@critical-path/core 0.35.0 → 0.36.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,14 @@
1
1
  # @critical-path/core
2
2
 
3
+ ## 0.36.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 810d8d1: Upload and request body limits.
8
+
9
+ - **@critical-path/core:** new `uploads: { maxBytes, allowedMimeTypes }` engine option, with `type/*` wildcards. It applies to direct uploads (decoded size), presigned uploads (content type) and registered attachments (declared size and type). Violations throw `ValidationError` (400).
10
+ - **@critical-path/server:** new `maxBodyBytes` router option (default 10 MiB). Larger bodies get `413`, checked while streaming rather than only through `Content-Length`. Previously bodies were read without any limit.
11
+
3
12
  ## 0.35.0
4
13
 
5
14
  ### Minor Changes
package/README.md CHANGED
@@ -157,6 +157,17 @@ import { runStorageAdapterConformance } from '@critical-path/core/testing';
157
157
  runStorageAdapterConformance({ name: 'PostgresStore', createStore: () => new PostgresStore(db), describe, it, expect });
158
158
  ```
159
159
 
160
+ #### Upload Limits
161
+
162
+ ```ts
163
+ new CriticalPathEngine({
164
+ fileStorage,
165
+ uploads: { maxBytes: 25 * 1024 * 1024, allowedMimeTypes: ['image/*', 'application/pdf'] }
166
+ });
167
+ ```
168
+
169
+ Limits apply to direct uploads (checked against the decoded size), presigned uploads (content type) and registered attachments (declared `sizeBytes` and `mimeType`). Presigned uploads go straight to storage, so also cap their size in your bucket policy.
170
+
160
171
  #### Querying & Pagination
161
172
 
162
173
  ```ts
@@ -178,6 +178,8 @@ export declare class CriticalPathEngine {
178
178
  contentType?: string;
179
179
  expiresInSeconds?: number;
180
180
  }): Promise<PresignedUploadResult>;
181
+ /** Enforces `config.uploads` (MIME allow-list with `type/*` wildcards, and maximum size). */
182
+ private assertUploadAllowed;
181
183
  /**
182
184
  * A caller-supplied `storageKey` must live under the attachment's project prefix, because
183
185
  * deleting the attachment deletes that file: otherwise anyone could register, then delete,
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,QAAQ,EACR,IAAI,EACJ,KAAK,EAEL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EAEf,qBAAqB,EACrB,SAAS,EACT,OAAO,EACP,aAAa,EACb,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,KAAK,aAAa,EAAE,KAAK,IAAI,EAAE,KAAK,SAAS,EAAE,MAAM,mBAAmB,CAAC;AACjH,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EAuCf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAE,iBAAiB,EAAoB,MAAM,2BAA2B,CAAC;AAIhF,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,+GAA+G;IAC/G,SAAgB,QAAQ,EAAE,iBAAiB,CAAC;IAC5C,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;IAC9B,wFAAwF;IACxF,OAAO,CAAC,QAAQ,CAAC,qBAAqB,CAAC,CAAU;gBAErC,MAAM,GAAE,kBAAuB;IAiC3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,iEAAiE;YACnD,YAAY;IAQ1B,OAAO,CAAC,SAAS;IAMjB;;;OAGG;IACH,OAAO,KAAK,SAAS,GAEpB;IAED,qGAAqG;IACrG,OAAO,CAAC,QAAQ;IAOhB,OAAO,CAAC,aAAa;YAKP,SAAS;IAWvB,yFAAyF;YAC3E,eAAe;YAOf,cAAc;IAK5B;;;OAGG;YACW,oBAAoB;YAapB,sBAAsB;IAIpC,kGAAkG;YACpF,cAAc;YAgBd,eAAe;YAIf,kBAAkB;YAMlB,qBAAqB;IAInC,wFAAwF;IACxF,OAAO,CAAC,aAAa;YAMP,UAAU;YASV,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAKjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA4BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAiBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAK/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IA+BzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA+BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA6C3C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAMnD;;;OAGG;IACG,UAAU,CAAC,KAAK,GAAE,SAAc,GAAG,OAAO,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAQ5D,sFAAsF;IAChF,eAAe,CAAC,KAAK,GAAE,aAAkB,GAAG,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAW3D,kBAAkB;IAK1B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAoGrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EACtB,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YA8TT,8BAA8B;IAyE5C;;;;OAIG;IACG,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,GAAE;QAAE,QAAQ,CAAC,EAAE,QAAQ,GAAG,QAAQ,CAAA;KAAO,GAAG,OAAO,CAAC,OAAO,CAAC;IAsChG,mFAAmF;YACrE,kBAAkB;IAiChC,sGAAsG;IAChG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB9C,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA8B7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAgCpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IA4C1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAM/C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKpF,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,UAAU,CACd,KAAK,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAC1F,OAAO,CAAC,OAAO,CAAC;IA0Bb,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4B7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8CzG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC5G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAUlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;YAM7C,uBAAuB;IAO/B,gBAAgB,CACpB,KAAK,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,YAAY,CAAC,GAAG;QAAE,UAAU,CAAC,EAAE,MAAM,CAAA;KAAE,GACjG,OAAO,CAAC,UAAU,CAAC;IAuBhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsC9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IAmChB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiCrD;;;;OAIG;IACG,+BAA+B,CAAC,OAAO,EAAE;QAC7C,SAAS,EAAE,MAAM,CAAC;QAClB,QAAQ,EAAE,MAAM,CAAC;QACjB,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,gBAAgB,CAAC,EAAE,MAAM,CAAC;KAC3B,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAiBlC;;;;OAIG;YACW,uBAAuB;IAW/B,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAKzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAgBpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAiBxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAMvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAgBjG,gGAAgG;IAC1F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAoBnD,gGAAgG;YAClF,mBAAmB;IAW3B,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAMvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAiDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA6B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAMnD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAwBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAuCzF,6FAA6F;IACvF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAkB7C,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAoB1B,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAyDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IA4BhC;;;OAGG;IACG,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAUjC,sFAAsF;YACxE,eAAe;IAS7B,OAAO,CAAC,eAAe;IAIvB,mGAAmG;IAC7F,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAMvC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAM3D;;;OAGG;IACG,aAAa,CAAC,KAAK,EAAE;QACzB,IAAI,EAAE,MAAM,CAAC;QACb,GAAG,EAAE,MAAM,CAAC;QACZ,MAAM,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,MAAM,CAAC,EAAE,OAAO,CAAC;KAClB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAgBjD,aAAa,CACjB,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,OAAO,EAAE,MAAM,GAAG,KAAK,GAAG,QAAQ,GAAG,QAAQ,GAAG,QAAQ,CAAC,CAAC,GAC/E,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAY1B,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOjD,OAAO,CAAC,kBAAkB;IAQ1B,2FAA2F;YAC7E,kBAAkB;CAkBjC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,QAAQ,EACR,IAAI,EACJ,KAAK,EAEL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EAEf,qBAAqB,EACrB,SAAS,EACT,OAAO,EACP,aAAa,EACb,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,KAAK,aAAa,EAAE,KAAK,IAAI,EAAE,KAAK,SAAS,EAAE,MAAM,mBAAmB,CAAC;AACjH,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EAuCf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAE,iBAAiB,EAAoB,MAAM,2BAA2B,CAAC;AAIhF,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,+GAA+G;IAC/G,SAAgB,QAAQ,EAAE,iBAAiB,CAAC;IAC5C,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;IAC9B,wFAAwF;IACxF,OAAO,CAAC,QAAQ,CAAC,qBAAqB,CAAC,CAAU;gBAErC,MAAM,GAAE,kBAAuB;IAiC3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,iEAAiE;YACnD,YAAY;IAQ1B,OAAO,CAAC,SAAS;IAMjB;;;OAGG;IACH,OAAO,KAAK,SAAS,GAEpB;IAED,qGAAqG;IACrG,OAAO,CAAC,QAAQ;IAOhB,OAAO,CAAC,aAAa;YAKP,SAAS;IAWvB,yFAAyF;YAC3E,eAAe;YAOf,cAAc;IAK5B;;;OAGG;YACW,oBAAoB;YAapB,sBAAsB;IAIpC,kGAAkG;YACpF,cAAc;YAgBd,eAAe;YAIf,kBAAkB;YAMlB,qBAAqB;IAInC,wFAAwF;IACxF,OAAO,CAAC,aAAa;YAMP,UAAU;YASV,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAKjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA4BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAiBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAK/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IA+BzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA+BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA6C3C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAMnD;;;OAGG;IACG,UAAU,CAAC,KAAK,GAAE,SAAc,GAAG,OAAO,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAQ5D,sFAAsF;IAChF,eAAe,CAAC,KAAK,GAAE,aAAkB,GAAG,OAAO,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;YAW3D,kBAAkB;IAK1B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAoGrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EACtB,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YA8TT,8BAA8B;IAyE5C;;;;OAIG;IACG,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,GAAE;QAAE,QAAQ,CAAC,EAAE,QAAQ,GAAG,QAAQ,CAAA;KAAO,GAAG,OAAO,CAAC,OAAO,CAAC;IAsChG,mFAAmF;YACrE,kBAAkB;IAiChC,sGAAsG;IAChG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB9C,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA8B7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAgCpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IA4C1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAM/C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKpF,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,UAAU,CACd,KAAK,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAC1F,OAAO,CAAC,OAAO,CAAC;IA0Bb,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4B7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAyB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8CzG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC5G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAUlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;YAM7C,uBAAuB;IAO/B,gBAAgB,CACpB,KAAK,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,YAAY,CAAC,GAAG;QAAE,UAAU,CAAC,EAAE,MAAM,CAAA;KAAE,GACjG,OAAO,CAAC,UAAU,CAAC;IAwBhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsC9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IAuChB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiCrD;;;;OAIG;IACG,+BAA+B,CAAC,OAAO,EAAE;QAC7C,SAAS,EAAE,MAAM,CAAC;QAClB,QAAQ,EAAE,MAAM,CAAC;QACjB,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,gBAAgB,CAAC,EAAE,MAAM,CAAC;KAC3B,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAkBlC,6FAA6F;IAC7F,OAAO,CAAC,mBAAmB;IAgB3B;;;;OAIG;YACW,uBAAuB;IAW/B,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAKzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAgBpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAiBxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAMvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAgBjG,gGAAgG;IAC1F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAoBnD,gGAAgG;YAClF,mBAAmB;IAW3B,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAMvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAiDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA6B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAMnD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAwBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAuCzF,6FAA6F;IACvF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAkB7C,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAoB1B,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAyDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IA4BhC;;;OAGG;IACG,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAUjC,sFAAsF;YACxE,eAAe;IAS7B,OAAO,CAAC,eAAe;IAIvB,mGAAmG;IAC7F,WAAW,IAAI,OAAO,CAAC,aAAa,EAAE,CAAC;IAMvC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAM3D;;;OAGG;IACG,aAAa,CAAC,KAAK,EAAE;QACzB,IAAI,EAAE,MAAM,CAAC;QACb,GAAG,EAAE,MAAM,CAAC;QACZ,MAAM,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,MAAM,CAAC,EAAE,OAAO,CAAC;KAClB,GAAG,OAAO,CAAC;QAAE,OAAO,EAAE,aAAa,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,CAAC;IAgBjD,aAAa,CACjB,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,OAAO,EAAE,MAAM,GAAG,KAAK,GAAG,QAAQ,GAAG,QAAQ,GAAG,QAAQ,CAAC,CAAC,GAC/E,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAY1B,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOjD,OAAO,CAAC,kBAAkB;IAQ1B,2FAA2F;YAC7E,kBAAkB;CAkBjC"}
@@ -9,7 +9,7 @@ import { validateCustomFieldValues, validateCustomFieldDefinitions } from '../do
9
9
  import { detectDependencyCycle, CircularDependencyError } from '../domain/graph.js';
10
10
  import { ValidationError, NotFoundError, ForbiddenError } from '../domain/errors.js';
11
11
  import { WebhookDispatcher, assertWebhookUrl } from '../webhooks/dispatcher.js';
12
- import { buildStorageKey } from '../storage/file-storage.js';
12
+ import { buildStorageKey, normalizeUploadData } from '../storage/file-storage.js';
13
13
  import { generateWebhookSecret } from '../webhooks/signature.js';
14
14
  import { calculateCPM } from '../domain/cpm.js';
15
15
  import { buildTimelineLadder, aggregateConcreteEvidenceForTask } from '../domain/ladder.js';
@@ -1339,6 +1339,7 @@ export class CriticalPathEngine {
1339
1339
  }
1340
1340
  async createAttachment(input) {
1341
1341
  await this.requireAttachmentCreate(input);
1342
+ this.assertUploadAllowed(input.mimeType, input.sizeBytes);
1342
1343
  if (this.actor)
1343
1344
  await this.assertStorageKeyBelongs(input);
1344
1345
  const attachment = this.actor
@@ -1405,9 +1406,12 @@ export class CriticalPathEngine {
1405
1406
  if (this.actor && !projectId) {
1406
1407
  throw new ValidationError('Attachments must reference a project, task or comment.');
1407
1408
  }
1409
+ // Decode once so limits apply to the real byte size, then hand the bytes to the adapter.
1410
+ const data = normalizeUploadData(input.data, input.encoding, input.mimeType);
1411
+ this.assertUploadAllowed(input.mimeType || 'application/octet-stream', data.byteLength);
1408
1412
  const uploadResult = await this.fileStorage.upload({
1409
1413
  filename: input.filename,
1410
- data: input.data,
1414
+ data,
1411
1415
  mimeType: input.mimeType,
1412
1416
  pathPrefix: projectId && (this.actor || !input.pathPrefix) ? `projects/${projectId}` : input.pathPrefix
1413
1417
  });
@@ -1465,6 +1469,7 @@ export class CriticalPathEngine {
1465
1469
  }
1466
1470
  if (!options.projectId)
1467
1471
  throw new ValidationError('projectId is required for presigned uploads.');
1472
+ this.assertUploadAllowed(options.contentType ?? 'application/octet-stream');
1468
1473
  if (this.enforcing) {
1469
1474
  await this.requireProjectAccess('attachment.create', options.projectId);
1470
1475
  }
@@ -1477,6 +1482,24 @@ export class CriticalPathEngine {
1477
1482
  expiresInSeconds: options.expiresInSeconds
1478
1483
  });
1479
1484
  }
1485
+ /** Enforces `config.uploads` (MIME allow-list with `type/*` wildcards, and maximum size). */
1486
+ assertUploadAllowed(mimeType, sizeBytes) {
1487
+ const limits = this.config.uploads;
1488
+ if (!limits)
1489
+ return;
1490
+ if (limits.maxBytes !== undefined && sizeBytes !== undefined && sizeBytes > limits.maxBytes) {
1491
+ throw new ValidationError(`File is ${sizeBytes} bytes; the maximum is ${limits.maxBytes} bytes.`);
1492
+ }
1493
+ if (limits.allowedMimeTypes) {
1494
+ const type = mimeType.split(';')[0].trim().toLowerCase();
1495
+ const allowed = limits.allowedMimeTypes.some((pattern) => {
1496
+ const p = pattern.toLowerCase();
1497
+ return p.endsWith('/*') ? type.startsWith(p.slice(0, -1)) : type === p;
1498
+ });
1499
+ if (!allowed)
1500
+ throw new ValidationError(`File type "${type}" is not allowed.`);
1501
+ }
1502
+ }
1480
1503
  /**
1481
1504
  * A caller-supplied `storageKey` must live under the attachment's project prefix, because
1482
1505
  * deleting the attachment deletes that file: otherwise anyone could register, then delete,
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAyCA,OAAO,EAAkB,aAAa,EAAiD,MAAM,mBAAmB,CAAC;AACjH,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EAuCf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,8BAA8B,EAAE,MAAM,4BAA4B,CAAC;AACvG,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,eAAe,EAAE,aAAa,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrF,OAAO,EAAE,iBAAiB,EAAE,gBAAgB,EAAE,MAAM,2BAA2B,CAAC;AAChF,OAAO,EAAE,eAAe,EAAE,MAAM,4BAA4B,CAAC;AAC7D,OAAO,EAAE,qBAAqB,EAAE,MAAM,0BAA0B,CAAC;AAEjE,OAAO,EAAE,YAAY,EAAmB,MAAM,kBAAkB,CAAC;AACjE,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvC,+GAA+G;IAC/F,QAAQ,CAAoB;IAC5B,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IACzD,2FAA2F;IAC3E,KAAK,CAAS;IAC9B,wFAAwF;IACvE,qBAAqB,CAAW;IAEjD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,MAAM,CAAC,KAAK,KAAK,SAAS,IAAI,CAAC,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI,CAAC,EAAE,CAAC;YAC9F,0EAA0E;YAC1E,MAAM,IAAI,KAAK,CACb,yHAAyH,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,KAAK,CAAC,GAAG,CACzJ,CAAC;QACJ,CAAC;QACD,IAAI,CAAC,KAAK,GAAG,MAAM,CAAC,KAAK,IAAI,IAAI,aAAa,EAAE,CAAC;QAEjD,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QACnC,IAAI,CAAC,QAAQ,GAAG,IAAI,iBAAiB,CACnC;YACE,YAAY,EAAE,GAAG,EAAE,CAAC,IAAI,CAAC,eAAe,EAAE;YAC1C,aAAa,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC;SACzD,EACD,MAAM,CAAC,eAAe,CACvB,CAAC;QACF,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC,GAAG,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAEnE,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;QACrC,yGAAyG;QACzG,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,EAAE,GAAE,CAAC,CAAC,CAAC;IAC7B,CAAC;IAED;;;;;;OAMG;IACH,SAAS,CAAC,KAAY;QACpB,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACzD,MAAM,CAAC,cAAc,CAAC,MAAM,EAAE,OAAO,EAAE,EAAE,KAAK,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,GAAG,KAAK,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACjG,OAAO,MAAM,CAAC;IAChB,CAAC;IAED,iEAAiE;IACzD,KAAK,CAAC,YAAY,CAAoC,KAAmC;QAC/F,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC;YACxB,GAAG,KAAK;YACR,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SAChC,CAAC,CAAC;IACV,CAAC;IAEO,SAAS,CAAC,QAAgB;QAChC,OAAO,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;IACxC,CAAC;IAED,sFAAsF;IAEtF;;;OAGG;IACH,IAAY,SAAS;QACnB,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,qBAAqB,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,SAAS,IAAI,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC;IAC3G,CAAC;IAED,qGAAqG;IAC7F,QAAQ;QACd,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACvD,MAAM,CAAC,cAAc,CAAC,IAAI,EAAE,uBAAuB,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC;QACtE,OAAO,IAAI,CAAC;IACd,CAAC;IAEO,aAAa,CAAC,MAAgD;QACpE,MAAM,MAAM,GAAG,IAAI,CAAC,KAAK,EAAE,QAAQ,CAAC;QACpC,OAAO,CAAC,MAAM,IAAI,MAAM,EAAE,QAAQ,KAAK,MAAM,CAAC;IAChD,CAAC;IAEO,KAAK,CAAC,SAAS,CACrB,MAA2B,EAC3B,OAAiB,EACjB,QAAwE;QAExE,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,IAAI,OAAO,IAAI,CAAC,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC;YAAE,OAAO,KAAK,CAAC;QAC1D,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC;QACrC,OAAO,MAAM,CAAC,CAAC,CAAC,MAAM,MAAM,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAM,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACzF,CAAC;IAED,yFAAyF;IACjF,KAAK,CAAC,eAAe,CAAC,SAA6B;QACzD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAC1B,OAAO,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC;IAC1E,CAAC;IAEO,KAAK,CAAC,cAAc,CAAC,SAA6B;QACxD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,OAAO,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC,KAAK,IAAI,CAAC;IAC1D,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,oBAAoB,CAChC,MAA2B,EAC3B,SAA6B,EAC7B,QAAwE;QAExE,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO;QAC5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QACtD,IAAI,CAAC,OAAO;YAAE,MAAM,IAAI,aAAa,CAAC,YAAY,SAAS,cAAc,CAAC,CAAC;QAC3E,IAAI,MAAM,KAAK,cAAc,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,OAAO,EAAE,QAAQ,CAAC,CAAC,EAAE,CAAC;YACpF,MAAM,IAAI,cAAc,CAAC,kBAAkB,MAAM,gBAAgB,SAAS,IAAI,CAAC,CAAC;QAClF,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,sBAAsB,CAAC,MAA6C;QAChF,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC;YAAE,MAAM,IAAI,cAAc,CAAC,kBAAkB,MAAM,GAAG,CAAC,CAAC;IAC7F,CAAC;IAED,kGAAkG;IAC1F,KAAK,CAAC,cAAc,CAC1B,KAAU,EACV,WAA0E;QAE1E,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,KAAK,CAAC;QAClC,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAmB,CAAC;QAC5C,MAAM,MAAM,GAAQ,EAAE,CAAC;QACvB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,MAAM,WAAW,CAAC,IAAI,CAAC,CAAC;YAC1C,IAAI,CAAC,SAAS;gBAAE,SAAS;YACzB,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC,CAAC;YAC5F,IAAI,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC;gBAAE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACjD,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,MAA0B;QACtD,OAAO,MAAM,CAAC,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC;IAC5E,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,SAA6B;QAC5D,IAAI,CAAC,SAAS;YAAE,OAAO,SAAS,CAAC;QACjC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,OAAO,IAAI,CAAC,eAAe,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAC/C,CAAC;IAEO,KAAK,CAAC,qBAAqB,CAAC,CAA8D;QAChG,OAAO,CAAC,CAAC,SAAS,IAAI,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,IAAI,CAAC,kBAAkB,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IAC/G,CAAC;IAED,wFAAwF;IAChF,aAAa,CAAkC,OAAU;QAC/D,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,IAAI,OAAO,CAAC;YAAE,OAAO,OAAO,CAAC;QAC5D,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,GAAG,IAAI,EAAE,GAAG,OAAO,CAAC;QAChD,OAAO,IAAS,CAAC;IACnB,CAAC;IAEO,KAAK,CAAC,UAAU,CAAC,MAA0B;QACjD,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,MAAM,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACjD,CAAC;QACD,KAAK,MAAM,MAAM,IAAI,IAAI,CAAC,OAAO,CAAC,UAAU,EAAE,EAAE,CAAC;YAC/C,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC;QAC5B,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,OAAO,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,OAAO,QAAQ,IAAI,IAAI,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,GAAG,QAAQ,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,QAAQ,EAAE,CAAC,CAAC;QACjI,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAC5C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,OAAO,GAAG,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAC5C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QAEtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC9E,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,6DAA6D;QAC7D,MAAM,SAAS,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,EAAE,QAAQ,CAAC,CAAC;QACpG,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,OAAO,IAAI,CAAC,cAAc,CAAC,QAAQ,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACpD,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACtD,OAAO,IAAI,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,IAAI,CAAC,sBAAsB,CAAC,gBAAgB,CAAC,CAAC;QACpD,8BAA8B,CAAC,OAAO,CAAC,sBAAsB,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACnG,kGAAkG;QAClG,MAAM,KAAK,GAAG,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,EAAE,CAAC;QAC5F,mDAAmD;QACnD,IAAI,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,KAAK,CAAC,OAAO,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,IAAI,CAAC,KAAM,CAAC,MAAM,CAAC,EAAE,CAAC;YACpH,KAAK,CAAC,OAAO,GAAG,CAAC,GAAG,CAAC,KAAK,CAAC,OAAO,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QAC3F,CAAC;QACD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QACtD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,OAAO,IAAI,QAAQ,CAAC;YACpD,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACtD,IAAI,SAAS,IAAI,OAAO;YAAE,MAAM,IAAI,CAAC,oBAAoB,CAAC,wBAAwB,EAAE,EAAE,CAAC,CAAC;QACxF,8BAA8B,CAAC,OAAO,CAAC,sBAAsB,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACnG,OAAO,GAAG,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACtD,yFAAyF;QACzF,MAAM,OAAO,GAAG,IAAI,CAAC,QAAQ,EAAE,CAAC;QAEhC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC;QAC5C,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,iFAAiF;YACjF,MAAM,OAAO,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACpC,CAAC;QACD,MAAM,cAAc,GAAG,CACrB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,KAAK,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAC5F,CAAC,MAAM,CAAC,CAAC,MAAM,EAAoB,EAAE,CAAC,MAAM,KAAK,IAAI,CAAC,CAAC;QAExD,KAAK,MAAM,SAAS,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;YAAE,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC3G,KAAK,MAAM,SAAS,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;YAAE,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC3G,KAAK,MAAM,WAAW,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC;YAAE,MAAM,OAAO,CAAC,iBAAiB,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAChH,KAAK,MAAM,UAAU,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,EAAE,EAAE,CAAC;YAAE,MAAM,OAAO,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAE3H,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,cAAc,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC7F,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,EAAE;gBACb,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,gBAAgB,EAAE,cAAc,CAAC,MAAM,EAAE;aAC1E,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,IAAI,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,OAAO,SAAS,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,KAAK,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;IAC5E,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,QAAmB,EAAE;QACpC,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;YACpB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QACrG,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,MAAM,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IAC1G,CAAC;IAED,sFAAsF;IACtF,KAAK,CAAC,eAAe,CAAC,QAAuB,EAAE;QAC7C,IAAI,KAAK,CAAC,MAAM,EAAE,CAAC;YACjB,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAChG,CAAC;QACD,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;YACpB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAC1G,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC;QAC9D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,MAAM,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IAC/G,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,SAAoB;QACnD,MAAM,QAAQ,GAAG,CAAC,MAAM,IAAI,CAAC,WAAW,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QAC7D,OAAO,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,QAAQ,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC;IAChF,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,CAAC,UAAU,EAAE,CAAC;YACxC,SAAS,GAAG,EAAE,GAAG,SAAS,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC;QAC9D,CAAC;QACD,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,IAAI,cAAc,CAAC,SAAS,IAAI,cAAc,CAAC,SAAS,KAAK,SAAS,CAAC,SAAS,EAAE,CAAC;YACjF,MAAM,IAAI,eAAe,CAAC,oEAAoE,CAAC,CAAC;QAClG,CAAC;QACD,MAAM,SAAS,GAAG,SAAS,CAAC,SAAS,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,yGAAyG;QACzG,yBAAyB,CACvB,OAAO,EAAE,sBAAsB,EAC/B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,EACrD,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CACnC,CAAC;QAEF,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,cAAc,GAAG,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;QACvG,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC/K,MAAM,WAAW,GAAG,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAElI,MAAM,gBAAgB,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,IAAI,KAAK,CAAC;QAClF,MAAM,YAAY,GAAG,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,CAAC,gBAAgB,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC3J,MAAM,sBAAsB,GAAG,cAAc,CAAC,sBAAsB,IAAI,SAAS,CAAC,sBAAsB,CAAC;QAEzG,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,cAAc;YACd,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,WAAW;YACX,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,eAAe;YACf,sBAAsB;YACtB,YAAY;YACZ,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACzG,SAAS,EAAE,gBAAgB;YAC3B,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,IAAI;YAC9E,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,UAAU,IAAI,QAAQ,CAAC;YACvD,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAAsB,EACtB,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,4FAA4F;QAC5F,OAAO,GAAG,OAAO,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,OAAO,EAAE,OAAO,IAAI,OAAO,EAAE,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;QACvE,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,QAAQ,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAClG,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,SAAS,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAChG,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC;QACvF,MAAM,WAAW,GAAG,OAAO,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,oFAAoF;QACpF,+CAA+C;QAC/C,MAAM,EACJ,EAAE,EAAE,GAAG,EACP,SAAS,EAAE,UAAU,EACrB,SAAS,EAAE,UAAU,EACrB,GAAG,gBAAgB,EACpB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAkB,CAAC;QAE7E,yCAAyC;QACzC,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,gBAAgB,CAAC,MAAM,CAAC,CAAC;YACpG,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,gBAAgB,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YAC5F,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,gBAAgB,CAAC,YAAY,EAAE,CAAC;YAClC,yBAAyB,CACvB,OAAO,EAAE,sBAAsB,EAC/B,EAAE,GAAG,QAAQ,CAAC,YAAY,EAAE,GAAG,gBAAgB,CAAC,YAAY,EAAE,EAC9D,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CACnC,CAAC;QACJ,CAAC;QAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;QACF,MAAM,YAAY,GAAG,gBAAgB,CAAC,MAAM;YAC1C,CAAC,CAAC,uBAAuB,CACrB,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD;YACH,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,iBAAiB,GAAG,YAAY,EAAE,QAAQ,IAAI,iBAAiB,CAAC,QAAQ,CAAC;QAE/E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,IAAI,YAAY,EAAE,CAAC;YAC3F,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,YAAY,CAAC,QAAQ,CAAC;YAE3F,gFAAgF;YAChF,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5F,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;gBAED,MAAM,YAAY,GAAG,gBAAgB,CAAC,YAAY,IAAI,QAAQ,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;YAED,2GAA2G;YAC3G,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5C,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,MAAM,aAAa,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;oBAC5D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;oBACrC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;gBAChC,IAAI,aAAa,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACpD,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;gBACD,yFAAyF;gBACzF,IACE,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,EACvF,CAAC;oBACD,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;wBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;oBAC7C,CAAC;oBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;wBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;oBAC3C,CAAC;oBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;wBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;oBAChC,CAAC;gBACH,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,YAAY,CAAC,QAAQ,KAAK,aAAa,EACvC,CAAC;gBACD,yFAAyF;gBACzF,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;oBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;gBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;oBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;gBAChC,CAAC;YACH,CAAC;YAED,oCAAoC;YACpC,IAAI,YAAY,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBAC1C,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC;oBAClC,gBAAgB,CAAC,WAAW,GAAG,GAAG,CAAC;gBACrC,CAAC;gBACD,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBAC9E,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;gBAChD,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mGAAmG;QACnG,IAAI,iBAAiB,KAAK,aAAa,EAAE,CAAC;YACxC,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC/C,MAAM,YAAY,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;gBAC3D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;gBACrC,CAAC,CAAC,UAAU,CAAC;YAEf,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;gBAChC,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACnC,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;gBACvC,MAAM,YAAY,GAAG,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,SAAS,KAAK,KAAK,IAAI,CAAC,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC,EAAE,CAAC;YAC5G,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;QACvC,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAGH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;wBAChF,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;wBAC7B,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;4BAC5B,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;4BAC5D,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC,OAAO,EAAE,CAAC;4BACnC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;gCACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;gCAC7D,OAAO,CAAC,sBAAsB,GAAG,CAAC,UAAU,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;4BAC7F,CAAC;4BACD,OAAO,CAAC,YAAY,GAAG,IAAI,CAAC;wBAC9B,CAAC;oBACH,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;wBAChC,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;wBACjC,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;gBAEL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,UAA8C,EAAE;QAC3E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QACrD,MAAM,IAAI,CAAC,kBAAkB,CAAC,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,QAAQ,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;YACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mFAAmF;IAC3E,KAAK,CAAC,kBAAkB,CAAC,IAAU,EAAE,QAA6B;QACxE,MAAM,OAAO,GAAG,IAAI,CAAC,QAAQ,EAAE,CAAC;QAEhC,MAAM,QAAQ,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC;QACnG,KAAK,MAAM,KAAK,IAAI,QAAQ,EAAE,CAAC;YAC7B,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBAC1B,MAAM,OAAO,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,CAAC,CAAC;YACnD,CAAC;iBAAM,CAAC;gBACN,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC,CAAC;YACjE,CAAC;QACH,CAAC;QAED,KAAK,MAAM,UAAU,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;YACnE,MAAM,OAAO,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,CAAC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,WAAW,GAAG;YAClB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YACzD,GAAG,CAAC,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE;SACnG,CAAC;QACF,KAAK,MAAM,YAAY,IAAI,IAAI,GAAG,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;YACjE,MAAM,OAAO,CAAC,gBAAgB,CAAC,YAAY,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,MAAM,OAAO,IAAI,QAAQ,EAAE,CAAC;YAC/B,MAAM,OAAO,CAAC,aAAa,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,CAAC;QAED,KAAK,MAAM,KAAK,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;YAC7D,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC7C,CAAC;IACH,CAAC;IAED,sGAAsG;IACtG,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,CAAC,UAAU;YAAE,OAAO,KAAK,CAAC;QAC9B,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;YACnD,IAAI,CAAC,IAAI;gBAAE,OAAO,KAAK,CAAC;YACxB,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACjE,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,KAAK,GAA+B;gBACxC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;gBACpC,OAAO,EAAE,EAAE,UAAU,EAAE;aACxB,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QACnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,CAAC,IAAI,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAC1G,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,GAAG,CAAC,MAAM,cAAc,CAAC,CAAC;YACtE,IAAI,CAAC,QAAQ;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,GAAG,CAAC,eAAe,cAAc,CAAC,CAAC;YACnF,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACjE,CAAC;QACD,iDAAiD;QACjD,MAAM,aAAa,GAAG,MAAM,IAAI,CAAC,2BAA2B,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;QAClF,MAAM,UAAU,GAAG,qBAAqB,CAAC,aAAa,EAAE,GAAG,CAAC,CAAC;QAC7D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,2BAA2B,CAAC,WAAmB;QAC3D,MAAM,KAAK,GAAG,IAAI,GAAG,EAA0B,CAAC;QAChD,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;QAClC,IAAI,QAAQ,GAAG,CAAC,WAAW,CAAC,CAAC;QAE7B,OAAO,QAAQ,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YAC3B,MAAM,IAAI,GAAa,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;YACxF,QAAQ,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1C,KAAK,MAAM,IAAI,IAAI,OAAO,EAAE,CAAC;gBAC3B,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;oBACrB,+EAA+E;oBAC/E,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC;wBAAE,SAAS;oBACrC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;oBACnB,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,IAAI,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC;wBACzE,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC;oBAC/B,CAAC;gBACH,CAAC;YACH,CAAC;YACD,QAAQ,GAAG,IAAI,CAAC;QAClB,CAAC;QAED,OAAO,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,CAAC;YACpD,OAAO,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,EAAE,eAAe,EAAE,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC;QAC9E,CAAC;QACD,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAC7E,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAC/E,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACtD,MAAM,IAAI,eAAe,CAAC,yCAAyC,CAAC,CAAC;QACvE,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,KAAK,CAAC,MAAM,cAAc,CAAC,CAAC;YACxE,MAAM,IAAI,CAAC,oBAAoB,CAAC,UAAU,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC9D,CAAC;QACD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YAC1E,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAC1B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC;IAClG,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAC1D,OAAO,IAAI,CAAC,cAAc,CAAC,UAAU,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;IAC/F,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;IAC3C,CAAC;IAED,KAAK,CAAC,UAAU,CACd,KAA2F;QAE3F,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;YAC9C,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,KAAK,CAAC,MAAM,cAAc,CAAC,CAAC;YACxE,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACpE,CAAC;QACD,MAAM,OAAO,GAAoD,IAAI,CAAC,KAAK;YACzE,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YACvF,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,QAAQ,EAAE,CAAC;QACvD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,kBAAkB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE;YAC/F,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,QAAQ,CAAC,QAAQ;SAC3B,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,kBAAkB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE;YAC/F,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,QAAQ,CAAC,QAAQ;SAC3B,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,KAAyC;QACnF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAE/F,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,KAAyC;QACtF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAE/F,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAC3F,IAAI,CAAC,qBAAqB,CAAC,CAAC,CAAC,CAC9B,CAAC;QACF,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,CAAC,UAAU;YAAE,OAAO,IAAI,CAAC;QAC7B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,qBAAqB,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC;IACvG,CAAC;IAEO,KAAK,CAAC,uBAAuB,CAAC,IAAiE;QACrG,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO;QAC5B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,eAAe,CAAC,wDAAwD,CAAC,CAAC;QACpG,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,SAAS,CAAC,CAAC;IAClE,CAAC;IAED,KAAK,CAAC,gBAAgB,CACpB,KAAkG;QAElG,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1C,IAAI,IAAI,CAAC,KAAK;YAAE,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1D,MAAM,UAAU,GAAuD,IAAI,CAAC,KAAK;YAC/E,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YAC3F,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,QAAQ,EAAE,CAAC;QAC3D,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,MAAM,IAAI,CAAC,qBAAqB,CAAC,QAAQ,CAAC,EAAE;YAC/F,IAAI,EAAE,YAAY;YAClB,OAAO,EAAE,QAAQ,CAAC,UAAU;SAC7B,CAAC,CAAC;QAEH,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,YAAY,EAAE,EAAE;oBAChB,UAAU,EAAE,QAAQ,CAAC,UAAU;oBAC/B,GAAG,EAAE,QAAQ,CAAC,GAAG;oBACjB,SAAS,EAAE,MAAM,IAAI,CAAC,qBAAqB,CAAC,QAAQ,CAAC;iBACtD;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QACD,gFAAgF;QAChF,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1C,qGAAqG;QACrG,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,KAAK,CAAC,CAAC;QAC1D,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,EAAE,CAAC;YAC7B,MAAM,IAAI,eAAe,CAAC,wDAAwD,CAAC,CAAC;QACtF,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,SAAS,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,YAAY,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,UAAU;SACxG,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,aAAa,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QACnE,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,+BAA+B,CAAC,OAKrC;QACC,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,IAAI,CAAC,OAAO,CAAC,SAAS;YAAE,MAAM,IAAI,eAAe,CAAC,8CAA8C,CAAC,CAAC;QAClG,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAC1E,CAAC;aAAM,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC;YAC7D,MAAM,IAAI,aAAa,CAAC,YAAY,OAAO,CAAC,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC;YAC5C,UAAU,EAAE,eAAe,CAAC,YAAY,OAAO,CAAC,SAAS,EAAE,EAAE,OAAO,CAAC,QAAQ,CAAC;YAC9E,WAAW,EAAE,OAAO,CAAC,WAAW;YAChC,gBAAgB,EAAE,OAAO,CAAC,gBAAgB;SAC3C,CAAC,CAAC;IACL,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,uBAAuB,CAAC,IAAsF;QAC1H,IAAI,CAAC,IAAI,CAAC,UAAU;YAAE,OAAO;QAC7B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,MAAM,MAAM,GAAG,YAAY,SAAS,GAAG,CAAC;QACxC,MAAM,QAAQ,GAAG,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;QAC5C,IAAI,CAAC,SAAS,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,UAAU,CAAC,MAAM,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,GAAG,CAAC,EAAE,CAAC;YACvG,MAAM,IAAI,eAAe,CAAC,6BAA6B,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,uBAAuB,wBAAwB,CAAC,CAAC;QAC/H,CAAC;IACH,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,OAAO,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC;IACpD,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,OAAO,IAAI,IAAI,IAAI,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,EAAE,CAAC,CAAC;QACrH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC,CAAC;QAC7E,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAmB;gBACxC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAC/C,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAmB;gBACxC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,OAAO,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC1E,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7E,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACpD,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gGAAgG;IAChG,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,aAAa,EAAE,EAAE,CAAC,CAAC;QACtE,KAAK,MAAM,KAAK,IAAI,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,EAAE,CAAC,EAAE,CAAC;YAC1G,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC,CAAC;QACtE,CAAC;QACD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjF,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gGAAgG;IACxF,KAAK,CAAC,mBAAmB,CAC/B,SAAiB,EACjB,KAAsD,EACtD,EAAU;QAEV,KAAK,MAAM,IAAI,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,EAAE,CAAC;YACxD,IAAI,IAAI,CAAC,KAAK,CAAC,KAAK,EAAE;gBAAE,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;QACvF,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACxD,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAC9B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,CAAC,IAAI,CAAC;IACjF,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,KAAK,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACpH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QAC/C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YACzC,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QAC/C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC;QAExE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QAC7D,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7E,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,IAAI,CAAC,YAAY,CAAwB;YAC7C,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QACnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACpD,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACnC,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACnC,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,6FAA6F;IAC7F,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,aAAa,EAAE,EAAE,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjF,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC3D,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;IACtF,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC3D,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,aAAa,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,IAAI,SAAS;YAAE,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC1E,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC7C,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,EAAE,CAAC;QACpC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,EAAE,CAAC;QACpC,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAED,gBAAgB;IAEhB;;;OAGG;IACH,KAAK,CAAC,QAAQ;QACZ,MAAM,UAAU,GAAG,OAAO,IAAI,CAAC,MAAM,CAAC,KAAK,KAAK,UAAU,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,KAAK,IAAI,EAAE,CAAC;QAC3H,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,IAAI,EAAE,CAAC;QACpD,MAAM,IAAI,GAAG,IAAI,GAAG,EAAgB,CAAC;QACrC,KAAK,MAAM,IAAI,IAAI,CAAC,GAAG,MAAM,EAAE,GAAG,UAAU,CAAC;YAAE,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,CAAC;QACvE,OAAO,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,mBAAmB;IAEnB,sFAAsF;IAC9E,KAAK,CAAC,eAAe;QAC3B,MAAM,UAAU,GAAc,CAAC,IAAI,CAAC,MAAM,CAAC,QAAQ,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC;YACxE,GAAG,CAAC;YACJ,EAAE,EAAE,UAAU,CAAC,EAAE;YACjB,SAAS,EAAE,IAAI,IAAI,CAAC,CAAC,CAAC,CAAC,WAAW,EAAE;SACrC,CAAC,CAAC,CAAC;QACJ,OAAO,CAAC,GAAG,UAAU,EAAE,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC;IAC9D,CAAC;IAEO,eAAe,CAAC,EAAE,MAAM,EAAE,GAAG,OAAO,EAAW;QACrD,OAAO,EAAE,GAAG,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC;IAC7C,CAAC;IAED,mGAAmG;IACnG,KAAK,CAAC,WAAW;QACf,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,OAAO,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,CAAC;IAC3F,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,OAAO,OAAO,IAAI,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACvF,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,KAMnB;QACC,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,MAAM,GAAG,KAAK,CAAC,MAAM,IAAI,qBAAqB,EAAE,CAAC;QACvD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,GAAG,EAAE,KAAK,CAAC,GAAG;YACd,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,MAAM;YACN,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI;YAC5B,QAAQ,EAAE,IAAI,CAAC,KAAK,EAAE,QAAQ;SAC/B,CAAC,CAAC;QACH,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,EAAE,OAAO,EAAE,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IAC5D,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,EAAU,EACV,OAAgF;QAEhF,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAAE,OAAO,IAAI,CAAC;QAC9C,IAAI,OAAO,CAAC,GAAG;YAAE,IAAI,CAAC,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;QACtD,MAAM,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,OAAO,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAC5C,EAAE,EACF,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,SAAS,CAAC,CAAC,CAC7G,CAAC;QACF,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAAE,OAAO,KAAK,CAAC;QAC/C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,kBAAkB,CAAC,GAAW;QACpC,IAAI,CAAC;YACH,gBAAgB,CAAC,GAAG,EAAE,IAAI,CAAC,MAAM,CAAC,eAAe,EAAE,gBAAgB,CAAC,CAAC;QACvE,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,IAAI,eAAe,CAAE,GAAa,CAAC,OAAO,CAAC,CAAC;QACpD,CAAC;IACH,CAAC;IAED,2FAA2F;IACnF,KAAK,CAAC,kBAAkB,CAAC,KAAkB;QACjD,MAAM,CAAC,GAAG,KAAK,CAAC,OAA8B,CAAC;QAC/C,MAAM,KAAK,GAAG,CAAC,CAAC,OAAO,IAAI,CAAC,CAAC,QAAQ,IAAI,CAAC,CAAC,IAAI,CAAC;QAChD,IAAI,KAAK;YAAE,OAAO,KAAK,CAAC,QAAQ,IAAI,SAAS,CAAC;QAC9C,oEAAoE;QACpE,IAAI,UAAU,IAAI,CAAC;YAAE,OAAO,CAAC,CAAC,QAAQ,IAAI,SAAS,CAAC;QAEpD,MAAM,SAAS,GACb,CAAC,CAAC,SAAS;YACX,CAAC,CAAC,IAAI,EAAE,SAAS;YACjB,CAAC,CAAC,WAAW,EAAE,SAAS;YACxB,CAAC,CAAC,SAAS,EAAE,SAAS;YACtB,CAAC,CAAC,SAAS,EAAE,SAAS;YACtB,CAAC,CAAC,UAAU,EAAE,SAAS;YACvB,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,OAAO,EAAE,MAAM,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,IAAI,CAAC,CAAC,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC;QACrI,IAAI,CAAC,SAAS;YAAE,OAAO,SAAS,CAAC;QACjC,OAAO,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,EAAE,QAAQ,IAAI,SAAS,CAAC;IACzE,CAAC;CACF"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAyCA,OAAO,EAAkB,aAAa,EAAiD,MAAM,mBAAmB,CAAC;AACjH,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EAuCf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,8BAA8B,EAAE,MAAM,4BAA4B,CAAC;AACvG,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,eAAe,EAAE,aAAa,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrF,OAAO,EAAE,iBAAiB,EAAE,gBAAgB,EAAE,MAAM,2BAA2B,CAAC;AAChF,OAAO,EAAE,eAAe,EAAE,mBAAmB,EAAE,MAAM,4BAA4B,CAAC;AAClF,OAAO,EAAE,qBAAqB,EAAE,MAAM,0BAA0B,CAAC;AAEjE,OAAO,EAAE,YAAY,EAAmB,MAAM,kBAAkB,CAAC;AACjE,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvC,+GAA+G;IAC/F,QAAQ,CAAoB;IAC5B,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IACzD,2FAA2F;IAC3E,KAAK,CAAS;IAC9B,wFAAwF;IACvE,qBAAqB,CAAW;IAEjD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,MAAM,CAAC,KAAK,KAAK,SAAS,IAAI,CAAC,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI,CAAC,EAAE,CAAC;YAC9F,0EAA0E;YAC1E,MAAM,IAAI,KAAK,CACb,yHAAyH,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,KAAK,CAAC,GAAG,CACzJ,CAAC;QACJ,CAAC;QACD,IAAI,CAAC,KAAK,GAAG,MAAM,CAAC,KAAK,IAAI,IAAI,aAAa,EAAE,CAAC;QAEjD,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QACnC,IAAI,CAAC,QAAQ,GAAG,IAAI,iBAAiB,CACnC;YACE,YAAY,EAAE,GAAG,EAAE,CAAC,IAAI,CAAC,eAAe,EAAE;YAC1C,aAAa,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC;SACzD,EACD,MAAM,CAAC,eAAe,CACvB,CAAC;QACF,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC,GAAG,EAAE,CAAC,KAAK,EAAE,EAAE,CAAC,IAAI,CAAC,QAAQ,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,CAAC;QAEnE,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;QACrC,yGAAyG;QACzG,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,GAAG,EAAE,GAAE,CAAC,CAAC,CAAC;IAC7B,CAAC;IAED;;;;;;OAMG;IACH,SAAS,CAAC,KAAY;QACpB,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACzD,MAAM,CAAC,cAAc,CAAC,MAAM,EAAE,OAAO,EAAE,EAAE,KAAK,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,GAAG,KAAK,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACjG,OAAO,MAAM,CAAC;IAChB,CAAC;IAED,iEAAiE;IACzD,KAAK,CAAC,YAAY,CAAoC,KAAmC;QAC/F,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC;YACxB,GAAG,KAAK;YACR,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SAChC,CAAC,CAAC;IACV,CAAC;IAEO,SAAS,CAAC,QAAgB;QAChC,OAAO,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;IACxC,CAAC;IAED,sFAAsF;IAEtF;;;OAGG;IACH,IAAY,SAAS;QACnB,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,IAAI,CAAC,qBAAqB,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,SAAS,IAAI,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC;IAC3G,CAAC;IAED,qGAAqG;IAC7F,QAAQ;QACd,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,MAAM,IAAI,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACvD,MAAM,CAAC,cAAc,CAAC,IAAI,EAAE,uBAAuB,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC;QACtE,OAAO,IAAI,CAAC;IACd,CAAC;IAEO,aAAa,CAAC,MAAgD;QACpE,MAAM,MAAM,GAAG,IAAI,CAAC,KAAK,EAAE,QAAQ,CAAC;QACpC,OAAO,CAAC,MAAM,IAAI,MAAM,EAAE,QAAQ,KAAK,MAAM,CAAC;IAChD,CAAC;IAEO,KAAK,CAAC,SAAS,CACrB,MAA2B,EAC3B,OAAiB,EACjB,QAAwE;QAExE,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,IAAI,OAAO,IAAI,CAAC,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC;YAAE,OAAO,KAAK,CAAC;QAC1D,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,SAAS,CAAC;QACrC,OAAO,MAAM,CAAC,CAAC,CAAC,MAAM,MAAM,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAM,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACzF,CAAC;IAED,yFAAyF;IACjF,KAAK,CAAC,eAAe,CAAC,SAA6B;QACzD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAC1B,OAAO,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC;IAC1E,CAAC;IAEO,KAAK,CAAC,cAAc,CAAC,SAA6B;QACxD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QACjC,OAAO,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC,KAAK,IAAI,CAAC;IAC1D,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,oBAAoB,CAChC,MAA2B,EAC3B,SAA6B,EAC7B,QAAwE;QAExE,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO;QAC5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QACtD,IAAI,CAAC,OAAO;YAAE,MAAM,IAAI,aAAa,CAAC,YAAY,SAAS,cAAc,CAAC,CAAC;QAC3E,IAAI,MAAM,KAAK,cAAc,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,MAAM,EAAE,OAAO,EAAE,QAAQ,CAAC,CAAC,EAAE,CAAC;YACpF,MAAM,IAAI,cAAc,CAAC,kBAAkB,MAAM,gBAAgB,SAAS,IAAI,CAAC,CAAC;QAClF,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,sBAAsB,CAAC,MAA6C;QAChF,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC;YAAE,MAAM,IAAI,cAAc,CAAC,kBAAkB,MAAM,GAAG,CAAC,CAAC;IAC7F,CAAC;IAED,kGAAkG;IAC1F,KAAK,CAAC,cAAc,CAC1B,KAAU,EACV,WAA0E;QAE1E,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,KAAK,CAAC;QAClC,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAmB,CAAC;QAC5C,MAAM,MAAM,GAAQ,EAAE,CAAC;QACvB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,MAAM,WAAW,CAAC,IAAI,CAAC,CAAC;YAC1C,IAAI,CAAC,SAAS;gBAAE,SAAS;YACzB,IAAI,CAAC,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC;gBAAE,QAAQ,CAAC,GAAG,CAAC,SAAS,EAAE,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC,CAAC;YAC5F,IAAI,QAAQ,CAAC,GAAG,CAAC,SAAS,CAAC;gBAAE,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACjD,CAAC;QACD,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,MAA0B;QACtD,OAAO,MAAM,CAAC,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC;IAC5E,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,SAA6B;QAC5D,IAAI,CAAC,SAAS;YAAE,OAAO,SAAS,CAAC;QACjC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,OAAO,IAAI,CAAC,eAAe,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC;IAC/C,CAAC;IAEO,KAAK,CAAC,qBAAqB,CAAC,CAA8D;QAChG,OAAO,CAAC,CAAC,SAAS,IAAI,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,IAAI,CAAC,kBAAkB,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IAC/G,CAAC;IAED,wFAAwF;IAChF,aAAa,CAAkC,OAAU;QAC/D,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,CAAC,UAAU,IAAI,OAAO,CAAC;YAAE,OAAO,OAAO,CAAC;QAC5D,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,GAAG,IAAI,EAAE,GAAG,OAAO,CAAC;QAChD,OAAO,IAAS,CAAC;IACnB,CAAC;IAEO,KAAK,CAAC,UAAU,CAAC,MAA0B;QACjD,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,MAAM,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACjD,CAAC;QACD,KAAK,MAAM,MAAM,IAAI,IAAI,CAAC,OAAO,CAAC,UAAU,EAAE,EAAE,CAAC;YAC/C,MAAM,MAAM,CAAC,IAAI,EAAE,CAAC,IAAI,CAAC,CAAC;QAC5B,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,OAAO,SAAS,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,OAAO,QAAQ,IAAI,IAAI,CAAC,aAAa,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,GAAG,QAAQ,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,QAAQ,EAAE,CAAC,CAAC;QACjI,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAC5C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,OAAO,GAAG,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAC5C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QAEtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC9E,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,6DAA6D;QAC7D,MAAM,SAAS,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,EAAE,QAAQ,CAAC,CAAC;QACpG,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,OAAO,IAAI,CAAC,cAAc,CAAC,QAAQ,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACpD,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACtD,OAAO,IAAI,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,IAAI,CAAC,sBAAsB,CAAC,gBAAgB,CAAC,CAAC;QACpD,8BAA8B,CAAC,OAAO,CAAC,sBAAsB,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACnG,kGAAkG;QAClG,MAAM,KAAK,GAAG,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,EAAE,CAAC;QAC5F,mDAAmD;QACnD,IAAI,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,KAAK,CAAC,OAAO,EAAE,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,IAAI,CAAC,KAAM,CAAC,MAAM,CAAC,EAAE,CAAC;YACpH,KAAK,CAAC,OAAO,GAAG,CAAC,GAAG,CAAC,KAAK,CAAC,OAAO,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QAC3F,CAAC;QACD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC;QACtD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,OAAO,IAAI,QAAQ,CAAC;YACpD,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACtD,IAAI,SAAS,IAAI,OAAO;YAAE,MAAM,IAAI,CAAC,oBAAoB,CAAC,wBAAwB,EAAE,EAAE,CAAC,CAAC;QACxF,8BAA8B,CAAC,OAAO,CAAC,sBAAsB,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACnG,OAAO,GAAG,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,EAAE,CAAC,CAAC;QACtD,yFAAyF;QACzF,MAAM,OAAO,GAAG,IAAI,CAAC,QAAQ,EAAE,CAAC;QAEhC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC;QAC5C,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,iFAAiF;YACjF,MAAM,OAAO,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACpC,CAAC;QACD,MAAM,cAAc,GAAG,CACrB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,KAAK,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAC5F,CAAC,MAAM,CAAC,CAAC,MAAM,EAAoB,EAAE,CAAC,MAAM,KAAK,IAAI,CAAC,CAAC;QAExD,KAAK,MAAM,SAAS,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;YAAE,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC3G,KAAK,MAAM,SAAS,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC;YAAE,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC3G,KAAK,MAAM,WAAW,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC;YAAE,MAAM,OAAO,CAAC,iBAAiB,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAChH,KAAK,MAAM,UAAU,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,EAAE,EAAE,CAAC;YAAE,MAAM,OAAO,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAE3H,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,cAAc,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC7F,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,EAAE;gBACb,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,gBAAgB,EAAE,cAAc,CAAC,MAAM,EAAE;aAC1E,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,IAAI,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,OAAO,SAAS,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,KAAK,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;IAC5E,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,UAAU,CAAC,QAAmB,EAAE;QACpC,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;YACpB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QACrG,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,MAAM,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IAC1G,CAAC;IAED,sFAAsF;IACtF,KAAK,CAAC,eAAe,CAAC,QAAuB,EAAE;QAC7C,IAAI,KAAK,CAAC,MAAM,EAAE,CAAC;YACjB,OAAO,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAChG,CAAC;QACD,IAAI,KAAK,CAAC,SAAS,EAAE,CAAC;YACpB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,EAAE,EAAE,CAAC;QAC1G,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,CAAC;QAC9D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,MAAM,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IAC/G,CAAC;IAEO,KAAK,CAAC,kBAAkB,CAAC,SAAoB;QACnD,MAAM,QAAQ,GAAG,CAAC,MAAM,IAAI,CAAC,WAAW,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QAC7D,OAAO,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,QAAQ,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC;IAChF,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,CAAC,UAAU,EAAE,CAAC;YACxC,SAAS,GAAG,EAAE,GAAG,SAAS,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC;QAC9D,CAAC;QACD,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,IAAI,cAAc,CAAC,SAAS,IAAI,cAAc,CAAC,SAAS,KAAK,SAAS,CAAC,SAAS,EAAE,CAAC;YACjF,MAAM,IAAI,eAAe,CAAC,oEAAoE,CAAC,CAAC;QAClG,CAAC;QACD,MAAM,SAAS,GAAG,SAAS,CAAC,SAAS,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,yGAAyG;QACzG,yBAAyB,CACvB,OAAO,EAAE,sBAAsB,EAC/B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,EACrD,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CACnC,CAAC;QAEF,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,cAAc,GAAG,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;QACvG,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC/K,MAAM,WAAW,GAAG,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAElI,MAAM,gBAAgB,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,IAAI,KAAK,CAAC;QAClF,MAAM,YAAY,GAAG,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,CAAC,gBAAgB,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC3J,MAAM,sBAAsB,GAAG,cAAc,CAAC,sBAAsB,IAAI,SAAS,CAAC,sBAAsB,CAAC;QAEzG,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,cAAc;YACd,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,WAAW;YACX,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,eAAe;YACf,sBAAsB;YACtB,YAAY;YACZ,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACzG,SAAS,EAAE,gBAAgB;YAC3B,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,IAAI;YAC9E,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,UAAU,IAAI,QAAQ,CAAC;YACvD,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAAsB,EACtB,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,4FAA4F;QAC5F,OAAO,GAAG,OAAO,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,OAAO,EAAE,OAAO,IAAI,OAAO,EAAE,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;QACvE,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,QAAQ,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAClG,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,SAAS,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAChG,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC;QACvF,MAAM,WAAW,GAAG,OAAO,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,oFAAoF;QACpF,+CAA+C;QAC/C,MAAM,EACJ,EAAE,EAAE,GAAG,EACP,SAAS,EAAE,UAAU,EACrB,SAAS,EAAE,UAAU,EACrB,GAAG,gBAAgB,EACpB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAkB,CAAC;QAE7E,yCAAyC;QACzC,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,gBAAgB,CAAC,MAAM,CAAC,CAAC;YACpG,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,gBAAgB,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YAC5F,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,gBAAgB,CAAC,YAAY,EAAE,CAAC;YAClC,yBAAyB,CACvB,OAAO,EAAE,sBAAsB,EAC/B,EAAE,GAAG,QAAQ,CAAC,YAAY,EAAE,GAAG,gBAAgB,CAAC,YAAY,EAAE,EAC9D,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CACnC,CAAC;QACJ,CAAC;QAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;QACF,MAAM,YAAY,GAAG,gBAAgB,CAAC,MAAM;YAC1C,CAAC,CAAC,uBAAuB,CACrB,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD;YACH,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,iBAAiB,GAAG,YAAY,EAAE,QAAQ,IAAI,iBAAiB,CAAC,QAAQ,CAAC;QAE/E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,IAAI,YAAY,EAAE,CAAC;YAC3F,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,YAAY,CAAC,QAAQ,CAAC;YAE3F,gFAAgF;YAChF,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5F,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;gBAED,MAAM,YAAY,GAAG,gBAAgB,CAAC,YAAY,IAAI,QAAQ,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;YAED,2GAA2G;YAC3G,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5C,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,MAAM,aAAa,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;oBAC5D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;oBACrC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;gBAChC,IAAI,aAAa,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACpD,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;gBACD,yFAAyF;gBACzF,IACE,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,EACvF,CAAC;oBACD,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;wBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;oBAC7C,CAAC;oBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;wBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;oBAC3C,CAAC;oBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;wBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;oBAChC,CAAC;gBACH,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,YAAY,CAAC,QAAQ,KAAK,aAAa,EACvC,CAAC;gBACD,yFAAyF;gBACzF,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;oBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;gBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;oBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;gBAChC,CAAC;YACH,CAAC;YAED,oCAAoC;YACpC,IAAI,YAAY,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBAC1C,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC;oBAClC,gBAAgB,CAAC,WAAW,GAAG,GAAG,CAAC;gBACrC,CAAC;gBACD,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBAC9E,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;gBAChD,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mGAAmG;QACnG,IAAI,iBAAiB,KAAK,aAAa,EAAE,CAAC;YACxC,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC/C,MAAM,YAAY,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;gBAC3D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;gBACrC,CAAC,CAAC,UAAU,CAAC;YAEf,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;gBAChC,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACnC,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;gBACvC,MAAM,YAAY,GAAG,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,SAAS,KAAK,KAAK,IAAI,CAAC,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC,EAAE,CAAC;YAC5G,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;QACvC,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAGH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;wBAChF,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;wBAC7B,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;4BAC5B,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;4BAC5D,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC,OAAO,EAAE,CAAC;4BACnC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;gCACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;gCAC7D,OAAO,CAAC,sBAAsB,GAAG,CAAC,UAAU,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;4BAC7F,CAAC;4BACD,OAAO,CAAC,YAAY,GAAG,IAAI,CAAC;wBAC9B,CAAC;oBACH,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;wBAChC,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;wBACjC,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;gBAEL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,UAA8C,EAAE;QAC3E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QACrD,MAAM,IAAI,CAAC,kBAAkB,CAAC,QAAQ,EAAE,OAAO,CAAC,QAAQ,IAAI,QAAQ,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;YACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mFAAmF;IAC3E,KAAK,CAAC,kBAAkB,CAAC,IAAU,EAAE,QAA6B;QACxE,MAAM,OAAO,GAAG,IAAI,CAAC,QAAQ,EAAE,CAAC;QAEhC,MAAM,QAAQ,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,IAAI,CAAC,EAAE,CAAC,CAAC;QACnG,KAAK,MAAM,KAAK,IAAI,QAAQ,EAAE,CAAC;YAC7B,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBAC1B,MAAM,OAAO,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,CAAC,CAAC;YACnD,CAAC;iBAAM,CAAC;gBACN,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC,CAAC;YACjE,CAAC;QACH,CAAC;QAED,KAAK,MAAM,UAAU,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;YACnE,MAAM,OAAO,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,CAAC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACvD,MAAM,WAAW,GAAG;YAClB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YACzD,GAAG,CAAC,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE;SACnG,CAAC;QACF,KAAK,MAAM,YAAY,IAAI,IAAI,GAAG,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;YACjE,MAAM,OAAO,CAAC,gBAAgB,CAAC,YAAY,CAAC,CAAC;QAC/C,CAAC;QACD,KAAK,MAAM,OAAO,IAAI,QAAQ,EAAE,CAAC;YAC/B,MAAM,OAAO,CAAC,aAAa,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,CAAC;QAED,KAAK,MAAM,KAAK,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;YAC7D,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC7C,CAAC;IACH,CAAC;IAED,sGAAsG;IACtG,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,CAAC,UAAU;YAAE,OAAO,KAAK,CAAC;QAC9B,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC;YACnD,IAAI,CAAC,IAAI;gBAAE,OAAO,KAAK,CAAC;YACxB,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACjE,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,KAAK,GAA+B;gBACxC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;gBACpC,OAAO,EAAE,EAAE,UAAU,EAAE;aACxB,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QACnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,CAAC,IAAI,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAC1G,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,GAAG,CAAC,MAAM,cAAc,CAAC,CAAC;YACtE,IAAI,CAAC,QAAQ;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,GAAG,CAAC,eAAe,cAAc,CAAC,CAAC;YACnF,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACjE,CAAC;QACD,iDAAiD;QACjD,MAAM,aAAa,GAAG,MAAM,IAAI,CAAC,2BAA2B,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;QAClF,MAAM,UAAU,GAAG,qBAAqB,CAAC,aAAa,EAAE,GAAG,CAAC,CAAC;QAC7D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,2BAA2B,CAAC,WAAmB;QAC3D,MAAM,KAAK,GAAG,IAAI,GAAG,EAA0B,CAAC;QAChD,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;QAClC,IAAI,QAAQ,GAAG,CAAC,WAAW,CAAC,CAAC;QAE7B,OAAO,QAAQ,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YAC3B,MAAM,IAAI,GAAa,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;YACxF,QAAQ,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1C,KAAK,MAAM,IAAI,IAAI,OAAO,EAAE,CAAC;gBAC3B,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;oBACrB,+EAA+E;oBAC/E,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC;wBAAE,SAAS;oBACrC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;oBACnB,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,IAAI,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC;wBACzE,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC;oBAC/B,CAAC;gBACH,CAAC;YACH,CAAC;YACD,QAAQ,GAAG,IAAI,CAAC;QAClB,CAAC;QAED,OAAO,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,EAAE,CAAC;YACpD,OAAO,EAAE,MAAM,EAAE,aAAa,EAAE,EAAE,EAAE,eAAe,EAAE,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,CAAC;QAC9E,CAAC;QACD,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAC7E,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CAC/E,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACtD,MAAM,IAAI,eAAe,CAAC,yCAAyC,CAAC,CAAC;QACvE,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,KAAK,CAAC,MAAM,cAAc,CAAC,CAAC;YACxE,MAAM,IAAI,CAAC,oBAAoB,CAAC,UAAU,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC9D,CAAC;QACD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YAC1E,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAC1B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC;IAClG,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,MAAM,CAAC,CAAC;QAC1D,OAAO,IAAI,CAAC,cAAc,CAAC,UAAU,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;IAC/F,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,IAAI,IAAI,CAAC,SAAS,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;IAC3C,CAAC;IAED,KAAK,CAAC,UAAU,CACd,KAA2F;QAE3F,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;YAC9C,IAAI,CAAC,IAAI;gBAAE,MAAM,IAAI,aAAa,CAAC,SAAS,KAAK,CAAC,MAAM,cAAc,CAAC,CAAC;YACxE,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QACpE,CAAC;QACD,MAAM,OAAO,GAAoD,IAAI,CAAC,KAAK;YACzE,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YACvF,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,QAAQ,EAAE,CAAC;QACvD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,kBAAkB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE;YAC/F,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,QAAQ,CAAC,QAAQ;SAC3B,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC3C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,kBAAkB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,EAAE;YAC/F,IAAI,EAAE,SAAS;YACf,OAAO,EAAE,QAAQ,CAAC,QAAQ;SAC3B,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,KAAyC;QACnF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAE/F,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,KAAyC;QACtF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,gBAAgB,EAAE,MAAM,IAAI,CAAC,eAAe,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAE/F,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAC3F,IAAI,CAAC,qBAAqB,CAAC,CAAC,CAAC,CAC9B,CAAC;QACF,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,CAAC,UAAU;YAAE,OAAO,IAAI,CAAC;QAC7B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,IAAI,CAAC,qBAAqB,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,CAAC,IAAI,CAAC;IACvG,CAAC;IAEO,KAAK,CAAC,uBAAuB,CAAC,IAAiE;QACrG,IAAI,CAAC,IAAI,CAAC,SAAS;YAAE,OAAO;QAC5B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,IAAI,CAAC,SAAS;YAAE,MAAM,IAAI,eAAe,CAAC,wDAAwD,CAAC,CAAC;QACpG,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,SAAS,CAAC,CAAC;IAClE,CAAC;IAED,KAAK,CAAC,gBAAgB,CACpB,KAAkG;QAElG,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1C,IAAI,CAAC,mBAAmB,CAAC,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,SAAS,CAAC,CAAC;QAC1D,IAAI,IAAI,CAAC,KAAK;YAAE,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1D,MAAM,UAAU,GAAuD,IAAI,CAAC,KAAK;YAC/E,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YAC3F,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,QAAQ,EAAE,CAAC;QAC3D,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,MAAM,IAAI,CAAC,qBAAqB,CAAC,QAAQ,CAAC,EAAE;YAC/F,IAAI,EAAE,YAAY;YAClB,OAAO,EAAE,QAAQ,CAAC,UAAU;SAC7B,CAAC,CAAC;QAEH,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,YAAY,EAAE,EAAE;oBAChB,UAAU,EAAE,QAAQ,CAAC,UAAU;oBAC/B,GAAG,EAAE,QAAQ,CAAC,GAAG;oBACjB,SAAS,EAAE,MAAM,IAAI,CAAC,qBAAqB,CAAC,QAAQ,CAAC;iBACtD;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QACD,gFAAgF;QAChF,MAAM,IAAI,CAAC,uBAAuB,CAAC,KAAK,CAAC,CAAC;QAC1C,qGAAqG;QACrG,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,KAAK,CAAC,CAAC;QAC1D,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,EAAE,CAAC;YAC7B,MAAM,IAAI,eAAe,CAAC,wDAAwD,CAAC,CAAC;QACtF,CAAC;QAED,yFAAyF;QACzF,MAAM,IAAI,GAAG,mBAAmB,CAAC,KAAK,CAAC,IAAI,EAAE,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC7E,IAAI,CAAC,mBAAmB,CAAC,KAAK,CAAC,QAAQ,IAAI,0BAA0B,EAAE,IAAI,CAAC,UAAU,CAAC,CAAC;QAExF,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI;YACJ,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,SAAS,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,YAAY,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,UAAU;SACxG,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,aAAa,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QACnE,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED;;;;OAIG;IACH,KAAK,CAAC,+BAA+B,CAAC,OAKrC;QACC,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,IAAI,CAAC,OAAO,CAAC,SAAS;YAAE,MAAM,IAAI,eAAe,CAAC,8CAA8C,CAAC,CAAC;QAClG,IAAI,CAAC,mBAAmB,CAAC,OAAO,CAAC,WAAW,IAAI,0BAA0B,CAAC,CAAC;QAC5E,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,MAAM,IAAI,CAAC,oBAAoB,CAAC,mBAAmB,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAC1E,CAAC;aAAM,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC;YAC7D,MAAM,IAAI,aAAa,CAAC,YAAY,OAAO,CAAC,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC;YAC5C,UAAU,EAAE,eAAe,CAAC,YAAY,OAAO,CAAC,SAAS,EAAE,EAAE,OAAO,CAAC,QAAQ,CAAC;YAC9E,WAAW,EAAE,OAAO,CAAC,WAAW;YAChC,gBAAgB,EAAE,OAAO,CAAC,gBAAgB;SAC3C,CAAC,CAAC;IACL,CAAC;IAED,6FAA6F;IACrF,mBAAmB,CAAC,QAAgB,EAAE,SAAkB;QAC9D,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC;QACnC,IAAI,CAAC,MAAM;YAAE,OAAO;QACpB,IAAI,MAAM,CAAC,QAAQ,KAAK,SAAS,IAAI,SAAS,KAAK,SAAS,IAAI,SAAS,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;YAC5F,MAAM,IAAI,eAAe,CAAC,WAAW,SAAS,0BAA0B,MAAM,CAAC,QAAQ,SAAS,CAAC,CAAC;QACpG,CAAC;QACD,IAAI,MAAM,CAAC,gBAAgB,EAAE,CAAC;YAC5B,MAAM,IAAI,GAAG,QAAQ,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACzD,MAAM,OAAO,GAAG,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC,OAAO,EAAE,EAAE;gBACvD,MAAM,CAAC,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;gBAChC,OAAO,CAAC,CAAC,QAAQ,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,CAAC;YACzE,CAAC,CAAC,CAAC;YACH,IAAI,CAAC,OAAO;gBAAE,MAAM,IAAI,eAAe,CAAC,cAAc,IAAI,mBAAmB,CAAC,CAAC;QACjF,CAAC;IACH,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,uBAAuB,CAAC,IAAsF;QAC1H,IAAI,CAAC,IAAI,CAAC,UAAU;YAAE,OAAO;QAC7B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,MAAM,MAAM,GAAG,YAAY,SAAS,GAAG,CAAC;QACxC,MAAM,QAAQ,GAAG,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;QAC5C,IAAI,CAAC,SAAS,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,UAAU,CAAC,MAAM,CAAC,IAAI,QAAQ,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,GAAG,CAAC,EAAE,CAAC;YACvG,MAAM,IAAI,eAAe,CAAC,6BAA6B,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,uBAAuB,wBAAwB,CAAC,CAAC;QAC/H,CAAC;IACH,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,OAAO,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC;IACpD,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC1C,OAAO,IAAI,IAAI,IAAI,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,IAAI,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,CAAC,QAAQ,EAAE,CAAC,CAAC;QACrH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC,CAAC;QAC7E,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAmB;gBACxC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAC/C,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxC,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAmB;gBACxC,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,OAAO,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,QAAQ,EAAE,QAAQ,CAAC,QAAQ,EAAE;aAC1E,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7E,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACpD,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gGAAgG;IAChG,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,aAAa,EAAE,EAAE,CAAC,CAAC;QACtE,KAAK,MAAM,KAAK,IAAI,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,EAAE,CAAC,EAAE,CAAC;YAC1G,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC,CAAC;QACtE,CAAC;QACD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjF,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gGAAgG;IACxF,KAAK,CAAC,mBAAmB,CAC/B,SAAiB,EACjB,KAAsD,EACtD,EAAU;QAEV,KAAK,MAAM,IAAI,IAAI,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,EAAE,CAAC;YACxD,IAAI,IAAI,CAAC,KAAK,CAAC,KAAK,EAAE;gBAAE,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,CAAC,KAAK,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC;QACvF,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACxD,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAC9B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,CAAC,IAAI,CAAC;IACjF,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,KAAK,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,EAAE,IAAI,CAAC,OAAO,CAAC,mBAAmB,EAAE,CAAC,CAAC;QACpH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;YAChC,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QAC/C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YACzC,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QAC/C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,eAAe,EAAE,EAAE,CAAC,CAAC;QAExE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QAC7D,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC;YAAE,OAAO,EAAE,CAAC;QACvD,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,SAAS;YAAE,OAAO,IAAI,CAAC;QAC5B,OAAO,CAAC,MAAM,IAAI,CAAC,cAAc,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC;IAC7E,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,SAAS,CAAC,SAAS,CAAC,CAAC;QACpE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,IAAI,CAAC,YAAY,CAAwB;YAC7C,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;gBAChC,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QACnC,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAC3B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEnE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACpD,CAAC,CAAC;YACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACnC,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,MAAM,CAAC,UAAU,EAAE,EAAE;oBAChC,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACnC,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,6FAA6F;IAC7F,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QAC7C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAC5B,MAAM,IAAI,CAAC,oBAAoB,CAAC,aAAa,EAAE,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,IAAI,CAAC,mBAAmB,CAAC,QAAQ,CAAC,SAAS,EAAE,aAAa,EAAE,EAAE,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,YAAY,CAAwB;gBAC7C,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,WAAW;gBAC1B,OAAO,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjF,CAAC,CAAC;QACL,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC3D,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;IACtF,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC3D,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,aAAa,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,IAAI,SAAS;YAAE,MAAM,IAAI,CAAC,oBAAoB,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC;QAC1E,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC7C,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,EAAE,CAAC;QACpC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,QAAQ,EAAE,CAAC;QACpC,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAED,gBAAgB;IAEhB;;;OAGG;IACH,KAAK,CAAC,QAAQ;QACZ,MAAM,UAAU,GAAG,OAAO,IAAI,CAAC,MAAM,CAAC,KAAK,KAAK,UAAU,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,KAAK,IAAI,EAAE,CAAC;QAC3H,MAAM,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,IAAI,EAAE,CAAC;QACpD,MAAM,IAAI,GAAG,IAAI,GAAG,EAAgB,CAAC;QACrC,KAAK,MAAM,IAAI,IAAI,CAAC,GAAG,MAAM,EAAE,GAAG,UAAU,CAAC;YAAE,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,CAAC;QACvE,OAAO,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,MAAM,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,mBAAmB;IAEnB,sFAAsF;IAC9E,KAAK,CAAC,eAAe;QAC3B,MAAM,UAAU,GAAc,CAAC,IAAI,CAAC,MAAM,CAAC,QAAQ,IAAI,EAAE,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC;YACxE,GAAG,CAAC;YACJ,EAAE,EAAE,UAAU,CAAC,EAAE;YACjB,SAAS,EAAE,IAAI,IAAI,CAAC,CAAC,CAAC,CAAC,WAAW,EAAE;SACrC,CAAC,CAAC,CAAC;QACJ,OAAO,CAAC,GAAG,UAAU,EAAE,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC;IAC9D,CAAC;IAEO,eAAe,CAAC,EAAE,MAAM,EAAE,GAAG,OAAO,EAAW;QACrD,OAAO,EAAE,GAAG,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,MAAM,EAAE,CAAC;IAC7C,CAAC;IAED,mGAAmG;IACnG,KAAK,CAAC,WAAW;QACf,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,OAAO,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,CAAC;IAC3F,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChD,OAAO,OAAO,IAAI,IAAI,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACvF,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,KAMnB;QACC,MAAM,IAAI,CAAC,sBAAsB,CAAC,kBAAkB,CAAC,CAAC;QACtD,IAAI,CAAC,kBAAkB,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;QACnC,MAAM,MAAM,GAAG,KAAK,CAAC,MAAM,IAAI,qBAAqB,EAAE,CAAC;QACvD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,GAAG,EAAE,KAAK,CAAC,GAAG;YACd,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,MAAM;YACN,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI;YAC5B,QAAQ,EAAE,IAAI,CAAC,KAAK,EAAE,QAAQ;SAC/B,CAAC,CAAC;QACH,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,EAAE,OAAO,EAAE,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IAC5D,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,EAAU,EACV,OAAgF;QAEhF,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAAE,OAAO,IAAI,CAAC;QAC9C,IAAI,OAAO,CAAC,GAAG;YAAE,IAAI,CAAC,kBAAkB,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;QACtD,MAAM,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,OAAO,CAAC;QACtD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAC5C,EAAE,EACF,MAAM,CAAC,WAAW,CAAC,MAAM,CAAC,OAAO,CAAC,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,KAAK,SAAS,CAAC,CAAC,CAC7G,CAAC;QACF,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACxD,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,IAAI,CAAC,CAAC,MAAM,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAAE,OAAO,KAAK,CAAC;QAC/C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ,CAAC,UAAU,EAAE,CAAC;QAC3B,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,kBAAkB,CAAC,GAAW;QACpC,IAAI,CAAC;YACH,gBAAgB,CAAC,GAAG,EAAE,IAAI,CAAC,MAAM,CAAC,eAAe,EAAE,gBAAgB,CAAC,CAAC;QACvE,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,MAAM,IAAI,eAAe,CAAE,GAAa,CAAC,OAAO,CAAC,CAAC;QACpD,CAAC;IACH,CAAC;IAED,2FAA2F;IACnF,KAAK,CAAC,kBAAkB,CAAC,KAAkB;QACjD,MAAM,CAAC,GAAG,KAAK,CAAC,OAA8B,CAAC;QAC/C,MAAM,KAAK,GAAG,CAAC,CAAC,OAAO,IAAI,CAAC,CAAC,QAAQ,IAAI,CAAC,CAAC,IAAI,CAAC;QAChD,IAAI,KAAK;YAAE,OAAO,KAAK,CAAC,QAAQ,IAAI,SAAS,CAAC;QAC9C,oEAAoE;QACpE,IAAI,UAAU,IAAI,CAAC;YAAE,OAAO,CAAC,CAAC,QAAQ,IAAI,SAAS,CAAC;QAEpD,MAAM,SAAS,GACb,CAAC,CAAC,SAAS;YACX,CAAC,CAAC,IAAI,EAAE,SAAS;YACjB,CAAC,CAAC,WAAW,EAAE,SAAS;YACxB,CAAC,CAAC,SAAS,EAAE,SAAS;YACtB,CAAC,CAAC,SAAS,EAAE,SAAS;YACtB,CAAC,CAAC,UAAU,EAAE,SAAS;YACvB,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,OAAO,EAAE,MAAM,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,IAAI,CAAC,CAAC,UAAU,EAAE,MAAM,IAAI,CAAC,CAAC,SAAS,EAAE,MAAM,CAAC,CAAC,CAAC;QACrI,IAAI,CAAC,SAAS;YAAE,OAAO,SAAS,CAAC;QACjC,OAAO,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,EAAE,QAAQ,IAAI,SAAS,CAAC;IACzE,CAAC;CACF"}
@@ -0,0 +1,2 @@
1
+ export {};
2
+ //# sourceMappingURL=upload-limits.test.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"upload-limits.test.d.ts","sourceRoot":"","sources":["../../src/storage/upload-limits.test.ts"],"names":[],"mappings":""}
@@ -0,0 +1,31 @@
1
+ import { describe, it, expect } from 'vitest';
2
+ import { CriticalPathEngine, InMemoryFileStore, ValidationError } from '../index.js';
3
+ async function setup() {
4
+ const engine = new CriticalPathEngine({
5
+ fileStorage: new InMemoryFileStore(),
6
+ uploads: { maxBytes: 10, allowedMimeTypes: ['image/*', 'application/pdf'] }
7
+ });
8
+ const project = await engine.createProject({ name: 'Limits' });
9
+ return { engine, project };
10
+ }
11
+ describe('upload limits', () => {
12
+ it('enforces the decoded size of direct uploads', async () => {
13
+ const { engine, project } = await setup();
14
+ await expect(engine.uploadAttachmentFile({ projectId: project.id, filename: 'ok.png', mimeType: 'image/png', data: new Uint8Array(10), uploaderId: 'u' })).resolves.toMatchObject({ sizeBytes: 10 });
15
+ // 16 base64 characters decode to 12 bytes
16
+ await expect(engine.uploadAttachmentFile({ projectId: project.id, filename: 'big.png', mimeType: 'image/png', data: 'AAAAAAAAAAAAAAAA', encoding: 'base64', uploaderId: 'u' })).rejects.toThrow(/maximum is 10 bytes/);
17
+ });
18
+ it('allows MIME types by exact match or wildcard', async () => {
19
+ const { engine, project } = await setup();
20
+ const upload = (mimeType) => engine.uploadAttachmentFile({ projectId: project.id, filename: 'f', mimeType, data: new Uint8Array(1), uploaderId: 'u' });
21
+ await expect(upload('image/webp')).resolves.toBeDefined();
22
+ await expect(upload('application/pdf; charset=binary')).resolves.toBeDefined();
23
+ await expect(upload('text/html')).rejects.toThrow(ValidationError);
24
+ });
25
+ it('applies to presigned uploads and registered attachments', async () => {
26
+ const { engine, project } = await setup();
27
+ await expect(engine.getPresignedAttachmentUploadUrl({ projectId: project.id, filename: 'x.html', contentType: 'text/html' })).rejects.toThrow(/not allowed/);
28
+ await expect(engine.createAttachment({ projectId: project.id, filename: 'x', url: 'https://e.com/x', mimeType: 'image/png', sizeBytes: 11, uploaderId: 'u' })).rejects.toThrow(/maximum/);
29
+ });
30
+ });
31
+ //# sourceMappingURL=upload-limits.test.js.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"upload-limits.test.js","sourceRoot":"","sources":["../../src/storage/upload-limits.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,iBAAiB,EAAE,eAAe,EAAE,MAAM,aAAa,CAAC;AAErF,KAAK,UAAU,KAAK;IAClB,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;QACpC,WAAW,EAAE,IAAI,iBAAiB,EAAE;QACpC,OAAO,EAAE,EAAE,QAAQ,EAAE,EAAE,EAAE,gBAAgB,EAAE,CAAC,SAAS,EAAE,iBAAiB,CAAC,EAAE;KAC5E,CAAC,CAAC;IACH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC,CAAC;IAC/D,OAAO,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC;AAC7B,CAAC;AAED,QAAQ,CAAC,eAAe,EAAE,GAAG,EAAE;IAC7B,EAAE,CAAC,6CAA6C,EAAE,KAAK,IAAI,EAAE;QAC3D,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,KAAK,EAAE,CAAC;QAC1C,MAAM,MAAM,CACV,MAAM,CAAC,oBAAoB,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,EAAE,QAAQ,EAAE,WAAW,EAAE,IAAI,EAAE,IAAI,UAAU,CAAC,EAAE,CAAC,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAC7I,CAAC,QAAQ,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,EAAE,EAAE,CAAC,CAAC;QAC5C,0CAA0C;QAC1C,MAAM,MAAM,CACV,MAAM,CAAC,oBAAoB,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,QAAQ,EAAE,WAAW,EAAE,IAAI,EAAE,kBAAkB,EAAE,QAAQ,EAAE,QAAQ,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAClK,CAAC,OAAO,CAAC,OAAO,CAAC,qBAAqB,CAAC,CAAC;IAC3C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8CAA8C,EAAE,KAAK,IAAI,EAAE;QAC5D,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,KAAK,EAAE,CAAC;QAC1C,MAAM,MAAM,GAAG,CAAC,QAAgB,EAAE,EAAE,CAClC,MAAM,CAAC,oBAAoB,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,GAAG,EAAE,QAAQ,EAAE,IAAI,EAAE,IAAI,UAAU,CAAC,CAAC,CAAC,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CAAC;QAC5H,MAAM,MAAM,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC,CAAC,QAAQ,CAAC,WAAW,EAAE,CAAC;QAC1D,MAAM,MAAM,CAAC,MAAM,CAAC,iCAAiC,CAAC,CAAC,CAAC,QAAQ,CAAC,WAAW,EAAE,CAAC;QAC/E,MAAM,MAAM,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,eAAe,CAAC,CAAC;IACrE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yDAAyD,EAAE,KAAK,IAAI,EAAE;QACvE,MAAM,EAAE,MAAM,EAAE,OAAO,EAAE,GAAG,MAAM,KAAK,EAAE,CAAC;QAC1C,MAAM,MAAM,CAAC,MAAM,CAAC,+BAA+B,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,QAAQ,EAAE,WAAW,EAAE,WAAW,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,aAAa,CAAC,CAAC;QAC7J,MAAM,MAAM,CACV,MAAM,CAAC,gBAAgB,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,QAAQ,EAAE,GAAG,EAAE,GAAG,EAAE,iBAAiB,EAAE,QAAQ,EAAE,WAAW,EAAE,SAAS,EAAE,EAAE,EAAE,UAAU,EAAE,GAAG,EAAE,CAAC,CACjJ,CAAC,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;IAC/B,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
@@ -330,6 +330,15 @@ export interface UploadFileInput {
330
330
  pathPrefix?: string;
331
331
  encoding?: 'base64' | 'utf-8' | 'binary';
332
332
  }
333
+ export interface UploadLimits {
334
+ /** Largest accepted upload in bytes. Applies to direct uploads and declared `sizeBytes`. */
335
+ maxBytes?: number;
336
+ /**
337
+ * Accepted MIME types; entries may end in `/*` (e.g. `image/*`). Applies to uploads, presigned
338
+ * uploads and registered attachments. Default: any type.
339
+ */
340
+ allowedMimeTypes?: string[];
341
+ }
333
342
  export interface UploadFileResult {
334
343
  storageKey: string;
335
344
  url: string;
@@ -479,6 +488,8 @@ export interface CriticalPathConfig {
479
488
  plugins?: CriticalPathPlugin[];
480
489
  /** Static webhooks (not stored or editable through the API). */
481
490
  webhooks?: Omit<Webhook, 'id' | 'createdAt'>[];
491
+ /** Limits applied to attachment uploads, presigned uploads and attachment registration. */
492
+ uploads?: UploadLimits;
482
493
  /** Delivery behaviour: queue, timeouts, retries, private URL policy, failure callbacks. */
483
494
  webhookDelivery?: import('../webhooks/dispatcher.js').WebhookDeliveryOptions;
484
495
  defaultSchedule?: WorkSchedule;
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/types/index.ts"],"names":[],"mappings":"AAAA,MAAM,MAAM,eAAe,GAAG,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;AAC5E,MAAM,MAAM,QAAQ,GAAG,eAAe,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAEvD,MAAM,MAAM,iBAAiB,GAAG,SAAS,GAAG,MAAM,GAAG,aAAa,GAAG,WAAW,GAAG,MAAM,GAAG,UAAU,CAAC;AACvG,MAAM,MAAM,UAAU,GAAG,iBAAiB,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAE3D,MAAM,MAAM,cAAc,GAAG,aAAa,GAAG,aAAa,GAAG,WAAW,GAAG,UAAU,CAAC;AAEtF,MAAM,WAAW,gBAAgB;IAC/B,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,QAAQ,EAAE,cAAc,CAAC;CAC1B;AAED,MAAM,WAAW,iBAAiB;IAChC,cAAc,EAAE,cAAc,CAAC;IAC/B,OAAO,EAAE,OAAO,CAAC;IACjB,SAAS,EAAE,OAAO,CAAC;IACnB,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,SAAS,EAAE,OAAO,CAAC;IACnB,UAAU,EAAE,OAAO,CAAC;IACpB,WAAW,EAAE,OAAO,CAAC;IACrB,YAAY,EAAE,OAAO,CAAC;IACtB,SAAS,EAAE,OAAO,CAAC;IACnB,cAAc,EAAE,OAAO,CAAC;IACxB,aAAa,EAAE,OAAO,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,QAAQ,EAAE,OAAO,CAAC;IAClB,WAAW,EAAE,OAAO,CAAC;CACtB;AAED,MAAM,MAAM,kBAAkB,GAAG,iBAAiB,CAAC;AAEnD,MAAM,MAAM,IAAI,GAAG,OAAO,GAAG,iBAAiB,GAAG,aAAa,GAAG,QAAQ,CAAC;AAE1E,MAAM,WAAW,iBAAiB;IAChC,KAAK,EAAE,MAAM,CAAC;IACd,GAAG,EAAE,MAAM,CAAC;CACb;AAED,MAAM,WAAW,WAAW;IAC1B,SAAS,EAAE,MAAM,CAAC;IAClB,YAAY,EAAE,OAAO,CAAC;IACtB,KAAK,CAAC,EAAE,iBAAiB,EAAE,CAAC;CAC7B;AAED,MAAM,WAAW,OAAO;IACtB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,OAAO,CAAC,EAAE,OAAO,CAAC;CACnB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,IAAI,EAAE,WAAW,EAAE,CAAC;IACpB,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;CACtB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,IAAI,EAAE,IAAI,CAAC;IACX,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,EAAE,CAAC;IACpB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,4EAA4E;IAC5E,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,qBAAqB;IACpC,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,8EAA8E;IAC9E,IAAI,EAAE,MAAM,GAAG,QAAQ,GAAG,MAAM,GAAG,SAAS,GAAG,eAAe,GAAG,cAAc,GAAG,MAAM,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;IACzG,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,QAAQ,CAAC,EAAE,OAAO,CAAC;IACnB,YAAY,CAAC,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,kBAAkB;IACjC,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,aAAa,EAAE,MAAM,GAAG,GAAG,CAAC;IAC5B,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,gBAAgB,EAAE,CAAC;IAC7B,WAAW,EAAE,kBAAkB,EAAE,CAAC;IAClC,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,gFAAgF;IAChF,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,+EAA+E;IAC/E,OAAO,CAAC,EAAE,aAAa,EAAE,CAAC;IAC1B,oGAAoG;IACpG,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;IACpB,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;IACvC,mBAAmB,CAAC,EAAE,KAAK,CAAC;QAAE,GAAG,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAC;QAAC,KAAK,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAC5E,sBAAsB,CAAC,EAAE,qBAAqB,EAAE,CAAC;IACjD,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,SAAS,GAAG,QAAQ,GAAG,MAAM,CAAC;IACxD,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,cAAc;IAC7B,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,MAAM,CAAC;IACxB,IAAI,EAAE,UAAU,GAAG,YAAY,GAAG,YAAY,CAAC;CAChD;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,aAAa,EAAE,IAAI,EAAE,CAAC;IACtB,eAAe,EAAE,IAAI,EAAE,CAAC;IACxB,YAAY,EAAE,cAAc,EAAE,CAAC;CAChC;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,EAAE,OAAO,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,MAAM,CAAC;IACjC,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,QAAQ,EAAE,QAAQ,CAAC;IACnB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC;IAC3B,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IAEjB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,wBAAwB,CAAC,EAAE,MAAM,CAAC;IAClC,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,uBAAuB,CAAC,EAAE,MAAM,CAAC;IACjC,kFAAkF;IAClF,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,6GAA6G;IAC7G,eAAe,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAChC,gFAAgF;IAChF,sBAAsB,CAAC,EAAE,MAAM,CAAC;IAChC,gIAAgI;IAChI,YAAY,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAE7B,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAC9B,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,KAAK,CAAC,EAAE,YAAY,EAAE,CAAC;IACvB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,eAAe,GAAG,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,GAAG,UAAU,CAAC,GAAG;IACnG,MAAM,CAAC,EAAE,UAAU,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;CACrB,CAAC;AAEF,MAAM,MAAM,iBAAiB,GACzB,OAAO,GACP,SAAS,GACT,eAAe,GACf,iBAAiB,GACjB,eAAe,GACf,oBAAoB,GACpB,UAAU,GACV,WAAW,GACX,UAAU,GACV,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAElB,MAAM,WAAW,WAAW;IAC1B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,iBAAiB,CAAC;IAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,KAAK,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IAChC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,kBAAkB;IACjC,WAAW,EAAE,WAAW,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,MAAM,sBAAsB,GAAG,IAAI,CAAC,WAAW,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,CAAC,GAAG;IACpG,MAAM,CAAC,EAAE,iBAAiB,CAAC;CAC5B,CAAC;AAEF,MAAM,MAAM,kBAAkB,GAAG,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEjF,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,WAAW,GAAG,MAAM,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,MAAM,EAAE,UAAU,GAAG,QAAQ,GAAG,WAAW,CAAC;IAC5C,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,UAAU,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAErD,qFAAqF;AACrF,MAAM,WAAW,KAAK;IACpB,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,UAAU,CAAC;IACvB;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,uFAAuF;IACvF,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;CAClB;AAED,kCAAkC;AAClC,MAAM,MAAM,WAAW,GAAG,IAAI,CAAC;AAE/B,MAAM,WAAW,aAAa;IAC5B,MAAM,EAAE,MAAM,CAAC;IACf,IAAI,EAAE,WAAW,CAAC;CACnB;AAED,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,MAAM,CAAC;IACd,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,EAAE,MAAM,CAAC;IACjB,UAAU,CAAC,EAAE,UAAU,CAAC;IACxB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,EAAE,CAAC;IACpB,SAAS,CAAC,EAAE,eAAe,EAAE,CAAC;IAC9B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,UAAU;IACzB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,CAAC,EAAE,UAAU,CAAC;IAC1B,QAAQ,EAAE,MAAM,CAAC;IACjB,QAAQ,EAAE,MAAM,CAAC;IACjB,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,EAAE,MAAM,CAAC;IACZ,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;IACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,qBAAqB,GAAG,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEvF,MAAM,WAAW,eAAe;IAC9B,QAAQ,EAAE,MAAM,CAAC;IACjB,IAAI,EAAE,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,IAAI,GAAG,MAAM,CAAC;IACxD,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,QAAQ,CAAC;CAC1C;AAED,MAAM,WAAW,gBAAgB;IAC/B,UAAU,EAAE,MAAM,CAAC;IACnB,GAAG,EAAE,MAAM,CAAC;IACZ,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,mBAAmB;IAClC,UAAU,EAAE,MAAM,CAAC;IACnB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,KAAK,GAAG,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAClC;AAED,MAAM,WAAW,kBAAkB;IACjC,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC;IAC1D,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC;IAC7C,QAAQ,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,UAAU,CAAC,CAAC;IAC5D,cAAc,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC;IACrD,qBAAqB,CAAC,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC,CAAC;CACtF;AAED,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,MAAM,CAAC;IACf,KAAK,EAAE,MAAM,CAAC;IACd,UAAU,CAAC,EAAE,OAAO,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,OAAO,EAAE,MAAM,CAAC;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,OAAO,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACjC,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,GAAG,EAAE,MAAM,CAAC;IACZ,wFAAwF;IACxF,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,wDAAwD;IACxD,MAAM,EAAE,YAAY,EAAE,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,8EAA8E;IAC9E,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,4FAA4F;AAC5F,MAAM,MAAM,aAAa,GAAG,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,GAAG;IAAE,SAAS,EAAE,OAAO,CAAA;CAAE,CAAC;AAE7E;;;GAGG;AACH,MAAM,MAAM,YAAY,GAAG,OAAO,qBAAqB,EAAE,uBAAuB,CAAC,MAAM,CAAC,GAAG,GAAG,CAAC;AAE/F;;;;;;;GAOG;AACH,MAAM,WAAW,WAAW;IAC1B,gBAAgB,CAAC,EAAE,CAAC,IAAI,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IACnF,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACvD,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IAClG,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,EAAE,aAAa,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IAC5E,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACpE,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;CACpE;AAED,6EAA6E;AAC7E,MAAM,WAAW,eAAe;IAC9B,8FAA8F;IAC9F,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,yGAAyG;IACzG,QAAQ,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,UAAU,EAAE,qBAAqB,KAAK,MAAM,GAAG,IAAI,GAAG,SAAS,GAAG,IAAI,CAAC;CACnG;AAED,sDAAsD;AACtD,MAAM,WAAW,oBAAoB;IACnC,yEAAyE;IACzE,MAAM,EAAE,OAAO,oBAAoB,EAAE,kBAAkB,CAAC;IACxD,gEAAgE;IAChE,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;IACxD,GAAG,EAAE,GAAG,CAAC;IACT,oGAAoG;IACpG,MAAM,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAChC;AAED,MAAM,WAAW,WAAW;IAC1B,MAAM,EAAE,KAAK,GAAG,MAAM,GAAG,KAAK,GAAG,OAAO,GAAG,QAAQ,CAAC;IACpD,yFAAyF;IACzF,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,CAAC,OAAO,EAAE,OAAO,EAAE,GAAG,EAAE,oBAAoB,KAAK,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC;CACxF;AAED;;;GAGG;AACH,MAAM,MAAM,gBAAgB,GAAG,CAC7B,OAAO,EAAE,OAAO,EAChB,GAAG,EAAE,IAAI,CAAC,oBAAoB,EAAE,QAAQ,CAAC,EACzC,IAAI,EAAE,MAAM,OAAO,CAAC,QAAQ,CAAC,KAC1B,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC;AAElC,MAAM,WAAW,kBAAkB;IACjC,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,KAAK,CAAC,EAAE,WAAW,CAAC;IACpB,kFAAkF;IAClF,gBAAgB,CAAC,EAAE,eAAe,EAAE,CAAC;IACrC,6FAA6F;IAC7F,IAAI,CAAC,EAAE,CAAC,MAAM,EAAE,OAAO,oBAAoB,EAAE,kBAAkB,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACzF,qFAAqF;IACrF,MAAM,CAAC,EAAE,WAAW,EAAE,CAAC;IACvB,6EAA6E;IAC7E,UAAU,CAAC,EAAE,gBAAgB,CAAC;CAC/B;AAED,MAAM,WAAW,kBAAkB;IACjC;;;;;OAKG;IACH,SAAS,CAAC,EAAE,mBAAmB,CAAC;IAChC;;;OAGG;IACH,KAAK,CAAC,EAAE,OAAO,mBAAmB,EAAE,cAAc,CAAC;IACnD;;;;OAIG;IACH,KAAK,CAAC,EAAE,IAAI,EAAE,GAAG,CAAC,CAAC,KAAK,CAAC,EAAE,KAAK,KAAK,IAAI,EAAE,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,CAAC;IAC/D,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjC,OAAO,CAAC,EAAE,kBAAkB,EAAE,CAAC;IAC/B,gEAAgE;IAChE,QAAQ,CAAC,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,CAAC,EAAE,CAAC;IAC/C,2FAA2F;IAC3F,eAAe,CAAC,EAAE,OAAO,2BAA2B,EAAE,sBAAsB,CAAC;IAC7E,eAAe,CAAC,EAAE,YAAY,CAAC;IAC/B,WAAW,CAAC,EAAE;QACZ,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;QACrB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,oEAAoE;QACpE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,SAAS,EAAE,CAAC;QACzB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,aAAa,EAAE,CAAC;QAC7B,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC;QACvB,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC;KAC9B,CAAC;CACH;AAMD,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK,CAAC;AAEzE,MAAM,MAAM,gBAAgB,GAAG,UAAU,GAAG,SAAS,GAAG,SAAS,GAAG,SAAS,GAAG,WAAW,CAAC;AAE5F,MAAM,WAAW,gBAAgB;IAC/B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,WAAW,GAAG,WAAW,GAAG,aAAa,GAAG,OAAO,CAAC;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,aAAa,EAAE,MAAM,CAAC;IACtB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,eAAe,EAAE,MAAM,CAAC;IACxB,YAAY,EAAE,MAAM,CAAC;IACrB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,mBAAmB,EAAE,MAAM,CAAC;IAC5B,gBAAgB,EAAE,MAAM,CAAC;IACzB,UAAU,EAAE,OAAO,CAAC;IACpB,iBAAiB,EAAE,MAAM,CAAC;IAC1B,MAAM,EAAE,gBAAgB,CAAC;IACzB,OAAO,EAAE,MAAM,EAAE,CAAC;CACnB;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,WAAW,EAAE,MAAM,CAAC;IACpB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,kBAAkB,EAAE,MAAM,CAAC;IAC3B,yBAAyB,EAAE,MAAM,CAAC;IAClC,yBAAyB,EAAE,MAAM,CAAC;IAClC,MAAM,EAAE,gBAAgB,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,eAAe,EAAE,MAAM,CAAC;IACxB,YAAY,EAAE,MAAM,CAAC;IACrB,mBAAmB,EAAE,MAAM,CAAC;IAC5B,gBAAgB,EAAE,MAAM,CAAC;IACzB,MAAM,EAAE,gBAAgB,EAAE,CAAC;CAC5B;AAED,MAAM,WAAW,wBAAwB;IACvC,MAAM,EAAE,MAAM,CAAC;IACf,UAAU,EAAE,MAAM,CAAC;IACnB,WAAW,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,OAAO,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,iBAAiB,CAAC,EAAE,MAAM,CAAC;CAC5B;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,YAAY,EAAE,MAAM,CAAC;IACrB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,iBAAiB,CAAC,EAAE,MAAM,CAAC;IAC3B,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,KAAK,EAAE,wBAAwB,EAAE,CAAC;CACnC;AAED,MAAM,WAAW,uBAAuB;IACtC,eAAe,EAAE,MAAM,CAAC;IACxB,gBAAgB,EAAE,MAAM,CAAC;IACzB,SAAS,EAAE,MAAM,CAAC;IAClB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,gBAAgB,EAAE,MAAM,CAAC;IACzB,cAAc,EAAE,OAAO,CAAC;IACxB,cAAc,CAAC,EAAE,MAAM,CAAC;CACzB;AAED,MAAM,WAAW,wBAAyB,SAAQ,IAAI;IACpD,GAAG,CAAC,EAAE,wBAAwB,CAAC;IAC/B,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,gBAAgB,EAAE,MAAM,EAAE,CAAC;IAC3B,YAAY,EAAE,MAAM,EAAE,CAAC;IACvB,uBAAuB,EAAE,uBAAuB,CAAC;CAClD;AAED,MAAM,WAAW,YAAY;IAC3B,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,aAAa,EAAE,MAAM,CAAC;IACtB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,oBAAoB,CAAC,EAAE,MAAM,CAAC;IAC9B,2BAA2B,CAAC,EAAE,MAAM,CAAC;IACrC,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,OAAO,CAAC;IACnB,cAAc,EAAE,OAAO,CAAC;CACzB;AAED,MAAM,MAAM,uBAAuB,GAAG,UAAU,GAAG,OAAO,GAAG,aAAa,GAAG,kBAAkB,GAAG,SAAS,CAAC;AAE5G,MAAM,WAAW,qBAAqB;IACpC,kBAAkB,EAAE,MAAM,CAAC;IAC3B,MAAM,EAAE,uBAAuB,CAAC;IAChC,UAAU,EAAE,OAAO,CAAC;IACpB,SAAS,EAAE;QACT,gBAAgB,CAAC,EAAE,MAAM,CAAC;QAC1B,YAAY,CAAC,EAAE,MAAM,CAAC;QACtB,cAAc,CAAC,EAAE,MAAM,CAAC;QACxB,gBAAgB,CAAC,EAAE,MAAM,CAAC;KAC3B,CAAC;CACH;AAED,MAAM,MAAM,oBAAoB,GAC5B,QAAQ,GACR,SAAS,GACT,aAAa,GACb,WAAW,GACX,SAAS,GACT,mBAAmB,CAAC;AAExB,MAAM,WAAW,wBAAwB;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;IACjB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,MAAM,EAAE,MAAM,CAAC;CAChB;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,wBAAwB,EAAE,CAAC;IACnC,YAAY,EAAE,oBAAoB,CAAC;CACpC;AAED,MAAM,WAAW,OAAO;IACtB,YAAY,EAAE,MAAM,CAAC;IACrB,WAAW,EAAE,MAAM,CAAC;IACpB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,EAAE,MAAM,CAAC;IACrB,gBAAgB,EAAE,MAAM,CAAC;IACzB,oBAAoB,EAAE,MAAM,CAAC;IAC7B,wBAAwB,EAAE,MAAM,CAAC;CAClC;AAED,MAAM,WAAW,mBAAmB;IAClC,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,mBAAmB,EAAE,OAAO,CAAC;IAC7B,iBAAiB,EAAE,OAAO,CAAC;IAC3B,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,uEAAuE;IACvE,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,sDAAsD;IACtD,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,gFAAgF;IAChF,sBAAsB,CAAC,EAAE,MAAM,CAAC;CACjC;AAED,MAAM,WAAW,WAAW;IAC1B,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,mBAAmB,CAAC;IACrC,YAAY,EAAE,YAAY,CAAC;IAC3B,QAAQ,EAAE,qBAAqB,CAAC;IAChC,GAAG,EAAE,OAAO,CAAC;IACb,eAAe,EAAE,mBAAmB,CAAC;CACtC;AAED,MAAM,WAAW,oBAAoB;IACnC,MAAM,EAAE,MAAM,CAAC;IACf,WAAW,EAAE,UAAU,EAAE,CAAC;IAC1B,YAAY,EAAE,WAAW,EAAE,CAAC;IAC5B,KAAK,EAAE,YAAY,EAAE,CAAC;IACtB,WAAW,EAAE,SAAS,EAAE,CAAC;IACzB,uBAAuB,EAAE,KAAK,CAAC;QAAE,IAAI,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAChE,UAAU,EAAE,QAAQ,EAAE,CAAC;IACvB,YAAY,EAAE,YAAY,CAAC;IAC3B,eAAe,EAAE,uBAAuB,CAAC;CAC1C;AAED,MAAM,WAAW,qBAAqB;IACpC,KAAK,CAAC,EAAE,gBAAgB,CAAC;IACzB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,cAAc;IAC7B,SAAS,EAAE,MAAM,CAAC;IAClB,WAAW,EAAE,MAAM,CAAC;IACpB,KAAK,EAAE,gBAAgB,CAAC;IACxB,KAAK,CAAC,EAAE,oBAAoB,CAAC;IAC7B,QAAQ,CAAC,EAAE;QACT,KAAK,EAAE,wBAAwB,EAAE,CAAC;QAClC,mBAAmB,EAAE,MAAM,EAAE,CAAC;QAC9B,YAAY,EAAE,cAAc,EAAE,CAAC;QAC/B,kBAAkB,EAAE,MAAM,CAAC;KAC5B,CAAC;IACF,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;CACjD;AAED,MAAM,WAAW,cAAc;IAC7B,MAAM,EAAE,MAAM,CAAC;IACf,UAAU,CAAC,EAAE,gBAAgB,CAAC;IAC9B,QAAQ,EAAE,wBAAwB,CAAC;IACnC,QAAQ,EAAE,oBAAoB,CAAC;IAC/B,OAAO,CAAC,EAAE,WAAW,CAAC;CACvB;AAED,MAAM,MAAM,gBAAgB,GAAG,KAAK,GAAG,MAAM,GAAG,OAAO,CAAC;AACxD,MAAM,MAAM,eAAe,GAAG,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ,CAAC;AACvF,MAAM,MAAM,cAAc,GAAG,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS,CAAC;AAE9E,MAAM,WAAW,cAAc;IAC7B,IAAI,EAAE,MAAM,CAAC;IACb,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAC/B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAClC,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;CAC3B;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,EAAE,gBAAgB,CAAC;IAC3B,OAAO,EAAE,eAAe,CAAC;IACzB,MAAM,EAAE,cAAc,CAAC;IACvB,UAAU,EAAE,MAAM,EAAE,CAAC;IACrB,YAAY,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACrC,OAAO,EAAE,cAAc,EAAE,CAAC;IAC1B,UAAU,EAAE,MAAM,CAAC;IACnB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,kBAAkB,CAAC,EAAE,MAAM,CAAC;CAC7B;AAED,MAAM,WAAW,2BAA2B;IAC1C,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,QAAQ,CAAC,EAAE,gBAAgB,CAAC;IAC5B,OAAO,CAAC,EAAE,eAAe,CAAC;IAC1B,MAAM,CAAC,EAAE,cAAc,CAAC;IACxB,0BAA0B,CAAC,EAAE,MAAM,CAAC;IACpC,iBAAiB,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAC3C,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,aAAa,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IAC7C,aAAa,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;CAC9C;AAMD;;;GAGG;AACH,MAAM,MAAM,mBAAmB,GAC3B,cAAc,GACd,gBAAgB,GAChB,gBAAgB,GAChB,gBAAgB,GAChB,wBAAwB,GACxB,aAAa,GACb,aAAa,GACb,aAAa,GACb,gBAAgB,GAChB,kBAAkB,GAClB,mBAAmB,GACnB,mBAAmB,GACnB,UAAU,GACV,aAAa,GACb,kBAAkB,CAAC;AAEvB,MAAM,WAAW,oBAAoB;IACnC,KAAK,EAAE,KAAK,CAAC;IACb,MAAM,EAAE,mBAAmB,CAAC;IAC5B,kEAAkE;IAClE,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,0EAA0E;IAC1E,QAAQ,CAAC,EAAE;QAAE,IAAI,EAAE,MAAM,GAAG,SAAS,GAAG,YAAY,CAAC;QAAC,OAAO,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CAC1E;AAED,MAAM,MAAM,mBAAmB,GAAG,CAAC,OAAO,EAAE,oBAAoB,KAAK,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/types/index.ts"],"names":[],"mappings":"AAAA,MAAM,MAAM,eAAe,GAAG,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;AAC5E,MAAM,MAAM,QAAQ,GAAG,eAAe,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAEvD,MAAM,MAAM,iBAAiB,GAAG,SAAS,GAAG,MAAM,GAAG,aAAa,GAAG,WAAW,GAAG,MAAM,GAAG,UAAU,CAAC;AACvG,MAAM,MAAM,UAAU,GAAG,iBAAiB,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAE3D,MAAM,MAAM,cAAc,GAAG,aAAa,GAAG,aAAa,GAAG,WAAW,GAAG,UAAU,CAAC;AAEtF,MAAM,WAAW,gBAAgB;IAC/B,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,QAAQ,EAAE,cAAc,CAAC;CAC1B;AAED,MAAM,WAAW,iBAAiB;IAChC,cAAc,EAAE,cAAc,CAAC;IAC/B,OAAO,EAAE,OAAO,CAAC;IACjB,SAAS,EAAE,OAAO,CAAC;IACnB,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,SAAS,EAAE,OAAO,CAAC;IACnB,UAAU,EAAE,OAAO,CAAC;IACpB,WAAW,EAAE,OAAO,CAAC;IACrB,YAAY,EAAE,OAAO,CAAC;IACtB,SAAS,EAAE,OAAO,CAAC;IACnB,cAAc,EAAE,OAAO,CAAC;IACxB,aAAa,EAAE,OAAO,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,QAAQ,EAAE,OAAO,CAAC;IAClB,WAAW,EAAE,OAAO,CAAC;CACtB;AAED,MAAM,MAAM,kBAAkB,GAAG,iBAAiB,CAAC;AAEnD,MAAM,MAAM,IAAI,GAAG,OAAO,GAAG,iBAAiB,GAAG,aAAa,GAAG,QAAQ,CAAC;AAE1E,MAAM,WAAW,iBAAiB;IAChC,KAAK,EAAE,MAAM,CAAC;IACd,GAAG,EAAE,MAAM,CAAC;CACb;AAED,MAAM,WAAW,WAAW;IAC1B,SAAS,EAAE,MAAM,CAAC;IAClB,YAAY,EAAE,OAAO,CAAC;IACtB,KAAK,CAAC,EAAE,iBAAiB,EAAE,CAAC;CAC7B;AAED,MAAM,WAAW,OAAO;IACtB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,OAAO,CAAC,EAAE,OAAO,CAAC;CACnB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,IAAI,EAAE,WAAW,EAAE,CAAC;IACpB,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;CACtB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,IAAI,EAAE,IAAI,CAAC;IACX,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,EAAE,CAAC;IACpB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,4EAA4E;IAC5E,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,qBAAqB;IACpC,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,8EAA8E;IAC9E,IAAI,EAAE,MAAM,GAAG,QAAQ,GAAG,MAAM,GAAG,SAAS,GAAG,eAAe,GAAG,cAAc,GAAG,MAAM,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;IACzG,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,QAAQ,CAAC,EAAE,OAAO,CAAC;IACnB,YAAY,CAAC,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,kBAAkB;IACjC,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,aAAa,EAAE,MAAM,GAAG,GAAG,CAAC;IAC5B,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,gBAAgB,EAAE,CAAC;IAC7B,WAAW,EAAE,kBAAkB,EAAE,CAAC;IAClC,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,gFAAgF;IAChF,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,+EAA+E;IAC/E,OAAO,CAAC,EAAE,aAAa,EAAE,CAAC;IAC1B,oGAAoG;IACpG,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;IACpB,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;IACvC,mBAAmB,CAAC,EAAE,KAAK,CAAC;QAAE,GAAG,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAC;QAAC,KAAK,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAC5E,sBAAsB,CAAC,EAAE,qBAAqB,EAAE,CAAC;IACjD,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,SAAS,GAAG,QAAQ,GAAG,MAAM,CAAC;IACxD,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,cAAc;IAC7B,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,MAAM,CAAC;IACxB,IAAI,EAAE,UAAU,GAAG,YAAY,GAAG,YAAY,CAAC;CAChD;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,aAAa,EAAE,IAAI,EAAE,CAAC;IACtB,eAAe,EAAE,IAAI,EAAE,CAAC;IACxB,YAAY,EAAE,cAAc,EAAE,CAAC;CAChC;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,EAAE,OAAO,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,MAAM,CAAC;IACjC,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,QAAQ,EAAE,QAAQ,CAAC;IACnB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC;IAC3B,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IAEjB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,wBAAwB,CAAC,EAAE,MAAM,CAAC;IAClC,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,uBAAuB,CAAC,EAAE,MAAM,CAAC;IACjC,kFAAkF;IAClF,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,6GAA6G;IAC7G,eAAe,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAChC,gFAAgF;IAChF,sBAAsB,CAAC,EAAE,MAAM,CAAC;IAChC,gIAAgI;IAChI,YAAY,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAE7B,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,GAAG,IAAI,CAAC;IAC9B,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,KAAK,CAAC,EAAE,YAAY,EAAE,CAAC;IACvB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,eAAe,GAAG,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,GAAG,UAAU,CAAC,GAAG;IACnG,MAAM,CAAC,EAAE,UAAU,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;CACrB,CAAC;AAEF,MAAM,MAAM,iBAAiB,GACzB,OAAO,GACP,SAAS,GACT,eAAe,GACf,iBAAiB,GACjB,eAAe,GACf,oBAAoB,GACpB,UAAU,GACV,WAAW,GACX,UAAU,GACV,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAElB,MAAM,WAAW,WAAW;IAC1B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,iBAAiB,CAAC;IAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,KAAK,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IAChC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,kBAAkB;IACjC,WAAW,EAAE,WAAW,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,MAAM,sBAAsB,GAAG,IAAI,CAAC,WAAW,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,CAAC,GAAG;IACpG,MAAM,CAAC,EAAE,iBAAiB,CAAC;CAC5B,CAAC;AAEF,MAAM,MAAM,kBAAkB,GAAG,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEjF,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,WAAW,GAAG,MAAM,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,MAAM,EAAE,UAAU,GAAG,QAAQ,GAAG,WAAW,CAAC;IAC5C,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,UAAU,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAErD,qFAAqF;AACrF,MAAM,WAAW,KAAK;IACpB,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,CAAC,EAAE,UAAU,CAAC;IACvB;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,uFAAuF;IACvF,KAAK,CAAC,EAAE,MAAM,EAAE,CAAC;CAClB;AAED,kCAAkC;AAClC,MAAM,MAAM,WAAW,GAAG,IAAI,CAAC;AAE/B,MAAM,WAAW,aAAa;IAC5B,MAAM,EAAE,MAAM,CAAC;IACf,IAAI,EAAE,WAAW,CAAC;CACnB;AAED,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,MAAM,CAAC;IACd,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,EAAE,MAAM,CAAC;IACjB,UAAU,CAAC,EAAE,UAAU,CAAC;IACxB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,EAAE,CAAC;IACpB,SAAS,CAAC,EAAE,eAAe,EAAE,CAAC;IAC9B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,UAAU;IACzB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,CAAC,EAAE,UAAU,CAAC;IAC1B,QAAQ,EAAE,MAAM,CAAC;IACjB,QAAQ,EAAE,MAAM,CAAC;IACjB,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,EAAE,MAAM,CAAC;IACZ,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;IACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,qBAAqB,GAAG,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEvF,MAAM,WAAW,eAAe;IAC9B,QAAQ,EAAE,MAAM,CAAC;IACjB,IAAI,EAAE,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,IAAI,GAAG,MAAM,CAAC;IACxD,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,QAAQ,CAAC;CAC1C;AAED,MAAM,WAAW,YAAY;IAC3B,4FAA4F;IAC5F,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB;;;OAGG;IACH,gBAAgB,CAAC,EAAE,MAAM,EAAE,CAAC;CAC7B;AAED,MAAM,WAAW,gBAAgB;IAC/B,UAAU,EAAE,MAAM,CAAC;IACnB,GAAG,EAAE,MAAM,CAAC;IACZ,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,mBAAmB;IAClC,UAAU,EAAE,MAAM,CAAC;IACnB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,KAAK,GAAG,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAClC;AAED,MAAM,WAAW,kBAAkB;IACjC,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC;IAC1D,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC;IAC7C,QAAQ,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,UAAU,CAAC,CAAC;IAC5D,cAAc,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC;IACrD,qBAAqB,CAAC,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC,CAAC;CACtF;AAED,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,MAAM,CAAC;IACf,KAAK,EAAE,MAAM,CAAC;IACd,UAAU,CAAC,EAAE,OAAO,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,OAAO,EAAE,MAAM,CAAC;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,OAAO,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACjC,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,GAAG,EAAE,MAAM,CAAC;IACZ,wFAAwF;IACxF,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,wDAAwD;IACxD,MAAM,EAAE,YAAY,EAAE,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,8EAA8E;IAC9E,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,4FAA4F;AAC5F,MAAM,MAAM,aAAa,GAAG,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,GAAG;IAAE,SAAS,EAAE,OAAO,CAAA;CAAE,CAAC;AAE7E;;;GAGG;AACH,MAAM,MAAM,YAAY,GAAG,OAAO,qBAAqB,EAAE,uBAAuB,CAAC,MAAM,CAAC,GAAG,GAAG,CAAC;AAE/F;;;;;;;GAOG;AACH,MAAM,WAAW,WAAW;IAC1B,gBAAgB,CAAC,EAAE,CAAC,IAAI,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IACnF,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACvD,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IAClG,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,EAAE,aAAa,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IAC5E,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACpE,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;CACpE;AAED,6EAA6E;AAC7E,MAAM,WAAW,eAAe;IAC9B,8FAA8F;IAC9F,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,yGAAyG;IACzG,QAAQ,EAAE,CAAC,KAAK,EAAE,OAAO,EAAE,UAAU,EAAE,qBAAqB,KAAK,MAAM,GAAG,IAAI,GAAG,SAAS,GAAG,IAAI,CAAC;CACnG;AAED,sDAAsD;AACtD,MAAM,WAAW,oBAAoB;IACnC,yEAAyE;IACzE,MAAM,EAAE,OAAO,oBAAoB,EAAE,kBAAkB,CAAC;IACxD,gEAAgE;IAChE,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;IACxD,GAAG,EAAE,GAAG,CAAC;IACT,oGAAoG;IACpG,MAAM,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAChC;AAED,MAAM,WAAW,WAAW;IAC1B,MAAM,EAAE,KAAK,GAAG,MAAM,GAAG,KAAK,GAAG,OAAO,GAAG,QAAQ,CAAC;IACpD,yFAAyF;IACzF,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,CAAC,OAAO,EAAE,OAAO,EAAE,GAAG,EAAE,oBAAoB,KAAK,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC;CACxF;AAED;;;GAGG;AACH,MAAM,MAAM,gBAAgB,GAAG,CAC7B,OAAO,EAAE,OAAO,EAChB,GAAG,EAAE,IAAI,CAAC,oBAAoB,EAAE,QAAQ,CAAC,EACzC,IAAI,EAAE,MAAM,OAAO,CAAC,QAAQ,CAAC,KAC1B,QAAQ,GAAG,OAAO,CAAC,QAAQ,CAAC,CAAC;AAElC,MAAM,WAAW,kBAAkB;IACjC,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,KAAK,CAAC,EAAE,WAAW,CAAC;IACpB,kFAAkF;IAClF,gBAAgB,CAAC,EAAE,eAAe,EAAE,CAAC;IACrC,6FAA6F;IAC7F,IAAI,CAAC,EAAE,CAAC,MAAM,EAAE,OAAO,oBAAoB,EAAE,kBAAkB,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACzF,qFAAqF;IACrF,MAAM,CAAC,EAAE,WAAW,EAAE,CAAC;IACvB,6EAA6E;IAC7E,UAAU,CAAC,EAAE,gBAAgB,CAAC;CAC/B;AAED,MAAM,WAAW,kBAAkB;IACjC;;;;;OAKG;IACH,SAAS,CAAC,EAAE,mBAAmB,CAAC;IAChC;;;OAGG;IACH,KAAK,CAAC,EAAE,OAAO,mBAAmB,EAAE,cAAc,CAAC;IACnD;;;;OAIG;IACH,KAAK,CAAC,EAAE,IAAI,EAAE,GAAG,CAAC,CAAC,KAAK,CAAC,EAAE,KAAK,KAAK,IAAI,EAAE,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC,CAAC;IAC/D,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjC,OAAO,CAAC,EAAE,kBAAkB,EAAE,CAAC;IAC/B,gEAAgE;IAChE,QAAQ,CAAC,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,CAAC,EAAE,CAAC;IAC/C,2FAA2F;IAC3F,OAAO,CAAC,EAAE,YAAY,CAAC;IACvB,2FAA2F;IAC3F,eAAe,CAAC,EAAE,OAAO,2BAA2B,EAAE,sBAAsB,CAAC;IAC7E,eAAe,CAAC,EAAE,YAAY,CAAC;IAC/B,WAAW,CAAC,EAAE;QACZ,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;QACrB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,oEAAoE;QACpE,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,SAAS,EAAE,CAAC;QACzB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,aAAa,EAAE,CAAC;QAC7B,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC;QACvB,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC;KAC9B,CAAC;CACH;AAMD,MAAM,MAAM,gBAAgB,GAAG,OAAO,GAAG,UAAU,GAAG,UAAU,GAAG,KAAK,CAAC;AAEzE,MAAM,MAAM,gBAAgB,GAAG,UAAU,GAAG,SAAS,GAAG,SAAS,GAAG,SAAS,GAAG,WAAW,CAAC;AAE5F,MAAM,WAAW,gBAAgB;IAC/B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,WAAW,GAAG,WAAW,GAAG,aAAa,GAAG,OAAO,CAAC;IAC1D,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,aAAa,EAAE,MAAM,CAAC;IACtB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,eAAe,EAAE,MAAM,CAAC;IACxB,YAAY,EAAE,MAAM,CAAC;IACrB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,mBAAmB,EAAE,MAAM,CAAC;IAC5B,gBAAgB,EAAE,MAAM,CAAC;IACzB,UAAU,EAAE,OAAO,CAAC;IACpB,iBAAiB,EAAE,MAAM,CAAC;IAC1B,MAAM,EAAE,gBAAgB,CAAC;IACzB,OAAO,EAAE,MAAM,EAAE,CAAC;CACnB;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,WAAW,EAAE,MAAM,CAAC;IACpB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,kBAAkB,EAAE,MAAM,CAAC;IAC3B,yBAAyB,EAAE,MAAM,CAAC;IAClC,yBAAyB,EAAE,MAAM,CAAC;IAClC,MAAM,EAAE,gBAAgB,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,eAAe,EAAE,MAAM,CAAC;IACxB,YAAY,EAAE,MAAM,CAAC;IACrB,mBAAmB,EAAE,MAAM,CAAC;IAC5B,gBAAgB,EAAE,MAAM,CAAC;IACzB,MAAM,EAAE,gBAAgB,EAAE,CAAC;CAC5B;AAED,MAAM,WAAW,wBAAwB;IACvC,MAAM,EAAE,MAAM,CAAC;IACf,UAAU,EAAE,MAAM,CAAC;IACnB,WAAW,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,OAAO,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,iBAAiB,CAAC,EAAE,MAAM,CAAC;CAC5B;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,YAAY,EAAE,MAAM,CAAC;IACrB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,iBAAiB,CAAC,EAAE,MAAM,CAAC;IAC3B,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,KAAK,EAAE,wBAAwB,EAAE,CAAC;CACnC;AAED,MAAM,WAAW,uBAAuB;IACtC,eAAe,EAAE,MAAM,CAAC;IACxB,gBAAgB,EAAE,MAAM,CAAC;IACzB,SAAS,EAAE,MAAM,CAAC;IAClB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,gBAAgB,EAAE,MAAM,CAAC;IACzB,cAAc,EAAE,OAAO,CAAC;IACxB,cAAc,CAAC,EAAE,MAAM,CAAC;CACzB;AAED,MAAM,WAAW,wBAAyB,SAAQ,IAAI;IACpD,GAAG,CAAC,EAAE,wBAAwB,CAAC;IAC/B,eAAe,EAAE,MAAM,EAAE,CAAC;IAC1B,gBAAgB,EAAE,MAAM,EAAE,CAAC;IAC3B,YAAY,EAAE,MAAM,EAAE,CAAC;IACvB,uBAAuB,EAAE,uBAAuB,CAAC;CAClD;AAED,MAAM,WAAW,YAAY;IAC3B,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,aAAa,EAAE,MAAM,CAAC;IACtB,mBAAmB,CAAC,EAAE,MAAM,CAAC;IAC7B,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,oBAAoB,CAAC,EAAE,MAAM,CAAC;IAC9B,2BAA2B,CAAC,EAAE,MAAM,CAAC;IACrC,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,SAAS,EAAE,OAAO,CAAC;IACnB,cAAc,EAAE,OAAO,CAAC;CACzB;AAED,MAAM,MAAM,uBAAuB,GAAG,UAAU,GAAG,OAAO,GAAG,aAAa,GAAG,kBAAkB,GAAG,SAAS,CAAC;AAE5G,MAAM,WAAW,qBAAqB;IACpC,kBAAkB,EAAE,MAAM,CAAC;IAC3B,MAAM,EAAE,uBAAuB,CAAC;IAChC,UAAU,EAAE,OAAO,CAAC;IACpB,SAAS,EAAE;QACT,gBAAgB,CAAC,EAAE,MAAM,CAAC;QAC1B,YAAY,CAAC,EAAE,MAAM,CAAC;QACtB,cAAc,CAAC,EAAE,MAAM,CAAC;QACxB,gBAAgB,CAAC,EAAE,MAAM,CAAC;KAC3B,CAAC;CACH;AAED,MAAM,MAAM,oBAAoB,GAC5B,QAAQ,GACR,SAAS,GACT,aAAa,GACb,WAAW,GACX,SAAS,GACT,mBAAmB,CAAC;AAExB,MAAM,WAAW,wBAAwB;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;IACjB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,MAAM,EAAE,MAAM,CAAC;CAChB;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,wBAAwB,EAAE,CAAC;IACnC,YAAY,EAAE,oBAAoB,CAAC;CACpC;AAED,MAAM,WAAW,OAAO;IACtB,YAAY,EAAE,MAAM,CAAC;IACrB,WAAW,EAAE,MAAM,CAAC;IACpB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,EAAE,MAAM,CAAC;IACrB,gBAAgB,EAAE,MAAM,CAAC;IACzB,oBAAoB,EAAE,MAAM,CAAC;IAC7B,wBAAwB,EAAE,MAAM,CAAC;CAClC;AAED,MAAM,WAAW,mBAAmB;IAClC,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,mBAAmB,EAAE,OAAO,CAAC;IAC7B,iBAAiB,EAAE,OAAO,CAAC;IAC3B,kBAAkB,CAAC,EAAE,MAAM,CAAC;IAC5B,uEAAuE;IACvE,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,sDAAsD;IACtD,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,gFAAgF;IAChF,sBAAsB,CAAC,EAAE,MAAM,CAAC;CACjC;AAED,MAAM,WAAW,WAAW;IAC1B,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,mBAAmB,CAAC;IACrC,YAAY,EAAE,YAAY,CAAC;IAC3B,QAAQ,EAAE,qBAAqB,CAAC;IAChC,GAAG,EAAE,OAAO,CAAC;IACb,eAAe,EAAE,mBAAmB,CAAC;CACtC;AAED,MAAM,WAAW,oBAAoB;IACnC,MAAM,EAAE,MAAM,CAAC;IACf,WAAW,EAAE,UAAU,EAAE,CAAC;IAC1B,YAAY,EAAE,WAAW,EAAE,CAAC;IAC5B,KAAK,EAAE,YAAY,EAAE,CAAC;IACtB,WAAW,EAAE,SAAS,EAAE,CAAC;IACzB,uBAAuB,EAAE,KAAK,CAAC;QAAE,IAAI,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAChE,UAAU,EAAE,QAAQ,EAAE,CAAC;IACvB,YAAY,EAAE,YAAY,CAAC;IAC3B,eAAe,EAAE,uBAAuB,CAAC;CAC1C;AAED,MAAM,WAAW,qBAAqB;IACpC,KAAK,CAAC,EAAE,gBAAgB,CAAC;IACzB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,cAAc;IAC7B,SAAS,EAAE,MAAM,CAAC;IAClB,WAAW,EAAE,MAAM,CAAC;IACpB,KAAK,EAAE,gBAAgB,CAAC;IACxB,KAAK,CAAC,EAAE,oBAAoB,CAAC;IAC7B,QAAQ,CAAC,EAAE;QACT,KAAK,EAAE,wBAAwB,EAAE,CAAC;QAClC,mBAAmB,EAAE,MAAM,EAAE,CAAC;QAC9B,YAAY,EAAE,cAAc,EAAE,CAAC;QAC/B,kBAAkB,EAAE,MAAM,CAAC;KAC5B,CAAC;IACF,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;CACjD;AAED,MAAM,WAAW,cAAc;IAC7B,MAAM,EAAE,MAAM,CAAC;IACf,UAAU,CAAC,EAAE,gBAAgB,CAAC;IAC9B,QAAQ,EAAE,wBAAwB,CAAC;IACnC,QAAQ,EAAE,oBAAoB,CAAC;IAC/B,OAAO,CAAC,EAAE,WAAW,CAAC;CACvB;AAED,MAAM,MAAM,gBAAgB,GAAG,KAAK,GAAG,MAAM,GAAG,OAAO,CAAC;AACxD,MAAM,MAAM,eAAe,GAAG,UAAU,GAAG,MAAM,GAAG,UAAU,GAAG,UAAU,GAAG,QAAQ,CAAC;AACvF,MAAM,MAAM,cAAc,GAAG,WAAW,GAAG,QAAQ,GAAG,WAAW,GAAG,SAAS,CAAC;AAE9E,MAAM,WAAW,cAAc;IAC7B,IAAI,EAAE,MAAM,CAAC;IACb,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAC/B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAClC,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;CAC3B;AAED,MAAM,WAAW,oBAAoB;IACnC,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,EAAE,gBAAgB,CAAC;IAC3B,OAAO,EAAE,eAAe,CAAC;IACzB,MAAM,EAAE,cAAc,CAAC;IACvB,UAAU,EAAE,MAAM,EAAE,CAAC;IACrB,YAAY,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACrC,OAAO,EAAE,cAAc,EAAE,CAAC;IAC1B,UAAU,EAAE,MAAM,CAAC;IACnB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,kBAAkB,CAAC,EAAE,MAAM,CAAC;CAC7B;AAED,MAAM,WAAW,2BAA2B;IAC1C,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,QAAQ,CAAC,EAAE,gBAAgB,CAAC;IAC5B,OAAO,CAAC,EAAE,eAAe,CAAC;IAC1B,MAAM,CAAC,EAAE,cAAc,CAAC;IACxB,0BAA0B,CAAC,EAAE,MAAM,CAAC;IACpC,iBAAiB,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IAC3C,QAAQ,CAAC,EAAE,YAAY,CAAC;IACxB,aAAa,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;IAC7C,aAAa,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,YAAY,CAAC,CAAC;CAC9C;AAMD;;;GAGG;AACH,MAAM,MAAM,mBAAmB,GAC3B,cAAc,GACd,gBAAgB,GAChB,gBAAgB,GAChB,gBAAgB,GAChB,wBAAwB,GACxB,aAAa,GACb,aAAa,GACb,aAAa,GACb,gBAAgB,GAChB,kBAAkB,GAClB,mBAAmB,GACnB,mBAAmB,GACnB,UAAU,GACV,aAAa,GACb,kBAAkB,CAAC;AAEvB,MAAM,WAAW,oBAAoB;IACnC,KAAK,EAAE,KAAK,CAAC;IACb,MAAM,EAAE,mBAAmB,CAAC;IAC5B,kEAAkE;IAClE,OAAO,CAAC,EAAE,OAAO,CAAC;IAClB,0EAA0E;IAC1E,QAAQ,CAAC,EAAE;QAAE,IAAI,EAAE,MAAM,GAAG,SAAS,GAAG,YAAY,CAAC;QAAC,OAAO,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC;CAC1E;AAED,MAAM,MAAM,mBAAmB,GAAG,CAAC,OAAO,EAAE,oBAAoB,KAAK,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/core",
3
- "version": "0.35.0",
3
+ "version": "0.36.0",
4
4
  "description": "Core headless domain engine, plugin architecture, and data stores for Critical Path",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -97,7 +97,7 @@ import { validateCustomFieldValues, validateCustomFieldDefinitions } from '../do
97
97
  import { detectDependencyCycle, CircularDependencyError } from '../domain/graph.js';
98
98
  import { ValidationError, NotFoundError, ForbiddenError } from '../domain/errors.js';
99
99
  import { WebhookDispatcher, assertWebhookUrl } from '../webhooks/dispatcher.js';
100
- import { buildStorageKey } from '../storage/file-storage.js';
100
+ import { buildStorageKey, normalizeUploadData } from '../storage/file-storage.js';
101
101
  import { generateWebhookSecret } from '../webhooks/signature.js';
102
102
  import type { DomainEvent } from '../domain/events.js';
103
103
  import { calculateCPM, type CPMOptions } from '../domain/cpm.js';
@@ -1595,6 +1595,7 @@ export class CriticalPathEngine {
1595
1595
  input: Omit<Attachment, 'id' | 'createdAt' | 'updatedAt' | 'uploaderId'> & { uploaderId?: string }
1596
1596
  ): Promise<Attachment> {
1597
1597
  await this.requireAttachmentCreate(input);
1598
+ this.assertUploadAllowed(input.mimeType, input.sizeBytes);
1598
1599
  if (this.actor) await this.assertStorageKeyBelongs(input);
1599
1600
  const attachment: Omit<Attachment, 'id' | 'createdAt' | 'updatedAt'> = this.actor
1600
1601
  ? { ...input, uploaderId: this.actor.userId, uploaderType: this.actor.actorType ?? 'user' }
@@ -1676,9 +1677,13 @@ export class CriticalPathEngine {
1676
1677
  throw new ValidationError('Attachments must reference a project, task or comment.');
1677
1678
  }
1678
1679
 
1680
+ // Decode once so limits apply to the real byte size, then hand the bytes to the adapter.
1681
+ const data = normalizeUploadData(input.data, input.encoding, input.mimeType);
1682
+ this.assertUploadAllowed(input.mimeType || 'application/octet-stream', data.byteLength);
1683
+
1679
1684
  const uploadResult = await this.fileStorage.upload({
1680
1685
  filename: input.filename,
1681
- data: input.data,
1686
+ data,
1682
1687
  mimeType: input.mimeType,
1683
1688
  pathPrefix: projectId && (this.actor || !input.pathPrefix) ? `projects/${projectId}` : input.pathPrefix
1684
1689
  });
@@ -1747,6 +1752,7 @@ export class CriticalPathEngine {
1747
1752
  throw new Error('Presigned uploads are not supported by the configured FileStorageAdapter.');
1748
1753
  }
1749
1754
  if (!options.projectId) throw new ValidationError('projectId is required for presigned uploads.');
1755
+ this.assertUploadAllowed(options.contentType ?? 'application/octet-stream');
1750
1756
  if (this.enforcing) {
1751
1757
  await this.requireProjectAccess('attachment.create', options.projectId);
1752
1758
  } else if (!(await this.store.getProject(options.projectId))) {
@@ -1759,6 +1765,23 @@ export class CriticalPathEngine {
1759
1765
  });
1760
1766
  }
1761
1767
 
1768
+ /** Enforces `config.uploads` (MIME allow-list with `type/*` wildcards, and maximum size). */
1769
+ private assertUploadAllowed(mimeType: string, sizeBytes?: number): void {
1770
+ const limits = this.config.uploads;
1771
+ if (!limits) return;
1772
+ if (limits.maxBytes !== undefined && sizeBytes !== undefined && sizeBytes > limits.maxBytes) {
1773
+ throw new ValidationError(`File is ${sizeBytes} bytes; the maximum is ${limits.maxBytes} bytes.`);
1774
+ }
1775
+ if (limits.allowedMimeTypes) {
1776
+ const type = mimeType.split(';')[0].trim().toLowerCase();
1777
+ const allowed = limits.allowedMimeTypes.some((pattern) => {
1778
+ const p = pattern.toLowerCase();
1779
+ return p.endsWith('/*') ? type.startsWith(p.slice(0, -1)) : type === p;
1780
+ });
1781
+ if (!allowed) throw new ValidationError(`File type "${type}" is not allowed.`);
1782
+ }
1783
+ }
1784
+
1762
1785
  /**
1763
1786
  * A caller-supplied `storageKey` must live under the attachment's project prefix, because
1764
1787
  * deleting the attachment deletes that file: otherwise anyone could register, then delete,
@@ -0,0 +1,41 @@
1
+ import { describe, it, expect } from 'vitest';
2
+ import { CriticalPathEngine, InMemoryFileStore, ValidationError } from '../index.js';
3
+
4
+ async function setup() {
5
+ const engine = new CriticalPathEngine({
6
+ fileStorage: new InMemoryFileStore(),
7
+ uploads: { maxBytes: 10, allowedMimeTypes: ['image/*', 'application/pdf'] }
8
+ });
9
+ const project = await engine.createProject({ name: 'Limits' });
10
+ return { engine, project };
11
+ }
12
+
13
+ describe('upload limits', () => {
14
+ it('enforces the decoded size of direct uploads', async () => {
15
+ const { engine, project } = await setup();
16
+ await expect(
17
+ engine.uploadAttachmentFile({ projectId: project.id, filename: 'ok.png', mimeType: 'image/png', data: new Uint8Array(10), uploaderId: 'u' })
18
+ ).resolves.toMatchObject({ sizeBytes: 10 });
19
+ // 16 base64 characters decode to 12 bytes
20
+ await expect(
21
+ engine.uploadAttachmentFile({ projectId: project.id, filename: 'big.png', mimeType: 'image/png', data: 'AAAAAAAAAAAAAAAA', encoding: 'base64', uploaderId: 'u' })
22
+ ).rejects.toThrow(/maximum is 10 bytes/);
23
+ });
24
+
25
+ it('allows MIME types by exact match or wildcard', async () => {
26
+ const { engine, project } = await setup();
27
+ const upload = (mimeType: string) =>
28
+ engine.uploadAttachmentFile({ projectId: project.id, filename: 'f', mimeType, data: new Uint8Array(1), uploaderId: 'u' });
29
+ await expect(upload('image/webp')).resolves.toBeDefined();
30
+ await expect(upload('application/pdf; charset=binary')).resolves.toBeDefined();
31
+ await expect(upload('text/html')).rejects.toThrow(ValidationError);
32
+ });
33
+
34
+ it('applies to presigned uploads and registered attachments', async () => {
35
+ const { engine, project } = await setup();
36
+ await expect(engine.getPresignedAttachmentUploadUrl({ projectId: project.id, filename: 'x.html', contentType: 'text/html' })).rejects.toThrow(/not allowed/);
37
+ await expect(
38
+ engine.createAttachment({ projectId: project.id, filename: 'x', url: 'https://e.com/x', mimeType: 'image/png', sizeBytes: 11, uploaderId: 'u' })
39
+ ).rejects.toThrow(/maximum/);
40
+ });
41
+ });
@@ -378,6 +378,16 @@ export interface UploadFileInput {
378
378
  encoding?: 'base64' | 'utf-8' | 'binary';
379
379
  }
380
380
 
381
+ export interface UploadLimits {
382
+ /** Largest accepted upload in bytes. Applies to direct uploads and declared `sizeBytes`. */
383
+ maxBytes?: number;
384
+ /**
385
+ * Accepted MIME types; entries may end in `/*` (e.g. `image/*`). Applies to uploads, presigned
386
+ * uploads and registered attachments. Default: any type.
387
+ */
388
+ allowedMimeTypes?: string[];
389
+ }
390
+
381
391
  export interface UploadFileResult {
382
392
  storageKey: string;
383
393
  url: string;
@@ -542,6 +552,8 @@ export interface CriticalPathConfig {
542
552
  plugins?: CriticalPathPlugin[];
543
553
  /** Static webhooks (not stored or editable through the API). */
544
554
  webhooks?: Omit<Webhook, 'id' | 'createdAt'>[];
555
+ /** Limits applied to attachment uploads, presigned uploads and attachment registration. */
556
+ uploads?: UploadLimits;
545
557
  /** Delivery behaviour: queue, timeouts, retries, private URL policy, failure callbacks. */
546
558
  webhookDelivery?: import('../webhooks/dispatcher.js').WebhookDeliveryOptions;
547
559
  defaultSchedule?: WorkSchedule;
@@ -1 +1 @@
1
- {"root":["./src/deliverables.test.ts","./src/index.test.ts","./src/index.ts","./src/status.test.ts","./src/task-state.test.ts","./src/use-case-validation.test.ts","./src/domain/authorization.ts","./src/domain/calendar.test.ts","./src/domain/calendar.ts","./src/domain/cpm.test.ts","./src/domain/cpm.ts","./src/domain/custom-fields.ts","./src/domain/ddd.test.ts","./src/domain/entities.ts","./src/domain/errors.ts","./src/domain/events.ts","./src/domain/graph.ts","./src/domain/index.ts","./src/domain/ladder.test.ts","./src/domain/ladder.ts","./src/domain/metrics.test.ts","./src/domain/metrics.ts","./src/domain/task-duration.test.ts","./src/domain/workload.test.ts","./src/domain/workload.ts","./src/engine/actor.test.ts","./src/engine/authorization.test.ts","./src/engine/cascade.test.ts","./src/engine/config.test.ts","./src/engine/entity-events.test.ts","./src/engine/index.ts","./src/plugins/index.ts","./src/plugins/plugins.test.ts","./src/schemas/index.ts","./src/schemas/schemas.test.ts","./src/storage/file-storage.ts","./src/storage/firebase-storage.ts","./src/storage/index.ts","./src/storage/s3.ts","./src/storage/storage.test.ts","./src/store/conformance.test.ts","./src/store/firebase.test.ts","./src/store/firebase.ts","./src/store/index.ts","./src/store/query.test.ts","./src/store/query.ts","./src/store/sqlite.test.ts","./src/store/sqlite.ts","./src/testing/conformance.ts","./src/testing/index.ts","./src/types/index.ts","./src/utils/fractional-index.test.ts","./src/utils/fractional-index.ts","./src/utils/index.ts","./src/utils/key.test.ts","./src/utils/key.ts","./src/utils/mentions.test.ts","./src/utils/mentions.ts","./src/utils/status.ts","./src/utils/workflow.ts","./src/webhooks/dispatcher.ts","./src/webhooks/index.ts","./src/webhooks/signature.ts","./src/webhooks/webhooks.test.ts"],"version":"5.9.3"}
1
+ {"root":["./src/deliverables.test.ts","./src/index.test.ts","./src/index.ts","./src/status.test.ts","./src/task-state.test.ts","./src/use-case-validation.test.ts","./src/domain/authorization.ts","./src/domain/calendar.test.ts","./src/domain/calendar.ts","./src/domain/cpm.test.ts","./src/domain/cpm.ts","./src/domain/custom-fields.ts","./src/domain/ddd.test.ts","./src/domain/entities.ts","./src/domain/errors.ts","./src/domain/events.ts","./src/domain/graph.ts","./src/domain/index.ts","./src/domain/ladder.test.ts","./src/domain/ladder.ts","./src/domain/metrics.test.ts","./src/domain/metrics.ts","./src/domain/task-duration.test.ts","./src/domain/workload.test.ts","./src/domain/workload.ts","./src/engine/actor.test.ts","./src/engine/authorization.test.ts","./src/engine/cascade.test.ts","./src/engine/config.test.ts","./src/engine/entity-events.test.ts","./src/engine/index.ts","./src/plugins/index.ts","./src/plugins/plugins.test.ts","./src/schemas/index.ts","./src/schemas/schemas.test.ts","./src/storage/file-storage.ts","./src/storage/firebase-storage.ts","./src/storage/index.ts","./src/storage/s3.ts","./src/storage/storage.test.ts","./src/storage/upload-limits.test.ts","./src/store/conformance.test.ts","./src/store/firebase.test.ts","./src/store/firebase.ts","./src/store/index.ts","./src/store/query.test.ts","./src/store/query.ts","./src/store/sqlite.test.ts","./src/store/sqlite.ts","./src/testing/conformance.ts","./src/testing/index.ts","./src/types/index.ts","./src/utils/fractional-index.test.ts","./src/utils/fractional-index.ts","./src/utils/index.ts","./src/utils/key.test.ts","./src/utils/key.ts","./src/utils/mentions.test.ts","./src/utils/mentions.ts","./src/utils/status.ts","./src/utils/workflow.ts","./src/webhooks/dispatcher.ts","./src/webhooks/index.ts","./src/webhooks/signature.ts","./src/webhooks/webhooks.test.ts"],"version":"5.9.3"}