@critical-path/client 0.14.6 → 0.14.8

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
package/CHANGELOG.md CHANGED
@@ -1,5 +1,48 @@
1
1
  # @critical-path/client
2
2
 
3
+ ## 0.14.8
4
+
5
+ ### Patch Changes
6
+
7
+ - Updated dependencies [6dd5529]
8
+ - @critical-path/core@0.23.0
9
+
10
+ ## 0.14.7
11
+
12
+ ### Patch Changes
13
+
14
+ - b243a37: Fix correctness and safety issues found in a code audit.
15
+
16
+ **@critical-path/core**
17
+ - `SQLiteStore` now loads `node:sqlite` via `process.getBuiltinModule`, fixing `require is not defined` when constructed from a filename in plain Node ESM.
18
+ - Removed the unused `better-sqlite3` runtime dependency.
19
+ - `engine.addDependency` now detects indirect cycles (e.g. A → B → C → D → A), not just cycles between direct neighbours.
20
+ - Fixed `generateKeyBetween` returning out-of-range, duplicate keys after repeated inserts after the same item. It now throws a `RangeError` when `a >= b`.
21
+ - Added `engine.deleteProject(id)`, which deletes a project's tasks through `deleteTask` and publishes a new `project.deleted` event and webhook.
22
+ - Added exported `ValidationError` and `NotFoundError` classes. `logTime` now rejects non-numeric hours.
23
+
24
+ **@critical-path/server**
25
+ - `DELETE /projects/:id`, `POST /tasks/:id/dependencies` and `POST /time-entries` now go through the engine, so cycle checks, hour validation, roll-ups, events and webhooks apply.
26
+ - Added `PATCH /projects/:id`.
27
+ - `DELETE` on a resource that does not exist now returns `404` instead of `200 { success: false }`.
28
+ - Malformed JSON returns `400`, validation errors `400`, `NotFoundError` `404`, and dependency cycles `409`. Unexpected errors return a generic `500` message outside development.
29
+ - `OPTIONS` preflight requests return `204` with CORS headers.
30
+ - New router/adapter options: `onError(error, request)` to report unexpected errors or return a custom response, and `exposeErrors` to include real messages in 500 responses (defaults to on only when `NODE_ENV === 'development'`).
31
+ - `createNextHandler` returns a callable handler that also exposes per-method properties, so `export { handler as GET }` works as documented.
32
+
33
+ **@critical-path/mcp**
34
+ - Tools excluded via the `tools` option can no longer be called by name.
35
+ - Tool arguments are validated with each tool's zod schema; undeclared fields are stripped.
36
+ - Tool listings include `title` and MCP `readOnlyHint` / `destructiveHint` annotations.
37
+
38
+ **@critical-path/svelte**
39
+ - Rebuilt with the bundled `@critical-path/mcp` WebMCP argument validation.
40
+
41
+ **@critical-path/client**
42
+ - Delete methods resolve to `false` when the server returns `404`, keeping their boolean contract with the new server behaviour.
43
+ - Updated dependencies [b243a37]
44
+ - @critical-path/core@0.22.0
45
+
3
46
  ## 0.14.6
4
47
 
5
48
  ### Patch Changes
package/dist/index.d.ts CHANGED
@@ -21,6 +21,11 @@ export declare class CriticalPathClient {
21
21
  private headers;
22
22
  private customFetch;
23
23
  constructor(options: ClientOptions);
24
+ /**
25
+ * Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
26
+ * so delete methods keep their boolean contract instead of throwing.
27
+ */
28
+ private deleteRequest;
24
29
  private request;
25
30
  getWorkflows(): Promise<Workflow[]>;
26
31
  getWorkflow(id: string): Promise<Workflow>;
@@ -1 +1 @@
1
- {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EACV,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,MAAM,CAAC;IAChB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACjC,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;CACtB;AAED,qBAAa,kBAAkB;IAC7B,OAAO,CAAC,OAAO,CAAS;IACxB,OAAO,CAAC,OAAO,CAAyB;IACxC,OAAO,CAAC,WAAW,CAAe;gBAEtB,OAAO,EAAE,aAAa;YAMpB,OAAO;IA0Bf,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,CAAC;IAK1C,cAAc,CAAC,IAAI,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQzF,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQzE,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ5C,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtF,qBAAqB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,oBAAoB,CAAC;IAOvE,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAapB,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IAsB1B,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAM7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,CAAC;IAOtD,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAOpD,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAOpE,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7E,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG;QACvB,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,CAAC;IAQV,aAAa,CACjB,YAAY,EAAE,MAAM,EACpB,IAAI,EAAE;QACJ,KAAK,EAAE,MAAM,CAAC;QACd,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,MAAM,CAAC,EAAE,UAAU,CAAC;QACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;QACpB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACxC,GACA,OAAO,CAAC,IAAI,CAAC;IAkBV,OAAO,CACX,MAAM,EAAE,MAAM,EACd,KAAK,EAAE,MAAM,EACb,OAAO,CAAC,EAAE;QAAE,OAAO,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACrE,OAAO,CAAC,YAAY,CAAC;IAalB,UAAU,CACd,MAAM,EAAE,MAAM,EACd,aAAa,EAAE,MAAM,EACrB,SAAS,CAAC,EAAE,OAAO,EACnB,OAAO,CAAC,EAAE;QAAE,OAAO,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACrE,OAAO,CAAC,IAAI,CAAC;IAgBV,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAOxC,mBAAmB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAKjE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,iBAAiB,CAAC;IAKjE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAK5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAMpE,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7D,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAQxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,eAAe,CAAC,IAAI,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAQpG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAQpF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAKhD,qBAAqB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,CAAC;IAK9D,iBAAiB,CAAC,IAAI,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQrE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,CAAC;IAQlF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ/C,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,eAAe,CAAC,IAAI,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ9E,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ5E,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAQ7C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAUpF,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQnF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtE,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAO3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,CAAC;IAQpG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,CAAC;IASvG,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAU3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,CAAC;IAK9C,gBAAgB,CAAC,IAAI,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAQ/F,oBAAoB,CAAC,IAAI,EAAE;QAC/B,QAAQ,EAAE,MAAM,CAAC;QACjB,IAAI,EAAE,MAAM,GAAG,UAAU,GAAG,WAAW,CAAC;QACxC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAClB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,EAAE,MAAM,CAAC;QACnB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GAAG,OAAO,CAAC,UAAU,CAAC;IAQjB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAO9C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAS7F,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,OAAO,CAAC,IAAI,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IASrE,YAAY,CAChB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE,mBAAmB,GAC5B,OAAO,CAAC,kBAAkB,CAAC;CAa/B;AAED,YAAY,EAAE,eAAe,EAAE,CAAC"}
1
+ {"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EACV,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,MAAM,CAAC;IAChB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACjC,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;CACtB;AASD,qBAAa,kBAAkB;IAC7B,OAAO,CAAC,OAAO,CAAS;IACxB,OAAO,CAAC,OAAO,CAAyB;IACxC,OAAO,CAAC,WAAW,CAAe;gBAEtB,OAAO,EAAE,aAAa;IAMlC;;;OAGG;YACW,aAAa;YAUb,OAAO;IA0Bf,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,CAAC;IAK1C,cAAc,CAAC,IAAI,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQzF,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQzE,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK5C,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtF,qBAAqB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,oBAAoB,CAAC;IAOvE,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAapB,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IAsB1B,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAM7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,CAAC;IAOtD,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAOpD,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAOpE,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7E,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG;QACvB,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,CAAC;IAQV,aAAa,CACjB,YAAY,EAAE,MAAM,EACpB,IAAI,EAAE;QACJ,KAAK,EAAE,MAAM,CAAC;QACd,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,MAAM,CAAC,EAAE,UAAU,CAAC;QACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;QACpB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACxC,GACA,OAAO,CAAC,IAAI,CAAC;IAkBV,OAAO,CACX,MAAM,EAAE,MAAM,EACd,KAAK,EAAE,MAAM,EACb,OAAO,CAAC,EAAE;QAAE,OAAO,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACrE,OAAO,CAAC,YAAY,CAAC;IAalB,UAAU,CACd,MAAM,EAAE,MAAM,EACd,aAAa,EAAE,MAAM,EACrB,SAAS,CAAC,EAAE,OAAO,EACnB,OAAO,CAAC,EAAE;QAAE,OAAO,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACrE,OAAO,CAAC,IAAI,CAAC;IAgBV,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIxC,mBAAmB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAKjE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,iBAAiB,CAAC;IAKjE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAK5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAMpE,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7D,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,eAAe,CAAC,IAAI,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAQpG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAQpF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAKhD,qBAAqB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,CAAC;IAK9D,iBAAiB,CAAC,IAAI,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQrE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,CAAC;IAQlF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK/C,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,eAAe,CAAC,IAAI,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ9E,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ5E,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAUpF,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQnF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtE,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,CAAC;IAQpG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,CAAC;IASvG,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAU3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,CAAC;IAK9C,gBAAgB,CAAC,IAAI,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAQ/F,oBAAoB,CAAC,IAAI,EAAE;QAC/B,QAAQ,EAAE,MAAM,CAAC;QACjB,IAAI,EAAE,MAAM,GAAG,UAAU,GAAG,WAAW,CAAC;QACxC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAClB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,EAAE,MAAM,CAAC;QACnB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GAAG,OAAO,CAAC,UAAU,CAAC;IAQjB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI9C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAS7F,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,OAAO,CAAC,IAAI,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IASrE,YAAY,CAChB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE,mBAAmB,GAC5B,OAAO,CAAC,kBAAkB,CAAC;CAa/B;AAED,YAAY,EAAE,eAAe,EAAE,CAAC"}
package/dist/index.js CHANGED
@@ -1,3 +1,9 @@
1
+ class NotFoundResponseError extends Error {
2
+ constructor(message) {
3
+ super(message);
4
+ this.name = 'NotFoundResponseError';
5
+ }
6
+ }
1
7
  export class CriticalPathClient {
2
8
  baseUrl;
3
9
  headers;
@@ -7,6 +13,21 @@ export class CriticalPathClient {
7
13
  this.headers = options.headers || {};
8
14
  this.customFetch = options.fetch || globalThis.fetch;
9
15
  }
16
+ /**
17
+ * Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
18
+ * so delete methods keep their boolean contract instead of throwing.
19
+ */
20
+ async deleteRequest(endpoint) {
21
+ try {
22
+ const res = await this.request(endpoint, { method: 'DELETE' });
23
+ return res.success;
24
+ }
25
+ catch (err) {
26
+ if (err instanceof NotFoundResponseError)
27
+ return false;
28
+ throw err;
29
+ }
30
+ }
10
31
  async request(endpoint, options = {}) {
11
32
  const url = `${this.baseUrl}${endpoint.startsWith('/') ? endpoint : `/${endpoint}`}`;
12
33
  const response = await this.customFetch(url, {
@@ -27,7 +48,7 @@ export class CriticalPathClient {
27
48
  catch {
28
49
  // Fallback to HTTP error
29
50
  }
30
- throw new Error(errorMsg);
51
+ throw response.status === 404 ? new NotFoundResponseError(errorMsg) : new Error(errorMsg);
31
52
  }
32
53
  return response.json();
33
54
  }
@@ -55,10 +76,7 @@ export class CriticalPathClient {
55
76
  return res.workflow;
56
77
  }
57
78
  async deleteWorkflow(id) {
58
- const res = await this.request(`/workflows/${id}`, {
59
- method: 'DELETE'
60
- });
61
- return res.success;
79
+ return this.deleteRequest(`/workflows/${id}`);
62
80
  }
63
81
  // Projects
64
82
  async getProjects() {
@@ -195,10 +213,7 @@ export class CriticalPathClient {
195
213
  return this.updateTask(taskId, { todos: task.todos, ...options });
196
214
  }
197
215
  async deleteTask(id) {
198
- const res = await this.request(`/tasks/${id}`, {
199
- method: 'DELETE'
200
- });
201
- return res.success;
216
+ return this.deleteRequest(`/tasks/${id}`);
202
217
  }
203
218
  async getTaskDependencies(taskId) {
204
219
  const res = await this.request(`/tasks/${encodeURIComponent(taskId)}/dependencies`);
@@ -240,10 +255,7 @@ export class CriticalPathClient {
240
255
  return res.team;
241
256
  }
242
257
  async deleteTeam(id) {
243
- const res = await this.request(`/teams/${id}`, {
244
- method: 'DELETE'
245
- });
246
- return res.success;
258
+ return this.deleteRequest(`/teams/${id}`);
247
259
  }
248
260
  // Containers
249
261
  async getContainers(projectId) {
@@ -265,10 +277,7 @@ export class CriticalPathClient {
265
277
  return res.container;
266
278
  }
267
279
  async deleteContainer(id) {
268
- const res = await this.request(`/containers/${id}`, {
269
- method: 'DELETE'
270
- });
271
- return res.success;
280
+ return this.deleteRequest(`/containers/${id}`);
272
281
  }
273
282
  // Deliverables
274
283
  async getDeliverables(projectId) {
@@ -298,10 +307,7 @@ export class CriticalPathClient {
298
307
  return res.deliverable;
299
308
  }
300
309
  async deleteDeliverable(id) {
301
- const res = await this.request(`/deliverables/${id}`, {
302
- method: 'DELETE'
303
- });
304
- return res.success;
310
+ return this.deleteRequest(`/deliverables/${id}`);
305
311
  }
306
312
  // Iterations
307
313
  async getIterations(projectId) {
@@ -323,10 +329,7 @@ export class CriticalPathClient {
323
329
  return res.iteration;
324
330
  }
325
331
  async deleteIteration(id) {
326
- const res = await this.request(`/iterations/${id}`, {
327
- method: 'DELETE'
328
- });
329
- return res.success;
332
+ return this.deleteRequest(`/iterations/${id}`);
330
333
  }
331
334
  // Activity Stream
332
335
  async getActivities(filter) {
@@ -363,10 +366,7 @@ export class CriticalPathClient {
363
366
  return res.comment;
364
367
  }
365
368
  async deleteComment(id) {
366
- const res = await this.request(`/comments/${encodeURIComponent(id)}`, {
367
- method: 'DELETE'
368
- });
369
- return res.success;
369
+ return this.deleteRequest(`/comments/${encodeURIComponent(id)}`);
370
370
  }
371
371
  async addCommentReaction(commentId, reaction) {
372
372
  const res = await this.request(`/comments/${encodeURIComponent(commentId)}/reactions`, {
@@ -414,10 +414,7 @@ export class CriticalPathClient {
414
414
  return res.attachment;
415
415
  }
416
416
  async deleteAttachment(id) {
417
- const res = await this.request(`/attachments/${encodeURIComponent(id)}`, {
418
- method: 'DELETE'
419
- });
420
- return res.success;
417
+ return this.deleteRequest(`/attachments/${encodeURIComponent(id)}`);
421
418
  }
422
419
  async getPresignedAttachmentUploadUrl(options) {
423
420
  const res = await this.request('/attachments/presign', {
package/dist/index.js.map CHANGED
@@ -1 +1 @@
1
- {"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAoGA,MAAM,OAAO,kBAAkB;IACrB,OAAO,CAAS;IAChB,OAAO,CAAyB;IAChC,WAAW,CAAe;IAElC,YAAY,OAAsB;QAChC,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,IAAI,EAAE,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,KAAK,IAAI,UAAU,CAAC,KAAK,CAAC;IACvD,CAAC;IAEO,KAAK,CAAC,OAAO,CAAI,QAAgB,EAAE,UAAuB,EAAE;QAClE,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,OAAO,GAAG,QAAQ,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,QAAQ,EAAE,EAAE,CAAC;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,GAAG,EAAE;YAC3C,GAAG,OAAO;YACV,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;gBAClC,GAAG,IAAI,CAAC,OAAO;gBACf,GAAG,OAAO,CAAC,OAAO;aACnB;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,QAAQ,CAAC,EAAE,EAAE,CAAC;YACjB,IAAI,QAAQ,GAAG,cAAc,QAAQ,CAAC,MAAM,KAAK,QAAQ,CAAC,UAAU,EAAE,CAAC;YACvE,IAAI,CAAC;gBACH,MAAM,OAAO,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;gBACtC,IAAI,OAAO,CAAC,KAAK;oBAAE,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC;YAC9C,CAAC;YAAC,MAAM,CAAC;gBACP,yBAAyB;YAC3B,CAAC;YACD,MAAM,IAAI,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC5B,CAAC;QAED,OAAO,QAAQ,CAAC,IAAI,EAAE,CAAC;IACzB,CAAC;IAED,YAAY;IACZ,KAAK,CAAC,YAAY;QAChB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA4B,YAAY,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,CAAC,CAAC;QAC3E,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,IAAsD;QACzE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,YAAY,EAAE;YACnE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,EAAE;YACzE,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,cAAc,EAAE,EAAE,EAAE;YACvE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,WAAW,CAAC,CAAC;QACrE,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,EAAE,EAAE,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,IAAqD;QACvE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,gBAAgB,CAC3D,CAAC;QACF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,KAAK;YAAE,MAAM,CAAC,GAAG,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,CAAC,CAAC;QACtD,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,UAAU,KAAK,EAAE,CAC5D,CAAC;QACF,OAAO,GAAG,CAAC,MAAM,CAAC;IACpB,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAClE,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,QAAQ;YAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC/D,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QACzD,IAAI,OAAO,OAAO,CAAC,0BAA0B,KAAK,QAAQ,EAAE,CAAC;YAC3D,MAAM,CAAC,GAAG,CAAC,4BAA4B,EAAE,OAAO,CAAC,0BAA0B,CAAC,QAAQ,EAAE,CAAC,CAAC;QAC1F,CAAC;QAED,MAAM,IAAI,GAAG,SAAS;YACpB,CAAC,CAAC,aAAa,kBAAkB,CAAC,SAAS,CAAC,WAAW;YACvD,CAAC,CAAC,WAAW,CAAC;QAChB,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqC,GAAG,IAAI,GAAG,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,MAAM,KAAK,GAAG,SAAS,CAAC,CAAC,CAAC,cAAc,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,SAAS,KAAK,EAAE,CAAC,CAAC;QACpE,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,SAAS,CAC9C,CAAC;QACF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,UAAU,CAC/C,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,mBAAmB,CACxD,CAAC;QACF,OAAO,GAAG,CAAC,eAAe,CAAC;IAC7B,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC;QAED,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,YAAoB,EACpB,IAQC;QAED,IAAI,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAC/B,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACpD,SAAS,GAAG,UAAU,CAAC,SAAS,CAAC;QACnC,CAAC;QACD,OAAO,IAAI,CAAC,UAAU,CAAC;YACrB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,QAAQ,EAAE,YAAY;YACtB,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,QAAQ;YACnC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,YAAY,EAAE,IAAI,CAAC,YAAY;SAChC,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,OAAO,CACX,MAAc,EACd,KAAa,EACb,OAAsE;QAEtE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACtE,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,IAAI,EAAE,CAAC,EAAE,IAAI,CAAC,CAAC;QAC5C,MAAM,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,GAAG,OAAO,EAAE,CAAC,CAAC;QACrD,OAAO,IAAI,CAAC;IACd,CAAC;IAED,KAAK,CAAC,UAAU,CACd,MAAc,EACd,aAAqB,EACrB,SAAmB,EACnB,OAAsE;QAEtE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;YAC3C,MAAM,IAAI,KAAK,CAAC,QAAQ,MAAM,0BAA0B,CAAC,CAAC;QAC5D,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAC1B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,aAAa,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,KAAK,aAAa,CAAC,WAAW,EAAE,CACvF,CAAC;QACF,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,mBAAmB,aAAa,uBAAuB,MAAM,GAAG,CAAC,CAAC;QACpF,CAAC;QACD,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;QACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACzE,OAAO,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,GAAG,OAAO,EAAE,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,UAAU,EAAE,EAAE,EAAE;YACnE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,mBAAmB,CAAC,MAAc;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC;QACpH,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,UAAU,kBAAkB,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC;QAC/G,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,mBAAmB,CAAC;IACjC,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,uBAAuB,IAAI,EAAE,CAAC;IAC3C,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ;QACZ,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,QAAQ,CAAC,CAAC;QAC5D,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,UAAU,EAAE,EAAE,EAAE;YACnE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC1H,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAA2D;QAC/E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,aAAa,EAAE;YAC1E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE,EAAE,EAAE;YAChF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,eAAe,EAAE,EAAE,EAAE;YACxE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,2BAA2B,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5H,OAAO,GAAG,CAAC,YAAY,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,CAAC,CAAC;QACpF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,EAAU;QACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,iBAAiB,EAAE,UAAU,CAAC,CAAC;QAC/F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,IAA4B;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE;YAC5E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,EAAE;YAClF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,iBAAiB,EAAE,EAAE,EAAE;YAC1E,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA8B,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QACtH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyC;QAC7D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,aAAa,EAAE;YACtE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE,EAAE,EAAE;YAC5E,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,eAAe,EAAE,EAAE,EAAE;YACxE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,kBAAkB;IAClB,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,KAAK,EAAE,CAAC,CAAC;QAClF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,oBAAoB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC1G,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAqD;QACpE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,QAAQ;YAChB,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,cAAc;IACd,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAgC,eAAe,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrG,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,IAAwD;QAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,EAAE;YACzE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,oBAAoB,CAAC,IAW1B;QACC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,qBAAqB,EAAE;YAChF,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC7F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuC,sBAAsB,EAAE;YAC3F,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,wBAAwB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,IAAwC;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,2BAA2B;IAC3B,KAAK,CAAC,YAAY,CAChB,MAAc,EACd,OAA6B;QAE7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqB,SAAS,EAAE;YAC5D,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM;gBACN,MAAM,EAAE,OAAO,EAAE,MAAM;gBACvB,SAAS,EAAE,OAAO,EAAE,SAAS;gBAC7B,OAAO,EAAE,OAAO,EAAE,OAAO;gBACzB,SAAS,EAAE,OAAO,EAAE,SAAS,IAAI,IAAI;aACtC,CAAC;SACH,CAAC,CAAC;QACH,OAAO,GAAG,CAAC;IACb,CAAC;CACF"}
1
+ {"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAoGA,MAAM,qBAAsB,SAAQ,KAAK;IACvC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,uBAAuB,CAAC;IACtC,CAAC;CACF;AAED,MAAM,OAAO,kBAAkB;IACrB,OAAO,CAAS;IAChB,OAAO,CAAyB;IAChC,WAAW,CAAe;IAElC,YAAY,OAAsB;QAChC,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,IAAI,EAAE,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,KAAK,IAAI,UAAU,CAAC,KAAK,CAAC;IACvD,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,aAAa,CAAC,QAAgB;QAC1C,IAAI,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,QAAQ,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC;YACrF,OAAO,GAAG,CAAC,OAAO,CAAC;QACrB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,GAAG,YAAY,qBAAqB;gBAAE,OAAO,KAAK,CAAC;YACvD,MAAM,GAAG,CAAC;QACZ,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,OAAO,CAAI,QAAgB,EAAE,UAAuB,EAAE;QAClE,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,OAAO,GAAG,QAAQ,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,QAAQ,EAAE,EAAE,CAAC;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,GAAG,EAAE;YAC3C,GAAG,OAAO;YACV,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;gBAClC,GAAG,IAAI,CAAC,OAAO;gBACf,GAAG,OAAO,CAAC,OAAO;aACnB;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,QAAQ,CAAC,EAAE,EAAE,CAAC;YACjB,IAAI,QAAQ,GAAG,cAAc,QAAQ,CAAC,MAAM,KAAK,QAAQ,CAAC,UAAU,EAAE,CAAC;YACvE,IAAI,CAAC;gBACH,MAAM,OAAO,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;gBACtC,IAAI,OAAO,CAAC,KAAK;oBAAE,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC;YAC9C,CAAC;YAAC,MAAM,CAAC;gBACP,yBAAyB;YAC3B,CAAC;YACD,MAAM,QAAQ,CAAC,MAAM,KAAK,GAAG,CAAC,CAAC,CAAC,IAAI,qBAAqB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC5F,CAAC;QAED,OAAO,QAAQ,CAAC,IAAI,EAAE,CAAC;IACzB,CAAC;IAED,YAAY;IACZ,KAAK,CAAC,YAAY;QAChB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA4B,YAAY,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,CAAC,CAAC;QAC3E,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,IAAsD;QACzE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,YAAY,EAAE;YACnE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,EAAE;YACzE,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,aAAa,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC;IAChD,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,WAAW,CAAC,CAAC;QACrE,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,EAAE,EAAE,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,IAAqD;QACvE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,gBAAgB,CAC3D,CAAC;QACF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,KAAK;YAAE,MAAM,CAAC,GAAG,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,CAAC,CAAC;QACtD,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,UAAU,KAAK,EAAE,CAC5D,CAAC;QACF,OAAO,GAAG,CAAC,MAAM,CAAC;IACpB,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAClE,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,QAAQ;YAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC/D,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QACzD,IAAI,OAAO,OAAO,CAAC,0BAA0B,KAAK,QAAQ,EAAE,CAAC;YAC3D,MAAM,CAAC,GAAG,CAAC,4BAA4B,EAAE,OAAO,CAAC,0BAA0B,CAAC,QAAQ,EAAE,CAAC,CAAC;QAC1F,CAAC;QAED,MAAM,IAAI,GAAG,SAAS;YACpB,CAAC,CAAC,aAAa,kBAAkB,CAAC,SAAS,CAAC,WAAW;YACvD,CAAC,CAAC,WAAW,CAAC;QAChB,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqC,GAAG,IAAI,GAAG,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,MAAM,KAAK,GAAG,SAAS,CAAC,CAAC,CAAC,cAAc,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,SAAS,KAAK,EAAE,CAAC,CAAC;QACpE,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,SAAS,CAC9C,CAAC;QACF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,UAAU,CAC/C,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,mBAAmB,CACxD,CAAC;QACF,OAAO,GAAG,CAAC,eAAe,CAAC;IAC7B,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC;QAED,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,YAAoB,EACpB,IAQC;QAED,IAAI,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAC/B,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACpD,SAAS,GAAG,UAAU,CAAC,SAAS,CAAC;QACnC,CAAC;QACD,OAAO,IAAI,CAAC,UAAU,CAAC;YACrB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,QAAQ,EAAE,YAAY;YACtB,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,QAAQ;YACnC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,YAAY,EAAE,IAAI,CAAC,YAAY;SAChC,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,OAAO,CACX,MAAc,EACd,KAAa,EACb,OAAsE;QAEtE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACtE,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,IAAI,EAAE,CAAC,EAAE,IAAI,CAAC,CAAC;QAC5C,MAAM,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,GAAG,OAAO,EAAE,CAAC,CAAC;QACrD,OAAO,IAAI,CAAC;IACd,CAAC;IAED,KAAK,CAAC,UAAU,CACd,MAAc,EACd,aAAqB,EACrB,SAAmB,EACnB,OAAsE;QAEtE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;YAC3C,MAAM,IAAI,KAAK,CAAC,QAAQ,MAAM,0BAA0B,CAAC,CAAC;QAC5D,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAC1B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,aAAa,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,KAAK,aAAa,CAAC,WAAW,EAAE,CACvF,CAAC;QACF,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,mBAAmB,aAAa,uBAAuB,MAAM,GAAG,CAAC,CAAC;QACpF,CAAC;QACD,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;QACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACzE,OAAO,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,GAAG,OAAO,EAAE,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,EAAE,EAAE,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,mBAAmB,CAAC,MAAc;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC;QACpH,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,UAAU,kBAAkB,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC;QAC/G,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,mBAAmB,CAAC;IACjC,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,uBAAuB,IAAI,EAAE,CAAC;IAC3C,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ;QACZ,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,QAAQ,CAAC,CAAC;QAC5D,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,EAAE,EAAE,CAAC,CAAC;IAC5C,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC1H,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAA2D;QAC/E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,aAAa,EAAE;YAC1E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE,EAAE,EAAE;YAChF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,EAAE,EAAE,CAAC,CAAC;IACjD,CAAC;IAED,eAAe;IACf,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,2BAA2B,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5H,OAAO,GAAG,CAAC,YAAY,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,CAAC,CAAC;QACpF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,EAAU;QACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,iBAAiB,EAAE,UAAU,CAAC,CAAC;QAC/F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,IAA4B;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE;YAC5E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,EAAE;YAClF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,OAAO,IAAI,CAAC,aAAa,CAAC,iBAAiB,EAAE,EAAE,CAAC,CAAC;IACnD,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA8B,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QACtH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyC;QAC7D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,aAAa,EAAE;YACtE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE,EAAE,EAAE;YAC5E,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,EAAE,EAAE,CAAC,CAAC;IACjD,CAAC;IAED,kBAAkB;IAClB,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,KAAK,EAAE,CAAC,CAAC;QAClF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,oBAAoB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC1G,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAqD;QACpE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,QAAQ;YAChB,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,cAAc;IACd,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAgC,eAAe,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrG,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,IAAwD;QAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,EAAE;YACzE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,oBAAoB,CAAC,IAW1B;QACC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,qBAAqB,EAAE;YAChF,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,OAAO,IAAI,CAAC,aAAa,CAAC,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACtE,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuC,sBAAsB,EAAE;YAC3F,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,wBAAwB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,IAAwC;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,2BAA2B;IAC3B,KAAK,CAAC,YAAY,CAChB,MAAc,EACd,OAA6B;QAE7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqB,SAAS,EAAE;YAC5D,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM;gBACN,MAAM,EAAE,OAAO,EAAE,MAAM;gBACvB,SAAS,EAAE,OAAO,EAAE,SAAS;gBAC7B,OAAO,EAAE,OAAO,EAAE,OAAO;gBACzB,SAAS,EAAE,OAAO,EAAE,SAAS,IAAI,IAAI;aACtC,CAAC;SACH,CAAC,CAAC;QACH,OAAO,GAAG,CAAC;IACb,CAAC;CACF"}
@@ -343,5 +343,17 @@ describe('@critical-path/client Tests', () => {
343
343
  isEngaged: true
344
344
  });
345
345
  });
346
+ it('resolves delete methods to false on 404 and still throws other errors', async () => {
347
+ let status = 404;
348
+ const mockFetch = async () => new Response(JSON.stringify({ error: status === 404 ? 'Not found' : 'Internal Server Error' }), {
349
+ status,
350
+ headers: { 'Content-Type': 'application/json' }
351
+ });
352
+ const client = new CriticalPathClient({ baseUrl: 'http://localhost/api', fetch: mockFetch });
353
+ expect(await client.deleteTask('missing')).toBe(false);
354
+ expect(await client.deleteComment('missing')).toBe(false);
355
+ status = 500;
356
+ await expect(client.deleteTask('t1')).rejects.toThrow('Internal Server Error');
357
+ });
346
358
  });
347
359
  //# sourceMappingURL=index.test.js.map
@@ -1 +1 @@
1
- {"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,YAAY,CAAC;AAEhD,QAAQ,CAAC,6BAA6B,EAAE,GAAG,EAAE;IAC3C,EAAE,CAAC,mDAAmD,EAAE,KAAK,IAAI,EAAE;QACjE,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,WAAW,CAAC,IAAI,CAAC,CAAC,IAAI,EAAE,MAAM,IAAI,IAAI,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,KAAK,CAAC,EAAE,CAAC;gBAC3F,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACrH,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;QAC5C,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAChC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+DAA+D,EAAE,KAAK,IAAI,EAAE;QAC7E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,YAAY,CAAC,EAAE,CAAC;gBAClC,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7G,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,uBAAuB,CAAC,EAAE,CAAC;gBAC7C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,mBAAmB,EAAE,CAAC,aAAa,EAAE,UAAU,CAAC;oBAChD,uBAAuB,EAAE,CAAC,SAAS,CAAC;iBACrC,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;QAC9C,MAAM,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;QAE/C,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,IAAI,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,CAAC,OAAO,CAAC,CAAC,aAAa,EAAE,UAAU,CAAC,CAAC,CAAC;QAEzD,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,IAAI,CAAC,CAAC;QACjF,MAAM,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACnD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,EAAE,WAAW,EAAE,IAAI,KAAK,CAAC;YAEpD,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAC/D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC/J,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,WAAW,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC3F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC1D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACnE,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACrG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBACrE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,SAAS,EAAE,EAAE,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACjG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC3D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAClE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,SAAS,EAAE,QAAQ,EAAE,YAAY,EAAE,SAAS,EAAE,EAAE,EAAE,GAAG,EAAE,4BAA4B,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvL,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACzD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,UAAU,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC9F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBAChE,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,UAAU,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,GAAG,IAAI,EAAE,GAAG,EAAE,sCAAsC,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7I,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,iBAAiB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC9D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,IAAI,CAAC,CAAC;QAChD,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAEhD,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC,CAAC;QAC7H,MAAM,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAErC,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,EAAE,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,cAAc,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QACrF,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC1C,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEhD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QAC1F,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAE5C,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;QACxD,MAAM,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAElC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QAClE,MAAM,CAAC,WAAW,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACpC,MAAM,CAAC,WAAW,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAEhD,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,QAAQ,EAAE,UAAU,EAAE,QAAQ,EAAE,YAAY,EAAE,SAAS,EAAE,EAAE,EAAE,GAAG,EAAE,8BAA8B,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACzK,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEjC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,EAAE,QAAQ,EAAE,cAAc,EAAE,IAAI,EAAE,YAAY,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QAC1H,MAAM,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACpC,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,sCAAsC,CAAC,CAAC;QAErE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;QACvD,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAChC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;QAC5E,MAAM,eAAe,GAAG;YACtB,EAAE,EAAE,IAAI;YACR,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,SAAkB;YAC1B,MAAM,EAAE,YAAY;YACpB,UAAU,EAAE,EAAE;YACd,SAAS,EAAE,sBAAsB;YACjC,SAAS,EAAE,sBAAsB;SAClC,CAAC;QAEF,MAAM,WAAW,GAAG;YAClB,WAAW,EAAE,eAAe;YAC5B,UAAU,EAAE,CAAC;YACb,cAAc,EAAE,CAAC;YACjB,WAAW,EAAE,CAAC;YACd,kBAAkB,EAAE,EAAE;YACtB,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;SAChB,CAAC;QAEF,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,EAAE,WAAW,EAAE,IAAI,KAAK,CAAC;YAEpD,IAAI,MAAM,CAAC,QAAQ,CAAC,4BAA4B,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACtE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC5F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,0BAA0B,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACpE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACjF,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAC5D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,eAAe,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,eAAe,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC/F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC9D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,EAAE,GAAG,eAAe,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC/D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;QAChD,MAAM,CAAC,IAAI,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC7B,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;QAE3C,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,IAAI,CAAC,CAAC;QACjD,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE7B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAE5C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC;YAC7C,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,YAAY;SACrB,CAAC,CAAC;QACH,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC,CAAC;QAC9E,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QAEzC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAC7B,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,gEAAgE,EAAE,KAAK,IAAI,EAAE;QAC9E,MAAM,SAAS,GAAG;YAChB,cAAc,EAAE,aAAsB;YACtC,OAAO,EAAE,KAAK;YACd,SAAS,EAAE,IAAI;YACf,eAAe,EAAE,CAAC,eAAe,CAAC;YAClC,SAAS,EAAE,KAAK;YAChB,UAAU,EAAE,KAAK;YACjB,WAAW,EAAE,IAAI;YACjB,YAAY,EAAE,KAAK;YACnB,SAAS,EAAE,KAAK;YAChB,cAAc,EAAE,KAAK;YACrB,aAAa,EAAE,KAAK;YACpB,MAAM,EAAE,KAAK;YACb,QAAQ,EAAE,KAAK;YACf,WAAW,EAAE,KAAK;SACnB,CAAC;QAEF,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,EAAE;YACtD,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,EAAE,CAAC;gBAC3C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,EAAE,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,KAAK,EAAE;wBACL,MAAM,EAAE,IAAI;wBACZ,aAAa,EAAE,CAAC,EAAE,EAAE,EAAE,eAAe,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;wBAC7E,eAAe,EAAE,EAAE;wBACnB,YAAY,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,eAAe,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC;qBACjG;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QAC3D,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvC,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtC,MAAM,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QAE7D,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,mBAAmB,CAAC,IAAI,CAAC,CAAC;QACpD,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC3C,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QACvD,MAAM,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IAC5C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;QAC5E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,EAAE;YACtD,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAE9B,IAAI,MAAM,CAAC,QAAQ,CAAC,4BAA4B,CAAC,EAAE,CAAC;gBAClD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,QAAQ,EAAE;wBACR,SAAS,EAAE,IAAI;wBACf,YAAY,EAAE,sBAAsB;wBACpC,kBAAkB,EAAE,EAAE;wBACtB,eAAe,EAAE,CAAC,IAAI,EAAE,IAAI,CAAC;wBAC7B,KAAK,EAAE,EAAE;qBACV;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,iCAAiC,CAAC,EAAE,CAAC;gBACvD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,MAAM,EAAE;wBACN,SAAS,EAAE,IAAI;wBACf,WAAW,EAAE,sBAAsB;wBACnC,KAAK,EAAE,OAAO;wBACd,KAAK,EAAE;4BACL,SAAS,EAAE,IAAI;4BACf,WAAW,EAAE,gBAAgB;4BAC7B,kBAAkB,EAAE,EAAE;4BACtB,yBAAyB,EAAE,EAAE;4BAC7B,yBAAyB,EAAE,EAAE;4BAC7B,MAAM,EAAE,UAAU;4BAClB,UAAU,EAAE,CAAC;4BACb,cAAc,EAAE,CAAC;4BACjB,eAAe,EAAE,CAAC;4BAClB,YAAY,EAAE,CAAC;4BACf,mBAAmB,EAAE,EAAE;4BACvB,gBAAgB,EAAE,CAAC;4BACnB,MAAM,EAAE,EAAE;yBACX;qBACF;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,EAAE,CAAC;gBACxC,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,UAAU,EAAE;wBACV,MAAM,EAAE,IAAI;wBACZ,QAAQ,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,aAAa,EAAE,QAAQ,EAAE,MAAM,EAAE;wBAChF,QAAQ,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,uBAAuB,EAAE,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE;qBACvI;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,uBAAuB,CAAC,EAAE,CAAC;gBAC7C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,QAAQ,EAAE;wBACR,SAAS,EAAE,IAAI;wBACf,SAAS,EAAE,YAAY;wBACvB,OAAO,EAAE,YAAY;wBACrB,QAAQ,EAAE,MAAM;wBAChB,OAAO,EAAE,UAAU;wBACnB,MAAM,EAAE,SAAS;wBACjB,UAAU,EAAE,CAAC,IAAI,EAAE,IAAI,CAAC;wBACxB,YAAY,EAAE,EAAE,EAAE,EAAE,OAAO,EAAE,EAAE,EAAE,KAAK,EAAE;wBACxC,OAAO,EAAE;4BACP,EAAE,IAAI,EAAE,YAAY,EAAE,SAAS,EAAE,aAAa,EAAE,UAAU,EAAE,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,CAAC,EAAE,EAAE;yBAC5F;wBACD,UAAU,EAAE,EAAE;qBACf;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACrD,MAAM,CAAC,GAAG,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACxC,MAAM,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAElD,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,MAAM,CAAC,MAAM,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;QACzD,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEnC,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;QACpD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACrC,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QAEjD,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,IAAI,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC;QACrG,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAClD,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,oDAAoD,EAAE,KAAK,IAAI,EAAE;QAClE,IAAI,YAAY,GAAQ,IAAI,CAAC;QAC7B,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1D,YAAY,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,IAAc,CAAC,CAAC;gBAC/C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,YAAY,CAAC,MAAM,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7H,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,oBAAoB,EAAE;YAC7D,MAAM,EAAE,IAAI;YACZ,SAAS,EAAE,IAAI;YACf,OAAO,EAAE,sBAAsB;SAChC,CAAC,CAAC;QAEH,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,oBAAoB,CAAC,CAAC;QACjD,MAAM,CAAC,YAAY,CAAC,CAAC,OAAO,CAAC;YAC3B,MAAM,EAAE,oBAAoB;YAC5B,MAAM,EAAE,IAAI;YACZ,SAAS,EAAE,IAAI;YACf,OAAO,EAAE,sBAAsB;YAC/B,SAAS,EAAE,IAAI;SAChB,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
1
+ {"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,YAAY,CAAC;AAEhD,QAAQ,CAAC,6BAA6B,EAAE,GAAG,EAAE;IAC3C,EAAE,CAAC,mDAAmD,EAAE,KAAK,IAAI,EAAE;QACjE,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,WAAW,CAAC,IAAI,CAAC,CAAC,IAAI,EAAE,MAAM,IAAI,IAAI,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,KAAK,CAAC,EAAE,CAAC;gBAC3F,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACrH,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;QAC5C,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAChC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+DAA+D,EAAE,KAAK,IAAI,EAAE;QAC7E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,YAAY,CAAC,EAAE,CAAC;gBAClC,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7G,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,uBAAuB,CAAC,EAAE,CAAC;gBAC7C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,mBAAmB,EAAE,CAAC,aAAa,EAAE,UAAU,CAAC;oBAChD,uBAAuB,EAAE,CAAC,SAAS,CAAC;iBACrC,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;QAC9C,MAAM,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;QAE/C,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,IAAI,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,CAAC,OAAO,CAAC,CAAC,aAAa,EAAE,UAAU,CAAC,CAAC,CAAC;QAEzD,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,IAAI,CAAC,CAAC;QACjF,MAAM,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACnD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,EAAE,WAAW,EAAE,IAAI,KAAK,CAAC;YAEpD,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAC/D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC/J,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,WAAW,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC3F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC1D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACnE,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACrG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBACrE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,SAAS,EAAE,EAAE,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACjG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC3D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAClE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,SAAS,EAAE,QAAQ,EAAE,YAAY,EAAE,SAAS,EAAE,EAAE,EAAE,GAAG,EAAE,4BAA4B,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvL,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACzD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,UAAU,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC9F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBAChE,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,UAAU,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,GAAG,IAAI,EAAE,GAAG,EAAE,sCAAsC,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7I,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,iBAAiB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC9D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,IAAI,CAAC,CAAC;QAChD,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAEhD,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC,CAAC;QAC7H,MAAM,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAErC,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,EAAE,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,cAAc,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QACrF,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC1C,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEhD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QAC1F,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAE5C,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;QACxD,MAAM,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAElC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QAClE,MAAM,CAAC,WAAW,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACpC,MAAM,CAAC,WAAW,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAEhD,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,QAAQ,EAAE,UAAU,EAAE,QAAQ,EAAE,YAAY,EAAE,SAAS,EAAE,EAAE,EAAE,GAAG,EAAE,8BAA8B,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACzK,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEjC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,EAAE,QAAQ,EAAE,cAAc,EAAE,IAAI,EAAE,YAAY,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QAC1H,MAAM,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACpC,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,sCAAsC,CAAC,CAAC;QAErE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;QACvD,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAChC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;QAC5E,MAAM,eAAe,GAAG;YACtB,EAAE,EAAE,IAAI;YACR,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,SAAkB;YAC1B,MAAM,EAAE,YAAY;YACpB,UAAU,EAAE,EAAE;YACd,SAAS,EAAE,sBAAsB;YACjC,SAAS,EAAE,sBAAsB;SAClC,CAAC;QAEF,MAAM,WAAW,GAAG;YAClB,WAAW,EAAE,eAAe;YAC5B,UAAU,EAAE,CAAC;YACb,cAAc,EAAE,CAAC;YACjB,WAAW,EAAE,CAAC;YACd,kBAAkB,EAAE,EAAE;YACtB,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;SAChB,CAAC;QAEF,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,EAAE,WAAW,EAAE,IAAI,KAAK,CAAC;YAEpD,IAAI,MAAM,CAAC,QAAQ,CAAC,4BAA4B,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACtE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC5F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,0BAA0B,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACpE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACjF,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAC5D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,eAAe,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,eAAe,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC/F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC9D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,EAAE,GAAG,eAAe,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC/D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;QAChD,MAAM,CAAC,IAAI,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC7B,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;QAE3C,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,IAAI,CAAC,CAAC;QACjD,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE7B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAE5C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC;YAC7C,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,YAAY;SACrB,CAAC,CAAC;QACH,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC,CAAC;QAC9E,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QAEzC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAC7B,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,gEAAgE,EAAE,KAAK,IAAI,EAAE;QAC9E,MAAM,SAAS,GAAG;YAChB,cAAc,EAAE,aAAsB;YACtC,OAAO,EAAE,KAAK;YACd,SAAS,EAAE,IAAI;YACf,eAAe,EAAE,CAAC,eAAe,CAAC;YAClC,SAAS,EAAE,KAAK;YAChB,UAAU,EAAE,KAAK;YACjB,WAAW,EAAE,IAAI;YACjB,YAAY,EAAE,KAAK;YACnB,SAAS,EAAE,KAAK;YAChB,cAAc,EAAE,KAAK;YACrB,aAAa,EAAE,KAAK;YACpB,MAAM,EAAE,KAAK;YACb,QAAQ,EAAE,KAAK;YACf,WAAW,EAAE,KAAK;SACnB,CAAC;QAEF,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,EAAE;YACtD,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,EAAE,CAAC;gBAC3C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,EAAE,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,KAAK,EAAE;wBACL,MAAM,EAAE,IAAI;wBACZ,aAAa,EAAE,CAAC,EAAE,EAAE,EAAE,eAAe,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;wBAC7E,eAAe,EAAE,EAAE;wBACnB,YAAY,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,eAAe,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC;qBACjG;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QAC3D,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvC,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtC,MAAM,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QAE7D,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,mBAAmB,CAAC,IAAI,CAAC,CAAC;QACpD,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC3C,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QACvD,MAAM,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IAC5C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;QAC5E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,EAAE;YACtD,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAE9B,IAAI,MAAM,CAAC,QAAQ,CAAC,4BAA4B,CAAC,EAAE,CAAC;gBAClD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,QAAQ,EAAE;wBACR,SAAS,EAAE,IAAI;wBACf,YAAY,EAAE,sBAAsB;wBACpC,kBAAkB,EAAE,EAAE;wBACtB,eAAe,EAAE,CAAC,IAAI,EAAE,IAAI,CAAC;wBAC7B,KAAK,EAAE,EAAE;qBACV;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,iCAAiC,CAAC,EAAE,CAAC;gBACvD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,MAAM,EAAE;wBACN,SAAS,EAAE,IAAI;wBACf,WAAW,EAAE,sBAAsB;wBACnC,KAAK,EAAE,OAAO;wBACd,KAAK,EAAE;4BACL,SAAS,EAAE,IAAI;4BACf,WAAW,EAAE,gBAAgB;4BAC7B,kBAAkB,EAAE,EAAE;4BACtB,yBAAyB,EAAE,EAAE;4BAC7B,yBAAyB,EAAE,EAAE;4BAC7B,MAAM,EAAE,UAAU;4BAClB,UAAU,EAAE,CAAC;4BACb,cAAc,EAAE,CAAC;4BACjB,eAAe,EAAE,CAAC;4BAClB,YAAY,EAAE,CAAC;4BACf,mBAAmB,EAAE,EAAE;4BACvB,gBAAgB,EAAE,CAAC;4BACnB,MAAM,EAAE,EAAE;yBACX;qBACF;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,EAAE,CAAC;gBACxC,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,UAAU,EAAE;wBACV,MAAM,EAAE,IAAI;wBACZ,QAAQ,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,aAAa,EAAE,QAAQ,EAAE,MAAM,EAAE;wBAChF,QAAQ,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,uBAAuB,EAAE,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE;qBACvI;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,uBAAuB,CAAC,EAAE,CAAC;gBAC7C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,QAAQ,EAAE;wBACR,SAAS,EAAE,IAAI;wBACf,SAAS,EAAE,YAAY;wBACvB,OAAO,EAAE,YAAY;wBACrB,QAAQ,EAAE,MAAM;wBAChB,OAAO,EAAE,UAAU;wBACnB,MAAM,EAAE,SAAS;wBACjB,UAAU,EAAE,CAAC,IAAI,EAAE,IAAI,CAAC;wBACxB,YAAY,EAAE,EAAE,EAAE,EAAE,OAAO,EAAE,EAAE,EAAE,KAAK,EAAE;wBACxC,OAAO,EAAE;4BACP,EAAE,IAAI,EAAE,YAAY,EAAE,SAAS,EAAE,aAAa,EAAE,UAAU,EAAE,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,CAAC,EAAE,EAAE;yBAC5F;wBACD,UAAU,EAAE,EAAE;qBACf;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACrD,MAAM,CAAC,GAAG,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACxC,MAAM,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAElD,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,MAAM,CAAC,MAAM,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;QACzD,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEnC,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;QACpD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACrC,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QAEjD,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,IAAI,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC;QACrG,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAClD,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,oDAAoD,EAAE,KAAK,IAAI,EAAE;QAClE,IAAI,YAAY,GAAQ,IAAI,CAAC;QAC7B,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1D,YAAY,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,IAAc,CAAC,CAAC;gBAC/C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,YAAY,CAAC,MAAM,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7H,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,oBAAoB,EAAE;YAC7D,MAAM,EAAE,IAAI;YACZ,SAAS,EAAE,IAAI;YACf,OAAO,EAAE,sBAAsB;SAChC,CAAC,CAAC;QAEH,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,oBAAoB,CAAC,CAAC;QACjD,MAAM,CAAC,YAAY,CAAC,CAAC,OAAO,CAAC;YAC3B,MAAM,EAAE,oBAAoB;YAC5B,MAAM,EAAE,IAAI;YACZ,SAAS,EAAE,IAAI;YACf,OAAO,EAAE,sBAAsB;YAC/B,SAAS,EAAE,IAAI;SAChB,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uEAAuE,EAAE,KAAK,IAAI,EAAE;QACrF,IAAI,MAAM,GAAG,GAAG,CAAC;QACjB,MAAM,SAAS,GAAG,KAAK,IAAI,EAAE,CAC3B,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,MAAM,KAAK,GAAG,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,CAAC,uBAAuB,EAAE,CAAC,EAAE;YAC9F,MAAM;YACN,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;SAChD,CAAC,CAAC;QACL,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,OAAO,EAAE,sBAAsB,EAAE,KAAK,EAAE,SAAyB,EAAE,CAAC,CAAC;QAE7G,MAAM,CAAC,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACvD,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAE1D,MAAM,GAAG,GAAG,CAAC;QACb,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,uBAAuB,CAAC,CAAC;IACjF,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@critical-path/client",
3
- "version": "0.14.6",
3
+ "version": "0.14.8",
4
4
  "description": "Type-safe JavaScript/TypeScript client SDK for consuming Critical Path API endpoints",
5
5
  "author": "Jack James",
6
6
  "license": "MIT",
@@ -21,7 +21,7 @@
21
21
  }
22
22
  },
23
23
  "dependencies": {
24
- "@critical-path/core": "0.21.0"
24
+ "@critical-path/core": "0.23.0"
25
25
  },
26
26
  "devDependencies": {
27
27
  "@types/node": "^24.0.0",
package/src/index.test.ts CHANGED
@@ -395,6 +395,21 @@ describe('@critical-path/client Tests', () => {
395
395
  isEngaged: true
396
396
  });
397
397
  });
398
- });
399
398
 
399
+ it('resolves delete methods to false on 404 and still throws other errors', async () => {
400
+ let status = 404;
401
+ const mockFetch = async () =>
402
+ new Response(JSON.stringify({ error: status === 404 ? 'Not found' : 'Internal Server Error' }), {
403
+ status,
404
+ headers: { 'Content-Type': 'application/json' }
405
+ });
406
+ const client = new CriticalPathClient({ baseUrl: 'http://localhost/api', fetch: mockFetch as typeof fetch });
407
+
408
+ expect(await client.deleteTask('missing')).toBe(false);
409
+ expect(await client.deleteComment('missing')).toBe(false);
410
+
411
+ status = 500;
412
+ await expect(client.deleteTask('t1')).rejects.toThrow('Internal Server Error');
413
+ });
414
+ });
400
415
 
package/src/index.ts CHANGED
@@ -98,6 +98,13 @@ export interface ClientOptions {
98
98
  fetch?: typeof fetch;
99
99
  }
100
100
 
101
+ class NotFoundResponseError extends Error {
102
+ constructor(message: string) {
103
+ super(message);
104
+ this.name = 'NotFoundResponseError';
105
+ }
106
+ }
107
+
101
108
  export class CriticalPathClient {
102
109
  private baseUrl: string;
103
110
  private headers: Record<string, string>;
@@ -109,6 +116,20 @@ export class CriticalPathClient {
109
116
  this.customFetch = options.fetch || globalThis.fetch;
110
117
  }
111
118
 
119
+ /**
120
+ * Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
121
+ * so delete methods keep their boolean contract instead of throwing.
122
+ */
123
+ private async deleteRequest(endpoint: string): Promise<boolean> {
124
+ try {
125
+ const res = await this.request<{ success: boolean }>(endpoint, { method: 'DELETE' });
126
+ return res.success;
127
+ } catch (err) {
128
+ if (err instanceof NotFoundResponseError) return false;
129
+ throw err;
130
+ }
131
+ }
132
+
112
133
  private async request<T>(endpoint: string, options: RequestInit = {}): Promise<T> {
113
134
  const url = `${this.baseUrl}${endpoint.startsWith('/') ? endpoint : `/${endpoint}`}`;
114
135
  const response = await this.customFetch(url, {
@@ -128,7 +149,7 @@ export class CriticalPathClient {
128
149
  } catch {
129
150
  // Fallback to HTTP error
130
151
  }
131
- throw new Error(errorMsg);
152
+ throw response.status === 404 ? new NotFoundResponseError(errorMsg) : new Error(errorMsg);
132
153
  }
133
154
 
134
155
  return response.json();
@@ -162,10 +183,7 @@ export class CriticalPathClient {
162
183
  }
163
184
 
164
185
  async deleteWorkflow(id: string): Promise<boolean> {
165
- const res = await this.request<{ success: boolean }>(`/workflows/${id}`, {
166
- method: 'DELETE'
167
- });
168
- return res.success;
186
+ return this.deleteRequest(`/workflows/${id}`);
169
187
  }
170
188
 
171
189
  // Projects
@@ -359,10 +377,7 @@ export class CriticalPathClient {
359
377
  }
360
378
 
361
379
  async deleteTask(id: string): Promise<boolean> {
362
- const res = await this.request<{ success: boolean }>(`/tasks/${id}`, {
363
- method: 'DELETE'
364
- });
365
- return res.success;
380
+ return this.deleteRequest(`/tasks/${id}`);
366
381
  }
367
382
 
368
383
  async getTaskDependencies(taskId: string): Promise<TaskDependencyGraph> {
@@ -413,10 +428,7 @@ export class CriticalPathClient {
413
428
  }
414
429
 
415
430
  async deleteTeam(id: string): Promise<boolean> {
416
- const res = await this.request<{ success: boolean }>(`/teams/${id}`, {
417
- method: 'DELETE'
418
- });
419
- return res.success;
431
+ return this.deleteRequest(`/teams/${id}`);
420
432
  }
421
433
 
422
434
  // Containers
@@ -442,10 +454,7 @@ export class CriticalPathClient {
442
454
  }
443
455
 
444
456
  async deleteContainer(id: string): Promise<boolean> {
445
- const res = await this.request<{ success: boolean }>(`/containers/${id}`, {
446
- method: 'DELETE'
447
- });
448
- return res.success;
457
+ return this.deleteRequest(`/containers/${id}`);
449
458
  }
450
459
 
451
460
  // Deliverables
@@ -481,10 +490,7 @@ export class CriticalPathClient {
481
490
  }
482
491
 
483
492
  async deleteDeliverable(id: string): Promise<boolean> {
484
- const res = await this.request<{ success: boolean }>(`/deliverables/${id}`, {
485
- method: 'DELETE'
486
- });
487
- return res.success;
493
+ return this.deleteRequest(`/deliverables/${id}`);
488
494
  }
489
495
 
490
496
  // Iterations
@@ -510,10 +516,7 @@ export class CriticalPathClient {
510
516
  }
511
517
 
512
518
  async deleteIteration(id: string): Promise<boolean> {
513
- const res = await this.request<{ success: boolean }>(`/iterations/${id}`, {
514
- method: 'DELETE'
515
- });
516
- return res.success;
519
+ return this.deleteRequest(`/iterations/${id}`);
517
520
  }
518
521
 
519
522
  // Activity Stream
@@ -554,10 +557,7 @@ export class CriticalPathClient {
554
557
  }
555
558
 
556
559
  async deleteComment(id: string): Promise<boolean> {
557
- const res = await this.request<{ success: boolean }>(`/comments/${encodeURIComponent(id)}`, {
558
- method: 'DELETE'
559
- });
560
- return res.success;
560
+ return this.deleteRequest(`/comments/${encodeURIComponent(id)}`);
561
561
  }
562
562
 
563
563
  async addCommentReaction(commentId: string, reaction: { emoji: string; userId: string }): Promise<Comment> {
@@ -620,10 +620,7 @@ export class CriticalPathClient {
620
620
  }
621
621
 
622
622
  async deleteAttachment(id: string): Promise<boolean> {
623
- const res = await this.request<{ success: boolean }>(`/attachments/${encodeURIComponent(id)}`, {
624
- method: 'DELETE'
625
- });
626
- return res.success;
623
+ return this.deleteRequest(`/attachments/${encodeURIComponent(id)}`);
627
624
  }
628
625
 
629
626
  async getPresignedAttachmentUploadUrl(options: PresignedUrlOptions): Promise<PresignedUploadResult> {