@critical-path/core 0.15.2 → 0.17.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (66) hide show
  1. package/CHANGELOG.md +24 -0
  2. package/README.md +25 -0
  3. package/dist/domain/cpm.d.ts +10 -0
  4. package/dist/domain/cpm.d.ts.map +1 -0
  5. package/dist/domain/cpm.js +176 -0
  6. package/dist/domain/cpm.js.map +1 -0
  7. package/dist/domain/cpm.test.d.ts +2 -0
  8. package/dist/domain/cpm.test.d.ts.map +1 -0
  9. package/dist/domain/cpm.test.js +113 -0
  10. package/dist/domain/cpm.test.js.map +1 -0
  11. package/dist/domain/entities.d.ts.map +1 -1
  12. package/dist/domain/entities.js +5 -0
  13. package/dist/domain/entities.js.map +1 -1
  14. package/dist/domain/index.d.ts +3 -0
  15. package/dist/domain/index.d.ts.map +1 -1
  16. package/dist/domain/index.js +3 -0
  17. package/dist/domain/index.js.map +1 -1
  18. package/dist/domain/ladder.d.ts +16 -0
  19. package/dist/domain/ladder.d.ts.map +1 -0
  20. package/dist/domain/ladder.js +352 -0
  21. package/dist/domain/ladder.js.map +1 -0
  22. package/dist/domain/ladder.test.d.ts +2 -0
  23. package/dist/domain/ladder.test.d.ts.map +1 -0
  24. package/dist/domain/ladder.test.js +213 -0
  25. package/dist/domain/ladder.test.js.map +1 -0
  26. package/dist/domain/metrics.d.ts +29 -0
  27. package/dist/domain/metrics.d.ts.map +1 -0
  28. package/dist/domain/metrics.js +403 -0
  29. package/dist/domain/metrics.js.map +1 -0
  30. package/dist/domain/metrics.test.d.ts +2 -0
  31. package/dist/domain/metrics.test.d.ts.map +1 -0
  32. package/dist/domain/metrics.test.js +251 -0
  33. package/dist/domain/metrics.test.js.map +1 -0
  34. package/dist/engine/index.d.ts +8 -1
  35. package/dist/engine/index.d.ts.map +1 -1
  36. package/dist/engine/index.js +124 -1
  37. package/dist/engine/index.js.map +1 -1
  38. package/dist/store/firebase.d.ts +3 -1
  39. package/dist/store/firebase.d.ts.map +1 -1
  40. package/dist/store/firebase.js +1 -1
  41. package/dist/store/firebase.js.map +1 -1
  42. package/dist/store/index.d.ts +6 -2
  43. package/dist/store/index.d.ts.map +1 -1
  44. package/dist/store/index.js +1 -1
  45. package/dist/store/index.js.map +1 -1
  46. package/dist/store/sqlite.d.ts +3 -1
  47. package/dist/store/sqlite.d.ts.map +1 -1
  48. package/dist/store/sqlite.js +1 -1
  49. package/dist/store/sqlite.js.map +1 -1
  50. package/dist/types/index.d.ts +177 -0
  51. package/dist/types/index.d.ts.map +1 -1
  52. package/package.json +1 -1
  53. package/src/domain/cpm.test.ts +128 -0
  54. package/src/domain/cpm.ts +215 -0
  55. package/src/domain/entities.ts +6 -0
  56. package/src/domain/index.ts +4 -0
  57. package/src/domain/ladder.test.ts +251 -0
  58. package/src/domain/ladder.ts +453 -0
  59. package/src/domain/metrics.test.ts +286 -0
  60. package/src/domain/metrics.ts +484 -0
  61. package/src/engine/index.ts +169 -4
  62. package/src/store/firebase.ts +2 -2
  63. package/src/store/index.ts +3 -3
  64. package/src/store/sqlite.ts +2 -2
  65. package/src/types/index.ts +206 -0
  66. package/tsconfig.tsbuildinfo +1 -1
package/CHANGELOG.md CHANGED
@@ -1,5 +1,29 @@
1
1
  # @critical-path/core
2
2
 
3
+ ## 0.17.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 9c31e8d: Introduce comprehensive Task Metrics, Inferred Actuals, Progress Inference, Earned Value Management (EVM), and Time-Series Progress History Curve Profiling.
8
+ - **Inferred Actuals**: Automatic start/completion auto-stamping on workflow transitions with fallback inference from activity logs, plus automatic completion timestamp clearing on task re-open.
9
+ - **Reality Delta**: Multi-dimensional variance analysis comparing planned estimates to logged hours (`effortVarianceHours`, `durationVarianceHours`, `accuracyRatio`, `isOverdue`, `isOverEstimate`).
10
+ - **Progress Inference**: Deterministic priority waterfall resolving completion progress across explicit values, checklist/todo completion ratios, logged effort, and elapsed schedule time.
11
+ - **Earned Value Management (EVM)**: Task-level PV, EV, AC, CV, SV, CPI, and SPI calculations.
12
+ - **Time-Series History & Curve Shapes**: Historical timeline reconstruction from activity logs with piecewise interpolation curve classification (`linear`, `s_curve`, `early_surge`, `late_rush`, `stalled`).
13
+ - **Full-Stack Integration**: REST endpoints (`/tasks/:id/metrics`, `/tasks/:id/progress-history`), Client SDK methods, React `useTaskMetrics` hook, Svelte 5 `TaskMetricsState`, and MCP tools (`get_task_metrics`, `get_task_progress_history`).
14
+
15
+ ## 0.16.0
16
+
17
+ ### Minor Changes
18
+
19
+ - e2a7eef: Introduce Ladder of Abstraction and Critical Path Method (CPM) timeline synthesis to the framework data model:
20
+ - **Core Domain**: Multi-scale timeline synthesis model across Macro phase rollups, Standard CPM Gantt schedule (early/late bounds, float/slack calculation, bottleneck identification), and Concrete grounding (deliverables, file attachments, daily effort distribution, and reality deltas). Added `calculateCriticalPath`, `getTimelineLadder`, and `getTaskLadder` to `CriticalPathEngine`.
21
+ - **Server Router**: HTTP endpoints `GET /projects/:id/critical-path`, `GET /projects/:id/ladder`, and `GET /tasks/:id/ladder`.
22
+ - **Client SDK**: `CriticalPathClient` methods `calculateCriticalPath`, `getTimelineLadder`, and `getTaskLadder`.
23
+ - **MCP**: New AI tools `calculate_critical_path`, `get_timeline_ladder`, and `get_task_ladder`.
24
+ - **React**: Custom hooks `useTimelineLadder`, `useCriticalPath`, and `useTaskLadder`.
25
+ - **Svelte 5**: Svelte 5 Runes state classes `TimelineLadderState` and `CriticalPathState`.
26
+
3
27
  ## 0.15.2
4
28
 
5
29
  ### Patch Changes
package/README.md CHANGED
@@ -32,6 +32,10 @@
32
32
  - `DeliverableEntity` aggregate with automatic delivery timestamps (`deliveredAt`) and URL registry (`outputUrls`).
33
33
  - `DEFAULT_CREATIVE_WORKFLOW` template tailored for creative agencies and content production pipelines.
34
34
  - Rollup calculations via `getDeliverableSummary()` delivering progress percentages, completed tasks, and total estimated/logged hours across assigned tasks.
35
+ - **Ladder of Abstraction & Critical Path Method (CPM)**:
36
+ - Multi-scale timeline synthesis: Macro bird's-eye phase rollups (`getTimelineLadder({ level: 'macro' })`), Standard Gantt view with topological CPM forward/backward passes and total float/slack, and Concrete grounding (attachments, deliverables, checklist items, daily effort histograms, and reality deltas).
37
+ - Single-task contextual drilldown via `getTaskLadder(taskId)`.
38
+ - Comprehensive CPM analysis via `calculateCriticalPath(projectId)` identifying project bottleneck tasks and critical path duration.
35
39
 
36
40
  ---
37
41
 
@@ -149,6 +153,27 @@ if (state?.isPaceWarning) {
149
153
  }
150
154
  ```
151
155
 
156
+ ### 6. Task Metrics, Inferred Actuals & EVM
157
+
158
+ ```ts
159
+ // Calculate comprehensive task metrics
160
+ const metrics = await engine.getTaskMetrics('task_123');
161
+
162
+ console.log('Inferred Actuals:', metrics?.inferredActuals);
163
+ // { actualStartDate: '...', isStartDateInferred: false, activeWorkingHours: 18.5 }
164
+
165
+ console.log('Progress Inference:', metrics?.progress);
166
+ // { progressPercentage: 80, source: 'todos', breakdown: { todoProgress: 80 } }
167
+
168
+ console.log('Earned Value Management:', metrics?.evm);
169
+ // { plannedValue: 20, earnedValue: 16, actualCost: 18, cpi: 0.89, spi: 0.8 }
170
+
171
+ // Reconstruct historical progress time-series and curve profile
172
+ const history = await engine.getTaskProgressHistory('task_123');
173
+ console.log('Curve Profile:', history?.curveProfile);
174
+ // 's_curve' | 'linear' | 'early_surge' | 'late_rush' | 'stalled'
175
+ ```
176
+
152
177
  ---
153
178
 
154
179
  ## 🔌 Creating a Custom Plugin
@@ -0,0 +1,10 @@
1
+ import type { Task, TaskDependency, CriticalPathAnalysis } from '../types/index.js';
2
+ export declare function getTaskDurationHours(task: Task): number;
3
+ /**
4
+ * Calculates the Critical Path Method (CPM) schedule for a set of tasks and their dependencies.
5
+ * - Forward Pass: computes earlyStart and earlyFinish
6
+ * - Backward Pass: computes lateStart, lateFinish, and totalSlack
7
+ * - Identifies critical tasks (totalSlack === 0) that dictate the minimum project duration.
8
+ */
9
+ export declare function calculateCPM(projectId: string, tasks: Task[], dependencies: TaskDependency[]): CriticalPathAnalysis;
10
+ //# sourceMappingURL=cpm.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"cpm.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,cAAc,EAEd,oBAAoB,EACrB,MAAM,mBAAmB,CAAC;AAE3B,wBAAgB,oBAAoB,CAAC,IAAI,EAAE,IAAI,GAAG,MAAM,CAYvD;AAED;;;;;GAKG;AACH,wBAAgB,YAAY,CAC1B,SAAS,EAAE,MAAM,EACjB,KAAK,EAAE,IAAI,EAAE,EACb,YAAY,EAAE,cAAc,EAAE,GAC7B,oBAAoB,CAuLtB"}
@@ -0,0 +1,176 @@
1
+ export function getTaskDurationHours(task) {
2
+ if (typeof task.estimatedHours === 'number' && task.estimatedHours >= 0) {
3
+ return task.estimatedHours;
4
+ }
5
+ if (typeof task.estimatedDurationMinutes === 'number' && task.estimatedDurationMinutes >= 0) {
6
+ return task.estimatedDurationMinutes / 60;
7
+ }
8
+ if (typeof task.actualHours === 'number' && task.actualHours > 0) {
9
+ return task.actualHours;
10
+ }
11
+ // Default to 1 hour for non-empty tasks without explicit estimate
12
+ return 1;
13
+ }
14
+ /**
15
+ * Calculates the Critical Path Method (CPM) schedule for a set of tasks and their dependencies.
16
+ * - Forward Pass: computes earlyStart and earlyFinish
17
+ * - Backward Pass: computes lateStart, lateFinish, and totalSlack
18
+ * - Identifies critical tasks (totalSlack === 0) that dictate the minimum project duration.
19
+ */
20
+ export function calculateCPM(projectId, tasks, dependencies) {
21
+ const calculatedAt = new Date().toISOString();
22
+ if (tasks.length === 0) {
23
+ return {
24
+ projectId,
25
+ calculatedAt,
26
+ totalDurationHours: 0,
27
+ criticalTaskIds: [],
28
+ tasks: []
29
+ };
30
+ }
31
+ const taskMap = new Map(tasks.map((t) => [t.id, t]));
32
+ const taskIds = Array.from(taskMap.keys());
33
+ // Build adjacency graph:
34
+ // prerequisites[v] = tasks that v depends on (must finish before v starts)
35
+ // successors[u] = tasks that depend on u (can only start after u finishes)
36
+ const prerequisites = new Map();
37
+ const successors = new Map();
38
+ for (const id of taskIds) {
39
+ prerequisites.set(id, new Set());
40
+ successors.set(id, new Set());
41
+ }
42
+ for (const dep of dependencies) {
43
+ let sourceId = null;
44
+ let targetId = null;
45
+ if (dep.type === 'blocking') {
46
+ // taskId depends on dependsOnTaskId (dependsOnTaskId -> taskId)
47
+ sourceId = dep.dependsOnTaskId;
48
+ targetId = dep.taskId;
49
+ }
50
+ else if (dep.type === 'blocked_by') {
51
+ // dependsOnTaskId is blocked by taskId (taskId -> dependsOnTaskId)
52
+ sourceId = dep.taskId;
53
+ targetId = dep.dependsOnTaskId;
54
+ }
55
+ if (sourceId && targetId && taskMap.has(sourceId) && taskMap.has(targetId) && sourceId !== targetId) {
56
+ prerequisites.get(targetId).add(sourceId);
57
+ successors.get(sourceId).add(targetId);
58
+ }
59
+ }
60
+ // Topological sorting via Kahn's algorithm
61
+ const inDegree = new Map();
62
+ for (const id of taskIds) {
63
+ inDegree.set(id, prerequisites.get(id).size);
64
+ }
65
+ const queue = [];
66
+ for (const [id, deg] of inDegree.entries()) {
67
+ if (deg === 0) {
68
+ queue.push(id);
69
+ }
70
+ }
71
+ const topoOrder = [];
72
+ while (queue.length > 0) {
73
+ const current = queue.shift();
74
+ topoOrder.push(current);
75
+ for (const next of successors.get(current)) {
76
+ const updatedDeg = inDegree.get(next) - 1;
77
+ inDegree.set(next, updatedDeg);
78
+ if (updatedDeg === 0) {
79
+ queue.push(next);
80
+ }
81
+ }
82
+ }
83
+ // If there's a cycle or disconnected nodes not processed in topoOrder, append them
84
+ if (topoOrder.length < taskIds.length) {
85
+ for (const id of taskIds) {
86
+ if (!topoOrder.includes(id)) {
87
+ topoOrder.push(id);
88
+ }
89
+ }
90
+ }
91
+ // --- FORWARD PASS ---
92
+ const earlyStart = new Map();
93
+ const earlyFinish = new Map();
94
+ for (const id of topoOrder) {
95
+ const task = taskMap.get(id);
96
+ const duration = getTaskDurationHours(task);
97
+ const prereqs = prerequisites.get(id) || new Set();
98
+ let maxPrereqFinish = 0;
99
+ for (const p of prereqs) {
100
+ const pFinish = earlyFinish.get(p) ?? 0;
101
+ if (pFinish > maxPrereqFinish) {
102
+ maxPrereqFinish = pFinish;
103
+ }
104
+ }
105
+ const es = maxPrereqFinish;
106
+ const ef = es + duration;
107
+ earlyStart.set(id, es);
108
+ earlyFinish.set(id, ef);
109
+ }
110
+ // Total project duration
111
+ let totalDurationHours = 0;
112
+ for (const ef of earlyFinish.values()) {
113
+ if (ef > totalDurationHours) {
114
+ totalDurationHours = ef;
115
+ }
116
+ }
117
+ // --- BACKWARD PASS ---
118
+ const lateStart = new Map();
119
+ const lateFinish = new Map();
120
+ // Process in reverse topological order
121
+ for (let i = topoOrder.length - 1; i >= 0; i--) {
122
+ const id = topoOrder[i];
123
+ const task = taskMap.get(id);
124
+ const duration = getTaskDurationHours(task);
125
+ const succs = successors.get(id) || new Set();
126
+ let minSuccLateStart = totalDurationHours;
127
+ if (succs.size > 0) {
128
+ minSuccLateStart = Infinity;
129
+ for (const s of succs) {
130
+ const sLateStart = lateStart.get(s);
131
+ if (sLateStart !== undefined && sLateStart < minSuccLateStart) {
132
+ minSuccLateStart = sLateStart;
133
+ }
134
+ }
135
+ if (!Number.isFinite(minSuccLateStart)) {
136
+ minSuccLateStart = totalDurationHours;
137
+ }
138
+ }
139
+ const lf = minSuccLateStart;
140
+ const ls = lf - duration;
141
+ lateFinish.set(id, lf);
142
+ lateStart.set(id, ls);
143
+ }
144
+ // --- SLACK & CRITICAL PATH ---
145
+ const schedules = [];
146
+ const criticalTaskIds = [];
147
+ for (const id of taskIds) {
148
+ const es = earlyStart.get(id) ?? 0;
149
+ const ef = earlyFinish.get(id) ?? 0;
150
+ const ls = lateStart.get(id) ?? 0;
151
+ const lf = lateFinish.get(id) ?? 0;
152
+ const rawSlack = lf - ef;
153
+ const totalSlack = Math.round(rawSlack * 100) / 100;
154
+ const isCritical = totalSlack <= 0.001;
155
+ if (isCritical) {
156
+ criticalTaskIds.push(id);
157
+ }
158
+ schedules.push({
159
+ taskId: id,
160
+ earlyStart: Math.round(es * 100) / 100,
161
+ earlyFinish: Math.round(ef * 100) / 100,
162
+ lateStart: Math.round(ls * 100) / 100,
163
+ lateFinish: Math.round(lf * 100) / 100,
164
+ totalSlack,
165
+ isCritical
166
+ });
167
+ }
168
+ return {
169
+ projectId,
170
+ calculatedAt,
171
+ totalDurationHours: Math.round(totalDurationHours * 100) / 100,
172
+ criticalTaskIds,
173
+ tasks: schedules
174
+ };
175
+ }
176
+ //# sourceMappingURL=cpm.js.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"cpm.js","sourceRoot":"","sources":["../../src/domain/cpm.ts"],"names":[],"mappings":"AAOA,MAAM,UAAU,oBAAoB,CAAC,IAAU;IAC7C,IAAI,OAAO,IAAI,CAAC,cAAc,KAAK,QAAQ,IAAI,IAAI,CAAC,cAAc,IAAI,CAAC,EAAE,CAAC;QACxE,OAAO,IAAI,CAAC,cAAc,CAAC;IAC7B,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,wBAAwB,KAAK,QAAQ,IAAI,IAAI,CAAC,wBAAwB,IAAI,CAAC,EAAE,CAAC;QAC5F,OAAO,IAAI,CAAC,wBAAwB,GAAG,EAAE,CAAC;IAC5C,CAAC;IACD,IAAI,OAAO,IAAI,CAAC,WAAW,KAAK,QAAQ,IAAI,IAAI,CAAC,WAAW,GAAG,CAAC,EAAE,CAAC;QACjE,OAAO,IAAI,CAAC,WAAW,CAAC;IAC1B,CAAC;IACD,kEAAkE;IAClE,OAAO,CAAC,CAAC;AACX,CAAC;AAED;;;;;GAKG;AACH,MAAM,UAAU,YAAY,CAC1B,SAAiB,EACjB,KAAa,EACb,YAA8B;IAE9B,MAAM,YAAY,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAE9C,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;QACvB,OAAO;YACL,SAAS;YACT,YAAY;YACZ,kBAAkB,EAAE,CAAC;YACrB,eAAe,EAAE,EAAE;YACnB,KAAK,EAAE,EAAE;SACV,CAAC;IACJ,CAAC;IAED,MAAM,OAAO,GAAG,IAAI,GAAG,CAAe,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC;IACnE,MAAM,OAAO,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,IAAI,EAAE,CAAC,CAAC;IAE3C,yBAAyB;IACzB,2EAA2E;IAC3E,2EAA2E;IAC3E,MAAM,aAAa,GAAG,IAAI,GAAG,EAAuB,CAAC;IACrD,MAAM,UAAU,GAAG,IAAI,GAAG,EAAuB,CAAC;IAElD,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,aAAa,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;QACzC,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,IAAI,GAAG,EAAU,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;QAC/B,IAAI,QAAQ,GAAkB,IAAI,CAAC;QACnC,IAAI,QAAQ,GAAkB,IAAI,CAAC;QAEnC,IAAI,GAAG,CAAC,IAAI,KAAK,UAAU,EAAE,CAAC;YAC5B,gEAAgE;YAChE,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;YAC/B,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;QACxB,CAAC;aAAM,IAAI,GAAG,CAAC,IAAI,KAAK,YAAY,EAAE,CAAC;YACrC,mEAAmE;YACnE,QAAQ,GAAG,GAAG,CAAC,MAAM,CAAC;YACtB,QAAQ,GAAG,GAAG,CAAC,eAAe,CAAC;QACjC,CAAC;QAED,IAAI,QAAQ,IAAI,QAAQ,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,OAAO,CAAC,GAAG,CAAC,QAAQ,CAAC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACpG,aAAa,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;YAC3C,UAAU,CAAC,GAAG,CAAC,QAAQ,CAAE,CAAC,GAAG,CAAC,QAAQ,CAAC,CAAC;QAC1C,CAAC;IACH,CAAC;IAED,2CAA2C;IAC3C,MAAM,QAAQ,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC3C,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,QAAQ,CAAC,GAAG,CAAC,EAAE,EAAE,aAAa,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC,IAAI,CAAC,CAAC;IAChD,CAAC;IAED,MAAM,KAAK,GAAa,EAAE,CAAC;IAC3B,KAAK,MAAM,CAAC,EAAE,EAAE,GAAG,CAAC,IAAI,QAAQ,CAAC,OAAO,EAAE,EAAE,CAAC;QAC3C,IAAI,GAAG,KAAK,CAAC,EAAE,CAAC;YACd,KAAK,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACjB,CAAC;IACH,CAAC;IAED,MAAM,SAAS,GAAa,EAAE,CAAC;IAC/B,OAAO,KAAK,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;QACxB,MAAM,OAAO,GAAG,KAAK,CAAC,KAAK,EAAG,CAAC;QAC/B,SAAS,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAExB,KAAK,MAAM,IAAI,IAAI,UAAU,CAAC,GAAG,CAAC,OAAO,CAAE,EAAE,CAAC;YAC5C,MAAM,UAAU,GAAG,QAAQ,CAAC,GAAG,CAAC,IAAI,CAAE,GAAG,CAAC,CAAC;YAC3C,QAAQ,CAAC,GAAG,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;YAC/B,IAAI,UAAU,KAAK,CAAC,EAAE,CAAC;gBACrB,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACnB,CAAC;QACH,CAAC;IACH,CAAC;IAED,mFAAmF;IACnF,IAAI,SAAS,CAAC,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QACtC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;YACzB,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC,EAAE,CAAC,EAAE,CAAC;gBAC5B,SAAS,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;YACrB,CAAC;QACH,CAAC;IACH,CAAC;IAED,uBAAuB;IACvB,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC7C,MAAM,WAAW,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE9C,KAAK,MAAM,EAAE,IAAI,SAAS,EAAE,CAAC;QAC3B,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,oBAAoB,CAAC,IAAI,CAAC,CAAC;QAC5C,MAAM,OAAO,GAAG,aAAa,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAEnD,IAAI,eAAe,GAAG,CAAC,CAAC;QACxB,KAAK,MAAM,CAAC,IAAI,OAAO,EAAE,CAAC;YACxB,MAAM,OAAO,GAAG,WAAW,CAAC,GAAG,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC;YACxC,IAAI,OAAO,GAAG,eAAe,EAAE,CAAC;gBAC9B,eAAe,GAAG,OAAO,CAAC;YAC5B,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,eAAe,CAAC;QAC3B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,WAAW,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IAC1B,CAAC;IAED,yBAAyB;IACzB,IAAI,kBAAkB,GAAG,CAAC,CAAC;IAC3B,KAAK,MAAM,EAAE,IAAI,WAAW,CAAC,MAAM,EAAE,EAAE,CAAC;QACtC,IAAI,EAAE,GAAG,kBAAkB,EAAE,CAAC;YAC5B,kBAAkB,GAAG,EAAE,CAAC;QAC1B,CAAC;IACH,CAAC;IAED,wBAAwB;IACxB,MAAM,SAAS,GAAG,IAAI,GAAG,EAAkB,CAAC;IAC5C,MAAM,UAAU,GAAG,IAAI,GAAG,EAAkB,CAAC;IAE7C,uCAAuC;IACvC,KAAK,IAAI,CAAC,GAAG,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,EAAE,CAAC,EAAE,EAAE,CAAC;QAC/C,MAAM,EAAE,GAAG,SAAS,CAAC,CAAC,CAAC,CAAC;QACxB,MAAM,IAAI,GAAG,OAAO,CAAC,GAAG,CAAC,EAAE,CAAE,CAAC;QAC9B,MAAM,QAAQ,GAAG,oBAAoB,CAAC,IAAI,CAAC,CAAC;QAC5C,MAAM,KAAK,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,IAAI,GAAG,EAAE,CAAC;QAE9C,IAAI,gBAAgB,GAAG,kBAAkB,CAAC;QAC1C,IAAI,KAAK,CAAC,IAAI,GAAG,CAAC,EAAE,CAAC;YACnB,gBAAgB,GAAG,QAAQ,CAAC;YAC5B,KAAK,MAAM,CAAC,IAAI,KAAK,EAAE,CAAC;gBACtB,MAAM,UAAU,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC;gBACpC,IAAI,UAAU,KAAK,SAAS,IAAI,UAAU,GAAG,gBAAgB,EAAE,CAAC;oBAC9D,gBAAgB,GAAG,UAAU,CAAC;gBAChC,CAAC;YACH,CAAC;YACD,IAAI,CAAC,MAAM,CAAC,QAAQ,CAAC,gBAAgB,CAAC,EAAE,CAAC;gBACvC,gBAAgB,GAAG,kBAAkB,CAAC;YACxC,CAAC;QACH,CAAC;QAED,MAAM,EAAE,GAAG,gBAAgB,CAAC;QAC5B,MAAM,EAAE,GAAG,EAAE,GAAG,QAAQ,CAAC;QAEzB,UAAU,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;QACvB,SAAS,CAAC,GAAG,CAAC,EAAE,EAAE,EAAE,CAAC,CAAC;IACxB,CAAC;IAED,gCAAgC;IAChC,MAAM,SAAS,GAA+B,EAAE,CAAC;IACjD,MAAM,eAAe,GAAa,EAAE,CAAC;IAErC,KAAK,MAAM,EAAE,IAAI,OAAO,EAAE,CAAC;QACzB,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACnC,MAAM,EAAE,GAAG,WAAW,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QACpC,MAAM,EAAE,GAAG,SAAS,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,EAAE,GAAG,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC,IAAI,CAAC,CAAC;QAEnC,MAAM,QAAQ,GAAG,EAAE,GAAG,EAAE,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,KAAK,CAAC,QAAQ,GAAG,GAAG,CAAC,GAAG,GAAG,CAAC;QACpD,MAAM,UAAU,GAAG,UAAU,IAAI,KAAK,CAAC;QAEvC,IAAI,UAAU,EAAE,CAAC;YACf,eAAe,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAC3B,CAAC;QAED,SAAS,CAAC,IAAI,CAAC;YACb,MAAM,EAAE,EAAE;YACV,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,WAAW,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACvC,SAAS,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACrC,UAAU,EAAE,IAAI,CAAC,KAAK,CAAC,EAAE,GAAG,GAAG,CAAC,GAAG,GAAG;YACtC,UAAU;YACV,UAAU;SACX,CAAC,CAAC;IACL,CAAC;IAED,OAAO;QACL,SAAS;QACT,YAAY;QACZ,kBAAkB,EAAE,IAAI,CAAC,KAAK,CAAC,kBAAkB,GAAG,GAAG,CAAC,GAAG,GAAG;QAC9D,eAAe;QACf,KAAK,EAAE,SAAS;KACjB,CAAC;AACJ,CAAC"}
@@ -0,0 +1,2 @@
1
+ export {};
2
+ //# sourceMappingURL=cpm.test.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"cpm.test.d.ts","sourceRoot":"","sources":["../../src/domain/cpm.test.ts"],"names":[],"mappings":""}
@@ -0,0 +1,113 @@
1
+ import { describe, it, expect } from 'vitest';
2
+ import { calculateCPM, getTaskDurationHours } from './cpm.js';
3
+ describe('Critical Path Method (CPM)', () => {
4
+ it('returns empty analysis for empty tasks array', () => {
5
+ const analysis = calculateCPM('proj-1', [], []);
6
+ expect(analysis.projectId).toBe('proj-1');
7
+ expect(analysis.totalDurationHours).toBe(0);
8
+ expect(analysis.criticalTaskIds).toEqual([]);
9
+ expect(analysis.tasks).toEqual([]);
10
+ });
11
+ it('calculates duration, slack, and critical path for sequential linear tasks', () => {
12
+ const now = new Date().toISOString();
13
+ const tasks = [
14
+ {
15
+ id: 'task-1',
16
+ projectId: 'proj-1',
17
+ title: 'Task 1',
18
+ status: 'todo',
19
+ priority: 'medium',
20
+ estimatedHours: 2,
21
+ createdAt: now,
22
+ updatedAt: now
23
+ },
24
+ {
25
+ id: 'task-2',
26
+ projectId: 'proj-1',
27
+ title: 'Task 2',
28
+ status: 'todo',
29
+ priority: 'medium',
30
+ estimatedHours: 3,
31
+ createdAt: now,
32
+ updatedAt: now
33
+ },
34
+ {
35
+ id: 'task-3',
36
+ projectId: 'proj-1',
37
+ title: 'Task 3',
38
+ status: 'todo',
39
+ priority: 'medium',
40
+ estimatedHours: 1,
41
+ createdAt: now,
42
+ updatedAt: now
43
+ }
44
+ ];
45
+ const dependencies = [
46
+ { id: 'dep-1', taskId: 'task-2', dependsOnTaskId: 'task-1', type: 'blocking' },
47
+ { id: 'dep-2', taskId: 'task-3', dependsOnTaskId: 'task-2', type: 'blocking' }
48
+ ];
49
+ const result = calculateCPM('proj-1', tasks, dependencies);
50
+ expect(result.totalDurationHours).toBe(6);
51
+ expect(result.criticalTaskIds).toEqual(['task-1', 'task-2', 'task-3']);
52
+ const sched1 = result.tasks.find((t) => t.taskId === 'task-1');
53
+ expect(sched1.earlyStart).toBe(0);
54
+ expect(sched1.earlyFinish).toBe(2);
55
+ expect(sched1.lateStart).toBe(0);
56
+ expect(sched1.lateFinish).toBe(2);
57
+ expect(sched1.totalSlack).toBe(0);
58
+ expect(sched1.isCritical).toBe(true);
59
+ const sched2 = result.tasks.find((t) => t.taskId === 'task-2');
60
+ expect(sched2.earlyStart).toBe(2);
61
+ expect(sched2.earlyFinish).toBe(5);
62
+ expect(sched2.totalSlack).toBe(0);
63
+ expect(sched2.isCritical).toBe(true);
64
+ const sched3 = result.tasks.find((t) => t.taskId === 'task-3');
65
+ expect(sched3.earlyStart).toBe(5);
66
+ expect(sched3.earlyFinish).toBe(6);
67
+ expect(sched3.totalSlack).toBe(0);
68
+ expect(sched3.isCritical).toBe(true);
69
+ });
70
+ it('correctly identifies bottleneck critical path vs non-critical slack in parallel branches', () => {
71
+ // A (1h) -> B (4h) -> D (1h) => Path length = 6h (CRITICAL)
72
+ // A (1h) -> C (2h) -> D (1h) => Path length = 4h (Non-critical, C has 2h slack)
73
+ const now = new Date().toISOString();
74
+ const tasks = [
75
+ { id: 'A', projectId: 'p1', title: 'A', status: 'todo', priority: 'medium', estimatedHours: 1, createdAt: now, updatedAt: now },
76
+ { id: 'B', projectId: 'p1', title: 'B', status: 'todo', priority: 'medium', estimatedHours: 4, createdAt: now, updatedAt: now },
77
+ { id: 'C', projectId: 'p1', title: 'C', status: 'todo', priority: 'medium', estimatedHours: 2, createdAt: now, updatedAt: now },
78
+ { id: 'D', projectId: 'p1', title: 'D', status: 'todo', priority: 'medium', estimatedHours: 1, createdAt: now, updatedAt: now }
79
+ ];
80
+ const dependencies = [
81
+ { id: 'd1', taskId: 'B', dependsOnTaskId: 'A', type: 'blocking' },
82
+ { id: 'd2', taskId: 'C', dependsOnTaskId: 'A', type: 'blocking' },
83
+ { id: 'd3', taskId: 'D', dependsOnTaskId: 'B', type: 'blocking' },
84
+ { id: 'd4', taskId: 'D', dependsOnTaskId: 'C', type: 'blocking' }
85
+ ];
86
+ const result = calculateCPM('p1', tasks, dependencies);
87
+ expect(result.totalDurationHours).toBe(6);
88
+ expect(result.criticalTaskIds).toEqual(['A', 'B', 'D']);
89
+ const schedC = result.tasks.find((t) => t.taskId === 'C');
90
+ expect(schedC.earlyStart).toBe(1);
91
+ expect(schedC.earlyFinish).toBe(3);
92
+ expect(schedC.lateStart).toBe(3);
93
+ expect(schedC.lateFinish).toBe(5);
94
+ expect(schedC.totalSlack).toBe(2);
95
+ expect(schedC.isCritical).toBe(false);
96
+ const schedB = result.tasks.find((t) => t.taskId === 'B');
97
+ expect(schedB.totalSlack).toBe(0);
98
+ expect(schedB.isCritical).toBe(true);
99
+ });
100
+ it('falls back gracefully to 1 hour duration if no estimate or minutes are set', () => {
101
+ const task = {
102
+ id: 'no-est',
103
+ projectId: 'p1',
104
+ title: 'Unestimated Task',
105
+ status: 'todo',
106
+ priority: 'none',
107
+ createdAt: '',
108
+ updatedAt: ''
109
+ };
110
+ expect(getTaskDurationHours(task)).toBe(1);
111
+ });
112
+ });
113
+ //# sourceMappingURL=cpm.test.js.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"cpm.test.js","sourceRoot":"","sources":["../../src/domain/cpm.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,YAAY,EAAE,oBAAoB,EAAE,MAAM,UAAU,CAAC;AAG9D,QAAQ,CAAC,4BAA4B,EAAE,GAAG,EAAE;IAC1C,EAAE,CAAC,8CAA8C,EAAE,GAAG,EAAE;QACtD,MAAM,QAAQ,GAAG,YAAY,CAAC,QAAQ,EAAE,EAAE,EAAE,EAAE,CAAC,CAAC;QAChD,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QAC1C,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC5C,MAAM,CAAC,QAAQ,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC7C,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,2EAA2E,EAAE,GAAG,EAAE;QACnF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAW;YACpB;gBACE,EAAE,EAAE,QAAQ;gBACZ,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,QAAQ;gBACf,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,QAAQ;gBAClB,cAAc,EAAE,CAAC;gBACjB,SAAS,EAAE,GAAG;gBACd,SAAS,EAAE,GAAG;aACf;YACD;gBACE,EAAE,EAAE,QAAQ;gBACZ,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,QAAQ;gBACf,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,QAAQ;gBAClB,cAAc,EAAE,CAAC;gBACjB,SAAS,EAAE,GAAG;gBACd,SAAS,EAAE,GAAG;aACf;YACD;gBACE,EAAE,EAAE,QAAQ;gBACZ,SAAS,EAAE,QAAQ;gBACnB,KAAK,EAAE,QAAQ;gBACf,MAAM,EAAE,MAAM;gBACd,QAAQ,EAAE,QAAQ;gBAClB,cAAc,EAAE,CAAC;gBACjB,SAAS,EAAE,GAAG;gBACd,SAAS,EAAE,GAAG;aACf;SACF,CAAC;QAEF,MAAM,YAAY,GAAqB;YACrC,EAAE,EAAE,EAAE,OAAO,EAAE,MAAM,EAAE,QAAQ,EAAE,eAAe,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE;YAC9E,EAAE,EAAE,EAAE,OAAO,EAAE,MAAM,EAAE,QAAQ,EAAE,eAAe,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE;SAC/E,CAAC;QAEF,MAAM,MAAM,GAAG,YAAY,CAAC,QAAQ,EAAE,KAAK,EAAE,YAAY,CAAC,CAAC;QAE3D,MAAM,CAAC,MAAM,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC1C,MAAM,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,QAAQ,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC,CAAC;QAEvE,MAAM,MAAM,GAAG,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAE,CAAC;QAChE,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACjC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAErC,MAAM,MAAM,GAAG,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAE,CAAC;QAChE,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAErC,MAAM,MAAM,GAAG,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAE,CAAC;QAChE,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACvC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0FAA0F,EAAE,GAAG,EAAE;QAClG,6DAA6D;QAC7D,iFAAiF;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAW;YACpB,EAAE,EAAE,EAAE,GAAG,EAAE,SAAS,EAAE,IAAI,EAAE,KAAK,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,cAAc,EAAE,CAAC,EAAE,SAAS,EAAE,GAAG,EAAE,SAAS,EAAE,GAAG,EAAE;YAC/H,EAAE,EAAE,EAAE,GAAG,EAAE,SAAS,EAAE,IAAI,EAAE,KAAK,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,cAAc,EAAE,CAAC,EAAE,SAAS,EAAE,GAAG,EAAE,SAAS,EAAE,GAAG,EAAE;YAC/H,EAAE,EAAE,EAAE,GAAG,EAAE,SAAS,EAAE,IAAI,EAAE,KAAK,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,cAAc,EAAE,CAAC,EAAE,SAAS,EAAE,GAAG,EAAE,SAAS,EAAE,GAAG,EAAE;YAC/H,EAAE,EAAE,EAAE,GAAG,EAAE,SAAS,EAAE,IAAI,EAAE,KAAK,EAAE,GAAG,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,QAAQ,EAAE,cAAc,EAAE,CAAC,EAAE,SAAS,EAAE,GAAG,EAAE,SAAS,EAAE,GAAG,EAAE;SAChI,CAAC;QAEF,MAAM,YAAY,GAAqB;YACrC,EAAE,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE,eAAe,EAAE,GAAG,EAAE,IAAI,EAAE,UAAU,EAAE;YACjE,EAAE,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE,eAAe,EAAE,GAAG,EAAE,IAAI,EAAE,UAAU,EAAE;YACjE,EAAE,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE,eAAe,EAAE,GAAG,EAAE,IAAI,EAAE,UAAU,EAAE;YACjE,EAAE,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,GAAG,EAAE,eAAe,EAAE,GAAG,EAAE,IAAI,EAAE,UAAU,EAAE;SAClE,CAAC;QAEF,MAAM,MAAM,GAAG,YAAY,CAAC,IAAI,EAAE,KAAK,EAAE,YAAY,CAAC,CAAC;QAEvD,MAAM,CAAC,MAAM,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC1C,MAAM,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,GAAG,EAAE,GAAG,EAAE,GAAG,CAAC,CAAC,CAAC;QAExD,MAAM,MAAM,GAAG,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,GAAG,CAAE,CAAC;QAC3D,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,MAAM,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACjC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAEtC,MAAM,MAAM,GAAG,MAAM,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,KAAK,GAAG,CAAE,CAAC;QAC3D,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IACvC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,4EAA4E,EAAE,GAAG,EAAE;QACpF,MAAM,IAAI,GAAS;YACjB,EAAE,EAAE,QAAQ;YACZ,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,kBAAkB;YACzB,MAAM,EAAE,MAAM;YACd,QAAQ,EAAE,MAAM;YAChB,SAAS,EAAE,EAAE;YACb,SAAS,EAAE,EAAE;SACd,CAAC;QACF,MAAM,CAAC,oBAAoB,CAAC,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
@@ -1 +1 @@
1
- {"version":3,"file":"entities.d.ts","sourceRoot":"","sources":["../../src/domain/entities.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,OAAO,EACP,QAAQ,EACR,SAAS,EACT,QAAQ,EACR,UAAU,EACV,YAAY,EACZ,qBAAqB,EACrB,eAAe,EACf,kBAAkB,EAClB,WAAW,EACX,iBAAiB,EACjB,sBAAsB,EACtB,cAAc,EACf,MAAM,mBAAmB,CAAC;AAC3B,OAAO,KAAK,EACV,WAAW,EASZ,MAAM,aAAa,CAAC;AAMrB,8BAAsB,UAAU;IAC9B,SAAgB,EAAE,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IACzB,OAAO,CAAC,iBAAiB,CAAqB;gBAElC,EAAE,EAAE,MAAM,EAAE,SAAS,CAAC,EAAE,MAAM,EAAE,SAAS,CAAC,EAAE,MAAM;IAO9D,SAAS,CAAC,UAAU,CAAC,KAAK,EAAE,WAAW,GAAG,IAAI;IAIvC,oBAAoB,IAAI,WAAW,EAAE;IAIrC,WAAW,IAAI,IAAI;IAI1B,SAAS,CAAC,WAAW,IAAI,IAAI;CAG9B;AAED,qBAAa,UAAW,SAAQ,UAAU;IACjC,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,QAAQ,EAAE,QAAQ,CAAC;IACnB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,wBAAwB,CAAC,EAAE,MAAM,CAAC;IAClC,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,uBAAuB,CAAC,EAAE,MAAM,CAAC;IACjC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,KAAK,CAAC,EAAE,YAAY,EAAE,CAAC;IACvB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,QAAQ,CAAC,EAAE,MAAM,CAAC;gBAEb,IAAI,EAAE,IAAI;WAmCR,MAAM,CAClB,KAAK,EAAE,eAAe,EACtB,OAAO,CAAC,EAAE;QAAE,EAAE,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,QAAQ,CAAC;QAAC,eAAe,CAAC,EAAE,qBAAqB,EAAE,CAAA;KAAE,GACxF,UAAU;IAuCN,YAAY,CACjB,SAAS,EAAE,MAAM,EACjB,QAAQ,CAAC,EAAE,QAAQ,EACnB,OAAO,CAAC,EAAE;QAAE,UAAU,CAAC,EAAE,QAAQ,CAAC,UAAU,CAAC,CAAC;QAAC,OAAO,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,IAAI;IA4CA,OAAO,CACZ,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,UAAU,CAAC,EAAE,OAAO,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,WAAW,CAAC,EAAE,MAAM,CAAA;KAAE,GACpF,SAAS;IAwCL,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,MAAM,GAAG,YAAY;IA8BjD,UAAU,CAAC,MAAM,EAAE,MAAM,EAAE,SAAS,CAAC,EAAE,OAAO,GAAG,IAAI;IAyBrD,UAAU,CAAC,MAAM,EAAE,MAAM,GAAG,IAAI;IAsBhC,MAAM,CAAC,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EAAE,eAAe,CAAC,EAAE,qBAAqB,EAAE,GAAG,IAAI;IA6B/E,OAAO,IAAI,IAAI;CAsCvB;AAED,qBAAa,aAAc,SAAQ,UAAU;IACpC,GAAG,EAAE,MAAM,CAAC;IACZ,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;IACpB,SAAS,CAAC,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;IACjC,iBAAiB,CAAC,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;IACjD,mBAAmB,CAAC,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;IACrD,sBAAsB,CAAC,EAAE,qBAAqB,EAAE,CAAC;gBAE5C,IAAI,EAAE,OAAO;WAgBX,MAAM,CAClB,KAAK,EAAE,kBAAkB,EACzB,OAAO,CAAC,EAAE;QAAE,EAAE,CAAC,EAAE,MAAM,CAAA;KAAE,GACxB,aAAa;IA0BT,oBAAoB,CAAC,MAAM,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,GAAG,IAAI;IAI5D,OAAO,IAAI,OAAO;CAmB1B;AAED,qBAAa,iBAAkB,SAAQ,UAAU;IACxC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,iBAAiB,CAAC;IAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,KAAK,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IAChC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;gBAElC,IAAI,EAAE,WAAW;WAgBf,MAAM,CAClB,KAAK,EAAE,sBAAsB,EAC7B,OAAO,CAAC,EAAE;QAAE,EAAE,CAAC,EAAE,MAAM,CAAC;QAAC,eAAe,CAAC,EAAE,qBAAqB,EAAE,CAAA;KAAE,GACnE,iBAAiB;IA+Bb,YAAY,CAAC,SAAS,EAAE,iBAAiB,GAAG,IAAI;IA8BhD,YAAY,CAAC,GAAG,EAAE,MAAM,GAAG,IAAI;IAyB/B,MAAM,CAAC,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,EAAE,eAAe,CAAC,EAAE,qBAAqB,EAAE,GAAG,IAAI;IAkCtF,OAAO,IAAI,WAAW;CAmB9B;AAED,qBAAa,yBAA0B,SAAQ,KAAK;gBACtC,OAAO,EAAE,MAAM;CAI5B;AAED,wBAAgB,qBAAqB,CAAC,GAAG,CAAC,EAAE,MAAM,GAAG,IAAI,CASxD"}
1
+ {"version":3,"file":"entities.d.ts","sourceRoot":"","sources":["../../src/domain/entities.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,IAAI,EACJ,OAAO,EACP,QAAQ,EACR,SAAS,EACT,QAAQ,EACR,UAAU,EACV,YAAY,EACZ,qBAAqB,EACrB,eAAe,EACf,kBAAkB,EAClB,WAAW,EACX,iBAAiB,EACjB,sBAAsB,EACtB,cAAc,EACf,MAAM,mBAAmB,CAAC;AAC3B,OAAO,KAAK,EACV,WAAW,EASZ,MAAM,aAAa,CAAC;AAMrB,8BAAsB,UAAU;IAC9B,SAAgB,EAAE,EAAE,MAAM,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IACzB,OAAO,CAAC,iBAAiB,CAAqB;gBAElC,EAAE,EAAE,MAAM,EAAE,SAAS,CAAC,EAAE,MAAM,EAAE,SAAS,CAAC,EAAE,MAAM;IAO9D,SAAS,CAAC,UAAU,CAAC,KAAK,EAAE,WAAW,GAAG,IAAI;IAIvC,oBAAoB,IAAI,WAAW,EAAE;IAIrC,WAAW,IAAI,IAAI;IAI1B,SAAS,CAAC,WAAW,IAAI,IAAI;CAG9B;AAED,qBAAa,UAAW,SAAQ,UAAU;IACjC,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,UAAU,CAAC;IACnB,cAAc,CAAC,EAAE,cAAc,CAAC;IAChC,QAAQ,EAAE,QAAQ,CAAC;IACnB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,wBAAwB,CAAC,EAAE,MAAM,CAAC;IAClC,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,uBAAuB,CAAC,EAAE,MAAM,CAAC;IACjC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,KAAK,CAAC,EAAE,YAAY,EAAE,CAAC;IACvB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,QAAQ,CAAC,EAAE,MAAM,CAAC;gBAEb,IAAI,EAAE,IAAI;WAmCR,MAAM,CAClB,KAAK,EAAE,eAAe,EACtB,OAAO,CAAC,EAAE;QAAE,EAAE,CAAC,EAAE,MAAM,CAAC;QAAC,QAAQ,CAAC,EAAE,QAAQ,CAAC;QAAC,eAAe,CAAC,EAAE,qBAAqB,EAAE,CAAA;KAAE,GACxF,UAAU;IAuCN,YAAY,CACjB,SAAS,EAAE,MAAM,EACjB,QAAQ,CAAC,EAAE,QAAQ,EACnB,OAAO,CAAC,EAAE;QAAE,UAAU,CAAC,EAAE,QAAQ,CAAC,UAAU,CAAC,CAAC;QAAC,OAAO,CAAC,EAAE,MAAM,CAAA;KAAE,GAChE,IAAI;IAkDA,OAAO,CACZ,KAAK,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,UAAU,CAAC,EAAE,OAAO,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,WAAW,CAAC,EAAE,MAAM,CAAA;KAAE,GACpF,SAAS;IAwCL,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,EAAE,CAAC,EAAE,MAAM,GAAG,YAAY;IA8BjD,UAAU,CAAC,MAAM,EAAE,MAAM,EAAE,SAAS,CAAC,EAAE,OAAO,GAAG,IAAI;IAyBrD,UAAU,CAAC,MAAM,EAAE,MAAM,GAAG,IAAI;IAsBhC,MAAM,CAAC,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,EAAE,eAAe,CAAC,EAAE,qBAAqB,EAAE,GAAG,IAAI;IA6B/E,OAAO,IAAI,IAAI;CAsCvB;AAED,qBAAa,aAAc,SAAQ,UAAU;IACpC,GAAG,EAAE,MAAM,CAAC;IACZ,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;IACpB,SAAS,CAAC,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;IACjC,iBAAiB,CAAC,EAAE,OAAO,CAAC,mBAAmB,CAAC,CAAC;IACjD,mBAAmB,CAAC,EAAE,OAAO,CAAC,qBAAqB,CAAC,CAAC;IACrD,sBAAsB,CAAC,EAAE,qBAAqB,EAAE,CAAC;gBAE5C,IAAI,EAAE,OAAO;WAgBX,MAAM,CAClB,KAAK,EAAE,kBAAkB,EACzB,OAAO,CAAC,EAAE;QAAE,EAAE,CAAC,EAAE,MAAM,CAAA;KAAE,GACxB,aAAa;IA0BT,oBAAoB,CAAC,MAAM,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,GAAG,IAAI;IAI5D,OAAO,IAAI,OAAO;CAmB1B;AAED,qBAAa,iBAAkB,SAAQ,UAAU;IACxC,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,iBAAiB,CAAC;IAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,KAAK,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IAChC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;gBAElC,IAAI,EAAE,WAAW;WAgBf,MAAM,CAClB,KAAK,EAAE,sBAAsB,EAC7B,OAAO,CAAC,EAAE;QAAE,EAAE,CAAC,EAAE,MAAM,CAAC;QAAC,eAAe,CAAC,EAAE,qBAAqB,EAAE,CAAA;KAAE,GACnE,iBAAiB;IA+Bb,YAAY,CAAC,SAAS,EAAE,iBAAiB,GAAG,IAAI;IA8BhD,YAAY,CAAC,GAAG,EAAE,MAAM,GAAG,IAAI;IAyB/B,MAAM,CAAC,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,EAAE,eAAe,CAAC,EAAE,qBAAqB,EAAE,GAAG,IAAI;IAkCtF,OAAO,IAAI,WAAW;CAmB9B;AAED,qBAAa,yBAA0B,SAAQ,KAAK;gBACtC,OAAO,EAAE,MAAM;CAI5B;AAED,wBAAgB,qBAAqB,CAAC,GAAG,CAAC,EAAE,MAAM,GAAG,IAAI,CASxD"}
@@ -137,6 +137,11 @@ export class TaskEntity extends BaseEntity {
137
137
  const now = new Date().toISOString();
138
138
  const statusDef = resolveStatusDefinition(newStatus, options?.statusDefs || workflow?.statuses);
139
139
  this.semanticStatus = statusDef.category;
140
+ const prevStatusDef = resolveStatusDefinition(previousStatus, options?.statusDefs || workflow?.statuses);
141
+ if ((prevStatusDef.category === 'completed' || prevStatusDef.category === 'canceled') &&
142
+ (statusDef.category === 'in_progress' || statusDef.category === 'not_started')) {
143
+ this.actualEndDate = undefined;
144
+ }
140
145
  if (statusDef.category === 'in_progress' && !this.actualStartDate) {
141
146
  this.actualStartDate = now;
142
147
  }
@@ -1 +1 @@
1
- {"version":3,"file":"entities.js","sourceRoot":"","sources":["../../src/domain/entities.ts"],"names":[],"mappings":"AA2BA,OAAO,EAAE,kBAAkB,EAAE,uBAAuB,EAAE,MAAM,sBAAsB,CAAC;AACnF,OAAO,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AAC7D,OAAO,EAAE,yBAAyB,EAAE,MAAM,oBAAoB,CAAC;AAC/D,OAAO,EAAE,kBAAkB,EAAE,MAAM,iBAAiB,CAAC;AAErD,MAAM,OAAgB,UAAU;IACd,EAAE,CAAS;IACpB,SAAS,CAAS;IAClB,SAAS,CAAS;IACjB,iBAAiB,GAAkB,EAAE,CAAC;IAE9C,YAAY,EAAU,EAAE,SAAkB,EAAE,SAAkB;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,IAAI,CAAC,EAAE,GAAG,EAAE,CAAC;QACb,IAAI,CAAC,SAAS,GAAG,SAAS,IAAI,GAAG,CAAC;QAClC,IAAI,CAAC,SAAS,GAAG,SAAS,IAAI,GAAG,CAAC;IACpC,CAAC;IAES,UAAU,CAAC,KAAkB;QACrC,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;IACrC,CAAC;IAEM,oBAAoB;QACzB,OAAO,CAAC,GAAG,IAAI,CAAC,iBAAiB,CAAC,CAAC;IACrC,CAAC;IAEM,WAAW;QAChB,IAAI,CAAC,iBAAiB,GAAG,EAAE,CAAC;IAC9B,CAAC;IAES,WAAW;QACnB,IAAI,CAAC,SAAS,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC5C,CAAC;CACF;AAED,MAAM,OAAO,UAAW,SAAQ,UAAU;IACjC,SAAS,CAAS;IAClB,GAAG,CAAU;IACb,KAAK,CAAS;IACd,WAAW,CAAU;IACrB,MAAM,CAAa;IACnB,cAAc,CAAkB;IAChC,QAAQ,CAAW;IACnB,QAAQ,CAAU;IAClB,UAAU,CAAU;IACpB,UAAU,CAAU;IACpB,UAAU,CAAU;IACpB,WAAW,CAAU;IACrB,MAAM,CAAU;IAChB,WAAW,CAAU;IACrB,aAAa,CAAU;IACvB,gBAAgB,CAAU;IAC1B,eAAe,CAAU;IACzB,aAAa,CAAU;IACvB,OAAO,CAAU;IACjB,cAAc,CAAU;IACxB,WAAW,CAAU;IACrB,WAAW,CAAU;IACrB,aAAa,CAAU;IACvB,wBAAwB,CAAU;IAClC,qBAAqB,CAAU;IAC/B,uBAAuB,CAAU;IACjC,QAAQ,CAAU;IAClB,IAAI,CAAY;IAChB,KAAK,CAAkB;IACvB,YAAY,CAA2B;IACvC,QAAQ,CAAU;IAEzB,YAAY,IAAU;QACpB,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC/C,IAAI,CAAC,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAChC,IAAI,CAAC,GAAG,GAAG,IAAI,CAAC,GAAG,CAAC;QACpB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC;QACxB,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,cAAc,GAAG,IAAI,CAAC,cAAc,CAAC;QAC1C,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,CAAC;QAC9B,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,CAAC;QAC9B,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,aAAa,GAAG,IAAI,CAAC,aAAa,CAAC;QACxC,IAAI,CAAC,gBAAgB,GAAG,IAAI,CAAC,gBAAgB,CAAC;QAC9C,IAAI,CAAC,eAAe,GAAG,IAAI,CAAC,eAAe,CAAC;QAC5C,IAAI,CAAC,aAAa,GAAG,IAAI,CAAC,aAAa,CAAC;QACxC,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC;QAC5B,IAAI,CAAC,cAAc,GAAG,IAAI,CAAC,cAAc,CAAC;QAC1C,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC;QACzC,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,aAAa,GAAG,IAAI,CAAC,aAAa,CAAC;QACxC,IAAI,CAAC,wBAAwB,GAAG,IAAI,CAAC,wBAAwB,CAAC;QAC9D,IAAI,CAAC,qBAAqB,GAAG,IAAI,CAAC,qBAAqB,CAAC;QACxD,IAAI,CAAC,uBAAuB,GAAG,IAAI,CAAC,uBAAuB,CAAC;QAC5D,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,IAAI,CAAC,CAAC;QACnC,IAAI,CAAC,IAAI,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QAC5C,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,IAAI,CAAC,YAAY,GAAG,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACtE,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,CAAC;IAChC,CAAC;IAEM,MAAM,CAAC,MAAM,CAClB,KAAsB,EACtB,OAAyF;QAEzF,MAAM,EAAE,GAAG,OAAO,EAAE,EAAE,IAAI,QAAQ,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAC/E,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,IAAI,OAAO,EAAE,eAAe,EAAE,CAAC;YAC7B,yBAAyB,CAAC,OAAO,CAAC,eAAe,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QAED,MAAM,MAAM,GAAG,KAAK,CAAC,MAAM,IAAI,OAAO,EAAE,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC7E,MAAM,SAAS,GAAG,uBAAuB,CAAC,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAE/E,MAAM,IAAI,GAAG,IAAI,UAAU,CAAC;YAC1B,GAAG,KAAK;YACR,EAAE;YACF,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;YACd,MAAM;YACN,cAAc,EAAE,KAAK,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ;YAC1D,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,QAAQ;YACpC,WAAW,EAAE,KAAK,CAAC,WAAW,IAAI,CAAC;YACnC,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,CAAC;YAC7B,IAAI,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE;YACtB,KAAK,EAAE,KAAK,CAAC,KAAK,IAAI,EAAE;YACxB,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAqB;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,EAAE;SAClC,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC;QAE9B,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,YAAY,CACjB,SAAiB,EACjB,QAAmB,EACnB,OAAiE;QAEjE,IAAI,IAAI,CAAC,MAAM,KAAK,SAAS;YAAE,OAAO,IAAI,CAAC;QAE3C,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,EAAE,IAAI,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC;QACrE,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;QAC1E,CAAC;QAED,MAAM,cAAc,GAAG,IAAI,CAAC,MAAM,CAAC;QACnC,IAAI,CAAC,MAAM,GAAG,SAAS,CAAC;QACxB,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,SAAS,GAAG,uBAAuB,CAAC,SAAS,EAAE,OAAO,EAAE,UAAU,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAChG,IAAI,CAAC,cAAc,GAAG,SAAS,CAAC,QAAQ,CAAC;QAEzC,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,IAAI,CAAC,IAAI,CAAC,eAAe,EAAE,CAAC;YAClE,IAAI,CAAC,eAAe,GAAG,GAAG,CAAC;QAC7B,CAAC;QACD,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YAC5E,IAAI,CAAC,aAAa,GAAG,GAAG,CAAC;YACzB,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,IAAI,CAAC,QAAQ,KAAK,SAAS,IAAI,IAAI,CAAC,QAAQ,GAAG,GAAG,EAAE,CAAC;gBAC7F,IAAI,CAAC,QAAQ,GAAG,GAAG,CAAC;YACtB,CAAC;QACH,CAAC;QAED,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;gBACpB,cAAc;gBACd,SAAS;aACV;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,OAAO,CACZ,KAAqF;QAErF,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACrB,MAAM,IAAI,KAAK,CAAC,yCAAyC,CAAC,CAAC;QAC7D,CAAC;QAED,IAAI,CAAC,WAAW,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;QACzD,IAAI,CAAC,WAAW,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;QACzD,IAAI,KAAK,CAAC,UAAU,KAAK,KAAK,EAAE,CAAC;YAC/B,IAAI,CAAC,aAAa,GAAG,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;QAC/D,CAAC;QAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,SAAS,GAAc;YAC3B,EAAE,EAAE,QAAQ,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACxD,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI,CAAC,UAAU,IAAI,QAAQ;YACnD,KAAK,EAAE,KAAK,CAAC,KAAK;YAClB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,IAAI;YACpC,WAAW,EAAE,KAAK,CAAC,WAAW;YAC9B,QAAQ,EAAE,GAAG;SACd,CAAC;QAEF,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS;aACV;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,SAAS,CAAC;IACnB,CAAC;IAEM,OAAO,CAAC,KAAa,EAAE,EAAW;QACvC,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;QAChC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,EAAE,IAAI,QAAQ,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YAC9D,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,IAAI,CAAC,IAAI,CAAC,KAAK,EAAE,CAAC;YAChB,IAAI,CAAC,KAAK,GAAG,EAAE,CAAC;QAClB,CAAC;QACD,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACtB,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;YACpC,OAAO,EAAE;gBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;gBACpB,QAAQ;aACT;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,UAAU,CAAC,MAAc,EAAE,SAAmB;QACnD,IAAI,CAAC,IAAI,CAAC,KAAK;YAAE,OAAO,IAAI,CAAC;QAC7B,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;YAChC,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;YACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;YACzE,IAAI,CAAC,WAAW,EAAE,CAAC;YAEnB,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,IAAI,CAAC,EAAE;gBACpB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;gBACpC,OAAO,EAAE;oBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;oBACpB,QAAQ;iBACT;aACF,CAAC;YACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzB,CAAC;QACD,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,UAAU,CAAC,MAAc;QAC9B,IAAI,CAAC,IAAI,CAAC,KAAK;YAAE,OAAO,IAAI,CAAC;QAC7B,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;QAChC,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACvD,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;YACpC,OAAO,EAAE;gBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;gBACpB,QAAQ;aACT;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,MAAM,CAAC,OAAsB,EAAE,eAAyC;QAC7E,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;QAEhC,IAAI,OAAO,CAAC,YAAY,IAAI,eAAe,EAAE,CAAC;YAC5C,yBAAyB,CAAC,eAAe,EAAE;gBACzC,GAAG,IAAI,CAAC,YAAY;gBACpB,GAAG,OAAO,CAAC,YAAY;aACxB,CAAC,CAAC;QACL,CAAC;QAED,MAAM,CAAC,MAAM,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;QAC7B,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;YACpC,OAAO,EAAE;gBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;gBACpB,QAAQ;aACT;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,OAAO;QACZ,OAAO;YACL,EAAE,EAAE,IAAI,CAAC,EAAE;YACX,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,GAAG,EAAE,IAAI,CAAC,GAAG;YACb,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,gBAAgB,EAAE,IAAI,CAAC,gBAAgB;YACvC,eAAe,EAAE,IAAI,CAAC,eAAe;YACrC,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,wBAAwB,EAAE,IAAI,CAAC,wBAAwB;YACvD,qBAAqB,EAAE,IAAI,CAAC,qBAAqB;YACjD,uBAAuB,EAAE,IAAI,CAAC,uBAAuB;YACrD,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,IAAI,EAAE,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,EAAE;YACrC,KAAK,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE;YAC1D,YAAY,EAAE,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE;YAC/D,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,SAAS,EAAE,IAAI,CAAC,SAAS;SAC1B,CAAC;IACJ,CAAC;CACF;AAED,MAAM,OAAO,aAAc,SAAQ,UAAU;IACpC,GAAG,CAAS;IACZ,IAAI,CAAS;IACb,WAAW,CAAU;IACrB,OAAO,CAAU;IACjB,OAAO,CAAY;IACnB,OAAO,CAAY;IACnB,UAAU,CAAU;IACpB,QAAQ,CAAY;IACpB,SAAS,CAAwB;IACjC,iBAAiB,CAAgC;IACjD,mBAAmB,CAAkC;IACrD,sBAAsB,CAA2B;IAExD,YAAY,IAAa;QACvB,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC/C,IAAI,CAAC,GAAG,GAAG,IAAI,CAAC,GAAG,IAAI,kBAAkB,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACrD,IAAI,CAAC,IAAI,GAAG,IAAI,CAAC,IAAI,CAAC;QACtB,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC;QAC5B,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACrD,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACrD,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,CAAC;QAC9B,IAAI,CAAC,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAChC,IAAI,CAAC,iBAAiB,GAAG,IAAI,CAAC,iBAAiB,CAAC;QAChD,IAAI,CAAC,mBAAmB,GAAG,IAAI,CAAC,mBAAmB,CAAC;QACpD,IAAI,CAAC,sBAAsB,GAAG,IAAI,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IACpG,CAAC;IAEM,MAAM,CAAC,MAAM,CAClB,KAAyB,EACzB,OAAyB;QAEzB,MAAM,EAAE,GAAG,OAAO,EAAE,EAAE,IAAI,QAAQ,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAC/E,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,GAAG,GAAG,KAAK,CAAC,GAAG,IAAI,kBAAkB,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC;QAExD,MAAM,OAAO,GAAG,IAAI,aAAa,CAAC;YAChC,GAAG,KAAK;YACR,EAAE;YACF,GAAG;YACH,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC,CAAC;QAEH,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,EAAE,EAAE;SACxC,CAAC;QACF,OAAO,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAE1B,OAAO,OAAO,CAAC;IACjB,CAAC;IAEM,oBAAoB,CAAC,MAAgC;QAC1D,yBAAyB,CAAC,IAAI,CAAC,sBAAsB,EAAE,MAAM,CAAC,CAAC;IACjE,CAAC;IAEM,OAAO;QACZ,OAAO;YACL,EAAE,EAAE,IAAI,CAAC,EAAE;YACX,GAAG,EAAE,IAAI,CAAC,GAAG;YACb,IAAI,EAAE,IAAI,CAAC,IAAI;YACf,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,OAAO,EAAE,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,EAAE;YAC9C,OAAO,EAAE,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,EAAE;YAC9C,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,iBAAiB,EAAE,IAAI,CAAC,iBAAiB;YACzC,mBAAmB,EAAE,IAAI,CAAC,mBAAmB;YAC7C,sBAAsB,EAAE,IAAI,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC,EAAE;YAC3F,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,SAAS,EAAE,IAAI,CAAC,SAAS;SAC1B,CAAC;IACJ,CAAC;CACF;AAED,MAAM,OAAO,iBAAkB,SAAQ,UAAU;IACxC,SAAS,CAAS;IAClB,KAAK,CAAS;IACd,WAAW,CAAU;IACrB,MAAM,CAAoB;IAC1B,MAAM,CAAU;IAChB,KAAK,CAA2B;IAChC,MAAM,CAAU;IAChB,UAAU,CAAU;IACpB,OAAO,CAAU;IACjB,WAAW,CAAU;IACrB,UAAU,CAAY;IACtB,YAAY,CAA2B;IAE9C,YAAY,IAAiB;QAC3B,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC/C,IAAI,CAAC,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAChC,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC;QACxB,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACxD,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC;QAC5B,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QAC9D,IAAI,CAAC,YAAY,GAAG,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;IACxE,CAAC;IAEM,MAAM,CAAC,MAAM,CAClB,KAA6B,EAC7B,OAAoE;QAEpE,MAAM,EAAE,GAAG,OAAO,EAAE,EAAE,IAAI,SAAS,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAChF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,IAAI,OAAO,EAAE,eAAe,EAAE,CAAC;YAC7B,yBAAyB,CAAC,OAAO,CAAC,eAAe,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QAED,MAAM,WAAW,GAAG,IAAI,iBAAiB,CAAC;YACxC,GAAG,KAAK;YACR,EAAE;YACF,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;YACd,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QAEH,MAAM,YAAY,GAA4B;YAC5C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,WAAW,CAAC,EAAE;YAC3B,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,WAAW,CAAC,OAAO,EAAE,EAAE;SAChD,CAAC;QACF,WAAW,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC;QAErC,OAAO,WAAW,CAAC;IACrB,CAAC;IAEM,YAAY,CAAC,SAA4B;QAC9C,IAAI,IAAI,CAAC,MAAM,KAAK,SAAS;YAAE,OAAO,IAAI,CAAC;QAE3C,MAAM,cAAc,GAAG,IAAI,CAAC,MAAM,CAAC;QACnC,IAAI,CAAC,MAAM,GAAG,SAAS,CAAC;QACxB,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,IAAI,SAAS,KAAK,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACnD,IAAI,CAAC,WAAW,GAAG,GAAG,CAAC;QACzB,CAAC;QAED,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAAkC;YAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,4BAA4B;YAClC,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,WAAW,EAAE,IAAI,CAAC,OAAO,EAAE;gBAC3B,cAAc;gBACd,SAAS;aACV;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,YAAY,CAAC,GAAW;QAC7B,IAAI,CAAC,IAAI,CAAC,UAAU,EAAE,CAAC;YACrB,IAAI,CAAC,UAAU,GAAG,EAAE,CAAC;QACvB,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAC;YACnC,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;YAChC,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC1B,IAAI,CAAC,WAAW,EAAE,CAAC;YAEnB,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,IAAI,CAAC,EAAE;gBACpB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;gBACpC,OAAO,EAAE;oBACP,WAAW,EAAE,IAAI,CAAC,OAAO,EAAE;oBAC3B,QAAQ;iBACT;aACF,CAAC;YACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzB,CAAC;QACD,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,MAAM,CAAC,OAA6B,EAAE,eAAyC;QACpF,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;QAEhC,IAAI,OAAO,CAAC,YAAY,IAAI,eAAe,EAAE,CAAC;YAC5C,yBAAyB,CAAC,eAAe,EAAE;gBACzC,GAAG,IAAI,CAAC,YAAY;gBACpB,GAAG,OAAO,CAAC,YAAY;aACxB,CAAC,CAAC;QACL,CAAC;QAED,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,IAAI,CAAC,MAAM,EAAE,CAAC;YACrD,IAAI,CAAC,YAAY,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,OAAO,OAAO,CAAC,MAAM,CAAC;QACxB,CAAC;QAED,MAAM,CAAC,MAAM,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;QAC7B,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;YACpC,OAAO,EAAE;gBACP,WAAW,EAAE,IAAI,CAAC,OAAO,EAAE;gBAC3B,QAAQ;aACT;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,OAAO;QACZ,OAAO;YACL,EAAE,EAAE,IAAI,CAAC,EAAE;YACX,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,KAAK,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS;YACjD,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,UAAU,EAAE,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,EAAE;YACvD,YAAY,EAAE,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE;YAC/D,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,SAAS,EAAE,IAAI,CAAC,SAAS;SAC1B,CAAC;IACJ,CAAC;CACF;AAED,MAAM,OAAO,yBAA0B,SAAQ,KAAK;IAClD,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,2BAA2B,CAAC;IAC1C,CAAC;CACF;AAED,MAAM,UAAU,qBAAqB,CAAC,GAAY;IAChD,IAAI,CAAC,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,GAAG,CAAC,IAAI,EAAE,KAAK,EAAE,EAAE,CAAC;QACzD,MAAM,IAAI,yBAAyB,CAAC,4CAA4C,CAAC,CAAC;IACpF,CAAC;IACD,IAAI,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,IAAI,GAAG,CAAC,MAAM,GAAG,IAAI,EAAE,CAAC;QACjD,MAAM,IAAI,yBAAyB,CACjC,8IAA8I,CAC/I,CAAC;IACJ,CAAC;AACH,CAAC"}
1
+ {"version":3,"file":"entities.js","sourceRoot":"","sources":["../../src/domain/entities.ts"],"names":[],"mappings":"AA2BA,OAAO,EAAE,kBAAkB,EAAE,uBAAuB,EAAE,MAAM,sBAAsB,CAAC;AACnF,OAAO,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AAC7D,OAAO,EAAE,yBAAyB,EAAE,MAAM,oBAAoB,CAAC;AAC/D,OAAO,EAAE,kBAAkB,EAAE,MAAM,iBAAiB,CAAC;AAErD,MAAM,OAAgB,UAAU;IACd,EAAE,CAAS;IACpB,SAAS,CAAS;IAClB,SAAS,CAAS;IACjB,iBAAiB,GAAkB,EAAE,CAAC;IAE9C,YAAY,EAAU,EAAE,SAAkB,EAAE,SAAkB;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,IAAI,CAAC,EAAE,GAAG,EAAE,CAAC;QACb,IAAI,CAAC,SAAS,GAAG,SAAS,IAAI,GAAG,CAAC;QAClC,IAAI,CAAC,SAAS,GAAG,SAAS,IAAI,GAAG,CAAC;IACpC,CAAC;IAES,UAAU,CAAC,KAAkB;QACrC,IAAI,CAAC,iBAAiB,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;IACrC,CAAC;IAEM,oBAAoB;QACzB,OAAO,CAAC,GAAG,IAAI,CAAC,iBAAiB,CAAC,CAAC;IACrC,CAAC;IAEM,WAAW;QAChB,IAAI,CAAC,iBAAiB,GAAG,EAAE,CAAC;IAC9B,CAAC;IAES,WAAW;QACnB,IAAI,CAAC,SAAS,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;IAC5C,CAAC;CACF;AAED,MAAM,OAAO,UAAW,SAAQ,UAAU;IACjC,SAAS,CAAS;IAClB,GAAG,CAAU;IACb,KAAK,CAAS;IACd,WAAW,CAAU;IACrB,MAAM,CAAa;IACnB,cAAc,CAAkB;IAChC,QAAQ,CAAW;IACnB,QAAQ,CAAU;IAClB,UAAU,CAAU;IACpB,UAAU,CAAU;IACpB,UAAU,CAAU;IACpB,WAAW,CAAU;IACrB,MAAM,CAAU;IAChB,WAAW,CAAU;IACrB,aAAa,CAAU;IACvB,gBAAgB,CAAU;IAC1B,eAAe,CAAU;IACzB,aAAa,CAAU;IACvB,OAAO,CAAU;IACjB,cAAc,CAAU;IACxB,WAAW,CAAU;IACrB,WAAW,CAAU;IACrB,aAAa,CAAU;IACvB,wBAAwB,CAAU;IAClC,qBAAqB,CAAU;IAC/B,uBAAuB,CAAU;IACjC,QAAQ,CAAU;IAClB,IAAI,CAAY;IAChB,KAAK,CAAkB;IACvB,YAAY,CAA2B;IACvC,QAAQ,CAAU;IAEzB,YAAY,IAAU;QACpB,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC/C,IAAI,CAAC,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAChC,IAAI,CAAC,GAAG,GAAG,IAAI,CAAC,GAAG,CAAC;QACpB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC;QACxB,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,cAAc,GAAG,IAAI,CAAC,cAAc,CAAC;QAC1C,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,CAAC;QAC9B,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,CAAC;QAC9B,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,aAAa,GAAG,IAAI,CAAC,aAAa,CAAC;QACxC,IAAI,CAAC,gBAAgB,GAAG,IAAI,CAAC,gBAAgB,CAAC;QAC9C,IAAI,CAAC,eAAe,GAAG,IAAI,CAAC,eAAe,CAAC;QAC5C,IAAI,CAAC,aAAa,GAAG,IAAI,CAAC,aAAa,CAAC;QACxC,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC;QAC5B,IAAI,CAAC,cAAc,GAAG,IAAI,CAAC,cAAc,CAAC;QAC1C,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC;QACzC,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,aAAa,GAAG,IAAI,CAAC,aAAa,CAAC;QACxC,IAAI,CAAC,wBAAwB,GAAG,IAAI,CAAC,wBAAwB,CAAC;QAC9D,IAAI,CAAC,qBAAqB,GAAG,IAAI,CAAC,qBAAqB,CAAC;QACxD,IAAI,CAAC,uBAAuB,GAAG,IAAI,CAAC,uBAAuB,CAAC;QAC5D,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,IAAI,CAAC,CAAC;QACnC,IAAI,CAAC,IAAI,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QAC5C,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACjE,IAAI,CAAC,YAAY,GAAG,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACtE,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,CAAC;IAChC,CAAC;IAEM,MAAM,CAAC,MAAM,CAClB,KAAsB,EACtB,OAAyF;QAEzF,MAAM,EAAE,GAAG,OAAO,EAAE,EAAE,IAAI,QAAQ,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAC/E,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,IAAI,OAAO,EAAE,eAAe,EAAE,CAAC;YAC7B,yBAAyB,CAAC,OAAO,CAAC,eAAe,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QAED,MAAM,MAAM,GAAG,KAAK,CAAC,MAAM,IAAI,OAAO,EAAE,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC7E,MAAM,SAAS,GAAG,uBAAuB,CAAC,MAAM,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAE/E,MAAM,IAAI,GAAG,IAAI,UAAU,CAAC;YAC1B,GAAG,KAAK;YACR,EAAE;YACF,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;YACd,MAAM;YACN,cAAc,EAAE,KAAK,CAAC,cAAc,IAAI,SAAS,CAAC,QAAQ;YAC1D,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,QAAQ;YACpC,WAAW,EAAE,KAAK,CAAC,WAAW,IAAI,CAAC;YACnC,QAAQ,EAAE,KAAK,CAAC,QAAQ,IAAI,CAAC;YAC7B,IAAI,EAAE,KAAK,CAAC,IAAI,IAAI,EAAE;YACtB,KAAK,EAAE,KAAK,CAAC,KAAK,IAAI,EAAE;YACxB,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QAEH,MAAM,YAAY,GAAqB;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,EAAE;SAClC,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC;QAE9B,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,YAAY,CACjB,SAAiB,EACjB,QAAmB,EACnB,OAAiE;QAEjE,IAAI,IAAI,CAAC,MAAM,KAAK,SAAS;YAAE,OAAO,IAAI,CAAC;QAE3C,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,EAAE,IAAI,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC;QACrE,IAAI,CAAC,OAAO,EAAE,CAAC;YACb,MAAM,IAAI,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;QAC1E,CAAC;QAED,MAAM,cAAc,GAAG,IAAI,CAAC,MAAM,CAAC;QACnC,IAAI,CAAC,MAAM,GAAG,SAAS,CAAC;QACxB,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,SAAS,GAAG,uBAAuB,CAAC,SAAS,EAAE,OAAO,EAAE,UAAU,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAChG,IAAI,CAAC,cAAc,GAAG,SAAS,CAAC,QAAQ,CAAC;QAEzC,MAAM,aAAa,GAAG,uBAAuB,CAAC,cAAc,EAAE,OAAO,EAAE,UAAU,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QACzG,IAAI,CAAC,aAAa,CAAC,QAAQ,KAAK,WAAW,IAAI,aAAa,CAAC,QAAQ,KAAK,UAAU,CAAC;YACjF,CAAC,SAAS,CAAC,QAAQ,KAAK,aAAa,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,CAAC,EAAE,CAAC;YACnF,IAAI,CAAC,aAAa,GAAG,SAAS,CAAC;QACjC,CAAC;QAED,IAAI,SAAS,CAAC,QAAQ,KAAK,aAAa,IAAI,CAAC,IAAI,CAAC,eAAe,EAAE,CAAC;YAClE,IAAI,CAAC,eAAe,GAAG,GAAG,CAAC;QAC7B,CAAC;QACD,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,SAAS,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YAC5E,IAAI,CAAC,aAAa,GAAG,GAAG,CAAC;YACzB,IAAI,SAAS,CAAC,QAAQ,KAAK,WAAW,IAAI,IAAI,CAAC,QAAQ,KAAK,SAAS,IAAI,IAAI,CAAC,QAAQ,GAAG,GAAG,EAAE,CAAC;gBAC7F,IAAI,CAAC,QAAQ,GAAG,GAAG,CAAC;YACtB,CAAC;QACH,CAAC;QAED,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;gBACpB,cAAc;gBACd,SAAS;aACV;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,OAAO,CACZ,KAAqF;QAErF,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACrB,MAAM,IAAI,KAAK,CAAC,yCAAyC,CAAC,CAAC;QAC7D,CAAC;QAED,IAAI,CAAC,WAAW,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;QACzD,IAAI,CAAC,WAAW,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;QACzD,IAAI,KAAK,CAAC,UAAU,KAAK,KAAK,EAAE,CAAC;YAC/B,IAAI,CAAC,aAAa,GAAG,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;QAC/D,CAAC;QAED,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,SAAS,GAAc;YAC3B,EAAE,EAAE,QAAQ,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACxD,MAAM,EAAE,IAAI,CAAC,EAAE;YACf,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI,CAAC,UAAU,IAAI,QAAQ;YACnD,KAAK,EAAE,KAAK,CAAC,KAAK;YAClB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,IAAI;YACpC,WAAW,EAAE,KAAK,CAAC,WAAW;YAC9B,QAAQ,EAAE,GAAG;SACd,CAAC;QAEF,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS;aACV;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,SAAS,CAAC;IACnB,CAAC;IAEM,OAAO,CAAC,KAAa,EAAE,EAAW;QACvC,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;QAChC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,EAAE,IAAI,QAAQ,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YAC9D,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,IAAI,CAAC,IAAI,CAAC,KAAK,EAAE,CAAC;YAChB,IAAI,CAAC,KAAK,GAAG,EAAE,CAAC;QAClB,CAAC;QACD,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACtB,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;YACpC,OAAO,EAAE;gBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;gBACpB,QAAQ;aACT;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,UAAU,CAAC,MAAc,EAAE,SAAmB;QACnD,IAAI,CAAC,IAAI,CAAC,KAAK;YAAE,OAAO,IAAI,CAAC;QAC7B,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACrD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;YAChC,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;YACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;YACzE,IAAI,CAAC,WAAW,EAAE,CAAC;YAEnB,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,IAAI,CAAC,EAAE;gBACpB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;gBACpC,OAAO,EAAE;oBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;oBACpB,QAAQ;iBACT;aACF,CAAC;YACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzB,CAAC;QACD,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,UAAU,CAAC,MAAc;QAC9B,IAAI,CAAC,IAAI,CAAC,KAAK;YAAE,OAAO,IAAI,CAAC;QAC7B,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;QAChC,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,MAAM,CAAC,CAAC;QACvD,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;YACpC,OAAO,EAAE;gBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;gBACpB,QAAQ;aACT;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,MAAM,CAAC,OAAsB,EAAE,eAAyC;QAC7E,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;QAEhC,IAAI,OAAO,CAAC,YAAY,IAAI,eAAe,EAAE,CAAC;YAC5C,yBAAyB,CAAC,eAAe,EAAE;gBACzC,GAAG,IAAI,CAAC,YAAY;gBACpB,GAAG,OAAO,CAAC,YAAY;aACxB,CAAC,CAAC;QACL,CAAC;QAED,MAAM,CAAC,MAAM,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;QAC7B,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;YACpC,OAAO,EAAE;gBACP,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE;gBACpB,QAAQ;aACT;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,OAAO;QACZ,OAAO;YACL,EAAE,EAAE,IAAI,CAAC,EAAE;YACX,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,GAAG,EAAE,IAAI,CAAC,GAAG;YACb,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,gBAAgB,EAAE,IAAI,CAAC,gBAAgB;YACvC,eAAe,EAAE,IAAI,CAAC,eAAe;YACrC,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,cAAc,EAAE,IAAI,CAAC,cAAc;YACnC,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,aAAa,EAAE,IAAI,CAAC,aAAa;YACjC,wBAAwB,EAAE,IAAI,CAAC,wBAAwB;YACvD,qBAAqB,EAAE,IAAI,CAAC,qBAAqB;YACjD,uBAAuB,EAAE,IAAI,CAAC,uBAAuB;YACrD,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,IAAI,EAAE,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,EAAE;YACrC,KAAK,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,EAAE,GAAG,CAAC,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,EAAE;YAC1D,YAAY,EAAE,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE;YAC/D,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,SAAS,EAAE,IAAI,CAAC,SAAS;SAC1B,CAAC;IACJ,CAAC;CACF;AAED,MAAM,OAAO,aAAc,SAAQ,UAAU;IACpC,GAAG,CAAS;IACZ,IAAI,CAAS;IACb,WAAW,CAAU;IACrB,OAAO,CAAU;IACjB,OAAO,CAAY;IACnB,OAAO,CAAY;IACnB,UAAU,CAAU;IACpB,QAAQ,CAAY;IACpB,SAAS,CAAwB;IACjC,iBAAiB,CAAgC;IACjD,mBAAmB,CAAkC;IACrD,sBAAsB,CAA2B;IAExD,YAAY,IAAa;QACvB,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC/C,IAAI,CAAC,GAAG,GAAG,IAAI,CAAC,GAAG,IAAI,kBAAkB,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACrD,IAAI,CAAC,IAAI,GAAG,IAAI,CAAC,IAAI,CAAC;QACtB,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC;QAC5B,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACrD,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QACrD,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,QAAQ,GAAG,IAAI,CAAC,QAAQ,CAAC;QAC9B,IAAI,CAAC,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAChC,IAAI,CAAC,iBAAiB,GAAG,IAAI,CAAC,iBAAiB,CAAC;QAChD,IAAI,CAAC,mBAAmB,GAAG,IAAI,CAAC,mBAAmB,CAAC;QACpD,IAAI,CAAC,sBAAsB,GAAG,IAAI,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;IACpG,CAAC;IAEM,MAAM,CAAC,MAAM,CAClB,KAAyB,EACzB,OAAyB;QAEzB,MAAM,EAAE,GAAG,OAAO,EAAE,EAAE,IAAI,QAAQ,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAC/E,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,GAAG,GAAG,KAAK,CAAC,GAAG,IAAI,kBAAkB,CAAC,KAAK,CAAC,IAAI,CAAC,CAAC;QAExD,MAAM,OAAO,GAAG,IAAI,aAAa,CAAC;YAChC,GAAG,KAAK;YACR,EAAE;YACF,GAAG;YACH,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;SACf,CAAC,CAAC;QAEH,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,EAAE,EAAE;SACxC,CAAC;QACF,OAAO,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAE1B,OAAO,OAAO,CAAC;IACjB,CAAC;IAEM,oBAAoB,CAAC,MAAgC;QAC1D,yBAAyB,CAAC,IAAI,CAAC,sBAAsB,EAAE,MAAM,CAAC,CAAC;IACjE,CAAC;IAEM,OAAO;QACZ,OAAO;YACL,EAAE,EAAE,IAAI,CAAC,EAAE;YACX,GAAG,EAAE,IAAI,CAAC,GAAG;YACb,IAAI,EAAE,IAAI,CAAC,IAAI;YACf,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,OAAO,EAAE,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,EAAE;YAC9C,OAAO,EAAE,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,EAAE;YAC9C,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,QAAQ,EAAE,IAAI,CAAC,QAAQ;YACvB,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,iBAAiB,EAAE,IAAI,CAAC,iBAAiB;YACzC,mBAAmB,EAAE,IAAI,CAAC,mBAAmB;YAC7C,sBAAsB,EAAE,IAAI,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,sBAAsB,CAAC,CAAC,CAAC,CAAC,EAAE;YAC3F,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,SAAS,EAAE,IAAI,CAAC,SAAS;SAC1B,CAAC;IACJ,CAAC;CACF;AAED,MAAM,OAAO,iBAAkB,SAAQ,UAAU;IACxC,SAAS,CAAS;IAClB,KAAK,CAAS;IACd,WAAW,CAAU;IACrB,MAAM,CAAoB;IAC1B,MAAM,CAAU;IAChB,KAAK,CAA2B;IAChC,MAAM,CAAU;IAChB,UAAU,CAAU;IACpB,OAAO,CAAU;IACjB,WAAW,CAAU;IACrB,UAAU,CAAY;IACtB,YAAY,CAA2B;IAE9C,YAAY,IAAiB;QAC3B,KAAK,CAAC,IAAI,CAAC,EAAE,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,CAAC,CAAC;QAC/C,IAAI,CAAC,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAChC,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC;QACxB,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACxD,IAAI,CAAC,MAAM,GAAG,IAAI,CAAC,MAAM,CAAC;QAC1B,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC;QAClC,IAAI,CAAC,OAAO,GAAG,IAAI,CAAC,OAAO,CAAC;QAC5B,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,WAAW,CAAC;QACpC,IAAI,CAAC,UAAU,GAAG,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;QAC9D,IAAI,CAAC,YAAY,GAAG,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;IACxE,CAAC;IAEM,MAAM,CAAC,MAAM,CAClB,KAA6B,EAC7B,OAAoE;QAEpE,MAAM,EAAE,GAAG,OAAO,EAAE,EAAE,IAAI,SAAS,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE,CAAC;QAChF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,IAAI,OAAO,EAAE,eAAe,EAAE,CAAC;YAC7B,yBAAyB,CAAC,OAAO,CAAC,eAAe,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QAED,MAAM,WAAW,GAAG,IAAI,iBAAiB,CAAC;YACxC,GAAG,KAAK;YACR,EAAE;YACF,SAAS,EAAE,GAAG;YACd,SAAS,EAAE,GAAG;YACd,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QAEH,MAAM,YAAY,GAA4B;YAC5C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,WAAW,CAAC,EAAE;YAC3B,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,WAAW,CAAC,OAAO,EAAE,EAAE;SAChD,CAAC;QACF,WAAW,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC;QAErC,OAAO,WAAW,CAAC;IACrB,CAAC;IAEM,YAAY,CAAC,SAA4B;QAC9C,IAAI,IAAI,CAAC,MAAM,KAAK,SAAS;YAAE,OAAO,IAAI,CAAC;QAE3C,MAAM,cAAc,GAAG,IAAI,CAAC,MAAM,CAAC;QACnC,IAAI,CAAC,MAAM,GAAG,SAAS,CAAC;QACxB,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,IAAI,SAAS,KAAK,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACnD,IAAI,CAAC,WAAW,GAAG,GAAG,CAAC;QACzB,CAAC;QAED,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAAkC;YAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,4BAA4B;YAClC,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,WAAW,EAAE,IAAI,CAAC,OAAO,EAAE;gBAC3B,cAAc;gBACd,SAAS;aACV;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,YAAY,CAAC,GAAW;QAC7B,IAAI,CAAC,IAAI,CAAC,UAAU,EAAE,CAAC;YACrB,IAAI,CAAC,UAAU,GAAG,EAAE,CAAC;QACvB,CAAC;QACD,IAAI,CAAC,IAAI,CAAC,UAAU,CAAC,QAAQ,CAAC,GAAG,CAAC,EAAE,CAAC;YACnC,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;YAChC,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;YAC1B,IAAI,CAAC,WAAW,EAAE,CAAC;YAEnB,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,IAAI,CAAC,EAAE;gBACpB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;gBACpC,OAAO,EAAE;oBACP,WAAW,EAAE,IAAI,CAAC,OAAO,EAAE;oBAC3B,QAAQ;iBACT;aACF,CAAC;YACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QACzB,CAAC;QACD,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,MAAM,CAAC,OAA6B,EAAE,eAAyC;QACpF,MAAM,QAAQ,GAAG,IAAI,CAAC,OAAO,EAAE,CAAC;QAEhC,IAAI,OAAO,CAAC,YAAY,IAAI,eAAe,EAAE,CAAC;YAC5C,yBAAyB,CAAC,eAAe,EAAE;gBACzC,GAAG,IAAI,CAAC,YAAY;gBACpB,GAAG,OAAO,CAAC,YAAY;aACxB,CAAC,CAAC;QACL,CAAC;QAED,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,IAAI,CAAC,MAAM,EAAE,CAAC;YACrD,IAAI,CAAC,YAAY,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;YAClC,OAAO,OAAO,CAAC,MAAM,CAAC;QACxB,CAAC;QAED,MAAM,CAAC,MAAM,CAAC,IAAI,EAAE,OAAO,CAAC,CAAC;QAC7B,IAAI,CAAC,WAAW,EAAE,CAAC;QAEnB,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,IAAI,CAAC,EAAE;YACpB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;YACpC,OAAO,EAAE;gBACP,WAAW,EAAE,IAAI,CAAC,OAAO,EAAE;gBAC3B,QAAQ;aACT;SACF,CAAC;QACF,IAAI,CAAC,UAAU,CAAC,KAAK,CAAC,CAAC;QAEvB,OAAO,IAAI,CAAC;IACd,CAAC;IAEM,OAAO;QACZ,OAAO;YACL,EAAE,EAAE,IAAI,CAAC,EAAE;YACX,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,KAAK,EAAE,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,SAAS;YACjD,MAAM,EAAE,IAAI,CAAC,MAAM;YACnB,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,OAAO,EAAE,IAAI,CAAC,OAAO;YACrB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,UAAU,EAAE,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,GAAG,IAAI,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC,EAAE;YACvD,YAAY,EAAE,IAAI,CAAC,YAAY,CAAC,CAAC,CAAC,EAAE,GAAG,IAAI,CAAC,YAAY,EAAE,CAAC,CAAC,CAAC,EAAE;YAC/D,SAAS,EAAE,IAAI,CAAC,SAAS;YACzB,SAAS,EAAE,IAAI,CAAC,SAAS;SAC1B,CAAC;IACJ,CAAC;CACF;AAED,MAAM,OAAO,yBAA0B,SAAQ,KAAK;IAClD,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,2BAA2B,CAAC;IAC1C,CAAC;CACF;AAED,MAAM,UAAU,qBAAqB,CAAC,GAAY;IAChD,IAAI,CAAC,GAAG,IAAI,OAAO,GAAG,KAAK,QAAQ,IAAI,GAAG,CAAC,IAAI,EAAE,KAAK,EAAE,EAAE,CAAC;QACzD,MAAM,IAAI,yBAAyB,CAAC,4CAA4C,CAAC,CAAC;IACpF,CAAC;IACD,IAAI,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,IAAI,GAAG,CAAC,MAAM,GAAG,IAAI,EAAE,CAAC;QACjD,MAAM,IAAI,yBAAyB,CACjC,8IAA8I,CAC/I,CAAC;IACJ,CAAC;AACH,CAAC"}
@@ -2,4 +2,7 @@ export * from './events.js';
2
2
  export * from './custom-fields.js';
3
3
  export * from './graph.js';
4
4
  export * from './entities.js';
5
+ export * from './cpm.js';
6
+ export * from './ladder.js';
7
+ export * from './metrics.js';
5
8
  //# sourceMappingURL=index.d.ts.map
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/domain/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,YAAY,CAAC;AAC3B,cAAc,eAAe,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/domain/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,YAAY,CAAC;AAC3B,cAAc,eAAe,CAAC;AAC9B,cAAc,UAAU,CAAC;AACzB,cAAc,aAAa,CAAC;AAC5B,cAAc,cAAc,CAAC"}
@@ -2,4 +2,7 @@ export * from './events.js';
2
2
  export * from './custom-fields.js';
3
3
  export * from './graph.js';
4
4
  export * from './entities.js';
5
+ export * from './cpm.js';
6
+ export * from './ladder.js';
7
+ export * from './metrics.js';
5
8
  //# sourceMappingURL=index.js.map
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/domain/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,YAAY,CAAC;AAC3B,cAAc,eAAe,CAAC"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/domain/index.ts"],"names":[],"mappings":"AAAA,cAAc,aAAa,CAAC;AAC5B,cAAc,oBAAoB,CAAC;AACnC,cAAc,YAAY,CAAC;AAC3B,cAAc,eAAe,CAAC;AAC9B,cAAc,UAAU,CAAC;AACzB,cAAc,aAAa,CAAC;AAC5B,cAAc,cAAc,CAAC"}
@@ -0,0 +1,16 @@
1
+ import type { Project, Task, TaskDependency, TaskContainer, Iteration, Deliverable, Attachment, TimeEntry, Activity, TimelineLadder, TimelineLadderOptions, MacroPhaseRollup, ConcreteTaskEvidence } from '../types/index.js';
2
+ export interface LadderContext {
3
+ project: Project;
4
+ tasks: Task[];
5
+ dependencies: TaskDependency[];
6
+ containers?: TaskContainer[];
7
+ iterations?: Iteration[];
8
+ deliverables?: Deliverable[];
9
+ attachments?: Attachment[];
10
+ timeEntries?: TimeEntry[];
11
+ activities?: Activity[];
12
+ }
13
+ export declare function aggregateConcreteEvidenceForTask(task: Task, attachments?: Attachment[], deliverables?: Deliverable[], timeEntries?: TimeEntry[], activities?: Activity[]): ConcreteTaskEvidence;
14
+ export declare function computeMacroPhases(tasks: Task[], containers: TaskContainer[] | undefined, iterations: Iteration[] | undefined, criticalTaskIds: Set<string>): MacroPhaseRollup[];
15
+ export declare function buildTimelineLadder(context: LadderContext, options?: TimelineLadderOptions): TimelineLadder;
16
+ //# sourceMappingURL=ladder.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"ladder.d.ts","sourceRoot":"","sources":["../../src/domain/ladder.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,cAAc,EACd,aAAa,EACb,SAAS,EACT,WAAW,EACX,UAAU,EACV,SAAS,EACT,QAAQ,EACR,cAAc,EACd,qBAAqB,EAErB,gBAAgB,EAGhB,oBAAoB,EAIrB,MAAM,mBAAmB,CAAC;AAG3B,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,OAAO,CAAC;IACjB,KAAK,EAAE,IAAI,EAAE,CAAC;IACd,YAAY,EAAE,cAAc,EAAE,CAAC;IAC/B,UAAU,CAAC,EAAE,aAAa,EAAE,CAAC;IAC7B,UAAU,CAAC,EAAE,SAAS,EAAE,CAAC;IACzB,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC;IAC7B,WAAW,CAAC,EAAE,UAAU,EAAE,CAAC;IAC3B,WAAW,CAAC,EAAE,SAAS,EAAE,CAAC;IAC1B,UAAU,CAAC,EAAE,QAAQ,EAAE,CAAC;CACzB;AAED,wBAAgB,gCAAgC,CAC9C,IAAI,EAAE,IAAI,EACV,WAAW,GAAE,UAAU,EAAO,EAC9B,YAAY,GAAE,WAAW,EAAO,EAChC,WAAW,GAAE,SAAS,EAAO,EAC7B,UAAU,GAAE,QAAQ,EAAO,GAC1B,oBAAoB,CAsGtB;AAED,wBAAgB,kBAAkB,CAChC,KAAK,EAAE,IAAI,EAAE,EACb,UAAU,EAAE,aAAa,EAAE,YAAK,EAChC,UAAU,EAAE,SAAS,EAAE,YAAK,EAC5B,eAAe,EAAE,GAAG,CAAC,MAAM,CAAC,GAC3B,gBAAgB,EAAE,CAsJpB;AAED,wBAAgB,mBAAmB,CACjC,OAAO,EAAE,aAAa,EACtB,OAAO,GAAE,qBAA0B,GAClC,cAAc,CAmJhB"}