@critical-path/client 0.14.8 → 0.15.0

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,46 @@
1
1
  # @critical-path/client
2
2
 
3
+ ## 0.15.0
4
+
5
+ ### Minor Changes
6
+
7
+ - fd79762: **BREAKING:** strict request bodies, no identity in payloads, and CORS off by default.
8
+
9
+ **@critical-path/core**
10
+ - Request schemas are strict: unknown keys, server-assigned fields and identity fields are rejected instead of stripped.
11
+ - Identity is never read from payloads. `updateTask` no longer reads `actorId`/`actorName`/`actorType`/`actor` from the update object; pass them as the third `options` argument or use `withActor`. `addComment`, `addCommentReaction`, `removeCommentReaction` and `createAttachment` take the actor from `withActor`, falling back to an optional `authorId`/`userId`/`uploaderId`, then `'system'`.
12
+ - Schemas export request body types (`CreateTaskBody`, `UpdateTaskBody`, ...).
13
+
14
+ **@critical-path/server**
15
+ - Bodies containing unknown, server-assigned or identity fields return `400`.
16
+ - Every request runs as the `getContext` user, or `ANONYMOUS_ACTOR` (`anonymous`). Authors of comments, reactions, attachments and time entries are no longer accepted from bodies.
17
+ - `DELETE /comments/:id/reactions` takes `?emoji=` only.
18
+ - CORS is off by default (`cors: false`). Pass `cors: { origins: [...] }` to allow cross-origin browsers.
19
+
20
+ **@critical-path/client**
21
+ - Method parameters use the server's body types, so identity fields no longer type-check. `addCommentReaction`/`removeCommentReaction` take `{ emoji }`; `addTodo`/`toggleTodo` drop the actor options argument.
22
+ - New `updateProject`, `deleteProject` and `addDependency`. `uploadAttachmentFile` base64-encodes binary data (previously it sent unusable JSON for `Uint8Array`/`ArrayBuffer`).
23
+ - CLI: `--author`, `--actor-id`, `--actor-name`, `--agent-name` and `CRITICAL_PATH_AUTHOR_ID`/`ACTOR_ID`/`AGENT_NAME` are removed; identity comes from the `--key` token via the server's `getContext`.
24
+
25
+ **@critical-path/mcp**
26
+ - Tool arguments are strict: undeclared arguments return an `isError` result.
27
+ - `add_comment` no longer takes `authorId`. With an `engine`, writes are attributed to the new `actor` server option (default `DEFAULT_MCP_ACTOR`).
28
+
29
+ **@critical-path/react / @critical-path/svelte**
30
+ - `addReaction`/`removeReaction` take `(commentId, emoji)`; comment and attachment inputs no longer accept `authorId`/`uploaderId`. Task, comment and deliverable update parameters use the schema body types.
31
+
32
+ ### Patch Changes
33
+
34
+ - Updated dependencies [fd79762]
35
+ - @critical-path/core@0.25.0
36
+
37
+ ## 0.14.9
38
+
39
+ ### Patch Changes
40
+
41
+ - Updated dependencies [b54e22c]
42
+ - @critical-path/core@0.24.0
43
+
3
44
  ## 0.14.8
4
45
 
5
46
  ### Patch Changes
package/README.md CHANGED
@@ -39,28 +39,23 @@ const newTask = await client.createTask({
39
39
  status: 'todo'
40
40
  });
41
41
 
42
+ // Identity comes from your auth headers (resolved by the server's getContext), never from
43
+ // request bodies. Without auth, writes are attributed to "anonymous".
44
+
42
45
  // Update task status
43
46
  await client.updateTask(newTask.id, { status: 'in_progress' });
44
47
 
45
48
  // Add threaded comment
46
49
  const comment = await client.addComment({
47
50
  taskId: newTask.id,
48
- content: 'Initial implementation ready for review',
49
- authorId: 'user_1',
50
- authorType: 'user'
51
- });
51
+ content: 'Initial implementation ready for review'
52
+ }); // authored by the caller the server resolves from your auth headers
52
53
 
53
54
  // Add emoji reaction
54
- await client.addCommentReaction(comment.id, {
55
- emoji: '🚀',
56
- userId: 'user_2'
57
- });
55
+ await client.addCommentReaction(comment.id, { emoji: '🚀' });
58
56
 
59
57
  // Remove emoji reaction
60
- await client.removeCommentReaction(comment.id, {
61
- emoji: '🚀',
62
- userId: 'user_2'
63
- });
58
+ await client.removeCommentReaction(comment.id, { emoji: '🚀' });
64
59
 
65
60
  // Upload file directly or register storage attachment
66
61
  const attachment = await client.uploadAttachmentFile({
@@ -68,9 +63,8 @@ const attachment = await client.uploadAttachmentFile({
68
63
  data: fileBuffer,
69
64
  mimeType: 'image/png',
70
65
  taskId: newTask.id,
71
- commentId: comment.id,
72
- uploaderId: 'user_1'
73
- });
66
+ commentId: comment.id
67
+ }); // binary data is base64-encoded automatically
74
68
 
75
69
  // Calculate Critical Path Method (CPM) schedule & bottlenecks
76
70
  const cpmAnalysis = await client.calculateCriticalPath('proj_1');
@@ -1 +1 @@
1
- {"version":3,"file":"cli.d.ts","sourceRoot":"","sources":["../../src/bin/cli.ts"],"names":[],"mappings":";AAyGA,wBAAsB,IAAI,CAAC,IAAI,WAAwB,GAAG,OAAO,CAAC,IAAI,CAAC,CAqYtE;AAGD,wBAAgB,iBAAiB,CAC/B,SAAS,GAAE,MAAwB,EACnC,KAAK,GAAE,MAAM,GAAG,SAA2B,GAC1C,OAAO,CAQT"}
1
+ {"version":3,"file":"cli.d.ts","sourceRoot":"","sources":["../../src/bin/cli.ts"],"names":[],"mappings":";AAsGA,wBAAsB,IAAI,CAAC,IAAI,WAAwB,GAAG,OAAO,CAAC,IAAI,CAAC,CAoWtE;AAGD,wBAAgB,iBAAiB,CAC/B,SAAS,GAAE,MAAwB,EACnC,KAAK,GAAE,MAAM,GAAG,SAA2B,GAC1C,OAAO,CAQT"}
package/dist/bin/cli.js CHANGED
@@ -43,8 +43,6 @@ function getContext(flags) {
43
43
  const apiKey = flags.key || process.env.CRITICAL_PATH_KEY;
44
44
  const taskId = flags.task || process.env.CRITICAL_PATH_TASK_ID;
45
45
  const projectId = flags.project || process.env.CRITICAL_PATH_PROJECT_ID;
46
- const authorId = flags.author || flags['actor-id'] || process.env.CRITICAL_PATH_AUTHOR_ID || process.env.CRITICAL_PATH_ACTOR_ID || 'agent';
47
- const agentName = flags['actor-name'] || flags['agent-name'] || process.env.CRITICAL_PATH_AGENT_NAME || undefined;
48
46
  if (!apiUrl) {
49
47
  console.error('[critical-path] Error: Base API URL is required. Provide --api or set CRITICAL_PATH_API.');
50
48
  process.exit(1);
@@ -54,7 +52,7 @@ function getContext(flags) {
54
52
  headers['Authorization'] = `Bearer ${apiKey}`;
55
53
  }
56
54
  const client = new CriticalPathClient({ baseUrl: apiUrl, headers });
57
- return { client, taskId, projectId, authorId, agentName };
55
+ return { client, taskId, projectId };
58
56
  }
59
57
  function printHelp() {
60
58
  console.log(`
@@ -130,16 +128,10 @@ export async function main(argv = process.argv.slice(2)) {
130
128
  }
131
129
  await client.addComment({
132
130
  taskId,
133
- authorId: getContext(flags).authorId,
134
131
  content: commentContent,
135
- authorType: 'agent'
136
132
  });
137
- const { authorId: blockAuthorId, agentName: blockAgentName } = getContext(flags);
138
133
  await client.updateTask(taskId, {
139
134
  isBlocked: true,
140
- actorId: blockAuthorId,
141
- actorName: blockAgentName,
142
- actorType: 'agent',
143
135
  customFields: {
144
136
  blockerReason: reason,
145
137
  ...(prUrl ? { prUrl } : {})
@@ -158,7 +150,7 @@ export async function main(argv = process.argv.slice(2)) {
158
150
  console.error('[critical-path] Error: --reason is required when requesting clarification.');
159
151
  process.exit(1);
160
152
  }
161
- const { client, taskId, authorId, agentName } = getContext(flags);
153
+ const { client, taskId } = getContext(flags);
162
154
  if (!taskId) {
163
155
  console.error('[critical-path] Error: Task ID is required (--task or CRITICAL_PATH_TASK_ID).');
164
156
  process.exit(1);
@@ -174,15 +166,10 @@ export async function main(argv = process.argv.slice(2)) {
174
166
  }
175
167
  await client.addComment({
176
168
  taskId,
177
- authorId,
178
169
  content,
179
- authorType: 'agent'
180
170
  });
181
171
  await client.updateTask(taskId, {
182
172
  isBlocked: true,
183
- actorId: authorId,
184
- actorName: agentName,
185
- actorType: 'agent',
186
173
  customFields: {
187
174
  needsClarification: true,
188
175
  clarificationReason: reason
@@ -228,7 +215,7 @@ export async function main(argv = process.argv.slice(2)) {
228
215
  console.error('[critical-path] Error: Both --title and --url are required for deliverable.');
229
216
  process.exit(1);
230
217
  }
231
- const { client, taskId, projectId, authorId, agentName } = getContext(flags);
218
+ const { client, taskId, projectId } = getContext(flags);
232
219
  if (projectId) {
233
220
  try {
234
221
  await client.createDeliverable({
@@ -245,14 +232,9 @@ export async function main(argv = process.argv.slice(2)) {
245
232
  if (taskId) {
246
233
  await client.addComment({
247
234
  taskId,
248
- authorId,
249
235
  content: `Deliverable recorded: [${title}](${url})`,
250
- authorType: 'agent'
251
236
  });
252
237
  await client.updateTask(taskId, {
253
- actorId: authorId,
254
- actorName: agentName,
255
- actorType: 'agent',
256
238
  customFields: {
257
239
  deliverableUrl: url,
258
240
  deliverableTitle: title
@@ -268,16 +250,14 @@ export async function main(argv = process.argv.slice(2)) {
268
250
  console.error('[critical-path] Error: Comment content is required.');
269
251
  process.exit(1);
270
252
  }
271
- const { client, taskId, authorId } = getContext(flags);
253
+ const { client, taskId } = getContext(flags);
272
254
  if (!taskId) {
273
255
  console.error('[critical-path] Error: Task ID is required (--task or CRITICAL_PATH_TASK_ID).');
274
256
  process.exit(1);
275
257
  }
276
258
  await client.addComment({
277
259
  taskId,
278
- authorId,
279
260
  content,
280
- authorType: 'agent'
281
261
  });
282
262
  console.log(`[critical-path] Added comment to task ${taskId}.`);
283
263
  break;
@@ -339,7 +319,7 @@ export async function main(argv = process.argv.slice(2)) {
339
319
  case 'checklist':
340
320
  case 'todo': {
341
321
  const subAction = positionals[1];
342
- const { client, taskId, authorId, agentName } = getContext(flags);
322
+ const { client, taskId } = getContext(flags);
343
323
  if (!taskId) {
344
324
  console.error('[critical-path] Error: Task ID is required (--task or CRITICAL_PATH_TASK_ID).');
345
325
  process.exit(1);
@@ -363,11 +343,7 @@ export async function main(argv = process.argv.slice(2)) {
363
343
  console.error('[critical-path] Error: Checklist item ID or title is required. Example: critical-path checklist check "Write unit tests"');
364
344
  process.exit(1);
365
345
  }
366
- const updated = await client.toggleTodo(taskId, query, true, {
367
- actorId: authorId,
368
- actorName: agentName,
369
- actorType: 'agent'
370
- });
346
+ const updated = await client.toggleTodo(taskId, query, true);
371
347
  const item = updated.todos?.find((t) => t.id === query || t.title.toLowerCase().includes(query.toLowerCase()));
372
348
  console.log(`[critical-path] Marked checklist item "${item?.title || query}" as completed on task ${taskId}.`);
373
349
  break;
@@ -378,11 +354,7 @@ export async function main(argv = process.argv.slice(2)) {
378
354
  console.error('[critical-path] Error: Checklist item ID or title is required.');
379
355
  process.exit(1);
380
356
  }
381
- const updated = await client.toggleTodo(taskId, query, false, {
382
- actorId: authorId,
383
- actorName: agentName,
384
- actorType: 'agent'
385
- });
357
+ const updated = await client.toggleTodo(taskId, query, false);
386
358
  const item = updated.todos?.find((t) => t.id === query || t.title.toLowerCase().includes(query.toLowerCase()));
387
359
  console.log(`[critical-path] Marked checklist item "${item?.title || query}" as incomplete on task ${taskId}.`);
388
360
  break;
@@ -402,9 +374,6 @@ export async function main(argv = process.argv.slice(2)) {
402
374
  }));
403
375
  await client.updateTask(taskId, {
404
376
  todos: newTodos,
405
- actorId: authorId,
406
- actorName: agentName,
407
- actorType: 'agent'
408
377
  });
409
378
  console.log(`[critical-path] Set ${newTodos.length} checklist item(s) on task ${taskId}.`);
410
379
  break;
@@ -417,11 +386,7 @@ export async function main(argv = process.argv.slice(2)) {
417
386
  console.error('[critical-path] Error: Item title is required. Example: critical-path checklist add "Write unit tests"');
418
387
  process.exit(1);
419
388
  }
420
- const item = await client.addTodo(taskId, title, {
421
- actorId: authorId,
422
- actorName: agentName,
423
- actorType: 'agent'
424
- });
389
+ const item = await client.addTodo(taskId, title);
425
390
  console.log(`[critical-path] Added checklist item "${item.title}" (${item.id}) to task ${taskId}.`);
426
391
  break;
427
392
  }
@@ -1 +1 @@
1
- {"version":3,"file":"cli.js","sourceRoot":"","sources":["../../src/bin/cli.ts"],"names":[],"mappings":";AACA,OAAO,EAAE,aAAa,EAAE,MAAM,UAAU,CAAC;AACzC,OAAO,EAAE,MAAM,SAAS,CAAC;AACzB,OAAO,EAAE,kBAAkB,EAAqB,MAAM,aAAa,CAAC;AASpE,SAAS,YAAY,CAAC,IAAc;IAClC,MAAM,KAAK,GAAgD,EAAE,CAAC;IAC9D,MAAM,WAAW,GAAa,EAAE,CAAC;IAEjC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;QACrC,MAAM,GAAG,GAAG,IAAI,CAAC,CAAC,CAAC,CAAC;QACpB,IAAI,GAAG,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC;YACzB,MAAM,GAAG,GAAG,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;YACzB,MAAM,OAAO,GAAG,IAAI,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;YAC5B,IAAI,OAAO,IAAI,CAAC,OAAO,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC;gBACzC,IAAI,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC;oBACf,IAAI,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC;wBAC7B,KAAK,CAAC,GAAG,CAAc,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;oBACzC,CAAC;yBAAM,CAAC;wBACN,KAAK,CAAC,GAAG,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAW,EAAE,OAAO,CAAC,CAAC;oBAC/C,CAAC;gBACH,CAAC;qBAAM,CAAC;oBACN,KAAK,CAAC,GAAG,CAAC,GAAG,OAAO,CAAC;gBACvB,CAAC;gBACD,CAAC,EAAE,CAAC;YACN,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,GAAG,CAAC,GAAG,IAAI,CAAC;YACpB,CAAC;QACH,CAAC;aAAM,IAAI,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC;YAC/B,MAAM,GAAG,GAAG,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;YACzB,KAAK,CAAC,GAAG,CAAC,GAAG,IAAI,CAAC;QACpB,CAAC;aAAM,CAAC;YACN,WAAW,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACxB,CAAC;IACH,CAAC;IAED,OAAO,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC;AAChC,CAAC;AAED,SAAS,UAAU,CAAC,KAA0B;IAO5C,MAAM,MAAM,GAAI,KAAK,CAAC,GAAc,IAAI,OAAO,CAAC,GAAG,CAAC,iBAAiB,CAAC;IACtE,MAAM,MAAM,GAAI,KAAK,CAAC,GAAc,IAAI,OAAO,CAAC,GAAG,CAAC,iBAAiB,CAAC;IACtE,MAAM,MAAM,GAAI,KAAK,CAAC,IAAe,IAAI,OAAO,CAAC,GAAG,CAAC,qBAAqB,CAAC;IAC3E,MAAM,SAAS,GAAI,KAAK,CAAC,OAAkB,IAAI,OAAO,CAAC,GAAG,CAAC,wBAAwB,CAAC;IACpF,MAAM,QAAQ,GAAI,KAAK,CAAC,MAAiB,IAAK,KAAK,CAAC,UAAU,CAAY,IAAI,OAAO,CAAC,GAAG,CAAC,uBAAuB,IAAI,OAAO,CAAC,GAAG,CAAC,sBAAsB,IAAI,OAAO,CAAC;IACnK,MAAM,SAAS,GAAI,KAAK,CAAC,YAAY,CAAY,IAAK,KAAK,CAAC,YAAY,CAAY,IAAI,OAAO,CAAC,GAAG,CAAC,wBAAwB,IAAI,SAAS,CAAC;IAE1I,IAAI,CAAC,MAAM,EAAE,CAAC;QACZ,OAAO,CAAC,KAAK,CAAC,0FAA0F,CAAC,CAAC;QAC1G,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClB,CAAC;IAED,MAAM,OAAO,GAA2B,EAAE,CAAC;IAC3C,IAAI,MAAM,EAAE,CAAC;QACX,OAAO,CAAC,eAAe,CAAC,GAAG,UAAU,MAAM,EAAE,CAAC;IAChD,CAAC;IAED,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,OAAO,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC;IACpE,OAAO,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,QAAQ,EAAE,SAAS,EAAE,CAAC;AAC5D,CAAC;AAED,SAAS,SAAS;IAChB,OAAO,CAAC,GAAG,CAAC;;;;;;;;;;;;;;;;;;;;;;;;;;;CA2Bb,CAAC,CAAC;AACH,CAAC;AAED,MAAM,CAAC,KAAK,UAAU,IAAI,CAAC,IAAI,GAAG,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC;IACrD,MAAM,EAAE,KAAK,EAAE,WAAW,EAAE,GAAG,YAAY,CAAC,IAAI,CAAC,CAAC;IAClD,MAAM,OAAO,GAAG,WAAW,CAAC,CAAC,CAAC,CAAC;IAE/B,IAAI,CAAC,OAAO,IAAI,KAAK,CAAC,IAAI,IAAI,OAAO,KAAK,MAAM,EAAE,CAAC;QACjD,SAAS,EAAE,CAAC;QACZ,OAAO;IACT,CAAC;IAED,QAAQ,OAAO,EAAE,CAAC;QAChB,KAAK,QAAQ,CAAC,CAAC,CAAC;YACd,MAAM,aAAa,GAAG,WAAW,CAAC,CAAC,CAAC,IAAK,KAAK,CAAC,OAAkB,CAAC;YAClE,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,OAAO,CAAC,KAAK,CAAC,uGAAuG,CAAC,CAAC;gBACvH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YACxD,MAAM,SAAS,GAAG,CAAC,KAAK,CAAC,UAAU,CAAC;YACpC,MAAM,OAAO,GAAG,KAAK,CAAC,OAA6B,CAAC;YAEpD,MAAM,MAAM,CAAC,YAAY,CAAC,aAAa,EAAE;gBACvC,MAAM;gBACN,SAAS;gBACT,OAAO;gBACP,SAAS;aACV,CAAC,CAAC;YACH,OAAO,CAAC,GAAG,CAAC,oCAAoC,aAAa,GAAG,CAAC,CAAC;YAClE,MAAM;QACR,CAAC;QAED,KAAK,OAAO,CAAC,CAAC,CAAC;YACb,MAAM,MAAM,GAAI,KAAK,CAAC,MAAiB,IAAI,WAAW,CAAC,CAAC,CAAC,CAAC;YAC1D,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,wEAAwE,CAAC,CAAC;gBACxF,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,+EAA+E,CAAC,CAAC;gBAC/F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,KAAK,GAAG,KAAK,CAAC,EAAwB,CAAC;YAE7C,IAAI,cAAc,GAAG,2BAA2B,MAAM,EAAE,CAAC;YACzD,IAAI,KAAK,EAAE,CAAC;gBACV,cAAc,IAAI,qBAAqB,KAAK,EAAE,CAAC;YACjD,CAAC;YAED,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtB,MAAM;gBACN,QAAQ,EAAE,UAAU,CAAC,KAAK,CAAC,CAAC,QAAQ;gBACpC,OAAO,EAAE,cAAc;gBACvB,UAAU,EAAE,OAAO;aACpB,CAAC,CAAC;YAEH,MAAM,EAAE,QAAQ,EAAE,aAAa,EAAE,SAAS,EAAE,cAAc,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YACjF,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE;gBAC9B,SAAS,EAAE,IAAI;gBACf,OAAO,EAAE,aAAa;gBACtB,SAAS,EAAE,cAAc;gBACzB,SAAS,EAAE,OAAO;gBAClB,YAAY,EAAE;oBACZ,aAAa,EAAE,MAAM;oBACrB,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;iBAC5B;aACF,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,YAAY,CAAC,YAAY,MAAM,EAAE,EAAE;gBAC9C,MAAM;gBACN,SAAS,EAAE,KAAK;aACjB,CAAC,CAAC;YAEH,OAAO,CAAC,GAAG,CAAC,wBAAwB,MAAM,wBAAwB,MAAM,GAAG,CAAC,CAAC;YAC7E,MAAM;QACR,CAAC;QAED,KAAK,SAAS,CAAC,CAAC,CAAC;YACf,MAAM,MAAM,GAAI,KAAK,CAAC,MAAiB,IAAI,WAAW,CAAC,CAAC,CAAC,CAAC;YAC1D,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,4EAA4E,CAAC,CAAC;gBAC5F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAClE,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,+EAA+E,CAAC,CAAC;gBAC/F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,MAAM,SAAS,GAAG,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,QAAQ,CAAC;gBAC7C,CAAC,CAAE,KAAK,CAAC,QAAqB;gBAC9B,CAAC,CAAC,KAAK,CAAC,QAAQ;oBACd,CAAC,CAAC,CAAC,KAAK,CAAC,QAAkB,CAAC;oBAC5B,CAAC,CAAC,EAAE,CAAC;YAET,IAAI,OAAO,GAAG,2CAA2C,MAAM,EAAE,CAAC;YAClE,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBACzB,OAAO,IAAI,sBAAsB,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAChF,CAAC;YAED,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtB,MAAM;gBACN,QAAQ;gBACR,OAAO;gBACP,UAAU,EAAE,OAAO;aACpB,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE;gBAC9B,SAAS,EAAE,IAAI;gBACf,OAAO,EAAE,QAAQ;gBACjB,SAAS,EAAE,SAAS;gBACpB,SAAS,EAAE,OAAO;gBAClB,YAAY,EAAE;oBACZ,kBAAkB,EAAE,IAAI;oBACxB,mBAAmB,EAAE,MAAM;iBAC5B;aACF,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,YAAY,CAAC,wBAAwB,EAAE;gBAClD,MAAM;gBACN,SAAS,EAAE,KAAK;aACjB,CAAC,CAAC;YAEH,OAAO,CAAC,GAAG,CAAC,wDAAwD,MAAM,GAAG,CAAC,CAAC;YAC/E,MAAM;QACR,CAAC;QAED,KAAK,SAAS,CAAC,CAAC,CAAC;YACf,MAAM,KAAK,GAAI,KAAK,CAAC,KAAgB,IAAI,WAAW,CAAC,CAAC,CAAC,CAAC;YACxD,IAAI,CAAC,KAAK,EAAE,CAAC;gBACX,OAAO,CAAC,KAAK,CAAC,2EAA2E,CAAC,CAAC;gBAC3F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,WAAW,GAAI,KAAK,CAAC,WAAsB,IAAI,EAAE,CAAC;YACxD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAExD,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,OAAO,CAAC,KAAK,CAAC,wFAAwF,CAAC,CAAC;gBACxG,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtC,SAAS;gBACT,KAAK;gBACL,WAAW;gBACX,MAAM,EAAE,OAAc;gBACtB,QAAQ,EAAG,KAAK,CAAC,QAAgB,IAAI,QAAQ;gBAC7C,QAAQ,EAAG,KAAK,CAAC,MAAiB,IAAI,SAAS;gBAC/C,YAAY,EAAE;oBACZ,eAAe,EAAE,IAAI;iBACtB;aACF,CAAC,CAAC;YAEH,OAAO,CAAC,GAAG,CAAC,2CAA2C,KAAK,UAAU,OAAO,CAAC,EAAE,GAAG,CAAC,CAAC;YACrF,MAAM;QACR,CAAC;QAED,KAAK,aAAa,CAAC,CAAC,CAAC;YACnB,MAAM,KAAK,GAAI,KAAK,CAAC,KAAgB,IAAI,WAAW,CAAC,CAAC,CAAC,CAAC;YACxD,MAAM,GAAG,GAAI,KAAK,CAAC,GAAc,IAAK,KAAK,CAAC,EAAa,CAAC;YAC1D,IAAI,CAAC,KAAK,IAAI,CAAC,GAAG,EAAE,CAAC;gBACnB,OAAO,CAAC,KAAK,CAAC,6EAA6E,CAAC,CAAC;gBAC7F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,QAAQ,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAE7E,IAAI,SAAS,EAAE,CAAC;gBACd,IAAI,CAAC;oBACH,MAAM,MAAM,CAAC,iBAAiB,CAAC;wBAC7B,SAAS;wBACT,KAAK;wBACL,MAAM,EAAE,WAAW;wBACnB,UAAU,EAAE,CAAC,GAAG,CAAC;qBAClB,CAAC,CAAC;gBACL,CAAC;gBAAC,MAAM,CAAC;oBACP,sFAAsF;gBACxF,CAAC;YACH,CAAC;YAED,IAAI,MAAM,EAAE,CAAC;gBACX,MAAM,MAAM,CAAC,UAAU,CAAC;oBACtB,MAAM;oBACN,QAAQ;oBACR,OAAO,EAAE,0BAA0B,KAAK,KAAK,GAAG,GAAG;oBACnD,UAAU,EAAE,OAAO;iBACpB,CAAC,CAAC;gBACH,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE;oBAC9B,OAAO,EAAE,QAAQ;oBACjB,SAAS,EAAE,SAAS;oBACpB,SAAS,EAAE,OAAO;oBAClB,YAAY,EAAE;wBACZ,cAAc,EAAE,GAAG;wBACnB,gBAAgB,EAAE,KAAK;qBACxB;iBACF,CAAC,CAAC;YACL,CAAC;YAED,OAAO,CAAC,GAAG,CAAC,yCAAyC,KAAK,MAAM,GAAG,GAAG,CAAC,CAAC;YACxE,MAAM;QACR,CAAC;QAED,KAAK,SAAS,CAAC,CAAC,CAAC;YACf,MAAM,OAAO,GAAG,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,OAAkB,IAAK,KAAK,CAAC,OAAkB,CAAC;YACzG,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,OAAO,CAAC,KAAK,CAAC,qDAAqD,CAAC,CAAC;gBACrE,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YACvD,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,+EAA+E,CAAC,CAAC;gBAC/F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtB,MAAM;gBACN,QAAQ;gBACR,OAAO;gBACP,UAAU,EAAE,OAAO;aACpB,CAAC,CAAC;YACH,OAAO,CAAC,GAAG,CAAC,yCAAyC,MAAM,GAAG,CAAC,CAAC;YAChE,MAAM;QACR,CAAC;QAED,KAAK,SAAS,CAAC,CAAC,CAAC;YACf,MAAM,SAAS,GAAG,WAAW,CAAC,CAAC,CAAC,CAAC;YACjC,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YACxD,MAAM,cAAc,GAAI,KAAK,CAAC,MAAiB,IAAI,MAAM,CAAC;YAE1D,IAAI,SAAS,KAAK,MAAM,EAAE,CAAC;gBACzB,MAAM,UAAU,GAAI,KAAK,CAAC,OAAkB,IAAI,SAAS,CAAC;gBAC1D,IAAI,CAAC,cAAc,EAAE,CAAC;oBACpB,OAAO,CAAC,KAAK,CAAC,iGAAiG,CAAC,CAAC;oBACjH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBAClB,CAAC;gBACD,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;gBAChD,MAAM,QAAQ,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,cAAc,CAAC,CAAC;gBACpE,IAAI,QAAQ,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;oBAC1B,OAAO,CAAC,GAAG,CAAC,qDAAqD,cAAc,GAAG,CAAC,CAAC;gBACtF,CAAC;qBAAM,CAAC;oBACN,OAAO,CAAC,GAAG,CAAC,4CAA4C,cAAc,KAAK,QAAQ,CAAC,MAAM,IAAI,CAAC,CAAC;oBAChG,KAAK,MAAM,EAAE,IAAI,QAAQ,EAAE,CAAC;wBAC1B,OAAO,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,MAAM,MAAM,EAAE,CAAC,KAAK,EAAE,CAAC,CAAC;oBAC5D,CAAC;gBACH,CAAC;gBACD,MAAM;YACR,CAAC;YAED,MAAM,KAAK,GACT,SAAS,KAAK,QAAQ;gBACpB,CAAC,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,KAAgB;gBAC3D,CAAC,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,KAAgB,CAAC;YAEhE,IAAI,CAAC,KAAK,EAAE,CAAC;gBACX,OAAO,CAAC,KAAK,CAAC,yGAAyG,CAAC,CAAC;gBACzH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,IAAI,CAAC,cAAc,EAAE,CAAC;gBACpB,OAAO,CAAC,KAAK,CAAC,iGAAiG,CAAC,CAAC;gBACjH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,IAAI,UAAU,GAAI,KAAK,CAAC,OAAkB,IAAI,SAAS,CAAC;YACxD,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;gBACxD,UAAU,GAAG,UAAU,CAAC,SAAS,CAAC;YACpC,CAAC;YAED,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtC,SAAS,EAAE,UAAU;gBACrB,KAAK;gBACL,WAAW,EAAG,KAAK,CAAC,WAAsB,IAAI,EAAE;gBAChD,QAAQ,EAAE,cAAc;gBACxB,MAAM,EAAG,KAAK,CAAC,MAAc,IAAI,MAAM;gBACvC,QAAQ,EAAG,KAAK,CAAC,QAAgB,IAAI,QAAQ;gBAC7C,UAAU,EAAG,KAAK,CAAC,QAAmB,IAAI,SAAS;gBACnD,YAAY,EAAE;oBACZ,cAAc,EAAE,IAAI;iBACrB;aACF,CAAC,CAAC;YAEH,OAAO,CAAC,GAAG,CAAC,oCAAoC,OAAO,CAAC,KAAK,UAAU,OAAO,CAAC,EAAE,uBAAuB,cAAc,GAAG,CAAC,CAAC;YAC3H,MAAM;QACR,CAAC;QAED,KAAK,WAAW,CAAC;QACjB,KAAK,MAAM,CAAC,CAAC,CAAC;YACZ,MAAM,SAAS,GAAG,WAAW,CAAC,CAAC,CAAC,CAAC;YACjC,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,QAAQ,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAClE,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,+EAA+E,CAAC,CAAC;gBAC/F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,IAAI,CAAC,SAAS,IAAI,SAAS,KAAK,MAAM,EAAE,CAAC;gBACvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;gBAC1C,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;oBAC3C,OAAO,CAAC,GAAG,CAAC,wBAAwB,MAAM,0BAA0B,CAAC,CAAC;gBACxE,CAAC;qBAAM,CAAC;oBACN,OAAO,CAAC,GAAG,CAAC,sCAAsC,MAAM,KAAK,IAAI,CAAC,KAAK,CAAC,MAAM,IAAI,CAAC,CAAC;oBACpF,KAAK,MAAM,IAAI,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;wBAC9B,OAAO,CAAC,GAAG,CAAC,KAAK,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,KAAK,IAAI,CAAC,EAAE,GAAG,CAAC,CAAC;oBAChF,CAAC;gBACH,CAAC;gBACD,MAAM;YACR,CAAC;YAED,IAAI,SAAS,KAAK,OAAO,IAAI,SAAS,KAAK,MAAM,IAAI,SAAS,KAAK,UAAU,EAAE,CAAC;gBAC9E,MAAM,KAAK,GAAG,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,IAAe,IAAK,KAAK,CAAC,KAAgB,IAAK,KAAK,CAAC,EAAa,CAAC;gBAC1H,IAAI,CAAC,KAAK,EAAE,CAAC;oBACX,OAAO,CAAC,KAAK,CAAC,0HAA0H,CAAC,CAAC;oBAC1I,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBAClB,CAAC;gBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,KAAK,EAAE,IAAI,EAAE;oBAC3D,OAAO,EAAE,QAAQ;oBACjB,SAAS,EAAE,SAAS;oBACpB,SAAS,EAAE,OAAO;iBACnB,CAAC,CAAC;gBACH,MAAM,IAAI,GAAG,OAAO,CAAC,KAAK,EAAE,IAAI,CAC9B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,KAAK,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,QAAQ,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,CAC7E,CAAC;gBACF,OAAO,CAAC,GAAG,CAAC,0CAA0C,IAAI,EAAE,KAAK,IAAI,KAAK,0BAA0B,MAAM,GAAG,CAAC,CAAC;gBAC/G,MAAM;YACR,CAAC;YAED,IAAI,SAAS,KAAK,SAAS,EAAE,CAAC;gBAC5B,MAAM,KAAK,GAAG,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,IAAe,IAAK,KAAK,CAAC,KAAgB,IAAK,KAAK,CAAC,EAAa,CAAC;gBAC1H,IAAI,CAAC,KAAK,EAAE,CAAC;oBACX,OAAO,CAAC,KAAK,CAAC,gEAAgE,CAAC,CAAC;oBAChF,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBAClB,CAAC;gBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,KAAK,EAAE,KAAK,EAAE;oBAC5D,OAAO,EAAE,QAAQ;oBACjB,SAAS,EAAE,SAAS;oBACpB,SAAS,EAAE,OAAO;iBACnB,CAAC,CAAC;gBACH,MAAM,IAAI,GAAG,OAAO,CAAC,KAAK,EAAE,IAAI,CAC9B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,KAAK,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,QAAQ,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,CAC7E,CAAC;gBACF,OAAO,CAAC,GAAG,CAAC,0CAA0C,IAAI,EAAE,KAAK,IAAI,KAAK,2BAA2B,MAAM,GAAG,CAAC,CAAC;gBAChH,MAAM;YACR,CAAC;YAED,IAAI,SAAS,KAAK,KAAK,EAAE,CAAC;gBACxB,MAAM,QAAQ,GAAG,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;gBACtC,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAE,KAAK,CAAC,KAAkB,IAAI,EAAE,CAAC;gBAC/E,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;oBACvB,OAAO,CAAC,KAAK,CAAC,qEAAqE,CAAC,CAAC;oBACrF,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBAClB,CAAC;gBACD,MAAM,QAAQ,GAAmB,KAAK,CAAC,GAAG,CAAC,CAAC,KAAK,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC;oBACxD,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,CAAC,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBAC3E,KAAK;oBACL,SAAS,EAAE,KAAK;oBAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC,CAAC;gBACJ,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE;oBAC9B,KAAK,EAAE,QAAQ;oBACf,OAAO,EAAE,QAAQ;oBACjB,SAAS,EAAE,SAAS;oBACpB,SAAS,EAAE,OAAO;iBACnB,CAAC,CAAC;gBACH,OAAO,CAAC,GAAG,CAAC,uBAAuB,QAAQ,CAAC,MAAM,8BAA8B,MAAM,GAAG,CAAC,CAAC;gBAC3F,MAAM;YACR,CAAC;YAED,mBAAmB;YACnB,MAAM,KAAK,GACT,SAAS,KAAK,KAAK;gBACjB,CAAC,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,KAAgB,IAAK,KAAK,CAAC,IAAe;gBACrF,CAAC,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,KAAgB,IAAK,KAAK,CAAC,IAAe,CAAC;YAE1F,IAAI,CAAC,KAAK,EAAE,CAAC;gBACX,OAAO,CAAC,KAAK,CAAC,wGAAwG,CAAC,CAAC;gBACxH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,EAAE,KAAK,EAAE;gBAC/C,OAAO,EAAE,QAAQ;gBACjB,SAAS,EAAE,SAAS;gBACpB,SAAS,EAAE,OAAO;aACnB,CAAC,CAAC;YACH,OAAO,CAAC,GAAG,CAAC,yCAAyC,IAAI,CAAC,KAAK,MAAM,IAAI,CAAC,EAAE,aAAa,MAAM,GAAG,CAAC,CAAC;YACpG,MAAM;QACR,CAAC;QAED;YACE,OAAO,CAAC,KAAK,CAAC,qCAAqC,OAAO,0CAA0C,CAAC,CAAC;YACtG,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IACpB,CAAC;AACH,CAAC;AAED,wDAAwD;AACxD,MAAM,UAAU,iBAAiB,CAC/B,YAAoB,MAAM,CAAC,IAAI,CAAC,GAAG,EACnC,QAA4B,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC;IAE3C,IAAI,CAAC,KAAK;QAAE,OAAO,KAAK,CAAC;IACzB,IAAI,CAAC;QACH,MAAM,UAAU,GAAG,aAAa,CAAC,SAAS,CAAC,CAAC;QAC5C,OAAO,EAAE,CAAC,YAAY,CAAC,UAAU,CAAC,KAAK,EAAE,CAAC,YAAY,CAAC,KAAK,CAAC,CAAC;IAChE,CAAC;IAAC,MAAM,CAAC;QACP,OAAO,KAAK,CAAC;IACf,CAAC;AACH,CAAC;AAED,IAAI,iBAAiB,EAAE,EAAE,CAAC;IACxB,IAAI,EAAE,CAAC,KAAK,CAAC,CAAC,GAAG,EAAE,EAAE;QACnB,OAAO,CAAC,KAAK,CAAC,kCAAkC,EAAE,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC;QAC5F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClB,CAAC,CAAC,CAAC;AACL,CAAC"}
1
+ {"version":3,"file":"cli.js","sourceRoot":"","sources":["../../src/bin/cli.ts"],"names":[],"mappings":";AACA,OAAO,EAAE,aAAa,EAAE,MAAM,UAAU,CAAC;AACzC,OAAO,EAAE,MAAM,SAAS,CAAC;AACzB,OAAO,EAAE,kBAAkB,EAAqB,MAAM,aAAa,CAAC;AASpE,SAAS,YAAY,CAAC,IAAc;IAClC,MAAM,KAAK,GAAgD,EAAE,CAAC;IAC9D,MAAM,WAAW,GAAa,EAAE,CAAC;IAEjC,KAAK,IAAI,CAAC,GAAG,CAAC,EAAE,CAAC,GAAG,IAAI,CAAC,MAAM,EAAE,CAAC,EAAE,EAAE,CAAC;QACrC,MAAM,GAAG,GAAG,IAAI,CAAC,CAAC,CAAC,CAAC;QACpB,IAAI,GAAG,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC;YACzB,MAAM,GAAG,GAAG,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;YACzB,MAAM,OAAO,GAAG,IAAI,CAAC,CAAC,GAAG,CAAC,CAAC,CAAC;YAC5B,IAAI,OAAO,IAAI,CAAC,OAAO,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,CAAC;gBACzC,IAAI,KAAK,CAAC,GAAG,CAAC,EAAE,CAAC;oBACf,IAAI,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,GAAG,CAAC,CAAC,EAAE,CAAC;wBAC7B,KAAK,CAAC,GAAG,CAAc,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;oBACzC,CAAC;yBAAM,CAAC;wBACN,KAAK,CAAC,GAAG,CAAC,GAAG,CAAC,KAAK,CAAC,GAAG,CAAW,EAAE,OAAO,CAAC,CAAC;oBAC/C,CAAC;gBACH,CAAC;qBAAM,CAAC;oBACN,KAAK,CAAC,GAAG,CAAC,GAAG,OAAO,CAAC;gBACvB,CAAC;gBACD,CAAC,EAAE,CAAC;YACN,CAAC;iBAAM,CAAC;gBACN,KAAK,CAAC,GAAG,CAAC,GAAG,IAAI,CAAC;YACpB,CAAC;QACH,CAAC;aAAM,IAAI,GAAG,CAAC,UAAU,CAAC,GAAG,CAAC,EAAE,CAAC;YAC/B,MAAM,GAAG,GAAG,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;YACzB,KAAK,CAAC,GAAG,CAAC,GAAG,IAAI,CAAC;QACpB,CAAC;aAAM,CAAC;YACN,WAAW,CAAC,IAAI,CAAC,GAAG,CAAC,CAAC;QACxB,CAAC;IACH,CAAC;IAED,OAAO,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC;AAChC,CAAC;AAED,SAAS,UAAU,CAAC,KAA0B;IAM5C,MAAM,MAAM,GAAI,KAAK,CAAC,GAAc,IAAI,OAAO,CAAC,GAAG,CAAC,iBAAiB,CAAC;IACtE,MAAM,MAAM,GAAI,KAAK,CAAC,GAAc,IAAI,OAAO,CAAC,GAAG,CAAC,iBAAiB,CAAC;IACtE,MAAM,MAAM,GAAI,KAAK,CAAC,IAAe,IAAI,OAAO,CAAC,GAAG,CAAC,qBAAqB,CAAC;IAC3E,MAAM,SAAS,GAAI,KAAK,CAAC,OAAkB,IAAI,OAAO,CAAC,GAAG,CAAC,wBAAwB,CAAC;IAEpF,IAAI,CAAC,MAAM,EAAE,CAAC;QACZ,OAAO,CAAC,KAAK,CAAC,0FAA0F,CAAC,CAAC;QAC1G,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClB,CAAC;IAED,MAAM,OAAO,GAA2B,EAAE,CAAC;IAC3C,IAAI,MAAM,EAAE,CAAC;QACX,OAAO,CAAC,eAAe,CAAC,GAAG,UAAU,MAAM,EAAE,CAAC;IAChD,CAAC;IAED,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,OAAO,EAAE,MAAM,EAAE,OAAO,EAAE,CAAC,CAAC;IACpE,OAAO,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC;AACvC,CAAC;AAED,SAAS,SAAS;IAChB,OAAO,CAAC,GAAG,CAAC;;;;;;;;;;;;;;;;;;;;;;;;;;;CA2Bb,CAAC,CAAC;AACH,CAAC;AAED,MAAM,CAAC,KAAK,UAAU,IAAI,CAAC,IAAI,GAAG,OAAO,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC,CAAC;IACrD,MAAM,EAAE,KAAK,EAAE,WAAW,EAAE,GAAG,YAAY,CAAC,IAAI,CAAC,CAAC;IAClD,MAAM,OAAO,GAAG,WAAW,CAAC,CAAC,CAAC,CAAC;IAE/B,IAAI,CAAC,OAAO,IAAI,KAAK,CAAC,IAAI,IAAI,OAAO,KAAK,MAAM,EAAE,CAAC;QACjD,SAAS,EAAE,CAAC;QACZ,OAAO;IACT,CAAC;IAED,QAAQ,OAAO,EAAE,CAAC;QAChB,KAAK,QAAQ,CAAC,CAAC,CAAC;YACd,MAAM,aAAa,GAAG,WAAW,CAAC,CAAC,CAAC,IAAK,KAAK,CAAC,OAAkB,CAAC;YAClE,IAAI,CAAC,aAAa,EAAE,CAAC;gBACnB,OAAO,CAAC,KAAK,CAAC,uGAAuG,CAAC,CAAC;gBACvH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YACxD,MAAM,SAAS,GAAG,CAAC,KAAK,CAAC,UAAU,CAAC;YACpC,MAAM,OAAO,GAAG,KAAK,CAAC,OAA6B,CAAC;YAEpD,MAAM,MAAM,CAAC,YAAY,CAAC,aAAa,EAAE;gBACvC,MAAM;gBACN,SAAS;gBACT,OAAO;gBACP,SAAS;aACV,CAAC,CAAC;YACH,OAAO,CAAC,GAAG,CAAC,oCAAoC,aAAa,GAAG,CAAC,CAAC;YAClE,MAAM;QACR,CAAC;QAED,KAAK,OAAO,CAAC,CAAC,CAAC;YACb,MAAM,MAAM,GAAI,KAAK,CAAC,MAAiB,IAAI,WAAW,CAAC,CAAC,CAAC,CAAC;YAC1D,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,wEAAwE,CAAC,CAAC;gBACxF,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,+EAA+E,CAAC,CAAC;gBAC/F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,KAAK,GAAG,KAAK,CAAC,EAAwB,CAAC;YAE7C,IAAI,cAAc,GAAG,2BAA2B,MAAM,EAAE,CAAC;YACzD,IAAI,KAAK,EAAE,CAAC;gBACV,cAAc,IAAI,qBAAqB,KAAK,EAAE,CAAC;YACjD,CAAC;YAED,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtB,MAAM;gBACN,OAAO,EAAE,cAAc;aACxB,CAAC,CAAC;YAEG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE;gBACpC,SAAS,EAAE,IAAI;gBACf,YAAY,EAAE;oBACZ,aAAa,EAAE,MAAM;oBACrB,GAAG,CAAC,KAAK,CAAC,CAAC,CAAC,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;iBAC5B;aACF,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,YAAY,CAAC,YAAY,MAAM,EAAE,EAAE;gBAC9C,MAAM;gBACN,SAAS,EAAE,KAAK;aACjB,CAAC,CAAC;YAEH,OAAO,CAAC,GAAG,CAAC,wBAAwB,MAAM,wBAAwB,MAAM,GAAG,CAAC,CAAC;YAC7E,MAAM;QACR,CAAC;QAED,KAAK,SAAS,CAAC,CAAC,CAAC;YACf,MAAM,MAAM,GAAI,KAAK,CAAC,MAAiB,IAAI,WAAW,CAAC,CAAC,CAAC,CAAC;YAC1D,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,4EAA4E,CAAC,CAAC;gBAC5F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,+EAA+E,CAAC,CAAC;gBAC/F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,MAAM,SAAS,GAAG,KAAK,CAAC,OAAO,CAAC,KAAK,CAAC,QAAQ,CAAC;gBAC7C,CAAC,CAAE,KAAK,CAAC,QAAqB;gBAC9B,CAAC,CAAC,KAAK,CAAC,QAAQ;oBACd,CAAC,CAAC,CAAC,KAAK,CAAC,QAAkB,CAAC;oBAC5B,CAAC,CAAC,EAAE,CAAC;YAET,IAAI,OAAO,GAAG,2CAA2C,MAAM,EAAE,CAAC;YAClE,IAAI,SAAS,CAAC,MAAM,GAAG,CAAC,EAAE,CAAC;gBACzB,OAAO,IAAI,sBAAsB,GAAG,SAAS,CAAC,GAAG,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,KAAK,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;YAChF,CAAC;YAED,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtB,MAAM;gBACN,OAAO;aACR,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE;gBAC9B,SAAS,EAAE,IAAI;gBACf,YAAY,EAAE;oBACZ,kBAAkB,EAAE,IAAI;oBACxB,mBAAmB,EAAE,MAAM;iBAC5B;aACF,CAAC,CAAC;YAEH,MAAM,MAAM,CAAC,YAAY,CAAC,wBAAwB,EAAE;gBAClD,MAAM;gBACN,SAAS,EAAE,KAAK;aACjB,CAAC,CAAC;YAEH,OAAO,CAAC,GAAG,CAAC,wDAAwD,MAAM,GAAG,CAAC,CAAC;YAC/E,MAAM;QACR,CAAC;QAED,KAAK,SAAS,CAAC,CAAC,CAAC;YACf,MAAM,KAAK,GAAI,KAAK,CAAC,KAAgB,IAAI,WAAW,CAAC,CAAC,CAAC,CAAC;YACxD,IAAI,CAAC,KAAK,EAAE,CAAC;gBACX,OAAO,CAAC,KAAK,CAAC,2EAA2E,CAAC,CAAC;gBAC3F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,WAAW,GAAI,KAAK,CAAC,WAAsB,IAAI,EAAE,CAAC;YACxD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAExD,IAAI,CAAC,SAAS,EAAE,CAAC;gBACf,OAAO,CAAC,KAAK,CAAC,wFAAwF,CAAC,CAAC;gBACxG,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtC,SAAS;gBACT,KAAK;gBACL,WAAW;gBACX,MAAM,EAAE,OAAc;gBACtB,QAAQ,EAAG,KAAK,CAAC,QAAgB,IAAI,QAAQ;gBAC7C,QAAQ,EAAG,KAAK,CAAC,MAAiB,IAAI,SAAS;gBAC/C,YAAY,EAAE;oBACZ,eAAe,EAAE,IAAI;iBACtB;aACF,CAAC,CAAC;YAEH,OAAO,CAAC,GAAG,CAAC,2CAA2C,KAAK,UAAU,OAAO,CAAC,EAAE,GAAG,CAAC,CAAC;YACrF,MAAM;QACR,CAAC;QAED,KAAK,aAAa,CAAC,CAAC,CAAC;YACnB,MAAM,KAAK,GAAI,KAAK,CAAC,KAAgB,IAAI,WAAW,CAAC,CAAC,CAAC,CAAC;YACxD,MAAM,GAAG,GAAI,KAAK,CAAC,GAAc,IAAK,KAAK,CAAC,EAAa,CAAC;YAC1D,IAAI,CAAC,KAAK,IAAI,CAAC,GAAG,EAAE,CAAC;gBACnB,OAAO,CAAC,KAAK,CAAC,6EAA6E,CAAC,CAAC;gBAC7F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAExD,IAAI,SAAS,EAAE,CAAC;gBACd,IAAI,CAAC;oBACH,MAAM,MAAM,CAAC,iBAAiB,CAAC;wBAC7B,SAAS;wBACT,KAAK;wBACL,MAAM,EAAE,WAAW;wBACnB,UAAU,EAAE,CAAC,GAAG,CAAC;qBAClB,CAAC,CAAC;gBACL,CAAC;gBAAC,MAAM,CAAC;oBACP,sFAAsF;gBACxF,CAAC;YACH,CAAC;YAED,IAAI,MAAM,EAAE,CAAC;gBACX,MAAM,MAAM,CAAC,UAAU,CAAC;oBACtB,MAAM;oBACN,OAAO,EAAE,0BAA0B,KAAK,KAAK,GAAG,GAAG;iBACpD,CAAC,CAAC;gBACH,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE;oBAC9B,YAAY,EAAE;wBACZ,cAAc,EAAE,GAAG;wBACnB,gBAAgB,EAAE,KAAK;qBACxB;iBACF,CAAC,CAAC;YACL,CAAC;YAED,OAAO,CAAC,GAAG,CAAC,yCAAyC,KAAK,MAAM,GAAG,GAAG,CAAC,CAAC;YACxE,MAAM;QACR,CAAC;QAED,KAAK,SAAS,CAAC,CAAC,CAAC;YACf,MAAM,OAAO,GAAG,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,OAAkB,IAAK,KAAK,CAAC,OAAkB,CAAC;YACzG,IAAI,CAAC,OAAO,EAAE,CAAC;gBACb,OAAO,CAAC,KAAK,CAAC,qDAAqD,CAAC,CAAC;gBACrE,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YACD,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,+EAA+E,CAAC,CAAC;gBAC/F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtB,MAAM;gBACN,OAAO;aACR,CAAC,CAAC;YACH,OAAO,CAAC,GAAG,CAAC,yCAAyC,MAAM,GAAG,CAAC,CAAC;YAChE,MAAM;QACR,CAAC;QAED,KAAK,SAAS,CAAC,CAAC,CAAC;YACf,MAAM,SAAS,GAAG,WAAW,CAAC,CAAC,CAAC,CAAC;YACjC,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YACxD,MAAM,cAAc,GAAI,KAAK,CAAC,MAAiB,IAAI,MAAM,CAAC;YAE1D,IAAI,SAAS,KAAK,MAAM,EAAE,CAAC;gBACzB,MAAM,UAAU,GAAI,KAAK,CAAC,OAAkB,IAAI,SAAS,CAAC;gBAC1D,IAAI,CAAC,cAAc,EAAE,CAAC;oBACpB,OAAO,CAAC,KAAK,CAAC,iGAAiG,CAAC,CAAC;oBACjH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBAClB,CAAC;gBACD,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC;gBAChD,MAAM,QAAQ,GAAG,KAAK,CAAC,MAAM,CAAC,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,QAAQ,KAAK,cAAc,CAAC,CAAC;gBACpE,IAAI,QAAQ,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;oBAC1B,OAAO,CAAC,GAAG,CAAC,qDAAqD,cAAc,GAAG,CAAC,CAAC;gBACtF,CAAC;qBAAM,CAAC;oBACN,OAAO,CAAC,GAAG,CAAC,4CAA4C,cAAc,KAAK,QAAQ,CAAC,MAAM,IAAI,CAAC,CAAC;oBAChG,KAAK,MAAM,EAAE,IAAI,QAAQ,EAAE,CAAC;wBAC1B,OAAO,CAAC,GAAG,CAAC,QAAQ,EAAE,CAAC,EAAE,MAAM,EAAE,CAAC,MAAM,MAAM,EAAE,CAAC,KAAK,EAAE,CAAC,CAAC;oBAC5D,CAAC;gBACH,CAAC;gBACD,MAAM;YACR,CAAC;YAED,MAAM,KAAK,GACT,SAAS,KAAK,QAAQ;gBACpB,CAAC,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,KAAgB;gBAC3D,CAAC,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,KAAgB,CAAC;YAEhE,IAAI,CAAC,KAAK,EAAE,CAAC;gBACX,OAAO,CAAC,KAAK,CAAC,yGAAyG,CAAC,CAAC;gBACzH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,IAAI,CAAC,cAAc,EAAE,CAAC;gBACpB,OAAO,CAAC,KAAK,CAAC,iGAAiG,CAAC,CAAC;gBACjH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,IAAI,UAAU,GAAI,KAAK,CAAC,OAAkB,IAAI,SAAS,CAAC;YACxD,IAAI,CAAC,UAAU,EAAE,CAAC;gBAChB,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,cAAc,CAAC,CAAC;gBACxD,UAAU,GAAG,UAAU,CAAC,SAAS,CAAC;YACpC,CAAC;YAED,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC;gBACtC,SAAS,EAAE,UAAU;gBACrB,KAAK;gBACL,WAAW,EAAG,KAAK,CAAC,WAAsB,IAAI,EAAE;gBAChD,QAAQ,EAAE,cAAc;gBACxB,MAAM,EAAG,KAAK,CAAC,MAAc,IAAI,MAAM;gBACvC,QAAQ,EAAG,KAAK,CAAC,QAAgB,IAAI,QAAQ;gBAC7C,UAAU,EAAG,KAAK,CAAC,QAAmB,IAAI,SAAS;gBACnD,YAAY,EAAE;oBACZ,cAAc,EAAE,IAAI;iBACrB;aACF,CAAC,CAAC;YAEH,OAAO,CAAC,GAAG,CAAC,oCAAoC,OAAO,CAAC,KAAK,UAAU,OAAO,CAAC,EAAE,uBAAuB,cAAc,GAAG,CAAC,CAAC;YAC3H,MAAM;QACR,CAAC;QAED,KAAK,WAAW,CAAC;QACjB,KAAK,MAAM,CAAC,CAAC,CAAC;YACZ,MAAM,SAAS,GAAG,WAAW,CAAC,CAAC,CAAC,CAAC;YACjC,MAAM,EAAE,MAAM,EAAE,MAAM,EAAE,GAAG,UAAU,CAAC,KAAK,CAAC,CAAC;YAC7C,IAAI,CAAC,MAAM,EAAE,CAAC;gBACZ,OAAO,CAAC,KAAK,CAAC,+EAA+E,CAAC,CAAC;gBAC/F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,IAAI,CAAC,SAAS,IAAI,SAAS,KAAK,MAAM,EAAE,CAAC;gBACvC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;gBAC1C,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;oBAC3C,OAAO,CAAC,GAAG,CAAC,wBAAwB,MAAM,0BAA0B,CAAC,CAAC;gBACxE,CAAC;qBAAM,CAAC;oBACN,OAAO,CAAC,GAAG,CAAC,sCAAsC,MAAM,KAAK,IAAI,CAAC,KAAK,CAAC,MAAM,IAAI,CAAC,CAAC;oBACpF,KAAK,MAAM,IAAI,IAAI,IAAI,CAAC,KAAK,EAAE,CAAC;wBAC9B,OAAO,CAAC,GAAG,CAAC,KAAK,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,KAAK,IAAI,CAAC,EAAE,GAAG,CAAC,CAAC;oBAChF,CAAC;gBACH,CAAC;gBACD,MAAM;YACR,CAAC;YAED,IAAI,SAAS,KAAK,OAAO,IAAI,SAAS,KAAK,MAAM,IAAI,SAAS,KAAK,UAAU,EAAE,CAAC;gBAC9E,MAAM,KAAK,GAAG,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,IAAe,IAAK,KAAK,CAAC,KAAgB,IAAK,KAAK,CAAC,EAAa,CAAC;gBAC1H,IAAI,CAAC,KAAK,EAAE,CAAC;oBACX,OAAO,CAAC,KAAK,CAAC,0HAA0H,CAAC,CAAC;oBAC1I,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBAClB,CAAC;gBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,KAAK,EAAE,IAAI,CAAC,CAAC;gBAC7D,MAAM,IAAI,GAAG,OAAO,CAAC,KAAK,EAAE,IAAI,CAC9B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,KAAK,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,QAAQ,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,CAC7E,CAAC;gBACF,OAAO,CAAC,GAAG,CAAC,0CAA0C,IAAI,EAAE,KAAK,IAAI,KAAK,0BAA0B,MAAM,GAAG,CAAC,CAAC;gBAC/G,MAAM;YACR,CAAC;YAED,IAAI,SAAS,KAAK,SAAS,EAAE,CAAC;gBAC5B,MAAM,KAAK,GAAG,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,IAAe,IAAK,KAAK,CAAC,KAAgB,IAAK,KAAK,CAAC,EAAa,CAAC;gBAC1H,IAAI,CAAC,KAAK,EAAE,CAAC;oBACX,OAAO,CAAC,KAAK,CAAC,gEAAgE,CAAC,CAAC;oBAChF,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBAClB,CAAC;gBACD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE,KAAK,EAAE,KAAK,CAAC,CAAC;gBAC9D,MAAM,IAAI,GAAG,OAAO,CAAC,KAAK,EAAE,IAAI,CAC9B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,KAAK,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,QAAQ,CAAC,KAAK,CAAC,WAAW,EAAE,CAAC,CAC7E,CAAC;gBACF,OAAO,CAAC,GAAG,CAAC,0CAA0C,IAAI,EAAE,KAAK,IAAI,KAAK,2BAA2B,MAAM,GAAG,CAAC,CAAC;gBAChH,MAAM;YACR,CAAC;YAED,IAAI,SAAS,KAAK,KAAK,EAAE,CAAC;gBACxB,MAAM,QAAQ,GAAG,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC;gBACtC,MAAM,KAAK,GAAG,QAAQ,CAAC,MAAM,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAE,KAAK,CAAC,KAAkB,IAAI,EAAE,CAAC;gBAC/E,IAAI,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;oBACvB,OAAO,CAAC,KAAK,CAAC,qEAAqE,CAAC,CAAC;oBACrF,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;gBAClB,CAAC;gBACD,MAAM,QAAQ,GAAmB,KAAK,CAAC,GAAG,CAAC,CAAC,KAAK,EAAE,CAAC,EAAE,EAAE,CAAC,CAAC;oBACxD,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,CAAC,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;oBAC3E,KAAK;oBACL,SAAS,EAAE,KAAK;oBAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;iBACpC,CAAC,CAAC,CAAC;gBACJ,MAAM,MAAM,CAAC,UAAU,CAAC,MAAM,EAAE;oBAC9B,KAAK,EAAE,QAAQ;iBAChB,CAAC,CAAC;gBACH,OAAO,CAAC,GAAG,CAAC,uBAAuB,QAAQ,CAAC,MAAM,8BAA8B,MAAM,GAAG,CAAC,CAAC;gBAC3F,MAAM;YACR,CAAC;YAED,mBAAmB;YACnB,MAAM,KAAK,GACT,SAAS,KAAK,KAAK;gBACjB,CAAC,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,KAAgB,IAAK,KAAK,CAAC,IAAe;gBACrF,CAAC,CAAC,WAAW,CAAC,KAAK,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,GAAG,CAAC,IAAK,KAAK,CAAC,KAAgB,IAAK,KAAK,CAAC,IAAe,CAAC;YAE1F,IAAI,CAAC,KAAK,EAAE,CAAC;gBACX,OAAO,CAAC,KAAK,CAAC,wGAAwG,CAAC,CAAC;gBACxH,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;YAClB,CAAC;YAED,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,MAAM,EAAE,KAAK,CAAC,CAAC;YACjD,OAAO,CAAC,GAAG,CAAC,yCAAyC,IAAI,CAAC,KAAK,MAAM,IAAI,CAAC,EAAE,aAAa,MAAM,GAAG,CAAC,CAAC;YACpG,MAAM;QACR,CAAC;QAED;YACE,OAAO,CAAC,KAAK,CAAC,qCAAqC,OAAO,0CAA0C,CAAC,CAAC;YACtG,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IACpB,CAAC;AACH,CAAC;AAED,wDAAwD;AACxD,MAAM,UAAU,iBAAiB,CAC/B,YAAoB,MAAM,CAAC,IAAI,CAAC,GAAG,EACnC,QAA4B,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC;IAE3C,IAAI,CAAC,KAAK;QAAE,OAAO,KAAK,CAAC;IACzB,IAAI,CAAC;QACH,MAAM,UAAU,GAAG,aAAa,CAAC,SAAS,CAAC,CAAC;QAC5C,OAAO,EAAE,CAAC,YAAY,CAAC,UAAU,CAAC,KAAK,EAAE,CAAC,YAAY,CAAC,KAAK,CAAC,CAAC;IAChE,CAAC;IAAC,MAAM,CAAC;QACP,OAAO,KAAK,CAAC;IACf,CAAC;AACH,CAAC;AAED,IAAI,iBAAiB,EAAE,EAAE,CAAC;IACxB,IAAI,EAAE,CAAC,KAAK,CAAC,CAAC,GAAG,EAAE,EAAE;QACnB,OAAO,CAAC,KAAK,CAAC,kCAAkC,EAAE,GAAG,YAAY,KAAK,CAAC,CAAC,CAAC,GAAG,CAAC,OAAO,CAAC,CAAC,CAAC,GAAG,CAAC,CAAC;QAC5F,OAAO,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;IAClB,CAAC,CAAC,CAAC;AACL,CAAC"}
@@ -0,0 +1,2 @@
1
+ export {};
2
+ //# sourceMappingURL=contract.test.d.ts.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"contract.test.d.ts","sourceRoot":"","sources":["../src/contract.test.ts"],"names":[],"mappings":""}
@@ -0,0 +1,54 @@
1
+ import { describe, it, expect } from 'vitest';
2
+ import { CriticalPathRouter } from '@critical-path/server';
3
+ import { CriticalPathClient } from './index.js';
4
+ /**
5
+ * Runs the client against the real router (no network), so client request shapes are checked
6
+ * against the server's validation schemas rather than hand-written mocks.
7
+ */
8
+ function connect(router, token) {
9
+ return new CriticalPathClient({
10
+ baseUrl: 'http://localhost/api/critical-path',
11
+ headers: token ? { Authorization: `Bearer ${token}` } : {},
12
+ fetch: ((input, init) => router.handleRequest(new Request(input, init)))
13
+ });
14
+ }
15
+ describe('client ↔ server contract', () => {
16
+ const router = new CriticalPathRouter(undefined, {
17
+ getContext: (request) => {
18
+ const token = request.headers.get('Authorization')?.replace('Bearer ', '');
19
+ return token ? { userId: token } : null;
20
+ }
21
+ });
22
+ it('round-trips the main resources with identity taken from the token', async () => {
23
+ const client = connect(router, 'alice');
24
+ const project = await client.createProject({ key: 'CON', name: 'Contract' });
25
+ const renamed = await client.updateProject(project.id, { name: 'Contract v2' });
26
+ expect(renamed.name).toBe('Contract v2');
27
+ const task = await client.createTask({ projectId: project.id, title: 'Wire it up' });
28
+ expect(task.reporterId).toBe('alice');
29
+ const other = await client.createTask({ projectId: project.id, title: 'Upstream' });
30
+ await client.addDependency(task.id, { dependsOnTaskId: other.id });
31
+ await client.addTodo(task.id, 'Write tests');
32
+ const toggled = await client.toggleTodo(task.id, 'Write tests', true);
33
+ expect(toggled.todos?.[0].completed).toBe(true);
34
+ const comment = await client.addComment({ taskId: task.id, content: 'On it' });
35
+ expect(comment.authorId).toBe('alice');
36
+ const reacted = await client.addCommentReaction(comment.id, { emoji: '🚀' });
37
+ expect(reacted.reactions?.[0].userId).toBe('alice');
38
+ const unreacted = await client.removeCommentReaction(comment.id, { emoji: '🚀' });
39
+ expect(unreacted.reactions ?? []).toHaveLength(0);
40
+ const attachment = await client.createAttachment({ taskId: task.id, filename: 'spec.md', url: 'https://example.com/spec.md' });
41
+ expect(attachment.uploaderId).toBe('alice');
42
+ const entry = await client.logTime({ taskId: task.id, hours: 1.5 });
43
+ expect(entry.userId).toBe('alice');
44
+ expect(await client.deleteProject(project.id)).toBe(true);
45
+ expect(await client.deleteProject(project.id)).toBe(false);
46
+ });
47
+ it('surfaces validation errors for fields the server rejects', async () => {
48
+ const client = connect(router);
49
+ const project = await client.createProject({ name: 'Strict' });
50
+ const task = await client.createTask({ projectId: project.id, title: 'T' });
51
+ await expect(client.updateTask(task.id, { projectId: 'elsewhere' })).rejects.toThrow(/Unrecognized key/);
52
+ });
53
+ });
54
+ //# sourceMappingURL=contract.test.js.map
@@ -0,0 +1 @@
1
+ {"version":3,"file":"contract.test.js","sourceRoot":"","sources":["../src/contract.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,uBAAuB,CAAC;AAC3D,OAAO,EAAE,kBAAkB,EAAE,MAAM,YAAY,CAAC;AAEhD;;;GAGG;AACH,SAAS,OAAO,CAAC,MAA0B,EAAE,KAAc;IACzD,OAAO,IAAI,kBAAkB,CAAC;QAC5B,OAAO,EAAE,oCAAoC;QAC7C,OAAO,EAAE,KAAK,CAAC,CAAC,CAAC,EAAE,aAAa,EAAE,UAAU,KAAK,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE;QAC1D,KAAK,EAAE,CAAC,CAAC,KAAwB,EAAE,IAAkB,EAAE,EAAE,CAAC,MAAM,CAAC,aAAa,CAAC,IAAI,OAAO,CAAC,KAAK,EAAE,IAAI,CAAC,CAAC,CAAiB;KAC1H,CAAC,CAAC;AACL,CAAC;AAED,QAAQ,CAAC,0BAA0B,EAAE,GAAG,EAAE;IACxC,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,SAAS,EAAE;QAC/C,UAAU,EAAE,CAAC,OAAO,EAAE,EAAE;YACtB,MAAM,KAAK,GAAG,OAAO,CAAC,OAAO,CAAC,GAAG,CAAC,eAAe,CAAC,EAAE,OAAO,CAAC,SAAS,EAAE,EAAE,CAAC,CAAC;YAC3E,OAAO,KAAK,CAAC,CAAC,CAAC,EAAE,MAAM,EAAE,KAAK,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC;QAC1C,CAAC;KACF,CAAC,CAAC;IAEH,EAAE,CAAC,mEAAmE,EAAE,KAAK,IAAI,EAAE;QACjF,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;QAExC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,GAAG,EAAE,KAAK,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC,CAAC;QAC7E,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,aAAa,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAEzC,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,YAAY,EAAE,CAAC,CAAC;QACrF,MAAM,CAAC,IAAI,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACtC,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,UAAU,EAAE,CAAC,CAAC;QACpF,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,eAAe,EAAE,KAAK,CAAC,EAAE,EAAE,CAAC,CAAC;QAEnE,MAAM,MAAM,CAAC,OAAO,CAAC,IAAI,CAAC,EAAE,EAAE,aAAa,CAAC,CAAC;QAC7C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,aAAa,EAAE,IAAI,CAAC,CAAC;QACtE,MAAM,CAAC,OAAO,CAAC,KAAK,EAAE,CAAC,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEhD,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,OAAO,EAAE,OAAO,EAAE,CAAC,CAAC;QAC/E,MAAM,CAAC,OAAO,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACvC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC;QAC7E,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QACpD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,OAAO,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,CAAC,CAAC;QAClF,MAAM,CAAC,SAAS,CAAC,SAAS,IAAI,EAAE,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAElD,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,QAAQ,EAAE,SAAS,EAAE,GAAG,EAAE,6BAA6B,EAAE,CAAC,CAAC;QAC/H,MAAM,CAAC,UAAU,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAE5C,MAAM,KAAK,GAAG,MAAM,MAAM,CAAC,OAAO,CAAC,EAAE,MAAM,EAAE,IAAI,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;QACpE,MAAM,CAAC,KAAK,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEnC,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAC1D,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;IAC7D,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,0DAA0D,EAAE,KAAK,IAAI,EAAE;QACxE,MAAM,MAAM,GAAG,OAAO,CAAC,MAAM,CAAC,CAAC;QAC/B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,EAAE,IAAI,EAAE,QAAQ,EAAE,CAAC,CAAC;QAC/D,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,SAAS,EAAE,OAAO,CAAC,EAAE,EAAE,KAAK,EAAE,GAAG,EAAE,CAAC,CAAC;QAE5E,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,EAAE,EAAE,EAAE,SAAS,EAAE,WAAW,EAAS,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC;IAClH,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
package/dist/index.d.ts CHANGED
@@ -1,4 +1,5 @@
1
- import type { Project, Task, TaskTodoItem, TaskStatus, Priority, TaskDependencyGraph, Team, TaskContainer, Iteration, Activity, Comment, CommentReaction, Attachment, PresignedUrlOptions, PresignedUploadResult, TimeEntry, Workflow, Deliverable, DeliverableSummary, CreateDeliverableInput, SemanticStatus, StatusDefinition, TaskDerivedStatus, TaskLifecycleState, CriticalPathAnalysis, TimelineLadder, TimelineLadderOptions, TaskLadderView, MacroTimelineSummary, MacroPhaseRollup, StandardTaskTimelineItem, ConcreteTaskEvidence, RealityDelta, TaskMetrics, TaskProgressHistory, TaskProgressInference, TaskEVM, TaskInferredActuals, ProgressInferenceSource, ProgressCurveProfile, WorkloadDistribution, WorkloadBucket, WorkloadDistributionOptions, WorkloadInterval, WorkloadGroupBy, WorkloadMetric } from '@critical-path/core';
1
+ import type { CreateWorkflowBody, UpdateWorkflowBody, CreateProjectBody, UpdateProjectBody, CreateTaskBody, UpdateTaskBody, CreateDependencyBody, CreateTeamBody, UpdateTeamBody, CreateContainerBody, UpdateContainerBody, CreateDeliverableBody, UpdateDeliverableBody, CreateIterationBody, UpdateIterationBody, CreateCommentBody, UpdateCommentBody, CommentReactionBody, CreateAttachmentBody, UploadAttachmentBody, PresignAttachmentBody, LogTimeBody } from '@critical-path/core/schemas';
2
+ import type { TaskDependency, Project, Task, TaskTodoItem, TaskStatus, Priority, TaskDependencyGraph, Team, TaskContainer, Iteration, Activity, Comment, CommentReaction, Attachment, PresignedUploadResult, TimeEntry, Workflow, Deliverable, DeliverableSummary, SemanticStatus, StatusDefinition, TaskDerivedStatus, TaskLifecycleState, CriticalPathAnalysis, TimelineLadder, TimelineLadderOptions, TaskLadderView, MacroTimelineSummary, MacroPhaseRollup, StandardTaskTimelineItem, ConcreteTaskEvidence, RealityDelta, TaskMetrics, TaskProgressHistory, TaskProgressInference, TaskEVM, TaskInferredActuals, ProgressInferenceSource, ProgressCurveProfile, WorkloadDistribution, WorkloadBucket, WorkloadDistributionOptions, WorkloadInterval, WorkloadGroupBy, WorkloadMetric } from '@critical-path/core';
2
3
  export type { TaskTodoItem, TaskStatus, Priority, SemanticStatus, StatusDefinition, TaskDerivedStatus, TaskLifecycleState, CriticalPathAnalysis, TimelineLadder, TimelineLadderOptions, TaskLadderView, MacroTimelineSummary, MacroPhaseRollup, StandardTaskTimelineItem, ConcreteTaskEvidence, RealityDelta, TaskMetrics, TaskProgressHistory, TaskProgressInference, TaskEVM, TaskInferredActuals, ProgressInferenceSource, ProgressCurveProfile, WorkloadDistribution, WorkloadBucket, WorkloadDistributionOptions, WorkloadInterval, WorkloadGroupBy, WorkloadMetric };
3
4
  export interface UpdateStatusOptions {
4
5
  taskId?: string;
@@ -29,12 +30,15 @@ export declare class CriticalPathClient {
29
30
  private request;
30
31
  getWorkflows(): Promise<Workflow[]>;
31
32
  getWorkflow(id: string): Promise<Workflow>;
32
- createWorkflow(data: Omit<Workflow, 'id' | 'createdAt' | 'updatedAt'>): Promise<Workflow>;
33
- updateWorkflow(id: string, updates: Partial<Workflow>): Promise<Workflow>;
33
+ createWorkflow(data: CreateWorkflowBody): Promise<Workflow>;
34
+ updateWorkflow(id: string, updates: UpdateWorkflowBody): Promise<Workflow>;
34
35
  deleteWorkflow(id: string): Promise<boolean>;
35
36
  getProjects(): Promise<Project[]>;
36
37
  getProject(id: string): Promise<Project>;
37
- createProject(data: Omit<Project, 'id' | 'createdAt' | 'updatedAt'>): Promise<Project>;
38
+ createProject(data: CreateProjectBody): Promise<Project>;
39
+ updateProject(id: string, updates: UpdateProjectBody): Promise<Project>;
40
+ /** Deletes a project and its tasks. Resolves to `false` if it does not exist. */
41
+ deleteProject(id: string): Promise<boolean>;
38
42
  calculateCriticalPath(projectId: string): Promise<CriticalPathAnalysis>;
39
43
  getTimelineLadder(projectId: string, options?: TimelineLadderOptions): Promise<TimelineLadder>;
40
44
  getWorkloadDistribution(projectId?: string, options?: WorkloadDistributionOptions): Promise<WorkloadDistribution>;
@@ -43,17 +47,8 @@ export declare class CriticalPathClient {
43
47
  getTaskLadder(taskId: string): Promise<TaskLadderView>;
44
48
  getTaskMetrics(taskId: string): Promise<TaskMetrics>;
45
49
  getTaskProgressHistory(taskId: string): Promise<TaskProgressHistory>;
46
- createTask(data: Omit<Task, 'id' | 'createdAt' | 'updatedAt'>): Promise<Task>;
47
- updateTask(id: string, updates: Partial<Task> & {
48
- actorId?: string;
49
- actorName?: string;
50
- actorType?: string;
51
- actor?: {
52
- userId: string;
53
- username?: string;
54
- actorType?: string;
55
- };
56
- }): Promise<Task>;
50
+ createTask(data: CreateTaskBody): Promise<Task>;
51
+ updateTask(id: string, updates: UpdateTaskBody): Promise<Task>;
57
52
  createSubtask(parentTaskId: string, data: {
58
53
  title: string;
59
54
  description?: string;
@@ -63,16 +58,10 @@ export declare class CriticalPathClient {
63
58
  assigneeId?: string;
64
59
  customFields?: Record<string, unknown>;
65
60
  }): Promise<Task>;
66
- addTodo(taskId: string, title: string, options?: {
67
- actorId?: string;
68
- actorName?: string;
69
- actorType?: string;
70
- }): Promise<TaskTodoItem>;
71
- toggleTodo(taskId: string, todoIdOrTitle: string, completed?: boolean, options?: {
72
- actorId?: string;
73
- actorName?: string;
74
- actorType?: string;
75
- }): Promise<Task>;
61
+ addTodo(taskId: string, title: string): Promise<TaskTodoItem>;
62
+ toggleTodo(taskId: string, todoIdOrTitle: string, completed?: boolean): Promise<Task>;
63
+ /** Declares that `taskId` depends on another task. Rejects with a 409 error on cycles. */
64
+ addDependency(taskId: string, data: CreateDependencyBody): Promise<TaskDependency>;
76
65
  deleteTask(id: string): Promise<boolean>;
77
66
  getTaskDependencies(taskId: string): Promise<TaskDependencyGraph>;
78
67
  getTaskLifecycleState(taskId: string): Promise<TaskDerivedStatus>;
@@ -80,22 +69,22 @@ export declare class CriticalPathClient {
80
69
  getAllowedPreviousTaskTransitions(taskId: string): Promise<string[]>;
81
70
  getTeams(): Promise<Team[]>;
82
71
  getTeam(id: string): Promise<Team>;
83
- createTeam(data: Omit<Team, 'id' | 'createdAt' | 'updatedAt'>): Promise<Team>;
84
- updateTeam(id: string, updates: Partial<Team>): Promise<Team>;
72
+ createTeam(data: CreateTeamBody): Promise<Team>;
73
+ updateTeam(id: string, updates: UpdateTeamBody): Promise<Team>;
85
74
  deleteTeam(id: string): Promise<boolean>;
86
75
  getContainers(projectId: string): Promise<TaskContainer[]>;
87
- createContainer(data: Omit<TaskContainer, 'id' | 'createdAt' | 'updatedAt'>): Promise<TaskContainer>;
88
- updateContainer(id: string, updates: Partial<TaskContainer>): Promise<TaskContainer>;
76
+ createContainer(data: CreateContainerBody): Promise<TaskContainer>;
77
+ updateContainer(id: string, updates: UpdateContainerBody): Promise<TaskContainer>;
89
78
  deleteContainer(id: string): Promise<boolean>;
90
79
  getDeliverables(projectId: string): Promise<Deliverable[]>;
91
80
  getDeliverable(id: string): Promise<Deliverable>;
92
81
  getDeliverableSummary(id: string): Promise<DeliverableSummary>;
93
- createDeliverable(data: CreateDeliverableInput): Promise<Deliverable>;
94
- updateDeliverable(id: string, updates: Partial<Deliverable>): Promise<Deliverable>;
82
+ createDeliverable(data: CreateDeliverableBody): Promise<Deliverable>;
83
+ updateDeliverable(id: string, updates: UpdateDeliverableBody): Promise<Deliverable>;
95
84
  deleteDeliverable(id: string): Promise<boolean>;
96
85
  getIterations(projectId: string): Promise<Iteration[]>;
97
- createIteration(data: Omit<Iteration, 'id' | 'createdAt'>): Promise<Iteration>;
98
- updateIteration(id: string, updates: Partial<Iteration>): Promise<Iteration>;
86
+ createIteration(data: CreateIterationBody): Promise<Iteration>;
87
+ updateIteration(id: string, updates: UpdateIterationBody): Promise<Iteration>;
99
88
  deleteIteration(id: string): Promise<boolean>;
100
89
  getActivities(filter?: {
101
90
  projectId?: string;
@@ -103,40 +92,28 @@ export declare class CriticalPathClient {
103
92
  }): Promise<Activity[]>;
104
93
  getComments(taskId: string): Promise<Comment[]>;
105
94
  getComment(id: string): Promise<Comment>;
106
- addComment(data: Omit<Comment, 'id' | 'createdAt' | 'updatedAt'>): Promise<Comment>;
107
- updateComment(id: string, updates: Partial<Comment>): Promise<Comment>;
95
+ addComment(data: CreateCommentBody): Promise<Comment>;
96
+ updateComment(id: string, updates: UpdateCommentBody): Promise<Comment>;
108
97
  deleteComment(id: string): Promise<boolean>;
109
- addCommentReaction(commentId: string, reaction: {
110
- emoji: string;
111
- userId: string;
112
- }): Promise<Comment>;
113
- removeCommentReaction(commentId: string, reaction: {
114
- emoji: string;
115
- userId: string;
116
- }): Promise<Comment>;
98
+ addCommentReaction(commentId: string, reaction: CommentReactionBody): Promise<Comment>;
99
+ removeCommentReaction(commentId: string, reaction: CommentReactionBody): Promise<Comment>;
117
100
  getAttachments(filter?: {
118
101
  taskId?: string;
119
102
  projectId?: string;
120
103
  commentId?: string;
121
104
  }): Promise<Attachment[]>;
122
105
  getAttachment(id: string): Promise<Attachment>;
123
- createAttachment(data: Omit<Attachment, 'id' | 'createdAt' | 'updatedAt'>): Promise<Attachment>;
124
- uploadAttachmentFile(data: {
125
- filename: string;
106
+ createAttachment(data: CreateAttachmentBody): Promise<Attachment>;
107
+ /**
108
+ * Uploads a file through the server's FileStorageAdapter. Binary data is sent base64-encoded.
109
+ */
110
+ uploadAttachmentFile(data: Omit<UploadAttachmentBody, 'data'> & {
126
111
  data: string | Uint8Array | ArrayBuffer;
127
- mimeType?: string;
128
- pathPrefix?: string;
129
- taskId?: string;
130
- projectId?: string;
131
- commentId?: string;
132
- uploaderId: string;
133
- uploaderType?: 'user' | 'agent' | 'system';
134
- metadata?: Record<string, unknown>;
135
112
  }): Promise<Attachment>;
136
113
  deleteAttachment(id: string): Promise<boolean>;
137
- getPresignedAttachmentUploadUrl(options: PresignedUrlOptions): Promise<PresignedUploadResult>;
114
+ getPresignedAttachmentUploadUrl(options: PresignAttachmentBody): Promise<PresignedUploadResult>;
138
115
  getTimeEntries(taskId: string): Promise<TimeEntry[]>;
139
- logTime(data: Omit<TimeEntry, 'id' | 'loggedAt'>): Promise<TimeEntry>;
116
+ logTime(data: LogTimeBody): Promise<TimeEntry>;
140
117
  updateStatus(status: string, options?: UpdateStatusOptions): Promise<UpdateStatusResult>;
141
118
  }
142
119
  export type { CommentReaction };
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EACV,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,MAAM,CAAC;IAChB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACjC,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;CACtB;AASD,qBAAa,kBAAkB;IAC7B,OAAO,CAAC,OAAO,CAAS;IACxB,OAAO,CAAC,OAAO,CAAyB;IACxC,OAAO,CAAC,WAAW,CAAe;gBAEtB,OAAO,EAAE,aAAa;IAMlC;;;OAGG;YACW,aAAa;YAUb,OAAO;IA0Bf,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,CAAC;IAK1C,cAAc,CAAC,IAAI,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQzF,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQzE,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK5C,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtF,qBAAqB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,oBAAoB,CAAC;IAOvE,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAapB,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IAsB1B,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAM7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,CAAC;IAOtD,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAOpD,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAOpE,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7E,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG;QACvB,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,CAAC;IAQV,aAAa,CACjB,YAAY,EAAE,MAAM,EACpB,IAAI,EAAE;QACJ,KAAK,EAAE,MAAM,CAAC;QACd,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,MAAM,CAAC,EAAE,UAAU,CAAC;QACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;QACpB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACxC,GACA,OAAO,CAAC,IAAI,CAAC;IAkBV,OAAO,CACX,MAAM,EAAE,MAAM,EACd,KAAK,EAAE,MAAM,EACb,OAAO,CAAC,EAAE;QAAE,OAAO,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACrE,OAAO,CAAC,YAAY,CAAC;IAalB,UAAU,CACd,MAAM,EAAE,MAAM,EACd,aAAa,EAAE,MAAM,EACrB,SAAS,CAAC,EAAE,OAAO,EACnB,OAAO,CAAC,EAAE;QAAE,OAAO,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACrE,OAAO,CAAC,IAAI,CAAC;IAgBV,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIxC,mBAAmB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAKjE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,iBAAiB,CAAC;IAKjE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAK5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAMpE,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7D,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,eAAe,CAAC,IAAI,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAQpG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAQpF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAKhD,qBAAqB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,CAAC;IAK9D,iBAAiB,CAAC,IAAI,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQrE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,CAAC;IAQlF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK/C,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,eAAe,CAAC,IAAI,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ9E,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ5E,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAUpF,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQnF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtE,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,CAAC;IAQpG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,CAAC;IASvG,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAU3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,CAAC;IAK9C,gBAAgB,CAAC,IAAI,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAQ/F,oBAAoB,CAAC,IAAI,EAAE;QAC/B,QAAQ,EAAE,MAAM,CAAC;QACjB,IAAI,EAAE,MAAM,GAAG,UAAU,GAAG,WAAW,CAAC;QACxC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAClB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,EAAE,MAAM,CAAC;QACnB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GAAG,OAAO,CAAC,UAAU,CAAC;IAQjB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI9C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAS7F,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,OAAO,CAAC,IAAI,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IASrE,YAAY,CAChB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE,mBAAmB,GAC5B,OAAO,CAAC,kBAAkB,CAAC;CAa/B;AAED,YAAY,EAAE,eAAe,EAAE,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,kBAAkB,EAClB,kBAAkB,EAClB,iBAAiB,EACjB,iBAAiB,EACjB,cAAc,EACd,cAAc,EACd,oBAAoB,EACpB,cAAc,EACd,cAAc,EACd,mBAAmB,EACnB,mBAAmB,EACnB,qBAAqB,EACrB,qBAAqB,EACrB,mBAAmB,EACnB,mBAAmB,EACnB,iBAAiB,EACjB,iBAAiB,EACjB,mBAAmB,EACnB,oBAAoB,EACpB,oBAAoB,EACpB,qBAAqB,EACrB,WAAW,EACZ,MAAM,6BAA6B,CAAC;AACrC,OAAO,KAAK,EACV,cAAc,EACd,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EAEV,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAElB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,MAAM,CAAC;IAChB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACjC,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;CACtB;AAkBD,qBAAa,kBAAkB;IAC7B,OAAO,CAAC,OAAO,CAAS;IACxB,OAAO,CAAC,OAAO,CAAyB;IACxC,OAAO,CAAC,WAAW,CAAe;gBAEtB,OAAO,EAAE,aAAa;IAMlC;;;OAGG;YACW,aAAa;YAUb,OAAO;IA0Bf,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,CAAC;IAK1C,cAAc,CAAC,IAAI,EAAE,kBAAkB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQ3D,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,kBAAkB,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQ1E,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK5C,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQxD,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ7E,iFAAiF;IAC3E,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,qBAAqB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,oBAAoB,CAAC;IAOvE,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAapB,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IAsB1B,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAM7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,CAAC;IAOtD,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAOpD,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAOpE,UAAU,CAAC,IAAI,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ/C,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ9D,aAAa,CACjB,YAAY,EAAE,MAAM,EACpB,IAAI,EAAE;QACJ,KAAK,EAAE,MAAM,CAAC;QACd,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,MAAM,CAAC,EAAE,UAAU,CAAC;QACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;QACpB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACxC,GACA,OAAO,CAAC,IAAI,CAAC;IAkBV,OAAO,CACX,MAAM,EAAE,MAAM,EACd,KAAK,EAAE,MAAM,GACZ,OAAO,CAAC,YAAY,CAAC;IAalB,UAAU,CACd,MAAM,EAAE,MAAM,EACd,aAAa,EAAE,MAAM,EACrB,SAAS,CAAC,EAAE,OAAO,GAClB,OAAO,CAAC,IAAI,CAAC;IAgBhB,0FAA0F;IACpF,aAAa,CAAC,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,oBAAoB,GAAG,OAAO,CAAC,cAAc,CAAC;IAQlF,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIxC,mBAAmB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAKjE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,iBAAiB,CAAC;IAKjE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAK5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAMpE,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,UAAU,CAAC,IAAI,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ/C,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,cAAc,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ9D,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,eAAe,CAAC,IAAI,EAAE,mBAAmB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQlE,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,aAAa,CAAC;IAQjF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAKhD,qBAAqB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,CAAC;IAK9D,iBAAiB,CAAC,IAAI,EAAE,qBAAqB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQpE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,qBAAqB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQnF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK/C,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,eAAe,CAAC,IAAI,EAAE,mBAAmB,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ9D,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ7E,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAUpF,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,UAAU,CAAC,IAAI,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQrD,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,iBAAiB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQvE,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE,mBAAmB,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtF,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE,mBAAmB,GAAG,OAAO,CAAC,OAAO,CAAC;IAUzF,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAU3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,CAAC;IAK9C,gBAAgB,CAAC,IAAI,EAAE,oBAAoB,GAAG,OAAO,CAAC,UAAU,CAAC;IAQvE;;OAEG;IACG,oBAAoB,CACxB,IAAI,EAAE,IAAI,CAAC,oBAAoB,EAAE,MAAM,CAAC,GAAG;QAAE,IAAI,EAAE,MAAM,GAAG,UAAU,GAAG,WAAW,CAAA;KAAE,GACrF,OAAO,CAAC,UAAU,CAAC;IAYhB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI9C,+BAA+B,CAAC,OAAO,EAAE,qBAAqB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAS/F,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,OAAO,CAAC,IAAI,EAAE,WAAW,GAAG,OAAO,CAAC,SAAS,CAAC;IAS9C,YAAY,CAChB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE,mBAAmB,GAC5B,OAAO,CAAC,kBAAkB,CAAC;CAa/B;AAED,YAAY,EAAE,eAAe,EAAE,CAAC"}