@critical-path/core 0.17.0 → 0.18.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,11 @@
1
1
  # @critical-path/core
2
2
 
3
+ ## 0.18.0
4
+
5
+ ### Minor Changes
6
+
7
+ - adf44f6: Add headless workload and capacity distribution engine for streamgraphs, stacked area charts, and team capacity planning. Features include contiguous calendar bucketing (`day`, `week`, `month`), multi-dimension grouping (`assignee`, `team`, `taskType`, `priority`, `status`), effort metric distribution (`scheduled`, `logged`, `remaining`, `blended`), tabular zero-filled series matrix for D3 stack layouts, and capacity/utilization thresholds.
8
+
3
9
  ## 0.17.0
4
10
 
5
11
  ### Minor Changes
package/README.md CHANGED
@@ -36,6 +36,10 @@
36
36
  - Multi-scale timeline synthesis: Macro bird's-eye phase rollups (`getTimelineLadder({ level: 'macro' })`), Standard Gantt view with topological CPM forward/backward passes and total float/slack, and Concrete grounding (attachments, deliverables, checklist items, daily effort histograms, and reality deltas).
37
37
  - Single-task contextual drilldown via `getTaskLadder(taskId)`.
38
38
  - Comprehensive CPM analysis via `calculateCriticalPath(projectId)` identifying project bottleneck tasks and critical path duration.
39
+ - **Headless Workload & Capacity Distribution (Streamgraphs & Capacity Planning)**:
40
+ - Time-series aggregations across customizable intervals (`day`, `week`, `month`) and dimensions (`assignee`, `team`, `taskType`, `priority`, `status`).
41
+ - Pluggable effort distribution metrics (`scheduled`, `logged`, `remaining`, `blended`) with contiguous, gap-free calendar buckets and zero-filled tabular series matrices ready for D3 (`d3.stack().offset(d3.stackOffsetWiggle)`).
42
+ - Dynamic capacity modeling per person and team, reporting bucket-level capacity thresholds and utilization ratios (`totalHours / totalCapacity`).
39
43
 
40
44
  ---
41
45
 
@@ -174,6 +178,30 @@ console.log('Curve Profile:', history?.curveProfile);
174
178
  // 's_curve' | 'linear' | 'early_surge' | 'late_rush' | 'stalled'
175
179
  ```
176
180
 
181
+ ### 7. Headless Workload & Capacity Distribution (Streamgraphs)
182
+
183
+ ```ts
184
+ // Calculate weekly capacity and workload distribution across assignees
185
+ const workload = await engine.getWorkloadDistribution('proj_123', {
186
+ interval: 'week',
187
+ groupBy: 'assignee',
188
+ metric: 'blended'
189
+ });
190
+
191
+ console.log('Series Keys (Assignee IDs):', workload.seriesKeys);
192
+ console.log('Contiguous Weekly Buckets:', workload.buckets);
193
+ // Each bucket contains zero-filled numeric values for all seriesKeys:
194
+ // {
195
+ // date: '2026-09-01',
196
+ // timestamp: 1788220800000,
197
+ // values: { alice: 32, bob: 18, unassigned: 0 },
198
+ // capacity: { alice: 40, bob: 40 },
199
+ // totalHours: 50,
200
+ // totalCapacity: 80,
201
+ // utilizationRatio: 0.625
202
+ // }
203
+ ```
204
+
177
205
  ---
178
206
 
179
207
  ## 🔌 Creating a Custom Plugin
@@ -5,4 +5,5 @@ export * from './entities.js';
5
5
  export * from './cpm.js';
6
6
  export * from './ladder.js';
7
7
  export * from './metrics.js';
8
+ export * from './workload.js';
8
9
  //# sourceMappingURL=index.d.ts.map
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/domain/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,YAAY,CAAC;AAC3B,cAAc,eAAe,CAAC;AAC9B,cAAc,UAAU,CAAC;AACzB,cAAc,aAAa,CAAC;AAC5B,cAAc,cAAc,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/domain/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,YAAY,CAAC;AAC3B,cAAc,eAAe,CAAC;AAC9B,cAAc,UAAU,CAAC;AACzB,cAAc,aAAa,CAAC;AAC5B,cAAc,cAAc,CAAC;AAC7B,cAAc,eAAe,CAAC"}
@@ -5,4 +5,5 @@ export * from './entities.js';
5
5
  export * from './cpm.js';
6
6
  export * from './ladder.js';
7
7
  export * from './metrics.js';
8
+ export * from './workload.js';
8
9
  //# sourceMappingURL=index.js.map
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/domain/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,YAAY,CAAC;AAC3B,cAAc,eAAe,CAAC;AAC9B,cAAc,UAAU,CAAC;AACzB,cAAc,aAAa,CAAC;AAC5B,cAAc,cAAc,CAAC"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/domain/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,YAAY,CAAC;AAC3B,cAAc,eAAe,CAAC;AAC9B,cAAc,UAAU,CAAC;AACzB,cAAc,aAAa,CAAC;AAC5B,cAAc,cAAc,CAAC;AAC7B,cAAc,eAAe,CAAC"}
@@ -0,0 +1,10 @@
1
+ import type { Task, TimeEntry, User, Team, WorkloadDistribution, WorkloadDistributionOptions } from '../types/index.js';
2
+ export interface WorkloadContext {
3
+ tasks: Task[];
4
+ timeEntries?: TimeEntry[];
5
+ users?: User[];
6
+ teams?: Team[];
7
+ projectId?: string;
8
+ }
9
+ export declare function calculateWorkloadDistribution(context: WorkloadContext, options?: WorkloadDistributionOptions): WorkloadDistribution;
10
+ //# sourceMappingURL=workload.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"workload.d.ts","sourceRoot":"","sources":["../../src/domain/workload.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,SAAS,EACT,IAAI,EACJ,IAAI,EAKJ,oBAAoB,EACpB,2BAA2B,EAC5B,MAAM,mBAAmB,CAAC;AAE3B,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,WAAW,CAAC,EAAE,SAAS,EAAE,CAAC;IAC1B,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AA+DD,wBAAgB,6BAA6B,CAC3C,OAAO,EAAE,eAAe,EACxB,OAAO,GAAE,2BAAgC,GACxC,oBAAoB,CA6TtB"}
@@ -0,0 +1,349 @@
1
+ function toDateString(d) {
2
+ return d.toISOString().split('T')[0];
3
+ }
4
+ function parseDateOnly(isoString) {
5
+ const parts = isoString.split('T')[0].split('-');
6
+ return new Date(Date.UTC(parseInt(parts[0], 10), parseInt(parts[1], 10) - 1, parseInt(parts[2], 10)));
7
+ }
8
+ function addDays(d, days) {
9
+ const res = new Date(d.getTime());
10
+ res.setUTCDate(res.getUTCDate() + days);
11
+ return res;
12
+ }
13
+ function startOfWeek(d) {
14
+ const date = new Date(d.getTime());
15
+ const day = date.getUTCDay();
16
+ // Monday is day 1, Sunday is day 0 -> shift Sunday to 7
17
+ const diff = date.getUTCDate() - day + (day === 0 ? -6 : 1);
18
+ return new Date(Date.UTC(date.getUTCFullYear(), date.getUTCMonth(), diff));
19
+ }
20
+ function startOfMonth(d) {
21
+ return new Date(Date.UTC(d.getUTCFullYear(), d.getUTCMonth(), 1));
22
+ }
23
+ function nextBucketDate(d, interval) {
24
+ if (interval === 'day') {
25
+ return addDays(d, 1);
26
+ }
27
+ if (interval === 'week') {
28
+ return addDays(d, 7);
29
+ }
30
+ // month: next month 1st
31
+ return new Date(Date.UTC(d.getUTCFullYear(), d.getUTCMonth() + 1, 1));
32
+ }
33
+ function getBucketKey(d, interval) {
34
+ if (interval === 'day') {
35
+ return toDateString(d);
36
+ }
37
+ if (interval === 'week') {
38
+ return toDateString(startOfWeek(d));
39
+ }
40
+ return toDateString(startOfMonth(d));
41
+ }
42
+ function getTaskDurationHours(task) {
43
+ if (typeof task.estimatedHours === 'number' && task.estimatedHours >= 0) {
44
+ return task.estimatedHours;
45
+ }
46
+ if (typeof task.estimatedDurationMinutes === 'number' && task.estimatedDurationMinutes >= 0) {
47
+ return task.estimatedDurationMinutes / 60;
48
+ }
49
+ if (typeof task.actualHours === 'number' && task.actualHours > 0) {
50
+ return task.actualHours;
51
+ }
52
+ return 1;
53
+ }
54
+ export function calculateWorkloadDistribution(context, options = {}) {
55
+ const { tasks, timeEntries = [], users = [], teams = [], projectId } = context;
56
+ const interval = options.interval || 'week';
57
+ const groupBy = options.groupBy || 'assignee';
58
+ const metric = options.metric || 'blended';
59
+ const defaultWeeklyCapacity = options.defaultWeeklyCapacityHours ?? 40;
60
+ // Build lookups for human-readable labels
61
+ const userMap = new Map(users.map((u) => [u.id, u]));
62
+ const teamMap = new Map(teams.map((t) => [t.id, t]));
63
+ // 1. Determine date range
64
+ let minDate = options.startDate ? parseDateOnly(options.startDate) : null;
65
+ let maxDate = options.endDate ? parseDateOnly(options.endDate) : null;
66
+ if (!minDate || !maxDate) {
67
+ const dates = [];
68
+ for (const t of tasks) {
69
+ if (t.plannedStartDate)
70
+ dates.push(parseDateOnly(t.plannedStartDate).getTime());
71
+ if (t.actualStartDate)
72
+ dates.push(parseDateOnly(t.actualStartDate).getTime());
73
+ if (t.dueDate)
74
+ dates.push(parseDateOnly(t.dueDate).getTime());
75
+ if (t.actualEndDate)
76
+ dates.push(parseDateOnly(t.actualEndDate).getTime());
77
+ if (t.createdAt)
78
+ dates.push(parseDateOnly(t.createdAt).getTime());
79
+ }
80
+ for (const te of timeEntries) {
81
+ if (te.loggedAt)
82
+ dates.push(parseDateOnly(te.loggedAt).getTime());
83
+ }
84
+ if (dates.length > 0) {
85
+ if (!minDate)
86
+ minDate = new Date(Math.min(...dates));
87
+ if (!maxDate)
88
+ maxDate = new Date(Math.max(...dates));
89
+ }
90
+ else {
91
+ const now = new Date();
92
+ if (!minDate)
93
+ minDate = addDays(now, -7);
94
+ if (!maxDate)
95
+ maxDate = addDays(now, 28);
96
+ }
97
+ }
98
+ // Ensure minDate <= maxDate
99
+ if (minDate > maxDate) {
100
+ maxDate = new Date(minDate.getTime());
101
+ }
102
+ // Align start to bucket boundary
103
+ let cursor = interval === 'week' ? startOfWeek(minDate) : interval === 'month' ? startOfMonth(minDate) : minDate;
104
+ const endLimit = interval === 'week' ? startOfWeek(maxDate) : interval === 'month' ? startOfMonth(maxDate) : maxDate;
105
+ const bucketList = [];
106
+ const bucketMap = new Map();
107
+ while (cursor <= endLimit || bucketList.length === 0) {
108
+ const dateStr = toDateString(cursor);
109
+ const nextDate = nextBucketDate(cursor, interval);
110
+ const b = {
111
+ date: dateStr,
112
+ startDate: new Date(cursor.getTime()),
113
+ endDate: nextDate,
114
+ timestamp: cursor.getTime(),
115
+ values: {}
116
+ };
117
+ bucketList.push(b);
118
+ bucketMap.set(dateStr, b);
119
+ cursor = nextDate;
120
+ }
121
+ const seriesKeySet = new Set();
122
+ const getDimensionKey = (task, timeEntry) => {
123
+ switch (groupBy) {
124
+ case 'assignee':
125
+ if (timeEntry?.userId)
126
+ return timeEntry.userId;
127
+ return task.assigneeId || 'unassigned';
128
+ case 'team':
129
+ return task.teamId || task.customFields?.teamId || 'unassigned';
130
+ case 'taskType':
131
+ return task.taskType || task.customFields?.type || 'standard';
132
+ case 'priority':
133
+ return task.priority || 'none';
134
+ case 'status':
135
+ return task.status || 'todo';
136
+ default:
137
+ return 'unassigned';
138
+ }
139
+ };
140
+ const addValue = (bucket, key, hours) => {
141
+ if (hours <= 0)
142
+ return;
143
+ seriesKeySet.add(key);
144
+ bucket.values[key] = (bucket.values[key] || 0) + hours;
145
+ };
146
+ const todayStr = toDateString(new Date());
147
+ const taskMap = new Map(tasks.map((t) => [t.id, t]));
148
+ // 2. Process Logged Hours from TimeEntries
149
+ if (metric === 'logged' || metric === 'blended') {
150
+ for (const entry of timeEntries) {
151
+ if (!entry.hours || entry.hours <= 0)
152
+ continue;
153
+ const entryDate = parseDateOnly(entry.loggedAt);
154
+ const bKey = getBucketKey(entryDate, interval);
155
+ const bucket = bucketMap.get(bKey);
156
+ if (bucket) {
157
+ const associatedTask = taskMap.get(entry.taskId) || {
158
+ id: entry.taskId,
159
+ projectId: projectId || '',
160
+ title: '',
161
+ status: 'in_progress',
162
+ priority: 'medium',
163
+ createdAt: entry.loggedAt,
164
+ updatedAt: entry.loggedAt
165
+ };
166
+ const dimKey = getDimensionKey(associatedTask, entry);
167
+ addValue(bucket, dimKey, entry.hours);
168
+ }
169
+ }
170
+ }
171
+ // 3. Process Scheduled / Remaining / Blended Hours from Tasks
172
+ if (metric === 'scheduled' || metric === 'remaining' || metric === 'blended') {
173
+ for (const task of tasks) {
174
+ const estimated = getTaskDurationHours(task);
175
+ const logged = task.loggedHours || 0;
176
+ let hoursToDistribute = 0;
177
+ if (metric === 'scheduled') {
178
+ hoursToDistribute = estimated;
179
+ }
180
+ else if (metric === 'remaining' || metric === 'blended') {
181
+ if (task.semanticStatus === 'completed' || task.semanticStatus === 'canceled') {
182
+ hoursToDistribute = 0;
183
+ }
184
+ else {
185
+ hoursToDistribute = Math.max(0, estimated - logged);
186
+ }
187
+ }
188
+ if (hoursToDistribute <= 0)
189
+ continue;
190
+ const dimKey = getDimensionKey(task);
191
+ // Determine task date range
192
+ let taskStart = task.plannedStartDate
193
+ ? parseDateOnly(task.plannedStartDate)
194
+ : task.actualStartDate
195
+ ? parseDateOnly(task.actualStartDate)
196
+ : task.createdAt
197
+ ? parseDateOnly(task.createdAt)
198
+ : minDate;
199
+ let taskEnd = task.dueDate
200
+ ? parseDateOnly(task.dueDate)
201
+ : taskStart
202
+ ? addDays(taskStart, Math.max(1, Math.ceil(hoursToDistribute / 8)))
203
+ : maxDate;
204
+ // In blended mode, uncompleted tasks' remaining hours start from today or planned start (whichever is later)
205
+ if (metric === 'blended') {
206
+ const today = parseDateOnly(todayStr);
207
+ if (taskStart < today) {
208
+ taskStart = today;
209
+ }
210
+ if (taskEnd < taskStart) {
211
+ taskEnd = addDays(taskStart, 1);
212
+ }
213
+ }
214
+ if (taskEnd < taskStart) {
215
+ taskEnd = taskStart;
216
+ }
217
+ // Calculate days in task window
218
+ const msPerDay = 1000 * 60 * 60 * 24;
219
+ const totalDays = Math.max(1, Math.round((taskEnd.getTime() - taskStart.getTime()) / msPerDay) + 1);
220
+ const hoursPerDay = hoursToDistribute / totalDays;
221
+ // Distribute across overlapping buckets
222
+ for (const bucket of bucketList) {
223
+ const bucketLastDay = addDays(bucket.endDate, -1);
224
+ const overlapStart = new Date(Math.max(taskStart.getTime(), bucket.startDate.getTime()));
225
+ const overlapEnd = new Date(Math.min(taskEnd.getTime(), bucketLastDay.getTime()));
226
+ if (overlapStart <= overlapEnd) {
227
+ const overlapDays = Math.round((overlapEnd.getTime() - overlapStart.getTime()) / msPerDay) + 1;
228
+ const bucketEffort = overlapDays * hoursPerDay;
229
+ addValue(bucket, dimKey, bucketEffort);
230
+ }
231
+ }
232
+ }
233
+ }
234
+ // Ensure all registered users are in series keys if grouping by assignee
235
+ if (groupBy === 'assignee' && users.length > 0) {
236
+ for (const u of users) {
237
+ seriesKeySet.add(u.id);
238
+ }
239
+ }
240
+ if (groupBy === 'team' && teams.length > 0) {
241
+ for (const t of teams) {
242
+ seriesKeySet.add(t.id);
243
+ }
244
+ }
245
+ const seriesKeys = Array.from(seriesKeySet).sort();
246
+ // Create human-readable series labels
247
+ const seriesLabels = {};
248
+ for (const key of seriesKeys) {
249
+ if (groupBy === 'assignee') {
250
+ const u = userMap.get(key);
251
+ seriesLabels[key] = u ? u.name : key === 'unassigned' ? 'Unassigned' : key;
252
+ }
253
+ else if (groupBy === 'team') {
254
+ const t = teamMap.get(key);
255
+ seriesLabels[key] = t ? t.name : key === 'unassigned' ? 'Unassigned' : key;
256
+ }
257
+ else {
258
+ seriesLabels[key] = key.charAt(0).toUpperCase() + key.slice(1).replace(/_/g, ' ');
259
+ }
260
+ }
261
+ // 4. Calculate Capacity & Normalize Buckets
262
+ let totalDistributedHours = 0;
263
+ let sumCapacityAcrossBuckets = 0;
264
+ const buckets = bucketList.map((ib) => {
265
+ const values = {};
266
+ const capacity = {};
267
+ let bucketTotalHours = 0;
268
+ let bucketTotalCapacity = 0;
269
+ for (const key of seriesKeys) {
270
+ const rawHours = ib.values[key] || 0;
271
+ const roundedHours = Math.round(rawHours * 100) / 100;
272
+ values[key] = roundedHours;
273
+ bucketTotalHours += roundedHours;
274
+ // Capacity calculation
275
+ let weeklyCap = defaultWeeklyCapacity;
276
+ if (options.capacityOverrides && typeof options.capacityOverrides[key] === 'number') {
277
+ weeklyCap = options.capacityOverrides[key];
278
+ }
279
+ else if (groupBy === 'assignee') {
280
+ const u = userMap.get(key);
281
+ if (u?.weeklyCapacityHours)
282
+ weeklyCap = u.weeklyCapacityHours;
283
+ else if (key === 'unassigned')
284
+ weeklyCap = 0;
285
+ }
286
+ else if (groupBy === 'team') {
287
+ const t = teamMap.get(key);
288
+ if (t?.weeklyCapacityHours) {
289
+ weeklyCap = t.weeklyCapacityHours;
290
+ }
291
+ else if (t?.memberIds?.length) {
292
+ weeklyCap = t.memberIds.length * defaultWeeklyCapacity;
293
+ }
294
+ else if (key === 'unassigned') {
295
+ weeklyCap = 0;
296
+ }
297
+ }
298
+ let bucketCap = 0;
299
+ if (interval === 'week') {
300
+ bucketCap = weeklyCap;
301
+ }
302
+ else if (interval === 'day') {
303
+ bucketCap = Math.round((weeklyCap / 5) * 100) / 100;
304
+ }
305
+ else if (interval === 'month') {
306
+ const daysInMonth = new Date(Date.UTC(ib.startDate.getUTCFullYear(), ib.startDate.getUTCMonth() + 1, 0)).getUTCDate();
307
+ bucketCap = Math.round((weeklyCap * (daysInMonth / 7)) * 100) / 100;
308
+ }
309
+ capacity[key] = bucketCap;
310
+ bucketTotalCapacity += bucketCap;
311
+ }
312
+ bucketTotalHours = Math.round(bucketTotalHours * 100) / 100;
313
+ bucketTotalCapacity = Math.round(bucketTotalCapacity * 100) / 100;
314
+ totalDistributedHours += bucketTotalHours;
315
+ sumCapacityAcrossBuckets += bucketTotalCapacity;
316
+ const utilizationRatio = bucketTotalCapacity > 0
317
+ ? Math.round((bucketTotalHours / bucketTotalCapacity) * 1000) / 1000
318
+ : undefined;
319
+ return {
320
+ date: ib.date,
321
+ timestamp: ib.timestamp,
322
+ totalHours: bucketTotalHours,
323
+ values,
324
+ capacity,
325
+ totalCapacity: bucketTotalCapacity,
326
+ utilizationRatio
327
+ };
328
+ });
329
+ totalDistributedHours = Math.round(totalDistributedHours * 100) / 100;
330
+ sumCapacityAcrossBuckets = Math.round(sumCapacityAcrossBuckets * 100) / 100;
331
+ const averageUtilization = sumCapacityAcrossBuckets > 0
332
+ ? Math.round((totalDistributedHours / sumCapacityAcrossBuckets) * 1000) / 1000
333
+ : undefined;
334
+ return {
335
+ projectId,
336
+ startDate: toDateString(minDate),
337
+ endDate: toDateString(maxDate),
338
+ interval,
339
+ groupBy,
340
+ metric,
341
+ seriesKeys,
342
+ seriesLabels,
343
+ buckets,
344
+ totalHours: totalDistributedHours,
345
+ totalCapacity: sumCapacityAcrossBuckets,
346
+ averageUtilization
347
+ };
348
+ }
349
+ //# sourceMappingURL=workload.js.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"workload.js","sourceRoot":"","sources":["../../src/domain/workload.ts"],"names":[],"mappings":"AAqBA,SAAS,YAAY,CAAC,CAAO;IAC3B,OAAO,CAAC,CAAC,WAAW,EAAE,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;AACvC,CAAC;AAED,SAAS,aAAa,CAAC,SAAiB;IACtC,MAAM,KAAK,GAAG,SAAS,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC;IACjD,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,EAAE,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,GAAG,CAAC,EAAE,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC;AACxG,CAAC;AAED,SAAS,OAAO,CAAC,CAAO,EAAE,IAAY;IACpC,MAAM,GAAG,GAAG,IAAI,IAAI,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;IAClC,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,UAAU,EAAE,GAAG,IAAI,CAAC,CAAC;IACxC,OAAO,GAAG,CAAC;AACb,CAAC;AAED,SAAS,WAAW,CAAC,CAAO;IAC1B,MAAM,IAAI,GAAG,IAAI,IAAI,CAAC,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;IACnC,MAAM,GAAG,GAAG,IAAI,CAAC,SAAS,EAAE,CAAC;IAC7B,wDAAwD;IACxD,MAAM,IAAI,GAAG,IAAI,CAAC,UAAU,EAAE,GAAG,GAAG,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;IAC5D,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,CAAC,cAAc,EAAE,EAAE,IAAI,CAAC,WAAW,EAAE,EAAE,IAAI,CAAC,CAAC,CAAC;AAC7E,CAAC;AAED,SAAS,YAAY,CAAC,CAAO;IAC3B,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC,WAAW,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC;AACpE,CAAC;AAED,SAAS,cAAc,CAAC,CAAO,EAAE,QAA0B;IACzD,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;QACvB,OAAO,OAAO,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IACvB,CAAC;IACD,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;QACxB,OAAO,OAAO,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;IACvB,CAAC;IACD,wBAAwB;IACxB,OAAO,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC,WAAW,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC;AACxE,CAAC;AAED,SAAS,YAAY,CAAC,CAAO,EAAE,QAA0B;IACvD,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;QACvB,OAAO,YAAY,CAAC,CAAC,CAAC,CAAC;IACzB,CAAC;IACD,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;QACxB,OAAO,YAAY,CAAC,WAAW,CAAC,CAAC,CAAC,CAAC,CAAC;IACtC,CAAC;IACD,OAAO,YAAY,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC,CAAC;AACvC,CAAC;AAED,SAAS,oBAAoB,CAAC,IAAU;IACtC,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,OAAO,CAAC,CAAC;AACX,CAAC;AAED,MAAM,UAAU,6BAA6B,CAC3C,OAAwB,EACxB,UAAuC,EAAE;IAEzC,MAAM,EAAE,KAAK,EAAE,WAAW,GAAG,EAAE,EAAE,KAAK,GAAG,EAAE,EAAE,KAAK,GAAG,EAAE,EAAE,SAAS,EAAE,GAAG,OAAO,CAAC;IAC/E,MAAM,QAAQ,GAAqB,OAAO,CAAC,QAAQ,IAAI,MAAM,CAAC;IAC9D,MAAM,OAAO,GAAoB,OAAO,CAAC,OAAO,IAAI,UAAU,CAAC;IAC/D,MAAM,MAAM,GAAmB,OAAO,CAAC,MAAM,IAAI,SAAS,CAAC;IAC3D,MAAM,qBAAqB,GAAG,OAAO,CAAC,0BAA0B,IAAI,EAAE,CAAC;IAEvE,0CAA0C;IAC1C,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAEnE,0BAA0B;IAC1B,IAAI,OAAO,GAAgB,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IACvF,IAAI,OAAO,GAAgB,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,aAAa,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC;IAEnF,IAAI,CAAC,OAAO,IAAI,CAAC,OAAO,EAAE,CAAC;QACzB,MAAM,KAAK,GAAa,EAAE,CAAC;QAC3B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,IAAI,CAAC,CAAC,gBAAgB;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,gBAAgB,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAChF,IAAI,CAAC,CAAC,eAAe;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,eAAe,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC9E,IAAI,CAAC,CAAC,OAAO;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC9D,IAAI,CAAC,CAAC,aAAa;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,aAAa,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;YAC1E,IAAI,CAAC,CAAC,SAAS;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,KAAK,MAAM,EAAE,IAAI,WAAW,EAAE,CAAC;YAC7B,IAAI,EAAE,CAAC,QAAQ;gBAAE,KAAK,CAAC,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,QAAQ,CAAC,CAAC,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QAED,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;YACrB,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC;YACrD,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,GAAG,KAAK,CAAC,CAAC,CAAC;QACvD,CAAC;aAAM,CAAC;YACN,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC;YACvB,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE,CAAC,CAAC,CAAC,CAAC;YACzC,IAAI,CAAC,OAAO;gBAAE,OAAO,GAAG,OAAO,CAAC,GAAG,EAAE,EAAE,CAAC,CAAC;QAC3C,CAAC;IACH,CAAC;IAED,4BAA4B;IAC5B,IAAI,OAAO,GAAG,OAAO,EAAE,CAAC;QACtB,OAAO,GAAG,IAAI,IAAI,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,iCAAiC;IACjC,IAAI,MAAM,GAAG,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,CAAC,CAAC,CAAC,YAAY,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC;IACjH,MAAM,QAAQ,GAAG,QAAQ,KAAK,MAAM,CAAC,CAAC,CAAC,WAAW,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,QAAQ,KAAK,OAAO,CAAC,CAAC,CAAC,YAAY,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC;IAWrH,MAAM,UAAU,GAAqB,EAAE,CAAC;IACxC,MAAM,SAAS,GAAG,IAAI,GAAG,EAA0B,CAAC;IAEpD,OAAO,MAAM,IAAI,QAAQ,IAAI,UAAU,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACrD,MAAM,OAAO,GAAG,YAAY,CAAC,MAAM,CAAC,CAAC;QACrC,MAAM,QAAQ,GAAG,cAAc,CAAC,MAAM,EAAE,QAAQ,CAAC,CAAC;QAClD,MAAM,CAAC,GAAmB;YACxB,IAAI,EAAE,OAAO;YACb,SAAS,EAAE,IAAI,IAAI,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC;YACrC,OAAO,EAAE,QAAQ;YACjB,SAAS,EAAE,MAAM,CAAC,OAAO,EAAE;YAC3B,MAAM,EAAE,EAAE;SACX,CAAC;QACF,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnB,SAAS,CAAC,GAAG,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;QAC1B,MAAM,GAAG,QAAQ,CAAC;IACpB,CAAC;IAED,MAAM,YAAY,GAAG,IAAI,GAAG,EAAU,CAAC;IAEvC,MAAM,eAAe,GAAG,CAAC,IAAU,EAAE,SAAqB,EAAU,EAAE;QACpE,QAAQ,OAAO,EAAE,CAAC;YAChB,KAAK,UAAU;gBACb,IAAI,SAAS,EAAE,MAAM;oBAAE,OAAO,SAAS,CAAC,MAAM,CAAC;gBAC/C,OAAO,IAAI,CAAC,UAAU,IAAI,YAAY,CAAC;YACzC,KAAK,MAAM;gBACT,OAAO,IAAI,CAAC,MAAM,IAAK,IAAI,CAAC,YAAY,EAAE,MAAiB,IAAI,YAAY,CAAC;YAC9E,KAAK,UAAU;gBACb,OAAO,IAAI,CAAC,QAAQ,IAAK,IAAI,CAAC,YAAY,EAAE,IAAe,IAAI,UAAU,CAAC;YAC5E,KAAK,UAAU;gBACb,OAAO,IAAI,CAAC,QAAQ,IAAI,MAAM,CAAC;YACjC,KAAK,QAAQ;gBACX,OAAO,IAAI,CAAC,MAAM,IAAI,MAAM,CAAC;YAC/B;gBACE,OAAO,YAAY,CAAC;QACxB,CAAC;IACH,CAAC,CAAC;IAEF,MAAM,QAAQ,GAAG,CAAC,MAAsB,EAAE,GAAW,EAAE,KAAa,EAAE,EAAE;QACtE,IAAI,KAAK,IAAI,CAAC;YAAE,OAAO;QACvB,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;QACtB,MAAM,CAAC,MAAM,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC;IACzD,CAAC,CAAC;IAEF,MAAM,QAAQ,GAAG,YAAY,CAAC,IAAI,IAAI,EAAE,CAAC,CAAC;IAC1C,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IAEnE,2CAA2C;IAC3C,IAAI,MAAM,KAAK,QAAQ,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;QAChD,KAAK,MAAM,KAAK,IAAI,WAAW,EAAE,CAAC;YAChC,IAAI,CAAC,KAAK,CAAC,KAAK,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC;gBAAE,SAAS;YAC/C,MAAM,SAAS,GAAG,aAAa,CAAC,KAAK,CAAC,QAAQ,CAAC,CAAC;YAChD,MAAM,IAAI,GAAG,YAAY,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;YAC/C,MAAM,MAAM,GAAG,SAAS,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;YACnC,IAAI,MAAM,EAAE,CAAC;gBACX,MAAM,cAAc,GAAG,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,MAAM,CAAC,IAAK;oBACnD,EAAE,EAAE,KAAK,CAAC,MAAM;oBAChB,SAAS,EAAE,SAAS,IAAI,EAAE;oBAC1B,KAAK,EAAE,EAAE;oBACT,MAAM,EAAE,aAAa;oBACrB,QAAQ,EAAE,QAAQ;oBAClB,SAAS,EAAE,KAAK,CAAC,QAAQ;oBACzB,SAAS,EAAE,KAAK,CAAC,QAAQ;iBACjB,CAAC;gBACX,MAAM,MAAM,GAAG,eAAe,CAAC,cAAc,EAAE,KAAK,CAAC,CAAC;gBACtD,QAAQ,CAAC,MAAM,EAAE,MAAM,EAAE,KAAK,CAAC,KAAK,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;IACH,CAAC;IAED,8DAA8D;IAC9D,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;QAC7E,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,oBAAoB,CAAC,IAAI,CAAC,CAAC;YAC7C,MAAM,MAAM,GAAG,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC;YACrC,IAAI,iBAAiB,GAAG,CAAC,CAAC;YAE1B,IAAI,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC3B,iBAAiB,GAAG,SAAS,CAAC;YAChC,CAAC;iBAAM,IAAI,MAAM,KAAK,WAAW,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;gBAC1D,IAAI,IAAI,CAAC,cAAc,KAAK,WAAW,IAAI,IAAI,CAAC,cAAc,KAAK,UAAU,EAAE,CAAC;oBAC9E,iBAAiB,GAAG,CAAC,CAAC;gBACxB,CAAC;qBAAM,CAAC;oBACN,iBAAiB,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,SAAS,GAAG,MAAM,CAAC,CAAC;gBACtD,CAAC;YACH,CAAC;YAED,IAAI,iBAAiB,IAAI,CAAC;gBAAE,SAAS;YAErC,MAAM,MAAM,GAAG,eAAe,CAAC,IAAI,CAAC,CAAC;YAErC,4BAA4B;YAC5B,IAAI,SAAS,GAAG,IAAI,CAAC,gBAAgB;gBACnC,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,gBAAgB,CAAC;gBACtC,CAAC,CAAC,IAAI,CAAC,eAAe;oBACpB,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,eAAe,CAAC;oBACrC,CAAC,CAAC,IAAI,CAAC,SAAS;wBACd,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,SAAS,CAAC;wBAC/B,CAAC,CAAC,OAAO,CAAC;YAEhB,IAAI,OAAO,GAAG,IAAI,CAAC,OAAO;gBACxB,CAAC,CAAC,aAAa,CAAC,IAAI,CAAC,OAAO,CAAC;gBAC7B,CAAC,CAAC,SAAS;oBACT,CAAC,CAAC,OAAO,CAAC,SAAS,EAAE,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,IAAI,CAAC,iBAAiB,GAAG,CAAC,CAAC,CAAC,CAAC;oBACnE,CAAC,CAAC,OAAO,CAAC;YAEd,6GAA6G;YAC7G,IAAI,MAAM,KAAK,SAAS,EAAE,CAAC;gBACzB,MAAM,KAAK,GAAG,aAAa,CAAC,QAAQ,CAAC,CAAC;gBACtC,IAAI,SAAS,GAAG,KAAK,EAAE,CAAC;oBACtB,SAAS,GAAG,KAAK,CAAC;gBACpB,CAAC;gBACD,IAAI,OAAO,GAAG,SAAS,EAAE,CAAC;oBACxB,OAAO,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC;gBAClC,CAAC;YACH,CAAC;YAED,IAAI,OAAO,GAAG,SAAS,EAAE,CAAC;gBACxB,OAAO,GAAG,SAAS,CAAC;YACtB,CAAC;YAED,gCAAgC;YAChC,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAE,GAAG,EAAE,GAAG,EAAE,CAAC;YACrC,MAAM,SAAS,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,OAAO,CAAC,OAAO,EAAE,GAAG,SAAS,CAAC,OAAO,EAAE,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC,CAAC;YACpG,MAAM,WAAW,GAAG,iBAAiB,GAAG,SAAS,CAAC;YAElD,wCAAwC;YACxC,KAAK,MAAM,MAAM,IAAI,UAAU,EAAE,CAAC;gBAChC,MAAM,aAAa,GAAG,OAAO,CAAC,MAAM,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC,CAAC;gBAClD,MAAM,YAAY,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,SAAS,CAAC,OAAO,EAAE,EAAE,MAAM,CAAC,SAAS,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;gBACzF,MAAM,UAAU,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,OAAO,CAAC,OAAO,EAAE,EAAE,aAAa,CAAC,OAAO,EAAE,CAAC,CAAC,CAAC;gBAElF,IAAI,YAAY,IAAI,UAAU,EAAE,CAAC;oBAC/B,MAAM,WAAW,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,UAAU,CAAC,OAAO,EAAE,GAAG,YAAY,CAAC,OAAO,EAAE,CAAC,GAAG,QAAQ,CAAC,GAAG,CAAC,CAAC;oBAC/F,MAAM,YAAY,GAAG,WAAW,GAAG,WAAW,CAAC;oBAC/C,QAAQ,CAAC,MAAM,EAAE,MAAM,EAAE,YAAY,CAAC,CAAC;gBACzC,CAAC;YACH,CAAC;QACH,CAAC;IACH,CAAC;IAED,yEAAyE;IACzE,IAAI,OAAO,KAAK,UAAU,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC/C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,YAAY,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QACzB,CAAC;IACH,CAAC;IACD,IAAI,OAAO,KAAK,MAAM,IAAI,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QAC3C,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;YACtB,YAAY,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC;QACzB,CAAC;IACH,CAAC;IAED,MAAM,UAAU,GAAG,KAAK,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,IAAI,EAAE,CAAC;IAEnD,sCAAsC;IACtC,MAAM,YAAY,GAA2B,EAAE,CAAC;IAChD,KAAK,MAAM,GAAG,IAAI,UAAU,EAAE,CAAC;QAC7B,IAAI,OAAO,KAAK,UAAU,EAAE,CAAC;YAC3B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;YAC3B,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,GAAG,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC;QAC7E,CAAC;aAAM,IAAI,OAAO,KAAK,MAAM,EAAE,CAAC;YAC9B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;YAC3B,YAAY,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,GAAG,KAAK,YAAY,CAAC,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,GAAG,CAAC;QAC7E,CAAC;aAAM,CAAC;YACN,YAAY,CAAC,GAAG,CAAC,GAAG,GAAG,CAAC,MAAM,CAAC,CAAC,CAAC,CAAC,WAAW,EAAE,GAAG,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,IAAI,EAAE,GAAG,CAAC,CAAC;QACpF,CAAC;IACH,CAAC;IAED,4CAA4C;IAC5C,IAAI,qBAAqB,GAAG,CAAC,CAAC;IAC9B,IAAI,wBAAwB,GAAG,CAAC,CAAC;IAEjC,MAAM,OAAO,GAAqB,UAAU,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE;QACtD,MAAM,MAAM,GAA2B,EAAE,CAAC;QAC1C,MAAM,QAAQ,GAA2B,EAAE,CAAC;QAC5C,IAAI,gBAAgB,GAAG,CAAC,CAAC;QACzB,IAAI,mBAAmB,GAAG,CAAC,CAAC;QAE5B,KAAK,MAAM,GAAG,IAAI,UAAU,EAAE,CAAC;YAC7B,MAAM,QAAQ,GAAG,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;YACrC,MAAM,YAAY,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACtD,MAAM,CAAC,GAAG,CAAC,GAAG,YAAY,CAAC;YAC3B,gBAAgB,IAAI,YAAY,CAAC;YAEjC,uBAAuB;YACvB,IAAI,SAAS,GAAG,qBAAqB,CAAC;YACtC,IAAI,OAAO,CAAC,iBAAiB,IAAI,OAAO,OAAO,CAAC,iBAAiB,CAAC,GAAG,CAAC,KAAK,QAAQ,EAAE,CAAC;gBACpF,SAAS,GAAG,OAAO,CAAC,iBAAiB,CAAC,GAAG,CAAC,CAAC;YAC7C,CAAC;iBAAM,IAAI,OAAO,KAAK,UAAU,EAAE,CAAC;gBAClC,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;gBAC3B,IAAI,CAAC,EAAE,mBAAmB;oBAAE,SAAS,GAAG,CAAC,CAAC,mBAAmB,CAAC;qBACzD,IAAI,GAAG,KAAK,YAAY;oBAAE,SAAS,GAAG,CAAC,CAAC;YAC/C,CAAC;iBAAM,IAAI,OAAO,KAAK,MAAM,EAAE,CAAC;gBAC9B,MAAM,CAAC,GAAG,OAAO,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC;gBAC3B,IAAI,CAAC,EAAE,mBAAmB,EAAE,CAAC;oBAC3B,SAAS,GAAG,CAAC,CAAC,mBAAmB,CAAC;gBACpC,CAAC;qBAAM,IAAI,CAAC,EAAE,SAAS,EAAE,MAAM,EAAE,CAAC;oBAChC,SAAS,GAAG,CAAC,CAAC,SAAS,CAAC,MAAM,GAAG,qBAAqB,CAAC;gBACzD,CAAC;qBAAM,IAAI,GAAG,KAAK,YAAY,EAAE,CAAC;oBAChC,SAAS,GAAG,CAAC,CAAC;gBAChB,CAAC;YACH,CAAC;YAED,IAAI,SAAS,GAAG,CAAC,CAAC;YAClB,IAAI,QAAQ,KAAK,MAAM,EAAE,CAAC;gBACxB,SAAS,GAAG,SAAS,CAAC;YACxB,CAAC;iBAAM,IAAI,QAAQ,KAAK,KAAK,EAAE,CAAC;gBAC9B,SAAS,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,SAAS,GAAG,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACtD,CAAC;iBAAM,IAAI,QAAQ,KAAK,OAAO,EAAE,CAAC;gBAChC,MAAM,WAAW,GAAG,IAAI,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,SAAS,CAAC,cAAc,EAAE,EAAE,EAAE,CAAC,SAAS,CAAC,WAAW,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,UAAU,EAAE,CAAC;gBACtH,SAAS,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,SAAS,GAAG,CAAC,WAAW,GAAG,CAAC,CAAC,CAAC,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;YACtE,CAAC;YAED,QAAQ,CAAC,GAAG,CAAC,GAAG,SAAS,CAAC;YAC1B,mBAAmB,IAAI,SAAS,CAAC;QACnC,CAAC;QAED,gBAAgB,GAAG,IAAI,CAAC,KAAK,CAAC,gBAAgB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QAC5D,mBAAmB,GAAG,IAAI,CAAC,KAAK,CAAC,mBAAmB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QAClE,qBAAqB,IAAI,gBAAgB,CAAC;QAC1C,wBAAwB,IAAI,mBAAmB,CAAC;QAEhD,MAAM,gBAAgB,GACpB,mBAAmB,GAAG,CAAC;YACrB,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,gBAAgB,GAAG,mBAAmB,CAAC,GAAG,IAAI,CAAC,GAAG,IAAI;YACpE,CAAC,CAAC,SAAS,CAAC;QAEhB,OAAO;YACL,IAAI,EAAE,EAAE,CAAC,IAAI;YACb,SAAS,EAAE,EAAE,CAAC,SAAS;YACvB,UAAU,EAAE,gBAAgB;YAC5B,MAAM;YACN,QAAQ;YACR,aAAa,EAAE,mBAAmB;YAClC,gBAAgB;SACjB,CAAC;IACJ,CAAC,CAAC,CAAC;IAEH,qBAAqB,GAAG,IAAI,CAAC,KAAK,CAAC,qBAAqB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;IACtE,wBAAwB,GAAG,IAAI,CAAC,KAAK,CAAC,wBAAwB,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;IAE5E,MAAM,kBAAkB,GACtB,wBAAwB,GAAG,CAAC;QAC1B,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,qBAAqB,GAAG,wBAAwB,CAAC,GAAG,IAAI,CAAC,GAAG,IAAI;QAC9E,CAAC,CAAC,SAAS,CAAC;IAEhB,OAAO;QACL,SAAS;QACT,SAAS,EAAE,YAAY,CAAC,OAAO,CAAC;QAChC,OAAO,EAAE,YAAY,CAAC,OAAO,CAAC;QAC9B,QAAQ;QACR,OAAO;QACP,MAAM;QACN,UAAU;QACV,YAAY;QACZ,OAAO;QACP,UAAU,EAAE,qBAAqB;QACjC,aAAa,EAAE,wBAAwB;QACvC,kBAAkB;KACnB,CAAC;AACJ,CAAC"}
@@ -0,0 +1,2 @@
1
+ export {};
2
+ //# sourceMappingURL=workload.test.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"workload.test.d.ts","sourceRoot":"","sources":["../../src/domain/workload.test.ts"],"names":[],"mappings":""}