@critical-path/core 0.13.2 → 0.14.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,17 @@
1
1
  # @critical-path/core
2
2
 
3
+ ## 0.14.0
4
+
5
+ ### Minor Changes
6
+
7
+ - 3dc2798: feat(core): add readAttachmentText engine method, download on storage adapters, and artifactType metadata
8
+
9
+ ## 0.13.3
10
+
11
+ ### Patch Changes
12
+
13
+ - 573a4fa: Fix mention regex to avoid capturing trailing punctuation like periods or commas in unquoted handles
14
+
3
15
  ## 0.13.2
4
16
 
5
17
  ### Patch Changes
@@ -51,6 +51,7 @@ export declare class CriticalPathEngine {
51
51
  taskId?: string;
52
52
  projectId?: string;
53
53
  commentId?: string;
54
+ artifactType?: string;
54
55
  }): Promise<Attachment[]>;
55
56
  getAttachment(id: string): Promise<Attachment | null>;
56
57
  createAttachment(attachment: Omit<Attachment, 'id' | 'createdAt' | 'updatedAt'>): Promise<Attachment>;
@@ -61,8 +62,10 @@ export declare class CriticalPathEngine {
61
62
  commentId?: string;
62
63
  uploaderId: string;
63
64
  uploaderType?: 'user' | 'agent' | 'system';
65
+ artifactType?: 'plan' | 'spec' | 'deliverable' | 'review' | 'general';
64
66
  metadata?: Record<string, unknown>;
65
67
  }): Promise<Attachment>;
68
+ readAttachmentText(id: string): Promise<string>;
66
69
  getPresignedAttachmentUploadUrl(options: PresignedUrlOptions): Promise<PresignedUploadResult>;
67
70
  getTeams(): Promise<Team[]>;
68
71
  getTeam(id: string): Promise<Team | null>;
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EAET,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACvB,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAA4B,KAAK,kBAAkB,EAA2B,MAAM,oBAAoB,CAAC;AAShH,OAAO,EACL,cAAc,EA2Bf,MAAM,qBAAqB,CAAC;AAK7B,qBAAa,kBAAkB;IAC7B,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;gBAE7C,MAAM,GAAE,kBAAuB;YAoB7B,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAInC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAIjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA2BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAgBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAIjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAwBzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA6B7E,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAI7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAgFrD,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAiGpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsCxC,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA6BvE,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IA6BpE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAUzE,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IAuCvG,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAI/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,UAAU,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAmBtF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAyB7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA6C3G,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAgC9G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAI3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;IAIrD,gBAAgB,CAAC,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAmBrG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA8B9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,EAAE,MAAM,CAAC;QACnB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IA2BhB,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAQ7F,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAI3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAI1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAIvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAI3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAI1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAIvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAsDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA4B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAItD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAInD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAkBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAkCnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAIrC,eAAe;CAc9B"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,OAAO,EACP,IAAI,EACJ,cAAc,EACd,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,OAAO,EACP,UAAU,EACV,kBAAkB,EAClB,eAAe,EACf,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EAET,QAAQ,EACR,eAAe,EAEf,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACvB,MAAM,mBAAmB,CAAC;AAC3B,OAAO,EAAE,cAAc,EAAiB,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAA4B,KAAK,kBAAkB,EAA2B,MAAM,oBAAoB,CAAC;AAShH,OAAO,EACL,cAAc,EA2Bf,MAAM,qBAAqB,CAAC;AAK7B,qBAAa,kBAAkB;IAC7B,SAAgB,KAAK,EAAE,cAAc,CAAC;IACtC,SAAgB,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjD,SAAgB,OAAO,EAAE,cAAc,CAAC;IACxC,SAAgB,MAAM,EAAE,cAAc,CAAC;IACvC,SAAgB,KAAK,EAAE,OAAO,CAAC,IAAI,CAAC,CAAqB;gBAE7C,MAAM,GAAE,kBAAuB;YAoB7B,eAAe;IAuCvB,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAInC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAIjD,cAAc,CAAC,QAAQ,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAuB7F,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IA2BhF,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA2B5C,sBAAsB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,GAAG,IAAI,CAAC;IAgBnE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAO5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAQpE,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAIjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,aAAa,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAwBzF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA6B7E,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAI7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,SAAS,EAAE,eAAe,GAAG,OAAO,CAAC,IAAI,CAAC;IAgFrD,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAiGpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsCxC,aAAa,CAAC,GAAG,EAAE,IAAI,CAAC,cAAc,EAAE,IAAI,CAAC,GAAG,OAAO,CAAC,cAAc,CAAC;IA6BvE,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IA6BpE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAUzE,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,GAAG,QAAQ,CAAC,GAAG;QAAE,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,SAAS,CAAC;IAuCvG,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAI/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAI/C,UAAU,CAAC,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAmBtF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAyB7E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAsB3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IA6C3G,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,GAAG,IAAI,CAAC;IAgC9G,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,YAAY,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAQlI,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,GAAG,IAAI,CAAC;IAIrD,gBAAgB,CAAC,UAAU,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAmBrG,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA8B9C,oBAAoB,CACxB,KAAK,EAAE,eAAe,GAAG;QACvB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,EAAE,MAAM,CAAC;QACnB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;QACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GACA,OAAO,CAAC,UAAU,CAAC;IA4BhB,kBAAkB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAiC/C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAQ7F,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAI3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIzC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAkB7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,GAAG,IAAI,CAAC;IAIpE,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAI1D,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAIvD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAkBzG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,GAAG,IAAI,CAAC;IAI3F,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAI1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAIvD,iBAAiB,CAAC,KAAK,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAkCtE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,GAAG,IAAI,CAAC;IAsDzF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IA4B/C,qBAAqB,CAAC,aAAa,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,GAAG,IAAI,CAAC;IAgDhF,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAItD,YAAY,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAInD,eAAe,CAAC,SAAS,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAkBnF,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,GAAG,IAAI,CAAC;IAkCnF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;YAIrC,eAAe;CAc9B"}
@@ -645,7 +645,11 @@ export class CriticalPathEngine {
645
645
  }
646
646
  // --- Attachments ---
647
647
  async getAttachments(filter) {
648
- return this.store.getAttachments(filter);
648
+ const attachments = await this.store.getAttachments(filter);
649
+ if (filter?.artifactType) {
650
+ return attachments.filter(a => a.artifactType === filter.artifactType);
651
+ }
652
+ return attachments;
649
653
  }
650
654
  async getAttachment(id) {
651
655
  return this.store.getAttachment(id);
@@ -715,9 +719,38 @@ export class CriticalPathEngine {
715
719
  sizeBytes: uploadResult.sizeBytes,
716
720
  url: uploadResult.url,
717
721
  storageKey: uploadResult.storageKey,
722
+ artifactType: input.artifactType,
718
723
  metadata: input.metadata
719
724
  });
720
725
  }
726
+ async readAttachmentText(id) {
727
+ const attachment = await this.getAttachment(id);
728
+ if (!attachment) {
729
+ throw new Error(`Attachment with id "${id}" not found.`);
730
+ }
731
+ if (attachment.storageKey && this.fileStorage && typeof this.fileStorage.download === 'function') {
732
+ const bytes = await this.fileStorage.download(attachment.storageKey);
733
+ return new TextDecoder().decode(bytes);
734
+ }
735
+ if (attachment.url) {
736
+ if (attachment.url.startsWith('data:')) {
737
+ const commaIndex = attachment.url.indexOf(',');
738
+ const encoded = commaIndex !== -1 ? attachment.url.substring(commaIndex + 1) : attachment.url;
739
+ if (typeof Buffer !== 'undefined') {
740
+ return Buffer.from(encoded, 'base64').toString('utf-8');
741
+ }
742
+ if (typeof atob === 'function') {
743
+ return atob(encoded);
744
+ }
745
+ }
746
+ const res = await fetch(attachment.url);
747
+ if (!res.ok) {
748
+ throw new Error(`Failed to fetch attachment from URL "${attachment.url}": ${res.statusText}`);
749
+ }
750
+ return await res.text();
751
+ }
752
+ throw new Error(`Cannot read attachment "${id}": no valid storageKey or URL found.`);
753
+ }
721
754
  async getPresignedAttachmentUploadUrl(options) {
722
755
  if (!this.fileStorage || !this.fileStorage.getPresignedUploadUrl) {
723
756
  throw new Error('Presigned uploads are not supported by the configured FileStorageAdapter.');
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAwBA,OAAO,EAAkB,aAAa,EAAE,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAA2B,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AAChH,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EA2Bf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,MAAM,4BAA4B,CAAC;AACvE,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AAEpF,MAAM,OAAO,kBAAkB;IACb,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvB,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IAEzD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,KAAK,GAAG,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI;YACpE,CAAC,CAAE,MAAM,CAAC,KAAwB;YAClC,CAAC,CAAC,IAAI,aAAa,EAAE,CAAC;QAExB,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QAEnC,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACxD,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC1D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,CAAC,CAAC;QACpF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACxD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,QAAQ;YACpC,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,MAAM,SAAS,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,CAAC;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,0CAA0C;QAC1C,IAAI,OAAO,EAAE,sBAAsB,IAAI,CAAC,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CAAC,EAAE,CAAC;YAC/F,yBAAyB,CACvB,OAAO,CAAC,sBAAsB,EAC9B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CACtD,CAAC;QACJ,CAAC;QAED,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,sCAAsC;QACtC,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,cAAc,KAAK,QAAQ,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACjJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,SAAS,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAE1I,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3G,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,OAAO,CAAC,UAAU,IAAI,QAAQ;YACvC,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,yCAAyC;QACzC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YACzD,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAC3F,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YACnF,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,OAAO,EAAE,sBAAsB,IAAI,OAAO,CAAC,YAAY,EAAE,CAAC;YAC5D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE;gBACxD,GAAG,QAAQ,CAAC,YAAY;gBACxB,GAAG,OAAO,CAAC,YAAY;aACxB,CAAC,CAAC;QACL,CAAC;QAED,MAAM,gBAAgB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAE7E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,SAAS,GAAG,uBAAuB,CACvC,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,SAAS,CAAC,cAAc,KAAK,QAAQ,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;gBAC5G,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;YACzC,CAAC;YACD,IAAI,SAAS,CAAC,eAAe,KAAK,MAAM,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;gBAC5E,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACrC,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBAC9E,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;iBACnB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,OAAO,CAAC,UAAU,IAAI,QAAQ;YACvC,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,MAAM,EAAE,QAAQ,EAAE,OAAO,CAAC,MAAM,EAAE;SACnE,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc,EAAE;YAC5E,IAAI,EAAE,OAAO;YACb,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC;YAC1C,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,MAAM,oBAAoB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;QAC1E,MAAM,cAAc,GAAG;YACrB,GAAG,oBAAoB;YACvB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;SAC3D,CAAC;QAEF,iDAAiD;QACjD,MAAM,UAAU,GAAG,qBAAqB,CAAC,cAAc,EAAE,GAAG,CAAC,CAAC;QAC9D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACnF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACrF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QACpE,OAAO,wBAAwB,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;IACpD,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA0E;QACtF,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACrB,MAAM,IAAI,KAAK,CAAC,yCAAyC,CAAC,CAAC;QAC7D,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QACpD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAAuC;YACpD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;SACrD,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,OAAwD;QACvE,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,wBAAwB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,0BAA0B,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACjF,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;IAC3C,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;IACtC,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,UAA8D;QACnF,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,GAAG,EAAE,QAAQ,CAAC,GAAG,EAAE;aAClF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QAC3H,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAOC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,YAAY,KAAK,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;SACvI,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC,OAAO,CAAC,CAAC;IACzD,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;IAC/B,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QAClE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACjD,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QAChF,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACtE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;gBACvC,IAAI,CAAC,eAAe,CAAC,4BAA4B,EAAE;oBACjD,WAAW,EAAE,OAAO;oBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B,CAAC,CAAC;YACL,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QACpG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QACnE,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBACzC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,cAAc,KAAK,QAAQ,EAAE,CAAC;gBACjD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAClE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACpE,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACtE,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,KAAmB,EAAE,OAAgC;QACjF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC;QAE5E,KAAK,MAAM,EAAE,IAAI,MAAM,EAAE,CAAC;YACxB,KAAK,CAAC,EAAE,CAAC,GAAG,EAAE;gBACZ,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC;aACpF,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE;gBACZ,yCAAyC;YAC3C,CAAC,CAAC,CAAC;QACL,CAAC;IACH,CAAC;CACF"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../../src/engine/index.ts"],"names":[],"mappings":"AAwBA,OAAO,EAAkB,aAAa,EAAE,MAAM,mBAAmB,CAAC;AAClE,OAAO,EAAE,cAAc,EAAE,MAAM,qBAAqB,CAAC;AACrD,OAAO,EAAE,wBAAwB,EAA2B,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AAChH,OAAO,EACL,kBAAkB,EAClB,sBAAsB,EACtB,0BAA0B,EAC1B,uBAAuB,EACvB,yBAAyB,EAC1B,MAAM,sBAAsB,CAAC;AAC9B,OAAO,EAAE,eAAe,EAAE,MAAM,sBAAsB,CAAC;AACvD,OAAO,EACL,cAAc,EA2Bf,MAAM,qBAAqB,CAAC;AAC7B,OAAO,EAAE,qBAAqB,EAA6B,MAAM,uBAAuB,CAAC;AACzF,OAAO,EAAE,yBAAyB,EAAE,MAAM,4BAA4B,CAAC;AACvE,OAAO,EAAE,qBAAqB,EAAE,uBAAuB,EAAE,MAAM,oBAAoB,CAAC;AAEpF,MAAM,OAAO,kBAAkB;IACb,KAAK,CAAiB;IACtB,WAAW,CAAsB;IACjC,OAAO,CAAiB;IACxB,MAAM,CAAiB;IACvB,KAAK,GAAkB,OAAO,CAAC,OAAO,EAAE,CAAC;IAEzD,YAAY,SAA6B,EAAE;QACzC,IAAI,CAAC,KAAK,GAAG,OAAO,MAAM,CAAC,KAAK,KAAK,QAAQ,IAAI,MAAM,CAAC,KAAK,KAAK,IAAI;YACpE,CAAC,CAAE,MAAM,CAAC,KAAwB;YAClC,CAAC,CAAC,IAAI,aAAa,EAAE,CAAC;QAExB,IAAI,CAAC,WAAW,GAAG,MAAM,CAAC,WAAW,CAAC;QACtC,IAAI,CAAC,OAAO,GAAG,IAAI,cAAc,EAAE,CAAC;QACpC,IAAI,CAAC,MAAM,GAAG,IAAI,cAAc,EAAE,CAAC;QAEnC,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;YACnB,KAAK,MAAM,MAAM,IAAI,MAAM,CAAC,OAAO,EAAE,CAAC;gBACpC,IAAI,CAAC,OAAO,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC;YAChC,CAAC;QACH,CAAC;QAED,IAAI,MAAM,CAAC,WAAW,EAAE,CAAC;YACvB,IAAI,CAAC,KAAK,GAAG,IAAI,CAAC,eAAe,CAAC,MAAM,CAAC,WAAW,CAAC,CAAC;QACxD,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,IAAoD;QAChF,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;YACnB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,SAAS,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;YAClB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,QAAQ,EAAE,CAAC;gBAC9B,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC5B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAClC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YACtC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;YACtB,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,YAAY,EAAE,CAAC;gBAClC,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,CAAC,CAAC,CAAC;YACxC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;YACpB,KAAK,MAAM,EAAE,IAAI,IAAI,CAAC,UAAU,EAAE,CAAC;gBACjC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;YACvC,CAAC;QACH,CAAC;QACD,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;YACf,KAAK,MAAM,CAAC,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;gBAC3B,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;YACjC,CAAC;QACH,CAAC;IACH,CAAC;IAED,oBAAoB;IACpB,KAAK,CAAC,YAAY;QAChB,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;IACpC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,QAA0D;QAC7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,QAAQ,CAAC,CAAC;QAC1D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAyB;YAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,UAAU;YACzB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE;SAC/B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,kBAAkB;YAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;SAChC,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACnD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,QAAQ,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC;QAClD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAyB;gBAClC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,kBAAkB;gBACxB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,UAAU;gBACzB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,kBAAkB;gBAC1B,OAAO,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE;aACjC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,kBAAkB,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,CAAC,IAAI,EAAE,CAAC,CAAC;QACpF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,SAAiB;QAC5C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,QAAQ;YAAE,OAAO,OAAO,CAAC,QAAQ,CAAC;QAC/C,IAAI,OAAO,EAAE,UAAU,EAAE,CAAC;YACxB,MAAM,EAAE,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC;YAC5D,IAAI,EAAE;gBAAE,OAAO,EAAE,CAAC;QACpB,CAAC;QAED,MAAM,SAAS,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,EAAE,CAAC;QAClD,MAAM,SAAS,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACrD,IAAI,SAAS;YAAE,OAAO,SAAS,CAAC;QAChC,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC;YAAE,OAAO,SAAS,CAAC,CAAC,CAAC,CAAC;QAE9C,OAAO,yBAAyB,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,sBAAsB,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QAC9C,IAAI,CAAC,IAAI;YAAE,OAAO,EAAE,CAAC;QACrB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,OAAO,0BAA0B,CAAC,QAAQ,IAAI,SAAS,EAAE,IAAI,CAAC,MAAM,CAAC,CAAC;IACxE,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW;QACf,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;IAClC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,OAAwD;QAC1E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,OAAO,CAAC,CAAC;QACxD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE;SAC9B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;YACrB,OAAO,EAAE,OAAO,CAAC,OAAO,IAAI,QAAQ;YACpC,MAAM,EAAE,iBAAiB;YACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE,GAAG,EAAE,OAAO,CAAC,GAAG,EAAE;SAClD,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aAClD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,iBAAiB;gBACzB,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,CAAC,IAAI,EAAE;aAChC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAChE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,SAA0B;QACzC,MAAM,cAAc,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,SAAS,CAAC,CAAC;QACzE,MAAM,SAAS,GAAG,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS,CAAC;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,SAAS,CAAC,CAAC;QAE9D,0CAA0C;QAC1C,IAAI,OAAO,EAAE,sBAAsB,IAAI,CAAC,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CAAC,EAAE,CAAC;YAC/F,yBAAyB,CACvB,OAAO,CAAC,sBAAsB,EAC9B,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,CACtD,CAAC;QACJ,CAAC;QAED,MAAM,aAAa,GAAG,QAAQ,EAAE,gBAAgB,IAAI,MAAM,CAAC;QAC3D,MAAM,aAAa,GAAG,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM,IAAI,aAAa,CAAC;QACjF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,sCAAsC;QACtC,MAAM,SAAS,GAAG,uBAAuB,CAAC,aAAa,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;QAC3G,MAAM,eAAe,GAAG,cAAc,CAAC,eAAe,IAAI,SAAS,CAAC,eAAe,IAAI,CAAC,SAAS,CAAC,cAAc,KAAK,QAAQ,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACjJ,MAAM,aAAa,GAAG,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa,IAAI,CAAC,SAAS,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QAE1I,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC;YAC1C,SAAS;YACT,KAAK,EAAE,cAAc,CAAC,KAAK,IAAI,SAAS,CAAC,KAAK;YAC9C,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,aAAa;YACrB,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,QAAQ;YACnE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,MAAM;YACjE,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,SAAS,EAAE,cAAc,CAAC,SAAS,IAAI,SAAS,CAAC,SAAS;YAC1D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,UAAU,EAAE,cAAc,CAAC,UAAU,IAAI,SAAS,CAAC,UAAU;YAC7D,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,MAAM,EAAE,cAAc,CAAC,MAAM,IAAI,SAAS,CAAC,MAAM;YACjD,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,gBAAgB,EAAE,cAAc,CAAC,gBAAgB,IAAI,SAAS,CAAC,gBAAgB;YAC/E,eAAe;YACf,aAAa;YACb,OAAO,EAAE,cAAc,CAAC,OAAO,IAAI,SAAS,CAAC,OAAO;YACpD,cAAc,EAAE,cAAc,CAAC,cAAc,IAAI,SAAS,CAAC,cAAc;YACzE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW,IAAI,CAAC;YACrE,WAAW,EAAE,cAAc,CAAC,WAAW,IAAI,SAAS,CAAC,WAAW;YAChE,aAAa,EAAE,cAAc,CAAC,aAAa,IAAI,SAAS,CAAC,aAAa;YACtE,wBAAwB,EAAE,cAAc,CAAC,wBAAwB,IAAI,SAAS,CAAC,wBAAwB;YACvG,qBAAqB,EAAE,cAAc,CAAC,qBAAqB,IAAI,SAAS,CAAC,qBAAqB;YAC9F,uBAAuB,EAAE,cAAc,CAAC,uBAAuB,IAAI,SAAS,CAAC,uBAAuB;YACpG,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ,IAAI,CAAC,SAAS,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAC3G,IAAI,EAAE,cAAc,CAAC,IAAI,IAAI,SAAS,CAAC,IAAI,IAAI,EAAE;YACjD,YAAY,EAAE,cAAc,CAAC,YAAY,IAAI,SAAS,CAAC,YAAY,IAAI,EAAE;YACzE,QAAQ,EAAE,cAAc,CAAC,QAAQ,IAAI,SAAS,CAAC,QAAQ;SACxD,CAAC,CAAC;QAEH,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,CAAC,CAAC;QAE/C,6BAA6B;QAC7B,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,OAAO,CAAC,UAAU,IAAI,QAAQ;YACvC,MAAM,EAAE,cAAc;YACtB,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAChE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC;QAEvE,yCAAyC;QACzC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YACzD,MAAM,OAAO,GAAG,kBAAkB,CAAC,QAAQ,IAAI,SAAS,EAAE,QAAQ,CAAC,MAAM,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;YAC3F,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,MAAM,IAAI,uBAAuB,CAAC,QAAQ,CAAC,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,QAAQ,EAAE,EAAE,CAAC,CAAC;YACnF,CAAC;QACH,CAAC;QAED,mCAAmC;QACnC,IAAI,OAAO,EAAE,sBAAsB,IAAI,OAAO,CAAC,YAAY,EAAE,CAAC;YAC5D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE;gBACxD,GAAG,QAAQ,CAAC,YAAY;gBACxB,GAAG,OAAO,CAAC,YAAY;aACxB,CAAC,CAAC;QACL,CAAC;QAED,MAAM,gBAAgB,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAE7E,gEAAgE;QAChE,IAAI,gBAAgB,CAAC,MAAM,IAAI,gBAAgB,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;YAC3E,MAAM,SAAS,GAAG,uBAAuB,CACvC,gBAAgB,CAAC,MAAM,EACvB,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CACjD,CAAC;YACF,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,SAAS,CAAC,cAAc,KAAK,QAAQ,IAAI,CAAC,QAAQ,CAAC,eAAe,IAAI,CAAC,gBAAgB,CAAC,eAAe,EAAE,CAAC;gBAC5G,gBAAgB,CAAC,eAAe,GAAG,GAAG,CAAC;YACzC,CAAC;YACD,IAAI,SAAS,CAAC,eAAe,KAAK,MAAM,IAAI,CAAC,gBAAgB,CAAC,aAAa,EAAE,CAAC;gBAC5E,gBAAgB,CAAC,aAAa,GAAG,GAAG,CAAC;gBACrC,IAAI,gBAAgB,CAAC,QAAQ,KAAK,SAAS,IAAI,CAAC,QAAQ,CAAC,QAAQ,IAAI,CAAC,CAAC,GAAG,GAAG,EAAE,CAAC;oBAC9E,gBAAgB,CAAC,QAAQ,GAAG,GAAG,CAAC;gBAClC,CAAC;YACH,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,gBAAgB,CAAC,CAAC;QAClE,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC;QAEzD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,cAAc,GAAG,QAAQ,CAAC,MAAM,KAAK,OAAO,CAAC,MAAM,CAAC;QAE1D,8BAA8B;QAC9B,IAAI,cAAc,EAAE,CAAC;YACnB,MAAM,WAAW,GAA2B;gBAC1C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;aAAM,CAAC;YACN,MAAM,WAAW,GAAqB;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,IAAI,EAAE,OAAO;oBACb,QAAQ,EAAE,QAAQ;iBACnB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;QACzC,CAAC;QAED,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,MAAM,EAAE,OAAO,CAAC,EAAE;YAClB,OAAO,EAAE,OAAO,CAAC,UAAU,IAAI,QAAQ;YACvC,MAAM,EAAE,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc;YAC/D,OAAO,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,MAAM,EAAE,QAAQ,EAAE,OAAO,CAAC,MAAM,EAAE;SACnE,CAAC,CAAC;QAEH,IAAI,CAAC,eAAe,CAAC,cAAc,CAAC,CAAC,CAAC,qBAAqB,CAAC,CAAC,CAAC,cAAc,EAAE;YAC5E,IAAI,EAAE,OAAO;YACb,QAAQ,EAAE,QAAQ;SACnB,CAAC,CAAC;QAEH,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC9C,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,IAAI,CAAC,OAAO,CAAC,mBAAmB,CAAC,EAAE,CAAC,CAAC;QAC3C,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QAEhD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,IAAI,CAAC,OAAO,CAAC,kBAAkB,CAAC,EAAE,CAAC,CAAC;YAC1C,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,MAAM,KAAK,GAAqB;gBAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,cAAc;gBACpB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,MAAM;gBACrB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE;oBACP,MAAM,EAAE,EAAE;oBACV,SAAS,EAAE,QAAQ,CAAC,SAAS;oBAC7B,KAAK,EAAE,QAAQ,CAAC,KAAK;iBACtB;aACF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,MAAM,EAAE,EAAE;gBACV,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,cAAc;gBACtB,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,oCAAoC;IACpC,KAAK,CAAC,aAAa,CAAC,GAA+B;QACjD,MAAM,oBAAoB,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;QAC1E,MAAM,cAAc,GAAG;YACrB,GAAG,oBAAoB;YACvB,GAAG,CAAC,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;SAC3D,CAAC;QAEF,iDAAiD;QACjD,MAAM,UAAU,GAAG,qBAAqB,CAAC,cAAc,EAAE,GAAG,CAAC,CAAC;QAC9D,IAAI,UAAU,CAAC,QAAQ,EAAE,CAAC;YACxB,MAAM,IAAI,uBAAuB,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,eAAe,EAAE,UAAU,CAAC,SAAS,CAAC,CAAC;QAC3F,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,GAAG,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA6B;YACtC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,kBAAkB;YACxB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC;QAC9D,MAAM,eAAe,GAAG,IAAI,GAAG,EAAU,CAAC;QAC1C,MAAM,iBAAiB,GAAG,IAAI,GAAG,EAAU,CAAC;QAE5C,KAAK,MAAM,GAAG,IAAI,YAAY,EAAE,CAAC;YAC/B,IAAI,GAAG,CAAC,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1B,eAAe,CAAC,GAAG,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC;YAC3C,CAAC;iBAAM,IAAI,GAAG,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBAC1C,iBAAiB,CAAC,GAAG,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACpC,CAAC;QACH,CAAC;QAED,MAAM,aAAa,GAAG,CACpB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACnF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,MAAM,eAAe,GAAG,CACtB,MAAM,OAAO,CAAC,GAAG,CAAC,KAAK,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC,GAAG,CAAC,CAAC,EAAE,EAAE,EAAE,CAAC,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,CACrF,CAAC,MAAM,CAAC,CAAC,CAAC,EAAa,EAAE,CAAC,CAAC,KAAK,IAAI,CAAC,CAAC;QAEvC,OAAO;YACL,MAAM;YACN,aAAa;YACb,eAAe;YACf,YAAY;SACb,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI;YAAE,OAAO,IAAI,CAAC;QACvB,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,UAAU,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACtD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,UAAU,GAAG,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC;QACpE,OAAO,wBAAwB,CAAC,IAAI,EAAE,UAAU,CAAC,CAAC;IACpD,CAAC;IAED,wBAAwB;IACxB,KAAK,CAAC,OAAO,CAAC,KAA0E;QACtF,IAAI,KAAK,CAAC,KAAK,IAAI,CAAC,EAAE,CAAC;YACrB,MAAM,IAAI,KAAK,CAAC,yCAAyC,CAAC,CAAC;QAC7D,CAAC;QAED,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC;QACpD,IAAI,IAAI,EAAE,CAAC;YACT,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,cAAc,GAAG,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC;YAC7D,MAAM,gBAAgB,GAAG,KAAK,CAAC,UAAU,KAAK,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,IAAI,CAAC,CAAC,GAAG,KAAK,CAAC,KAAK,CAAC,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC;YACnH,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE;gBACnC,WAAW,EAAE,cAAc;gBAC3B,WAAW,EAAE,cAAc;gBAC3B,aAAa,EAAE,gBAAgB;aAChC,CAAC,CAAC;QACL,CAAC;QAED,MAAM,SAAS,GAAuC;YACpD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,IAAI,EAAE,UAAU,IAAI,QAAQ;SACrD,CAAC;QAEF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC;QACpD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAoB;YAC7B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,aAAa;YACnB,WAAW,EAAE,KAAK,CAAC,MAAM;YACzB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,KAAK,CAAC,MAAM,EAAE,SAAS,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,mBAAmB;IACnB,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,MAAM,CAAC,CAAC;IACxC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,OAAwD;QACvE,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC;QACtE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACtE,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAsB;YAC/B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE,OAAO,EAAE,OAAO,EAAE;SACtD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,QAAQ,GAAG,OAAO,CAAC,QAAQ,IAAI,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,eAAe,CAAC,OAAO,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC;QACtG,MAAM,QAAQ,GAAG,QAAQ,KAAK,SAAS,CAAC,CAAC,CAAC,EAAE,GAAG,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC;QAE7E,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,EAAE,QAAQ,CAAC,CAAC;QAC7D,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAwB;YACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,iBAAiB;YACvB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;SAClD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC9D,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;QACjD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAAwB;gBACjC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,iBAAiB;gBACvB,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,SAAS;gBACxB,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,EAAE,EAAE;aACpD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,iBAAiB,EAAE,EAAE,SAAS,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,CAAC,CAAC;QACtF,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;YAC3B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QAC9D,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,GAAG,QAAQ,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC;YACpE,MAAM,aAAa,GAAG,SAAS,CAAC,IAAI,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CAAC;YACxG,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,SAAS,CAAC,IAAI,CAAC;oBACb,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC;YACL,CAAC;YACD,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAA8B;YACvC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,wBAAwB;YAC9B,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE;gBACP,SAAS;gBACT,QAAQ,EAAE;oBACR,KAAK,EAAE,QAAQ,CAAC,KAAK;oBACrB,MAAM,EAAE,QAAQ,CAAC,MAAM;oBACvB,SAAS,EAAE,GAAG;iBACf;gBACD,OAAO,EAAE,OAAO;aACjB;SACF,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,wBAAwB,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/E,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC;QACxD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAuB,CAAC;QAC5B,IAAI,IAAI,CAAC,KAAK,CAAC,cAAc,EAAE,CAAC;YAC9B,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,SAAS,EAAE,QAAQ,CAAC,CAAC;QACjE,CAAC;aAAM,CAAC;YACN,MAAM,SAAS,GAAG,CAAC,QAAQ,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,MAAM,CACjD,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,CAAC,CAAC,KAAK,KAAK,QAAQ,CAAC,KAAK,IAAI,CAAC,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,CAAC,CACrE,CAAC;YACF,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,EAAE,EAAE,SAAS,EAAE,CAAC,CAAC;QACrE,CAAC;QAED,IAAI,CAAC,OAAO;YAAE,OAAO,IAAI,CAAC;QAE1B,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACrC,MAAM,KAAK,GAAgC;YACzC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,0BAA0B;YAChC,WAAW,EAAE,SAAS;YACtB,aAAa,EAAE,SAAS;YACxB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,QAAQ,EAAE,OAAO,EAAE,OAAO,EAAE;SACnD,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,0BAA0B,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,QAAQ,EAAE,CAAC,CAAC;QACjF,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,sBAAsB;IACtB,KAAK,CAAC,cAAc,CAAC,MAA2F;QAC9G,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,MAAM,CAAC,CAAC;QAC5D,IAAI,MAAM,EAAE,YAAY,EAAE,CAAC;YACzB,OAAO,WAAW,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC,YAAY,KAAK,MAAM,CAAC,YAAY,CAAC,CAAC;QACzE,CAAC;QACD,OAAO,WAAW,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;IACtC,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,UAA8D;QACnF,qBAAqB,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;QACtC,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,UAAU,CAAC,CAAC;QAC9D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA2B;YACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,oBAAoB;YAC1B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,YAAY;YAC3B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE;SACjC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,UAAU,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QACpD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,IAAI,QAAQ,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,EAAE,CAAC;YAC5C,IAAI,CAAC;gBACH,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;YACrD,CAAC;YAAC,MAAM,CAAC;gBACP,uDAAuD;YACzD,CAAC;QACH,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,gBAAgB,CAAC,EAAE,CAAC,CAAC;QACtD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA2B;gBACpC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,oBAAoB;gBAC1B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,YAAY;gBAC3B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,UAAU,EAAE,QAAQ,CAAC,UAAU,EAAE,GAAG,EAAE,QAAQ,CAAC,GAAG,EAAE;aAClF,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,IAAI,CAAC,eAAe,CAAC,oBAAoB,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,MAAM,EAAE,QAAQ,CAAC,MAAM,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QAC3H,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,oBAAoB,CACxB,KAQC;QAED,IAAI,CAAC,IAAI,CAAC,WAAW,EAAE,CAAC;YACtB,MAAM,IAAI,KAAK,CAAC,qHAAqH,CAAC,CAAC;QACzI,CAAC;QAED,MAAM,YAAY,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,MAAM,CAAC;YACjD,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,IAAI,EAAE,KAAK,CAAC,IAAI;YAChB,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC,CAAC,YAAY,KAAK,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,SAAS,KAAK,CAAC,MAAM,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;SACvI,CAAC,CAAC;QAEH,OAAO,IAAI,CAAC,gBAAgB,CAAC;YAC3B,MAAM,EAAE,KAAK,CAAC,MAAM;YACpB,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,SAAS,EAAE,KAAK,CAAC,SAAS;YAC1B,UAAU,EAAE,KAAK,CAAC,UAAU;YAC5B,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,MAAM;YAC1C,QAAQ,EAAE,KAAK,CAAC,QAAQ;YACxB,QAAQ,EAAE,YAAY,CAAC,QAAQ;YAC/B,SAAS,EAAE,YAAY,CAAC,SAAS;YACjC,GAAG,EAAE,YAAY,CAAC,GAAG;YACrB,UAAU,EAAE,YAAY,CAAC,UAAU;YACnC,YAAY,EAAE,KAAK,CAAC,YAAY;YAChC,QAAQ,EAAE,KAAK,CAAC,QAAQ;SACzB,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,EAAU;QACjC,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,aAAa,CAAC,EAAE,CAAC,CAAC;QAChD,IAAI,CAAC,UAAU,EAAE,CAAC;YAChB,MAAM,IAAI,KAAK,CAAC,uBAAuB,EAAE,cAAc,CAAC,CAAC;QAC3D,CAAC;QAED,IAAI,UAAU,CAAC,UAAU,IAAI,IAAI,CAAC,WAAW,IAAI,OAAO,IAAI,CAAC,WAAW,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACjG,MAAM,KAAK,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YACrE,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC;QACzC,CAAC;QAED,IAAI,UAAU,CAAC,GAAG,EAAE,CAAC;YACnB,IAAI,UAAU,CAAC,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;gBACvC,MAAM,UAAU,GAAG,UAAU,CAAC,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;gBAC/C,MAAM,OAAO,GAAG,UAAU,KAAK,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC,UAAU,CAAC,GAAG,CAAC;gBAC9F,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,OAAO,MAAM,CAAC,IAAI,CAAC,OAAO,EAAE,QAAQ,CAAC,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC;gBAC1D,CAAC;gBACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;oBAC/B,OAAO,IAAI,CAAC,OAAO,CAAC,CAAC;gBACvB,CAAC;YACH,CAAC;YAED,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC;YACxC,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;gBACZ,MAAM,IAAI,KAAK,CAAC,wCAAwC,UAAU,CAAC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAChG,CAAC;YACD,OAAO,MAAM,GAAG,CAAC,IAAI,EAAE,CAAC;QAC1B,CAAC;QAED,MAAM,IAAI,KAAK,CAAC,2BAA2B,EAAE,sCAAsC,CAAC,CAAC;IACvF,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,IAAI,CAAC,IAAI,CAAC,WAAW,IAAI,CAAC,IAAI,CAAC,WAAW,CAAC,qBAAqB,EAAE,CAAC;YACjE,MAAM,IAAI,KAAK,CAAC,2EAA2E,CAAC,CAAC;QAC/F,CAAC;QACD,OAAO,IAAI,CAAC,WAAW,CAAC,qBAAqB,CAAC,OAAO,CAAC,CAAC;IACzD,CAAC;IAED,gBAAgB;IAChB,KAAK,CAAC,QAAQ;QACZ,OAAO,IAAI,CAAC,KAAK,CAAC,QAAQ,EAAE,CAAC;IAC/B,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,OAAO,IAAI,CAAC,KAAK,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;IAChC,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAAqB;YAC9B,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,cAAc;YACpB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,MAAM;YACrB,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE;SAC3B,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,cAAc,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC,CAAC;QACxD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;IACnC,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAAgE;QACpF,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA0B;YACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,mBAAmB;YACzB,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,WAAW;YAC1B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;SAChC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QAClE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;IACjD,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAED,uBAAuB;IACvB,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;IAC/C,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,KAA6B;QACnD,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,KAAK,CAAC,SAAS,CAAC,CAAC;QAC7D,IAAI,OAAO,EAAE,sBAAsB,IAAI,KAAK,CAAC,YAAY,EAAE,CAAC;YAC1D,yBAAyB,CAAC,OAAO,CAAC,sBAAsB,EAAE,KAAK,CAAC,YAAY,CAAC,CAAC;QAChF,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC;YACjD,GAAG,KAAK;YACR,MAAM,EAAE,KAAK,CAAC,MAAM,IAAI,SAAS;YACjC,UAAU,EAAE,KAAK,CAAC,UAAU,IAAI,EAAE;YAClC,YAAY,EAAE,KAAK,CAAC,YAAY,IAAI,EAAE;SACvC,CAAC,CAAC;QACH,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QAErC,MAAM,KAAK,GAA4B;YACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACvD,IAAI,EAAE,qBAAqB;YAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;YACvB,aAAa,EAAE,aAAa;YAC5B,UAAU,EAAE,GAAG;YACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE;SAClC,CAAC;QACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;QAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;YAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;YAC5B,OAAO,EAAE,QAAQ;YACjB,MAAM,EAAE,qBAAqB;YAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;SAC1D,CAAC,CAAC;QACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACtE,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,IAAI,CAAC,QAAQ,CAAC,WAAW,IAAI,CAAC,OAAO,CAAC,WAAW,EAAE,CAAC;YACtG,OAAO,CAAC,WAAW,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;QACjD,CAAC;QAED,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAChE,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YAErC,IAAI,OAAO,CAAC,MAAM,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,CAAC,MAAM,EAAE,CAAC;gBACzD,MAAM,WAAW,GAAkC;oBACjD,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,4BAA4B;oBAClC,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,aAAa;oBAC5B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE;wBACP,WAAW,EAAE,OAAO;wBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;wBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;qBAC1B;iBACF,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;gBACvC,IAAI,CAAC,eAAe,CAAC,4BAA4B,EAAE;oBACjD,WAAW,EAAE,OAAO;oBACpB,cAAc,EAAE,QAAQ,CAAC,MAAM;oBAC/B,SAAS,EAAE,OAAO,CAAC,MAAM;iBAC1B,CAAC,CAAC;YACL,CAAC;YAED,MAAM,WAAW,GAA4B;gBAC3C,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE;aACtD,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,WAAW,CAAC,CAAC;YAEvC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,OAAO,CAAC,SAAS;gBAC5B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,OAAO,CAAC,KAAK,EAAE,MAAM,EAAE,OAAO,CAAC,MAAM,EAAE;aAC1D,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,WAAW,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC;QACrD,IAAI,CAAC,QAAQ;YAAE,OAAO,KAAK,CAAC;QAE5B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,iBAAiB,CAAC,EAAE,CAAC,CAAC;QACvD,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA4B;gBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,qBAAqB;gBAC3B,WAAW,EAAE,EAAE;gBACf,aAAa,EAAE,aAAa;gBAC5B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE;aAC9D,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YAEjC,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,CAAC;gBAC3B,SAAS,EAAE,QAAQ,CAAC,SAAS;gBAC7B,OAAO,EAAE,QAAQ;gBACjB,MAAM,EAAE,qBAAqB;gBAC7B,OAAO,EAAE,EAAE,KAAK,EAAE,QAAQ,CAAC,KAAK,EAAE;aACnC,CAAC,CAAC;YACH,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,aAAa,EAAE,EAAE,EAAE,SAAS,EAAE,QAAQ,CAAC,SAAS,EAAE,CAAC,CAAC;QACpG,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,aAAqB;QAC/C,MAAM,WAAW,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,cAAc,CAAC,aAAa,CAAC,CAAC;QACnE,IAAI,CAAC,WAAW;YAAE,OAAO,IAAI,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,UAAU,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QACnE,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,sBAAsB,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAC1E,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,QAAQ,CAAC,WAAW,CAAC,SAAS,CAAC,CAAC;QAClE,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,aAAa,KAAK,aAAa,CAAC,CAAC;QAExE,MAAM,UAAU,GAAG,KAAK,CAAC,MAAM,CAAC;QAChC,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,cAAc,GAAG,CAAC,CAAC;QACvB,IAAI,WAAW,GAAG,CAAC,CAAC;QACpB,IAAI,aAAa,GAAG,CAAC,CAAC;QAEtB,KAAK,MAAM,IAAI,IAAI,KAAK,EAAE,CAAC;YACzB,MAAM,SAAS,GAAG,uBAAuB,CAAC,IAAI,CAAC,MAAM,EAAE,OAAO,EAAE,iBAAiB,IAAI,QAAQ,EAAE,QAAQ,CAAC,CAAC;YACzG,IAAI,SAAS,CAAC,eAAe,KAAK,MAAM,EAAE,CAAC;gBACzC,cAAc,EAAE,CAAC;YACnB,CAAC;iBAAM,IAAI,SAAS,CAAC,cAAc,KAAK,QAAQ,EAAE,CAAC;gBACjD,WAAW,EAAE,CAAC;YAChB,CAAC;YAED,IAAI,IAAI,CAAC,cAAc;gBAAE,cAAc,IAAI,IAAI,CAAC,cAAc,CAAC;YAC/D,IAAI,IAAI,CAAC,WAAW;gBAAE,WAAW,IAAI,IAAI,CAAC,WAAW,CAAC;YAEtD,IAAI,OAAO,IAAI,CAAC,QAAQ,KAAK,QAAQ,EAAE,CAAC;gBACtC,aAAa,IAAI,IAAI,CAAC,QAAQ,CAAC;YACjC,CAAC;iBAAM,CAAC;gBACN,aAAa,IAAI,SAAS,CAAC,eAAe,KAAK,MAAM,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,CAAC;YAClE,CAAC;QACH,CAAC;QAED,MAAM,kBAAkB,GAAG,UAAU,GAAG,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,aAAa,GAAG,UAAU,CAAC,CAAC,CAAC,CAAC,CAAC,CAAC;QAEvF,OAAO;YACL,WAAW;YACX,UAAU;YACV,cAAc;YACd,WAAW;YACX,kBAAkB;YAClB,cAAc;YACd,WAAW;SACZ,CAAC;IACJ,CAAC;IAED,qBAAqB;IACrB,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,OAAO,IAAI,CAAC,KAAK,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC;IAC7C,CAAC;IAED,KAAK,CAAC,YAAY,CAAC,EAAU;QAC3B,OAAO,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,SAA8C;QAClE,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,SAAS,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;YAChC,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,MAAM,KAAK,GAA0B;gBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;gBACvD,IAAI,EAAE,mBAAmB;gBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;gBACvB,aAAa,EAAE,WAAW;gBAC1B,UAAU,EAAE,GAAG;gBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;aAChC,CAAC;YACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;YACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,YAAY,CAAC,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,QAAQ;YAAE,OAAO,IAAI,CAAC;QAE3B,MAAM,OAAO,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,EAAE,OAAO,CAAC,CAAC;QAC9D,IAAI,OAAO,EAAE,CAAC;YACZ,MAAM,GAAG,GAAG,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC;YACrC,IAAI,QAAQ,CAAC,MAAM,KAAK,QAAQ,IAAI,OAAO,CAAC,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAChE,MAAM,KAAK,GAA0B;oBACnC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,mBAAmB;oBACzB,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,mBAAmB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACpE,CAAC;iBAAM,IAAI,QAAQ,CAAC,MAAM,KAAK,WAAW,IAAI,OAAO,CAAC,MAAM,KAAK,WAAW,EAAE,CAAC;gBAC7E,MAAM,KAAK,GAA4B;oBACrC,EAAE,EAAE,OAAO,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBACvD,IAAI,EAAE,qBAAqB;oBAC3B,WAAW,EAAE,OAAO,CAAC,EAAE;oBACvB,aAAa,EAAE,WAAW;oBAC1B,UAAU,EAAE,GAAG;oBACf,OAAO,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE;iBAChC,CAAC;gBACF,MAAM,IAAI,CAAC,MAAM,CAAC,OAAO,CAAC,KAAK,CAAC,CAAC;gBACjC,IAAI,CAAC,eAAe,CAAC,qBAAqB,EAAE,EAAE,SAAS,EAAE,OAAO,EAAE,CAAC,CAAC;YACtE,CAAC;QACH,CAAC;QACD,OAAO,OAAO,CAAC;IACjB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,KAAK,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC;IACxC,CAAC;IAEO,KAAK,CAAC,eAAe,CAAC,KAAmB,EAAE,OAAgC;QACjF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC;QAChD,MAAM,MAAM,GAAG,QAAQ,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,MAAM,IAAI,CAAC,CAAC,MAAM,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,CAAC;QAE5E,KAAK,MAAM,EAAE,IAAI,MAAM,EAAE,CAAC;YACxB,KAAK,CAAC,EAAE,CAAC,GAAG,EAAE;gBACZ,MAAM,EAAE,MAAM;gBACd,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;gBAC/C,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,CAAC;aACpF,CAAC,CAAC,KAAK,CAAC,GAAG,EAAE;gBACZ,yCAAyC;YAC3C,CAAC,CAAC,CAAC;QACL,CAAC;IACH,CAAC;CACF"}
@@ -17,6 +17,7 @@ export declare class InMemoryFileStore implements FileStorageAdapter {
17
17
  });
18
18
  upload(input: UploadFileInput): Promise<UploadFileResult>;
19
19
  delete(storageKey: string): Promise<boolean>;
20
+ download(storageKey: string): Promise<Buffer | Uint8Array>;
20
21
  getDownloadUrl(storageKey: string): Promise<string>;
21
22
  getPresignedUploadUrl(options: PresignedUrlOptions): Promise<PresignedUploadResult>;
22
23
  getFile(storageKey: string): StoredFile | undefined;
@@ -1 +1 @@
1
- {"version":3,"file":"file-storage.d.ts","sourceRoot":"","sources":["../../src/storage/file-storage.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,eAAe,EACf,gBAAgB,EAChB,mBAAmB,EACnB,qBAAqB,EACtB,MAAM,mBAAmB,CAAC;AAE3B,MAAM,WAAW,UAAU;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,IAAI,EAAE,UAAU,CAAC;IACjB,QAAQ,EAAE,MAAM,CAAC;IACjB,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,EAAE,MAAM,CAAC;IACZ,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,IAAI,GAAG,MAAM,GAAG,OAAO,EACjE,QAAQ,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,QAAQ,EACxC,QAAQ,CAAC,EAAE,MAAM,GAChB,UAAU,CA8DZ;AAED,qBAAa,iBAAkB,YAAW,kBAAkB;IAC1D,OAAO,CAAC,KAAK,CAAiC;IAC9C,OAAO,CAAC,aAAa,CAAS;gBAElB,OAAO,GAAE;QAAE,aAAa,CAAC,EAAE,MAAM,CAAC;QAAC,aAAa,CAAC,EAAE,MAAM,CAAA;KAAO;IAItE,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC;IA4BzD,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI5C,cAAc,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAQnD,qBAAqB,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAWzF,OAAO,CAAC,UAAU,EAAE,MAAM,GAAG,UAAU,GAAG,SAAS;IAInD,KAAK,IAAI,IAAI;CAGd"}
1
+ {"version":3,"file":"file-storage.d.ts","sourceRoot":"","sources":["../../src/storage/file-storage.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,eAAe,EACf,gBAAgB,EAChB,mBAAmB,EACnB,qBAAqB,EACtB,MAAM,mBAAmB,CAAC;AAE3B,MAAM,WAAW,UAAU;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,IAAI,EAAE,UAAU,CAAC;IACjB,QAAQ,EAAE,MAAM,CAAC;IACjB,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,EAAE,MAAM,CAAC;IACZ,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,wBAAgB,mBAAmB,CACjC,IAAI,EAAE,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,IAAI,GAAG,MAAM,GAAG,OAAO,EACjE,QAAQ,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,QAAQ,EACxC,QAAQ,CAAC,EAAE,MAAM,GAChB,UAAU,CA8DZ;AAED,qBAAa,iBAAkB,YAAW,kBAAkB;IAC1D,OAAO,CAAC,KAAK,CAAiC;IAC9C,OAAO,CAAC,aAAa,CAAS;gBAElB,OAAO,GAAE;QAAE,aAAa,CAAC,EAAE,MAAM,CAAC;QAAC,aAAa,CAAC,EAAE,MAAM,CAAA;KAAO;IAItE,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC;IA4BzD,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI5C,QAAQ,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,UAAU,CAAC;IAQ1D,cAAc,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAQnD,qBAAqB,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAWzF,OAAO,CAAC,UAAU,EAAE,MAAM,GAAG,UAAU,GAAG,SAAS;IAInD,KAAK,IAAI,IAAI;CAGd"}
@@ -91,6 +91,13 @@ export class InMemoryFileStore {
91
91
  async delete(storageKey) {
92
92
  return this.files.delete(storageKey);
93
93
  }
94
+ async download(storageKey) {
95
+ const file = this.files.get(storageKey);
96
+ if (!file) {
97
+ throw new Error(`File with storageKey "${storageKey}" not found`);
98
+ }
99
+ return file.data;
100
+ }
94
101
  async getDownloadUrl(storageKey) {
95
102
  const file = this.files.get(storageKey);
96
103
  if (!file) {
@@ -1 +1 @@
1
- {"version":3,"file":"file-storage.js","sourceRoot":"","sources":["../../src/storage/file-storage.ts"],"names":[],"mappings":"AAiBA,MAAM,UAAU,mBAAmB,CACjC,IAAiE,EACjE,QAAwC,EACxC,QAAiB;IAEjB,IAAI,IAAI,YAAY,UAAU,EAAE,CAAC;QAC/B,OAAO,IAAI,CAAC;IACd,CAAC;IACD,IAAI,IAAI,YAAY,WAAW,EAAE,CAAC;QAChC,OAAO,IAAI,UAAU,CAAC,IAAI,CAAC,CAAC;IAC9B,CAAC;IACD,IAAI,OAAO,MAAM,KAAK,WAAW,IAAI,MAAM,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,CAAC;QAC3D,OAAO,IAAI,UAAU,CAAC,IAAI,CAAC,MAAM,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,CAAC,UAAU,CAAC,CAAC;IACvE,CAAC;IACD,IAAI,OAAO,IAAI,KAAK,QAAQ,EAAE,CAAC;QAC7B,IAAI,GAAG,GAAG,IAAI,CAAC,IAAI,EAAE,CAAC;QAEtB,0DAA0D;QAC1D,IAAI,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;YAC5B,MAAM,UAAU,GAAG,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;YACpC,IAAI,UAAU,KAAK,CAAC,CAAC,EAAE,CAAC;gBACtB,GAAG,GAAG,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;YAC7C,CAAC;YACD,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;gBAClC,MAAM,GAAG,GAAG,MAAM,CAAC,IAAI,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;gBACvC,OAAO,IAAI,UAAU,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,UAAU,EAAE,GAAG,CAAC,MAAM,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,qCAAqC;QACrC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YAC1B,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;gBAClC,MAAM,GAAG,GAAG,MAAM,CAAC,IAAI,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;gBACvC,OAAO,IAAI,UAAU,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,UAAU,EAAE,GAAG,CAAC,MAAM,CAAC,CAAC;YAChE,CAAC;YACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;gBAC/B,MAAM,YAAY,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC;gBAC/B,MAAM,KAAK,GAAG,IAAI,UAAU,CAAC,YAAY,CAAC,MAAM,CAAC,CAAC;gBAClD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,YAAY,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;oBAC7C,KAAK,CAAC,CAAC,CAAC,GAAG,YAAY,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;gBACxC,CAAC;gBACD,OAAO,KAAK,CAAC;YACf,CAAC;QACH,CAAC;QAED,oDAAoD;QACpD,MAAM,UAAU,GAAG,QAAQ,IAAI,CAAC,QAAQ,CAAC,UAAU,CAAC,OAAO,CAAC,IAAI,QAAQ,KAAK,kBAAkB,IAAI,QAAQ,KAAK,iBAAiB,CAAC,CAAC;QACnI,IAAI,CAAC,UAAU,IAAI,QAAQ,KAAK,OAAO,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACjE,MAAM,eAAe,GAAG,4BAA4B,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,GAAG,CAAC,MAAM,GAAG,CAAC,IAAI,GAAG,CAAC,MAAM,GAAG,CAAC,KAAK,CAAC,CAAC;YACzG,IAAI,eAAe,EAAE,CAAC;gBACpB,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,IAAI,CAAC;wBACH,MAAM,GAAG,GAAG,MAAM,CAAC,IAAI,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;wBACvC,IAAI,GAAG,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;4BACnB,OAAO,IAAI,UAAU,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,UAAU,EAAE,GAAG,CAAC,MAAM,CAAC,CAAC;wBAChE,CAAC;oBACH,CAAC;oBAAC,MAAM,CAAC;wBACP,6BAA6B;oBAC/B,CAAC;gBACH,CAAC;YACH,CAAC;QACH,CAAC;QAED,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC;IACxC,CAAC;IACD,OAAO,IAAI,UAAU,EAAE,CAAC;AAC1B,CAAC;AAED,MAAM,OAAO,iBAAiB;IACpB,KAAK,GAAG,IAAI,GAAG,EAAsB,CAAC;IACtC,aAAa,CAAS;IAE9B,YAAY,UAA8D,EAAE;QAC1E,IAAI,CAAC,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,OAAO,CAAC,aAAa,IAAI,sBAAsB,CAAC;IAChG,CAAC;IAED,KAAK,CAAC,MAAM,CAAC,KAAsB;QACjC,MAAM,MAAM,GAAG,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,GAAG,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,QAAQ,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;QAC5D,MAAM,iBAAiB,GAAG,KAAK,CAAC,QAAQ,CAAC,OAAO,CAAC,kBAAkB,EAAE,GAAG,CAAC,CAAC;QAC1E,MAAM,UAAU,GAAG,GAAG,MAAM,GAAG,IAAI,CAAC,GAAG,EAAE,IAAI,QAAQ,IAAI,iBAAiB,EAAE,CAAC;QAE7E,MAAM,MAAM,GAAG,mBAAmB,CAAC,KAAK,CAAC,IAAI,EAAE,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC/E,MAAM,QAAQ,GAAG,KAAK,CAAC,QAAQ,IAAI,0BAA0B,CAAC;QAC9D,MAAM,SAAS,GAAG,MAAM,CAAC,UAAU,CAAC;QACpC,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,aAAa,IAAI,UAAU,EAAE,CAAC;QAElD,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,UAAU,EAAE;YACzB,UAAU;YACV,IAAI,EAAE,MAAM;YACZ,QAAQ;YACR,SAAS;YACT,GAAG;YACH,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC,CAAC;QAEH,OAAO;YACL,UAAU;YACV,GAAG;YACH,SAAS;YACT,QAAQ;SACT,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,MAAM,CAAC,UAAkB;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,UAAkB;QACrC,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,yBAAyB,UAAU,aAAa,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,IAAI,CAAC,GAAG,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,OAA4B;QACtD,MAAM,UAAU,GAAG,OAAO,CAAC,UAAU,CAAC;QACtC,MAAM,SAAS,GAAG,GAAG,IAAI,CAAC,aAAa,WAAW,kBAAkB,CAAC,UAAU,CAAC,EAAE,CAAC;QACnF,OAAO;YACL,SAAS;YACT,UAAU;YACV,MAAM,EAAE,KAAK;YACb,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,OAAO,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,EAAE;SAC5E,CAAC;IACJ,CAAC;IAED,OAAO,CAAC,UAAkB;QACxB,OAAO,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;IACpC,CAAC;IAED,KAAK;QACH,IAAI,CAAC,KAAK,CAAC,KAAK,EAAE,CAAC;IACrB,CAAC;CACF"}
1
+ {"version":3,"file":"file-storage.js","sourceRoot":"","sources":["../../src/storage/file-storage.ts"],"names":[],"mappings":"AAiBA,MAAM,UAAU,mBAAmB,CACjC,IAAiE,EACjE,QAAwC,EACxC,QAAiB;IAEjB,IAAI,IAAI,YAAY,UAAU,EAAE,CAAC;QAC/B,OAAO,IAAI,CAAC;IACd,CAAC;IACD,IAAI,IAAI,YAAY,WAAW,EAAE,CAAC;QAChC,OAAO,IAAI,UAAU,CAAC,IAAI,CAAC,CAAC;IAC9B,CAAC;IACD,IAAI,OAAO,MAAM,KAAK,WAAW,IAAI,MAAM,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,CAAC;QAC3D,OAAO,IAAI,UAAU,CAAC,IAAI,CAAC,MAAM,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,CAAC,UAAU,CAAC,CAAC;IACvE,CAAC;IACD,IAAI,OAAO,IAAI,KAAK,QAAQ,EAAE,CAAC;QAC7B,IAAI,GAAG,GAAG,IAAI,CAAC,IAAI,EAAE,CAAC;QAEtB,0DAA0D;QAC1D,IAAI,GAAG,CAAC,UAAU,CAAC,OAAO,CAAC,EAAE,CAAC;YAC5B,MAAM,UAAU,GAAG,GAAG,CAAC,OAAO,CAAC,GAAG,CAAC,CAAC;YACpC,IAAI,UAAU,KAAK,CAAC,CAAC,EAAE,CAAC;gBACtB,GAAG,GAAG,GAAG,CAAC,SAAS,CAAC,UAAU,GAAG,CAAC,CAAC,CAAC,IAAI,EAAE,CAAC;YAC7C,CAAC;YACD,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;gBAClC,MAAM,GAAG,GAAG,MAAM,CAAC,IAAI,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;gBACvC,OAAO,IAAI,UAAU,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,UAAU,EAAE,GAAG,CAAC,MAAM,CAAC,CAAC;YAChE,CAAC;QACH,CAAC;QAED,qCAAqC;QACrC,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YAC1B,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;gBAClC,MAAM,GAAG,GAAG,MAAM,CAAC,IAAI,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;gBACvC,OAAO,IAAI,UAAU,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,UAAU,EAAE,GAAG,CAAC,MAAM,CAAC,CAAC;YAChE,CAAC;YACD,IAAI,OAAO,IAAI,KAAK,UAAU,EAAE,CAAC;gBAC/B,MAAM,YAAY,GAAG,IAAI,CAAC,GAAG,CAAC,CAAC;gBAC/B,MAAM,KAAK,GAAG,IAAI,UAAU,CAAC,YAAY,CAAC,MAAM,CAAC,CAAC;gBAClD,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,YAAY,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;oBAC7C,KAAK,CAAC,CAAC,CAAC,GAAG,YAAY,CAAC,UAAU,CAAC,CAAC,CAAC,CAAC;gBACxC,CAAC;gBACD,OAAO,KAAK,CAAC;YACf,CAAC;QACH,CAAC;QAED,oDAAoD;QACpD,MAAM,UAAU,GAAG,QAAQ,IAAI,CAAC,QAAQ,CAAC,UAAU,CAAC,OAAO,CAAC,IAAI,QAAQ,KAAK,kBAAkB,IAAI,QAAQ,KAAK,iBAAiB,CAAC,CAAC;QACnI,IAAI,CAAC,UAAU,IAAI,QAAQ,KAAK,OAAO,IAAI,QAAQ,KAAK,QAAQ,EAAE,CAAC;YACjE,MAAM,eAAe,GAAG,4BAA4B,CAAC,IAAI,CAAC,GAAG,CAAC,IAAI,GAAG,CAAC,MAAM,GAAG,CAAC,IAAI,GAAG,CAAC,MAAM,GAAG,CAAC,KAAK,CAAC,CAAC;YACzG,IAAI,eAAe,EAAE,CAAC;gBACpB,IAAI,OAAO,MAAM,KAAK,WAAW,EAAE,CAAC;oBAClC,IAAI,CAAC;wBACH,MAAM,GAAG,GAAG,MAAM,CAAC,IAAI,CAAC,GAAG,EAAE,QAAQ,CAAC,CAAC;wBACvC,IAAI,GAAG,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;4BACnB,OAAO,IAAI,UAAU,CAAC,GAAG,CAAC,MAAM,EAAE,GAAG,CAAC,UAAU,EAAE,GAAG,CAAC,MAAM,CAAC,CAAC;wBAChE,CAAC;oBACH,CAAC;oBAAC,MAAM,CAAC;wBACP,6BAA6B;oBAC/B,CAAC;gBACH,CAAC;YACH,CAAC;QACH,CAAC;QAED,OAAO,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC;IACxC,CAAC;IACD,OAAO,IAAI,UAAU,EAAE,CAAC;AAC1B,CAAC;AAED,MAAM,OAAO,iBAAiB;IACpB,KAAK,GAAG,IAAI,GAAG,EAAsB,CAAC;IACtC,aAAa,CAAS;IAE9B,YAAY,UAA8D,EAAE;QAC1E,IAAI,CAAC,aAAa,GAAG,OAAO,CAAC,aAAa,IAAI,OAAO,CAAC,aAAa,IAAI,sBAAsB,CAAC;IAChG,CAAC;IAED,KAAK,CAAC,MAAM,CAAC,KAAsB;QACjC,MAAM,MAAM,GAAG,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,GAAG,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,QAAQ,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;QAC5D,MAAM,iBAAiB,GAAG,KAAK,CAAC,QAAQ,CAAC,OAAO,CAAC,kBAAkB,EAAE,GAAG,CAAC,CAAC;QAC1E,MAAM,UAAU,GAAG,GAAG,MAAM,GAAG,IAAI,CAAC,GAAG,EAAE,IAAI,QAAQ,IAAI,iBAAiB,EAAE,CAAC;QAE7E,MAAM,MAAM,GAAG,mBAAmB,CAAC,KAAK,CAAC,IAAI,EAAE,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC/E,MAAM,QAAQ,GAAG,KAAK,CAAC,QAAQ,IAAI,0BAA0B,CAAC;QAC9D,MAAM,SAAS,GAAG,MAAM,CAAC,UAAU,CAAC;QACpC,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,aAAa,IAAI,UAAU,EAAE,CAAC;QAElD,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,UAAU,EAAE;YACzB,UAAU;YACV,IAAI,EAAE,MAAM;YACZ,QAAQ;YACR,SAAS;YACT,GAAG;YACH,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC,CAAC;QAEH,OAAO;YACL,UAAU;YACV,GAAG;YACH,SAAS;YACT,QAAQ;SACT,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,MAAM,CAAC,UAAkB;QAC7B,OAAO,IAAI,CAAC,KAAK,CAAC,MAAM,CAAC,UAAU,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,QAAQ,CAAC,UAAkB;QAC/B,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,yBAAyB,UAAU,aAAa,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,IAAI,CAAC,IAAI,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,UAAkB;QACrC,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,yBAAyB,UAAU,aAAa,CAAC,CAAC;QACpE,CAAC;QACD,OAAO,IAAI,CAAC,GAAG,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,OAA4B;QACtD,MAAM,UAAU,GAAG,OAAO,CAAC,UAAU,CAAC;QACtC,MAAM,SAAS,GAAG,GAAG,IAAI,CAAC,aAAa,WAAW,kBAAkB,CAAC,UAAU,CAAC,EAAE,CAAC;QACnF,OAAO;YACL,SAAS;YACT,UAAU;YACV,MAAM,EAAE,KAAK;YACb,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,OAAO,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,EAAE;SAC5E,CAAC;IACJ,CAAC;IAED,OAAO,CAAC,UAAkB;QACxB,OAAO,IAAI,CAAC,KAAK,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;IACpC,CAAC;IAED,KAAK;QACH,IAAI,CAAC,KAAK,CAAC,KAAK,EAAE,CAAC;IACrB,CAAC;CACF"}
@@ -25,6 +25,7 @@ export declare class InMemoryFirebaseStorageMock implements FirebaseStorageBucke
25
25
  file(path: string): {
26
26
  save(data: Uint8Array | Buffer | string, options?: any): Promise<void>;
27
27
  delete(): Promise<void>;
28
+ download(): Promise<[Uint8Array]>;
28
29
  getMetadata(): Promise<[any]>;
29
30
  getSignedUrl(config: any): Promise<[string]>;
30
31
  publicUrl(): string;
@@ -43,6 +44,7 @@ export declare class FirebaseStorageAdapter implements FileStorageAdapter {
43
44
  private getPublicUrl;
44
45
  upload(input: UploadFileInput): Promise<UploadFileResult>;
45
46
  delete(storageKey: string): Promise<boolean>;
47
+ download(storageKey: string): Promise<Buffer | Uint8Array>;
46
48
  getDownloadUrl(storageKey: string): Promise<string>;
47
49
  getPresignedUploadUrl(options: PresignedUrlOptions): Promise<PresignedUploadResult>;
48
50
  }
@@ -1 +1 @@
1
- {"version":3,"file":"firebase-storage.d.ts","sourceRoot":"","sources":["../../src/storage/firebase-storage.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,eAAe,EACf,gBAAgB,EAChB,mBAAmB,EACnB,qBAAqB,EACtB,MAAM,mBAAmB,CAAC;AAG3B,MAAM,WAAW,8BAA8B;IAC7C,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,IAAI,EAAE,MAAM,GAAG;QAClB,IAAI,CACF,IAAI,EAAE,UAAU,GAAG,MAAM,GAAG,MAAM,EAClC,OAAO,CAAC,EAAE;YAAE,QAAQ,CAAC,EAAE;gBAAE,WAAW,CAAC,EAAE,MAAM,CAAC;gBAAC,CAAC,GAAG,EAAE,MAAM,GAAG,GAAG,CAAA;aAAE,CAAC;YAAC,SAAS,CAAC,EAAE,OAAO,CAAA;SAAE,GACzF,OAAO,CAAC,IAAI,CAAC,CAAC;QACjB,MAAM,CAAC,OAAO,CAAC,EAAE,GAAG,GAAG,OAAO,CAAC,GAAG,CAAC,CAAC;QACpC,YAAY,CAAC,CAAC,MAAM,EAAE;YAAE,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC;YAAC,OAAO,EAAE,MAAM,GAAG,MAAM,GAAG,IAAI,CAAC;YAAC,WAAW,CAAC,EAAE,MAAM,CAAA;SAAE,GAAG,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QAC9H,SAAS,CAAC,IAAI,MAAM,CAAC;KACtB,CAAC;CACH;AAED,qBAAa,2BAA4B,YAAW,8BAA8B;IAChF,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,CAAC,KAAK,CAAgF;gBAEjF,IAAI,GAAE,MAA+B;IAIjD,IAAI,CAAC,IAAI,EAAE,MAAM;mBAII,UAAU,GAAG,MAAM,GAAG,MAAM,YAAY,GAAG;;uBAoBvC,OAAO,CAAC,CAAC,GAAG,CAAC,CAAC;6BASR,GAAG,GAAG,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC;;;CAUvD;AAED,MAAM,WAAW,qBAAqB;IACpC,MAAM,CAAC,EAAE,8BAA8B,CAAC;IACxC,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,CAAC;CACxB;AAED,qBAAa,sBAAuB,YAAW,kBAAkB;IAC/D,OAAO,CAAC,MAAM,CAAiC;IAC/C,OAAO,CAAC,UAAU,CAAS;IAC3B,OAAO,CAAC,aAAa,CAAC,CAAS;gBAEnB,MAAM,GAAE,qBAA0B;IAS9C,OAAO,CAAC,YAAY;IAQd,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC;IAmCzD,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAU5C,cAAc,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAcnD,qBAAqB,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;CA6B1F"}
1
+ {"version":3,"file":"firebase-storage.d.ts","sourceRoot":"","sources":["../../src/storage/firebase-storage.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,eAAe,EACf,gBAAgB,EAChB,mBAAmB,EACnB,qBAAqB,EACtB,MAAM,mBAAmB,CAAC;AAG3B,MAAM,WAAW,8BAA8B;IAC7C,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,IAAI,EAAE,MAAM,GAAG;QAClB,IAAI,CACF,IAAI,EAAE,UAAU,GAAG,MAAM,GAAG,MAAM,EAClC,OAAO,CAAC,EAAE;YAAE,QAAQ,CAAC,EAAE;gBAAE,WAAW,CAAC,EAAE,MAAM,CAAC;gBAAC,CAAC,GAAG,EAAE,MAAM,GAAG,GAAG,CAAA;aAAE,CAAC;YAAC,SAAS,CAAC,EAAE,OAAO,CAAA;SAAE,GACzF,OAAO,CAAC,IAAI,CAAC,CAAC;QACjB,MAAM,CAAC,OAAO,CAAC,EAAE,GAAG,GAAG,OAAO,CAAC,GAAG,CAAC,CAAC;QACpC,YAAY,CAAC,CAAC,MAAM,EAAE;YAAE,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC;YAAC,OAAO,EAAE,MAAM,GAAG,MAAM,GAAG,IAAI,CAAC;YAAC,WAAW,CAAC,EAAE,MAAM,CAAA;SAAE,GAAG,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QAC9H,SAAS,CAAC,IAAI,MAAM,CAAC;KACtB,CAAC;CACH;AAED,qBAAa,2BAA4B,YAAW,8BAA8B;IAChF,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,CAAC,KAAK,CAAgF;gBAEjF,IAAI,GAAE,MAA+B;IAIjD,IAAI,CAAC,IAAI,EAAE,MAAM;mBAII,UAAU,GAAG,MAAM,GAAG,MAAM,YAAY,GAAG;;oBAoB1C,OAAO,CAAC,CAAC,UAAU,CAAC,CAAC;uBAKlB,OAAO,CAAC,CAAC,GAAG,CAAC,CAAC;6BASR,GAAG,GAAG,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC;;;CAUvD;AAED,MAAM,WAAW,qBAAqB;IACpC,MAAM,CAAC,EAAE,8BAA8B,CAAC;IACxC,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,aAAa,CAAC,EAAE,MAAM,CAAC;CACxB;AAED,qBAAa,sBAAuB,YAAW,kBAAkB;IAC/D,OAAO,CAAC,MAAM,CAAiC;IAC/C,OAAO,CAAC,UAAU,CAAS;IAC3B,OAAO,CAAC,aAAa,CAAC,CAAS;gBAEnB,MAAM,GAAE,qBAA0B;IAS9C,OAAO,CAAC,YAAY;IAQd,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC;IAmCzD,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAU5C,QAAQ,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,UAAU,CAAC;IAe1D,cAAc,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC;IAcnD,qBAAqB,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;CA6B1F"}
@@ -32,6 +32,12 @@ export class InMemoryFirebaseStorageMock {
32
32
  async delete() {
33
33
  files.delete(path);
34
34
  },
35
+ async download() {
36
+ const file = files.get(path);
37
+ if (!file)
38
+ throw new Error(`File not found: ${path}`);
39
+ return [file.data];
40
+ },
35
41
  async getMetadata() {
36
42
  const file = files.get(path);
37
43
  return [{
@@ -110,6 +116,20 @@ export class FirebaseStorageAdapter {
110
116
  return false;
111
117
  }
112
118
  }
119
+ async download(storageKey) {
120
+ const fileRef = this.bucket.file(storageKey);
121
+ if (typeof fileRef.download === 'function') {
122
+ const [buf] = await fileRef.download();
123
+ return buf;
124
+ }
125
+ const url = await this.getDownloadUrl(storageKey);
126
+ const res = await fetch(url);
127
+ if (!res.ok) {
128
+ throw new Error(`Failed to download file from "${url}": ${res.statusText}`);
129
+ }
130
+ const arrayBuffer = await res.arrayBuffer();
131
+ return new Uint8Array(arrayBuffer);
132
+ }
113
133
  async getDownloadUrl(storageKey) {
114
134
  const fileRef = this.bucket.file(storageKey);
115
135
  if (typeof fileRef.getMetadata === 'function') {
@@ -1 +1 @@
1
- {"version":3,"file":"firebase-storage.js","sourceRoot":"","sources":["../../src/storage/firebase-storage.ts"],"names":[],"mappings":"AAOA,OAAO,EAAE,mBAAmB,EAAE,MAAM,mBAAmB,CAAC;AAexD,MAAM,OAAO,2BAA2B;IACtC,IAAI,CAAS;IACL,KAAK,GAAG,IAAI,GAAG,EAAqE,CAAC;IAE7F,YAAY,OAAe,sBAAsB;QAC/C,IAAI,CAAC,IAAI,GAAG,IAAI,CAAC;IACnB,CAAC;IAED,IAAI,CAAC,IAAY;QACf,MAAM,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,IAAI,CAAC;QAC7B,OAAO;YACL,KAAK,CAAC,IAAI,CAAC,IAAkC,EAAE,OAAa;gBAC1D,IAAI,KAAiB,CAAC;gBACtB,IAAI,OAAO,IAAI,KAAK,QAAQ,EAAE,CAAC;oBAC7B,KAAK,GAAG,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC;gBACzC,CAAC;qBAAM,IAAI,IAAI,YAAY,UAAU,EAAE,CAAC;oBACtC,KAAK,GAAG,IAAI,CAAC;gBACf,CAAC;qBAAM,IAAI,OAAO,MAAM,KAAK,WAAW,IAAI,MAAM,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,CAAC;oBAClE,KAAK,GAAG,IAAI,UAAU,CAAC,IAAI,CAAC,CAAC;gBAC/B,CAAC;qBAAM,CAAC;oBACN,KAAK,GAAG,IAAI,UAAU,EAAE,CAAC;gBAC3B,CAAC;gBACD,KAAK,CAAC,GAAG,CAAC,IAAI,EAAE;oBACd,IAAI,EAAE,KAAK;oBACX,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,WAAW,IAAI,0BAA0B;oBACzE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,6BAA6B;iBAClE,CAAC,CAAC;YACL,CAAC;YACD,KAAK,CAAC,MAAM;gBACV,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC;YACrB,CAAC;YACD,KAAK,CAAC,WAAW;gBACf,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;gBAC7B,OAAO,CAAC;wBACN,WAAW,EAAE,IAAI,EAAE,WAAW;wBAC9B,QAAQ,EAAE;4BACR,6BAA6B,EAAE,IAAI,EAAE,KAAK;yBAC3C;qBACF,CAAC,CAAC;YACL,CAAC;YACD,KAAK,CAAC,YAAY,CAAC,MAAW;gBAC5B,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;gBAC7B,MAAM,KAAK,GAAG,IAAI,EAAE,KAAK,IAAI,mBAAmB,CAAC;gBACjD,OAAO,CAAC,+CAA+C,kBAAkB,CAAC,UAAU,CAAC,MAAM,kBAAkB,CAAC,IAAI,CAAC,oBAAoB,KAAK,EAAE,CAAC,CAAC;YAClJ,CAAC;YACD,SAAS;gBACP,OAAO,+CAA+C,kBAAkB,CAAC,UAAU,CAAC,MAAM,kBAAkB,CAAC,IAAI,CAAC,YAAY,CAAC;YACjI,CAAC;SACF,CAAC;IACJ,CAAC;CACF;AAQD,MAAM,OAAO,sBAAsB;IACzB,MAAM,CAAiC;IACvC,UAAU,CAAS;IACnB,aAAa,CAAU;IAE/B,YAAY,SAAgC,EAAE;QAC5C,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC,MAAM,IAAI,IAAI,2BAA2B,CAAC,MAAM,CAAC,UAAU,IAAI,gBAAgB,CAAC,CAAC;QACtG,IAAI,CAAC,UAAU,GAAG,MAAM,CAAC,UAAU,IAAI,IAAI,CAAC,MAAM,CAAC,IAAI,IAAI,gBAAgB,CAAC;QAC5E,IAAI,IAAI,CAAC,MAAM,IAAI,MAAM,CAAC,UAAU,IAAI,IAAI,CAAC,MAAM,CAAC,IAAI,KAAK,MAAM,CAAC,UAAU,EAAE,CAAC;YAC/E,IAAI,CAAC,MAAM,CAAC,IAAI,GAAG,MAAM,CAAC,UAAU,CAAC;QACvC,CAAC;QACD,IAAI,CAAC,aAAa,GAAG,MAAM,CAAC,aAAa,EAAE,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IACjE,CAAC;IAEO,YAAY,CAAC,UAAkB,EAAE,KAAc;QACrD,IAAI,IAAI,CAAC,aAAa,EAAE,CAAC;YACvB,OAAO,GAAG,IAAI,CAAC,aAAa,IAAI,kBAAkB,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,GAAG,CAAC,EAAE,CAAC;QACxF,CAAC;QACD,MAAM,UAAU,GAAG,KAAK,CAAC,CAAC,CAAC,UAAU,kBAAkB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACtE,OAAO,+CAA+C,kBAAkB,CAAC,IAAI,CAAC,UAAU,CAAC,MAAM,kBAAkB,CAAC,UAAU,CAAC,aAAa,UAAU,EAAE,CAAC;IACzJ,CAAC;IAED,KAAK,CAAC,MAAM,CAAC,KAAsB;QACjC,MAAM,MAAM,GAAG,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,GAAG,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,QAAQ,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;QAC5D,MAAM,iBAAiB,GAAG,KAAK,CAAC,QAAQ,CAAC,OAAO,CAAC,kBAAkB,EAAE,GAAG,CAAC,CAAC;QAC1E,MAAM,UAAU,GAAG,GAAG,MAAM,GAAG,IAAI,CAAC,GAAG,EAAE,IAAI,QAAQ,IAAI,iBAAiB,EAAE,CAAC;QAE7E,MAAM,QAAQ,GAAG,mBAAmB,CAAC,KAAK,CAAC,IAAI,EAAE,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,QAAQ,CAAC,CAAC;QACjF,MAAM,QAAQ,GAAG,KAAK,CAAC,QAAQ,IAAI,0BAA0B,CAAC;QAC9D,MAAM,SAAS,GAAG,QAAQ,CAAC,UAAU,CAAC;QACtC,MAAM,aAAa,GACjB,OAAO,MAAM,KAAK,WAAW,IAAI,OAAO,MAAM,CAAC,UAAU,KAAK,UAAU;YACtE,CAAC,CAAC,MAAM,CAAC,UAAU,EAAE;YACrB,CAAC,CAAC,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,EAAE,CAAC,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QAEhG,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QAC7C,MAAM,OAAO,CAAC,IAAI,CAAC,QAAQ,EAAE;YAC3B,QAAQ,EAAE;gBACR,WAAW,EAAE,QAAQ;gBACrB,QAAQ,EAAE;oBACR,6BAA6B,EAAE,aAAa;iBAC7C;aACF;YACD,SAAS,EAAE,KAAK;SACjB,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,IAAI,CAAC,YAAY,CAAC,UAAU,EAAE,aAAa,CAAC,CAAC;QAEzD,OAAO;YACL,UAAU;YACV,GAAG;YACH,SAAS;YACT,QAAQ;SACT,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,MAAM,CAAC,UAAkB;QAC7B,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;YAC7C,MAAM,OAAO,CAAC,MAAM,EAAE,CAAC;YACvB,OAAO,IAAI,CAAC;QACd,CAAC;QAAC,MAAM,CAAC;YACP,OAAO,KAAK,CAAC;QACf,CAAC;IACH,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,UAAkB;QACrC,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QAC7C,IAAI,OAAQ,OAAe,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACvD,IAAI,CAAC;gBACH,MAAM,CAAC,IAAI,CAAC,GAAG,MAAO,OAAe,CAAC,WAAW,EAAE,CAAC;gBACpD,MAAM,KAAK,GAAG,IAAI,EAAE,QAAQ,EAAE,6BAA6B,CAAC;gBAC5D,OAAO,IAAI,CAAC,YAAY,CAAC,UAAU,EAAE,KAAK,CAAC,CAAC;YAC9C,CAAC;YAAC,MAAM,CAAC;gBACP,uCAAuC;YACzC,CAAC;QACH,CAAC;QACD,OAAO,IAAI,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,OAA4B;QACtD,MAAM,UAAU,GAAG,OAAO,CAAC,UAAU,CAAC;QACtC,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QAE7C,IAAI,OAAO,OAAO,CAAC,YAAY,KAAK,UAAU,EAAE,CAAC;YAC/C,MAAM,WAAW,GAAG,CAAC,OAAO,CAAC,gBAAgB,IAAI,GAAG,CAAC,GAAG,IAAI,CAAC;YAC7D,MAAM,OAAO,GAAG,IAAI,CAAC,GAAG,EAAE,GAAG,WAAW,CAAC;YACzC,MAAM,CAAC,GAAG,CAAC,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC;gBACvC,MAAM,EAAE,OAAO;gBACf,OAAO;gBACP,WAAW,EAAE,OAAO,CAAC,WAAW;aACjC,CAAC,CAAC;YAEH,OAAO;gBACL,SAAS,EAAE,GAAG;gBACd,UAAU;gBACV,MAAM,EAAE,KAAK;gBACb,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,OAAO,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,EAAE;aAC5E,CAAC;QACJ,CAAC;QAED,uCAAuC;QACvC,OAAO;YACL,SAAS,EAAE,IAAI,CAAC,YAAY,CAAC,UAAU,CAAC;YACxC,UAAU;YACV,MAAM,EAAE,KAAK;YACb,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,OAAO,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,EAAE;SAC5E,CAAC;IACJ,CAAC;CACF"}
1
+ {"version":3,"file":"firebase-storage.js","sourceRoot":"","sources":["../../src/storage/firebase-storage.ts"],"names":[],"mappings":"AAOA,OAAO,EAAE,mBAAmB,EAAE,MAAM,mBAAmB,CAAC;AAexD,MAAM,OAAO,2BAA2B;IACtC,IAAI,CAAS;IACL,KAAK,GAAG,IAAI,GAAG,EAAqE,CAAC;IAE7F,YAAY,OAAe,sBAAsB;QAC/C,IAAI,CAAC,IAAI,GAAG,IAAI,CAAC;IACnB,CAAC;IAED,IAAI,CAAC,IAAY;QACf,MAAM,KAAK,GAAG,IAAI,CAAC,KAAK,CAAC;QACzB,MAAM,UAAU,GAAG,IAAI,CAAC,IAAI,CAAC;QAC7B,OAAO;YACL,KAAK,CAAC,IAAI,CAAC,IAAkC,EAAE,OAAa;gBAC1D,IAAI,KAAiB,CAAC;gBACtB,IAAI,OAAO,IAAI,KAAK,QAAQ,EAAE,CAAC;oBAC7B,KAAK,GAAG,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC;gBACzC,CAAC;qBAAM,IAAI,IAAI,YAAY,UAAU,EAAE,CAAC;oBACtC,KAAK,GAAG,IAAI,CAAC;gBACf,CAAC;qBAAM,IAAI,OAAO,MAAM,KAAK,WAAW,IAAI,MAAM,CAAC,QAAQ,CAAC,IAAI,CAAC,EAAE,CAAC;oBAClE,KAAK,GAAG,IAAI,UAAU,CAAC,IAAI,CAAC,CAAC;gBAC/B,CAAC;qBAAM,CAAC;oBACN,KAAK,GAAG,IAAI,UAAU,EAAE,CAAC;gBAC3B,CAAC;gBACD,KAAK,CAAC,GAAG,CAAC,IAAI,EAAE;oBACd,IAAI,EAAE,KAAK;oBACX,WAAW,EAAE,OAAO,EAAE,QAAQ,EAAE,WAAW,IAAI,0BAA0B;oBACzE,KAAK,EAAE,OAAO,EAAE,QAAQ,EAAE,QAAQ,EAAE,6BAA6B;iBAClE,CAAC,CAAC;YACL,CAAC;YACD,KAAK,CAAC,MAAM;gBACV,KAAK,CAAC,MAAM,CAAC,IAAI,CAAC,CAAC;YACrB,CAAC;YACD,KAAK,CAAC,QAAQ;gBACZ,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;gBAC7B,IAAI,CAAC,IAAI;oBAAE,MAAM,IAAI,KAAK,CAAC,mBAAmB,IAAI,EAAE,CAAC,CAAC;gBACtD,OAAO,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YACrB,CAAC;YACD,KAAK,CAAC,WAAW;gBACf,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;gBAC7B,OAAO,CAAC;wBACN,WAAW,EAAE,IAAI,EAAE,WAAW;wBAC9B,QAAQ,EAAE;4BACR,6BAA6B,EAAE,IAAI,EAAE,KAAK;yBAC3C;qBACF,CAAC,CAAC;YACL,CAAC;YACD,KAAK,CAAC,YAAY,CAAC,MAAW;gBAC5B,MAAM,IAAI,GAAG,KAAK,CAAC,GAAG,CAAC,IAAI,CAAC,CAAC;gBAC7B,MAAM,KAAK,GAAG,IAAI,EAAE,KAAK,IAAI,mBAAmB,CAAC;gBACjD,OAAO,CAAC,+CAA+C,kBAAkB,CAAC,UAAU,CAAC,MAAM,kBAAkB,CAAC,IAAI,CAAC,oBAAoB,KAAK,EAAE,CAAC,CAAC;YAClJ,CAAC;YACD,SAAS;gBACP,OAAO,+CAA+C,kBAAkB,CAAC,UAAU,CAAC,MAAM,kBAAkB,CAAC,IAAI,CAAC,YAAY,CAAC;YACjI,CAAC;SACF,CAAC;IACJ,CAAC;CACF;AAQD,MAAM,OAAO,sBAAsB;IACzB,MAAM,CAAiC;IACvC,UAAU,CAAS;IACnB,aAAa,CAAU;IAE/B,YAAY,SAAgC,EAAE;QAC5C,IAAI,CAAC,MAAM,GAAG,MAAM,CAAC,MAAM,IAAI,IAAI,2BAA2B,CAAC,MAAM,CAAC,UAAU,IAAI,gBAAgB,CAAC,CAAC;QACtG,IAAI,CAAC,UAAU,GAAG,MAAM,CAAC,UAAU,IAAI,IAAI,CAAC,MAAM,CAAC,IAAI,IAAI,gBAAgB,CAAC;QAC5E,IAAI,IAAI,CAAC,MAAM,IAAI,MAAM,CAAC,UAAU,IAAI,IAAI,CAAC,MAAM,CAAC,IAAI,KAAK,MAAM,CAAC,UAAU,EAAE,CAAC;YAC/E,IAAI,CAAC,MAAM,CAAC,IAAI,GAAG,MAAM,CAAC,UAAU,CAAC;QACvC,CAAC;QACD,IAAI,CAAC,aAAa,GAAG,MAAM,CAAC,aAAa,EAAE,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;IACjE,CAAC;IAEO,YAAY,CAAC,UAAkB,EAAE,KAAc;QACrD,IAAI,IAAI,CAAC,aAAa,EAAE,CAAC;YACvB,OAAO,GAAG,IAAI,CAAC,aAAa,IAAI,kBAAkB,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,MAAM,EAAE,GAAG,CAAC,EAAE,CAAC;QACxF,CAAC;QACD,MAAM,UAAU,GAAG,KAAK,CAAC,CAAC,CAAC,UAAU,kBAAkB,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACtE,OAAO,+CAA+C,kBAAkB,CAAC,IAAI,CAAC,UAAU,CAAC,MAAM,kBAAkB,CAAC,UAAU,CAAC,aAAa,UAAU,EAAE,CAAC;IACzJ,CAAC;IAED,KAAK,CAAC,MAAM,CAAC,KAAsB;QACjC,MAAM,MAAM,GAAG,KAAK,CAAC,UAAU,CAAC,CAAC,CAAC,GAAG,KAAK,CAAC,UAAU,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,CAAC;QAClF,MAAM,QAAQ,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,CAAC;QAC5D,MAAM,iBAAiB,GAAG,KAAK,CAAC,QAAQ,CAAC,OAAO,CAAC,kBAAkB,EAAE,GAAG,CAAC,CAAC;QAC1E,MAAM,UAAU,GAAG,GAAG,MAAM,GAAG,IAAI,CAAC,GAAG,EAAE,IAAI,QAAQ,IAAI,iBAAiB,EAAE,CAAC;QAE7E,MAAM,QAAQ,GAAG,mBAAmB,CAAC,KAAK,CAAC,IAAI,EAAE,KAAK,CAAC,QAAQ,EAAE,KAAK,CAAC,QAAQ,CAAC,CAAC;QACjF,MAAM,QAAQ,GAAG,KAAK,CAAC,QAAQ,IAAI,0BAA0B,CAAC;QAC9D,MAAM,SAAS,GAAG,QAAQ,CAAC,UAAU,CAAC;QACtC,MAAM,aAAa,GACjB,OAAO,MAAM,KAAK,WAAW,IAAI,OAAO,MAAM,CAAC,UAAU,KAAK,UAAU;YACtE,CAAC,CAAC,MAAM,CAAC,UAAU,EAAE;YACrB,CAAC,CAAC,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,EAAE,CAAC,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC;QAEhG,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QAC7C,MAAM,OAAO,CAAC,IAAI,CAAC,QAAQ,EAAE;YAC3B,QAAQ,EAAE;gBACR,WAAW,EAAE,QAAQ;gBACrB,QAAQ,EAAE;oBACR,6BAA6B,EAAE,aAAa;iBAC7C;aACF;YACD,SAAS,EAAE,KAAK;SACjB,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,IAAI,CAAC,YAAY,CAAC,UAAU,EAAE,aAAa,CAAC,CAAC;QAEzD,OAAO;YACL,UAAU;YACV,GAAG;YACH,SAAS;YACT,QAAQ;SACT,CAAC;IACJ,CAAC;IAED,KAAK,CAAC,MAAM,CAAC,UAAkB;QAC7B,IAAI,CAAC;YACH,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;YAC7C,MAAM,OAAO,CAAC,MAAM,EAAE,CAAC;YACvB,OAAO,IAAI,CAAC;QACd,CAAC;QAAC,MAAM,CAAC;YACP,OAAO,KAAK,CAAC;QACf,CAAC;IACH,CAAC;IAED,KAAK,CAAC,QAAQ,CAAC,UAAkB;QAC/B,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QAC7C,IAAI,OAAQ,OAAe,CAAC,QAAQ,KAAK,UAAU,EAAE,CAAC;YACpD,MAAM,CAAC,GAAG,CAAC,GAAG,MAAO,OAAe,CAAC,QAAQ,EAAE,CAAC;YAChD,OAAO,GAAG,CAAC;QACb,CAAC;QACD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,cAAc,CAAC,UAAU,CAAC,CAAC;QAClD,MAAM,GAAG,GAAG,MAAM,KAAK,CAAC,GAAG,CAAC,CAAC;QAC7B,IAAI,CAAC,GAAG,CAAC,EAAE,EAAE,CAAC;YACZ,MAAM,IAAI,KAAK,CAAC,iCAAiC,GAAG,MAAM,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;QAC9E,CAAC;QACD,MAAM,WAAW,GAAG,MAAM,GAAG,CAAC,WAAW,EAAE,CAAC;QAC5C,OAAO,IAAI,UAAU,CAAC,WAAW,CAAC,CAAC;IACrC,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,UAAkB;QACrC,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QAC7C,IAAI,OAAQ,OAAe,CAAC,WAAW,KAAK,UAAU,EAAE,CAAC;YACvD,IAAI,CAAC;gBACH,MAAM,CAAC,IAAI,CAAC,GAAG,MAAO,OAAe,CAAC,WAAW,EAAE,CAAC;gBACpD,MAAM,KAAK,GAAG,IAAI,EAAE,QAAQ,EAAE,6BAA6B,CAAC;gBAC5D,OAAO,IAAI,CAAC,YAAY,CAAC,UAAU,EAAE,KAAK,CAAC,CAAC;YAC9C,CAAC;YAAC,MAAM,CAAC;gBACP,uCAAuC;YACzC,CAAC;QACH,CAAC;QACD,OAAO,IAAI,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;IACvC,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,OAA4B;QACtD,MAAM,UAAU,GAAG,OAAO,CAAC,UAAU,CAAC;QACtC,MAAM,OAAO,GAAG,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC;QAE7C,IAAI,OAAO,OAAO,CAAC,YAAY,KAAK,UAAU,EAAE,CAAC;YAC/C,MAAM,WAAW,GAAG,CAAC,OAAO,CAAC,gBAAgB,IAAI,GAAG,CAAC,GAAG,IAAI,CAAC;YAC7D,MAAM,OAAO,GAAG,IAAI,CAAC,GAAG,EAAE,GAAG,WAAW,CAAC;YACzC,MAAM,CAAC,GAAG,CAAC,GAAG,MAAM,OAAO,CAAC,YAAY,CAAC;gBACvC,MAAM,EAAE,OAAO;gBACf,OAAO;gBACP,WAAW,EAAE,OAAO,CAAC,WAAW;aACjC,CAAC,CAAC;YAEH,OAAO;gBACL,SAAS,EAAE,GAAG;gBACd,UAAU;gBACV,MAAM,EAAE,KAAK;gBACb,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,OAAO,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,EAAE;aAC5E,CAAC;QACJ,CAAC;QAED,uCAAuC;QACvC,OAAO;YACL,SAAS,EAAE,IAAI,CAAC,YAAY,CAAC,UAAU,CAAC;YACxC,UAAU;YACV,MAAM,EAAE,KAAK;YACb,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC,CAAC,EAAE,cAAc,EAAE,OAAO,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,EAAE;SAC5E,CAAC;IACJ,CAAC;CACF"}
@@ -138,6 +138,38 @@ describe('Storage Adapters', () => {
138
138
  expect(storedUri?.sizeBytes).toBe(Buffer.from(rawText).length);
139
139
  expect(new TextDecoder().decode(storedUri?.data)).toBe(rawText);
140
140
  });
141
+ it('downloads file bytes and reads text content from attachments via engine', async () => {
142
+ const mockStorage = new InMemoryFirebaseStorageMock();
143
+ const storageAdapter = new FirebaseStorageAdapter({ bucket: mockStorage, bucketName: 'test-bucket' });
144
+ const engine = new CriticalPathEngine({ fileStorage: storageAdapter });
145
+ const project = await engine.createProject({ name: 'Attachment Reading Test' });
146
+ const task = await engine.createTask({ projectId: project.id, title: 'Document Task' });
147
+ const planMarkdown = '# Project Roadmap\n\nPhase 1: Research\nPhase 2: Execution';
148
+ const attachment = await engine.uploadAttachmentFile({
149
+ filename: 'Roadmap.md',
150
+ data: planMarkdown,
151
+ mimeType: 'text/markdown',
152
+ taskId: task.id,
153
+ projectId: project.id,
154
+ uploaderId: 'agent_planner',
155
+ uploaderType: 'agent',
156
+ artifactType: 'plan'
157
+ });
158
+ expect(attachment.id).toBeDefined();
159
+ expect(attachment.artifactType).toBe('plan');
160
+ // Test download method on adapter
161
+ const downloadedBytes = await storageAdapter.download(attachment.storageKey);
162
+ expect(new TextDecoder().decode(downloadedBytes)).toBe(planMarkdown);
163
+ // Test engine readAttachmentText
164
+ const readText = await engine.readAttachmentText(attachment.id);
165
+ expect(readText).toBe(planMarkdown);
166
+ // Test filtering by artifactType
167
+ const planAttachments = await engine.getAttachments({ taskId: task.id, artifactType: 'plan' });
168
+ expect(planAttachments.length).toBe(1);
169
+ expect(planAttachments[0].id).toBe(attachment.id);
170
+ const reviewAttachments = await engine.getAttachments({ taskId: task.id, artifactType: 'review' });
171
+ expect(reviewAttachments.length).toBe(0);
172
+ });
141
173
  });
142
174
  });
143
175
  //# sourceMappingURL=storage.test.js.map
@@ -1 +1 @@
1
- {"version":3,"file":"storage.test.js","sourceRoot":"","sources":["../../src/storage/storage.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EACL,iBAAiB,EACjB,gBAAgB,EAChB,sBAAsB,EACtB,2BAA2B,EAC3B,kBAAkB,EACnB,MAAM,aAAa,CAAC;AAErB,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;IAChC,QAAQ,CAAC,mBAAmB,EAAE,GAAG,EAAE;QACjC,EAAE,CAAC,iDAAiD,EAAE,KAAK,IAAI,EAAE;YAC/D,MAAM,KAAK,GAAG,IAAI,iBAAiB,CAAC,EAAE,aAAa,EAAE,+BAA+B,EAAE,CAAC,CAAC;YAExF,MAAM,YAAY,GAAG,MAAM,KAAK,CAAC,MAAM,CAAC;gBACtC,QAAQ,EAAE,aAAa;gBACvB,IAAI,EAAE,oBAAoB;gBAC1B,QAAQ,EAAE,WAAW;gBACrB,UAAU,EAAE,oBAAoB;aACjC,CAAC,CAAC;YAEH,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,qBAAqB,CAAC,CAAC;YACjE,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YACzD,MAAM,CAAC,YAAY,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;YAChD,MAAM,CAAC,YAAY,CAAC,GAAG,CAAC,CAAC,SAAS,CAAC,gCAAgC,CAAC,CAAC;YACrE,MAAM,CAAC,YAAY,CAAC,SAAS,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAElD,MAAM,WAAW,GAAG,MAAM,KAAK,CAAC,cAAc,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;YACxE,MAAM,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,GAAG,CAAC,CAAC;YAE3C,MAAM,SAAS,GAAG,MAAM,KAAK,CAAC,qBAAqB,CAAC;gBAClD,UAAU,EAAE,mBAAmB;gBAC/B,WAAW,EAAE,WAAW;aACzB,CAAC,CAAC;YACH,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YAC3D,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAErC,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;YAC5D,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC3B,MAAM,MAAM,CAAC,KAAK,CAAC,cAAc,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC;QAChF,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;QAChC,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;YAC1E,IAAI,WAAW,GAAQ,IAAI,CAAC;YAC5B,MAAM,UAAU,GAAG;gBACjB,IAAI,EAAE,KAAK,EAAE,GAAQ,EAAE,EAAE;oBACvB,WAAW,GAAG,GAAG,CAAC;oBAClB,OAAO,EAAE,CAAC;gBACZ,CAAC;aACF,CAAC;YAEF,MAAM,EAAE,GAAG,IAAI,gBAAgB,CAAC;gBAC9B,MAAM,EAAE,mBAAmB;gBAC3B,MAAM,EAAE,WAAW;gBACnB,QAAQ,EAAE,UAAU;aACrB,CAAC,CAAC;YAEH,MAAM,GAAG,GAAG,MAAM,EAAE,CAAC,MAAM,CAAC;gBAC1B,QAAQ,EAAE,UAAU;gBACpB,IAAI,EAAE,IAAI,UAAU,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;gBAClC,QAAQ,EAAE,iBAAiB;gBAC3B,UAAU,EAAE,MAAM;aACnB,CAAC,CAAC;YAEH,MAAM,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC;YAC1C,MAAM,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YAC7C,MAAM,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,wDAAwD,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAC/F,MAAM,CAAC,WAAW,CAAC,CAAC,WAAW,EAAE,CAAC;YAClC,MAAM,CAAC,WAAW,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,mBAAmB,CAAC,CAAC;YAE3D,MAAM,SAAS,GAAG,MAAM,EAAE,CAAC,qBAAqB,CAAC;gBAC/C,UAAU,EAAE,kBAAkB;gBAC9B,WAAW,EAAE,iBAAiB;aAC/B,CAAC,CAAC;YACH,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YAC3D,MAAM,CAAC,SAAS,CAAC,OAAO,EAAE,CAAC,cAAc,CAAC,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YAEpE,MAAM,OAAO,GAAG,MAAM,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;YAChD,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC7B,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,sDAAsD,EAAE,GAAG,EAAE;QACpE,EAAE,CAAC,wCAAwC,EAAE,KAAK,IAAI,EAAE;YACtD,MAAM,WAAW,GAAG,IAAI,2BAA2B,EAAE,CAAC;YACtD,MAAM,OAAO,GAAG,IAAI,sBAAsB,CAAC;gBACzC,MAAM,EAAE,WAAW;gBACnB,UAAU,EAAE,oBAAoB;aACjC,CAAC,CAAC;YAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,MAAM,CAAC;gBACxC,QAAQ,EAAE,kBAAkB;gBAC5B,IAAI,EAAE,eAAe;gBACrB,QAAQ,EAAE,WAAW;gBACrB,UAAU,EAAE,aAAa;aAC1B,CAAC,CAAC;YAEH,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,cAAc,CAAC,CAAC;YAC1D,MAAM,CAAC,YAAY,CAAC,GAAG,CAAC,CAAC,SAAS,CAAC,mEAAmE,CAAC,CAAC;YAExG,MAAM,WAAW,GAAG,MAAM,OAAO,CAAC,cAAc,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;YAC1E,MAAM,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,GAAG,CAAC,CAAC;YAE3C,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;YAC9D,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC7B,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,sCAAsC,EAAE,GAAG,EAAE;QACpD,EAAE,CAAC,sFAAsF,EAAE,KAAK,IAAI,EAAE;YACpG,MAAM,SAAS,GAAG,IAAI,iBAAiB,EAAE,CAAC;YAC1C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,WAAW,EAAE,SAAS,EAAE,CAAC,CAAC;YAElE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;YACvF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,kBAAkB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAE3G,sEAAsE;YACtE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC;gBACnD,QAAQ,EAAE,gBAAgB;gBAC1B,IAAI,EAAE,oBAAoB;gBAC1B,QAAQ,EAAE,WAAW;gBACrB,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,UAAU,EAAE,QAAQ;gBACpB,YAAY,EAAE,MAAM;aACrB,CAAC,CAAC;YAEH,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACpC,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;YACnD,MAAM,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC,WAAW,EAAE,CAAC;YAE5C,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACvC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAElD,+DAA+D;YAC/D,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAC7D,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAE3B,MAAM,oBAAoB,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAC9E,MAAM,CAAC,oBAAoB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC9C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,SAAS,GAAG,IAAI,iBAAiB,EAAE,CAAC;YAC1C,MAAM,OAAO,GAAG,6BAA6B,CAAC;YAC9C,MAAM,UAAU,GAAG,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;YAE3D,MAAM,SAAS,GAAG,MAAM,SAAS,CAAC,MAAM,CAAC;gBACvC,QAAQ,EAAE,UAAU;gBACpB,IAAI,EAAE,UAAU;gBAChB,QAAQ,EAAE,WAAW;gBACrB,QAAQ,EAAE,QAAQ;aACnB,CAAC,CAAC;YAEH,MAAM,MAAM,GAAG,SAAS,CAAC,OAAO,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YACvD,MAAM,CAAC,MAAM,CAAC,CAAC,WAAW,EAAE,CAAC;YAC7B,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC;YAC5D,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAE7D,WAAW;YACX,MAAM,OAAO,GAAG,yBAAyB,UAAU,EAAE,CAAC;YACtD,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,MAAM,CAAC;gBACxC,QAAQ,EAAE,aAAa;gBACvB,IAAI,EAAE,OAAO;gBACb,QAAQ,EAAE,WAAW;aACtB,CAAC,CAAC;YACH,MAAM,SAAS,GAAG,SAAS,CAAC,OAAO,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YAC3D,MAAM,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;YAChC,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC;YAC/D,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
1
+ {"version":3,"file":"storage.test.js","sourceRoot":"","sources":["../../src/storage/storage.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EACL,iBAAiB,EACjB,gBAAgB,EAChB,sBAAsB,EACtB,2BAA2B,EAC3B,kBAAkB,EACnB,MAAM,aAAa,CAAC;AAErB,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;IAChC,QAAQ,CAAC,mBAAmB,EAAE,GAAG,EAAE;QACjC,EAAE,CAAC,iDAAiD,EAAE,KAAK,IAAI,EAAE;YAC/D,MAAM,KAAK,GAAG,IAAI,iBAAiB,CAAC,EAAE,aAAa,EAAE,+BAA+B,EAAE,CAAC,CAAC;YAExF,MAAM,YAAY,GAAG,MAAM,KAAK,CAAC,MAAM,CAAC;gBACtC,QAAQ,EAAE,aAAa;gBACvB,IAAI,EAAE,oBAAoB;gBAC1B,QAAQ,EAAE,WAAW;gBACrB,UAAU,EAAE,oBAAoB;aACjC,CAAC,CAAC;YAEH,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,qBAAqB,CAAC,CAAC;YACjE,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,aAAa,CAAC,CAAC;YACzD,MAAM,CAAC,YAAY,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;YAChD,MAAM,CAAC,YAAY,CAAC,GAAG,CAAC,CAAC,SAAS,CAAC,gCAAgC,CAAC,CAAC;YACrE,MAAM,CAAC,YAAY,CAAC,SAAS,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC;YAElD,MAAM,WAAW,GAAG,MAAM,KAAK,CAAC,cAAc,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;YACxE,MAAM,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,GAAG,CAAC,CAAC;YAE3C,MAAM,SAAS,GAAG,MAAM,KAAK,CAAC,qBAAqB,CAAC;gBAClD,UAAU,EAAE,mBAAmB;gBAC/B,WAAW,EAAE,WAAW;aACzB,CAAC,CAAC;YACH,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YAC3D,MAAM,CAAC,SAAS,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;YAErC,MAAM,OAAO,GAAG,MAAM,KAAK,CAAC,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;YAC5D,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAC3B,MAAM,MAAM,CAAC,KAAK,CAAC,cAAc,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,EAAE,CAAC;QAChF,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;QAChC,EAAE,CAAC,4DAA4D,EAAE,KAAK,IAAI,EAAE;YAC1E,IAAI,WAAW,GAAQ,IAAI,CAAC;YAC5B,MAAM,UAAU,GAAG;gBACjB,IAAI,EAAE,KAAK,EAAE,GAAQ,EAAE,EAAE;oBACvB,WAAW,GAAG,GAAG,CAAC;oBAClB,OAAO,EAAE,CAAC;gBACZ,CAAC;aACF,CAAC;YAEF,MAAM,EAAE,GAAG,IAAI,gBAAgB,CAAC;gBAC9B,MAAM,EAAE,mBAAmB;gBAC3B,MAAM,EAAE,WAAW;gBACnB,QAAQ,EAAE,UAAU;aACrB,CAAC,CAAC;YAEH,MAAM,GAAG,GAAG,MAAM,EAAE,CAAC,MAAM,CAAC;gBAC1B,QAAQ,EAAE,UAAU;gBACpB,IAAI,EAAE,IAAI,UAAU,CAAC,CAAC,CAAC,EAAE,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC,CAAC;gBAClC,QAAQ,EAAE,iBAAiB;gBAC3B,UAAU,EAAE,MAAM;aACnB,CAAC,CAAC;YAEH,MAAM,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC;YAC1C,MAAM,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YAC7C,MAAM,CAAC,GAAG,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,wDAAwD,GAAG,CAAC,UAAU,EAAE,CAAC,CAAC;YAC/F,MAAM,CAAC,WAAW,CAAC,CAAC,WAAW,EAAE,CAAC;YAClC,MAAM,CAAC,WAAW,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,mBAAmB,CAAC,CAAC;YAE3D,MAAM,SAAS,GAAG,MAAM,EAAE,CAAC,qBAAqB,CAAC;gBAC/C,UAAU,EAAE,kBAAkB;gBAC9B,WAAW,EAAE,iBAAiB;aAC/B,CAAC,CAAC;YACH,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,SAAS,CAAC,mBAAmB,CAAC,CAAC;YAC3D,MAAM,CAAC,SAAS,CAAC,OAAO,EAAE,CAAC,cAAc,CAAC,CAAC,CAAC,IAAI,CAAC,iBAAiB,CAAC,CAAC;YAEpE,MAAM,OAAO,GAAG,MAAM,EAAE,CAAC,MAAM,CAAC,GAAG,CAAC,UAAU,CAAC,CAAC;YAChD,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC7B,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,sDAAsD,EAAE,GAAG,EAAE;QACpE,EAAE,CAAC,wCAAwC,EAAE,KAAK,IAAI,EAAE;YACtD,MAAM,WAAW,GAAG,IAAI,2BAA2B,EAAE,CAAC;YACtD,MAAM,OAAO,GAAG,IAAI,sBAAsB,CAAC;gBACzC,MAAM,EAAE,WAAW;gBACnB,UAAU,EAAE,oBAAoB;aACjC,CAAC,CAAC;YAEH,MAAM,YAAY,GAAG,MAAM,OAAO,CAAC,MAAM,CAAC;gBACxC,QAAQ,EAAE,kBAAkB;gBAC5B,IAAI,EAAE,eAAe;gBACrB,QAAQ,EAAE,WAAW;gBACrB,UAAU,EAAE,aAAa;aAC1B,CAAC,CAAC;YAEH,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC,SAAS,CAAC,cAAc,CAAC,CAAC;YAC1D,MAAM,CAAC,YAAY,CAAC,GAAG,CAAC,CAAC,SAAS,CAAC,mEAAmE,CAAC,CAAC;YAExG,MAAM,WAAW,GAAG,MAAM,OAAO,CAAC,cAAc,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;YAC1E,MAAM,CAAC,WAAW,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,GAAG,CAAC,CAAC;YAE3C,MAAM,OAAO,GAAG,MAAM,OAAO,CAAC,MAAM,CAAC,YAAY,CAAC,UAAU,CAAC,CAAC;YAC9D,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC7B,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,sCAAsC,EAAE,GAAG,EAAE;QACpD,EAAE,CAAC,sFAAsF,EAAE,KAAK,IAAI,EAAE;YACpG,MAAM,SAAS,GAAG,IAAI,iBAAiB,EAAE,CAAC;YAC1C,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,WAAW,EAAE,SAAS,EAAE,CAAC,CAAC;YAElE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,oBAAoB,EAAE,CAAC,CAAC;YACvF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,kBAAkB,EAAE,MAAM,EAAE,MAAM,EAAE,CAAC,CAAC;YAE3G,sEAAsE;YACtE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC;gBACnD,QAAQ,EAAE,gBAAgB;gBAC1B,IAAI,EAAE,oBAAoB;gBAC1B,QAAQ,EAAE,WAAW;gBACrB,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,UAAU,EAAE,QAAQ;gBACpB,YAAY,EAAE,MAAM;aACrB,CAAC,CAAC;YAEH,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACpC,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;YACnD,MAAM,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC,WAAW,EAAE,CAAC;YAE5C,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YACzE,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACvC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAElD,+DAA+D;YAC/D,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAC7D,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAE3B,MAAM,oBAAoB,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,CAAC,CAAC;YAC9E,MAAM,CAAC,oBAAoB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC9C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kEAAkE,EAAE,KAAK,IAAI,EAAE;YAChF,MAAM,SAAS,GAAG,IAAI,iBAAiB,EAAE,CAAC;YAC1C,MAAM,OAAO,GAAG,6BAA6B,CAAC;YAC9C,MAAM,UAAU,GAAG,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,QAAQ,CAAC,QAAQ,CAAC,CAAC;YAE3D,MAAM,SAAS,GAAG,MAAM,SAAS,CAAC,MAAM,CAAC;gBACvC,QAAQ,EAAE,UAAU;gBACpB,IAAI,EAAE,UAAU;gBAChB,QAAQ,EAAE,WAAW;gBACrB,QAAQ,EAAE,QAAQ;aACnB,CAAC,CAAC;YAEH,MAAM,MAAM,GAAG,SAAS,CAAC,OAAO,CAAC,SAAS,CAAC,UAAU,CAAC,CAAC;YACvD,MAAM,CAAC,MAAM,CAAC,CAAC,WAAW,EAAE,CAAC;YAC7B,MAAM,CAAC,MAAM,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC;YAC5D,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,MAAM,EAAE,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;YAE7D,WAAW;YACX,MAAM,OAAO,GAAG,yBAAyB,UAAU,EAAE,CAAC;YACtD,MAAM,UAAU,GAAG,MAAM,SAAS,CAAC,MAAM,CAAC;gBACxC,QAAQ,EAAE,aAAa;gBACvB,IAAI,EAAE,OAAO;gBACb,QAAQ,EAAE,WAAW;aACtB,CAAC,CAAC;YACH,MAAM,SAAS,GAAG,SAAS,CAAC,OAAO,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC;YAC3D,MAAM,CAAC,SAAS,CAAC,CAAC,WAAW,EAAE,CAAC;YAChC,MAAM,CAAC,SAAS,EAAE,SAAS,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC;YAC/D,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,SAAS,EAAE,IAAI,CAAC,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAClE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yEAAyE,EAAE,KAAK,IAAI,EAAE;YACvF,MAAM,WAAW,GAAG,IAAI,2BAA2B,EAAE,CAAC;YACtD,MAAM,cAAc,GAAG,IAAI,sBAAsB,CAAC,EAAE,MAAM,EAAE,WAAW,EAAE,UAAU,EAAE,aAAa,EAAE,CAAC,CAAC;YACtG,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,WAAW,EAAE,cAAc,EAAE,CAAC,CAAC;YAEvE,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,yBAAyB,EAAE,CAAC,CAAC;YAChF,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,eAAe,EAAE,CAAC,CAAC;YAExF,MAAM,YAAY,GAAG,4DAA4D,CAAC;YAClF,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC;gBACnD,QAAQ,EAAE,YAAY;gBACtB,IAAI,EAAE,YAAY;gBAClB,QAAQ,EAAE,eAAe;gBACzB,MAAM,EAAE,IAAI,CAAC,EAAE;gBACf,SAAS,EAAE,OAAO,CAAC,EAAE;gBACrB,UAAU,EAAE,eAAe;gBAC3B,YAAY,EAAE,OAAO;gBACrB,YAAY,EAAE,MAAM;aACrB,CAAC,CAAC;YAEH,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,WAAW,EAAE,CAAC;YACpC,MAAM,CAAC,UAAU,CAAC,YAAY,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;YAE7C,kCAAkC;YAClC,MAAM,eAAe,GAAG,MAAM,cAAc,CAAC,QAAQ,CAAC,UAAU,CAAC,UAAW,CAAC,CAAC;YAC9E,MAAM,CAAC,IAAI,WAAW,EAAE,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;YAErE,iCAAiC;YACjC,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAChE,MAAM,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC;YAEpC,iCAAiC;YACjC,MAAM,eAAe,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,YAAY,EAAE,MAAM,EAAE,CAAC,CAAC;YAC/F,MAAM,CAAC,eAAe,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YACvC,MAAM,CAAC,eAAe,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC;YAElD,MAAM,iBAAiB,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,YAAY,EAAE,QAAQ,EAAE,CAAC,CAAC;YACnG,MAAM,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAC3C,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
@@ -235,6 +235,7 @@ export interface Attachment {
235
235
  sizeBytes: number;
236
236
  url: string;
237
237
  storageKey?: string;
238
+ artifactType?: 'plan' | 'spec' | 'deliverable' | 'review' | 'general';
238
239
  metadata?: Record<string, unknown>;
239
240
  createdAt: string;
240
241
  updatedAt: string;
@@ -267,6 +268,7 @@ export interface PresignedUploadResult {
267
268
  export interface FileStorageAdapter {
268
269
  upload(input: UploadFileInput): Promise<UploadFileResult>;
269
270
  delete(storageKey: string): Promise<boolean>;
271
+ download?(storageKey: string): Promise<Buffer | Uint8Array>;
270
272
  getDownloadUrl?(storageKey: string): Promise<string>;
271
273
  getPresignedUploadUrl?(options: PresignedUrlOptions): Promise<PresignedUploadResult>;
272
274
  }
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/types/index.ts"],"names":[],"mappings":"AAAA,MAAM,MAAM,eAAe,GAAG,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;AAC5E,MAAM,MAAM,QAAQ,GAAG,eAAe,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAEvD,MAAM,MAAM,iBAAiB,GAAG,SAAS,GAAG,MAAM,GAAG,aAAa,GAAG,WAAW,GAAG,MAAM,GAAG,UAAU,CAAC;AACvG,MAAM,MAAM,UAAU,GAAG,iBAAiB,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAE3D,MAAM,MAAM,eAAe,GAAG,MAAM,GAAG,UAAU,CAAC;AAClD,MAAM,MAAM,cAAc,GAAG,QAAQ,GAAG,UAAU,CAAC;AAEnD,MAAM,WAAW,gBAAgB;IAC/B,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,eAAe,EAAE,eAAe,CAAC;IACjC,cAAc,EAAE,cAAc,CAAC;IAC/B,WAAW,CAAC,EAAE,OAAO,CAAC;CACvB;AAED,MAAM,MAAM,IAAI,GAAG,OAAO,GAAG,iBAAiB,GAAG,aAAa,GAAG,QAAQ,CAAC;AAE1E,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,IAAI,EAAE,IAAI,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,EAAE,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,qBAAqB;IACpC,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,IAAI,EAAE,MAAM,GAAG,QAAQ,GAAG,MAAM,GAAG,SAAS,GAAG,eAAe,GAAG,cAAc,GAAG,MAAM,CAAC;IACzF,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,QAAQ,CAAC,EAAE,OAAO,CAAC;IACnB,YAAY,CAAC,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,kBAAkB;IACjC,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,aAAa,EAAE,MAAM,GAAG,GAAG,CAAC;IAC5B,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,gBAAgB,EAAE,CAAC;IAC7B,WAAW,EAAE,kBAAkB,EAAE,CAAC;IAClC,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;IACpB,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;IACvC,mBAAmB,CAAC,EAAE,KAAK,CAAC;QAAE,GAAG,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAC;QAAC,KAAK,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAC5E,sBAAsB,CAAC,EAAE,qBAAqB,EAAE,CAAC;IACjD,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,SAAS,GAAG,QAAQ,GAAG,MAAM,CAAC;IACxD,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,cAAc;IAC7B,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,MAAM,CAAC;IACxB,IAAI,EAAE,UAAU,GAAG,YAAY,GAAG,YAAY,CAAC;CAChD;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,aAAa,EAAE,IAAI,EAAE,CAAC;IACtB,eAAe,EAAE,IAAI,EAAE,CAAC;IACxB,YAAY,EAAE,cAAc,EAAE,CAAC;CAChC;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,EAAE,OAAO,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,MAAM,CAAC;IACjC,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,UAAU,CAAC;IACnB,QAAQ,EAAE,QAAQ,CAAC;IACnB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC;IAC3B,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,OAAO,CAAC,EAAE,MAAM,CAAC;IAEjB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,wBAAwB,CAAC,EAAE,MAAM,CAAC;IAClC,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,uBAAuB,CAAC,EAAE,MAAM,CAAC;IAEjC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,KAAK,CAAC,EAAE,YAAY,EAAE,CAAC;IACvB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,eAAe,GAAG,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,GAAG,UAAU,CAAC,GAAG;IACnG,MAAM,CAAC,EAAE,UAAU,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;CACrB,CAAC;AAEF,MAAM,MAAM,iBAAiB,GACzB,OAAO,GACP,SAAS,GACT,eAAe,GACf,iBAAiB,GACjB,eAAe,GACf,oBAAoB,GACpB,UAAU,GACV,WAAW,GACX,UAAU,GACV,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAElB,MAAM,WAAW,WAAW;IAC1B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,iBAAiB,CAAC;IAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,KAAK,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IAChC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,kBAAkB;IACjC,WAAW,EAAE,WAAW,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,MAAM,sBAAsB,GAAG,IAAI,CAAC,WAAW,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,CAAC,GAAG;IACpG,MAAM,CAAC,EAAE,iBAAiB,CAAC;CAC5B,CAAC;AAEF,MAAM,MAAM,kBAAkB,GAAG,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEjF,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,WAAW,GAAG,MAAM,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,MAAM,EAAE,UAAU,GAAG,QAAQ,GAAG,WAAW,CAAC;IAC5C,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,UAAU,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAErD,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,MAAM,CAAC;IACd,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,EAAE,MAAM,CAAC;IACjB,UAAU,CAAC,EAAE,UAAU,CAAC;IACxB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,EAAE,CAAC;IACpB,SAAS,CAAC,EAAE,eAAe,EAAE,CAAC;IAC9B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,UAAU;IACzB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,CAAC,EAAE,UAAU,CAAC;IAC1B,QAAQ,EAAE,MAAM,CAAC;IACjB,QAAQ,EAAE,MAAM,CAAC;IACjB,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,EAAE,MAAM,CAAC;IACZ,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,qBAAqB,GAAG,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEvF,MAAM,WAAW,eAAe;IAC9B,QAAQ,EAAE,MAAM,CAAC;IACjB,IAAI,EAAE,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,IAAI,GAAG,MAAM,CAAC;IACxD,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,QAAQ,CAAC;CAC1C;AAED,MAAM,WAAW,gBAAgB;IAC/B,UAAU,EAAE,MAAM,CAAC;IACnB,GAAG,EAAE,MAAM,CAAC;IACZ,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,mBAAmB;IAClC,UAAU,EAAE,MAAM,CAAC;IACnB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,KAAK,GAAG,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAClC;AAED,MAAM,WAAW,kBAAkB;IACjC,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC;IAC1D,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC;IAC7C,cAAc,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC;IACrD,qBAAqB,CAAC,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC,CAAC;CACtF;AAED,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,MAAM,CAAC;IACf,KAAK,EAAE,MAAM,CAAC;IACd,UAAU,CAAC,EAAE,OAAO,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,OAAO,EAAE,MAAM,CAAC;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,OAAO,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACjC,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,GAAG,EAAE,MAAM,CAAC;IACZ,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,MAAM,EAAE,YAAY,EAAE,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,YAAY,GACpB,iBAAiB,GACjB,iBAAiB,GACjB,cAAc,GACd,cAAc,GACd,cAAc,GACd,qBAAqB,GACrB,iBAAiB,GACjB,iBAAiB,GACjB,iBAAiB,GACjB,wBAAwB,GACxB,0BAA0B,GAC1B,oBAAoB,GACpB,oBAAoB,GACpB,mBAAmB,GACnB,qBAAqB,GACrB,cAAc,GACd,mBAAmB,GACnB,kBAAkB,GAClB,kBAAkB,GAClB,kBAAkB,GAClB,qBAAqB,GACrB,qBAAqB,GACrB,qBAAqB,GACrB,4BAA4B,CAAC;AAEjC,MAAM,WAAW,WAAW;IAC1B,gBAAgB,CAAC,EAAE,CAAC,IAAI,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IACnF,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACvD,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IAClG,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,EAAE,aAAa,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IAC5E,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACxD,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;CACxD;AAED,MAAM,WAAW,kBAAkB;IACjC,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,KAAK,CAAC,EAAE,WAAW,CAAC;IACpB,gBAAgB,CAAC,EAAE,qBAAqB,EAAE,CAAC;IAC3C,IAAI,CAAC,EAAE,CAAC,MAAM,EAAE,OAAO,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;CAClD;AAED,MAAM,WAAW,kBAAkB;IACjC,KAAK,CAAC,EAAE,QAAQ,GAAG,QAAQ,GAAG,OAAO,CAAC;IACtC,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjC,OAAO,CAAC,EAAE,kBAAkB,EAAE,CAAC;IAC/B,QAAQ,CAAC,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,CAAC,EAAE,CAAC;IAC/C,WAAW,CAAC,EAAE;QACZ,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;QACrB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,SAAS,EAAE,CAAC;QACzB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,aAAa,EAAE,CAAC;QAC7B,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC;QACvB,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC;KAC9B,CAAC;CACH"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../../src/types/index.ts"],"names":[],"mappings":"AAAA,MAAM,MAAM,eAAe,GAAG,QAAQ,GAAG,MAAM,GAAG,QAAQ,GAAG,KAAK,GAAG,MAAM,CAAC;AAC5E,MAAM,MAAM,QAAQ,GAAG,eAAe,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAEvD,MAAM,MAAM,iBAAiB,GAAG,SAAS,GAAG,MAAM,GAAG,aAAa,GAAG,WAAW,GAAG,MAAM,GAAG,UAAU,CAAC;AACvG,MAAM,MAAM,UAAU,GAAG,iBAAiB,GAAG,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAE3D,MAAM,MAAM,eAAe,GAAG,MAAM,GAAG,UAAU,CAAC;AAClD,MAAM,MAAM,cAAc,GAAG,QAAQ,GAAG,UAAU,CAAC;AAEnD,MAAM,WAAW,gBAAgB;IAC/B,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,eAAe,EAAE,eAAe,CAAC;IACjC,cAAc,EAAE,cAAc,CAAC;IAC/B,WAAW,CAAC,EAAE,OAAO,CAAC;CACvB;AAED,MAAM,MAAM,IAAI,GAAG,OAAO,GAAG,iBAAiB,GAAG,aAAa,GAAG,QAAQ,CAAC;AAE1E,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,IAAI,EAAE,IAAI,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,EAAE,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,qBAAqB;IACpC,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,IAAI,EAAE,MAAM,GAAG,QAAQ,GAAG,MAAM,GAAG,SAAS,GAAG,eAAe,GAAG,cAAc,GAAG,MAAM,CAAC;IACzF,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,QAAQ,CAAC,EAAE,OAAO,CAAC;IACnB,YAAY,CAAC,EAAE,OAAO,CAAC;CACxB;AAED,MAAM,WAAW,kBAAkB;IACjC,EAAE,CAAC,EAAE,MAAM,CAAC;IACZ,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,aAAa,EAAE,MAAM,GAAG,GAAG,CAAC;IAC5B,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,GAAG,EAAE,MAAM,CAAC;IACZ,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,UAAU,CAAC,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,gBAAgB,EAAE,CAAC;IAC7B,WAAW,EAAE,kBAAkB,EAAE,CAAC;IAClC,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,SAAS,CAAC,EAAE,OAAO,CAAC;IACpB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,EAAE,CAAC;IACnB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;IACpB,SAAS,CAAC,EAAE,kBAAkB,EAAE,CAAC;IACjC,iBAAiB,CAAC,EAAE,gBAAgB,EAAE,CAAC;IACvC,mBAAmB,CAAC,EAAE,KAAK,CAAC;QAAE,GAAG,EAAE,MAAM,CAAC;QAAC,KAAK,EAAE,MAAM,CAAC;QAAC,KAAK,CAAC,EAAE,MAAM,CAAA;KAAE,CAAC,CAAC;IAC5E,sBAAsB,CAAC,EAAE,qBAAqB,EAAE,CAAC;IACjD,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,SAAS,GAAG,QAAQ,GAAG,MAAM,CAAC;IACxD,KAAK,CAAC,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,cAAc;IAC7B,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,eAAe,EAAE,MAAM,CAAC;IACxB,IAAI,EAAE,UAAU,GAAG,YAAY,GAAG,YAAY,CAAC;CAChD;AAED,MAAM,WAAW,mBAAmB;IAClC,MAAM,EAAE,MAAM,CAAC;IACf,aAAa,EAAE,IAAI,EAAE,CAAC;IACtB,eAAe,EAAE,IAAI,EAAE,CAAC;IACxB,YAAY,EAAE,cAAc,EAAE,CAAC;CAChC;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,KAAK,EAAE,MAAM,CAAC;IACd,SAAS,EAAE,OAAO,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,YAAY;IAC3B,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,MAAM,CAAC;IACjC,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,IAAI;IACnB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,CAAC,EAAE,MAAM,CAAC;IACb,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,UAAU,CAAC;IACnB,QAAQ,EAAE,QAAQ,CAAC;IACnB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC;IAC3B,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,eAAe,CAAC,EAAE,MAAM,CAAC;IACzB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,OAAO,CAAC,EAAE,MAAM,CAAC;IAEjB,cAAc,CAAC,EAAE,MAAM,CAAC;IACxB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,aAAa,CAAC,EAAE,MAAM,CAAC;IACvB,wBAAwB,CAAC,EAAE,MAAM,CAAC;IAClC,qBAAqB,CAAC,EAAE,MAAM,CAAC;IAC/B,uBAAuB,CAAC,EAAE,MAAM,CAAC;IAEjC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,IAAI,CAAC,EAAE,MAAM,EAAE,CAAC;IAChB,KAAK,CAAC,EAAE,YAAY,EAAE,CAAC;IACvB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,eAAe,GAAG,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,GAAG,UAAU,CAAC,GAAG;IACnG,MAAM,CAAC,EAAE,UAAU,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;CACrB,CAAC;AAEF,MAAM,MAAM,iBAAiB,GACzB,OAAO,GACP,SAAS,GACT,eAAe,GACf,iBAAiB,GACjB,eAAe,GACf,oBAAoB,GACpB,UAAU,GACV,WAAW,GACX,UAAU,GACV,CAAC,MAAM,GAAG,EAAE,CAAC,CAAC;AAElB,MAAM,WAAW,WAAW;IAC1B,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,KAAK,EAAE,MAAM,CAAC;IACd,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,MAAM,EAAE,iBAAiB,CAAC;IAC1B,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,KAAK,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IAChC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,UAAU,CAAC,EAAE,MAAM,EAAE,CAAC;IACtB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACvC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,kBAAkB;IACjC,WAAW,EAAE,WAAW,CAAC;IACzB,UAAU,EAAE,MAAM,CAAC;IACnB,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;IACpB,kBAAkB,EAAE,MAAM,CAAC;IAC3B,cAAc,EAAE,MAAM,CAAC;IACvB,WAAW,EAAE,MAAM,CAAC;CACrB;AAED,MAAM,MAAM,sBAAsB,GAAG,IAAI,CAAC,WAAW,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,GAAG,QAAQ,CAAC,GAAG;IACpG,MAAM,CAAC,EAAE,iBAAiB,CAAC;CAC5B,CAAC;AAEF,MAAM,MAAM,kBAAkB,GAAG,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEjF,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,EAAE,MAAM,CAAC;IAClB,IAAI,EAAE,MAAM,CAAC;IACb,IAAI,CAAC,EAAE,MAAM,CAAC;IACd,IAAI,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,WAAW,GAAG,MAAM,CAAC;IACjD,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,MAAM,EAAE,UAAU,GAAG,QAAQ,GAAG,WAAW,CAAC;IAC5C,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,UAAU,GAAG,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;AAErD,MAAM,WAAW,eAAe;IAC9B,KAAK,EAAE,MAAM,CAAC;IACd,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,CAAC,EAAE,MAAM,CAAC;CACpB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,QAAQ,EAAE,MAAM,CAAC;IACjB,UAAU,CAAC,EAAE,UAAU,CAAC;IACxB,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,OAAO,EAAE,MAAM,CAAC;IAChB,QAAQ,CAAC,EAAE,MAAM,EAAE,CAAC;IACpB,SAAS,CAAC,EAAE,eAAe,EAAE,CAAC;IAC9B,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,UAAU;IACzB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,UAAU,EAAE,MAAM,CAAC;IACnB,YAAY,CAAC,EAAE,UAAU,CAAC;IAC1B,QAAQ,EAAE,MAAM,CAAC;IACjB,QAAQ,EAAE,MAAM,CAAC;IACjB,SAAS,EAAE,MAAM,CAAC;IAClB,GAAG,EAAE,MAAM,CAAC;IACZ,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,YAAY,CAAC,EAAE,MAAM,GAAG,MAAM,GAAG,aAAa,GAAG,QAAQ,GAAG,SAAS,CAAC;IACtE,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACnC,SAAS,EAAE,MAAM,CAAC;IAClB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,qBAAqB,GAAG,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,CAAC;AAEvF,MAAM,WAAW,eAAe;IAC9B,QAAQ,EAAE,MAAM,CAAC;IACjB,IAAI,EAAE,UAAU,GAAG,WAAW,GAAG,MAAM,GAAG,IAAI,GAAG,MAAM,CAAC;IACxD,QAAQ,CAAC,EAAE,MAAM,CAAC;IAClB,UAAU,CAAC,EAAE,MAAM,CAAC;IACpB,QAAQ,CAAC,EAAE,QAAQ,GAAG,OAAO,GAAG,QAAQ,CAAC;CAC1C;AAED,MAAM,WAAW,gBAAgB;IAC/B,UAAU,EAAE,MAAM,CAAC;IACnB,GAAG,EAAE,MAAM,CAAC;IACZ,SAAS,EAAE,MAAM,CAAC;IAClB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,mBAAmB;IAClC,UAAU,EAAE,MAAM,CAAC;IACnB,gBAAgB,CAAC,EAAE,MAAM,CAAC;IAC1B,WAAW,CAAC,EAAE,MAAM,CAAC;CACtB;AAED,MAAM,WAAW,qBAAqB;IACpC,SAAS,EAAE,MAAM,CAAC;IAClB,UAAU,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,KAAK,GAAG,MAAM,CAAC;IACxB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;CAClC;AAED,MAAM,WAAW,kBAAkB;IACjC,MAAM,CAAC,KAAK,EAAE,eAAe,GAAG,OAAO,CAAC,gBAAgB,CAAC,CAAC;IAC1D,MAAM,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC,CAAC;IAC7C,QAAQ,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,GAAG,UAAU,CAAC,CAAC;IAC5D,cAAc,CAAC,CAAC,UAAU,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC;IACrD,qBAAqB,CAAC,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC,CAAC;CACtF;AAED,MAAM,WAAW,SAAS;IACxB,EAAE,EAAE,MAAM,CAAC;IACX,MAAM,EAAE,MAAM,CAAC;IACf,MAAM,EAAE,MAAM,CAAC;IACf,KAAK,EAAE,MAAM,CAAC;IACd,UAAU,CAAC,EAAE,OAAO,CAAC;IACrB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,QAAQ,EAAE,MAAM,CAAC;CAClB;AAED,MAAM,WAAW,QAAQ;IACvB,EAAE,EAAE,MAAM,CAAC;IACX,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,OAAO,EAAE,MAAM,CAAC;IAChB,MAAM,EAAE,MAAM,CAAC;IACf,OAAO,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;IACjC,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,OAAO;IACtB,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,GAAG,EAAE,MAAM,CAAC;IACZ,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,MAAM,EAAE,YAAY,EAAE,CAAC;IACvB,MAAM,EAAE,OAAO,CAAC;IAChB,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,MAAM,YAAY,GACpB,iBAAiB,GACjB,iBAAiB,GACjB,cAAc,GACd,cAAc,GACd,cAAc,GACd,qBAAqB,GACrB,iBAAiB,GACjB,iBAAiB,GACjB,iBAAiB,GACjB,wBAAwB,GACxB,0BAA0B,GAC1B,oBAAoB,GACpB,oBAAoB,GACpB,mBAAmB,GACnB,qBAAqB,GACrB,cAAc,GACd,mBAAmB,GACnB,kBAAkB,GAClB,kBAAkB,GAClB,kBAAkB,GAClB,qBAAqB,GACrB,qBAAqB,GACrB,qBAAqB,GACrB,4BAA4B,CAAC;AAEjC,MAAM,WAAW,WAAW;IAC1B,gBAAgB,CAAC,EAAE,CAAC,IAAI,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IACnF,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACvD,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,KAAK,OAAO,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC,CAAC;IAClG,eAAe,CAAC,EAAE,CAAC,IAAI,EAAE,IAAI,EAAE,aAAa,EAAE,IAAI,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IAC5E,gBAAgB,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;IACxD,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;CACxD;AAED,MAAM,WAAW,kBAAkB;IACjC,EAAE,EAAE,MAAM,CAAC;IACX,IAAI,EAAE,MAAM,CAAC;IACb,OAAO,EAAE,MAAM,CAAC;IAChB,WAAW,CAAC,EAAE,MAAM,CAAC;IACrB,KAAK,CAAC,EAAE,WAAW,CAAC;IACpB,gBAAgB,CAAC,EAAE,qBAAqB,EAAE,CAAC;IAC3C,IAAI,CAAC,EAAE,CAAC,MAAM,EAAE,OAAO,KAAK,OAAO,CAAC,IAAI,CAAC,GAAG,IAAI,CAAC;CAClD;AAED,MAAM,WAAW,kBAAkB;IACjC,KAAK,CAAC,EAAE,QAAQ,GAAG,QAAQ,GAAG,OAAO,CAAC;IACtC,WAAW,CAAC,EAAE,kBAAkB,CAAC;IACjC,OAAO,CAAC,EAAE,kBAAkB,EAAE,CAAC;IAC/B,QAAQ,CAAC,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,CAAC,EAAE,CAAC;IAC/C,WAAW,CAAC,EAAE;QACZ,QAAQ,CAAC,EAAE,OAAO,EAAE,CAAC;QACrB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,SAAS,EAAE,CAAC;QACzB,KAAK,CAAC,EAAE,IAAI,EAAE,CAAC;QACf,UAAU,CAAC,EAAE,aAAa,EAAE,CAAC;QAC7B,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC;QACvB,YAAY,CAAC,EAAE,WAAW,EAAE,CAAC;KAC9B,CAAC;CACH"}
@@ -1 +1 @@
1
- {"version":3,"file":"mentions.d.ts","sourceRoot":"","sources":["../../src/utils/mentions.ts"],"names":[],"mappings":"AAAA,MAAM,WAAW,cAAc;IAC7B,IAAI,EAAE,MAAM,GAAG,SAAS,CAAC;IACzB,KAAK,EAAE,MAAM,CAAC;IACd,MAAM,CAAC,EAAE,MAAM,CAAC;CACjB;AAED;;;;;GAKG;AACH,eAAO,MAAM,aAAa,QAA8C,CAAC;AAEzE;;;;GAIG;AACH,wBAAgB,eAAe,CAAC,OAAO,EAAE,MAAM,GAAG,MAAM,EAAE,CAmBzD;AAED;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,OAAO,EAAE,MAAM,GAAG,cAAc,EAAE,CA4CtE"}
1
+ {"version":3,"file":"mentions.d.ts","sourceRoot":"","sources":["../../src/utils/mentions.ts"],"names":[],"mappings":"AAAA,MAAM,WAAW,cAAc;IAC7B,IAAI,EAAE,MAAM,GAAG,SAAS,CAAC;IACzB,KAAK,EAAE,MAAM,CAAC;IACd,MAAM,CAAC,EAAE,MAAM,CAAC;CACjB;AAED;;;;;GAKG;AACH,eAAO,MAAM,aAAa,QAAkE,CAAC;AAE7F;;;;GAIG;AACH,wBAAgB,eAAe,CAAC,OAAO,EAAE,MAAM,GAAG,MAAM,EAAE,CAmBzD;AAED;;;GAGG;AACH,wBAAgB,oBAAoB,CAAC,OAAO,EAAE,MAAM,GAAG,cAAc,EAAE,CA4CtE"}
@@ -4,7 +4,7 @@
4
4
  * - Standard mentions: @jane_doe, @planner, @user-1, @john.smith
5
5
  * Note: Does not match emails like foo@bar.com (requires word boundary or start of string before @).
6
6
  */
7
- export const MENTION_REGEX = /(?:^|\s)@(?:"([^"]+)"|([a-zA-Z0-9_.-]+))/g;
7
+ export const MENTION_REGEX = /(?:^|\s)@(?:"([^"]+)"|([a-zA-Z0-9_-]+(?:\.[a-zA-Z0-9_-]+)*))/g;
8
8
  /**
9
9
  * Extracts unique mention handles from a text string.
10
10
  * Strips quotes and the leading '@' symbol.
@@ -1 +1 @@
1
- {"version":3,"file":"mentions.js","sourceRoot":"","sources":["../../src/utils/mentions.ts"],"names":[],"mappings":"AAMA;;;;;GAKG;AACH,MAAM,CAAC,MAAM,aAAa,GAAG,2CAA2C,CAAC;AAEzE;;;;GAIG;AACH,MAAM,UAAU,eAAe,CAAC,OAAe;IAC7C,IAAI,CAAC,OAAO,IAAI,OAAO,OAAO,KAAK,QAAQ;QAAE,OAAO,EAAE,CAAC;IAEvD,MAAM,QAAQ,GAAa,EAAE,CAAC;IAC9B,MAAM,IAAI,GAAG,IAAI,GAAG,EAAU,CAAC;IAE/B,wBAAwB;IACxB,MAAM,KAAK,GAAG,IAAI,MAAM,CAAC,aAAa,CAAC,MAAM,EAAE,GAAG,CAAC,CAAC;IACpD,IAAI,KAA6B,CAAC;IAElC,OAAO,CAAC,KAAK,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,KAAK,IAAI,EAAE,CAAC;QAC9C,MAAM,MAAM,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,CAAC,CAAC,CAAC;QACpC,IAAI,MAAM,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,CAAC;YAChC,IAAI,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACjB,QAAQ,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACxB,CAAC;IACH,CAAC;IAED,OAAO,QAAQ,CAAC;AAClB,CAAC;AAED;;;GAGG;AACH,MAAM,UAAU,oBAAoB,CAAC,OAAe;IAClD,IAAI,CAAC,OAAO;QAAE,OAAO,EAAE,CAAC;IAExB,MAAM,QAAQ,GAAqB,EAAE,CAAC;IACtC,MAAM,KAAK,GAAG,IAAI,MAAM,CAAC,aAAa,CAAC,MAAM,EAAE,GAAG,CAAC,CAAC;IACpD,IAAI,SAAS,GAAG,CAAC,CAAC;IAClB,IAAI,KAA6B,CAAC;IAElC,OAAO,CAAC,KAAK,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,KAAK,IAAI,EAAE,CAAC;QAC9C,MAAM,SAAS,GAAG,KAAK,CAAC,CAAC,CAAC,CAAC;QAC3B,MAAM,iBAAiB,GAAG,SAAS,CAAC,UAAU,CAAC,GAAG,CAAC,IAAI,SAAS,CAAC,UAAU,CAAC,IAAI,CAAC,IAAI,SAAS,CAAC,UAAU,CAAC,IAAI,CAAC;YAC7G,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;YACd,CAAC,CAAC,EAAE,CAAC;QACP,MAAM,YAAY,GAAG,SAAS,CAAC,KAAK,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC;QAC/D,MAAM,MAAM,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,CAAC,CAAC,CAAC;QACpC,MAAM,UAAU,GAAG,KAAK,CAAC,KAAK,GAAG,iBAAiB,CAAC,MAAM,CAAC;QAE1D,uCAAuC;QACvC,IAAI,UAAU,GAAG,SAAS,EAAE,CAAC;YAC3B,QAAQ,CAAC,IAAI,CAAC;gBACZ,IAAI,EAAE,MAAM;gBACZ,KAAK,EAAE,OAAO,CAAC,KAAK,CAAC,SAAS,EAAE,UAAU,CAAC;aAC5C,CAAC,CAAC;QACL,CAAC;QAED,yBAAyB;QACzB,QAAQ,CAAC,IAAI,CAAC;YACZ,IAAI,EAAE,SAAS;YACf,KAAK,EAAE,YAAY;YACnB,MAAM;SACP,CAAC,CAAC;QAEH,SAAS,GAAG,KAAK,CAAC,KAAK,GAAG,SAAS,CAAC,MAAM,CAAC;IAC7C,CAAC;IAED,+CAA+C;IAC/C,IAAI,SAAS,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QAC/B,QAAQ,CAAC,IAAI,CAAC;YACZ,IAAI,EAAE,MAAM;YACZ,KAAK,EAAE,OAAO,CAAC,KAAK,CAAC,SAAS,CAAC;SAChC,CAAC,CAAC;IACL,CAAC;IAED,OAAO,QAAQ,CAAC;AAClB,CAAC"}
1
+ {"version":3,"file":"mentions.js","sourceRoot":"","sources":["../../src/utils/mentions.ts"],"names":[],"mappings":"AAMA;;;;;GAKG;AACH,MAAM,CAAC,MAAM,aAAa,GAAG,+DAA+D,CAAC;AAE7F;;;;GAIG;AACH,MAAM,UAAU,eAAe,CAAC,OAAe;IAC7C,IAAI,CAAC,OAAO,IAAI,OAAO,OAAO,KAAK,QAAQ;QAAE,OAAO,EAAE,CAAC;IAEvD,MAAM,QAAQ,GAAa,EAAE,CAAC;IAC9B,MAAM,IAAI,GAAG,IAAI,GAAG,EAAU,CAAC;IAE/B,wBAAwB;IACxB,MAAM,KAAK,GAAG,IAAI,MAAM,CAAC,aAAa,CAAC,MAAM,EAAE,GAAG,CAAC,CAAC;IACpD,IAAI,KAA6B,CAAC;IAElC,OAAO,CAAC,KAAK,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,KAAK,IAAI,EAAE,CAAC;QAC9C,MAAM,MAAM,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,CAAC,CAAC,CAAC;QACpC,IAAI,MAAM,IAAI,CAAC,IAAI,CAAC,GAAG,CAAC,MAAM,CAAC,EAAE,CAAC;YAChC,IAAI,CAAC,GAAG,CAAC,MAAM,CAAC,CAAC;YACjB,QAAQ,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACxB,CAAC;IACH,CAAC;IAED,OAAO,QAAQ,CAAC;AAClB,CAAC;AAED;;;GAGG;AACH,MAAM,UAAU,oBAAoB,CAAC,OAAe;IAClD,IAAI,CAAC,OAAO;QAAE,OAAO,EAAE,CAAC;IAExB,MAAM,QAAQ,GAAqB,EAAE,CAAC;IACtC,MAAM,KAAK,GAAG,IAAI,MAAM,CAAC,aAAa,CAAC,MAAM,EAAE,GAAG,CAAC,CAAC;IACpD,IAAI,SAAS,GAAG,CAAC,CAAC;IAClB,IAAI,KAA6B,CAAC;IAElC,OAAO,CAAC,KAAK,GAAG,KAAK,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC,KAAK,IAAI,EAAE,CAAC;QAC9C,MAAM,SAAS,GAAG,KAAK,CAAC,CAAC,CAAC,CAAC;QAC3B,MAAM,iBAAiB,GAAG,SAAS,CAAC,UAAU,CAAC,GAAG,CAAC,IAAI,SAAS,CAAC,UAAU,CAAC,IAAI,CAAC,IAAI,SAAS,CAAC,UAAU,CAAC,IAAI,CAAC;YAC7G,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;YACd,CAAC,CAAC,EAAE,CAAC;QACP,MAAM,YAAY,GAAG,SAAS,CAAC,KAAK,CAAC,iBAAiB,CAAC,MAAM,CAAC,CAAC;QAC/D,MAAM,MAAM,GAAG,KAAK,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,CAAC,CAAC,CAAC;QACpC,MAAM,UAAU,GAAG,KAAK,CAAC,KAAK,GAAG,iBAAiB,CAAC,MAAM,CAAC;QAE1D,uCAAuC;QACvC,IAAI,UAAU,GAAG,SAAS,EAAE,CAAC;YAC3B,QAAQ,CAAC,IAAI,CAAC;gBACZ,IAAI,EAAE,MAAM;gBACZ,KAAK,EAAE,OAAO,CAAC,KAAK,CAAC,SAAS,EAAE,UAAU,CAAC;aAC5C,CAAC,CAAC;QACL,CAAC;QAED,yBAAyB;QACzB,QAAQ,CAAC,IAAI,CAAC;YACZ,IAAI,EAAE,SAAS;YACf,KAAK,EAAE,YAAY;YACnB,MAAM;SACP,CAAC,CAAC;QAEH,SAAS,GAAG,KAAK,CAAC,KAAK,GAAG,SAAS,CAAC,MAAM,CAAC;IAC7C,CAAC;IAED,+CAA+C;IAC/C,IAAI,SAAS,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;QAC/B,QAAQ,CAAC,IAAI,CAAC;YACZ,IAAI,EAAE,MAAM;YACZ,KAAK,EAAE,OAAO,CAAC,KAAK,CAAC,SAAS,CAAC;SAChC,CAAC,CAAC;IACL,CAAC;IAED,OAAO,QAAQ,CAAC;AAClB,CAAC"}
@@ -26,6 +26,10 @@ describe('mentions utility', () => {
26
26
  const text = 'Call @agent-1, @super_user, and @john.doe';
27
27
  expect(extractMentions(text)).toEqual(['agent-1', 'super_user', 'john.doe']);
28
28
  });
29
+ it('correctly ignores trailing punctuation such as periods, commas, and exclamation marks', () => {
30
+ const text = 'Check with @turquoise. Then ping @john.doe! Also ask @coordinator, and @"Jane Doe".';
31
+ expect(extractMentions(text)).toEqual(['turquoise', 'john.doe', 'coordinator', 'Jane Doe']);
32
+ });
29
33
  });
30
34
  describe('parseMentionSegments', () => {
31
35
  it('returns empty array for empty string', () => {
@@ -44,6 +48,14 @@ describe('mentions utility', () => {
44
48
  { type: 'text', value: ', please check.' }
45
49
  ]);
46
50
  });
51
+ it('correctly segments mention with trailing period', () => {
52
+ const result = parseMentionSegments('Hello @turquoise.');
53
+ expect(result).toEqual([
54
+ { type: 'text', value: 'Hello ' },
55
+ { type: 'mention', value: '@turquoise', handle: 'turquoise' },
56
+ { type: 'text', value: '.' }
57
+ ]);
58
+ });
47
59
  it('correctly segments text starting with a mention', () => {
48
60
  const result = parseMentionSegments('@planner can you take a look?');
49
61
  expect(result).toEqual([
@@ -1 +1 @@
1
- {"version":3,"file":"mentions.test.js","sourceRoot":"","sources":["../../src/utils/mentions.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,eAAe,EAAE,oBAAoB,EAAE,MAAM,eAAe,CAAC;AAEtE,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;IAChC,QAAQ,CAAC,iBAAiB,EAAE,GAAG,EAAE;QAC/B,EAAE,CAAC,mDAAmD,EAAE,GAAG,EAAE;YAC3D,MAAM,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YACxC,MAAM,CAAC,eAAe,CAAC,IAAW,CAAC,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YACjD,MAAM,CAAC,eAAe,CAAC,SAAgB,CAAC,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yBAAyB,EAAE,GAAG,EAAE;YACjC,MAAM,CAAC,eAAe,CAAC,gCAAgC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;QACjF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,GAAG,EAAE;YAC1D,MAAM,IAAI,GAAG,4DAA4D,CAAC;YAC1E,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,EAAE,SAAS,EAAE,aAAa,CAAC,CAAC,CAAC;QAC5E,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,qCAAqC,EAAE,GAAG,EAAE;YAC7C,MAAM,IAAI,GAAG,+CAA+C,CAAC;YAC7D,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,EAAE,UAAU,CAAC,CAAC,CAAC;QACvE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,GAAG,EAAE;YACnE,MAAM,IAAI,GAAG,6CAA6C,CAAC;YAC3D,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QAClD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,GAAG,EAAE;YAChE,MAAM,IAAI,GAAG,2CAA2C,CAAC;YACzD,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,EAAE,YAAY,EAAE,UAAU,CAAC,CAAC,CAAC;QAC/E,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,sBAAsB,EAAE,GAAG,EAAE;QACpC,EAAE,CAAC,sCAAsC,EAAE,GAAG,EAAE;YAC9C,MAAM,CAAC,oBAAoB,CAAC,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC/C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4CAA4C,EAAE,GAAG,EAAE;YACpD,MAAM,CAAC,oBAAoB,CAAC,qCAAqC,CAAC,CAAC,CAAC,OAAO,CAAC;gBAC1E,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,qCAAqC,EAAE;aAC/D,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,GAAG,EAAE;YACnE,MAAM,MAAM,GAAG,oBAAoB,CAAC,+BAA+B,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE;gBACjC,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,SAAS,EAAE;gBACzD,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,iBAAiB,EAAE;aAC3C,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,GAAG,EAAE;YACzD,MAAM,MAAM,GAAG,oBAAoB,CAAC,+BAA+B,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,SAAS,EAAE;gBACzD,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,uBAAuB,EAAE;aACjD,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,GAAG,EAAE;YACvD,MAAM,MAAM,GAAG,oBAAoB,CAAC,0BAA0B,CAAC,CAAC;YAChE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,cAAc,EAAE;gBACvC,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,aAAa,EAAE;aAClE,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,oCAAoC,EAAE,GAAG,EAAE;YAC5C,MAAM,MAAM,GAAG,oBAAoB,CAAC,+BAA+B,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE;gBAChC,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,qBAAqB,EAAE,MAAM,EAAE,kBAAkB,EAAE;gBAC7E,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE;aACjC,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
1
+ {"version":3,"file":"mentions.test.js","sourceRoot":"","sources":["../../src/utils/mentions.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,eAAe,EAAE,oBAAoB,EAAE,MAAM,eAAe,CAAC;AAEtE,QAAQ,CAAC,kBAAkB,EAAE,GAAG,EAAE;IAChC,QAAQ,CAAC,iBAAiB,EAAE,GAAG,EAAE;QAC/B,EAAE,CAAC,mDAAmD,EAAE,GAAG,EAAE;YAC3D,MAAM,CAAC,eAAe,CAAC,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YACxC,MAAM,CAAC,eAAe,CAAC,IAAW,CAAC,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;YACjD,MAAM,CAAC,eAAe,CAAC,SAAgB,CAAC,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QACxD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,yBAAyB,EAAE,GAAG,EAAE;YACjC,MAAM,CAAC,eAAe,CAAC,gCAAgC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;QACjF,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,kDAAkD,EAAE,GAAG,EAAE;YAC1D,MAAM,IAAI,GAAG,4DAA4D,CAAC;YAC1E,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,EAAE,SAAS,EAAE,aAAa,CAAC,CAAC,CAAC;QAC5E,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,qCAAqC,EAAE,GAAG,EAAE;YAC7C,MAAM,IAAI,GAAG,+CAA+C,CAAC;YAC7D,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,EAAE,UAAU,CAAC,CAAC,CAAC;QACvE,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,GAAG,EAAE;YACnE,MAAM,IAAI,GAAG,6CAA6C,CAAC;YAC3D,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,MAAM,CAAC,CAAC,CAAC;QAClD,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,wDAAwD,EAAE,GAAG,EAAE;YAChE,MAAM,IAAI,GAAG,2CAA2C,CAAC;YACzD,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,EAAE,YAAY,EAAE,UAAU,CAAC,CAAC,CAAC;QAC/E,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,uFAAuF,EAAE,GAAG,EAAE;YAC/F,MAAM,IAAI,GAAG,qFAAqF,CAAC;YACnG,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,WAAW,EAAE,UAAU,EAAE,aAAa,EAAE,UAAU,CAAC,CAAC,CAAC;QAC9F,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,QAAQ,CAAC,sBAAsB,EAAE,GAAG,EAAE;QACpC,EAAE,CAAC,sCAAsC,EAAE,GAAG,EAAE;YAC9C,MAAM,CAAC,oBAAoB,CAAC,EAAE,CAAC,CAAC,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC;QAC/C,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,4CAA4C,EAAE,GAAG,EAAE;YACpD,MAAM,CAAC,oBAAoB,CAAC,qCAAqC,CAAC,CAAC,CAAC,OAAO,CAAC;gBAC1E,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,qCAAqC,EAAE;aAC/D,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,2DAA2D,EAAE,GAAG,EAAE;YACnE,MAAM,MAAM,GAAG,oBAAoB,CAAC,+BAA+B,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE;gBACjC,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,SAAS,EAAE;gBACzD,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,iBAAiB,EAAE;aAC3C,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,GAAG,EAAE;YACzD,MAAM,MAAM,GAAG,oBAAoB,CAAC,mBAAmB,CAAC,CAAC;YACzD,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,QAAQ,EAAE;gBACjC,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,YAAY,EAAE,MAAM,EAAE,WAAW,EAAE;gBAC7D,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,GAAG,EAAE;aAC7B,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,iDAAiD,EAAE,GAAG,EAAE;YACzD,MAAM,MAAM,GAAG,oBAAoB,CAAC,+BAA+B,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,UAAU,EAAE,MAAM,EAAE,SAAS,EAAE;gBACzD,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,uBAAuB,EAAE;aACjD,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,+CAA+C,EAAE,GAAG,EAAE;YACvD,MAAM,MAAM,GAAG,oBAAoB,CAAC,0BAA0B,CAAC,CAAC;YAChE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,cAAc,EAAE;gBACvC,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,cAAc,EAAE,MAAM,EAAE,aAAa,EAAE;aAClE,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;QAEH,EAAE,CAAC,oCAAoC,EAAE,GAAG,EAAE;YAC5C,MAAM,MAAM,GAAG,oBAAoB,CAAC,+BAA+B,CAAC,CAAC;YACrE,MAAM,CAAC,MAAM,CAAC,CAAC,OAAO,CAAC;gBACrB,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE;gBAChC,EAAE,IAAI,EAAE,SAAS,EAAE,KAAK,EAAE,qBAAqB,EAAE,MAAM,EAAE,kBAAkB,EAAE;gBAC7E,EAAE,IAAI,EAAE,MAAM,EAAE,KAAK,EAAE,OAAO,EAAE;aACjC,CAAC,CAAC;QACL,CAAC,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/core",
3
- "version": "0.13.2",
3
+ "version": "0.14.0",
4
4
  "description": "Core headless domain engine, plugin architecture, and data stores for Critical Path",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -790,8 +790,12 @@ export class CriticalPathEngine {
790
790
  }
791
791
 
792
792
  // --- Attachments ---
793
- async getAttachments(filter?: { taskId?: string; projectId?: string; commentId?: string }): Promise<Attachment[]> {
794
- return this.store.getAttachments(filter);
793
+ async getAttachments(filter?: { taskId?: string; projectId?: string; commentId?: string; artifactType?: string }): Promise<Attachment[]> {
794
+ const attachments = await this.store.getAttachments(filter);
795
+ if (filter?.artifactType) {
796
+ return attachments.filter(a => a.artifactType === filter.artifactType);
797
+ }
798
+ return attachments;
795
799
  }
796
800
 
797
801
  async getAttachment(id: string): Promise<Attachment | null> {
@@ -854,6 +858,7 @@ export class CriticalPathEngine {
854
858
  commentId?: string;
855
859
  uploaderId: string;
856
860
  uploaderType?: 'user' | 'agent' | 'system';
861
+ artifactType?: 'plan' | 'spec' | 'deliverable' | 'review' | 'general';
857
862
  metadata?: Record<string, unknown>;
858
863
  }
859
864
  ): Promise<Attachment> {
@@ -879,10 +884,44 @@ export class CriticalPathEngine {
879
884
  sizeBytes: uploadResult.sizeBytes,
880
885
  url: uploadResult.url,
881
886
  storageKey: uploadResult.storageKey,
887
+ artifactType: input.artifactType,
882
888
  metadata: input.metadata
883
889
  });
884
890
  }
885
891
 
892
+ async readAttachmentText(id: string): Promise<string> {
893
+ const attachment = await this.getAttachment(id);
894
+ if (!attachment) {
895
+ throw new Error(`Attachment with id "${id}" not found.`);
896
+ }
897
+
898
+ if (attachment.storageKey && this.fileStorage && typeof this.fileStorage.download === 'function') {
899
+ const bytes = await this.fileStorage.download(attachment.storageKey);
900
+ return new TextDecoder().decode(bytes);
901
+ }
902
+
903
+ if (attachment.url) {
904
+ if (attachment.url.startsWith('data:')) {
905
+ const commaIndex = attachment.url.indexOf(',');
906
+ const encoded = commaIndex !== -1 ? attachment.url.substring(commaIndex + 1) : attachment.url;
907
+ if (typeof Buffer !== 'undefined') {
908
+ return Buffer.from(encoded, 'base64').toString('utf-8');
909
+ }
910
+ if (typeof atob === 'function') {
911
+ return atob(encoded);
912
+ }
913
+ }
914
+
915
+ const res = await fetch(attachment.url);
916
+ if (!res.ok) {
917
+ throw new Error(`Failed to fetch attachment from URL "${attachment.url}": ${res.statusText}`);
918
+ }
919
+ return await res.text();
920
+ }
921
+
922
+ throw new Error(`Cannot read attachment "${id}": no valid storageKey or URL found.`);
923
+ }
924
+
886
925
  async getPresignedAttachmentUploadUrl(options: PresignedUrlOptions): Promise<PresignedUploadResult> {
887
926
  if (!this.fileStorage || !this.fileStorage.getPresignedUploadUrl) {
888
927
  throw new Error('Presigned uploads are not supported by the configured FileStorageAdapter.');
@@ -123,6 +123,14 @@ export class InMemoryFileStore implements FileStorageAdapter {
123
123
  return this.files.delete(storageKey);
124
124
  }
125
125
 
126
+ async download(storageKey: string): Promise<Buffer | Uint8Array> {
127
+ const file = this.files.get(storageKey);
128
+ if (!file) {
129
+ throw new Error(`File with storageKey "${storageKey}" not found`);
130
+ }
131
+ return file.data;
132
+ }
133
+
126
134
  async getDownloadUrl(storageKey: string): Promise<string> {
127
135
  const file = this.files.get(storageKey);
128
136
  if (!file) {
@@ -52,6 +52,11 @@ export class InMemoryFirebaseStorageMock implements FirebaseStorageBucketInterfa
52
52
  async delete() {
53
53
  files.delete(path);
54
54
  },
55
+ async download(): Promise<[Uint8Array]> {
56
+ const file = files.get(path);
57
+ if (!file) throw new Error(`File not found: ${path}`);
58
+ return [file.data];
59
+ },
55
60
  async getMetadata(): Promise<[any]> {
56
61
  const file = files.get(path);
57
62
  return [{
@@ -146,6 +151,21 @@ export class FirebaseStorageAdapter implements FileStorageAdapter {
146
151
  }
147
152
  }
148
153
 
154
+ async download(storageKey: string): Promise<Buffer | Uint8Array> {
155
+ const fileRef = this.bucket.file(storageKey);
156
+ if (typeof (fileRef as any).download === 'function') {
157
+ const [buf] = await (fileRef as any).download();
158
+ return buf;
159
+ }
160
+ const url = await this.getDownloadUrl(storageKey);
161
+ const res = await fetch(url);
162
+ if (!res.ok) {
163
+ throw new Error(`Failed to download file from "${url}": ${res.statusText}`);
164
+ }
165
+ const arrayBuffer = await res.arrayBuffer();
166
+ return new Uint8Array(arrayBuffer);
167
+ }
168
+
149
169
  async getDownloadUrl(storageKey: string): Promise<string> {
150
170
  const fileRef = this.bucket.file(storageKey);
151
171
  if (typeof (fileRef as any).getMetadata === 'function') {
@@ -172,5 +172,45 @@ describe('Storage Adapters', () => {
172
172
  expect(storedUri?.sizeBytes).toBe(Buffer.from(rawText).length);
173
173
  expect(new TextDecoder().decode(storedUri?.data)).toBe(rawText);
174
174
  });
175
+
176
+ it('downloads file bytes and reads text content from attachments via engine', async () => {
177
+ const mockStorage = new InMemoryFirebaseStorageMock();
178
+ const storageAdapter = new FirebaseStorageAdapter({ bucket: mockStorage, bucketName: 'test-bucket' });
179
+ const engine = new CriticalPathEngine({ fileStorage: storageAdapter });
180
+
181
+ const project = await engine.createProject({ name: 'Attachment Reading Test' });
182
+ const task = await engine.createTask({ projectId: project.id, title: 'Document Task' });
183
+
184
+ const planMarkdown = '# Project Roadmap\n\nPhase 1: Research\nPhase 2: Execution';
185
+ const attachment = await engine.uploadAttachmentFile({
186
+ filename: 'Roadmap.md',
187
+ data: planMarkdown,
188
+ mimeType: 'text/markdown',
189
+ taskId: task.id,
190
+ projectId: project.id,
191
+ uploaderId: 'agent_planner',
192
+ uploaderType: 'agent',
193
+ artifactType: 'plan'
194
+ });
195
+
196
+ expect(attachment.id).toBeDefined();
197
+ expect(attachment.artifactType).toBe('plan');
198
+
199
+ // Test download method on adapter
200
+ const downloadedBytes = await storageAdapter.download(attachment.storageKey!);
201
+ expect(new TextDecoder().decode(downloadedBytes)).toBe(planMarkdown);
202
+
203
+ // Test engine readAttachmentText
204
+ const readText = await engine.readAttachmentText(attachment.id);
205
+ expect(readText).toBe(planMarkdown);
206
+
207
+ // Test filtering by artifactType
208
+ const planAttachments = await engine.getAttachments({ taskId: task.id, artifactType: 'plan' });
209
+ expect(planAttachments.length).toBe(1);
210
+ expect(planAttachments[0].id).toBe(attachment.id);
211
+
212
+ const reviewAttachments = await engine.getAttachments({ taskId: task.id, artifactType: 'review' });
213
+ expect(reviewAttachments.length).toBe(0);
214
+ });
175
215
  });
176
216
  });
@@ -271,6 +271,7 @@ export interface Attachment {
271
271
  sizeBytes: number;
272
272
  url: string;
273
273
  storageKey?: string;
274
+ artifactType?: 'plan' | 'spec' | 'deliverable' | 'review' | 'general';
274
275
  metadata?: Record<string, unknown>;
275
276
  createdAt: string;
276
277
  updatedAt: string;
@@ -309,6 +310,7 @@ export interface PresignedUploadResult {
309
310
  export interface FileStorageAdapter {
310
311
  upload(input: UploadFileInput): Promise<UploadFileResult>;
311
312
  delete(storageKey: string): Promise<boolean>;
313
+ download?(storageKey: string): Promise<Buffer | Uint8Array>;
312
314
  getDownloadUrl?(storageKey: string): Promise<string>;
313
315
  getPresignedUploadUrl?(options: PresignedUrlOptions): Promise<PresignedUploadResult>;
314
316
  }
@@ -32,6 +32,11 @@ describe('mentions utility', () => {
32
32
  const text = 'Call @agent-1, @super_user, and @john.doe';
33
33
  expect(extractMentions(text)).toEqual(['agent-1', 'super_user', 'john.doe']);
34
34
  });
35
+
36
+ it('correctly ignores trailing punctuation such as periods, commas, and exclamation marks', () => {
37
+ const text = 'Check with @turquoise. Then ping @john.doe! Also ask @coordinator, and @"Jane Doe".';
38
+ expect(extractMentions(text)).toEqual(['turquoise', 'john.doe', 'coordinator', 'Jane Doe']);
39
+ });
35
40
  });
36
41
 
37
42
  describe('parseMentionSegments', () => {
@@ -54,6 +59,15 @@ describe('mentions utility', () => {
54
59
  ]);
55
60
  });
56
61
 
62
+ it('correctly segments mention with trailing period', () => {
63
+ const result = parseMentionSegments('Hello @turquoise.');
64
+ expect(result).toEqual([
65
+ { type: 'text', value: 'Hello ' },
66
+ { type: 'mention', value: '@turquoise', handle: 'turquoise' },
67
+ { type: 'text', value: '.' }
68
+ ]);
69
+ });
70
+
57
71
  it('correctly segments text starting with a mention', () => {
58
72
  const result = parseMentionSegments('@planner can you take a look?');
59
73
  expect(result).toEqual([
@@ -10,7 +10,7 @@ export interface MentionSegment {
10
10
  * - Standard mentions: @jane_doe, @planner, @user-1, @john.smith
11
11
  * Note: Does not match emails like foo@bar.com (requires word boundary or start of string before @).
12
12
  */
13
- export const MENTION_REGEX = /(?:^|\s)@(?:"([^"]+)"|([a-zA-Z0-9_.-]+))/g;
13
+ export const MENTION_REGEX = /(?:^|\s)@(?:"([^"]+)"|([a-zA-Z0-9_-]+(?:\.[a-zA-Z0-9_-]+)*))/g;
14
14
 
15
15
  /**
16
16
  * Extracts unique mention handles from a text string.