@critical-path/core 0.20.1 → 0.20.2

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
@@ -266,6 +266,9 @@ export class CriticalPathEngine {
266
266
  const actualStartDate = processedInput.actualStartDate ?? taskInput.actualStartDate ?? (statusDef.category === 'in_progress' ? now : undefined);
267
267
  const inProgressSince = processedInput.inProgressSince ?? taskInput.inProgressSince ?? (statusDef.category === 'in_progress' ? now : undefined);
268
268
  const actualEndDate = processedInput.actualEndDate ?? taskInput.actualEndDate ?? ((statusDef.category === 'completed' || statusDef.category === 'canceled') ? now : undefined);
269
+ const isInitialBlocked = processedInput.isBlocked ?? taskInput.isBlocked ?? false;
270
+ const blockedSince = processedInput.blockedSince ?? taskInput.blockedSince ?? (isInitialBlocked && statusDef.category === 'in_progress' ? now : undefined);
271
+ const blockedDurationSeconds = processedInput.blockedDurationSeconds ?? taskInput.blockedDurationSeconds;
269
272
  const created = await this.store.createTask({
270
273
  projectId,
271
274
  title: processedInput.title || taskInput.title,
@@ -295,8 +298,10 @@ export class CriticalPathEngine {
295
298
  billableDurationMinutes: processedInput.billableDurationMinutes ?? taskInput.billableDurationMinutes,
296
299
  actualDurationSeconds: processedInput.actualDurationSeconds ?? taskInput.actualDurationSeconds,
297
300
  inProgressSince,
301
+ blockedDurationSeconds,
302
+ blockedSince,
298
303
  progress: processedInput.progress ?? taskInput.progress ?? (statusDef.category === 'completed' ? 100 : 0),
299
- isBlocked: processedInput.isBlocked ?? taskInput.isBlocked ?? false,
304
+ isBlocked: isInitialBlocked,
300
305
  blockedReason: processedInput.blockedReason ?? taskInput.blockedReason ?? null,
301
306
  tags: processedInput.tags ?? taskInput.tags ?? [],
302
307
  customFields: processedInput.customFields ?? taskInput.customFields ?? {},
@@ -365,14 +370,17 @@ export class CriticalPathEngine {
365
370
  });
366
371
  }
367
372
  const processedUpdates = await this.plugins.runBeforeTaskUpdate(id, taskUpdates);
373
+ const now = new Date().toISOString();
374
+ const existingStatusDef = resolveStatusDefinition(existing.status, project?.statusDefinitions || workflow?.statuses);
375
+ const newStatusDef = processedUpdates.status
376
+ ? resolveStatusDefinition(processedUpdates.status, project?.statusDefinitions || workflow?.statuses)
377
+ : undefined;
378
+ const effectiveCategory = newStatusDef?.category ?? existingStatusDef.category;
368
379
  // Auto-update execution/completion timestamps if status changes
369
- if (processedUpdates.status && processedUpdates.status !== existing.status) {
370
- const statusDef = resolveStatusDefinition(processedUpdates.status, project?.statusDefinitions || workflow?.statuses);
371
- processedUpdates.semanticStatus = processedUpdates.semanticStatus ?? statusDef.category;
372
- const now = new Date().toISOString();
373
- const existingStatusDef = resolveStatusDefinition(existing.status, project?.statusDefinitions || workflow?.statuses);
374
- // 1. Leaving in_progress: finalize active session duration
375
- if (existingStatusDef.category === 'in_progress' && statusDef.category !== 'in_progress') {
380
+ if (processedUpdates.status && processedUpdates.status !== existing.status && newStatusDef) {
381
+ processedUpdates.semanticStatus = processedUpdates.semanticStatus ?? newStatusDef.category;
382
+ // 1. Leaving in_progress: finalize active session duration and blocked duration
383
+ if (existingStatusDef.category === 'in_progress' && newStatusDef.category !== 'in_progress') {
376
384
  const inProgressSince = existing.inProgressSince;
377
385
  if (inProgressSince) {
378
386
  const startMs = new Date(inProgressSince).getTime();
@@ -390,33 +398,78 @@ export class CriticalPathEngine {
390
398
  }
391
399
  processedUpdates.inProgressSince = null;
392
400
  }
401
+ const blockedSince = processedUpdates.blockedSince ?? existing.blockedSince;
402
+ if (blockedSince) {
403
+ const startMs = new Date(blockedSince).getTime();
404
+ const endMs = new Date(now).getTime();
405
+ if (!isNaN(startMs) && !isNaN(endMs) && endMs >= startMs) {
406
+ const sessionSeconds = Math.max(0, (endMs - startMs) / 1000);
407
+ processedUpdates.blockedDurationSeconds =
408
+ (processedUpdates.blockedDurationSeconds ?? existing.blockedDurationSeconds ?? 0) + sessionSeconds;
409
+ }
410
+ processedUpdates.blockedSince = null;
411
+ }
393
412
  }
394
- // 2. Entering in_progress: retain earliest start date & start session timer
395
- if (statusDef.category === 'in_progress') {
413
+ // 2. Entering in_progress: retain earliest start date & start session timer (and blocked timer if blocked)
414
+ if (newStatusDef.category === 'in_progress') {
396
415
  if (!existing.actualStartDate && !processedUpdates.actualStartDate) {
397
416
  processedUpdates.actualStartDate = now;
398
417
  }
399
418
  if (!processedUpdates.inProgressSince) {
400
419
  processedUpdates.inProgressSince = now;
401
420
  }
421
+ const isTaskBlocked = processedUpdates.isBlocked !== undefined
422
+ ? Boolean(processedUpdates.isBlocked)
423
+ : Boolean(existing.isBlocked);
424
+ if (isTaskBlocked && !processedUpdates.blockedSince) {
425
+ processedUpdates.blockedSince = now;
426
+ }
402
427
  if ((existingStatusDef.category === 'completed' || existingStatusDef.category === 'canceled') &&
403
428
  processedUpdates.actualEndDate === undefined) {
404
429
  processedUpdates.actualEndDate = undefined;
405
430
  }
406
431
  }
407
432
  else if ((existingStatusDef.category === 'completed' || existingStatusDef.category === 'canceled') &&
408
- statusDef.category === 'not_started' &&
433
+ newStatusDef.category === 'not_started' &&
409
434
  processedUpdates.actualEndDate === undefined) {
410
435
  processedUpdates.actualEndDate = undefined;
411
436
  }
412
437
  // 3. Entering completed or canceled
413
- if ((statusDef.category === 'completed' || statusDef.category === 'canceled') && !processedUpdates.actualEndDate) {
438
+ if ((newStatusDef.category === 'completed' || newStatusDef.category === 'canceled') && !processedUpdates.actualEndDate) {
414
439
  processedUpdates.actualEndDate = now;
415
- if (statusDef.category === 'completed' && processedUpdates.progress === undefined && (existing.progress || 0) < 100) {
440
+ if (newStatusDef.category === 'completed' && processedUpdates.progress === undefined && (existing.progress || 0) < 100) {
416
441
  processedUpdates.progress = 100;
417
442
  }
418
443
  }
419
444
  }
445
+ // Handle isBlocked transitions while in_progress (when in_progress, whether status changed or not)
446
+ if (effectiveCategory === 'in_progress') {
447
+ const wasBlocked = Boolean(existing.isBlocked);
448
+ const isNowBlocked = processedUpdates.isBlocked !== undefined
449
+ ? Boolean(processedUpdates.isBlocked)
450
+ : wasBlocked;
451
+ if (!wasBlocked && isNowBlocked) {
452
+ if (!processedUpdates.blockedSince) {
453
+ processedUpdates.blockedSince = now;
454
+ }
455
+ }
456
+ else if (wasBlocked && !isNowBlocked) {
457
+ const blockedSince = existing.blockedSince ?? processedUpdates.blockedSince;
458
+ if (blockedSince) {
459
+ const startMs = new Date(blockedSince).getTime();
460
+ const endMs = new Date(now).getTime();
461
+ if (!isNaN(startMs) && !isNaN(endMs) && endMs >= startMs) {
462
+ const sessionSeconds = Math.max(0, (endMs - startMs) / 1000);
463
+ processedUpdates.blockedDurationSeconds =
464
+ (processedUpdates.blockedDurationSeconds ?? existing.blockedDurationSeconds ?? 0) + sessionSeconds;
465
+ }
466
+ processedUpdates.blockedSince = null;
467
+ }
468
+ }
469
+ }
470
+ else if (processedUpdates.isBlocked === false && (existing.blockedSince || processedUpdates.blockedSince)) {
471
+ processedUpdates.blockedSince = null;
472
+ }
420
473
  // Mutual sync for manual duration/effort edits
421
474
  if (processedUpdates.actualDurationSeconds !== undefined && processedUpdates.actualHours === undefined) {
422
475
  processedUpdates.actualHours = Math.round((processedUpdates.actualDurationSeconds / 3600) * 100) / 100;
@@ -434,7 +487,6 @@ export class CriticalPathEngine {
434
487
  if (!updated)
435
488
  return null;
436
489
  await this.plugins.runAfterTaskUpdate(updated, existing);
437
- const now = new Date().toISOString();
438
490
  const isStatusChange = existing.status !== updated.status;
439
491
  // Publish typed Domain Events
440
492
  if (isStatusChange) {
@@ -571,9 +623,18 @@ export class CriticalPathEngine {
571
623
  if (allUpstreamsCompleted) {
572
624
  let updatedDownstream = downstream;
573
625
  const updates = {};
574
- if (downstream.isBlocked || downstream.blockedReason) {
626
+ if (downstream.isBlocked || downstream.blockedReason || downstream.blockedSince) {
575
627
  updates.isBlocked = false;
576
628
  updates.blockedReason = null;
629
+ if (downstream.blockedSince) {
630
+ const startMs = new Date(downstream.blockedSince).getTime();
631
+ const endMs = new Date().getTime();
632
+ if (!isNaN(startMs) && !isNaN(endMs) && endMs >= startMs) {
633
+ const blockedSeconds = Math.max(0, (endMs - startMs) / 1000);
634
+ updates.blockedDurationSeconds = (downstream.blockedDurationSeconds ?? 0) + blockedSeconds;
635
+ }
636
+ updates.blockedSince = null;
637
+ }
577
638
  }
578
639
  if (Object.keys(updates).length > 0) {
579
640
  const res = await this.store.updateTask(downstream.id, updates);
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAoCA,OAAO,EAAkB,aAAa,EAAE,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EA6Bf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,MAAM,4BAA4B,CAAC;AACvE,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,YAAY,EAAmB,MAAM,kBAAkB,CAAC;AACjE,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvB,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IAEzD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,CAAC,KAAK,GAAG,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI;YACpE,CAAC,CAAE,MAAM,CAAC,KAAwB;YAClC,CAAC,CAAC,IAAI,aAAa,EAAE,CAAC;QAExB,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QAEnC,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACxD,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC1D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,CAAC,CAAC;QACpF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACxD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,QAAQ;YACpC,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,MAAM,SAAS,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,CAAC;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,0CAA0C;QAC1C,IAAI,OAAO,EAAE,sBAAsB,IAAI,CAAC,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CAAC,EAAE,CAAC;YAC/F,yBAAyB,CACvB,OAAO,CAAC,sBAAsB,EAC9B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CACtD,CAAC;QACJ,CAAC;QAED,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,cAAc,GAAG,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;QACvG,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAE/K,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,cAAc;YACd,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,eAAe;YACf,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACzG,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,IAAI,KAAK;YACnE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,IAAI;YAC9E,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,OAAO,CAAC,UAAU,IAAI,QAAQ;YACvC,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC,EACD,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GACX,OAAO,EAAE,OAAO;YAChB,OAAO,CAAC,OAAO;YACf,OAAO,EAAE,KAAK,EAAE,MAAM;YACtB,OAAO,CAAC,KAAK,EAAE,MAAM;YACrB,QAAQ,CAAC;QACX,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,CAAC,SAAS;YACjB,OAAO,EAAE,KAAK,EAAE,QAAQ;YACxB,OAAO,CAAC,KAAK,EAAE,QAAQ;YACvB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChD,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,CAAC,SAAS;YACjB,OAAO,EAAE,KAAK,EAAE,SAAS;YACzB,OAAO,CAAC,KAAK,EAAE,SAAS;YACxB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAC7C,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,OAAO,CAAC,KAAK,IAAI;YAClD,MAAM,EAAE,OAAO;YACf,QAAQ,EAAE,SAAS;YACnB,SAAS;SACV,CAAC;QAEF,MAAM,EACJ,OAAO,EAAE,IAAI,EACb,SAAS,EAAE,MAAM,EACjB,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,KAAK,EACZ,GAAG,WAAW,EACf,GAAG,OAAO,CAAC;QAEZ,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,yCAAyC;QACzC,IAAI,WAAW,CAAC,MAAM,IAAI,WAAW,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YACjE,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,CAAC,CAAC;YAC/F,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YACvF,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,OAAO,EAAE,sBAAsB,IAAI,WAAW,CAAC,YAAY,EAAE,CAAC;YAChE,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE;gBACxD,GAAG,QAAQ,CAAC,YAAY;gBACxB,GAAG,WAAW,CAAC,YAAY;aAC5B,CAAC,CAAC;QACL,CAAC;QAED,MAAM,gBAAgB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAC,CAAC;QAEjF,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,SAAS,GAAG,uBAAuB,CACvC,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;YACxF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YAEF,2DAA2D;YAC3D,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBACzF,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;YACH,CAAC;YAED,4EAA4E;YAC5E,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBACzC,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IACE,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;oBACzF,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAC5C,CAAC;oBACD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,SAAS,CAAC,QAAQ,KAAK,aAAa;gBACpC,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAC5C,CAAC;gBACD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;YAC7C,CAAC;YAED,oCAAoC;YACpC,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;gBACjH,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACrC,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBACpH,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;QACH,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE;gBACnC,IAAI,EAAE,OAAO;gBACb,MAAM,EAAE,aAAa;aACtB,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;gBACrC,IAAI,EAAE,OAAO;aACd,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc,EAAE;YAC5E,IAAI,EAAE,OAAO;YACb,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,EAAE,CAAC;wBACrD,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;oBAC/B,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;wBACvD,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,QAAQ;wBACjB,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;oBAEH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;wBACrC,IAAI,EAAE,iBAAiB;wBACvB,cAAc,EAAE,aAAa,CAAC,EAAE;qBACjC,CAAC,CAAC;gBACL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC;YAC1C,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,MAAM,oBAAoB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;QAC1E,MAAM,cAAc,GAAG;YACrB,GAAG,oBAAoB;YACvB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;SAC3D,CAAC;QAEF,iDAAiD;QACjD,MAAM,UAAU,GAAG,qBAAqB,CAAC,cAAc,EAAE,GAAG,CAAC,CAAC;QAC9D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACnF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACrF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACrB,MAAM,IAAI,KAAK,CAAC,yCAAyC,CAAC,CAAC;QAC7D,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QACpD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YACpD,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,OAAwD;QACvE,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,wBAAwB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,0BAA0B,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACjF,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAC5D,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;IACtC,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,UAA8D;QACnF,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,GAAG,EAAE,QAAQ,CAAC,GAAG,EAAE;aAClF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QAC3H,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,YAAY,KAAK,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;SACvI,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,KAAK,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QAC3D,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC,OAAO,CAAC,CAAC;IACzD,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;IAC/B,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QAClE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACjD,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QAChF,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACtE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;gBACvC,IAAI,CAAC,eAAe,CAAC,4BAA4B,EAAE;oBACjD,WAAW,EAAE,OAAO;oBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B,CAAC,CAAC;YACL,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QACpG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QACnE,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACpE,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACtE,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;IACtF,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,KAAK,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QAC/D,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,KAAmB,EAAE,OAAgC;QACjF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC;QAE5E,KAAK,MAAM,EAAE,IAAI,MAAM,EAAE,CAAC;YACxB,KAAK,CAAC,EAAE,CAAC,GAAG,EAAE;gBACZ,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC;aACpF,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE;gBACZ,yCAAyC;YAC3C,CAAC,CAAC,CAAC;QACL,CAAC;IACH,CAAC;CACF"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAoCA,OAAO,EAAkB,aAAa,EAAE,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EA6Bf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,MAAM,4BAA4B,CAAC;AACvE,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,YAAY,EAAmB,MAAM,kBAAkB,CAAC;AACjE,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvB,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IAEzD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,CAAC,KAAK,GAAG,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI;YACpE,CAAC,CAAE,MAAM,CAAC,KAAwB;YAClC,CAAC,CAAC,IAAI,aAAa,EAAE,CAAC;QAExB,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QAEnC,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACxD,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC1D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,CAAC,CAAC;QACpF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACxD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,QAAQ;YACpC,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,MAAM,SAAS,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,CAAC;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,0CAA0C;QAC1C,IAAI,OAAO,EAAE,sBAAsB,IAAI,CAAC,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CAAC,EAAE,CAAC;YAC/F,yBAAyB,CACvB,OAAO,CAAC,sBAAsB,EAC9B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CACtD,CAAC;QACJ,CAAC;QAED,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,cAAc,GAAG,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;QACvG,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAE/K,MAAM,gBAAgB,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,IAAI,KAAK,CAAC;QAClF,MAAM,YAAY,GAAG,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,CAAC,gBAAgB,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAC3J,MAAM,sBAAsB,GAAG,cAAc,CAAC,sBAAsB,IAAI,SAAS,CAAC,sBAAsB,CAAC;QAEzG,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,cAAc;YACd,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,eAAe;YACf,sBAAsB;YACtB,YAAY;YACZ,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACzG,SAAS,EAAE,gBAAgB;YAC3B,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,IAAI;YAC9E,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,OAAO,CAAC,UAAU,IAAI,QAAQ;YACvC,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC,EACD,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GACX,OAAO,EAAE,OAAO;YAChB,OAAO,CAAC,OAAO;YACf,OAAO,EAAE,KAAK,EAAE,MAAM;YACtB,OAAO,CAAC,KAAK,EAAE,MAAM;YACrB,QAAQ,CAAC;QACX,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,CAAC,SAAS;YACjB,OAAO,EAAE,KAAK,EAAE,QAAQ;YACxB,OAAO,CAAC,KAAK,EAAE,QAAQ;YACvB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChD,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,CAAC,SAAS;YACjB,OAAO,EAAE,KAAK,EAAE,SAAS;YACzB,OAAO,CAAC,KAAK,EAAE,SAAS;YACxB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAC7C,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,OAAO,CAAC,KAAK,IAAI;YAClD,MAAM,EAAE,OAAO;YACf,QAAQ,EAAE,SAAS;YACnB,SAAS;SACV,CAAC;QAEF,MAAM,EACJ,OAAO,EAAE,IAAI,EACb,SAAS,EAAE,MAAM,EACjB,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,KAAK,EACZ,GAAG,WAAW,EACf,GAAG,OAAO,CAAC;QAEZ,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,yCAAyC;QACzC,IAAI,WAAW,CAAC,MAAM,IAAI,WAAW,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YACjE,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,CAAC,CAAC;YAC/F,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YACvF,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,OAAO,EAAE,sBAAsB,IAAI,WAAW,CAAC,YAAY,EAAE,CAAC;YAChE,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE;gBACxD,GAAG,QAAQ,CAAC,YAAY;gBACxB,GAAG,WAAW,CAAC,YAAY;aAC5B,CAAC,CAAC;QACL,CAAC;QAED,MAAM,gBAAgB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAC,CAAC;QAEjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;QACF,MAAM,YAAY,GAAG,gBAAgB,CAAC,MAAM;YAC1C,CAAC,CAAC,uBAAuB,CACrB,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD;YACH,CAAC,CAAC,SAAS,CAAC;QACd,MAAM,iBAAiB,GAAG,YAAY,EAAE,QAAQ,IAAI,iBAAiB,CAAC,QAAQ,CAAC;QAE/E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,IAAI,YAAY,EAAE,CAAC;YAC3F,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,YAAY,CAAC,QAAQ,CAAC;YAE3F,gFAAgF;YAChF,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5F,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;gBAED,MAAM,YAAY,GAAG,gBAAgB,CAAC,YAAY,IAAI,QAAQ,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;YAED,2GAA2G;YAC3G,IAAI,YAAY,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAC5C,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,MAAM,aAAa,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;oBAC5D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;oBACrC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;gBAChC,IAAI,aAAa,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACpD,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;gBACD,IACE,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;oBACzF,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAC5C,CAAC;oBACD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,YAAY,CAAC,QAAQ,KAAK,aAAa;gBACvC,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAC5C,CAAC;gBACD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;YAC7C,CAAC;YAED,oCAAoC;YACpC,IAAI,CAAC,YAAY,CAAC,QAAQ,KAAK,WAAW,IAAI,YAAY,CAAC,QAAQ,KAAK,UAAU,CAAC,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;gBACvH,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACrC,IAAI,YAAY,CAAC,QAAQ,KAAK,WAAW,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBACvH,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;QACH,CAAC;QAED,mGAAmG;QACnG,IAAI,iBAAiB,KAAK,aAAa,EAAE,CAAC;YACxC,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;YAC/C,MAAM,YAAY,GAAG,gBAAgB,CAAC,SAAS,KAAK,SAAS;gBAC3D,CAAC,CAAC,OAAO,CAAC,gBAAgB,CAAC,SAAS,CAAC;gBACrC,CAAC,CAAC,UAAU,CAAC;YAEf,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;gBAChC,IAAI,CAAC,gBAAgB,CAAC,YAAY,EAAE,CAAC;oBACnC,gBAAgB,CAAC,YAAY,GAAG,GAAG,CAAC;gBACtC,CAAC;YACH,CAAC;iBAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;gBACvC,MAAM,YAAY,GAAG,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC;gBAC5E,IAAI,YAAY,EAAE,CAAC;oBACjB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;oBACjD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,sBAAsB;4BACrC,CAAC,gBAAgB,CAAC,sBAAsB,IAAI,QAAQ,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;oBACvG,CAAC;oBACD,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;gBACvC,CAAC;YACH,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,SAAS,KAAK,KAAK,IAAI,CAAC,QAAQ,CAAC,YAAY,IAAI,gBAAgB,CAAC,YAAY,CAAC,EAAE,CAAC;YAC5G,gBAAgB,CAAC,YAAY,GAAG,IAAI,CAAC;QACvC,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE;gBACnC,IAAI,EAAE,OAAO;gBACb,MAAM,EAAE,aAAa;aACtB,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;gBACrC,IAAI,EAAE,OAAO;aACd,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc,EAAE;YAC5E,IAAI,EAAE,OAAO;YACb,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;wBAChF,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;wBAC7B,IAAI,UAAU,CAAC,YAAY,EAAE,CAAC;4BAC5B,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC,OAAO,EAAE,CAAC;4BAC5D,MAAM,KAAK,GAAG,IAAI,IAAI,EAAE,CAAC,OAAO,EAAE,CAAC;4BACnC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;gCACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;gCAC7D,OAAO,CAAC,sBAAsB,GAAG,CAAC,UAAU,CAAC,sBAAsB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;4BAC7F,CAAC;4BACD,OAAO,CAAC,YAAY,GAAG,IAAI,CAAC;wBAC9B,CAAC;oBACH,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;wBACvD,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,QAAQ;wBACjB,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;oBAEH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;wBACrC,IAAI,EAAE,iBAAiB;wBACvB,cAAc,EAAE,aAAa,CAAC,EAAE;qBACjC,CAAC,CAAC;gBACL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC;YAC1C,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,MAAM,oBAAoB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;QAC1E,MAAM,cAAc,GAAG;YACrB,GAAG,oBAAoB;YACvB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;SAC3D,CAAC;QAEF,iDAAiD;QACjD,MAAM,UAAU,GAAG,qBAAqB,CAAC,cAAc,EAAE,GAAG,CAAC,CAAC;QAC9D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACnF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACrF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACrB,MAAM,IAAI,KAAK,CAAC,yCAAyC,CAAC,CAAC;QAC7D,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QACpD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YACpD,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,OAAwD;QACvE,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,wBAAwB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,0BAA0B,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACjF,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAC5D,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;IACtC,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,UAA8D;QACnF,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,GAAG,EAAE,QAAQ,CAAC,GAAG,EAAE;aAClF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QAC3H,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,YAAY,KAAK,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;SACvI,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,KAAK,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QAC3D,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC,OAAO,CAAC,CAAC;IACzD,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;IAC/B,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QAClE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACjD,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QAChF,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACtE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;gBACvC,IAAI,CAAC,eAAe,CAAC,4BAA4B,EAAE;oBACjD,WAAW,EAAE,OAAO;oBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B,CAAC,CAAC;YACL,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QACpG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QACnE,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACpE,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACtE,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;IACtF,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,KAAK,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QAC/D,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,KAAmB,EAAE,OAAgC;QACjF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC;QAE5E,KAAK,MAAM,EAAE,IAAI,MAAM,EAAE,CAAC;YACxB,KAAK,CAAC,EAAE,CAAC,GAAG,EAAE;gBACZ,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC;aACpF,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE;gBACZ,yCAAyC;YAC3C,CAAC,CAAC,CAAC;QACL,CAAC;IACH,CAAC;CACF"}
@@ -1 +1 @@
1
- {"version":3,"file":"sqlite.d.ts","sourceRoot":"","sources":["../../src/store/sqlite.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EAAE,YAAY,EAAE,MAAM,aAAa,CAAC;AAChD,OAAO,KAAK,EAAE,cAAc,EAAE,MAAM,YAAY,CAAC;AACjD,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,SAAS,EACT,IAAI,EACJ,aAAa,EACb,OAAO,EACP,UAAU,EACV,SAAS,EACT,QAAQ,EACR,OAAO,EACP,cAAc,EACd,QAAQ,EACR,WAAW,EACX,sBAAsB,EACvB,MAAM,mBAAmB,CAAC;AAG3B,MAAM,WAAW,iBAAiB;IAChC;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB;;OAEG;IACH,EAAE,CAAC,EAAE,YAAY,CAAC;CACnB;AAED,qBAAa,WAAY,YAAW,cAAc;IAChD,OAAO,CAAC,EAAE,CAAe;gBAEb,MAAM,GAAE,iBAAsB;IAiB1C,OAAO,CAAC,UAAU;IAyNZ,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAMjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAM/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IA6BzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAkC7E,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAMnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAMjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAwB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA4BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAM5C,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAO3C,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAM3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAqB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAoBpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAM1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAMvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAuBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAqB3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAO7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAM1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAMvD,iBAAiB,CAAC,WAAW,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAuC5E,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAkCzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAO/C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAY7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAyD7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IA8DpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAMtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAMnD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAuBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAsBnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOnD,OAAO,CAAC,UAAU;IAgBZ,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAM/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAO/C,UAAU,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAyBtF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAoC7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAM3C,WAAW,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAepG,cAAc,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAUvG,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAgC3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;IAWrD,gBAAgB,CAAC,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAiCrG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAM9C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IA2BpF,WAAW,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAsB5E,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAMpD,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IAsB9F,eAAe,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,EAAE,CAAC;IAK1D,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IAavE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAUjC,UAAU,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAqB9E,OAAO,CAAC,UAAU;IAalB,OAAO,CAAC,WAAW;IAUnB,OAAO,CAAC,OAAO;IAOf,OAAO,CAAC,OAAO;IAaf,OAAO,CAAC,cAAc;CAQvB"}
1
+ {"version":3,"file":"sqlite.d.ts","sourceRoot":"","sources":["../../src/store/sqlite.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EAAE,YAAY,EAAE,MAAM,aAAa,CAAC;AAChD,OAAO,KAAK,EAAE,cAAc,EAAE,MAAM,YAAY,CAAC;AACjD,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,SAAS,EACT,IAAI,EACJ,aAAa,EACb,OAAO,EACP,UAAU,EACV,SAAS,EACT,QAAQ,EACR,OAAO,EACP,cAAc,EACd,QAAQ,EACR,WAAW,EACX,sBAAsB,EACvB,MAAM,mBAAmB,CAAC;AAG3B,MAAM,WAAW,iBAAiB;IAChC;;;OAGG;IACH,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB;;OAEG;IACH,EAAE,CAAC,EAAE,YAAY,CAAC;CACnB;AAED,qBAAa,WAAY,YAAW,cAAc;IAChD,OAAO,CAAC,EAAE,CAAe;gBAEb,MAAM,GAAE,iBAAsB;IAiB1C,OAAO,CAAC,UAAU;IA2NZ,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAMjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAM/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IA6BzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAkC7E,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAMnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAMjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAwB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA4BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAM5C,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAO3C,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAM3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAqB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAoBpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAM1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAMvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAuBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAqB3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAO7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAM1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAMvD,iBAAiB,CAAC,WAAW,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAuC5E,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAkCzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAO/C,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAY7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAMzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IA2D7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAgEpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAMtD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAMnD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAuBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAsBnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOnD,OAAO,CAAC,UAAU;IAgBZ,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAM/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAO/C,UAAU,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAyBtF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAoC7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAM3C,WAAW,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAepG,cAAc,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAUvG,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAgC3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;IAWrD,gBAAgB,CAAC,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAiCrG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAM9C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IA2BpF,WAAW,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAsB5E,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAMpD,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,CAAC,GAAG;QAAE,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IAsB9F,eAAe,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,EAAE,CAAC;IAK1D,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IAavE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAUjC,UAAU,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAqB9E,OAAO,CAAC,UAAU;IAalB,OAAO,CAAC,WAAW;IAUnB,OAAO,CAAC,OAAO;IAOf,OAAO,CAAC,OAAO;IAiBf,OAAO,CAAC,cAAc;CAQvB"}
@@ -102,6 +102,8 @@ export class SQLiteStore {
102
102
  billableDurationMinutes REAL,
103
103
  actualDurationSeconds REAL,
104
104
  inProgressSince TEXT,
105
+ blockedDurationSeconds REAL,
106
+ blockedSince TEXT,
105
107
  progress REAL,
106
108
  isBlocked INTEGER,
107
109
  blockedReason TEXT,
@@ -483,12 +485,12 @@ export class SQLiteStore {
483
485
  reviewerId, iterationId, teamId, containerId, deliverableId, plannedStartDate, actualStartDate, actualEndDate,
484
486
  dueDate, estimatedHours, loggedHours, actualHours, billableHours,
485
487
  estimatedDurationMinutes, actualDurationMinutes, billableDurationMinutes,
486
- actualDurationSeconds, inProgressSince, progress,
488
+ actualDurationSeconds, inProgressSince, blockedDurationSeconds, blockedSince, progress,
487
489
  isBlocked, blockedReason,
488
490
  tags, customFields, parentId, createdAt, updatedAt
489
- ) VALUES (?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?)
491
+ ) VALUES (?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?)
490
492
  `);
491
- stmt.run(newTask.id, newTask.projectId, newTask.title, newTask.description || null, newTask.status, newTask.priority, newTask.taskType || null, newTask.assigneeId || null, newTask.assignees ? JSON.stringify(newTask.assignees) : null, newTask.reporterId || null, newTask.reviewerId || null, newTask.iterationId || null, newTask.teamId || null, newTask.containerId || null, newTask.deliverableId || null, newTask.plannedStartDate || null, newTask.actualStartDate || null, newTask.actualEndDate || null, newTask.dueDate || null, newTask.estimatedHours ?? null, newTask.loggedHours ?? null, newTask.actualHours ?? null, newTask.billableHours ?? null, newTask.estimatedDurationMinutes ?? null, newTask.actualDurationMinutes ?? null, newTask.billableDurationMinutes ?? null, newTask.actualDurationSeconds ?? null, newTask.inProgressSince ?? null, newTask.progress ?? null, newTask.isBlocked !== undefined ? (newTask.isBlocked ? 1 : 0) : null, newTask.blockedReason ?? null, JSON.stringify(newTask.tags || []), JSON.stringify(newTask.customFields || {}), newTask.parentId || null, newTask.createdAt, newTask.updatedAt);
493
+ stmt.run(newTask.id, newTask.projectId, newTask.title, newTask.description || null, newTask.status || 'todo', newTask.priority || 'medium', newTask.taskType || null, newTask.assigneeId || null, newTask.assignees ? JSON.stringify(newTask.assignees) : null, newTask.reporterId || null, newTask.reviewerId || null, newTask.iterationId || null, newTask.teamId || null, newTask.containerId || null, newTask.deliverableId || null, newTask.plannedStartDate || null, newTask.actualStartDate || null, newTask.actualEndDate || null, newTask.dueDate || null, newTask.estimatedHours ?? null, newTask.loggedHours ?? null, newTask.actualHours ?? null, newTask.billableHours ?? null, newTask.estimatedDurationMinutes ?? null, newTask.actualDurationMinutes ?? null, newTask.billableDurationMinutes ?? null, newTask.actualDurationSeconds ?? null, newTask.inProgressSince ?? null, newTask.blockedDurationSeconds ?? null, newTask.blockedSince ?? null, newTask.progress ?? null, newTask.isBlocked !== undefined ? (newTask.isBlocked ? 1 : 0) : null, newTask.blockedReason ?? null, JSON.stringify(newTask.tags || []), JSON.stringify(newTask.customFields || {}), newTask.parentId || null, newTask.createdAt, newTask.updatedAt);
492
494
  return newTask;
493
495
  }
494
496
  async updateTask(id, updates) {
@@ -507,12 +509,12 @@ export class SQLiteStore {
507
509
  plannedStartDate = ?, actualStartDate = ?, actualEndDate = ?, dueDate = ?,
508
510
  estimatedHours = ?, loggedHours = ?, actualHours = ?, billableHours = ?,
509
511
  estimatedDurationMinutes = ?, actualDurationMinutes = ?, billableDurationMinutes = ?,
510
- actualDurationSeconds = ?, inProgressSince = ?, progress = ?,
512
+ actualDurationSeconds = ?, inProgressSince = ?, blockedDurationSeconds = ?, blockedSince = ?, progress = ?,
511
513
  isBlocked = ?, blockedReason = ?,
512
514
  tags = ?, customFields = ?, parentId = ?, updatedAt = ?
513
515
  WHERE id = ?
514
516
  `);
515
- stmt.run(updated.projectId, updated.title, updated.description || null, updated.status, updated.priority, updated.taskType || null, updated.assigneeId || null, updated.assignees ? JSON.stringify(updated.assignees) : null, updated.reporterId || null, updated.reviewerId || null, updated.iterationId || null, updated.teamId || null, updated.containerId || null, updated.deliverableId || null, updated.plannedStartDate || null, updated.actualStartDate || null, updated.actualEndDate || null, updated.dueDate || null, updated.estimatedHours ?? null, updated.loggedHours ?? null, updated.actualHours ?? null, updated.billableHours ?? null, updated.estimatedDurationMinutes ?? null, updated.actualDurationMinutes ?? null, updated.billableDurationMinutes ?? null, updated.actualDurationSeconds ?? null, updated.inProgressSince ?? null, updated.progress ?? null, updated.isBlocked !== undefined ? (updated.isBlocked ? 1 : 0) : null, updated.blockedReason ?? null, JSON.stringify(updated.tags || []), JSON.stringify(updated.customFields || {}), updated.parentId || null, updated.updatedAt, id);
517
+ stmt.run(updated.projectId, updated.title, updated.description || null, updated.status, updated.priority, updated.taskType || null, updated.assigneeId || null, updated.assignees ? JSON.stringify(updated.assignees) : null, updated.reporterId || null, updated.reviewerId || null, updated.iterationId || null, updated.teamId || null, updated.containerId || null, updated.deliverableId || null, updated.plannedStartDate || null, updated.actualStartDate || null, updated.actualEndDate || null, updated.dueDate || null, updated.estimatedHours ?? null, updated.loggedHours ?? null, updated.actualHours ?? null, updated.billableHours ?? null, updated.estimatedDurationMinutes ?? null, updated.actualDurationMinutes ?? null, updated.billableDurationMinutes ?? null, updated.actualDurationSeconds ?? null, updated.inProgressSince ?? null, updated.blockedDurationSeconds ?? null, updated.blockedSince ?? null, updated.progress ?? null, updated.isBlocked !== undefined ? (updated.isBlocked ? 1 : 0) : null, updated.blockedReason ?? null, JSON.stringify(updated.tags || []), JSON.stringify(updated.customFields || {}), updated.parentId || null, updated.updatedAt, id);
516
518
  return updated;
517
519
  }
518
520
  async deleteTask(id) {
@@ -828,6 +830,10 @@ export class SQLiteStore {
828
830
  mapTask(row) {
829
831
  return {
830
832
  ...row,
833
+ actualDurationSeconds: row.actualDurationSeconds ?? undefined,
834
+ inProgressSince: row.inProgressSince || undefined,
835
+ blockedDurationSeconds: row.blockedDurationSeconds ?? undefined,
836
+ blockedSince: row.blockedSince || undefined,
831
837
  isBlocked: row.isBlocked !== null && row.isBlocked !== undefined ? Boolean(row.isBlocked) : undefined,
832
838
  blockedReason: row.blockedReason || undefined,
833
839
  taskType: row.taskType || undefined,