,WAAW,SAAS,0BAA0B,MAAM,CAAC,QAAQ,SAAS,CAAC,CAAC;QACpG,CAAC;QACD,IAAI,MAAM,CAAC,gBAAgB,EAAE,CAAC;YAC5B,MAAM,IAAI,GAAG,QAAQ,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACzD,MAAM,OAAO,GAAG,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,EAAE;gBACvD,MAAM,CAAC,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;gBAChC,OAAO,CAAC,CAAC,QAAQ,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,CAAC;YACzE,CAAC,CAAC,CAAC;YACH,IAAI,CAAC,OAAO;gBAAE,MAAM,IAAI,eAAe,CAAC,cAAc,IAAI,mBAAmB,CAAC,CAAC;QACjF,CAAC;IACH,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,uBAAuB,CAAC,IAAsF;QAC1H,IAAI,CAAC,IAAI,CAAC,UAAU;YAAE,OAAO;QAC7B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,MAAM,MAAM,GAAG,YAAY,SAAS,GAAG,CAAC;QACxC,MAAM,QAAQ,GAAG,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;QAC5C,IAAI,CAAC,SAAS,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,UAAU,CAAC,MAAM,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,GAAG,CAAC,EAAE,CAAC;YACvG,MAAM,IAAI,eAAe,CAAC,6BAA6B,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,uBAAuB,wBAAwB,CAAC,CAAC;QAC/H,CAAC;IACH,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,OAAO,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC;IACpD,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,OAAO,IAAI,IAAI,IAAI,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,EAAE,CAAC,CAAC;QACrH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC,CAAC;QAC7E,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAmB;gBACxC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAC/C,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAmB;gBACxC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,OAAO,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC1E,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7E,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACpD,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gGAAgG;IAChG,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC,CAAC;IACvE,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACzC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,aAAa,EAAE,EAAE,CAAC,CAAC;QACtE,KAAK,MAAM,KAAK,IAAI,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,EAAE,CAAC,EAAE,CAAC;YAC1G,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC,CAAC;QACtE,CAAC;QACD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjF,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gGAAgG;IACxF,KAAK,CAAC,mBAAmB,CAC/B,SAAiB,EACjB,KAAsD,EACtD,EAAU;QAEV,KAAK,MAAM,IAAI,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,EAAE,CAAC;YACxD,IAAI,IAAI,CAAC,KAAK,CAAC,KAAK,EAAE;gBAAE,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;QACvF,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACxD,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAC9B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,CAAC,IAAI,CAAC;IACjF,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,KAAK,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACpH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QAC/C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YACzC,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,oBAAoB,CAAC,EAAE,CAAC,CAAC,CAAC;IACzE,CAAC;IAEO,KAAK,CAAC,oBAAoB,CAAC,EAAU;QAC3C,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QAC/C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC;QAExE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QAC7D,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7E,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,IAAI,CAAC,YAAY,CAAwB;YAC7C,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QACnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACpD,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACnC,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACnC,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,6FAA6F;IAC7F,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,CAAC,MAAM,EAAE,EAAE,CAAC,MAAM,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC,CAAC;IACvE,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACzC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,aAAa,EAAE,EAAE,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjF,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC3D,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,gBAAgB,CAAC,KAAK,CAAC,CAAC;QACxD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,MAAM,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,GAAG,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC;QAC9F,IAAI,SAAS,KAAK,SAAS;YAAE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,MAAM,EAAE,CAAC,CAAC;QACzH,MAAM,EAAE,KAAK,EAAE,KAAK,EAAE,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,OAAO,EAAE,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,CAAC;QAC7E,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE;YAClD,QAAQ;YACR,gBAAgB;YAChB,SAAS;YACT,KAAK;YACL,KAAK;YACL,cAAc;YACd,gBAAgB;YAChB,MAAM;SACP,CAAC,CAAC;IACL,CAAC;IAED;;;;;;;OAOG;IACH,KAAK,CAAC,8BAA8B,CAAC,UAAwC,EAAE;QAC7E,MAAM,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,GAAG,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC;QAC9F,IAAI,QAAmB,CAAC;QACxB,IAAI,OAAO,CAAC,UAAU,EAAE,CAAC;YACvB,MAAM,GAAG,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,CAAC;YAC7C,IAAI,GAAG,CAAC,MAAM,KAAK,CAAC;gBAAE,MAAM,IAAI,eAAe,CAAC,+BAA+B,CAAC,CAAC;YACjF,QAAQ,GAAG,EAAE,CAAC;YACd,KAAK,MAAM,EAAE,IAAI,GAAG,EAAE,CAAC;gBACrB,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC;gBACpD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBAChD,IAAI,CAAC,OAAO;oBAAE,MAAM,IAAI,aAAa,CAAC,YAAY,EAAE,cAAc,CAAC,CAAC;gBACpE,QAAQ,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YACzB,CAAC;QACH,CAAC;aAAM,CAAC;YACN,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,EAAE,CAAC;QACtC,CAAC;QAED,IAAI,UAAU,GAA4D,EAAE,CAAC;QAC7E,IAAI,OAAO,CAAC,iBAAiB,EAAE,CAAC;YAC9B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;YACtD,MAAM,QAAQ,GAAG,IAAI,CAAC,KAAK,EAAE,QAAQ,CAAC;YACtC,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YACrD,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,CAAC,MAAM,IAAI,CAAC,WAAW,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;YACtE,UAAU,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;iBAC7E,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;iBACnC,GAAG,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,CAAC,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC;QAC5F,CAAC;QAED,MAAM,cAAc,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,GAAG,QAAQ,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QACnI,MAAM,KAAK,GAAG,cAAc,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,KAAK,EAAE,EAAE,CAAC,GAAG,GAAG,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC;QAC3E,MAAM,KAAK,GAAG,IAAI,CAAC,MAAM,CAAC,kBAAkB,IAAI,IAAI,CAAC;QACrD,IAAI,KAAK,GAAG,KAAK,EAAE,CAAC;YAClB,MAAM,IAAI,eAAe,CAAC,6BAA6B,KAAK,8BAA8B,KAAK,sDAAsD,CAAC,CAAC;QACzJ,CAAC;QACD,MAAM,QAAQ,GAAG,cAAc,CAAC,IAAI,EAAE,CAAC;QACvC,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;QACpD,wFAAwF;QACxF,MAAM,YAAY,GAAG,CAAC,MAAM,IAAI,CAAC,gBAAgB,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC,IAAI,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QAEtI,MAAM,EAAE,KAAK,EAAE,KAAK,EAAE,GAAG,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,OAAO,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAC/I,MAAM,MAAM,GAAG,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC,EAAE,GAAG,UAAU,CAAC,CAAC;QAC7F,OAAO,qBAAqB,CAC1B,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,OAAO,EAAE,CAAC,EAAE,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC;YACvC,SAAS,EAAE,CAAC,CAAC,EAAE;YACf,KAAK,EAAE,cAAc,CAAC,CAAC,CAAC;YACxB,gBAAgB,EAAE,CAAC,CAAC,SAAS,IAAI,OAAO,CAAC,gBAAgB;YACzD,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe;YACvE,GAAG,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;SACtC,CAAC,CAAC,EACH,YAAY,EACZ,EAAE,SAAS,EAAE,KAAK,EAAE,KAAK,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,YAAY,EAAE,OAAO,CAAC,YAAY,EAAE,CAC1G,CAAC;IACJ,CAAC;IAED,4EAA4E;IACpE,eAAe,CAAC,OAAmB;QACzC,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,IAAI,IAAI,CAAC,MAAM,CAAC,qBAAqB,IAAI,SAAS,CAAC;QACtF,IAAI,SAAS,KAAK,SAAS,IAAI,SAAS,KAAK,UAAU,EAAE,CAAC;YACxD,MAAM,IAAI,eAAe,CAAC,2BAA2B,SAAS,iCAAiC,CAAC,CAAC;QACnG,CAAC;QACD,MAAM,cAAc,GAAG,OAAO,CAAC,cAAc,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,0BAA0B,IAAI,SAAS,KAAK,UAAU,CAAC,CAAC;QACxH,IAAI,cAAc,IAAI,SAAS,KAAK,UAAU,EAAE,CAAC;YAC/C,MAAM,IAAI,eAAe,CAAC,gDAAgD,CAAC,CAAC;QAC9E,CAAC;QACD,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC;QAClD,IAAI,gBAAgB,IAAI,CAAC,CAAC,OAAO,EAAE,UAAU,EAAE,SAAS,EAAE,OAAO,CAAC,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;YAC9F,MAAM,IAAI,eAAe,CAAC,6BAA6B,gBAAgB,mDAAmD,CAAC,CAAC;QAC9H,CAAC;QACD,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,IAAI,IAAI,CAAC,MAAM,CAAC,kBAAkB,IAAI,UAAU,CAAC;QAC9E,IAAI,MAAM,KAAK,UAAU,IAAI,MAAM,KAAK,WAAW,EAAE,CAAC;YACpD,MAAM,IAAI,eAAe,CAAC,mBAAmB,MAAM,mCAAmC,CAAC,CAAC;QAC1F,CAAC;QACD,OAAO,EAAE,SAAS,EAAE,cAAc,EAAE,gBAAgB,EAAE,MAAM,EAAE,CAAC;IACjE,CAAC;IAED,oDAAoD;IAC5C,KAAK,CAAC,gBAAgB,CAAC,KAAa;QAC1C,MAAM,IAAI,GAAG,IAAI,GAAG,EAA0B,CAAC;QAC/C,KAAK,MAAM,IAAI,IAAI,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACzF,KAAK,MAAM,CAAC,IAAI,IAAI;gBAAE,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;QAC1C,CAAC;QACD,OAAO,CAAC,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC;IAC5B,CAAC;IAED,sFAAsF;IAC9E,KAAK,CAAC,UAAU,CAAC,OAAmB,EAAE,SAAoC;QAChF,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,OAAO,CAAC,KAAK,IAAI,IAAI,CAAC,QAAQ,EAAE,EAAE,OAAO,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC;QACxH,MAAM,OAAO,GAAG,IAAI,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,IAAI,SAAS,CAAC,CAAC,CAAC;QAC9D,MAAM,KAAK,GAAG,OAAO,CAAC,KAAK,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,QAAQ,IAAI,SAAS,CAAC,CAAC,CAAC;QACtG,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC3D,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,aAAa,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,IAAI,SAAS;YAAE,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC1E,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC7C,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,EAAE,CAAC;QACpC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,EAAE,CAAC;QACpC,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAED,gBAAgB;IAEhB;;;OAGG;IACH,KAAK,CAAC,QAAQ;QACZ,MAAM,UAAU,GAAG,OAAO,IAAI,CAAC,MAAM,CAAC,KAAK,KAAK,UAAU,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,KAAK,IAAI,EAAE,CAAC;QAC3H,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,IAAI,EAAE,CAAC;QACpD,MAAM,IAAI,GAAG,IAAI,GAAG,EAAgB,CAAC;QACrC,KAAK,MAAM,IAAI,IAAI,CAAC,GAAG,MAAM,EAAE,GAAG,UAAU,CAAC;YAAE,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,CAAC;QACvE,OAAO,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,mBAAmB;IAEnB,sFAAsF;IAC9E,KAAK,CAAC,eAAe;QAC3B,MAAM,UAAU,GAAc,CAAC,IAAI,CAAC,MAAM,CAAC,QAAQ,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC;YACxE,GAAG,CAAC;YACJ,EAAE,EAAE,UAAU,CAAC,EAAE;YACjB,SAAS,EAAE,IAAI,IAAI,CAAC,CAAC,CAAC,CAAC,WAAW,EAAE;SACrC,CAAC,CAAC,CAAC;QACJ,OAAO,CAAC,GAAG,UAAU,EAAE,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC;IAC9D,CAAC;IAEO,eAAe,CAAC,EAAE,MAAM,EAAE,GAAG,OAAO,EAAW;QACrD,OAAO,EAAE,GAAG,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC;IAC7C,CAAC;IAED,mGAAmG;IACnG,KAAK,CAAC,WAAW;QACf,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,OAAO,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,CAAC;IAC3F,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,OAAO,OAAO,IAAI,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACvF,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,KAMnB;QACC,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,MAAM,GAAG,KAAK,CAAC,MAAM,IAAI,qBAAqB,EAAE,CAAC;QACvD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,GAAG,EAAE,KAAK,CAAC,GAAG;YACd,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,MAAM;YACN,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI;YAC5B,QAAQ,EAAE,IAAI,CAAC,KAAK,EAAE,QAAQ;SAC/B,CAAC,CAAC;QACH,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,EAAE,OAAO,EAAE,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IAC5D,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,EAAU,EACV,OAAgF;QAEhF,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAAE,OAAO,IAAI,CAAC;QAC9C,IAAI,OAAO,CAAC,GAAG;YAAE,IAAI,CAAC,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;QACtD,MAAM,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,OAAO,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAC5C,EAAE,EACF,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,SAAS,CAAC,CAAC,CAC7G,CAAC;QACF,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAAE,OAAO,KAAK,CAAC;QAC/C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,kBAAkB,CAAC,GAAW;QACpC,IAAI,CAAC;YACH,gBAAgB,CAAC,GAAG,EAAE,IAAI,CAAC,MAAM,CAAC,eAAe,EAAE,gBAAgB,CAAC,CAAC;QACvE,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,IAAI,eAAe,CAAE,GAAa,CAAC,OAAO,CAAC,CAAC;QACpD,CAAC;IACH,CAAC;IAED,2FAA2F;IACnF,KAAK,CAAC,kBAAkB,CAAC,KAAkB;QACjD,MAAM,CAAC,GAAG,KAAK,CAAC,OAA8B,CAAC;QAC/C,MAAM,KAAK,GAAG,CAAC,CAAC,OAAO,IAAI,CAAC,CAAC,QAAQ,IAAI,CAAC,CAAC,IAAI,CAAC;QAChD,IAAI,KAAK;YAAE,OAAO,KAAK,CAAC,QAAQ,IAAI,SAAS,CAAC;QAC9C,oEAAoE;QACpE,IAAI,UAAU,IAAI,CAAC;YAAE,OAAO,CAAC,CAAC,QAAQ,IAAI,SAAS,CAAC;QAEpD,MAAM,SAAS,GACb,CAAC,CAAC,SAAS;YACX,CAAC,CAAC,IAAI,EAAE,SAAS;YACjB,CAAC,CAAC,WAAW,EAAE,SAAS;YACxB,CAAC,CAAC,SAAS,EAAE,SAAS;YACtB,CAAC,CAAC,SAAS,EAAE,SAAS;YACtB,CAAC,CAAC,UAAU,EAAE,SAAS;YACvB,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,OAAO,EAAE,MAAM,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,IAAI,CAAC,CAAC,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC;QACrI,IAAI,CAAC,SAAS;YAAE,OAAO,SAAS,CAAC;QACjC,OAAO,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,EAAE,QAAQ,IAAI,SAAS,CAAC;IACzE,CAAC;CACF"}
@@ -527,6 +527,11 @@ export interface CriticalPathConfig {
527
527
  * a time. Requires `criticalPathCalendars: 'assignee'` (or `calendars: 'assignee'` per call).
528
528
  */
529
529
  criticalPathLevelResources?: boolean;
530
+ /**
531
+ * Default `effort` for critical path analysis: `'estimate'` (full estimates) or `'remaining'`
532
+ * (in-progress tasks schedule only `estimate - loggedHours`).
533
+ */
534
+ criticalPathEffort?: 'estimate' | 'remaining';
530
535
  /** Most tasks `calculatePortfolioCriticalPath` analyses in one call. Default 5000. */
531
536
  portfolioTaskLimit?: number;
532
537
  initialData?: {
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/types/index.ts"],"names":[],"mappings":"AAAA,MAAM,MAAM,eAAe,GAAG,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;AAC5E,MAAM,MAAM,QAAQ,GAAG,eAAe,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAEvD,MAAM,MAAM,iBAAiB,GAAG,SAAS,GAAG,MAAM,GAAG,aAAa,GAAG,WAAW,GAAG,MAAM,GAAG,UAAU,CAAC;AACvG,MAAM,MAAM,UAAU,GAAG,iBAAiB,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAE3D,MAAM,MAAM,cAAc,GAAG,aAAa,GAAG,aAAa,GAAG,WAAW,GAAG,UAAU,CAAC;AAEtF,MAAM,WAAW,gBAAgB;IAC/B,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,QAAQ,EAAE,cAAc,CAAC;CAC1B;AAED,MAAM,WAAW,iBAAiB;IAChC,cAAc,EAAE,cAAc,CAAC;IAC/B,OAAO,EAAE,OAAO,CAAC;IACjB,SAAS,EAAE,OAAO,CAAC;IACnB,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,SAAS,EAAE,OAAO,CAAC;IACnB,UAAU,EAAE,OAAO,CAAC;IACpB,WAAW,EAAE,OAAO,CAAC;IACrB,YAAY,EAAE,OAAO,CAAC;IACtB,SAAS,EAAE,OAAO,CAAC;IACnB,cAAc,EAAE,OAAO,CAAC;IACxB,aAAa,EAAE,OAAO,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,QAAQ,EAAE,OAAO,CAAC;IAClB,WAAW,EAAE,OAAO,CAAC;CACtB;AAED,MAAM,MAAM,kBAAkB,GAAG,iBAAiB,CAAC;AAEnD,MAAM,MAAM,IAAI,GAAG,OAAO,GAAG,iBAAiB,GAAG,aAAa,GAAG,QAAQ,CAAC;AAE1E,MAAM,WAAW,iBAAiB;IAChC,KAAK,EAAE,MAAM,CAAC;IACd,GAAG,EAAE,MAAM,CAAC;CACb;AAED,MAAM,WAAW,WAAW;IAC1B,SAAS,EAAE,MAAM,CAAC;IAClB,YAAY,EAAE,OAAO,CAAC;IACtB,KAAK,CAAC,EAAE,iBAAiB,EAAE,CAAC;CAC7B;AAED,MAAM,WAAW,OAAO;IACtB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,OAAO,CAAC,EAAE,OAAO,CAAC;CACnB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,IAAI,EAAE,WAAW,EAAE,CAAC;IACpB,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;CACtB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,IAAI,EAAE,IAAI,CAAC;IACX,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,EAAE,CAAC;IACpB;;;OAGG;IACH,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,4EAA4E;IAC5E,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,qBAAqB;IACpC,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,8EAA8E;IAC9E,IAAI,EAAE,MAAM,GAAG,QAAQ,GAAG,MAAM,GAAG,SAAS,GAAG,eAAe,GAAG,cAAc,GAAG,MAAM,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;IACzG,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,QAAQ,CAAC,EAAE,OAAO,CAAC;IACnB,YAAY,CAAC,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,kBAAkB;IACjC,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,aAAa,EAAE,MAAM,GAAG,GAAG,CAAC;IAC5B,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,gBAAgB,EAAE,CAAC;IAC7B,WAAW,EAAE,kBAAkB,EAAE,CAAC;IAClC,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,gFAAgF;IAChF,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,+EAA+E;IAC/E,OAAO,CAAC,EAAE,aAAa,EAAE,CAAC;IAC1B,oGAAoG;IACpG,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;IACpB,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;IACvC,mBAAmB,CAAC,EAAE,KAAK,CAAC;QAAE,GAAG,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAC;QAAC,KAAK,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAC5E,sBAAsB,CAAC,EAAE,qBAAqB,EAAE,CAAC;IACjD,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,SAAS,GAAG,QAAQ,GAAG,MAAM,CAAC;IACxD,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,cAAc;IAC7B,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,MAAM,CAAC;IACxB,IAAI,EAAE,UAAU,GAAG,YAAY,GAAG,YAAY,CAAC;CAChD;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,aAAa,EAAE,IAAI,EAAE,CAAC;IACtB,eAAe,EAAE,IAAI,EAAE,CAAC;IACxB,YAAY,EAAE,cAAc,EAAE,CAAC;CAChC;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,EAAE,OAAO,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,MAAM,CAAC;IACjC,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,QAAQ,EAAE,QAAQ,CAAC;IACnB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC;IAC3B,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IAEjB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,wBAAwB,CAAC,EAAE,MAAM,CAAC;IAClC,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,uBAAuB,CAAC,EAAE,MAAM,CAAC;IACjC,kFAAkF;IAClF,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,6GAA6G;IAC7G,eAAe,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAChC,gFAAgF;IAChF,sBAAsB,CAAC,EAAE,MAAM,CAAC;IAChC,gIAAgI;IAChI,YAAY,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAE7B,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAC9B,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,KAAK,CAAC,EAAE,YAAY,EAAE,CAAC;IACvB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,eAAe,GAAG,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,GAAG,UAAU,CAAC,GAAG;IACnG,MAAM,CAAC,EAAE,UAAU,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;CACrB,CAAC;AAEF,MAAM,MAAM,iBAAiB,GACzB,OAAO,GACP,SAAS,GACT,eAAe,GACf,iBAAiB,GACjB,eAAe,GACf,oBAAoB,GACpB,UAAU,GACV,WAAW,GACX,UAAU,GACV,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAElB,MAAM,WAAW,WAAW;IAC1B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,iBAAiB,CAAC;IAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,KAAK,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IAChC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,kBAAkB;IACjC,WAAW,EAAE,WAAW,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,MAAM,sBAAsB,GAAG,IAAI,CAAC,WAAW,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,CAAC,GAAG;IACpG,MAAM,CAAC,EAAE,iBAAiB,CAAC;CAC5B,CAAC;AAEF,MAAM,MAAM,kBAAkB,GAAG,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEjF,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,WAAW,GAAG,MAAM,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,MAAM,EAAE,UAAU,GAAG,QAAQ,GAAG,WAAW,CAAC;IAC5C,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,UAAU,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAErD,qFAAqF;AACrF,MAAM,WAAW,KAAK;IACpB,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,UAAU,CAAC;IACvB;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,uFAAuF;IACvF,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;CAClB;AAED,kCAAkC;AAClC,MAAM,MAAM,WAAW,GAAG,IAAI,CAAC;AAE/B;;;GAGG;AACH,MAAM,MAAM,aAAa,GAAG;IAAE,MAAM,EAAE,MAAM,CAAC;IAAC,MAAM,CAAC,EAAE,KAAK,CAAC;IAAC,IAAI,EAAE,WAAW,CAAA;CAAE,GAAG;IAAE,MAAM,EAAE,MAAM,CAAC;IAAC,MAAM,CAAC,EAAE,KAAK,CAAC;IAAC,IAAI,EAAE,WAAW,CAAA;CAAE,CAAC;AAE1I,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,MAAM,CAAC;IACd,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,EAAE,MAAM,CAAC;IACjB,UAAU,CAAC,EAAE,UAAU,CAAC;IACxB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,EAAE,CAAC;IACpB,SAAS,CAAC,EAAE,eAAe,EAAE,CAAC;IAC9B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,UAAU;IACzB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,CAAC,EAAE,UAAU,CAAC;IAC1B,QAAQ,EAAE,MAAM,CAAC;IACjB,QAAQ,EAAE,MAAM,CAAC;IACjB,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,EAAE,MAAM,CAAC;IACZ,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;IACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,qBAAqB,GAAG,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEvF,MAAM,WAAW,eAAe;IAC9B,QAAQ,EAAE,MAAM,CAAC;IACjB,IAAI,EAAE,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,IAAI,GAAG,MAAM,CAAC;IACxD,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,QAAQ,CAAC;CAC1C;AAED,MAAM,WAAW,YAAY;IAC3B,4FAA4F;IAC5F,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB;;;OAGG;IACH,gBAAgB,CAAC,EAAE,MAAM,EAAE,CAAC;CAC7B;AAED,MAAM,WAAW,gBAAgB;IAC/B,UAAU,EAAE,MAAM,CAAC;IACnB,GAAG,EAAE,MAAM,CAAC;IACZ,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,mBAAmB;IAClC,UAAU,EAAE,MAAM,CAAC;IACnB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,KAAK,GAAG,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAClC;AAED,MAAM,WAAW,kBAAkB;IACjC,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC;IAC1D,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC;IAC7C,QAAQ,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,UAAU,CAAC,CAAC;IAC5D,cAAc,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC;IACrD,qBAAqB,CAAC,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC,CAAC;CACtF;AAED,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,MAAM,CAAC;IACf,KAAK,EAAE,MAAM,CAAC;IACd,UAAU,CAAC,EAAE,OAAO,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,OAAO,EAAE,MAAM,CAAC;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,OAAO,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACjC,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,GAAG,EAAE,MAAM,CAAC;IACZ,wFAAwF;IACxF,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,wDAAwD;IACxD,MAAM,EAAE,YAAY,EAAE,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,8EAA8E;IAC9E,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,4FAA4F;AAC5F,MAAM,MAAM,aAAa,GAAG,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,GAAG;IAAE,SAAS,EAAE,OAAO,CAAA;CAAE,CAAC;AAE7E;;;GAGG;AACH,MAAM,MAAM,YAAY,GAAG,OAAO,qBAAqB,EAAE,uBAAuB,CAAC,MAAM,CAAC,GAAG,GAAG,CAAC;AAE/F;;;;;;;GAOG;AACH,MAAM,WAAW,WAAW;IAC1B,gBAAgB,CAAC,EAAE,CAAC,IAAI,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IACnF,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACvD,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IAClG,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,EAAE,aAAa,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IAC5E,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACpE,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;CACpE;AAED,6EAA6E;AAC7E,MAAM,WAAW,eAAe;IAC9B,8FAA8F;IAC9F,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,yGAAyG;IACzG,QAAQ,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,UAAU,EAAE,qBAAqB,KAAK,MAAM,GAAG,IAAI,GAAG,SAAS,GAAG,IAAI,CAAC;CACnG;AAED,sDAAsD;AACtD,MAAM,WAAW,oBAAoB;IACnC,yEAAyE;IACzE,MAAM,EAAE,OAAO,oBAAoB,EAAE,kBAAkB,CAAC;IACxD,gEAAgE;IAChE,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;IACxD,GAAG,EAAE,GAAG,CAAC;IACT,oGAAoG;IACpG,MAAM,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAChC;AAED,MAAM,WAAW,WAAW;IAC1B,MAAM,EAAE,KAAK,GAAG,MAAM,GAAG,KAAK,GAAG,OAAO,GAAG,QAAQ,CAAC;IACpD,yFAAyF;IACzF,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,CAAC,OAAO,EAAE,OAAO,EAAE,GAAG,EAAE,oBAAoB,KAAK,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC;CACxF;AAED;;;GAGG;AACH,MAAM,MAAM,gBAAgB,GAAG,CAC7B,OAAO,EAAE,OAAO,EAChB,GAAG,EAAE,IAAI,CAAC,oBAAoB,EAAE,QAAQ,CAAC,EACzC,IAAI,EAAE,MAAM,OAAO,CAAC,QAAQ,CAAC,KAC1B,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC;AAElC,MAAM,WAAW,kBAAkB;IACjC,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,KAAK,CAAC,EAAE,WAAW,CAAC;IACpB,kFAAkF;IAClF,gBAAgB,CAAC,EAAE,eAAe,EAAE,CAAC;IACrC,6FAA6F;IAC7F,IAAI,CAAC,EAAE,CAAC,MAAM,EAAE,OAAO,oBAAoB,EAAE,kBAAkB,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACzF,qFAAqF;IACrF,MAAM,CAAC,EAAE,WAAW,EAAE,CAAC;IACvB,6EAA6E;IAC7E,UAAU,CAAC,EAAE,gBAAgB,CAAC;CAC/B;AAED,MAAM,WAAW,kBAAkB;IACjC;;;;;OAKG;IACH,SAAS,CAAC,EAAE,mBAAmB,CAAC;IAChC;;;OAGG;IACH,KAAK,CAAC,EAAE,OAAO,mBAAmB,EAAE,cAAc,CAAC;IACnD;;;;OAIG;IACH,KAAK,CAAC,EAAE,IAAI,EAAE,GAAG,CAAC,CAAC,KAAK,CAAC,EAAE,KAAK,KAAK,IAAI,EAAE,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,CAAC;IAC/D,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjC,OAAO,CAAC,EAAE,kBAAkB,EAAE,CAAC;IAC/B,gEAAgE;IAChE,QAAQ,CAAC,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,CAAC,EAAE,CAAC;IAC/C,2FAA2F;IAC3F,OAAO,CAAC,EAAE,YAAY,CAAC;IACvB,2FAA2F;IAC3F,eAAe,CAAC,EAAE,OAAO,2BAA2B,EAAE,sBAAsB,CAAC;IAC7E,eAAe,CAAC,EAAE,YAAY,CAAC;IAC/B;;;OAGG;IACH,qBAAqB,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IAC/C;;;OAGG;IACH,0BAA0B,CAAC,EAAE,OAAO,CAAC;IACrC,sFAAsF;IACtF,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,WAAW,CAAC,EAAE;QACZ,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;QACrB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,oEAAoE;QACpE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,SAAS,EAAE,CAAC;QACzB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,aAAa,EAAE,CAAC;QAC7B,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC;QACvB,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC;KAC9B,CAAC;CACH;AAMD,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK,CAAC;AAEzE,MAAM,MAAM,gBAAgB,GAAG,UAAU,GAAG,SAAS,GAAG,SAAS,GAAG,SAAS,GAAG,WAAW,CAAC;AAE5F,MAAM,WAAW,gBAAgB;IAC/B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,WAAW,GAAG,WAAW,GAAG,aAAa,GAAG,OAAO,CAAC;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,aAAa,EAAE,MAAM,CAAC;IACtB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,eAAe,EAAE,MAAM,CAAC;IACxB,YAAY,EAAE,MAAM,CAAC;IACrB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,mBAAmB,EAAE,MAAM,CAAC;IAC5B,gBAAgB,EAAE,MAAM,CAAC;IACzB,UAAU,EAAE,OAAO,CAAC;IACpB,iBAAiB,EAAE,MAAM,CAAC;IAC1B,MAAM,EAAE,gBAAgB,CAAC;IACzB,OAAO,EAAE,MAAM,EAAE,CAAC;CACnB;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,WAAW,EAAE,MAAM,CAAC;IACpB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,kBAAkB,EAAE,MAAM,CAAC;IAC3B,yBAAyB,EAAE,MAAM,CAAC;IAClC,yBAAyB,EAAE,MAAM,CAAC;IAClC,MAAM,EAAE,gBAAgB,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,eAAe,EAAE,MAAM,CAAC;IACxB,YAAY,EAAE,MAAM,CAAC;IACrB,mBAAmB,EAAE,MAAM,CAAC;IAC5B,gBAAgB,EAAE,MAAM,CAAC;IACzB,MAAM,EAAE,gBAAgB,EAAE,CAAC;CAC5B;AAED,MAAM,WAAW,wBAAwB;IACvC,MAAM,EAAE,MAAM,CAAC;IACf,UAAU,EAAE,MAAM,CAAC;IACnB,WAAW,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,OAAO,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,iBAAiB,CAAC,EAAE,MAAM,CAAC;IAC3B,oGAAoG;IACpG,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,6GAA6G;IAC7G,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,8FAA8F;IAC9F,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,0FAA0F;IAC1F,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB;AAED,4EAA4E;AAC5E,MAAM,WAAW,cAAc;IAC7B,wBAAwB;IACxB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,oEAAoE;IACpE,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,iGAAiG;IACjG,QAAQ,EAAE,MAAM,CAAC;IACjB,KAAK,EAAE,MAAM,CAAC;IACd,GAAG,EAAE,MAAM,CAAC;IACZ,yDAAyD;IACzD,UAAU,EAAE,MAAM,CAAC;IACnB,OAAO,EAAE,MAAM,EAAE,CAAC;CACnB;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,YAAY,EAAE,MAAM,CAAC;IACrB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,iBAAiB,CAAC,EAAE,MAAM,CAAC;IAC3B,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,KAAK,EAAE,wBAAwB,EAAE,CAAC;IAClC,gDAAgD;IAChD,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,8EAA8E;IAC9E,uBAAuB,CAAC,EAAE,MAAM,CAAC;IACjC,6FAA6F;IAC7F,eAAe,CAAC,EAAE,cAAc,EAAE,CAAC;CACpC;AAED,yFAAyF;AACzF,MAAM,WAAW,6BAA6B;IAC5C,YAAY,EAAE,MAAM,CAAC;IACrB,uGAAuG;IACvG,QAAQ,EAAE,oBAAoB,EAAE,CAAC;IACjC,8BAA8B;IAC9B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,0DAA0D;IAC1D,eAAe,EAAE,cAAc,EAAE,CAAC;CACnC;AAED,MAAM,WAAW,uBAAuB;IACtC,eAAe,EAAE,MAAM,CAAC;IACxB,gBAAgB,EAAE,MAAM,CAAC;IACzB,SAAS,EAAE,MAAM,CAAC;IAClB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,gBAAgB,EAAE,MAAM,CAAC;IACzB,cAAc,EAAE,OAAO,CAAC;IACxB,cAAc,CAAC,EAAE,MAAM,CAAC;CACzB;AAED,MAAM,WAAW,wBAAyB,SAAQ,IAAI;IACpD,GAAG,CAAC,EAAE,wBAAwB,CAAC;IAC/B,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,gBAAgB,EAAE,MAAM,EAAE,CAAC;IAC3B,YAAY,EAAE,MAAM,EAAE,CAAC;IACvB,uBAAuB,EAAE,uBAAuB,CAAC;CAClD;AAED,MAAM,WAAW,YAAY;IAC3B,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,aAAa,EAAE,MAAM,CAAC;IACtB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,oBAAoB,CAAC,EAAE,MAAM,CAAC;IAC9B,2BAA2B,CAAC,EAAE,MAAM,CAAC;IACrC,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,OAAO,CAAC;IACnB,cAAc,EAAE,OAAO,CAAC;CACzB;AAED,MAAM,MAAM,uBAAuB,GAAG,UAAU,GAAG,OAAO,GAAG,aAAa,GAAG,kBAAkB,GAAG,SAAS,CAAC;AAE5G,MAAM,WAAW,qBAAqB;IACpC,kBAAkB,EAAE,MAAM,CAAC;IAC3B,MAAM,EAAE,uBAAuB,CAAC;IAChC,UAAU,EAAE,OAAO,CAAC;IACpB,SAAS,EAAE;QACT,gBAAgB,CAAC,EAAE,MAAM,CAAC;QAC1B,YAAY,CAAC,EAAE,MAAM,CAAC;QACtB,cAAc,CAAC,EAAE,MAAM,CAAC;QACxB,gBAAgB,CAAC,EAAE,MAAM,CAAC;KAC3B,CAAC;CACH;AAED,MAAM,MAAM,oBAAoB,GAC5B,QAAQ,GACR,SAAS,GACT,aAAa,GACb,WAAW,GACX,SAAS,GACT,mBAAmB,CAAC;AAExB,MAAM,WAAW,wBAAwB;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;IACjB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,MAAM,EAAE,MAAM,CAAC;CAChB;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,wBAAwB,EAAE,CAAC;IACnC,YAAY,EAAE,oBAAoB,CAAC;CACpC;AAED,MAAM,WAAW,OAAO;IACtB,YAAY,EAAE,MAAM,CAAC;IACrB,WAAW,EAAE,MAAM,CAAC;IACpB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,EAAE,MAAM,CAAC;IACrB,gBAAgB,EAAE,MAAM,CAAC;IACzB,oBAAoB,EAAE,MAAM,CAAC;IAC7B,wBAAwB,EAAE,MAAM,CAAC;CAClC;AAED,MAAM,WAAW,mBAAmB;IAClC,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,mBAAmB,EAAE,OAAO,CAAC;IAC7B,iBAAiB,EAAE,OAAO,CAAC;IAC3B,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,uEAAuE;IACvE,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,sDAAsD;IACtD,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,gFAAgF;IAChF,sBAAsB,CAAC,EAAE,MAAM,CAAC;CACjC;AAED,MAAM,WAAW,WAAW;IAC1B,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,mBAAmB,CAAC;IACrC,YAAY,EAAE,YAAY,CAAC;IAC3B,QAAQ,EAAE,qBAAqB,CAAC;IAChC,GAAG,EAAE,OAAO,CAAC;IACb,eAAe,EAAE,mBAAmB,CAAC;CACtC;AAED,MAAM,WAAW,oBAAoB;IACnC,MAAM,EAAE,MAAM,CAAC;IACf,WAAW,EAAE,UAAU,EAAE,CAAC;IAC1B,YAAY,EAAE,WAAW,EAAE,CAAC;IAC5B,KAAK,EAAE,YAAY,EAAE,CAAC;IACtB,WAAW,EAAE,SAAS,EAAE,CAAC;IACzB,uBAAuB,EAAE,KAAK,CAAC;QAAE,IAAI,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAChE,UAAU,EAAE,QAAQ,EAAE,CAAC;IACvB,YAAY,EAAE,YAAY,CAAC;IAC3B,eAAe,EAAE,uBAAuB,CAAC;CAC1C;AAED,MAAM,WAAW,qBAAqB;IACpC,KAAK,CAAC,EAAE,gBAAgB,CAAC;IACzB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,cAAc;IAC7B,SAAS,EAAE,MAAM,CAAC;IAClB,WAAW,EAAE,MAAM,CAAC;IACpB,KAAK,EAAE,gBAAgB,CAAC;IACxB,KAAK,CAAC,EAAE,oBAAoB,CAAC;IAC7B,QAAQ,CAAC,EAAE;QACT,KAAK,EAAE,wBAAwB,EAAE,CAAC;QAClC,mBAAmB,EAAE,MAAM,EAAE,CAAC;QAC9B,YAAY,EAAE,cAAc,EAAE,CAAC;QAC/B,kBAAkB,EAAE,MAAM,CAAC;KAC5B,CAAC;IACF,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;CACjD;AAED,MAAM,WAAW,cAAc;IAC7B,MAAM,EAAE,MAAM,CAAC;IACf,UAAU,CAAC,EAAE,gBAAgB,CAAC;IAC9B,QAAQ,EAAE,wBAAwB,CAAC;IACnC,QAAQ,EAAE,oBAAoB,CAAC;IAC/B,OAAO,CAAC,EAAE,WAAW,CAAC;CACvB;AAED,MAAM,MAAM,gBAAgB,GAAG,KAAK,GAAG,MAAM,GAAG,OAAO,CAAC;AACxD,MAAM,MAAM,eAAe,GAAG,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ,CAAC;AACvF,MAAM,MAAM,cAAc,GAAG,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS,CAAC;AAE9E,MAAM,WAAW,cAAc;IAC7B,IAAI,EAAE,MAAM,CAAC;IACb,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAC/B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAClC,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;CAC3B;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,EAAE,gBAAgB,CAAC;IAC3B,OAAO,EAAE,eAAe,CAAC;IACzB,MAAM,EAAE,cAAc,CAAC;IACvB,UAAU,EAAE,MAAM,EAAE,CAAC;IACrB,YAAY,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACrC,OAAO,EAAE,cAAc,EAAE,CAAC;IAC1B,UAAU,EAAE,MAAM,CAAC;IACnB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,kBAAkB,CAAC,EAAE,MAAM,CAAC;CAC7B;AAED,MAAM,WAAW,2BAA2B;IAC1C,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,QAAQ,CAAC,EAAE,gBAAgB,CAAC;IAC5B,OAAO,CAAC,EAAE,eAAe,CAAC;IAC1B,MAAM,CAAC,EAAE,cAAc,CAAC;IACxB,0BAA0B,CAAC,EAAE,MAAM,CAAC;IACpC,iBAAiB,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAC3C,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,aAAa,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IAC7C,aAAa,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;CAC9C;AAMD;;;GAGG;AACH,MAAM,MAAM,mBAAmB,GAC3B,cAAc,GACd,gBAAgB,GAChB,gBAAgB,GAChB,gBAAgB,GAChB,wBAAwB,GACxB,aAAa,GACb,aAAa,GACb,aAAa,GACb,gBAAgB,GAChB,kBAAkB,GAClB,mBAAmB,GACnB,mBAAmB,GACnB,UAAU,GACV,aAAa,GACb,kBAAkB,CAAC;AAEvB,MAAM,WAAW,oBAAoB;IACnC,KAAK,EAAE,KAAK,CAAC;IACb,MAAM,EAAE,mBAAmB,CAAC;IAC5B,kEAAkE;IAClE,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,0EAA0E;IAC1E,QAAQ,CAAC,EAAE;QAAE,IAAI,EAAE,MAAM,GAAG,SAAS,GAAG,YAAY,CAAC;QAAC,OAAO,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;IACzE,6FAA6F;IAC7F,OAAO,EAAE,MAAM,EAAE,CAAC;CACnB;AAED,MAAM,MAAM,mBAAmB,GAAG,CAAC,OAAO,EAAE,oBAAoB,KAAK,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/types/index.ts"],"names":[],"mappings":"AAAA,MAAM,MAAM,eAAe,GAAG,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;AAC5E,MAAM,MAAM,QAAQ,GAAG,eAAe,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAEvD,MAAM,MAAM,iBAAiB,GAAG,SAAS,GAAG,MAAM,GAAG,aAAa,GAAG,WAAW,GAAG,MAAM,GAAG,UAAU,CAAC;AACvG,MAAM,MAAM,UAAU,GAAG,iBAAiB,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAE3D,MAAM,MAAM,cAAc,GAAG,aAAa,GAAG,aAAa,GAAG,WAAW,GAAG,UAAU,CAAC;AAEtF,MAAM,WAAW,gBAAgB;IAC/B,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,QAAQ,EAAE,cAAc,CAAC;CAC1B;AAED,MAAM,WAAW,iBAAiB;IAChC,cAAc,EAAE,cAAc,CAAC;IAC/B,OAAO,EAAE,OAAO,CAAC;IACjB,SAAS,EAAE,OAAO,CAAC;IACnB,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,SAAS,EAAE,OAAO,CAAC;IACnB,UAAU,EAAE,OAAO,CAAC;IACpB,WAAW,EAAE,OAAO,CAAC;IACrB,YAAY,EAAE,OAAO,CAAC;IACtB,SAAS,EAAE,OAAO,CAAC;IACnB,cAAc,EAAE,OAAO,CAAC;IACxB,aAAa,EAAE,OAAO,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,QAAQ,EAAE,OAAO,CAAC;IAClB,WAAW,EAAE,OAAO,CAAC;CACtB;AAED,MAAM,MAAM,kBAAkB,GAAG,iBAAiB,CAAC;AAEnD,MAAM,MAAM,IAAI,GAAG,OAAO,GAAG,iBAAiB,GAAG,aAAa,GAAG,QAAQ,CAAC;AAE1E,MAAM,WAAW,iBAAiB;IAChC,KAAK,EAAE,MAAM,CAAC;IACd,GAAG,EAAE,MAAM,CAAC;CACb;AAED,MAAM,WAAW,WAAW;IAC1B,SAAS,EAAE,MAAM,CAAC;IAClB,YAAY,EAAE,OAAO,CAAC;IACtB,KAAK,CAAC,EAAE,iBAAiB,EAAE,CAAC;CAC7B;AAED,MAAM,WAAW,OAAO;IACtB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,OAAO,CAAC,EAAE,OAAO,CAAC;CACnB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,IAAI,EAAE,WAAW,EAAE,CAAC;IACpB,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;CACtB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,IAAI,EAAE,IAAI,CAAC;IACX,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,EAAE,CAAC;IACpB;;;OAGG;IACH,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,4EAA4E;IAC5E,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,qBAAqB;IACpC,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,8EAA8E;IAC9E,IAAI,EAAE,MAAM,GAAG,QAAQ,GAAG,MAAM,GAAG,SAAS,GAAG,eAAe,GAAG,cAAc,GAAG,MAAM,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;IACzG,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,QAAQ,CAAC,EAAE,OAAO,CAAC;IACnB,YAAY,CAAC,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,kBAAkB;IACjC,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,aAAa,EAAE,MAAM,GAAG,GAAG,CAAC;IAC5B,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,gBAAgB,EAAE,CAAC;IAC7B,WAAW,EAAE,kBAAkB,EAAE,CAAC;IAClC,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,gFAAgF;IAChF,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,+EAA+E;IAC/E,OAAO,CAAC,EAAE,aAAa,EAAE,CAAC;IAC1B,oGAAoG;IACpG,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;IACpB,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;IACvC,mBAAmB,CAAC,EAAE,KAAK,CAAC;QAAE,GAAG,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAC;QAAC,KAAK,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAC5E,sBAAsB,CAAC,EAAE,qBAAqB,EAAE,CAAC;IACjD,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,SAAS,GAAG,QAAQ,GAAG,MAAM,CAAC;IACxD,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,cAAc;IAC7B,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,MAAM,CAAC;IACxB,IAAI,EAAE,UAAU,GAAG,YAAY,GAAG,YAAY,CAAC;CAChD;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,aAAa,EAAE,IAAI,EAAE,CAAC;IACtB,eAAe,EAAE,IAAI,EAAE,CAAC;IACxB,YAAY,EAAE,cAAc,EAAE,CAAC;CAChC;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,EAAE,OAAO,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,MAAM,CAAC;IACjC,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,QAAQ,EAAE,QAAQ,CAAC;IACnB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC;IAC3B,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IAEjB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,wBAAwB,CAAC,EAAE,MAAM,CAAC;IAClC,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,uBAAuB,CAAC,EAAE,MAAM,CAAC;IACjC,kFAAkF;IAClF,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,6GAA6G;IAC7G,eAAe,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAChC,gFAAgF;IAChF,sBAAsB,CAAC,EAAE,MAAM,CAAC;IAChC,gIAAgI;IAChI,YAAY,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAE7B,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAC9B,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,KAAK,CAAC,EAAE,YAAY,EAAE,CAAC;IACvB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,eAAe,GAAG,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,GAAG,UAAU,CAAC,GAAG;IACnG,MAAM,CAAC,EAAE,UAAU,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;CACrB,CAAC;AAEF,MAAM,MAAM,iBAAiB,GACzB,OAAO,GACP,SAAS,GACT,eAAe,GACf,iBAAiB,GACjB,eAAe,GACf,oBAAoB,GACpB,UAAU,GACV,WAAW,GACX,UAAU,GACV,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAElB,MAAM,WAAW,WAAW;IAC1B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,iBAAiB,CAAC;IAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,KAAK,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IAChC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,kBAAkB;IACjC,WAAW,EAAE,WAAW,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,MAAM,sBAAsB,GAAG,IAAI,CAAC,WAAW,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,CAAC,GAAG;IACpG,MAAM,CAAC,EAAE,iBAAiB,CAAC;CAC5B,CAAC;AAEF,MAAM,MAAM,kBAAkB,GAAG,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEjF,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,WAAW,GAAG,MAAM,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,MAAM,EAAE,UAAU,GAAG,QAAQ,GAAG,WAAW,CAAC;IAC5C,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,UAAU,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAErD,qFAAqF;AACrF,MAAM,WAAW,KAAK;IACpB,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,UAAU,CAAC;IACvB;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,uFAAuF;IACvF,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;CAClB;AAED,kCAAkC;AAClC,MAAM,MAAM,WAAW,GAAG,IAAI,CAAC;AAE/B;;;GAGG;AACH,MAAM,MAAM,aAAa,GAAG;IAAE,MAAM,EAAE,MAAM,CAAC;IAAC,MAAM,CAAC,EAAE,KAAK,CAAC;IAAC,IAAI,EAAE,WAAW,CAAA;CAAE,GAAG;IAAE,MAAM,EAAE,MAAM,CAAC;IAAC,MAAM,CAAC,EAAE,KAAK,CAAC;IAAC,IAAI,EAAE,WAAW,CAAA;CAAE,CAAC;AAE1I,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,MAAM,CAAC;IACd,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,EAAE,MAAM,CAAC;IACjB,UAAU,CAAC,EAAE,UAAU,CAAC;IACxB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,EAAE,CAAC;IACpB,SAAS,CAAC,EAAE,eAAe,EAAE,CAAC;IAC9B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,UAAU;IACzB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,CAAC,EAAE,UAAU,CAAC;IAC1B,QAAQ,EAAE,MAAM,CAAC;IACjB,QAAQ,EAAE,MAAM,CAAC;IACjB,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,EAAE,MAAM,CAAC;IACZ,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;IACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,qBAAqB,GAAG,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEvF,MAAM,WAAW,eAAe;IAC9B,QAAQ,EAAE,MAAM,CAAC;IACjB,IAAI,EAAE,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,IAAI,GAAG,MAAM,CAAC;IACxD,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,QAAQ,CAAC;CAC1C;AAED,MAAM,WAAW,YAAY;IAC3B,4FAA4F;IAC5F,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB;;;OAGG;IACH,gBAAgB,CAAC,EAAE,MAAM,EAAE,CAAC;CAC7B;AAED,MAAM,WAAW,gBAAgB;IAC/B,UAAU,EAAE,MAAM,CAAC;IACnB,GAAG,EAAE,MAAM,CAAC;IACZ,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,mBAAmB;IAClC,UAAU,EAAE,MAAM,CAAC;IACnB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,KAAK,GAAG,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAClC;AAED,MAAM,WAAW,kBAAkB;IACjC,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC;IAC1D,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC;IAC7C,QAAQ,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,UAAU,CAAC,CAAC;IAC5D,cAAc,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC;IACrD,qBAAqB,CAAC,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC,CAAC;CACtF;AAED,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,MAAM,CAAC;IACf,KAAK,EAAE,MAAM,CAAC;IACd,UAAU,CAAC,EAAE,OAAO,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,OAAO,EAAE,MAAM,CAAC;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,OAAO,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACjC,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,GAAG,EAAE,MAAM,CAAC;IACZ,wFAAwF;IACxF,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,wDAAwD;IACxD,MAAM,EAAE,YAAY,EAAE,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,8EAA8E;IAC9E,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,4FAA4F;AAC5F,MAAM,MAAM,aAAa,GAAG,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,GAAG;IAAE,SAAS,EAAE,OAAO,CAAA;CAAE,CAAC;AAE7E;;;GAGG;AACH,MAAM,MAAM,YAAY,GAAG,OAAO,qBAAqB,EAAE,uBAAuB,CAAC,MAAM,CAAC,GAAG,GAAG,CAAC;AAE/F;;;;;;;GAOG;AACH,MAAM,WAAW,WAAW;IAC1B,gBAAgB,CAAC,EAAE,CAAC,IAAI,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IACnF,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACvD,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IAClG,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,EAAE,aAAa,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IAC5E,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACpE,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;CACpE;AAED,6EAA6E;AAC7E,MAAM,WAAW,eAAe;IAC9B,8FAA8F;IAC9F,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,yGAAyG;IACzG,QAAQ,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,UAAU,EAAE,qBAAqB,KAAK,MAAM,GAAG,IAAI,GAAG,SAAS,GAAG,IAAI,CAAC;CACnG;AAED,sDAAsD;AACtD,MAAM,WAAW,oBAAoB;IACnC,yEAAyE;IACzE,MAAM,EAAE,OAAO,oBAAoB,EAAE,kBAAkB,CAAC;IACxD,gEAAgE;IAChE,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;IACxD,GAAG,EAAE,GAAG,CAAC;IACT,oGAAoG;IACpG,MAAM,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAChC;AAED,MAAM,WAAW,WAAW;IAC1B,MAAM,EAAE,KAAK,GAAG,MAAM,GAAG,KAAK,GAAG,OAAO,GAAG,QAAQ,CAAC;IACpD,yFAAyF;IACzF,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,CAAC,OAAO,EAAE,OAAO,EAAE,GAAG,EAAE,oBAAoB,KAAK,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC;CACxF;AAED;;;GAGG;AACH,MAAM,MAAM,gBAAgB,GAAG,CAC7B,OAAO,EAAE,OAAO,EAChB,GAAG,EAAE,IAAI,CAAC,oBAAoB,EAAE,QAAQ,CAAC,EACzC,IAAI,EAAE,MAAM,OAAO,CAAC,QAAQ,CAAC,KAC1B,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC;AAElC,MAAM,WAAW,kBAAkB;IACjC,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,KAAK,CAAC,EAAE,WAAW,CAAC;IACpB,kFAAkF;IAClF,gBAAgB,CAAC,EAAE,eAAe,EAAE,CAAC;IACrC,6FAA6F;IAC7F,IAAI,CAAC,EAAE,CAAC,MAAM,EAAE,OAAO,oBAAoB,EAAE,kBAAkB,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACzF,qFAAqF;IACrF,MAAM,CAAC,EAAE,WAAW,EAAE,CAAC;IACvB,6EAA6E;IAC7E,UAAU,CAAC,EAAE,gBAAgB,CAAC;CAC/B;AAED,MAAM,WAAW,kBAAkB;IACjC;;;;;OAKG;IACH,SAAS,CAAC,EAAE,mBAAmB,CAAC;IAChC;;;OAGG;IACH,KAAK,CAAC,EAAE,OAAO,mBAAmB,EAAE,cAAc,CAAC;IACnD;;;;OAIG;IACH,KAAK,CAAC,EAAE,IAAI,EAAE,GAAG,CAAC,CAAC,KAAK,CAAC,EAAE,KAAK,KAAK,IAAI,EAAE,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,CAAC;IAC/D,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjC,OAAO,CAAC,EAAE,kBAAkB,EAAE,CAAC;IAC/B,gEAAgE;IAChE,QAAQ,CAAC,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,CAAC,EAAE,CAAC;IAC/C,2FAA2F;IAC3F,OAAO,CAAC,EAAE,YAAY,CAAC;IACvB,2FAA2F;IAC3F,eAAe,CAAC,EAAE,OAAO,2BAA2B,EAAE,sBAAsB,CAAC;IAC7E,eAAe,CAAC,EAAE,YAAY,CAAC;IAC/B;;;OAGG;IACH,qBAAqB,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IAC/C;;;OAGG;IACH,0BAA0B,CAAC,EAAE,OAAO,CAAC;IACrC;;;OAGG;IACH,kBAAkB,CAAC,EAAE,UAAU,GAAG,WAAW,CAAC;IAC9C,sFAAsF;IACtF,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,WAAW,CAAC,EAAE;QACZ,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;QACrB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,oEAAoE;QACpE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,SAAS,EAAE,CAAC;QACzB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,aAAa,EAAE,CAAC;QAC7B,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC;QACvB,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC;KAC9B,CAAC;CACH;AAMD,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK,CAAC;AAEzE,MAAM,MAAM,gBAAgB,GAAG,UAAU,GAAG,SAAS,GAAG,SAAS,GAAG,SAAS,GAAG,WAAW,CAAC;AAE5F,MAAM,WAAW,gBAAgB;IAC/B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,WAAW,GAAG,WAAW,GAAG,aAAa,GAAG,OAAO,CAAC;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,aAAa,EAAE,MAAM,CAAC;IACtB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,eAAe,EAAE,MAAM,CAAC;IACxB,YAAY,EAAE,MAAM,CAAC;IACrB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,mBAAmB,EAAE,MAAM,CAAC;IAC5B,gBAAgB,EAAE,MAAM,CAAC;IACzB,UAAU,EAAE,OAAO,CAAC;IACpB,iBAAiB,EAAE,MAAM,CAAC;IAC1B,MAAM,EAAE,gBAAgB,CAAC;IACzB,OAAO,EAAE,MAAM,EAAE,CAAC;CACnB;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,WAAW,EAAE,MAAM,CAAC;IACpB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,kBAAkB,EAAE,MAAM,CAAC;IAC3B,yBAAyB,EAAE,MAAM,CAAC;IAClC,yBAAyB,EAAE,MAAM,CAAC;IAClC,MAAM,EAAE,gBAAgB,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,eAAe,EAAE,MAAM,CAAC;IACxB,YAAY,EAAE,MAAM,CAAC;IACrB,mBAAmB,EAAE,MAAM,CAAC;IAC5B,gBAAgB,EAAE,MAAM,CAAC;IACzB,MAAM,EAAE,gBAAgB,EAAE,CAAC;CAC5B;AAED,MAAM,WAAW,wBAAwB;IACvC,MAAM,EAAE,MAAM,CAAC;IACf,UAAU,EAAE,MAAM,CAAC;IACnB,WAAW,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,OAAO,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,iBAAiB,CAAC,EAAE,MAAM,CAAC;IAC3B,oGAAoG;IACpG,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,6GAA6G;IAC7G,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,8FAA8F;IAC9F,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,0FAA0F;IAC1F,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB;AAED,4EAA4E;AAC5E,MAAM,WAAW,cAAc;IAC7B,wBAAwB;IACxB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,oEAAoE;IACpE,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,iGAAiG;IACjG,QAAQ,EAAE,MAAM,CAAC;IACjB,KAAK,EAAE,MAAM,CAAC;IACd,GAAG,EAAE,MAAM,CAAC;IACZ,yDAAyD;IACzD,UAAU,EAAE,MAAM,CAAC;IACnB,OAAO,EAAE,MAAM,EAAE,CAAC;CACnB;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,YAAY,EAAE,MAAM,CAAC;IACrB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,iBAAiB,CAAC,EAAE,MAAM,CAAC;IAC3B,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,KAAK,EAAE,wBAAwB,EAAE,CAAC;IAClC,gDAAgD;IAChD,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,8EAA8E;IAC9E,uBAAuB,CAAC,EAAE,MAAM,CAAC;IACjC,6FAA6F;IAC7F,eAAe,CAAC,EAAE,cAAc,EAAE,CAAC;CACpC;AAED,yFAAyF;AACzF,MAAM,WAAW,6BAA6B;IAC5C,YAAY,EAAE,MAAM,CAAC;IACrB,uGAAuG;IACvG,QAAQ,EAAE,oBAAoB,EAAE,CAAC;IACjC,8BAA8B;IAC9B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,0DAA0D;IAC1D,eAAe,EAAE,cAAc,EAAE,CAAC;CACnC;AAED,MAAM,WAAW,uBAAuB;IACtC,eAAe,EAAE,MAAM,CAAC;IACxB,gBAAgB,EAAE,MAAM,CAAC;IACzB,SAAS,EAAE,MAAM,CAAC;IAClB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,gBAAgB,EAAE,MAAM,CAAC;IACzB,cAAc,EAAE,OAAO,CAAC;IACxB,cAAc,CAAC,EAAE,MAAM,CAAC;CACzB;AAED,MAAM,WAAW,wBAAyB,SAAQ,IAAI;IACpD,GAAG,CAAC,EAAE,wBAAwB,CAAC;IAC/B,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,gBAAgB,EAAE,MAAM,EAAE,CAAC;IAC3B,YAAY,EAAE,MAAM,EAAE,CAAC;IACvB,uBAAuB,EAAE,uBAAuB,CAAC;CAClD;AAED,MAAM,WAAW,YAAY;IAC3B,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,aAAa,EAAE,MAAM,CAAC;IACtB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,oBAAoB,CAAC,EAAE,MAAM,CAAC;IAC9B,2BAA2B,CAAC,EAAE,MAAM,CAAC;IACrC,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,OAAO,CAAC;IACnB,cAAc,EAAE,OAAO,CAAC;CACzB;AAED,MAAM,MAAM,uBAAuB,GAAG,UAAU,GAAG,OAAO,GAAG,aAAa,GAAG,kBAAkB,GAAG,SAAS,CAAC;AAE5G,MAAM,WAAW,qBAAqB;IACpC,kBAAkB,EAAE,MAAM,CAAC;IAC3B,MAAM,EAAE,uBAAuB,CAAC;IAChC,UAAU,EAAE,OAAO,CAAC;IACpB,SAAS,EAAE;QACT,gBAAgB,CAAC,EAAE,MAAM,CAAC;QAC1B,YAAY,CAAC,EAAE,MAAM,CAAC;QACtB,cAAc,CAAC,EAAE,MAAM,CAAC;QACxB,gBAAgB,CAAC,EAAE,MAAM,CAAC;KAC3B,CAAC;CACH;AAED,MAAM,MAAM,oBAAoB,GAC5B,QAAQ,GACR,SAAS,GACT,aAAa,GACb,WAAW,GACX,SAAS,GACT,mBAAmB,CAAC;AAExB,MAAM,WAAW,wBAAwB;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;IACjB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,MAAM,EAAE,MAAM,CAAC;CAChB;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,wBAAwB,EAAE,CAAC;IACnC,YAAY,EAAE,oBAAoB,CAAC;CACpC;AAED,MAAM,WAAW,OAAO;IACtB,YAAY,EAAE,MAAM,CAAC;IACrB,WAAW,EAAE,MAAM,CAAC;IACpB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,EAAE,MAAM,CAAC;IACrB,gBAAgB,EAAE,MAAM,CAAC;IACzB,oBAAoB,EAAE,MAAM,CAAC;IAC7B,wBAAwB,EAAE,MAAM,CAAC;CAClC;AAED,MAAM,WAAW,mBAAmB;IAClC,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,mBAAmB,EAAE,OAAO,CAAC;IAC7B,iBAAiB,EAAE,OAAO,CAAC;IAC3B,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,uEAAuE;IACvE,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,sDAAsD;IACtD,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,gFAAgF;IAChF,sBAAsB,CAAC,EAAE,MAAM,CAAC;CACjC;AAED,MAAM,WAAW,WAAW;IAC1B,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,mBAAmB,CAAC;IACrC,YAAY,EAAE,YAAY,CAAC;IAC3B,QAAQ,EAAE,qBAAqB,CAAC;IAChC,GAAG,EAAE,OAAO,CAAC;IACb,eAAe,EAAE,mBAAmB,CAAC;CACtC;AAED,MAAM,WAAW,oBAAoB;IACnC,MAAM,EAAE,MAAM,CAAC;IACf,WAAW,EAAE,UAAU,EAAE,CAAC;IAC1B,YAAY,EAAE,WAAW,EAAE,CAAC;IAC5B,KAAK,EAAE,YAAY,EAAE,CAAC;IACtB,WAAW,EAAE,SAAS,EAAE,CAAC;IACzB,uBAAuB,EAAE,KAAK,CAAC;QAAE,IAAI,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAChE,UAAU,EAAE,QAAQ,EAAE,CAAC;IACvB,YAAY,EAAE,YAAY,CAAC;IAC3B,eAAe,EAAE,uBAAuB,CAAC;CAC1C;AAED,MAAM,WAAW,qBAAqB;IACpC,KAAK,CAAC,EAAE,gBAAgB,CAAC;IACzB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,cAAc;IAC7B,SAAS,EAAE,MAAM,CAAC;IAClB,WAAW,EAAE,MAAM,CAAC;IACpB,KAAK,EAAE,gBAAgB,CAAC;IACxB,KAAK,CAAC,EAAE,oBAAoB,CAAC;IAC7B,QAAQ,CAAC,EAAE;QACT,KAAK,EAAE,wBAAwB,EAAE,CAAC;QAClC,mBAAmB,EAAE,MAAM,EAAE,CAAC;QAC9B,YAAY,EAAE,cAAc,EAAE,CAAC;QAC/B,kBAAkB,EAAE,MAAM,CAAC;KAC5B,CAAC;IACF,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;CACjD;AAED,MAAM,WAAW,cAAc;IAC7B,MAAM,EAAE,MAAM,CAAC;IACf,UAAU,CAAC,EAAE,gBAAgB,CAAC;IAC9B,QAAQ,EAAE,wBAAwB,CAAC;IACnC,QAAQ,EAAE,oBAAoB,CAAC;IAC/B,OAAO,CAAC,EAAE,WAAW,CAAC;CACvB;AAED,MAAM,MAAM,gBAAgB,GAAG,KAAK,GAAG,MAAM,GAAG,OAAO,CAAC;AACxD,MAAM,MAAM,eAAe,GAAG,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ,CAAC;AACvF,MAAM,MAAM,cAAc,GAAG,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS,CAAC;AAE9E,MAAM,WAAW,cAAc;IAC7B,IAAI,EAAE,MAAM,CAAC;IACb,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAC/B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAClC,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;CAC3B;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,EAAE,gBAAgB,CAAC;IAC3B,OAAO,EAAE,eAAe,CAAC;IACzB,MAAM,EAAE,cAAc,CAAC;IACvB,UAAU,EAAE,MAAM,EAAE,CAAC;IACrB,YAAY,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACrC,OAAO,EAAE,cAAc,EAAE,CAAC;IAC1B,UAAU,EAAE,MAAM,CAAC;IACnB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,kBAAkB,CAAC,EAAE,MAAM,CAAC;CAC7B;AAED,MAAM,WAAW,2BAA2B;IAC1C,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,QAAQ,CAAC,EAAE,gBAAgB,CAAC;IAC5B,OAAO,CAAC,EAAE,eAAe,CAAC;IAC1B,MAAM,CAAC,EAAE,cAAc,CAAC;IACxB,0BAA0B,CAAC,EAAE,MAAM,CAAC;IACpC,iBAAiB,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAC3C,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,aAAa,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IAC7C,aAAa,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;CAC9C;AAMD;;;GAGG;AACH,MAAM,MAAM,mBAAmB,GAC3B,cAAc,GACd,gBAAgB,GAChB,gBAAgB,GAChB,gBAAgB,GAChB,wBAAwB,GACxB,aAAa,GACb,aAAa,GACb,aAAa,GACb,gBAAgB,GAChB,kBAAkB,GAClB,mBAAmB,GACnB,mBAAmB,GACnB,UAAU,GACV,aAAa,GACb,kBAAkB,CAAC;AAEvB,MAAM,WAAW,oBAAoB;IACnC,KAAK,EAAE,KAAK,CAAC;IACb,MAAM,EAAE,mBAAmB,CAAC;IAC5B,kEAAkE;IAClE,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,0EAA0E;IAC1E,QAAQ,CAAC,EAAE;QAAE,IAAI,EAAE,MAAM,GAAG,SAAS,GAAG,YAAY,CAAC;QAAC,OAAO,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;IACzE,6FAA6F;IAC7F,OAAO,EAAE,MAAM,EAAE,CAAC;CACnB;AAED,MAAM,MAAM,mBAAmB,GAAG,CAAC,OAAO,EAAE,oBAAoB,KAAK,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/core",
3
- "version": "0.45.0",
3
+ "version": "0.46.0",
4
4
  "description": "Core headless domain engine, plugin architecture, and data stores for Critical Path",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",