@critical-path/core 0.24.0 → 0.25.0
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/CHANGELOG.md +29 -0
- package/README.md +3 -3
- package/dist/engine/actor.test.js +1 -0
- package/dist/engine/actor.test.js.map +1 -1
- package/dist/engine/index.d.ts +12 -17
- package/dist/engine/index.d.ts.map +1 -1
- package/dist/engine/index.js +18 -38
- package/dist/engine/index.js.map +1 -1
- package/dist/index.test.js +1 -5
- package/dist/index.test.js.map +1 -1
- package/dist/schemas/index.d.ts +87 -124
- package/dist/schemas/index.d.ts.map +1 -1
- package/dist/schemas/index.js +36 -49
- package/dist/schemas/index.js.map +1 -1
- package/dist/schemas/schemas.test.js +10 -11
- package/dist/schemas/schemas.test.js.map +1 -1
- package/package.json +1 -1
- package/src/engine/actor.test.ts +2 -1
- package/src/engine/index.ts +24 -52
- package/src/index.test.ts +1 -5
- package/src/schemas/index.ts +62 -50
- package/src/schemas/schemas.test.ts +16 -15
package/CHANGELOG.md
CHANGED
|
@@ -1,5 +1,34 @@
|
|
|
1
1
|
# @critical-path/core
|
|
2
2
|
|
|
3
|
+
## 0.25.0
|
|
4
|
+
|
|
5
|
+
### Minor Changes
|
|
6
|
+
|
|
7
|
+
- fd79762: **BREAKING:** strict request bodies, no identity in payloads, and CORS off by default.
|
|
8
|
+
|
|
9
|
+
**@critical-path/core**
|
|
10
|
+
- Request schemas are strict: unknown keys, server-assigned fields and identity fields are rejected instead of stripped.
|
|
11
|
+
- Identity is never read from payloads. `updateTask` no longer reads `actorId`/`actorName`/`actorType`/`actor` from the update object; pass them as the third `options` argument or use `withActor`. `addComment`, `addCommentReaction`, `removeCommentReaction` and `createAttachment` take the actor from `withActor`, falling back to an optional `authorId`/`userId`/`uploaderId`, then `'system'`.
|
|
12
|
+
- Schemas export request body types (`CreateTaskBody`, `UpdateTaskBody`, ...).
|
|
13
|
+
|
|
14
|
+
**@critical-path/server**
|
|
15
|
+
- Bodies containing unknown, server-assigned or identity fields return `400`.
|
|
16
|
+
- Every request runs as the `getContext` user, or `ANONYMOUS_ACTOR` (`anonymous`). Authors of comments, reactions, attachments and time entries are no longer accepted from bodies.
|
|
17
|
+
- `DELETE /comments/:id/reactions` takes `?emoji=` only.
|
|
18
|
+
- CORS is off by default (`cors: false`). Pass `cors: { origins: [...] }` to allow cross-origin browsers.
|
|
19
|
+
|
|
20
|
+
**@critical-path/client**
|
|
21
|
+
- Method parameters use the server's body types, so identity fields no longer type-check. `addCommentReaction`/`removeCommentReaction` take `{ emoji }`; `addTodo`/`toggleTodo` drop the actor options argument.
|
|
22
|
+
- New `updateProject`, `deleteProject` and `addDependency`. `uploadAttachmentFile` base64-encodes binary data (previously it sent unusable JSON for `Uint8Array`/`ArrayBuffer`).
|
|
23
|
+
- CLI: `--author`, `--actor-id`, `--actor-name`, `--agent-name` and `CRITICAL_PATH_AUTHOR_ID`/`ACTOR_ID`/`AGENT_NAME` are removed; identity comes from the `--key` token via the server's `getContext`.
|
|
24
|
+
|
|
25
|
+
**@critical-path/mcp**
|
|
26
|
+
- Tool arguments are strict: undeclared arguments return an `isError` result.
|
|
27
|
+
- `add_comment` no longer takes `authorId`. With an `engine`, writes are attributed to the new `actor` server option (default `DEFAULT_MCP_ACTOR`).
|
|
28
|
+
|
|
29
|
+
**@critical-path/react / @critical-path/svelte**
|
|
30
|
+
- `addReaction`/`removeReaction` take `(commentId, emoji)`; comment and attachment inputs no longer accept `authorId`/`uploaderId`. Task, comment and deliverable update parameters use the schema body types.
|
|
31
|
+
|
|
3
32
|
## 0.24.0
|
|
4
33
|
|
|
5
34
|
### Minor Changes
|
package/README.md
CHANGED
|
@@ -131,17 +131,17 @@ const input = parsePayload(CreateTaskSchema, await request.json()); // throws Va
|
|
|
131
131
|
await engine.createTask(input);
|
|
132
132
|
```
|
|
133
133
|
|
|
134
|
-
Create and update schemas exist for workflows, projects, tasks, dependencies, deliverables, teams, containers, iterations, comments, reactions, attachments and time entries. They
|
|
134
|
+
Create and update schemas exist for workflows, projects, tasks, dependencies, deliverables, teams, containers, iterations, comments, reactions, attachments and time entries. They are strict: server-assigned fields, identity fields and unknown keys are rejected. The schemas live on a subpath so importing `@critical-path/core` in a browser bundle does not pull in zod. A compile-time test fails the build if a domain type gains a field its schema lacks.
|
|
135
135
|
|
|
136
136
|
#### Attributing Mutations to a User (`withActor`)
|
|
137
137
|
|
|
138
138
|
```ts
|
|
139
139
|
const asAlice = engine.withActor({ userId: 'alice', username: 'Alice' });
|
|
140
140
|
await asAlice.updateTask(taskId, { status: 'in_progress' }); // activity actorId: 'alice'
|
|
141
|
-
await asAlice.addComment({ taskId, content: 'On it'
|
|
141
|
+
await asAlice.addComment({ taskId, content: 'On it' }); // authorId: 'alice'
|
|
142
142
|
```
|
|
143
143
|
|
|
144
|
-
`withActor` returns a per-request view that shares the store, plugins and event bus with the base engine. On the view,
|
|
144
|
+
`withActor` returns a per-request view that shares the store, plugins and event bus with the base engine. On the view, every write is attributed to the actor: activity log entries, comment authors, reactions, time entries, attachment uploaders, and the default task `reporterId`. `updateTask` never reads identity from the update payload; trusted server-side automation can pass `updateTask(id, updates, { actorId })` explicitly. Without a view, `addComment`, reactions and `createAttachment` accept an optional `authorId` / `userId` / `uploaderId` and fall back to `'system'`. `@critical-path/server` runs every request through a view (the resolved user, or `anonymous`).
|
|
145
145
|
|
|
146
146
|
Other domain errors are exported for callers and route handlers to map: `ValidationError` (bad input, e.g. non-positive logged hours) and `NotFoundError` (missing referenced entity). `engine.deleteProject(id)` deletes a project and its tasks through `deleteTask`, then publishes `project.deleted`.
|
|
147
147
|
|
|
@@ -7,6 +7,7 @@ describe('CriticalPathEngine.withActor', () => {
|
|
|
7
7
|
const project = await alice.createProject({ key: 'ACT', name: 'Actors', ownerId: 'mallory' });
|
|
8
8
|
const task = await alice.createTask({ projectId: project.id, title: 'Scoped' });
|
|
9
9
|
expect(task.reporterId).toBe('alice');
|
|
10
|
+
// Identity in the payload is not part of the update type at all; cast to simulate an untyped caller
|
|
10
11
|
await alice.updateTask(task.id, { title: 'Renamed', actorId: 'ceo', actor: { userId: 'ceo' } });
|
|
11
12
|
const comment = await alice.addComment({ taskId: task.id, content: 'hi', authorId: 'ceo', authorType: 'agent' });
|
|
12
13
|
const reacted = await alice.addCommentReaction(comment.id, { emoji: '👍', userId: 'ceo' });
|
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"actor.test.js","sourceRoot":"","sources":["../../src/engine/actor.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AAEjD,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;IAC5C,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;QACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,KAAK,GAAG,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAEvE,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;QAC9F,MAAM,IAAI,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,EAAE,MAAM,EAAE,KAAK,EAAE,
|
|
1
|
+
{"version":3,"file":"actor.test.js","sourceRoot":"","sources":["../../src/engine/actor.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AAEjD,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;IAC5C,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;QACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,KAAK,GAAG,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAEvE,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;QAC9F,MAAM,IAAI,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEtC,oGAAoG;QACpG,MAAM,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,EAAE,MAAM,EAAE,KAAK,EAAE,EAAS,CAAC,CAAC;QACvG,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACjH,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC;QAC3F,MAAM,KAAK,GAAG,MAAM,KAAK,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,MAAM,EAAE,KAAK,EAAS,CAAC,CAAC;QACvF,MAAM,UAAU,GAAG,MAAM,KAAK,CAAC,gBAAgB,CAAC;YAC9C,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,UAAU,EAAE,KAAK;YACjB,QAAQ,EAAE,SAAS;YACnB,QAAQ,EAAE,eAAe;YACzB,SAAS,EAAE,CAAC;YACZ,GAAG,EAAE,6BAA6B;SACnC,CAAC,CAAC;QAEH,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACvC,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACrD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAE5C,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC;QAC/E,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAC7C,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACpE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,qEAAqE,EAAE,KAAK,IAAI,EAAE;QACnF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAE9E,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YAC/B,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC;YACnF,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC;SACpF,CAAC,CAAC;QACH,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,aAAa,EAAE,CAAC;QAErC,yCAAyC;QACzC,MAAM,CAAC,MAAM,MAAM,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;IACpD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;QAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;QAC5E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;QAE5E,MAAM,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,EAAE,EAAE,OAAO,EAAE,YAAY,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACzE,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,YAAY,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
package/dist/engine/index.d.ts
CHANGED
|
@@ -45,16 +45,7 @@ export declare class CriticalPathEngine {
|
|
|
45
45
|
getTasks(projectId?: string): Promise<Task[]>;
|
|
46
46
|
getTask(id: string): Promise<Task | null>;
|
|
47
47
|
createTask(taskInput: CreateTaskInput): Promise<Task>;
|
|
48
|
-
updateTask(id: string, updates: Partial<Task
|
|
49
|
-
actorId?: string;
|
|
50
|
-
actorName?: string;
|
|
51
|
-
actorType?: string;
|
|
52
|
-
actor?: {
|
|
53
|
-
userId: string;
|
|
54
|
-
username?: string;
|
|
55
|
-
actorType?: string;
|
|
56
|
-
};
|
|
57
|
-
}, options?: {
|
|
48
|
+
updateTask(id: string, updates: Partial<Task>, options?: {
|
|
58
49
|
actorId?: string;
|
|
59
50
|
actorName?: string;
|
|
60
51
|
actorType?: string;
|
|
@@ -84,16 +75,18 @@ export declare class CriticalPathEngine {
|
|
|
84
75
|
}): Promise<TimeEntry>;
|
|
85
76
|
getComments(taskId: string): Promise<Comment[]>;
|
|
86
77
|
getComment(id: string): Promise<Comment | null>;
|
|
87
|
-
addComment(
|
|
78
|
+
addComment(input: Omit<Comment, 'id' | 'createdAt' | 'updatedAt' | 'authorId'> & {
|
|
79
|
+
authorId?: string;
|
|
80
|
+
}): Promise<Comment>;
|
|
88
81
|
updateComment(id: string, updates: Partial<Comment>): Promise<Comment | null>;
|
|
89
82
|
deleteComment(id: string): Promise<boolean>;
|
|
90
|
-
addCommentReaction(commentId: string,
|
|
83
|
+
addCommentReaction(commentId: string, input: {
|
|
91
84
|
emoji: string;
|
|
92
|
-
userId
|
|
85
|
+
userId?: string;
|
|
93
86
|
}): Promise<Comment | null>;
|
|
94
|
-
removeCommentReaction(commentId: string,
|
|
87
|
+
removeCommentReaction(commentId: string, input: {
|
|
95
88
|
emoji: string;
|
|
96
|
-
userId
|
|
89
|
+
userId?: string;
|
|
97
90
|
}): Promise<Comment | null>;
|
|
98
91
|
getAttachments(filter?: {
|
|
99
92
|
taskId?: string;
|
|
@@ -102,13 +95,15 @@ export declare class CriticalPathEngine {
|
|
|
102
95
|
artifactType?: string;
|
|
103
96
|
}): Promise<Attachment[]>;
|
|
104
97
|
getAttachment(id: string): Promise<Attachment | null>;
|
|
105
|
-
createAttachment(
|
|
98
|
+
createAttachment(input: Omit<Attachment, 'id' | 'createdAt' | 'updatedAt' | 'uploaderId'> & {
|
|
99
|
+
uploaderId?: string;
|
|
100
|
+
}): Promise<Attachment>;
|
|
106
101
|
deleteAttachment(id: string): Promise<boolean>;
|
|
107
102
|
uploadAttachmentFile(input: UploadFileInput & {
|
|
108
103
|
taskId?: string;
|
|
109
104
|
projectId?: string;
|
|
110
105
|
commentId?: string;
|
|
111
|
-
uploaderId
|
|
106
|
+
uploaderId?: string;
|
|
112
107
|
uploaderType?: 'user' | 'agent' | 'system';
|
|
113
108
|
artifactType?: 'plan' | 'spec' | 'deliverable' | 'review' | 'general';
|
|
114
109
|
metadata?: Record<string, unknown>;
|
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,KAAK,EACL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EAET,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EA8Bf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;gBAElB,MAAM,GAAE,kBAAuB;IAqB3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,OAAO,CAAC,SAAS;YAIH,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAInC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAIjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA2BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAgBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAIjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAwBzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAqC3C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAI7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAkGrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,
|
|
1
|
+
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,KAAK,EACL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EAET,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EA8Bf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;gBAElB,MAAM,GAAE,kBAAuB;IAqB3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,OAAO,CAAC,SAAS;YAIH,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAInC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAIjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA2BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAgBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAIjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAwBzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAqC3C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAI7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAkGrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EACtB,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YAgUT,8BAA8B;IA6EtC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsCxC,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IAwB7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IA6BpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IAwC1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAI/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,UAAU,CACd,KAAK,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAC1F,OAAO,CAAC,OAAO,CAAC;IAsBb,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAyB7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8CzG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC5G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAQlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;IAIrD,gBAAgB,CACpB,KAAK,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,YAAY,CAAC,GAAG;QAAE,UAAU,CAAC,EAAE,MAAM,CAAA;KAAE,GACjG,OAAO,CAAC,UAAU,CAAC;IAsBhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA8B9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IA4BhB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiC/C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAQ7F,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAI3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAI1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAIvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAI3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAI1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAIvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAsDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA4B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAItD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAInD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAkBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAkCnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAmB1B,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAwDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;YAuBlB,eAAe;CAc9B"}
|
package/dist/engine/index.js
CHANGED
|
@@ -392,31 +392,13 @@ export class CriticalPathEngine {
|
|
|
392
392
|
const existing = await this.store.getTask(id);
|
|
393
393
|
if (!existing)
|
|
394
394
|
return null;
|
|
395
|
-
//
|
|
396
|
-
// Explicit options from trusted server-side code still take precedence.
|
|
395
|
+
// Identity comes from trusted options or the withActor view, never from the update payload.
|
|
397
396
|
options = options ?? (this.actor ? { actor: this.actor } : undefined);
|
|
398
|
-
const
|
|
399
|
-
const
|
|
400
|
-
|
|
401
|
-
|
|
402
|
-
|
|
403
|
-
'system';
|
|
404
|
-
const actorName = options?.actorName ||
|
|
405
|
-
claimed?.actorName ||
|
|
406
|
-
options?.actor?.username ||
|
|
407
|
-
claimed?.actor?.username ||
|
|
408
|
-
(actorId === 'system' ? 'System' : undefined);
|
|
409
|
-
const actorType = options?.actorType ||
|
|
410
|
-
claimed?.actorType ||
|
|
411
|
-
options?.actor?.actorType ||
|
|
412
|
-
claimed?.actor?.actorType ||
|
|
413
|
-
(actorId === 'system' ? 'system' : 'user');
|
|
414
|
-
const actorObj = options?.actor || claimed?.actor || {
|
|
415
|
-
userId: actorId,
|
|
416
|
-
username: actorName,
|
|
417
|
-
actorType
|
|
418
|
-
};
|
|
419
|
-
const { actorId: _aId, actorName: _aName, actorType: _aType, actor: _aObj, ...taskUpdates } = updates;
|
|
397
|
+
const actorId = options?.actorId || options?.actor?.userId || 'system';
|
|
398
|
+
const actorName = options?.actorName || options?.actor?.username || (actorId === 'system' ? 'System' : undefined);
|
|
399
|
+
const actorType = options?.actorType || options?.actor?.actorType || (actorId === 'system' ? 'system' : 'user');
|
|
400
|
+
const actorObj = options?.actor || { userId: actorId, username: actorName, actorType };
|
|
401
|
+
const taskUpdates = updates;
|
|
420
402
|
const project = await this.store.getProject(existing.projectId);
|
|
421
403
|
const workflow = await this.resolveProjectWorkflow(existing.projectId);
|
|
422
404
|
// Validate workflow transition invariant
|
|
@@ -925,10 +907,10 @@ export class CriticalPathEngine {
|
|
|
925
907
|
async getComment(id) {
|
|
926
908
|
return this.store.getComment(id);
|
|
927
909
|
}
|
|
928
|
-
async addComment(
|
|
929
|
-
|
|
930
|
-
|
|
931
|
-
|
|
910
|
+
async addComment(input) {
|
|
911
|
+
const comment = this.actor
|
|
912
|
+
? { ...input, authorId: this.actor.userId, authorType: this.actor.actorType ?? 'user' }
|
|
913
|
+
: { ...input, authorId: input.authorId ?? 'system' };
|
|
932
914
|
const mentions = comment.mentions ?? extractMentions(comment.content);
|
|
933
915
|
const created = await this.store.addComment({ ...comment, mentions });
|
|
934
916
|
const now = new Date().toISOString();
|
|
@@ -986,9 +968,8 @@ export class CriticalPathEngine {
|
|
|
986
968
|
}
|
|
987
969
|
return deleted;
|
|
988
970
|
}
|
|
989
|
-
async addCommentReaction(commentId,
|
|
990
|
-
|
|
991
|
-
reaction = { ...reaction, userId: this.actor.userId };
|
|
971
|
+
async addCommentReaction(commentId, input) {
|
|
972
|
+
const reaction = { emoji: input.emoji, userId: this.actor?.userId ?? input.userId ?? 'system' };
|
|
992
973
|
const existing = await this.store.getComment(commentId);
|
|
993
974
|
if (!existing)
|
|
994
975
|
return null;
|
|
@@ -1031,9 +1012,8 @@ export class CriticalPathEngine {
|
|
|
1031
1012
|
this.dispatchWebhook('comment.reaction.added', { comment: updated, reaction });
|
|
1032
1013
|
return updated;
|
|
1033
1014
|
}
|
|
1034
|
-
async removeCommentReaction(commentId,
|
|
1035
|
-
|
|
1036
|
-
reaction = { ...reaction, userId: this.actor.userId };
|
|
1015
|
+
async removeCommentReaction(commentId, input) {
|
|
1016
|
+
const reaction = { emoji: input.emoji, userId: this.actor?.userId ?? input.userId ?? 'system' };
|
|
1037
1017
|
const existing = await this.store.getComment(commentId);
|
|
1038
1018
|
if (!existing)
|
|
1039
1019
|
return null;
|
|
@@ -1071,10 +1051,10 @@ export class CriticalPathEngine {
|
|
|
1071
1051
|
async getAttachment(id) {
|
|
1072
1052
|
return this.store.getAttachment(id);
|
|
1073
1053
|
}
|
|
1074
|
-
async createAttachment(
|
|
1075
|
-
|
|
1076
|
-
|
|
1077
|
-
|
|
1054
|
+
async createAttachment(input) {
|
|
1055
|
+
const attachment = this.actor
|
|
1056
|
+
? { ...input, uploaderId: this.actor.userId, uploaderType: this.actor.actorType ?? 'user' }
|
|
1057
|
+
: { ...input, uploaderId: input.uploaderId ?? 'system' };
|
|
1078
1058
|
validateAttachmentUrl(attachment.url);
|
|
1079
1059
|
const created = await this.store.createAttachment(attachment);
|
|
1080
1060
|
const now = new Date().toISOString();
|
package/dist/engine/index.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAqCA,OAAO,EAAkB,aAAa,EAAE,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EA8Bf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,MAAM,4BAA4B,CAAC;AACvE,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,eAAe,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AACrE,OAAO,EAAE,YAAY,EAAmB,MAAM,kBAAkB,CAAC;AACjE,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvB,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IACzD,2FAA2F;IAC3E,KAAK,CAAS;IAE9B,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,CAAC,KAAK,GAAG,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI;YACpE,CAAC,CAAE,MAAM,CAAC,KAAwB;YAClC,CAAC,CAAC,IAAI,aAAa,EAAE,CAAC;QAExB,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QAEnC,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACxD,CAAC;IACH,CAAC;IAED;;;;;;OAMG;IACH,SAAS,CAAC,KAAY;QACpB,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACzD,MAAM,CAAC,cAAc,CAAC,MAAM,EAAE,OAAO,EAAE,EAAE,KAAK,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,GAAG,KAAK,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACjG,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,SAAS,CAAC,QAAgB;QAChC,OAAO,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;IACxC,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC1D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,CAAC,CAAC;QACpF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACxD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,OAAO,IAAI,QAAQ,CAAC;YACpD,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,cAAc,GAAa,EAAE,CAAC;QACpC,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,IAAI,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;gBACnC,cAAc,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC/B,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,cAAc,EAAE;aAChE,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,EAAE;gBACb,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,gBAAgB,EAAE,cAAc,CAAC,MAAM,EAAE;aAC1E,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,cAAc,EAAE,CAAC,CAAC;QAClG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,CAAC,UAAU,EAAE,CAAC;YACxC,SAAS,GAAG,EAAE,GAAG,SAAS,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC;QAC9D,CAAC;QACD,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,MAAM,SAAS,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,CAAC;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,0CAA0C;QAC1C,IAAI,OAAO,EAAE,sBAAsB,IAAI,CAAC,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CAAC,EAAE,CAAC;YAC/F,yBAAyB,CACvB,OAAO,CAAC,sBAAsB,EAC9B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CACtD,CAAC;QACJ,CAAC;QAED,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,cAAc,GAAG,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;QACvG,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC/K,MAAM,WAAW,GAAG,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAElI,MAAM,gBAAgB,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,IAAI,KAAK,CAAC;QAClF,MAAM,YAAY,GAAG,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,CAAC,gBAAgB,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC3J,MAAM,sBAAsB,GAAG,cAAc,CAAC,sBAAsB,IAAI,SAAS,CAAC,sBAAsB,CAAC;QAEzG,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,cAAc;YACd,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,WAAW;YACX,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,eAAe;YACf,sBAAsB;YACtB,YAAY;YACZ,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACzG,SAAS,EAAE,gBAAgB;YAC3B,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,IAAI;YAC9E,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,UAAU,IAAI,QAAQ,CAAC;YACvD,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC,EACD,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,sFAAsF;QACtF,wEAAwE;QACxE,OAAO,GAAG,OAAO,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,OAAO,CAAC;QAEjD,MAAM,OAAO,GACX,OAAO,EAAE,OAAO;YAChB,OAAO,EAAE,OAAO;YAChB,OAAO,EAAE,KAAK,EAAE,MAAM;YACtB,OAAO,EAAE,KAAK,EAAE,MAAM;YACtB,QAAQ,CAAC;QACX,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,EAAE,SAAS;YAClB,OAAO,EAAE,KAAK,EAAE,QAAQ;YACxB,OAAO,EAAE,KAAK,EAAE,QAAQ;YACxB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChD,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,EAAE,SAAS;YAClB,OAAO,EAAE,KAAK,EAAE,SAAS;YACzB,OAAO,EAAE,KAAK,EAAE,SAAS;YACzB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAC7C,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,OAAO,EAAE,KAAK,IAAI;YACnD,MAAM,EAAE,OAAO;YACf,QAAQ,EAAE,SAAS;YACnB,SAAS;SACV,CAAC;QAEF,MAAM,EACJ,OAAO,EAAE,IAAI,EACb,SAAS,EAAE,MAAM,EACjB,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,KAAK,EACZ,GAAG,WAAW,EACf,GAAG,OAAO,CAAC;QAEZ,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,yCAAyC;QACzC,IAAI,WAAW,CAAC,MAAM,IAAI,WAAW,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YACjE,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,CAAC,CAAC;YAC/F,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YACvF,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,OAAO,EAAE,sBAAsB,IAAI,WAAW,CAAC,YAAY,EAAE,CAAC;YAChE,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE;gBACxD,GAAG,QAAQ,CAAC,YAAY;gBACxB,GAAG,WAAW,CAAC,YAAY;aAC5B,CAAC,CAAC;QACL,CAAC;QAED,MAAM,gBAAgB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAC,CAAC;QAEjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;QACF,MAAM,YAAY,GAAG,gBAAgB,CAAC,MAAM;YAC1C,CAAC,CAAC,uBAAuB,CACrB,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD;YACH,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,iBAAiB,GAAG,YAAY,EAAE,QAAQ,IAAI,iBAAiB,CAAC,QAAQ,CAAC;QAE/E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,IAAI,YAAY,EAAE,CAAC;YAC3F,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,YAAY,CAAC,QAAQ,CAAC;YAE3F,gFAAgF;YAChF,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5F,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;gBAED,MAAM,YAAY,GAAG,gBAAgB,CAAC,YAAY,IAAI,QAAQ,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;YAED,2GAA2G;YAC3G,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5C,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,MAAM,aAAa,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;oBAC5D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;oBACrC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;gBAChC,IAAI,aAAa,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACpD,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;gBACD,yFAAyF;gBACzF,IACE,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,EACvF,CAAC;oBACD,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;wBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;oBAC7C,CAAC;oBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;wBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;oBAC3C,CAAC;oBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;wBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;oBAChC,CAAC;gBACH,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,YAAY,CAAC,QAAQ,KAAK,aAAa,EACvC,CAAC;gBACD,yFAAyF;gBACzF,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;oBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;gBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;oBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;gBAChC,CAAC;YACH,CAAC;YAED,oCAAoC;YACpC,IAAI,YAAY,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBAC1C,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC;oBAClC,gBAAgB,CAAC,WAAW,GAAG,GAAG,CAAC;gBACrC,CAAC;gBACD,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBAC9E,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;gBAChD,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mGAAmG;QACnG,IAAI,iBAAiB,KAAK,aAAa,EAAE,CAAC;YACxC,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC/C,MAAM,YAAY,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;gBAC3D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;gBACrC,CAAC,CAAC,UAAU,CAAC;YAEf,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;gBAChC,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACnC,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;gBACvC,MAAM,YAAY,GAAG,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,SAAS,KAAK,KAAK,IAAI,CAAC,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC,EAAE,CAAC;YAC5G,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;QACvC,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE;gBACnC,IAAI,EAAE,OAAO;gBACb,MAAM,EAAE,aAAa;aACtB,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;gBACrC,IAAI,EAAE,OAAO;aACd,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc,EAAE;YAC5E,IAAI,EAAE,OAAO;YACb,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;wBAChF,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;wBAC7B,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;4BAC5B,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;4BAC5D,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC,OAAO,EAAE,CAAC;4BACnC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;gCACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;gCAC7D,OAAO,CAAC,sBAAsB,GAAG,CAAC,UAAU,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;4BAC7F,CAAC;4BACD,OAAO,CAAC,YAAY,GAAG,IAAI,CAAC;wBAC9B,CAAC;oBACH,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;wBACvD,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;wBACjC,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;oBAEH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;wBACrC,IAAI,EAAE,iBAAiB;wBACvB,cAAc,EAAE,aAAa,CAAC,EAAE;qBACjC,CAAC,CAAC;gBACL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC;YAC1C,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,iDAAiD;QACjD,MAAM,aAAa,GAAG,MAAM,IAAI,CAAC,2BAA2B,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;QAClF,MAAM,UAAU,GAAG,qBAAqB,CAAC,aAAa,EAAE,GAAG,CAAC,CAAC;QAC7D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,2BAA2B,CAAC,WAAmB;QAC3D,MAAM,KAAK,GAAG,IAAI,GAAG,EAA0B,CAAC;QAChD,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;QAClC,IAAI,QAAQ,GAAG,CAAC,WAAW,CAAC,CAAC;QAE7B,OAAO,QAAQ,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YAC3B,MAAM,IAAI,GAAa,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;YACxF,QAAQ,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1C,KAAK,MAAM,IAAI,IAAI,OAAO,EAAE,CAAC;gBAC3B,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;oBACrB,+EAA+E;oBAC/E,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC;wBAAE,SAAS;oBACrC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;oBACnB,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,IAAI,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC;wBACzE,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC;oBAC/B,CAAC;gBACH,CAAC;YACH,CAAC;YACD,QAAQ,GAAG,IAAI,CAAC;QAClB,CAAC;QAED,OAAO,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACnF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACrF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACtD,MAAM,IAAI,eAAe,CAAC,yCAAyC,CAAC,CAAC;QACvE,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QACpD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YAC1E,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,OAAwD;QACvE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,OAAO,GAAG,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE,CAAC;QACpG,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,IAAI,IAAI,CAAC,KAAK;YAAE,QAAQ,GAAG,EAAE,GAAG,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC;QACtE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,wBAAwB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,IAAI,IAAI,CAAC,KAAK;YAAE,QAAQ,GAAG,EAAE,GAAG,QAAQ,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC;QACtE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,0BAA0B,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACjF,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAC5D,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;IACtC,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,UAA8D;QACnF,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,UAAU,GAAG,EAAE,GAAG,UAAU,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE,CAAC;QAC9G,CAAC;QACD,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,GAAG,EAAE,QAAQ,CAAC,GAAG,EAAE;aAClF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QAC3H,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,YAAY,KAAK,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;SACvI,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,aAAa,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QACnE,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC,OAAO,CAAC,CAAC;IACzD,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;IAC/B,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QAClE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACjD,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QAChF,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACtE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;gBACvC,IAAI,CAAC,eAAe,CAAC,4BAA4B,EAAE;oBACjD,WAAW,EAAE,OAAO;oBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B,CAAC,CAAC;YACL,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QACpG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QACnE,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACpE,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACtE,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;IACtF,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,aAAa,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,KAAmB,EAAE,OAAgC;QACjF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC;QAE5E,KAAK,MAAM,EAAE,IAAI,MAAM,EAAE,CAAC;YACxB,KAAK,CAAC,EAAE,CAAC,GAAG,EAAE;gBACZ,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC;aACpF,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE;gBACZ,yCAAyC;YAC3C,CAAC,CAAC,CAAC;QACL,CAAC;IACH,CAAC;CACF"}
|
|
1
|
+
{"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAqCA,OAAO,EAAkB,aAAa,EAAE,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EA8Bf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,MAAM,4BAA4B,CAAC;AACvE,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,eAAe,EAAE,aAAa,EAAE,MAAM,qBAAqB,CAAC;AACrE,OAAO,EAAE,YAAY,EAAmB,MAAM,kBAAkB,CAAC;AACjE,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvB,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IACzD,2FAA2F;IAC3E,KAAK,CAAS;IAE9B,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,CAAC,KAAK,GAAG,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI;YACpE,CAAC,CAAE,MAAM,CAAC,KAAwB;YAClC,CAAC,CAAC,IAAI,aAAa,EAAE,CAAC;QAExB,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QAEnC,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACxD,CAAC;IACH,CAAC;IAED;;;;;;OAMG;IACH,SAAS,CAAC,KAAY;QACpB,MAAM,MAAM,GAAG,MAAM,CAAC,MAAM,CAAC,IAAI,CAAuB,CAAC;QACzD,MAAM,CAAC,cAAc,CAAC,MAAM,EAAE,OAAO,EAAE,EAAE,KAAK,EAAE,MAAM,CAAC,MAAM,CAAC,EAAE,GAAG,KAAK,EAAE,CAAC,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACjG,OAAO,MAAM,CAAC;IAChB,CAAC;IAEO,SAAS,CAAC,QAAgB;QAChC,OAAO,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;IACxC,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC1D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,CAAC,CAAC;QACpF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACxD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,OAAO,IAAI,QAAQ,CAAC;YACpD,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;OAGG;IACH,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,cAAc,GAAa,EAAE,CAAC;QACpC,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,IAAI,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,CAAC;gBACnC,cAAc,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC/B,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,cAAc,EAAE;aAChE,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,EAAE;gBACb,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,gBAAgB,EAAE,cAAc,CAAC,MAAM,EAAE;aAC1E,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,cAAc,EAAE,CAAC,CAAC;QAClG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,IAAI,IAAI,CAAC,KAAK,IAAI,CAAC,SAAS,CAAC,UAAU,EAAE,CAAC;YACxC,SAAS,GAAG,EAAE,GAAG,SAAS,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC;QAC9D,CAAC;QACD,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,MAAM,SAAS,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,CAAC;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,0CAA0C;QAC1C,IAAI,OAAO,EAAE,sBAAsB,IAAI,CAAC,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CAAC,EAAE,CAAC;YAC/F,yBAAyB,CACvB,OAAO,CAAC,sBAAsB,EAC9B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CACtD,CAAC;QACJ,CAAC;QAED,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,cAAc,GAAG,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;QACvG,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC/K,MAAM,WAAW,GAAG,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAElI,MAAM,gBAAgB,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,IAAI,KAAK,CAAC;QAClF,MAAM,YAAY,GAAG,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,CAAC,gBAAgB,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC3J,MAAM,sBAAsB,GAAG,cAAc,CAAC,sBAAsB,IAAI,SAAS,CAAC,sBAAsB,CAAC;QAEzG,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,cAAc;YACd,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,WAAW;YACX,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,eAAe;YACf,sBAAsB;YACtB,YAAY;YACZ,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACzG,SAAS,EAAE,gBAAgB;YAC3B,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,IAAI;YAC9E,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC,UAAU,IAAI,QAAQ,CAAC;YACvD,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAAsB,EACtB,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,4FAA4F;QAC5F,OAAO,GAAG,OAAO,IAAI,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,OAAO,EAAE,OAAO,IAAI,OAAO,EAAE,KAAK,EAAE,MAAM,IAAI,QAAQ,CAAC;QACvE,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,QAAQ,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAClG,MAAM,SAAS,GACb,OAAO,EAAE,SAAS,IAAI,OAAO,EAAE,KAAK,EAAE,SAAS,IAAI,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAChG,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC;QACvF,MAAM,WAAW,GAAG,OAAO,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,yCAAyC;QACzC,IAAI,WAAW,CAAC,MAAM,IAAI,WAAW,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YACjE,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,CAAC,CAAC;YAC/F,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YACvF,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,OAAO,EAAE,sBAAsB,IAAI,WAAW,CAAC,YAAY,EAAE,CAAC;YAChE,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE;gBACxD,GAAG,QAAQ,CAAC,YAAY;gBACxB,GAAG,WAAW,CAAC,YAAY;aAC5B,CAAC,CAAC;QACL,CAAC;QAED,MAAM,gBAAgB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAC,CAAC;QAEjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;QACF,MAAM,YAAY,GAAG,gBAAgB,CAAC,MAAM;YAC1C,CAAC,CAAC,uBAAuB,CACrB,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD;YACH,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,iBAAiB,GAAG,YAAY,EAAE,QAAQ,IAAI,iBAAiB,CAAC,QAAQ,CAAC;QAE/E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,IAAI,YAAY,EAAE,CAAC;YAC3F,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,YAAY,CAAC,QAAQ,CAAC;YAE3F,gFAAgF;YAChF,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5F,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;gBAED,MAAM,YAAY,GAAG,gBAAgB,CAAC,YAAY,IAAI,QAAQ,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;YAED,2GAA2G;YAC3G,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5C,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,MAAM,aAAa,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;oBAC5D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;oBACrC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;gBAChC,IAAI,aAAa,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACpD,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;gBACD,yFAAyF;gBACzF,IACE,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,EACvF,CAAC;oBACD,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;wBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;oBAC7C,CAAC;oBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;wBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;oBAC3C,CAAC;oBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;wBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;oBAChC,CAAC;gBACH,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,YAAY,CAAC,QAAQ,KAAK,aAAa,EACvC,CAAC;gBACD,yFAAyF;gBACzF,IAAI,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAAE,CAAC;oBACjD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;gBACD,IAAI,QAAQ,CAAC,QAAQ,KAAK,GAAG,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,EAAE,CAAC;oBACzE,gBAAgB,CAAC,QAAQ,GAAG,CAAC,CAAC;gBAChC,CAAC;YACH,CAAC;YAED,oCAAoC;YACpC,IAAI,YAAY,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBAC1C,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,WAAW,EAAE,CAAC;oBAClC,gBAAgB,CAAC,WAAW,GAAG,GAAG,CAAC;gBACrC,CAAC;gBACD,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBAC9E,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;iBAAM,IAAI,YAAY,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;gBAChD,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;oBACpC,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACvC,CAAC;gBACD,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;oBAC/C,gBAAgB,CAAC,WAAW,GAAG,SAAS,CAAC;gBAC3C,CAAC;YACH,CAAC;QACH,CAAC;QAED,mGAAmG;QACnG,IAAI,iBAAiB,KAAK,aAAa,EAAE,CAAC;YACxC,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC/C,MAAM,YAAY,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;gBAC3D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;gBACrC,CAAC,CAAC,UAAU,CAAC;YAEf,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;gBAChC,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACnC,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;gBACvC,MAAM,YAAY,GAAG,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,SAAS,KAAK,KAAK,IAAI,CAAC,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC,EAAE,CAAC;YAC5G,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;QACvC,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE;gBACnC,IAAI,EAAE,OAAO;gBACb,MAAM,EAAE,aAAa;aACtB,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;gBACrC,IAAI,EAAE,OAAO;aACd,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc,EAAE;YAC5E,IAAI,EAAE,OAAO;YACb,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;wBAChF,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;wBAC7B,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;4BAC5B,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;4BAC5D,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC,OAAO,EAAE,CAAC;4BACnC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;gCACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;gCAC7D,OAAO,CAAC,sBAAsB,GAAG,CAAC,UAAU,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;4BAC7F,CAAC;4BACD,OAAO,CAAC,YAAY,GAAG,IAAI,CAAC;wBAC9B,CAAC;oBACH,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;wBACvD,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;wBACjC,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;oBAEH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;wBACrC,IAAI,EAAE,iBAAiB;wBACvB,cAAc,EAAE,aAAa,CAAC,EAAE;qBACjC,CAAC,CAAC;gBACL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC;YAC1C,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,iDAAiD;QACjD,MAAM,aAAa,GAAG,MAAM,IAAI,CAAC,2BAA2B,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;QAClF,MAAM,UAAU,GAAG,qBAAqB,CAAC,aAAa,EAAE,GAAG,CAAC,CAAC;QAC7D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED;;;;OAIG;IACK,KAAK,CAAC,2BAA2B,CAAC,WAAmB;QAC3D,MAAM,KAAK,GAAG,IAAI,GAAG,EAA0B,CAAC;QAChD,MAAM,OAAO,GAAG,IAAI,GAAG,EAAU,CAAC;QAClC,IAAI,QAAQ,GAAG,CAAC,WAAW,CAAC,CAAC;QAE7B,OAAO,QAAQ,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YAC3B,MAAM,IAAI,GAAa,EAAE,CAAC;YAC1B,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;YACxF,QAAQ,CAAC,OAAO,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,OAAO,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;YAE1C,KAAK,MAAM,IAAI,IAAI,OAAO,EAAE,CAAC;gBAC3B,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;oBACrB,+EAA+E;oBAC/E,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,MAAM,CAAC;wBAAE,SAAS;oBACrC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC;oBACnB,IAAI,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC,CAAC,eAAe,CAAC,IAAI,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,CAAC,eAAe,CAAC,EAAE,CAAC;wBACzE,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC;oBAC/B,CAAC;gBACH,CAAC;YACH,CAAC;YACD,QAAQ,GAAG,IAAI,CAAC;QAClB,CAAC;QAED,OAAO,KAAK,CAAC,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACnF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACrF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACtD,MAAM,IAAI,eAAe,CAAC,yCAAyC,CAAC,CAAC;QACvE,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QACpD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YAC1E,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,UAAU,CACd,KAA2F;QAE3F,MAAM,OAAO,GAAoD,IAAI,CAAC,KAAK;YACzE,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YACvF,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,QAAQ,EAAE,CAAC;QACvD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,KAAyC;QACnF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,wBAAwB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,KAAyC;QACtF,MAAM,QAAQ,GAAG,EAAE,KAAK,EAAE,KAAK,CAAC,KAAK,EAAE,MAAM,EAAE,IAAI,CAAC,KAAK,EAAE,MAAM,IAAI,KAAK,CAAC,MAAM,IAAI,QAAQ,EAAE,CAAC;QAChG,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,0BAA0B,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACjF,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAC5D,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;IACtC,CAAC;IAED,KAAK,CAAC,gBAAgB,CACpB,KAAkG;QAElG,MAAM,UAAU,GAAuD,IAAI,CAAC,KAAK;YAC/E,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,MAAM,EAAE,YAAY,EAAE,IAAI,CAAC,KAAK,CAAC,SAAS,IAAI,MAAM,EAAE;YAC3F,CAAC,CAAC,EAAE,GAAG,KAAK,EAAE,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,QAAQ,EAAE,CAAC;QAC3D,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,GAAG,EAAE,QAAQ,CAAC,GAAG,EAAE;aAClF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QAC3H,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,YAAY,KAAK,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;SACvI,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,aAAa,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QACnE,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC,OAAO,CAAC,CAAC;IACzD,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;IAC/B,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QAClE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACjD,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QAChF,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;YACjC,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACtE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;gBACvC,IAAI,CAAC,eAAe,CAAC,4BAA4B,EAAE;oBACjD,WAAW,EAAE,OAAO;oBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B,CAAC,CAAC;YACL,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;gBACjC,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QACpG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QACnE,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACpE,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACtE,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;IACtF,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,aAAa,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QACvE,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,KAAmB,EAAE,OAAgC;QACjF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC;QAE5E,KAAK,MAAM,EAAE,IAAI,MAAM,EAAE,CAAC;YACxB,KAAK,CAAC,EAAE,CAAC,GAAG,EAAE;gBACZ,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC;aACpF,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE;gBACZ,yCAAyC;YAC3C,CAAC,CAAC,CAAC;QACL,CAAC;IACH,CAAC;CACF"}
|
package/dist/index.test.js
CHANGED
|
@@ -405,11 +405,7 @@ describe('CriticalPathEngine Core Tests', () => {
|
|
|
405
405
|
receivedEvents.push(evt);
|
|
406
406
|
});
|
|
407
407
|
// Update with explicit actor (e.g. human user updating an assigned agent task)
|
|
408
|
-
await engine.updateTask(task.id, {
|
|
409
|
-
status: 'in_progress',
|
|
410
|
-
actorId: 'user_human_42',
|
|
411
|
-
actorName: 'Jack James'
|
|
412
|
-
});
|
|
408
|
+
await engine.updateTask(task.id, { status: 'in_progress' }, { actorId: 'user_human_42', actorName: 'Jack James' });
|
|
413
409
|
const activities = await engine.store.getActivities({ taskId: task.id });
|
|
414
410
|
const statusActivity = activities.find((a) => a.action === 'task.status_changed');
|
|
415
411
|
expect(statusActivity).toBeDefined();
|