@critical-path/core 0.23.0 → 0.25.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,55 @@
1
1
  # @critical-path/core
2
2
 
3
+ ## 0.25.0
4
+
5
+ ### Minor Changes
6
+
7
+ - fd79762: **BREAKING:** strict request bodies, no identity in payloads, and CORS off by default.
8
+
9
+ **@critical-path/core**
10
+ - Request schemas are strict: unknown keys, server-assigned fields and identity fields are rejected instead of stripped.
11
+ - Identity is never read from payloads. `updateTask` no longer reads `actorId`/`actorName`/`actorType`/`actor` from the update object; pass them as the third `options` argument or use `withActor`. `addComment`, `addCommentReaction`, `removeCommentReaction` and `createAttachment` take the actor from `withActor`, falling back to an optional `authorId`/`userId`/`uploaderId`, then `'system'`.
12
+ - Schemas export request body types (`CreateTaskBody`, `UpdateTaskBody`, ...).
13
+
14
+ **@critical-path/server**
15
+ - Bodies containing unknown, server-assigned or identity fields return `400`.
16
+ - Every request runs as the `getContext` user, or `ANONYMOUS_ACTOR` (`anonymous`). Authors of comments, reactions, attachments and time entries are no longer accepted from bodies.
17
+ - `DELETE /comments/:id/reactions` takes `?emoji=` only.
18
+ - CORS is off by default (`cors: false`). Pass `cors: { origins: [...] }` to allow cross-origin browsers.
19
+
20
+ **@critical-path/client**
21
+ - Method parameters use the server's body types, so identity fields no longer type-check. `addCommentReaction`/`removeCommentReaction` take `{ emoji }`; `addTodo`/`toggleTodo` drop the actor options argument.
22
+ - New `updateProject`, `deleteProject` and `addDependency`. `uploadAttachmentFile` base64-encodes binary data (previously it sent unusable JSON for `Uint8Array`/`ArrayBuffer`).
23
+ - CLI: `--author`, `--actor-id`, `--actor-name`, `--agent-name` and `CRITICAL_PATH_AUTHOR_ID`/`ACTOR_ID`/`AGENT_NAME` are removed; identity comes from the `--key` token via the server's `getContext`.
24
+
25
+ **@critical-path/mcp**
26
+ - Tool arguments are strict: undeclared arguments return an `isError` result.
27
+ - `add_comment` no longer takes `authorId`. With an `engine`, writes are attributed to the new `actor` server option (default `DEFAULT_MCP_ACTOR`).
28
+
29
+ **@critical-path/react / @critical-path/svelte**
30
+ - `addReaction`/`removeReaction` take `(commentId, emoji)`; comment and attachment inputs no longer accept `authorId`/`uploaderId`. Task, comment and deliverable update parameters use the schema body types.
31
+
32
+ ## 0.24.0
33
+
34
+ ### Minor Changes
35
+
36
+ - b54e22c: Validate request bodies with shared zod schemas and publish an OpenAPI document.
37
+
38
+ **@critical-path/core**
39
+ - New `@critical-path/core/schemas` subpath with create/update schemas for every resource and `parsePayload(schema, data)`. Kept off the package root so browser bundles do not include zod. `zod` is now a dependency of core.
40
+ - `ValidationError` carries an optional `issues: { path, message }[]`.
41
+
42
+ **@critical-path/server**
43
+ - All request bodies are validated. Invalid bodies return `400` with `issues`. Server-assigned fields (`id`, `createdAt`, `updatedAt`, task `key`, owning `projectId` on updates) and unknown keys are stripped, so a `PATCH` can no longer move a task to another project.
44
+ - Comments, reactions and attachments require an author unless `getContext` resolves the caller. Attachment `mimeType` and `sizeBytes` default to `application/octet-stream` and `0` for linked files.
45
+ - New `GET /openapi.json` and `buildOpenApiDocument()` (OpenAPI 3.1, request bodies generated from the validation schemas).
46
+
47
+ **@critical-path/mcp**
48
+ - Tool `inputSchema`s are generated from their zod schemas via the new `defineTool`, removing the hand-written JSON copies.
49
+
50
+ **@critical-path/svelte**
51
+ - Rebuilt with the bundled `@critical-path/mcp` changes.
52
+
3
53
  ## 0.23.0
4
54
 
5
55
  ### Minor Changes
package/README.md CHANGED
@@ -122,15 +122,26 @@ try {
122
122
 
123
123
  Cycle detection follows the full upstream chain, so indirect cycles (A → B → C → D → A) are rejected as well as direct ones.
124
124
 
125
+ #### Request Payload Schemas (`@critical-path/core/schemas`)
126
+
127
+ ```ts
128
+ import { CreateTaskSchema, UpdateTaskSchema, parsePayload } from '@critical-path/core/schemas';
129
+
130
+ const input = parsePayload(CreateTaskSchema, await request.json()); // throws ValidationError with `issues`
131
+ await engine.createTask(input);
132
+ ```
133
+
134
+ Create and update schemas exist for workflows, projects, tasks, dependencies, deliverables, teams, containers, iterations, comments, reactions, attachments and time entries. They are strict: server-assigned fields, identity fields and unknown keys are rejected. The schemas live on a subpath so importing `@critical-path/core` in a browser bundle does not pull in zod. A compile-time test fails the build if a domain type gains a field its schema lacks.
135
+
125
136
  #### Attributing Mutations to a User (`withActor`)
126
137
 
127
138
  ```ts
128
139
  const asAlice = engine.withActor({ userId: 'alice', username: 'Alice' });
129
140
  await asAlice.updateTask(taskId, { status: 'in_progress' }); // activity actorId: 'alice'
130
- await asAlice.addComment({ taskId, content: 'On it', authorId: 'ignored' }); // authorId: 'alice'
141
+ await asAlice.addComment({ taskId, content: 'On it' }); // authorId: 'alice'
131
142
  ```
132
143
 
133
- `withActor` returns a per-request view that shares the store, plugins and event bus with the base engine. On the view, identity fields in payloads (`actorId`, `authorId`, reaction `userId`, time entry `userId`, `uploaderId`) are replaced by the actor, and new tasks default `reporterId` to it. Explicit `updateTask(id, updates, { actorId })` options still win, for trusted server-side automation. `@critical-path/server` creates these views from its `getContext` option.
144
+ `withActor` returns a per-request view that shares the store, plugins and event bus with the base engine. On the view, every write is attributed to the actor: activity log entries, comment authors, reactions, time entries, attachment uploaders, and the default task `reporterId`. `updateTask` never reads identity from the update payload; trusted server-side automation can pass `updateTask(id, updates, { actorId })` explicitly. Without a view, `addComment`, reactions and `createAttachment` accept an optional `authorId` / `userId` / `uploaderId` and fall back to `'system'`. `@critical-path/server` runs every request through a view (the resolved user, or `anonymous`).
134
145
 
135
146
  Other domain errors are exported for callers and route handlers to map: `ValidationError` (bad input, e.g. non-positive logged hours) and `NotFoundError` (missing referenced entity). `engine.deleteProject(id)` deletes a project and its tasks through `deleteTask`, then publishes `project.deleted`.
136
147
 
@@ -1,8 +1,14 @@
1
1
  /**
2
2
  * Thrown when input fails a domain rule. Route handlers map it to HTTP 400.
3
3
  */
4
+ export interface ValidationIssue {
5
+ /** Dot-separated path to the invalid field, e.g. `todos.0.title`. Empty for the whole payload. */
6
+ path: string;
7
+ message: string;
8
+ }
4
9
  export declare class ValidationError extends Error {
5
- constructor(message: string);
10
+ readonly issues?: ValidationIssue[];
11
+ constructor(message: string, issues?: ValidationIssue[]);
6
12
  }
7
13
  /**
8
14
  * Thrown when a referenced entity does not exist. Route handlers map it to HTTP 404.
@@ -1 +1 @@
1
- {"version":3,"file":"errors.d.ts","sourceRoot":"","sources":["../../src/domain/errors.ts"],"names":[],"mappings":"AAAA;;GAEG;AACH,qBAAa,eAAgB,SAAQ,KAAK;gBAC5B,OAAO,EAAE,MAAM;CAI5B;AAED;;GAEG;AACH,qBAAa,aAAc,SAAQ,KAAK;gBAC1B,OAAO,EAAE,MAAM;CAI5B"}
1
+ {"version":3,"file":"errors.d.ts","sourceRoot":"","sources":["../../src/domain/errors.ts"],"names":[],"mappings":"AAAA;;GAEG;AACH,MAAM,WAAW,eAAe;IAC9B,kGAAkG;IAClG,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;CACjB;AAED,qBAAa,eAAgB,SAAQ,KAAK;IACxC,SAAgB,MAAM,CAAC,EAAE,eAAe,EAAE,CAAC;gBAE/B,OAAO,EAAE,MAAM,EAAE,MAAM,CAAC,EAAE,eAAe,EAAE;CAKxD;AAED;;GAEG;AACH,qBAAa,aAAc,SAAQ,KAAK;gBAC1B,OAAO,EAAE,MAAM;CAI5B"}
@@ -1,10 +1,9 @@
1
- /**
2
- * Thrown when input fails a domain rule. Route handlers map it to HTTP 400.
3
- */
4
1
  export class ValidationError extends Error {
5
- constructor(message) {
2
+ issues;
3
+ constructor(message, issues) {
6
4
  super(message);
7
5
  this.name = 'ValidationError';
6
+ this.issues = issues;
8
7
  }
9
8
  }
10
9
  /**
@@ -1 +1 @@
1
- {"version":3,"file":"errors.js","sourceRoot":"","sources":["../../src/domain/errors.ts"],"names":[],"mappings":"AAAA;;GAEG;AACH,MAAM,OAAO,eAAgB,SAAQ,KAAK;IACxC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,iBAAiB,CAAC;IAChC,CAAC;CACF;AAED;;GAEG;AACH,MAAM,OAAO,aAAc,SAAQ,KAAK;IACtC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,eAAe,CAAC;IAC9B,CAAC;CACF"}
1
+ {"version":3,"file":"errors.js","sourceRoot":"","sources":["../../src/domain/errors.ts"],"names":[],"mappings":"AASA,MAAM,OAAO,eAAgB,SAAQ,KAAK;IACxB,MAAM,CAAqB;IAE3C,YAAY,OAAe,EAAE,MAA0B;QACrD,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,iBAAiB,CAAC;QAC9B,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;IACvB,CAAC;CACF;AAED;;GAEG;AACH,MAAM,OAAO,aAAc,SAAQ,KAAK;IACtC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,eAAe,CAAC;IAC9B,CAAC;CACF"}
@@ -7,6 +7,7 @@ describe('CriticalPathEngine.withActor', () => {
7
7
  const project = await alice.createProject({ key: 'ACT', name: 'Actors', ownerId: 'mallory' });
8
8
  const task = await alice.createTask({ projectId: project.id, title: 'Scoped' });
9
9
  expect(task.reporterId).toBe('alice');
10
+ // Identity in the payload is not part of the update type at all; cast to simulate an untyped caller
10
11
  await alice.updateTask(task.id, { title: 'Renamed', actorId: 'ceo', actor: { userId: 'ceo' } });
11
12
  const comment = await alice.addComment({ taskId: task.id, content: 'hi', authorId: 'ceo', authorType: 'agent' });
12
13
  const reacted = await alice.addCommentReaction(comment.id, { emoji: '👍', userId: 'ceo' });
@@ -1 +1 @@
1
- {"version":3,"file":"actor.test.js","sourceRoot":"","sources":["../../src/engine/actor.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AAEjD,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;IAC5C,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;QACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,KAAK,GAAG,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAEvE,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;QAC9F,MAAM,IAAI,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEtC,MAAM,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,EAAE,MAAM,EAAE,KAAK,EAAE,EAAE,CAAC,CAAC;QAChG,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACjH,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC;QAC3F,MAAM,KAAK,GAAG,MAAM,KAAK,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,MAAM,EAAE,KAAK,EAAS,CAAC,CAAC;QACvF,MAAM,UAAU,GAAG,MAAM,KAAK,CAAC,gBAAgB,CAAC;YAC9C,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,UAAU,EAAE,KAAK;YACjB,QAAQ,EAAE,SAAS;YACnB,QAAQ,EAAE,eAAe;YACzB,SAAS,EAAE,CAAC;YACZ,GAAG,EAAE,6BAA6B;SACnC,CAAC,CAAC;QAEH,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACvC,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACrD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAE5C,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC;QAC/E,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAC7C,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACpE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,qEAAqE,EAAE,KAAK,IAAI,EAAE;QACnF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAE9E,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YAC/B,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC;YACnF,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC;SACpF,CAAC,CAAC;QACH,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,aAAa,EAAE,CAAC;QAErC,yCAAyC;QACzC,MAAM,CAAC,MAAM,MAAM,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;IACpD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;QAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;QAC5E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;QAE5E,MAAM,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,EAAE,EAAE,OAAO,EAAE,YAAY,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACzE,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,YAAY,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
1
+ {"version":3,"file":"actor.test.js","sourceRoot":"","sources":["../../src/engine/actor.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,aAAa,CAAC;AAEjD,QAAQ,CAAC,8BAA8B,EAAE,GAAG,EAAE;IAC5C,EAAE,CAAC,mFAAmF,EAAE,KAAK,IAAI,EAAE;QACjG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,KAAK,GAAG,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAEvE,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,QAAQ,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;QAC9F,MAAM,IAAI,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEtC,oGAAoG;QACpG,MAAM,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,SAAS,EAAE,OAAO,EAAE,KAAK,EAAE,KAAK,EAAE,EAAE,MAAM,EAAE,KAAK,EAAE,EAAS,CAAC,CAAC;QACvG,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,OAAO,EAAE,IAAI,EAAE,QAAQ,EAAE,KAAK,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACjH,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC;QAC3F,MAAM,KAAK,GAAG,MAAM,KAAK,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,CAAC,EAAE,MAAM,EAAE,KAAK,EAAS,CAAC,CAAC;QACvF,MAAM,UAAU,GAAG,MAAM,KAAK,CAAC,gBAAgB,CAAC;YAC9C,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,UAAU,EAAE,KAAK;YACjB,QAAQ,EAAE,SAAS;YACnB,QAAQ,EAAE,eAAe;YACzB,SAAS,EAAE,CAAC;YACZ,GAAG,EAAE,6BAA6B;SACnC,CAAC,CAAC;QAEH,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACvC,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,CAAC,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACrD,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,MAAM,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAE5C,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,CAAC,CAAC;QAC/E,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;QAC7C,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,OAAO,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACpE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,qEAAqE,EAAE,KAAK,IAAI,EAAE;QACnF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,CAAC;QAE9E,MAAM,CAAC,CAAC,EAAE,CAAC,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YAC/B,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC;YACnF,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC;SACpF,CAAC,CAAC;QACH,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,CAAC,CAAC,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/B,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,aAAa,EAAE,CAAC;QAErC,yCAAyC;QACzC,MAAM,CAAC,MAAM,MAAM,CAAC,OAAO,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;IACpD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;QAChF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,CAAC;QAC5E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;QAE5E,MAAM,MAAM,CAAC,SAAS,CAAC,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,EAAE,EAAE,OAAO,EAAE,YAAY,EAAE,CAAC,CAAC;QAC5G,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACzE,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,KAAK,YAAY,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACxE,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
@@ -45,16 +45,7 @@ export declare class CriticalPathEngine {
45
45
  getTasks(projectId?: string): Promise<Task[]>;
46
46
  getTask(id: string): Promise<Task | null>;
47
47
  createTask(taskInput: CreateTaskInput): Promise<Task>;
48
- updateTask(id: string, updates: Partial<Task> & {
49
- actorId?: string;
50
- actorName?: string;
51
- actorType?: string;
52
- actor?: {
53
- userId: string;
54
- username?: string;
55
- actorType?: string;
56
- };
57
- }, options?: {
48
+ updateTask(id: string, updates: Partial<Task>, options?: {
58
49
  actorId?: string;
59
50
  actorName?: string;
60
51
  actorType?: string;
@@ -84,16 +75,18 @@ export declare class CriticalPathEngine {
84
75
  }): Promise<TimeEntry>;
85
76
  getComments(taskId: string): Promise<Comment[]>;
86
77
  getComment(id: string): Promise<Comment | null>;
87
- addComment(comment: Omit<Comment, 'id' | 'createdAt' | 'updatedAt'>): Promise<Comment>;
78
+ addComment(input: Omit<Comment, 'id' | 'createdAt' | 'updatedAt' | 'authorId'> & {
79
+ authorId?: string;
80
+ }): Promise<Comment>;
88
81
  updateComment(id: string, updates: Partial<Comment>): Promise<Comment | null>;
89
82
  deleteComment(id: string): Promise<boolean>;
90
- addCommentReaction(commentId: string, reaction: {
83
+ addCommentReaction(commentId: string, input: {
91
84
  emoji: string;
92
- userId: string;
85
+ userId?: string;
93
86
  }): Promise<Comment | null>;
94
- removeCommentReaction(commentId: string, reaction: {
87
+ removeCommentReaction(commentId: string, input: {
95
88
  emoji: string;
96
- userId: string;
89
+ userId?: string;
97
90
  }): Promise<Comment | null>;
98
91
  getAttachments(filter?: {
99
92
  taskId?: string;
@@ -102,13 +95,15 @@ export declare class CriticalPathEngine {
102
95
  artifactType?: string;
103
96
  }): Promise<Attachment[]>;
104
97
  getAttachment(id: string): Promise<Attachment | null>;
105
- createAttachment(attachment: Omit<Attachment, 'id' | 'createdAt' | 'updatedAt'>): Promise<Attachment>;
98
+ createAttachment(input: Omit<Attachment, 'id' | 'createdAt' | 'updatedAt' | 'uploaderId'> & {
99
+ uploaderId?: string;
100
+ }): Promise<Attachment>;
106
101
  deleteAttachment(id: string): Promise<boolean>;
107
102
  uploadAttachmentFile(input: UploadFileInput & {
108
103
  taskId?: string;
109
104
  projectId?: string;
110
105
  commentId?: string;
111
- uploaderId: string;
106
+ uploaderId?: string;
112
107
  uploaderType?: 'user' | 'agent' | 'system';
113
108
  artifactType?: 'plan' | 'spec' | 'deliverable' | 'review' | 'general';
114
109
  metadata?: Record<string, unknown>;
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,KAAK,EACL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EAET,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EA8Bf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;gBAElB,MAAM,GAAE,kBAAuB;IAqB3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,OAAO,CAAC,SAAS;YAIH,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAInC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAIjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA2BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAgBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAIjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAwBzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAqC3C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAI7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAkGrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG;QACvB,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,EACD,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YA2VT,8BAA8B;IA6EtC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsCxC,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IAwB7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IA6BpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IAwC1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAI/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,UAAU,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAsBtF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAyB7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8C3G,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC9G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAQlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;IAIrD,gBAAgB,CAAC,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAsBrG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA8B9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,EAAE,MAAM,CAAC;QACnB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IA4BhB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiC/C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAQ7F,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAI3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAI1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAIvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAI3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAI1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAIvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAsDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA4B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAItD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAInD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAkBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAkCnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAmB1B,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAwDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;YAuBlB,eAAe;CAc9B"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,KAAK,EACL,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EAET,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EA8Bf,MAAM,qBAAqB,CAAC;AAK7B,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;IACzD,2FAA2F;IAC3F,SAAgB,KAAK,CAAC,EAAE,KAAK,CAAC;gBAElB,MAAM,GAAE,kBAAuB;IAqB3C;;;;;;OAMG;IACH,SAAS,CAAC,KAAK,EAAE,KAAK,GAAG,kBAAkB;IAM3C,OAAO,CAAC,SAAS;YAIH,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAInC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAIjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA2BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAgBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAIjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAwBzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA4BnF;;;OAGG;IACG,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAqC3C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAI7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAkGrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EACtB,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YAgUT,8BAA8B;IA6EtC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsCxC,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IAwB7E;;;;OAIG;YACW,2BAA2B;IA0BnC,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IA6BpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IAwC1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAI/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,UAAU,CACd,KAAK,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAC1F,OAAO,CAAC,OAAO,CAAC;IAsBb,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAyB7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA8CzG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAiC5G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAQlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;IAIrD,gBAAgB,CACpB,KAAK,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,YAAY,CAAC,GAAG;QAAE,UAAU,CAAC,EAAE,MAAM,CAAA;KAAE,GACjG,OAAO,CAAC,UAAU,CAAC;IAsBhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA8B9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IA4BhB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiC/C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAQ7F,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAI3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAI1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAIvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAI3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAI1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAIvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAsDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA4B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAItD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAInD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAkBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAkCnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAmB1B,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAwDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;YAuBlB,eAAe;CAc9B"}
@@ -392,31 +392,13 @@ export class CriticalPathEngine {
392
392
  const existing = await this.store.getTask(id);
393
393
  if (!existing)
394
394
  return null;
395
- // On a withActor view, the scoped actor replaces any identity claimed in the payload.
396
- // Explicit options from trusted server-side code still take precedence.
395
+ // Identity comes from trusted options or the withActor view, never from the update payload.
397
396
  options = options ?? (this.actor ? { actor: this.actor } : undefined);
398
- const claimed = this.actor ? undefined : updates;
399
- const actorId = options?.actorId ||
400
- claimed?.actorId ||
401
- options?.actor?.userId ||
402
- claimed?.actor?.userId ||
403
- 'system';
404
- const actorName = options?.actorName ||
405
- claimed?.actorName ||
406
- options?.actor?.username ||
407
- claimed?.actor?.username ||
408
- (actorId === 'system' ? 'System' : undefined);
409
- const actorType = options?.actorType ||
410
- claimed?.actorType ||
411
- options?.actor?.actorType ||
412
- claimed?.actor?.actorType ||
413
- (actorId === 'system' ? 'system' : 'user');
414
- const actorObj = options?.actor || claimed?.actor || {
415
- userId: actorId,
416
- username: actorName,
417
- actorType
418
- };
419
- const { actorId: _aId, actorName: _aName, actorType: _aType, actor: _aObj, ...taskUpdates } = updates;
397
+ const actorId = options?.actorId || options?.actor?.userId || 'system';
398
+ const actorName = options?.actorName || options?.actor?.username || (actorId === 'system' ? 'System' : undefined);
399
+ const actorType = options?.actorType || options?.actor?.actorType || (actorId === 'system' ? 'system' : 'user');
400
+ const actorObj = options?.actor || { userId: actorId, username: actorName, actorType };
401
+ const taskUpdates = updates;
420
402
  const project = await this.store.getProject(existing.projectId);
421
403
  const workflow = await this.resolveProjectWorkflow(existing.projectId);
422
404
  // Validate workflow transition invariant
@@ -925,10 +907,10 @@ export class CriticalPathEngine {
925
907
  async getComment(id) {
926
908
  return this.store.getComment(id);
927
909
  }
928
- async addComment(comment) {
929
- if (this.actor) {
930
- comment = { ...comment, authorId: this.actor.userId, authorType: this.actor.actorType ?? 'user' };
931
- }
910
+ async addComment(input) {
911
+ const comment = this.actor
912
+ ? { ...input, authorId: this.actor.userId, authorType: this.actor.actorType ?? 'user' }
913
+ : { ...input, authorId: input.authorId ?? 'system' };
932
914
  const mentions = comment.mentions ?? extractMentions(comment.content);
933
915
  const created = await this.store.addComment({ ...comment, mentions });
934
916
  const now = new Date().toISOString();
@@ -986,9 +968,8 @@ export class CriticalPathEngine {
986
968
  }
987
969
  return deleted;
988
970
  }
989
- async addCommentReaction(commentId, reaction) {
990
- if (this.actor)
991
- reaction = { ...reaction, userId: this.actor.userId };
971
+ async addCommentReaction(commentId, input) {
972
+ const reaction = { emoji: input.emoji, userId: this.actor?.userId ?? input.userId ?? 'system' };
992
973
  const existing = await this.store.getComment(commentId);
993
974
  if (!existing)
994
975
  return null;
@@ -1031,9 +1012,8 @@ export class CriticalPathEngine {
1031
1012
  this.dispatchWebhook('comment.reaction.added', { comment: updated, reaction });
1032
1013
  return updated;
1033
1014
  }
1034
- async removeCommentReaction(commentId, reaction) {
1035
- if (this.actor)
1036
- reaction = { ...reaction, userId: this.actor.userId };
1015
+ async removeCommentReaction(commentId, input) {
1016
+ const reaction = { emoji: input.emoji, userId: this.actor?.userId ?? input.userId ?? 'system' };
1037
1017
  const existing = await this.store.getComment(commentId);
1038
1018
  if (!existing)
1039
1019
  return null;
@@ -1071,10 +1051,10 @@ export class CriticalPathEngine {
1071
1051
  async getAttachment(id) {
1072
1052
  return this.store.getAttachment(id);
1073
1053
  }
1074
- async createAttachment(attachment) {
1075
- if (this.actor) {
1076
- attachment = { ...attachment, uploaderId: this.actor.userId, uploaderType: this.actor.actorType ?? 'user' };
1077
- }
1054
+ async createAttachment(input) {
1055
+ const attachment = this.actor
1056
+ ? { ...input, uploaderId: this.actor.userId, uploaderType: this.actor.actorType ?? 'user' }
1057
+ : { ...input, uploaderId: input.uploaderId ?? 'system' };
1078
1058
  validateAttachmentUrl(attachment.url);
1079
1059
  const created = await this.store.createAttachment(attachment);
1080
1060
  const now = new Date().toISOString();