@critical-path/core 0.44.0 → 0.46.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/README.md CHANGED
@@ -355,7 +355,7 @@ const leveled = await engine.calculateCriticalPath('proj_123', { calendars: 'ass
355
355
  console.log(leveled.unleveledProjectEndDate, '->', leveled.projectEndDate);
356
356
  ```
357
357
 
358
- With `calendars: 'assignee'` (or `criticalPathCalendars: 'assignee'` on the engine), each task uses its assignee's schedule, then its team's, then the project calendar. Passes run on dates, slack is measured in each task's calendar, and each calendar is evaluated in its own `timezone` (IANA name; default UTC), including daylight-saving changes. `levelResources: true` additionally delays tasks so nobody works on two at once (priority rule `levelingPriority`, default least slack), reporting `levelingDelayHours` and `waitingOn` per task. Tasks with `allocation` below 1 take that share of their assignee (a 16h task at 0.5 spans 32 working hours); levelling fits them within 100% per person, and `overallocations` lists who is booked above 100% and when. Teams act as pools of `headcount` people (default: member count) shared by team-only tasks and members' own tasks.
358
+ With `calendars: 'assignee'` (or `criticalPathCalendars: 'assignee'` on the engine), each task uses its assignee's schedule, then its team's, then the project calendar. Passes run on dates, slack is measured in each task's calendar, and each calendar is evaluated in its own `timezone` (IANA name; default UTC), including daylight-saving changes. `levelResources: true` additionally delays tasks so nobody works on two at once (priority rule `levelingPriority`, default least slack), reporting `levelingDelayHours` and `waitingOn` per task. Tasks with `allocation` below 1 take that share of their assignee (a 16h task at 0.5 spans 32 working hours); levelling fits them within 100% per person, and `overallocations` lists who is booked above 100% and when. Teams act as pools of `headcount` people (default: member count) shared by team-only tasks and members' own tasks. Finished tasks take no time. `calculatePortfolioCriticalPath({ projectIds })` levels several projects together, sharing people and teams across them; `includeHiddenWork` also counts unreadable projects' work as `'hidden'`. `effort: 'remaining'` schedules only what is left on in-progress tasks.
359
359
 
360
360
  ### 9. Fractional Lexical Indexing (Kanban Reordering)
361
361
 
@@ -1,9 +1,19 @@
1
- import type { Task, TaskDependency, CriticalPathAnalysis, WorkSchedule, User, Team } from '../types/index.js';
1
+ import type { Task, TaskDependency, CriticalPathAnalysis, WorkSchedule, User, Team, PortfolioCriticalPathAnalysis } from '../types/index.js';
2
2
  export declare function getTaskDurationHours(task: Task): number;
3
3
  /** The task's `allocation`, clamped to (0, 1]; 1 when unset or invalid. */
4
4
  export declare function getTaskAllocation(task: Task): number;
5
5
  /** Working hours a task spans: its effort divided by its allocation. */
6
6
  export declare function getTaskElapsedHours(task: Task): number;
7
+ /** True for completed or canceled tasks (by `semanticStatus`, else the default `done`/`canceled` statuses). */
8
+ export declare function isTaskFinished(task: Task): boolean;
9
+ /** What effort critical path analysis schedules: the full estimate, or what remains on in-progress tasks. */
10
+ export type EffortBasis = 'estimate' | 'remaining';
11
+ /**
12
+ * Working hours critical path analysis schedules for a task: 0 when it is finished (it needs no
13
+ * more time and occupies nobody), otherwise its effort divided by its allocation. With
14
+ * `effort: 'remaining'`, an in-progress task's effort is `max(0, estimate - loggedHours)`.
15
+ */
16
+ export declare function getTaskScheduledHours(task: Task, effort?: EffortBasis): number;
7
17
  export interface CPMOptions {
8
18
  projectStartDate?: string | Date;
9
19
  /** The project calendar. Default: `DEFAULT_WORK_SCHEDULE`. */
@@ -31,6 +41,12 @@ export interface CPMOptions {
31
41
  * due date, then slack) or `'order'` (creation order).
32
42
  */
33
43
  levelingPriority?: LevelingPriority;
44
+ /**
45
+ * `'estimate'` (default) schedules each unfinished task's full estimate. `'remaining'` schedules
46
+ * only what is left on in-progress tasks: `max(0, estimate - loggedHours)`. Finished tasks take
47
+ * no time either way.
48
+ */
49
+ effort?: EffortBasis;
34
50
  }
35
51
  export type LevelingPriority = 'slack' | 'priority' | 'dueDate' | 'order';
36
52
  /** The calendar a task runs on in assignee mode: assignee, then task team, then project. */
@@ -39,6 +55,32 @@ export declare function resolveTaskSchedule(task: Task, context: {
39
55
  teams?: Team[];
40
56
  schedule?: WorkSchedule;
41
57
  }): WorkSchedule;
58
+ export interface PortfolioProjectInput {
59
+ projectId: string;
60
+ tasks: Task[];
61
+ /** The project's start. Default: today (UTC midnight). */
62
+ projectStartDate?: string | Date;
63
+ /** The project calendar. Default: `DEFAULT_WORK_SCHEDULE`. */
64
+ schedule?: WorkSchedule;
65
+ /**
66
+ * Background work: the project's tasks take up people and team capacity but the project is
67
+ * left out of the results. `'hidden'` also replaces its task ids with `'hidden'` wherever they
68
+ * would appear (`waitingOn`, over-allocations); `'visible'` keeps them.
69
+ */
70
+ background?: 'visible' | 'hidden';
71
+ }
72
+ export interface PortfolioCPMOptions extends Omit<CPMOptions, 'projectStartDate' | 'schedule'> {
73
+ /** Project ids in priority order; when levelling, their tasks get people first. Unlisted projects come last. */
74
+ projectOrder?: string[];
75
+ }
76
+ /**
77
+ * Critical path analysis over several projects at once. Always date-based. Each task starts no
78
+ * earlier than its own project's start and is due by its project's end. Dependencies between tasks
79
+ * in different projects are honoured. With `levelResources` (requires `calendars: 'assignee'`),
80
+ * assignees and team pools are shared across all projects, so nobody is booked above capacity in
81
+ * total. Returns one analysis per project, the latest end, and the combined over-allocation report.
82
+ */
83
+ export declare function calculatePortfolioCPM(projects: PortfolioProjectInput[], dependencies: TaskDependency[], options?: PortfolioCPMOptions): PortfolioCriticalPathAnalysis;
42
84
  /**
43
85
  * Calculates the Critical Path Method (CPM) schedule for a set of tasks and their dependencies.
44
86
  * - Forward Pass: computes earlyStart and earlyFinish (in working hours and calendar dates)
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEL,MAAM,mBAAmB,CAAC;AAW3B,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAYvD;AAED,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAEtD;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;CACrC;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAkfD;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CA4JtB"}
1
+ {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACpB,YAAY,EACZ,IAAI,EACJ,IAAI,EAEJ,6BAA6B,EAC9B,MAAM,mBAAmB,CAAC;AAY3B,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAYvD;AAED,2EAA2E;AAC3E,wBAAgB,iBAAiB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAGpD;AAED,wEAAwE;AACxE,wBAAgB,mBAAmB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAEtD;AAED,+GAA+G;AAC/G,wBAAgB,cAAc,CAAC,IAAI,EAAE,IAAI,GAAG,OAAO,CAGlD;AAED,6GAA6G;AAC7G,MAAM,MAAM,WAAW,GAAG,UAAU,GAAG,WAAW,CAAC;AAEnD;;;;GAIG;AACH,wBAAgB,qBAAqB,CAAC,IAAI,EAAE,IAAI,EAAE,MAAM,GAAE,WAAwB,GAAG,MAAM,CAM1F;AAED,MAAM,WAAW,UAAU;IACzB,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;;OAKG;IACH,SAAS,CAAC,EAAE,SAAS,GAAG,UAAU,CAAC;IACnC,iFAAiF;IACjF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,kFAAkF;IAClF,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf;;;;OAIG;IACH,cAAc,CAAC,EAAE,OAAO,CAAC;IACzB;;;;OAIG;IACH,gBAAgB,CAAC,EAAE,gBAAgB,CAAC;IACpC;;;;OAIG;IACH,MAAM,CAAC,EAAE,WAAW,CAAC;CACtB;AAED,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,SAAS,GAAG,OAAO,CAAC;AAE1E,4FAA4F;AAC5F,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,IAAI,EACV,OAAO,EAAE;IAAE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IAAC,QAAQ,CAAC,EAAE,YAAY,CAAA;CAAE,GACnE,YAAY,CAOd;AAmjBD,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,0DAA0D;IAC1D,gBAAgB,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IACjC,8DAA8D;IAC9D,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB;;;;OAIG;IACH,UAAU,CAAC,EAAE,SAAS,GAAG,QAAQ,CAAC;CACnC;AAED,MAAM,WAAW,mBAAoB,SAAQ,IAAI,CAAC,UAAU,EAAE,kBAAkB,GAAG,UAAU,CAAC;IAC5F,gHAAgH;IAChH,YAAY,CAAC,EAAE,MAAM,EAAE,CAAC;CACzB;AAED;;;;;;GAMG;AACH,wBAAgB,qBAAqB,CACnC,QAAQ,EAAE,qBAAqB,EAAE,EACjC,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,mBAAwB,GAChC,6BAA6B,CAsC/B;AAED;;;;;;GAMG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,EAC9B,OAAO,GAAE,UAAe,GACvB,oBAAoB,CA4JtB"}
@@ -1,4 +1,5 @@
1
1
  import { DEFAULT_WORK_SCHEDULE, addWorkingHours, subtractWorkingHours, getWorkingHoursBetween, nextWorkingTime, previousWorkingTime, parseDate } from './calendar.js';
2
+ import { isTaskInProgress } from '../utils/status.js';
2
3
  export function getTaskDurationHours(task) {
3
4
  if (typeof task.estimatedHours === 'number' && task.estimatedHours >= 0) {
4
5
  return task.estimatedHours;
@@ -21,6 +22,25 @@ export function getTaskAllocation(task) {
21
22
  export function getTaskElapsedHours(task) {
22
23
  return getTaskDurationHours(task) / getTaskAllocation(task);
23
24
  }
25
+ /** True for completed or canceled tasks (by `semanticStatus`, else the default `done`/`canceled` statuses). */
26
+ export function isTaskFinished(task) {
27
+ if (task.semanticStatus)
28
+ return task.semanticStatus === 'completed' || task.semanticStatus === 'canceled';
29
+ return task.status === 'done' || task.status === 'canceled';
30
+ }
31
+ /**
32
+ * Working hours critical path analysis schedules for a task: 0 when it is finished (it needs no
33
+ * more time and occupies nobody), otherwise its effort divided by its allocation. With
34
+ * `effort: 'remaining'`, an in-progress task's effort is `max(0, estimate - loggedHours)`.
35
+ */
36
+ export function getTaskScheduledHours(task, effort = 'estimate') {
37
+ if (isTaskFinished(task))
38
+ return 0;
39
+ if (effort === 'remaining' && isTaskInProgress({ status: task.status, semanticStatus: task.semanticStatus })) {
40
+ return Math.max(0, getTaskDurationHours(task) - (task.loggedHours ?? 0)) / getTaskAllocation(task);
41
+ }
42
+ return getTaskElapsedHours(task);
43
+ }
24
44
  /** The calendar a task runs on in assignee mode: assignee, then task team, then project. */
25
45
  export function resolveTaskSchedule(task, context) {
26
46
  return ((task.assigneeId && context.users?.find((u) => u.id === task.assigneeId)?.schedule) ||
@@ -105,40 +125,80 @@ function buildGraph(tasks, dependencies) {
105
125
  * the project start. With `levelResources`, see `levelSchedule`.
106
126
  */
107
127
  function calculateCalendarCPM(projectId, calculatedAt, graph, options) {
108
- const { taskMap, taskIds, prerequisites, successors, topoOrder } = graph;
109
- const projectSchedule = options.schedule || DEFAULT_WORK_SCHEDULE;
128
+ const segment = {
129
+ projectId,
130
+ start: startOrToday(options.projectStartDate),
131
+ schedule: options.schedule || DEFAULT_WORK_SCHEDULE,
132
+ taskIds: graph.taskIds
133
+ };
134
+ const result = scheduleOnDates(graph, [segment], options, calculatedAt);
135
+ return result.projects[0];
136
+ }
137
+ function startOrToday(input) {
138
+ if (input)
139
+ return parseDate(input);
110
140
  const today = new Date();
111
- const projectStart = options.projectStartDate
112
- ? parseDate(options.projectStartDate)
113
- : new Date(Date.UTC(today.getUTCFullYear(), today.getUTCMonth(), today.getUTCDate()));
114
- const calendarOf = new Map(taskIds.map((id) => [id, resolveTaskSchedule(taskMap.get(id), options)]));
115
- const durationOf = new Map(taskIds.map((id) => [id, getTaskElapsedHours(taskMap.get(id))]));
116
- const ctx = { taskMap, calendarOf, durationOf, projectStart };
117
- const early = forwardPass(topoOrder, prerequisites, ctx);
118
- const late = backwardPass([...topoOrder].reverse(), (id) => successors.get(id), latest(early.finish, projectStart), ctx);
141
+ return new Date(Date.UTC(today.getUTCFullYear(), today.getUTCMonth(), today.getUTCDate()));
142
+ }
143
+ /**
144
+ * Date-based passes over one or more projects at once. Each task starts no earlier than its
145
+ * project's start and is due by its project's end; dependencies, assignees and team pools may span
146
+ * projects. Returns one analysis per project plus the combined over-allocation report.
147
+ */
148
+ function scheduleOnDates(graph, segments, options, calculatedAt) {
149
+ const { taskMap, taskIds, prerequisites, successors, topoOrder } = graph;
150
+ const segmentOf = new Map(segments.flatMap((seg) => seg.taskIds.map((id) => [id, seg])));
151
+ const calendarOf = new Map(taskIds.map((id) => {
152
+ const seg = segmentOf.get(id);
153
+ const task = taskMap.get(id);
154
+ return [id, options.calendars === 'assignee' ? resolveTaskSchedule(task, { ...options, schedule: seg.schedule }) : seg.schedule];
155
+ }));
156
+ const durationOf = new Map(taskIds.map((id) => [id, getTaskScheduledHours(taskMap.get(id), options.effort)]));
157
+ const ctx = { taskMap, calendarOf, durationOf, startOf: (id) => segmentOf.get(id).start };
158
+ const endOfProjects = (dates) => {
159
+ const ends = new Map(segments.map((seg) => [seg.projectId, latest(seg.taskIds.map((id) => dates.finish.get(id)), seg.start)]));
160
+ return (id) => ends.get(segmentOf.get(id).projectId);
161
+ };
119
162
  const resourcesOf = resourceModel(options.teams);
163
+ const early = forwardPass(topoOrder, prerequisites, ctx);
164
+ const late = backwardPass([...topoOrder].reverse(), (id) => successors.get(id), endOfProjects(early), ctx);
165
+ const analyse = (seg, e, l, extra) => buildAnalysis(seg, calculatedAt, e, l, ctx, extra);
120
166
  if (!options.levelResources) {
121
- const analysis = buildAnalysis(projectId, calculatedAt, taskIds, early, late, projectSchedule, ctx);
122
- return { ...analysis, overallocations: findOverallocations(taskMap, early, resourcesOf) };
167
+ const overallocations = findOverallocations(taskMap, early, resourcesOf);
168
+ return {
169
+ projects: segments.map((seg) => ({ ...analyse(seg, early, late), overallocations: involving(overallocations, seg) })),
170
+ overallocations
171
+ };
123
172
  }
124
173
  const unleveledSlack = new Map(taskIds.map((id) => [id, slackHours(early.finish.get(id), late.finish.get(id), calendarOf.get(id))]));
125
- const leveled = levelSchedule(graph, ctx, unleveledSlack, options.levelingPriority ?? 'slack', resourcesOf);
126
- const leveledLate = backwardPass(leveled.backwardOrder, (id) => [...successors.get(id), ...(leveled.resourceSuccessors.get(id) ?? [])], latest(leveled.early.finish, projectStart), ctx);
127
- const analysis = buildAnalysis(projectId, calculatedAt, taskIds, leveled.early, leveledLate, projectSchedule, ctx, (id) => {
128
- const delay = round2(getWorkingHoursBetween(early.start.get(id), leveled.early.start.get(id), calendarOf.get(id)));
129
- const waitingOn = leveled.waitingOn.get(id);
130
- return { levelingDelayHours: delay, ...(waitingOn ? { waitingOn } : {}) };
131
- });
174
+ const projectRank = new Map((options.projectOrder ?? []).map((pid, i) => [pid, i]));
175
+ const rankOf = (id) => projectRank.get(segmentOf.get(id).projectId) ?? projectRank.size;
176
+ const leveled = levelSchedule(graph, ctx, unleveledSlack, options.levelingPriority ?? 'slack', resourcesOf, rankOf);
177
+ const leveledLate = backwardPass(leveled.backwardOrder, (id) => [...successors.get(id), ...(leveled.resourceSuccessors.get(id) ?? [])], endOfProjects(leveled.early), ctx);
178
+ const overallocations = findOverallocations(taskMap, leveled.early, resourcesOf);
179
+ const unleveledEnd = endOfProjects(early);
132
180
  return {
133
- ...analysis,
134
- leveled: true,
135
- unleveledProjectEndDate: latest(early.finish, projectStart).toISOString(),
136
- overallocations: findOverallocations(taskMap, leveled.early, resourcesOf)
181
+ projects: segments.map((seg) => ({
182
+ ...analyse(seg, leveled.early, leveledLate, (id) => {
183
+ const delay = round2(getWorkingHoursBetween(early.start.get(id), leveled.early.start.get(id), calendarOf.get(id)));
184
+ const waitingOn = leveled.waitingOn.get(id);
185
+ return { levelingDelayHours: delay, ...(waitingOn ? { waitingOn } : {}) };
186
+ }),
187
+ leveled: true,
188
+ unleveledProjectEndDate: (seg.taskIds.length ? unleveledEnd(seg.taskIds[0]) : seg.start).toISOString(),
189
+ overallocations: involving(overallocations, seg)
190
+ })),
191
+ overallocations
137
192
  };
138
193
  }
194
+ /** Over-allocation entries that include at least one of the project's tasks. */
195
+ function involving(overallocations, seg) {
196
+ const ids = new Set(seg.taskIds);
197
+ return overallocations.filter((o) => o.taskIds.some((id) => ids.has(id)));
198
+ }
139
199
  function latest(dates, floor) {
140
200
  let max = floor;
141
- for (const d of dates.values())
201
+ for (const d of dates)
142
202
  if (d > max)
143
203
  max = d;
144
204
  return max;
@@ -153,7 +213,7 @@ function forwardPass(order, prerequisites, ctx) {
153
213
  const start = new Map();
154
214
  const finish = new Map();
155
215
  for (const id of order) {
156
- let ready = ctx.projectStart;
216
+ let ready = ctx.startOf(id);
157
217
  for (const p of prerequisites.get(id)) {
158
218
  const f = finish.get(p);
159
219
  if (f && f > ready)
@@ -167,11 +227,11 @@ function forwardPass(order, prerequisites, ctx) {
167
227
  return { start, finish };
168
228
  }
169
229
  /** Latest dates; `order` must list every successor before its predecessors. */
170
- function backwardPass(order, successorsOf, projectEnd, ctx) {
230
+ function backwardPass(order, successorsOf, endOf, ctx) {
171
231
  const start = new Map();
172
232
  const finish = new Map();
173
233
  for (const id of order) {
174
- let due = projectEnd;
234
+ let due = endOf(id);
175
235
  for (const s of successorsOf(id)) {
176
236
  const ls = start.get(s);
177
237
  if (ls && ls < due)
@@ -197,7 +257,7 @@ const PRIORITY_RANK = { urgent: 0, high: 1, medium: 2, low: 3, none: 4 };
197
257
  * resource whose allocations exceed its capacity the earlier precedes the later, and each delayed
198
258
  * task follows the task whose finish freed its capacity.
199
259
  */
200
- function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder }, ctx, unleveledSlack, rule, resourcesOf) {
260
+ function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder }, ctx, unleveledSlack, rule, resourcesOf, projectRankOf = () => 0) {
201
261
  const creation = new Map([...taskIds]
202
262
  .sort((a, b) => (taskMap.get(a).createdAt ?? '').localeCompare(taskMap.get(b).createdAt ?? '') || a.localeCompare(b))
203
263
  .map((id, i) => [id, i]));
@@ -212,13 +272,21 @@ function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder
212
272
  dueDate: (id) => [due(id), unleveledSlack.get(id), creation.get(id)],
213
273
  order: (id) => [creation.get(id)]
214
274
  };
215
- const compare = (a, b) => {
216
- const ka = keys[rule](a);
217
- const kb = keys[rule](b);
275
+ // Keys never change, so compute them once; picking the next task is then a linear scan.
276
+ const keyOf = new Map(taskIds.map((id) => [id, [projectRankOf(id), ...keys[rule](id)]]));
277
+ const before = (a, b) => {
278
+ const [ka, kb] = [keyOf.get(a), keyOf.get(b)];
218
279
  for (let i = 0; i < ka.length; i++)
219
280
  if (ka[i] !== kb[i])
220
- return ka[i] - kb[i];
221
- return 0;
281
+ return ka[i] < kb[i];
282
+ return false;
283
+ };
284
+ const first = (ids) => {
285
+ let best;
286
+ for (const id of ids)
287
+ if (best === undefined || before(id, best))
288
+ best = id;
289
+ return best;
222
290
  };
223
291
  const start = new Map();
224
292
  const finish = new Map();
@@ -232,9 +300,9 @@ function levelSchedule({ taskMap, taskIds, prerequisites, successors, topoOrder
232
300
  // A dependency cycle leaves tasks that never become eligible; take them in topological order.
233
301
  if (eligible.size === 0)
234
302
  eligible.add(topoOrder.find((id) => !start.has(id)));
235
- const id = [...eligible].sort(compare)[0];
303
+ const id = first(eligible);
236
304
  eligible.delete(id);
237
- let ready = ctx.projectStart;
305
+ let ready = ctx.startOf(id);
238
306
  for (const p of prerequisites.get(id)) {
239
307
  const f = finish.get(p);
240
308
  if (f && f > ready)
@@ -391,8 +459,8 @@ function findOverallocations(taskMap, dates, resourcesOf) {
391
459
  }
392
460
  return result;
393
461
  }
394
- function buildAnalysis(projectId, calculatedAt, taskIds, early, late, projectSchedule, ctx, extra = () => ({})) {
395
- const { projectStart, calendarOf, durationOf, taskMap } = ctx;
462
+ function buildAnalysis({ projectId, start: projectStart, schedule: projectSchedule, taskIds }, calculatedAt, early, late, ctx, extra = () => ({})) {
463
+ const { calendarOf, durationOf, taskMap } = ctx;
396
464
  const offset = (date) => date >= projectStart
397
465
  ? getWorkingHoursBetween(projectStart, date, projectSchedule)
398
466
  : -getWorkingHoursBetween(date, projectStart, projectSchedule);
@@ -425,7 +493,7 @@ function buildAnalysis(projectId, calculatedAt, taskIds, early, late, projectSch
425
493
  ...extra(id)
426
494
  });
427
495
  }
428
- const projectEnd = latest(early.finish, projectStart);
496
+ const projectEnd = latest(taskIds.map((id) => early.finish.get(id)), projectStart);
429
497
  const totalHours = round2(offset(projectEnd));
430
498
  return {
431
499
  projectId,
@@ -438,6 +506,49 @@ function buildAnalysis(projectId, calculatedAt, taskIds, early, late, projectSch
438
506
  tasks: schedules
439
507
  };
440
508
  }
509
+ /**
510
+ * Critical path analysis over several projects at once. Always date-based. Each task starts no
511
+ * earlier than its own project's start and is due by its project's end. Dependencies between tasks
512
+ * in different projects are honoured. With `levelResources` (requires `calendars: 'assignee'`),
513
+ * assignees and team pools are shared across all projects, so nobody is booked above capacity in
514
+ * total. Returns one analysis per project, the latest end, and the combined over-allocation report.
515
+ */
516
+ export function calculatePortfolioCPM(projects, dependencies, options = {}) {
517
+ if (options.levelResources && options.calendars !== 'assignee') {
518
+ throw new Error("levelResources requires calendars: 'assignee'.");
519
+ }
520
+ const calculatedAt = new Date().toISOString();
521
+ const graph = buildGraph(projects.flatMap((p) => p.tasks), dependencies);
522
+ const segments = projects.map((p) => ({
523
+ projectId: p.projectId,
524
+ start: startOrToday(p.projectStartDate),
525
+ schedule: p.schedule || DEFAULT_WORK_SCHEDULE,
526
+ taskIds: p.tasks.map((t) => t.id)
527
+ }));
528
+ const result = scheduleOnDates(graph, segments, options, calculatedAt);
529
+ // Background projects are dropped from the results; hidden ones also have their task ids redacted.
530
+ const background = new Set(projects.filter((p) => p.background).map((p) => p.projectId));
531
+ const hiddenTasks = new Set(projects.filter((p) => p.background === 'hidden').flatMap((p) => p.tasks.map((t) => t.id)));
532
+ const backgroundTask = new Set(projects.filter((p) => p.background).flatMap((p) => p.tasks.map((t) => t.id)));
533
+ const redact = (id) => (hiddenTasks.has(id) ? 'hidden' : id);
534
+ const redactAll = (list) => list.map((o) => ({ ...o, taskIds: [...new Set(o.taskIds.map(redact))] }));
535
+ const shown = result.projects
536
+ .filter((a) => !background.has(a.projectId))
537
+ .map((a) => ({
538
+ ...a,
539
+ tasks: a.tasks.map((t) => (t.waitingOn ? { ...t, waitingOn: redact(t.waitingOn) } : t)),
540
+ ...(a.overallocations ? { overallocations: redactAll(a.overallocations) } : {})
541
+ }));
542
+ const ends = shown.map((a) => a.projectEndDate).filter(Boolean).sort();
543
+ return {
544
+ calculatedAt,
545
+ projects: shown,
546
+ ...(ends.length ? { projectEndDate: ends[ends.length - 1] } : {}),
547
+ ...(options.levelResources ? { leveled: true } : {}),
548
+ // Only periods that involve a task in the results; other projects' own clashes are not reported.
549
+ overallocations: redactAll(result.overallocations.filter((o) => o.taskIds.some((id) => !backgroundTask.has(id))))
550
+ };
551
+ }
441
552
  /**
442
553
  * Calculates the Critical Path Method (CPM) schedule for a set of tasks and their dependencies.
443
554
  * - Forward Pass: computes earlyStart and earlyFinish (in working hours and calendar dates)
@@ -473,7 +584,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
473
584
  const earlyFinish = new Map();
474
585
  for (const id of topoOrder) {
475
586
  const task = taskMap.get(id);
476
- const duration = getTaskElapsedHours(task);
587
+ const duration = getTaskScheduledHours(task, options.effort);
477
588
  const prereqs = prerequisites.get(id) || new Set();
478
589
  let maxPrereqFinish = 0;
479
590
  for (const p of prereqs) {
@@ -501,7 +612,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
501
612
  for (let i = topoOrder.length - 1; i >= 0; i--) {
502
613
  const id = topoOrder[i];
503
614
  const task = taskMap.get(id);
504
- const duration = getTaskElapsedHours(task);
615
+ const duration = getTaskScheduledHours(task, options.effort);
505
616
  const succs = successors.get(id) || new Set();
506
617
  let minSuccLateStart = totalDurationHours;
507
618
  if (succs.size > 0) {
@@ -536,7 +647,7 @@ export function calculateCPM(projectId, tasks, dependencies, options = {}) {
536
647
  criticalTaskIds.push(id);
537
648
  }
538
649
  const task = taskMap.get(id);
539
- const duration = getTaskElapsedHours(task);
650
+ const duration = getTaskScheduledHours(task, options.effort);
540
651
  const earlyStartDate = projectStartDate
541
652
  ? addWorkingHours(projectStartDate, es, schedule).toISOString()
542
653
  : undefined;
@@ -1 +1 @@
1
- {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAUA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACV,MAAM,eAAe,CAAC;AAEvB,MAAM,UAAU,oBAAoB,CAAC,IAAU;IAC7C,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,kEAAkE;IAClE,OAAO,CAAC,CAAC;AACX,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU;IAC5C,OAAO,oBAAoB,CAAC,IAAI,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AAC9D,CAAC;AAiCD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAYrH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,IAAI,QAAQ,GAAkB,IAAI,CAAC;QACnC,IAAI,QAAQ,GAAkB,IAAI,CAAC;QAEnC,IAAI,GAAG,CAAC,IAAI,KAAK,UAAU,EAAE,CAAC;YAC5B,gEAAgE;YAChE,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;YAC/B,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;QACxB,CAAC;aAAM,IAAI,GAAG,CAAC,IAAI,KAAK,YAAY,EAAE,CAAC;YACrC,mEAAmE;YACnE,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;YACtB,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;QACjC,CAAC;QAED,IAAI,QAAQ,IAAI,QAAQ,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACpG,aAAa,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YAC3C,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,mFAAmF;IACnF,IAAI,SAAS,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC;gBAC5B,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACrB,CAAC;QACH,CAAC;IACH,CAAC;IAED,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,CAAC;AACpE,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,eAAe,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAClE,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,MAAM,YAAY,GAAG,OAAO,CAAC,gBAAgB;QAC3C,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC;QACrC,CAAC,CAAC,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;IACxF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,mBAAmB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;IACtG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,mBAAmB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC7F,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,CAAC;IAE3E,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,MAAM,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,CAAC,EAAE,GAAG,CAAC,CAAC;IAC1H,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IACjD,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,QAAQ,GAAG,aAAa,CAAC,SAAS,EAAE,YAAY,EAAE,OAAO,EAAE,KAAK,EAAE,IAAI,EAAE,eAAe,EAAE,GAAG,CAAC,CAAC;QACpG,OAAO,EAAE,GAAG,QAAQ,EAAE,eAAe,EAAE,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,EAAE,CAAC;IAC5F,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,CAAC,CAAC;IAC5G,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,CAAC,EAC1C,GAAG,CACJ,CAAC;IACF,MAAM,QAAQ,GAAG,aAAa,CAAC,SAAS,EAAE,YAAY,EAAE,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,eAAe,EAAE,GAAG,EAAE,CAAC,EAAE,EAAE,EAAE;QACxH,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;QACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;QAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;IAC5E,CAAC,CAAC,CAAC;IACH,OAAO;QACL,GAAG,QAAQ;QACX,OAAO,EAAE,IAAI;QACb,uBAAuB,EAAE,MAAM,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC,WAAW,EAAE;QACzE,eAAe,EAAE,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC;KAC1E,CAAC;AACJ,CAAC;AAcD,SAAS,MAAM,CAAC,KAAwB,EAAE,KAAW;IACnD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK,CAAC,MAAM,EAAE;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IACrD,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,OAAO,MAAM,CACX,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,CAAC;AACJ,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,YAAY,CAAC;QAC7B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC5C,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IACzE,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,+EAA+E;AAC/E,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,UAAgB,EAAE,GAAgB;IACvH,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,UAAU,CAAC;QACrB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC;IAEvC,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,MAAM,OAAO,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACvC,MAAM,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC;QACzB,MAAM,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC;QACzB,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,CAAC,CAAC;IACX,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,CAAC,GAAG,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;QAC1C,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,YAAY,CAAC;QAC7B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC1C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,SAAiB,EACjB,YAAoB,EACpB,OAAiB,EACjB,KAAY,EACZ,IAAW,EACX,eAA6B,EAC7B,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,YAAY,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAC9D,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IACtD,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IACnG,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5H,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,mBAAmB,CAAC,IAAI,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,mBAAmB,CAAC,IAAI,CAAC,CAAC;QAC3C,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,gBAAgB,CAAC;QAC5B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,mBAAmB,CAAC,IAAI,CAAC,CAAC;QAE3C,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC"}
1
+ {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAWA,OAAO,EACL,qBAAqB,EACrB,eAAe,EACf,oBAAoB,EACpB,sBAAsB,EACtB,eAAe,EACf,mBAAmB,EACnB,SAAS,EACV,MAAM,eAAe,CAAC;AACvB,OAAO,EAAE,gBAAgB,EAAE,MAAM,oBAAoB,CAAC;AAEtD,MAAM,UAAU,oBAAoB,CAAC,IAAU;IAC7C,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,kEAAkE;IAClE,OAAO,CAAC,CAAC;AACX,CAAC;AAED,2EAA2E;AAC3E,MAAM,UAAU,iBAAiB,CAAC,IAAU;IAC1C,MAAM,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC;IAC1B,OAAO,OAAO,CAAC,KAAK,QAAQ,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;AAC1D,CAAC;AAED,wEAAwE;AACxE,MAAM,UAAU,mBAAmB,CAAC,IAAU;IAC5C,OAAO,oBAAoB,CAAC,IAAI,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;AAC9D,CAAC;AAED,+GAA+G;AAC/G,MAAM,UAAU,cAAc,CAAC,IAAU;IACvC,IAAI,IAAI,CAAC,cAAc;QAAE,OAAO,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,CAAC;IAC1G,OAAO,IAAI,CAAC,MAAM,KAAK,MAAM,IAAI,IAAI,CAAC,MAAM,KAAK,UAAU,CAAC;AAC9D,CAAC;AAKD;;;;GAIG;AACH,MAAM,UAAU,qBAAqB,CAAC,IAAU,EAAE,SAAsB,UAAU;IAChF,IAAI,cAAc,CAAC,IAAI,CAAC;QAAE,OAAO,CAAC,CAAC;IACnC,IAAI,MAAM,KAAK,WAAW,IAAI,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,MAAM,EAAE,cAAc,EAAE,IAAI,CAAC,cAAc,EAAE,CAAC,EAAE,CAAC;QAC7G,OAAO,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,CAAC,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC;IACrG,CAAC;IACD,OAAO,mBAAmB,CAAC,IAAI,CAAC,CAAC;AACnC,CAAC;AAuCD,4FAA4F;AAC5F,MAAM,UAAU,mBAAmB,CACjC,IAAU,EACV,OAAoE;IAEpE,OAAO,CACL,CAAC,IAAI,CAAC,UAAU,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,UAAU,CAAC,EAAE,QAAQ,CAAC;QACnF,CAAC,IAAI,CAAC,MAAM,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,EAAE,QAAQ,CAAC;QAC3E,OAAO,CAAC,QAAQ;QAChB,qBAAqB,CACtB,CAAC;AACJ,CAAC;AAED,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;AAExD,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,EAAE,CAAC,CAAC,iBAAiB,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;AAYrH,SAAS,UAAU,CAAC,KAAa,EAAE,YAA8B;IAC/D,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,IAAI,QAAQ,GAAkB,IAAI,CAAC;QACnC,IAAI,QAAQ,GAAkB,IAAI,CAAC;QAEnC,IAAI,GAAG,CAAC,IAAI,KAAK,UAAU,EAAE,CAAC;YAC5B,gEAAgE;YAChE,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;YAC/B,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;QACxB,CAAC;aAAM,IAAI,GAAG,CAAC,IAAI,KAAK,YAAY,EAAE,CAAC;YACrC,mEAAmE;YACnE,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;YACtB,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;QACjC,CAAC;QAED,IAAI,QAAQ,IAAI,QAAQ,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACpG,aAAa,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YAC3C,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,mFAAmF;IACnF,IAAI,SAAS,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC;gBAC5B,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACrB,CAAC;QACH,CAAC;IACH,CAAC;IAED,OAAO,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,CAAC;AACpE,CAAC;AAED;;;;;;;;;;GAUG;AACH,SAAS,oBAAoB,CAC3B,SAAiB,EACjB,YAAoB,EACpB,KAAgB,EAChB,OAAmB;IAEnB,MAAM,OAAO,GAAmB;QAC9B,SAAS;QACT,KAAK,EAAE,YAAY,CAAC,OAAO,CAAC,gBAAgB,CAAC;QAC7C,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,qBAAqB;QACnD,OAAO,EAAE,KAAK,CAAC,OAAO;KACvB,CAAC;IACF,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,CAAC,OAAO,CAAC,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IACxE,OAAO,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC;AAC5B,CAAC;AAUD,SAAS,YAAY,CAAC,KAAqB;IACzC,IAAI,KAAK;QAAE,OAAO,SAAS,CAAC,KAAK,CAAC,CAAC;IACnC,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC;IACzB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,KAAK,CAAC,cAAc,EAAE,EAAE,KAAK,CAAC,WAAW,EAAE,EAAE,KAAK,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;AAC7F,CAAC;AAED;;;;GAIG;AACH,SAAS,eAAe,CACtB,KAAgB,EAChB,QAA0B,EAC1B,OAAiD,EACjD,YAAoB;IAEpB,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,KAAK,CAAC;IACzE,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,GAAG,CAAU,CAAC,CAAC,CAAC,CAAC;IAClG,MAAM,UAAU,GAAG,IAAI,GAAG,CACxB,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACjB,MAAM,GAAG,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC/B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,OAAO,CAAC,EAAE,EAAE,OAAO,CAAC,SAAS,KAAK,UAAU,CAAC,CAAC,CAAC,mBAAmB,CAAC,IAAI,EAAE,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,GAAG,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;IACnI,CAAC,CAAC,CACH,CAAC;IACF,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,qBAAqB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC;IAC/G,MAAM,GAAG,GAAgB,EAAE,OAAO,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,KAAK,EAAE,CAAC;IACxG,MAAM,aAAa,GAAG,CAAC,KAAY,EAAE,EAAE;QACrC,MAAM,IAAI,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC;QAChI,OAAO,CAAC,EAAU,EAAE,EAAE,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAE,CAAC;IACjE,CAAC,CAAC;IACF,MAAM,WAAW,GAAG,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;IAEjD,MAAM,KAAK,GAAG,WAAW,CAAC,SAAS,EAAE,aAAa,EAAE,GAAG,CAAC,CAAC;IACzD,MAAM,IAAI,GAAG,YAAY,CAAC,CAAC,GAAG,SAAS,CAAC,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,aAAa,CAAC,KAAK,CAAC,EAAE,GAAG,CAAC,CAAC;IAC5G,MAAM,OAAO,GAAG,CAAC,GAAmB,EAAE,CAAQ,EAAE,CAAQ,EAAE,KAAyD,EAAE,EAAE,CACrH,aAAa,CAAC,GAAG,EAAE,YAAY,EAAE,CAAC,EAAE,CAAC,EAAE,GAAG,EAAE,KAAK,CAAC,CAAC;IAErD,IAAI,CAAC,OAAO,CAAC,cAAc,EAAE,CAAC;QAC5B,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,KAAK,EAAE,WAAW,CAAC,CAAC;QACzE,OAAO;YACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,OAAO,CAAC,GAAG,EAAE,KAAK,EAAE,IAAI,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC;YACrH,eAAe;SAChB,CAAC;IACJ,CAAC;IAED,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,UAAU,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACxI,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,CAAC,OAAO,CAAC,YAAY,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACpF,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,WAAW,CAAC,GAAG,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,SAAS,CAAC,IAAI,WAAW,CAAC,IAAI,CAAC;IACjG,MAAM,OAAO,GAAG,aAAa,CAAC,KAAK,EAAE,GAAG,EAAE,cAAc,EAAE,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,WAAW,EAAE,MAAM,CAAC,CAAC;IACpH,MAAM,WAAW,GAAG,YAAY,CAC9B,OAAO,CAAC,aAAa,EACrB,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,GAAG,CAAC,OAAO,CAAC,kBAAkB,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,EAAE,CAAC,CAAC,EAC/E,aAAa,CAAC,OAAO,CAAC,KAAK,CAAC,EAC5B,GAAG,CACJ,CAAC;IACF,MAAM,eAAe,GAAG,mBAAmB,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC;IACjF,MAAM,YAAY,GAAG,aAAa,CAAC,KAAK,CAAC,CAAC;IAC1C,OAAO;QACL,QAAQ,EAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;YAC/B,GAAG,OAAO,CAAC,GAAG,EAAE,OAAO,CAAC,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE;gBACjD,MAAM,KAAK,GAAG,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,OAAO,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC;gBACtH,MAAM,SAAS,GAAG,OAAO,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC;gBAC5C,OAAO,EAAE,kBAAkB,EAAE,KAAK,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;YAC5E,CAAC,CAAC;YACF,OAAO,EAAE,IAAI;YACb,uBAAuB,EAAE,CAAC,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,YAAY,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,KAAK,CAAC,CAAC,WAAW,EAAE;YACtG,eAAe,EAAE,SAAS,CAAC,eAAe,EAAE,GAAG,CAAC;SACjD,CAAC,CAAC;QACH,eAAe;KAChB,CAAC;AACJ,CAAC;AAED,gFAAgF;AAChF,SAAS,SAAS,CAAC,eAAiC,EAAE,GAAmB;IACvE,MAAM,GAAG,GAAG,IAAI,GAAG,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC;IACjC,OAAO,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AAC5E,CAAC;AAeD,SAAS,MAAM,CAAC,KAAqB,EAAE,KAAW;IAChD,IAAI,GAAG,GAAG,KAAK,CAAC;IAChB,KAAK,MAAM,CAAC,IAAI,KAAK;QAAE,IAAI,CAAC,GAAG,GAAG;YAAE,GAAG,GAAG,CAAC,CAAC;IAC5C,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,UAAU,CAAC,WAAiB,EAAE,UAAgB,EAAE,QAAsB;IAC7E,OAAO,MAAM,CACX,UAAU,IAAI,WAAW;QACvB,CAAC,CAAC,sBAAsB,CAAC,WAAW,EAAE,UAAU,EAAE,QAAQ,CAAC;QAC3D,CAAC,CAAC,CAAC,sBAAsB,CAAC,UAAU,EAAE,WAAW,EAAE,QAAQ,CAAC,CAC/D,CAAC;AACJ,CAAC;AAED,+CAA+C;AAC/C,SAAS,WAAW,CAAC,KAAe,EAAE,aAAuC,EAAE,GAAgB;IAC7F,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC5C,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,eAAe,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IACzE,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,+EAA+E;AAC/E,SAAS,YAAY,CAAC,KAAe,EAAE,YAA8C,EAAE,KAA2B,EAAE,GAAgB;IAClI,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,KAAK,MAAM,EAAE,IAAI,KAAK,EAAE,CAAC;QACvB,IAAI,GAAG,GAAG,KAAK,CAAC,EAAE,CAAC,CAAC;QACpB,KAAK,MAAM,CAAC,IAAI,YAAY,CAAC,EAAE,CAAC,EAAE,CAAC;YACjC,MAAM,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,EAAE,IAAI,EAAE,GAAG,GAAG;gBAAE,GAAG,GAAG,EAAE,CAAC;QAC/B,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,EAAE,GAAG,mBAAmB,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;QAC9C,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,oBAAoB,CAAC,EAAE,EAAE,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,CAAC,CAAC;IAC7E,CAAC;IACD,OAAO,EAAE,KAAK,EAAE,MAAM,EAAE,CAAC;AAC3B,CAAC;AAED,MAAM,aAAa,GAA2B,EAAE,MAAM,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,IAAI,EAAE,CAAC,EAAE,CAAC;AAEjG;;;;;;;;;;;GAWG;AACH,SAAS,aAAa,CACpB,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAa,EACrE,GAAgB,EAChB,cAAmC,EACnC,IAAsB,EACtB,WAAuC,EACvC,gBAAwC,GAAG,EAAE,CAAC,CAAC;IAE/C,MAAM,QAAQ,GAAG,IAAI,GAAG,CACtB,CAAC,GAAG,OAAO,CAAC;SACT,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,SAAS,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;SACtH,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAC3B,CAAC;IACF,MAAM,GAAG,GAAG,CAAC,EAAU,EAAE,EAAE;QACzB,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,CAAC;QACnC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,QAAQ,CAAC;IAC/C,CAAC,CAAC;IACF,MAAM,IAAI,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,aAAa,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,QAAQ,CAAC,IAAI,aAAa,CAAC,MAAM,CAAC;IAC9F,MAAM,IAAI,GAAuD;QAC/D,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,IAAI,CAAC,EAAE,CAAC,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACxE,OAAO,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,EAAE,cAAc,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACtE,KAAK,EAAE,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;KACnC,CAAC;IACF,wFAAwF;IACxF,MAAM,KAAK,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,aAAa,CAAC,EAAE,CAAC,EAAE,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IACzF,MAAM,MAAM,GAAG,CAAC,CAAS,EAAE,CAAS,EAAE,EAAE;QACtC,MAAM,CAAC,EAAE,EAAE,EAAE,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,EAAE,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,CAAC;QAChD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,EAAE,CAAC,MAAM,EAAE,CAAC,EAAE;YAAE,IAAI,EAAE,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC;gBAAE,OAAO,EAAE,CAAC,CAAC,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;QAC9E,OAAO,KAAK,CAAC;IACf,CAAC,CAAC;IACF,MAAM,KAAK,GAAG,CAAC,GAAgB,EAAE,EAAE;QACjC,IAAI,IAAwB,CAAC;QAC7B,KAAK,MAAM,EAAE,IAAI,GAAG;YAAE,IAAI,IAAI,KAAK,SAAS,IAAI,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC;gBAAE,IAAI,GAAG,EAAE,CAAC;QAC5E,OAAO,IAAK,CAAC;IACf,CAAC,CAAC;IAEF,MAAM,KAAK,GAAG,IAAI,GAAG,EAAgB,CAAC;IACtC,MAAM,MAAM,GAAG,IAAI,GAAG,EAAgB,CAAC;IACvC,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,IAAI,GAAG,IAAI,GAAG,EAAqB,CAAC;IAC1C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,MAAM,GAAa,EAAE,CAAC;IAC5B,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClF,MAAM,QAAQ,GAAG,IAAI,GAAG,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;IAE1E,OAAO,MAAM,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,8FAA8F;QAC9F,IAAI,QAAQ,CAAC,IAAI,KAAK,CAAC;YAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC,CAAE,CAAC,CAAC;QAC/E,MAAM,EAAE,GAAG,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC3B,QAAQ,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAEpB,IAAI,KAAK,GAAG,GAAG,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC5B,KAAK,MAAM,CAAC,IAAI,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACvC,MAAM,CAAC,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YACxB,IAAI,CAAC,IAAI,CAAC,GAAG,KAAK;gBAAE,KAAK,GAAG,CAAC,CAAC;QAChC,CAAC;QACD,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,QAAQ,GAAG,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACzC,MAAM,SAAS,GAAG,QAAQ,GAAG,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACpE,MAAM,UAAU,GAAG,iBAAiB,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;QACvD,IAAI,EAAE,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC;QAC1C,IAAI,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACjD,SAAS,CAAC;YACR,IAAI,OAA4B,CAAC;YACjC,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;gBACjC,OAAO,GAAG,oBAAoB,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;gBACxH,IAAI,OAAO;oBAAE,MAAM;YACrB,CAAC;YACD,IAAI,CAAC,OAAO;gBAAE,MAAM;YACpB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,EAAE,GAAG,eAAe,CAAC,IAAI,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,CAAC;YACtD,EAAE,GAAG,eAAe,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QAClB,MAAM,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACnB,KAAK,MAAM,QAAQ,IAAI,SAAS,EAAE,CAAC;YACjC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,EAAE,EAAE,KAAK,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,GAAG,EAAE,EAAE,CAAC,OAAO,EAAE,EAAE,UAAU,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC,CAAC;YAChI,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,QAAQ,CAAC,QAAQ,CAAC,CAAC;QAClD,CAAC;QACD,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAEhB,KAAK,MAAM,CAAC,IAAI,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,EAAE,CAAC;YACpC,MAAM,IAAI,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,CAAC,CAAC;YACnC,SAAS,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,CAAC;YACvB,IAAI,IAAI,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;QACnD,CAAC;IACH,CAAC;IAED,MAAM,kBAAkB,GAAG,IAAI,GAAG,EAAuB,CAAC;IAC1D,MAAM,IAAI,GAAG,CAAC,IAAY,EAAE,EAAU,EAAE,EAAE;QACxC,IAAI,IAAI,KAAK,EAAE;YAAE,kBAAkB,CAAC,GAAG,CAAC,IAAI,EAAE,CAAC,kBAAkB,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;IACrG,CAAC,CAAC;IACF,KAAK,MAAM,CAAC,GAAG,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE,CAAC;QAChC,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,GAAG,CAAE,CAAC;QACtC,MAAM,OAAO,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,CAAC,CAAC,KAAK,CAAC,CAAC;QAC7D,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YACxC,KAAK,IAAI,CAAC,GAAG,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;gBAC5C,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC;gBACxC,IAAI,CAAC,CAAC,GAAG,IAAI,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,GAAG,CAAC,CAAC,UAAU,GAAG,QAAQ,GAAG,OAAO;oBAAE,IAAI,CAAC,CAAC,CAAC,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC;YACrG,CAAC;QACH,CAAC;IACH,CAAC;IACD,6FAA6F;IAC7F,mCAAmC;IACnC,KAAK,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,IAAI,SAAS;QAAE,IAAI,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAEjE,0FAA0F;IAC1F,6CAA6C;IAC7C,MAAM,SAAS,GAAG,IAAI,GAAG,CAAC,MAAM,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAC1D,MAAM,aAAa,GAAG,CAAC,GAAG,OAAO,CAAC,CAAC,IAAI,CACrC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAE,CAAC,OAAO,EAAE,IAAI,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAE,CACrG,CAAC;IAEF,OAAO;QACL,KAAK,EAAE,EAAE,KAAK,EAAE,MAAM,EAAW;QACjC,SAAS;QACT,kBAAkB,EAAE,IAAI,GAAG,CAAC,CAAC,GAAG,kBAAkB,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;QACjF,aAAa;KACd,CAAC;AACJ,CAAC;AAED,MAAM,OAAO,GAAG,IAAI,CAAC;AASrB;;;GAGG;AACH,SAAS,oBAAoB,CAAC,QAAmB,EAAE,KAAa,EAAE,GAAW,EAAE,UAAkB,EAAE,QAAgB;IACjH,MAAM,WAAW,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,GAAG,GAAG,IAAI,CAAC,CAAC,GAAG,GAAG,KAAK,CAAC,CAAC;IAC3E,IAAI,WAAW,CAAC,MAAM,KAAK,CAAC;QAAE,OAAO,SAAS,CAAC;IAC/C,2FAA2F;IAC3F,MAAM,MAAM,GAAG,CAAC,KAAK,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;IAC1G,KAAK,MAAM,CAAC,IAAI,MAAM,EAAE,CAAC;QACvB,MAAM,MAAM,GAAG,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,CAAC;QACpE,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC;QAC9D,IAAI,IAAI,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;YAAE,SAAS;QACtD,qDAAqD;QACrD,IAAI,KAAK,GAAG,IAAI,CAAC;QACjB,KAAK,MAAM,CAAC,IAAI,CAAC,GAAG,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC;YAC1D,KAAK,IAAI,CAAC,CAAC,UAAU,CAAC;YACtB,IAAI,KAAK,GAAG,UAAU,IAAI,QAAQ,GAAG,OAAO;gBAAE,OAAO,CAAC,CAAC;QACzD,CAAC;IACH,CAAC;IACD,OAAO,SAAS,CAAC;AACnB,CAAC;AAUD;;;;;GAKG;AACH,SAAS,aAAa,CAAC,QAAgB,EAAE;IACvC,MAAM,KAAK,GAAG,KAAK;SAChB,GAAG,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,CAAC,CAAC;SAC5E,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,GAAG,CAAC,CAAC,CAAC;IACvC,MAAM,YAAY,GAAG,CAAC,EAAE,IAAI,EAAE,QAAQ,EAA0B,EAAY,EAAE,CAAC,CAAC,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;IACvI,OAAO,CAAC,IAAI,EAAE,EAAE;QACd,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,OAAO;gBACL,EAAE,GAAG,EAAE,QAAQ,IAAI,CAAC,UAAU,EAAE,EAAE,QAAQ,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE;gBAC5E,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,IAAI,CAAC,UAAW,CAAC,CAAC,CAAC,GAAG,CAAC,YAAY,CAAC;aAC5F,CAAC;QACJ,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,EAAE,KAAK,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QACpF,OAAO,IAAI,CAAC,CAAC,CAAC,CAAC,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IAC1C,CAAC,CAAC;AACJ,CAAC;AAED,8EAA8E;AAC9E,SAAS,mBAAmB,CAAC,OAA0B,EAAE,KAAY,EAAE,WAAuC;IAC5G,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuD,CAAC;IAClF,KAAK,MAAM,CAAC,EAAE,EAAE,IAAI,CAAC,IAAI,OAAO,EAAE,CAAC;QACjC,MAAM,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QACzC,MAAM,CAAC,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,OAAO,EAAE,CAAC;QAC1C,IAAI,CAAC,IAAI,CAAC;YAAE,SAAS;QACrB,KAAK,MAAM,QAAQ,IAAI,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC;YACzC,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,EAAE,EAAE,EAAE,CAAC;YACzE,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,KAAK,EAAE,CAAC,EAAE,GAAG,EAAE,CAAC,EAAE,UAAU,EAAE,iBAAiB,CAAC,IAAI,CAAC,EAAE,MAAM,EAAE,EAAE,EAAE,CAAC,CAAC;YAC3F,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,EAAE,KAAK,CAAC,CAAC;QACtC,CAAC;IACH,CAAC;IAED,MAAM,MAAM,GAAqB,EAAE,CAAC;IACpC,KAAK,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,IAAI,UAAU,CAAC,MAAM,EAAE,EAAE,CAAC;QACzD,MAAM,KAAK,GAAG,QAAQ,CAAC,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAO,EAAE,CAAC;QACvG,MAAM,MAAM,GAAG,CAAC,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;QAC7F,IAAI,QAAoC,CAAC;QACzC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,CAAC,GAAG,MAAM,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;YAC3C,MAAM,CAAC,IAAI,EAAE,EAAE,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,MAAM,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;YAC9C,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,IAAI,CAAC,CAAC,GAAG,IAAI,EAAE,CAAC,CAAC;YACtE,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,GAAG,EAAE,CAAC,EAAE,EAAE,CAAC,GAAG,GAAG,CAAC,CAAC,UAAU,EAAE,CAAC,CAAC,CAAC,CAAC;YAC5E,IAAI,UAAU,IAAI,QAAQ,CAAC,QAAQ,GAAG,OAAO,EAAE,CAAC;gBAC9C,QAAQ,GAAG,SAAS,CAAC;gBACrB,SAAS;YACX,CAAC;YACD,MAAM,OAAO,GAAG,MAAM,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,EAAE,CAAC;YACnD,IAAI,QAAQ,IAAI,QAAQ,CAAC,GAAG,KAAK,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,IAAI,QAAQ,CAAC,OAAO,CAAC,IAAI,EAAE,KAAK,OAAO,CAAC,IAAI,EAAE,EAAE,CAAC;gBAC5G,QAAQ,CAAC,GAAG,GAAG,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YAC5C,CAAC;iBAAM,CAAC;gBACN,QAAQ,GAAG,EAAE,GAAG,KAAK,EAAE,KAAK,EAAE,IAAI,IAAI,CAAC,IAAI,CAAC,CAAC,WAAW,EAAE,EAAE,GAAG,EAAE,IAAI,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,UAAU,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE,OAAO,EAAE,CAAC;gBAChJ,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YACxB,CAAC;QACH,CAAC;IACH,CAAC;IACD,OAAO,MAAM,CAAC;AAChB,CAAC;AAED,SAAS,aAAa,CACpB,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,QAAQ,EAAE,eAAe,EAAE,OAAO,EAAkB,EACtF,YAAoB,EACpB,KAAY,EACZ,IAAW,EACX,GAAgB,EAChB,QAA2D,GAAG,EAAE,CAAC,CAAC,EAAE,CAAC;IAErE,MAAM,EAAE,UAAU,EAAE,UAAU,EAAE,OAAO,EAAE,GAAG,GAAG,CAAC;IAChD,MAAM,MAAM,GAAG,CAAC,IAAU,EAAE,EAAE,CAC5B,IAAI,IAAI,YAAY;QAClB,CAAC,CAAC,sBAAsB,CAAC,YAAY,EAAE,IAAI,EAAE,eAAe,CAAC;QAC7D,CAAC,CAAC,CAAC,sBAAsB,CAAC,IAAI,EAAE,YAAY,EAAE,eAAe,CAAC,CAAC;IAEnE,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IACrC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,QAAQ,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACrC,MAAM,EAAE,GAAG,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QACjC,MAAM,EAAE,GAAG,IAAI,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAChC,MAAM,KAAK,GAAG,UAAU,CAAC,EAAE,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC3C,MAAM,UAAU,GAAG,KAAK,IAAI,KAAK,CAAC;QAClC,IAAI,UAAU;YAAE,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACzC,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAChD,WAAW,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC/B,SAAS,EAAE,MAAM,CAAC,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,CAAC;YAC9C,UAAU,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;YAC9B,UAAU,EAAE,KAAK;YACjB,UAAU;YACV,aAAa,EAAE,UAAU,CAAC,GAAG,CAAC,EAAE,CAAE;YAClC,iBAAiB,EAAE,KAAK;YACxB,cAAc,EAAE,KAAK,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAClD,eAAe,EAAE,EAAE,CAAC,WAAW,EAAE;YACjC,aAAa,EAAE,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,WAAW,EAAE;YAChD,cAAc,EAAE,EAAE,CAAC,WAAW,EAAE;YAChC,GAAG,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,QAAQ,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;YACnD,GAAG,eAAe,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;YACpC,GAAG,KAAK,CAAC,EAAE,CAAC;SACb,CAAC,CAAC;IACL,CAAC;IAED,MAAM,UAAU,GAAG,MAAM,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,MAAM,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,EAAE,YAAY,CAAC,CAAC;IACpF,MAAM,UAAU,GAAG,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,CAAC;IAC9C,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,UAAU;QAC9B,iBAAiB,EAAE,UAAU;QAC7B,gBAAgB,EAAE,YAAY,CAAC,WAAW,EAAE;QAC5C,cAAc,EAAE,UAAU,CAAC,WAAW,EAAE;QACxC,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC;AAsBD;;;;;;GAMG;AACH,MAAM,UAAU,qBAAqB,CACnC,QAAiC,EACjC,YAA8B,EAC9B,UAA+B,EAAE;IAEjC,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,KAAK,GAAG,UAAU,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,EAAE,YAAY,CAAC,CAAC;IACzE,MAAM,QAAQ,GAAqB,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACtD,SAAS,EAAE,CAAC,CAAC,SAAS;QACtB,KAAK,EAAE,YAAY,CAAC,CAAC,CAAC,gBAAgB,CAAC;QACvC,QAAQ,EAAE,CAAC,CAAC,QAAQ,IAAI,qBAAqB;QAC7C,OAAO,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAClC,CAAC,CAAC,CAAC;IACJ,MAAM,MAAM,GAAG,eAAe,CAAC,KAAK,EAAE,QAAQ,EAAE,OAAO,EAAE,YAAY,CAAC,CAAC;IAEvE,mGAAmG;IACnG,MAAM,UAAU,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACzF,MAAM,WAAW,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,KAAK,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IACxH,MAAM,cAAc,GAAG,IAAI,GAAG,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;IAC9G,MAAM,MAAM,GAAG,CAAC,EAAU,EAAE,EAAE,CAAC,CAAC,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACrE,MAAM,SAAS,GAAG,CAAC,IAAsB,EAAE,EAAE,CAC3C,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,OAAO,EAAE,CAAC,GAAG,IAAI,GAAG,CAAC,CAAC,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IAC5E,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ;SAC1B,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;SAC3C,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QACX,GAAG,CAAC;QACJ,KAAK,EAAE,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QACvF,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,eAAe,EAAE,SAAS,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;KAChF,CAAC,CAAC,CAAC;IAEN,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,cAAe,CAAC,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,CAAC;IACxE,OAAO;QACL,YAAY;QACZ,QAAQ,EAAE,KAAK;QACf,GAAG,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,IAAI,CAAC,IAAI,CAAC,MAAM,GAAG,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,GAAG,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACpD,iGAAiG;QACjG,eAAe,EAAE,SAAS,CAAC,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC,cAAc,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;KAClH,CAAC;AACJ,CAAC;AAED;;;;;;GAMG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B,EAC9B,UAAsB,EAAE;IAExB,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC9C,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,qBAAqB,CAAC;IAC3D,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,gBAAgB,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;IAEpG,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,iBAAiB,EAAE,CAAC;YACpB,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC/E,cAAc,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;YAC7E,eAAe,EAAE,EAAE;YACnB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,EAAE,YAAY,CAAC,CAAC;IACnG,IAAI,OAAO,CAAC,cAAc,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QAC/D,MAAM,IAAI,KAAK,CAAC,gDAAgD,CAAC,CAAC;IACpE,CAAC;IACD,IAAI,OAAO,CAAC,SAAS,KAAK,UAAU,EAAE,CAAC;QACrC,OAAO,oBAAoB,CAAC,SAAS,EAAE,YAAY,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,aAAa,EAAE,UAAU,EAAE,SAAS,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5H,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAC7D,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,gBAAgB,CAAC;QAC5B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,qBAAqB,CAAC,IAAI,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QAE7D,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,eAAe,GAAG,gBAAgB;YACtC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,aAAa,GAAG,gBAAgB;YACpC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,cAAc,GAAG,gBAAgB;YACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,EAAE,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;YAC/D,CAAC,CAAC,SAAS,CAAC;QAEd,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;YACV,aAAa,EAAE,QAAQ;YACvB,GAAG,eAAe,CAAC,IAAI,CAAC;YACxB,iBAAiB,EAAE,UAAU;YAC7B,cAAc;YACd,eAAe;YACf,aAAa;YACb,cAAc;SACf,CAAC,CAAC;IACL,CAAC;IAED,MAAM,cAAc,GAAG,gBAAgB;QACrC,CAAC,CAAC,eAAe,CAAC,gBAAgB,EAAE,kBAAkB,EAAE,QAAQ,CAAC,CAAC,WAAW,EAAE;QAC/E,CAAC,CAAC,SAAS,CAAC;IAEd,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,iBAAiB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC7D,gBAAgB,EAAE,gBAAgB,CAAC,CAAC,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS;QAC/E,cAAc;QACd,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC"}
@@ -1,9 +1,22 @@
1
- import type { Activity, User, Actor, CriticalPathConfig, Project, Task, TaskDependency, TaskDependencyGraph, Team, TaskContainer, Iteration, Comment, Attachment, FileStorageAdapter, UploadFileInput, PresignedUploadResult, TimeEntry, Webhook, PublicWebhook, Workflow, CreateTaskInput, Deliverable, DeliverableSummary, CreateDeliverableInput, TaskLifecycleState, CriticalPathAnalysis, TimelineLadder, TimelineLadderOptions, TaskLadderView, TaskMetrics, TaskProgressHistory, WorkloadDistribution, WorkloadDistributionOptions } from '../types/index.js';
1
+ import type { Activity, User, Actor, CriticalPathConfig, Project, Task, TaskDependency, TaskDependencyGraph, Team, TaskContainer, Iteration, Comment, Attachment, FileStorageAdapter, UploadFileInput, PresignedUploadResult, TimeEntry, Webhook, PublicWebhook, Workflow, CreateTaskInput, Deliverable, DeliverableSummary, CreateDeliverableInput, TaskLifecycleState, CriticalPathAnalysis, PortfolioCriticalPathAnalysis, TimelineLadder, TimelineLadderOptions, TaskLadderView, TaskMetrics, TaskProgressHistory, WorkloadDistribution, WorkloadDistributionOptions } from '../types/index.js';
2
2
  import { StorageAdapter, type ActivityQuery, type Page, type TaskQuery } from '../store/index.js';
3
3
  import { PluginRegistry } from '../plugins/index.js';
4
4
  import { DomainEventBus } from '../domain/events.js';
5
5
  import { WebhookDispatcher } from '../webhooks/dispatcher.js';
6
6
  import { type CPMOptions } from '../domain/cpm.js';
7
+ /** Options for `calculatePortfolioCriticalPath`. */
8
+ export interface PortfolioCriticalPathOptions extends CPMOptions {
9
+ /** Projects to include. Default: every project the caller can read. */
10
+ projectIds?: string[];
11
+ /** Project ids in priority order for levelling; unlisted projects come last. */
12
+ projectOrder?: string[];
13
+ /**
14
+ * Also count work from every other project in the caller's tenant (including ones they cannot
15
+ * read) toward people's and teams' capacity, without including those projects in the results.
16
+ * Tasks from unreadable projects appear only as `'hidden'`. Requires `workspace.manage`.
17
+ */
18
+ includeHiddenWork?: boolean;
19
+ }
7
20
  import { type MetricOptions } from '../domain/metrics.js';
8
21
  export declare class CriticalPathEngine {
9
22
  readonly config: CriticalPathConfig;
@@ -232,6 +245,21 @@ export declare class CriticalPathEngine {
232
245
  deleteIteration(id: string): Promise<boolean>;
233
246
  private deleteIterationNow;
234
247
  calculateCriticalPath(projectId: string, options?: CPMOptions): Promise<CriticalPathAnalysis>;
248
+ /**
249
+ * Critical path analysis across several projects at once: `projectIds`, or every project the
250
+ * caller can read. Projects the caller cannot read are left out entirely. Dependencies between the
251
+ * included projects are honoured and, with `levelResources`, people and team pools are shared, so
252
+ * nobody is booked above capacity across projects. `projectOrder` ranks projects for levelling.
253
+ * Each project uses its own start and calendar (`projectStartDate` / `schedule` are fallbacks).
254
+ * Rejects runs above `portfolioTaskLimit` tasks (default 5000).
255
+ */
256
+ calculatePortfolioCriticalPath(options?: PortfolioCriticalPathOptions): Promise<PortfolioCriticalPathAnalysis>;
257
+ /** Validated calendar and levelling modes, with engine defaults applied. */
258
+ private resolveCpmModes;
259
+ /** Every dependency touching `tasks`, once each. */
260
+ private loadDependencies;
261
+ /** Users and the teams of the given tenants (team pools match members by user id). */
262
+ private loadPeople;
235
263
  getTimelineLadder(projectId: string, options?: TimelineLadderOptions): Promise<TimelineLadder>;
236
264
  getTaskLadder(taskId: string): Promise<TaskLadderView | null>;
237
265
  getTaskMetrics(taskId: string, options?: MetricOptions): Promise<TaskMetrics | null>;