@critical-path/client 0.14.5 → 0.14.7
This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/CHANGELOG.md +43 -0
- package/dist/index.d.ts +5 -0
- package/dist/index.d.ts.map +1 -1
- package/dist/index.js +30 -33
- package/dist/index.js.map +1 -1
- package/dist/index.test.js +12 -0
- package/dist/index.test.js.map +1 -1
- package/package.json +2 -2
- package/src/index.test.ts +16 -1
- package/src/index.ts +30 -33
package/CHANGELOG.md
CHANGED
|
@@ -1,5 +1,48 @@
|
|
|
1
1
|
# @critical-path/client
|
|
2
2
|
|
|
3
|
+
## 0.14.7
|
|
4
|
+
|
|
5
|
+
### Patch Changes
|
|
6
|
+
|
|
7
|
+
- b243a37: Fix correctness and safety issues found in a code audit.
|
|
8
|
+
|
|
9
|
+
**@critical-path/core**
|
|
10
|
+
- `SQLiteStore` now loads `node:sqlite` via `process.getBuiltinModule`, fixing `require is not defined` when constructed from a filename in plain Node ESM.
|
|
11
|
+
- Removed the unused `better-sqlite3` runtime dependency.
|
|
12
|
+
- `engine.addDependency` now detects indirect cycles (e.g. A → B → C → D → A), not just cycles between direct neighbours.
|
|
13
|
+
- Fixed `generateKeyBetween` returning out-of-range, duplicate keys after repeated inserts after the same item. It now throws a `RangeError` when `a >= b`.
|
|
14
|
+
- Added `engine.deleteProject(id)`, which deletes a project's tasks through `deleteTask` and publishes a new `project.deleted` event and webhook.
|
|
15
|
+
- Added exported `ValidationError` and `NotFoundError` classes. `logTime` now rejects non-numeric hours.
|
|
16
|
+
|
|
17
|
+
**@critical-path/server**
|
|
18
|
+
- `DELETE /projects/:id`, `POST /tasks/:id/dependencies` and `POST /time-entries` now go through the engine, so cycle checks, hour validation, roll-ups, events and webhooks apply.
|
|
19
|
+
- Added `PATCH /projects/:id`.
|
|
20
|
+
- `DELETE` on a resource that does not exist now returns `404` instead of `200 { success: false }`.
|
|
21
|
+
- Malformed JSON returns `400`, validation errors `400`, `NotFoundError` `404`, and dependency cycles `409`. Unexpected errors return a generic `500` message outside development.
|
|
22
|
+
- `OPTIONS` preflight requests return `204` with CORS headers.
|
|
23
|
+
- New router/adapter options: `onError(error, request)` to report unexpected errors or return a custom response, and `exposeErrors` to include real messages in 500 responses (defaults to on only when `NODE_ENV === 'development'`).
|
|
24
|
+
- `createNextHandler` returns a callable handler that also exposes per-method properties, so `export { handler as GET }` works as documented.
|
|
25
|
+
|
|
26
|
+
**@critical-path/mcp**
|
|
27
|
+
- Tools excluded via the `tools` option can no longer be called by name.
|
|
28
|
+
- Tool arguments are validated with each tool's zod schema; undeclared fields are stripped.
|
|
29
|
+
- Tool listings include `title` and MCP `readOnlyHint` / `destructiveHint` annotations.
|
|
30
|
+
|
|
31
|
+
**@critical-path/svelte**
|
|
32
|
+
- Rebuilt with the bundled `@critical-path/mcp` WebMCP argument validation.
|
|
33
|
+
|
|
34
|
+
**@critical-path/client**
|
|
35
|
+
- Delete methods resolve to `false` when the server returns `404`, keeping their boolean contract with the new server behaviour.
|
|
36
|
+
- Updated dependencies [b243a37]
|
|
37
|
+
- @critical-path/core@0.22.0
|
|
38
|
+
|
|
39
|
+
## 0.14.6
|
|
40
|
+
|
|
41
|
+
### Patch Changes
|
|
42
|
+
|
|
43
|
+
- Updated dependencies [f3301bf]
|
|
44
|
+
- @critical-path/core@0.21.0
|
|
45
|
+
|
|
3
46
|
## 0.14.5
|
|
4
47
|
|
|
5
48
|
### Patch Changes
|
package/dist/index.d.ts
CHANGED
|
@@ -21,6 +21,11 @@ export declare class CriticalPathClient {
|
|
|
21
21
|
private headers;
|
|
22
22
|
private customFetch;
|
|
23
23
|
constructor(options: ClientOptions);
|
|
24
|
+
/**
|
|
25
|
+
* Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
|
|
26
|
+
* so delete methods keep their boolean contract instead of throwing.
|
|
27
|
+
*/
|
|
28
|
+
private deleteRequest;
|
|
24
29
|
private request;
|
|
25
30
|
getWorkflows(): Promise<Workflow[]>;
|
|
26
31
|
getWorkflow(id: string): Promise<Workflow>;
|
package/dist/index.d.ts.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EACV,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,MAAM,CAAC;IAChB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACjC,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;CACtB;
|
|
1
|
+
{"version":3,"file":"index.d.ts","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAAA,OAAO,KAAK,EACV,OAAO,EACP,IAAI,EACJ,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,mBAAmB,EACnB,IAAI,EACJ,aAAa,EACb,SAAS,EACT,QAAQ,EACR,OAAO,EACP,eAAe,EACf,UAAU,EACV,mBAAmB,EACnB,qBAAqB,EACrB,SAAS,EACT,QAAQ,EACR,WAAW,EACX,kBAAkB,EAClB,sBAAsB,EACtB,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,MAAM,qBAAqB,CAAC;AAE7B,YAAY,EACV,YAAY,EACZ,UAAU,EACV,QAAQ,EACR,cAAc,EACd,gBAAgB,EAChB,iBAAiB,EACjB,kBAAkB,EAClB,oBAAoB,EACpB,cAAc,EACd,qBAAqB,EACrB,cAAc,EACd,oBAAoB,EACpB,gBAAgB,EAChB,wBAAwB,EACxB,oBAAoB,EACpB,YAAY,EACZ,WAAW,EACX,mBAAmB,EACnB,qBAAqB,EACrB,OAAO,EACP,mBAAmB,EACnB,uBAAuB,EACvB,oBAAoB,EACpB,oBAAoB,EACpB,cAAc,EACd,2BAA2B,EAC3B,gBAAgB,EAChB,eAAe,EACf,cAAc,EACf,CAAC;AAEF,MAAM,WAAW,mBAAmB;IAClC,MAAM,CAAC,EAAE,MAAM,CAAC;IAChB,SAAS,CAAC,EAAE,MAAM,CAAC;IACnB,OAAO,CAAC,EAAE,MAAM,CAAC;IACjB,SAAS,CAAC,EAAE,OAAO,CAAC;CACrB;AAED,MAAM,WAAW,kBAAkB;IACjC,OAAO,EAAE,OAAO,CAAC;IACjB,MAAM,EAAE,MAAM,CAAC;IACf,SAAS,EAAE,MAAM,CAAC;CACnB;AAED,MAAM,WAAW,aAAa;IAC5B,OAAO,EAAE,MAAM,CAAC;IAChB,OAAO,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,MAAM,CAAC,CAAC;IACjC,KAAK,CAAC,EAAE,OAAO,KAAK,CAAC;CACtB;AASD,qBAAa,kBAAkB;IAC7B,OAAO,CAAC,OAAO,CAAS;IACxB,OAAO,CAAC,OAAO,CAAyB;IACxC,OAAO,CAAC,WAAW,CAAe;gBAEtB,OAAO,EAAE,aAAa;IAMlC;;;OAGG;YACW,aAAa;YAUb,OAAO;IA0Bf,YAAY,IAAI,OAAO,CAAC,QAAQ,EAAE,CAAC;IAKnC,WAAW,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,QAAQ,CAAC;IAK1C,cAAc,CAAC,IAAI,EAAE,IAAI,CAAC,QAAQ,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQzF,cAAc,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,QAAQ,CAAC,GAAG,OAAO,CAAC,QAAQ,CAAC;IAQzE,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK5C,WAAW,IAAI,OAAO,CAAC,OAAO,EAAE,CAAC;IAKjC,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtF,qBAAqB,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,oBAAoB,CAAC;IAOvE,iBAAiB,CACrB,SAAS,EAAE,MAAM,EACjB,OAAO,GAAE,qBAA0B,GAClC,OAAO,CAAC,cAAc,CAAC;IAapB,uBAAuB,CAC3B,SAAS,CAAC,EAAE,MAAM,EAClB,OAAO,GAAE,2BAAgC,GACxC,OAAO,CAAC,oBAAoB,CAAC;IAsB1B,QAAQ,CAAC,SAAS,CAAC,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,EAAE,CAAC;IAM7C,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,aAAa,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,cAAc,CAAC;IAOtD,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAOpD,sBAAsB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAOpE,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7E,UAAU,CACd,EAAE,EAAE,MAAM,EACV,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG;QACvB,OAAO,CAAC,EAAE,MAAM,CAAC;QACjB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,KAAK,CAAC,EAAE;YAAE,MAAM,EAAE,MAAM,CAAC;YAAC,QAAQ,CAAC,EAAE,MAAM,CAAC;YAAC,SAAS,CAAC,EAAE,MAAM,CAAA;SAAE,CAAC;KACnE,GACA,OAAO,CAAC,IAAI,CAAC;IAQV,aAAa,CACjB,YAAY,EAAE,MAAM,EACpB,IAAI,EAAE;QACJ,KAAK,EAAE,MAAM,CAAC;QACd,WAAW,CAAC,EAAE,MAAM,CAAC;QACrB,MAAM,CAAC,EAAE,UAAU,CAAC;QACpB,QAAQ,CAAC,EAAE,QAAQ,CAAC;QACpB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,YAAY,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACxC,GACA,OAAO,CAAC,IAAI,CAAC;IAkBV,OAAO,CACX,MAAM,EAAE,MAAM,EACd,KAAK,EAAE,MAAM,EACb,OAAO,CAAC,EAAE;QAAE,OAAO,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACrE,OAAO,CAAC,YAAY,CAAC;IAalB,UAAU,CACd,MAAM,EAAE,MAAM,EACd,aAAa,EAAE,MAAM,EACrB,SAAS,CAAC,EAAE,OAAO,EACnB,OAAO,CAAC,EAAE;QAAE,OAAO,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GACrE,OAAO,CAAC,IAAI,CAAC;IAgBV,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAIxC,mBAAmB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,mBAAmB,CAAC;IAKjE,qBAAqB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,iBAAiB,CAAC;IAKjE,yBAAyB,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAK5D,iCAAiC,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,MAAM,EAAE,CAAC;IAMpE,QAAQ,IAAI,OAAO,CAAC,IAAI,EAAE,CAAC;IAK3B,OAAO,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,IAAI,CAAC;IAKlC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,IAAI,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7E,UAAU,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,IAAI,CAAC,GAAG,OAAO,CAAC,IAAI,CAAC;IAQ7D,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,aAAa,EAAE,CAAC;IAK1D,eAAe,CAAC,IAAI,EAAE,IAAI,CAAC,aAAa,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAQpG,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,aAAa,CAAC,GAAG,OAAO,CAAC,aAAa,CAAC;IAQpF,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,eAAe,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,EAAE,CAAC;IAK1D,cAAc,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,WAAW,CAAC;IAKhD,qBAAqB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,kBAAkB,CAAC;IAK9D,iBAAiB,CAAC,IAAI,EAAE,sBAAsB,GAAG,OAAO,CAAC,WAAW,CAAC;IAQrE,iBAAiB,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,WAAW,CAAC,GAAG,OAAO,CAAC,WAAW,CAAC;IAQlF,iBAAiB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK/C,aAAa,CAAC,SAAS,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKtD,eAAe,CAAC,IAAI,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ9E,eAAe,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,SAAS,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IAQ5E,eAAe,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAK7C,aAAa,CAAC,MAAM,CAAC,EAAE;QAAE,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,MAAM,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,QAAQ,EAAE,CAAC;IAUpF,WAAW,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,EAAE,CAAC;IAK/C,UAAU,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAKxC,UAAU,CAAC,IAAI,EAAE,IAAI,CAAC,OAAO,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQnF,aAAa,CAAC,EAAE,EAAE,MAAM,EAAE,OAAO,EAAE,OAAO,CAAC,OAAO,CAAC,GAAG,OAAO,CAAC,OAAO,CAAC;IAQtE,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI3C,kBAAkB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,CAAC;IAQpG,qBAAqB,CAAC,SAAS,EAAE,MAAM,EAAE,QAAQ,EAAE;QAAE,KAAK,EAAE,MAAM,CAAC;QAAC,MAAM,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,OAAO,CAAC;IASvG,cAAc,CAAC,MAAM,CAAC,EAAE;QAAE,MAAM,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAC;QAAC,SAAS,CAAC,EAAE,MAAM,CAAA;KAAE,GAAG,OAAO,CAAC,UAAU,EAAE,CAAC;IAU3G,aAAa,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,UAAU,CAAC;IAK9C,gBAAgB,CAAC,IAAI,EAAE,IAAI,CAAC,UAAU,EAAE,IAAI,GAAG,WAAW,GAAG,WAAW,CAAC,GAAG,OAAO,CAAC,UAAU,CAAC;IAQ/F,oBAAoB,CAAC,IAAI,EAAE;QAC/B,QAAQ,EAAE,MAAM,CAAC;QACjB,IAAI,EAAE,MAAM,GAAG,UAAU,GAAG,WAAW,CAAC;QACxC,QAAQ,CAAC,EAAE,MAAM,CAAC;QAClB,UAAU,CAAC,EAAE,MAAM,CAAC;QACpB,MAAM,CAAC,EAAE,MAAM,CAAC;QAChB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,SAAS,CAAC,EAAE,MAAM,CAAC;QACnB,UAAU,EAAE,MAAM,CAAC;QACnB,YAAY,CAAC,EAAE,MAAM,GAAG,OAAO,GAAG,QAAQ,CAAC;QAC3C,QAAQ,CAAC,EAAE,MAAM,CAAC,MAAM,EAAE,OAAO,CAAC,CAAC;KACpC,GAAG,OAAO,CAAC,UAAU,CAAC;IAQjB,gBAAgB,CAAC,EAAE,EAAE,MAAM,GAAG,OAAO,CAAC,OAAO,CAAC;IAI9C,+BAA+B,CAAC,OAAO,EAAE,mBAAmB,GAAG,OAAO,CAAC,qBAAqB,CAAC;IAS7F,cAAc,CAAC,MAAM,EAAE,MAAM,GAAG,OAAO,CAAC,SAAS,EAAE,CAAC;IAKpD,OAAO,CAAC,IAAI,EAAE,IAAI,CAAC,SAAS,EAAE,IAAI,GAAG,UAAU,CAAC,GAAG,OAAO,CAAC,SAAS,CAAC;IASrE,YAAY,CAChB,MAAM,EAAE,MAAM,EACd,OAAO,CAAC,EAAE,mBAAmB,GAC5B,OAAO,CAAC,kBAAkB,CAAC;CAa/B;AAED,YAAY,EAAE,eAAe,EAAE,CAAC"}
|
package/dist/index.js
CHANGED
|
@@ -1,3 +1,9 @@
|
|
|
1
|
+
class NotFoundResponseError extends Error {
|
|
2
|
+
constructor(message) {
|
|
3
|
+
super(message);
|
|
4
|
+
this.name = 'NotFoundResponseError';
|
|
5
|
+
}
|
|
6
|
+
}
|
|
1
7
|
export class CriticalPathClient {
|
|
2
8
|
baseUrl;
|
|
3
9
|
headers;
|
|
@@ -7,6 +13,21 @@ export class CriticalPathClient {
|
|
|
7
13
|
this.headers = options.headers || {};
|
|
8
14
|
this.customFetch = options.fetch || globalThis.fetch;
|
|
9
15
|
}
|
|
16
|
+
/**
|
|
17
|
+
* Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
|
|
18
|
+
* so delete methods keep their boolean contract instead of throwing.
|
|
19
|
+
*/
|
|
20
|
+
async deleteRequest(endpoint) {
|
|
21
|
+
try {
|
|
22
|
+
const res = await this.request(endpoint, { method: 'DELETE' });
|
|
23
|
+
return res.success;
|
|
24
|
+
}
|
|
25
|
+
catch (err) {
|
|
26
|
+
if (err instanceof NotFoundResponseError)
|
|
27
|
+
return false;
|
|
28
|
+
throw err;
|
|
29
|
+
}
|
|
30
|
+
}
|
|
10
31
|
async request(endpoint, options = {}) {
|
|
11
32
|
const url = `${this.baseUrl}${endpoint.startsWith('/') ? endpoint : `/${endpoint}`}`;
|
|
12
33
|
const response = await this.customFetch(url, {
|
|
@@ -27,7 +48,7 @@ export class CriticalPathClient {
|
|
|
27
48
|
catch {
|
|
28
49
|
// Fallback to HTTP error
|
|
29
50
|
}
|
|
30
|
-
throw new Error(errorMsg);
|
|
51
|
+
throw response.status === 404 ? new NotFoundResponseError(errorMsg) : new Error(errorMsg);
|
|
31
52
|
}
|
|
32
53
|
return response.json();
|
|
33
54
|
}
|
|
@@ -55,10 +76,7 @@ export class CriticalPathClient {
|
|
|
55
76
|
return res.workflow;
|
|
56
77
|
}
|
|
57
78
|
async deleteWorkflow(id) {
|
|
58
|
-
|
|
59
|
-
method: 'DELETE'
|
|
60
|
-
});
|
|
61
|
-
return res.success;
|
|
79
|
+
return this.deleteRequest(`/workflows/${id}`);
|
|
62
80
|
}
|
|
63
81
|
// Projects
|
|
64
82
|
async getProjects() {
|
|
@@ -195,10 +213,7 @@ export class CriticalPathClient {
|
|
|
195
213
|
return this.updateTask(taskId, { todos: task.todos, ...options });
|
|
196
214
|
}
|
|
197
215
|
async deleteTask(id) {
|
|
198
|
-
|
|
199
|
-
method: 'DELETE'
|
|
200
|
-
});
|
|
201
|
-
return res.success;
|
|
216
|
+
return this.deleteRequest(`/tasks/${id}`);
|
|
202
217
|
}
|
|
203
218
|
async getTaskDependencies(taskId) {
|
|
204
219
|
const res = await this.request(`/tasks/${encodeURIComponent(taskId)}/dependencies`);
|
|
@@ -240,10 +255,7 @@ export class CriticalPathClient {
|
|
|
240
255
|
return res.team;
|
|
241
256
|
}
|
|
242
257
|
async deleteTeam(id) {
|
|
243
|
-
|
|
244
|
-
method: 'DELETE'
|
|
245
|
-
});
|
|
246
|
-
return res.success;
|
|
258
|
+
return this.deleteRequest(`/teams/${id}`);
|
|
247
259
|
}
|
|
248
260
|
// Containers
|
|
249
261
|
async getContainers(projectId) {
|
|
@@ -265,10 +277,7 @@ export class CriticalPathClient {
|
|
|
265
277
|
return res.container;
|
|
266
278
|
}
|
|
267
279
|
async deleteContainer(id) {
|
|
268
|
-
|
|
269
|
-
method: 'DELETE'
|
|
270
|
-
});
|
|
271
|
-
return res.success;
|
|
280
|
+
return this.deleteRequest(`/containers/${id}`);
|
|
272
281
|
}
|
|
273
282
|
// Deliverables
|
|
274
283
|
async getDeliverables(projectId) {
|
|
@@ -298,10 +307,7 @@ export class CriticalPathClient {
|
|
|
298
307
|
return res.deliverable;
|
|
299
308
|
}
|
|
300
309
|
async deleteDeliverable(id) {
|
|
301
|
-
|
|
302
|
-
method: 'DELETE'
|
|
303
|
-
});
|
|
304
|
-
return res.success;
|
|
310
|
+
return this.deleteRequest(`/deliverables/${id}`);
|
|
305
311
|
}
|
|
306
312
|
// Iterations
|
|
307
313
|
async getIterations(projectId) {
|
|
@@ -323,10 +329,7 @@ export class CriticalPathClient {
|
|
|
323
329
|
return res.iteration;
|
|
324
330
|
}
|
|
325
331
|
async deleteIteration(id) {
|
|
326
|
-
|
|
327
|
-
method: 'DELETE'
|
|
328
|
-
});
|
|
329
|
-
return res.success;
|
|
332
|
+
return this.deleteRequest(`/iterations/${id}`);
|
|
330
333
|
}
|
|
331
334
|
// Activity Stream
|
|
332
335
|
async getActivities(filter) {
|
|
@@ -363,10 +366,7 @@ export class CriticalPathClient {
|
|
|
363
366
|
return res.comment;
|
|
364
367
|
}
|
|
365
368
|
async deleteComment(id) {
|
|
366
|
-
|
|
367
|
-
method: 'DELETE'
|
|
368
|
-
});
|
|
369
|
-
return res.success;
|
|
369
|
+
return this.deleteRequest(`/comments/${encodeURIComponent(id)}`);
|
|
370
370
|
}
|
|
371
371
|
async addCommentReaction(commentId, reaction) {
|
|
372
372
|
const res = await this.request(`/comments/${encodeURIComponent(commentId)}/reactions`, {
|
|
@@ -414,10 +414,7 @@ export class CriticalPathClient {
|
|
|
414
414
|
return res.attachment;
|
|
415
415
|
}
|
|
416
416
|
async deleteAttachment(id) {
|
|
417
|
-
|
|
418
|
-
method: 'DELETE'
|
|
419
|
-
});
|
|
420
|
-
return res.success;
|
|
417
|
+
return this.deleteRequest(`/attachments/${encodeURIComponent(id)}`);
|
|
421
418
|
}
|
|
422
419
|
async getPresignedAttachmentUploadUrl(options) {
|
|
423
420
|
const res = await this.request('/attachments/presign', {
|
package/dist/index.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAoGA,MAAM,OAAO,kBAAkB;IACrB,OAAO,CAAS;IAChB,OAAO,CAAyB;IAChC,WAAW,CAAe;IAElC,YAAY,OAAsB;QAChC,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,IAAI,EAAE,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,KAAK,IAAI,UAAU,CAAC,KAAK,CAAC;IACvD,CAAC;IAEO,KAAK,CAAC,OAAO,CAAI,QAAgB,EAAE,UAAuB,EAAE;QAClE,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,OAAO,GAAG,QAAQ,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,QAAQ,EAAE,EAAE,CAAC;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,GAAG,EAAE;YAC3C,GAAG,OAAO;YACV,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;gBAClC,GAAG,IAAI,CAAC,OAAO;gBACf,GAAG,OAAO,CAAC,OAAO;aACnB;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,QAAQ,CAAC,EAAE,EAAE,CAAC;YACjB,IAAI,QAAQ,GAAG,cAAc,QAAQ,CAAC,MAAM,KAAK,QAAQ,CAAC,UAAU,EAAE,CAAC;YACvE,IAAI,CAAC;gBACH,MAAM,OAAO,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;gBACtC,IAAI,OAAO,CAAC,KAAK;oBAAE,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC;YAC9C,CAAC;YAAC,MAAM,CAAC;gBACP,yBAAyB;YAC3B,CAAC;YACD,MAAM,IAAI,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC5B,CAAC;QAED,OAAO,QAAQ,CAAC,IAAI,EAAE,CAAC;IACzB,CAAC;IAED,YAAY;IACZ,KAAK,CAAC,YAAY;QAChB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA4B,YAAY,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,CAAC,CAAC;QAC3E,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,IAAsD;QACzE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,YAAY,EAAE;YACnE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,EAAE;YACzE,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,cAAc,EAAE,EAAE,EAAE;YACvE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,WAAW,CAAC,CAAC;QACrE,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,EAAE,EAAE,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,IAAqD;QACvE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,gBAAgB,CAC3D,CAAC;QACF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,KAAK;YAAE,MAAM,CAAC,GAAG,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,CAAC,CAAC;QACtD,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,UAAU,KAAK,EAAE,CAC5D,CAAC;QACF,OAAO,GAAG,CAAC,MAAM,CAAC;IACpB,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAClE,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,QAAQ;YAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC/D,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QACzD,IAAI,OAAO,OAAO,CAAC,0BAA0B,KAAK,QAAQ,EAAE,CAAC;YAC3D,MAAM,CAAC,GAAG,CAAC,4BAA4B,EAAE,OAAO,CAAC,0BAA0B,CAAC,QAAQ,EAAE,CAAC,CAAC;QAC1F,CAAC;QAED,MAAM,IAAI,GAAG,SAAS;YACpB,CAAC,CAAC,aAAa,kBAAkB,CAAC,SAAS,CAAC,WAAW;YACvD,CAAC,CAAC,WAAW,CAAC;QAChB,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqC,GAAG,IAAI,GAAG,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,MAAM,KAAK,GAAG,SAAS,CAAC,CAAC,CAAC,cAAc,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,SAAS,KAAK,EAAE,CAAC,CAAC;QACpE,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,SAAS,CAC9C,CAAC;QACF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,UAAU,CAC/C,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,mBAAmB,CACxD,CAAC;QACF,OAAO,GAAG,CAAC,eAAe,CAAC;IAC7B,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC;QAED,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,YAAoB,EACpB,IAQC;QAED,IAAI,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAC/B,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACpD,SAAS,GAAG,UAAU,CAAC,SAAS,CAAC;QACnC,CAAC;QACD,OAAO,IAAI,CAAC,UAAU,CAAC;YACrB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,QAAQ,EAAE,YAAY;YACtB,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,QAAQ;YACnC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,YAAY,EAAE,IAAI,CAAC,YAAY;SAChC,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,OAAO,CACX,MAAc,EACd,KAAa,EACb,OAAsE;QAEtE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACtE,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,IAAI,EAAE,CAAC,EAAE,IAAI,CAAC,CAAC;QAC5C,MAAM,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,GAAG,OAAO,EAAE,CAAC,CAAC;QACrD,OAAO,IAAI,CAAC;IACd,CAAC;IAED,KAAK,CAAC,UAAU,CACd,MAAc,EACd,aAAqB,EACrB,SAAmB,EACnB,OAAsE;QAEtE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;YAC3C,MAAM,IAAI,KAAK,CAAC,QAAQ,MAAM,0BAA0B,CAAC,CAAC;QAC5D,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAC1B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,aAAa,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,KAAK,aAAa,CAAC,WAAW,EAAE,CACvF,CAAC;QACF,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,mBAAmB,aAAa,uBAAuB,MAAM,GAAG,CAAC,CAAC;QACpF,CAAC;QACD,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;QACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACzE,OAAO,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,GAAG,OAAO,EAAE,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,UAAU,EAAE,EAAE,EAAE;YACnE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,mBAAmB,CAAC,MAAc;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC;QACpH,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,UAAU,kBAAkB,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC;QAC/G,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,mBAAmB,CAAC;IACjC,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,uBAAuB,IAAI,EAAE,CAAC;IAC3C,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ;QACZ,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,QAAQ,CAAC,CAAC;QAC5D,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,UAAU,EAAE,EAAE,EAAE;YACnE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC1H,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAA2D;QAC/E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,aAAa,EAAE;YAC1E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE,EAAE,EAAE;YAChF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,eAAe,EAAE,EAAE,EAAE;YACxE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,2BAA2B,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5H,OAAO,GAAG,CAAC,YAAY,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,CAAC,CAAC;QACpF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,EAAU;QACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,iBAAiB,EAAE,UAAU,CAAC,CAAC;QAC/F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,IAA4B;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE;YAC5E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,EAAE;YAClF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,iBAAiB,EAAE,EAAE,EAAE;YAC1E,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA8B,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QACtH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyC;QAC7D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,aAAa,EAAE;YACtE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE,EAAE,EAAE;YAC5E,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,eAAe,EAAE,EAAE,EAAE;YACxE,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,kBAAkB;IAClB,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,KAAK,EAAE,CAAC,CAAC;QAClF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,oBAAoB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC1G,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAqD;QACpE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,QAAQ;YAChB,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,cAAc;IACd,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAgC,eAAe,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrG,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,IAAwD;QAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,EAAE;YACzE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,oBAAoB,CAAC,IAW1B;QACC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,qBAAqB,EAAE;YAChF,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC7F,MAAM,EAAE,QAAQ;SACjB,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuC,sBAAsB,EAAE;YAC3F,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,wBAAwB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,IAAwC;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,2BAA2B;IAC3B,KAAK,CAAC,YAAY,CAChB,MAAc,EACd,OAA6B;QAE7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqB,SAAS,EAAE;YAC5D,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM;gBACN,MAAM,EAAE,OAAO,EAAE,MAAM;gBACvB,SAAS,EAAE,OAAO,EAAE,SAAS;gBAC7B,OAAO,EAAE,OAAO,EAAE,OAAO;gBACzB,SAAS,EAAE,OAAO,EAAE,SAAS,IAAI,IAAI;aACtC,CAAC;SACH,CAAC,CAAC;QACH,OAAO,GAAG,CAAC;IACb,CAAC;CACF"}
|
|
1
|
+
{"version":3,"file":"index.js","sourceRoot":"","sources":["../src/index.ts"],"names":[],"mappings":"AAoGA,MAAM,qBAAsB,SAAQ,KAAK;IACvC,YAAY,OAAe;QACzB,KAAK,CAAC,OAAO,CAAC,CAAC;QACf,IAAI,CAAC,IAAI,GAAG,uBAAuB,CAAC;IACtC,CAAC;CACF;AAED,MAAM,OAAO,kBAAkB;IACrB,OAAO,CAAS;IAChB,OAAO,CAAyB;IAChC,WAAW,CAAe;IAElC,YAAY,OAAsB;QAChC,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,CAAC,OAAO,CAAC,MAAM,EAAE,EAAE,CAAC,CAAC;QACnD,IAAI,CAAC,OAAO,GAAG,OAAO,CAAC,OAAO,IAAI,EAAE,CAAC;QACrC,IAAI,CAAC,WAAW,GAAG,OAAO,CAAC,KAAK,IAAI,UAAU,CAAC,KAAK,CAAC;IACvD,CAAC;IAED;;;OAGG;IACK,KAAK,CAAC,aAAa,CAAC,QAAgB;QAC1C,IAAI,CAAC;YACH,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,QAAQ,EAAE,EAAE,MAAM,EAAE,QAAQ,EAAE,CAAC,CAAC;YACrF,OAAO,GAAG,CAAC,OAAO,CAAC;QACrB,CAAC;QAAC,OAAO,GAAG,EAAE,CAAC;YACb,IAAI,GAAG,YAAY,qBAAqB;gBAAE,OAAO,KAAK,CAAC;YACvD,MAAM,GAAG,CAAC;QACZ,CAAC;IACH,CAAC;IAEO,KAAK,CAAC,OAAO,CAAI,QAAgB,EAAE,UAAuB,EAAE;QAClE,MAAM,GAAG,GAAG,GAAG,IAAI,CAAC,OAAO,GAAG,QAAQ,CAAC,UAAU,CAAC,GAAG,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,CAAC,IAAI,QAAQ,EAAE,EAAE,CAAC;QACrF,MAAM,QAAQ,GAAG,MAAM,IAAI,CAAC,WAAW,CAAC,GAAG,EAAE;YAC3C,GAAG,OAAO;YACV,OAAO,EAAE;gBACP,cAAc,EAAE,kBAAkB;gBAClC,GAAG,IAAI,CAAC,OAAO;gBACf,GAAG,OAAO,CAAC,OAAO;aACnB;SACF,CAAC,CAAC;QAEH,IAAI,CAAC,QAAQ,CAAC,EAAE,EAAE,CAAC;YACjB,IAAI,QAAQ,GAAG,cAAc,QAAQ,CAAC,MAAM,KAAK,QAAQ,CAAC,UAAU,EAAE,CAAC;YACvE,IAAI,CAAC;gBACH,MAAM,OAAO,GAAG,MAAM,QAAQ,CAAC,IAAI,EAAE,CAAC;gBACtC,IAAI,OAAO,CAAC,KAAK;oBAAE,QAAQ,GAAG,OAAO,CAAC,KAAK,CAAC;YAC9C,CAAC;YAAC,MAAM,CAAC;gBACP,yBAAyB;YAC3B,CAAC;YACD,MAAM,QAAQ,CAAC,MAAM,KAAK,GAAG,CAAC,CAAC,CAAC,IAAI,qBAAqB,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,KAAK,CAAC,QAAQ,CAAC,CAAC;QAC5F,CAAC;QAED,OAAO,QAAQ,CAAC,IAAI,EAAE,CAAC;IACzB,CAAC;IAED,YAAY;IACZ,KAAK,CAAC,YAAY;QAChB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA4B,YAAY,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,WAAW,CAAC,EAAU;QAC1B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,CAAC,CAAC;QAC3E,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,IAAsD;QACzE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,YAAY,EAAE;YACnE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU,EAAE,OAA0B;QACzD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAyB,cAAc,EAAE,EAAE,EAAE;YACzE,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,OAAO,IAAI,CAAC,aAAa,CAAC,cAAc,EAAE,EAAE,CAAC,CAAC;IAChD,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW;QACf,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,WAAW,CAAC,CAAC;QACrE,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,EAAE,EAAE,CAAC,CAAC;QACxE,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,IAAqD;QACvE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB;QAC3C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,gBAAgB,CAC3D,CAAC;QACF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,iBAAiB,CACrB,SAAiB,EACjB,UAAiC,EAAE;QAEnC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,KAAK;YAAE,MAAM,CAAC,GAAG,CAAC,OAAO,EAAE,OAAO,CAAC,KAAK,CAAC,CAAC;QACtD,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,IAAI,OAAO,CAAC,WAAW;YAAE,MAAM,CAAC,GAAG,CAAC,aAAa,EAAE,OAAO,CAAC,WAAW,CAAC,CAAC;QACxE,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,aAAa,kBAAkB,CAAC,SAAS,CAAC,UAAU,KAAK,EAAE,CAC5D,CAAC;QACF,OAAO,GAAG,CAAC,MAAM,CAAC;IACpB,CAAC;IAED,KAAK,CAAC,uBAAuB,CAC3B,SAAkB,EAClB,UAAuC,EAAE;QAEzC,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,OAAO,CAAC,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,OAAO,CAAC,SAAS,CAAC,CAAC;QAClE,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,QAAQ;YAAE,MAAM,CAAC,GAAG,CAAC,UAAU,EAAE,OAAO,CAAC,QAAQ,CAAC,CAAC;QAC/D,IAAI,OAAO,CAAC,OAAO;YAAE,MAAM,CAAC,GAAG,CAAC,SAAS,EAAE,OAAO,CAAC,OAAO,CAAC,CAAC;QAC5D,IAAI,OAAO,CAAC,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,OAAO,CAAC,MAAM,CAAC,CAAC;QACzD,IAAI,OAAO,OAAO,CAAC,0BAA0B,KAAK,QAAQ,EAAE,CAAC;YAC3D,MAAM,CAAC,GAAG,CAAC,4BAA4B,EAAE,OAAO,CAAC,0BAA0B,CAAC,QAAQ,EAAE,CAAC,CAAC;QAC1F,CAAC;QAED,MAAM,IAAI,GAAG,SAAS;YACpB,CAAC,CAAC,aAAa,kBAAkB,CAAC,SAAS,CAAC,WAAW;YACvD,CAAC,CAAC,WAAW,CAAC;QAChB,MAAM,EAAE,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC;QAC7B,MAAM,KAAK,GAAG,EAAE,CAAC,CAAC,CAAC,IAAI,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAEjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqC,GAAG,IAAI,GAAG,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ,CAAC,SAAkB;QAC/B,MAAM,KAAK,GAAG,SAAS,CAAC,CAAC,CAAC,cAAc,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,SAAS,KAAK,EAAE,CAAC,CAAC;QACpE,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,MAAc;QAChC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,SAAS,CAC9C,CAAC;QACF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,UAAU,CAC/C,CAAC;QACF,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,sBAAsB,CAAC,MAAc;QACzC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAC5B,UAAU,kBAAkB,CAAC,MAAM,CAAC,mBAAmB,CACxD,CAAC;QACF,OAAO,GAAG,CAAC,eAAe,CAAC;IAC7B,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CACd,EAAU,EACV,OAKC;QAED,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,aAAa,CACjB,YAAoB,EACpB,IAQC;QAED,IAAI,SAAS,GAAG,IAAI,CAAC,SAAS,CAAC;QAC/B,IAAI,CAAC,SAAS,EAAE,CAAC;YACf,MAAM,UAAU,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,YAAY,CAAC,CAAC;YACpD,SAAS,GAAG,UAAU,CAAC,SAAS,CAAC;QACnC,CAAC;QACD,OAAO,IAAI,CAAC,UAAU,CAAC;YACrB,SAAS;YACT,KAAK,EAAE,IAAI,CAAC,KAAK;YACjB,WAAW,EAAE,IAAI,CAAC,WAAW;YAC7B,QAAQ,EAAE,YAAY;YACtB,MAAM,EAAE,IAAI,CAAC,MAAM,IAAI,MAAM;YAC7B,QAAQ,EAAE,IAAI,CAAC,QAAQ,IAAI,QAAQ;YACnC,UAAU,EAAE,IAAI,CAAC,UAAU;YAC3B,YAAY,EAAE,IAAI,CAAC,YAAY;SAChC,CAAC,CAAC;IACL,CAAC;IAED,KAAK,CAAC,OAAO,CACX,MAAc,EACd,KAAa,EACb,OAAsE;QAEtE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,MAAM,IAAI,GAAiB;YACzB,EAAE,EAAE,QAAQ,IAAI,CAAC,GAAG,EAAE,IAAI,IAAI,CAAC,MAAM,EAAE,CAAC,QAAQ,CAAC,EAAE,CAAC,CAAC,SAAS,CAAC,CAAC,EAAE,CAAC,CAAC,EAAE;YACtE,KAAK;YACL,SAAS,EAAE,KAAK;YAChB,SAAS,EAAE,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE;SACpC,CAAC;QACF,MAAM,KAAK,GAAG,CAAC,GAAG,CAAC,IAAI,CAAC,KAAK,IAAI,EAAE,CAAC,EAAE,IAAI,CAAC,CAAC;QAC5C,MAAM,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,GAAG,OAAO,EAAE,CAAC,CAAC;QACrD,OAAO,IAAI,CAAC;IACd,CAAC;IAED,KAAK,CAAC,UAAU,CACd,MAAc,EACd,aAAqB,EACrB,SAAmB,EACnB,OAAsE;QAEtE,MAAM,IAAI,GAAG,MAAM,IAAI,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC;QACxC,IAAI,CAAC,IAAI,CAAC,KAAK,IAAI,IAAI,CAAC,KAAK,CAAC,MAAM,KAAK,CAAC,EAAE,CAAC;YAC3C,MAAM,IAAI,KAAK,CAAC,QAAQ,MAAM,0BAA0B,CAAC,CAAC;QAC5D,CAAC;QACD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAC1B,CAAC,CAAC,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,KAAK,aAAa,IAAI,CAAC,CAAC,KAAK,CAAC,WAAW,EAAE,KAAK,aAAa,CAAC,WAAW,EAAE,CACvF,CAAC;QACF,IAAI,CAAC,IAAI,EAAE,CAAC;YACV,MAAM,IAAI,KAAK,CAAC,mBAAmB,aAAa,uBAAuB,MAAM,GAAG,CAAC,CAAC;QACpF,CAAC;QACD,IAAI,CAAC,SAAS,GAAG,SAAS,KAAK,SAAS,CAAC,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC;QACvE,IAAI,CAAC,WAAW,GAAG,IAAI,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,IAAI,EAAE,CAAC,WAAW,EAAE,CAAC,CAAC,CAAC,SAAS,CAAC;QACzE,OAAO,IAAI,CAAC,UAAU,CAAC,MAAM,EAAE,EAAE,KAAK,EAAE,IAAI,CAAC,KAAK,EAAE,GAAG,OAAO,EAAE,CAAC,CAAC;IACpE,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,EAAE,EAAE,CAAC,CAAC;IAC5C,CAAC;IAED,KAAK,CAAC,mBAAmB,CAAC,MAAc;QACtC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiC,UAAU,kBAAkB,CAAC,MAAM,CAAC,eAAe,CAAC,CAAC;QACpH,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,MAAc;QACxC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,UAAU,kBAAkB,CAAC,MAAM,CAAC,YAAY,CAAC,CAAC;QAC/G,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,yBAAyB,CAAC,MAAc;QAC5C,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,mBAAmB,CAAC;IACjC,CAAC;IAED,KAAK,CAAC,iCAAiC,CAAC,MAAc;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAwE,UAAU,kBAAkB,CAAC,MAAM,CAAC,cAAc,CAAC,CAAC;QAC1J,OAAO,GAAG,CAAC,uBAAuB,IAAI,EAAE,CAAC;IAC3C,CAAC;IAED,QAAQ;IACR,KAAK,CAAC,QAAQ;QACZ,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAoB,QAAQ,CAAC,CAAC;QAC5D,OAAO,GAAG,CAAC,KAAK,CAAC;IACnB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,EAAU;QACtB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,CAAC,CAAC;QAC/D,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAkD;QACjE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,QAAQ,EAAE;YACvD,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU,EAAE,OAAsB;QACjD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAiB,UAAU,EAAE,EAAE,EAAE;YAC7D,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,IAAI,CAAC;IAClB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,OAAO,IAAI,CAAC,aAAa,CAAC,UAAU,EAAE,EAAE,CAAC,CAAC;IAC5C,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC1H,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAA2D;QAC/E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,aAAa,EAAE;YAC1E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA+B;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE,EAAE,EAAE;YAChF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,EAAE,EAAE,CAAC,CAAC;IACjD,CAAC;IAED,eAAe;IACf,KAAK,CAAC,eAAe,CAAC,SAAiB;QACrC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,2BAA2B,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QAC5H,OAAO,GAAG,CAAC,YAAY,CAAC;IAC1B,CAAC;IAED,KAAK,CAAC,cAAc,CAAC,EAAU;QAC7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,CAAC,CAAC;QACpF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,EAAU;QACpC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAkC,iBAAiB,EAAE,UAAU,CAAC,CAAC;QAC/F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,IAA4B;QAClD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,eAAe,EAAE;YAC5E,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU,EAAE,OAA6B;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,iBAAiB,EAAE,EAAE,EAAE;YAClF,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,iBAAiB,CAAC,EAAU;QAChC,OAAO,IAAI,CAAC,aAAa,CAAC,iBAAiB,EAAE,EAAE,CAAC,CAAC;IACnD,CAAC;IAED,aAAa;IACb,KAAK,CAAC,aAAa,CAAC,SAAiB;QACnC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA8B,yBAAyB,kBAAkB,CAAC,SAAS,CAAC,EAAE,CAAC,CAAC;QACtH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,IAAyC;QAC7D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,aAAa,EAAE;YACtE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU,EAAE,OAA2B;QAC3D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE,EAAE,EAAE;YAC5E,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,KAAK,CAAC,eAAe,CAAC,EAAU;QAC9B,OAAO,IAAI,CAAC,aAAa,CAAC,eAAe,EAAE,EAAE,CAAC,CAAC;IACjD,CAAC;IAED,kBAAkB;IAClB,KAAK,CAAC,aAAa,CAAC,MAAgD;QAClE,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,KAAK,EAAE,CAAC,CAAC;QAClF,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,WAAW;IACX,KAAK,CAAC,WAAW,CAAC,MAAc;QAC9B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA0B,oBAAoB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QAC1G,OAAO,GAAG,CAAC,QAAQ,CAAC;IACtB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,EAAU;QACzB,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QAC5F,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,UAAU,CAAC,IAAqD;QACpE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,WAAW,EAAE;YAChE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU,EAAE,OAAyB;QACvD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,EAAE;YAC1F,MAAM,EAAE,OAAO;YACf,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,OAAO,IAAI,CAAC,aAAa,CAAC,aAAa,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACnE,CAAC;IAED,KAAK,CAAC,kBAAkB,CAAC,SAAiB,EAAE,QAA2C;QACrF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,KAAK,CAAC,qBAAqB,CAAC,SAAiB,EAAE,QAA2C;QACxF,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuB,aAAa,kBAAkB,CAAC,SAAS,CAAC,YAAY,EAAE;YAC3G,MAAM,EAAE,QAAQ;YAChB,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,QAAQ,CAAC;SAC/B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,OAAO,CAAC;IACrB,CAAC;IAED,cAAc;IACd,KAAK,CAAC,cAAc,CAAC,MAAoE;QACvF,MAAM,MAAM,GAAG,IAAI,eAAe,EAAE,CAAC;QACrC,IAAI,MAAM,EAAE,MAAM;YAAE,MAAM,CAAC,GAAG,CAAC,QAAQ,EAAE,MAAM,CAAC,MAAM,CAAC,CAAC;QACxD,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,IAAI,MAAM,EAAE,SAAS;YAAE,MAAM,CAAC,GAAG,CAAC,WAAW,EAAE,MAAM,CAAC,SAAS,CAAC,CAAC;QACjE,MAAM,KAAK,GAAG,MAAM,CAAC,QAAQ,EAAE,CAAC,CAAC,CAAC,IAAI,MAAM,CAAC,QAAQ,EAAE,EAAE,CAAC,CAAC,CAAC,EAAE,CAAC;QAC/D,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAgC,eAAe,KAAK,EAAE,CAAC,CAAC;QACtF,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,aAAa,CAAC,EAAU;QAC5B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;QACrG,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,IAAwD;QAC7E,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,cAAc,EAAE;YACzE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,oBAAoB,CAAC,IAW1B;QACC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA6B,qBAAqB,EAAE;YAChF,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,UAAU,CAAC;IACxB,CAAC;IAED,KAAK,CAAC,gBAAgB,CAAC,EAAU;QAC/B,OAAO,IAAI,CAAC,aAAa,CAAC,gBAAgB,kBAAkB,CAAC,EAAE,CAAC,EAAE,CAAC,CAAC;IACtE,CAAC;IAED,KAAK,CAAC,+BAA+B,CAAC,OAA4B;QAChE,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAuC,sBAAsB,EAAE;YAC3F,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,OAAO,CAAC;SAC9B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,eAAe;IACf,KAAK,CAAC,cAAc,CAAC,MAAc;QACjC,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA+B,wBAAwB,kBAAkB,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC;QACnH,OAAO,GAAG,CAAC,WAAW,CAAC;IACzB,CAAC;IAED,KAAK,CAAC,OAAO,CAAC,IAAwC;QACpD,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAA2B,eAAe,EAAE;YACxE,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC,IAAI,CAAC;SAC3B,CAAC,CAAC;QACH,OAAO,GAAG,CAAC,SAAS,CAAC;IACvB,CAAC;IAED,2BAA2B;IAC3B,KAAK,CAAC,YAAY,CAChB,MAAc,EACd,OAA6B;QAE7B,MAAM,GAAG,GAAG,MAAM,IAAI,CAAC,OAAO,CAAqB,SAAS,EAAE;YAC5D,MAAM,EAAE,MAAM;YACd,IAAI,EAAE,IAAI,CAAC,SAAS,CAAC;gBACnB,MAAM;gBACN,MAAM,EAAE,OAAO,EAAE,MAAM;gBACvB,SAAS,EAAE,OAAO,EAAE,SAAS;gBAC7B,OAAO,EAAE,OAAO,EAAE,OAAO;gBACzB,SAAS,EAAE,OAAO,EAAE,SAAS,IAAI,IAAI;aACtC,CAAC;SACH,CAAC,CAAC;QACH,OAAO,GAAG,CAAC;IACb,CAAC;CACF"}
|
package/dist/index.test.js
CHANGED
|
@@ -343,5 +343,17 @@ describe('@critical-path/client Tests', () => {
|
|
|
343
343
|
isEngaged: true
|
|
344
344
|
});
|
|
345
345
|
});
|
|
346
|
+
it('resolves delete methods to false on 404 and still throws other errors', async () => {
|
|
347
|
+
let status = 404;
|
|
348
|
+
const mockFetch = async () => new Response(JSON.stringify({ error: status === 404 ? 'Not found' : 'Internal Server Error' }), {
|
|
349
|
+
status,
|
|
350
|
+
headers: { 'Content-Type': 'application/json' }
|
|
351
|
+
});
|
|
352
|
+
const client = new CriticalPathClient({ baseUrl: 'http://localhost/api', fetch: mockFetch });
|
|
353
|
+
expect(await client.deleteTask('missing')).toBe(false);
|
|
354
|
+
expect(await client.deleteComment('missing')).toBe(false);
|
|
355
|
+
status = 500;
|
|
356
|
+
await expect(client.deleteTask('t1')).rejects.toThrow('Internal Server Error');
|
|
357
|
+
});
|
|
346
358
|
});
|
|
347
359
|
//# sourceMappingURL=index.test.js.map
|
package/dist/index.test.js.map
CHANGED
|
@@ -1 +1 @@
|
|
|
1
|
-
{"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,YAAY,CAAC;AAEhD,QAAQ,CAAC,6BAA6B,EAAE,GAAG,EAAE;IAC3C,EAAE,CAAC,mDAAmD,EAAE,KAAK,IAAI,EAAE;QACjE,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,WAAW,CAAC,IAAI,CAAC,CAAC,IAAI,EAAE,MAAM,IAAI,IAAI,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,KAAK,CAAC,EAAE,CAAC;gBAC3F,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACrH,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;QAC5C,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAChC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+DAA+D,EAAE,KAAK,IAAI,EAAE;QAC7E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,YAAY,CAAC,EAAE,CAAC;gBAClC,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7G,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,uBAAuB,CAAC,EAAE,CAAC;gBAC7C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,mBAAmB,EAAE,CAAC,aAAa,EAAE,UAAU,CAAC;oBAChD,uBAAuB,EAAE,CAAC,SAAS,CAAC;iBACrC,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;QAC9C,MAAM,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;QAE/C,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,IAAI,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,CAAC,OAAO,CAAC,CAAC,aAAa,EAAE,UAAU,CAAC,CAAC,CAAC;QAEzD,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,IAAI,CAAC,CAAC;QACjF,MAAM,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACnD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,EAAE,WAAW,EAAE,IAAI,KAAK,CAAC;YAEpD,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAC/D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC/J,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,WAAW,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC3F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC1D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACnE,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACrG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBACrE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,SAAS,EAAE,EAAE,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACjG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC3D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAClE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,SAAS,EAAE,QAAQ,EAAE,YAAY,EAAE,SAAS,EAAE,EAAE,EAAE,GAAG,EAAE,4BAA4B,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvL,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACzD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,UAAU,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC9F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBAChE,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,UAAU,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,GAAG,IAAI,EAAE,GAAG,EAAE,sCAAsC,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7I,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,iBAAiB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC9D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,IAAI,CAAC,CAAC;QAChD,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAEhD,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC,CAAC;QAC7H,MAAM,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAErC,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,EAAE,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,cAAc,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QACrF,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC1C,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEhD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QAC1F,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAE5C,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;QACxD,MAAM,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAElC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QAClE,MAAM,CAAC,WAAW,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACpC,MAAM,CAAC,WAAW,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAEhD,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,QAAQ,EAAE,UAAU,EAAE,QAAQ,EAAE,YAAY,EAAE,SAAS,EAAE,EAAE,EAAE,GAAG,EAAE,8BAA8B,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACzK,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEjC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,EAAE,QAAQ,EAAE,cAAc,EAAE,IAAI,EAAE,YAAY,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QAC1H,MAAM,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACpC,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,sCAAsC,CAAC,CAAC;QAErE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;QACvD,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAChC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;QAC5E,MAAM,eAAe,GAAG;YACtB,EAAE,EAAE,IAAI;YACR,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,SAAkB;YAC1B,MAAM,EAAE,YAAY;YACpB,UAAU,EAAE,EAAE;YACd,SAAS,EAAE,sBAAsB;YACjC,SAAS,EAAE,sBAAsB;SAClC,CAAC;QAEF,MAAM,WAAW,GAAG;YAClB,WAAW,EAAE,eAAe;YAC5B,UAAU,EAAE,CAAC;YACb,cAAc,EAAE,CAAC;YACjB,WAAW,EAAE,CAAC;YACd,kBAAkB,EAAE,EAAE;YACtB,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;SAChB,CAAC;QAEF,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,EAAE,WAAW,EAAE,IAAI,KAAK,CAAC;YAEpD,IAAI,MAAM,CAAC,QAAQ,CAAC,4BAA4B,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACtE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC5F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,0BAA0B,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACpE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACjF,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAC5D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,eAAe,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,eAAe,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC/F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC9D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,EAAE,GAAG,eAAe,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC/D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;QAChD,MAAM,CAAC,IAAI,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC7B,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;QAE3C,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,IAAI,CAAC,CAAC;QACjD,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE7B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAE5C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC;YAC7C,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,YAAY;SACrB,CAAC,CAAC;QACH,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC,CAAC;QAC9E,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QAEzC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAC7B,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,gEAAgE,EAAE,KAAK,IAAI,EAAE;QAC9E,MAAM,SAAS,GAAG;YAChB,cAAc,EAAE,aAAsB;YACtC,OAAO,EAAE,KAAK;YACd,SAAS,EAAE,IAAI;YACf,eAAe,EAAE,CAAC,eAAe,CAAC;YAClC,SAAS,EAAE,KAAK;YAChB,UAAU,EAAE,KAAK;YACjB,WAAW,EAAE,IAAI;YACjB,YAAY,EAAE,KAAK;YACnB,SAAS,EAAE,KAAK;YAChB,cAAc,EAAE,KAAK;YACrB,aAAa,EAAE,KAAK;YACpB,MAAM,EAAE,KAAK;YACb,QAAQ,EAAE,KAAK;YACf,WAAW,EAAE,KAAK;SACnB,CAAC;QAEF,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,EAAE;YACtD,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,EAAE,CAAC;gBAC3C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,EAAE,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,KAAK,EAAE;wBACL,MAAM,EAAE,IAAI;wBACZ,aAAa,EAAE,CAAC,EAAE,EAAE,EAAE,eAAe,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;wBAC7E,eAAe,EAAE,EAAE;wBACnB,YAAY,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,eAAe,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC;qBACjG;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QAC3D,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvC,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtC,MAAM,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QAE7D,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,mBAAmB,CAAC,IAAI,CAAC,CAAC;QACpD,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC3C,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QACvD,MAAM,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IAC5C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;QAC5E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,EAAE;YACtD,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAE9B,IAAI,MAAM,CAAC,QAAQ,CAAC,4BAA4B,CAAC,EAAE,CAAC;gBAClD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,QAAQ,EAAE;wBACR,SAAS,EAAE,IAAI;wBACf,YAAY,EAAE,sBAAsB;wBACpC,kBAAkB,EAAE,EAAE;wBACtB,eAAe,EAAE,CAAC,IAAI,EAAE,IAAI,CAAC;wBAC7B,KAAK,EAAE,EAAE;qBACV;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,iCAAiC,CAAC,EAAE,CAAC;gBACvD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,MAAM,EAAE;wBACN,SAAS,EAAE,IAAI;wBACf,WAAW,EAAE,sBAAsB;wBACnC,KAAK,EAAE,OAAO;wBACd,KAAK,EAAE;4BACL,SAAS,EAAE,IAAI;4BACf,WAAW,EAAE,gBAAgB;4BAC7B,kBAAkB,EAAE,EAAE;4BACtB,yBAAyB,EAAE,EAAE;4BAC7B,yBAAyB,EAAE,EAAE;4BAC7B,MAAM,EAAE,UAAU;4BAClB,UAAU,EAAE,CAAC;4BACb,cAAc,EAAE,CAAC;4BACjB,eAAe,EAAE,CAAC;4BAClB,YAAY,EAAE,CAAC;4BACf,mBAAmB,EAAE,EAAE;4BACvB,gBAAgB,EAAE,CAAC;4BACnB,MAAM,EAAE,EAAE;yBACX;qBACF;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,EAAE,CAAC;gBACxC,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,UAAU,EAAE;wBACV,MAAM,EAAE,IAAI;wBACZ,QAAQ,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,aAAa,EAAE,QAAQ,EAAE,MAAM,EAAE;wBAChF,QAAQ,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,uBAAuB,EAAE,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE;qBACvI;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,uBAAuB,CAAC,EAAE,CAAC;gBAC7C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,QAAQ,EAAE;wBACR,SAAS,EAAE,IAAI;wBACf,SAAS,EAAE,YAAY;wBACvB,OAAO,EAAE,YAAY;wBACrB,QAAQ,EAAE,MAAM;wBAChB,OAAO,EAAE,UAAU;wBACnB,MAAM,EAAE,SAAS;wBACjB,UAAU,EAAE,CAAC,IAAI,EAAE,IAAI,CAAC;wBACxB,YAAY,EAAE,EAAE,EAAE,EAAE,OAAO,EAAE,EAAE,EAAE,KAAK,EAAE;wBACxC,OAAO,EAAE;4BACP,EAAE,IAAI,EAAE,YAAY,EAAE,SAAS,EAAE,aAAa,EAAE,UAAU,EAAE,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,CAAC,EAAE,EAAE;yBAC5F;wBACD,UAAU,EAAE,EAAE;qBACf;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACrD,MAAM,CAAC,GAAG,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACxC,MAAM,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAElD,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,MAAM,CAAC,MAAM,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;QACzD,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEnC,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;QACpD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACrC,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QAEjD,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,IAAI,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC;QACrG,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAClD,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,oDAAoD,EAAE,KAAK,IAAI,EAAE;QAClE,IAAI,YAAY,GAAQ,IAAI,CAAC;QAC7B,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1D,YAAY,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,IAAc,CAAC,CAAC;gBAC/C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,YAAY,CAAC,MAAM,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7H,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,oBAAoB,EAAE;YAC7D,MAAM,EAAE,IAAI;YACZ,SAAS,EAAE,IAAI;YACf,OAAO,EAAE,sBAAsB;SAChC,CAAC,CAAC;QAEH,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,oBAAoB,CAAC,CAAC;QACjD,MAAM,CAAC,YAAY,CAAC,CAAC,OAAO,CAAC;YAC3B,MAAM,EAAE,oBAAoB;YAC5B,MAAM,EAAE,IAAI;YACZ,SAAS,EAAE,IAAI;YACf,OAAO,EAAE,sBAAsB;YAC/B,SAAS,EAAE,IAAI;SAChB,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
|
1
|
+
{"version":3,"file":"index.test.js","sourceRoot":"","sources":["../src/index.test.ts"],"names":[],"mappings":"AAAA,OAAO,EAAE,QAAQ,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,QAAQ,CAAC;AAC9C,OAAO,EAAE,kBAAkB,EAAE,MAAM,YAAY,CAAC;AAEhD,QAAQ,CAAC,6BAA6B,EAAE,GAAG,EAAE;IAC3C,EAAE,CAAC,mDAAmD,EAAE,KAAK,IAAI,EAAE;QACjE,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,WAAW,CAAC,IAAI,CAAC,CAAC,IAAI,EAAE,MAAM,IAAI,IAAI,CAAC,MAAM,CAAC,WAAW,EAAE,KAAK,KAAK,CAAC,EAAE,CAAC;gBAC3F,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACrH,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,EAAE,CAAC;QAC5C,MAAM,CAAC,QAAQ,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QAChC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;IAC7C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,+DAA+D,EAAE,KAAK,IAAI,EAAE;QAC7E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,YAAY,CAAC,EAAE,CAAC;gBAClC,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,cAAc,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7G,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,uBAAuB,CAAC,EAAE,CAAC;gBAC7C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,mBAAmB,EAAE,CAAC,aAAa,EAAE,UAAU,CAAC;oBAChD,uBAAuB,EAAE,CAAC,SAAS,CAAC;iBACrC,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,YAAY,EAAE,CAAC;QAC9C,MAAM,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAClC,MAAM,CAAC,SAAS,CAAC,CAAC,CAAC,CAAC,IAAI,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;QAE/C,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,yBAAyB,CAAC,IAAI,CAAC,CAAC;QACjE,MAAM,CAAC,WAAW,CAAC,CAAC,OAAO,CAAC,CAAC,aAAa,EAAE,UAAU,CAAC,CAAC,CAAC;QAEzD,MAAM,mBAAmB,GAAG,MAAM,MAAM,CAAC,iCAAiC,CAAC,IAAI,CAAC,CAAC;QACjF,MAAM,CAAC,mBAAmB,CAAC,CAAC,OAAO,CAAC,CAAC,SAAS,CAAC,CAAC,CAAC;IACnD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,6DAA6D,EAAE,KAAK,IAAI,EAAE;QAC3E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,EAAE,WAAW,EAAE,IAAI,KAAK,CAAC;YAEpD,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAC/D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,QAAQ,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC/J,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,WAAW,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACtD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC3F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC1D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,OAAO,EAAE,IAAI,CAAC,OAAO,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACnE,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,SAAS,EAAE,CAAC,IAAI,CAAC,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACrG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBACrE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,SAAS,EAAE,EAAE,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACjG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC3D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAClE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,EAAE,IAAI,EAAE,QAAQ,EAAE,SAAS,EAAE,QAAQ,EAAE,YAAY,EAAE,SAAS,EAAE,EAAE,EAAE,GAAG,EAAE,4BAA4B,EAAE,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvL,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,cAAc,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBACzD,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,UAAU,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC9F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBAChE,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,UAAU,EAAE,EAAE,EAAE,EAAE,MAAM,EAAE,GAAG,IAAI,EAAE,GAAG,EAAE,sCAAsC,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7I,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,iBAAiB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC9D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,WAAW,CAAC,IAAI,CAAC,CAAC;QAChD,MAAM,CAAC,QAAQ,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACjC,MAAM,CAAC,QAAQ,CAAC,CAAC,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC;QAEhD,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,UAAU,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,OAAO,EAAE,aAAa,EAAE,QAAQ,EAAE,IAAI,EAAE,UAAU,EAAE,MAAM,EAAE,CAAC,CAAC;QAC7H,MAAM,CAAC,cAAc,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAErC,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,EAAE,EAAE,OAAO,EAAE,SAAS,EAAE,CAAC,CAAC;QAChF,MAAM,CAAC,cAAc,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAE/C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,kBAAkB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QACrF,MAAM,CAAC,OAAO,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC1C,MAAM,CAAC,OAAO,CAAC,SAAS,EAAE,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEhD,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,IAAI,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QAC1F,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAE5C,MAAM,cAAc,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;QACxD,MAAM,CAAC,cAAc,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAElC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,EAAE,MAAM,EAAE,IAAI,EAAE,CAAC,CAAC;QAClE,MAAM,CAAC,WAAW,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QACpC,MAAM,CAAC,WAAW,CAAC,CAAC,CAAC,CAAC,QAAQ,CAAC,CAAC,IAAI,CAAC,SAAS,CAAC,CAAC;QAEhD,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,EAAE,QAAQ,EAAE,UAAU,EAAE,QAAQ,EAAE,YAAY,EAAE,SAAS,EAAE,EAAE,EAAE,GAAG,EAAE,8BAA8B,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QACzK,MAAM,CAAC,UAAU,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAEjC,MAAM,WAAW,GAAG,MAAM,MAAM,CAAC,oBAAoB,CAAC,EAAE,QAAQ,EAAE,cAAc,EAAE,IAAI,EAAE,YAAY,EAAE,UAAU,EAAE,IAAI,EAAE,CAAC,CAAC;QAC1H,MAAM,CAAC,WAAW,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,MAAM,CAAC,CAAC;QACpC,MAAM,CAAC,WAAW,CAAC,GAAG,CAAC,CAAC,IAAI,CAAC,sCAAsC,CAAC,CAAC;QAErE,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,gBAAgB,CAAC,IAAI,CAAC,CAAC;QACvD,MAAM,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAChC,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;QAC5E,MAAM,eAAe,GAAG;YACtB,EAAE,EAAE,IAAI;YACR,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,SAAkB;YAC1B,MAAM,EAAE,YAAY;YACpB,UAAU,EAAE,EAAE;YACd,SAAS,EAAE,sBAAsB;YACjC,SAAS,EAAE,sBAAsB;SAClC,CAAC;QAEF,MAAM,WAAW,GAAG;YAClB,WAAW,EAAE,eAAe;YAC5B,UAAU,EAAE,CAAC;YACb,cAAc,EAAE,CAAC;YACjB,WAAW,EAAE,CAAC;YACd,kBAAkB,EAAE,EAAE;YACtB,cAAc,EAAE,EAAE;YAClB,WAAW,EAAE,EAAE;SAChB,CAAC;QAEF,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,MAAM,MAAM,GAAG,IAAI,EAAE,MAAM,EAAE,WAAW,EAAE,IAAI,KAAK,CAAC;YAEpD,IAAI,MAAM,CAAC,QAAQ,CAAC,4BAA4B,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACtE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,YAAY,EAAE,CAAC,eAAe,CAAC,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC5F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,0BAA0B,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBACpE,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACjF,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,KAAK,EAAE,CAAC;gBAC5D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,eAAe,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzF,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,eAAe,CAAC,IAAI,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC/F,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,OAAO,EAAE,CAAC;gBAC9D,MAAM,IAAI,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,EAAE,IAAc,CAAC,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,WAAW,EAAE,EAAE,GAAG,eAAe,EAAE,GAAG,IAAI,EAAE,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACzG,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,IAAI,MAAM,KAAK,QAAQ,EAAE,CAAC;gBAC/D,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC1E,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,eAAe,CAAC,IAAI,CAAC,CAAC;QAChD,MAAM,CAAC,IAAI,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC7B,MAAM,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,cAAc,CAAC,CAAC;QAE3C,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,cAAc,CAAC,IAAI,CAAC,CAAC;QACjD,MAAM,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE7B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACzD,MAAM,CAAC,OAAO,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,CAAC,CAAC,CAAC;QACnC,MAAM,CAAC,OAAO,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QAE5C,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC;YAC7C,SAAS,EAAE,IAAI;YACf,KAAK,EAAE,cAAc;YACrB,MAAM,EAAE,YAAY;SACrB,CAAC,CAAC;QACH,MAAM,CAAC,OAAO,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAE9B,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,EAAE,EAAE,MAAM,EAAE,WAAW,EAAE,CAAC,CAAC;QAC9E,MAAM,CAAC,OAAO,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,WAAW,CAAC,CAAC;QAEzC,MAAM,OAAO,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,CAAC,CAAC;QACrD,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;IAC7B,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,gEAAgE,EAAE,KAAK,IAAI,EAAE;QAC9E,MAAM,SAAS,GAAG;YAChB,cAAc,EAAE,aAAsB;YACtC,OAAO,EAAE,KAAK;YACd,SAAS,EAAE,IAAI;YACf,eAAe,EAAE,CAAC,eAAe,CAAC;YAClC,SAAS,EAAE,KAAK;YAChB,UAAU,EAAE,KAAK;YACjB,WAAW,EAAE,IAAI;YACjB,YAAY,EAAE,KAAK;YACnB,SAAS,EAAE,KAAK;YAChB,cAAc,EAAE,KAAK;YACrB,aAAa,EAAE,KAAK;YACpB,MAAM,EAAE,KAAK;YACb,QAAQ,EAAE,KAAK;YACf,WAAW,EAAE,KAAK;SACnB,CAAC;QAEF,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,EAAE;YACtD,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,qBAAqB,CAAC,EAAE,CAAC;gBAC3C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7E,CAAC;YACD,IAAI,MAAM,CAAC,QAAQ,CAAC,wBAAwB,CAAC,EAAE,CAAC;gBAC9C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,KAAK,EAAE;wBACL,MAAM,EAAE,IAAI;wBACZ,aAAa,EAAE,CAAC,EAAE,EAAE,EAAE,eAAe,EAAE,KAAK,EAAE,KAAK,EAAE,MAAM,EAAE,aAAa,EAAE,CAAC;wBAC7E,eAAe,EAAE,EAAE;wBACnB,YAAY,EAAE,CAAC,EAAE,EAAE,EAAE,MAAM,EAAE,MAAM,EAAE,IAAI,EAAE,eAAe,EAAE,eAAe,EAAE,IAAI,EAAE,UAAU,EAAE,CAAC;qBACjG;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,SAAS,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QAC3D,MAAM,CAAC,SAAS,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACvC,MAAM,CAAC,SAAS,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACtC,MAAM,CAAC,SAAS,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,eAAe,CAAC,CAAC,CAAC;QAE7D,MAAM,IAAI,GAAG,MAAM,MAAM,CAAC,mBAAmB,CAAC,IAAI,CAAC,CAAC;QACpD,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;QAC3C,MAAM,CAAC,IAAI,CAAC,aAAa,CAAC,CAAC,CAAC,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,eAAe,CAAC,CAAC;QACvD,MAAM,CAAC,IAAI,CAAC,YAAY,CAAC,CAAC,YAAY,CAAC,CAAC,CAAC,CAAC;IAC5C,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,8DAA8D,EAAE,KAAK,IAAI,EAAE;QAC5E,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,EAAE;YACtD,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAE9B,IAAI,MAAM,CAAC,QAAQ,CAAC,4BAA4B,CAAC,EAAE,CAAC;gBAClD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,QAAQ,EAAE;wBACR,SAAS,EAAE,IAAI;wBACf,YAAY,EAAE,sBAAsB;wBACpC,kBAAkB,EAAE,EAAE;wBACtB,eAAe,EAAE,CAAC,IAAI,EAAE,IAAI,CAAC;wBAC7B,KAAK,EAAE,EAAE;qBACV;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,iCAAiC,CAAC,EAAE,CAAC;gBACvD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,MAAM,EAAE;wBACN,SAAS,EAAE,IAAI;wBACf,WAAW,EAAE,sBAAsB;wBACnC,KAAK,EAAE,OAAO;wBACd,KAAK,EAAE;4BACL,SAAS,EAAE,IAAI;4BACf,WAAW,EAAE,gBAAgB;4BAC7B,kBAAkB,EAAE,EAAE;4BACtB,yBAAyB,EAAE,EAAE;4BAC7B,yBAAyB,EAAE,EAAE;4BAC7B,MAAM,EAAE,UAAU;4BAClB,UAAU,EAAE,CAAC;4BACb,cAAc,EAAE,CAAC;4BACjB,eAAe,EAAE,CAAC;4BAClB,YAAY,EAAE,CAAC;4BACf,mBAAmB,EAAE,EAAE;4BACvB,gBAAgB,EAAE,CAAC;4BACnB,MAAM,EAAE,EAAE;yBACX;qBACF;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,kBAAkB,CAAC,EAAE,CAAC;gBACxC,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,UAAU,EAAE;wBACV,MAAM,EAAE,IAAI;wBACZ,QAAQ,EAAE,EAAE,EAAE,EAAE,IAAI,EAAE,KAAK,EAAE,QAAQ,EAAE,MAAM,EAAE,aAAa,EAAE,QAAQ,EAAE,MAAM,EAAE;wBAChF,QAAQ,EAAE,EAAE,MAAM,EAAE,IAAI,EAAE,WAAW,EAAE,EAAE,EAAE,YAAY,EAAE,EAAE,EAAE,KAAK,EAAE,EAAE,EAAE,WAAW,EAAE,EAAE,EAAE,uBAAuB,EAAE,EAAE,EAAE,UAAU,EAAE,EAAE,EAAE;qBACvI;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,IAAI,MAAM,CAAC,QAAQ,CAAC,uBAAuB,CAAC,EAAE,CAAC;gBAC7C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC;oBACjC,QAAQ,EAAE;wBACR,SAAS,EAAE,IAAI;wBACf,SAAS,EAAE,YAAY;wBACvB,OAAO,EAAE,YAAY;wBACrB,QAAQ,EAAE,MAAM;wBAChB,OAAO,EAAE,UAAU;wBACnB,MAAM,EAAE,SAAS;wBACjB,UAAU,EAAE,CAAC,IAAI,EAAE,IAAI,CAAC;wBACxB,YAAY,EAAE,EAAE,EAAE,EAAE,OAAO,EAAE,EAAE,EAAE,KAAK,EAAE;wBACxC,OAAO,EAAE;4BACP,EAAE,IAAI,EAAE,YAAY,EAAE,SAAS,EAAE,aAAa,EAAE,UAAU,EAAE,EAAE,EAAE,MAAM,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,EAAE,CAAC,EAAE,EAAE;yBAC5F;wBACD,UAAU,EAAE,EAAE;qBACf;iBACF,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YACvB,CAAC;YAED,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,GAAG,GAAG,MAAM,MAAM,CAAC,qBAAqB,CAAC,IAAI,CAAC,CAAC;QACrD,MAAM,CAAC,GAAG,CAAC,kBAAkB,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACxC,MAAM,CAAC,GAAG,CAAC,eAAe,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAElD,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,iBAAiB,CAAC,IAAI,EAAE,EAAE,KAAK,EAAE,OAAO,EAAE,CAAC,CAAC;QACxE,MAAM,CAAC,MAAM,CAAC,KAAK,EAAE,WAAW,CAAC,CAAC,IAAI,CAAC,gBAAgB,CAAC,CAAC;QACzD,MAAM,CAAC,MAAM,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,OAAO,CAAC,CAAC;QAEnC,MAAM,UAAU,GAAG,MAAM,MAAM,CAAC,aAAa,CAAC,IAAI,CAAC,CAAC;QACpD,MAAM,CAAC,UAAU,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACrC,MAAM,CAAC,UAAU,CAAC,QAAQ,CAAC,KAAK,CAAC,CAAC,IAAI,CAAC,QAAQ,CAAC,CAAC;QAEjD,MAAM,QAAQ,GAAG,MAAM,MAAM,CAAC,uBAAuB,CAAC,IAAI,EAAE,EAAE,QAAQ,EAAE,MAAM,EAAE,MAAM,EAAE,SAAS,EAAE,CAAC,CAAC;QACrG,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QACtC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;QACrC,MAAM,CAAC,QAAQ,CAAC,UAAU,CAAC,CAAC,OAAO,CAAC,CAAC,IAAI,EAAE,IAAI,CAAC,CAAC,CAAC;QAClD,MAAM,CAAC,QAAQ,CAAC,OAAO,CAAC,CAAC,CAAC,CAAC,MAAM,CAAC,EAAE,CAAC,CAAC,IAAI,CAAC,EAAE,CAAC,CAAC;IACjD,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,oDAAoD,EAAE,KAAK,IAAI,EAAE;QAClE,IAAI,YAAY,GAAQ,IAAI,CAAC;QAC7B,MAAM,SAAS,GAAG,KAAK,EAAE,GAA2B,EAAE,IAAkB,EAAE,EAAE;YAC1E,MAAM,MAAM,GAAG,GAAG,CAAC,QAAQ,EAAE,CAAC;YAC9B,IAAI,MAAM,CAAC,QAAQ,CAAC,SAAS,CAAC,IAAI,IAAI,EAAE,MAAM,KAAK,MAAM,EAAE,CAAC;gBAC1D,YAAY,GAAG,IAAI,CAAC,KAAK,CAAC,IAAI,CAAC,IAAc,CAAC,CAAC;gBAC/C,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,OAAO,EAAE,IAAI,EAAE,MAAM,EAAE,YAAY,CAAC,MAAM,EAAE,SAAS,EAAE,SAAS,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;YAC7H,CAAC;YACD,OAAO,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,WAAW,EAAE,CAAC,EAAE,EAAE,MAAM,EAAE,GAAG,EAAE,CAAC,CAAC;QAC/E,CAAC,CAAC;QAEF,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC;YACpC,OAAO,EAAE,yCAAyC;YAClD,KAAK,EAAE,SAAyB;SACjC,CAAC,CAAC;QAEH,MAAM,MAAM,GAAG,MAAM,MAAM,CAAC,YAAY,CAAC,oBAAoB,EAAE;YAC7D,MAAM,EAAE,IAAI;YACZ,SAAS,EAAE,IAAI;YACf,OAAO,EAAE,sBAAsB;SAChC,CAAC,CAAC;QAEH,MAAM,CAAC,MAAM,CAAC,OAAO,CAAC,CAAC,IAAI,CAAC,IAAI,CAAC,CAAC;QAClC,MAAM,CAAC,MAAM,CAAC,MAAM,CAAC,CAAC,IAAI,CAAC,oBAAoB,CAAC,CAAC;QACjD,MAAM,CAAC,YAAY,CAAC,CAAC,OAAO,CAAC;YAC3B,MAAM,EAAE,oBAAoB;YAC5B,MAAM,EAAE,IAAI;YACZ,SAAS,EAAE,IAAI;YACf,OAAO,EAAE,sBAAsB;YAC/B,SAAS,EAAE,IAAI;SAChB,CAAC,CAAC;IACL,CAAC,CAAC,CAAC;IAEH,EAAE,CAAC,uEAAuE,EAAE,KAAK,IAAI,EAAE;QACrF,IAAI,MAAM,GAAG,GAAG,CAAC;QACjB,MAAM,SAAS,GAAG,KAAK,IAAI,EAAE,CAC3B,IAAI,QAAQ,CAAC,IAAI,CAAC,SAAS,CAAC,EAAE,KAAK,EAAE,MAAM,KAAK,GAAG,CAAC,CAAC,CAAC,WAAW,CAAC,CAAC,CAAC,uBAAuB,EAAE,CAAC,EAAE;YAC9F,MAAM;YACN,OAAO,EAAE,EAAE,cAAc,EAAE,kBAAkB,EAAE;SAChD,CAAC,CAAC;QACL,MAAM,MAAM,GAAG,IAAI,kBAAkB,CAAC,EAAE,OAAO,EAAE,sBAAsB,EAAE,KAAK,EAAE,SAAyB,EAAE,CAAC,CAAC;QAE7G,MAAM,CAAC,MAAM,MAAM,CAAC,UAAU,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QACvD,MAAM,CAAC,MAAM,MAAM,CAAC,aAAa,CAAC,SAAS,CAAC,CAAC,CAAC,IAAI,CAAC,KAAK,CAAC,CAAC;QAE1D,MAAM,GAAG,GAAG,CAAC;QACb,MAAM,MAAM,CAAC,MAAM,CAAC,UAAU,CAAC,IAAI,CAAC,CAAC,CAAC,OAAO,CAAC,OAAO,CAAC,uBAAuB,CAAC,CAAC;IACjF,CAAC,CAAC,CAAC;AACL,CAAC,CAAC,CAAC"}
|
package/package.json
CHANGED
|
@@ -1,6 +1,6 @@
|
|
|
1
1
|
{
|
|
2
2
|
"name": "@critical-path/client",
|
|
3
|
-
"version": "0.14.
|
|
3
|
+
"version": "0.14.7",
|
|
4
4
|
"description": "Type-safe JavaScript/TypeScript client SDK for consuming Critical Path API endpoints",
|
|
5
5
|
"author": "Jack James",
|
|
6
6
|
"license": "MIT",
|
|
@@ -21,7 +21,7 @@
|
|
|
21
21
|
}
|
|
22
22
|
},
|
|
23
23
|
"dependencies": {
|
|
24
|
-
"@critical-path/core": "0.
|
|
24
|
+
"@critical-path/core": "0.22.0"
|
|
25
25
|
},
|
|
26
26
|
"devDependencies": {
|
|
27
27
|
"@types/node": "^24.0.0",
|
package/src/index.test.ts
CHANGED
|
@@ -395,6 +395,21 @@ describe('@critical-path/client Tests', () => {
|
|
|
395
395
|
isEngaged: true
|
|
396
396
|
});
|
|
397
397
|
});
|
|
398
|
-
});
|
|
399
398
|
|
|
399
|
+
it('resolves delete methods to false on 404 and still throws other errors', async () => {
|
|
400
|
+
let status = 404;
|
|
401
|
+
const mockFetch = async () =>
|
|
402
|
+
new Response(JSON.stringify({ error: status === 404 ? 'Not found' : 'Internal Server Error' }), {
|
|
403
|
+
status,
|
|
404
|
+
headers: { 'Content-Type': 'application/json' }
|
|
405
|
+
});
|
|
406
|
+
const client = new CriticalPathClient({ baseUrl: 'http://localhost/api', fetch: mockFetch as typeof fetch });
|
|
407
|
+
|
|
408
|
+
expect(await client.deleteTask('missing')).toBe(false);
|
|
409
|
+
expect(await client.deleteComment('missing')).toBe(false);
|
|
410
|
+
|
|
411
|
+
status = 500;
|
|
412
|
+
await expect(client.deleteTask('t1')).rejects.toThrow('Internal Server Error');
|
|
413
|
+
});
|
|
414
|
+
});
|
|
400
415
|
|
package/src/index.ts
CHANGED
|
@@ -98,6 +98,13 @@ export interface ClientOptions {
|
|
|
98
98
|
fetch?: typeof fetch;
|
|
99
99
|
}
|
|
100
100
|
|
|
101
|
+
class NotFoundResponseError extends Error {
|
|
102
|
+
constructor(message: string) {
|
|
103
|
+
super(message);
|
|
104
|
+
this.name = 'NotFoundResponseError';
|
|
105
|
+
}
|
|
106
|
+
}
|
|
107
|
+
|
|
101
108
|
export class CriticalPathClient {
|
|
102
109
|
private baseUrl: string;
|
|
103
110
|
private headers: Record<string, string>;
|
|
@@ -109,6 +116,20 @@ export class CriticalPathClient {
|
|
|
109
116
|
this.customFetch = options.fetch || globalThis.fetch;
|
|
110
117
|
}
|
|
111
118
|
|
|
119
|
+
/**
|
|
120
|
+
* Sends a DELETE and resolves to `false` when the resource does not exist (HTTP 404),
|
|
121
|
+
* so delete methods keep their boolean contract instead of throwing.
|
|
122
|
+
*/
|
|
123
|
+
private async deleteRequest(endpoint: string): Promise<boolean> {
|
|
124
|
+
try {
|
|
125
|
+
const res = await this.request<{ success: boolean }>(endpoint, { method: 'DELETE' });
|
|
126
|
+
return res.success;
|
|
127
|
+
} catch (err) {
|
|
128
|
+
if (err instanceof NotFoundResponseError) return false;
|
|
129
|
+
throw err;
|
|
130
|
+
}
|
|
131
|
+
}
|
|
132
|
+
|
|
112
133
|
private async request<T>(endpoint: string, options: RequestInit = {}): Promise<T> {
|
|
113
134
|
const url = `${this.baseUrl}${endpoint.startsWith('/') ? endpoint : `/${endpoint}`}`;
|
|
114
135
|
const response = await this.customFetch(url, {
|
|
@@ -128,7 +149,7 @@ export class CriticalPathClient {
|
|
|
128
149
|
} catch {
|
|
129
150
|
// Fallback to HTTP error
|
|
130
151
|
}
|
|
131
|
-
throw new Error(errorMsg);
|
|
152
|
+
throw response.status === 404 ? new NotFoundResponseError(errorMsg) : new Error(errorMsg);
|
|
132
153
|
}
|
|
133
154
|
|
|
134
155
|
return response.json();
|
|
@@ -162,10 +183,7 @@ export class CriticalPathClient {
|
|
|
162
183
|
}
|
|
163
184
|
|
|
164
185
|
async deleteWorkflow(id: string): Promise<boolean> {
|
|
165
|
-
|
|
166
|
-
method: 'DELETE'
|
|
167
|
-
});
|
|
168
|
-
return res.success;
|
|
186
|
+
return this.deleteRequest(`/workflows/${id}`);
|
|
169
187
|
}
|
|
170
188
|
|
|
171
189
|
// Projects
|
|
@@ -359,10 +377,7 @@ export class CriticalPathClient {
|
|
|
359
377
|
}
|
|
360
378
|
|
|
361
379
|
async deleteTask(id: string): Promise<boolean> {
|
|
362
|
-
|
|
363
|
-
method: 'DELETE'
|
|
364
|
-
});
|
|
365
|
-
return res.success;
|
|
380
|
+
return this.deleteRequest(`/tasks/${id}`);
|
|
366
381
|
}
|
|
367
382
|
|
|
368
383
|
async getTaskDependencies(taskId: string): Promise<TaskDependencyGraph> {
|
|
@@ -413,10 +428,7 @@ export class CriticalPathClient {
|
|
|
413
428
|
}
|
|
414
429
|
|
|
415
430
|
async deleteTeam(id: string): Promise<boolean> {
|
|
416
|
-
|
|
417
|
-
method: 'DELETE'
|
|
418
|
-
});
|
|
419
|
-
return res.success;
|
|
431
|
+
return this.deleteRequest(`/teams/${id}`);
|
|
420
432
|
}
|
|
421
433
|
|
|
422
434
|
// Containers
|
|
@@ -442,10 +454,7 @@ export class CriticalPathClient {
|
|
|
442
454
|
}
|
|
443
455
|
|
|
444
456
|
async deleteContainer(id: string): Promise<boolean> {
|
|
445
|
-
|
|
446
|
-
method: 'DELETE'
|
|
447
|
-
});
|
|
448
|
-
return res.success;
|
|
457
|
+
return this.deleteRequest(`/containers/${id}`);
|
|
449
458
|
}
|
|
450
459
|
|
|
451
460
|
// Deliverables
|
|
@@ -481,10 +490,7 @@ export class CriticalPathClient {
|
|
|
481
490
|
}
|
|
482
491
|
|
|
483
492
|
async deleteDeliverable(id: string): Promise<boolean> {
|
|
484
|
-
|
|
485
|
-
method: 'DELETE'
|
|
486
|
-
});
|
|
487
|
-
return res.success;
|
|
493
|
+
return this.deleteRequest(`/deliverables/${id}`);
|
|
488
494
|
}
|
|
489
495
|
|
|
490
496
|
// Iterations
|
|
@@ -510,10 +516,7 @@ export class CriticalPathClient {
|
|
|
510
516
|
}
|
|
511
517
|
|
|
512
518
|
async deleteIteration(id: string): Promise<boolean> {
|
|
513
|
-
|
|
514
|
-
method: 'DELETE'
|
|
515
|
-
});
|
|
516
|
-
return res.success;
|
|
519
|
+
return this.deleteRequest(`/iterations/${id}`);
|
|
517
520
|
}
|
|
518
521
|
|
|
519
522
|
// Activity Stream
|
|
@@ -554,10 +557,7 @@ export class CriticalPathClient {
|
|
|
554
557
|
}
|
|
555
558
|
|
|
556
559
|
async deleteComment(id: string): Promise<boolean> {
|
|
557
|
-
|
|
558
|
-
method: 'DELETE'
|
|
559
|
-
});
|
|
560
|
-
return res.success;
|
|
560
|
+
return this.deleteRequest(`/comments/${encodeURIComponent(id)}`);
|
|
561
561
|
}
|
|
562
562
|
|
|
563
563
|
async addCommentReaction(commentId: string, reaction: { emoji: string; userId: string }): Promise<Comment> {
|
|
@@ -620,10 +620,7 @@ export class CriticalPathClient {
|
|
|
620
620
|
}
|
|
621
621
|
|
|
622
622
|
async deleteAttachment(id: string): Promise<boolean> {
|
|
623
|
-
|
|
624
|
-
method: 'DELETE'
|
|
625
|
-
});
|
|
626
|
-
return res.success;
|
|
623
|
+
return this.deleteRequest(`/attachments/${encodeURIComponent(id)}`);
|
|
627
624
|
}
|
|
628
625
|
|
|
629
626
|
async getPresignedAttachmentUploadUrl(options: PresignedUrlOptions): Promise<PresignedUploadResult> {
|