@critical-path/core 0.20.0 → 0.20.1
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/CHANGELOG.md +10 -0
- package/dist/engine/index.d.ts.map +1 -1
- package/dist/engine/index.js +5 -14
- package/dist/engine/index.js.map +1 -1
- package/dist/index.test.js +4 -3
- package/dist/index.test.js.map +1 -1
- package/dist/task-state.test.js +11 -11
- package/dist/task-state.test.js.map +1 -1
- package/dist/utils/status.d.ts.map +1 -1
- package/dist/utils/status.js +1 -3
- package/dist/utils/status.js.map +1 -1
- package/package.json +1 -1
- package/src/engine/index.ts +5 -16
- package/src/index.test.ts +4 -3
- package/src/task-state.test.ts +11 -11
- package/src/utils/status.ts +1 -5
package/CHANGELOG.md
CHANGED
|
@@ -1,5 +1,15 @@
|
|
|
1
1
|
# @critical-path/core
|
|
2
2
|
|
|
3
|
+
## 0.20.1
|
|
4
|
+
|
|
5
|
+
### Patch Changes
|
|
6
|
+
|
|
7
|
+
- 500b353: Standardize task blocker state on `isBlocked` as the single source of truth:
|
|
8
|
+
- Persist `isBlocked` and `blockedReason` on task creation in `engine.createTask`
|
|
9
|
+
- Rely strictly on `task.isBlocked` in `engine.updateTask` when detecting blocked transitions
|
|
10
|
+
- Remove redundant checks and mutations of `customFields.isBlocked` and `status === 'blocked'` during downstream dependency auto-unblocking
|
|
11
|
+
- Update `deriveTaskLifecycleState` to evaluate `task.isBlocked === true`
|
|
12
|
+
|
|
3
13
|
## 0.20.0
|
|
4
14
|
|
|
5
15
|
### Minor Changes
|
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EAET,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EA6Bf,MAAM,qBAAqB,CAAC;AAI7B,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;gBAE7C,MAAM,GAAE,kBAAuB;YAqB7B,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAInC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAIjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA2BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAgBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAIjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAwBzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA6B7E,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAI7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;
|
|
1
|
+
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EAET,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EAId,WAAW,EACX,mBAAmB,EACnB,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AAWrD,OAAO,EACL,cAAc,EA6Bf,MAAM,qBAAqB,CAAC;AAI7B,OAAO,EAAgB,KAAK,UAAU,EAAE,MAAM,kBAAkB,CAAC;AAEjE,OAAO,EAGL,KAAK,aAAa,EACnB,MAAM,sBAAsB,CAAC;AAG9B,qBAAa,kBAAkB;IAC7B,SAAgB,MAAM,EAAE,kBAAkB,CAAC;IAC3C,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;gBAE7C,MAAM,GAAE,kBAAuB;YAqB7B,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAInC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAIjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA2BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAgBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,6BAA6B,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAOhE,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAIjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAwBzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA6B7E,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAI7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAuFrD,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG;QACvB,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,EACD,OAAO,CAAC,EAAE;QACR,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;YA0QT,8BAA8B;IAoEtC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsCxC,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA6BvE,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IA6BpE,qBAAqB,CACzB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE;QAAE,aAAa,CAAC,EAAE,IAAI,CAAC;QAAC,oBAAoB,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAmB/B,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IAwC1H,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAI/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,UAAU,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAmBtF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAyB7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA6C3G,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAgC9G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAQlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;IAIrD,gBAAgB,CAAC,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAmBrG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA8B9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,EAAE,MAAM,CAAC;QACnB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IA4BhB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiC/C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAQ7F,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAI3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAI1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAIvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAI3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAI1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAIvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAsDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA4B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAItD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAInD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAkBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAkCnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,qBAAqB,CACzB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,UAAe,GACvB,OAAO,CAAC,oBAAoB,CAAC;IAmB1B,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAwDpB,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,GAAG,IAAI,CAAC;IAwB7D,cAAc,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAmBpF,sBAAsB,CAAC,MAAM,EAAE,MAAM,EAAE,OAAO,CAAC,EAAE,aAAa,GAAG,OAAO,CAAC,mBAAmB,GAAG,IAAI,CAAC;IAkBpG,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;YAuBlB,eAAe;CAc9B"}
|
package/dist/engine/index.js
CHANGED
|
@@ -296,6 +296,8 @@ export class CriticalPathEngine {
|
|
|
296
296
|
actualDurationSeconds: processedInput.actualDurationSeconds ?? taskInput.actualDurationSeconds,
|
|
297
297
|
inProgressSince,
|
|
298
298
|
progress: processedInput.progress ?? taskInput.progress ?? (statusDef.category === 'completed' ? 100 : 0),
|
|
299
|
+
isBlocked: processedInput.isBlocked ?? taskInput.isBlocked ?? false,
|
|
300
|
+
blockedReason: processedInput.blockedReason ?? taskInput.blockedReason ?? null,
|
|
299
301
|
tags: processedInput.tags ?? taskInput.tags ?? [],
|
|
300
302
|
customFields: processedInput.customFields ?? taskInput.customFields ?? {},
|
|
301
303
|
parentId: processedInput.parentId ?? taskInput.parentId
|
|
@@ -474,10 +476,10 @@ export class CriticalPathEngine {
|
|
|
474
476
|
};
|
|
475
477
|
await this.events.publish(updateEvent);
|
|
476
478
|
}
|
|
477
|
-
const wasBlocked = Boolean(existing.isBlocked
|
|
478
|
-
const isNowBlocked = Boolean(updated.isBlocked
|
|
479
|
+
const wasBlocked = Boolean(existing.isBlocked);
|
|
480
|
+
const isNowBlocked = Boolean(updated.isBlocked);
|
|
479
481
|
if (!wasBlocked && isNowBlocked) {
|
|
480
|
-
const blockedReason = updated.blockedReason ??
|
|
482
|
+
const blockedReason = updated.blockedReason ?? null;
|
|
481
483
|
const blockedEvent = {
|
|
482
484
|
id: `evt_${Math.random().toString(36).substring(2, 9)}`,
|
|
483
485
|
name: 'task.blocked',
|
|
@@ -569,21 +571,10 @@ export class CriticalPathEngine {
|
|
|
569
571
|
if (allUpstreamsCompleted) {
|
|
570
572
|
let updatedDownstream = downstream;
|
|
571
573
|
const updates = {};
|
|
572
|
-
if (downstream.status === 'blocked') {
|
|
573
|
-
const defaultStatus = downstreamWorkflow?.defaultStatusKey || 'todo';
|
|
574
|
-
updates.status = defaultStatus;
|
|
575
|
-
}
|
|
576
574
|
if (downstream.isBlocked || downstream.blockedReason) {
|
|
577
575
|
updates.isBlocked = false;
|
|
578
576
|
updates.blockedReason = null;
|
|
579
577
|
}
|
|
580
|
-
if (downstream.customFields?.isBlocked || downstream.customFields?.blockedReason) {
|
|
581
|
-
updates.customFields = {
|
|
582
|
-
...downstream.customFields,
|
|
583
|
-
isBlocked: false,
|
|
584
|
-
blockedReason: null
|
|
585
|
-
};
|
|
586
|
-
}
|
|
587
578
|
if (Object.keys(updates).length > 0) {
|
|
588
579
|
const res = await this.store.updateTask(downstream.id, updates);
|
|
589
580
|
if (res)
|
package/dist/engine/index.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAoCA,OAAO,EAAkB,aAAa,EAAE,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EA6Bf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,MAAM,4BAA4B,CAAC;AACvE,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,YAAY,EAAmB,MAAM,kBAAkB,CAAC;AACjE,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvB,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IAEzD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,CAAC,KAAK,GAAG,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI;YACpE,CAAC,CAAE,MAAM,CAAC,KAAwB;YAClC,CAAC,CAAC,IAAI,aAAa,EAAE,CAAC;QAExB,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QAEnC,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACxD,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC1D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,CAAC,CAAC;QACpF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACxD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,QAAQ;YACpC,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,MAAM,SAAS,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,CAAC;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,0CAA0C;QAC1C,IAAI,OAAO,EAAE,sBAAsB,IAAI,CAAC,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CAAC,EAAE,CAAC;YAC/F,yBAAyB,CACvB,OAAO,CAAC,sBAAsB,EAC9B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CACtD,CAAC;QACJ,CAAC;QAED,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,cAAc,GAAG,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;QACvG,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAE/K,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,cAAc;YACd,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,eAAe;YACf,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACzG,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,OAAO,CAAC,UAAU,IAAI,QAAQ;YACvC,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC,EACD,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GACX,OAAO,EAAE,OAAO;YAChB,OAAO,CAAC,OAAO;YACf,OAAO,EAAE,KAAK,EAAE,MAAM;YACtB,OAAO,CAAC,KAAK,EAAE,MAAM;YACrB,QAAQ,CAAC;QACX,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,CAAC,SAAS;YACjB,OAAO,EAAE,KAAK,EAAE,QAAQ;YACxB,OAAO,CAAC,KAAK,EAAE,QAAQ;YACvB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChD,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,CAAC,SAAS;YACjB,OAAO,EAAE,KAAK,EAAE,SAAS;YACzB,OAAO,CAAC,KAAK,EAAE,SAAS;YACxB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAC7C,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,OAAO,CAAC,KAAK,IAAI;YAClD,MAAM,EAAE,OAAO;YACf,QAAQ,EAAE,SAAS;YACnB,SAAS;SACV,CAAC;QAEF,MAAM,EACJ,OAAO,EAAE,IAAI,EACb,SAAS,EAAE,MAAM,EACjB,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,KAAK,EACZ,GAAG,WAAW,EACf,GAAG,OAAO,CAAC;QAEZ,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,yCAAyC;QACzC,IAAI,WAAW,CAAC,MAAM,IAAI,WAAW,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YACjE,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,CAAC,CAAC;YAC/F,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YACvF,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,OAAO,EAAE,sBAAsB,IAAI,WAAW,CAAC,YAAY,EAAE,CAAC;YAChE,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE;gBACxD,GAAG,QAAQ,CAAC,YAAY;gBACxB,GAAG,WAAW,CAAC,YAAY;aAC5B,CAAC,CAAC;QACL,CAAC;QAED,MAAM,gBAAgB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAC,CAAC;QAEjF,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,SAAS,GAAG,uBAAuB,CACvC,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;YACxF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YAEF,2DAA2D;YAC3D,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBACzF,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;YACH,CAAC;YAED,4EAA4E;YAC5E,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBACzC,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IACE,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;oBACzF,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAC5C,CAAC;oBACD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,SAAS,CAAC,QAAQ,KAAK,aAAa;gBACpC,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAC5C,CAAC;gBACD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;YAC7C,CAAC;YAED,oCAAoC;YACpC,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;gBACjH,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACrC,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBACpH,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;QACH,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,IAAI,QAAQ,CAAC,YAAY,EAAE,SAAS,IAAI,QAAQ,CAAC,MAAM,KAAK,SAAS,CAAC,CAAC;QACpH,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,IAAI,OAAO,CAAC,YAAY,EAAE,SAAS,IAAI,OAAO,CAAC,MAAM,KAAK,SAAS,CAAC,CAAC;QAEnH,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAK,OAAO,CAAC,YAAY,EAAE,aAAoC,IAAI,IAAI,CAAC;YACnH,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE;gBACnC,IAAI,EAAE,OAAO;gBACb,MAAM,EAAE,aAAa;aACtB,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;gBACrC,IAAI,EAAE,OAAO;aACd,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc,EAAE;YAC5E,IAAI,EAAE,OAAO;YACb,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,MAAM,KAAK,SAAS,EAAE,CAAC;wBACpC,MAAM,aAAa,GAAG,kBAAkB,EAAE,gBAAgB,IAAI,MAAM,CAAC;wBACrE,OAAO,CAAC,MAAM,GAAG,aAAa,CAAC;oBACjC,CAAC;oBAED,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,EAAE,CAAC;wBACrD,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;oBAC/B,CAAC;oBAED,IAAI,UAAU,CAAC,YAAY,EAAE,SAAS,IAAI,UAAU,CAAC,YAAY,EAAE,aAAa,EAAE,CAAC;wBACjF,OAAO,CAAC,YAAY,GAAG;4BACrB,GAAG,UAAU,CAAC,YAAY;4BAC1B,SAAS,EAAE,KAAK;4BAChB,aAAa,EAAE,IAAI;yBACpB,CAAC;oBACJ,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;wBACvD,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,QAAQ;wBACjB,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;oBAEH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;wBACrC,IAAI,EAAE,iBAAiB;wBACvB,cAAc,EAAE,aAAa,CAAC,EAAE;qBACjC,CAAC,CAAC;gBACL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC;YAC1C,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,MAAM,oBAAoB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;QAC1E,MAAM,cAAc,GAAG;YACrB,GAAG,oBAAoB;YACvB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;SAC3D,CAAC;QAEF,iDAAiD;QACjD,MAAM,UAAU,GAAG,qBAAqB,CAAC,cAAc,EAAE,GAAG,CAAC,CAAC;QAC9D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACnF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACrF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACrB,MAAM,IAAI,KAAK,CAAC,yCAAyC,CAAC,CAAC;QAC7D,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QACpD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YACpD,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,OAAwD;QACvE,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,wBAAwB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,0BAA0B,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACjF,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAC5D,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;IACtC,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,UAA8D;QACnF,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,GAAG,EAAE,QAAQ,CAAC,GAAG,EAAE;aAClF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QAC3H,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,YAAY,KAAK,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;SACvI,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,KAAK,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QAC3D,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC,OAAO,CAAC,CAAC;IACzD,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;IAC/B,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QAClE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACjD,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QAChF,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACtE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;gBACvC,IAAI,CAAC,eAAe,CAAC,4BAA4B,EAAE;oBACjD,WAAW,EAAE,OAAO;oBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B,CAAC,CAAC;YACL,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QACpG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QACnE,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACpE,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACtE,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;IACtF,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,KAAK,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QAC/D,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,KAAmB,EAAE,OAAgC;QACjF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC;QAE5E,KAAK,MAAM,EAAE,IAAI,MAAM,EAAE,CAAC;YACxB,KAAK,CAAC,EAAE,CAAC,GAAG,EAAE;gBACZ,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC;aACpF,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE;gBACZ,yCAAyC;YAC3C,CAAC,CAAC,CAAC;QACL,CAAC;IACH,CAAC;CACF"}
|
|
1
|
+
{"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAoCA,OAAO,EAAkB,aAAa,EAAE,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACvF,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,qBAAqB,EACrB,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EA6Bf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,MAAM,4BAA4B,CAAC;AACvE,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AACpF,OAAO,EAAE,YAAY,EAAmB,MAAM,kBAAkB,CAAC;AACjE,OAAO,EAAE,mBAAmB,EAAE,gCAAgC,EAAE,MAAM,qBAAqB,CAAC;AAC5F,OAAO,EACL,oBAAoB,EACpB,8BAA8B,EAE/B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,6BAA6B,EAAE,MAAM,uBAAuB,CAAC;AAEtE,MAAM,OAAO,kBAAkB;IACb,MAAM,CAAqB;IAC3B,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvB,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IAEzD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC;QACrB,IAAI,CAAC,KAAK,GAAG,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI;YACpE,CAAC,CAAE,MAAM,CAAC,KAAwB;YAClC,CAAC,CAAC,IAAI,aAAa,EAAE,CAAC;QAExB,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QAEnC,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACxD,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC1D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,CAAC,CAAC;QACpF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,qBAAqB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,6BAA6B,CAAC,MAAc;QAChD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACxD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,QAAQ;YACpC,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,MAAM,SAAS,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,CAAC;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,0CAA0C;QAC1C,IAAI,OAAO,EAAE,sBAAsB,IAAI,CAAC,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CAAC,EAAE,CAAC;YAC/F,yBAAyB,CACvB,OAAO,CAAC,sBAAsB,EAC9B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CACtD,CAAC;QACJ,CAAC;QAED,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,0DAA0D;QAC1D,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,cAAc,GAAG,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;QACvG,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAE/K,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,cAAc;YACd,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,eAAe;YACf,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YACzG,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,IAAI,KAAK;YACnE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,IAAI;YAC9E,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,OAAO,CAAC,UAAU,IAAI,QAAQ;YACvC,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC,EACD,OAKC;QAED,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GACX,OAAO,EAAE,OAAO;YAChB,OAAO,CAAC,OAAO;YACf,OAAO,EAAE,KAAK,EAAE,MAAM;YACtB,OAAO,CAAC,KAAK,EAAE,MAAM;YACrB,QAAQ,CAAC;QACX,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,CAAC,SAAS;YACjB,OAAO,EAAE,KAAK,EAAE,QAAQ;YACxB,OAAO,CAAC,KAAK,EAAE,QAAQ;YACvB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAChD,MAAM,SAAS,GACb,OAAO,EAAE,SAAS;YAClB,OAAO,CAAC,SAAS;YACjB,OAAO,EAAE,KAAK,EAAE,SAAS;YACzB,OAAO,CAAC,KAAK,EAAE,SAAS;YACxB,CAAC,OAAO,KAAK,QAAQ,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC;QAC7C,MAAM,QAAQ,GAAG,OAAO,EAAE,KAAK,IAAI,OAAO,CAAC,KAAK,IAAI;YAClD,MAAM,EAAE,OAAO;YACf,QAAQ,EAAE,SAAS;YACnB,SAAS;SACV,CAAC;QAEF,MAAM,EACJ,OAAO,EAAE,IAAI,EACb,SAAS,EAAE,MAAM,EACjB,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,KAAK,EACZ,GAAG,WAAW,EACf,GAAG,OAAO,CAAC;QAEZ,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,yCAAyC;QACzC,IAAI,WAAW,CAAC,MAAM,IAAI,WAAW,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YACjE,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,CAAC,CAAC;YAC/F,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,WAAW,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YACvF,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,OAAO,EAAE,sBAAsB,IAAI,WAAW,CAAC,YAAY,EAAE,CAAC;YAChE,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE;gBACxD,GAAG,QAAQ,CAAC,YAAY;gBACxB,GAAG,WAAW,CAAC,YAAY;aAC5B,CAAC,CAAC;QACL,CAAC;QAED,MAAM,gBAAgB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,WAAW,CAAC,CAAC;QAEjF,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,SAAS,GAAG,uBAAuB,CACvC,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,gBAAgB,CAAC,cAAc,GAAG,gBAAgB,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ,CAAC;YACxF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,iBAAiB,GAAG,uBAAuB,CAC/C,QAAQ,CAAC,MAAM,EACf,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YAEF,2DAA2D;YAC3D,IAAI,iBAAiB,CAAC,QAAQ,KAAK,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBACzF,MAAM,eAAe,GAAG,QAAQ,CAAC,eAAe,CAAC;gBACjD,IAAI,eAAe,EAAE,CAAC;oBACpB,MAAM,OAAO,GAAG,IAAI,IAAI,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC;oBACpD,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,GAAG,CAAC,CAAC,OAAO,EAAE,CAAC;oBACtC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,IAAI,KAAK,IAAI,OAAO,EAAE,CAAC;wBACzD,MAAM,cAAc,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC,KAAK,GAAG,OAAO,CAAC,GAAG,IAAI,CAAC,CAAC;wBAC7D,gBAAgB,CAAC,qBAAqB;4BACpC,CAAC,gBAAgB,CAAC,qBAAqB,IAAI,QAAQ,CAAC,qBAAqB,IAAI,CAAC,CAAC,GAAG,cAAc,CAAC;wBACnG,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;4BAC/C,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;wBACzG,CAAC;wBACD,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;4BACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;wBACnG,CAAC;oBACH,CAAC;oBACD,gBAAgB,CAAC,eAAe,GAAG,IAAI,CAAC;gBAC1C,CAAC;YACH,CAAC;YAED,4EAA4E;YAC5E,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBACzC,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACnE,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;oBACtC,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;gBACzC,CAAC;gBACD,IACE,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;oBACzF,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAC5C,CAAC;oBACD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;gBAC7C,CAAC;YACH,CAAC;iBAAM,IACL,CAAC,iBAAiB,CAAC,QAAQ,KAAK,WAAW,IAAI,iBAAiB,CAAC,QAAQ,KAAK,UAAU,CAAC;gBACzF,SAAS,CAAC,QAAQ,KAAK,aAAa;gBACpC,gBAAgB,CAAC,aAAa,KAAK,SAAS,EAC5C,CAAC;gBACD,gBAAgB,CAAC,aAAa,GAAG,SAAS,CAAC;YAC7C,CAAC;YAED,oCAAoC;YACpC,IAAI,CAAC,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,CAAC,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;gBACjH,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACrC,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBACpH,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;QACH,CAAC;QAED,+CAA+C;QAC/C,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,EAAE,CAAC;YACvG,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACvG,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,qBAAqB,GAAG,EAAE,CAAC,CAAC;YACnG,CAAC;QACH,CAAC;aAAM,IAAI,gBAAgB,CAAC,WAAW,KAAK,SAAS,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;YAC9G,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,IAAI,CAAC,CAAC;YACzF,IAAI,gBAAgB,CAAC,qBAAqB,KAAK,SAAS,EAAE,CAAC;gBACzD,gBAAgB,CAAC,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,WAAW,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;oBACzB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,SAAS,GAAG,uBAAuB,CACvC,OAAO,CAAC,MAAM,EACd,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,MAAM,IAAI,CAAC,8BAA8B,CAAC,OAAO,CAAC,CAAC;YACrD,CAAC;QACH,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;oBAClB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,UAAU,GAAG,OAAO,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAC/C,MAAM,YAAY,GAAG,OAAO,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QAEhD,IAAI,CAAC,UAAU,IAAI,YAAY,EAAE,CAAC;YAChC,MAAM,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,IAAI,CAAC;YACpD,MAAM,YAAY,GAAqB;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,MAAM,EAAE,aAAa;oBACrB,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACxC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACxE,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE;gBACnC,IAAI,EAAE,OAAO;gBACb,MAAM,EAAE,aAAa;aACtB,CAAC,CAAC;QACL,CAAC;aAAM,IAAI,UAAU,IAAI,CAAC,YAAY,EAAE,CAAC;YACvC,MAAM,cAAc,GAAuB;gBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,gBAAgB;gBACtB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,OAAO;oBACP,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;oBACnC,KAAK,EAAE,QAAQ;iBAChB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;YAC1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;gBAClB,OAAO;gBACP,MAAM,EAAE,gBAAgB;gBACxB,OAAO,EAAE,EAAE,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE;aACjD,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;gBACrC,IAAI,EAAE,OAAO;aACd,CAAC,CAAC;QACL,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO;YACP,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE;gBACP,UAAU,EAAE,QAAQ,CAAC,MAAM;gBAC3B,QAAQ,EAAE,OAAO,CAAC,MAAM;gBACxB,GAAG,CAAC,SAAS,CAAC,CAAC,CAAC,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;aACpC;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc,EAAE;YAC5E,IAAI,EAAE,OAAO;YACb,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAEO,KAAK,CAAC,8BAA8B,CAAC,aAAmB;QAC9D,IAAI,CAAC;YACH,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;YAClE,IAAI,CAAC,KAAK,CAAC,eAAe,IAAI,KAAK,CAAC,eAAe,CAAC,MAAM,KAAK,CAAC;gBAAE,OAAO;YAEzE,KAAK,MAAM,UAAU,IAAI,KAAK,CAAC,eAAe,EAAE,CAAC;gBAC/C,MAAM,iBAAiB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBAC5E,MAAM,kBAAkB,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;gBACnF,MAAM,oBAAoB,GAAG,iBAAiB,EAAE,iBAAiB,IAAI,kBAAkB,EAAE,QAAQ,CAAC;gBAClG,MAAM,mBAAmB,GAAG,uBAAuB,CAAC,UAAU,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;gBAE7F,IAAI,mBAAmB,CAAC,QAAQ,KAAK,WAAW,IAAI,mBAAmB,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;oBAChG,SAAS;gBACX,CAAC;gBAED,MAAM,eAAe,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;gBACzE,MAAM,qBAAqB,GAAG,eAAe,CAAC,aAAa,CAAC,KAAK,CAAC,CAAC,EAAE,EAAE,EAAE;oBACvE,MAAM,KAAK,GAAG,uBAAuB,CAAC,EAAE,CAAC,MAAM,EAAE,oBAAoB,CAAC,CAAC;oBACvE,OAAO,KAAK,CAAC,QAAQ,KAAK,WAAW,CAAC;gBACxC,CAAC,CAAC,CAAC;gBAEH,IAAI,qBAAqB,EAAE,CAAC;oBAC1B,IAAI,iBAAiB,GAAG,UAAU,CAAC;oBACnC,MAAM,OAAO,GAAkB,EAAE,CAAC;oBAElC,IAAI,UAAU,CAAC,SAAS,IAAI,UAAU,CAAC,aAAa,EAAE,CAAC;wBACrD,OAAO,CAAC,SAAS,GAAG,KAAK,CAAC;wBAC1B,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;oBAC/B,CAAC;oBAED,IAAI,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;wBACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;wBAChE,IAAI,GAAG;4BAAE,iBAAiB,GAAG,GAAG,CAAC;oBACnC,CAAC;oBAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;oBACrC,MAAM,cAAc,GAAuB;wBACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;wBACvD,IAAI,EAAE,gBAAgB;wBACtB,WAAW,EAAE,UAAU,CAAC,EAAE;wBAC1B,aAAa,EAAE,MAAM;wBACrB,UAAU,EAAE,GAAG;wBACf,OAAO,EAAE;4BACP,IAAI,EAAE,iBAAiB;4BACvB,cAAc,EAAE,aAAa,CAAC,EAAE;yBACjC;qBACF,CAAC;oBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;oBAE1C,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;wBAC3B,SAAS,EAAE,UAAU,CAAC,SAAS;wBAC/B,MAAM,EAAE,UAAU,CAAC,EAAE;wBACrB,OAAO,EAAE,QAAQ;wBACjB,MAAM,EAAE,gBAAgB;wBACxB,OAAO,EAAE,EAAE,iBAAiB,EAAE,aAAa,CAAC,EAAE,EAAE;qBACjD,CAAC,CAAC;oBAEH,IAAI,CAAC,eAAe,CAAC,gBAAgB,EAAE;wBACrC,IAAI,EAAE,iBAAiB;wBACvB,cAAc,EAAE,aAAa,CAAC,EAAE;qBACjC,CAAC,CAAC;gBACL,CAAC;YACH,CAAC;QACH,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,OAAO,CAAC,KAAK,CAAC,8DAA8D,aAAa,CAAC,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC;QACxG,CAAC;IACH,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC;YAC1C,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,MAAM,oBAAoB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;QAC1E,MAAM,cAAc,GAAG;YACrB,GAAG,oBAAoB;YACvB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;SAC3D,CAAC;QAEF,iDAAiD;QACjD,MAAM,UAAU,GAAG,qBAAqB,CAAC,cAAc,EAAE,GAAG,CAAC,CAAC;QAC9D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACnF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACrF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CACzB,MAAc,EACd,OAAiE;QAEjE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEpE,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,aAAa,GAAG,KAAK,CAAC,aAAa,CAAC;QAE1C,OAAO,wBAAwB,CAAC,IAAI,EAAE;YACpC,iBAAiB,EAAE,UAAU;YAC7B,aAAa,EAAE,OAAO,EAAE,aAAa;YACrC,oBAAoB,EAAE,OAAO,EAAE,oBAAoB;YACnD,aAAa;SACd,CAAC,CAAC;IACL,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA6F;QACzG,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACrB,MAAM,IAAI,KAAK,CAAC,yCAAyC,CAAC,CAAC;QAC7D,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QACpD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAA+D;YAC5E,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;YACpD,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,OAAwD;QACvE,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,wBAAwB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,0BAA0B,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACjF,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAC5D,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;IACtC,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,UAA8D;QACnF,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,GAAG,EAAE,QAAQ,CAAC,GAAG,EAAE;aAClF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QAC3H,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,YAAY,KAAK,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;SACvI,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,KAAK,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QAC3D,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC,OAAO,CAAC,CAAC;IACzD,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;IAC/B,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QAClE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACjD,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QAChF,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACtE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;gBACvC,IAAI,CAAC,eAAe,CAAC,4BAA4B,EAAE;oBACjD,WAAW,EAAE,OAAO;oBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B,CAAC,CAAC;YACL,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QACpG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QACnE,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,EAAE,CAAC;gBACvC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,EAAE,CAAC;gBAChD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACpE,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACtE,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uDAAuD;IACvD,KAAK,CAAC,qBAAqB,CACzB,SAAiB,EACjB,UAAsB,EAAE;QAExB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QACD,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QACtF,MAAM,gBAAgB,GAAG,OAAO,CAAC,gBAAgB,IAAI,OAAO,EAAE,SAAS,CAAC;QACxE,OAAO,YAAY,CAAC,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,EAAE,QAAQ,EAAE,gBAAgB,EAAE,CAAC,CAAC;IACtF,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,KAAK,CAAC,oBAAoB,SAAS,cAAc,CAAC,CAAC;QAC/D,CAAC;QAED,IAAI,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACjD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QACD,IAAI,OAAO,CAAC,WAAW,EAAE,CAAC;YACxB,KAAK,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,WAAW,KAAK,OAAO,CAAC,WAAW,CAAC,CAAC;QACrE,CAAC;QAED,MAAM,CAAC,UAAU,EAAE,UAAU,EAAE,YAAY,EAAE,WAAW,EAAE,UAAU,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxF,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC;YACnC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,SAAS,EAAE,CAAC;YACxC,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,CAAC;SACxC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC3F,MAAM,UAAU,GAAG,IAAI,GAAG,EAAU,CAAC;QACrC,MAAM,YAAY,GAAqB,EAAE,CAAC;QAC1C,KAAK,MAAM,IAAI,IAAI,YAAY,EAAE,CAAC;YAChC,KAAK,MAAM,CAAC,IAAI,IAAI,EAAE,CAAC;gBACrB,IAAI,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC;oBAC1B,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;oBACrB,YAAY,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEjE,OAAO,mBAAmB,CACxB;YACE,OAAO;YACP,KAAK;YACL,YAAY;YACZ,UAAU;YACV,UAAU;YACV,YAAY;YACZ,WAAW;YACX,WAAW;YACX,UAAU;YACV,QAAQ;SACT,EACD,OAAO,CACR,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,MAAM,GAAG,MAAM,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,SAAS,EAAE,EAAE,KAAK,EAAE,KAAK,EAAE,CAAC,CAAC;QAC9E,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrE,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,MAAM,CAAC,IAAI,gCAAgC,CAAC,IAAI,CAAC,CAAC;QACrF,MAAM,UAAU,GAAG,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC;QAChF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAElD,OAAO;YACL,MAAM;YACN,UAAU;YACV,QAAQ;YACR,QAAQ;YACR,OAAO,EAAE,OAAO,IAAI,SAAS;SAC9B,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc,EAAE,OAAuB;QAC1D,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACrE,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC;YACjC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,oBAAoB,CAAC,IAAI,EAAE,UAAU,EAAE,WAAW,EAAE;YACzD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc,EAAE,OAAuB;QAClE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QAEvB,MAAM,CAAC,UAAU,EAAE,OAAO,EAAE,QAAQ,CAAC,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC;YACxD,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,CAAC;YACpC,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC;YACrC,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC;SAC5C,CAAC,CAAC;QAEH,MAAM,uBAAuB,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QAEjF,OAAO,8BAA8B,CAAC,IAAI,EAAE,UAAU,EAAE;YACtD,uBAAuB;YACvB,GAAG,OAAO;SACX,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QACnD,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;QAC1C,MAAM,OAAO,GAAG,SAAS,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC;QAC/E,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,OAAO,EAAE,QAAQ,IAAI,IAAI,CAAC,MAAM,CAAC,eAAe,CAAC;QAEtF,MAAM,iBAAiB,GAAG,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;QAC/F,MAAM,WAAW,GAAgB,iBAAiB,CAAC,IAAI,EAAE,CAAC;QAE1D,OAAO,6BAA6B,CAClC;YACE,KAAK;YACL,WAAW;YACX,KAAK;YACL,SAAS;SACV,EACD;YACE,GAAG,OAAO;YACV,QAAQ;SACT,CACF,CAAC;IACJ,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,KAAmB,EAAE,OAAgC;QACjF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC;QAE5E,KAAK,MAAM,EAAE,IAAI,MAAM,EAAE,CAAC;YACxB,KAAK,CAAC,EAAE,CAAC,GAAG,EAAE;gBACZ,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC;aACpF,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE;gBACZ,yCAAyC;YAC3C,CAAC,CAAC,CAAC;QACL,CAAC;IACH,CAAC;CACF"}
|
package/dist/index.test.js
CHANGED
|
@@ -323,8 +323,9 @@ describe('CriticalPathEngine Core Tests', () => {
|
|
|
323
323
|
const downstream = await engine.createTask({
|
|
324
324
|
projectId: proj.id,
|
|
325
325
|
title: 'Downstream Task',
|
|
326
|
-
status: '
|
|
327
|
-
|
|
326
|
+
status: 'todo',
|
|
327
|
+
isBlocked: true,
|
|
328
|
+
blockedReason: 'Waiting on upstream'
|
|
328
329
|
});
|
|
329
330
|
await engine.addDependency({
|
|
330
331
|
taskId: downstream.id,
|
|
@@ -344,7 +345,7 @@ describe('CriticalPathEngine Core Tests', () => {
|
|
|
344
345
|
expect(unblockedEvents[0].payload.upstreamTaskId).toBe(upstream.id);
|
|
345
346
|
const refreshedDownstream = await engine.getTask(downstream.id);
|
|
346
347
|
expect(refreshedDownstream?.status).toBe('todo');
|
|
347
|
-
expect(refreshedDownstream?.
|
|
348
|
+
expect(refreshedDownstream?.isBlocked).toBe(false);
|
|
348
349
|
});
|
|
349
350
|
it('allows VFX workflow transitions from revision_requested to in_production', async () => {
|
|
350
351
|
const engine = new CriticalPathEngine();
|
package/dist/index.test.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAA4B,oBAAoB,EAAE,MAAM,YAAY,CAAC;AAGhG,QAAQ,CAAC,+BAA+B,EAAE,GAAG,EAAE;IAC7C,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;QAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,MAAM;YACX,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,gBAAgB;SAC9B,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE9B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,YAAY;YACnB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,MAAM;SACjB,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QAEtC,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC5E,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;IACtD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,qCAAqC,EAAE,KAAK,IAAI,EAAE;QACnD,IAAI,YAAY,GAAG,KAAK,CAAC;QAEzB,MAAM,UAAU,GAAuB;YACrC,EAAE,EAAE,iBAAiB;YACrB,IAAI,EAAE,iBAAiB;YACvB,OAAO,EAAE,OAAO;YAChB,KAAK,EAAE;gBACL,gBAAgB,EAAE,CAAC,IAAI,EAAE,EAAE;oBACzB,YAAY,GAAG,IAAI,CAAC;oBACpB,OAAO;wBACL,GAAG,IAAI;wBACP,IAAI,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,EAAE,CAAC,EAAE,aAAa,CAAC;qBAC5C,CAAC;gBACJ,CAAC;aACF;SACF,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,OAAO,EAAE,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEjE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE,CAAC,CAAC;QAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,aAAa;YACpB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,MAAM,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAChC,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,2CAA2C,EAAE,KAAK,IAAI,EAAE;QACzD,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,IAAI,EAAE,aAAa;YACnB,SAAS,EAAE,CAAC,QAAQ,EAAE,QAAQ,CAAC;SAChC,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,KAAK;YACV,IAAI,EAAE,qBAAqB;YAC3B,OAAO,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC;SACnB,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC;YAC7C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,IAAI,EAAE,oBAAoB;YAC1B,IAAI,EAAE,MAAM;SACb,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC;YAC7C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,IAAI,EAAE,UAAU;YAChB,IAAI,EAAE,QAAQ;YACd,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,uBAAuB;YAC9B,MAAM,EAAE,aAAa;YACrB,QAAQ,EAAE,QAAQ;YAClB,UAAU,EAAE,QAAQ;YACpB,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,WAAW,EAAE,SAAS,CAAC,EAAE;YACzB,WAAW,EAAE,SAAS,CAAC,EAAE;YACzB,gBAAgB,EAAE,0BAA0B;YAC5C,OAAO,EAAE,0BAA0B;YACnC,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,CAAC;YACd,aAAa,EAAE,CAAC;YAChB,wBAAwB,EAAE,GAAG;YAC7B,qBAAqB,EAAE,GAAG;YAC1B,uBAAuB,EAAE,GAAG;YAC5B,QAAQ,EAAE,EAAE;SACb,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QACvC,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAClC,MAAM,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrC,MAAM,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACjC,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,IAAI,CAAC,wBAAwB,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChD,MAAM,CAAC,IAAI,CAAC,qBAAqB,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7C,MAAM,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/C,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;QACrE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,MAAM;YACX,IAAI,EAAE,yBAAyB;YAC/B,iBAAiB,EAAE;gBACjB,EAAE,GAAG,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;gBACzD,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,aAAa,EAAE,QAAQ,EAAE,aAAa,EAAE;gBACrE,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,UAAU,EAAE,QAAQ,EAAE,WAAW,EAAE;aAC9D;SACF,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,eAAe;YACtB,MAAM,EAAE,aAAa;YACrB,QAAQ,EAAE,QAAQ;YAClB,gBAAgB,EAAE,0BAA0B;YAC5C,OAAO,EAAE,0BAA0B;SACpC,CAAC,CAAC;QAEH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC1D,MAAM,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,CAAC,KAAK,EAAE,cAAc,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAClD,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAClC,MAAM,CAAC,KAAK,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;IACvC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;QAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;QAEpF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACnH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAEnH,2BAA2B;QAC3B,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC;YAC/B,MAAM,EAAE,KAAK,CAAC,EAAE;YAChB,eAAe,EAAE,KAAK,CAAC,EAAE;YACzB,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC7D,MAAM,CAAC,MAAM,CAAC,eAAe,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAEpE,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC7D,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;IACpE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mDAAmD,EAAE,KAAK,IAAI,EAAE;QACjE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,2BAA2B;QAC3B,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC;YAC3C,IAAI,EAAE,0BAA0B;YAChC,gBAAgB,EAAE,SAAS;YAC3B,QAAQ,EAAE;gBACR,EAAE,GAAG,EAAE,SAAS,EAAE,KAAK,EAAE,SAAS,EAAE,QAAQ,EAAE,aAAa,EAAE;gBAC7D,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,aAAa,EAAE,QAAQ,EAAE,aAAa,EAAE;gBACrE,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;aACtD;YACD,WAAW,EAAE;gBACX,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,SAAS,EAAE,WAAW,EAAE,aAAa,EAAE,IAAI,EAAE,YAAY,EAAE;gBACtF,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,aAAa,EAAE,WAAW,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE;aACvF;SACF,CAAC,CAAC;QAEH,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;QAElC,kCAAkC;QAClC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,IAAI;YACT,IAAI,EAAE,kBAAkB;YACxB,UAAU,EAAE,QAAQ,CAAC,EAAE;SACxB,CAAC,CAAC;QAEH,cAAc;QACd,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,eAAe;YACtB,MAAM,EAAE,SAAS;YACjB,QAAQ,EAAE,MAAM;SACjB,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACpC,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAEnC,4BAA4B;QAC5B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC;QAEzC,2CAA2C;QAC3C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC,CAAC;QAC5E,MAAM,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAE5C,8EAA8E;QAC9E,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC;QAElF,wCAAwC;QACxC,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QACtE,MAAM,CAAC,QAAQ,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;QACtE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;QACpF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,sBAAsB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAE5G,kBAAkB;QAClB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC;YAC7C,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,UAAU,EAAE,QAAQ;YACpB,QAAQ,EAAE,UAAU;YACpB,QAAQ,EAAE,iBAAiB;YAC3B,SAAS,EAAE,IAAI;YACf,GAAG,EAAE,gDAAgD;SACtD,CAAC,CAAC;QACH,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;QAClC,MAAM,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,gDAAgD,CAAC,CAAC;QAE5E,uCAAuC;QACvC,MAAM,YAAY,GAAG,+BAA+B,GAAG,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC;QACvE,MAAM,MAAM,CACV,MAAM,CAAC,gBAAgB,CAAC;YACtB,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,UAAU,EAAE,QAAQ;YACpB,QAAQ,EAAE,UAAU;YACpB,QAAQ,EAAE,iBAAiB;YAC3B,SAAS,EAAE,IAAI;YACf,GAAG,EAAE,YAAY;SAClB,CAAC,CACH,CAAC,OAAO,CAAC,OAAO,CAAC,2CAA2C,CAAC,CAAC;IACjE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,wFAAwF,EAAE,KAAK,IAAI,EAAE;QACtG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,iBAAiB,EAAE,CAAC,CAAC;QACjF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAEpG,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACtC,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,QAAQ,EAAE,QAAQ;YAClB,OAAO,EAAE,iBAAiB;SAC3B,CAAC,CAAC;QAEH,MAAM,cAAc,GAAa,EAAE,CAAC;QACpC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,GAAG,EAAE,CAAC,KAAK,EAAE,EAAE;YACrC,cAAc,CAAC,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC;QAClC,CAAC,CAAC,CAAC;QAEH,kBAAkB;QAClB,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE;YAC/D,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,YAAY,EAAE,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChD,MAAM,CAAC,YAAY,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,aAAa,CAAC;YACjD,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,YAAY,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;QAC7D,MAAM,CAAC,cAAc,CAAC,CAAC,SAAS,CAAC,wBAAwB,CAAC,CAAC;QAE3D,6DAA6D;QAC7D,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE;YACpE,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,iBAAiB,EAAE,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAErD,2CAA2C;QAC3C,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE;YACjE,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAElD,qBAAqB;QACrB,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,OAAO,CAAC,EAAE,EAAE;YAClE,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,YAAY,EAAE,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChD,MAAM,CAAC,YAAY,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACtD,MAAM,CAAC,cAAc,CAAC,CAAC,SAAS,CAAC,0BAA0B,CAAC,CAAC;IAC/D,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0EAA0E,EAAE,KAAK,IAAI,EAAE;QACxF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,kBAAkB,EAAE,CAAC,CAAC;QAClF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAErG,0BAA0B;QAC1B,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACvC,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,QAAQ,EAAE,QAAQ;YAClB,OAAO,EAAE,kEAAkE;SAC5E,CAAC,CAAC;QACH,MAAM,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,EAAE,QAAQ,EAAE,kBAAkB,CAAC,CAAC,CAAC;QAE7E,2BAA2B;QAC3B,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACvC,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,QAAQ,EAAE,QAAQ;YAClB,OAAO,EAAE,2BAA2B;YACpC,QAAQ,EAAE,CAAC,iBAAiB,CAAC;SAC9B,CAAC,CAAC;QACH,MAAM,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,iBAAiB,CAAC,CAAC,CAAC;QAEvD,0CAA0C;QAC1C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,EAAE,EAAE;YACtD,OAAO,EAAE,+BAA+B;SACzC,CAAC,CAAC;QACH,MAAM,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC;IACrD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,qBAAqB,EAAE,CAAC,CAAC;QAErF,4BAA4B;QAC5B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,qBAAqB;YAC5B,MAAM,EAAE,aAAa;YACrB,SAAS,EAAE;gBACT,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,aAAa,EAAE,IAAI,EAAE,SAAS,EAAE,IAAI,EAAE,OAAO,EAAE;gBACtE,EAAE,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,iBAAiB,EAAE,IAAI,EAAE,WAAW,EAAE,IAAI,EAAE,MAAM,EAAE,SAAS,EAAE,+BAA+B,EAAE;aACvH;SACF,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvC,MAAM,CAAC,IAAI,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAC/C,MAAM,CAAC,IAAI,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,+BAA+B,CAAC,CAAC;QAE5E,uBAAuB;QACvB,MAAM,gBAAgB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjF,MAAM,CAAC,gBAAgB,CAAC,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC;QAE3C,wDAAwD;QACxD,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YAC1C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,SAAS;SAClB,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QACnF,MAAM,CAAC,WAAW,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAClC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yGAAyG,EAAE,KAAK,IAAI,EAAE;QACvH,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,sBAAsB,EAAE,CAAC,CAAC;QAExF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACvC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,eAAe;YACtB,MAAM,EAAE,aAAa;SACtB,CAAC,CAAC;QAEH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACzC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,iBAAiB;YACxB,MAAM,EAAE,SAAS;YACjB,YAAY,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,aAAa,EAAE,qBAAqB,EAAE;SACxE,CAAC,CAAC;QAEH,MAAM,MAAM,CAAC,aAAa,CAAC;YACzB,MAAM,EAAE,UAAU,CAAC,EAAE;YACrB,eAAe,EAAE,QAAQ,CAAC,EAAE;YAC5B,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,MAAM,eAAe,GAAU,EAAE,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,gBAAgB,EAAE,KAAK,EAAE,GAAG,EAAE,EAAE;YACtD,eAAe,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC5B,CAAC,CAAC,CAAC;QAEH,yBAAyB;QACzB,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QACnF,MAAM,CAAC,iBAAiB,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE/C,0CAA0C;QAC1C,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACxC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC/D,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC;QAEpE,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,mBAAmB,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACjD,MAAM,CAAC,mBAAmB,EAAE,YAAY,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;IACnE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0EAA0E,EAAE,KAAK,IAAI,EAAE;QACxF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,oBAAoB,CAAC,CAAC;QACtE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,KAAK;YACV,IAAI,EAAE,kBAAkB;YACxB,UAAU,EAAE,WAAW,CAAC,EAAE;SAC3B,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,sBAAsB;YAC7B,MAAM,EAAE,oBAAoB;SAC7B,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;QAC3C,MAAM,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,iBAAiB,CAAC,CAAC;QAE7C,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,eAAe,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;QAEnD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,eAAe,EAAE,CAAC,CAAC;QAC9E,MAAM,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;IAChD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,oFAAoF,EAAE,KAAK,IAAI,EAAE;QAClG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,CAAC,CAAC;QAC3F,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,eAAe;YACtB,MAAM,EAAE,MAAM;YACd,UAAU,EAAE,gBAAgB;SAC7B,CAAC,CAAC;QAEH,MAAM,cAAc,GAAU,EAAE,CAAC;QACjC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,qBAAqB,EAAE,KAAK,EAAE,GAAG,EAAE,EAAE;YAC3D,cAAc,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3B,CAAC,CAAC,CAAC;QACH,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,cAAc,EAAE,KAAK,EAAE,GAAG,EAAE,EAAE;YACpD,cAAc,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3B,CAAC,CAAC,CAAC;QAEH,+EAA+E;QAC/E,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;YAC/B,MAAM,EAAE,aAAa;YACrB,OAAO,EAAE,eAAe;YACxB,SAAS,EAAE,YAAY;SACxB,CAAC,CAAC;QAEH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACzE,MAAM,cAAc,GAAG,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,qBAAqB,CAAC,CAAC;QAClF,MAAM,CAAC,cAAc,CAAC,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QACtD,MAAM,CAAE,cAAc,EAAE,OAAe,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QACvE,MAAM,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,GAAG,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;QAE3D,MAAM,CAAC,cAAc,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvC,MAAM,CAAC,cAAc,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QAChE,MAAM,CAAC,cAAc,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QAE/D,sFAAsF;QACtF,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;YAC/B,KAAK,EAAE,eAAe;SACvB,CAAC,CAAC;QAEH,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAChF,MAAM,cAAc,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,cAAc,CAAC,CAAC;QAClF,MAAM,CAAC,cAAc,CAAC,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QAC/C,MAAM,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,GAAG,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;IAC7D,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
|
1
|
+
{"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAA4B,oBAAoB,EAAE,MAAM,YAAY,CAAC;AAGhG,QAAQ,CAAC,+BAA+B,EAAE,GAAG,EAAE;IAC7C,EAAE,CAAC,+CAA+C,EAAE,KAAK,IAAI,EAAE;QAC7D,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,MAAM;YACX,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,gBAAgB;SAC9B,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE9B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,YAAY;YACnB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,MAAM;SACjB,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;QAC9B,MAAM,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QAEtC,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAC5E,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC;IACtD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,qCAAqC,EAAE,KAAK,IAAI,EAAE;QACnD,IAAI,YAAY,GAAG,KAAK,CAAC;QAEzB,MAAM,UAAU,GAAuB;YACrC,EAAE,EAAE,iBAAiB;YACrB,IAAI,EAAE,iBAAiB;YACvB,OAAO,EAAE,OAAO;YAChB,KAAK,EAAE;gBACL,gBAAgB,EAAE,CAAC,IAAI,EAAE,EAAE;oBACzB,YAAY,GAAG,IAAI,CAAC;oBACpB,OAAO;wBACL,GAAG,IAAI;wBACP,IAAI,EAAE,CAAC,GAAG,CAAC,IAAI,CAAC,IAAI,IAAI,EAAE,CAAC,EAAE,aAAa,CAAC;qBAC5C,CAAC;gBACJ,CAAC;aACF;SACF,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,OAAO,EAAE,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEjE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,aAAa,EAAE,CAAC,CAAC;QAC9E,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,aAAa;YACpB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,MAAM,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAChC,MAAM,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,2CAA2C,EAAE,KAAK,IAAI,EAAE;QACzD,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,IAAI,EAAE,aAAa;YACnB,SAAS,EAAE,CAAC,QAAQ,EAAE,QAAQ,CAAC;SAChC,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,KAAK;YACV,IAAI,EAAE,qBAAqB;YAC3B,OAAO,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC;SACnB,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC;YAC7C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,IAAI,EAAE,oBAAoB;YAC1B,IAAI,EAAE,MAAM;SACb,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC;YAC7C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,IAAI,EAAE,UAAU;YAChB,IAAI,EAAE,QAAQ;YACd,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,uBAAuB;YAC9B,MAAM,EAAE,aAAa;YACrB,QAAQ,EAAE,QAAQ;YAClB,UAAU,EAAE,QAAQ;YACpB,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,WAAW,EAAE,SAAS,CAAC,EAAE;YACzB,WAAW,EAAE,SAAS,CAAC,EAAE;YACzB,gBAAgB,EAAE,0BAA0B;YAC5C,OAAO,EAAE,0BAA0B;YACnC,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,CAAC;YACd,aAAa,EAAE,CAAC;YAChB,wBAAwB,EAAE,GAAG;YAC7B,qBAAqB,EAAE,GAAG;YAC1B,uBAAuB,EAAE,GAAG;YAC5B,QAAQ,EAAE,EAAE;SACb,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QACvC,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAClC,MAAM,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5C,MAAM,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrC,MAAM,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACjC,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,IAAI,CAAC,wBAAwB,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAChD,MAAM,CAAC,IAAI,CAAC,qBAAqB,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC7C,MAAM,CAAC,IAAI,CAAC,uBAAuB,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC/C,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uDAAuD,EAAE,KAAK,IAAI,EAAE;QACrE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,MAAM;YACX,IAAI,EAAE,yBAAyB;YAC/B,iBAAiB,EAAE;gBACjB,EAAE,GAAG,EAAE,OAAO,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;gBACzD,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,aAAa,EAAE,QAAQ,EAAE,aAAa,EAAE;gBACrE,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,UAAU,EAAE,QAAQ,EAAE,WAAW,EAAE;aAC9D;SACF,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,eAAe;YACtB,MAAM,EAAE,aAAa;YACrB,QAAQ,EAAE,QAAQ;YAClB,gBAAgB,EAAE,0BAA0B;YAC5C,OAAO,EAAE,0BAA0B;SACpC,CAAC,CAAC;QAEH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC1D,MAAM,CAAC,KAAK,CAAC,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,CAAC,KAAK,EAAE,cAAc,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAClD,MAAM,CAAC,KAAK,EAAE,QAAQ,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,CAAC,KAAK,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAClC,MAAM,CAAC,KAAK,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;IACvC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;QAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;QAEpF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACnH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QAEnH,2BAA2B;QAC3B,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC;YAC/B,MAAM,EAAE,KAAK,CAAC,EAAE;YAChB,eAAe,EAAE,KAAK,CAAC,EAAE;YACzB,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC7D,MAAM,CAAC,MAAM,CAAC,eAAe,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAEpE,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,sBAAsB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;QAC7D,MAAM,CAAC,MAAM,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;IACpE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,mDAAmD,EAAE,KAAK,IAAI,EAAE;QACjE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QAExC,2BAA2B;QAC3B,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC;YAC3C,IAAI,EAAE,0BAA0B;YAChC,gBAAgB,EAAE,SAAS;YAC3B,QAAQ,EAAE;gBACR,EAAE,GAAG,EAAE,SAAS,EAAE,KAAK,EAAE,SAAS,EAAE,QAAQ,EAAE,aAAa,EAAE;gBAC7D,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,aAAa,EAAE,QAAQ,EAAE,aAAa,EAAE;gBACrE,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;aACtD;YACD,WAAW,EAAE;gBACX,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,SAAS,EAAE,WAAW,EAAE,aAAa,EAAE,IAAI,EAAE,YAAY,EAAE;gBACtF,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,aAAa,EAAE,WAAW,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE;aACvF;SACF,CAAC,CAAC;QAEH,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;QAElC,kCAAkC;QAClC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,IAAI;YACT,IAAI,EAAE,kBAAkB;YACxB,UAAU,EAAE,QAAQ,CAAC,EAAE;SACxB,CAAC,CAAC;QAEH,cAAc;QACd,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,eAAe;YACtB,MAAM,EAAE,SAAS;YACjB,QAAQ,EAAE,MAAM;SACjB,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACpC,MAAM,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAEnC,4BAA4B;QAC5B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC;QAEzC,2CAA2C;QAC3C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC,CAAC;QAC5E,MAAM,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAE5C,8EAA8E;QAC9E,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC;QAElF,wCAAwC;QACxC,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QACtE,MAAM,CAAC,QAAQ,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,wDAAwD,EAAE,KAAK,IAAI,EAAE;QACtE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;QACpF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,sBAAsB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAE5G,kBAAkB;QAClB,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC;YAC7C,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,UAAU,EAAE,QAAQ;YACpB,QAAQ,EAAE,UAAU;YACpB,QAAQ,EAAE,iBAAiB;YAC3B,SAAS,EAAE,IAAI;YACf,GAAG,EAAE,gDAAgD;SACtD,CAAC,CAAC;QACH,MAAM,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;QAClC,MAAM,CAAC,QAAQ,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,gDAAgD,CAAC,CAAC;QAE5E,uCAAuC;QACvC,MAAM,YAAY,GAAG,+BAA+B,GAAG,CAAC,MAAM,CAAC,IAAI,CAAC,EAAE,CAAC;QACvE,MAAM,MAAM,CACV,MAAM,CAAC,gBAAgB,CAAC;YACtB,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,UAAU,EAAE,QAAQ;YACpB,QAAQ,EAAE,UAAU;YACpB,QAAQ,EAAE,iBAAiB;YAC3B,SAAS,EAAE,IAAI;YACf,GAAG,EAAE,YAAY;SAClB,CAAC,CACH,CAAC,OAAO,CAAC,OAAO,CAAC,2CAA2C,CAAC,CAAC;IACjE,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,wFAAwF,EAAE,KAAK,IAAI,EAAE;QACtG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,iBAAiB,EAAE,CAAC,CAAC;QACjF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAEpG,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACtC,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,QAAQ,EAAE,QAAQ;YAClB,OAAO,EAAE,iBAAiB;SAC3B,CAAC,CAAC;QAEH,MAAM,cAAc,GAAa,EAAE,CAAC;QACpC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,GAAG,EAAE,CAAC,KAAK,EAAE,EAAE;YACrC,cAAc,CAAC,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC;QAClC,CAAC,CAAC,CAAC;QAEH,kBAAkB;QAClB,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE;YAC/D,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,YAAY,EAAE,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChD,MAAM,CAAC,YAAY,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,aAAa,CAAC;YACjD,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,YAAY,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;QAC7D,MAAM,CAAC,cAAc,CAAC,CAAC,SAAS,CAAC,wBAAwB,CAAC,CAAC;QAE3D,6DAA6D;QAC7D,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE;YACpE,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,iBAAiB,EAAE,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAErD,2CAA2C;QAC3C,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE;YACjE,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,cAAc,EAAE,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAElD,qBAAqB;QACrB,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,OAAO,CAAC,EAAE,EAAE;YAClE,KAAK,EAAE,IAAI;YACX,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,MAAM,CAAC,YAAY,EAAE,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChD,MAAM,CAAC,YAAY,EAAE,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACtD,MAAM,CAAC,cAAc,CAAC,CAAC,SAAS,CAAC,0BAA0B,CAAC,CAAC;IAC/D,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0EAA0E,EAAE,KAAK,IAAI,EAAE;QACxF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,kBAAkB,EAAE,CAAC,CAAC;QAClF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QAErG,0BAA0B;QAC1B,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACvC,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,QAAQ,EAAE,QAAQ;YAClB,OAAO,EAAE,kEAAkE;SAC5E,CAAC,CAAC;QACH,MAAM,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,EAAE,QAAQ,EAAE,kBAAkB,CAAC,CAAC,CAAC;QAE7E,2BAA2B;QAC3B,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACvC,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,QAAQ,EAAE,QAAQ;YAClB,OAAO,EAAE,2BAA2B;YACpC,QAAQ,EAAE,CAAC,iBAAiB,CAAC;SAC9B,CAAC,CAAC;QACH,MAAM,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,iBAAiB,CAAC,CAAC,CAAC;QAEvD,0CAA0C;QAC1C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,QAAQ,CAAC,EAAE,EAAE;YACtD,OAAO,EAAE,+BAA+B;SACzC,CAAC,CAAC;QACH,MAAM,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,OAAO,CAAC,CAAC,aAAa,CAAC,CAAC,CAAC;IACrD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,qBAAqB,EAAE,CAAC,CAAC;QAErF,4BAA4B;QAC5B,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,qBAAqB;YAC5B,MAAM,EAAE,aAAa;YACrB,SAAS,EAAE;gBACT,EAAE,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,aAAa,EAAE,IAAI,EAAE,SAAS,EAAE,IAAI,EAAE,OAAO,EAAE;gBACtE,EAAE,EAAE,EAAE,QAAQ,EAAE,IAAI,EAAE,iBAAiB,EAAE,IAAI,EAAE,WAAW,EAAE,IAAI,EAAE,MAAM,EAAE,SAAS,EAAE,+BAA+B,EAAE;aACvH;SACF,CAAC,CAAC;QAEH,MAAM,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvC,MAAM,CAAC,IAAI,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAC/C,MAAM,CAAC,IAAI,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,+BAA+B,CAAC,CAAC;QAE5E,uBAAuB;QACvB,MAAM,gBAAgB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjF,MAAM,CAAC,gBAAgB,CAAC,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC;QAE3C,wDAAwD;QACxD,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YAC1C,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,SAAS;SAClB,CAAC,CAAC;QACH,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QACnF,MAAM,CAAC,WAAW,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAClC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,yGAAyG,EAAE,KAAK,IAAI,EAAE;QACvH,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,sBAAsB,EAAE,CAAC,CAAC;QAExF,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACvC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,eAAe;YACtB,MAAM,EAAE,aAAa;SACtB,CAAC,CAAC;QAEH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACzC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,iBAAiB;YACxB,MAAM,EAAE,MAAM;YACd,SAAS,EAAE,IAAI;YACf,aAAa,EAAE,qBAAqB;SACrC,CAAC,CAAC;QAEH,MAAM,MAAM,CAAC,aAAa,CAAC;YACzB,MAAM,EAAE,UAAU,CAAC,EAAE;YACrB,eAAe,EAAE,QAAQ,CAAC,EAAE;YAC5B,IAAI,EAAE,UAAU;SACjB,CAAC,CAAC;QAEH,MAAM,eAAe,GAAU,EAAE,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,gBAAgB,EAAE,KAAK,EAAE,GAAG,EAAE,EAAE;YACtD,eAAe,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC5B,CAAC,CAAC,CAAC;QAEH,yBAAyB;QACzB,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;QACnF,MAAM,CAAC,iBAAiB,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QAE/C,0CAA0C;QAC1C,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACxC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAC/D,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC;QAEpE,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,mBAAmB,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACjD,MAAM,CAAC,mBAAmB,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;IACrD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0EAA0E,EAAE,KAAK,IAAI,EAAE;QACxF,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,oBAAoB,CAAC,CAAC;QACtE,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC;YACtC,GAAG,EAAE,KAAK;YACV,IAAI,EAAE,kBAAkB;YACxB,UAAU,EAAE,WAAW,CAAC,EAAE;SAC3B,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,sBAAsB;YAC7B,MAAM,EAAE,oBAAoB;SAC7B,CAAC,CAAC;QAEH,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAChE,MAAM,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;QAC3C,MAAM,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,iBAAiB,CAAC,CAAC;QAE7C,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,eAAe,CAAC,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC;QAEnD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,eAAe,EAAE,CAAC,CAAC;QAC9E,MAAM,CAAC,OAAO,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;IAChD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,oFAAoF,EAAE,KAAK,IAAI,EAAE;QAClG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;QACxC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,2BAA2B,EAAE,CAAC,CAAC;QAC3F,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;YACnC,SAAS,EAAE,IAAI,CAAC,EAAE;YAClB,KAAK,EAAE,eAAe;YACtB,MAAM,EAAE,MAAM;YACd,UAAU,EAAE,gBAAgB;SAC7B,CAAC,CAAC;QAEH,MAAM,cAAc,GAAU,EAAE,CAAC;QACjC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,qBAAqB,EAAE,KAAK,EAAE,GAAG,EAAE,EAAE;YAC3D,cAAc,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3B,CAAC,CAAC,CAAC;QACH,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,cAAc,EAAE,KAAK,EAAE,GAAG,EAAE,EAAE;YACpD,cAAc,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QAC3B,CAAC,CAAC,CAAC;QAEH,+EAA+E;QAC/E,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;YAC/B,MAAM,EAAE,aAAa;YACrB,OAAO,EAAE,eAAe;YACxB,SAAS,EAAE,YAAY;SACxB,CAAC,CAAC;QAEH,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QACzE,MAAM,cAAc,GAAG,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,qBAAqB,CAAC,CAAC;QAClF,MAAM,CAAC,cAAc,CAAC,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QACtD,MAAM,CAAE,cAAc,EAAE,OAAe,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QACvE,MAAM,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,GAAG,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;QAE3D,MAAM,CAAC,cAAc,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACvC,MAAM,CAAC,cAAc,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QAChE,MAAM,CAAC,cAAc,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;QAE/D,sFAAsF;QACtF,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;YAC/B,KAAK,EAAE,eAAe;SACvB,CAAC,CAAC;QAEH,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;QAChF,MAAM,cAAc,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,cAAc,CAAC,CAAC;QAClF,MAAM,CAAC,cAAc,CAAC,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QAC/C,MAAM,CAAC,cAAc,EAAE,OAAO,CAAC,CAAC,GAAG,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;IAC7D,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
package/dist/task-state.test.js
CHANGED
|
@@ -297,12 +297,13 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
297
297
|
title: 'Compile Library',
|
|
298
298
|
status: 'todo'
|
|
299
299
|
});
|
|
300
|
-
// Create downstream task with
|
|
300
|
+
// Create downstream task with isBlocked = true
|
|
301
301
|
const taskDownstream = await engine.createTask({
|
|
302
302
|
projectId: project.id,
|
|
303
303
|
title: 'Run Integration Tests',
|
|
304
|
-
status: '
|
|
305
|
-
|
|
304
|
+
status: 'todo',
|
|
305
|
+
isBlocked: true,
|
|
306
|
+
blockedReason: 'Waiting on compilation'
|
|
306
307
|
});
|
|
307
308
|
await engine.addDependency({
|
|
308
309
|
taskId: taskDownstream.id,
|
|
@@ -321,11 +322,11 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
321
322
|
expect(unblockedEvents[0].name).toBe('task.unblocked');
|
|
322
323
|
expect(unblockedEvents[0].aggregateId).toBe(taskDownstream.id);
|
|
323
324
|
expect(unblockedEvents[0].payload.upstreamTaskId).toBe(taskUpstream.id);
|
|
324
|
-
// Verify downstream task
|
|
325
|
+
// Verify downstream task is unblocked
|
|
325
326
|
const updatedDownstream = await engine.getTask(taskDownstream.id);
|
|
326
327
|
expect(updatedDownstream?.status).toBe('todo');
|
|
327
|
-
expect(updatedDownstream?.
|
|
328
|
-
expect(updatedDownstream?.
|
|
328
|
+
expect(updatedDownstream?.isBlocked).toBe(false);
|
|
329
|
+
expect(updatedDownstream?.blockedReason).toBeNull();
|
|
329
330
|
// Verify lifecycle state is ready and unblocked
|
|
330
331
|
const lifecycle = await engine.getTaskLifecycleState(taskDownstream.id);
|
|
331
332
|
expect(lifecycle?.isBlocked).toBe(false);
|
|
@@ -339,8 +340,8 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
339
340
|
const downstream = await engine.createTask({
|
|
340
341
|
projectId: project.id,
|
|
341
342
|
title: 'Final Assembly',
|
|
342
|
-
status: '
|
|
343
|
-
|
|
343
|
+
status: 'todo',
|
|
344
|
+
isBlocked: true
|
|
344
345
|
});
|
|
345
346
|
await engine.addDependency({ taskId: downstream.id, dependsOnTaskId: up1.id, type: 'blocking' });
|
|
346
347
|
await engine.addDependency({ taskId: downstream.id, dependsOnTaskId: up2.id, type: 'blocking' });
|
|
@@ -353,8 +354,7 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
353
354
|
// Downstream should NOT be unblocked because up2 is still incomplete
|
|
354
355
|
expect(unblockedEvents).toHaveLength(0);
|
|
355
356
|
let taskState = await engine.getTask(downstream.id);
|
|
356
|
-
expect(taskState?.
|
|
357
|
-
expect(taskState?.customFields?.isBlocked).toBe(true);
|
|
357
|
+
expect(taskState?.isBlocked).toBe(true);
|
|
358
358
|
let lifecycle = await engine.getTaskLifecycleState(downstream.id);
|
|
359
359
|
expect(lifecycle?.isBlocked).toBe(true);
|
|
360
360
|
expect(lifecycle?.blockingTaskIds).toEqual([up2.id]);
|
|
@@ -364,7 +364,7 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
364
364
|
expect(unblockedEvents).toHaveLength(1);
|
|
365
365
|
taskState = await engine.getTask(downstream.id);
|
|
366
366
|
expect(taskState?.status).toBe('todo');
|
|
367
|
-
expect(taskState?.
|
|
367
|
+
expect(taskState?.isBlocked).toBe(false);
|
|
368
368
|
lifecycle = await engine.getTaskLifecycleState(downstream.id);
|
|
369
369
|
expect(lifecycle?.isBlocked).toBe(false);
|
|
370
370
|
expect(lifecycle?.isReady).toBe(true);
|
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"task-state.test.js","sourceRoot":"","sources":["../src/task-state.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAM,MAAM,QAAQ,CAAC;AAClD,OAAO,EAAE,kBAAkB,EAAE,MAAM,mBAAmB,CAAC;AACvD,OAAO,EAAE,wBAAwB,EAAE,MAAM,mBAAmB,CAAC;AAG7D,QAAQ,CAAC,8CAA8C,EAAE,GAAG,EAAE;IAC5D,MAAM,QAAQ,GAAS;QACrB,EAAE,EAAE,aAAa;QACjB,SAAS,EAAE,QAAQ;QACnB,KAAK,EAAE,6BAA6B;QACpC,MAAM,EAAE,MAAM;QACd,QAAQ,EAAE,MAAM;QAChB,SAAS,EAAE,0BAA0B;QACrC,SAAS,EAAE,0BAA0B;KACtC,CAAC;IAEF,QAAQ,CAAC,0CAA0C,EAAE,GAAG,EAAE;QACxD,EAAE,CAAC,qEAAqE,EAAE,GAAG,EAAE;YAC7E,MAAM,kBAAkB,GAAS;gBAC/B,EAAE,EAAE,eAAe;gBACnB,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,kBAAkB;gBACzB,MAAM,EAAE,aAAa;gBACrB,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,MAAM,KAAK,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBAC/C,aAAa,EAAE,CAAC,kBAAkB,CAAC;aACpC,CAAC,CAAC;YAEH,MAAM,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAClC,MAAM,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0FAA0F,EAAE,GAAG,EAAE;YAClG,MAAM,gBAAgB,GAAS;gBAC7B,EAAE,EAAE,eAAe;gBACnB,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,kBAAkB;gBACzB,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,MAAM,KAAK,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBAC/C,aAAa,EAAE,CAAC,gBAAgB,CAAC;aAClC,CAAC,CAAC;YAEH,MAAM,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpC,MAAM,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACjC,MAAM,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mGAAmG,EAAE,GAAG,EAAE;YAC3G,MAAM,YAAY,GAAS;gBACzB,EAAE,EAAE,eAAe;gBACnB,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,kBAAkB;gBACzB,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,sCAAsC;YACtC,MAAM,OAAO,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACjD,aAAa,EAAE,CAAC,YAAY,CAAC;aAC9B,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAEnC,mCAAmC;YACnC,MAAM,gBAAgB,GAAS;gBAC7B,GAAG,YAAY;gBACf,MAAM,EAAE,aAAa;gBACrB,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,MAAM,WAAW,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACrD,aAAa,EAAE,CAAC,gBAAgB,CAAC;aAClC,CAAC,CAAC;YACH,MAAM,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACzC,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACxC,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QACjE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iFAAiF,EAAE,GAAG,EAAE;YACzF,MAAM,SAAS,GAAS;gBACtB,EAAE,EAAE,MAAM;gBACV,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,eAAe;gBACtB,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YACF,MAAM,SAAS,GAAS;gBACtB,EAAE,EAAE,MAAM;gBACV,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,2BAA2B;gBAClC,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,QAAQ;gBAClB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,yCAAyC;YACzC,MAAM,YAAY,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACtD,aAAa,EAAE,CAAC,SAAS,EAAE,SAAS,CAAC;aACtC,CAAC,CAAC;YACH,MAAM,CAAC,YAAY,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC1C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACzC,MAAM,CAAC,YAAY,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;YAEvD,0CAA0C;YAC1C,MAAM,gBAAgB,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBAC1D,aAAa,EAAE,CAAC,SAAS,EAAE,EAAE,GAAG,SAAS,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC;aAC7D,CAAC,CAAC;YACH,MAAM,CAAC,gBAAgB,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC/C,MAAM,CAAC,gBAAgB,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC5C,MAAM,CAAC,gBAAgB,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,sFAAsF,EAAE,GAAG,EAAE;YAC9F,MAAM,kBAAkB,GAAS;gBAC/B,EAAE,EAAE,eAAe;gBACnB,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,gBAAgB;gBACvB,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,8BAA8B;YAC9B,MAAM,aAAa,GAAS;gBAC1B,GAAG,QAAQ;gBACX,MAAM,EAAE,MAAM;aACf,CAAC;YACF,MAAM,SAAS,GAAG,wBAAwB,CAAC,aAAa,EAAE;gBACxD,aAAa,EAAE,CAAC,kBAAkB,CAAC;aACpC,CAAC,CAAC;YACH,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACpC,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAExC,2BAA2B;YAC3B,MAAM,YAAY,GAAS;gBACzB,GAAG,QAAQ;gBACX,MAAM,EAAE,UAAU;aACnB,CAAC;YACF,MAAM,aAAa,GAAG,wBAAwB,CAAC,YAAY,EAAE;gBAC3D,aAAa,EAAE,CAAC,kBAAkB,CAAC;aACpC,CAAC,CAAC;YACH,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC7C,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAC9C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2EAA2E,EAAE,GAAG,EAAE;YACnF,MAAM,iBAAiB,GAAuB;gBAC5C,EAAE,GAAG,EAAE,SAAS,EAAE,KAAK,EAAE,SAAS,EAAE,QAAQ,EAAE,aAAa,EAAE;gBAC7D,EAAE,GAAG,EAAE,WAAW,EAAE,KAAK,EAAE,WAAW,EAAE,QAAQ,EAAE,aAAa,EAAE;gBACjE,EAAE,GAAG,EAAE,cAAc,EAAE,KAAK,EAAE,uBAAuB,EAAE,QAAQ,EAAE,WAAW,EAAE;gBAC9E,EAAE,GAAG,EAAE,WAAW,EAAE,KAAK,EAAE,WAAW,EAAE,QAAQ,EAAE,UAAU,EAAE;aAC/D,CAAC;YAEF,MAAM,YAAY,GAAS;gBACzB,EAAE,EAAE,OAAO;gBACX,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,qBAAqB;gBAC5B,MAAM,EAAE,WAAW;gBACnB,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,2DAA2D;YAC3D,MAAM,YAAY,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACtD,iBAAiB;gBACjB,aAAa,EAAE,CAAC,YAAY,CAAC;aAC9B,CAAC,CAAC;YACH,MAAM,CAAC,YAAY,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC1C,MAAM,CAAC,YAAY,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC;YAExD,8DAA8D;YAC9D,MAAM,cAAc,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACxD,iBAAiB;gBACjB,aAAa,EAAE,CAAC,EAAE,GAAG,YAAY,EAAE,MAAM,EAAE,cAAc,EAAE,CAAC;aAC7D,CAAC,CAAC;YACH,MAAM,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC7C,MAAM,CAAC,cAAc,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC5C,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,uDAAuD,EAAE,GAAG,EAAE;QACrE,EAAE,CAAC,gEAAgE,EAAE,KAAK,IAAI,EAAE;YAC9E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,IAAI,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;YAEtF,mBAAmB;YACnB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACpC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,mBAAmB;gBAC1B,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;aACjB,CAAC,CAAC;YAEH,+BAA+B;YAC/B,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACpC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,qBAAqB;gBAC5B,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,QAAQ;aACnB,CAAC,CAAC;YAEH,wDAAwD;YACxD,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAEnC,0CAA0C;YAC1C,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,KAAK,CAAC,EAAE;gBAChB,eAAe,EAAE,KAAK,CAAC,EAAE;gBACzB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,0EAA0E;YAC1E,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAEtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEhD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;YAEpD,kDAAkD;YAClD,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAEtD,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAClC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEhD,uEAAuE;YACvE,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;QACtD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;YACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;YAEvF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAClG,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAElG,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,KAAK,CAAC,EAAE;gBAChB,eAAe,EAAE,KAAK,CAAC,EAAE;gBACzB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAErC,uBAAuB;YACvB,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAElC,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAClD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;YAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,eAAe,EAAE,CAAC,CAAC;YAEpF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,mBAAmB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAC7G,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,uBAAuB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YACjH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,uBAAuB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEjH,iBAAiB;YACjB,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,KAAK,CAAC,EAAE;gBAChB,eAAe,EAAE,KAAK,CAAC,EAAE;gBACzB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,iBAAiB;YACjB,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,KAAK,CAAC,EAAE;gBAChB,eAAe,EAAE,KAAK,CAAC,EAAE;gBACzB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,kEAAkE;YAClE,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAE1D,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;YACpD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;YAEpD,uDAAuD;YACvD,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAEtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAEnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;YAEpD,+CAA+C;YAC/C,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAClD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+GAA+G,EAAE,KAAK,IAAI,EAAE;YAC7H,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,sBAAsB,EAAE,CAAC,CAAC;YAE3F,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBAC3C,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,MAAM;aACf,CAAC,CAAC;YAEH,kFAAkF;YAClF,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBAC7C,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,uBAAuB;gBAC9B,MAAM,EAAE,SAAS;gBACjB,YAAY,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE,aAAa,EAAE,wBAAwB,EAAE;aAC3E,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,cAAc,CAAC,EAAE;gBACzB,eAAe,EAAE,YAAY,CAAC,EAAE;gBAChC,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,4BAA4B;YAC5B,MAAM,eAAe,GAAyB,EAAE,CAAC;YACjD,MAAM,CAAC,MAAM,CAAC,SAAS,CAAqB,gBAAgB,EAAE,CAAC,KAAK,EAAE,EAAE;gBACtE,eAAe,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC9B,CAAC,CAAC,CAAC;YAEH,yBAAyB;YACzB,MAAM,MAAM,CAAC,UAAU,CAAC,YAAY,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAE7D,oCAAoC;YACpC,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;YACvD,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YAC/D,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;YAExE,iFAAiF;YACjF,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YAClE,MAAM,CAAC,iBAAiB,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAC/C,MAAM,CAAC,iBAAiB,EAAE,YAAY,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC/D,MAAM,CAAC,iBAAiB,EAAE,YAAY,EAAE,aAAa,CAAC,CAAC,QAAQ,EAAE,CAAC;YAElE,gDAAgD;YAChD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACxE,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACzC,MAAM,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wFAAwF,EAAE,KAAK,IAAI,EAAE;YACtG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,gBAAgB,EAAE,CAAC,CAAC;YAErF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YACtG,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACzC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,gBAAgB;gBACvB,MAAM,EAAE,SAAS;gBACjB,YAAY,EAAE,EAAE,SAAS,EAAE,IAAI,EAAE;aAClC,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,UAAU,CAAC,EAAE,EAAE,eAAe,EAAE,GAAG,CAAC,EAAE,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,CAAC;YACjG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,UAAU,CAAC,EAAE,EAAE,eAAe,EAAE,GAAG,CAAC,EAAE,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,CAAC;YAEjG,MAAM,eAAe,GAAyB,EAAE,CAAC;YACjD,MAAM,CAAC,MAAM,CAAC,SAAS,CAAqB,gBAAgB,EAAE,CAAC,GAAG,EAAE,EAAE;gBACpE,eAAe,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,CAAC,CAAC,CAAC;YAEH,oBAAoB;YACpB,MAAM,MAAM,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEpD,qEAAqE;YACrE,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAExC,IAAI,SAAS,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YACpD,MAAM,CAAC,SAAS,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;YAC1C,MAAM,CAAC,SAAS,EAAE,YAAY,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAEtD,IAAI,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClE,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACxC,MAAM,CAAC,SAAS,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;YAErD,eAAe;YACf,MAAM,MAAM,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEpD,6BAA6B;YAC7B,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,SAAS,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAChD,MAAM,CAAC,SAAS,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YACvC,MAAM,CAAC,SAAS,EAAE,YAAY,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAEvD,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAC9D,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACzC,MAAM,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kFAAkF,EAAE,KAAK,IAAI,EAAE;YAChG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,sBAAsB,EAAE,CAAC,CAAC;YAE3F,MAAM,aAAa,GAAuB,EAAE,CAAC;YAC7C,MAAM,eAAe,GAAyB,EAAE,CAAC;YACjD,MAAM,CAAC,MAAM,CAAC,SAAS,CAAmB,cAAc,EAAE,CAAC,GAAG,EAAE,EAAE;gBAChE,aAAa,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC1B,CAAC,CAAC,CAAC;YACH,MAAM,CAAC,MAAM,CAAC,SAAS,CAAqB,gBAAgB,EAAE,CAAC,GAAG,EAAE,EAAE;gBACpE,eAAe,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,CAAC,CAAC,CAAC;YAEH,2CAA2C;YAC3C,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACnC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,aAAa;aACtB,CAAC,CAAC;YAEH,IAAI,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC5D,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAEzC,gEAAgE;YAChE,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnD,SAAS,EAAE,IAAI;gBACf,aAAa,EAAE,8BAA8B;aAC9C,CAAC,CAAC;YACH,MAAM,CAAC,WAAW,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC1C,MAAM,CAAC,WAAW,EAAE,aAAa,CAAC,CAAC,IAAI,CAAC,8BAA8B,CAAC,CAAC;YACxE,MAAM,CAAC,WAAW,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;YAEhD,sBAAsB;YACtB,MAAM,CAAC,aAAa,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACtC,MAAM,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACnD,MAAM,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,8BAA8B,CAAC,CAAC;YAE7E,yBAAyB;YACzB,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACxD,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACxC,MAAM,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAEvC,sBAAsB;YACtB,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACrD,SAAS,EAAE,KAAK;gBAChB,aAAa,EAAE,IAAI;aACpB,CAAC,CAAC;YACH,MAAM,CAAC,aAAa,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC7C,MAAM,CAAC,aAAa,EAAE,aAAa,CAAC,CAAC,QAAQ,EAAE,CAAC;YAChD,MAAM,CAAC,aAAa,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;YAElD,sBAAsB;YACtB,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAErD,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACxD,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAC3C,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
|
1
|
+
{"version":3,"file":"task-state.test.js","sourceRoot":"","sources":["../src/task-state.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAM,MAAM,QAAQ,CAAC;AAClD,OAAO,EAAE,kBAAkB,EAAE,MAAM,mBAAmB,CAAC;AACvD,OAAO,EAAE,wBAAwB,EAAE,MAAM,mBAAmB,CAAC;AAG7D,QAAQ,CAAC,8CAA8C,EAAE,GAAG,EAAE;IAC5D,MAAM,QAAQ,GAAS;QACrB,EAAE,EAAE,aAAa;QACjB,SAAS,EAAE,QAAQ;QACnB,KAAK,EAAE,6BAA6B;QACpC,MAAM,EAAE,MAAM;QACd,QAAQ,EAAE,MAAM;QAChB,SAAS,EAAE,0BAA0B;QACrC,SAAS,EAAE,0BAA0B;KACtC,CAAC;IAEF,QAAQ,CAAC,0CAA0C,EAAE,GAAG,EAAE;QACxD,EAAE,CAAC,qEAAqE,EAAE,GAAG,EAAE;YAC7E,MAAM,kBAAkB,GAAS;gBAC/B,EAAE,EAAE,eAAe;gBACnB,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,kBAAkB;gBACzB,MAAM,EAAE,aAAa;gBACrB,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,MAAM,KAAK,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBAC/C,aAAa,EAAE,CAAC,kBAAkB,CAAC;aACpC,CAAC,CAAC;YAEH,MAAM,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAClC,MAAM,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,0FAA0F,EAAE,GAAG,EAAE;YAClG,MAAM,gBAAgB,GAAS;gBAC7B,EAAE,EAAE,eAAe;gBACnB,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,kBAAkB;gBACzB,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,MAAM,KAAK,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBAC/C,aAAa,EAAE,CAAC,gBAAgB,CAAC;aAClC,CAAC,CAAC;YAEH,MAAM,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpC,MAAM,CAAC,KAAK,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACjC,MAAM,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAChD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,mGAAmG,EAAE,GAAG,EAAE;YAC3G,MAAM,YAAY,GAAS;gBACzB,EAAE,EAAE,eAAe;gBACnB,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,kBAAkB;gBACzB,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,sCAAsC;YACtC,MAAM,OAAO,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACjD,aAAa,EAAE,CAAC,YAAY,CAAC;aAC9B,CAAC,CAAC;YACH,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAEnC,mCAAmC;YACnC,MAAM,gBAAgB,GAAS;gBAC7B,GAAG,YAAY;gBACf,MAAM,EAAE,aAAa;gBACrB,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,MAAM,WAAW,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACrD,aAAa,EAAE,CAAC,gBAAgB,CAAC;aAClC,CAAC,CAAC;YACH,MAAM,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACzC,MAAM,CAAC,WAAW,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACxC,MAAM,CAAC,WAAW,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QACjE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iFAAiF,EAAE,GAAG,EAAE;YACzF,MAAM,SAAS,GAAS;gBACtB,EAAE,EAAE,MAAM;gBACV,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,eAAe;gBACtB,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YACF,MAAM,SAAS,GAAS;gBACtB,EAAE,EAAE,MAAM;gBACV,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,2BAA2B;gBAClC,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,QAAQ;gBAClB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,yCAAyC;YACzC,MAAM,YAAY,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACtD,aAAa,EAAE,CAAC,SAAS,EAAE,SAAS,CAAC;aACtC,CAAC,CAAC;YACH,MAAM,CAAC,YAAY,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC1C,MAAM,CAAC,YAAY,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACzC,MAAM,CAAC,YAAY,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;YAEvD,0CAA0C;YAC1C,MAAM,gBAAgB,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBAC1D,aAAa,EAAE,CAAC,SAAS,EAAE,EAAE,GAAG,SAAS,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC;aAC7D,CAAC,CAAC;YACH,MAAM,CAAC,gBAAgB,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC/C,MAAM,CAAC,gBAAgB,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC5C,MAAM,CAAC,gBAAgB,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC3D,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,sFAAsF,EAAE,GAAG,EAAE;YAC9F,MAAM,kBAAkB,GAAS;gBAC/B,EAAE,EAAE,eAAe;gBACnB,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,gBAAgB;gBACvB,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,8BAA8B;YAC9B,MAAM,aAAa,GAAS;gBAC1B,GAAG,QAAQ;gBACX,MAAM,EAAE,MAAM;aACf,CAAC;YACF,MAAM,SAAS,GAAG,wBAAwB,CAAC,aAAa,EAAE;gBACxD,aAAa,EAAE,CAAC,kBAAkB,CAAC;aACpC,CAAC,CAAC;YACH,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACpC,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAExC,2BAA2B;YAC3B,MAAM,YAAY,GAAS;gBACzB,GAAG,QAAQ;gBACX,MAAM,EAAE,UAAU;aACnB,CAAC;YACF,MAAM,aAAa,GAAG,wBAAwB,CAAC,YAAY,EAAE;gBAC3D,aAAa,EAAE,CAAC,kBAAkB,CAAC;aACpC,CAAC,CAAC;YACH,MAAM,CAAC,aAAa,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC7C,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAC9C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2EAA2E,EAAE,GAAG,EAAE;YACnF,MAAM,iBAAiB,GAAuB;gBAC5C,EAAE,GAAG,EAAE,SAAS,EAAE,KAAK,EAAE,SAAS,EAAE,QAAQ,EAAE,aAAa,EAAE;gBAC7D,EAAE,GAAG,EAAE,WAAW,EAAE,KAAK,EAAE,WAAW,EAAE,QAAQ,EAAE,aAAa,EAAE;gBACjE,EAAE,GAAG,EAAE,cAAc,EAAE,KAAK,EAAE,uBAAuB,EAAE,QAAQ,EAAE,WAAW,EAAE;gBAC9E,EAAE,GAAG,EAAE,WAAW,EAAE,KAAK,EAAE,WAAW,EAAE,QAAQ,EAAE,UAAU,EAAE;aAC/D,CAAC;YAEF,MAAM,YAAY,GAAS;gBACzB,EAAE,EAAE,OAAO;gBACX,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,qBAAqB;gBAC5B,MAAM,EAAE,WAAW;gBACnB,QAAQ,EAAE,MAAM;gBAChB,SAAS,EAAE,0BAA0B;gBACrC,SAAS,EAAE,0BAA0B;aACtC,CAAC;YAEF,2DAA2D;YAC3D,MAAM,YAAY,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACtD,iBAAiB;gBACjB,aAAa,EAAE,CAAC,YAAY,CAAC;aAC9B,CAAC,CAAC;YACH,MAAM,CAAC,YAAY,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC1C,MAAM,CAAC,YAAY,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,CAAC,CAAC,CAAC;YAExD,8DAA8D;YAC9D,MAAM,cAAc,GAAG,wBAAwB,CAAC,QAAQ,EAAE;gBACxD,iBAAiB;gBACjB,aAAa,EAAE,CAAC,EAAE,GAAG,YAAY,EAAE,MAAM,EAAE,cAAc,EAAE,CAAC;aAC7D,CAAC,CAAC;YACH,MAAM,CAAC,cAAc,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC7C,MAAM,CAAC,cAAc,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC5C,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,uDAAuD,EAAE,GAAG,EAAE;QACrE,EAAE,CAAC,gEAAgE,EAAE,KAAK,IAAI,EAAE;YAC9E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,IAAI,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;YAEtF,mBAAmB;YACnB,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACpC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,mBAAmB;gBAC1B,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,MAAM;aACjB,CAAC,CAAC;YAEH,+BAA+B;YAC/B,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACpC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,qBAAqB;gBAC5B,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,QAAQ;aACnB,CAAC,CAAC;YAEH,wDAAwD;YACxD,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAEnC,0CAA0C;YAC1C,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,KAAK,CAAC,EAAE;gBAChB,eAAe,EAAE,KAAK,CAAC,EAAE;gBACzB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,0EAA0E;YAC1E,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAEtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEhD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;YAEpD,kDAAkD;YAClD,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAEtD,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAClC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAEhD,uEAAuE;YACvE,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;QACtD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,sDAAsD,EAAE,KAAK,IAAI,EAAE;YACpE,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;YAEvF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAClG,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAElG,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,KAAK,CAAC,EAAE;gBAChB,eAAe,EAAE,KAAK,CAAC,EAAE;gBACzB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAErC,uBAAuB;YACvB,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAElC,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAClD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iEAAiE,EAAE,KAAK,IAAI,EAAE;YAC/E,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,eAAe,EAAE,CAAC,CAAC;YAEpF,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,mBAAmB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAC7G,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,uBAAuB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YACjH,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,uBAAuB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEjH,iBAAiB;YACjB,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,KAAK,CAAC,EAAE;gBAChB,eAAe,EAAE,KAAK,CAAC,EAAE;gBACzB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,iBAAiB;YACjB,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,KAAK,CAAC,EAAE;gBAChB,eAAe,EAAE,KAAK,CAAC,EAAE;gBACzB,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,kEAAkE;YAClE,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAC1D,IAAI,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAE1D,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;YACpD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;YAEpD,uDAAuD;YACvD,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YAEtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAEnC,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACpC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC;YAEpD,+CAA+C;YAC/C,MAAM,MAAM,CAAC,UAAU,CAAC,KAAK,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtD,MAAM,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC;YACtD,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACtC,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnC,MAAM,CAAC,MAAM,EAAE,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAClD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+GAA+G,EAAE,KAAK,IAAI,EAAE;YAC7H,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,sBAAsB,EAAE,CAAC,CAAC;YAE3F,MAAM,YAAY,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBAC3C,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,MAAM;aACf,CAAC,CAAC;YAEH,+CAA+C;YAC/C,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBAC7C,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,uBAAuB;gBAC9B,MAAM,EAAE,MAAM;gBACd,SAAS,EAAE,IAAI;gBACf,aAAa,EAAE,wBAAwB;aACxC,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,aAAa,CAAC;gBACzB,MAAM,EAAE,cAAc,CAAC,EAAE;gBACzB,eAAe,EAAE,YAAY,CAAC,EAAE;gBAChC,IAAI,EAAE,UAAU;aACjB,CAAC,CAAC;YAEH,4BAA4B;YAC5B,MAAM,eAAe,GAAyB,EAAE,CAAC;YACjD,MAAM,CAAC,MAAM,CAAC,SAAS,CAAqB,gBAAgB,EAAE,CAAC,KAAK,EAAE,EAAE;gBACtE,eAAe,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC9B,CAAC,CAAC,CAAC;YAEH,yBAAyB;YACzB,MAAM,MAAM,CAAC,UAAU,CAAC,YAAY,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAE7D,oCAAoC;YACpC,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;YACvD,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YAC/D,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;YAExE,sCAAsC;YACtC,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YAClE,MAAM,CAAC,iBAAiB,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAC/C,MAAM,CAAC,iBAAiB,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACjD,MAAM,CAAC,iBAAiB,EAAE,aAAa,CAAC,CAAC,QAAQ,EAAE,CAAC;YAEpD,gDAAgD;YAChD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACxE,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACzC,MAAM,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wFAAwF,EAAE,KAAK,IAAI,EAAE;YACtG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,gBAAgB,EAAE,CAAC,CAAC;YAErF,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YACtG,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEtG,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACzC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,gBAAgB;gBACvB,MAAM,EAAE,MAAM;gBACd,SAAS,EAAE,IAAI;aAChB,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,UAAU,CAAC,EAAE,EAAE,eAAe,EAAE,GAAG,CAAC,EAAE,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,CAAC;YACjG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,MAAM,EAAE,UAAU,CAAC,EAAE,EAAE,eAAe,EAAE,GAAG,CAAC,EAAE,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,CAAC;YAEjG,MAAM,eAAe,GAAyB,EAAE,CAAC;YACjD,MAAM,CAAC,MAAM,CAAC,SAAS,CAAqB,gBAAgB,EAAE,CAAC,GAAG,EAAE,EAAE;gBACpE,eAAe,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,CAAC,CAAC,CAAC;YAEH,oBAAoB;YACpB,MAAM,MAAM,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEpD,qEAAqE;YACrE,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YAExC,IAAI,SAAS,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YACpD,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAExC,IAAI,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClE,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACxC,MAAM,CAAC,SAAS,EAAE,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC;YAErD,eAAe;YACf,MAAM,MAAM,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAEpD,6BAA6B;YAC7B,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,SAAS,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAChD,MAAM,CAAC,SAAS,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YACvC,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAEzC,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAC9D,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YACzC,MAAM,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACxC,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kFAAkF,EAAE,KAAK,IAAI,EAAE;YAChG,MAAM,MAAM,GAAG,IAAI,kBAAkB,EAAE,CAAC;YACxC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,OAAO,EAAE,IAAI,EAAE,sBAAsB,EAAE,CAAC,CAAC;YAE3F,MAAM,aAAa,GAAuB,EAAE,CAAC;YAC7C,MAAM,eAAe,GAAyB,EAAE,CAAC;YACjD,MAAM,CAAC,MAAM,CAAC,SAAS,CAAmB,cAAc,EAAE,CAAC,GAAG,EAAE,EAAE;gBAChE,aAAa,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC1B,CAAC,CAAC,CAAC;YACH,MAAM,CAAC,MAAM,CAAC,SAAS,CAAqB,gBAAgB,EAAE,CAAC,GAAG,EAAE,EAAE;gBACpE,eAAe,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC5B,CAAC,CAAC,CAAC;YAEH,2CAA2C;YAC3C,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACnC,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,KAAK,EAAE,iBAAiB;gBACxB,MAAM,EAAE,aAAa;aACtB,CAAC,CAAC;YAEH,IAAI,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAC5D,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAEzC,gEAAgE;YAChE,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnD,SAAS,EAAE,IAAI;gBACf,aAAa,EAAE,8BAA8B;aAC9C,CAAC,CAAC;YACH,MAAM,CAAC,WAAW,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC1C,MAAM,CAAC,WAAW,EAAE,aAAa,CAAC,CAAC,IAAI,CAAC,8BAA8B,CAAC,CAAC;YACxE,MAAM,CAAC,WAAW,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;YAEhD,sBAAsB;YACtB,MAAM,CAAC,aAAa,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACtC,MAAM,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACnD,MAAM,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,8BAA8B,CAAC,CAAC;YAE7E,yBAAyB;YACzB,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACxD,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACxC,MAAM,CAAC,SAAS,EAAE,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAEvC,sBAAsB;YACtB,MAAM,aAAa,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACrD,SAAS,EAAE,KAAK;gBAChB,aAAa,EAAE,IAAI;aACpB,CAAC,CAAC;YACH,MAAM,CAAC,aAAa,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAC7C,MAAM,CAAC,aAAa,EAAE,aAAa,CAAC,CAAC,QAAQ,EAAE,CAAC;YAChD,MAAM,CAAC,aAAa,EAAE,MAAM,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;YAElD,sBAAsB;YACtB,MAAM,CAAC,eAAe,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;YACxC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YAErD,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACxD,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAC3C,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"status.d.ts","sourceRoot":"","sources":["../../src/utils/status.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,gBAAgB,EAEhB,iBAAiB,EAClB,MAAM,mBAAmB,CAAC;AAE3B,eAAO,MAAM,0BAA0B,EAAE,MAAM,CAAC,MAAM,EAAE,gBAAgB,CAOvE,CAAC;AAEF,MAAM,WAAW,0BAA0B;IACzC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;IACvC,aAAa,CAAC,EAAE,IAAI,CAAC;IACrB,aAAa,CAAC,EAAE,IAAI,EAAE,CAAC;IACvB,oBAAoB,CAAC,EAAE,MAAM,CAAC;CAC/B;AAED,wBAAgB,uBAAuB,CACrC,SAAS,EAAE,MAAM,EACjB,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,GACrC,gBAAgB,CAyBlB;AAED,wBAAgB,wBAAwB,CACtC,IAAI,EAAE,IAAI,EACV,0BAA0B,CAAC,EAAE,gBAAgB,EAAE,GAAG,0BAA0B,EAC5E,mBAAmB,CAAC,EAAE,IAAI,GACzB,iBAAiB,
|
|
1
|
+
{"version":3,"file":"status.d.ts","sourceRoot":"","sources":["../../src/utils/status.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,gBAAgB,EAEhB,iBAAiB,EAClB,MAAM,mBAAmB,CAAC;AAE3B,eAAO,MAAM,0BAA0B,EAAE,MAAM,CAAC,MAAM,EAAE,gBAAgB,CAOvE,CAAC;AAEF,MAAM,WAAW,0BAA0B;IACzC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;IACvC,aAAa,CAAC,EAAE,IAAI,CAAC;IACrB,aAAa,CAAC,EAAE,IAAI,EAAE,CAAC;IACvB,oBAAoB,CAAC,EAAE,MAAM,CAAC;CAC/B;AAED,wBAAgB,uBAAuB,CACrC,SAAS,EAAE,MAAM,EACjB,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,GACrC,gBAAgB,CAyBlB;AAED,wBAAgB,wBAAwB,CACtC,IAAI,EAAE,IAAI,EACV,0BAA0B,CAAC,EAAE,gBAAgB,EAAE,GAAG,0BAA0B,EAC5E,mBAAmB,CAAC,EAAE,IAAI,GACzB,iBAAiB,CAkHnB"}
|
package/dist/utils/status.js
CHANGED
|
@@ -64,9 +64,7 @@ export function deriveTaskLifecycleState(task, customDefinitionsOrOptions, legac
|
|
|
64
64
|
return upstreamDef.category !== 'completed';
|
|
65
65
|
});
|
|
66
66
|
const blockingTaskIds = blockingTasks.map((t) => t.id);
|
|
67
|
-
const isExplicitlyBlocked = Boolean(task.isBlocked === true
|
|
68
|
-
task.customFields?.isBlocked === true ||
|
|
69
|
-
task.status === 'blocked');
|
|
67
|
+
const isExplicitlyBlocked = Boolean(task.isBlocked === true);
|
|
70
68
|
const isBlocked = !isDone && (blockingTaskIds.length > 0 || isExplicitlyBlocked);
|
|
71
69
|
const isReady = semanticStatus === 'not_started' && !isBlocked;
|
|
72
70
|
// Time & Schedule Indicators
|
package/dist/utils/status.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"status.js","sourceRoot":"","sources":["../../src/utils/status.ts"],"names":[],"mappings":"AAOA,MAAM,CAAC,MAAM,0BAA0B,GAAqC;IAC1E,OAAO,EAAE,EAAE,GAAG,EAAE,SAAS,EAAE,KAAK,EAAE,SAAS,EAAE,QAAQ,EAAE,aAAa,EAAE;IACtE,IAAI,EAAE,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;IAC9D,WAAW,EAAE,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,aAAa,EAAE,QAAQ,EAAE,aAAa,EAAE;IAClF,SAAS,EAAE,EAAE,GAAG,EAAE,WAAW,EAAE,KAAK,EAAE,WAAW,EAAE,QAAQ,EAAE,aAAa,EAAE;IAC5E,IAAI,EAAE,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;IAC3D,QAAQ,EAAE,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,UAAU,EAAE,QAAQ,EAAE,UAAU,EAAE;CACvE,CAAC;AASF,MAAM,UAAU,uBAAuB,CACrC,SAAiB,EACjB,iBAAsC;IAEtC,IAAI,iBAAiB,EAAE,CAAC;QACtB,MAAM,KAAK,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,KAAK,SAAS,CAAC,CAAC;QACrE,IAAI,KAAK;YAAE,OAAO,KAAK,CAAC;IAC1B,CAAC;IACD,IAAI,0BAA0B,CAAC,SAAS,CAAC,EAAE,CAAC;QAC1C,OAAO,0BAA0B,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,kDAAkD;IAClD,MAAM,KAAK,GAAG,SAAS,CAAC,WAAW,EAAE,CAAC;IACtC,IAAI,QAAQ,GAAmB,aAAa,CAAC;IAC7C,IAAI,CAAC,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE,WAAW,EAAE,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACzG,QAAQ,GAAG,UAAU,CAAC;IACxB,CAAC;SAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,UAAU,EAAE,QAAQ,EAAE,UAAU,EAAE,OAAO,EAAE,WAAW,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACnI,QAAQ,GAAG,WAAW,CAAC;IACzB,CAAC;SAAM,IAAI,CAAC,aAAa,EAAE,QAAQ,EAAE,SAAS,EAAE,WAAW,EAAE,QAAQ,EAAE,SAAS,EAAE,IAAI,EAAE,UAAU,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QAC9I,QAAQ,GAAG,aAAa,CAAC;IAC3B,CAAC;IAED,OAAO;QACL,GAAG,EAAE,SAAS;QACd,KAAK,EAAE,SAAS;QAChB,QAAQ;KACT,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,wBAAwB,CACtC,IAAU,EACV,0BAA4E,EAC5E,mBAA0B;IAE1B,IAAI,iBAAiD,CAAC;IACtD,IAAI,aAAa,GAAG,mBAAmB,IAAI,IAAI,IAAI,EAAE,CAAC;IACtD,IAAI,aAAa,GAAW,EAAE,CAAC;IAC/B,IAAI,oBAAoB,GAAG,CAAC,CAAC;IAE7B,IAAI,KAAK,CAAC,OAAO,CAAC,0BAA0B,CAAC,EAAE,CAAC;QAC9C,iBAAiB,GAAG,0BAA0B,CAAC;IACjD,CAAC;SAAM,IAAI,0BAA0B,EAAE,CAAC;QACtC,iBAAiB,GAAG,0BAA0B,CAAC,iBAAiB,CAAC;QACjE,IAAI,0BAA0B,CAAC,aAAa,EAAE,CAAC;YAC7C,aAAa,GAAG,0BAA0B,CAAC,aAAa,CAAC;QAC3D,CAAC;QACD,IAAI,0BAA0B,CAAC,aAAa,EAAE,CAAC;YAC7C,aAAa,GAAG,0BAA0B,CAAC,aAAa,CAAC;QAC3D,CAAC;QACD,IAAI,0BAA0B,CAAC,oBAAoB,KAAK,SAAS,EAAE,CAAC;YAClE,oBAAoB,GAAG,0BAA0B,CAAC,oBAAoB,CAAC;QACzE,CAAC;IACH,CAAC;IAED,MAAM,GAAG,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,iBAAiB,CAAC,CAAC;IACpE,MAAM,cAAc,GAAmB,GAAG,CAAC,QAAQ,CAAC;IACpD,MAAM,MAAM,GAAG,cAAc,KAAK,WAAW,IAAI,cAAc,KAAK,UAAU,CAAC;IAC/E,MAAM,QAAQ,GAAG,cAAc,KAAK,aAAa,CAAC;IAClD,MAAM,WAAW,GAAG,cAAc,KAAK,UAAU,CAAC;IAElD,+BAA+B;IAC/B,MAAM,aAAa,GAAG,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE;QAC/C,MAAM,WAAW,GAAG,uBAAuB,CAAC,CAAC,CAAC,MAAM,EAAE,iBAAiB,CAAC,CAAC;QACzE,OAAO,WAAW,CAAC,QAAQ,KAAK,WAAW,CAAC;IAC9C,CAAC,CAAC,CAAC;IACH,MAAM,eAAe,GAAG,aAAa,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACvD,MAAM,mBAAmB,GAAG,OAAO,
|
|
1
|
+
{"version":3,"file":"status.js","sourceRoot":"","sources":["../../src/utils/status.ts"],"names":[],"mappings":"AAOA,MAAM,CAAC,MAAM,0BAA0B,GAAqC;IAC1E,OAAO,EAAE,EAAE,GAAG,EAAE,SAAS,EAAE,KAAK,EAAE,SAAS,EAAE,QAAQ,EAAE,aAAa,EAAE;IACtE,IAAI,EAAE,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,aAAa,EAAE;IAC9D,WAAW,EAAE,EAAE,GAAG,EAAE,aAAa,EAAE,KAAK,EAAE,aAAa,EAAE,QAAQ,EAAE,aAAa,EAAE;IAClF,SAAS,EAAE,EAAE,GAAG,EAAE,WAAW,EAAE,KAAK,EAAE,WAAW,EAAE,QAAQ,EAAE,aAAa,EAAE;IAC5E,IAAI,EAAE,EAAE,GAAG,EAAE,MAAM,EAAE,KAAK,EAAE,MAAM,EAAE,QAAQ,EAAE,WAAW,EAAE;IAC3D,QAAQ,EAAE,EAAE,GAAG,EAAE,UAAU,EAAE,KAAK,EAAE,UAAU,EAAE,QAAQ,EAAE,UAAU,EAAE;CACvE,CAAC;AASF,MAAM,UAAU,uBAAuB,CACrC,SAAiB,EACjB,iBAAsC;IAEtC,IAAI,iBAAiB,EAAE,CAAC;QACtB,MAAM,KAAK,GAAG,iBAAiB,CAAC,IAAI,CAAC,CAAC,GAAG,EAAE,EAAE,CAAC,GAAG,CAAC,GAAG,KAAK,SAAS,CAAC,CAAC;QACrE,IAAI,KAAK;YAAE,OAAO,KAAK,CAAC;IAC1B,CAAC;IACD,IAAI,0BAA0B,CAAC,SAAS,CAAC,EAAE,CAAC;QAC1C,OAAO,0BAA0B,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,kDAAkD;IAClD,MAAM,KAAK,GAAG,SAAS,CAAC,WAAW,EAAE,CAAC;IACtC,IAAI,QAAQ,GAAmB,aAAa,CAAC;IAC7C,IAAI,CAAC,UAAU,EAAE,WAAW,EAAE,UAAU,EAAE,WAAW,EAAE,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACzG,QAAQ,GAAG,UAAU,CAAC;IACxB,CAAC;SAAM,IAAI,CAAC,MAAM,EAAE,WAAW,EAAE,UAAU,EAAE,QAAQ,EAAE,UAAU,EAAE,OAAO,EAAE,WAAW,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACnI,QAAQ,GAAG,WAAW,CAAC;IACzB,CAAC;SAAM,IAAI,CAAC,aAAa,EAAE,QAAQ,EAAE,SAAS,EAAE,WAAW,EAAE,QAAQ,EAAE,SAAS,EAAE,IAAI,EAAE,UAAU,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QAC9I,QAAQ,GAAG,aAAa,CAAC;IAC3B,CAAC;IAED,OAAO;QACL,GAAG,EAAE,SAAS;QACd,KAAK,EAAE,SAAS;QAChB,QAAQ;KACT,CAAC;AACJ,CAAC;AAED,MAAM,UAAU,wBAAwB,CACtC,IAAU,EACV,0BAA4E,EAC5E,mBAA0B;IAE1B,IAAI,iBAAiD,CAAC;IACtD,IAAI,aAAa,GAAG,mBAAmB,IAAI,IAAI,IAAI,EAAE,CAAC;IACtD,IAAI,aAAa,GAAW,EAAE,CAAC;IAC/B,IAAI,oBAAoB,GAAG,CAAC,CAAC;IAE7B,IAAI,KAAK,CAAC,OAAO,CAAC,0BAA0B,CAAC,EAAE,CAAC;QAC9C,iBAAiB,GAAG,0BAA0B,CAAC;IACjD,CAAC;SAAM,IAAI,0BAA0B,EAAE,CAAC;QACtC,iBAAiB,GAAG,0BAA0B,CAAC,iBAAiB,CAAC;QACjE,IAAI,0BAA0B,CAAC,aAAa,EAAE,CAAC;YAC7C,aAAa,GAAG,0BAA0B,CAAC,aAAa,CAAC;QAC3D,CAAC;QACD,IAAI,0BAA0B,CAAC,aAAa,EAAE,CAAC;YAC7C,aAAa,GAAG,0BAA0B,CAAC,aAAa,CAAC;QAC3D,CAAC;QACD,IAAI,0BAA0B,CAAC,oBAAoB,KAAK,SAAS,EAAE,CAAC;YAClE,oBAAoB,GAAG,0BAA0B,CAAC,oBAAoB,CAAC;QACzE,CAAC;IACH,CAAC;IAED,MAAM,GAAG,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,iBAAiB,CAAC,CAAC;IACpE,MAAM,cAAc,GAAmB,GAAG,CAAC,QAAQ,CAAC;IACpD,MAAM,MAAM,GAAG,cAAc,KAAK,WAAW,IAAI,cAAc,KAAK,UAAU,CAAC;IAC/E,MAAM,QAAQ,GAAG,cAAc,KAAK,aAAa,CAAC;IAClD,MAAM,WAAW,GAAG,cAAc,KAAK,UAAU,CAAC;IAElD,+BAA+B;IAC/B,MAAM,aAAa,GAAG,aAAa,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE;QAC/C,MAAM,WAAW,GAAG,uBAAuB,CAAC,CAAC,CAAC,MAAM,EAAE,iBAAiB,CAAC,CAAC;QACzE,OAAO,WAAW,CAAC,QAAQ,KAAK,WAAW,CAAC;IAC9C,CAAC,CAAC,CAAC;IACH,MAAM,eAAe,GAAG,aAAa,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;IACvD,MAAM,mBAAmB,GAAG,OAAO,CAAC,IAAI,CAAC,SAAS,KAAK,IAAI,CAAC,CAAC;IAC7D,MAAM,SAAS,GAAG,CAAC,MAAM,IAAI,CAAC,eAAe,CAAC,MAAM,GAAG,CAAC,IAAI,mBAAmB,CAAC,CAAC;IACjF,MAAM,OAAO,GAAG,cAAc,KAAK,aAAa,IAAI,CAAC,SAAS,CAAC;IAE/D,6BAA6B;IAC7B,IAAI,SAAS,GAAG,KAAK,CAAC;IACtB,IAAI,CAAC,MAAM,IAAI,IAAI,CAAC,OAAO,EAAE,CAAC;QAC5B,MAAM,GAAG,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACnC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,OAAO,EAAE,CAAC,IAAI,GAAG,GAAG,aAAa,EAAE,CAAC;YACjD,SAAS,GAAG,IAAI,CAAC;QACnB,CAAC;IACH,CAAC;IAED,IAAI,UAAU,GAAG,KAAK,CAAC;IACvB,IAAI,cAAc,KAAK,aAAa,IAAI,IAAI,CAAC,gBAAgB,EAAE,CAAC;QAC9D,MAAM,YAAY,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;QACrD,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,OAAO,EAAE,CAAC,IAAI,YAAY,GAAG,aAAa,EAAE,CAAC;YACnE,UAAU,GAAG,IAAI,CAAC;QACpB,CAAC;IACH,CAAC;IAED,MAAM,WAAW,GAAG,cAAc,KAAK,aAAa,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,gBAAgB,IAAI,CAAC,IAAI,CAAC,OAAO,CAAC;IAErH,iCAAiC;IACjC,MAAM,WAAW,GAAG,OAAO,CAAC,IAAI,CAAC,UAAU,IAAI,CAAC,IAAI,CAAC,SAAS,IAAI,IAAI,CAAC,SAAS,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC,CAAC;IAC9F,MAAM,YAAY,GAAG,CAAC,MAAM,IAAI,CAAC,WAAW,CAAC;IAE7C,IAAI,SAAS,GAAG,KAAK,CAAC;IACtB,IAAI,cAAc,KAAK,aAAa,EAAE,CAAC;QACrC,MAAM,YAAY,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;QACpH,IAAI,YAAY,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,OAAO,EAAE,CAAC,EAAE,CAAC;YACnD,MAAM,WAAW,GAAG,oBAAoB,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,GAAG,IAAI,CAAC;YAC/D,IAAI,aAAa,CAAC,OAAO,EAAE,GAAG,YAAY,CAAC,OAAO,EAAE,GAAG,WAAW,EAAE,CAAC;gBACnE,SAAS,GAAG,IAAI,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,+BAA+B;IAC/B,IAAI,cAAc,GAAG,KAAK,CAAC;IAC3B,MAAM,OAAO,GAAG,IAAI,CAAC,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,CAAC,cAAc,CAAC;IACvC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,CAAC,IAAI,OAAO,KAAK,SAAS,IAAI,OAAO,GAAG,UAAU,EAAE,CAAC;QAChG,cAAc,GAAG,IAAI,CAAC;IACxB,CAAC;IACD,MAAM,OAAO,GAAG,IAAI,CAAC,qBAAqB,CAAC;IAC3C,MAAM,UAAU,GAAG,IAAI,CAAC,wBAAwB,CAAC;IACjD,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,CAAC,IAAI,OAAO,KAAK,SAAS,IAAI,OAAO,GAAG,UAAU,EAAE,CAAC;QAChG,cAAc,GAAG,IAAI,CAAC;IACxB,CAAC;IAED,IAAI,aAAa,GAAG,KAAK,CAAC;IAC1B,IAAI,cAAc,KAAK,aAAa,IAAI,IAAI,CAAC,eAAe,EAAE,CAAC;QAC7D,MAAM,KAAK,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QAC7C,IAAI,CAAC,KAAK,CAAC,KAAK,CAAC,OAAO,EAAE,CAAC,EAAE,CAAC;YAC5B,MAAM,SAAS,GAAG,aAAa,CAAC,OAAO,EAAE,GAAG,KAAK,CAAC,OAAO,EAAE,CAAC;YAC5D,MAAM,YAAY,GAAG,SAAS,GAAG,CAAC,IAAI,GAAG,EAAE,GAAG,EAAE,CAAC,CAAC;YAClD,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,CAAC,IAAI,YAAY,GAAG,UAAU,EAAE,CAAC;gBAC5E,aAAa,GAAG,IAAI,CAAC;YACvB,CAAC;iBAAM,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,CAAC,IAAI,CAAC,SAAS,GAAG,CAAC,IAAI,GAAG,EAAE,CAAC,CAAC,GAAG,UAAU,EAAE,CAAC;gBAChG,aAAa,GAAG,IAAI,CAAC;YACvB,CAAC;QACH,CAAC;IACH,CAAC;IAED,OAAO;QACL,cAAc;QACd,OAAO;QACP,SAAS;QACT,eAAe;QACf,SAAS;QACT,UAAU;QACV,WAAW;QACX,YAAY;QACZ,SAAS;QACT,cAAc;QACd,aAAa;QACb,MAAM;QACN,QAAQ;QACR,WAAW;KACZ,CAAC;AACJ,CAAC"}
|
package/package.json
CHANGED
package/src/engine/index.ts
CHANGED
|
@@ -404,6 +404,8 @@ export class CriticalPathEngine {
|
|
|
404
404
|
actualDurationSeconds: processedInput.actualDurationSeconds ?? taskInput.actualDurationSeconds,
|
|
405
405
|
inProgressSince,
|
|
406
406
|
progress: processedInput.progress ?? taskInput.progress ?? (statusDef.category === 'completed' ? 100 : 0),
|
|
407
|
+
isBlocked: processedInput.isBlocked ?? taskInput.isBlocked ?? false,
|
|
408
|
+
blockedReason: processedInput.blockedReason ?? taskInput.blockedReason ?? null,
|
|
407
409
|
tags: processedInput.tags ?? taskInput.tags ?? [],
|
|
408
410
|
customFields: processedInput.customFields ?? taskInput.customFields ?? {},
|
|
409
411
|
parentId: processedInput.parentId ?? taskInput.parentId
|
|
@@ -636,11 +638,11 @@ export class CriticalPathEngine {
|
|
|
636
638
|
await this.events.publish(updateEvent);
|
|
637
639
|
}
|
|
638
640
|
|
|
639
|
-
const wasBlocked = Boolean(existing.isBlocked
|
|
640
|
-
const isNowBlocked = Boolean(updated.isBlocked
|
|
641
|
+
const wasBlocked = Boolean(existing.isBlocked);
|
|
642
|
+
const isNowBlocked = Boolean(updated.isBlocked);
|
|
641
643
|
|
|
642
644
|
if (!wasBlocked && isNowBlocked) {
|
|
643
|
-
const blockedReason = updated.blockedReason ??
|
|
645
|
+
const blockedReason = updated.blockedReason ?? null;
|
|
644
646
|
const blockedEvent: TaskBlockedEvent = {
|
|
645
647
|
id: `evt_${Math.random().toString(36).substring(2, 9)}`,
|
|
646
648
|
name: 'task.blocked',
|
|
@@ -739,24 +741,11 @@ export class CriticalPathEngine {
|
|
|
739
741
|
let updatedDownstream = downstream;
|
|
740
742
|
const updates: Partial<Task> = {};
|
|
741
743
|
|
|
742
|
-
if (downstream.status === 'blocked') {
|
|
743
|
-
const defaultStatus = downstreamWorkflow?.defaultStatusKey || 'todo';
|
|
744
|
-
updates.status = defaultStatus;
|
|
745
|
-
}
|
|
746
|
-
|
|
747
744
|
if (downstream.isBlocked || downstream.blockedReason) {
|
|
748
745
|
updates.isBlocked = false;
|
|
749
746
|
updates.blockedReason = null;
|
|
750
747
|
}
|
|
751
748
|
|
|
752
|
-
if (downstream.customFields?.isBlocked || downstream.customFields?.blockedReason) {
|
|
753
|
-
updates.customFields = {
|
|
754
|
-
...downstream.customFields,
|
|
755
|
-
isBlocked: false,
|
|
756
|
-
blockedReason: null
|
|
757
|
-
};
|
|
758
|
-
}
|
|
759
|
-
|
|
760
749
|
if (Object.keys(updates).length > 0) {
|
|
761
750
|
const res = await this.store.updateTask(downstream.id, updates);
|
|
762
751
|
if (res) updatedDownstream = res;
|
package/src/index.test.ts
CHANGED
|
@@ -386,8 +386,9 @@ describe('CriticalPathEngine Core Tests', () => {
|
|
|
386
386
|
const downstream = await engine.createTask({
|
|
387
387
|
projectId: proj.id,
|
|
388
388
|
title: 'Downstream Task',
|
|
389
|
-
status: '
|
|
390
|
-
|
|
389
|
+
status: 'todo',
|
|
390
|
+
isBlocked: true,
|
|
391
|
+
blockedReason: 'Waiting on upstream'
|
|
391
392
|
});
|
|
392
393
|
|
|
393
394
|
await engine.addDependency({
|
|
@@ -412,7 +413,7 @@ describe('CriticalPathEngine Core Tests', () => {
|
|
|
412
413
|
|
|
413
414
|
const refreshedDownstream = await engine.getTask(downstream.id);
|
|
414
415
|
expect(refreshedDownstream?.status).toBe('todo');
|
|
415
|
-
expect(refreshedDownstream?.
|
|
416
|
+
expect(refreshedDownstream?.isBlocked).toBe(false);
|
|
416
417
|
});
|
|
417
418
|
|
|
418
419
|
it('allows VFX workflow transitions from revision_requested to in_production', async () => {
|
package/src/task-state.test.ts
CHANGED
|
@@ -353,12 +353,13 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
353
353
|
status: 'todo'
|
|
354
354
|
});
|
|
355
355
|
|
|
356
|
-
// Create downstream task with
|
|
356
|
+
// Create downstream task with isBlocked = true
|
|
357
357
|
const taskDownstream = await engine.createTask({
|
|
358
358
|
projectId: project.id,
|
|
359
359
|
title: 'Run Integration Tests',
|
|
360
|
-
status: '
|
|
361
|
-
|
|
360
|
+
status: 'todo',
|
|
361
|
+
isBlocked: true,
|
|
362
|
+
blockedReason: 'Waiting on compilation'
|
|
362
363
|
});
|
|
363
364
|
|
|
364
365
|
await engine.addDependency({
|
|
@@ -382,11 +383,11 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
382
383
|
expect(unblockedEvents[0].aggregateId).toBe(taskDownstream.id);
|
|
383
384
|
expect(unblockedEvents[0].payload.upstreamTaskId).toBe(taskUpstream.id);
|
|
384
385
|
|
|
385
|
-
// Verify downstream task
|
|
386
|
+
// Verify downstream task is unblocked
|
|
386
387
|
const updatedDownstream = await engine.getTask(taskDownstream.id);
|
|
387
388
|
expect(updatedDownstream?.status).toBe('todo');
|
|
388
|
-
expect(updatedDownstream?.
|
|
389
|
-
expect(updatedDownstream?.
|
|
389
|
+
expect(updatedDownstream?.isBlocked).toBe(false);
|
|
390
|
+
expect(updatedDownstream?.blockedReason).toBeNull();
|
|
390
391
|
|
|
391
392
|
// Verify lifecycle state is ready and unblocked
|
|
392
393
|
const lifecycle = await engine.getTaskLifecycleState(taskDownstream.id);
|
|
@@ -404,8 +405,8 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
404
405
|
const downstream = await engine.createTask({
|
|
405
406
|
projectId: project.id,
|
|
406
407
|
title: 'Final Assembly',
|
|
407
|
-
status: '
|
|
408
|
-
|
|
408
|
+
status: 'todo',
|
|
409
|
+
isBlocked: true
|
|
409
410
|
});
|
|
410
411
|
|
|
411
412
|
await engine.addDependency({ taskId: downstream.id, dependsOnTaskId: up1.id, type: 'blocking' });
|
|
@@ -423,8 +424,7 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
423
424
|
expect(unblockedEvents).toHaveLength(0);
|
|
424
425
|
|
|
425
426
|
let taskState = await engine.getTask(downstream.id);
|
|
426
|
-
expect(taskState?.
|
|
427
|
-
expect(taskState?.customFields?.isBlocked).toBe(true);
|
|
427
|
+
expect(taskState?.isBlocked).toBe(true);
|
|
428
428
|
|
|
429
429
|
let lifecycle = await engine.getTaskLifecycleState(downstream.id);
|
|
430
430
|
expect(lifecycle?.isBlocked).toBe(true);
|
|
@@ -437,7 +437,7 @@ describe('Task State Behaviour & Dependency Validation', () => {
|
|
|
437
437
|
expect(unblockedEvents).toHaveLength(1);
|
|
438
438
|
taskState = await engine.getTask(downstream.id);
|
|
439
439
|
expect(taskState?.status).toBe('todo');
|
|
440
|
-
expect(taskState?.
|
|
440
|
+
expect(taskState?.isBlocked).toBe(false);
|
|
441
441
|
|
|
442
442
|
lifecycle = await engine.getTaskLifecycleState(downstream.id);
|
|
443
443
|
expect(lifecycle?.isBlocked).toBe(false);
|
package/src/utils/status.ts
CHANGED
|
@@ -88,11 +88,7 @@ export function deriveTaskLifecycleState(
|
|
|
88
88
|
return upstreamDef.category !== 'completed';
|
|
89
89
|
});
|
|
90
90
|
const blockingTaskIds = blockingTasks.map((t) => t.id);
|
|
91
|
-
const isExplicitlyBlocked = Boolean(
|
|
92
|
-
task.isBlocked === true ||
|
|
93
|
-
task.customFields?.isBlocked === true ||
|
|
94
|
-
task.status === 'blocked'
|
|
95
|
-
);
|
|
91
|
+
const isExplicitlyBlocked = Boolean(task.isBlocked === true);
|
|
96
92
|
const isBlocked = !isDone && (blockingTaskIds.length > 0 || isExplicitlyBlocked);
|
|
97
93
|
const isReady = semanticStatus === 'not_started' && !isBlocked;
|
|
98
94
|
|